Paul Hansen Engineering LLC - FY2027-00901203.0023 2151924.2 1 PROFESSIONAL SERVICES AGREEMENT By and Between CITY OF RANCHO PALOS VERDES and Paul Hansen Engineering, LLC for Project and Construction Management, Inspection, Cost Estimating, and Related Services for the Portuguese Bend Landslide Emergency Response Program Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF RANCHO PALOS VERDES AND PAUL HANSEN ENGINEERING, LLC THIS AGREEMENT FOR PROFESSIONAL SERVICES (“Agreement”) is made and entered into on July 1, 2026 by and between the CITY OF RANCHO PALOS VERDES , a California municipal corporation (“City”) and PAUL HANSEN ENGINEERING, a Limited Liability Company] (“Consultant”). City and Consultant may be referred to, individually or collectively, as “Party” or “Parties.” RECITALS A. City has sought, by issuance of a Request for Proposals, the performance of the services defined and described particularly in Article 1 of this Agreement. B. Consultant, following submission of a proposal for the performance of the services defined and described particularly in Article 1 of this Agreement, was selected by the City to perform those services. C. Pursuant to the City of Rancho Palos Verdes Municipal Code, City has authority to enter into and execute this Agreement. D. The Parties desire to formalize the selection of Consultant for performance of those services defined and described particularly in Article 1 of this Agreement and desire that the terms of that performance be as particularly defined and described herein. OPERATIVE PROVISIONS NOW, THEREFORE, in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows: ARTICLE 1. SERVICES OF CONSULTANT 1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, the Consultant shall provide those services specified in the “Scope of Services”, as stated in the Proposal, attached hereto as Exhibit “A” and incorporated herein by this reference, which may be referred to herein as the “services” or “work” hereunder. As a material inducement to the City entering into this Agreement, Consultant represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the services required under this Agreement in a thorough, competent, and professional manner, and is experienced in performing the work and services contemplated herein. Consultant shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all services described herein. Consultant covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be both of good quality as well as fit for the purpose Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 2 intended. For purposes of this Agreement, the phrase “highest professional standards” shall mean those standards of practice recognized by one or more first-class firms performing similar work under similar circumstances. 1.2 Consultant’s Proposal. The Scope of Service shall include the Consultant’s Proposal which shall be incorporated herein by this reference as though fully set forth herein. In the event of any inconsistency between the terms of such Proposal and this Agreement, the terms of this Agreement shall govern. 1.3 Compliance with Law. Consultant shall keep itself informed concerning, and shall render all services hereunder in accordance with, all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental entity having jurisdiction in effect at the time service is rendered. 1.4 California Labor Law. If the Scope of Services includes any “public work” or “maintenance work,” as those terms are defined in California Labor Code section 1720 et seq. and California Code of Regulations, Title 8, Section 16000 et seq., and if the total compensation is $1,000 or more, Consultant shall pay prevailing wages for such work and comply with the requirements in California Labor Code section 1770 et seq. and 1810 et seq., and all other applicable laws, including the following requirements: (a) Public Work. The Parties acknowledge that some or all of the work to be performed under this Agreement is a “public work” as defined in Labor Code Section 1720 and that this Agreement is therefore subject to the requirements of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works contracts and the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. The work performed under this Agreement is subject to compliance monitoring and enforcement by the DIR. Consultant shall post job site notices, as prescribed by regulation. (b) Prevailing Wages. Consultant shall pay prevailing wages to the extent required by Labor Code Section 1771. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are on file at City Hall and will be made available to any interested party on request. By initiating any work under this Agreement, Consultant acknowledges receipt of a copy of the DIR determination of the prevailing rate of per diem wages, and Consultant shall post a copy of the same at each job site where work is performed under this Agreement. (c) Penalty for Failure to Pay Prevailing Wages. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 3 Consultant shall, as a penalty to the City, forfeit $200 (two hundred dollars) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subcontractor. (d) Payroll Records. Consultant shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Consultant and each subconsultant to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform the City of the location of the records. (e) Apprentices. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777.6, and 1777.7 and California Code of Regulations Title 8, Section 200 et seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within 60 (sixty) days after concluding work pursuant to this Agreement, Consultant and each of its subconsultants shall submit to the City a verified statement of the journeyman and apprentice hours performed under this Agreement. (f) Eight-Hour Work Day. Consultant acknowledges that 8 (eight) hours labor constitutes a legal day's work. Consultant shall comply with and be bound by Labor Code Section 1810. (g) Penalties for Excess Hours. Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Consultant shall, as a penalty to the City, forfeit $25 (twenty five dollars for each worker employed in the performance of this Agreement by the Consultant or by any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 (eight) hours in any one calendar day and 40 (forty) hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Consultant in excess of 8 (eight) hours per day, and 40 (forty) hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than one and 1½ (one and one half) times the basic rate of pay. (h) Workers’ Compensation. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees if it has employees. In accordance with the provisions of California Labor Code Section 1861, Consultant certifies as follows: “I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.” Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 4 Consultant’s Authorized Initials ________ (i) Consultant’s Responsibility for Subcontractors. For every subcontractor who will perform work under this Agreement, Consultant shall be responsible for such subcontractor's compliance with Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, and shall make such compliance a requirement in any contract with any subcontractor for work under this Agreement. Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subcontractor's compliance, including without limitation, conducting a review of the certified payroll records of the subcontractor on a periodic basis or upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages. Consultant shall diligently take corrective action to halt or rectify any such failure by any subcontractor. 1.5 Licenses, Permits, Fees and Assessments. Consultant shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by law for the performance of the services required by this Agreement. Consultant shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Consultant’s performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City, its officers, employees or agents of City, against any such fees, assessments, taxes, penalties or interest levied, assessed or imposed against City hereunder. 1.6 Familiarity with Work. By executing this Agreement, Consultant warrants that Consultant (i) has thoroughly investigated and considered the scope of services to be performed, (ii) has carefully considered how the services should be performed, and (iii) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. If the services involve work upon any site, Consultant warrants that Consultant has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder. Should the Consultant discover any latent or unknown conditions, which will materially affect the performance of the services hereunder, Consultant shall immediately inform the City of such fact and shall not proceed except at Consultant’s risk until written instructions are received from the Contract Officer in the form of a Change Order. 1.7 Care of Work. The Consultant shall adopt reasonable methods during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as may be caused by City’s own negligence. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 5 1.8 Further Responsibilities of Parties. Both parties agree to use reasonable care and diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all instruments, prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of this Agreement. Unless hereafter specified, neither party shall be responsible for the service of the other. 1.9 Additional Services City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Services or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written Change Order is first given by the Contract Officer to the Consultant, incorporating therein any adjustment in (i) the Contract Sum for the actual costs of the extra work, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Consultant. Any increase in compensation of up to 15% (fifteen percent) of the Contract Sum; or, in the time to perform of up to 90 (ninety) days, may be approved by the Contract Officer through a written Change Order. Any greater increases, taken either separately or cumulatively, must be approved by the City Council. It is expressly understood by Consultant that the provisions of this Section shall not apply to services specifically set forth in the Scope of Services. Consultant hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of Services may be more costly or time consuming than Consultant anticipates and that Consultant shall not be entitled to additional compensation therefor. City may in its sole and absolute discretion have similar work done by other Consultants. No claims for an increase in the Contract Sum or time for performance shall be valid unless the procedures established in this Section are followed. If in the performance of the Services, the Contractor becomes aware of material defects in the Scope of Work, duration, or span of the Services, or the Contractor becomes aware of extenuating circumstance that will or could prevent the completion of the Services, on time or on budget, the Contractor shall inform the City’s Contract Officer of an anticipated Change Order. This proposed change order will stipulate the facts surrounding the issue, proposed solutions, proposed costs, and proposed schedule impacts. 1.10 Special Requirements. Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the “Special Requirements” attached hereto as Exhibit “B” and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit “B” and any other provisions of this Agreement, the provisions of Exhibit “B” shall govern. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 6 ARTICLE 2. COMPENSATION AND METHOD OF PAYMENT. 2.1 Contract Sum. Subject to any limitations set forth in this Agreement, City agrees to pay Consultant the amounts specified in the “Schedule of Compensation” attached hereto as Exhibit “C” and incorporated herein by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed $765,000.00 (Seven Hundred Sixty-Five Thousand Dollars) (the “Contract Sum”), unless additional compensation is approved pursuant to Section 1.9. 2.2 Method of Compensation. (a) The method of compensation may include: (i) a lump sum payment upon completion; (ii) payment in accordance with specified tasks or the percentage of completion of the services; (iii) payment for time and materials based upon the Consultant’s rates as specified in the Schedule of Compensation, provided that (a) time estimates are provided for the performance of sub tasks, and (b) the Contract Sum is not exceeded; or (iv) such other methods as may be specified in the Schedule of Compensation. (b) A retention of 10% shall be held from each payment as a contract retention to be paid as part of the final payment upon satisfactory and timely completion of services. This retention shall not apply for on-call agreements for continuous services or for agreements for scheduled routine maintenance of City property or City facilities. 2.3 Reimbursable Expenses. Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, telephone expenses, and travel expenses approved by the Contract Officer in advance, or actual subcontractor expenses of an approved subcontractor pursuant to Section 4.5, and only if specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Consultant at all project meetings reasonably deemed necessary by the City. Coordination of the performance of the work with City is a critical component of the services. If Consultant is required to attend additional meetings to facilitate such coordination, Consultant shall not be entitled to any additional compensation for attending said meetings. 2.4 Invoices. Each month Consultant shall furnish to City an original invoice, using the City template, or in a format acceptable to the City, for all work performed and expenses incurred during the preceding month in a form approved by City’s Director of Finance. By submitting an invoice for payment under this Agreement, Consultant is certifying compliance with all provisions of the Agreement. The invoice shall detail charges for all necessary and actual expenses by the following categories: labor (by sub-category), travel, materials, equipment, supplies, and sub- contractor contracts. Sub-contractor charges shall also be detailed by such categories. Consultant shall not invoice City for any duplicate services performed by more than one person. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 7 City shall independently review each invoice submitted by the Consultant to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. Except as to any charges for work performed or expenses incurred by Consultant which are disputed by City, or as provided in Section 7.3, City will use its best efforts to cause Consultant to be paid within 45 (forty-five) days of receipt of Consultant’s correct and undisputed invoice; however, Consultant acknowledges and agrees that due to City warrant run procedures, the City cannot guarantee that payment will occur within this time period. In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Consultant for correction and resubmission. Review and payment by City for any invoice provided by the Consultant shall not constitute a waiver of any rights or remedies provided herein or any applicable law. 2.5 Waiver. Payment to Consultant for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Consultant. ARTICLE 3. PERFORMANCE SCHEDULE 3.1 Time of Essence. Time is of the essence in the performance of this Agreement. 3.2 Schedule of Performance. Consultant shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the “Schedule of Performance” attached hereto as Exhibit “D” and incorporated herein by this reference. When requested by the Consultant, extensions to the time period(s) specified in the Schedule of Performance may be approved in writing by the Contract Officer through a Change Order, but not exceeding 60 (sixty) days cumulatively. 3.3 Force Majeure. The time period(s) specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Consultant shall within 10 (ten) days of the commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified. The Contract Officer’s determination shall be final and conclusive upon the parties to this Agreement. In no event shall Consultant be entitled to recover damages against the City for any delay in the performance of Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 8 this Agreement, however caused, Consultant’s sole remedy being extension of the Agreement pursuant to this Section. 3.4 Term. Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding One (1) year, except as otherwise provided in the Schedule of Performance (Exhibit “D”). ARTICLE 4. COORDINATION OF WORK 4.1 Representatives and Personnel of Consultant. The following principals of Consultant (“Principals”) are hereby designated as being the principals and representatives of Consultant authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith: Paul Hansen Managing Member, LLC (Name) (Title) It is expressly understood that the experience, knowledge, capability and reputation of the foregoing principals were a substantial inducement for City to enter into this Agreement. Therefore, the foregoing principals shall be responsible during the term of this Agreement for directing all activities of Consultant and devoting sufficient time to personally supervise the services hereunder. All personnel of Consultant, and any authorized agents, shall at all times be under the exclusive direction and control of the Principals. For purposes of this Agreement, the foregoing Principals may not be replaced nor may their responsibilities be substantially reduced by Consultant without the express written approval of City. Additionally, Consultant shall utilize only the personnel included in the Proposal to perform services pursuant to this Agreement. Consultant shall make every reasonable effort to maintain the stability and continuity of Consultant’s staff and subcontractors, if any, assigned to perform the services required under this Agreement. Consultant shall notify City of any changes in Consultant’s staff and subcontractors, if any, assigned to perform the services required under this Agreement, prior to and during any such performance. City shall have the right to approve or reject any proposed replacement personnel, which approval shall not be unreasonably withheld. 4.2 Status of Consultant. Consultant shall have no authority to bind City in any manner, or to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. Consultant shall not at any time or in any manner represent that Consultant or any of Consultant’s officers, employees, or agents are in any manner officials, officers, employees or agents of City. Neither Consultant, nor any of Consultant’s officers, employees or Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 9 agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Consultant expressly waives any claim Consultant may have to any such rights. 4.3 Contract Officer. The Contract Officer shall be David Copp, Public Works Deputy Director, or such person as may be designated by the Director of Public Works. It shall be the Consultant’s responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and the Consultant shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority, if specified in writing by the City Manager, to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement. 4.4 Independent Consultant. Neither the City nor any of its employees shall have any control over the manner, mode or means by which Consultant, its agents or employees, perform the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of Consultant’s employees, servants, representatives or agents, or in fixing their number, compensation or hours of service. Consultant shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Consultant shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Consultant in its business or otherwise or a joint venturer or a member of any joint enterprise with Consultant. 4.5 Prohibition Against Subcontracting or Assignment. The experience, knowledge, capability and reputation of Consultant, its principals and employees were a substantial inducement for the City to enter into this Agreement. Therefore, Consultant shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the City; all subcontractors included in the Proposal are deemed approved. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more 25% (twenty five percent) of the present ownership and/or control of Consultant, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Consultant or any surety of Consultant of any liability hereunder without the express consent of City. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 10 ARTICLE 5. INSURANCE AND INDEMNIFICATION 5.1 Insurance Coverages. Without limiting Consultant’s indemnification of City, and prior to commencement of any services under this Agreement, Consultant shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to City. (a) General liability insurance. Consultant shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted. (b) Automobile liability insurance. Consultant shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with Services to be performed under this Agreement, including coverage for any owned, hired, non- owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident. (c) Professional liability (errors & omissions) insurance. Consultant shall maintain professional liability insurance that covers the Services to be performed in connection with this Agreement, in the minimum amount of $1,000,000 per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this Agreement and Consultant agrees to maintain continuous coverage through a period no less than three (3) years after completion of the services required by this Agreement. (d) Workers’ compensation insurance. Consultant shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000). (e) Subcontractors. Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall include all of the requirements stated herein. (f) Additional Insurance. Policies of such other insurance, as may be required in the Special Requirements in Exhibit “B”. 5.2 General Insurance Requirements. (a) Proof of insurance. Consultant shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 11 approved by City’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Agreement. City reserves the right to require complete, certified copies of all required insurance policies, at any time. (b) Duration of coverage. Consultant shall procure and maintain for the duration of this Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Services hereunder by Consultant, its agents, representatives, employees or subconsultants. (c) Primary/noncontributing. Coverage provided by Consultant shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non- contributory basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured. (d) City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain and continuously maintain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement. (e) Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or that is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VI (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the City’s Risk Manager. (f) Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subconsultants. (g) Enforcement of contract provisions (non-estoppel). Consultant acknowledges and agrees that any actual or alleged failure on the part of the City to inform Consultant of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder. (h) Requirements not limiting. Requirements of specific coverage features or limits contained in this section are not intended as a limitation on coverage, limits or other Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 12 requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Consultant maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. (i) Notice of cancellation. Consultant agrees to oblige its insurance agent or broker and insurers to provide to City with a 30 (thirty) day notice of cancellation (except for nonpayment for which a 10 (ten) day notice is required) or nonrenewal of coverage for each required coverage. (j) Additional insured status. General liability policies shall provide or be endorsed to provide that City and its officers, officials, employees, and agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies. (k) Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. (l) Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions. (m) Pass through clause. Consultant agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by Consultant, provide the same minimum insurance coverage and endorsements required of Consultant. Consultant agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Consultant agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to City for review. (n) Agency’s right to revise specifications. The City reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Consultant 90 (ninety) days advance written notice of such change. If such change results in substantial additional cost to the Consultant, the City and Consultant may renegotiate Consultant’s compensation. (o) Self-insured retentions. Any self-insured retentions must be declared to and approved by City. City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by City. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 13 (p) Timely notice of claims. Consultant shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Consultant’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies. (q) Additional insurance. Consultant shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work. 5.3 Indemnification. To the full extent permitted by law, Consultant agrees to indemnify, defend and hold harmless the City, its officers, employees and agents (“Indemnified Parties”) against, and will hold and save them and each of them harmless from, any and all actions, either judicial, administrative, arbitration or regulatory claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities whether actual or threatened (herein “claims or liabilities”) that may be asserted or claimed by any person, firm or entity arising out of or in connection with the negligent performance of the work, operations or activities provided herein of Consultant, its officers, employees, agents, subcontractors, or invitees, or any individual or entity for which Consultant is legally liable (“indemnitors”), or arising from Consultant’s or indemnitors’ reckless or willful misconduct, or arising from Consultant’s or indemnitors’ negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, and in connection therewith: (a) Consultant will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys’ fees incurred in connection therewith; (b) Consultant will promptly pay any judgment rendered against the City, its officers, agents or employees for any such claims or liabilities arising out of or in connection with the negligent performance of or failure to perform such work, operations or activities of Consultant hereunder; and Consultant agrees to save and hold the City, its officers, agents, and employees harmless therefrom; (c) In the event the City, its officers, agents or employees is made a party to any action or proceeding filed or prosecuted against Consultant for such damages or other claims arising out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Consultant hereunder, Consultant agrees to pay to the City, its officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys’ fees. Consultant shall incorporate similar indemnity agreements with its subcontractors and if it fails to do so Consultant shall be fully responsible to indemnify City hereunder therefore, and failure of City to monitor compliance with these provisions shall not be a waiver hereof. This indemnification includes claims or liabilities arising from any negligent or wrongful act, error or omission, or reckless or willful misconduct of Consultant in the performance of professional Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 14 services hereunder. The provisions of this Section do not apply to claims or liabilities occurring as a result of City’s sole negligence or willful acts or omissions, but, to the fullest extent permitted by law, shall apply to claims and liabilities resulting in part from City’s negligence, except that design professionals’ indemnity hereunder shall be limited to claims and liabilities arising out of the negligence, recklessness or willful misconduct of the design professional. The indemnity obligation shall be binding on successors and assigns of Consultant and shall survive termination of this Agreement. ARTICLE 6. RECORDS, REPORTS, AND RELEASE OF INFORMATION 6.1 Records. Consultant shall keep, and require subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports, studies or other documents relating to the disbursements charged to City and services performed hereunder (the “books and records”), as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the performance of such services. Any and all such documents shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of three (3) years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required. In the event of dissolution of Consultant’s business, custody of the books and records may be given to City, and access shall be provided by Consultant’s successor in interest. Notwithstanding the above, the Consultant shall fully cooperate with the City in providing access to the books and records if a public records request is made and disclosure is required by law including but not limited to the California Public Records Act. 6.2 Reports. Consultant shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as the Contract Officer shall require. Consultant hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Consultant agrees that if Consultant becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services contemplated herein or, if Consultant is providing design services, the cost of the project being designed, Consultant shall promptly notify the Contract Officer of said fact, circumstance, technique or event and the estimated increased or decreased cost related thereto and, if Consultant is providing design services, the estimated increased or decreased cost estimate for the project being designed. 6.3 Ownership of Documents. All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents and other materials (the “documents and materials”) prepared by Consultant, its employees, subcontractors and agents in the performance of this Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 15 Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Consultant shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the documents and materials hereunder. Any use, reuse or assignment of such completed documents for other projects and/or use of uncompleted documents without specific written authorization by the Consultant will be at the City’s sole risk and without liability to Consultant, and Consultant’s guarantee and warranties shall not extend to such use, reuse or assignment. Consultant may retain copies of such documents for its own use. Consultant shall have the right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Consultant fails to secure such assignment, Consultant shall indemnify City for all damages resulting therefrom. Moreover, Consultant with respect to any documents and materials that may qualify as “works made for hire” as defined in 17 U.S.C. § 101, such documents and materials are hereby deemed “works made for hire” for the City. 6.4 Confidentiality and Release of Information. (a) All information gained or work product produced by Consultant in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Consultant. Consultant shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the Contract Officer. (b) Consultant, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the Contract Officer or unless requested by the City Attorney, voluntarily provide documents, declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered “voluntary” provided Consultant gives City notice of such court order or subpoena. (c) If Consultant, or any officer, employee, agent or subcontractor of Consultant, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Consultant for any damages, costs and fees, including attorney’s fees, caused by or incurred as a result of Consultant’s conduct. (d) Consultant shall promptly notify City should Consultant, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed there under. City retains the right, but has no obligation, to represent Consultant or be present at any deposition, hearing or similar proceeding. Consultant agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Consultant. However, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 16 ARTICLE 7. ENFORCEMENT OF AGREEMENT AND TERMINATION 7.1 California Law. This Agreement shall be interpreted, construed and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other appropriate court in such county, and Consultant covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in the County of Los Angeles, State of California. 7.2 Disputes; Default. In the event that Consultant is in default under the terms of this Agreement, the City shall not have any obligation or duty to continue compensating Consultant for any work performed after the date of default. Instead, the City may give notice to Consultant of the default and the reasons for the default. The notice shall include the timeframe in which Consultant may cure the default. This timeframe is 15 (fifteen) days, but may be extended, though not reduced, if circumstances warrant. During the period of time that Consultant is in default, the City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices. In the alternative, the City may, in its sole discretion, elect to pay some or all of the outstanding invoices during the period of default. If Consultant does not cure the default, the City may take necessary steps to terminate this Agreement under this Article. Any failure on the part of the City to give notice of the Consultant’s default shall not be deemed to result in a waiver of the City’s legal rights or any rights arising out of any provision of this Agreement. 7.3 Retention of Funds. Consultant hereby authorizes City to deduct from any amount payable to Consultant (whether or not arising out of this Agreement) (i) any amounts the payment of which may be in dispute hereunder or which are necessary to compensate City for any losses, costs, liabilities, or damages suffered by City, and (ii) all amounts for which City may be liable to third parties, by reason of Consultant’s acts or omissions in performing or failing to perform Consultant’s obligation under this Agreement. In the event that any claim is made by a third party, the amount or validity of which is disputed by Consultant, or any indebtedness shall exist which shall appear to be the basis for a claim of lien, City may withhold from any payment due, without liability for interest because of such withholding, an amount sufficient to cover such claim. The failure of City to exercise such right to deduct or to withhold shall not, however, affect the obligations of the Consultant to insure, indemnify, and protect City as elsewhere provided herein. 7.4 Waiver. Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 17 provision or a waiver of any subsequent breach or violation of any provision of this Agreement. Acceptance by City of any work or services by Consultant shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 7.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party. 7.6 Legal Action. In addition to any other rights or remedies, either party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. Notwithstanding any contrary provision herein, Consultant shall file a statutory claim pursuant to Government Code Sections 905 et seq. and 910 et seq., in order to pursue a legal action under this Agreement. 7.7 Termination Prior to Expiration of Term. This Section shall govern any termination of this Contract except as specifically provided in the following Section for termination for cause. The City reserves the right to terminate this Contract at any time, with or without cause, upon thirty (30) days’ written notice to Consultant, except that where termination is due to the fault of the Consultant, the period of notice may be such shorter time as may be determined by the Contract Officer. Upon receipt of any notice of termination, Consultant shall immediately cease all services hereunder except such as may be specifically approved by the Contract Officer. Consultant shall be entitled to compensation for all services rendered prior to the effective date of the notice of termination and for any services authorized by the Contract Officer thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, except as provided in Section 7.3. In the event of termination without cause pursuant to this Section, the City need not provide the Consultant with the opportunity to cure pursuant to Section 7.2. 7.8 Termination for Default of Party. If termination is due to the failure of the other Party to fulfill its obligations under this Agreement: (a) City may, after compliance with the provisions of Section 7.2, take over the work and prosecute the same to completion by contract or otherwise, and the Consultant shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 18 compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to the Consultant for the purpose of set-off or partial payment of the amounts owed the City as previously stated. (b) Consultant may, after compliance with the provisions of Section 7.2, terminate the Agreement upon written notice to the City‘s Contract Officer. Consultant shall be entitled to payment for all work performed up to the date of termination. 7.9 Attorneys’ Fees. If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney’s fees. Attorney’s fees shall include attorney’s fees on any appeal, and in addition a party entitled to attorney’s fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment. ARTICLE 8. CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION 8.1 Non-liability of City Officers and Employees. No officer or employee of the City shall be personally liable to the Consultant, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Consultant or to its successor, or for breach of any obligation of the terms of this Agreement. 8.2 Conflict of Interest. Consultant covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Consultant’s performance of services under this Agreement. Consultant further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of the Contract Officer. Consultant agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement. No officer or employee of the City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which affects her/his financial interest or the financial interest of any corporation, partnership or association in which (s)he is, directly or indirectly, interested, in violation of any State statute or regulation. The Consultant warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 19 8.3 Covenant Against Discrimination. Consultant covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class in the performance of this Agreement. Consultant shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class. 8.4 Unauthorized Aliens. Consultant hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C. § 1101 et seq., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Consultant so employ such unauthorized aliens for the performance of work and/or services covered by this Agreement, and should any liability or sanctions be imposed against City for such use of unauthorized aliens, Consultant hereby agrees to and shall reimburse City for the cost of all such liabilities or sanctions imposed, together with any and all costs, including attorneys’ fees, incurred by City. ARTICLE 9. MISCELLANEOUS PROVISIONS 9.1 Notices. Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail, in the case of the City, to the City Manager and to the attention of the Contract Officer (with her/his name and City title), City of Rancho Palos Verdes, 30940 Hawthorne Blvd., Rancho Palos Verdes, California 90275 and in the case of the Consultant, to the person(s) at the address designated on the execution page of this Agreement. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated at the time personally delivered or in 72 (seventy two) hours from the time of mailing if mailed as provided in this section. 9.2 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. 9.3 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 20 9.4 Integration; Amendment. This Agreement including the attachments hereto is the entire, complete and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by the Consultant and by the City Council. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void. 9.5 Severability. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless. 9.6 Warranty & Representation of Non-Collusion. No official, officer, or employee of City has any financial interest, direct or indirect, in this Agreement, nor shall any official, officer, or employee of City participate in any decision relating to this Agreement which may affect his/her financial interest or the financial interest of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any State or municipal statute or regulation. The determination of “financial interest” shall be consistent with State law and shall not include interests found to be “remote” or “noninterests” pursuant to Government Code Sections 1091 or 1091.5. Consultant warrants and represents that it has not paid or given, and will not pay or give, to any third party including, but not limited to, any City official, officer, or employee, any money, consideration, or other thing of value as a result or consequence of obtaining or being awarded any agreement. Consultant further warrants and represents that (s)he/it has not engaged in any act(s), omission(s), or other conduct or collusion that would result in the payment of any money, consideration, or other thing of value to any third party including, but not limited to, any City official, officer, or employee, as a result of consequence of obtaining or being awarded any agreement. Consultant is aware of and understands that any such act(s), omission(s) or other conduct resulting in such payment of money, consideration, or other thing of value will render this Agreement void and of no force or effect. Consultant’s Authorized Initials _______ Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 21 9.7 Corporate Authority. The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) that entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE] Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 22 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first-above written. CITY: CITY OF RANCHO PALOS VERDES, a municipal corporation Paul Seo, Mayor ATTEST: Teresa Takaoka, City Clerk APPROVED AS TO FORM: ALESHIRE & WYNDER, LLP William Wynder, City Attorney CONSULTANT: PAUL HANSEN ENGINEERING, LLC, a Limited Liability Company By: Name: Paul Hansen Title: Managing Member, LLC Address: 2103 West Crestwood Street, Rancho Palos Verdes, CA 90275 Two corporate officer signatures required when Consultant is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 6/23/2026 6/23/2026 6/23/2026 6/24/2026 6/24/2026 01203.0023 2151924.2 A-1 EXHIBIT “A” SCOPE OF SERVICES I. Consultant will perform the following Services, specified in items “A” through “C” below, to support the following elements of the Portuguese Bend Landslide Emergency Response (“the Project”): Element 8202 – Abalone Cove Sanitary Sewer Repair Program Element 8302 – Palos Verdes Drive South Landslide Repair Program Element 8307 – Portuguese Bend Landslide Remediation – Emergency Stabilization Measures Refer to Appendix C for the specific breakdown of tasks for each element of the Project. A. Project and Construction Management Services: 1. Provide comprehensive project and construction management services for the Project. Services include on-site and office support as deemed necessary by the City to effectively carry out the services. 2. Liaise with the City’s Contract Officer and other project parties identified by the City to keep them fully abreast of all field construction aspects of the project. 3. Provide budget oversight and forecasting for the Project, including the tracking of pending invoices, paid invoices, anticipated expenditures, and the opening and closure of purchase orders. 4. Coordinate with the Inspector to provide daily reports and weekly reports to document all construction field activities performed by the Project Contractor (the Contractor). 5. Serve as point of contact between the City and the construction Contractors, the Project’s design, engineering and geology team, City Inspector, Estimator, environmental and cultural resource monitors, utility companies, the Geologic Hazard Abatement Districts, and other stakeholder parties as identified and directed by the Contract Officer, including members of the public. 6. Provide and administer project document control in coordination with City standards and practices, including, but not limited to: correspondence, field memos, requests for information, change orders, submittals, plan clarifications, cost control logs, daily reports, weekly reports, meeting notes, meeting minutes, meeting agenda. 7. Review Task Proposals submitted by the Contractor and make recommendations to the City regarding the Proposals’ completeness, and the appropriateness of the proposed Task Budget and Task Completion Schedule. Negotiate Task Orders, and cost and Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 A-2 time extension proposals submitted by the Contractor as required. 8. Conduct progress meetings with City-contracted companies (construction general contractors, consultants and maintenance service companies) as directed by the City, including the preparation and issuance of meeting agendas and minutes. 9. Conduct issue specific focus and resolution meetings with city-contracted companies and other project stakeholders as determined necessary. 10. Provide oversight of the Project’s professional services contracts, including, but not limited to: geotechnical support, environmental compliance, and land movement monitoring surveys. 11. Review Project-related invoices from contractors, consultants and other vendors and make written recommendations for approval by the City’s project representative 12. Prepare project-related staff reports for the City’s use for regular updates to the City Council. 13. Take lead or assist City staff in preparing requests (soliciting) for proposals, contracts, and preparing other bid documents as necessary to provide additional resources to complete the project objectives. 14. Provide review of plans, specifications, estimates, schedules and other related deliverables for the Project. 15. Assist the city in pursuing grant opportunities for landslide response efforts. B. Construction Inspection Services: 1. Provide comprehensive construction inspection services for the Project. Services include on-site support, and off-site support, as directed by the Contract Officer. 2. Before construction work commences, proactively examine the work area prior to all work, including demolition activities. The work shall include documenting the conditions including pre-construction site photos. 3. While construction work is in progress: enforce the general contractor’s, including its subcontractors’ (collectively, the Contractor), compliance with the Project’s Bid Documents and City’s standards, including all executed task orders, change orders, and all applicable federal, state, and local laws and regulations. Take construction progress photographs. 4. Liaise with the City’s Contract Officer and Construction Manager to keep them fully abreast of all field construction aspects of the project. 5. Provide daily inspection reports to the Construction Manager at the end of each day Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 A-3 construction inspections are required, and in a format acceptable to the City. Inspection reports shall include pre-construction, construction progress, and post- construction photographs as needed for preparing a complete inspection report. 6. Prepare and submit to the Construction Manager a final summary of inspection reports at the completion of each project element. Consultant shall prepare final summary of inspection reports for each project element in the format and relative milestone date(s) acceptable to the City. 7. Attend project-related meetings, including pre-construction, construction progress, issue resolution, and other meetings as requested by the City. 8. Conduct necessary Specialty Inspections during the construction of the Project. Specialty Inspections may include soils and materials inspections, and shall be conducted as recommended by the Engineer, and as directed by the Contract Officer. 9. Monitor traffic and pedestrian controls and safety precautions used by the Contractor. 10. Provide all other services that may be needed related to the inspection of the work performed by the Contractor. C. Cost Estimating, Cost Validation and Related Services: 1. Review Task Proposals submitted by the Contractor and make recommendations to the City regarding the Proposals’ completeness, and the appropriateness of the proposed Task Budget and Task Completion Schedule. 2. Prepare independent cost estimates for comparison to cost proposals submitted by the contractor. 3. Participate in negotiations with the Contractor and the City to finalize Task Budgets. 4. Review Contractor-submitted Task Completion Schedules for compliance with project requirements and provide review comments and recommendations. 5. Prepare proposed Task Completion Schedules for planned work as directed by the Contract Officer. 6. Provide miscellaneous Project controls and cost analysis services as directed by the Contract Officer. 7. Conduct construction site visits as directed by the Contract Officer. II. As part of the Services, Consultant will prepare and deliver the following tangible work products to the City: A. See Section I of this Appendix. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 A-4 III. In addition to the requirements of Section 6.2, during performance of the Services, Consultant will keep the City appraised of the status of performance by delivering the following status reports: A. See Section I of this Appendix. IV. All work product is subject to review and acceptance by the City, and must be revised by the Consultant without additional charge to the City until found satisfactory and accepted by City. V. Consultant will utilize the following personnel, at minimum to accomplish the Services. A. See Appendix E Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 B-1 EXHIBIT “B” SPECIAL REQUIREMENTS (Superseding Contract Boilerplate) Added text indicated in bold italics, deleted text indicated in strikethrough. I. Section 1.2, Consultant’s Proposal, is amended to read: The Scope of Service shall include the Consultant’s Proposal, attached hereto as Exhibit “E” and which shall be incorporated herein by this reference, as though fully set forth herein. In the event of any inconsistency between the terms of such Proposal and this Agreement, the terms of this Agreement shall govern. II. Section 1.4, Compliance with California Labor Law, is amended to add a new Subsection (j), as follows: (j) Registration with DIR. Pursuant to Labor Code section 1771.1, if Contractor will be performing work subject to the requirement to pay prevailing wages, Contractor and all subcontractors must be registered with, and pay an annual fee to, the DIR prior to and during the performance of any work under this Agreement. III. Section 2.2, Method of Compensation, is amended to read: (a) The method of compensation may include: (i) a lump sum payment upon completion; (ii) payment in accordance with specified tasks or the percentage of completion of the services; (iii) payment for time and materials based upon the Consultant’s rates as specified in the Schedule of Compensation, provided that (a) time estimates are provided for the performance of sub tasks, and (b) the Contract Sum is not exceeded; or (iv) such other methods as may be specified in the Schedule of Compensation. (b) A retention of 10% shall be held from each payment as a contract retention to be paid as part of the final payment upon satisfactory and timely completion of services. This retention shall not apply for on-call agreements for continuous services or for agreements for scheduled routine maintenance of City property or City facilities. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 C-1 EXHIBIT “C” SCHEDULE OF COMPENSATION I. Consultant shall perform the tasks required under Exhibit “A” at the hourly rates established below: Role Hourly Rate Principal $209.87 Senior Project Manager/Contract Manager $197.41 Senior Project Manager/Senior Construction Manager $197.41 Construction Manager/Resident Engineer/Inspector $176.81 Senior Engineer/Project Controls $176.81 Senior Cost Estimator $185.16 Cost Estimator $151.00 Master Scheduler/P6 Integrator $185.16 Senior Scheduler $173.36 Document Control $137.08 Project Engineer $85.74 Additionally, Exhibit “C-1”, attached hereto includes a Task Breakdown Estimate reflecting Consultant’s best estimate of anticipated hours and expenditures by task to be used for City’s budgetary planning and contract management purposes. II. Within the budgeted amounts for each Task, and with the approval of the Contract Officer, funds may be shifted from one Task subbudget to another so long as the Contract Sum is not exceeded per Section 2.1, unless Additional Services are approved per Section 1.9. III. The City will compensate Consultant for the Services performed upon submission of a valid invoice. Each invoice is to include: A. Line items for all personnel describing the work performed, the number of hours worked, and the hourly rate. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 C-2 B. Line items for all materials and equipment properly charged to the Services. C. Line items for all other approved reimbursable expenses claimed, with supporting documentation. D. Line items for all approved subcontractor labor, supplies, equipment, materials, and travel properly charged to the Services. IV. The total compensation for the Services shall not exceed the Contract Sum as provided in Section 2.1 of this Agreement. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 D-1 EXHIBIT “C-1” TASK BREAKDOWN ESTIMATE Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 FY 26-27 LS Contracting - Task Breakdown Estimate - PM/CM/CI/Estimating Services Task Qty Hrs ea Total Hrs Qty Hrs ea Total Hrs Qty Hrs ea Total Hrs Qty Hrs ea Total Hrs Qty Hrs ea Total Hrs 8202 - AbCove Sanitary Sewer Repair Program Onboarding 1 20 20 1 20 20 1 4 4 1 20 20 0 0 0 Site Visits 19 3 57 6 2 12 0 0 0 Prepare & Negotiate Task Orders 7 8 56 0 0 0 0 0 0 Task Orders Cost Validation 0 0 0 0 7 4 28 On-Site Inspection & Report Preparation 0 0 0 35 8 280 0 Invoice Reviews - GC 14 1 14 0 0 0 0 Prepare & Negotiate Annual Agreements/Amendments 8 1 8 8 8 64 0 0 0 Prepare & Negotiate Add'l Agreements/Amendments 2 1 2 2 8 16 0 0 0 LS Update - AbCove SS Section 0 8 2 16 0 0 0 Prepare Weekly Project Status Reports (PSR)52 0.5 26 52 0.5 26 0 0 0 Budget Oversight, Control 26 0.25 6.5 26 0.25 6.5 0 0 0 Document Control 12 0.5 6 12 0.5 6 0 0 0 Tot. Proj. Hrs 196 Tot. Proj. Hrs 167 Tot. Proj. Hrs 4 Tot. Proj. Hrs 300 Tot. Proj. Hrs 28 Rate 197.41$ Rate 197.41$ Rate 209.87$ Rate 176.81$ Rate 185.16$ Sub 38,594.42$ Sub 32,869.42$ Sub 839.48$ Sub 53,042.20$ Sub 5,184.57$ 8302 - PVDS Landslide Repair Program Onboarding 1 16 16 1 16 16 1 4 4 1 20 20 1 8 8 Site Visits 24 2 48 6 2 12 0 0 0 Storm Response Coord 4 8 32 4 2 8 0 4 8 32 0 Task Orders Development, Execution & NTP 24 4 96 0 0 0 0 Task Orders Cost Validation 0 0 0 0 4 4 16 On-Site Inspection & Report Preparation 0 0 0 26 8 208 0 Invoice Review - Paving 12 1 12 0 0 0 0 Prepare & Negotiate Annual Agreements/Amendments 2 1 2 2 8 16 0 0 0 Prepare & Negotiate Add'l Agreements/Amendments 1 1 1 1 8 8 0 0 0 Prepare Weekly PSRs 52 0.5 26 52 0.5 26 0 0 0 Budget Oversight 26 0.25 6.5 26 0.25 6.5 0 0 0 Document Control 12 0.5 6 12 0.5 6 0 0 0 Tot. Proj. Hrs 246 Tot. Proj. Hrs 99 Tot. Proj. Hrs 4 Tot. Proj. Hrs 260 Tot. Proj. Hrs 24 197.41$ 197.41$ 209.87$ 176.81$ 185.16$ 48,465.12$ 19,445.27$ 839.48$ 45,969.91$ 4,443.91$ 8307 - Emergency Stabilization Onboarding 1 40 40 1 40 40 1 20 20 1 40 40 0 Capital Task Delivery Site Visits / DDW Drilling 10 2 20 12 2 24 0 0 0 Site Visits / Winterization 20 2 40 12 2 24 0 0 0 Prepare & Negotiate Task Orders - DDW 10 8 80 10 0.5 5 0 0 0 Prepare & Negotiate Task Change Orders - DDW 2 4 8 2 0.5 1 0 0 0 Prepare & Negotiate Task Orders - Wint.6 8 48 6 0.5 3 0 0 0 Prepare & Negotiate Task Change Orders - Wint.4 8 32 4 0.5 2 0 0 0 Task Orders Cost Validation - DDW Drilling 0 0 0 0 10 8 80 Task Orders Cost Validation - Winterization 0 0 0 0 6 8 48 Rate Sub Rate Sub Rate Sub Rate Sub Rate Sub Construction Inspection Estimating and Cost ValidationConstruction Management Project Management Program Manager Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 FY 26-27 LS Contracting - Task Breakdown Estimate - PM/CM/CI/Estimating Services Task Qty Hrs ea Total Hrs Qty Hrs ea Total Hrs Qty Hrs ea Total Hrs Qty Hrs ea Total Hrs Qty Hrs ea Total Hrs Construction Inspection Estimating and Cost ValidationConstruction Management Project Management Program Manager Task Orders Cost Validation - DDW O&M 0 0 0 0 4 4 16 On-Site Inspection & Report Preparation - DDW Drilling 0 0 0 50 8 400 0 On-Site Inspection & Report Preparation - Winterization 0 0 0 40 8 320 0 Invoice Review - DDW 10 1 10 0 0 0 0 Invoice Review - Winterization 12 1.5 18 0 0 0 0 Operations Management DDW O&M Coordination 52 1 52 52 0.5 26 0 0 0 Survey Monitoring Coordination 12 0.5 6 0 0 0 0 Survey Monitoring Report Review 0 12 1 12 0 0 0 Geo Coord. - DDW-Land Movmt. Analysis/Reporting 0 12 2 24 0 0 0 Geo Coord. (separate from above) - H&H Study/Report 12 5 60 0 0 0 Env. Compliance Oversight (office)0 12 2 24 0 0 0 Invoices - DDW O&M 12 1 12 0 0 0 0 Invoice Review - DDW Generator Rental 12 1.5 18 0 0 0 0 Invoice Review - DDW Generator Fueling 24 1 24 0 0 0 0 Invoice Review - Geology Peer-Review 0 12 0.5 6 0 0 0 Invoice Review - Project Geotech 0 12 1 12 0 0 0 Invoice Review - Monitoring Surveys 0 12 0.25 3 0 0 0 Invoice Review - Environmental Compliance 12 1 12 12 1 12 0 0 0 Program Management Prepare & Negotiate Annual Agreements/Amendments 15 1 15 15 8 120 0 0 0 Prepare & Negotiate Add'l Agreements/Amendments 2 1 2 2 8 16 0 0 0 Weekly Internal City Coordination Meetings (Hybrid)48 1 48 48 1 48 26 1 26 24 1 24 24 1 24 Weekly Geologist & GHAD Coordination Mtg (Virtual)48 1 48 48 1 48 12 1 12 0 0 Attend Monthly Public Q&A Meetings (Virtual)0 12 1 12 0 0 0 Prepare FY27-28 LS Multi-Contract Award Staff Report 1 4 4 1 24 24 0 0 0 Prepare Bi-Weekly LS Contracting Staff Report 26 0.25 7 26 1 26 0 0 0 Prepare 45-Day Recurring Landslide Update Staff Report 0 10 12 120 0 0 0 PBLR Project 8304 PS&E Review, Env. Phase Support 1 40 40 1 48 48 1 20 20 0 0 Grant-Related Tasks 0 4 48 192 0 0 4 20 80 Prepare Weekly PSRs 52 0.5 26 52 0.5 26 0 0 0 Budget Oversight 26 0.25 7 26 0.25 6.5 0 0 0 Document Control 12 0.5 6 12 0.5 6 0 0 0 Tot. Proj. Hrs 622 Tot. Proj. Hrs 971 Tot. Proj. Hrs 78 Tot. Proj. Hrs 784 Tot. Proj. Hrs 248 197.41$ 197.41$ 209.87$ 176.81$ 185.16$ 122,791.46$ 191,590.21$ 16,369.86$ 138,616.95$ 45,920.45$ Total Hours 1063 1236 86 1344 300 Subtotal - Cost of Service 209,851.00$ 243,904.90$ 18,048.82$ 237,629.05$ 55,548.93$ Full-Time Employee Equivalent 0.51 0.59 0.08 0.65 0.14 * = Rounded to Hours Equating to Days/Week 1040 1248 175 1248 300 Subtotals - used to calculate contract sum 205,310.48$ 246,372.57$ 36,727.25$ 220,655.55$ 55,548.93$ Total Estimated Contract Value:765,000$ Sub Rate Sub Rate Sub Rate Sub Rate Rate Sub ** Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 D-1 EXHIBIT “D SCHEDULE OF PERFORMANCE I. Time is of the essence in performing all services appropriate to the emergency response nature of the Project. II. The Contract Officer may approve an extension of the Agreement Term established in Section 3.4 of up to one (1) additional year, in the City’s sole and exclusive discretion. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 01203.0023 2151924.2 E-1 EXHIBIT “E” CONSULTANT’S PROPOSAL [CONTINUED ON NEXT PAGE] Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 City of Rancho Palos Verdes Request for Qualifi cation Project and Constuction Management, Inspection and Cost Estmating Services for the Portuguese Bend Landslide Reponse Program Prepared by: Paul Hansen Engineering, LLC April, 24th, 2026 Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Paul Hansen Engineering, LLC 2103 W Crestwood St, Rancho Palos Verdes, CA 90275 (310) 935-8586 April 24th, 2026 City of Rancho Palos Verdes 30940 Hawthorne Blvd Rancho Palos Verdes, CA 90275 Attn: Mr. David Copp, P.E Dear: Mr. Copp, Subject: Request for Qualifi cation for Services City of Rancho Palos Verdes - Project and Construc- tion Management, Inspection and Cost Estimating Services for the Portuguese Bend Emergency Landslide Response Program Paul Hansen Engineering, LLC (PHE) is pleased to submit this Statement of Qualifi cations to the City of Rancho Palos Verdes for Project and Construction Management, Inspection, and Cost Estimating Services in support of the Portuguese Bend Emergency Landslide Response Program. We value our established relationship with the City and appreciate the opportunity to support this critical and time-sensitive eff ort. PHE is a California-based Limited Liability Company (LLC), founded in 2014, and is currently in good standing in the State of California. As a small, locally based fi rm headquartered in Rancho Palos Verdes and licensed to do business within the City (Business License No. BLBU-1458), PHE provides construc- tion management and project controls services to public agencies throughout Southern California. PHE will serve as the prime consultant for this eff ort, providing a fully integrated in-house team of 18 profes- sionals, including project managers, construction managers, schedulers, cost estimators, and construction inspectors. PHE has relevant experience and qualifi cations particularly suited to the requirements of this program: •Experience with Local Agencies: Extensive experience supporting Southern California public agencies, including City of Los Angeles (LADWP, LASAN, BOE), MWD, City of Rancho Palos Verdes, City of Santa Monica, City of Manhattan Beach, and City of Torrance. •Experience on Relevant Projects: Deep dewater well installation, stormwater drainage and re- pair, earthwork grading, slope stabilization, electrical improvements, street improvements, miscellaneous infrastructure, groundwater remediation programs, water treatment facilities, and infrastructure projects involving complex site conditions, active construction environments, and emergency response eff orts. •Core Services: Construction management, project management, scheduling, cost estimating, project controls, and inspection services. •Project Controls Expertise: Development and review of project schedules, cost estimating at multiple design stages, and support for change order evaluation and time impact analysis. PHE understands that the Portuguese Bend area presents active landslide conditions requiring immediate response, coordinated execution, and continuous technical oversight. Our team is prepared to provide responsive, fi eld-driven support to assist the City in managing this critical emergency response program. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Primary Contact/ Authorized Representative: Paul Hansen P.E- Principal/ Managing Member, LLC Paul.Hansen@paulhansenengineering.com, (310) 935-8586. PHE confi rms that it is unaware of any confl icts of interest that would preclude the fi rm from performing the proposed work for the City of Rancho Palos Verdes. We appreciate the opportunity to submit this proposal and look forward to supporting the City on this important program. Please feel free to contact us with any questions. Best Regards, Paul Hansen, P.E. Managing Member, Paul Hansen Engineering, LLC Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Table Of Contents Section 1. Approach to Scope of Work Section 2. Organizing and Staffi ng Section 3. Staff Qualifi cations and Experience Section 3a. Prior Experience Section 3b. Staff Resumes Section 3c. Reference Projects Section 4. Quality Control Plan Section 5. Acceptance of Conditions Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Section 1. Approach to Scope Understanding of the Project and Scope Paul Hansen Engineering understands that the Portuguese Bend Landslide Emergency Response Program is an emergency eff ort requiring rapid response, real-time coordination, and proactive management of ongoing construction and maintenance activities. The program includes concurrent eff orts such as sanitary sewer repairs, roadway stabilization, dewatering well operations, and winterization measures to mitigate further land movement. These eff orts are executed through multiple contractors under continuously evolving fi eld conditions. PHE recognizes that success depends on real-time decision-making, effi cient task order management, and maintaining control over cost, schedule, and quality. Approach to Project and Construction Management PHE will deliver project and construction management services through a structured, fi eld-driven ap- proach tailored to emergency response conditions. Under the leadership of the Principal and Senior Proj- ect Manager, PHE will serve as the central point of coordination between the City, contractors, inspectors, and stakeholders, establishing clear communication protocols and ensuring alignment across all activities. The Senior Construction Manager and Project Manager/Construction Manager will oversee day-to-day fi eld operations, ensuring compliance with contract requirements, City standards, and regulatory require- ments. We will implement a centralized document control system to track RFIs, submittals, change orders, task orders, and project correspondence, providing the City with real-time visibility into project status and documentation. PHE will support the City’s task order-based contracting approach by reviewing contractor proposals, negotiating task orders, and evaluating cost and schedule impacts to ensure alignment with project ob- jectives and available funding. Regular progress meetings and focused issue-resolution sessions will be conducted to maintain momentum and address issues proactively. PHE will implement integrated cost, schedule, and document control systems to ensure all project infor mation is tracked, validated, and readily accessible to support timely and informed decision-making. Approach to Construction Inspection PHE will provide dedicated inspection staff to monitor construction activities and ensure compliance with project requirements. Inspectors will provide continuous fi eld presence, including pre-construction docu- mentation, progress monitoring, and verifi cation of completed work. Inspection staff will prepare daily reports documenting contractor activities, site conditions, safety com- pliance, and any issues encountered, supported by photographic documentation and submitted in accor- dance with City requirements. Inspectors will work closely with the Construction Manager and City staff to promptly identify and re- solve deviations from contract requirements. Specialty inspections, including materials and soils testing, will be coordinated as required to support quality assurance. We will monitor traffi c control, public safety measures, and contractor adherence to approved work plans to ensure safe and effi cient operations within an active and sensitive environment. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Approach to Cost Estimating and Project Controls PHE will provide independent cost estimating, cost validation, and project controls services to support informed decision-making and fi nancial accountability across all project elements. PHE’s cost estimating approach follows established industry practices, including AACE® methodologies, and utilizes current market data sources such as RSMeans and historical cost databases. Estimates will be developed using a structured Work Breakdown Structure (WBS) and will account for labor, materials, equipment, escalation, and contingencies. We will prepare independent estimates for contractor task proposals and support negotiation of task orders and change orders through detailed cost analysis to ensure fair and reasonable pricing. PHE will utilize Primavera P6 to evaluate contractor schedules for logic, sequencing, durations, and critical path activities. Schedule performance will be monitored through regular updates and four-week lookahead schedules to identify delays, assess impacts, and recommend corrective actions to maintain project progress. Given the multi-project, multi-contractor nature of the Landslide Response Program, PHE will implement a program-level management approach integrating cost, schedule, and fi eld operations to maintain re- al-time visibility and control across all active work eff orts. Program-Level Coordination and Delivery Given the multi-project, multi-contractor nature of the Landslide Response Program, PHE will implement a program-level management approach that integrates cost, schedule, and fi eld operations to maintain real-time visibility and control across all active work eff orts. This includes identifying interdependencies between project elements, prioritizing work based on risk and urgency, and coordinating activities to align with evolving site conditions and operational needs. PHE will lead coordination across all stakeholders, including contractors, City staff , geotechnical consul- tants, and utility providers, to reduce confl icts and support timely project delivery. PHE will work collab- oratively with the City and contractors to identify potential risks related to sequencing, constructability, and site conditions, and provide recommendations to mitigate impacts to cost and schedule. Approach to Key Project Elements PHE’s approach is tailored to each project element, including supporting continuous operation of critical sewer infrastructure, supporting rapid-response roadway repairs to sustain mobility, and prioritizing stabi- lization eff orts such as dewatering well operations and stormwater control measures. Each element will be managed with a focus on urgency, safety, and minimizing impacts to the community. Value-Added Strategies and Innovations •Rapid Task Order Review Process – expedited review and turnaround of contractor proposals •Integrated Cost and Schedule Controls – coordinated evaluation of cost and schedule impacts •Real-Time Document Control System – centralized tracking and access to project documentation •Proactive Risk Identifi cation – early detection of risks related to land movement, weather, and contractor performance •Effi cient Multi-Contractor Coordination – structured communication across multiple contractors and stakeholders •Field-Driven Decision Making – strong fi eld presence to support real-time problem solving Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Section 2. Organization and Staffi ng PHE has assembled a focused team to deliver project and construction management, inspection, schedul- ing, and cost estimating services for the Portuguese Bend Emergency Landslide Response Program. The team structure provides clear leadership, communication, and coordination across multiple contractors and ongoing emergency response eff orts. Principal Manager Paul Hansen, P.E. will provide executive oversight and strategic direction. Senior Project Manager / Construction Manager Patricia McCarthy, P.E. will serve as the primary point of contact for the City and lead overall project execution, coordination, and communication. Senior Project Manager / Construction Manager Jeff ery Fijalka, P.E. will support program delivery and contrac- tor coordination, ensuring construction activities are executed safely and effi ciently. Senior Scheduler Khalid Manzoor, PMP, PSP, CCM, will lead scheduling eff orts, including contractor schedule review, progress tracking, updates, and coordination across multiple task orders. Construction Manager / Senior Engineer / Senior Scheduler Rena Osorio will support fi eld coordination, task execution, and schedul- ing activities in coordination with the Senior Scheduler. Project Engineer Vanessa Murillo will support submittals, RFIs, and coordination. Deputy Inspector Irving Bacelis will provide full-time inspection, daily reporting, and compliance monitoring. Senior Cost Estimators Ken Becker and Yong Gao will provide independent cost estimating and validation. Senior Contract Administrator Tannaz Zandi, ENV.SP will support contract administration, document management, and reporting. All available individuals identifi ed above are available to provide services to the city as requested by city staff . The Principal Manager and key personnel will remain assigned for the duration of the Scope of Services. Organization Chart: Paul Hansen, P.E Patricia McCarthy, P.E Jeffery Fijalka, P.E Rena Osorio Ken Becker Yong Gao Khalid Manzoor, PMP, PSP, CCM Vanessa Murillo Tannaz Zandi, ENV.SP Irving Bacelis Senior PM/CM Senior PM/CM Principal CM/ Sr. Engineer/ Sr. Scheduler Senior Scheduler Project Engineer Contract Administrator Senior Cost Estimator Senior Cost Estimator Deputy Inspector Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Key personnel are assigned to support the full scope of services, including: •Project and Construction Management: Led by the Senior PM/CMs, responsible for coordination, contractor oversight, and task order execution •Construction Inspection: Performed by Deputy Inspectors providing full-time fi eld oversight, daily reporting, and compliance monitoring •Project Scheduling: Led by the Senior Scheduler, with support from the Construction Manager / Senior Engi- neer / Senior Scheduler, including schedule development, contractor schedule review, progress tracking, and coordination across multiple task orders •Cost Estimating and Validation: Provided by Senior Cost Estimators supporting independent estimates, cost review, and contractor negotiations •Project Coordination and Technical Support: Managed by the Project Engineer to support RFIs, submittals, and coordination across stakeholders •Contract Administration: Managed by the Contract Administrator to ensure accurate tracking, reporting, and information management This structure ensures effi cient coordination across multiple concurrent contractors, evolving fi eld conditions, and emer- gency response activities consistent with the City’s program requirements. Staffi ng Allocation and Availability Resource Availability and Responsiveness This approach ensures consistent, real-time support in both fi eld and offi ce environments. The Principal Manager and key personnel will remain assigned for the duration of the Scope of Services. Role Name % of Total Eīort Availability (% of 40 hrs/week) City Hall / Field Presence Principal Paul Hansen, P.E 10% 20% AS Needed Senior PM/ Senior CM Patricia McCarthy, P.E 25% 75% 75%-100% Onsite Senior PM/ Senior CM Jeīery Fijalka, P.E 30% 50% 50% Onsite CM/ Senior Engineer/ Senior Scheduler Rena Osorio 15% 75% 50-75% Onsite Project Engineer Vanessa Murillo 10% 100% 25-50% Onsite Senior Cost EsƟmator Ken Becker 5% 75% As Needed Senior Cost EsƟmator Yong Gao 3% 50% As Needed Senior Scheduler Khalid Manzoor, PMP, PSP, CCM 10% 50% As Needed Deputy Inspector Irving Bacelis 25% 100% 100% Onsite Senior Contract Administrator Tannaz Zandi, ENV.SP 2% 50% As Needed Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Section 3. Staff Qualifi cations and Experience The proposed project team is composed of highly experienced professionals with expertise in construction management, project controls, inspection, cost estimating, and infrastructure program delivery for public agencies. The team has extensive experience supporting complex projects in active and evolving envi- ronments, including those requiring coordination among multiple contractors, management of concurrent task orders, and responsiveness to changing fi eld conditions. This experience is directly aligned with the City of Rancho Palos Verdes’ Portuguese Bend Landslide Emergency Response Program. The team is led by Paul Hansen, P.E., Principal, who provides executive oversight and brings over 30 years of experience in the management of design, construction, cost estimating, planning, scheduling, and permitting for public works and infrastructure projects. Mr. Hansen has supported major capital programs for agencies including the Los Angeles Department of Water and Power (LADWP) and Los Angeles Sani- tation (LASAN), including progressive design-build programs and complex treatment facility upgrades. Patricia McCarthy, P.E., will serve as Senior Project Manager and Senior Construction Manager and is a registered Professional Engineer in the State of California, meeting the requirements of the RFQ. Ms. McCarthy has over 20 years of experience delivering public works and infrastructure projects and will be responsible for overall project delivery, coordination, and communication with the City. She has extensive experience managing construction in challenging environments, including hillside stabilization, deep ex- cavation, tunneling, and community-sensitive projects requiring coordination with residents, stakeholders, and regulatory agencies. Supporting construction management eff orts, Jeff ery Fijalka, P.E., Senior Project Manager and Senior Construction Manager, brings over 20 years of experience managing infrastructure and public works projects, including utilities, stormwater, emergency projects, and geotechnical improvements. He has extensive experience coordinating contractors and overseeing fi eld operations in active environments. Rena Osorio, CM / Senior Scheduler / Senior Engineer, supports construction coordination, scheduling, and project controls, with hands-on experience in Primavera P6, fi eld coordination, RFIs, submittals, and project reporting. The team is further supported by experienced technical staff , including Vanessa Murillo, Project Engi- neer, who provides support for submittal and RFI review, fi eld coordination, and project documentation. Cost estimating and fi nancial oversight are provided by Ken Becker and Yong Gao, who bring extensive experience in cost estimating, budgeting, and change order evaluation for public infrastructure projects. Project scheduling and controls support will be led by Khalid Manzoor, PMP, PSP, CCM, Senior Scheduler, who brings extensive experience in project planning, scheduling, and coordination across large-scale infrastructure programs. Tannaz Zandi, ENV. SP, provides document control and administra- tive support, including coordination of project records, tracking of deliverables, and ensuring accurate and timely management of project documentation. Field inspection services are supported by Irving Bacelis, Deputy Inspector, who provides on-site observation, compliance verifi cation, and reporting to support construction activities. Collectively, the proposed team off ers a well-balanced combination of leadership, technical expertise, and hands-on experience necessary to support the City under dynamic conditions requiring responsiveness, coordination, and successful project delivery. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Section 3a. Prior Experience Paul Hansen Engineering, LLC (PHE) was founded in 2014 to support clients in the successful delivery of complex capital projects and programs, particularly those requiring strong coordination, real-time deci- sion-making, and adaptability under changing conditions. The Portuguese Bend Landslide Emergency Re- sponse Program refl ects a highly dynamic and evolving environment, where ongoing ground movement, emergency construction activities, and multiple concurrent task orders require immediate response and continuous oversight. PHE understands the challenges associated with managing projects under emergen- cy conditions, including rapidly changing site conditions, the need for accelerated decision-making, and coordination among multiple contractors, agencies, and stakeholders. Our team has experience supporting programs where work must progress in parallel with active fi eld conditions, requiring fl exible planning, continuous cost and schedule monitoring, and proactive risk management to maintain momentum and protect critical infrastructure. PHE supports all phases of project delivery—from planning and procure- ment through construction and closeout—with a focus on maintaining progress in complex and time-sen- sitive environments. Utilizing tools such as Oracle Primavera P6 and RSMeans, our team provides project controls, cost estimating, and construction management support to help clients make informed decisions, respond to changing conditions, and successfully deliver critical projects under demanding circumstances. Representative PHE Projects and Programs include: Hyperion Wastewater Treatment Plant Flood Assessment and Recovery Client: City of Los Angeles, Los Angeles Sanitation (LASAN) PHE provided cost estimating support to LASAN following a major spill event at the Hyperion Waste- water Treatment Plant, where approximately 100 million gallons of effl uent impacted multiple facility systems. The event aff ected critical treatment infrastructure, including headworks, primary settling basins, digesters, pumping facilities, and effl uent systems. PHE supported a comprehensive forensic evaluation to assess damage and determine the full scope of recovery. Eff orts included development of assessment plans, coordination of fi eld investigations, and detailed evaluation of facility conditions over a six-month period. The work required close collaboration with a large, multidisciplinary team of over 75 stakehold- ers, including plant personnel, engineers, and insurance representatives. Based on fi eld assessments and technical evaluations, PHE prepared a detailed cost estimate for full facility recovery, including structural, mechanical, electrical, instrumentation, and architectural components, as well as equipment replacement and labor requirements. The estimated recovery cost was approximately $160 million over a multi-year implementation period. PHE’s work supported informed decision-making and planning for restoration of critical wastewater treatment operations. San Fernando Basin Groundwater Replenishment Program Client: Los Angeles Department of Water and Power (LADWP) / Hazen & Sawyer PHE is currently supporting LADWP as part of the Owner’s Agent team for this large-scale groundwater remediation and water supply program, delivered through a Progressive Design-Build approach. The pro- gram includes multiple treatment facilities and wellfi elds designed to restore groundwater resources and improve regional water quality. PHE provides planning, scheduling, and cost estimating support, includ- ing review and analysis of contractor baseline schedules and monthly updates, evaluation of sequencing and constructability, and identifi cation of potential impacts to program milestones. PHE also supports coordination across multiple task orders and stakeholders, ensuring alignment with program objectives, regulatory requirements, and evolving project conditions. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Fairmont Sedimentation Basin Improvements Project Client: Los Angeles Department of Water and Power (LADWP) / Arcadis PHE is supporting the Fairmont project as part of the Arcadis team, providing scheduling and cost es- timating services for improvements at an active water treatment facility. The project requires detailed coordination to maintain ongoing operations while implementing critical infrastructure upgrades. PHE’s responsibilities include development and maintenance of detailed project schedules, evaluation of con- struction sequencing, and support for cost estimating. The team works closely with stakeholders to moni- tor progress, identify potential risks, and provide timely updates to support informed decision-making and effi cient project delivery. Hyperion Digester Gas Utilization Project (DGUP) Client: City of Los Angeles, Los Angeles Sanitation (LASAN) The Hyperion DGUP is a $127 million design-build-operate project that converts digester gas into re- newable energy at the Hyperion Water Reclamation Plant. The project involved demolition of existing systems and installation of new gas turbines, heat recovery systems, and supporting infrastructure within an active treatment facility. PHE supported construction management and project controls eff orts, includ- ing contractor schedule review, progress tracking, and cost estimating. PHE’s work ensured alignment between design, permitting, procurement, and construction activities, contributing to successful delivery of a complex, multi-phase project. Hyperion Advanced Water Purifi cation Facility (AWPF) Client:City of Los Angeles, Los Angeles Sanitation (LASAN) PHE is currently supporting construction management eff orts for the Advanced Water Purifi cation Fa- cility at the Hyperion Water Reclamation Plant, a progressive design-build project focused on producing high-quality recycled water for benefi cial reuse. PHE provides schedule review, cost control support, and coordination with project stakeholders. The team assists in evaluating project progress, reviewing contrac- tor submissions, and supporting change order review and cost estimating eff orts to help maintain align- ment with project goals and regulatory requirements. PHE’s experience across these projects demonstrates our ability to support complex water infrastructure programs through eff ective planning, scheduling, cost estimating, and coordination. Our team’s familiarity with local agencies, regulatory environments, and advanced treatment systems enables us to provide responsive and reliable support tailored to each client’s needs. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Section 3b. Staff Resumes Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Portuguese Bend Landslide Remediation- Emergency Stabilization Measures I City of Ranchos Palos Verdes | Ranchos Palos Verdes, CA I 2023 Cost Estimating Support. Cost Estimating Support. Assisted with cost estimating for emergency landslide stabilization efforts, including dewatering systems (up to 340 feet) and piezometer installation. Supported time-sensitive estimating for ongoing field operations, including re-drilling and maintenance due to ground movement. Total construction value approximately $25M over 10 months. Hyperion Advanced Water Purification Project I City of Los Angeles, Department of Public Works, Bureau of Engineering and Los Angeles Sanitation (2001-08/2025) Construction Management Support. Supported construction management and project controls for a major progressive design-build project, including schedule review, RFI and submittal coordination, change order negotiation, and contractor coordination. Los Angeles Department of Water and Power, San Fernando Groundwater Basin Program (2015- Present) Owner’s Agent / Program Support. Provides oversight of program schedules and cost estimates for a $400M progressive design-build groundwater remediation program. Supports planning, scheduling, cost estimating, and GMP negotiations across multiple concurrent projects. Digester Gas Utilization Project | City of Los Angeles, Bureau of Engineering , Bureau of Sanitation and Carollo Engineering, Los Angeles, CA (2014-2017) CM Team / Steering Committee Member. Provided construction management support for a $127M design- build-operate project, including contractor schedule review, coordination of design and construction activities, and cost estimating support. City of Los Angeles, Department of Water & Power (DWP), Operation NEXT, Master Planning (2013-2014) As part of the Owner's team, Paul supported the schedule and cost development of Operation NEXT master plan to evaluate and identify long term strategies Los Angeles Department of Water and Power, Power, Construction and Maintenance (2017-2019) Lead Master Scheduler. Mr. Hansen Developed and maintained a comprehensive Primavera P6 master schedule integrating multiple systems and projects, providing reporting and performance tracking for stakeholders. PAUL HANSEN PE PRINCIPAL Paul Hansen, P.E. is a Principal with over 35 years of experience providing project and construction management, scheduling, and cost estimating services for large- -contra projects. Mr. Hansen brings extensive expertise in project controls, including rogressive design- emergency response efforts, working across multiple concurrent projects and For this project, Mr. Hansen will serve as Principal Manager, providing executive oversight, strategic Education  BS, Civil Engineering North Carolina State University Registrations  CA Professional Engineer, RCE. License #57778 Experience 11 Years as Principal Years of Experience Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 PATRICIA MCCARTHY PE, MS, ENV. SP SENIOR PROJECT MANAGER/ SENIOR CONSTRUCTION MANAGER Office Location: Los Angeles, CA Patricia McCarthy, P.E. is a Project and Construction Manager with over 21 years of experience delivering water and wastewater infrastructure projects for public agencies. Her experience includes managing construction activities for treatment plants, conveyance systems, and underground utilities under complex and constrained site conditions. Ms. McCarthy brings strong expertise in construction management for active projects involving multiple contractors, including coordination of field activities, RFIs, submittals, permitting, and change order review. She has extensive experience supporting schedule oversight and cost control efforts, as well as identifying and resolving field issues to maintain project progress. She has supported progressive design-build projects and large capital improvement programs, working in dynamic environments requiring coordination with City staff, contractors, and multiple stakeholders. For this project, Ms. McCarthy will lead day-to-day project execution, ensuring effective coordination, timely decision-making, and successful delivery of services under evolving field conditions. Education ► BS, Civil Engineering, California State University of Los Angeles ► MS, Civil Engineering. California State University of Long Beach Registration ► Ca Professional Engineer, RCE #69154 Experience 8 Years with Current Employer 21 Years of Experience Construction Management Support City of Los Angeles, Bureau of Engineering | Parsons / AECOM Los Angeles, CA | 2022-Present Construction Manager. Ms. McCarthy currently provides Construction Management support for the City’s wastewater treatment program. The majority of work is for new construction, repair and rehabilitation projects located at the City’s four wastewater treatment reclamation plants. She proactively identifies issues and resolves problems in order to mitigate cost and schedule impacts. Her experience includes scheduling, RFI’s, submittals, permits, change- and allowance orders, negotiations, field memos, weekly project meetings, contractor notices and letter responses. She performs constructability review, establishes contract durations, milestones, and operational constraints for projects under design. She coordinates with agencies and stakeholders including DWP, utility agencies, real estate, LADBS Permits, BOE Permits adjacent cities including El Segundo. San Fernando Groundwater Basin Remediation Project | Los Angeles Dept of Water and Power | Hazen and Sawyer | Los Angeles, CA | 2019-2022 Project Engineer. Ms. McCarthy Supported a $450M progressive design-build groundwater remediation program, including review of schedules and cost estimates, and coordination of major project components such as treatment facilities, pipelines, wells, and associated infrastructure. Worked with the Owner’s Agent team to support design and construction activities, ensuring alignment between design development, cost, and schedule. Coordinated with consultants and stakeholders to support project delivery under a complex, multi-phase program. Fairmont Sedimentation Plant | Los Angeles Department of Water and Power and Arcadis Los Angeles, CA | 2018 Project Engineer. Supported development of a large-scale water treatment facility, including cost estimating based on 30% design documents and coordination of structural, mechanical, electrical, and process components under a design-build delivery approach. Digester Gas Utilization Project, Hyperion Water Reclamation Plant | City of Los Angeles Bureau of Engineering | Los Angeles, CA | 2015-2018 Construction Management. Supported delivery of a $127M design-build cogeneration facility at Hyperion Treatment Plant. Responsibilities included contractor coordination, review of submittals and RFIs, change order support, and coordination with City operations during construction and commissioning. Avenue 45 and Arroyo Drive Relief Sewer, City of Los Angeles, Bureau of Engineering | Los Angeles, CA | 2007-2010 Construction Manager. Managed construction of a $43M sewer project involving deep excavation, tunneling, and micro-tunneling. Responsibilities included contractor oversight, coordination with City inspectors, schedule and budget management, and resolution of field issues. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 JEFFERY FIJALKA P.E. SENIOR PROJECT MANAGER/SENIOR CONSTRUCTION MANAGER Office Location: Los Angeles, CA Jeffery Fijalka, P.E. is a Construction Manager with over 22 years of experience delivering public infrastructure and capital improvement projects, including stormwater, utilities, and transportation improvements. His experience includes managing construction activities, coordinating contractors, and overseeing field operations for projects ranging from $1M to over $25M. Mr. Fijalka has extensive experience working in active construction environments requiring coordination across multiple stakeholders, including contractors, City staff, utility agencies, and the public. His expertise includes contractor oversight, permitting, schedule tracking, field issue resolution, and ensuring compliance with regulatory and safety requirements. He has led projects under time-sensitive and high-visibility conditions, including emergency response efforts and projects with significant public impact. For this project, Mr. Fijalka will oversee field operations, coordinate contractors and inspectors, and ensure construction activities are executed safely, efficiently, and in accordance with project requirements. Education BS, Business Management. Arizona State University MS, Civil Engineering. Arizona State University Registration  CA Professional Engineering, RCE. License #C84990 Experience 22 Years of Experience Fairmont Sedimentation Plant | Los Angeles Department of Water and Power | Los Angeles, CA | 2025- Present Project Manager. Mr. Fijalka is currently serving as Senior Project Manager for the Fairmont Sedimentation Project, a major water infrastructure initiative for the Los Angeles Department of Water & Power. Leads project planning, design coordination, permitting, and construction oversight for a new sedimentation treatment facility to improve raw water quality and system reliability. Manages multidisciplinary teams, contractors, schedules, and budgets while ensuring compliance with environmental regulations, safety standards, and stakeholder requirements throughout all phases of project delivery. City of Manhattan Beach | Manhattan Beach, CA | August 2020- May 2025 Principal Civil Engineer. In this role, Jefferey Fijalka supervised internal and consultant project managers, and managed utility undergrounding and various capital improvement projects from inception through construction and close-out. Project types included roadway resurfacing, concrete replacement, waterline installation, facility construction, structure demolition, and stormwater diversion and infiltration. Typical project construction costs ranged from $1M to $25M. Lot 3 Parking Structure Emergency Demolition and Replacement |City of Manhattan Beach | Manhattan Beach, CA |2024- 2025 In September 2024, the Manhattan Beach City Council ordered the immediate demolition of an existing parking structure in the downtown area following the recommendations of the City’s Engineering Division. Mr. Fijalka was the Principal Civil Engineer assigned to manage the demolition activities and the design of a new at-grade interim surface lot. Throughout the project, Mr. Fijalka lead a Task Force comprised of directors and managers from all City departments that met regularly to discuss the project status, public impacts, temporary measures, and messaging to the public and the City Council. South Santa Monica Bay TMDL Trash Capture Project |City of Manhattan Beach | Manhattan Beach, CA |2024- 2025 Project Manager. Mr. Fijalka served as the Project Manager during the installation of three large-scale trash capture devices that were designed bring the City into compliance with current water protection regulations by collecting trash and debris before it entered the ocean. Mr. Fijalka managed project financials, permitting, and public relations, and supervised a dedicated Construction Manager and On-site Inspector during construction. 28th Street Stormwater Infiltration Project |City of Manhattan Beach | Manhattan Beach, CA |2022- 2025 Project Manager. Mr. Fijalka served as the Project Manager for the design of this large-scale water quality improvement project that was intended to capture and infiltrate surface drainage from approximately 65% of the City’s land area. The project was funded by three separate grant programs, and had an estimated construction budget exceeding $20M. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 RENA OSORIO CONSTRUCTION MANAGER/SENIOR SCHEDULER/ SENIOR ENGINEER Office Location: Los Angeles, CA Rena Osorio is a Project Engineer and Estimator with over 9 years of experience supporting construction and infrastructure projects for public agencies and private clients. Her experience includes scheduling, cost estimating, and construction management support for water, wastewater, and capital improvement projects.Ms. Osorio has strong experience supporting active construction projects involving coordination with contractors, designers, and stakeholders. Her expertise includes preparation and review of RFIs, submittals, and change orders, as well as schedule development and tracking using Primavera P6. She has supported both design-build and design-bid-build projects, working in dynamic environments requiring coordination across multiple project elements. For this project, Ms. Osorio will support task order coordination, document control, and field and office coordination to ensure timely and effective delivery of services. Education ► BS, Civil Engineer; California State University, Los Angeles Certifications ► P6 Certification Issu. 3/2024- No Exp. Experience 2 Year with Current Employer 9 Years of Experience Bowtie Demonstration Project – The Nature Conservancy I Geosyntec I Los Angeles, CA I 2024-Present Project Engineer. Rena Osorio is a project engineer on the construction management team for the Bowtie Demonstration Project, an $8 Mil Contract. Ms. Osorio is responsible for fieldwork oversight, daily reports and field coordination with the owner, The Nature Conservancy. She is also responsible for document controls, including review and processing RFIs and Submittals. While in a support role, she assists in coordination with the contractor, oversight committee, designer, stake holders including the State Park and The Nature Conservancy. The project will convert the 3.4 acre parcel to divert storm water and treat dry and wet weather flows from an existing storm drain to underground pre-treatment system. The project will construct a diversion maintenance hole, bio-clean dual stage hydrodynamic separator, bio-clean water polisher flow media filter, pump station, valve vault and meter vault. Rinaldi-Toluca Chlorination Station Improvements – Department of Water and Power I Hazen & Sawyer I Los Angeles, CA I 2024-present Scheduler. As the scheduler, Ms. Osorio has prepared the Baseline Schedule and is providing monthly schedule updates. This project involves new construction of a brine storage building with new chlorination stations, sodium hypochlorite room, and instrumentations, improvements to existing brine storage facility, and site improvements for yard piping. This project utilized design-build delivery method. Diemer Filter Rehabilitation Project - Metropolitan Water District I Stantec I Los Angeles, CA I 2023-Present Scheduler and Cost Estimator. As part of STANTEC Team, Ms. Osorio evaluated the predevelopment of the campus from concept to 60% and then is presently evaluating to 100% design cost estimates, $65M. This involves demolition and replacement of filters and filtration media, structural upgrades, washwater piping replacements, electrical and instrumentation upgrades. P6 Construction schedule developed using P6 Primavera. Garvey Reservoir Floating Cover Project - Metropolitan Water District I Arcadis UC Inc. I Los Angeles, CA I 2023- Present Scheduler and Cost Estimator. As part of ARCADIS Team, Ms. Osorio is evaluating the predevelopment of the design from concept to 60% and then to 100% design. This involves demolition and replacement of existing geomembrane cover and liner, underdrain system, enhanced mixing system, facility standby generator, campus drainage, electrical and instrumentation support. P6 Construction schedule developed using P6 Primavera. Fairmont Sedimentation Plant Project- I Arcadis US Inc. I Los Angeles, CA I 2024 Scheduler and Cost Estimator. As part of Arcadis Team, Ms. Osorio is evaluating the predevelopment of the design from concept to 60% and then to 100% design. This involves aqueduct relocation and site optimization, intake structure upgrades, centrifuge upgrades, improvements to dewatered solids loading facilities, gravity thickeners upgrades, outlet modifications, sedimentation basin sludge collection upgrades, electrical and instrumentations upgrades. P6 Construction schedule developed using P6 Primavera. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 KENNETH BECKER SENIOR COST ESTIMATOR Office Location: Los Angeles, CA Kenneth Becker is a Senior Cost Estimator with over 30 years of experience providing cost estimating, project controls, and construction cost management services for public infrastructure and capital improvement projects. His experience spans water and wastewater facilities, reservoirs, buildings, and infrastructure projects for public agencies throughout Southern California.Mr. Becker specializes in developing cost estimates across all project phases, including conceptual, design, and construction, as well as preparing independent cost estimates, validating contractor bids, and supporting change order negotiations. He has extensive experience supporting design-build and progressive design- build projects, providing cost control, cost risk evaluation, and claims support. He has supported projects in active construction environments requiring rapid response and coordination with multiple stakeholders. For this project, Mr. Becker will provide cost estimating, cost validation, and change order review services to support timely and cost- effective project delivery. Education ► BS, Business Management, University of Phoenix Certification ► P6 Certification Issu. 3/2024- No Exp. Experience 7 Year with Current Employer 31 Years of Experience Owner’s Agent for San Fernando Groundwater Basin Remediation | Los Angeles Department of Water & Power | Hazen and Sawyer | Los Angeles, CA | 2020-Present Lead Estimator. As part of the Owner's Agent team, a $450M program, responsibilities include overseeing the Progressive Design Build Contract cost control, and cost claims review. The program entails design, procurement and construction of the treatment facilities selected in these areas to address groundwater contamination and restore beneficial use of the San Fernando Groundwater Basin. The project includes control building, control systems, instrumentation and controls, advanced treatment system utilizing granular activated carbon (GAC), ultraviolet (UV) irradiation and ion exchange technologies, wells, pumps, pipelines, UV AOP building, structures, mechanical equipment and piping, electrical and instrumentation. Mr. Becker is responsible for evaluating the cost estimate development at various stages of the program including bridging documents, 30%, 60% 90% and GMP phases and provide a recommendation. Portuguese Bend Landslide Remediation - Emergency Stabilization Measures I City of Ranchos Palos Verdes | Ranchos Palos Verdes, CA I 2023 Cost Estimator. Mr. Becker provided cost estimating services for emergency landslide stabilization efforts under active and evolving field conditions. He supported rapid-response estimating for dewatering systems, including deep wells (up to 340 feet) and piezometer installations used to monitor ground movement. Ken also provided continuous cost evaluation to support re - drilling and maintenance activities. Total construction value is approximately $25M over a 10-month period. Santa Monica Reservoir Upgrades| City of Santa Monica, Stantec |Los Angeles | 2024-Present Cost Estimator. Ken Becker is currently providing cost estimating and project planning services for the City of Santa Monica Reservoir Upgrades and Improvements Project. This effort includes development of an Opinion of Probable Construction Cost (OPCC) for four staged phases of De sign Development. The project involves a comprehensive inspection and assessment of all components across four reservoirs, including structures, pumps, piping, electrical, mechanical, instrumentation, controls, and associated appurtenances required for rel iable operation. In addition, the scope includes preparation of a Basis of Design report establishing design criteria for upgrades at each reservoir, as well as the development of bidding documents consisting of technical specifications and construction dr awings for reservoir rehabilitation. This project supports the City’s commitment to delivering safe, reliable water to its residents and commercial customers. Fairmont Sedimentation Plant I Los Angeles Department of Water and Power | Los Angeles, CA I 2018-2019 Lead Cost Estimator. Mr. Becker developed cost estimates for a $200M water treatment facility to pre-treat source water for the Los Angeles Aqueduct, based on scoping and 30% design documents. He prepared detailed estimates for structural, mechanical, electrical, and process components, including screening, flocculation, sedimentation basins, and associated facilities. The project combines flows from Aqueducts 1 and 2 and includes site development, process buildings, and major treatment infrastructure to support system reliability and capacity improvements. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 YONG GAO SENIOR COST ESTIMATOR Office Location: Los Angeles, CA Yong Gao is a Senior Cost Estimator with over 20 years of experience providing cost estimating, budgeting, and project planning services for infrastructure, water, and building projects. His experience includes development of cost estimates across all project phases, independent cost reviews, and support of procurement and construction activities. Mr. Gao has experience working with public agencies and private clients, supporting design-build and capital improvement projects. His expertise includes preparation of Opinions of Probable Construction Cost (OPCC), review of contractor estimates, and coordination of cost information across project teams. He is proficient in Bluebeam, PlanSwift, Primavera, and MS Project, supporting accurate and efficient cost analysis. For this project, Mr. Gao will provide cost estimating support, cost validation, and coordination with project teams to support effective project delivery. Education ► BS, Civil Engineering, Yangzhou University ► MBA, Finance, Estimating and Construction Management, ESLSCA Business School Certification ► Construction Project Management (George Brown College) ► Construction Estimator Certified (No. 249341) Canadian Institute of Quantity Surveyors Experience 2 3 Years of Experience Fairmont Sedimentation Plant I Los Angeles Department of Water and Power, Los Angeles, CA I 2026 Cost Estimator. Mr. Gao developed and prepared cost estimates for structural, electrical, mechanical, architectural and all components of the project. The Project will combine flows from Los Angeles Aqueduct 1 and 2 upstream of Fairmont Reservoir No. 2, to treat flow from both aqueducts. The Plant will treat the maximum combined flow condition of 720 cuft. The water treatment process consists of coarse screening, fine screening, followed by rapid mix, flocculation, and sedimentation using plate settlers. This project consists of site preparation, process buildings and new sedimentation basins, plate settlers, emulsion polymer system, EQ Basins and centrifuges. This project utilized design-build delivery method. The Water Quality Laboratory Project| Los Angeles Department of Water and Power, Jacobs Engineering |2025 Cost Estimator. Yong Gao is responsible for the independent review and evaluation of the Design-Builder’s cost estimate and the Guaranteed Maximum Price as desired by LADWP. The Water Quality Laboratory Project includes the planning, design, and construction of a new two-story laboratory and office building (approx. 100,000 square feet) This project will be located at 6001 W. Forest Lawn Drive, Los Angeles, CA 90068 within the Tom LaBonge Headworks Water Complex . Santa Monica Reservoir Upgrades| City of Santa Monica, Stantec |2025-Present Cost Estimator. Yong is currently providing cost estimating and project planning services for the City of Santa Monica Reservoir Upgrades and Improvements Project. This effort includes development of an Opinion of Probable Construction Cost (OPCC) for four staged phases of Design Development. The project involves a comprehensive inspection and assessment of all components across four reservoirs, including structures, pumps, piping, electrical, mechanical, instrumentation, controls, and associated appurtenances required for reliable operation. In addition, the scope includes preparation of a Basis of Design report establishing design criteria for upgrades at each reservoir, as well as the development of bidding documents consisting of technical specifications and construction drawings for reservoir rehabilitation. This project supports the City’s commitment to delivering safe, reliable water to its residents and commercial customers. Chamberlain Architect & Construction I 2005-2009 Estimator. Yong Gao delivered preconstruction estimating and cost planning for hospitality and commercial projects, conducting feasibility and PIP studies, value engineering, and budget control to ensure financial and design alignment. He reviewed contractor bids, issued contracts, and managed change orders and holdbacks throughout project execution. Key projects included hotel developments such as Homewood Suites, Hampton Inn, Staybridge, Crowne Plaza, and Residence Inn, as well as commercial facilities including the Morison Insurance headquarters, Fort Frances Library, and John Bear Auto. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 IRVING BACELIS DEPUTY INSPECTOR Office Location: Los Angeles, CA Irving Bacelis is a certified Deputy Building Inspector with the City of Los Angeles Department of Building and Safety, bringing extensive expertise in structural inspection and building code compliance. He holds multiple specialized inspection certifications, including Gunite/Shotcrete, Drilled-In Anchors, and Concrete Construction, demonstrating a strong technical understanding of reinforced concrete systems and structural construction practices. Irving is also affiliated with the International Code Council (ICC), reflecting his commitment to staying current with industry standards, building regulations, and best practices in construction safety and quality assurance. Through his work with engineering and construction teams, he supports projects by ensuring that structural work is performed in accordance with approved plans, municipal codes, and safety requirements, helping maintain the integrity and compliance of complex construction projects. Certification ► Deputy Building Inspector – Gunite/Shotcrete Issued by the City of Los Angeles Department of Building and Safety ► Deputy Building Inspector – Drilled-In Anchors Issued by the City of Los Angeles Department of Building and Safety License ► Deputy Building Inspector – Concrete Construction Issued by the City of Los Angeles Department of Building and Safety License ► International Code Council (ICC) Certified) Experience 9 Years of Experience Rinaldi-Toluca Chlorination Station Improvements – Department of Water and Power I Hazen & Sawyer I Los Angeles, CA I 2025-present Deputy Inspector. Irving Bacelis is currently providing special inspection services for the construction and improvement of a brine storage facility project that includes a new brine storage building, chlorination stations, a sodium hypochlorite room, instrumentation systems, and site improvements for yard piping. In his role as a Special Inspector, Irving performs field inspections related to structural construction elements to ensure compliance with approved plans, project specifications, and applicable building codes. He works closely with contractors, engineers, and project teams to verify construction quality and ensure that all work meets safety standards and regulatory requirements throughout the design-build project. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 KHALID MANZOOR PMP, PSP, CCM SENIOR SCHEDULER Office Location: Los Angeles, CA Khalid Manzoor brings over 33 years of progressive engineering experience with a strong emphasis on Project Management, Program Management, Project Controls, and project scheduling. His expertise spans a wide range of infrastructure projects, including power transmission, oil refinery developments, water and wastewater systems, stormwater pollution-abatement and conveyance systems, building construction, and educational facility projects. Mr. Manzoor has successfully directed the planning, coordination, and execution of complex, multidisciplinary projects from concept through close-out, consistently aligning program-wide objectives with client expectations. Khalid possesses excellent knowledge of Primavera P6 and Microsoft Project scheduling software, enabling him to develop detailed, integrated design/construction schedules from summary engineering schedules. Khalid is recognized for his ability to manage multiple project schedules simultaneously, anticipate potential delays, and implement effective solutions to maintain progress. Known for his strong written and verbal communication skills, he has collaborated extensively with project owners, private developers, consultants, contractors, and public agencies to ensure timely, cost-effective, and high-quality project delivery. Education ► BS, Construction Management, Eastern Michigan University ► MS, Construction Management, Eastern Michigan University Registration ► PMP ID.#471564 ► PSP ID# 01767 ► CCM ID#13274 ► P6 Certification Issu. 3/2024-No Exp. Experience 7 Year with Current Employer 34 Years of Experience Construction Management Support City of Los Angeles, Bureau of Engineering | AECOM Los Angeles, CA | 2019-Present Senior Scheduler Mr. Manzoor currently provides Scheduling services for the City’s wastewater treatment program in the Environmental Engineering Division. Mr. Manzoor is responsible for baseline schedule review, review of majority of work for new construction, repair and rehabilitation projects located at the City’s four wastewater treatment/ reclamation plants and some off-site projects. Mr. Manzoor is also responsible for reviewing the contractors’ baseline Critical Path Method (CPM) schedules and monitor job progress and reviewing contractors’ schedule updates. As part of his role as a Senior Scheduler Khalid Manzoor has excellent knowledge and experience with of using Primavera scheduling software, and can communicate scheduling priorities. With his responsibilities he prepares and review time impact analysis per General Requirements Section 1321 and complemented by related sections in General Requirement Section 1254. Significant projects included: Energy Imbalance Market (EIM) | Los Angeles Department of Water & Power, Worley Group (Advisian) | Los Angeles, CA | 2020-2022 Senior Scheduler. The Department is integrating into the CAISO Energy Imbalance Market to provide better reliability and more efficient renewable resource integration for the region. The electric system will be shared by a broad array of resources throughout the West Coast. His responsibilities include participating in coordination meetings and development of the implementation schedule for the EIM program. Owner’s Agent for San Fernando Groundwater Basin Remediation | Los Angeles Department of Water & Power, Hazen and Sawyer | Los Angeles, CA | 2020- Present Lead Scheduler. As part of the Owner's Agent team, responsibilities include overseeing the Progressive Design Build Contract schedule review. The program entails design, procurement and construction of the treatment facilities selected in these areas to address groundwater contamination and restore beneficial use of the San Fernando Groundwater Basin. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 VANESSA MURILLO PROJECT ENGINEER Office Location: Los Angeles, CA Vanessa Murillo is a civil engineering professional with experience supporting design-build projects through cost estimation, plan review, and project coordination. She holds a Bachelor of Science in Civil Engineering from California State University, Long Beach. Her experience includes reviewing and assisting with the development of budgetary cost estimates, performing plan reviews using Bluebeam, and supporting quantity takeoff procedures. Vanessa has worked closely with engineering and project teams to ensure accuracy in documentation, efficient workflows, and effective coordination throughout the project lifecycle. She also brings experience in administrative and financial support, including payroll processing and invoice preparation, contributing to a well-rounded understanding of project operations. In addition to her technical skills, Vanessa offers strong leadership and organizational abilities developed through supervisory and team-lead roles. She has trained and supported new team members, managed detailed records, and stepped into leadership responsibilities as needed. She is recognized for her attention to detail, reliability, and ability to perform effectively in fast-paced engineering environments. Education BS, Civil Engineering, California State University, Long Beach AA Las, Math and Sciences AA Las, Social/ Behavioral Science Certifications  OSHA 30 Experience 2 Year with Current Employer Bowtie Demonstration Project – The Nature Conservancy I Geosyntec | Los Angeles, CA I 2026 Project Engineer. Vanessa Murillo is a project engineer on the construction management team for the Bowtie Demonstration Project, an $8 Mil Contract. Ms. Murillo is responsible for fieldwork oversight, daily reports and field coordination with the owner, The Nature Conservancy. The project will convert the 3.4 acre parcel to divert storm water and treat dry and wet weather flows from an existing storm drain to underground pre-treatment system. The project will construct a diversion maintenance hole, bio-clean dual stage hydrodynamic separator, bio-clean water polisher flow media filter, pump station, valve vault and meter vault. MOAPA Southern Paiute Valuation Service | Utilicast Los Angeles, CA| 2025 The Moapa Southern Paiute Solar Project is a 250-MW alternating current solar array spanning approximately 2,000 acres on the Moapa River Indian Reservation in Clark County, Nevada. As the first large-scale solar project approved for construction on tribal land in North America, the project represents a major milestone in renewable energy development. Vanessa supported field activities by assisting with solar panel inspections and contributing to the preparation of inspection reports and project documentation. Jensen Solids Mechanical Dewatering Facility| Pasadena, CA| February 2023-Present Vanessa Murillo reviewed and assisted in the development of budgetary cost estimates for a design-build project. Utilized Bluebeam to perform detailed plan reviews, identify scope elements, and support quantity takeoff procedures. Collaborated with project team members to ensure accuracy and consistency in cost assumptions and documentation. Paul Hansen Engineering LLC| Administrative | 2024- 2025 Assisted with processing payroll and preparing monthly invoices to support the firm’s financial operations. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 TANNAZ ZANDI ENV. SP SENIOR CONTRACT ADMINISTRATOR Office Location: Los Angeles, CA Tannaz Zandi is a Contract Administrator with over 25 years of experience supporting project teams through document control, contract administration, and invoicing services for public agency projects. She has extensive experience working with the Los Angeles Department of Water and Power (LADWP) and City of Los Angeles on capital improvement programs. Ms. Zandi specializes in document processing, invoice preparation, and tracking of project records, including task orders, deliverables, and subcontractor documentation. She supports coordination between project teams, ensuring contract compliance and accurate documentation throughout project execution. Her experience includes tracking budgets, maintaining project files, and supporting reporting requirements in fast-paced project environments. For this project, Ms. Zandi will support document control, contract administration, and coordination of project records to ensure organized and timely delivery of services. Education ► BS, Chemistry Education Certification ► P6 Certification Issu. 4/2021- No Exp. Experience 1 1 Years with Current Employer 25 Years of Experience Professional, Technical, Training, And Consulting Services I Los Angeles Department of Water & Power, Utilicast | Los Angeles, CA | 2022-Present Administrative Specialist. As part of Utilicast team for this $10M program which is to support LADWP's Energy Imbalance Market participation and provide regional market knowledge and economic analysis capabilities, Ms. Zandi is providing support to LADWP and Utilicast for preparing and keep updating the EDAM Project Plan, the LADWP EDAM Program Organizational Structure Chart, EDAM Project Charter, and Trainings. She attends bi-weekly EDAM Workstream Leads meetings. She has also prepared the LADWP Beacon PPA Sites observation reports. Owner’s Agent for San Fernando Groundwater Basin Remediation | Los Angeles Department of Water & Power, Hazen and Sawyer | Los Angeles, CA | 2015-Present Administrative Specialist. Ms. Zandi is providing document processing support for Hazen and Sawyer for LADWP OASFGBR contract. She is reviewing subcontractors’ contracts and insurances, processing subcontractors’ invoices, preparing Invoice packages to be submitted to LADWP including statements and supporting documentation in accordance with the contract. She keeps track of all the contract related documents such as TO Authorizations, deliverables, and meetings. Also tracking the budget for each task order as well as Sub-consultants’ budget is part of her responsibilities. Tannaz also monitors any access to the project files through share point to identify any unauthorized access and possible confidentiality breaches. Supplemental Construction Management Services | Los Angeles Department of Water & Power and Aracadis, Los Angeles, CA | 2012-2014 Document Processing and Invoice Specialist. Assigned to Arcadis-US provided document processing support for the CM- On Call Contract. Her responsibilities included reviewing subcontractors’ contracts and insurances, obtaining renewal insurance certificates on annual basis, processing subcontractors invoices, preparing of Invoice packages including statements and supporting documentation for Invoicing in accordance with the contract; tracking and processing all the contract related documents such as TO Authorizations, MOUs; tracking budget on each task order including sub-consultants’ budget; drafting task order authorization letters for Sub-contractors; and scanning, photocopying, word processing, filing, and data entry. Engineering On-Call- As Needed Contract for Professional and Technical Services | Los Angeles Department of Water & Power and Arcadis, Los Angeles, CA | 2010-2012 Ms. Tannaz Zandi provided document processing support for ARCADIS-US on the LADWP UV Facility. Tannaz’s responsibilities included reviewing subcontractors’ contracts and insurance, processing subcontractors invoice requests, preparing of Invoices including statements and supporting documentation for Invoicing in accordance with the contract; keep tracking of all the contract related documents such as TO Authorizations, MOUs; tracking budget on all task orders. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Section 3c. Reference Projects Portuguese Bend Landslide Remediation- Emergency Stabilization Measures- Initial Re- sponse Phase Client: City of Rancho Palos Verdes Project Type: Emergency Infrastructure/ Landslide Mitigation Duration: 2023-Present Reference: David Copp, P.E, Public Works Deputy Director, (310) 544-5335, dcopp@rpvca.gov Project Description This work represents the initial emergency response phase of the broader Portuguese Bend Landslide Remediation Program. Following signifi cant rainfall events, a major portion of the southern slope with- in the Portuguese Bend area experienced accelerated ground movement toward the coastline, requiring immediate emergency stabilization. The City of Rancho Palos Verdes initiated a large-scale mitigation eff ort in coordination with local, state, and federal agencies to stabilize the area and protect surrounding infrastructure and properties. Emergency measures included the installation of deep hydraugers (up to 340 feet) to extract groundwater and reduce ground movement, along with the placement of piezometers to monitor subsurface conditions and movement rates. Due to continuously shifting ground conditions, installed equipment was frequently damaged or displaced, requiring ongoing re-drilling and adaptive fi eld coordination to maintain system eff ectiveness. Key Personnel and Responsibilities Paul Hansen Engineering provided real-time cost estimating support throughout the emergency response eff ort. •Paul Hansen, P.E. (Principal): Provided executive oversight, client coordination, and strategic guidance to support rapid decision-making during emergency response eff orts. •Ken Becker (Cost Estimator): Led preparation of rapid, iterative cost estimates to support im- mediate fi eld decision-making and evolving construction conditions. Core Services Included •Continuous cost tracking and forecasting under rapidly changing site conditions •Evaluation of construction approaches in response to ongoing ground movement and impacts to equipment and installed systems •Coordination with City staff and project stakeholders to maintain funding alignment and uninter- rupted progress •Support for emergency procurement and budgeting to sustain construction momentum Key Value / Relevance: •Enabled immediate response and uninterrupted emergency operations through rapid estimating turnaround •Supported coordination across multiple agencies and stakeholders •Demonstrated performance in high-risk, continuously evolving fi eld conditions •Provided critical cost insight for a $25 million emergency stabilization eff ort delivered under an accelerated schedule Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Project Photographs Portuguese Bend Landslide Remediation – BRIC Grant Cost Estimating Client: City of Rancho Palos Verdes Project Type: Emergency Mitigation / Grant-Funded Infrastructure Duration: 2023 Reference: David Copp, P.E, Public Works Deputy Director, (310) 544-5335, dcopp@rpvca.gov Project Description The Portuguese Bend Landslide Remediation Project is a large-scale hazard mitigation eff ort aimed at slowing ground movement within the Greater Portuguese Bend landslide complex, where historical move- ment has reached up to 8.5 feet per year. To address ongoing instability and protect critical infrastructure, the City of Rancho Palos Verdes pursued federal funding through FEMA’s Building Resilient Infrastruc- ture and Communities (BRIC) grant program. The project includes installation of deep hydraugers (de- watering wells), surface drainage improvements, and other geotechnical stabilization measures designed to reduce groundwater infi ltration into underlying bentonite clay layers. The scope also incorporates environmental compliance requirements, including Environmental Impact Report (EIR) preparation, and coordination with state and federal agencies. Key Personnel and Responsibilities •Paul Hansen (Principal): Provided executive oversight, strategic guidance, and coordination with City leadership and funding agencies. •Ken Becker (Cost Estimator): Led development of detailed, FEMA-compliant cost estimates, including quantity take-off s, unit pricing, and cost modeling for complex geotechnical work. Core Services Included •Development of detailed cost estimates supporting FEMA BRIC grant applications •Preparation and updates of Benefi t-Cost Analysis (BCA) to demonstrate project cost-eff ective- ness •Refi nement of cost estimates to refl ect evolving scope, infl ation, and accelerated landslide condi- tions •Separation of emergency stabilization costs from long-term remediation eff orts to ensure funding compliance •Coordination with engineering, environmental, and regulatory teams to incorporate updated design and permitting requirements •Risk-based contingency modeling to account for unstable terrain, access limitations, and con- struction uncertainties Key Value / Relevance •Pending $23.3M in federal funding, the largest grant in the City’s history and a fi rst-of-its-kind BRIC landslide mitigation award Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 •Enabled adaptive scaling of project funding, increasing total estimates from ~$33M to ~$48.7M while maintaining grant eligibility •Ensured FEMA compliance through accurate cost estimating and defensible Benefi t-Cost Analy- sis •Successfully diff erentiated between emergency response and long-term mitigation costs, protect- ing funding eligibility and City resources •Demonstrated expertise in high-risk, geotechnical emergency environments and multi-agency coordination Portuguese Bend Landslide Remediation – Construction Phase Project Controls Services Client: City of Rancho Palos Verdes (via Prime Construction Manager) Project Type: Emergency Infrastructure / Landslide Stabilization Duration: 2024 – 2025 Reference: David Copp, P.E, Public Works Deputy Director, (310) 544-5335, dcopp@rpvca.gov Project Description The Portuguese Bend Landslide Remediation Project is a high-profi le emergency stabilization eff ort addressing one of the largest active landslides in the United States. The project is supported by a $23.3 million FEMA Building Resilient Infrastructure and Communities (BRIC) grant and includes critical mea- sures such as directional drilling and installation of deep hydraugers (dewatering wells), surface drainage improvements, and fracture sealing to reduce ground movement and protect public infrastructure. Construction is being performed in a complex and continuously evolving environment, requiring real-time coordination, adaptive construction approaches, and rigorous cost control to address changing subsurface conditions and ongoing ground movement. Key Personnel and Responsibilities •Paul Hansen (Principal): Provided executive oversight and coordination with the Prime CM and City stakeholders to support eff ective project delivery. •Ken Becker (Cost Estimator): Led construction-phase estimating, cost analysis, and change order evaluation to maintain budget control in a dynamic fi eld environment. Core Services Included •Ongoing construction cost estimating and forecasting for active work packages, including direc- tional drilling, deep dewatering wells, earthwork, and drainage systems •Independent change order estimating and contractor cost validation to support fair and reason- able pricing •Monthly cost forecasting, expenditure tracking, and variance analysis against baseline and updat- ed budgets •Risk-based contingency development tailored to unstable ground conditions, access limitations, and weather impacts •Value engineering support through comparative cost analysis of alternative construction methods and materials Key Value / Relevance •Protected $23.3M in federal funding and City matching funds through independent, defensible cost control •Enabled eff ective change order management in a high-risk, rapidly evolving construction envi- ronment •Provided real-time cost forecasting and variance analysis, supporting proactive decision-making Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 •Reduced fi nancial risk through targeted contingency planning for active landslide conditions •Supported value engineering and cost optimization while maintaining safety and performance requirements Deep Dewatering Wells (DDW) 1–6 Permanent Power – Grant Funding Application Sup- port Client: City of Rancho Palos Verdes Project Type: Emergency Infrastructure / Electrical Power Improvements Duration: Present Reference: David Copp, P.E, Public Works Deputy Director, (310) 544-5335, dcopp@rpvca.gov Project Description The Deep Dewatering Wells (DDW) 1 through 6 Permanent Power Project supports critical emergency stabilization eff orts within the Portuguese Bend Landslide area by improving the reliability and long-term operation of the City’s vertical dewatering wells (hydraugers). These wells have extracted hundreds of millions of gallons of groundwater from the toe of the active landslide, playing a key role in reducing groundwater pressure within underlying bentonite clay layers and slowing ground movement. The project replaces temporary diesel generators with permanent electrical infrastructure, including conduit systems, transformers, switchgear, and utility connections. This transition ensures continuous, cost-eff ective opera- tion of the dewatering system while reducing long-term maintenance costs and operational risks. Key Personnel and Responsibilities •Paul Hansen (Principal): Provided executive oversight and coordination with City stakeholders and design teams. •Ken Becker (Cost Estimator): Led preparation of detailed cost estimates, cost-benefi t analysis, and supporting documentation for grant application. Core Services Included •Preparation of detailed capital cost estimates for electrical infrastructure, including conduit in- stallation, transformers, switchgear, and site-specifi c connections •Development of local match funding requirements (~$525K–$600K) and alignment with total project budget ($1.5M–$2.1M) •Cost-benefi t analysis comparing permanent power systems to temporary generator-based opera- tions •Preparation of grant-compliant cost documentation, including basis of estimate and cost narra- tives •Coordination with electrical engineers and utility providers (including Southern California Edi- son) to validate scope and assumptions •Sensitivity analysis and contingency development for key cost drivers, including material escala- tion, site access, and geotechnical conditions Key Value / Relevance •Strengthened grant application through accurate, defensible cost estimates, improving likelihood of funding approval •Optimized local funding contributions, clearly defi ning the City’s match requirement and maxi- mizing external funding opportunities •Supported transition to permanent electrical infrastructure, reducing long-term operational and maintenance costs •Improved system reliability for continuous dewatering operations, critical to landslide stabiliza- Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 tion •Reduced risk and enhanced decision-making through cost modeling, sensitivity analysis, and contingency planning Lot 3 Parking Structure Emergency Demolition and Interim Replacement Client: City of Manhattan Beach, Department of Public Works Project Type: Emergency Demolition / Public Infrastructure Replacement Duration: 2024 – 2025 Reference: Bianca Cardenas, P.E, Senior Project Manager, (310)802-5357, bcardenas@manhattanbeach. gov Project Description In September 2024, the City of Manhattan Beach ordered the immediate demolition of an existing down- town parking structure following recommendations from the City’s Engineering Division due to safety concerns. The project required rapid mobilization and coordination to safely demolish the structure and implement an interim solution to maintain public parking capacity in a highly constrained urban environ- ment. The project included emergency demolition of the existing structure and design and construction of an at-grade interim surface parking lot. Work was performed in an active downtown setting, requiring careful coordination to minimize disruption to local businesses, residents, and visitors. This was a $1.3 million valued project. Key Personnel and Responsibilities: •Jeff ery Fijalka (Principal Civil Engineer /Project Manager): Led early-phase management of demolition planning and coordination, including oversight of multi-department task force activities. •Rena Osorio (Construction Manager): Assumed day-to-day construction management respon- sibilities, overseeing fi eld coordination, contractor activities, and delivery of the interim surface parking lot under accelerated conditions. •Paul Hansen (Principal): Provided executive oversight and support to ensure alignment with City priorities and rapid response requirements. •Patricia McCarthy (Contract Manager): Served as Contract Manager for the on-call PM services agreement, providing contract oversight and coordination with the City to support timely project delivery. Core Services Included: •Management and oversight of emergency demolition operations •Coordination of interim surface lot construction in an active urban environment •Leadership and participation in a multi-department City Task Force to coordinate project status, public impacts, and response strategies •Coordination with City departments, contractors, and stakeholders to support rapid implementa- tion •Field oversight and inspection support to ensure work was performed in accordance with project requirements •Support for public communication coordination and updates to City leadership and City Council Key Value / Relevance •Demonstrated ability to deliver emergency demolition and rapid infrastructure replacement •Showcased seamless transition of CM responsibilities to maintain project continuity under urgent conditions Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 •Led coordination across multiple City departments in a high-visibility environment •Maintained public safety and service continuity in a constrained downtown setting •Provided real-time fi eld oversight and coordination under accelerated timelines Project Photographs San Fernando Basin Groundwater Replenishment Program Client: Hazen & Sawyer / Los Angeles Department of Water and Power Project Type: Groundwater Treatment/ Water Quality Infrastructure Duration: On-Going (2019-Present) Reference: Ofelia Rubio, Contract Administrator, LADWP, (213) 367-0931, Ofelia.Rubio@ladwp.com Project Description The San Fernando Basin Groundwater Replenishment Program is a large-scale infrastructure initiative supporting Los Angeles Department of Water and Power eff orts to address groundwater contamination and improve regional water quality and supply reliability. Delivered through a Progressive Design-Build approach, the program includes the design and construction of three major groundwater treatment facil- ities—North Hollywood West, Central, and Tujunga Well Field Treatment Plants—as well as associated chlorination stations. The program incorporates advanced treatment technologies, including ultraviolet/ advanced oxidation (UV/AOP), hydrogen peroxide (H₂O₂) dosing, and liquid phase granular activated carbon (LPGAC), to remove contaminants of emerging concern. Additional scope includes wells, pumps, pipelines, and associated structural, mechanical, electrical, and instrumentation systems required for full system integration. PHE Role and Responsibilities •Paul Hansen, P.E. (Principal): Provides executive oversight, client coordination, and strategic guidance for program-level delivery. •Rena Osorio (Project Manager): Supports coordination of project controls activities and inter- faces with project stakeholders and subconsultants. •Ken Becker (Cost Estimator): Performed independent cost estimating to support project plan- ning, budgeting, and evaluation of project costs. •Jaymin Shah (Master Scheduler / P6 Integrator): Leads development and maintenance of the integrated Program Schedule, including phasing, task orders, and milestone tracking. •Khalid Manzoor (Senior Scheduler): Provides advanced scheduling expertise, including schedule analysis, risk identifi cation, and support for time impact evaluations. •Tannaz Zandi (Contract Administrator): Supports document control, coordination of project records, and tracking of deliverables, ensuring accurate and timely management of project documentation. Core Services Include •Contractor baseline schedule reviews and constructability/logic evaluation •Monthly schedule update reviews and progress tracking against critical path activities Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 •Development and maintenance of a comprehensive Program Schedule across multiple concurrent projects and task orders •Time impact analyses (TIA) and schedule-related claims review •Scheduling support for LADWP Owner-Direct construction activities •Contract administration support and coordination with stakeholders and subconsultants Key Value / Relevance •Supports delivery of a $600M+ water quality infrastructure program addressing groundwater contamination •Demonstrates expertise in Progressive Design-Build and multi-project program coordination •Provides critical scheduling and controls support across simultaneous design and construction eff orts •Enables proactive risk identifi cation and informed decision-making through advanced schedule analysis •Directly aligns with LADWP’s water quality and supply reliability objectives Project Photographs Fairmont Sedimentation Plant Client: Arcadis / Los Angeles Department of Water and Power Project Type: Water Treatment Infrastructure/ Sedimentation Facility Duration: On-Going (2019-Present) Reference: Christine Cotton, Vice President, Arcadis U.S. Inc., Christine.Cotton@arcadis.com Project Description The Fairmont Sedimentation Plant project involves the predevelopment and ongoing planning of a new water treatment facility designed to pre-treat source water conveyed through the Los Angeles Aqueduct system. The project combines fl ows from Los Angeles Aqueducts 1 and 2 upstream of Fairmont Reservoir No. 2, with a maximum treatment capacity of approximately 720 cubic feet per second (cfs). The treat- ment process includes coarse and fi ne screening, rapid mixing, fl occulation, and sedimentation utilizing plate settlers. The project scope also includes signifi cant supporting infrastructure such as site prepara- tion, new sedimentation basins, equalization basins, sludge dewatering facilities, solids handling systems, administration and laboratory buildings, and modifi cations to existing reservoir infrastructure, including relining of Fairmont Reservoir No. 2 and upgrades to the inlet structure. Additional improvements include roadway upgrades to support construction and long-term operations. PHE Role and Responsibilities •Paul Hansen, P.E. (Principal): Provides executive oversight and coordination with LADWP, ensuring alignment of project controls eff orts with client objectives. •Jeff ery Fijalka, P.E. (Project Manager): Leads project coordination and oversight of planning, Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 scheduling, and construction-related activities. •Ken Becker (Cost Estimator): Leads preparation of detailed cost estimates for all project com- ponents, including structural, mechanical, electrical, and architectural systems. •Ehimanre Ebohotemen (Scheduler): Supports development and maintenance of project sched- ules, including updates, reporting, and schedule analysis. •Tannaz Zandi (Contract Administrator): Supports document control, coordination of project records, and tracking of deliverables, ensuring accurate and timely management of project documentation. Core Services Include •Development and maintenance of a Critical Path Method (CPM) baseline and ongoing project schedules •Preparation of schedule updates and three-week look-ahead schedules •Participation in coordination meetings to review progress and identify potential schedule impacts •Identifi cation of schedule risks, critical path impacts, and activity slippage •Preparation and refi nement of cost estimates based on scoping and design development Key Value / Relevance •Supports ongoing delivery of a $200M+ water treatment facility critical to LADWP’s aqueduct system •Demonstrates expertise in water treatment processes and infrastructure planning •Provides integrated scheduling and cost estimating services during active project development •Enables proactive identifi cation of schedule risks and cost impacts •Directly supports water quality improvement and treatment system implementation Project Photographs Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Section 4. Quality Control Plan Quality Control Approach Paul Hansen Engineering (PHE) implements a proactive quality control (QC) program to ensure all deliv- erables and fi eld services meet the City’s expectations for accuracy, timeliness, and completeness. Given the emergency nature of the Portuguese Bend Landslide Response Program, our approach emphasizes real-time coordination, continuous oversight, and rapid response to evolving fi eld conditions. Quality control is integrated into all project activities, including fi eld inspection, contractor coordination, cost estimating, and document preparation. Quality Control Process PHE utilizes a multi-level review process to ensure consistency and accuracy: •Task-Level Review: Responsible staff verify technical accuracy and completeness. •Senior Review: The Project/Construction Manager confi rms coordination, compliance, and con- structability. •Independent QC Review: A senior reviewer not directly involved performs an independent check of key deliverables. This approach provides both direct supervision and independent peer review prior to submission. Deliverable and Document Control PHE will maintain a structured document control system to ensure consistency and accuracy of all deliv- erables. This includes: •Standardized templates and formatting •Version control and document tracking •Internal “check set” reviews prior to submission •Timely incorporation of City comments All reports, cost estimates, and project documentation are reviewed internally before submission. Field Quality Control and Oversight PHE emphasizes fi eld-based quality control to support active construction and emergency response condi- tions: •Daily inspection reporting with photo documentation •Verifi cation of contractor compliance with task orders and specifi cations •Real-time identifi cation and resolution of fi eld issues •Coordination with contractors, inspectors, and City staff •Monitoring of site conditions and safety practices Quality Control Tools and Continuous Improvement PHE applies established tools and procedures to support quality and effi ciency: •RFI and submittal tracking and review •Cost estimate validation and independent checks •Schedule review to support timely delivery •Change order review and cost verifi cation •Ongoing coordination and incorporation of City feedback Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Project and Constuction Management, Inspection and Cost Estimating Services for the Portuguese Bend Landslide Emergency Landslide Response Program 2103 W Crestwood St Rancho Palos Verdes, CA 90275 (310) 935-8586 Section 5. Acceptance of Conditions Paul Hansen Engineering, LLC (PHE) has carefully reviewed the Request for Qualifi cation (RFQ) documents, including all attachments, and the Sample Professional Services Agreement (PSA) provided as Attachment E. PHE acknowledges and understands the requirements, terms, and conditions set forth therein. PHE hereby affi rms its acceptance of all conditions, provisions, and requirements contained in the RFQ and the PSA without exception. PHE does not propose any modifi cations, exceptions, or deviations to the terms and conditions and agrees to be bound by all provisions as presented. PHE understands that, unless otherwise noted, the City will rely upon this Statement of Quali- fi cations as confi rmation of full compliance with all aspects of the RFQ and agreement with all provisions of the PSA. Accordingly, PHE confi rms its commitment to adhere to all contractual, administrative, and technical requirements identifi ed in the solicitation documents. Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. *LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LIMITS SHOWN ARE INCLUSIVE OF AMOUNTS REQUESTED BY THE CERTIFICATE HOLDER AND MAY NOT REFLECT POLICY LIMIT AMOUNTS IN EXCESS OF THOSE REQUESTED. *Not Applicable in WY $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED? (Mandatory in NH) DESCRIPTION OF OPERATIONS below If yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION$ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2025/12)© 1988-2025 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIRED AUTOS ONLY 06/22/2026 City of Rancho Palos Verdes 30940 Hawthorne Blvd Rancho Palos Verdes, CA 90275 PAUL HANSEN ENGINEERING LLC 2103 W CRESTWOOD ST RANCHO PALOS VERDES, CA 90275. PAUL HANSEN IS INDICATED AS EXCLUDED ON THE REFERENCED WORKERS COMPENSATION POLICY. UMBRELLA POLICY FOLLOWS FORM. THE CERTIFICATE HOLDER NAMED BELOW, CITY OF RANCHO PALOS VERDES ITS ELECTED OR APPOINTED OFFICERS, AGENTS, OFFICIALS, EMPLOYEES AND VOLUNTEERS ARE LISTED AS ADDITIONAL INSURED ON THIS POLICY, PER THE ATTACHED ENDORSEMENTS. Thirty (30) day cancellation notice for any reason, ten (10) day notice for nonpayment of premium or fraud, of the policies referenced. 1,000,000 1,000,000 1,000,00008/11/202608/11/2025A09480977 44 YC 2,000,00004/09/202704/09/2026605830039 2,000,00044 10,0004 44 B 04/09/202704/09/2026605830013 1,000,00044 4 4A 2,000,000 4,000,000 2,000,000 5,00004/09/202704/09/2026605830013 75,000 2,000,00044 4 4 4 A 21687Mid Century Insurance Company 21652Farmers Insurance Exchange 21709Truck Insurance Exchange dcolman@farmersagent.com 310-832-6621310-832-6155 Deborah Colman PAUL HANSEN ENGINEERING LLC 2103 W CRESTWOOD ST RANCHO PALOS VERDES CA 90275-0815 Deborah Colman 29000 S. Western Avenue Ste 404 Rancho Palos Verdes CA 90275 06/22/2026 Docusign Envelope ID: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Certificate Of Completion Envelope Id: B7FD722A-60BF-81E7-8313-AEAD6C46DB35 Status: Completed Subject: FY26-27 Landslide Emgy. Contracting - Paul Hansen Engineering LLC - Project-Const. Mgmt, Inspection Source Envelope: Document Pages: 68 Signatures: 4 Envelope Originator: Certificate Pages: 5 Initials: 2 David Copp AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 dcopp@rpvca.gov IP Address: 72.34.97.146 Record Tracking Status: Original 6/22/2026 10:27:25 AM Holder: David Copp dcopp@rpvca.gov Location: DocuSign Signer Events Signature Timestamp Paul Hansen Paul.Hansen@paulhansenengineering.com Managing Member, LLC Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 2600:1012:b0c4:6663:3db5:7f72:d3d0:a0d1 Sent: 6/22/2026 10:32:29 AM Viewed: 6/23/2026 4:57:46 PM Signed: 6/23/2026 4:58:32 PM Electronic Record and Signature Disclosure: Accepted: 6/23/2026 4:57:46 PM ID: df88d986-e17b-427f-bbe8-104ea9fe5ac9 William Wynder wwynder@awattorneys.com City Attorney City Attorney Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 13.88.155.124 Sent: 6/23/2026 4:58:33 PM Viewed: 6/23/2026 5:10:51 PM Signed: 6/23/2026 5:12:05 PM Electronic Record and Signature Disclosure: Accepted: 6/23/2026 5:10:51 PM ID: 1d9407f3-e4c3-447e-998a-5d186037115f Paul Seo paul.seo@rpvca.gov Mayor of RPV Security Level: Email, Account Authentication (None)Signature Adoption: Drawn on Device Using IP Address: 47.141.5.147 Sent: 6/23/2026 5:12:07 PM Viewed: 6/24/2026 9:41:23 AM Signed: 6/24/2026 9:41:32 AM Electronic Record and Signature Disclosure: Accepted: 12/17/2025 3:23:57 PM ID: 0771065e-75e8-4062-b23e-0088408f91e0 Teresa Takaoka terit@rpvca.gov City Clerk Security Level: Email, Account Authentication (None)Signature Adoption: Drawn on Device Using IP Address: 70.170.27.194 Signed using mobile Sent: 6/24/2026 9:41:33 AM Viewed: 6/24/2026 9:42:24 AM Signed: 6/24/2026 9:42:33 AM Electronic Record and Signature Disclosure: Accepted: 6/24/2026 9:42:24 AM ID: b3472682-e9f9-4428-9478-10fd5508a596 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 6/22/2026 10:32:29 AM Certified Delivered Security Checked 6/24/2026 9:42:24 AM Signing Complete Security Checked 6/24/2026 9:42:33 AM Completed Security Checked 6/24/2026 9:42:33 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Rancho Palos Verdes (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronicall y through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made av ailable electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/15/2021 5:55:39 PM Parties agreed to: Paul Hansen, William Wynder, Paul Seo, Teresa Takaoka Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Rancho Palos Verdes: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: terit@rpvca.gov To advise City of Rancho Palos Verdes of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at terit@rpvca.gov and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from City of Rancho Palos Verdes To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to terit@rpvca.gov and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Rancho Palos Verdes To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to terit@rpvca.gov and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:  You can access and read this Electronic Record and Signature Disclosure; and  You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and  Until or unless you notify City of Rancho Palos Verdes as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Rancho Palos Verdes during the course of your relationship with City of Rancho Palos Verdes.