Loading...
Geosyntec Consultants Inc - FY2027-00401203.0001/835260.1 PROFESSIONAL SERVICES AGREEMENT By and Between CITY OF RANCHO PALOS VERDES and GEOSYNTEC CONSULTANTS, INC for Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF RANCHO PALOS VERDES AND GEOSYNTEC CONSULTANTS, INC THIS AGREEMENT FOR PROFESSIONAL SERVICES (“Agreement”) is made and entered into on August 4, 2026 by and between the CITY OF RANCHO PALOS VERDES, a California municipal corporation (“City”) and GEOSYNTEC CONSULTANTS, INC., a Florida corporation (“Consultant”). City and Consultant may be referred to, individually or collectively, as “Party” or “Parties.” This Agreement is for Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services RECITALS A. City has sought, by issuance of a Request for Proposals, the performance of the services defined and described particularly in Article 1 of this Agreement. B. Consultant, following submission of a proposal for the performance of the services defined and described particularly in Article 1 of this Agreement, was selected by the City to perform those services. C. Pursuant to the City of Rancho Palos Verdes Municipal Code, City has authority to enter into and execute this Agreement. D. The Parties desire to formalize the selection of Consultant for performance of those services defined and described particularly in Article 1 of this Agreement and desire that the terms of that performance be as particularly defined and described herein. OPERATIVE PROVISIONS NOW, THEREFORE, in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows: ARTICLE 1. SERVICES OF CONSULTANT 1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, the Consultant shall provide those services specified in the “Scope of Services”, as stated in the Proposal, attached hereto as Exhibit “A” and incorporated herein by this reference, which may be referred to herein as the “services” or “work” hereunder. As a material inducement to the City entering into this Agreement, Consultant represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the services required under this Agreement in a thorough, competent, and professional manner, and is experienced in performing the work and services contemplated herein. Consultant shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all services described herein. Consultant covenants that it Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be both of good quality as well as fit for the purpose intended. For purposes of this Agreement, the phrase “highest professional standards” shall mean those standards of practice recognized by one or more first-class firms performing similar work under similar circumstances. 1.2 Consultant’s Proposal. The Scope of Service shall include the Consultant’s Proposal which shall be incorporated herein by this reference as though fully set forth herein. In the event of any inconsistency between the terms of such Proposal and this Agreement, the terms of this Agreement shall govern. 1.3 Compliance with Law. Consultant shall keep itself informed concerning, and shall render all services hereunder in accordance with, all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental entity having jurisdiction in effect at the time service is rendered. 1.4 California Labor Law. If the Scope of Services includes any “public work” or “maintenance work,” as those terms are defined in California Labor Code section 1720 et seq. and California Code of Regulations, Title 8, Section 16000 et seq., and if the total compensation is $1,000 or more, Consultant shall pay prevailing wages for such work and comply with the requirements in California Labor Code section 1770 et seq. and 1810 et seq., and all other applicable laws, including the following requirements: (a) Public Work. The Parties acknowledge that some or all of the work to be performed under this Agreement is a “public work” as defined in Labor Code Section 1720 and that this Agreement is therefore subject to the requirements of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works contracts and the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. The work performed under this Agreement is subject to compliance monitoring and enforcement by the DIR. Consultant shall post job site notices, as prescribed by regulation. (b) Prevailing Wages. Consultant shall pay prevailing wages to the extent required by Labor Code Section 1771. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are on file at City Hall and will be made available to any interested party on request. By initiating any work under this Agreement, Consultant acknowledges receipt of a copy of the DIR determination of the prevailing rate of per diem wages, and Consultant shall post a copy of the same at each job site where work is performed under this Agreement. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 (c) Penalty for Failure to Pay Prevailing Wages. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Consultant shall, as a penalty to the City, forfeit $200 (two hundred dollars) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subcontractor. (d) Payroll Records. Consultant shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Consultant and each subconsultant to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform the City of the location of the records. (e) Apprentices. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777.6, and 1777.7 and California Code of Regulations Title 8, Section 200 et seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within 60 (sixty) days after concluding work pursuant to this Agreement, Consultant and each of its subconsultants shall submit to the City a verified statement of the journeyman and apprentice hours performed under this Agreement. (f) Eight-Hour Work Day. Consultant acknowledges that 8 (eight) hours labor constitutes a legal day's work. Consultant shall comply with and be bound by Labor Code Section 1810. (g) Penalties for Excess Hours. Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Consultant shall, as a penalty to the City, forfeit $25 (twenty five dollars for each worker employed in the performance of this Agreement by the Consultant or by any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 (eight) hours in any one calendar day and 40 (forty) hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Consultant in excess of 8 (eight) hours per day, and 40 (forty) hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than one and 1½ (one and one half) times the basic rate of pay. (h) Workers’ Compensation. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees if it has employees. In accordance with the provisions of California Labor Code Section 1861, Consultant certifies as follows: “I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.” Consultant’s Authorized Initials ________ (i) Consultant’s Responsibility for Subcontractors. For every subcontractor who will perform work under this Agreement, Consultant shall be responsible for such subcontractor's compliance with Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, and shall make such compliance a requirement in any contract with any subcontractor for work under this Agreement. Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subcontractor's compliance, including without limitation, conducting a review of the certified payroll records of the subcontractor on a periodic basis or upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages. Consultant shall diligently take corrective action to halt or rectify any such failure by any subcontractor. 1.5 Licenses, Permits, Fees and Assessments. Consultant shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by law for the performance of the services required by this Agreement. Consultant shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Consultant’s performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City, its officers, employees or agents of City, against any such fees, assessments, taxes, penalties or interest levied, assessed or imposed against City hereunder. 1.6 Familiarity with Work. By executing this Agreement, Consultant warrants that Consultant (i) has thoroughly investigated and considered the scope of services to be performed, (ii) has carefully considered how the services should be performed, and (iii) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. If the services involve work upon any site, Consultant warrants that Consultant has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder. Should the Consultant discover any latent or unknown conditions, which will materially affect the performance of the services hereunder, Consultant shall immediately inform the City of such fact and shall not proceed except at Consultant’s risk until written instructions are received from the Contract Officer in the form of a Change Order. 1.7 Care of Work. The Consultant shall adopt reasonable methods during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as may be caused by City’s own negligence. 1.8 Further Responsibilities of Parties. Both parties agree to use reasonable care and diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all instruments, prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of this Agreement. Unless hereafter specified, neither party shall be responsible for the service of the other. 1.9 Additional Services City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Services or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written Change Order is first given by the Contract Officer to the Consultant, incorporating therein any adjustment in (i) the Contract Sum for the actual costs of the extra work, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Consultant. Any increase in compensation of up to 10% (ten percent) of the Contract Sum; or, in the time to perform of up to 90 (ninety) days, may be approved by the Contract Officer through a written Change Order. Any greater increases, taken either separately or cumulatively, must be approved by the City Council. It is expressly understood by Consultant that the provisions of this Section shall not apply to services specifically set forth in the Scope of Services. Consultant hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of Services may be more costly or time consuming than Consultant anticipates and that Consultant shall not be entitled to additional compensation therefor. City may in its sole and absolute discretion have similar work done by other Consultants. No claims for an increase in the Contract Sum or time for performance shall be valid unless the procedures established in this Section are followed. If in the performance of the Services, the Contractor becomes aware of material defects in the Scope of Work, duration, or span of the Services, or the Contractor becomes aware of extenuating circumstance that will or could prevent the completion of the Services, on time or on budget, the Contractor shall inform the City’s Contract Officer of an anticipated Change Order. This proposed change order will stipulate the facts surrounding the issue, proposed solutions, proposed costs, and proposed schedule impacts. 1.10 Special Requirements. Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the “Special Requirements” attached hereto as Exhibit “B” and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit “B” and any other provisions of this Agreement, the provisions of Exhibit “B” shall govern. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 ARTICLE 2. COMPENSATION AND METHOD OF PAYMENT. 2.1 Contract Sum. Subject to any limitations set forth in this Agreement, City agrees to pay Consultant the amounts specified in the “Schedule of Compensation” attached hereto as Exhibit “C” and incorporated herein by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed $2,650,344 (Two Million Six Hundred Fifty Thousand T h r e e Hundred Forty-Four Dollars) (the “Contract Sum”), unless additional compensation is approved pursuant to Section 1.9. 2.2 Method of Compensation. (a)The method of compensation may include: (i) a lump sum payment upon completion; (ii) payment in accordance with specified tasks or the percentage of completion of the services; (iii) payment for time and materials based upon the Consultant’s rates as specified in the Schedule of Compensation, provided that (a) time estimates are provided for the performance of sub tasks, and (b) the Contract Sum is not exceeded; or (iv) such other methods as may be specified in the Schedule of Compensation. (b)A retention of 10% shall be held from each payment as a contract retention to be paid as part of the final payment upon satisfactory and timely completion of services. This retention shall not apply for on-call agreements for continuous services or for agreements for scheduled routine maintenance of City property or City facilities. 2.3 Reimbursable Expenses. Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, telephone expenses, and travel expenses approved by the Contract Officer in advance, or actual subcontractor expenses of an approved subcontractor pursuant to Section 4.5, and only if specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Consultant at all project meetings reasonably deemed necessary by the City. Coordination of the performance of the work with City is a critical component of the services. If Consultant is required to attend additional meetings to facilitate such coordination, Consultant shall not be entitled to any additional compensation for attending said meetings. 2.4 Invoices. Each month Consultant shall furnish to City an original invoice, using the City template, or in a format acceptable to the City, for all work performed and expenses incurred during the preceding month in a form approved by City’s Director of Finance. By submitting an invoice for payment under this Agreement, Consultant is certifying compliance with all provisions of the Agreement. The invoice shall detail charges for all necessary and actual expenses by the following categories: labor (by sub-category), travel, materials, equipment, supplies, and sub- contractor contracts. Sub-contractor charges shall also be detailed by such categories. Consultant shall not invoice City for any duplicate services performed by more than one person. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 City shall independently review each invoice submitted by the Consultant to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. Except as to any charges for work performed or expenses incurred by Consultant which are disputed by City, or as provided in Section 7.3, City will use its best efforts to cause Consultant to be paid within 45 (forty-five) days of receipt of Consultant’s correct and undisputed invoice; however, Consultant acknowledges and agrees that due to City warrant run procedures, the City cannot guarantee that payment will occur within this time period. In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Consultant for correction and resubmission. Review and payment by City for any invoice provided by the Consultant shall not constitute a waiver of any rights or remedies provided herein or any applicable law. 2.5 Waiver. Payment to Consultant for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Consultant. ARTICLE 3. PERFORMANCE SCHEDULE 3.1 Time of Essence. Time is of the essence in the performance of this Agreement. 3.2 Schedule of Performance. Consultant shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the “Schedule of Performance” attached hereto as Exhibit “D” and incorporated herein by this reference. When requested by the Consultant, extensions to the time period(s) specified in the Schedule of Performance may be approved in writing by the Contract Officer through a Change Order, but not exceeding 60 (sixty) days cumulatively. 3.3 Force Majeure. The time period(s) specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Consultant shall within 10 (ten) days of the commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified. The Contract Officer’s determination shall be final and conclusive upon the parties to this Agreement. In no event shall Consultant be entitled to recover damages against the City for any delay in the performance of Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 this Agreement, however caused, Consultant’s sole remedy being extension of the Agreement pursuant to this Section. 3.4 Term. Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding December 31, 2031 except as otherwise provided in the Schedule of Performance (Exhibit “D”). ARTICLE 4. COORDINATION OF WORK 4.1 Representatives and Personnel of Consultant. The following principals of Consultant (“Principals”) are hereby designated as being the principals and representatives of Consultant authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith: Avery Blackwell Principal/Project Manager (Name) (Title) Chris Wessel Senior Services Director/Project Director (Name) (Title) It is expressly understood that the experience, knowledge, capability and reputation of the foregoing principals were a substantial inducement for City to enter into this Agreement. Therefore, the foregoing principals shall be responsible during the term of this Agreement for directing all activities of Consultant and devoting sufficient time to personally supervise the services hereunder. All personnel of Consultant, and any authorized agents, shall at all times be under the exclusive direction and control of the Principals. For purposes of this Agreement, the foregoing Principals may not be replaced nor may their responsibilities be substantially reduced by Consultant without the express written approval of City. Additionally, Consultant shall utilize only the personnel included in the Proposal to perform services pursuant to this Agreement. Consultant shall make every reasonable effort to maintain the stability and continuity of Consultant’s staff and subcontractors, if any, assigned to perform the services required under this Agreement. Consultant shall notify City of any changes in Consultant’s staff and subcontractors, if any, assigned to perform the services required under this Agreement, prior to and during any such performance. City shall have the right to approve or reject any proposed replacement personnel, which approval shall not be unreasonably withheld. 4.2 Status of Consultant. Consultant shall have no authority to bind City in any manner, or to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. Consultant shall not at any time or in any manner represent that Consultant or Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 any of Consultant’s officers, employees, or agents are in any manner officials, officers, employees or agents of City. Neither Consultant, nor any of Consultant’s officers, employees or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Consultant expressly waives any claim Consultant may have to any such rights. 4.3 Contract Officer. The Contract Officer shall be Vanessa Hevener, Project Manager or such person as may be designated by the Director of Public Works. It shall be the Consultant’s responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and the Consultant shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority, if specified in writing by the City Manager, to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement. 4.4 Independent Consultant. Neither the City nor any of its employees shall have any control over the manner, mode or means by which Consultant, its agents or employees, perform the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of Consultant’s employees, servants, representatives or agents, or in fixing their number, compensation or hours of service. Consultant shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Consultant shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Consultant in its business or otherwise or a joint venturer or a member of any joint enterprise with Consultant. 4.5 Prohibition Against Subcontracting or Assignment. The experience, knowledge, capability and reputation of Consultant, its principals and employees were a substantial inducement for the City to enter into this Agreement. Therefore, Consultant shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the City; all subcontractors included in the Proposal are deemed approved. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more 25% (twenty five percent) of the present ownership and/or control of Consultant, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Consultant or any surety of Consultant of any liability hereunder without the express consent of City. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 ARTICLE 5. INSURANCE AND INDEMNIFICATION 5.1 Insurance Coverages. Without limiting Consultant’s indemnification of City, and prior to commencement of any services under this Agreement, Consultant shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to City. (a) General liability insurance. Consultant shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted. (b) Automobile liability insurance. Consultant shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with Services to be performed under this Agreement, including coverage for any owned, hired, non- owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident. (c) Professional liability (errors & omissions) insurance. Consultant shall maintain professional liability insurance that covers the Services to be performed in connection with this Agreement, in the minimum amount of $1,000,000 per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this Agreement and Consultant agrees to maintain continuous coverage through a period no less than three (3) years after completion of the services required by this Agreement. (d) Workers’ compensation insurance. Consultant shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000). (e) Subcontractors. Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall include all of the requirements stated herein. (f) Additional Insurance. Policies of such other insurance, as may be required in the Special Requirements in Exhibit “B”. 5.2 General Insurance Requirements. (a) Proof of insurance. Consultant shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 approved by City’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Agreement. City reserves the right to require complete, certified copies of all required insurance policies, at any time. (b) Duration of coverage. Consultant shall procure and maintain for the duration of this Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Services hereunder by Consultant, its agents, representatives, employees or subconsultants. (c) Primary/noncontributing. Coverage provided by Consultant shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non- contributory basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured. (d) City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain and continuously maintain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement. (e) Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or that is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VI (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the City’s Risk Manager. (f) Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subconsultants. (g) Enforcement of contract provisions (non-estoppel). Consultant acknowledges and agrees that any actual or alleged failure on the part of the City to inform Consultant of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder. (h) Requirements not limiting. Requirements of specific coverage features or limits contained in this section are not intended as a limitation on coverage, limits or other Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Consultant maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. (i) Notice of cancellation. Consultant agrees to oblige its insurance agent or broker and insurers to provide to City with a 30 (thirty) day notice of cancellation (except for nonpayment for which a 10 (ten) day notice is required) or nonrenewal of coverage for each required coverage. (j) Additional insured status. General liability policies shall provide or be endorsed to provide that City and its officers, officials, employees, and agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies. (k) Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. (l) Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions. (m) Pass through clause. Consultant agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by Consultant, provide the same minimum insurance coverage and endorsements required of Consultant. Consultant agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Consultant agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to City for review. (n) Agency’s right to revise specifications. The City reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Consultant 90 (ninety) days advance written notice of such change. If such change results in substantial additional cost to the Consultant, the City and Consultant may renegotiate Consultant’s compensation. (o) Self-insured retentions. Any self-insured retentions must be declared to and approved by City. City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by City. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 (p) Timely notice of claims. Consultant shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Consultant’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies. (q) Additional insurance. Consultant shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work. 5.3 Indemnification. To the full extent permitted by law, Consultant agrees to indemnify, defend and hold harmless the City, its officers, employees and agents (“Indemnified Parties”) against, and will hold and save them and each of them harmless from, any and all actions, either judicial, administrative, arbitration or regulatory claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities whether actual or threatened (herein “claims or liabilities”) that may be asserted or claimed by any person, firm or entity arising out of or in connection with the negligent performance of the work, operations or activities provided herein of Consultant, its officers, employees, agents, subcontractors, or invitees, or any individual or entity for which Consultant is legally liable (“indemnitors”), or arising from Consultant’s or indemnitors’ reckless or willful misconduct, or arising from Consultant’s or indemnitors’ negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, and in connection therewith: (a) Consultant will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys’ fees incurred in connection therewith; (b) Consultant will promptly pay any judgment rendered against the City, its officers, agents or employees for any such claims or liabilities arising out of or in connection with the negligent performance of or failure to perform such work, operations or activities of Consultant hereunder; and Consultant agrees to save and hold the City, its officers, agents, and employees harmless therefrom; (c) In the event the City, its officers, agents or employees is made a party to any action or proceeding filed or prosecuted against Consultant for such damages or other claims arising out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Consultant hereunder, Consultant agrees to pay to the City, its officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys’ fees. Consultant shall incorporate similar indemnity agreements with its subcontractors and if it fails to do so Consultant shall be fully responsible to indemnify City hereunder therefore, and failure of City to monitor compliance with these provisions shall not be a waiver hereof. This indemnification includes claims or liabilities arising from any negligent or wrongful act, error or omission, or reckless or willful misconduct of Consultant in the performance of professional Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 services hereunder. The provisions of this Section do not apply to claims or liabilities occurring as a result of City’s sole negligence or willful acts or omissions, but, to the fullest extent permitted by law, shall apply to claims and liabilities resulting in part from City’s negligence, except that design professionals’ indemnity hereunder shall be limited to claims and liabilities arising out of the negligence, recklessness or willful misconduct of the design professional. The indemnity obligation shall be binding on successors and assigns of Consultant and shall survive termination of this Agreement. ARTICLE 6. RECORDS, REPORTS, AND RELEASE OF INFORMATION 6.1 Records. Consultant shall keep, and require subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports, studies or other documents relating to the disbursements charged to City and services performed hereunder (the “books and records”), as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the performance of such services. Any and all such documents shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of three (3) years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required. In the event of dissolution of Consultant’s business, custody of the books and records may be given to City, and access shall be provided by Consultant’s successor in interest. Notwithstanding the above, the Consultant shall fully cooperate with the City in providing access to the books and records if a public records request is made and disclosure is required by law including but not limited to the California Public Records Act. 6.2 Reports. Consultant shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as the Contract Officer shall require. Consultant hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Consultant agrees that if Consultant becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services contemplated herein or, if Consultant is providing design services, the cost of the project being designed, Consultant shall promptly notify the Contract Officer of said fact, circumstance, technique or event and the estimated increased or decreased cost related thereto and, if Consultant is providing design services, the estimated increased or decreased cost estimate for the project being designed. 6.3 Ownership of Documents. All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents and other materials (the “documents and materials”) prepared by Consultant, its employees, subcontractors and agents in the performance of this Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Consultant shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the documents and materials hereunder. Any use, reuse or assignment of such completed documents for other projects and/or use of uncompleted documents without specific written authorization by the Consultant will be at the City’s sole risk and without liability to Consultant, and Consultant’s guarantee and warranties shall not extend to such use, reuse or assignment. Consultant may retain copies of such documents for its own use. Consultant shall have the right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Consultant fails to secure such assignment, Consultant shall indemnify City for all damages resulting therefrom. Moreover, Consultant with respect to any documents and materials that may qualify as “works made for hire” as defined in 17 U.S.C. § 101, such documents and materials are hereby deemed “works made for hire” for the City. 6.4 Confidentiality and Release of Information. (a) All information gained or work product produced by Consultant in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Consultant. Consultant shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the Contract Officer. (b) Consultant, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the Contract Officer or unless requested by the City Attorney, voluntarily provide documents, declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered “voluntary” provided Consultant gives City notice of such court order or subpoena. (c) If Consultant, or any officer, employee, agent or subcontractor of Consultant, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Consultant for any damages, costs and fees, including attorney’s fees, caused by or incurred as a result of Consultant’s conduct. (d) Consultant shall promptly notify City should Consultant, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed there under. City retains the right, but has no obligation, to represent Consultant or be present at any deposition, hearing or similar proceeding. Consultant agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Consultant. However, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 ARTICLE 7. ENFORCEMENT OF AGREEMENT AND TERMINATION 7.1 California Law. This Agreement shall be interpreted, construed and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other appropriate court in such county, and Consultant covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in the County of Los Angeles, State of California. 7.2 Disputes; Default. In the event that Consultant is in default under the terms of this Agreement, the City shall not have any obligation or duty to continue compensating Consultant for any work performed after the date of default. Instead, the City may give notice to Consultant of the default and the reasons for the default. The notice shall include the timeframe in which Consultant may cure the default. This timeframe is 15 (fifteen) days, but may be extended, though not reduced, if circumstances warrant. During the period of time that Consultant is in default, the City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices. In the alternative, the City may, in its sole discretion, elect to pay some or all of the outstanding invoices during the period of default. If Consultant does not cure the default, the City may take necessary steps to terminate this Agreement under this Article. Any failure on the part of the City to give notice of the Consultant’s default shall not be deemed to result in a waiver of the City’s legal rights or any rights arising out of any provision of this Agreement. 7.3 Retention of Funds. Consultant hereby authorizes City to deduct from any amount payable to Consultant (whether or not arising out of this Agreement) (i) any amounts the payment of which may be in dispute hereunder or which are necessary to compensate City for any losses, costs, liabilities, or damages suffered by City, and (ii) all amounts for which City may be liable to third parties, by reason of Consultant’s acts or omissions in performing or failing to perform Consultant’s obligation under this Agreement. In the event that any claim is made by a third party, the amount or validity of which is disputed by Consultant, or any indebtedness shall exist which shall appear to be the basis for a claim of lien, City may withhold from any payment due, without liability for interest because of such withholding, an amount sufficient to cover such claim. The failure of City to exercise such right to deduct or to withhold shall not, however, affect the obligations of the Consultant to insure, indemnify, and protect City as elsewhere provided herein. 7.4 Waiver. Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 provision or a waiver of any subsequent breach or violation of any provision of this Agreement. Acceptance by City of any work or services by Consultant shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 7.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party. 7.6 Legal Action. In addition to any other rights or remedies, either party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. Notwithstanding any contrary provision herein, Consultant shall file a statutory claim pursuant to Government Code Sections 905 et seq. and 910 et seq., in order to pursue a legal action under this Agreement. 7.7 Termination Prior to Expiration of Term. This Section shall govern any termination of this Contract except as specifically provided in the following Section for termination for cause. The City reserves the right to terminate this Contract at any time, with or without cause, upon thirty (30) days’ written notice to Consultant, except that where termination is due to the fault of the Consultant, the period of notice may be such shorter time as may be determined by the Contract Officer. Upon receipt of any notice of termination, Consultant shall immediately cease all services hereunder except such as may be specifically approved by the Contract Officer. Consultant shall be entitled to compensation for all services rendered prior to the effective date of the notice of termination and for any services authorized by the Contract Officer thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, except as provided in Section 7.3. In the event of termination without cause pursuant to this Section, the City need not provide the Consultant with the opportunity to cure pursuant to Section 7.2. 7.8 Termination for Default of Party. If termination is due to the failure of the other Party to fulfill its obligations under this Agreement: (a) City may, after compliance with the provisions of Section 7.2, take over the work and prosecute the same to completion by contract or otherwise, and the Consultant shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to the Consultant for the purpose of set-off or partial payment of the amounts owed the City as previously stated. (b) Consultant may, after compliance with the provisions of Section 7.2, terminate the Agreement upon written notice to the City‘s Contract Officer. Consultant shall be entitled to payment for all work performed up to the date of termination. 7.9 Attorneys’ Fees. If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney’s fees. Attorney’s fees shall include attorney’s fees on any appeal, and in addition a party entitled to attorney’s fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment. ARTICLE 8. CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION 8.1 Non-liability of City Officers and Employees. No officer or employee of the City shall be personally liable to the Consultant, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Consultant or to its successor, or for breach of any obligation of the terms of this Agreement. 8.2 Conflict of Interest. Consultant covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Consultant’s performance of services under this Agreement. Consultant further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of the Contract Officer. Consultant agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement. No officer or employee of the City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which affects her/his financial interest or the financial interest of any corporation, partnership or association in which (s)he is, directly or indirectly, interested, in violation of any State statute or regulation. The Consultant warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 8.3 Covenant Against Discrimination. Consultant covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class in the performance of this Agreement. Consultant shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class. 8.4 Unauthorized Aliens. Consultant hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C. § 1101 et seq., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Consultant so employ such unauthorized aliens for the performance of work and/or services covered by this Agreement, and should any liability or sanctions be imposed against City for such use of unauthorized aliens, Consultant hereby agrees to and shall reimburse City for the cost of all such liabilities or sanctions imposed, together with any and all costs, including attorneys’ fees, incurred by City. ARTICLE 9. MISCELLANEOUS PROVISIONS 9.1 Notices. Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail, in the case of the City, to the City Manager and to the attention of the Contract Officer (with her/his name and City title), City of Rancho Palos Verdes, 30940 Hawthorne Blvd., Rancho Palos Verdes, California 90275 and in the case of the Consultant, to the person(s) at the address designated on the execution page of this Agreement. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated at the time personally delivered or in 72 (seventy two) hours from the time of mailing if mailed as provided in this section. 9.2 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. 9.3 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 9.4 Integration; Amendment. This Agreement including the attachments hereto is the entire, complete and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by the Consultant and by the City Council. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void. 9.5 Severability. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless. 9.6 Warranty & Representation of Non-Collusion. No official, officer, or employee of City has any financial interest, direct or indirect, in this Agreement, nor shall any official, officer, or employee of City participate in any decision relating to this Agreement which may affect his/her financial interest or the financial interest of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any State or municipal statute or regulation. The determination of “financial interest” shall be consistent with State law and shall not include interests found to be “remote” or “noninterests” pursuant to Government Code Sections 1091 or 1091.5. Consultant warrants and represents that it has not paid or given, and will not pay or give, to any third party including, but not limited to, any City official, officer, or employee, any money, consideration, or other thing of value as a result or consequence of obtaining or being awarded any agreement. Consultant further warrants and represents that (s)he/it has not engaged in any act(s), omission(s), or other conduct or collusion that would result in the payment of any money, consideration, or other thing of value to any third party including, but not limited to, any City official, officer, or employee, as a result of consequence of obtaining or being awarded any agreement. Consultant is aware of and understands that any such act(s), omission(s) or other conduct resulting in such payment of money, consideration, or other thing of value will render this Agreement void and of no force or effect. Consultant’s Authorized Initials ______ Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 9.7 Corporate Authority. The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) that entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE] Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first-above written. CITY: CITY OF RANCHO PALOS VERDES, a municipal corporation Paul Seo, Mayor ATTEST: Teresa Takaoka, City Clerk APPROVED AS TO FORM: ALESHIRE & WYNDER, LLP William Wynder, City Attorney CONSULTANT: GEOSYNTEC CONSULTANTS, INC., a Florida corporation By: Name: Brian Petty Title: Vice President By: Name: Christopher Wessel Title: Senior Services Director Address: 5901 W. Century Blvd Suite 1450 Los Angeles, CA 90045 Two corporate officer signatures required when Consultant is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-1 EXHIBIT “A” SCOPE OF SERVICES I. Consultant will perform the following Services: See below Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-2 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-3 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-4 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-5 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-6 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-7 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-8 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-9 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-10 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-11 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-12 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-13 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-14 II. As part of the Services, Consultant will prepare and deliver the following tangible work products to the City: Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-15 III. In addition to the requirements of Section 6.2, during performance of the Services, Consultant will keep the City appraised of the status of performance by delivering the following status reports: A. N/A IV. All work product is subject to review and acceptance by the City, and must be revised by the Consultant without additional charge to the City until found satisfactory and accepted by City. V. Consultant will utilize the following personnel to accomplish the Services: A. Avery Blackwell, Project Manager B. Lauren Godinez, Assistant Project Manager Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 A-16 EXHIBIT “B” SPECIAL REQUIREMENTS (Superseding Contract Boilerplate) Added text indicated in bold italics, deleted text indicated in strikethrough. Section 1.1, Scope of Services, is hereby amended as follows: 1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, the Consultant shall provide those services specified in the “Scope of Services”, as stated in the Proposal, attached hereto as Exhibit “A” and incorporated herein by this reference, which may be referred to herein as the “services” or “work” hereunder. As a material inducement to the City entering into this Agreement, Consultant represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the services required under this Agreement in a thorough, competent, and professional manner, and is experienced in performing the work and services contemplated herein. Consultant shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all services described herein. Consultant covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be both of good quality as well as fit for the purpose intended. For purposes of this Agreement, the phrase “highest professional standards” shall mean those standards of practice ordinarily exercised by other firms recognized by one or more first-class firms performing similar work under similar circumstances. Consultant not responsible for utilization of Consultant work product for purposes other than those intended and defined in the approved scope of work. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 D-1 EXHIBIT “C” SCHEDULE OF COMPENSATION I. Consultant shall perform the following tasks at the following rates: II. Within the budgeted amounts for each Task, and with the approval of the Contract Officer, funds may be shifted from one Task subbudget to another for any given contract year so long as the Contract Sum is not exceeded per Section 2.1, unless Additional Services are approved per Section 1.9. III. The total compensation for the Services shall not exceed the Contract Sum as provided in Section 2.1 of this Agreement. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 D-2 EXHIBIT “D SCHEDULE OF PERFORMANCE I. Consultant shall perform all services timely in accordance with the following schedule: Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 01203.0001/835260.1 D-3 III. The Contract Officer may approve extensions for performance of the services in accordance with Section 3.2. Any further extensions require City Council approval. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 EXHIBIT “E” Consultant’s Proposal Continued on next page Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 PROPOSAL FOR Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring PREPARED FOR City of Rancho Palos Verdes PREPARED BY Geosyntec Consultants, Inc. May 11, 2026 Revised June 8, 2026 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring iiGEOSYNTEC | a. Cover Letter ..................................................................................................................1 b. Approach to Scope of Services ....................................................................................3 c. Cost Proposal ...............................................................................................................5 d. Organization and Staffing .............................................................................................7 e. Staff Qualifications and Experience ..............................................................................9 Prior Experience ...............................................................................................................9 Staff Qualifications ....................................................................................................11 Reference Projects ...................................................................................................21 f. Project Schedule .........................................................................................................27 g. Quality Control Plan ....................................................................................................29 h. Acceptance of Conditions ...........................................................................................30 Attachment: List of Officers/Directors ...............................................................................iii TABLE OF CONTENTSTABLE OF CONTENTS Click through the hyperlinked table of contents to skip to a section. Return to this page via the page number/Geosyntec link on the bottom of each page. iiGEOSYNTEC | Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 1GEOSYNTEC | Geosyntec Consultants Inc. 5901 W Century Boulevard, Suite 1450 Los Angeles, CA 90045 geosyntec.com Vanessa Hevener, Project Manager City of Rancho Palos Verdes 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 Subject: Response to the City of Rancho Palos Verdes’ Request for Proposal: Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring Dear Ms. Hevener and Members of the Selection Committee, The City of Rancho Palos Verdes and the Palos Verdes Peninsula Watershed Management Group (Peninsula WMG) require a monitoring partner who can ensure uninterrupted, fully compliant implementation of the Palos Verdes Peninsula Coordinated Integrated Monitoring Program (Peninsula CIMP) while minimizing administrative burden, managing regulatory risk, and delivering defensible data to support MS4 compliance and future permit transitions. Geosyntec Consultants, Inc. (Geosyntec), in association with EcoKai Environmental, Inc. (EcoKai), offers the Peninsula WMG a proven, low‑risk solution—providing clear and established familiarity with the Peninsula CIMP, immediate continuity of services, and a responsive project team of experts trusted by the Los Angeles Regional Water Quality Control Board (Regional Board) and watershed stakeholders. Demonstrated Efficient CIMP Implementation and Peninsula Experience Geosyntec brings direct, hands-on experience implementing the Peninsula CIMP over the past five years. Our team successfully navigated the Peninsula CIMP update approval (one of the first in the region), identified and negotiated adaptive management program refinements such as monitoring location and parameter removals, and consistently executed safe and cost effective sampling while fulfilling all monitoring requirements. We also bring relevant experience from implementing the neighboring Beach Cities CIMP and supporting other Peninsula projects, allowing us to apply proven lessons learned across similar regulatory and coastal contexts. This experience enables efficient implementation that aligns with regulatory intent while minimizing unnecessary cost or complexity. Immediate, Seamless Continuity of the Scope of Services Because Geosyntec currently implements the Peninsula CIMP, we can provide ongoing consistent services with no ramp‑up period or transition risk. Our team is actively tracking adaptive management needs for the Peninsula CIMP and understands how to document, communicate, and implement these refinements in coordination with the Regional Board. We bring deep familiarity with all monitoring locations, including site access constraints and safety considerations, which reduces field risk and improves reliability during wet weather events. The City will benefit from cost savings through Geosyntec’s use of established Standard Operating Procedures (SOPs) with integrated Health and Safety Plans (HASPs) and existing flow-monitoring equipment—eliminating the need for new installations or protocol development. Our team also brings mature data management and reporting systems that support efficient progression from field collection to regulatory submittals. Our team maintains a comprehensive database of historical Peninsula monitoring data, integrates third-party datasets (including Harbor Toxics and Machado Lake TMDL data), and produces clear, decision‑ready summaries for meetings and reports. Streamlining Future Implementation and Addressing Unexpected Issues Project Manager Avery Blackwell will continue to lead a stable, dedicated team with in‑depth familiarity with the Peninsula CIMP and established working relationships with the WMG. Continuity in leadership and staffing enables efficient day‑to‑day implementation while positioning the program to respond quickly to changing conditions, evolving regulatory expectations, or unforeseen field constraints. May 11, 2026 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 2GEOSYNTEC | Avery Blackwell, PEPrincipal | Project Manager805.979.9125 ablackwell@geosyntec.com Chris Wessel, PE, QSDSenior Services Director | Project Director310.957.6117 cwessel@geosyntec.com Our qualified technical experts provide rigorous quality control and oversight, including senior technical oversight and independent technical review, ensuring monitoring results are accurate, defensible, and consistent year‑to‑year. EcoKai will continue to serve as the primary field partner, leveraging extensive local experience to support reliable storm response, sampling logistics, and adherence to schedules. Our team of experts will draw on substantial work in the watershed and unmatched advanced technical skills to provide enhanced sample‑collection recommendations and produce sample data that support Watershed Management Program (WMP) updates, future project planning, and response to potential enforcement or litigation‑related reviews. We maintain trusted working relationships with Regional Board staff and established relationships with CEDEN regional data managers, supporting efficient coordination and smooth data submittals. In addition, our experience producing defensible MS4 and TMDL monitoring datasets supports agency responses to heightened regulatory scrutiny, enforcement inquiries, or future litigation-related reviews. This depth of expertise allows the City to navigate unexpected issues with confidence, backed by a team that understands both the technical and regulatory landscape. Requested Company Information Geosyntec is a multidisciplinary engineering and consulting corporation with approximately 3,000 employees across more than 130 offices worldwide. Locally, Geosyntec has offices in Los Angeles, Long Beach, Costa Mesa, Ventura, and Santa Barbara. For over 40 years, we have served public, private, and non-profit clients in addressing complex problems involving the environment, natural resources, and civil infrastructure. We are in good standing with the state of California. Geosyntec is governed by a Board of Directors, supported by more than 60 appointed officers across executive, regional, operational, and practice leadership roles, and led by Majdi Othman, who serves as Chief Executive Officer and President. For a full list of Officers, please see Appendix A. Geosyntec is in good standing with the Secretary of the State of California, certificate No. 1635083, and affirms that there is no known conflict of interest associated with performing the proposed services for the City and the Peninsula WMG. Geosyntec appreciates the opportunity to submit this proposal to the City and the Peninsula WMG. We are committed to delivering safe, timely, and cost‑effective monitoring and reporting services that meet MS4 Permit requirements and support the Peninsula CIMP’s objectives. Geosyntec welcomes the opportunity to continue partnering with the Peninsula WMG. If you have any questions regarding our proposal, please do not hesitate to contact us. Sincerely, Geosyntec Consultants, Inc. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 3GEOSYNTEC | B. APPROACH TO SCOPE OF SERVICES The City of Rancho Palos Verdes (City) and the Palos Verdes Peninsula Watershed Management Group (Peninsula WMG) have a mature and operational Coordinated Integrated Monitoring Program (Peninsula CIMP). Looking ahead, you require a monitoring partner who can ensure no program delays, deliver MS4‑compliant monitoring data cost‑effectively, and envision innovative adaptive management for future permit transitions. To address this need, Geosyntec, in partnership with EcoKai (Geosyntec Team), brings the following cost‑saving scope of services that build directly upon our demonstrated efficient Peninsula CIMP implementation and other Peninsula experience, reflect a continuity-based approach that preserves institutional knowledge and minimizes transition risk, and leverage technical experts to continue streamlining implementation and address unexpected issues. Our proposed approach is specifically designed to provide the following added value: X Prevent compliance schedule delays associated with program start‑up and knowledge transfer: For example, the Geosyntec Team already has the sample bottles, Chain of Custody forms, access permits/ agreements, and location knowledge necessary to complete the first dry weather TMDL monitoring event, which is due just two months from when this proposal is submitted. X Ensure consistent application of approved methods, assumptions, and reporting logic: For example, Geosyntec worked closely with the Peninsula WMG to develop and obtain approval for a defensible approach to calculating the values for total DDTs and total PCBs. For our annual reports, this approach has been coded with robust quality‑control procedures to retrieve the results and calculate the values automatically. X Build on established workflows to reduce duplicated effort and avoidable costs: For example, the Geosyntec Team has already installed and tested continuous flow meters at all five stormwater sampling locations, saving a significant amount of start‑up costs, while providing valuable data. X Provide reliable, decision‑ready data to support ongoing and future CIMP adaptive management: For example, Geosyntec supported the development of initial data to request the modification of the Machado Lake Watershed TMDL monitoring locations and is ready to provide more in‑depth data for discussions with the Regional Board to save the Peninsula WMG future monitoring costs and potentially reduce compliance liability. The following proposed services align with the requirements of the Request for Proposals (RFP), the June 2024 Peninsula CIMP update, all applicable Total Maximum Daily Loads (TMDLs), and the Los Angeles Regional MS4 Permit (Order No. R4‑2021‑0105, NPDES Permit No. CAS004004). Description of Scope Services by Task Task 1. Project Management Geosyntec will provide overall project management, coordination, and administrative support for the implementation of the Peninsula CIMP. Project management activities will include coordination with the City, Peninsula WMG members, and designated MS4 consultants to ensure consistent and timely program execution. Geosyntec will manage the project schedule, scope, and budget throughout the contract period and will lead updates to the monitoring program at the bimonthly watershed program management meetings and the bimonthly Peninsula CIMP monitoring update meetings. Geosyntec will apply for and maintain all required access permits necessary to support sampling and flow meter installation, operation, and maintenance activities. Deliverables: Project coordination, bi‑monthly Peninsula WMG meeting support materials, and bimonthly CIMP Program Management, and meeting support materials (as requested); monthly invoices with task level cost tracking; one Draft and one Final updated Sampling and Analysis Plan (SAP) with integrated Health and Safety Plan (HASP). Task 2. Receiving Water Monitoring RFP Task 1.1 The Geosyntec Team will conduct MS4 Permit‑required receiving‑water monitoring in accordance with the approved Peninsula CIMP (June 2024). Monitoring will be conducted at Peninsula‑RW1 during three wet‑ weather events per reporting year. Sampling and field activities will be conducted in accordance with approved CIMP protocols and coordinated with stormwater outfall monitoring to support linkage analyses between MS4 discharges and receiving‑water conditions. Deliverables: Three Receiving Water Monitoring Reports per reporting year (one per wet weather event), including field logs, results tables, and analytical laboratory data. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 4GEOSYNTEC | Task 3. Stormwater Outfall Monitoring RFP Task 1.2 The Geosyntec Team will conduct stormwater outfall monitoring during three wet weather events per reporting year at designated MS4 outfalls, consistent with the Peninsula CIMP. Monitoring will be coordinated, where practicable, with receiving water sampling to support integrated evaluations of discharge and downstream impacts. Deliverables: Three Stormwater Outfall Monitoring Reports per reporting year (one per wet weather event), including field logs, summary of results, results tables, and analytical laboratory data. Task 4. TMDL Outfall Monitoring RFP Tasks 1.3 and 1.4 The Geosyntec Team will implement all TMDL-specific stormwater outfall monitoring requirements identified in the Peninsula CIMP, including the collection of water for filtration and sediment bound sampling. This includes stormwater monitoring at three outfall locations during wet weather events, as well as monthly dry weather outfall monitoring at three locations in support of the Machado Lake Nutrients TMDL. Deliverables: Twelve Machado Lake Nutrients TMDL Outfall Monitoring Reports per year (one per month), including field logs, summary of results, results tables, and analytical laboratory data. Task 5. Stormwater Outfall Monitoring Flowmeter Management RFP Task 1.6 The Geosyntec Team will manage the operation and maintenance of continuous flowmeters at five stormwater outfall locations throughout the contract period. Flowmeters will be owned by the Geosyntec Team and leased to the Peninsula WMG. Existing flowmeters installed at Peninsula- SD1, Peninsula‑SD3, RHE City Hall, Solano, and Valmonte will be used without additional installation. The Geosyntec Team will coordinate site access and permitting, as necessary, and will process and quality check flow data for inclusion in monitoring reports and annual reporting. Deliverables: Flow data processed and incorporated into field monitoring reports and the Annual Monitoring Report. RFP Task 1.5 is not included per guidance provided in the RFP. Task 6. Monitoring Records, QA/QC, and Reporting RFP Task 1.7 Geosyntec will manage all monitoring data within the Peninsula CIMP database and perform data QA/QC in accordance with the Peninsula CIMP. Laboratory data will be reviewed and data exceeding applicable water quality objectives will be validated internally. Significant findings will be communicated to the Peninsula WMG and summarized during meetings and in annual reporting. Geosyntec will prepare and submit CEDEN‑formatted datasets, complete semiannual data submittals (including co‑permittee data transmission), and prepare Draft and Final Annual Monitoring Reports in compliance with MS4 Permit requirements. Deliverables: Semi annual CEDEN data submittals; Draft and Final Annual Monitoring Reports. Optional Task 7. CIMP Adaptive Management RFP Task 1.8.1 Geosyntec will conduct annual reviews of monitoring results to support adaptive management and develop recommendations for monitoring program refinement. Geosyntec will participate in CIMP meetings with the Regional Board as needed and budget is available. Deliverables: Draft and Final Adaptive Management Memorandum; Draft and Final revised Peninsula CIMP (if authorized). Optional Task 8. SMBBB TMDL Monitoring RFP Attachment B Geosyntec will conduct weekly recreational shoreline monitoring at designated Santa Monica Bay Beaches Bacteria TMDL locations, analyze samples for fecal indicator bacteria, perform accelerated monitoring following exceedances, and transmit results to participating agencies. Deliverables: Weekly monitoring data summaries; accelerated monitoring results (as applicable); annual summary of shoreline monitoring results. Optional Task 9. CIMP Update RFP Task 1.8.2 Geosyntec will revise the Peninsula CIMP following adoption of a new MS4 Permit. Geosyntec will participate in CIMP update meetings with the Regional Board as needed and budget is available. This task is not an annually recurring task and will only be enacted if authorized. Deliverables (if authorized): Draft, Regional Board Draft #1, Regional Board Draft #2, and Final revised Peninsula CIMP; Response to Regional Board comments. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 5GEOSYNTEC | C. COST PROPOSAL Palos Verdes Peninsula CIMP Implementation Services: Receiving Water and Outfall Monitoring Cost Estimate Geosyntec Subs Labs Total Geosyntec Subs Labs Total Geosyntec Subs Labs Total Task 1. Project Management, Communications, and Meetings $49,892 $5,100 $0 $54,992 $52,129 $5,253 $0 $57,382 $54,477 $5,411 $0 $59,888 Task 2. Receiving Water Monitoring $9,154 $14,420 $4,440 $28,014 $9,574 $14,853 $4,573 $28,999 $10,013 $15,298 $4,710 $30,022 Task 3. MS4 Stormwater Outfall Monitoring $11,167 $37,620 $3,167 $51,954 $11,644 $38,749 $3,262 $53,655 $12,142 $39,911 $3,360 $55,413 Task 4. TMDL Outfall Monitoring $20,407 $36,360 $11,967 $68,734 $21,331 $37,451 $12,326 $71,108 $22,298 $38,574 $12,696 $73,568 Task 5. Stormwater Outfall Monitoring Flowmeter Installation $1,786 $17,860 $0 $19,646 $1,840 $18,396 $0 $20,235 $1,895 $18,948 $0 $20,842 Task 6. Monitoring Records $106,510 $7,720 $0 $114,230 $108,679 $7,952 $0 $116,631 $114,097 $8,190 $0 $122,287 Optional - Task 7. Annual CIMP Adaptive Management $19,309 $0 $0 $19,309 $19,792 $0 $0 $19,792 $21,289 $0 $0 $21,289 Optional - Task 8. SMBBB TMDL Monitoring $35,188 $33,800 $30,495 $99,483 $36,770 $34,814 $31,410 $102,993 $38,426 $35,858 $32,352 $106,637 Total, without annual optional Tasks $198,916 $119,080 $19,574 $337,570 $205,196 $122,652 $20,161 $348,010 $214,923 $126,332 $20,766 $362,021 Total, plus annual optional Tasks $253,414 $152,880 $50,069 $456,362 $261,758 $157,466 $51,571 $470,795 $274,638 $162,190 $53,118 $489,946 Geosyntec Subs Labs Total Optional - Task 9. PVP CIMP Update $31,285 $2,000 $0 $33,285 Not Year-dependentOne-time Optional Task Task 2026/27 2027/28 2028/29 Palos Verdes Peninsula CIMP Implementation Services: Receiving and Outfall Monitoring Cost Estimate Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 6GEOSYNTEC | Palos Verdes Peninsula CIMP Implementation Services: Receiving and Outfall Monitoring Cost Estimate Palos Verdes Peninsula CIMP Implementation Services: Receiving Water and Outfall Monitoring Cost Estimate Task 1. Project Management, Communications, and Meetings Task 2. Receiving Water Monitoring Task 3. MS4 Stormwater Outfall Monitoring Task 4. TMDL Outfall Monitoring Task 5. Stormwater Outfall Monitoring Flowmeter Installation Task 6. Monitoring Records Optional - Task 7. Annual CIMP Adaptive Management Optional - Task 8. SMBBB TMDL Monitoring Total, without annual optional Tasks Total, plus annual optional Tasks Optional - Task 9. PVP CIMP Update One-time Optional Task Task Geosyntec Subs Labs Total Geosyntec Subs Labs Total Geosyntec Subs Labs Total $56,943 $5,573 $0 $62,516 $59,532 $5,740 $0 $65,272 $18,377 $5,912 $0 $24,290 $10,474 $15,757 $4,852 $31,083 $10,957 $16,230 $4,997 $32,184 $12,663 $41,108 $3,461 $57,232 $13,207 $42,342 $3,564 $59,113 $23,310 $39,732 $13,077 $76,119 $24,370 $40,924 $13,469 $78,763 $1,952 $19,516 $0 $21,468 $2,010 $20,102 $0 $22,112 $119,786 $8,436 $0 $128,221 $125,758 $8,689 $0 $134,447 $102,957 $8,950 $0 $111,906 $22,353 $0 $0 $22,353 $23,471 $0 $0 $23,471 $24,644 $0 $0 $24,644 $40,162 $36,934 $33,323 $110,418 $41,980 $38,042 $34,322 $114,344 $225,128 $130,122 $21,389 $376,638 $235,833 $134,026 $22,031 $391,890 $121,334 $14,862 $0 $136,196 $287,642 $167,056 $54,712 $509,410 $301,284 $172,068 $56,353 $529,706 $145,978 $14,862 $0 $160,840 Jul - Dec 20312029/30 2030/31 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 7GEOSYNTEC | D. ORGANIZATION AND STAFFING Organizational Chart Lauren Godínez1 Todd M. Bear, D.Env. (Lead)2 Carlos Carreon2 SAMPLE COLLECTION Curtis Fang, PE, PMP (Lead)1 Kimberly Goins, PE1 Erica Dale1 DATA ASSESSMENT AND REPORTING ASSISTANT PROJECT MANAGER Chris Wessel, PE, QSD/P | Project Director / Principal In Charge 5% of Total Effort, 10% Availability to Work on this Project Chris is a Senior Principal Engineer and Qualified SWPPP Developer and Practitioner. He has over seventeen years of experience in watershed planning, computer modeling, and stormwater management. In his sixteen years at Geosyntec, his project experience has included WMP Plan modeling and development; stormwater planning and BMP design, specifically as regulated by Municipal NPDES Permits; hydraulic and hydrologic modeling, with an emphasis on BMP design and evaluation; and compliance monitoring programs. Chris managed the original (2015) and updated (2021 - 2023) Peninsula RAA/CIMP, wrote the NSMBCW and Beach Cities CIMPs, and is currently managing the Beach Cities CIMP Implementation and directing the Peninsula CIMP Implementation. Avery Blackwell, PE | Project Manager 20% of Total Effort, 40% Availability to Work on this Project Avery is a Principal Water Resources Engineer and project manager with over 15 years of experience leading MS4 Permit, TMDL, and watershed‑scale monitoring programs throughout Southern California, and the last five years leading the Peninsula CIMP Implementation. He has managed MS4-compliant receiving water and outfall monitoring efforts, including field implementation, laboratory coordination, data analysis, and regulatory reporting. Avery has led multi‑agency monitoring programs, supported TMDL compliance and reopeners, and prepared defensible datasets and reports for Regional Board submittals. As Project Manager, he brings proven regulatory insight, strong team coordination, and a consistent record of on‑time, compliant program delivery. Team Bios Avery Blackwell will continue to serve as the Project Manager and primary point of contact, responsible for the overall delivery of the project. Mr. Blackwell, as well as the key staff identified in the Organizational Chart below, most of whom are currently working on the Peninsula CIMP Implementation, will remain assigned to this project through the completion of the Scope of Services. Brandon Steets, PE, QISP, ToR1 Wendy Hovel, PhD1 Jim Burton, PE QSD/P2 INDEPENDENT TECHNICAL REVIEWER Chris Wessel, PE, QSD/P1 PROJECT DIRECTOR Avery Blackwell, PE1 PROJECT MANAGER The Geosyntec Team 1 = Geosyntec Consultants 2 = EcoKai Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 8GEOSYNTEC | Lauren Godínez | Assistant Project Manager 30% of Total Effort, 50% Availability to Work on this Project Lauren is a water resources professional with eight years of experience supporting NPDES and MS4 permit compliance, TMDL monitoring, and water quality regulatory reporting. She serves as Assistant Project Manager for the Peninsula CIMP, supporting receiving water and outfall monitoring, reporting, and agency coordination. Lauren brings hands-on experience translating monitoring data into defensible regulatory deliverables and specialized expertise in microbial and pollutant source tracking (MST) to support TMDL compliance and source‑abatement strategies. Brandon Steets, PE, QISP, ToR | Independent Technical Reviewer 5% of Total Effort, 20% Availability to Work on this Project Brandon Steets is a Senior Principal with over 20 years of experience specializing in NPDES and TMDL regulations, pollutant source investigation, watershed modeling, and green infrastructure design. He is a trusted technical expert to regulators and courts, having led high-profile statewide studies for the SWRCB and served as a frequent speaker and trainer for CASQA, ASCE, ITRC, and other professional organizations. Wendy Hovel, PhD | Senior Independent Technical Reviewer 5% of Total Effort, 20% Availability to Work on this Project Wendy is an environmental toxicologist with more than 20 years of experience supporting sediment-related water quality programs, TMDLs, and regulatory investigations. She has led or provided senior technical oversight of sediment monitoring, toxicity testing, and the interpretation of contaminant data in coastal and harbor environments, including work for the Ports of Los Angeles and Long Beach. On the CIMP team, Dr. Hovel provides specialized expertise for sediment-associated analytes and supports defensible interpretation of results when needed. Wendy has supported work in many capacities under the Harbor Toxics TMDL for the last 20 years and brings a deep understanding of sediment quality throughout the Harbor. Curtis Fang, PE, PMP | Data Assessment/Reporting Lead 10% of Total Effort, 25% Availability to Work on this Project Curtis is a senior civil engineer with 11 years of experience in stormwater management, watershed planning, and data reporting. He has extensive knowledge of Los Angeles Region water-quality regulations, including TMDLs, Basin Plan Objectives, California Toxic Rules, and Phase I MS4 permits. He has led and supported the development of multiple watershed monitoring programs in the Santa Monica Bay and Dominguez Channel watersheds. Curtis has helped implement the Beach Cities CIMP since 2016 and the Peninsula CIMP since 2018. He will lead data assessment and reporting, ensuring CIMP data and reports meet QA/QC and compliance requirements. Todd Bear, D.Env (EcoKai) | Sample Collection Lead and EcoKai Project Manager 25% of Total Effort, 30% Availability to Work on this Project Todd has over 25 years of professional experience with water resource projects, including: MS4 CIMP and SWPPP stormwater monitoring and reporting, water quality sampling for groundwater and surface waters, groundwater investigations, hydrological monitoring, regulatory permitting for compliance with the Clean Water Act and the State Fish and Wildlife Code; and in situ data‑logging equipment installation, maintenance, and data collection for hydrogeological parameters. Todd will continue as the senior field coordinator and EcoKai Project Manager for the Peninsula CIMP monitoring project. Jim Burton, PE, QSD/P (EcoKai) | Independent Technical Reviewer 5% of Total Effort, 30% Availability to Work on this Project Jim has over 35 years of experience in water resources and environmental engineering, with expertise in water quality sampling, stormwater monitoring, and installing data‑monitoring equipment and hydrologic instrumentation in both remote and urban environments. He is a registered Civil Engineer and a Qualified Stormwater Developer and Practitioner (QSD/P) in the State of California. He is also registered as a Civil Engineer in the States of Hawaii, Texas, and Washington, and serves as EcoKai’s President/CEO. Jim will continue as an Independent Reviewer and the EcoKai Project Director for the Peninsula CIMP monitoring project. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 9GEOSYNTEC | E. STAFF QUALIFICATIONS AND EXPERIENCE Prior Experience Demonstrated Efficient CIMP Implementation and Peninsula Experience As the incumbent Peninsula CIMP and SMBBB TMDL implementation team, the Geosyntec Team has already built and proven the systems that keep your program on schedule and your submittals regulator‑ready. We established site access and field/lab logistics that enable rapid storm mobilization—and we have maintained a 100% success rate in stormwater sampling, with no missed wet‑ weather events, even under challenging conditions. We led the Peninsula CIMP update following adoption of the 2021 Los Angeles Regional MS4 Permit, working collaboratively with PVP agencies and Regional Board staff to incorporate new requirements while preserving data continuity and program defensibility. Beyond monitoring execution, we helped create the Peninsula’s defensible compliance pathway by supporting EWMP planning and preparing the Reasonable Assurance Analysis (RAA), integrating monitoring data analysis, an inventory of existing programs and practices, and Permit approved modeling (including Geosyntec’s SBPAT tool) to prioritize water quality drivers and translate requirements into implementable strategies. We also developed and applied automated data management, QA/QC, and visualization tools that streamline submittals (including CEDEN) and accelerate interpretation and corrective action decisions. To reduce start‑up costs and improve data quality, we installed and tested continuous-flow meters at all five stormwater sampling locations and integrated the resulting datasets into routine monitoring and reporting to support adaptive management. In addition to Peninsula CIMP Implementation, Geosyntec has supported Peninsula communities with hydrogeologic investigations, groundwater seepage and slope‑stability assessments, and stormwater‑management project implementation, including work in Malaga Cove, the Ancient Altamira and Portuguese Bend Landslide Complex, and the Machado Lake TMDL watershed. As the long‑standing consultants for the neighboring Beach Cities CIMP Implementation, our team brings continuity across interconnected watershed programs and provides fresh implementation perspectives to the Peninsula WMG. Collectively, this experience across CIMP implementation, SMBBB compliance monitoring, WMP planning, RAA development, stormwater project delivery, and Peninsula hydrogeology provides a strong, low‑risk foundation for continued program implementation. Beyond the Peninsula, Geosyntec delivers watershed‑scale MS4 compliance, TMDL strategy, and defensible monitoring across Southern California—from long‑term development and implementation of receiving‑water and storm drain monitoring programs to EWMP/RAA and CIMP work for municipal clients, integrating Permit‑approved modeling tools (including SBPAT/WMMS) to prioritize BMPs and demonstrate reasonable assurance. We have led bacteria and microbial source tracking investigations that translate field and forensic data (e.g., human fecal markers, CCTV, dye testing, GIS) into targeted abatement actions for municipal clients (including City of Los Angeles and San Diego County) and supported bacteria TMDL compliance reporting and alternative compliance approaches for coastal systems (e.g., Malibu Creek and Channel Islands Harbor). We also bring Safe, Clean Water Program performance monitoring experience that directly translates to defensible reporting and benefit quantification: for the City of Torrance, we are implementing a three‑year post‑construction monitoring program for the Amie, Henrietta, and Entradero Basin Expansion Projects, including program management, permitting support, continuous flow monitoring (telemetry- enabled), wet and dry weather sampling, pollutant loading and runoff‑volume modeling to quantify pre‑ and post‑project conditions, and annual monitoring reports with CEDEN submittals—providing the City with clear documentation of water quality improvements, runoff volume reductions, water supply benefits, and verification of eliminated dry‑weather discharges. Our harbor and sediment experience further strengthens technical defensibility when sediment‑associated analytes or toxics questions arise; we have supported the Ports of Los Angeles and Long Beach under the Harbor Toxics TMDL (data review, QA/QC, and bioaccumulation modeling support), led bench‑scale enhanced natural recovery amendment testing for Fish Harbor sediments, and built The Geosyntec Team, worked with the Los Angeles County Sanitation District to remove significant debris blocking the Valmonte monitoring location and creating a flooding hazard. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 10GEOSYNTEC | secure web‑based GIS data tools that consolidate legacy sediment, stormwater, water, and tissue datasets into a single, queryable platform. Together, these capabilities reduce uncertainty and start‑up time, speed data review and issue triage, and help keep monitoring results and compliance narratives clear, consistent, and regulator‑ ready. Proven Experience and Strengths of the Project Manager The Geosyntec Team will continue to be led by Avery Blackwell, who has been the Project Manager for the Peninsula CIMP implementation for the past five years. Under his leadership, the Geosyntec Team successfully updated the Peninsula CIMP following adoption of the 2021 Los Angeles Regional MS4 Permit, working closely with PVP agencies and Regional Water Board staff to incorporate new permit requirements while preserving program continuity and historical data integrity. Mr. Blackwell also led the first year of transition to and implementation of the updated CIMP, providing hands‑on management of revised monitoring requirements, QA/QC procedures, data management frameworks, and reporting workflows, as well as coordination among co-permittees. His direct involvement in both planning‑level updates and early implementation significantly reduced transition risk and ensured efficient, compliant execution of the revised program. Proven Experience and Strengths of the Key Personnel Chris Wessel, Project Director, led development of the Peninsula CIMP and Reasonable Assurance Analysis (RAA), and has remained continuously involved in Peninsula CIMP implementation. Since 2015, he has been the Project Director for the Beach Cities CIMP, providing over a decade of uninterrupted watershed‑scale monitoring experience across Santa Monica Bay and the PVP. Mr. Wessel currently manages weekly SMBBB TMDL shoreline monitoring for Santa Monica Bay Jurisdictions 5/6 (Beach Cities) and Jurisdiction 7 (PVP Cities). This ongoing role provides direct insight into coastal water quality trends, bacterial source dynamics, reporting expectations, and compliance drivers specific to the PVP and adjacent coastal jurisdictions. Overlapping leadership across the Peninsula CIMP, SMBBB TMDL, and Beach Cities CIMP ensures alignment in monitoring approaches, data interpretation, and adaptive management strategies throughout the region. Brandon Steets, Independent Technical Reviewer, has supported CIMP development, implementation, and adaptive management through close coordination with the Los Angeles Regional Water Quality Control Board. His experience with MS4 compliance strategy, permit interpretation, and regulatory negotiation informs how monitoring data are evaluated, documented, and presented to ensure defensibility during both routine review and heightened scrutiny. Wendy Hovel, Independent Technical Reviewer, will leverage extensive sediment-related water quality program experience, including significant work on coastal and harbor sediment monitoring, toxicity testing, and contaminant data interpretation. She has served as a senior technical expert on the Harbor Toxics (sediment) TMDL for the Ports of Los Angeles and Long Beach, and has supported projects in roles that include technical lead and QA/QC manager, establishing data usability criteria and overseeing the defensibility of sediment data and interpretations. On the PVP CIMP team, Dr. Hovel provides senior-level QA/QC review and specialized expertise for sediment-associated analytes, strengthening data quality, consistency, and regulatory confidence. The core implementation team, including EcoKai field staff and Geosyntec technical leads Lauren Godínez, Curtis Fang, Kimberly Goins, and Erica Dale, has supported Peninsula CIMP implementation for more than five consecutive years. This long‑standing collaboration has resulted in a proven, seamless workflow across field operations, laboratory coordination, data management, QA/ QC, and reporting. We maintain strong working relationships with Regional Board staff and regularly coordinate with Executive Officer and Deputy Executive Officer leadership on complex technical and special study efforts. In addition, Geosyntec serves as a designated expert in MS4 compliance litigation related to the interpretation of monitoring data, Receiving Water Limitations (RWLs), and TMDL compliance. This perspective provides unique insight into how regulators and third parties may evaluate monitoring data and informs proactive, good‑faith compliance strategies. Geosyntec was “insightful, clearly communicated, and timely technical analysis that was directly responsive to State Water Board staff’s request for information.” In a 2017 Letter of recognition, the State Water Resources Control Board commends Geosyntec Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 11GEOSYNTEC | CAREER SUMMARY Mr. Avery Blackwell, PE, is a water resource engineer and project manager with 15 years of pioneering experience in Los Angeles MS4 Permit support, including monitoring, data analysis, and compliance reporting of stormwater and non‑ stormwater. RELEVANT PROJECT EXPERIENCE Palos Verdes Peninsula Coordinated Integrated Monitoring Plan Implementation, City of Rancho Palos Verdes, CA. Provide CIMP monitoring and reporting support for the Palos Verdes Peninsula Watershed Management Group, including wet and dry weather outfall, receiving water, and TMDL water quality and flow monitoring, monthly progress reporting, monitoring data management and visualization, Los Angeles MS4 permit complaint annual reporting, and CIMP revisions to align with new Los Angeles Permit requirements. Newhall Ranch WDR and NPDES Water Quality Monitoring and Reporting, Newhall Land and Farming Company, CA. Development and six years of implementation of a receiving water and storm drain outfall Water Quality Monitoring Plan to comply with the Newhall Ranch Specific Plan and Waste Discharge Requirements (WDR) Order/401 Certification and Los Angeles MS4 Permit. Preparation and submission of annual reports, including automated trends analysis, summary table population, and monitoring data upload to CEDEN. Confidential Litigation Monitoring Support, Southern California. Development and five years of implementation of a Water Quality Monitoring Plan capable of detecting project site influences on water quality between 22 upstream and downstream monitoring locations. Santa Barbara Urban Stormwater Monitoring, Santa Barbara County, and the Cities of Carpinteria, Goleta, Solvang, and Buellton, CA. Summarized the implementation of the Urban Stormwater Monitoring Program, including comparison of results to water quality objectives, correlations between acute toxicity levels and pyrethroid pesticides, metals, and nutrients, and statistically analyzing the sample results to determine whether sufficient samples had been collected to characterize the average land use-specific pollutant concentrations accurately. Recommendations were provided to improve safety, enhance result quality, reduce analysis costs, and broaden the applicability of monitoring results. Walnut Water Quality Management Plan (WMP) Reasonable Assurance Analysis (RAA) and Integrated Monitoring Program (IMP) Updates, City of Walnut, CA. Updated RAA approach and IMP in conformance with the 2021 Los Angeles Regional MS4 Permit. Tasks included calibrating WMMS 2.0 to local water quality monitoring data, calculating target load reductions for a handful of pollutants and surrogates, modeling expected load reductions from implementing development LID BMPs, regional BMPs, and green street projects, developing an advanced non‑ stormwater screening program, and demonstrating compliance with interim and final milestones. Santa Barbara and Goleta Beaches Microbial Source Tracking Study, California State Water Resources Control Board. Developed and implemented an MST work plan to determine sources that may be conveying human and/or other anthropogenic wastes in dry weather discharges, and to prescribe targeted remedies to abate these sources. Role: Project Manager Classification: Principal Specialties: MS4 Permit and TMDL implementation Water quality monitoring and pollutant source investigations Compliance data analysis and reporting Education: MS, Civil Engineering (Water Resources), Colorado State University, Fort Collins, CO, 2015 BS, Civil Engineering, California State Polytechnic University, San Luis Obispo, CA, 2002 Professional Registration: Registered Professional Engineer, Civil, California, No. 83866 Avery Blackwell, PE Staff Qualifications Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 12GEOSYNTEC | Malibu Creek Watershed Bacteria TMDL Outfall Monitoring Plan and Source Investigation, Ventura County, CA. Development of an outfall monitoring plan capable of assessing Waste Load Allocations in the Malibu Creek watershed Bacteria TMDL. Development and implementation of a study for dry weather monitoring and storm drain network investigations to identify sources of flow and bacteria to Malibu Creek. San Diego River and San Luis Rey Microbial Source Tracking Investigation, San Diego County, CA. Design and implementation of a novel study plan to investigate human waste contamination of MS4 outfalls and networks in sewered and unsewered areas within the unincorporated County portions of the San Luis Rey and San Diego River watersheds using genetic DNA markers, CCTV, field observations, GIS, and a new tablet app. Channel Island Harbor Bacteria TMDL Compliance Reports, Ventura County and the City of Oxnard, CA. Analysis and reporting of water‑quality monitoring results and BMP implementation to comply with the Channel Island Harbor bacteria TMDL. Development of an alternative compliance approach utilizing MST sampling. Upper Malibu Creek Watershed TMDL Time Schedule Order Request, Ventura County and the City of Thousand Oaks, CA. Summarized the status of compliance, ongoing compliance efforts, and planned implementation activities to request a time schedule order extending the final WLA for the Malibu Creek Watershed bacteria TMDL. Aliso Creek Watershed Collaboration Group, Orange County, CA. Under the supervision of the South Orange County IRWM group, developed and led a quarterly watershed project planning collaboration group for over 50 stakeholders in the Aliso Creek Watershed. Created a Reference Guide for stakeholders describing the collaboration tools developed, the state of the watershed science, and potential streamlined permitting approaches. North and South Orange County Integrated Regional Water Management Program Support, Orange County, CA. Led project selection and Department of Water Resources grant application development for both the North Orange County and South Orange County Integrated Regional Water Management programs (IRWMP). Tasks included vetting project details, developing and implementing a project scoring and ranking approach aligned with IRWMPs’ goals, completing application materials, and coordinating and preparing for Ad Hoc committee, stakeholder, and management committee meetings. Goleta Watershed Technical Services, City of Goleta, CA. Supporting the City of Goleta with comprehensive watershed program and environmental data management support, including the creation of a database to manager creek sampling results, data analysis, visualization, and creek monitoring recommendation, support the drafting of the MS4 Permit annual report, provided content for the Go Green Goleta website, identified potential stormwater capture projects, create a Creek and Watershed Management Program (CWMP) monitoring program, field inspections of industrial areas, summarized street sweeping data and trash collection data, prepared and lead presentation to the CWMP Technical Advisory Committee (TAC) and the City Council, research potential funding sources. Santa Barbara TMDL Wasteload Allocation Attainment Plan (WAAP), Santa Barbara County, CA. Development of the County’s WAAP for the Santa Maria River to address Bacteria, Nutrient, and Pesticide TMDL requirements, including source assessment and prioritization; BMP identification, implementation schedule, and effectiveness quantification; monitoring and reporting; and stakeholder coordination. Summarized five years of implementation, described progress towards compliance, and provided program enhancement recommendations. Avery Blackwell, PE Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 13GEOSYNTEC | CAREER SUMMARY Mr. Chris Wessel, PE, QSD/QSP, is a Senior Principal Engineer and Qualified SWPPP Developer and Practitioner. He has over 17 years of experience in watershed planning, hydrology, computer modeling, and stormwater management. In his sixteen years at Geosyntec, his project experience has included stormwater planning and BMP design; hydraulic and hydrologic modeling, with an emphasis on BMP design and evaluation; environmental planning for MS4 Permit compliance; and BMP performance and optimization. Mr. Wessel is Geosyntec’s project manager for the Beach Cities watershed management group, overseeing their WMP updates, project development, and coordinated monitoring. He has also led the modeling and development of numerous WMPs in the LA area, including the Peninsula Cities RAA; managed the optimization of eight regional stormwater projects for the City of Los Angeles; and supports LA Metro in establishing its LID and CGP programs. RELEVANT PROJECT EXPERIENCE Peninsula Cities Coordinated Integrated Monitoring Program (CIMP) Implementation, Palos Verdes Peninsula, CA. As Project Director, Mr. Wessel has been supporting the implementation of the Peninsula Cities CIMP on behalf of the cities of Peninsula Cities WMG. His role has primarily been focused on consistency with other WMG approaches in the area and compliance with the Los Angeles MS4 Permit. Southbay Beach Cities Coordinated Integrated Monitoring Program (CIMP) Implementation, Manhattan Beach, CA. Since 2015, Mr. Wessel has been managing the implementation of the Beach Cities CIMP on behalf of the cities of Manhattan Beach (lead agency), Redondo Beach, Hermosa Beach, and Torrance. Responsibilities include stormwater and non‑stormwater sampling (outfall and receiving water), data processing and analyses, and annual reporting per the Los Angeles MS4 Permit. Peninsula Cities and Beach Cities Revised RAAs/WMPs, Peninsula Cities WMG and Beach Cities WMG, CA. Project Manager who directed the revisions to the existing WMPs for the Peninsula Cities WMG and Beach Cities WMG. Revised RAAs used WMMS 2.0, with calibration based on available CIMP data and a bacteria modeling approach developed for application within Santa Monica Bay. The Beach Cities also included the development of two Feasibility Studies for applications under the Safe Clean Water Program. City of El Segundo Stormwater Program Support, City of El Segundo, CA. Chris has supported the City of El Segundo with their stormwater compliance program for over ten years, including development of City staff trainings; regional BMP modeling, siting, and crediting; drywell siting and analysis; LID ordinance drafting and implementation support; annual monitoring and reporting support; and erosion control support. Safe Clean Water (SCW) Program Feasibility Study Development, Los Angeles County, CA. Mr. Wessel has managed and/or supported multiple projects throughout Los Angeles County applying for SCW Regional Program funding, including Fulton Playfield in Redondo Beach, the Slauson Connect Clean Water Partnership, and LA Metro Orange Line, among others. Support has included project identification, preliminary design, geotechnical investigation oversight, completion of full Feasibility Studies, and support during Scoring Committee meetings. Role: Project Director / Principal in Charge Classification: Senior Principal Specialties: Stormwater Management MS4 Permit Compliance Watershed Planning Monitoring Education: MS, Civil Engineering, University of California, Los Angeles, 2009 BS, Civil Engineering, University of California, Los Angeles, 2007 Professional Registration: Professional Civil Engineer, California, No. C78522 Qualified SWPPP Developer/ Practitioner, California, No. 20321 Christopher Wessel, PE, QSD/QSP Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 14GEOSYNTEC | Christopher Wessel, PE, QSD/QSP Los Angeles County Metro (Metro) Water and Sustainability On-Call Services, Los Angeles, CA. Mr. Wessel supports the overall contract management for providing on-call consulting services to LA Metro. Geosyntec’s scope of work covers a wide array of service areas, including industrial wastewater, stormwater, and sustainability. Los Angeles County Metro (Metro) Water and Sustainability On-Call Services, Los Angeles, CA. Mr. Wessel supports the overall contract management for providing on-call consulting services to LA Metro. Geosyntec’s scope of work covers a wide array of service areas, including industrial wastewater, stormwater, and sustainability. Chris helped Metro establish its Construction Water Program and Low Impact Development Program, and continues to serve as the lead consultant for those programs on behalf of Metro. One Water LA Project, City of Los Angeles Department of Public Works. Los Angeles, CA. Project Manager for Task 8 (Stormwater Infrastructure Master Plan) of the One Water LA Project, which involves the City of Los Angeles Bureau of Sanitation, Bureau of Engineering, and Department of Water and Power. Project tasks include the collection and analysis of all existing and available stormwater infrastructure spatial data within the City of Los Angeles, as well as the analysis of system performance over the next 25 years. City of Los Angeles LID Handbook, City of Los Angeles, Los Angeles, CA. Responsible for drafting the technical sections of the City of Los Angeles’ new LID Handbook. Specific content included residential BMP design guidance and factsheets; large‑development BMP design guidance and feasibility criteria; constraint mapping; and technical writing. The Handbook was designed to be highly user‑friendly while remaining technically advanced. Los Angeles World Airports (LAWA) Environmental On-Call Services, Los Angeles, CA. Mr. Wessel is the Project Manager overseeing and managing Geosyntec’s prime contract with LAWA, which includes services in stormwater compliance, noise management, remediation, and sustainability, among others. As part of his responsibilities, Mr. Wessel manages LAX’s Work Plan and Implementation Report for PFAS investigations at the airport, and currently leads the Geosyntec team in its assessment of solutions for AFFF impacts in the West Campus Fire System. He also assisted with LID review and support for multiple projects at LAX, supporting LAWA with analyses and coordination for regional project approval and the creation of a LID crediting system. Environmental Consulting Services for MS4 Permit Compliance, Various Clients. Providing on‑call environmental consulting services to assist eight different cities with the implementation of the requirements of the Los Angeles County MS4 Permit. Ongoing MS4 Permit assistance has included: revisions of the city’s municipal codes to reflect requirements of the MS4 Permit, training presentations to city staff on the Planning and Land Development requirements set forth in the Permit, implementation planning, commercial facility inspections, and illicit connection and illicit discharge program planning. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 15GEOSYNTEC | CAREER SUMMARY Ms. Lauren Godínez is a water resources professional with eight years of experience supporting NPDES and MS4 permit compliance, TMDL monitoring and implementation, and water quality regulatory reporting for municipal and industrial clients. Her work focuses on the design and execution of stormwater, non‑stormwater, and receiving‑water monitoring programs, including water chemistry, toxicity testing, and compliance determination with respect to permit limits and water quality objectives. Ms. Godínez brings specialized expertise in microbial source tracking (MST) to support TMDL compliance and source‑abatement strategies, and is highly proficient in GIS-based data management and spatial analysis for source identification, trend evaluation, and the visualization of complex monitoring datasets. She also has a strong foundation in microbiology and environmental chemistry, gained through prior laboratory experience. RELEVANT PROJECT EXPERIENCE Palos Verdes Peninsula Coordinated Integrated Monitoring Program (CIMP), Los Angeles, CA. Lauren currently serves as Assistant Project Manager for a multi‑ jurisdictional MS4 monitoring program, supporting implementation and annual reporting of stormwater, non stormwater, receiving water, and TMDL monitoring, including Santa Monica Bay Nearshore, LA/Long Beach Harbor Toxics and Metals, and Machado Lake TMDLs.. Long Beach Generating Station NPDES Compliance Support, Long Beach, CA. Manages comprehensive NPDES permit compliance for an active power generation facility, including effluent and receiving water monitoring, bypass and exceedance response sampling, data validation, CIWQS reporting, and coordination with laboratories, subcontractors, and regulatory stakeholders. Santa Ana River TMDL Support, Riverside County, CA. Currently assisting the Riverside County Flood Control & Water Conservation District in developing a strategy for future MS4 Permit and Bacteria TMDL compliance. Includes data collection and analysis to support preliminary design of structural controls (e.g., MS4 diversions) and nonstructural abatement strategies. Municipal Separate Storm Sewer System (MS4) Dry Weather Microbial Source Tracking and Outfall Inspections and TMDL Support, County of San Diego Department of Public Works, San Diego, CA. Lauren was the lead field staff for the San Diego County Municipal Separate Storm Sewer System (MS4) outfall screening and investigation for potential sources of human fecal contamination. Her responsibilities included planning and coordinating all field operations including human fecal DNA marker sampling, above ground source tracking along the MS4 network and completing investigatory measures such as CCTV observations of upstream MS4 networks and sewer dye testing. She also managed all GIS information collected during the project to provide the client with crucial spatial trends to identify high‑risk source areas. Los Angeles River (LAR) Bacteria Pilot Study, City of Los Angeles Department of Sanitation, Los Angeles, CA. Lauren was the lead field staff for the Dry and Wet Weather Bacteria MS4 Investigations for the LAR Bacteria Pilot Study. The overarching objective of the study was to assess the feasibility of a risk‑based approach to addressing bacteria TMDL compliance in LAR Segment E. Lauren oversaw the collection of fecal indicator bacteria and human fecal DNA markers at Los Angeles River MS4 Outfalls, the implementation of aboveground MS4 network source investigations and as well as belowground investigations including CCTV and sewer dye testing. Role: Assistant Project Manager Classification: Project Professional Specialties: Surface and Groundwater Water Quality Monitoring NPDES and WDR Permitting and Compliance Microbial and Pollutant Source Tracking Fluvial Geomorphology and Hydrology Education: MS, Environmental Engineering, San Diego State University, San Diego, California, 2020 BS, Biogeochemistry and Environmental Science, University of Hawai’i at Mānoa, Honolulu, Hawai’i, 2016 Lauren (Mathews) Godínez Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 16GEOSYNTEC | CAREER SUMMARY Mr. Brandon Steets, PE, QISP, ToR, is a Senior Principal based in Santa Barbara with over 20 years’ experience. Mr. Steets specializes in NPDES and TMDL regulations, pollutant source investigation, watershed water quality modeling, and Green Infrastructure design. He often serves as technical expert on water-quality related litigation. Mr. Steets is a subject matter expert on bacteria issues, including Microbial Source Tracking (MST), risk assessment, and modeling. RELEVANT PROJECT EXPERIENCE Ventura River Groundwater-Surface Water (GW-SW) Model, SWRCB, California. Project director for selection, development, calibration, and application of a new GW‑SW interaction model to evaluate watershed management scenarios for meeting fish passage-based instream flows, as a model watershed for the State to establish new instream flow criteria. USGS’ GSFLOW model is being used, a fully coupled GW‑SW model that combines MODFLOW with PRMS, plus MT3D for modeling groundwater nitrogen transport and transformation, to support a reassessment of load allocations (for septic and ag sources) for the Algae TMDL. Also modeling impacts of wildfires and climate change. Stormwater Quality Source Investigations, Modeling, Risk Assessment, and Treatment for Field Laboratory, Southern California. Project director managing an independent Expert Panel; watershed quality modeling using LSPC for organic and inorganic chemicals and radionuclides in stormwater; hydrologic modeling using SWMM; hydraulic modeling using HEC RAS for instream stabilization design; design, permitting, construction, and performance evaluation of over a dozen structural stormwater treatment control measures; a first of its kind stormwater Human Health Risk Assessment; design and implementation of stormwater special studies with university researchers (e.g., column testing of engineered filter media, pollutant source testing including aerial deposition, pavement solids, wildfire ash, treated wood pole soils, and background soils); development of white papers (e.g., on sources of metals and dioxins in stormwater, site specific design storms, and statistical methods for prioritizing BMP placement based on subarea monitoring data); facilitation of public meetings including Regional Board members and staff; and NPDES permit renewals. Santa Monica Bay (SMB) Enhanced Watershed Management Plans (EWMPs) and Coordinated Integrated Monitoring Plans (CIMPs), Multiple Cities, Los Angeles County, California. Development of CIMPs to meet MS4 Permit receiving water and outfall monitoring requirements, and development of Work Plans and EWMPs, including BMP identification and Reasonable Assurance Analysis (RAA) watershed modeling to demonstrate compliance with bacteria TMDL‑based limits and other water quality standards, using the SBPAT and WMMS/LSPC models. The four SMB EWMP Groups were: North SMB (led by City of Malibu), SMB J2/3 (led by City of Los Angeles), Southbay Beach Cities (led by Redondo Beach), and Peninsula Cities (led by Rancho Palos Verdes). NPDES and TMDL Modeling, The Newhall Land and Farming Company, Valencia, California. Project director and lead modeler providing NPDES and WDR/401cert permitting support, including hydrology and nitrogen/chloride modeling using the WARMF watershed model in the Upper Santa Clara River (SCR) to evaluate various effluent discharge and reuse scenarios for a new Wastewater Reclamation Plant, including one-way coupling with an existing MODFLOW model to address groundwater‑surface water interactions. Role: Independent Technical Reviewer Classification: Senior Principal Specialties: Stormwater Planning and Permitting Water Quality Modeling and Monitoring Studies Education: MS, Environmental Engineering, University of California, Santa Barbara, 2000 BS, Environmental Engineering, Rensselaer Polytechnic Institute, Troy, New York, 1998 Professional Registration: Registered Professional Engineer, Chemical, California, No. CH6132 Brandon Steets, PE, QISP, ToR Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 17GEOSYNTEC | CAREER SUMMARY Dr. Wendy Hovel is a toxicologist with over 20 years of experience in water quality and sediment assessment, including specialized studies (e.g., contaminant flux and TIEs), remedial investigations and feasibility studies, TMDLs, ecological risk assessment, and bioaccumulation modeling. She has led and provided technical expertise on multidisciplinary investigations across North America, supporting industrial and government clients in developing effective water, sediment, and soil management strategies. Her roles have included toxicity laboratory director, project manager, technical lead, and QA/QC manager RELEVANT PROJECT EXPERIENCE Boat Shop Reconnaissance Study, Port of Los Angeles, California. Project Manager for Geosyntec on a contaminant delineation and data‑gap evaluation study in the boat shop area. Responsibilities included establishing data usability criteria; identifying priority contaminants; developing 2D and 3D contaminant extent models in ArcGIS and Leapfrog; and identifying data gaps. Led a sediment data-gap field investigation, analyzed new data, and updated models to refine the contaminant boundary associated with leasehold activities. Sediment Total Maximum Daily Loads Support, Ports of Los Angeles and Long Beach, Los Angeles and Long Beach, California. Project manager and technical expert on this multi-faceted program designed to allow the Ports of Los Angeles and Long Beach to achieve compliance with a seafood consumption‑based numeric target under harbor-wide Total Maximum Daily Loads. The program goal was to design an effective management strategy for reducing human health risks due to consumption of PCB-contaminated fish. In support of this goal, Wendy managed and provided technical support on numerous projects, including comprehensive data review, a Programmatic QAPP, a low‑detection‑limit water column study, sediment and food‑web data collection programs, bioaccumulation model development, and compliance evaluations. Along with a team of modelers, Wendy successfully completed peer review of a site-specific, calibrated bioaccumulation model and supported development of long‑term simulations to evaluate the effectiveness of potential management options. She regularly presented results at meetings with the State and Regional Water Boards, other stakeholders, and the Ports, and finalized the first Human Health Sediment Quality Objective Tier III Assessment incorporating agency comments. Gateway Watershed Management Authority, Greater Harbor Waters Responsible Parties, San Pedro Bay, California. QA/QC Manager for a multidisciplinary compliance monitoring program under the Greater Harbor Waters Toxics TMDL. Provided oversight for data validation, analytical issues, alternative sampling designs (including fish tissue), area weighted benthic SQO assessments, and updates to tissue collection procedures aligned with proposed Basin Plan amendments. Developed an RWQCB approved random sediment sampling design based on SCCWRP methods and provided QA/QC oversight for all regulatory deliverables. Sediment Amendment Study, Port of Los Angeles, California. Project Manager for a competitively bid investigation evaluating the effectiveness of enhanced natural recovery (ENR) amendment materials for reducing contaminant bioavailability in Fish Harbor surface sediments. Led bench scale testing at the SiREM laboratory to evaluate thin layer placement options, including clean dredged material, clean import sand, powdered activated carbon, and metal sequestering amendments. The study assessed both short and long term amendment performance for reducing PCB and copper bioavailability. Role: Independent Technical Reviewer Classification: Senior Scientist Specialties: Sediment Management and Remediation Ecological Risk Assessment Sediment Total Maximum Daily Loads Applied Environmental Toxicolog Education: PhD, Pharmacology and Toxicology, University of California, Davis 2005 MS, Marine Science, College of William and Mary, Williamsburg, VA 1999 BA, Biology, St. Olaf College 1995 Professional Registration: Member, Society of Environmental Toxicology and Chemistry (1997‑Present) Southern California Chapter, Society of Environmental Toxicology and Chemistry (2005‑Present) OSHA 40‑Hr HAZWOPER Certification Wendy Rose Hovel, PhD Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 18GEOSYNTEC | CAREER SUMMARY Mr. Jim Burton, PE, QSD/P is a senior environmental engineer with more than 35 years of experience in water resources and environmental engineering, with a strong focus on stormwater monitoring, water quality sampling, and regulatory compliance. He has led complex monitoring programs for municipal and regional agencies, including MS4, CIMP, and NPDES-permitted facilities, and has extensive experience overseeing field data collection, hydrologic instrumentation installation, laboratory coordination, and compliance reporting. Mr. Burton is the President and CEO of EcoKai Environmental, where he provides technical leadership and quality control for stormwater and water quality monitoring programs throughout Southern California. He is a registered Civil Engineer and Qualified Stormwater Developer and Practitioner (QSD/P) in California and brings deep expertise gained from leadership roles in both consulting and public‑sector agencies. RELEVANT PROJECT EXPERIENCE MS4 Stormwater Monitoring Programs. Mr. Burton manages the EcoKai team performing field water quality sampling for the Beach Cities Watershed Management Group and for the Palos Verdes Peninsula Watershed Management Group. Field activities include sampling during storm events as well as dry weather sampling, installation and maintenance of instrumentation within storm drains to measure water flow, coordinating laboratory analyses for water quality constituents of concern, dry weather flow source investigations, data analysis and reporting, and preparation of annual integrated monitoring compliance reports. The objective of the MS4 Permits is to ensure that discharges in the County of Los Angeles do not cause or contribute to the exceedance of water quality standards in regional water bodies. The MS4 Permit includes monitoring requirements for applicable TMDL standards, receiving water quality, stormwater outfall flows, and non-stormwater flows. EcoKai has conducted MS4 monitoring for BCWMG since 2016 and for PVPWMG since 2021. City of Torrance Stormwater Basin Water Quality Monitoring Program. Project Manager for the implementation of the Monitoring and Reporting Plan to assess key water quality parameters in dry and wet weather runoff entering three stormwater detention basins within the city. Monitoring includes summer dry weather, winter dry weather, and wet weather monitoring of flow into and out of the basins. Samples are collected and field-measured for various parameters and samples are collected for laboratory analyses of multiple constituents. Instrumentation is installed at key locations within the storm drain conveyance system to measure discharge flows. Mr. Burton performs field monitoring and provides regulatory compliance oversight of project operations. City of Redondo Beach Seaside Lagoon Water Quality Monitoring. Project Manager for water quality monitoring and sampling at the Seaside Lagoon public recreational center in Redondo Beach, CA. The City of Redondo Beach operates the 1.5‑million‑gallon Seaside Lagoon that is a fully enclosed public saltwater lagoon for recreational swimming with water slides and picnic areas. Water is pumped from the adjacent King Harbor and into the lagoon where it is chlorinated for public protection. The lagoon is regulated under an existing NPDES permit which requires rigorous water quality sampling and reporting. EcoKai performs all NPDES permit‑ required water sampling and analyses during the Seaside Lagoon’s Regular Season monitoring period from Memorial Day through Labor Day. EcoKai measures chlorine levels in the discharge and collects samples for laboratory analyses of bacteria and other pollutant constituents. Mr. Burton provides quality control oversight and compliance management for the project. Role: Independent Technical Reviewer and EcoKai Project Director Classification: Principal Environmental Engineer Specialties: Water Quality Sampling Stormwater Monitoring Education: BS, Civil Engineering, University of California, Irvine, California, 1989 Environmental Engineering, University of Southern California, 1994 Professional Registration: Professional Civil Engineer, California, No. 53976 Qualified SWPPP Developer/ Practitioner, CA, No. 23633 Jim Burton, PE, QSD/P Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 19GEOSYNTEC | CAREER SUMMARY Mr. Curtis Fang, PE, PMP, QSD, QISP is a professional civil engineer with 11 years of experience in stormwater management, watershed planning, and computer modeling. Mr. Fang’s project experience includes watershed management program development, stormwater BMP design, surface water modeling, and stormwater BMP monitoring., with an emphasis on helping clients in municipal, transportation and real estate sectors to develop. Mr. Fang has a thorough understanding of regulatory water quality drivers in Los Angeles Region, including Total Maximum Daily Loads (TMDLs), Basin Plan Objectives, California Toxic Rules, and Phase I and II MS4 Permits. Based on such understanding, he has led or contributed to the development of watershed management monitoring programs in Santa Monica Bay and Dominguez Channel watersheds. RELEVANT PROJECT EXPERIENCE South Bay Beach Cities Coordinated Integrated Monitoring Program (CIMP), Beach Cities Watershed Management Group, Redondo Beach. CA. Task lead and deputy project manager for the Beach Cities CIMP implementation since 2015. Project work included TMDL interpolation, permitting, stormwater and dry weather sampling coordination, exceedance analysis, annual monitoring report preparation, and coordination with Los Angeles Water Resources Control Board staff. Additional responsibility includes updating the CIMP to meet requirements outlined in the Los Angeles Regional MS4 Permit. Palos Verdes Peninsula CIMP, Peninsula Watershed Management Group, Ranchos Palos Verdes, California. Technical advisor to support the CIMP implementation since 2018. Project work included monitoring data reporting and exceedance analysis QA/QC, data visualization, and annual monitoring report preparation, and CIMP update. Torrance Basin Expansion Project Post-Construction Monitoring, City of Torrance, Torrance, CA. Project director overseeing the post‑construction monitoring program for the Amie, Entradero and Henrietta Basin Expansion Projects. Primary responsibilities include schedule tracking, sampling coordination, work plan development, and data QA/QC. Proposition O Project Optimization Phase 2, Los Angeles Sanitation, Los Angeles CA. Technical Lead for two Proposition O stormwater management projects in City of Los Angeles. Primary responsibilities include performing field reconnaissance to characterize existing project condition, quantifying pollutant load reduction using flow monitoring, dry‑weather and wet‑weather water quality sampling data, and preparing technical report summarizing the project optimization needs. Los Angeles River Real-time Monitoring, Arts District Community Council, Los Angeles, CA. Data analyst for the real-time flow monitoring system covering the Los Angeles River watershed. The project intends to correlate real-time flow monitoring data with additional flow and rain gauge data provided by public agencies (Los Angeles County Department of Public Works, United States Geologic Services) and establish an early warning system for the Los Angeles River bike trail access restriction. Primary responsibilities include preparing monitoring network figures to help identify feasible installation locations of Opti-RTC flow meters, QA/QC’ing and post-processing received flow and rain gauge data, and visualizing post-processed monitoring data through automated Python scripts. County of San Diego Dry Weather Microbial Source Tracking Study, County of San Diego Department of Public Works, County of San Diego, CA. GIS lead for developing digital survey form for field sampling team. Role: Data Assessment and Reporting Lead Classification: Senior Engineer Specialties: Watershed Planning Permitting and Regulatory Support Stormwater Modeling Data Management and Visualization Education: MS, Civil ‑ Environmental Engineering, University of Illinois at Urbana‑Champaign, Urbana, IL, 2014 BS, Environmental Engineering, University of Waterloo, Waterloo, ON. Canada, 2013 Professional Registration: Professional Civil Engineer, California, No. C86731 Project Management Professional, Project Management Institute, No. 3959373 Curtis Fang, PE, PMP, QSD, QISP Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 20GEOSYNTEC | Role: Sample Collection Lead and EcoKai Project Manager Classification: Principal Environmental Scientist Specialties: Water Quality Sampling Stormwater Monitoring Education: PhD, Environmental Science & Engineering, University of California, Los Angeles, California MS, Civil & Environmental Engineering, University of California, Los Angeles, California BS, Biology, University of Iowa Professional Registration: Professional Civil Engineer, California, No. 53976 Certified Stormwater QSP/QSD, No. 23633 Todd M. Bear, D.Env. CAREER SUMMARY Dr. Todd M. Bear, D.Env., is a principal environmental scientist with more than 25 years of experience in water quality monitoring, stormwater compliance, and environmental investigations throughout Southern California. His expertise includes MS4 and CIMP monitoring programs, NPDES‑regulated facilities, receiving water and outfall sampling, field instrumentation, and laboratory coordination. Dr. Bear has served in technical leadership roles for municipal stormwater and TMDL monitoring programs, providing oversight of field operations, data analysis, and quality assurance/quality control. He brings extensive experience gained from both consulting and regulatory‑driven monitoring programs to support defensible compliance and reporting outcomes. RELEVANT PROJECT EXPERIENCE MS4 Stormwater Monitoring, Beach Cities and Palos Verdes Peninsula Watershed Management Groups. Senior environmental scientist on a team performing stormwater monitoring and sampling for both the Beach Cities and Palos Verdes Peninsula watershed management groups in accordance with the Los Angeles County Municipal Separate Storm Sewer System (MS4) Permit mandated by the Federal Clean Water Act §402. The BCWMG includes the southern California coastal cities of Manhattan Beach, Hermosa Beach, Redondo Beach, and Torrance. The PVPWMG consists of the cities of Rancho Palos Verdes, Palos Verdes Estates, and Rolling Hills Estates. Responsibilities include installation and maintenance of hydrological flow monitoring equipment within storm drains, calculating storm flow volumes, collecting stormwater samples from multiple outfall and receiving water locations during qualifying rain events, performing TMDL wet and dry weather monitoring, collecting dry weather flow samples, coordinating field crews and laboratory analyses for various water quality constituents, performing non‑ stormwater flow source analyses, and conducting laboratory analytical data review and QA/QC. The objective of the monitoring is to ensure that stormwater discharges from the Beach Cities and Palos Verdes Peninsula do not cause or contribute to the exceedance of water quality standards. City of Torrance Stormwater Basin Water Quality Monitoring Program. Lead environmental scientist for the implementation of the Monitoring and Reporting Plan to assess key water quality parameters in dry and wet weather runoff entering three stormwater detention basins within the city. Monitoring includes summer dry weather, winter dry weather, and wet weather monitoring of flow into and out of the basins. Samples are collected and field-measured for various parameters and samples are collected for laboratory analyses of multiple constituents. Instrumentation is installed at key locations within the storm drain conveyance system to measure discharge flows. Dr. Bear coordinates and directs all field operations, laboratory coordination, and participates in monitoring events. City of Redondo Beach Seaside Lagoon Water Quality Monitoring. Lead environmental scientist for water quality monitoring and sampling at the Seaside Lagoon public recreational center in Redondo Beach, CA. The City of Redondo Beach operates the 1.5‑million‑gallon Seaside Lagoon that is a fully enclosed public saltwater lagoon for recreational swimming with water slides and picnic areas. Water is pumped from the adjacent King Harbor and into the lagoon where it is chlorinated for public protection. The lagoon is regulated under an existing NPDES permit which requires rigorous water quality sampling and reporting. EcoKai performs all NPDES permit-required water sampling and analyses during the Seaside Lagoon’s Regular Season monitoring period from Memorial Day through Labor Day. EcoKai measures chlorine levels in the discharge and collects samples for laboratory analyses of bacteria and other pollutant constituents. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 21GEOSYNTEC | Reference Projects Palos Verdes Peninsula RAA and CIMP | Palos Verdes Peninsula, California Project Description The 2012 Los Angeles MS4 Permit allows phased compliance with receiving water limitations (RWLs) and water quality-based effluent limits (WQBELs), enabling the development of Enhanced Watershed Management Programs (EWMPs). The Palos Verdes Peninsula Watershed Management Group (Peninsula WMG)— comprised of the County of Los Angeles, Los Angeles County Flood Control District, and the Cities of Palos Verdes Estates, Rancho Palos Verdes, Rolling Hills, and Rolling Hills Estates—developed an EWMP and a Coordinated Integrated Monitoring Program (CIMP) to document stormwater controls, fulfill MS4 monitoring requirements, and demonstrate compliance with applicable water quality standards. Geosyntec’s Scope of Services To support MS4 monitoring and reporting, Geosyntec developed and has implemented the Peninsula CIMP since 2021, providing nearshore receiving water, stormwater and non-stormwater outfall monitoring; coordination of field logistics and screening; data management; compliance analysis and reporting; and adaptive management strategies. The CIMP integrates TMDL and non‑TMDL requirements into a single, efficient monitoring framework and serves as a durable tool for ongoing and future compliance demonstrations. Geosyntec also developed a practical, fundable pathway to permit compliance through the Peninsula EWMP, including preparation of the Reasonable Assurance Analysis using monitoring data, program inventories, and numerical modeling with the permit‑approved SBPAT tool. The EWMP prioritizes water-quality drivers, translates complex regulatory requirements into implementable strategies, and provides a roadmap of structural and non‑structural BMPs that deliver measurable water‑quality improvements while advancing co-benefits such as flood risk reduction, water supply opportunities, recreation, and habitat enhancement. Following the 2020 LA MS4 Permit reissuance, Geosyntec updated the Peninsula CIMP to reflect new monitoring requirements, revised locations and parameters, and current TMDL and Clean Water Act listings, ensuring the program continues to generate decision‑grade data. Both the EWMP and CIMP were approved by the Los Angeles Regional Water Quality Control Board, enabling streamlined monitoring requirements and defensible compliance demonstrations for the Peninsula WMG. Notable Accomplishments Upon completion, both the EWMP and CIMP were submitted to and approved by the Los Angeles Regional Water Quality Control Board. Geosyntec’s expertise in CIMP and EWMP planning and implementation allowed for the careful curation of an efficient and effective compliance pathway for the PVP WMG. The revised Peninsula CIMP was approved by the Los Angeles Regional Water Quality Control Board, thereby allowing streamlined monitoring requirements through effective compliance demonstrations and reasonable assurance analyses. Client: John L. Hunter and Associates, City of Rancho Palos Verdes Contact: Vanessa Hevener, Project Manager310.544.5333, vhevener@rpvca.gov Project Dates: 2013 ‑ current Key Staff: Avery Blackwell (Project Manager), Chris Wessel (Project Director), Brandon Steets (Senior Advisor), Lauren Godinez (Assistant Project Manager), Curtis Fang (Technical Lead), Kim Goins (Technical Support), Erica Dale (Technical Support), Jim Burton (Technical Reviewer), Todd Bear and Carlos Carreon (Sample Collection) Relevant Services: • Surface Water Control Modeling and Analysis • Wet Weather and Dry Weather Compliance Monitoring • Data Assessment and Reporting • Non‑stormwater Discharge Tracking and Reporting • Identification and Development of Conceptual Stormwater Projects • Strategic Planning • Outreach, Stakeholder ParticipationSanta Monica Bay near Compliance Monitoring Location SMB‑7‑1 The following project descriptions highlight several of our Los Angeles area projects with a similar scope of services performed by the project team within the past three years. Each project description identifies the client contact, the specific responsibilities of each team member and the services provided. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 22GEOSYNTEC | Santa Monica Bay Beach Cities MS4 Permit Support | Santa Monica Bay Beaches, California Project Description The 2012 Los Angeles MS4 Permit includes provisions that allow flexibility to achieve compliance with receiving water limitations (RWLs) and water quality based effluent limits (WQBELs) over time, which allowed for the development of Enhanced Watershed Management Programs (EWMPs) in the region. The Santa Monica Bay Beach Cities Watershed Management Group (Beach Cities WMG), which includes the cities of Hermosa Beach, Manhattan Beach, Redondo Beach, and Torrance, was formed to develop an EWMP to summarize stormwater controls and ultimately demonstrate compliance with applicable water quality standards. The group also developed a Coordinated Integrated Monitoring Program to fulfill the monitoring plan requirements of the MS4 Permit. Geosyntec’s Scope of Services Geosyntec supported development and implementation of the EWMP and CIMP through preparation of a comprehensive Work Plan that identified water quality priorities, summarized existing and potential structural and non‑structural BMPs, developed a Reasonable Assurance Analysis (RAA) approach, and applied Permit‑approved numerical models, including SBPAT (developed by Geosyntec) and LSPC, based on monitoring data analysis and an inventory of current practices, culminating in an EWMP approved by the Regional Board. The EWMP prioritizes water quality issues and identifies implementation strategies and BMPs that meet applicable standards, integrate monitoring, support stakeholder input, and advance multi-benefit regional projects that improve water quality while also providing flood protection, water supply, recreation, and habitat enhancement. In parallel, Geosyntec developed a CIMP to meet MS4 Permit monitoring objectives without imposing unnecessary burden on the Beach Cities, addressing both TMDL and non‑TMDL requirements within the EWMP area, including receiving water, stormwater and non‑stormwater outfall monitoring, new and redevelopment effectiveness tracking, and regional studies, as well as data management, reporting, and adaptive management procedures. Geosyntec currently manages nearshore receiving water, stormwater outfall, and non‑stormwater outfall monitoring in accordance with strict EPA protocols, conducts outfall field screening and source investigations, and has developed a robust, transferable data analysis and reporting tool to support ongoing and future monitoring programs. Notable Accomplishments Geosyntec led Regional Board approval of the Beach Cities EWMP, delivering a defensible, data‑driven approach to MS4 compliance that integrates prioritized BMPs across four cities and is supported by a streamlined monitoring program meeting both TMDL and non‑TMDL requirements. Client: City of Manhattan Beach Contact: Geraldine Trivedi, Geraldine. Trivedi@redondo.org Project Dates: 2015 ‑ current Key Staff: Chris Wessel (Project Manager), Brandon Steets (Senior Advisor), Curtis Fang (Assistant Project Manager), Avery Blackwell (Technical Staff) Kimberly Goins (Technical Staff), Lauren Godinez (Technical Staff), Todd M. Bear (Sample Lead), Jim Burton (Sample Lead) Relevant Services: • Health and safety coordination • Wet weather and dry weather compliance monitoring • Modifying approved Beach Cities CIMP • Data assessment and reporting • Project management • Non‑stormwater discharge tracking and reporting Manhattan Beach Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 23GEOSYNTEC | Stormwater Basins Expansion Project Post-Construction Monitoring | Torrance California Project Description Completed in November 2023, the Stormwater Basins Expansion Project retrofitted the Amie, Henrietta, and Entradero flood control basins to improve stormwater quality, increase water supply benefits, and enhance community amenities. Project improvements include constructed wetlands, enhanced infiltration through dry wells, and public facing features such as walking trails and educational elements. Funded by the Los Angeles County Safe, Clean Water Program, the project is subject to post construction monitoring requirements to quantify achieved water quality improvements, runoff volume reductions, and water supply benefits, as well as to verify the elimination of dry weather discharges to Santa Monica Bay. Geosyntec serves as the prime consultant responsible for implementing the three year post construction monitoring program. Services include overall program management; health and safety coordination; permitting support; installation and oversight of continuous flow monitoring systems at the Henrietta and Entradero Basins; development of monitoring and modeling methodologies; and preparation of annual monitoring reports. The monitoring program includes two wet weather and four dry weather sampling events per year at each of the three basins. Geosyntec also develops a pollutant loading and runoff volume model to quantify pre and post project conditions, assess pollutant load and volume reductions, and estimate cumulative water quality and water supply benefits achieved by the basin retrofits. Water quality data are managed and submitted electronically to the CEDEN in accordance with program requirements. The first year of post construction monitoring has been successfully completed. EcoKai provides field implementation support for the monitoring program, delivering comprehensive, field based stormwater data collection services. This includes continuous flow measurement using telemetry enabled instrumentation, collection of field water quality parameters, and coordination of laboratory sampling and analysis during both wet and dry weather conditions. Field teams conduct storm event response, perform equipment maintenance, and complete routine quality assurance and operational checks to ensure data reliability and continuity. Continuous flow data, combined with discrete sampling results and field observations, are used to evaluate inflow and outflow conditions, quantify pollutant load reductions, and confirm elimination of dry weather discharges to Santa Monica Bay. Together, the monitoring team provides an integrated assessment of stormwater basin performance and long term project effectiveness. Results are used to document Safe, Clean Water Program compliance, support adaptive management, and inform future stormwater planning and infrastructure improvements for the City of Torrance. Client: City of Torrance Public Works Department Contact: Joshua Soliz, Engineering Manager, 310.781.6900, jsoliz@torranceCA.gov Project Dates: 2025 ‑ current Key Staff: Kimberly Goins (Project Manager), Curtis Fang (Project Director), Todd Bear (Ecokai), Jim Burton (Ecokai) Relevant Services: • Permitting • Wet and dry weather monitoring • Pollutant loading modeling Henrietta Basin Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 24GEOSYNTEC | Palos Verdes Peninsula SMBBB Monitoring | Palos Verdes Peninsula, California Project Description Under the SMBBB TMDL Coordinated Shoreline Monitoring Program (CSMP) and approved Peninsula Cities Coordinated Integrated Monitoring Program (CIMP), weekly sampling is required at five shoreline locations (SMB 7-1 through SMB 7‑5) for total coliform, fecal coliform, and enterococcus. Since 2018, the City of Rancho Palos Verdes, on behalf of the Peninsula Cities Watershed Management Group, has contracted with Geosyntec to manage these compliance monitoring activities, including project management, health and safety planning, weekly and accelerated sampling, laboratory coordination, QA/QC, and data reporting. Working in partnership with Michelson Laboratories, Geosyntec conducts field sampling and laboratory analyses, provides weekly monitoring summaries, performs accelerated monitoring when exceedances occur, and prepares semi-annual CEQA-formatted reports to meet the requirements of the SMBBB TMDL, CIMP, and MS4 Permit. Client: City of Rancho Palos Verdes Contact: Vanessa Hevener, Project Manager 310.544.5333, vhevener@rpvca.gov Project Dates: 2018 ‑ current Key Staff: Chris Wessel (Project Director); Curtis Fang (Project Manager), Kimberly Goins (Technical Staff), Jim Burton (Technical Reviewer), Todd Bear and Carlos Carreon (Sample Collection) Relevant Services: • Compliance monitoring • MS4 Permit and CEQA Reporting • Sample and Lab Coordination • Project Management Open beach sampling area for SMB‑7‑2 Sediment Amendment Testing Program | Los Angeles Harbor, California Project Description Geosyntec serves as a subconsultant to PI Environmental on an as needed contract supporting the Port’s Water Quality Group within EMD. Under this contract, Geosyntec has conducted bench‑scale treatability testing and feasibility analyses for sediment remediation alternatives in Fish Harbor, including enhanced natural recovery with amendments, and developed a field-scale mesocosm study for future in situ testing. Geosyntec also created a secure, web-based GIS platform that allows EMD staff to visualize, analyze, and manage environmental data for mapping, analysis, and reporting, with the ability to expand access to historical soil and groundwater records. Ongoing work includes supporting Water Quality, Real Estate, and Legal staff in delineating remediation responsibility areas within Fish Harbor. Client: Port of Los Angeles Contact: Kat Prickett 310.732.3951 Project Dates: 2019 ‑ current Key Staff: Wendy Hovel (Project Manager) Relevant Services: • Sediment Analysis • Post‑Fire Analysis Sediment Amendments Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 25GEOSYNTEC | Port of Los Angeles Web Data Tools | Los Angeles Harbor, California Project Description For more than two decades, the Port of Los Angeles (POLA) has collected extensive environmental monitoring data under its Harbor Toxics TMDL strategic and compliance programs, including sediment, stormwater, surface water, and tissue chemistry data, which were historically stored across legacy databases and disparate electronic files. To improve accessibility and usability, Geosyntec designed and developed a secure, web‑based GIS platform that consolidates these datasets into a centralized, geospatial framework, enabling POLA scientists and project managers to efficiently visualize, analyze, query, and export environmental data alongside geographic features. The customized system integrates laboratory data deliverables with GPS‑based mobile data collection tools, supports regulatory reporting and long‑term monitoring, and streamlines environmental review workflows; due to its success, POLA retained Geosyntec to further expand the platform to include biosurvey data. Client: Port of Los Angeles Contact: Kat Prickett 310.732.3951 Project Dates: 2020 ‑ current Key Staff: Wendy Hovel (Project Manager) Relevant Services: • Data management of TMDL parameters in Port of Los Angeles • Data visualization using ArcGIS Sediment Copper Concentrations by Magnitude of TMDL Numeric Target Exceedances LASAN Dry and Wet Weather Monitoring | Los Angeles, California Project Description As a subconsultant to Larry Walker Associates, Geosyntec has provided the City of Los Angeles Bureau of Sanitation & Environment with as‑needed support for CIMPs, TMDLs, and the Safe Clean Water Program. In coordination with LWA, Geosyntec helped design and implement a bacteria Pilot Study to evaluate improved methods for assessing recreational health risks affecting the City’s stormwater program and Water Reclamation Plants within the LA River and Santa Monica Bay watersheds. Geosyntec conducted desktop and field investigations to map MS4 drainage networks and potential human waste sources at four priority outfalls to Segment E of the LA River, including assessing sewer proximity, potential exfiltration or illicit connections, and in-network flows using field observations, CCTV, and human fecal markers. Findings were communicated in real time to support active mitigation, and the ongoing study continues to advance a risk‑based, data-driven approach to reducing fecal contamination, improving water quality, and reinforcing LASAN’s regional technical leadership. Client: City of Los Angeles Bureau of Sanitation and Environment Contact: Jon Ball 323.342.1557, jon.ball@lacity.org Project Dates: 2023 ‑ 2025 Key Staff: Brandon Steets (Project Manager), Lauren Godinez (Assistant Project Manager) Relevant Services: • Bacteria TMDL Compliance Support • Microbial Source Tracking • Use of Advanced Forensic Tools • CCTV and Dye Testing • Source Management and Abatement Recommendations Outfall Investigated on the Upper Los Angeles River Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 26GEOSYNTEC | Geologic and Geotechnical Characterization of Groundwater Seepage | City of Palos Verdes Estates, California Project Description Geosyntec evaluated ongoing groundwater seepage in the Malaga Cove area of Palos Verdes Estates, where intrusion has continued to impact infrastructure despite earlier mitigation efforts such as dewatering systems and subdrains. The work focused on defining geologic and geotechnical controls on seepage, supported by hydrogeologic evaluation. The team reviewed historical and publicly available data to develop a conceptual site model describing subsurface materials, structural features, and groundwater behavior. Geophysical methods, including high‑resolution electrical resistivity surveys, were used to image subsurface conditions and refine interpretation of faulting, stratigraphy, and groundwater pathways. The results indicate that fault‑controlled features and groundwater upwelling on both sides of a fault block are primary drivers of seepage near Malaga Cove Plaza and City Hall. Based on this integrated understanding, Geosyntec developed targeted mitigation concepts, including horizontal wells and subdrain systems designed to intercept groundwater at depth and reduce impacts on existing infrastructure. Client: City of Palos Verdes Estates Contact: Kerry Kallman, City Manager 310.378.0383 citymanager@pvestates.org Project Dates: 2024 ‑ current Key Staff: James Gonzales Relevant Services: • Groundwater Seepage Assessment • Geophysical Survey and Analysis • Historical Land Use Evaluation • Geotechnical Investigation and Analysis • Hydrogeology Assessment • Mitigation Planning and RecommendationsResistivity Line Seaside Lagoon – City of Redondo Beach | Redondo Beach, California Project Description The Seaside Lagoon is a constructed, public, flow-through saltwater lagoon located along the Redondo Beach waterfront near King Harbor and operates under oversight by the Los Angeles Regional Water Quality Control Board. Originally built in the 1960s, the approximately 1.5-million-gallon lagoon draws ocean water from the harbor, which is chlorinated prior to circulation and dechlorinated before discharge to create a safe, calm swimming environment. Since 2024, EcoKai has provided compliance water-quality monitoring for the City, including three-times-per-week field monitoring of key water-quality parameters, chlorine residuals, and influent and effluent sampling for laboratory analysis, including bacteriological constituents. Monitoring results are directly linked to lagoon operations and are used to guide real‑time adjustments to treatment processes, ensuring protection of public health and compliance with harbor receiving water quality objectives. Client: City of Redondo Beach Contact: Geraldine Trivedi; 310.697.3195; Geraldine.Trivedi@redondo.org Project Dates: 2024 ‑ current Key Staff: Todd Bear, Jim Burton Relevant Services: • Water quality monitoring • Field parameter measurements • Water quality sampling and analysis Seaside Lagoon at King Harbor Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 27GEOSYNTEC | J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J 1.1 Project management duties 1.2 Contracting Period Kick-off Meeting 1.3 (assumed attendance for 5 per reporting year (RY)) ✓✓✓ ✓ 2.1 by the date of storms) 3.1 determined by the date of storms) 4.1 determined by the date of storms) ●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●● ✓✓✓✓✓✓✓✓✓ 6.2 monitoring results)✓✓✓✓✓✓✓✓✓ 6.3 monitoring results)✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓ 6.4 Semi‑annual data submission (CEDEN) 6.5 Co-permittee Semi-annual Data Transmission 6.6 Draft Annual Monitoring Report 6.7 Final Annual Monitoring Report 7.1 Draft CIMP Adaptive Management Memo 7.2 Final CIMP Adaptive Management Memo 7.3 Attendance and participation at meetings with the Regional Board 8.1 Project management 8.2 each per RY ✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓ ✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓ ✓✓✓✓✓✓ 9.1 - 9.3 Draft and Final PVP CIMP Update; Attendance and participation at meetings with the Regional ✓ Deliverable ● Planned Monthly Dry Weather Event Task 9 - Optional PVP Cimp Update Not time-dependent. Upon authorization by WMG, Deliverable schedule will be determined by discussions with Geosyntec and WMG, and final approval by WMG. Task 8 - Optional: SMBBB TMDL Monitoring Task 7 - Optional: Annual CIMP Adaptive Management Task 2 - Receiving Water Monitoring Task 3 - Stormwater Outfall Monitoring Task 6 - Monitoring Records Task 1 - Project Management, Communications, and Meetings Task 5 - Stormwater Outfall Flow Monitoring Task 4 - TMDL Outfall Monitoring 2026-27 Reporting Year 2027-28 Reporting Year 2028-29 Reporting YearTask NameSubtask F. PROJECT SCHEDULE Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 28GEOSYNTEC | J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 1.1 Project management duties 1.2 Contracting Period Kick-off Meeting 1.3 (assumed attendance for 5 per reporting year (RY)) ✓✓ ✓ 2.1 3.1 4.1 determined by the date of storms) ●●●●●●●●●●●●●●●●●●●●●●●● ✓✓✓✓✓✓ 6.2 ✓✓✓✓✓✓ 6.3 ✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓ 6.4 Semi‑annual data submission (CEDEN) 6.5 Co-permittee Semi-annual Data Transmission 6.6 Draft Annual Monitoring Report 6.7 Final Annual Monitoring Report 7.1 Draft CIMP Adaptive Management Memo 7.2 Final CIMP Adaptive Management Memo 7.3 Attendance and participation at meetings with the Regional Board 8.1 Project management 8.2 locations each per RY ✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓ ✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓✓ ✓✓✓✓ 9.1 - 9.3 ✓ Deliverable ● Planned Monthly Dry Weather Event Task 8 - Optional: SMBBB TMDL Monitoring Task 9 - Optional Peninsula CIMP Update Not time-dependent. Upon authorization by Peninsula WMG, deliverable schedule will be determined by discussions with Geosyntec and Peninsula WMG, and final approval by Peninsula WMG. Task 2 - Receiving Water Monitoring Task 3 - Stormwater Outfall Monitoring Task 4 - TMDL Outfall Monitoring Task 5 - Stormwater Outfall Flow Monitoring Task 6 - Monitoring Records Task 7 - Optional: Annual CIMP Adaptive Management Task 1 - Project Management, Communications, and Meetings Subtask Task Name Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 29GEOSYNTEC | inputs, methodologies, and results. Peer reviews are conducted by Geosyntec personnel selected by the PM based on qualifications, relevant experience, and/or training. • Senior review is the term that applies to the ongoing review of the entire project by Project Manager Avery Blackwell to confirm that the project scope, schedule, budget, and H&S requirements are achieved, that the project-related guidelines of the QMP are satisfied, and that the project has been performed in accordance with the applicable standard of professional care. • Independent technical review of specific monitoring results, compliance considerations, program recommendations, and other critical components will be performed by Brandon Steets and Wendy Hovel, who are not otherwise involved in day-to-day task execution. G. QUALITY CONTROL PLAN Quality & Client Service Geosyntec maintains a high level of project quality and responsiveness to provide excellent client service. We believe the most important element of client service and quality management lies in prompt, clear, and open communication. We are also strongly committed to staff development and mentoring to ensure our practitioners have the support they need to thrive, deliver in challenging situations, and grow personally. As reflected in the proposed scope of work, we promote knowledge transfer and make our subject-matter experts available to train and update City staff on new technologies, analytical approaches, changing mandates and regulations, and other NPDES‑related information. Quality Management Program (QMP) As part of the firm’s QMP, Geosyntec developed and utilizes a company‑wide intranet tool: Guidance for Systematic Planning of Project Workflow. The Project Workflow guidance provides a roadmap for project planning, quality assurance, financial and schedule management, Health & Safety, field investigations, sampling and analysis, data management, calculations and modeling, engineering design, plans and specifications, and construction bid packages. Monitoring & Reporting Quality Control Workflow We will leverage our time‑tested monitoring and reporting quality‑control procedures that apply to every step of the process, from before the first sample is collected through the automated upload of monitoring results (see Workflow Figure). Lab reports are manually checked to make sure the results are reasonable, and based on our strong relationships with the lab project managers, we are able to quickly bring up any identified issues. We can also consult our in-house lab validation team for a third-party expert opinion on questionable results and recommended actions. Formal work‑product review procedures are important QC measures implemented for all project deliverables. Document review consists of a tiered review process established under formal company procedures. • The peer review process involves the review and checking of data, calculations, analyses, models, studies, and other project activities. Peer reviews are intended to identify and correct errors or mistakes in draft work products and to evaluate the work Sample Team Preparation & Training Sample Collection (Clean Hands – Dirty Hands) Sample Preparation (Bottle Counts, Equipment Prep & Decon, Instrument Calibration, Bottle Labels, etc.) Samples to Laboratory under COC protocol Laboratory report to Geosyntec Field Samples for QA/QC (Field Duplicates & Field Equipment Blanks) Laboratory QA/QC Program (Method Blanks, Matrix Spikes, and Control Samples) Geosyntec QA/QC of Data Automated Database QC • Normalize units, location IDs, analyte names, methods, etc. • Check for duplicates • Verify that values “make sense” (e.g., MDLs < RLs) Automated Data Reporting • Formatted summary tables and figures • Data uploads produced in appropriate format (e.g., CEDEN) Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring 30GEOSYNTEC | H. ACCEPTANCE OF CONDITIONS Geosyntec acceptances the conditions in the Sample Professional Services Agreement (Attachment D) except for the following proposed edits. ARTICLE 1. SERVICES OF CONSULTANT 1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, the Consultant shall provide those services specified in the “Scope of Services”, as stated in the Proposal, attached hereto as Exhibit “A” and incorporated herein by this reference, which may be referred to herein as the “services” or “work” hereunder. As a material inducement to the City entering into this Agreement, Consultant represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the services required under this Agreement in a thorough, competent, and professional manner, and is experienced in performing the work and services contemplated herein. Consultant shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all services described herein. Consultant covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be both of good quality as well as fit for the purpose intended. For purposes of this Agreement, the phrase “highest professional standards” shall mean those standards of practice recognized by one or more first-class firms performing similar work under similar circumstances. Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 ATTACHMENT List of Officers/Directors Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring ivGEOSYNTEC | WRITTEN CONSENT OF THE BOARD OF DIRECTORS OF GEOSYNTEC CONSULTANTS, INC. The undersigned, Board of Directors ("Board") of GEOSYNTEC CONSULTANTS, INC., a Florida corporation (the "Company"), did hereby consent in writing, effective as of January 1, 2026, to the following: Powers and Duties of Officers as Conferred by the Board: WHEREAS, pursuant to the by-laws, the officers of the Company shall consist of a President, Secretary and other such officers, including a Chairman of the Board and one or more Vice Presidents, which are appointed by the Board; WHEREAS, each Chairman of the Board, President, Secretary, Assistant Secretary, Treasurer, Executive Vice President, and Vice President shall have the authority to execute contracts and bind the Company; WHEREAS, on April 21, 2017 the Board adopted a Resolution establishing an additional category of officer referred to as a Practice Officer; NOW, THEREFORE, BE IT RESOLVED, that until the next election of officers, the Board appoints the officers as follows: First Name Last Name Officer Title Peter Zeeb Chair of the Board Majdi Othman Chief Executive Officer and President Susanne Bergquist President, Europe, Middle East and Australia Region Leslie Griffin President, North America East Region, Assistant Secretary Karen Kosiarek President, North America West Region, Assistant Secretary Jennifer Plauche Brown Executive Vice President, Chief Human Resources Officer Evan Cox Executive Vice President, Chief Strategy Officer Jonathan Doros Executive Vice President, Chief Financial Officer Jordan Rattray Executive Vice President, Chief Legal Officer and Corporate Secretary Matthew Bardol Senior Vice President of Operations, North America West Region Christopher Robb Senior Vice President of Operations, North America West Region Kirk Craig Senior Vice President of Business Development, North America West Region Michael Lambert Senior Vice President of Operations, North America East Region Eric Kovich Senior Vice President of Operations, North America East Region Andrew Montgomery Senior Vice President of Business Development, North America East Region Martin Schneider Senior Vice President of Energy and Security Docusign Envelope ID: B5EE4F68-9BCE-4064-8BFB-72BD48525D52 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring vGEOSYNTEC | Melissa Asher Operations Vice President Marlaina Auger Operations Vice President Rudolph Bonaparte Senior Vice President Peter de Haven Operations Vice President Jon Dickinson Senior Vice President and Assistant Secretary Christine Gelles Operations Vice President Cuneyt Gokmen Operations Vice President Anica Haynes Operations Vice President Kurt Herman Operations Vice President Brian Hitchens Operations Vice President Terry Holman Operations Vice President Jen Huha Operations Vice President Todd Kafka Operations Vice President Brent Miller Operations Vice President Brian Petty Operations Vice President Steve Poirier Operations Vice President Rodolfo Sancio Operations Vice President Lisa Van Tassell Operations Vice President Rula Deeb Vice President of Practice Development Jamie Delemos Vice President of Enterprise Program Management and Communications Lucas de Melo Vice President of Business Development Aimee Grossman Vice President of Accounting, Finance and Tax Bryan McFarland Vice President of Information Technology and Affirming Officer Eric Nesbit Vice President of Marketing Bob Poll Vice President of Health, Safety and Environment John Van Benschoten Vice President of Mergers & Acquisitions Mark Ellard Vice President Practice Officers Gary Bazemore Practice Officer (Florida) Renee Bourdeau Practice Officer (New Hampshire) Scott Graves Practice Officer (Ohio) Lisa Hall Practice Officer (California) Tim Mason Practice Officer (Virgin Islands) Derek Morley Practice Officer (California) Adrienne Nemura Practice Officer (Ohio) Ian Richardson Practice Officer (New York) Damian Vanetti Practice Officer (New York) Regan Welch Practice Officer (Ohio) Jessica Yeager Practice Officer (Ohio) Lisa Austin Practice Officer (California) Chris Wessel Practice Officer (California) Chad Bird Practice Officer (California) Scott Forbess Practice Officer (California) Ron Johnson Practice Officer (California Geotechnical) Mike Rudd Practice Officer (California) Docusign Envelope ID: B5EE4F68-9BCE-4064-8BFB-72BD48525D52 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Palos Verdes Peninsula Coordinated Integrated Monitoring Program Implementation Services: Receiving and Outfall Monitoring viGEOSYNTEC | Richard Gonzalez Practice Officer (California) Mark Hanna Practice Officer (California) Amer Hussain Practice Office (California) IN WITNESS WHEREOF, the undersigned Board of Directors have caused this consent action to be signed effective January 1, 2026. By: By: Mitchell Nimocks, Director Peter Zeeb, Chairman of the Board Docusign Envelope ID: B5EE4F68-9BCE-4064-8BFB-72BD48525D52 Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Find more information at Geosyntec.com Docusign Envelope ID: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Certificate Of Completion Envelope Id: A9F2E647-D0C4-89F8-818B-90D8D86CC282 Status: Completed Subject: Complete with Docusign: 2026 Geosysntec PSA_ 20260720.pdf Source Envelope: Document Pages: 80 Signatures: 5 Envelope Originator: Certificate Pages: 5 Initials: 2 Vanessa Hevener AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 vhevener@rpvca.gov IP Address: 72.34.97.146 Record Tracking Status: Original 8/5/2026 10:25:04 AM Holder: Vanessa Hevener vhevener@rpvca.gov Location: DocuSign Signer Events Signature Timestamp Christopher Wessel cwessel@geosyntec.com Sr. Principal, Senior Service Director Geosyntec Consultants Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 99.37.212.50 Sent: 8/5/2026 10:34:59 AM Viewed: 8/5/2026 10:56:01 AM Signed: 8/5/2026 10:56:21 AM Electronic Record and Signature Disclosure: Accepted: 8/5/2026 10:56:01 AM ID: 179f6e66-444b-4d2f-bbf7-6f548f37dafa Brian Petty bpetty@geosyntec.com Vice President Geosyntec Consultants, Inc. Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 174.195.198.73 Sent: 8/5/2026 10:56:26 AM Viewed: 8/5/2026 3:15:43 PM Signed: 8/5/2026 3:17:29 PM Electronic Record and Signature Disclosure: Accepted: 8/5/2026 3:15:43 PM ID: ab88e9db-c2d0-49dc-9061-8485761272cd William Wynder wwynder@awattorneys.com City Attorney City Attorney Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 13.88.155.124 Sent: 8/5/2026 3:17:34 PM Viewed: 8/6/2026 8:53:18 AM Signed: 8/6/2026 8:53:30 AM Electronic Record and Signature Disclosure: Accepted: 8/6/2026 8:53:18 AM ID: 5ab8fc4a-01ff-41c5-87e6-2a1c20dd3bbd Paul Seo paul.seo@rpvca.gov Mayor of RPV Security Level: Email, Account Authentication (None)Signature Adoption: Drawn on Device Using IP Address: 47.141.5.147 Signed using mobile Sent: 8/6/2026 8:53:34 AM Viewed: 8/6/2026 7:00:21 PM Signed: 8/6/2026 7:00:27 PM Electronic Record and Signature Disclosure: Accepted: 12/17/2025 3:23:57 PM ID: 0771065e-75e8-4062-b23e-0088408f91e0 Signer Events Signature Timestamp Teresa Takaoka TeriT@rpvca.gov City Clerk Security Level: Email, Account Authentication (None)Signature Adoption: Drawn on Device Using IP Address: 72.34.97.146 Sent: 8/6/2026 7:00:32 PM Viewed: 8/7/2026 8:35:35 AM Signed: 8/7/2026 8:35:58 AM Electronic Record and Signature Disclosure: Accepted: 8/7/2026 8:35:35 AM ID: bc4a39dc-4074-4f57-aae6-05858268c010 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Vanessa Hevener vhevener@rpvca.gov Project Manager City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Sent: 8/7/2026 8:36:02 AM Electronic Record and Signature Disclosure: Not Offered via Docusign City Clerk CityClerk@rpvca.gov Security Level: Email, Account Authentication (None) Sent: 8/7/2026 8:36:03 AM Electronic Record and Signature Disclosure: Accepted: 11/10/2025 8:10:54 AM ID: dcbfc65a-fde1-40b9-af46-8afb606fa9bc Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 8/5/2026 10:34:59 AM Certified Delivered Security Checked 8/7/2026 8:35:35 AM Signing Complete Security Checked 8/7/2026 8:35:58 AM Completed Security Checked 8/7/2026 8:36:03 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Rancho Palos Verdes (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronicall y through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made av ailable electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/15/2021 5:55:39 PM Parties agreed to: Christopher Wessel, Brian Petty, William Wynder, Paul Seo, Teresa Takaoka, City Clerk Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Rancho Palos Verdes: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: terit@rpvca.gov To advise City of Rancho Palos Verdes of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at terit@rpvca.gov and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from City of Rancho Palos Verdes To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to terit@rpvca.gov and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Rancho Palos Verdes To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to terit@rpvca.gov and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:  You can access and read this Electronic Record and Signature Disclosure; and  You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and  Until or unless you notify City of Rancho Palos Verdes as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Rancho Palos Verdes during the course of your relationship with City of Rancho Palos Verdes.