CC SR 20250429 01 - FY25-26 thru 29-30 CIP CITY COUNCIL MEETING DATE: 04/29/2025 AGENDA REPORT AGENDA HEADING: Regular Business AGENDA DESCRIPTION: Consideration and possible action to review the proposed Capital Improvement Program for Fiscal Years (FY) 2025-26 through 2029-30. RECOMMENDED COUNCIL ACTION: (1) Receive and file a report on the status of the current FY 2024-25 Capital Improvement Program; (2) Receive and file a report on the proposed Capital Improvement Program for FY 2025-26 through 2029-30; and (3) Provide direction on the proposed Capital Improvement Program for FY 2025-26 through 2029-30 for adoption consideration as part of the preliminary budget hearing on June 3, 2025. FISCAL IMPACT: Receiving and filing reports and providing direction as described in the recommended Council actions does not result in a fiscal impact. The fiscal impacts of approving the Capital Improvement Plan (CIP) will be included in the staff report for the FY 2025-26 Preliminary Budget tentatively scheduled to be considered on June 3, 2025. At this time, the CIP proposes an expenditure of $27.5 million (all funds) for FY 2025-26. Of this amount, $15.3 million (56%) is proposed from the CIP Fund, with the remaining $12.2 million (44%) million from various Special Revenue Funds (restricted funds). Amount Budgeted: N/A Additional Appropriation: N/A Account Number(s): N/A ORIGINATED BY: David Copp, Deputy Director of Public Works Robert Moya, Deputy Director of Finance RM REVIEWED BY: Ramzi Awwad, Director of Public Works Vina Ramos, Director of Finance VR APPROVED BY: Ara Mihranian, AICP, City Manager ATTACHED SUPPORTING DOCUMENTS: A. Proposed CIP for FY 2025-26 through 2029-30 (Page A-1) B. IMAC meeting minutes for February 17, 2025, March 31, 2025, and draft minutes for April 21, 2025 (Page B-1) C. Public Comment from Jim Knight dated April 23, 2025 (Page C-1) 1 BACKGROUND: The City’s CIP is the City’s plan for the expansion, rehabilitation, and major maintenance of public infrastructure (generally speaking maintenance projects that extend the useful life of City assets are capitalized rather than expensed as a one year cost that exceeds $100,000. The General Fund generally covers “one year” expenses). It defines needed infrastructure improvements, prioritizes them, and sets forth a funding strategy within the City’s financial limits. A critical element of the City’s CIP is the provision of funds to both preserve and enhance existing facilities, as well as provide new infrastructure in response to the changing needs of the community. The CIP plans for the City’s needs over a five-year horizon and is funded annually for a one-year period. It is revised annually in conjunction with the budget process. Revisions may include changes in priorities, project scopes, cost estimates, and/or schedules. Priorities may change because new projects may be added, or existing ones may be propelled to a higher level of importance as a result of the changing needs of the community, or the availability of external funding opportunities. Project scopes, schedules, and cost estimates are updated as more becomes known about each project through the planning and design phases. The CIP also includes a “needs/wants” list, which is comprised of projects that are not currently recommended for funding or not sufficiently developed to be included in the five- year plan. These projects are evaluated annually against other priorities for inclusion in the CIP. The CIP is a tool that serves as the “blueprint” for the future of the community’s infrastructure within the City’s financial constraints and provides a framework for the City’s management team and the City Council with respect to investment planning. CIP Process Each year, the CIP is updated by removing projects completed during the year; updating existing project scopes, schedules, and cost estimates; and adding new projects identified throughout the year by staff from various departments, constituents of the City, committees, elected or appointed officials, and other stakeholders. This update results in a preliminary unconstrained proposed projects list. The preliminary unconstrained proposed projects list is then discussed with the Infrastructure Management Advisory Committee (IMAC), which is a City Council appointed advisory body. The IMAC was formed in FY 2014-15 to advise the City Council on infrastructure needs and the CIP. Input from IMAC is incorporated to arrive at a draft project list. Staff then prioritizes the projects and constrains the project list for the upcoming fiscal year against the available staff resources and funding. The process is then repeated for each subsequent fiscal year. Projects that do not fit within the available staff resources and funding for the five-year horizon are placed on the Needs/Wants List and funding is 2 indicated as “To Be Determined”. The result is the Draft Proposed CIP, which is then shared with IMAC for their final input. Adjustments are made based on IMAC input and the Proposed CIP is presented to the City Council at a CIP workshop to provide direction on how to proceed. For the FY 2025-26 through 2029-30 CIP, because of the amount of funding dedicated to stabilization and remediation of the Ancient Altamira/Greater Portuguese Bend Landslide Complex (Landslide Complex), there are projects for which funding sources have not yet been identified but are considered priorities. Therefore, these projects are included in the CIP with an indication that funding has not yet been determined. Staff will seek various funding avenues for these projects, such as grants. However, some projects, especially maintenance projects, do not typically qualify for grants. Funding plans will updated in CIP iterations as funding is identified from grants or other revenue sources. Staff then presents the revised version to the Planning Commission for their review and determination of consistency with the General Plan. Staff then receives direction from the City Council during the CIP workshop and revises the Proposed CIP accordingly. Finally, the Revised Proposed CIP is presented to the City Council for their consideration and adoption into a Final CIP during the budget hearings in June. At tonight’s workshop, Staff is presenting the Proposed CIP to the City Council and is seeking direction on the City Council’s project priorities. DISCUSSION: Prioritization Strategy The Proposed CIP was developed based on following assumptions and prioritization principles: 1. Stabilization of the Landslide Complex. 2. Maintaining core infrastructure in a state of good repair. 3. Projects associated with City Council Goals. IMAC (Feb-April) CIP Workshop April 29 Planning Commission May 13 CIP Adoption June 3 3 The proposed CIP assumes that the Landslide Complex will be stabilized by the end of FY 2027-28. Stabilization is defined as returning to a rate of movement less than or equal to the rate of movement prior to the City’s October 2023 emergency declaration. The assumption that the landslide will be stabilized in the next two years is based on transitioning from the emergency stabilization efforts and completing the landslide remediation project that were being pursued prior to the accelerated movement; as well as effective completion of Abalone Cove Landslide Hazard Abatement District (ACLAD) and Klondike Canyon Hazard Abatement District (KCLAD) remediation projects. A significant portion of funding proposed for the CIP is dedicated to stabilizing the Landslide Complex (approximately 56% in FY 2025-26). Due to the CIP’s focus on landslide stabilization and the relative amount of funding required to implement supporting projects, there remains a funding gap for other core infrastructure work and for projects supporting City Council goals. In recent years, the CIP was constrained by staff vacancies rather than funding limitations. However, over the course of the current fiscal year, the Public Works (PW) Department has been successful in filling several vacant positions. As a result, PW does not anticipate staffing to be a constraint in the project commitments currently in the draft CIP. Cost Estimating Developing budgets for capital projects is a difficult endeavor for any public works agency. This is because budgets are based on a forecast of what engineers think consultants and contractors will charge to complete design and construction of a project at some future point in time. Many variables affect the price, and for projects where design is not complete, the cost estimating process is even more challenging because there remain many unknowns about the project. Project costs were estimated by using construction cost data for recent similar projects, when possible, and adjusted for special project conditions where appropriate. A contingency of 30% was applied to the estimated construction cost for projects that are in planning stages or are not scheduled to be constructed in the next five years, to reflect the high level of uncertainty that the many remaining unknowns present. The contingency was reduced as projects were further along in design and closer to being constructed, down to 10% percent for projects where engineering is complete, and construction is expected within the next year. For projects that are part of an ongoing program where the scope would typically be reduced to meet the budget constraints, that contingency was also reduced or eliminated. Soft costs for planning, environmental, engineering, management, and inspection were added as a percentage of the expected construction cost based on staff experience and judgement; and adjusted for special project conditions. 4 Staff applied an inflation to cost estimates by escalating estimated costs at a compounded rate of 3-4% for each future fiscal year, based on the latest available industry cost estimating guidelines and the type of work being estimated. In some cases, project costs beyond FY 2026-27 were exceptionally difficult to estimate because of significant unknowns associated with those projects. For projects associated with the Landslide Complex, the incremental progress in slowing land movement is particularly difficult to estimate and is a central factor in determining future costs associated with the program. For other projects, engineering studies that are in progress are needed to determine the scope of the needed improvements. As a result, estimates were prepared with the best information available at this time and will be further updated in future years where possible as more information is obtained to reduce or eliminate the key unknowns. Project Categories The proposed CIP is arranged in the following order of project categories based on the type of infrastructure they support. Each category is assigned a numerical program series code for which project codes are established. 8200 – Abalone Cove Sanitary Sewer System The Abalone Cove Sanitary Sewer System is operated and maintained by the City and serves approximately 113 developed parcels within the Landslide Complex. Projects in this series serve to implement long-term upgrades and immediate repairs as needed to sustain reliable service of the system. 8300 – Portuguese Bend Landslide Projects in this series serve to address the effects caused by land movement and reduce risks to public safety and infrastructure by implementing various land movement mitigation measures and infrastructure repairs. 8400 – Parks, Open Space & Recreation Facilities Projects in this series serve to implement repairs, upgrades, additions and other improvements at the City’s various parks, open space and reserves, for the benefit and enjoyment of the public. 8500 – Building Improvements The City owns and maintains a number of buildings and facilities. This series of projects is intended to implement repairs, upgrades or additions to the City’s portfolio of facilities to provide efficient government services, enhance a visitor’s experience, reduce facility lifecycle operations and maintenance costs, and meet relevant safety and accessibility standards. 5 8700 – Sewer and Storm Drain Improvements Projects in this series are intended to make improvements to existing sanitary sewer and drainage system infrastructure to reduce the risk to public safety and property damage associated with system failure or undercapacity. This series also includes recurring studies, assessments and inventory updates to forecast improvements needed to effectively manage and reduce the aforementioned risks. 8800 – Right-of-Way Improvements The City owns approximately 41.5 section miles of arterial streets and 108.6 section miles of residential streets. This series of projects are intended to maintain and enhance transportation infrastructure through implementing roadway rehabilitation and resurfacing, optimizing traffic flow, safety improvements, and beautification elements. These projects are supported by various roadway condition and traffic flow studies in order to effectively prioritize, schedule and fund right-of-way improvements. Proposed Five-Year CIP The Proposed CIP (Attachment A) includes a roll-up summary and individual project sheets with general descriptions of the scope, budget, and schedule. The project sheets are also categorized by type of infrastructure as described above. The discussion below is based on the following four sections, including a summary of completed projects in FY2024-25, that frames the Proposed CIP: 1. Completed Projects (FY 2024-25) 2. Ongoing Programs/Projects 3. New Projects 4. Needs/Wants List 1. FY 2024-25 Completed Projects: Projects that are complete or are expected to be complete by June 30, 2025 are listed below in Table 1. Projects completed in FY2024-25 that are recurring in nature are also included in the proposed FY2025-26 through FY2029-30 CIP. Some projects listed below are established as part of ongoing programs that continue into future years. Work completed in FY2024-25 within these programs are included in the list to further highlight their ongoing accomplishments. Table 1: FY 2024-25 Completed Projects Project Code Project Name 8509 Facilities Maintenance Program (FY2024-25) 1. Americans with Disabilities Act (ADA) Study for City Facilities 2. Point Vicente Interpretive Center (PVIC) Drainage Improvements 3. Hesse Park Community Center Roof Replacement 4. Trail Repairs at the PVIC Gardens 8722 Storm Drain Outlet Improvements at Ocean Crest Drive 8723 Storm Drain Improvements at Peacock Ridge Road 8844 Roadway Asset Management Program – Triennial Update 6 Project Code Project Name 2025 Pavement Management Plan Update 8846 Traffic Calming Program (FY2024-25) 1. Eddinghill Drive – Speed feedback signs 2. Abbotswood Drive – Temporary speed feedback signs 3. Hawthorne Boulevard-Woodbrook Road-Shorewood Road – Curb striping and traffic signs 4. Crest Road at Mira Catalina School – Crosswalk flashing beacons 5. Longhill Drive at Soledado Elementary School – Yield signs at crosswalk 6. Avenida Classica and Avenida Celestial –Pilot test traffic circles 7. Crest Road – Speed feedback signs and advance cross-street signs near Sea Terrance 2. Ongoing Programs/Projects: Programs/Projects that were part of the FY2024-25 through FY2028-29 CIP, or were approved after its adoption, and are continuing as part of the proposed FY2025-26 through FY2029-30 CIP are shown in Table 2 below. Table 2: Ongoing Projects from Prior CIPs Project Code Project Name 8202 Abalone Cove Sanitary Sewer Rehabilitation Program 8302 Palos Verdes Drive South Landslide Repair Program 8304 Portuguese Bend Landslide Remediation 8307 Portuguese Bend Landslide Remediation – Emergency Stabilization Measures 8426 Park Playground Improvements 8427 Wildlife Corridor Encroachment Removal 8503 New Civic Center Campus Master Plan 8509 Facilities Maintenance Program 8701 Storm Drain Asset Management Program & Master Plan Update 8715 Stormwater Drainage Improvements – Palos Verdes Drive South at Peppertree Drive 8721 Multi-Jurisdictional Stormwater Treatment at Torrance Airport 8724 Lift Station Improvements at Lower Point Vicente 8725 Stormwater Treatment Project – Dry Well 8808 Roadway Asset Management Program - Crenshaw Boulevard 8809 Western Avenue Traffic Flow Improvements 8810 Curb Ramp Improvements Program 8828 Intersection Improvements along Palos Verdes Drive South 8837 Traffic Signal at Palos Verdes Drive South and Palos Verdes Drive East 8840 Western Avenue Beautification (long-term) 8844 Roadway Asset Management Program – Triennial Update 8846 Traffic Calming Program – Citywide 8847 Palos Verdes Drive East Guardrail Improvements 8855 Roadway Asset Management Program – Palos Verdes Drive South and West 8856 Roadway Asset Management Program – Residential Streets 8857 Hawthorne Boulevard at Eddinghill / Seamount Left Turn Signal 8858 Roadway Asset Management Program – Palos Verdes Drive East 8859 Roadway Asset Management Program – Highridge Road 8860 Roadway Asset Management Program – Montemalaga Drive 8861 Sidewalk Management Program 88LY2 Roadway Asset Management Program – Indian Peak Road 88LY4 Roadway Asset Management Program – Crestridge Road 7 Project Code Project Name 88LY5 Roadway Asset Management Program – Crest Road 3. New Projects: Projects proposed for funding for the first time starting in FY 2025-26 through FY 2029- 30 are shown in Table 3 below. In consideration of current funding constraints, only new projects that serve to address near-term risks to infrastructure failure, property damage, and public safety are proposed. One exception is project 88New6 – Roadway Asset Management Program – Hawthorne Boulevard, which was identified as part of the 2025 Pavement Management Program (PMP). The findings and recommendations of the PMP forecasted the need to rehabilitate Hawthorne Boulevard within the next 4-5 years. As such, this new project was considered important to include in the proposed CIP to reflect all known infrastructure needs in the CIP as comprehensively as practical. Table 3: New Projects in FY2025-26 through FY2029-30 Project Code Project Name 83New3 Portuguese Bend Landslide Remediation – Permanent Energization of Deep Dewatering Wells 1 thru 6 83New4 Portuguese Bend Landslide Remediation – Hydrology & Hydraulics Study 87New7 Storm Drain Improvements at Montemalaga Canyon 87New8 Sewer Maintenance Access Improvements in Agua Amarga Canyon 88New6 Roadway Asset Management Program – Hawthorne Boulevard 4. Needs/Wants List: Table 4 below represents the Needs/Wants List, which includes projects considered, but not recommended for funding in the FY2025-26 through FY2029-30 CIP. The list was developed based on both staff capacity, as well as estimated funding constraints over the five-year CIP period. When considering current priorities and resource projections, these projects are now on the Needs/Wants List; however, the CIP is considered on an annual cycle and as part of future CIP discussions, priorities could change and one or more of these projects could move up into the 5-year plan and others could move down to the Needs/Wants List based on Council direction. Table 4: Wants/Needs List in FY2025-26 through FY2029-30 Project Code Project Name 8301 Palos Verdes Drive South Reconstruction 8404 Fence Program (Parks) 8411 Lower Point Vicente Parking Lot Improvements 8417 Point Vicente Interpretive Center “Bubbles“ Statue Marquee Sign 84New1 Connector Trail (Filiorum Reserve) 85New1 Civic Center Maintenance Trailer Rehabilitation for Public Safety Staff & Rangers 85Pot1 Restroom Improvements and New Office Space at Eastview Park 8708 Altamira Canyon Drainage Improvements 8711 Stormwater Drainage Improvements at Bayend Drive 8714 Stormwater Drainage Improvements from Crest Road to Crestridge Canyon Storm Drain Project 8718 Stormwater Drainage Improvements at Corsini Place 8 Project Code Project Name 87New1 Stormwater Drainage Improvements - Hawthorne Boulevard at Hawkhurst Drive 8811 Aesthetic Improvements Program- Arterial Walls and Fences (City-wide) 8839 Palos Verdes Drive East Widening and Path Improvements near Bronco Drive 8845 Palos Verdes Nature Preserve Parking – Crenshaw Blvd. (North of Crest Rd.) 8851 Arterial Roadway Beautification Program Special Project Considerations In addition to the above-described assumptions made and the approach taken by staff in preparing the proposed CIP, the following considerations were made for several projects: Abalone Cove Sanitary Sewer System Projects Staff assumed a continued high rate of land movement in this area of the Landslide Complex over the next fiscal year, with associated costs comparable to the current fiscal year. Staff assumed incremental improvements over the following fiscal year towards reaching stabilization by the end of Fiscal Year 2027-28. Accordingly, estimated repair costs for FY 2026-27 are reduced by approximately half, followed by incremental cost reductions in remaining years to support remaining anticipated hardening and repair work as the operations and maintenance costs return to levels experienced prior to October 2023. Landslide Improvement Projects • 8302 - Palos Verdes Drive South Landslide Repair Program: Staff made similar assumptions to those described above for the Abalone Cove Sanitary Sewer System Projects. Accordingly, estimated repair costs for FY 2025-26 are similar to those of the current fiscal year, then are reduced by approximately half for FY 2026-27. Incremental cost reductions are estimated for the remaining years to support remaining anticipated repair work as maintenance costs return to levels experienced prior to October 2023. • 8304 - Portuguese Bend Landslide Remediation Project: as further described below, this project is assumed to begin construction as the Emergency Stabilization Measures are being completed in FY 2026-27. There are expected to be operations and maintenance costs in the following years, which are estimated to be approximately $2.5 million in FY 2027-28 and decrease by $0.5M each fiscal year through FY 2029-30 as land movement is assumed to continue decreasing (resulting in less re-drilling of dewatering wells) and the operations and maintenance efforts are further optimized. The outcome of the study proposed as part of Project 83New4 – Portuguese Bend Landslide Hydrology and Hydraulics Study could inform changes to this project. • 8307 - Emergency Stabilization Measures: the work is expected to complete within the next two years in parallel with preparing the companion Portuguese Bend Landslide Remediation Project for construction; as well as the stabilization work being implemented by the KCLAD and ACLAD. Following the completion of the emergency stabilization measures/improvements by FY26/27, the associated 9 maintenance component would be rolled into the scope of the Portuguese Bend Landslide Remediation Project. • 83New3 – Portuguese Bend Landslide Remediation - Deep Dewatering Well 1 thru 6 Permanent Power: The project’s proposed improvements will significantly reduce the city’s reliance on diesel-fueled generators for DDWs 1 thru 6 and therefore reduce annual energy costs from approximately $350k per year to approximately $90k per year (in 2025 dollars). Parks, Open Space and Recreation Facilities • 8426 - Park Playground Improvements: The City has accrued a significant amount funding from Measure A ($1.2 million) that can be used for playground improvements without reliance on the CIP fund. Staff recommend piloting this approach for the playground at Ryan Park first (in FYs 25/26 and 26/27), which has the highest need for repairs and equipment replacement; and if successful, apply the same approach for both Hesse and Eastview Park playgrounds in subsequent years. Staff need additional time to assess those playgrounds to develop an appropriate schedule for implementing improvements while maintaining minimal-to-no dependency on the CIP fund. Additionally, staff are actively pursuing grant opportunities that would match the current proposed measure-A funded amounts and could be reflected in the updated 5-year CIP in FY26/27. Building Improvements • 8503 - New Civic Center Campus Master Plan: The federal government has informed the City that the emergency components, including the Emergency Operations Center (EOC), must be built no later than 2029 to be compliant with the property deed restriction, or the City risks the possibility of the parcel reverting to Federal control and being subject to potential sale. Accordingly, the Staff have prioritized the EOC portion of the Master Plan to expedite its delivery. Other elements of the Plan, including the other emergency components, will be delivered in later phases. Funding for the construction of the EOC is currently unknown. However, staff are pursuing various funding sources; primarily hazard mitigation grants, which staff believe the project is well suited for. • 8509 - Facilities Maintenance Program – budget reduction have required elements of the program to be spread out over a longer duration. However, critical elements most in need of immediate repair, replacement, or upgrade have been programmed to the fullest extent possible in FY 2025-26, considering funding constraints. • Audio/Visual Systems Improvements at Fred Hesse Park Community Center – Staff identified the need to upgrade the information technology and audio-visual systems to meet current standards for technology, accessibility, and public participation. Consideration was given to including these improvements as a 10 proposed CIP project. However, because of funding constraints, the improvements will be implemented in a phased and priority-sequenced approach over multiple years using the established Equipment Replacement Fund. Sanitary Sewer and Storm Drain Improvement Projects • 8202 - Storm Drain Asset Management Program & Master Plan Update: Staff have prioritized the City’s drainage infrastructure condition assessment, which will inform maintenance and repair needs so that they can be programmed in the appropriate fiscal year. Absent this data, Staff’s best estimate of future costs beyond FY 2025-26 is $500k annually, based on recent annual costs of repairs made to the City’s drainage infrastructure. • 8715 - Stormwater Drainage Improvements – Palos Verdes Drive South at Peppertree Drive: This project is not recommended to be designed or constructed until the above-described Landslide Complex stabilization timeline is realized in order to maximize its survivability and useful life. The funding source for this project is unknown at this time, but staff are actively pursuing grant opportunities to reduce or eliminate reliance on the CIP fund to implement (this project was originally approved for funding by then-Senator Feinstein as part of the Congressional Direct Spending program, but has since been deemed unsuitablefor this program funding because of active movement and the inability to meet the required cost/benefit analysis. The grant funding is being redirected to the permanent energization of the City’s deep dewatering wells at the Portuguese Bend Beach Club). • 87New7 - Storm Drain Improvements at Montemalaga Canyon: this new project is required due to the high level of risk of damage to nearby private property. • 87New8 - Sewer Maintenance Access Improvements in Agua Amarga Canyon: this new project is required to provide safe trail access by operations and maintenance staff to the sanitary sewer system in this area. This was a location of a recent sanitary sewer overflow spill and is considered a top priority to avoid future overflow spills and the associated fines and risk to public health. Because the scope of the project is not fully defined, funding an assessment and development of scope in FY 2025-26, followed by construction funding in FY 2026-27 has been programmed in the proposed CIP. The estimate is based on recent comparable projects. Right of Way Improvement Projects • 8809 - Western Avenue Traffic Flow Improvements: this project is fully funded by a sub-regional Measure M grant due to the project’s overall benefit to the region. • 8828 – Intersection Improvements along Palos Verdes Drive South: over the coming months, a traffic study will be prepared with input from the community. The outcome of the study will define the scope of needed improvements and will be used as a basis for seeking grant funds to support the detailed design and 11 construction of the improvements. Staff believe that this type of project will be competitive for securing grant funds. • 8837 – Traffic Signal at Palos Verdes Drive South and Palos Verdes Drive East: this project uses a dedicated restricted fund (1911 Act Fund). The fund balance, in addition to annual revenues, is sufficient to fund this project while also allowing sufficient funding to operate and maintain existing traffic signal infrastructure. • 8840 – Western Avenue Beautification: although this project is considered a priority and a goal of the City Council, the above-described prioritization strategy and identified immediate needs for core infrastructure do not support funding for the project at this time. • 8846 – Traffic Calming Program (City-Wide): The program has been scaled back based on the above-described funding constraints. The program will focus on preparing traffic studies that can be used to support grant opportunities. In the meantime, funding is proposed to be available for minor improvements such as updated/additional traffic signage and pavement markings. • 8856 – Roadway Asset Management Program for Residential Streets: the City’s 2025 Pavement Management Program (PMP), which included a condition assessment of roadways, identified a significant need for work on residential streets to maintain them in a state of good repair. However, due to limited funding, Staff prioritized arterial streets (rather than residential streets) on the basis that arterial streets serve a significantly higher volume of vehicles. • 8855 – Arterial Roadway Asset Management Program – Palos Verdes Drive South and West: pavement maintenance and associated work of Palos Verdes Drive South in the area around Terranea was prioritized in the first year of this project based on the PMP and so the general area remains in good condition. The remainder of this arterial roadway was programmed in following years based on the specific condition of certain segments. • 8858 – Arterial Roadway Asset Management Program – Palos Verdes Drive East: This project was prioritized as much as possible, second among arterial streets only to Palos Verdes Drive South around Terranea to allow for implementation of traffic calming needs identified in previous traffic calming studies. The traffic calming work consists primarily of pavement marking work, which should be synchronized with pavement maintenance work to avoid re-work. Although residents have been requesting traffic improvements for some time, the project needed to be pushed back to FY 2026-27 due to funding constraints. However, there are some elements of the traffic calming work, such as speed feedback signs and other signage improvements, that could be implemented in FY 2025-26 with funding from the Traffic Calming Program. 12 • 8808/55/58/59/60/LY2/LY4/LY5 – Roadway Asset Management Program for Arterial Roadways: the slurry sealing and/or re-paving of arterial streets along with associated work was prioritized based condition assessments from the 2025 PMP and recommendations from consultant pavement specialists. Priority was given to maintaining roadways in a state of good repair as funding is available in each fiscal year. In general, sealing roads within a recommended given timeframe extends the life and reduces the overall maintenance cost associated with re-paving. Arterial roadways that would not benefit from slurry sealing and need to be re- paved were pushed out as long as practical in favor of extending the life of roadways where short-term intervention could reduce the long-term cost. Funding Gap There exists a funding gap for some projects proposed to be included in the proposed five year CIP, mainly because of the magnitude of expenditures incurred responding to landslide movement and repairing damaged infrastructure. Table 5 below summarizes the gap in funding for several proposed projects in the FY 2025-26 through 2029-30 CIP. These projects are not considered by staff to be part of the Needs-Wants List of projects due to their current importance for maintaining reliable infrastructure, providing effective government services, and enhancing quality of life. Table 5: CIP Funding Gap Summary for FY 2025-26 through FY 2029-30 FY 2025-26 FY 2026-27 FY 2027-28 FY 2028-29 FY 2029-30 Total Five-Years 8202 Abalone Cove Sanitary Sewer Rehabilitation Program - - 755,000 755,000 755,000 2,265,000 8302 Palos Verdes Drive South Landslide Repair Program - - 575,000 575,000 575,000 1,725,000 8304 Portuguese Bend Landslide Remediation - 19,995,000 2,500,000 2,000,000 1,500,000 25,995,000 8307 Portuguese Bend Landslide Remediation - Emergency Stabilization Measures - 7,043,750 - - - 7,043,750 8503 New Civic Center Campus Master Plan - 10,290,000 - - 10,290,000 8701 Storm Drain Asset Management Program & Master Plan Update - 500,000 500,000 500,000 500,000 2,000,000 8715 Stormwater Drainage Improvements - Palos Verdes Drive South at Peppertree Drive - 320,000 3,005,000 - - 3,325,000 8840 Western Avenue Beautification (Long Term)225,000 3,000,000 350,000 - - 3,575,000 8856 Roadway Asset Management Program - Residential Streets 4,345,000 4,825,000 2,450,000 2,740,000 2,800,000 17,160,000 TOTAL $4,570,000 $35,683,750 $20,425,000 $6,570,000 $6,130,000 $73,378,750 CIP Funding Gap Summary Projects 13 Staff are actively working to identify alternative funding sources, such as grants and additional sources of revenue for the above projects, as further detailed in the “Additional Information” section of this staff report. IMAC Recommendation At its regular meeting on April 21, 2025, IMAC provided the following comments to the draft CIP: • Project 8715 – Stormwater Drainage Improvements: Palos Verdes Drive South at Peppertree – Staff should consider interim temporary measures to convey stormwater from the area to Palos Verdes Drive South and prevent pooling water that could contribute to land movement. • Project 88New3 – Portuguese Bend Landslide Stabilization – Deep Dewatering Wells 1 thru 6 Permanent Power – Southern California Edison (SCE) should consider underground or on-ground power transmission infrastructure instead of using above-ground transmission lines that could be compromised by land movement. • Project 8509 – Facilities Maintenance Program – Any reduction to funding should be limited, as this program supports proactive maintenance of City-owned facilities that results in reducing associated long-term operations and maintenance costs. • Project 87New8 – Sewer Maintenance Access Improvements in Agua Amarga Canyon – Staff should consider utilizing the established Trails Working Group in partnership with the Department of Recreation and Parks Open Space Management Division (OSM) for an early assessment and recommendations. • Project 8844 – Roadway Asset Management Program – Triennial Update – The project title should be changed to Roadway Maintenance Program • Project 8845 – Palos Verdes Nature Preserve Parking – Crenshaw Boulevard (North of Crest Road) – the project should be assigned a higher priority by way of funding in FY 2025-26 to conduct a study recommending parking improvements. • Project 8847 – Palos Verdes Drive East Guardrail Improvements – the project should provide measures to reduce vehicle damage to guardrails. • General Comment – The IMAC consider projects related to addressing the Landslide Complex are critical. • General Comment – Staff should be aggressive with pursing alternative funding sources, especially for grants associated with roadway projects. 14 Staff considered IMAC’s comments and suggest the following for the Council’s consideration: • Project 8715 – Stormwater Drainage Improvements: Palos Verdes Drive South at Peppertree – Any temporary measures determined to be feasible will be considered as part of the emergency winterization scope described in Project 8307 – Portuguese Bend Landslide Remediation Emergency Stabilization Measures. The current rate of movement in this specific area has a high potential to destroy improvements. Therefore, the risk-to-benefit trade-offs of improving drainage in this area will evaluated against other winterization work in the context of limited funding. • Project 88New3 – Portuguese Bend Landslide Stabilization – Deep Dewatering Wells 1 thru 6 Permanent Power – Staff is of the opinion that it is premature to consider underground or on-ground transmission lines due to the project’s early stage of development and discussions with SCE to date. Providing above-ground transmission lines will provide for a shorter installation schedule and allow for the best means of monitoring the effects of any land movement on the transmission lines. • Project 8509 – Facilities Maintenance Program – Staff have prioritized immediate repairs in FY 2025-26 to best reduce the risk of costly emergency repairs while also addressing elements that are in a state of good repair. The proposed funding in FY 2025-26 is reflective of this approach. Although maximum maintenance work is preferable, this approach balances critical work against funding constraints. • Project 87New8 –The Los Angeles County Department of Public Works (LACPW) is contracted with the City to provide operations and maintenance services to this section of the sanitary sewer system; therefore, the improvements must meet LACPW requirements for access. Staff will engage with OSM for input within the context of meeting LACPW requirements. • Project 8844 – Roadway Asset Management Program – this project and others in the roadway series (8800 series) will be re-named to “Roadway Maintenance” as part of the final draft of the CIP. • Project 8845 – Palos Verdes Nature Preserve Parking – Crenshaw Boulevard (North of Crest Road) – Staff recommends using the limited FY 2025-26 funding in accordance with the prioritization approach described in this staff report. Additionally, Staff recommends following the Traffic Safety Committee process for prioritizing traffic studies. • Project 8847 – Palos Verdes Drive East Guardrail Improvements – staff will work with the design team to implement measures to reduce vehicle damage to guardrails where this can be done in compliance with grant requirements. 15 • Staff assigned the highest priority possible to projects addressing the Landslide Complex. • Staff continue to be aggressive pursuing alternative funding sources. Staff notes that some projects are particularly difficult to fund with grants. For example, grants typically do not fund maintenance projects. Staff have been successful in securing many grants, as listed in the “additional Information” section of this staff report. Five-Year CIP Funding Transfers-Out from General Fund The City’s CIP Fund is not directly funded through the City’s operating tax revenues, as taxes collected by the City are considered general purpose and, therefore, must be recorded in the General Fund. Instead, in accordance with City Council Policy No. 41 Reserve Policy, during the annual budget process, the City Council may authorize a transfers-out amount equal to the Transient Occupancy Tax (TOT) collected from Terranea Resort - the main source of TOT revenues. As such, the transfer amounts exclude TOT received from the other City hotel, America’s Best Value Inn. To comply with Governmental Accounting Standards Board (GASB), the transfers authorized by the City Council must be recorded as a “Transfers-Out” from the General Fund to the CIP Fund. Additionally, the City Council may transfer additional funds based on all or a percentage of the prior year’s unallocated fund balance in the General Fund. In summary, the CIP Fund (capital, maintenance, other) are primarily funded through Transfers-Out from the General Fund. Starting in FY 2017-18, the Transfers-Out from the General Fund to the CIP Fund were impacted by the City’s public safety contract with the Los Angeles County Sheriff’s Department (LASD). To continue services based on the LASD contract without a revenue offset, at that time, the City Council approved reducing the TOT Transfers-Out from General Fund to the CIP Fund by the annual increases in the public safety contract. As a result, since 2017, ongoing increases to the public safety contract reduce transfers to the CIP Fund. However, when the City ends the fiscal year with revenues exceeding expenditures, the City Council typically approves additional transfers to the CIP Fund in the following year. This is intended to replenish the CIP Fund from the public safety reductions made during the start of the budget process. For example, in FY 2024-25, during the budget process, the City Council approved a total of $8.4 million additional transfers which include $1.1 million of additional transfers from prior year’s unallocated fund balance, $889,500 for the Ladera Linda loan payment, and in October 2024, approved an additional $6.4 million to support the landslide emergency and mitigation efforts. At the second budget workshop held on April 17, 2025, Staff presented the estimated Transfers-Out to CIP totaling $3.9 million. This amount reflects $6.8 million in TOT revenues minus the $2.8 million of cumulative increases in public safety since FY 2017- 18, as shown in Table 6 on the next page. Based on costs provided by the LASD, the 16 estimated increase in FY 2025-26 is roughly $286,000, or 3.5%, over the FY 2024-25 adopted budget. Table 6: FY 2025-26 Transfer-Out to CIP FY 2025-26 TOT (Terranea) Estimates $6,800,000 Minus Public Safety Increases: FY 2017-18 -$893,000 FY 2018-19 -$200,500 FY 2019-20 -$230,800 FY 2020-21 -$101,000 FY 2021-22 -$102,900 FY 2022-23 -$103,700 FY 2023-24 -$616,000 FY 2024-25 -$269,600 FY 2025-26 -$286,000 TOTAL deductions from TOT -2,803,500 Total Transfers-Out from General Fund to the CIP Fund $3,996,500 As part of the regular financial report submitted to the City Council on the Greater Portuguese Bend-Ancient Altamira Landslide Complex, on March 18, 2025, the estimated landslide emergency and mitigation efforts in FY 2024-25 will reach to $36.3 million. Of this amount, approximately $19 million is funded by the CIP Fund. As shown in Table 7 on the following page, the FY 2024-25 beginning fund balance is $29.6 million. With $15.7 million in revenues and Transfers-In from the General Fund, and estimated year-end expenditures of $29 million, the projected fund balance by June 30, 2025 is $16.2 million. Based on the projected Five-Year CIP, proposed funding from the CIP Fund for FY 2026 totals $15.3 million, which includes $8 million for the emergency stabilization measures and almost $7.3 million of other capital projects. From FY 2027 through FY 2030, based on the available balance and assuming no additional revenue sources, the proposed expenditures for capital and maintenance are expected to decline significantly, dropping to $5.6 million in FY 2027, $3.1 million in FY 2028, $2.9 million in FY 2029, and $4 million in FY 2030. Continued on next page 17 Table 7: FY 2025-30 Projected CIP Fund Balance – Including Capital, Maintenance, Other Special Revenue Funds The Five-Year CIP is also partially funded by Special Revenue Funds, which are restricted by law for specified purposes. When identifying funding sources for capital and maintenance projects, Staff prioritizes the use of Special Revenue Funds and utilizes them to the fullest extent allowed within their restrictions. Special Revenue Funds may be used for maintenance or capital projects, as approved by the City Council and in accordance with eligibility requirements. The following tables are a summary of the proposed Five-Year CIP funding sources, uses for the proposed five-year CIP, maintenance and operations, and the projected fund balances. CIP Fund FY 2025 YE Estimates FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Beginning Fund Balance 29,592,500 16,216,650 8,463,350 8,015,375 9,853,975 11,613,975 Revenues Interest Earnings 1,200,000 250,000 200,000 190,000 195,700 201,600 Grants - LA County Supervisor Hahn 2,200,000 570,000 - - - - Grants - Other - 2,000,000 - - - - Loan Payments from Districts - 342,900 342,900 342,900 342,900 342,900 Transfers-In: General Fund (Annual TOT minus public safety cumulative increases) 3,852,500 3,996,500 3,812,200 3,564,000 3,303,100 3,029,200 Transfers-In: General Fund (Additional - Ladera Loan)889,500 889,500 889,500 889,500 889,500 889,500 Transfers-In: General Fund (Additional - Prior Year's Unallocated Balance ) 1,178,650 620,000 - - - - Transfers-In: General Fund (Additional - Approved 10/1/2024 for Landslide) 6,400,000 - - - - - Total Revenues (Estimates)15,720,650 8,668,900 5,244,600 4,986,400 4,731,200 4,463,200 Expenditures Emergency Stabilization Measures (18,910,000) (8,050,000) - Capital Projects (5,690,000) (7,252,700) (4,556,975) (1,995,000) (1,800,000) (2,870,000) Loans to Districts (ACLAD and KCLAD) (3,527,000) - - - - - Personnel for Capital Programs (1) (80,000) (230,000) (246,100) (263,300) (281,700) (301,400) Ladera Loan Payment (889,500) (889,500) (889,500) (889,500) (889,500) (889,500) Total Expenditures (Estimates)(29,096,500) (16,422,200) (5,692,575) (3,147,800) (2,971,200) (4,060,900) Projected Ending Fund Balance 16,216,650 8,463,350 8,015,375 9,853,975 11,613,975 12,016,275 City Council Restricted Fund Balance Less: Reserve Policy (5,000,000) (5,000,000) (5,000,000) (5,000,000) (5,000,000) (5,000,000) Projected Restricted Balance 11,216,650 3,463,350 3,015,375 4,853,975 6,613,975 7,016,275 18 Gas Tax (Fund 202), including SB-1 (Fund 204) 1911 Act (Fund 211) Proposition C (Fund 215) FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 202-GAS TAX (HUTA)$1,429,146 $1,449,171 $649,271 $355,571 $99,971 $33,171 REVENUES & TRANSFERS 1,184,600 1,220,100 1,256,700 1,294,400 1,333,200 1,373,200 MAINTENANCE & OPERATIONS -1,164,575 -1,520,000 -1,550,400 -1,400,000 -1,400,000 -1,400,000 CAPITAL 0 -500,000 0 -150,000 0 0 REV/EXP VARIANCE 20,025 (799,900)(293,700)(255,600)(66,800)(26,800) PROJECTED RESTRICTED FUND BALANCE $1,449,171 $649,271 $355,571 $99,971 $33,171 $6,371 FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 202-GAS TAX (SB-1)$2,177,208 $2,863,008 $3,560,508 $2,223,908 $8,008 $1,770,208 REVENUES & TRANSFERS 1,123,800 1,157,500 1,192,200 1,228,000 1,264,800 1,302,700 MAINTENANCE & OPERATIONS -438,000 -460,000 -473,800 -100,000 -502,600 -517,700 CAPITAL 0 0 -2,055,000 -3,343,900 1,000,000 1,000,000 REV/EXP VARIANCE 685,800 697,500 (1,336,600)(2,215,900)1,762,200 1,785,000 PROJECTED RESTRICTED FUND BALANCE $2,863,008 $3,560,508 $2,223,908 $8,008 $1,770,208 $3,555,208 FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 211-1911 ACT ST. LIGHTING $2,918,462 $3,731,062 $4,191,562 $3,857,962 $4,420,762 $5,000,462 REVENUES & TRANSFERS 967,600 996,600 1,026,500 1,057,300 1,089,000 1,121,700 MAINTENANCE & OPERATIONS -155,000 -466,100 -480,100 -494,500 -509,300 -524,600 CAPITAL -70,000 -880,000 REV/EXP VARIANCE 812,600 460,500 (333,600)562,800 579,700 597,100 PROJECTED RESTRICTED FUND BALANCE $3,731,062 $4,191,562 $3,857,962 $4,420,762 $5,000,462 $5,597,562 FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 215-PROP. C $481,802 $401,002 $279,002 $333,302 $214,702 $1,174,002 REVENUES & TRANSFERS 969,200 878,000 904,300 931,400 959,300 988,100 MAINTENANCE & OPERATIONS 0 0 0 0 0 0 CAPITAL -1,050,000 -1,000,000 -850,000 -1,050,000 -1,395,000 REV/EXP VARIANCE (80,800)(122,000)54,300 (118,600)959,300 (406,900) PROJECTED RESTRICTED FUND BALANCE $401,002 $279,002 $333,302 $214,702 $1,174,002 $767,102 19 Measure R (Fund 220) Measure M (Fund 221) Measure A (Fund 224) Community Development Block Grants (CDBG, Fund 310) FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 220-MEASURE R $3,088,902 $3,670,772 $1,475,072 $922,272 $572,972 $632,772 REVENUES & TRANSFERS 782,000 724,300 746,000 768,400 791,500 815,200 MAINTENANCE & OPERATIONS -88,430 -125,000 -128,800 -132,700 -136,700 -140,800 CAPITAL -111,700 -2,795,000 -1,170,000 -985,000 -595,000 -340,000 REV/EXP VARIANCE 581,870 (2,195,700)(552,800)(349,300)59,800 334,400 PROJECTED RESTRICTED FUND BALANCE $3,670,772 $1,475,072 $922,272 $572,972 $632,772 $967,172 FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 221-MEASURE M & GRANT $548,310 $755,910 $606,110 $451,710 $492,690 $328,990 REVENUES & TRANSFERS 831,000 2,418,700 2,791,700 815,480 840,000 865,200 MAINTENANCE & OPERATIONS -623,400 -918,500 -946,100 -974,500 -1,003,700 -1,033,800 CAPITAL 0 -1,650,000 -2,000,000 200,000 0 0 REV/EXP VARIANCE 207,600 (149,800)(154,400)40,980 (163,700)(168,600) PROJECTED RESTRICTED FUND BALANCE $755,910 $606,110 $451,710 $492,690 $328,990 $160,390 FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 224-MEASURE A $46,626 $74,126 $21,626 $19,226 $214,326 $406,926 REVENUES & TRANSFERS 27,500 427,500 330,000 280,000 280,000 280,000 MAINTENANCE & OPERATIONS 0 -80,000 -82,400 -84,900 -87,400 -90,000 CAPITAL 0 -400,000 -250,000 0 0 0 REV/EXP VARIANCE 27,500 (52,500)(2,400)195,100 192,600 190,000 PROJECTED RESTRICTED FUND BALANCE $74,126 $21,626 $19,226 $214,326 $406,926 $596,926 FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 310-CDBG $27,851 $177,851 $7,851 $7,851 $7,851 $7,851 REVENUES & TRANSFERS 150,000 300,000 150,000 150,000 150,000 150,000 MAINTENANCE & OPERATIONS 0 0 0 0 0 0 CAPITAL 0 -470,000 -150,000 -150,000 -150,000 -150,000 REV/EXP VARIANCE 150,000 (170,000)0 0 0 0 PROJECTED RESTRICTED FUND BALANCE $177,851 $7,851 $7,851 $7,851 $7,851 $7,851 20 Federal Grants (Fund 331) Bicycle and Pedestrian Access (Fund 340) Measure W, including Local Return and Regional Grant (Fund 343) Funding Summary Based on the available balances in the CIP Fund and Special Revenue Funds, Table 8 on the next page summarizes the proposed budget of $27.5 million for FY 2025-26, totaling $61.7 million over five years. Of this amount, in FY 2025-26, approximately $15.3 million (56%) is proposed to be funded by the CIP Fund, with the remaining $12.2 million (44%) from Special Revenue Funds. Over the five-year period, the proposed funding is estimated to come from the CIP Fund at $26.5 million (43%) and from various Special Revenue Funds at $35.2 million (57%). Table 9 is a combined balance for CIP Fund and Special Revenue Funds for all proposed capital, maintenance and operations, and other programs. FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 331-FEDERAL GRANT $0 $0 $0 $0 $0 $0 REVENUES & TRANSFERS 550,000 4,011,177 0 0 0 0 MAINTENANCE & OPERATIONS 0 0 0 0 0 0 CAPITAL -550,000 -4,011,177 0 0 0 0 REV/EXP VARIANCE 0 0 0 0 0 0 PROJECTED RESTRICTED FUND BALANCE $0 $0 $0 $0 $0 $0 FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 340 - BICYCLE/PEDESTRIAN $0 $0 $0 $162,700 $330,300 $502,900 REVENUES & TRANSFERS 0 158,000 162,700 167,600 172,600 177,800 MAINTENANCE & OPERATIONS 0 0 0 0 0 0 CAPITAL 0 -158,000 0 0 0 0 REV/EXP VARIANCE 0 0 162,700 167,600 172,600 177,800 PROJECTED RESTRICTED FUND BALANCE $0 $0 $162,700 $330,300 $502,900 $680,700 FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 BEGINNING BALANCE FUND 343-MEASURE W $548,310 $740,010 $300,610 $362,910 $427,110 $493,310 REVENUES & TRANSFERS 712,600 1,372,600 2,533,900 3,665,900 1,013,700 957,100 MAINTENANCE & OPERATIONS -403,000 -652,000 -671,600 -691,700 -712,500 -733,800 CAPITAL -117,900 -1,160,000 -1,800,000 -2,910,000 -235,000 -155,000 REV/EXP VARIANCE 191,700 (439,400)62,300 64,200 66,200 68,300 PROJECTED RESTRICTED FUND BALANCE $740,010 $300,610 $362,910 $427,110 $493,310 $561,610 21 Table 8: FY 2025-30 Proposed Five-Year Capital Improvement Program – Including Capital and Maintenance Projects Table 9: FY 2025-30 CIP Fund and Special Revenue Funds Projected Balance – Including Capital and Maintenance Projects, and Other The attached CIP project sheets (Attachment A) outlines Staff’s proposal for funding projects for FY 2025-26 through 2029-30, and (if applicable) expenditures incurred on existing projects through April 17, 2025. Any direction from the City Council tonight will be reported as part of the Preliminary Budget to be presented on June 3, 2025. ADDITIONAL INFORMATION: Grant and External Funding Sources Staff regularly monitor funding opportunities to determine if any capital projects could be funded by grants or external sources, while being sure to fully understand potential conditions or deed restrictions of grants. The City has received, or is expected to receive, a grant/external funding on certain projects as follows: FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 TOTAL Five Years 202 Gas Tax (HUTA)500,000 - 150,000 - - 650,000 204 Gas Tax (SB1)- 2,055,000 3,343,900 1,000,000 1,000,000 7,398,900 211 1911 Act 70,000 880,000 - - - 950,000 215 Proposition C 1,000,000 850,000 1,050,000 - 1,395,000 4,295,000 220 Measure R 2,795,000 1,170,000 985,000 595,000 340,000 5,885,000 221 Measure M - - 200,000 - - 200,000 221 Measure M Grant 1,650,000 2,000,000 - - - 3,650,000 224 Measure A (LAC - RPOSD)400,000 250,000 - - - 650,000 310 CDBG 470,000 150,000 150,000 150,000 150,000 1,070,000 330 Capital Improvement Program 15,302,700 4,556,975 1,995,000 1,800,000 2,870,000 26,524,675 331 Federal Grant 4,011,177 - - - - 4,011,177 340 Bicycle/Pedestrian Access 158,000 - - - - 158,000 343 Measure W 500,000 - - - - 500,000 343 Measure W Grant 660,000 1,800,000 2,910,000 235,000 155,000 5,760,000 27,516,877 13,711,975 10,783,900 3,780,000 5,910,000 61,702,752 Fund Sources TOTAL FY 2025 YE FY2026 FY2027 FY2028 FY2029 FY2030 FY 2024-25 BEGINNING BALANCE $40,859,117 $30,079,562 $19,554,962 $16,712,787 $16,642,667 $21,964,567 REVENUES & TRANSFERS 23,018,950 22,333,377 16,338,600 15,344,880 12,625,300 12,494,200 MAINTENANCE AND OPERATIONS -21,782,405 -12,271,600 -4,333,200 -3,878,300 -4,352,200 -4,440,700 CAPITAL -7,519,600 -19,466,877 -13,711,975 -10,383,900 -1,780,000 -3,910,000 OTHER -4,496,500 -1,119,500 -1,135,600 -1,152,800 -1,171,200 -1,190,900 PROJECTED RESTRICTED FUND BALANCE $30,079,562 $19,554,962 $16,712,787 $16,642,667 $21,964,567 $24,917,167 22 1) Portuguese Bend Landslide Remediation – Deep Dewatering Wells 1 thru 6 Permanent Power (Congressionally Directed Spending Grant from then-Senator Feinstein) 2) Multi-Jurisdictional Stormwater Treatment at Torrance Airport (Measure W Regional Grant) 3) Western Avenue Traffic Flow Improvements (Measure M Sub Regional Grant) 4) Curb Ramp Improvements (Community Development Block Grant (CDBG)) 5) Palos Verdes Drive East Guardrail Improvements (Highway Safety Improvement Grant) 6) Sidewalk Management Program (Community Development Block Grant) Staff are actively pursuing grant/external funding on other projects as follows: 1) Portuguese Bend Landslide Remediation 2) Portuguese Bend Landslide Remediation – Emergency Stabilization Measures 3) New Civic Center Campus Master Plan (Emergency Operations Center) 4) Stormwater Drainage Improvements – Palos Verdes Drive South at Peppertree Dr. 5) Intersection Improvements along Palos Verdes Drive South 6) Western Avenue Beautification (Long Term) Federal Funding Requests for Portuguese Bend Landslide Remediation Project In January 2023, the City applied for a Federal Emergency Management Agency (FEMA) Building Resilient Infrastructure and Communities (BRIC) Fiscal Year 2022 cycle grant for the Portuguese Bend Landslide Remediation Project (PBL Remediation Project). The grant application was for 70% of the entire project with an estimated cost of approximately $33.3 million (from November 2022), with a requirement for the balance to be from non- federal sources. On August 28, 2023, FEMA announced the PBL Remediation Project was selected, with $23.3 million being allocated, not obligated, for the City’s project. The emergency protective and stabilization measures, which are a separate scope from the PBL Remediation Project, had some overlap with portions of the PBL Remediation Project footprint; therefore, the City was required to submit a revised BRIC grant to exclude such overlap. The revised PBL Remediation Project BRIC grant amount became approximately $16.4 million, with a required non-federal match of approximately $7 million. On July 31, 2024, the California Governor’s Office of Emergency Services (CalOES) received notification that FEMA approved Phase 1 of the City’s application which includes project management, final engineering, environmental deliverables, construction documents, project agreements, and permits. The total obligation amount was $2,295,091, up to actual approved costs, and a non-federal share of 30% up to $718,138. Approval for Phase 2 of the project, construction and associated activities, would require another approval at the conclusion of Phase 1. On April 15, 2025, CalOES notified the City that California along with other states received notification through a FEMA Advisory, that FEMA is discontinuing the BRIC program. An 23 update issued by FEMA on April 18, 2025 stated that FEMA projects only approved for Phase 1 will not receive Phase 2 approval. The update further stated that FEMA Regions will work with applications to end their BRIC projects after the completion of Phase 1, or at another appropriate stopping point. CalOES and the City are seeking further clarification and detail as to the impact on the City’s BRIC grant. In consideration of the FEMA Advisory, the City is preparing to submit applications to other programs, such as the Hazard Mitigation Grant Program (HMGP), for the PBL Remediation Project. Public Notification Tonight’s CIP workshop was advertised to listserv subscribers and on the City’s various social media platforms. Public Comments Staff public comment from former Mayor Mr. Jim Knight (Attachment C). The public comment, in summary, urges the City Council to create a project to install a pipe to convey Altamira Canyon flow from Palos Verdes Drive South to the ocean, rather than allowing that runoff to infiltrate into the soil. To date, the City Council’s position has been that surface drainage of the Abalone Cove Landslide is the responsibility of ACLAD per their plan of control. The City Council may wish to consider taking on this responsibility from ACLAD and direct staff to develop a project and prepare cost estimates for convey Altamira Canyon runoff from Palos Verdes Drive South to the ocean. CONCLUSION: The City’s Five-Year CIP which includes capital and maintenance projects is primarily funded by the CIP Fund and Special Revenue Funds. Based on City Council Policy No. 41 Reserve Policy, the CIP Fund is primarily funded through Transfers-Out from the General Fund in an amount equal to the TOT revenue collected from Terranea Resort, minus the cumulative annual increases in the public safety contract. In addition to the CIP Fund, the City utilizes its Special Revenue Funds for funding sources legally restricted for eligible maintenance and capital projects. Based on the available balances in the CIP Fund and Special Revenue Funds, the proposed budget for capital and maintenance in FY 2025-26 is $27.5 million, totaling $61.7 million over five years. Of this amount, in FY 2025-26, approximately $15.3 million (56%) is proposed to be funded by the CIP Fund, with the remaining $12.2 million (44%) from Special Revenue Funds. Over the five-year period, the proposed funding is estimated to come from the CIP Fund at $26.5 million (43%) and from various Special Revenue Funds at $35.2 million (57%). Staff continue to pursue grant opportunities and other funding sources to help address 24 the funding gap of approximately $73.4 million for all capital and maintenance needs in the next five years. The proposed 5-Year CIP reflects what Staff has determined to be the highest priority projects, with input from IMAC. At this time, Staff seeks feedback and direction from the City Council on the Staff’s Proposed Five-Year CIP. Any direction from the City Council tonight will be incorporated in the Preliminary Budget to be presented on June 3, 2025. ALTERNATIVES: 1. Alternately discuss and take other action related to this item. 25 Proposed Capital Improvement Program for Fiscal Years 2025-26 through 2029-30 April 29, 2025 A-1 Project Code Project Name Fund Committed as of 4/17/2025 Fiscal Year 2025-26 Fiscal Year 2026-27 Fiscal Year 2027-28 Fiscal Year 2028-29 Fiscal Year 2029-30 TOTAL 8200 Series Abalone Cove Santitary Sewer System Projects 330 (CIP Fund)18,252$ 3,000,000$ 1,500,000$ -$ -$ -$ 4,518,252$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8300 Series Landslide Improvement Projects 215 (Proposition C)-$ 1,000,000$ 850,000$ -$ -$ -$ 1,850,000$ 202 (Gas Tax - HUTA)-$ 500,000$ -$ -$ -$ -$ 500,000$ 220 (Measure R)-$ 1,000,000$ 300,000$ -$ -$ -$ 1,300,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)2,419,744$ 490,674$ -$ -$ -$ -$ 2,910,418$ 331 (Federal Grants)-$ 1,436,277$ -$ -$ -$ -$ 1,436,277$ 220 (Measure R)292,300$ -$ -$ -$ -$ -$ 292,300$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)16,481,399$ 8,050,000$ -$ -$ -$ -$ 24,531,399$ 333 (ARPA Federal Grant)4,266,897$ -$ -$ -$ -$ -$ 4,266,897$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 331 (Federal Grants)-$ 1,575,000$ -$ -$ -$ -$ 1,575,000$ 330 (CIP Fund)-$ 525,000$ -$ -$ -$ -$ 525,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)-$ 700,000$ -$ -$ -$ -$ 700,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8400 Series Parks, Open Space & Recreation Facilities Projects 224 (Measure A - LAC - RPOSD)-$ 400,000$ 250,000$ -$ -$ -$ 650,000$ 330 (CIP Fund)35,390$ -$ -$ -$ -$ -$ 35,390$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)30,800$ -$ -$ -$ -$ -$ 30,800$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 83New4 8426 8202 8427 83New3 Abalone Cove Sanitary Sewer Rehabilitation Program 8304 Portuguese Bend Landslide Remediation Palos Verdes Drive South Landslide Repair Program8302 Portuguese Bend Landslide Hydrology & Hydraulics Study Park Playground Improvements Wildlife Corridor Encroachment Removal 8307 Portuguese Bend Landslide Remediation - Emergency Stabilization Measures Portuguese Bend Landslide Remediation - Deep Dewatering Wells 1 thru 6 Permanent Power A-2 Project Code Project Name Fund Committed as of 4/17/2025 Fiscal Year 2025-26 Fiscal Year 2026-27 Fiscal Year 2027-28 Fiscal Year 2028-29 Fiscal Year 2029-30 TOTAL 8500 Series Building Improvements Projects 330 (CIP Fund)361,284$ 210,000$ 1,200,000$ -$ -$ -$ 1,771,284$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)788,169$ 435,000$ 435,000$ 495,000$ 540,000$ 660,000$ 3,353,169$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8700 Series Sewer & Storm Drain Improvements Projects 330 (CIP Fund)37,310$ 1,000,000$ -$ -$ -$ -$ 1,037,310$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)263,594$ -$ -$ -$ -$ -$ 263,594$ 333 (ARPA Federal Grant)11,000$ -$ -$ -$ -$ -$ 11,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 343 (Measure W - Regional Grant)-$ 660,000$ 1,800,000$ 2,910,000$ 235,000$ 155,000$ 5,760,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)24,080$ 100,000$ -$ -$ -$ -$ 124,080$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 343 (Measure W)26,858$ 500,000$ -$ -$ -$ -$ 526,858$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)-$ 695,000$ -$ -$ -$ -$ 695,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)-$ 75,000$ 610,000$ -$ -$ -$ 685,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8503 8509 87New8 8721 8724 8725 Sewer Maintenance Access Improvements in Agua Amarga Canyon Lift Station Improvements at Lower Point Vicente New Civic Center Campus Master Plan 8701 87New7 Storm Drain Improvements at Montemalaga Canyon 8715 Stormwater Drainage Improvements - Palos Verdes Drive South at Peppertree Drive Multi-Jurisdictional Stormwater Treatment at Torrance Airport Peninsula Verde Stormwater Treatment Drywell Facilities Maintenance Program Storm Drain Asset Management Program & Master Plan Update A-3 Project Code Project Name Fund Committed as of 4/17/2025 Fiscal Year 2025-26 Fiscal Year 2026-27 Fiscal Year 2027-28 Fiscal Year 2028-29 Fiscal Year 2029-30 TOTAL 8800 Series Right-of-Way Improvements Projects 220 (Measure R)-$ -$ -$ -$ -$ -$ -$ 215 (Proposition C)141,137$ -$ -$ 800,000$ -$ -$ 941,137$ 330 (CIP Fund)1,853$ -$ -$ 150,000$ -$ -$ 151,853$ 221 (Measure M)-$ -$ -$ 200,000$ -$ -$ 200,000$ -$ -$ -$ -$ -$ -$ -$ 221 (Measure M - Grant)1,279,990$ 1,650,000$ 2,000,000$ -$ -$ -$ 4,929,990$ 220 (Measure R)74,783$ -$ -$ -$ -$ -$ 74,783$ 215 (Proposition C)200,000$ -$ -$ -$ -$ -$ 200,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 310 (CDBG)-$ -$ 150,000$ 150,000$ 150,000$ 150,000$ 600,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 215 (Proposition C)155,401$ -$ -$ -$ -$ -$ 155,401$ 330 (CIP Fund)80,691$ -$ -$ -$ -$ -$ 80,691$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 215 (Proposition C)57,529$ -$ -$ -$ -$ -$ 57,529$ 211 (1911 Act)49,365$ 70,000$ 880,000$ -$ -$ -$ 999,365$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)259,191$ -$ -$ -$ -$ -$ 259,191$ 333 (ARPA Federal Grant)135,000$ -$ -$ -$ -$ -$ 135,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 215 (Proposition C)-$ -$ -$ 250,000$ -$ -$ 250,000$ 204 (Gas Tax - SB1)258,000$ -$ -$ -$ -$ -$ 258,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 220 (Measure R)30,405$ 300,000$ 320,000$ 325,000$ 335,000$ 340,000$ 1,650,405$ 330 (CIP Fund)389,789$ -$ -$ -$ -$ -$ 389,789$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 331 (Federal Grants)-$ 999,900$ -$ -$ -$ -$ 999,900$ 330 (CIP Fund)10,100$ -$ -$ -$ -$ -$ 10,100$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 220 (Measure R)-$ 1,495,000$ 550,000$ 660,000$ -$ -$ 2,705,000$ 204 (Gas Tax - SB1)-$ -$ 1,000,000$ 950,000$ -$ -$ 1,950,000$ 330 (CIP Fund)18,035$ -$ -$ -$ -$ -$ 18,035$ 332 (State Grants)120,000$ -$ -$ -$ -$ -$ 120,000$ -$ -$ -$ -$ -$ -$ -$ 8855 8844 8840 8808 8810 8809 Western Avenue Traffic Flow Improvements Western Avenue Beautification (long term) Roadway Asset Management Program - Palos Verdes Drive South and West Traffic Signal at Palos Verdes Drive South and Palos Verdes Drive East8837 8846 8847 Traffic Calming Program - (Citywide) 8828 Intersection Improvements along Palos Verdes Drive South Palos Verdes Drive East Guardrail Improvements Roadway Asset Management Program - Crenshaw Boulevard Curb Ramp Improvements Program Roadway Asset Management Program - Triennial Update A-4 Project Code Project Name Fund Committed as of 4/17/2025 Fiscal Year 2025-26 Fiscal Year 2026-27 Fiscal Year 2027-28 Fiscal Year 2028-29 Fiscal Year 2029-30 TOTAL -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 211 (1911 Act)685,207$ -$ -$ -$ -$ -$ 685,207$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 204 (Gas Tax - SB1)131,208$ -$ 1,055,000$ 953,948$ -$ -$ 2,140,156$ 215 (Proposition C)-$ -$ -$ -$ -$ 820,000$ 820,000$ 330 (CIP Fund)-$ -$ 811,975$ -$ -$ -$ 811,975$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 215 (Proposition C)-$ -$ -$ -$ -$ 575,000$ 575,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 204 (Gas Tax - SB1)-$ -$ -$ 620,000$ -$ -$ 620,000$ 330 (CIP Fund)40,000$ -$ -$ -$ -$ -$ 40,000$ 202 (Gas Tax - HUTA)-$ -$ -$ 150,000$ -$ -$ 150,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 310 (CDBG)-$ 470,000$ -$ -$ -$ -$ 470,000$ 340 (Bicycle & Ped access)35,000$ 158,000$ -$ -$ -$ -$ 193,000$ 330 (CIP Fund)72,021$ 22,000$ -$ -$ -$ -$ 94,021$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)-$ -$ -$ -$ -$ 615,000$ 615,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 220 (Measure R)-$ -$ -$ -$ 260,000$ -$ 260,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)-$ -$ -$ 1,350,000$ -$ -$ 1,350,000$ 204 (Gas Tax - SB1)-$ -$ -$ 820,000$ -$ -$ 820,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 204 (Gas Tax - SB1)-$ -$ -$ -$ 1,000,000$ 1,000,000$ 2,000,000$ 215 (Proposition C)-$ -$ -$ -$ -$ -$ -$ 221 (Measure M)-$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)-$ -$ -$ -$ 1,260,000$ 1,595,000$ 2,855,000$ 220 (Measure R)-$ -$ -$ -$ -$ -$ -$ TOTAL 29,281,782$ 27,516,851$ 13,711,975$ 10,783,948$ 3,780,000$ 5,910,000$ 90,984,556$ 8860 88New6 8858 Hawthorne Boulevard at Eddinghill/Seamount Left Turn Signal 88LY5 Roadway Asset Management Program - Crest Road 8859 8861 88LY2 Sidewalk Management Program 8857 8856 88LY4 Roadway Asset Management Program - Crestridge Road Roadway Asset Management Program - Indian Peak Road Roadway Asset Management Program - Palos Verdes Drive East Roadway Asset Management Program - Highridge Road Roadway Asset Management Program - Hawthorne Boulevard Roadway Asset Management Program - Residential Streets Roadway Asset Management Program - Montemalaga Drive A-5 Project Code Project Name Fund Committed as of 4/17/2025 Fiscal Year 2025-26 Fiscal Year 2026-27 Fiscal Year 2027-28 Fiscal Year 2028-29 Fiscal Year 2029-30 TOTAL Funding Summary TOTAL 202 (Gas Tax - HUTA)-$ 500,000$ -$ 150,000$ -$ -$ 650,000$ 204 (Gas Tax - SB1)389,208$ -$ 2,055,000$ 3,343,948$ 1,000,000$ 1,000,000$ 7,788,156$ 211 (1911 Act)734,572$ 70,000$ 880,000$ -$ -$ -$ 1,684,572$ 215 (Proposition C)554,067$ 1,000,000$ 850,000$ 1,050,000$ -$ 1,395,000$ 4,295,000$ 220 (Measure R)397,488$ 2,795,000$ 1,170,000$ 985,000$ 595,000$ 340,000$ 5,885,000$ 221 (Measure M)-$ -$ -$ 200,000$ -$ -$ 200,000$ 221 (Measure M - Grant)1,279,990$ 1,650,000$ 2,000,000$ -$ -$ -$ 4,929,990$ 224 (Measure A - LAC - RPOSD)-$ 400,000$ 250,000$ -$ -$ -$ 650,000$ 225 (Ab Cove sewer maint.)-$ -$ -$ -$ -$ -$ -$ 310 (CDBG)-$ 470,000$ 150,000$ 150,000$ 150,000$ 150,000$ 1,070,000$ 330 (CIP Fund)21,331,702$ 15,302,674$ 4,556,975$ 1,995,000$ 1,800,000$ 2,870,000$ 47,856,351$ 331 (Federal Grants)-$ 4,011,177$ -$ -$ -$ -$ 4,011,177$ 332 (State Grants)120,000$ -$ -$ -$ -$ -$ 120,000$ 333 (ARPA Federal Grant)4,412,897$ -$ -$ -$ -$ -$ 4,412,897$ 340 (Bicycle & Ped access)35,000$ 158,000$ -$ -$ -$ -$ 193,000$ 343 (Measure W)26,858$ 500,000$ -$ -$ -$ -$ 526,858$ 343 (Measure W - Regional Grant)-$ 660,000$ 1,800,000$ 2,910,000$ 235,000$ 155,000$ 5,760,000$ 0 (External Funding)-$ -$ -$ -$ -$ -$ -$ TOTAL 29,281,782$ 27,516,851$ 13,711,975$ 10,783,948$ 3,780,000$ 5,910,000$ 90,984,556$ A-6 The City is obligated to maintain the existing sanitary sewer system and minimize the risk of overflows so that the homes can continue to be occupied within Portuguese Bend Community. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Construction annually from Fiscal Year 2025-26 through 2029-30. Work beyond Fiscal Year 2026-27 is contingent on identifying available funding sources. Work in remaining years TBD. Project Location Map Background and Justification -$ 18,252$ 3,000,000$ 1,500,000$ TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ Committed as of 4/17/2025 Funding source for future needs undetermined -$ 18,252$ 3,000,000$ 1,500,000$ 330 (CIP Fund) -$ 18,252$ 3,000,000$ 1,500,000$ 755,000$ 755,000$ 755,000$ 6,783,252$ Inspection $ 25,000 $ 25,000 $ 15,000 $ 15,000 $ 15,000 TBD Construction $ 2,500,000 $ 1,325,000 $ 660,000 $ 660,000 $ 660,000 TBD Project Contingency $ 250,000 $ 125,000 $ 65,000 $ 65,000 $ 65,000 TBD TBD TBD Management $ 25,000 $ 25,000 $ 15,000 $ 15,000 $ 15,000 Engineering $ 200,000 TBD TBD TBD TBD Environmental $ - TBD TBD TBD TBD TBD Overall Planning $ - TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to repair the Abalone Cove sanitary sewer system to sustain continued reliable service as land movement within the area continues to significantly affect the system, and consists of: 1. Providing a backup power source to the lift stations 2. Relocating portions of the sewer force mains above ground 3. Repairing existing sections of force main sewer lines 4. Repairing existing sections of gravity sewer mains PROJECT COST ESTIMATES 8200 Series Abalone Cove Santitary Sewer System Projects 8202 Abalone Cove Sanitary Sewer Rehabilitation Program A-7 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to repair Palos Verdes Drive South and other roadways in the Greater Portuguese Bend Landslide Complex and consists of repairing: - The asphalt roadway - Storm drain infrastructure - Curbs and gutters - Traffic signs and pavement markings PROJECT COST ESTIMATES 8300 Series Landslide Improvement Projects 8302 Palos Verdes Drive South Landslide Repair Program Overall Planning $ - $ - $ - $ - $ - N/A FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed in FY24/25 as of 4/17/2025 Environmental $ - $ - $ - $ - $ - N/A Management $ 50,000 $ 50,000 $ 25,000 $ 25,000 $ 25,000 Engineering $ - $ - $ - $ - N/A $ - Project Contingency $ - $ - $ - $ - $ - N/A N/A $ 50,000 Inspection $ 200,000 $ 100,000 $ 50,000 $ 50,000 N/A Construction $ 2,250,000 $ 1,000,000 $ 500,000 $ 500,000 $ 500,000 N/A 1,837,376$ 2,500,000$ 1,150,000$ 575,000$ 575,000$ 575,000$ N/A FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ Committed in FY24/25 as of 4/17/2025 Funding source for future needs undetermined -$ -$ 1,000,000$ 850,000$ 215 (Proposition C) 202 (Gas Tax - HUTA) 220 (Measure R) -$ 500,000$ -$ -$ -$ -$ -$ -$ -$ 1,000,000$ 300,000$ Regular repair, resurfacing, and patching of the roadway and associated infrastructure is needed to mitigate impacts of roadway movement caused by the landslide. This program is expected to continue until landslide movement in this area can be managed. The roadway is regularly inspected and work is performed an as-needed basis as defects are discovered. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Construction annually from Fiscal Year 2025-26 through 2029-30. Work beyond Fiscal Year 2026-27 is contingent on identifying available funding sources. Work in remaining years TBD. Project Location Map Background and Justification -$ 1,837,376$ 2,500,000$ 1,150,000$ TBD TBD TBD TBD -$ -$ -$ A-8 -$ $2,500,000 $ 2,000,000 $ 1,500,000 -$ -$ Funding source for future needs undetermined -$ -$ 292,300$ -$ The Portuguese Bend Landslide creates a number of challenges for the City and the community including damage to Palos Verdes Drive South, utilities, and public and private properties. The completion of this project will help minimize movement in the Portuguese Bend Landslide, thereby minimizing potential impacts to the surrounding environment including marine life in the event the existing above-ground sewer lines are damaged. It will also minimize damage to public and private properties, including the roadway, and will alleviate the need for the annual Palos Verdes Drive South Landslide Repair Program. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Planning (Grant Administration and Procurement) begins in Fiscal Year 2023-24 and continues into 2024-25 Engineering and Environmental in Fiscal Year 2025-26 Work beyond Fiscal Year 2026-27 is dependent on identifying available funding sources. Project Location Map Background and Justification -$ 2,712,044$ 1,926,951$ TBD TBD TBD TBD -$ 220 (Measure R) 330 (CIP Fund) 331 (Federal Grants)-$ 1,436,277$ Construction Funding Unknown - Pursuing Various Grant Opportunities -$ 2,419,744$ 490,674$ 2,712,044$ 1,926,951$ 19,995,000$ 2,500,000$ 2,000,000$ 1,500,000$ 30,633,995$ N/A FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ Committed as of 4/17/2025 $ 12,900,000 $ 140,676 $ 645,000 Engineering $ 1,250,393 $ 1,290,000 Project Contingency $ - $ 3,870,000 Inspection $ - $ 645,000 Construction Management Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to slow movement of the Portuguese Bend Landslide to a negligible rate and consists of the following elements: - Infilling fissures in the earth to prevent rainwater infiltration - Installing context sensitive, long-term drainage systems - Installing hydraugers to intercept and/or extract groundwater - Installing deep dewatering wells (DDWs) to extract groundwater - Operations and maintenance of the DDWs Note: The scope of work does not include separate dewatering and drainage elements that would need to be implemented by KCLAD and ACLAD to provide for a comprehensive landslide remediation plan. PROJECT COST ESTIMATES $ 645,000 Overall Planning $ - $ - FY25/26 FY26/27 FY27/28 FY28/29 FY29/304/17/2025 Committed as of Environmental $ 535,882 8300 Series Landslide Improvement Projects 8304 Portuguese Bend Landslide Remediation A-9 The emergency project was approved by City Council on May 7, 2024. As a result of the confirmation of a deeper slide surface accounting for the majority of land movement in August 2024, the original hydrauger (horizontally/directionally-drilled groundwater extraction measures) scope was changed to installing a series of DDWs (vertically-drilled groundwater extraction measures) near the toe of the landslide. Additional City Council authorizations on October 1, 2024, December 17, 2024 and January 21, 2025 expanded the project scope to include emergency winterization measures and extend the duration of the initial operations and maintenance phase of the DDWs. -$ Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Years 2024-25 and 2025-26. Work beyond Fiscal Year 2025-26 assumes land movement will be managed, and if not, is dependent on identifying available funding sources. Project Location Map Background and Justification 20,748,296$ 8,050,000$ TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ Funding Unknown - Pursuing Various Grant Opportunities -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 333 (ARPA Federal Grant)4,266,897$ -$ -$ -$ -$ -$ 4/17/2025 330 (CIP Fund)16,481,399$ 8,050,000$ TBD FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ -$ -$ -$ 20,748,296$ 8,050,000$ 7,043,750$ -$ -$ -$ Project Contingency $ 575,000 $ 503,125 $ - $ - $ - 1,078,125$ Inspection $ 143,750 $ 125,781 $ - $ - $ - 269,531$ $ - 269,531$ Construction $ 5,750,000 $ 5,031,250 $ - $ - Management $ 143,750 $ 125,781 $ - $ - $ - 10,781,250$ Engineering $ 862,500 $ 754,688 $ - $ - $ - 1,617,188$ Environmental $ 575,000 $ 503,125 $ - $ - $ - 1,078,125$ Overall4/17/2025 Planning $ - $ - $ - $ - $ - Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 -$ Insert Descriptive Photo PROJECT DESCRIPTION This project is an emergency stabilization measure for the Portuguese Bend Landslide and consists of the following scope: - Operating and maintaining approximately 10 Deep Dewatering Wells (DDWs) generally consisting of generators and fuel, pump maintenance and optimization, sheared well re-drilling, well monitoring and data recording, and related work - Installing emergency winterization measures (fissure filling, temporary canyon lining, drainage system repairs, and street re-grading and re-surfacing) to reduce the infiltration of water into the ground, and related work - Land movement surveying PROJECT COST ESTIMATES 8300 Series Landslide Improvement Projects 8307 Portuguese Bend Landslide Remediation - Emergency Stabilization Measures A-10 DDWs 1-6 use a pumps that requires a constant source of electric power to operate. Currently, the DDWs are powered by diesel generators because there is no electric infrastructure to them. The diesel generators, in addition to their noise and air emissions footprint, are costly and labor intensive to operate, monitor, maintain, and fuel. Furthermore, the generators present a potential fire hazard and sometimes malfunction, which significantly detracts from the dewatering efforts. Permanent electric power is needed to increase reliability, minimize the environmental footprint, and reduce the life cycle cost of operating the DDWs. -$ Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 2025-26. Project Location Map Background and Justification -$ 2,100,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)-$ 525,000$ -$ -$ -$ -$ -$ 4/17/2025 331 (Federal Grants)-$ 1,575,000$ -$ 2,100,000$ FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ -$ -$ -$ -$ 2,100,000$ -$ -$ -$ -$ Project Contingency $ 480,000 $ - $ - $ - $ - 480,000$ Inspection $ 120,000 $ - $ - $ - $ - 120,000$ $ - 120,000$ Construction $ 1,200,000 $ - $ - $ - Management $ 120,000 $ - $ - $ - $ - 1,200,000$ Engineering $ 180,000 $ - $ - $ - $ - 180,000$ Environmental $ - $ - $ - $ - $ - -$ Overall4/17/2025 Planning $ - $ - $ - $ - $ - Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 -$ Insert Descriptive Photo PROJECT DESCRIPTION This project will extend permanent power infrastructure to replace the diesel generators for Deep Dewatering Wells (DDWs) 1-6 located at the toe of the Greater Portuguese Bend Landslide Complex. PROJECT COST ESTIMATES 8300 Series Landslide Improvement Projects 83New3 Portuguese Bend Landslide Remediation - Deep Dewatering Wells 1 thru 6 Permanent Power A-11 The Landslide Complex area is an ancient landslide that was re-activated in the 1950s. Since 2007, the City has monitored the movement of the Landslide Complex using a combination of ground-based instruments, aerial surveys, and test borings. On October 3, 2023, the City Council declared a local emergency within the geographic boundaries of the Landslide Complex. The local emergency remains in effect, as the rate of land movement has continued at the accelerated pace, with displacement rates at times exceeding one foot per week. The City’s recent studies of the land movement have correlated the rate of land movement with the volume of annual rainfall. Much of this rainfall is not draining to the nearby Pacific Ocean and as a result has infiltrated into the subsurface, creating groundwater conditions that are negatively impacting slope stability within the Landslide Complex. This project seeks to identify opportunities for diverting drainage away from the Landslide Complex while avoiding unintended consequences. TBD Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Planning in Fiscal Year 2025-26. Remaining phases TBD. Any constructed improvements based on the study's findings and recommendations would be a part of a separate project(s). Project Location Map Background and Justification -$ 700,000$ TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4/17/2025 330 (CIP Fund)-$ 700,000$ -$ TBD FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ -$ -$ -$ -$ 700,000$ TBD TBD TBD TBD Project Contingency $ - TBD TBD TBD TBD TBD Inspection $ - TBD TBD TBD TBD TBD TBD TBD Construction $ - TBD TBD TBD Management $ - TBD TBD TBD TBD TBD Engineering $ - TBD TBD TBD TBD TBD Environmental $ - TBD TBD TBD TBD TBD Overall4/17/2025 Planning $ 700,000 TBD TBD TBD TBD Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 TBD PROJECT DESCRIPTION This project will study drainage and groundwater infiltration patterns within the Greater Portuguese Bend Landslide Complex and characterize the area's subsurface geology in order to identify the patterns and sources of groundwater flow. Recommendations resulting from the study will be used to design and construct solutions to mitigate stormwater infiltration contributing to land movement. PROJECT COST ESTIMATES 8300 Series Landslide Improvement Projects 83New4 Portuguese Bend Landslide Hydrology & Hydraulics Study A-12 Improvements to playground areas are needed to ensure that they remain compliant with current playground regulations. Playground areas to be repaired, upgraded, or replaced are typically identified by a facilities assessment conducted by a specialized consultant and further supported by City staff's regular inspections. Where recommended, playground improvements may be replaced completely. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction for Ryan Park (Phase 1) in Fiscal Year 2025-26 Engineering and Construction for Ryan Park (Phase 2) in Fiscal Year 2026-27 Playground improvements at other parks TBD Project Location Map Background and Justification -$ -$ 35,390$ 400,000$ 250,000$ TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 35,390$ -$ -$ -$ -$ -$ -$ -$ 400,000$ 250,000$ -$ -$ 224 (Measure A - LAC - RPOSD) 330 (CIP Fund) FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ -$ Committed as of 4/17/2025 35,390$ 400,000$ 250,000$ TBD TBD TBD TBD Inspection $ 15,000 $ 10,000 TBD TBD TBD TBD Construction $ 285,000 $ 175,000 TBD TBD TBD TBD Project Contingency $ 55,000 $ 35,000 TBD TBD TBD TBD TBD TBD Management $ 15,000 $ 10,000 TBD TBD TBD Engineering $ 30,000 $ 20,000 TBD TBD TBD Environmental $ - $ - $ - $ - $ - -$ Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Insert Descriptive Photo PROJECT DESCRIPTION This project intends to repair, upgrade, or replace playground components at the following city parks: -Ryan Park -Hesse Park -Eastview Park -Ladera Linda Community Park The scope of work may include landing platforms, bridges, guardrails and barriers, playground hardware, playground signage, loose fill surfacing, unitary surfacing, and playground-adajcent items such as retaining walls, fencing, walkways, curbs, turf, and irrigation. PROJECT COST ESTIMATES 8400 Series Parks, Open Space & Recreation Facilities Projects 8426 Park Playground Improvements A-13 FY29/30 Overall4/17/2025 Planning $ - $ - $ - $ - $ - Committed as of FY25/26 FY26/27 FY27/28 PROJECT DESCRIPTION The project entails establishing a fenced boundary between areas of the Palos Verdes Nature Preserve and private property. PROJECT COST ESTIMATES 8400 Series Parks, Open Space & Recreation Facilities Projects 8427 Wildlife Corridor Encroachment Removal FY28/29 FY29/30 -$ Environmental $ - $ - $ - $ - $ - -$ Engineering $ - $ - $ - $ - $ - -$ $ - -$ Construction $ - $ - $ - $ - $ - Management $ - $ - $ - $ - -$ Inspection $ - $ - $ - $ - $ - -$ Project Contingency $ - $ - $ - $ - $ - -$ 4/17/2025 330 (CIP Fund)30,800$ -$ -$ 30,800$ FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 Future Fiscal Years 30,800$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ The City purchased the Wildlife Corridor property in 2023 and enrolled it into the Palos Verdes Nature Preserve. Among other funding sources, the City utilitized acquisition grant funding from the Wildlife Conservation Board and Section 6 funding. The grant agreements require the City to establish a separation between the preserve and nearby private lands by the grant-stipulated deadline. This project is intended to implement any remaining separations necessary within that deadline. -$ Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and construction in Fiscal Year 2024-25, with construction continuing into 2025-26. Project Location Map Background and Justification 30,800$ -$ -$ -$ -$ -$ A-14 Pursuant to the Parks Master Plan, the new Civic Center Master Plan (Plan) has completed Stage 1, which proposes new City Hall facilities and ancillary improvements such as a public counter, multi-purpose city council chambers, and an emergency operations center (EOC), among other improvements. The Plan also accommodates optional future buildouts including various public site amenities and a community center. The Civic Center site includes a centrally located 9.5 acre parcel that is subject to a federal government deed restriction which requires it be used for emergency management activities. The federal government has informed the City that the emergency components, including the EOC, must be built no later than 2029 to be in compliance with the deed restriction or risk the possibility of the parcel reverting to Federal control and being subject to potential sale. Accordingly, the City has prioritized the EOC portion of the Master Plan and will expedite its delivery. Other elements of the Plan, including the other emergency components, will be delivered in later phases. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering for EOC elements in Fiscal Years 2025-26 and 2026-27 Environmental Phase for EOC elements in Fiscal Year 2026-27 Construction Phase for EOC elements in Fiscal Year 2027-28, with funding sources TBD. Development of future remaining phases TBD. Project Location Map Background and Justification -$ -$ 361,284$ 210,000$ 1,200,000$ TBD -$ -$ TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 361,284$ 210,000$ -$ 330 (CIP Fund) FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years 5$ -$ Committed as of 4/17/2025 1,200,000$ -$ Funding Unknown - Pursuing Various Grant Opportunities 361,284$ 210,000$ 1,200,000$ 10,290,000$ -$ -$ 11,700,000$ Inspection $ - $ - $ 700,000 $ - $ - 700,000$ Construction $ - $ - $ 7,000,000 $ - $ - 7,000,000$ Project Contingency $ - $ - $ 2,100,000 $ - $ - 2,100,000$ $ - 1,050,000$ Management $ - $ - $ 350,000 $ - $ - Engineering $ 210,000 $ 700,000 $ 140,000 $ - 350,000$ Environmental $ - $ 500,000 $ - $ - $ - 500,000$ Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Insert Descriptive Photo PROJECT DESCRIPTION This project is for the development of a new civic center campus, starting with the Emergency Operation Center (EOC). Delivery of the emergency components of the Civic Center Master Plan Project (Project) have been prioritized due to deadlines to comply with federal land use requirements. Costs shown here reflect only the delivery of the EOC element of the Project. Costs for the full buildout of the Project will be estimated at a future date, subject to phasing. PROJECT COST ESTIMATES 8500 Series Building Improvements Projects 8503 New Civic Center Campus Master Plan A-15 The City uses the Facilities Maintenance Program to evaluate the condition of existing City-owned facilities, recommend repairs and upgrades, and proactively schedule the repairs and upgrades. All programmed work is based on recurring assesments performed by City-hired consultants and operational feedback from staff. The recurring assessments are planned to be performed every 5 years. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE On-going annual Engineering and Construction in each Fiscal Year. Planning (formal facilities assessments) every 5 Fiscal Years. Project Location Map Background and Justification -$ -$ 788,169$ 435,000$ 435,000$ 495,000$ 540,000$ 660,000$ TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 788,169$ 435,000$ 435,000$ 495,000$ 540,000$ 330 (CIP Fund) FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years 660,000$ TBD Committed as of 4/17/2025 788,169$ 435,000$ 435,000$ 495,000$ 540,000$ 660,000$ N/A Inspection $ 30,000 $ 30,000 $ 25,000 $ 40,000 $ 45,000 N/A Construction $ 300,000 $ 300,000 $ 260,000 $ 385,000 $ 420,000 N/A Project Contingency $ 60,000 $ 60,000 $ 50,000 $ 75,000 $ 125,000 N/A $ 45,000 N/A Management $ 15,000 $ 15,000 $ 15,000 $ 20,000 $ 25,000 Engineering $ 30,000 $ 30,000 $ 15,000 $ 20,000 N/A Environmental $ - $ - $ - $ - $ - N/A Overall Planning $ - $ - $ 130,000 $ - $ - N/A FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 8500 Series Building Improvements Projects 8509 Facilities Maintenance Program Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to create a program to inventory, assess, develop, and implement a maintenance plan for the City's facilities. The project consists of: - Inspecting existing facilities and determining needed preventative maintenance, repairs, and updates. - Estimating cost of needed work - Prioritizing and scheduling the work - Performing the work **Items identified as immediate needs are programmed over FY25-26; remaining elements are programmed over FYs 26-27 through 29-30** PROJECT COST ESTIMATES A-16 Additional Studies Structural condition assessment of the Point Vicente Interpretive Center Repairs at the Point Vicente Interpretive Center Replace automatic transfer switch Replace secondary, stepdown transformer Repair curbs and asphalt Replace large areas of concrete sidewalk Replace chain link fence Repairs at Fred Hesse, Jr. Community Park Repairs to concrete block of building Clean exterior walls Repairs to window screens Replace masonry stairs Refinish and waterproof wood stairs Repairs at the Civic Center Sectional repairs along the path to RPV TV studio building Repair eroded areas of sodding Sectional repairs to sidewalk areas Repairs at Robert Ryan Community Park Replace wood cornice of building Repairs at Eastview Park Replace trail edging Repair trail surfaces Studies, Repairs and Improvements programmed for Fiscal Year 2025-26 8500 Series Building Improvements Projects 8509 Facilities Maintenance Program A-17 Repairs at the Civic Center Roofing HVAC Electrical Site Mill and overlay parking lot pavement Repairs at Eastview Park HVAC Miscellaneous Repairs at Fred Hesse, Jr. Community Park HVAC Mill and Overlay Parking lot Repairs at the Point Vicente Interpretive Center HVAC Plumbing Pavement Miscellaneous # Repairs at Abalone Cove Park Electrical Pave, Seal and Stripe parking lot at Abalone Cove Repairs at the Portuguese Bend Nursery School Electrical Plumbing Miscellaneous Studies, Repairs and Improvements programmed for Fiscal Year 2026-27 thru 2029-30 8500 Series Building Improvements Projects 8509 Facilities Maintenance Program A-18 -$ -$ -$ -$ -$ The City uses an asset management program for its public infrastructure to effectively assess and forecast the City’s public infrastructure needs in order to ensure its reliability and resiliency, while effectively using available maintenance and capital project resources. By way of maintaining an updated master plan of drainage, the City’s drainage system remains part and parcel of the City’s asset management program and practices. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 2025-26 through 2029-30, with funding source(s) in 2026-27 through 2029-30 TBD Project Location Map Background and Justification 37,310$ 1,000,000$ TBD TBD TBD TBD TBD -$ -$ 330 (CIP Fund) -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years Committed as of 4/17/2025 37,310$ 1,000,000$ 37,310$ 1,000,000$ 500,000$ 500,000$ 500,000$ 500,000$ TBD FUNDING $ 25,000 Engineering $ 500,000 Project Contingency $ 150,000 Inspection $ 25,000 Construction $ 300,000 Overall Planning $ - FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 $500,000 $500,000 $500,000 $500,000 TBD Environmental $ - Management Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to create a program to inventory, assess, and develop a maintenance plan for the City's drainage infrastructure. The project consists of: - Creating an updated inventory of the City's drainage infrastructure - Inspecting City owned storm drain pipes to determine needed preventative maintenance, repair, and replacement work - Estimating the cost of the work - Prioritizing and scheduling the work - Implementing the work This program will also include an update to the drainage master plan PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8701 Storm Drain Asset Management Program & Master Plan Update Funding Source for Future Needs Undetermined A-19 -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 -$ -$ -$ -$ -$ -$ The storm drain system adjacent to Palos Verdes Drive South in the vicinity of Peppertree Drive is not functioning and is in need of upsizing. This project will allow stormwater in a localized area of the Portuguese Bend Landslide zone to be conveyed to the ocean rather than infiltrating into the ground and contributing to land movement. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering in Fiscal Year 2026-27 and Construction in Fiscal Year 2027-28. Construction timeline assumes landslide stabilization by Fiscal Year 2027-28. Project Location Map Background and Justification -$ -$ 274,594$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 274,594$ -$ 320,000$ 3,005,000$ -$ -$ 3,325,000$ $ - 645,000$ Project Contingency $ - $ - $ 645,000 $ - FUNDING 330 (CIP Fund) Committed as of 4/17/2025 263,594$ -$ -$ FY27/28 FY28/29 Funding Source Unknown - Seeking Grant Funding 333 (ARPA Federal Grant)11,000$ Inspection $ - $ - $ 110,000 $ - $ - 110,000$ Construction $ - $ - $ 2,140,000 $ - $ - 2,140,000$ $ - 215,000$ Management $ - $ - $ 110,000 $ - $ - Engineering $ - $ 215,000 $ - $ - 110,000$ Environmental $ - $ 105,000 $ - $ - $ - 105,000$ Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to repair storm drain systems in the vicinity of Palos Verdes Drive South at Peppertree Drive and consists of replacement and/or up-sizing of the existing storm drain system and associated work PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8715 Stormwater Drainage Improvements - Palos Verdes Drive South at Peppertree Drive A-20 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to capture stormwater runoff and filter pollutants in order to meet water quality regulatory requirements, and consists of: - Diversion structure and water pretreatment system - Subsurface detention facility - Discharge pump - Restoration and potential enhancement of above ground features PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8721 Multi-Jurisdictional Stormwater Treatment at Torrance Airport Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ - -$ Management $ - $ - $ - $ - $ - Engineering $ - $ - $ - $ - -$ Inspection $ - $ - $ - $ - $ - -$ Construction $ 660,000 $ 1,800,000 $ 2,910,000 $ 235,000 $ 155,000 5,760,000$ 343 FY29/30FY25/26 FY26/27 Future Fiscal Years 155,000$ -$ Committed as of 4/17/2025 FY27/28 FY28/29 Project Contingency $ - $ - $ - $ - FUNDING -$ 660,000$ 1,800,000$ 2,910,000$ 235,000$ 155,000$ 5,760,000$ $ - -$ To comply with state regulations, local government agencies are required to meet certain pollutant limits for stormwater originating in their watersheds and discharging into nearby water bodies. Treatment of stormwater is one method by which pollutant limits are met. Torrance Airport provides sufficient space and is located in an area suitable for capturing and treating stormwater runoff from the Palos Verdes Peninsula to benefit multiple adjacent jurisdictions, including the City of Rancho Palos Verdes, Rolling Hills Estates, and unincorporated Los Angeles County. Partnering on this project with the City of Torrance allows these multiple jurisdictions to achieve water quality goals. The City's share is approximately 30%, which is reflected in the project cost estimates below. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Design ongoing in Fiscal Year 2025-26. Construction schedule is based on the lastest available information and is subject to change based on the final design. Project Location Map Background and Justification -$ -$ -$ 660,000$ 1,800,000$ 2,910,000$ 235,000$ 155,000$ -$ (Measure W - Regional Grant) -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 660,000$ 1,800,000$ 2,910,000$ 235,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A-21 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to rehabilitate the lift station at Lower Point Vicente and consists of: - Replacing pumps and appurtenances - Installing new protective lining of the wet well - Installing remote monitoring for proactive and timely service response - Inspection of the lateral connection and repairing sections as identified necessary PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8724 Lift Station Improvements at Lower Point Vicente Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ - -$ Management $ 5,000 $ - $ - $ - $ - Engineering $ - $ - $ - $ - 5,000$ Inspection $ 5,000 $ - $ - $ - $ - 5,000$ Construction $ 80,000 $ - $ - $ - $ - 80,000$ Project Contingency $ 10,000 $ - $ - $ - FUNDING 330 (CIP Fund) Committed as of 4/17/2025 24,080$ 100,000$ -$ -$ -$ FY27/28 FY28/29 24,080$ 100,000$ -$ -$ -$ -$ 100,000$ $ - 10,000$ The lift station at Lower Point Vicente connects the Point Vicente Interpretive Center's sewer system to LA County's mainline sewer located at Palos Verdes Drive South. The lift station and associated lateral connection to the LA County sewer main is in need of a detailed assessment and rehabilitation to extend its useful service life. In February 2025, Public Works procured the services of a engineering consultant to assess the sanitary systems onsite for recommendations. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering in Fiscal Year 2024-25 and 2025-26 Construction in Fiscal Year 2025-26 Project Location Map Background and Justification -$ -$ 24,080$ 100,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A-22 To comply with State stormwater regulations for improving storm water quality in receiving water bodies, the City is required to meet certain pollutant limits for stormwater runoff originating in its watersheds and discharging into nearby water bodies. Construction of this stormwater treatment project is necessary for the City to reduce pollutants entering Machado Lake to meet the required thresholds. -$ Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering in Fiscal Year 2024-25 and 2025-26 Construction in Fiscal Year 2025-26 Project Location Map Background and Justification 26,858$ 500,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4/17/2025 343 (Measure W)26,858$ 500,000$ -$ 500,000$ FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years 26,858$ 500,000$ -$ -$ -$ -$ -$ -$ Project Contingency $ 50,000 $ - $ - $ - $ - 50,000$ Inspection $ 10,000 $ - $ - $ - $ - 10,000$ $ - 10,000$ Construction $ 350,000 $ - $ - $ - $ - Management $ 10,000 $ - $ - $ - 350,000$ Engineering $ 60,000 $ - $ - $ - $ - 60,000$ Environmental $ 20,000 $ - $ - $ - $ - 20,000$ Overall4/17/2025 Planning $ - $ - $ - $ - $ - Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 -$ Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to capture storm water runoff from the Peninsula Verde neighborhood area and infiltrate it into the ground rather than convey it through drainage systems. The project includes installing an underground structure (drywell) that captures storm water runoff from impervious surfaces and planting native vegetation. PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8725 Peninsula Verde Stormwater Treatment Drywell A-23 PROJECT DESCRIPTION This project is intended to replace the storm drain system in Montemalaga Canyon at Montemalaga Drive. PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 87New7 Storm Drain Improvements at Montemalaga Canyon Overall4/17/2025 Planning $ - $ - $ - $ - $ - Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 -$ Environmental $ 25,000 $ - $ - $ - $ - 25,000$ Engineering $ 45,000 $ - $ - $ - $ - 45,000$ $ - 25,000$ Construction $ 425,000 $ - $ - $ - $ - Management $ 25,000 $ - $ - $ - 425,000$ Inspection $ 45,000 $ - $ - $ - $ - 45,000$ Project Contingency $ 130,000 $ - $ - $ - $ - 130,000$ 4/17/2025 330 (CIP Fund)-$ 695,000$ -$ 695,000$ FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ 695,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A storm drain pipe which conveys stormwater from the surrounding neighborhoods down the canyon slope has significantly deteriorated and has reached the end of its service life. Drainage escaping from the heavily damaged pipe are eroding the hillside. -$ Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 25/26 Project Location Map Background and Justification -$ 695,000$ -$ -$ -$ -$ A-24 -$ -$ In accordance with the city's agreement with Los Angeles County Department of Public Works (LACDPW), LACDPW is responsible for maintaining the city's sanitary sewer system (with the exception of the Abalone Cove Sanitary Sewer System). Due to the existing slope conditions, LACDPW has required that the City install access improvements so their crews can traverse the Agua Amarga Canyon. The City Attorney has determined that the City is responsible for installing these improvements. Ready access to the city's sewer system allows for regular monitoring and maintenance to prevent overflows. -$ Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering in Fiscal Year 2025-26 Construction in Fiscal Year 2026-27 Project Location Map Background and Justification -$ 75,000$ 610,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 610,000$ -$ -$ -$ -$ -$ -$ Project Contingency $ - 4/17/2025 330 (CIP Fund)-$ 75,000$ 685,000$ FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ 75,000$ 610,000$ -$ -$ Construction $ - Management $ - Inspection $ - $ 20,000 $ - $ - $ - $ 450,000 $ - $ - $ - $ 30,000 $ - $ - $ - Environmental $ - Engineering $ 75,000 Overall4/17/2025 Planning $ - Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Insert Descriptive Photo PROJECT DESCRIPTION This project will implement access improvements for sections of the city's sanitary sewer system within Agua Amarga Canyon, and includes the following elements where required: - Fall protection measures - Access improvements over ravines and water courses PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 87New8 Sewer Maintenance Access Improvements in Agua Amarga Canyon $ 90,000 $ - $ - $ - -$ -$ 95,000$ 20,000$ 450,000$ 30,000$ 90,000$ $ - $ - $ - $ - $ - $ - $ - $ - $ 20,000 $ - $ - $ - -$ -$ -$ -$ -$ -$ -$ -$ -$ A-25 Insert Descriptive Photo PROJECT DESCRIPTION As part of the Arterial Roadways Rehabilitation Program, this project is intended to rehabilitate Crenshaw Boulevard from the City limit to Burrell Lane, and consists of: - Resurfacing the existing asphalt - Replacing damaged asphalt - Replacing damaged curbs, gutters, and sidewalks - Replacing pavement markings and signs - Improving drainage (if needed) PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8808 Roadway Asset Management Program - Crenshaw Boulevard Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 $ - $ - $ 40,000 $ - $ - Engineering $ - $ - $ 75,000 $ - Environmental $ - $ - $ - $ - $ - -$ 40,000$ Inspection $ - $ - $ 75,000 $ - $ - 75,000$ Construction $ - $ - $ 735,000 $ - $ - 735,000$ $ - 192,990$ Management Project Contingency $ - $ - $ 225,000 $ - FUNDING 220 (Measure R) Committed as of 4/17/2025 -$ -$ -$ -$ -$ FY27/28 FY28/29 142,990$ -$ -$ 1,150,000$ -$ -$ 1,292,990$ $ - 225,000$ Good road conditions with smooth pavement are expected by the City’s residents and businesses. According to the 2025 Pavement Management Program (PMP) Crenshaw Boulevard has an average Pavement Condtion Index (PCI) of 79. Timely maintenance reduces the overall lifecycle costs of roadway infrastructure. Road conditions are assessed through a triennial inspection and assigned a rating which is a basis for determining any needed treatment. The 2025 roadway condition assessment determined that treating this section of roadway will reduce the overall life cycle cost and improve its condition. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 2027-28 Project Location Map Background and Justification -$ -$ 142,990$ -$ -$ 1,150,000$ -$ -$ 215 (Proposition C)141,137$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund) 221 (Measure M)-$ 200,000$ -$ -$ -$ -$ -$ 1,853$ -$ -$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 -$ 150,000$ -$ -$ 800,000$ -$ -$ -$ -$ -$ A-26 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to improve traffic flow on Western Avenue, from Palos Verdes Drive North to 25th Street, and may include one or more of the following measures: - Traffic signal optimization - Addition of turn lanes - Access management improvements PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8809 Western Avenue Traffic Flow Improvements Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ - 100,000$ Management $ 230,000 $ 250,000 $ - $ - $ - Engineering $ 100,000 $ - $ - $ - 480,000$ Inspection $ 110,000 $ 150,000 $ - $ - $ - 260,000$ Construction $ 1,100,000 $ 1,450,000 $ - $ - $ - 2,550,000$ Project Contingency $ 110,000 $ 150,000 $ - $ - FUNDING 221 (Measure M - Grant) Committed as of 4/17/2025 1,279,990$ 1,650,000$ 2,000,000$ -$ -$ FY27/28 FY28/29 1,554,773$ 1,650,000$ 2,000,000$ -$ -$ -$ 5,204,773$ $ - 260,000$ In efforts to address traffic congestion along Western Avenue, an assessment of the current traffic conditions and analysis of various traffic signal operational scenarios was conducted. The assessment and analysis resulted in recommended upgrades and changes to the operations and maintenance of 13 traffic signals along Western Avenue. Coordination with the current operating agencies (Caltrans and LADOT) is required to implement recommended changes. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering in Fiscal Years 2022-23, 2023-24 and 2024-25 Construction in Fiscal Year 2025-26 and 2026-27 Project Location Map Background and Justification 1,554,773$ 1,650,000$ 2,000,000$ -$ -$ -$ 220 (Measure R)74,783$ -$ 215 (Proposition C) -$ 200,000$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 -$ -$ A-27 -$ FY25/26 FY26/27 Future Fiscal Years 150,000$ N/A - ongoing FY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ NA - ongoing -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Installations of ADA compliant curb ramps or improvements to sidewalks to make them ADA compliant remove barriers that would otherwise make it more difficult for people using wheelchairs, scooters, walkers, or other mobility devices to use sidewalks or cross streets. Projects are prioritized based on close proximity to senior facilities. FY25-26 funds are programmed towards sidewalk improvements. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE On-going annual Engineering and Construction starting in Fiscal Year 2026-27 Project Location Map Background and Justification -$ -$ -$ 150,000$ 150,000$ 150,000$ 150,000$ $ - 150,000$ 150,000$ 150,000$ 150,000$ NA - ongoing $ 15,000 NA - ongoingProject Contingency $ - $ 15,000 $ 15,000 $ 15,000 FUNDING 310 (CDBG) Committed as of 4/17/2025 -$ -$ 150,000$ 150,000$ 150,000$ FY27/28 FY28/29 Inspection $ - $ 10,000 $ 10,000 $ 10,000 $ 10,000 NA - ongoing Construction $ - $ 100,000 $ 100,000 $ 100,000 $ 100,000 NA - ongoing $ 20,000 NA - ongoing Management $ - $ 5,000 $ 5,000 $ 5,000 $ 5,000 Engineering $ - $ 20,000 $ 20,000 $ 20,000 NA - ongoing Environmental $ - $ - $ - $ - $ - NA - ongoing Overall Planning $ - $ - $ - $ - $ - NA - ongoing FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Insert Descriptive Photo PROJECT DESCRIPTION The City receives an annual Community Development Block Grant (CDBG) from the United States Department of Housing and Urban Development (HUD), with restricted uses. Accessibility improvements are an approved use and the City has traditionally used these grants to install new Americans with Disabilities Act (ADA) compliant curb ramps where they do not currently exist. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8810 Curb Ramp Improvements Program A-28 -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal YearsFY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ In 2018, the City Council discussed existing issues regarding several intersections along PVDS, which included periodic turning movement congestion at certain intersections during peak travel times. Staff were directed to investigate any improvements that would allow for better circulation, reduce traffic delays and, most importantly, enhance the safety of these intersections. Subsequently, plans were prepared for improvements at the above-listed locations. However, prior to being issued for construction, the Infrastructure Management Advisory Committee (IMAC) expressed interest in studying the feasibility of roundabouts at these intersections. As a result, a joint TSC- IMAC subcommittee was formed to discuss the idea. On August 17, 2021, a joint TSC-IMAC recommendation was presented to the City Council for a pilot program to install a “modern roundabout” at the intersection of PVDS and Forrestal Drive/Trump National Drive. The City Council-adopted FY 2024-25 CIP includes studying a pilot roundabout at the aforementioned intersections. In addition to a roundabout, the study will evaluate other possible solutions, with input from the community. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Planning in Fiscal Year 2024-25 and continuing through 2025-26. Engineering and Construction TBD, based on the outcome of the feasibility study and identification of funding sources. Project Location Map Background and Justification -$ -$ 236,092$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 236,092$ TBD TBD TBD TBD TBD TBD Concept Plan Programmed for FY25/26 Needed to Determine Future Cost for Construction and Related Items Project Contingency FUNDING 215 (Proposition C) Committed as of 4/17/2025 155,401$ FY27/28 FY28/29 Seeking Highway Safety Grants330(CIP Fund)80,691$ Inspection Construction Management Engineering Environmental Overall Planning FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to improve traffic operations and includes studying a pilot roundabout at certain intersections. Based on the outcome of the study, a permanent roundabout or other traffic improvements may be made at the following cross streets: - Schooner Drive (across from Yacht Harbor Drive) - Conqueror Drive - Forrestal Drive (across from Trump National Drive) PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8828 Intersection Improvements along Palos Verdes Drive South A-29 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to replace the standard design traffic signal at the intersection Palos Verdes Drive South and Palos Verdes Drive East with a signal that is more aesthetically pleasing and better blends into the surrounding environment. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8837 Traffic Signal at Palos Verdes Drive South and Palos Verdes Drive East Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ - 70,000$ Management $ - $ 35,000 $ - $ - $ - Engineering $ 70,000 $ - $ - $ - 35,000$ Inspection $ - $ 70,000 $ - $ - $ - 70,000$ Construction $ - $ 670,000 $ - $ - $ - 670,000$ Project Contingency $ - $ 105,000 $ - $ - FUNDING 215 (Proposition C) Committed as of 4/17/2025 57,529$ -$ -$ -$ -$ FY27/28 FY28/29 106,894$ 70,000$ 880,000$ -$ -$ -$ 950,000$ $ - 105,000$ On March 1, 2022, the City Council directed staff to re-design the traffic signal with one that reduces the aesthetic impacts to the surrounding area. This project is needed to carry out the City Council directive. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering in Fiscal Year 2025-26 Construction in Fiscal Year 2026-27 Project Location Map Background and Justification -$ -$ 106,894$ 70,000$ 880,000$ -$ -$ -$ 211 (1911 Act)49,365$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 70,000$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 -$ -$ -$ 880,000$ -$ -$ -$ -$ -$ -$ A-30 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to enhance the aesthetics of the public right-of-way along Western Avenue from Peninsula Verde Drive to Summerland Avenue, and consists of: - Landscape improvements - Hardscape improvements - New street furniture - Crosswalk enhancements PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8840 Western Avenue Beautification (long term) Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ - 340,000$ Management $ 10,000 $ 145,000 $ 20,000 $ - $ - Engineering $ 15,000 $ 280,000 $ 45,000 $ - 175,000$ Inspection $ 15,000 $ 280,000 $ 45,000 $ - $ - 340,000$ Construction $ 115,000 $ 2,775,000 $ 415,000 $ - $ - 3,305,000$ Project Contingency $ 25,000 $ 420,000 $ 70,000 $ - FUNDING 330 (CIP Fund) Committed as of 4/17/2025 259,191$ -$ FY27/28 FY28/29 Funding Undetermined333(ARPA Federal Grant)135,000$ 394,191$ 225,000$ 3,000,000$ 350,000$ -$ -$ 4,675,000$ $ - 515,000$ For many years, there has been a general desire by the City to enhance the aesthetics along the Western Avenue corridor. Aesthetic improvements to the public right-of-way and adjacent areas enhance the appeal of the surrounding area, bolster commerce with local businesses, and reflect positively on the entire City. The corridor is not currently considered desirable for re-development in today's built environment. This project will help achieve the vision of creating an attractive and business friendly environment along Western Avenue. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Construction of parkway and street furniture improvements in Fiscal Year 2024-25 and 2025-26 Construction of median improvements in Fiscal Year 2026-27 Construction of crosswalk improvements in Fiscal Year 2027-28 Delivery of all phases is contingent on identifying funding sources Project Location Map Background and Justification 394,191$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 -$ -$ -$ -$ A-31 Insert Descriptive Photo PROJECT DESCRIPTION Under the Roadway Asset Management Program, the Pavement Management Plan (PMP) is updated every three years to inventory, evaluate the condition, and develop a maintenance plan for the City's roadway and sidewalk network, and to identify Citywide Arterial and Residential Street Rehabilitation projects. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8844 Roadway Asset Management Program - Triennial Update Overall Planning $ - $ - $ 250,000 $ - $ - N/A - ongoing FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ - -$ Management $ - $ - $ - $ - $ - Engineering $ - $ - $ - $ - -$ Inspection $ - $ - $ - $ - $ - -$ Construction $ - $ - $ - $ - $ - -$ Project Contingency $ - $ - $ - $ - FUNDING 215 (Proposition C) Committed as of 4/17/2025 -$ -$ -$ 250,000$ -$ FY27/28 FY28/29 258,000$ -$ -$ 250,000$ -$ -$ NA - ongoing $ - -$ The City uses the PMP to evaluate the condition of existing pavement and sidewalks, recommend repairs and upgrades, and accordingly schedule the repairs and upgrades of specific areas throughout the city. The Metropolitan Transit Authority (Metro) requires a PMP update every three years in order for the City to continue receiving Proposition C funds. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE The latest triennial update was provided in Fiscal Year 2024-25. The next triennial update will be provided in Fiscal Year 2027-28. Project Location Map Background and Justification -$ -$ 258,000$ -$ -$ 250,000$ -$ -$ 204 (Gas Tax - SB1)258,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A-32 Insert Descriptive Photo PROJECT DESCRIPTION This program is intended to implement traffic calming measures throughout the City on arterial and residential streets. Improvements may include: signs, pavement markings, speed feedback signs, roundabouts, and speed humps. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8846 Traffic Calming Program - (Citywide) Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ 85,000 NA - ongoing Management $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 Engineering $ 75,000 $ 80,000 $ 80,000 $ 85,000 NA - ongoing Inspection $ 15,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 NA - ongoing Construction $ 175,000 $ 180,000 $ 185,000 $ 190,000 $ 195,000 NA - ongoing Project Contingency $ 25,000 $ 30,000 $ 30,000 $ 30,000 FUNDING 220 (Measure R) Committed as of 4/17/2025 30,405$ 300,000$ 320,000$ 325,000$ 335,000$ FY27/28 FY28/29 420,194$ 300,000$ 320,000$ 325,000$ 335,000$ 340,000$ NA - ongoing $ 30,000 NA - ongoing Concerns about traffic and speeding are one of the most persistent and emotional comments received by the City. This program is needed to assess those concerns and implement measures to mitigate the effects. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE On-going annual Engineering and Construction in each Fiscal Year. Project Location Map Background and Justification -$ -$ 420,194$ 300,000$ 320,000$ 325,000$ 335,000$ 340,000$ 330 (CIP Fund)389,789$ NA - ongoing -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years 340,000$ NA - ongoing FY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A-33 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to construct guardrail improvements along Palos Verdes Drive East, within the City limits. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8847 Palos Verdes Drive East Guardrail Improvements Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ - 70,000$ Management $ 35,000 $ - $ - $ - $ - Engineering $ 70,000 $ - $ - $ - 35,000$ Inspection $ 70,000 $ - $ - $ - $ - 70,000$ Construction $ 715,000 $ - $ - $ - $ - 715,000$ Project Contingency $ 109,900 $ - $ - $ - FUNDING 331 (Federal Grants) Committed as of 4/17/2025 -$ 999,900$ -$ -$ -$ FY27/28 FY28/29 10,100$ 999,900$ -$ -$ -$ -$ 999,900$ $ - 109,900$ On July 21, 2020, City Council authorized staff to apply for a federal Highway Safety Improvement Program (HSIP) grant to fund guard rail improvements along Palos Verdes Drive East. In April 2021, staff was notified that the project was approved for HSIP funding in the amount of $999,900, with no requirement for the City matching those funds. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 2025-26 Project Location Map Background and Justification -$ -$ 10,100$ 999,900$ -$ -$ -$ -$ 330 (CIP Fund)10,100$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A-34 Insert Descriptive Photo PROJECT DESCRIPTION As part of the Arterial Roadways Rehabilitation Program, this project is intended to rehabilitate Palos Verdes Drive South and Palos Verdes Drive West within city limits (excluding the landslide area), and consists of: - Resurfacing the existing asphalt - Replacing damaged asphalt - Replacing damaged curbs, gutters, and sidewalks - Replacing pavement markings and signs - Improving drainage (if needed) PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8855 Roadway Asset Management Program - Palos Verdes Drive South and West Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ - 435,000$ Management $ 45,000.00 $ 45,000.00 $ 50,000.00 $ - $ - Engineering $ 140,000.00 $145,000.00 $ 150,000.00 $ - 140,000$ Inspection $ 95,000.00 $100,000.00 $ 105,000.00 $ - $ - 300,000$ Construction $ 935,000.00 $970,000.00 $ 1,005,000.00 $ - $ - 2,910,000$ Project Contingency $ 280,000.00 $290,000.00 $ 300,000.00 $ - FUNDING 220 (Measure R) Committed as of 4/17/2025 -$ 1,495,000$ 550,000$ 660,000$ -$ FY27/28 FY28/29 138,035$ 1,495,000$ 1,550,000$ 1,610,000$ -$ -$ 4,655,000$ $ - 870,000$ Good road conditions with smooth pavement are expected by the City’s residents and businesses. According to the 2025 Pavement Management Program (PMP) Palos Verdes Drive South has an average Pavement Condtion Index (PCI) of 82 and Palos Verdes Drive West has an average PCI of 85. Timely maintenance reduces the overall lifecycle costs of roadway infrastructure. Road conditions are assessed through a triennial inspection and assigned a rating which is a basis for determining any needed treatment. The 2025 roadway condition assessment determined that treating this section of roadway will reduce the overall life cycle cost and improve its condition. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering in Fiscal Years 2024-25 through 2027-28 Construction in Fiscal Year 2025-26: Palos Verdes Drive West (PVDW) & Palos Verdes Drive South - from PVDW to Terranea Way Construction in Fiscal Year 2026-27: Palos Verdes Drive South - from Palos Verdes Drive East to City Limit Construction in Fiscal Year 2027-28: Palos Verdes Drive South - from Schooner Drive to Palos Verdes Drive East Project Location Map Background and Justification -$ -$ 138,035$ 1,495,000$ 1,550,000$ 1,610,000$ -$ -$ 204 (Gas Tax - SB1)-$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund) 332 (State Grants)-$ -$ -$ 120,000$ -$ -$ -$ 18,035$ -$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 -$ -$ -$ 1,000,000$ 950,000$ -$ -$ -$ -$ -$ A-35 Good road conditions with smooth pavement are expected by the City’s residents and businesses. Timely and proactive maintenance reduces the overall lifecycle costs of roadway infrastructure. Road conditions are assessed through a triennial inspection and assigned a rating which is a basis for determining any needed treatment. The 2025 roadway condition assessment determined that treating this section of roadway will reduce the overall life cycle cost and improve its condition. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Construction annually, starting in Fiscal Year 2025-26 Engineering for each FY of construction is provided in the preceding FY Delivery of all phases is contingent on identifying available funding sources. Project Location Map Background and Justification -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TBD Funding Undetermined TBD -$ TBD -$ -$ FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years TBD Committed as of 4/17/2025 -$ 4,345,000$ 4,825,000$ 2,450,000$ 2,740,000$ 2,800,000$ N/A Inspection $ 285,000 $ 315,000 $ 160,000 $ 205,000 N/A Construction $ 2,790,000 $ 3,100,000 $ 1,575,000 $ 1,610,000 N/A Project Contingency $ 840,000 $ 935,000 $ 475,000 $ 615,000 $ 630,000 N/A $ 210,000 N/A $ 1,645,000 $ 210,000 Management $ 145,000 $ 160,000 $ 80,000 $ 105,000 $ 105,000 Engineering $ 285,000 $ 315,000 $ 160,000 $ 205,000 N/A Environmental $ - $ - $ - $ - $ - N/A Overall Planning $ - $ - $ - $ - $ - N/A FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Insert Descriptive Photo PROJECT DESCRIPTION The Residential Roadways Rehabilitation Program is intended to rehabilitate residential roadways as assessed and prioritized in the Pavement Management Program, updated every 3 years. The scope of work generally consists of: - Sealing, resurfacing, and/or repairing existing asphalt - Repairing damaged curbs, gutters and sidewalks; installing curb ramps as needed - Replacing deteriorated signs, pavement markings, and curb address numbers PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8856 Roadway Asset Management Program - Residential Streets A-36 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 82 74 83 86 77 86 83 75 78 83 77 72 75 81 78 75 83 81 81 79 72 Ironwood St Silverspur Rd Basswood Av Santona Dr Lomo Dr End 84 84 86 Redondela Dr Alvesta Pl Eldena Dr Quailhill Dr Armaga Spring Rd End End 8800 Series Right-of-Way Improvements Projects 8856 Roadway Asset Management Program - Residential Streets Via Cambron End 65 64 69 Name From To Lightfoot Pl Hyte Rd End PCI 62 68 Rio Linda Dr West End East End Ironwood St Grayslake rd End Residential Streets to be improved in Fiscal Year 2025-26 Certa Dr Ella Rd Lomo Dr Helm Pl Dauntless Dr End Birchmont Dr Grayslake Rd Menominee Pl Valleta Dr Delasonde Dr Pontevedra Dr Ashfork Pl Ironwood St End Via Collado Rock Park Dr Kings Harbor Dr End Circlet Dr Shire Oaks Dr End Barkstone Dr Ironwood St End Bayridge Rd Basswood Av End Littlebow Rd Basswood Av Manitowac Dr Mazur Dr Basswood Av End Menominee Pl South End North End San Nicolas Dr Monero Dr Hawthorne Blvd Via La Cresta East End West End Cherty Dr Golden Meadow Dr End Seaclaire Dr Seaglen Dr End Toscanini Dr Mt Whitney Dr Mt Shasta Dr Clovercliff Dr Golden Meadow Dr Geronimo Dr 84 81 Nantasket Dr Beachview Dr Seacove Dr Cliffsite Dr Coolheights Dr End Aqua Vista Dr Palos Verdes Dr N/S End Basswood Av Silver Spur Rd North End Bendigo Dr Ganado Dr A-37 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 92 91 93 91 94 95 95 93 78 77 90 83 89 89 89 87 90 Blackhorse Dr Hawthorne Bl E/s End PCI 84 84 86 79 76 87 85 85 Homeworth Dr Highmore Av San Ramon Dr Palos Verdes Dr End Sea Raven Dr Pirate Dr 1000' s/o Pirate Dr Via Palacio Seacove Dr End End Via Cambron Berry Hill Dr End Nautilus Dr Palos Verdes Dr N/s End Via Del Mar Via Rivera End Calle Aventura Palos Verdes Dr End Residential Streets to be improved in Fiscal Year 2026-27NameFromTo Santa Luna Dr Vista Mesa Dr End Caddington Dr Western Ave Gunter Rd Rothrock Dr Eddinghill Dr Trailrider Dr Trudie Dr Bayend Dr Highmore Ave Covecrest Dr Seamount Dr Firthridge Rd Manitowac Dr Littlebow Rd Basswood Av Hightide Dr 1000' n/o Floweridge Dr 8800 Series Right-of-Way Improvements Projects 8856 Roadway Asset Management Program - Residential Streets Mesaba Rd Hawthorne Blvd Frontage End Birchfield Av Ironwood St Bayridge Rd Cherty Dr Trailrider Dr End 88 80 89 90 90 Seacliff Dr Palos Verdes Dr N/s End Nuvola Ct Albero Ct East End Abrazo Drive Ganado Drive Greve Drive Azores Pl Tarapaca Rd End Starline Dr Crest Rd N/s End Vigilance Dr 1000' e/o Phantom Dr End Jaybrook Dr Queenridge Dr Meadowmist Dr End Quailwood Dr Scotwood Dr 215' E of Stonecrest Rd (City Limit Casilina Dr Deluna Dr Palos Verdes Dr Vista Pacifica Dr West End East End Suana Dr Miraleste Dr End A-38 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 90 85 91 93 93 88 86 84 89 90 91 90 91 90 89 PCI 77 77 78 82 78 83 82 80 1397' w/o Highpoint Dr End Eaglehaven Cir Floweridge Dr End Deepbrook Dr Honey Creek Dr Rockvalley Rd Deluna Dr Casilina Dr E/S Dianora Dr W/s Eau Claire Dr Shorewood Rd Pembina Rd Crownview Dr Corinna Dr Dianora Dr W/s Casilina Dr Deluna Dr Crest Rd N/s End Camino Pequeno Calle De Suenos End Hawthorne Bl Seamount Dr Faircove Dr Locklenna Ln End Clint Pl Grayslake Rd End End Elkmont Dr Silverspur Rd Whitehorn Dr 87 8800 Series Right-of-Way Improvements Projects 8856 Roadway Asset Management Program - Residential Streets Residential Streets to be improved in Fiscal Year 2027-28Name Capeswood Dr Ironwood St Grayslake Rd Ella Rd Acana Rd South End Calle Quieta Avenida De Calma From To Coveridge Dr Covecrest Dr End Eddinghill Dr Trailrider Dr Hawthorne Blvd El Rodeo Rd Whites Point Dr Verde Ridge Rd Elmbank Rd Basswood Av Birchfield Av Cachan Dr Cartier Dr End Diversey Dr Basswood Av Birchfield Av Driftwood Ln Locklenna Ln End Doverridge Dr 76 79 83 79 Camino Porvenir Avenida De Calma Calle Del Suenos Falconhead Dr Hightide Dr End 84 86 87 Firthridge Rd Indian Valley Rd North End Daladier Dr Chandeleur Dr 2232 Daladier Dr Crownview Dr Knoll View Dr Highpoint Rd Dianora Dr Luciana Dr Corinna Dr S/s Calle De Resolana Avd De Calama End Coolheights Dr Floweridge Dr Cliffsite Dr Diamond Head Ln Blackhorse Dr End Calle Del Pajarito Avenida De Calma End 88 Chandeleur Dr Miraleste Dr Rue Le Charlene 91 A-39 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 85 86 90 89 89 83 PCI 74 74 76 82 85 79 71 83 84 80 84 82 77 87 88 88 87 Stadia Hill Ln Doverridge Dr End Palos Verdes Dr (Frontage Rd)Nautilus DR West End Floweridge Dr Ganado Dr W/s Seaglen Dr Palos Verdes Dr (Frontage Rd)East End St Peter's Church Rockvalley Rd Hawkhurst Dr E/s End Trump National Dr Palos Verdes Dr S Via Rivera Hawthorne Bl North End Grovespring Dr Purpleridge Dr Mossbank Dr Springcreek Rd East End Shire Oaks Dr 1065' S/O Seamount Dr Covecrest Dr W/S Alvarez Dr Shadow Wood Dr Elkmont Dr End Spruce Grove Dr 8800 Series Right-of-Way Improvements Projects 8856 Roadway Asset Management Program - Residential Streets Residential Streets to be improved in Fiscal Year 2028-29Name Scotgrove Dr Lomo Dr End Seabryn Dr Doverridge Dr End Hawthorne Blvd (Frontage Rd)Grayslake Rd From To Scotsview Dr Seabryn Dr End Seaspray Dr Locklenna Ln End Pembina Rd Waupaca Rd Eau Claire Dr Packet Rd Palos Verdes Dr Seacove Dr Seamount Dr Hawthorne Bl Covecrest Dr Sandbrook Dr Via Sonoma N/s End Hawthorne Blvd (Frontage Rd)Shorewood Rd End @ Grayslake Rd W Rockhurst Rd Rockvalley Rd End Mossbank Dr Basswood Av End 77 91 85 Scotmist Rd Lunada Ridge Dr Covecrest Dr Starstone Dr Geronimo Dr Golden Meadow Dr Nokomis Rd Deepbrook Dr End Hawkhurst Dr Blackhorse Dr Tarapaca Rd Calle Adventura End Hawthorne Blvd (Frontage Rd) End Vigilance Dr Phantom Dr 1000' e/o Phantom Dr Via Lorado Palos Verdes Dr Via Victoria 92 92 90 92 Via Maria Celeste Via Lorado End Vista Mesa Dr Calle Adventura E/s Palos Verdes Dr 93 93 A-40 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 82 88 91 87 92 94 90 85 82 74 80 83 82 84 86 89 PCI 56 80 82 81 81 73 85 76 Ganado Dr Palos Verdes Dr W/s 1993' N/O Bendigo Dr Hawksmoor Dr Ganado Dr End Gulfcrest Dr Heroic Dr End Hartcrest Dr Golden Meadow Dr Geronimo Dr Flambeau Rd Grayslake Rd Flambeau Rd Springcreek Rd Finecrest Dr Graylog St Basswood Av End Chartres Dr End Freeport Rd Hawthorne Bl Frontage Woodbrook Rd 74 8800 Series Right-of-Way Improvements Projects 8856 Roadway Asset Management Program - Residential Streets Residential Streets to be improved in Fiscal Year 2029-30Name Geronimo Dr Abbotswood Dr Hedgewood Dr Avenida Feliciano Avenida Del Mesa End Cheret Pl From To Avenida Aprenda Avenida Cuaderno Western Ave Greve Dr West End East End Cartier Dr Cachan Pl East End Golden Meadow Dr Beechfield Dr South End Chartres Dr Sattes Dr Cartier Dr Crest Rd 30' W/O Hawthorne Bl Calle De Suenos Caddington Dr Thistlewood Wy Mt Sawtooth Dr Finecrest Dr 84 85 85 89 Forrestal Dr Palos Verdes Dr N/S End At Gate Fond Du Lac Rd Pembina Rd Littlebow Rd Granvia Altamira Hawthorne Bl City Limits Diamond Head Ln End Albero Ct Palos Verdes Dr North End End Avenger Pl Dauntless Dr End Admirable Dr Dauntless Dr Conqueror Drive W/s Falcon Rock Pl Arrowroot Ln Barkentine Rd Grovespring Dr Golden Meadow Dr Sprucegrove Dr Heroic Dr Searaven Dr N/s Gulfcrest Dr Daladier Dr 2232 Daladier Dr End A-41 On January 16, 2024, based on the findings of a traffic study and TSC’s recommendation concurring with the recommended measures, the City Council approved the installation of left-turn signal arrows for Hawthorne Boulevard at Eddinghill Drive/Seamount Drive. -$ Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and construction in Fiscal Year 2024-25, with construction continuing into 2025-26 Project Location Map Background and Justification 685,207$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4/17/2025 211 (1911 Act)685,207$ -$ -$ 685,207$ FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 Future Fiscal Years 685,207$ -$ -$ -$ -$ -$ -$ -$ -$ Project Contingency $ - $ - $ - $ - $ - -$ Inspection $ - $ - $ - $ - $ - -$ $ - -$ Construction $ - $ - $ - $ - $ - Management $ - $ - $ - $ - -$ Engineering $ - $ - $ - $ - $ - -$ FY28/29 FY29/30 -$ Environmental $ - $ - $ - $ - $ - -$ Insert Descriptive Photo PROJECT DESCRIPTION This project is to intended to install a left turn arrow signal at the existing traffic signal at the intersection of Hawthorne Boulevard and Eddinghill Drive/Seamount Drive. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8857 Hawthorne Boulevard at Eddinghill/Seamount Left Turn Signal FY29/30 Overall4/17/2025 Planning $ - $ - $ - $ - $ - Committed as of FY25/26 FY26/27 FY27/28 A-42 Insert Descriptive Photo PROJECT DESCRIPTION As part of the Arterial Roadways Rehabilitation Program, this project is intended to rehabilitate Palos Verdes Drive East, from Palos Verdes Drive South to the city limit, and consists of: - Resurfacing the existing asphalt - Replacing damaged asphalt - Replacing damaged curbs, gutters, and sidewalks - Replacing pavement markings and signs - Improving drainage (if needed) - Traffic calming measures PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8858 Roadway Asset Management Program - Palos Verdes Drive East Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ 50,000 231,995$ Management $ - $ 60,225 $ 30,773 $ - $ 25,000 Engineering $ - $ 120,450 $ 61,545 $ - 115,998$ Inspection $ - $ 120,450 $ 61,545 $ - $ 50,000 231,995$ Construction $ - $ 1,204,500 $ 615,450 $ - $ 550,000 2,369,950$ Project Contingency $ - $ 361,350 $ 184,635 $ - FUNDING 204 (Gas Tax - SB1) Committed as of 4/17/2025 131,208$ -$ 1,055,000$ 953,948$ -$ FY27/28 FY28/29 131,208$ -$ 1,866,975$ 953,948$ -$ 820,000$ 3,640,923$ $ 145,000 690,985$ Good road conditions with smooth pavement are expected by the City’s residents and businesses. According to the 2025 Pavement Management Program (PMP) Palos Verdes Drive East has an average Pavement Condtion Index (PCI) of 85. Timely maintenance reduces the overall lifecycle costs of roadway infrastructure. Road conditions are assessed through a triennial inspection and assigned a rating which is a basis for determining any needed treatment. The 2025 roadway condition assessment determined that treating this section of roadway will reduce the overall life cycle cost and improve its condition. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Years 2026-27 and 2027-28: Sunnyside Ridge to Palos Verdes Drive South Engineering and Construction in Fiscal Years 2029-30: Sunnyside Ridge to City Limit Project Location Map Background and Justification -$ -$ 131,208$ -$ 1,866,975$ 953,948$ -$ 820,000$ 215 (Proposition C)-$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund) -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 811,975$ -$ -$ -$ -$ -$ -$ -$ 820,000$ -$ A-43 Insert Descriptive Photo PROJECT DESCRIPTION As part of the Arterial Roadways Rehabilitation Program, this project is intended to rehabilitate Highridge Road, and consists of: - Resurfacing the existing asphalt - Replacing damaged asphalt - Replacing damaged curbs, gutters, and sidewalks - Replacing pavement markings and signs - Improving drainage (if needed) PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8859 Roadway Asset Management Program - Highridge Road Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ Management $ - $ - $ - $ - $ 20,000 Engineering $ - $ - $ - $ - 20,000$ Project Contingency $ - $ - $ - $ - $ 110,000 110,000$ $ 40,000 40,000$ Inspection $ - $ - $ - $ - $ 40,000 40,000$ Construction $ - $ - $ - $ - $ 365,000 365,000$ -$ -$ -$ -$ -$ 575,000$ 575,000$ 215 (Proposition C)-$ -$ -$ -$ FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ 575,000$ -$ Committed as of 4/17/2025 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Good road conditions with smooth pavement are expected by the City’s residents and businesses. According to the 2025 Pavement Management Program (PMP) Highridge Road has an average Pavement Condtion Index (PCI) of 68. Timely maintenance reduces the overall lifecycle costs of roadway infrastructure. Road conditions are assessed through a triennial inspection and assigned a rating which is a basis for determining any needed treatment. The 2025 roadway condition assessment determined that treating this section of roadway will reduce the overall life cycle cost and improve its condition. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 2029-30 Project Location Map Background and Justification -$ -$ -$ -$ -$ -$ -$ -$ 575,000$ -$ -$ -$ -$ -$ A-44 Good road conditions with smooth pavement are expected by the City’s residents and businesses. According to the 2025 Pavement Management Program (PMP) Montemalga Drive has an average Pavement Condtion Index (PCI) of 79. Timely maintenance reduces the overall lifecycle costs of roadway infrastructure. Road conditions are assessed through a triennial inspection and assigned a rating which is a basis for determining any needed treatment. The 2025 roadway condition assessment determined that treating this section of roadway will reduce the overall life cycle cost and improve its condition. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 2027-28 Project Location Map Background and Justification -$ -$ -$ 40,000$ -$ -$ 770,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 202 (Gas Tax - HUTA)-$ -$ -$ 150,000$ -$ -$ -$ 330 (CIP Fund)40,000$ -$ -$ -$ -$ 204 (Gas Tax - SB1)-$ -$ -$ 620,000$ FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ -$ -$ Committed as of 4/17/2025 40,000$ -$ -$ 770,000$ -$ -$ 760,000$ Inspection $ - $ - $ 50,000 $ - $ - 50,000$ Construction $ - $ - $ 495,000 $ - $ - 495,000$ Project Contingency $ - $ - $ 150,000 $ - $ - 150,000$ $ - 40,000$ Management $ - $ - $ 25,000 $ - $ - Engineering $ - $ - $ 50,000 $ - 25,000$ Environmental $ - $ - $ - $ - $ - -$ Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Insert Descriptive Photo PROJECT DESCRIPTION As part of the Arterial Roadways Rehabilitation Program, this project is intended to rehabilitate Montemalaga Drive, from Silver Spur Road to the city limit, and consists of: - Resurfacing the existing asphalt - Replacing damaged asphalt - Replacing damaged curbs, gutters, and sidewalks - Replacing pavement markings and signs - Improving drainage (if needed) - Traffic calming measures PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8860 Roadway Asset Management Program - Montemalaga Drive A-45 PROJECT DESCRIPTION The Sidewalk Management Program is intended to rehabilitate sidewalks as assessed and prioritized every 3 years. The scope of work generally consists of grinding, repairing or replacing sections of damaged sidewalks. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8861 Sidewalk Management Program Overall4/17/2025 Planning $ - $ - $ - $ - $ - Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 -$ Environmental $ - $ - $ - $ - $ - -$ Engineering $ - $ - $ - $ - $ - -$ $ - 25,000$ Construction $ 500,000 $ - $ - $ - $ - Management $ 25,000 $ - $ - $ - 500,000$ Inspection $ 50,000 $ - $ - $ - $ - 50,000$ Project Contingency $ 75,000 $ - $ - $ - $ - 75,000$ 4/17/2025 310 (CDBG)-$ 470,000$ -$ 650,000$ FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years 107,021$ 650,000$ -$ -$ -$ -$ -$ -$ -$ -$ 340 (Bicycle & Ped access)35,000$ 158,000$ -$ -$ -$ -$ -$ 330 (CIP Fund)72,021$ 22,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Good sidewalk conditions are expected by the City’s residents and businesses. Timely maintenance reduces the overall lifecycle costs of sidewalk infrastructure. Sidewalk conditions are assessed through periodic inspection. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering in Fiscal Year 2024-25 and Construction in 2025-26. Program will be rolled back into the Roadway Asset Management Plan once the backlog of sidewalk repairs have been completed. Project Location Map Background and Justification 107,021$ 650,000$ -$ -$ -$ -$ City-wide A-46 Insert Descriptive Photo PROJECT DESCRIPTION As part of the Arterial Roadways Rehabilitation Program, this project is intended to rehabilitate Indian Peak Road, from Crenshaw Boulevard to the city limit, and consists of: - Resurfacing the existing asphalt - Replacing damaged asphalt - Replacing damaged curbs, gutters, and sidewalks - Replacing pavement markings and signs - Improving drainage (if needed) PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 88LY2 Roadway Asset Management Program - Indian Peak Road Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ 40,000 40,000$ Management $ - $ - $ - $ - $ 20,000 Engineering $ - $ - $ - $ - 20,000$ Inspection $ - $ - $ - $ - $ 40,000 40,000$ Construction $ - $ - $ - $ - $ 395,000 395,000$ Project Contingency $ - $ - $ - $ - FUNDING 330 (CIP Fund) Committed as of 4/17/2025 -$ -$ -$ -$ -$ FY27/28 FY28/29 -$ -$ -$ -$ -$ 615,000$ 615,000$ $ 120,000 120,000$ Good road conditions with smooth pavement are expected by the City’s residents and businesses. According to the 2025 Pavement Management Program (PMP) Indian Peak Road has an average Pavement Condtion Index (PCI) of 75. Timely maintenance reduces the overall lifecycle costs of roadway infrastructure. Road conditions are assessed through a triennial inspection and assigned a rating which is a basis for determining any needed treatment. The 2025 roadway condition assessment determined that treating this section of roadway will reduce the overall life cycle cost and improve its condition. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 2029-30 Project Location Map Background and Justification -$ -$ -$ -$ -$ -$ -$ 615,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years 615,000$ -$ FY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A-47 Insert Descriptive Photo PROJECT DESCRIPTION As part of the Arterial Roadways Rehabilitation Program, this project is intended to rehabilitate Crestridge Road, from Crenshaw to Highridge, and consists of: - Resurfacing the existing asphalt - Replacing damaged asphalt - Replacing damaged curbs, gutters, and sidewalks - Replacing pavement markings and signs - Improving drainage (if needed) PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 88LY4 Roadway Asset Management Program - Crestridge Road Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ Management $ - $ - $ - $ 10,000 $ - Engineering $ - $ - $ - $ 20,000 10,000$ Project Contingency $ - $ - $ - $ 50,000 $ - 50,000$ $ - 20,000$ Inspection $ - $ - $ - $ 20,000 $ - 20,000$ Construction $ - $ - $ - $ 160,000 $ - 160,000$ -$ -$ -$ -$ 260,000$ -$ 260,000$ 220 (Measure R)-$ -$ -$ -$ FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years 260,000$ -$ -$ Committed as of 4/17/2025 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Good road conditions with smooth pavement are expected by the City’s residents and businesses. According to the 2025 Pavement Management Program (PMP) Crestridge Road has an average Pavement Condtion Index (PCI) of 74. Timely maintenance reduces the overall lifecycle costs of roadway infrastructure. Road conditions are assessed through a triennial inspection and assigned a rating which is a basis for determining any needed treatment. The 2025 roadway condition assessment determined that treating this section of roadway will reduce the overall life cycle cost and improve its condition. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 2028-29 Project Location Map Background and Justification -$ -$ -$ -$ -$ -$ -$ 260,000$ -$ -$ -$ -$ -$ -$ A-48 Insert Descriptive Photo PROJECT DESCRIPTION As part of the Arterial Roadways Rehabilitation Program, this project is intended to rehabilitate Crest Road, from the city limit to Highridge Road and from La Croix Drive to Sea Terrace, and consists of: - Resurfacing the existing asphalt - Replacing damaged asphalt - Replacing damaged curbs, gutters, and sidewalks - Replacing pavement markings and signs - Improving drainage (if needed) PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 88LY5 Roadway Asset Management Program - Crest Road Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ Management $ - $ - $ 70,000 $ - $ - Engineering $ - $ - $ 140,000 $ - 70,000$ Project Contingency $ - $ - $ 420,000 $ - $ - 420,000$ $ - 140,000$ Inspection $ - $ - $ 140,000 $ - $ - 140,000$ Construction $ - $ - $ 1,400,000 $ - $ - 1,400,000$ -$ -$ -$ 2,170,000$ -$ -$ 2,170,000$ 330 (CIP Fund)-$ -$ -$ 1,350,000$ FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ -$ -$ Committed as of 4/17/2025 -$ -$ -$ -$ -$ -$ -$ -$ -$ 204 (Gas Tax - SB1)-$ -$ -$ 820,000$ -$ -$ -$ -$ -$ -$ -$ -$ Good road conditions with smooth pavement are expected by the City’s residents and businesses. According to the 2025 Pavement Management Program (PMP) Crest Road has an average Pavement Condtion Index (PCI) of 82. Timely maintenance reduces the overall lifecycle costs of roadway infrastructure. Road conditions are assessed through a triennial inspection and assigned a rating which is a basis for determining any needed treatment. The 2025 roadway condition assessment determined that treating this section of roadway will reduce the overall life cycle cost and improve its condition. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 2027-28 Project Location Map Background and Justification -$ -$ -$ -$ -$ -$ 2,170,000$ -$ -$ -$ -$ -$ -$ -$ A-49 Insert Descriptive Photo PROJECT DESCRIPTION As part of the Arterial Roadways Rehabilitation Program, this project is intended to rehabilitate Hawthorne Boulevard, from City Limit to Palos Verdes Drive West, and consists of: - Resurfacing the existing asphalt - Replacing damaged asphalt - Replacing damaged curbs, gutters, and sidewalks - Replacing pavement markings and signs - Improving drainage (if needed) PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 88New6 Roadway Asset Management Program - Hawthorne Boulevard Overall4/17/2025 Planning $ - $ - $ - $ - $ - Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 -$ Environmental $ - $ - $ - $ - $ - -$ Engineering $ - $ - $ - $ 165,000 $ 170,000 335,000$ $ 85,000 170,000$ Construction $ - $ - $ - $ 1,605,000 $ 1,670,000 Management $ - $ - $ - $ 85,000 3,275,000$ Inspection $ - $ - $ - $ 160,000 $ 170,000 330,000$ Project Contingency $ - $ - $ - $ 245,000 $ 500,000 745,000$ 4/17/2025 204 (Gas Tax - SB1)-$ -$ -$ 4,855,000$ FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ -$ -$ -$ 2,260,000$ 2,595,000$ -$ 1,000,000$ 1,000,000$ -$ 215 (Proposition C)-$ -$ -$ -$ -$ -$ -$ 221 (Measure M)-$ -$ -$ -$ -$ -$ -$ 330 (CIP Fund)-$ -$ -$ -$ 1,260,000$ 1,595,000$ -$ 220 (Measure R)-$ -$ -$ -$ -$ -$ -$ Good road conditions with smooth pavement are expected by the City’s residents and businesses. According to the 2025 Pavement Management Program (PMP) Hawthorne Boulveard has an average Pavement Condtion Index (PCI) of 79.8. Timely maintenance reduces the overall lifecycle costs of roadway infrastructure. Road conditions are assessed through a triennial inspection and assigned a rating which is a basis for determining any needed treatment. The 2025 roadway condition assessment determined that treating this section of roadway will reduce the overall life cycle cost and improve its condition. -$ Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering and Construction in Fiscal Year 2028-29 and 2029-30 Project Location Map Background and Justification -$ -$ -$ -$ 2,260,000$ 2,595,000$ A-50 Needs / Wants List A-51 Due to land movement associated with the Greater Portuguese Bend Landslide Complex, areas of this road have signficant vertical and horizontal deviations and drainage deficiencies. Additionaly, sections of the road have encroached onto private property. The current configuration of the roadway needs to be modified to allow for a more direct travel path. This project will result in an improved driving experience when passing through the area. Construction is not anticipated to begin until the Portuguese Bend Landslide Remediation project is constructed and land movement has stabilized. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD T BD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TBD TBD TBD TBD330(CIP Fund) FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years TBD TBD Currently Budgeted -$ TBD TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Environmental TBD TBD TBD TBD TBD TBD Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to realign and reconstruct Palos Verdes Drive South in the Greater Portuguese Bend Landslide Complex area. PROJECT COST ESTIMATES 8300 Series Landslide Improvement Projects 8301 Palos Verdes Drive South Reconstruction Not recommended for funding in Fiscal Years 2025-26 through 2029-30: A-52 Prior to establishing this program; the City was receiving a growing number of complaints about the condition of the deteriorating existing metal pipe coastal bluff fencing. The aesthetics of the public trails along the City's bluffs is improved through this program. The Coastal Bluff fence at Vanderlip Sr. Park is the remaining section of coastal bluff fencing needing replacement. The Del Cerro Park fencing has deteriorated and needs replacement. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TBD TBD TBD TBD FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years TBD TBD Currently Budgeted -$ TBD TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD TBD Environmental TBD TBD TBD TBD TBD TBD Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Fence Program Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to replace existing fencing or install new fencing, as deemed necessary by the City, and consists of: - Replace the existing coastal bluff fence at Frank A. Vanderlip, Sr. Park to match other sections of recently replaced coastal bluff fencing - Replace the existing rail fencing at the edge of Del Cerro Park PROJECT COST ESTIMATES 8400 Series Parks, Open Space & Recreation Facilities Projects 8404 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: A-53 New solar lighting was installed at the PVIC parking lot in 2018, but not at the parking lot for the park. The park parking lot is used at night for approximately 60 events (mostly weddings) per year, as the PVIC parking lot does not have sufficient space for those events. New lighting, similar to that installed at the PVIC parking lot, will improve visibility for guests to the facility after dusk. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TBD TBD TBD TBD FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years TBD TBD Currently Budgeted -$ TBD TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Environmental TBD TBD TBD TBD TBD TBD Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Lower Point Vicente Parking Lot Improvements Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to add new solar parking lights for the Point Vicente Park parking lot, and consists of: - Installing new parking lot lights - Replacing the light by the main entrance gate with a new solar-powered light PROJECT COST ESTIMATES 8400 Series Parks, Open Space & Recreation Facilities Projects 8411 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: A-54 Point Vicente Interpretive Center "Bubbles" Statue Marquee Sign Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to restore the "Bubbles" statue and consists of: - Restoring the statue - Installing the restored statue at a location to be determined in Lower Point Vicente Park PROJECT COST ESTIMATES 8400 Series Parks, Open Space & Recreation Facilities Projects 8417 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD -$ TBD TBD TBD TBD TBD TBD FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years TBD TBD Currently Budgeted -$ -$ -$ TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ In 2014, the public requested that the statue be incorporated into a park plan for Lower Point Vicente. Although not included at that time, in November 2016, City Council directed staff to find an appropriate location at the Point Vicente Interpretive Center (PVIC). There is significant public affection and nostalgia for Marineland and its pioneering work with marine mammals, including Bubbles. Bubbles was a performing pilot whale at Marineland for 20 years through the facility's closure in 1987, and then at SeaWorld until June 2016. The installation of the restored statue has marked potential to increase public visitations to the PVIC with accompanying increased commercial revenue. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined. Funding may be achieved through donations, in which case this project would be moved to the list of funded projects. Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD TBD -$ -$ -$ -$ -$ A-55 Connector Trail PROJECT DESCRIPTION This project is intendended to create a trail that will connect the Filiorum Reserve to the Three Sisters Reserve. The location, route, and user designation requires review and approval by the US Fish and Wildlife Service per the Wildlife Conservation Board acquisition Subgrant awarded to the City in 2023. Because the route traverses a blue line stream with unstable soil, considerable planning and engineering are anticipated. PROJECT COST ESTIMATES 8400 Series Parks, Open Space & Recreation Facilities Projects 84New1 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: Overall4/17/2025 Planning TBD TBD TBD TBD TBD Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 TBD Environmental TBD TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD TBD TBD Budgeted -$ TBD TBD TBD FUNDING Currently FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ TBD TBD TBD TBD TBD TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ This conceptual trail has been approved by way of the City Council-approved Preserve Public Use Master Plan. However, implementation of the trail was on hold due to its location within land that was privately owned at the time. In 2023, the City purchased the land, now called the Wildlife Cooridor, and containins three individual reserves that have been enrolled into the Palos Verdes Nature Preserve and are constrained to NCCP/HCP regulations. Trail connection improvements may be achieved with volunteer assistance. TBD Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ TBD TBD TBD TBD TBD A-56 PROJECT DESCRIPTION This project is intended to assess, remediate, and rehabilitate an existing trailer located at the Ken Dyda Civic Center to repurpose it as an office for the Public Safety and Open Space and Trails Ranger Programs. The trailer will also include a public counter for resident requests and inquiries. PROJECT COST ESTIMATES 8500 Series Building Improvements Projects 85New1 Civic Center Maintenance Trailer Rehabilitation for Public Safety Staff and Rangers Not recommended for funding in Fiscal Years 2025-26 through 2029-30: Overall4/17/2025 Planning TBD TBD TBD TBD TBD Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 TBD Environmental TBD TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD TBD TBD Budgeted -$ TBD TBD TBD FUNDING Currently FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years -$ TBD TBD TBD TBD TBD TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ The Civic Center site includes a large modular unit (trailer) that has been used for various purposes in the past and is currently in disrepair. The site it occupies has been identified for providing additional work spaces needed for the new Public Safety Division and Rangers. Rather than demolishing and rebuilding a new structure over the site to provide additional work spaces, remediation and rehabilitation of the existing trailer is expected to be a more efficient and cost effective alternative. TBD Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ TBD TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ A-57 Recreation and Parks staff currently use a small trailer parked next to the restrooms for office space. The trailer is inadequately sized and in poor condition. Additionally, the restrooms are in poor condition and are in need of significatnt renovation. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TBD TBD TBD TBD FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years TBD TBD Currently Budgeted -$ TBD TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Environmental TBD TBD TBD TBD TBD TBD Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Restroom Improvements and New Office Space at Eastview Park Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to implement the following imrovements for the public restrooms and employee accommodations at Eastview Park: (1) renovations to the existing two restrooms, (2) permanent office space and restroom for parks staff PROJECT COST ESTIMATES 8500 Series Building Improvements Projects 85Pot1 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: A-58 Stormwater going through Altimira Canyon is mostly infiltrating into the ground and contributing to land movement. The City is working with ACLAD to identify mitigation measures and identify funding sources and opportunities. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TBD TBD TBD TBD FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years TBD TBD Currently Budgeted -$ TBD TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Environmental TBD TBD TBD TBD TBD TBD Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to support the Abalone Cove Landslide Abatement District in their pursuit of conveying stormwater to the ocean and preventing infiltration into the ground. PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8708 Altamira Canyon Improvements Not recommended for funding in Fiscal Years 2025-26 through 2029-30: A-59 The existing catch basin at this location is not properly conveying storm water runoff. This project will improve the drainage system to properly collect and convey storm water runoff in this area. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TBD TBD TBD TBD FUNDING FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years TBD TBD Currently Budgeted -$ TBD TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Environmental TBD TBD TBD TBD TBD TBD Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Stormwater Drainage Improvements at Bayend Drive Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to efficiently convey runoff from Bayend Drive, and consists of replace the existing catch basin and pipes. PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8711 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: A-60 Stormwater Drainage Improvements from Crest Road to Crestridge Canyon Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to convey storm water runoff from Crest Road, along Crestridge Road, to a natural canyon and consists of: - Constructing a new strom water detention chamber - Replacing and upgrading existing metal pipe - Instaling a new curb opening for the existing catch basin - Restoring concrete curb, gutter and sidewalk PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8714 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD FUNDING FY29/30 -$ TBD TBD TBD TBD TBD TBD TBD TBD The existing drainage system requires extensive maintenance. A new system will reduce the maintenance burden and reduce the likelihood of flooding during heavy rainfall. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD -$ TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years TBD TBD Currently Budgeted -$ TBD TBD TBD TBD FY27/28 FY28/29 A-61 Stormwater Drainage Improvements at Corsini Place Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to implement a storm system solution to mitigate possible land erosion that runs through the hillside of 6415 Corsini Place property. PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8718 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD FUNDING FY29/30 -$ TBD TBD TBD TBD TBD TBD TBD TBD The City inherited many of its storm drains from LA County upon incorporation in 1973. Since then the City has been working to upgrade and repair its storm drain system to address needed maintenance and meet current hydraulic demands. The existing storm drain pipe at 6415 Corsini Place has been damaged and the catch basin needs repairs. This project will make needed repairs and will implement a storm system to properly convey runoff and reduce the likelihood of land erosion. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD -$ TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years TBD TBD Currently Budgeted -$ TBD TBD TBD TBD FY27/28 FY28/29 A-62 Stormwater Drainage Improvements - Hawthorne Boulevard at Hawkhurst Drive Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to improve the storm drain system in the area, and consists of: - Replacing and improving the existing underground storm drain system (lateral pipes, main storm drain pipes and box culverts) - Installing new catch basins, drainage inlets and manholes PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 87New1 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD FUNDING FY29/30 -$ TBD TBD TBD TBD TBD TBD TBD TBD The 2015 Master Plan of Drainage identified needed improvements throughout the City and this location was included in a list of areas to be improved. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD -$ TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years TBD TBD Currently Budgeted -$ TBD TBD TBD TBD FY27/28 FY28/29 A-63 Aesthetic Improvements Program - Arterial Walls and Fences (City-wide) Insert Descriptive Photo PROJECT DESCRIPTION This program is intended to improve the aesthetics of walls and fences along arterial roadways, and consists of: - Developing a master plan for walls and fences along arterial and collector roads - Developing standards for new walls and fences (including height, design and material requirements) - Replacing existing, or building new, walls and fences, at locations to be selected by the City PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8811 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD FUNDING Currently Budgeted -$ TBD TBD TBD TBD FY27/28 FY28/29 -$ TBD TBD TBD TBD TBD TBD TBD TBD Improvements to the walls and fences along arterial roadways reflects positively on the entire City and enhances the surrounding areas. This project includes a potential matching grant funding program with a maximum limit to assist private property owners with repairing failing arterial walls. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD -$ TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years TBD TBD FY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A-64 Palos Verdes Drive East Path Improvements near Bronco Drive Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to construct a decomposed granite (“DG”) pedestrian/equestrian path in the public right-of-way and implement traffic improvements. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8839 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD FUNDING FY29/30 -$ TBD TBD TBD TBD TBD TBD TBD TBD The original project scope was to provide a path in the public right-of-way and implement traffic improvements recommended by the Traffic Safety Committee. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD -$ TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years TBD TBD Currently Budgeted -$ TBD TBD TBD TBD FY27/28 FY28/29 A-65 Palos Verdes Nature Preserve Parking - Crenshaw Boulevard (North of Crest Road) Insert Descriptive Photo PROJECT DESCRIPTION This project is to manage parking for the Palos Verdes Nature Preserve on Crenshaw Boulevard, north of Crest Road. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8845 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: Overall Planning TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental TBD TBD TBD TBD TBD TBD TBD TBD Management TBD TBD TBD TBD TBD Engineering TBD TBD TBD TBD TBD Inspection TBD TBD TBD TBD TBD TBD Construction TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD FUNDING Currently Budgeted -$ TBD TBD TBD TBD FY27/28 FY28/29 -$ TBD TBD TBD TBD TBD TBD TBD TBD Parking along Crenshaw Boulevard, north of Crest Road, has increased dramatically, resulting increased pedestrian traffic from parking areas to the Preserve's access points. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD -$ TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years TBD TBD FY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A-66 Arterial Roadway Beautification Program Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to address sections of medians and parkway strips along various city arterial roadways and consists of: - Installing drought tolerant trees and shrubs - Installing bio swale runoff treatment facilities - Enhancing median appearances throughout the City PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8851 Not recommended for funding in Fiscal Years 2025-26 through 2029-30: Overall Planning (8009) TBD TBD TBD TBD TBD TBD FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental (8003) TBD TBD TBD TBD TBD TBD TBD TBD Management (8002) TBD TBD TBD TBD TBD Engineering (8005) TBD TBD TBD TBD TBD FY25/26 Inspection (8001) TBD TBD TBD TBD TBD TBD Construction (8008) TBD TBD TBD TBD TBD TBD Project Contingency TBD TBD TBD TBD TBD TBD FUNDING -$ TBD TBD TBD TBD TBD TBD FY26/27 FY27/28 FY28/29 Future Fiscal Years TBD TBD Most of the medians and parkway strips along arterial roadways in RPV are in need of attention. Beautifying arterials is appreciated by all who use our roadways; and tends to enhance the overall experience of motorists and pedestrians. Aesthetic improvements to medians and parkway strips enhances the appeal of the surrounding area and reflects positively on the entire City. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE To be determined Project Location Map Background and Justification -$ -$ -$ TBD TBD TBD TBD TBD -$ -$ -$ -$ TBD -$ -$ -$ -$ -$ -$ Currently Budgeted FY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TBD TBD TBD TBD -$ -$ -$ -$ -$ -$ -$ City-wide A-67 Completed Projects A-68 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to create a program to inventory, assess, develop, and implement a maintenance plan for the City's facilities. The project consists of: - Inspecting existing facilities and determining needed preventative maintenance, repairs, and updates. - Estimating cost of needed work - Prioritizing and scheduling the work - Performing the work **Items identified as immediate needs are programmed over FY25-26; items identified as 2-5 year range are programmed over FYs 26-27 through 29-30** PROJECT COST ESTIMATES 8500 Series Building Improvements Projects 8509 Facilities Maintenance Program Overall4/17/2025 Planning $ - $ - $ 130,000 $ - $ - Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 N/A Environmental $ - $ - $ - $ - $ - N/A Engineering $ 30,000 $ 30,000 $ 15,000 $ 20,000 $ 45,000 N/A $ 25,000 N/A Construction $ 300,000 $ 300,000 $ 260,000 $ 385,000 $ 420,000 Management $ 15,000 $ 15,000 $ 15,000 $ 20,000 N/A Inspection $ 30,000 $ 30,000 $ 25,000 $ 40,000 $ 45,000 N/A Project Contingency $ 60,000 $ 60,000 $ 50,000 $ 75,000 $ 125,000 N/A Budgeted 330 (CIP Fund)550,000$ 435,000$ 435,000$ N/A FUNDING Currently FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years 550,000$ 435,000$ 435,000$ 495,000$ 540,000$ 660,000$ 495,000$ 540,000$ 660,000$ TBD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ The City uses the Facilities Maintenance Program to evaluate the condition of existing City- owned facilities, recommend repairs and upgrades, and proactively schedule the repairs and upgrades. All programmed work is based on recurring assesments performed by City-hired consultants and operational feedback from staff. The recurring assessments are planned to be performed every 5 years. TBD Estimated annual operating / maintenance cost TBD COMPLETED WORK IN FY 2024-25 1. ADA-Compliance Study for City Facilities (December 2024) 2. Drainage Improvements at Point Vicente Interpretive Center (January 2025) 3. Hesse Park Community Center Roof Replacement (in construction; completion by June 2025) 4. Trail Repairs at PVIC gardens (in progress; completion by June 2025) Project Location Map Background and Justification 550,000$ 435,000$ 435,000$ 495,000$ 540,000$ 660,000$ (FY 2025-26) A-69 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to implement improvements to an existing storm drain as follows: -Remove and replace the existing deteriorated drainage pipe -Construct an energy dissipating structure at storm drain outlet to address potential erosion downstream PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8722 Storm Drain Outlet Improvements at Ocean Crest Drive Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ $ - -$ Management $ 5,000 $ - $ - $ - $ - $ - Engineering $ - $ - $ - $ - 5,000$ Inspection $ 10,000 $ - $ - $ - $ - $ - 10,000$ Construction $ 70,000 $ - $ - $ - $ - $ - 70,000$ Project Contingency $ - $ - $ - $ - FUNDING 330 (CIP Fund) Currently Budgeted 85,000$ -$ -$ -$ -$ FY27/28 FY28/29 85,000$ -$ -$ -$ -$ -$ 85,000$ $ - -$ The City Council directed Public Works to work with the gated community of Seagate Villas (Community) to repair a failing storm drain and outlet system located at the end of Ocean Crest Drive. The failed storm drain pipe is not able to convey runoff efficiently downstream. Delivery of the project is led by the Community. Approximately 20% of the value of planned improvements are within City property and provides the basis of reimbursement as memorilized in a memorandum of understanding (MOU) between the City and the Community. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Environmental and ratification of the MOU in FY 23/24 Construction in FY 24/25 Project Location Map Background and Justification -$ -$ 85,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ FY25/26 FY26/27 Future Fiscal Years -$ -$ FY29/30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A-70 Insert Descriptive Photo PROJECT DESCRIPTION This project is intended to remove and replace a collapsed storm drain pipe at Peacock Ridge Road and install associated infrastructure, including a new catch basin and storm drain outlet located at Scotmist Drive. PROJECT COST ESTIMATES 8700 Series Sewer & Storm Drain Improvements Projects 8723 Storm Drain Improvements at Peacock Ridge Road Overall Planning $ - $ - $ - $ - $ - -$ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Committed as of 4/17/2025 Environmental $ - $ - $ - $ - $ - -$ Management $ 10,000 $ - $ - $ - $ - $ - Engineering $ 42,605 $ - $ - $ - $ - 10,000$ Project Contingency $ 60,000 $ - $ - $ - $ - $ - 60,000$ $ - 42,605$ Inspection $ 20,000 $ - $ - $ - $ - $ - 20,000$ Construction $ 195,000 $ - $ - $ - $ - $ - 195,000$ 327,605$ -$ -$ -$ -$ -$ 327,605$ FUNDING -$ -$ 330 (CIP Fund) -$ -$ -$ -$ Currently FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal YearsBudgeted 327,605$ -$ -$ -$ -$ The existing storm drain pipe, collecting stormwater runoff from Peacock Ridge Road and conveying it to an outlet on Scotmist Drive, has collapsed and needs to be replaced. Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE Engineering in FY 23/24 Construction in FY 24/25 Project Location Map Background and Justification -$ -$ 327,605$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ A-71 Insert Descriptive Photo PROJECT DESCRIPTION Under the Roadway Asset Management Program, the Pavement Management Plan (PMP) is updated every three years to inventory, evaluate the condition, and develop a maintenance plan for the City's roadway and sidewalk network, and to identify Citywide Arterial and Residential Street Rehabilitation projects. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8844 Roadway Asset Management Program - Triennial Update Overall4/17/2025 Planning $ - $ - $ 250,000 $ - $ - Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 N/A - ongoing Environmental $ - $ - $ - $ - $ - -$ Engineering $ - $ - $ - $ - $ - -$ $ - -$ Construction $ - $ - $ - $ - $ - Management $ - $ - $ - $ - -$ Inspection $ - $ - $ - $ - $ - -$ Project Contingency $ - $ - $ - $ - $ - -$ Budgeted 204 (Gas Tax - SB1)224,600$ -$ -$ NA - ongoing FUNDING Currently FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years 224,600$ -$ -$ 250,000$ -$ -$ 250,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ The City uses the PMP to evaluate the condition of existing pavement and sidewalks, recommend repairs and upgrades, and accordingly schedule the repairs and upgrades of specific areas throughout the city. The Metropolitan Transit Authority (Metro) requires the PMP update in order for the City to continue receiving Proposition C funds. It must be conducted every three years. Failure to complete will result in lost funding. -$ Estimated annual operating / maintenance cost TBD ESTIMATED SCHEDULE The latest triennial update was provided in Fiscal Year 2024-25. The next triennial update will be provided in Fiscal Year 2027-28. Project Location Map Background and Justification 224,600$ -$ -$ 250,000$ -$ -$ (FY 2025-26) A-72 Insert Descriptive Photo PROJECT DESCRIPTION This program is intended to implement traffic calming measures throughout the City on arterial and residential streets. Improvements may include: signs, pavement markings, speed feedback signs, roundabouts, and speed humps. PROJECT COST ESTIMATES 8800 Series Right-of-Way Improvements Projects 8846 Traffic Calming Program - (Citywide) Overall4/17/2025 Planning $ - $ - $ - $ - $ - Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 -$ Environmental $ - $ - $ - $ - $ - -$ Engineering $ 75,000 $ 80,000 $ 80,000 $ 85,000 $ 85,000 NA - ongoing $ 10,000 NA - ongoing Construction $ 175,000 $ 180,000 $ 185,000 $ 190,000 $ 195,000 Management $ 10,000 $ 10,000 $ 10,000 $ 10,000 NA - ongoing Inspection $ 15,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 NA - ongoing Project Contingency $ 25,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 NA - ongoing 4/17/2025 220 (Measure R)30,405$ 300,000$ 320,000$ NA - ongoing FUNDING Committed as of FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 Future Fiscal Years 420,194$ 300,000$ 320,000$ 325,000$ 335,000$ 340,000$ 325,000$ 335,000$ 340,000$ NA - ongoing 330 (CIP Fund)389,789$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Concerns about traffic and speeding are one of the most persistent and emotional comments received by the City. This program is needed to assess those concerns and implement measures to mitigate the effects. NA - ongoing Estimated annual operating / maintenance cost TBD COMPLETED WORK IN FY 2024-25 Eddinghill Drive – Speed feedback signs; Abbotswood Drive – Temporary speed feedback signs; Hawthorne Boulevard-Woodbrook Road- Shorewood Road – Curb striping and traffic signs; Crest Road at Mira Catalina School – Crosswalk flashing beacons; Longhill Drive at Soledado Elementary School – Yield signs at crosswalk; Avenida Classica and Avenida Celestial – Pilot test traffic circles; Crest Road – Speed feedback signs and advance cross-street signs near Sea Terrance Project Location Map Background and Justification 420,194$ 300,000$ 320,000$ 325,000$ 335,000$ 340,000$ (FY 2025-26) A-73 Infrastructure Management Advisory Committee (IMAC) Minutes February 17, 2025 Page 1 of 4 MINUTES CITY OF RANCHO PALOS VERDES INFRASTRUCTURE MANAGEMENT ADVISORY COMMITTEE REGULAR MEETING FEBRUARY 17, 2025 CALL TO ORDER: A regularly scheduled meeting of the Rancho Palos Verdes Infrastructure Management Advisory Committee (IMAC) was called to order by Chairperson Peter Shaw at 6:05 p.m. in accordance with the requirements of the Ralph M. Brown Act, Section 54950 et seq. of the Government Code, notice having been given with affidavit thereto on file. ROLL CALL: The roll call for the Infrastructure Management Advisory Committee was answered as follows: Present: Members Grillo, Radke, Smalling, Spielman, Ziminsky, Vice- Chairperson Haig and Chairperson Shaw Absent (excused): None PLEDGE OF ALLEGIANCE: The Pledge of Allegiance was led by Peter Shaw. CHAIR’S ANNOUCEMENTS: Chairperson Shaw gave a brief report. APPROVAL OF AGENDA: Chairperson Shaw, seconded by Member Spielman, moved to approve the agenda subject to discussing Item 4 prior to Item 3. AYES: Grillo, Radke, Smalling, Spielman, Ziminsky, Vice-Chairperson Haig, and Chairperson Shaw ABSTAIN: None PUBLIC COMMENTS ON NON-AGENDA ITEMS: None DIRECTOR OF PUBLIC WORKS REPORT: Deputy Director David Copp gave a report and responded to questions. B-1 Infrastructure Management Advisory Committee (IMAC) Minutes February 17, 2025 Page 2 of 4 REGULAR BUSINESS: 1. Approval of Minutes of the May 20, 2024 meeting of the Infrastructure Management Advisory Committee (IMAC) Chairperson Shaw, seconded by Member Spielman, moved to approve the minutes of the May 20, 2024. AYES: Spielman, Ziminsky, Vice-Chairperson Haig, and Chairperson Shaw ABSTAIN: Grillo, Radke, and Smalling ABSENT: None 2. Approval of Minutes of the December 16, 2024 meeting of the Infrastructure Management Advisory Committee (IMAC) Member Spielman, seconded by Chairperson Shaw, moved to approve the minutes subject to changes of May 20, 2024. AYES: Radke, Smalling, Spielman, Ziminsky, Vice-Chairperson Haig, and Chairperson Shaw ABSTAIN: Grillo 4. Consideration and possible action to receive and file a report from the Landslide Water Study Subcommittee and invite up to three members of the Finance Advisory Committee (FAC) to join the subcommittee and become a joint ad-hoc subcommittee. Item 4 was approved to be discussed prior to Item 3 during the Approval of Agenda. Member Smalling presented the report. Discussion ensued between committee members. Chairperson Shaw, seconded by Member Smalling, moved to invite up to three members from the Finance Advisory Committee to join the subcommittee. AYES: Grillo, Radke, Smalling, Spielman, Ziminsky, Vice- Chairperson Haig, and Chairperson Shaw ABSTAIN: None 3. Consideration and possible action to create an ad-hoc joint subcommittee with the Emergency Preparedness Committee to assess the City’s Infrastructure as it relates to potential wildfire response and other potential emergencies. B-2 Infrastructure Management Advisory Committee (IMAC) Minutes February 17, 2025 Page 3 of 4 Chairperson Shaw, seconded by Member Spielman, moved to defer discussions and any decisions to a future IMAC regular meeting. AYES: Grillo, Radke, Smalling, Spielman, Ziminsky, Vice- Chairperson Haig, and Chairperson Shaw ABSTAIN: None 5. Consideration and possible action to review and provide comments on the first draft of the Capital Improvement Program for Fiscal Years 2025-26 through 2029-30. Deputy Director Copp presented the report and discussion ensued. Committee members provided the following comments:  Funding Summary o Provide an update to available CIP funding  8006-Audio Video Systems Improvements at Fred Hesse Jr. Community Park o Member Spielman requested to see the design documents.  8509-Facilities Asset Management Program o Clarify in the justification section that the program is supported by a condition assessment prepared by a consultant. o Revise the list of projects to reflect the correct planned fiscal year of implementation (adjust each sheet by +1 fiscal year).  85New1-Building Improvements Project o Indicate the expected service life of the existing trailer.  87New7-Storm Drain Improvements at Montemalaga Canyon o Chairperson Shaw asked why this project was being given priority over other storm drain projects. o Add additional background information to the description (How was the problem discovered? What is the risk?)  87New8-Sewer Maintenance Access Improvements in Agua Amarga Canyon o Revise image to show correct location o Chairperson Shaw stated that clearing the trails should allow for enough clearance for access o Inquire about details in scope and estimates in concepts  8809-Western Avenue Traffic Flow Improvements o Chairperson Shaw requested a summary of the improvements be presented to IMAC as part of a Future Agenda Item, to allow for a better understanding of the design and its expectations. o Requested that a representative from Caltrans be invited to discuss the project. B-3 Infrastructure Management Advisory Committee (IMAC) Minutes February 17, 2025 Page 4 of 4  8847-Palos Verdes Drive East Guardrail Improvements o Consider adding signage improvements to the scope  85Pot1 (in Needs/Wants section of CIP) o Chairperson Shaw commented on the need for restroom improvements at this location. o This item can be discussed at a future IMAC meeting.  8845 (in Needs/Wants section of CIP) o Look for other ways people can park on Crenshaw Blvd Deputy Director Copp offered IMAC members a visit to Lower Hesse Park with the Public Works Maintenance Superintendent to discuss possible improvements. Discussion ensued between committee members. FUTURE AGENDA ITEMS: Consideration and possible action to create an ad-hoc joint subcommittee with the Emergency Preparedness Committee to assess the City’s Infrastructure as it relates to potential wildfire response and other potential emergencies will be placed on the agenda for the next IMAC meeting. Western Avenue Improvements will be placed on a future agenda (TBD). COMMITTEE MEMBERS ORAL REPORTS: None ADJOURNMENT: Meeting adjourned at 10:11 p.m.to a date to be determined. AYES: Grillo, Radke, Smalling, Spielman, Ziminsky, Vice-Chairperson Haig, and Chairperson Shaw ABSTAIN: None B-4 Infrastructure Management Advisory Committee (IMAC) Minutes March 31, 2025 Page 1 of 4 MINUTES CITY OF RANCHO PALOS VERDES INFRASTRUCTURE MANAGEMENT ADVISORY COMMITTEE SPECIAL MEETING MARCH 31, 2025 CALL TO ORDER: A special meeting of the Rancho Palos Verdes Infrastructure Management Advisory Committee (IMAC) was called to order by Deputy Director at 6:02 p.m. in accordance with the requirements of the Ralph M. Brown Act, Section 54950 et seq. of the Government Code, notice having been given with affidavit thereto on file. Member Spielman, seconded by Member Grillo, moved to approve Chair Shaw attend Via Zoom. AYES: Grillo, Radke, Smalling, Spielman, Vice-Chairperson Haig, and Chairperson Shaw ABSENT: Ziminsky ROLL CALL: The roll call for the Infrastructure Management Advisory Committee was answered as follows: Present: Members Grillo, Radke, Smalling, Spielman, Vice-Chairperson Haig and Chairperson Shaw Absent (excused): Lauren Ziminsky (joined via Zoom at 6:37 p.m.) PLEDGE OF ALLEGIANCE: The Pledge of Allegiance was led by Totran Radke. CHAIR’S ANNOUCEMENTS: Chairperson Shaw and Vice-Chair Haig gave brief reports. APPROVAL OF AGENDA: Member Spielman, seconded by Member Smalling, moved to approve the agenda. AYES: Grillo, Radke, Smalling, Spielman, Vice-Chairperson Haig, and Chairperson Shaw ABSENT: Ziminsky B-5 Infrastructure Management Advisory Committee (IMAC) Minutes March 31, 2025 Page 2 of 4 PUBLIC COMMENTS ON NON-AGENDA ITEMS: None DIRECTOR OF PUBLIC WORKS REPORT: Deputy Public Works Director David Copp introduced Public Work’s Principal Engineers, Russ Bryden and Deanna Fraley. Deputy Director Copp gave a report and responded to questions. Vice-Chair Haig, seconded by Member Spielman, moved to approve Member Ziminsky join the meeting via Zoom. AYES: Grillo, Radke, Smalling, Spielman, Vice-Chairperson Haig, and Chairperson Shaw ABSENT: None NOES: None REGULAR BUSINESS: 1. Approval of Minutes of the February 17, 2025 meeting of the Infrastructure Management Advisory Committee (IMAC) Member Spielman, seconded by Member Grillo, moved to approve the minutes of the February 17, 2025 with the mentioned amendments. AYES: Grillo, Radke, Smalling, Spielman, Ziminsky, Vice- Chairperson Haig, and Chairperson Shaw ABSTAIN: None 2. Consideration and possible action to create an ad-hoc joint subcommittee with the Traffic Safety Committee to assess the City’s Roundabout Feasibility Study. Member Spielman presented background information for proposed roundabouts along Palos Verdes Drive South. Discussion ensued between committee members and Staff. Members Spielman, Grillo and Smalling volunteered to join the subcommittee. Chairperson Shaw, seconded by Member Smalling, moved to invite Members Spielman, Grillo and Smalling from the IMAC Committee to join the subcommittee. B-6 Infrastructure Management Advisory Committee (IMAC) Minutes March 31, 2025 Page 3 of 4 Traffic Safety Committee Special Meeting will be held on April 28 at 6:00 p.m. in the Community Room at the Ken Dyda Civic Center. Member Spielman, seconded by Vice-Chair Haig, moved to accept the proposed recommendations AYES: Grillo, Radke, Smalling, Spielman, Ziminsky, Vice- Chairperson Haig, and Chairperson Shaw ABSTAIN: None 3. Receive and file a report from the Needs/Wants Subcommittee on the proposed Capital Improvement program for Fiscal Years 2025-26 through 2029-30. Member Spielman presented the report from the Needs/Wants Subcommittee. Discussion ensued between committee members and Staff. Member Grillo, seconded by member Spielman, moved to receive and file the report. AYES: Grillo, Radke, Smalling, Spielman, Vice-Chairperson Haig, and Chairperson Shaw ABSENT: Ziminsky (Left the meeting early) ABSTAIN: None FUTURE AGENDA ITEMS: 1. Consideration and possible action to review and provide comments on the second draft of the Capital Improvement Program for Fiscal Years 2025-26 through 2029-30. (4/21/25 – Regular scheduled meeting) 2. Discuss Design Scope of the Western Avenue Traffic Flow Improvements (Date TBD) 3. Continue discussing IMAC’s potential role in evaluating the capability of infrastructure for wildfire and other emergencies and consider creating a subcommittee with the Emergency Preparedness Committee (EPC). (Date TBD) COMMITTEE MEMBERS ORAL REPORTS: Chair Shaw reported that FAC agreed to join the subcommittee and appointed Chair John McAllister and Member Paul Weber. Chair Shaw called and emailed Water B-7 Infrastructure Management Advisory Committee (IMAC) Minutes March 31, 2025 Page 4 of 4 Replenishment District. He will call next week to arrange for a visit their facility in Torrance. Member Radke reported she and Vice-Chair Haig attended the South Bay Cities Council of Government General Assembly. ADJOURNMENT: Meeting was adjourned at 7:37 p.m. until April 21, 2025 at 6:00 p.m. AYES: Grillo, Radke, Smalling, Spielman, Vice-Chairperson Haig, and Chairperson Shaw ABSENT: Ziminsky B-8 Infrastructure Management Advisory Committee (IMAC) Minutes April 21, 2025 Page 1 of 4 MINUTES (DRAFT) CITY OF RANCHO PALOS VERDES INFRASTRUCTURE MANAGEMENT ADVISORY COMMITTEE April 21, 2025 CALL TO ORDER: A regular scheduled meeting of the Rancho Palos Verdes Infrastructure Management Advisory Committee (IMAC) was called to order by Deputy Director at 6:05 p.m. in accordance with the requirements of the Ralph M. Brown Act, Section 54950 et seq. of the Government Code, notice having been given with affidavit thereto on file. ROLL CALL: The roll call for the Infrastructure Management Advisory Committee was answered as follows: Present: Members Radke, Smalling, Spielman, Vice-Chairperson Haig and Chairperson Shaw Absent (excused): Lauren Ziminsky Absent (unexcused): Nicholas Grillo PLEDGE OF ALLEGIANCE: The Pledge of Allegiance was led by Member Smalling. CHAIR’S ANNOUCEMENTS: Chairperson Shaw delivered a brief report. It was proposed that meeting announcements be sent at least one week by a City representative in advance to improve engagement, which staff were in agreement to do in the future. APPROVAL OF AGENDA: Member Spielman, seconded by Vice-Chairperson Haig, moved to approve the agenda. AYES: Radke, Smalling, Spielman, Vice-Chairperson Haig, and Chairperson Shaw ABSENT: Ziminsky, Grillo PUBLIC COMMENTS ON NON-AGENDA ITEMS: None B-9 Infrastructure Management Advisory Committee (IMAC) Minutes April 21, 2025 Page 2 of 4 DIRECTOR OF PUBLIC WORKS REPORT: Deputy Public Works Director David Copp provided a report on behalf of Public Works Director Ramzi Awwad and responded to questions. REGULAR BUSINESS: 1. Approval of Minutes of the March 31, 2025 meeting of the Infrastructure Management Advisory Committee (IMAC) Member Shaw, seconded by Member Spielman, moved to approve the minutes of the March 31, 2025 with the mentioned amendments. AYES: Radke, Smalling, Spielman, Vice-Chairperson Haig, and Chairperson Shaw ABSTAIN: None ABSENT: Ziminsky and Grillo 2. Consideration and possible action to discuss a list of accomplishments for the 2024-25 fiscal year, as well as the Infrastructure Management Advisory Committee (IMAC) Work Plan for the 2025-26 Fiscal Year, to support preparation of the biennial status report on City Advisory Committees to the City Council on June 3, 2025. Discussion ensued between committee members and Staff. No action was taken; a review of accomplishments from the past six months and the adoption of the Work Plan for Fiscal Year 2025-2026 will be considered at the May 19 regular IMAC meeting. 3. Consideration and possible action to receive an oral report from the Landslide Water Study Subcommittee. Chairperson Shaw presented the report. Discussion ensued between committee members and Staff. No action was taken. 4. Provide feedback on the second draft of the proposed Capital Improvement Program for Fiscal Years 2025-2026 through 2029-30 Deputy Public Works Director David Copp presented the report. B-10 Infrastructure Management Advisory Committee (IMAC) Minutes April 21, 2025 Page 3 of 4 Discussion ensued between committee members and Staff. The following feedback was provided by the IMAC:  Project 8715 – Stormwater Drainage Improvements: Palos Verdes Drive South at Peppertree – Staff should consider interim temporary measures to convey stormwater from the area to Palos Verdes Drive South and prevent pooling water that could contribute to land movement.  Project 88New3 – Portuguese Bend Landslide Stabilization – Deep Dewatering Wells 1 thru 6 Permanent Power – Southern California Edison (SCE) should consider underground or on-ground power transmission infrastructure instead of using above-ground transmission lines that could be compromised by land movement.  Project 8509 – Facilities Maintenance Program – Any reduction to funding should be limited, as this program supports proactive maintenance of city owned facilities that results in reducing associated long-term operations and maintenance costs.  Project 87New8 – Sewer Maintenance Access Improvements in Agua Amarga Canyon – Staff should consider utilizing the established Trails Working Group in partnership with the Department of Recreation and Parks Open Space Management Division (OSM) for an early assessment and recommendations.  Project 8844 – Roadway Asset Management Program – Triennial Update – The project title should be changed to Roadway Maintenance Program  Project 8845 – Palos Verdes Nature Preserve Parking – Crenshaw Boulevard (North of Crest Road) – the project should be assigned a higher priority by way of funding in FY 2025-26 to conduct a study recommending parking improvements.  Project 8847 – Palos Verdes Drive East Guardrail Improvements – the project should provide measures to reduce vehicle damage to guardrails.  General Comment – The IMAC consider projects related to addressing the Landslide Complex are critical.  General Comment – Staff should be aggressive with pursing alternative funding sources, especially for grants associated with roadway projects. No action was taken; staff will report this feedback as part of the associated April 29th, 2025 City Council CIP Workshop staff report. B-11 Infrastructure Management Advisory Committee (IMAC) Minutes April 21, 2025 Page 4 of 4 FUTURE AGENDA ITEMS: 1. Present a list of the IMAC’s accomplishments for the 2024-25 fiscal year, as well as the IMAC Work Plan for the 2025-26 Fiscal Year, in preparation of the biennial status report on City Advisory Committees to the City Council on June 3, 2025 (May 19, 2025 – Regular IMAC Meeting) 2. Discuss Design Scope of the Western Avenue Traffic Flow Improvements (Date TBD) 3. Continue discussing IMAC’s potential role in evaluating the capability of infrastructure for wildfire and other emergencies and consider creating a subcommittee with the Emergency Preparedness Committee (EPC). (Date TBD) 4. Discuss organizing a trip to observe the landslide emergency stabilization winterization work. Staff will explore potential dates and logistics. (Date TBD) COMMITTEE MEMBERS ORAL REPORTS: Member Radke attended the City’s Whale of a Day Celebration and reported that the committee should engage with the residents of the community at future events. Member Radke also reported that she attended the Infrastructure Working Group meeting with the South Bay Cities Council of Governments on March 27th, 2025. ADJOURNMENT: Meeting was adjourned at 10:37 p.m. until May 19, 2025 at 6:00 p.m. AYES: Radke, Smalling, Spielman, Vice-Chairperson Haig, and Chairperson Shaw ABSENT: Ziminsky and Grillo ABSTAIN: None B-12 From: Jim Knight <knightjim33@gmail.com> Sent: Wednesday, April 23, 2025 5:30 PM To: CC <CC@rpvca.gov> Subject: CIP project TO: RPV City Council FROM: Jim Knight Date: 4-23-2025 RE: CIP workshop Dear Mayor and Council members, I would like to address a CIP project that has been recommended by geologists since 1983: the completion of the storm drain system from PVDS to the shoreline. I have written to this Council on Aug. 1, 2023 and to former Council members on numerous occasions to complete this project. ACLAD has also written to the Council for this same project. To review, currently the 120” culvert under PVDS near Narcissa Dr. was never completed to the shoreline and dumps all of Altamira Canyon runoƯ into the raw land that the City owns beachside of PVDS. This beachside land mass is the toe of the Abalone Cove Landslide and it is critical to mitigate the instability in this area. The Council has spent millions to install deep dewatering wells but every winter this culvert dumps all of the runo Ư of Altamira Cyn. directly into the soil that the wells are trying to pump out. As I have said in the past, the water budget of the landslide is like a 5 gallon bucket. The wells reduce the water level of the bucket a spoonful at a time and gradually lower the water level. But one winter of direct infusion into the soil in this area fills that bucket right up again. An ounce of prevention (lining the canyon) is worth a pound of cure (deep dewatering wells). In addition to the wells, the City is also spending millions to repair PVDS in this area and the Sanitation District is continually repairing the sewer lines because of land instability in this same area. An investment in this CIP project would lessen that cost for years to come. The GPS readings that the City has collected over the past decades has shown that this beachside area of Abalone Cove has moved seaward far more than uphill land masses C-1 which over that time has resulted in loss of uphill support adversely a Ưecting the residents in this uphill area. Decades ago a City funded panel of geological experts including Perry Ehlig had recommended directing this storm water runoƯ to an impervious surface all of the way to the shoreline Below is a diagram Perry put forth to the Council in 1983. I have had casual conversations with several contractors and they said that the canyon here can be filled and the 120” culvert (preferably not CMP but some form of HDPE Corrugated Drain Pipe) extended to the shoreline. Thank you for your service and attention to these matters, Jim Knight C-2