Laserfiche WebLink
4110 <br /> CITY OF RANCHO PALOS VERDES <br /> PROFESSIONAL SERVICES AGREEMENT <br /> THIS AGREEMENT ("Agreement") is made and entered into this 5th day of March, <br /> 2013 by and between the City of Rancho Palos Verdes (hereinafter referred to as the <br /> "CITY") and SFC Communications, Inc. (hereafter referred to as "CONSULTANT"). <br /> IN CONSIDERATION of the covenants hereinafter set forth, the parties hereto <br /> agree as follows: <br /> ARTICLE 1 <br /> SCOPE OF SERVICES <br /> 1.1 Project Description <br /> The project (hereinafter "Project") is described as follows: CONSULTANT <br /> shall provide environmental related services for the CITY's San Ramon Canyon <br /> Stormwater Flood Reduction Project, in accordance with requirements of the Resource <br /> Agency Permits granted to the City of Rancho Palos Verdes, Permit Numbers SPL- <br /> 2011-01140-SLP, 7011 2970 0000 0645 0174 and 1600-1600-2011-0379-R5 <br /> 1.2 Description of Services <br /> CONSULTANT shall: produce and submit all pre-construction <br /> documentation and notifications required for construction commencement approval, <br /> conduct a pre-construction nesting survey and report the findings as required to the <br /> appropriate agencies; review the Contractor's biologist's work plan for compliance <br /> before commencement of work; review all work plans in terms with the permit <br /> requirements; monitor all specific activities required by the permits, such as protective <br /> measures for sensitive vegetation, the planting of the native plants in accordance with <br /> the agreed pallet and Native American monitoring; verify for all compliance <br /> requirements upon completion of the San Ramon Canyon Stormwater Flood Reduction <br /> Project, including landscape mitigation adequacy, beach restoration, restoration of <br /> conservation measures in disturbed areas and the preparation and submittal of reports <br /> to each of the required agencies and the submittal of as-built plans; annual inspections <br /> of the mitigated measures will be conducted and reports submitted for 5-years after the <br /> completion of the San Ramon Canyon Stormwater Flood Reduction Project; reporting; <br /> and attend meetings and site visits, as described in CONSULTANT's Proposal, which is <br /> attached hereto as Exhibit "A" and incorporated herein by this reference. In the event of <br /> any conflict between the terms of this Agreement and any incorporated documents, the <br /> terms of this Agreement shall control. <br /> Page 1 of 12 <br /> R6876-0001\1535235v2.doc Agreement for Professional Services <br />