Loading...
CC SR 20250415 02 - LLMD FY25-26 CITY COUNCIL MEETING DATE: 04/15/2025 AGENDA REPORT AGENDA HEADING: Regular Business AGENDA TITLE: Consideration to review assessment rate options for the Citywide Landscaping and Lightning Maintenance District (LLMD) for Fiscal Year (FY) 2025-26. RECOMMENDED COUNCIL ACTION: (1) Receive and file a report on the Citywide Landscaping and Lighting Maintenance (LLMD); (2) Direct Staff to initiate proceedings to set the FY 2025-26 LLMD levy at a rate of either: a. $0 per parcel for single family residences; b. Up to $23.50 per parcel for single family residences, which was the rate at the time that Proposition 218 came into effect on July 1, 1997; or c. Greater than $23.50 per parcel for single family residences, which would require voter approval pursuant to Proposition 218; and (3) Based on the above, direct Staff to prepare an Engineer’s Report for the LLMD for FY 2025-26 and return at a future date with the appropriate resolutions memorializing the Council’s directive for future consideration at a duly noticed public hearing. FISCAL IMPACT: There is no fiscal impact to receiving and filing a report on the Citywide Landscape and Lighting Maintenance District (LLMD). The fiscal impact of directing Staff to initiate proceedings to set an LLMD levy and accordingly prepare the annual Engineer’s Report will result in an expenditure of $9,075 to $13,700, depending upon whether there is a levy. Even if the levy is set at zero, an Engineer’s Report is required for the LLMD to continue to exist and allow the option of a future levy. Sufficient funds for the Engineer’s Report are available in the FY 2024-25 Operating Budget. The budget impact of setting the levy at various rates is detailed in this staff report for FY 2025-26. Depending on City Council direction, revenues can range from $0 to $350,000, or a higher amount if the City Council directs staff to conduct the Proposition 218 process for rates exceeding $23.50 per parcel. VR Amount Budgeted: $577,000 Additional Appropriation: $0 1 Account Number(s): 101-400-3110-5101 [General Fund- PW Administration- Professional/Technical Services] VR ORIGINATED BY: Vanessa Hevener, Project Manager REVIEWED BY: Deanna Fraley, Principal Engineer/City Engineer Ramzi Awwad, Director of Public Works APPROVED BY: Ara Mihranian, AICP, City Manager ATTACHED SUPPORTING DOCUMENTS: A. Resolution No. 92-85 Ordering the Formation of a Citywide Landscaping and Lighting Maintenance District (page A-1) BACKGROUND: On August 6, 1992, the City Council formed an assessment district designated as the Citywide Landscaping and Lighting Maintenance District (LLMD), pursuant to the Landscaping and Lighting Act of 1972, California Streets and Highways Code Section 22500, et seq. (1972 Act). The purpose of forming the LLMD was, in brief, to provide funding for the ongoing operation, maintenance, and servicing of landscaping, public lighting and signals, park and recreational improvements, and appurtenant facilities (Attachment A). The LLMD is funded through assessments on properties Citywide. In accordance with 1972 Act requirements, each parcel is assessed an amount based on the relative benefit the parcel receives from the LLMD’s operations rather than the parcel’s assessed value. The LLMD annual levy ranged from $49.99 per parcel for single -family residences (approximately 94% of properties Citywide) at inception on August 6, 1992, to $23.50 for FY 1997-98. Beginning in FY 1998-99, the annual levy was set to $20.38 per parcel for single-family residences, resulting in an annual revenue of approximately $333,000. On June 21, 2005, the City Council decided to fund streetlight and traffic signal operation and maintenance costs using a different fund, the 1911 Act Lighting and Maintenance District Fund (1911 Act Fund), rather than LLMD funds. The 1911 Act Fund is funded from property assessments collected by the County and transferred to the City and is restricted for use on streetlights and traffic signals. Staff presumes the City Council made this decision because of an adequate 1911 Act fund balance for the operation and maintenance of streetlights and traffic signals and the desire to reduce the overall tax burden on residents. Accordingly, the City Council reduced the LLMD assessment rate and annual levy to $15.92 per parcel for single-family residences. 2 The 1911 Act Fund continues to collect revenues and pay for costs associated with the installation, operation, and maintenance of streetlights and traffic signals. This annual revenue has been, and is projected to continue to be, sufficient to cover the typical annual expenses for installing, operating, and maintaining the City’s streetlights and traffic signals. On May 16, 2017, the City Council set the LLMD rate to zero, which means property owners were not assessed. The rate has been set to zero in each subsequent year since, which means that alternate funds are being used to pay costs that could otherwise be funded through the LLMD. Moreover, by setting the assessment at zero rather than sunsetting the LLMD, it enables the Council to reset an assessment up to rate at which time Proposition 218 (Prop 218) went into effect as discussed later in this report. To ensure a fair and equitable sharing of LLMD costs, the City conducts an annual review of an engineer’s report wherein the current year’s expenses are reviewed, the ensuing year’s expenses are budgeted, and the assessment for the ensuing fiscal year is set. In setting the annual assessment, the City Council is asked to consider any proposed new improvements or any changes in existing improvements, any fund balances or shortages, and adjust the assessment accordingly. Payment of the assessment for each par cel is made in the same manner and at the same time as payments are made for property taxes for each property. An Engineer’s Report is necessary to establish assessments based on relative benefit. The Engineer’s Report classifies areas within the City into various zones which, by reason of variations in the nature, location, and extent of the proposed activities and improvements, receive differing degrees of benefit from the operation of the LLMD. On June 6, 2023, during the City Council’s annual consideration of the LLMD, the City Council directed Staff to bring LLMD assessment options for the City Council’s consideration during the time that the budget is being developed so that the City Council’s assessment direction can be incorporated into budget calculations prior to finalizing the budget. Tonight, pursuant to Council’s 2023 directive, Staff seeks direction from the City Council with respect to setting the preferred option for the assessment rate of the LLMD for FY 2025-26. DISCUSSION: The 1972 Act allows the City to levy an assessment for the installation, construction, maintenance, servicing, and incidental costs of: • Landscaping • Ornamental Structures • Public Lighting and Traffic Signals • Park or Recreational Improvements • Acquisition of Land/Existing Improvements for Park, Recreational, or Open Space 3 • Acquisition or Construction of Community Center or Similar Facility Revenues may also be used for related items such as appurtenances; provision of electricity, gas, or water; and curbs, gutters, walls, sidewalks, paving, irrigation, drainage, or electrical facilities necessary or convenient for the maintenance of the aforementioned items. Table 1 below shows the proposed FY 2025-26 budget for landscaping and park/recreational improvements, which could be funded through the LLMD per Section 22500 of the California Streets and Highways Code Section. The table shows that eligible items are currently being funded through a combination of the General Fund, Gas Tax (allocation of state tax on fuel), Measure M (county-wide sales tax allocation to fund transportation improvements), and the Waste Reduction Fund (waste hauler fees). Table 1- Proposed FY 2025-26 Budget Items Eligible for LLMD Funding Category Proposed FY 25-26 Budget General Fund Trails & Open Space Maintenance $429,000 Parks Maintenance $1,174,000 Tree Trimming – View Restoration $175,000 Graffiti Abatement $72,000 Street Landscape Maintenance – Water & Irrigation $304,500 General Fund Sub Total $2,154,500 Gas Tax Street Landscape Maintenance $837,000 Gas Tax Sub Total $837,000 Measure M Street Landscape Maintenance $636,000 Measure M Sub Total $636,000 Waste Reduction Fund Landscaping Materials $111,500 Sub Total $111,500 Total $3,739,000 The proposed FY 2025-26 budget is an increase of approximately 8% compared to the FY 2024-25 budget. The increase is primarily due to higher costs of labor and materials evident in the lowest bid for landscaping services. The City Council has several options it may consider with respect to the annual LLMD levy for Fiscal Year 2025-26. a. Set a rate of zero, as has been the case since 2017, meaning that property owners will not be assessed. With this option, the funding sources outlined in the table above will be used to pay the costs that could otherwise be funded through the 4 LLMD. Setting the levy at zero allows the City Council to continue to consider a levy on an annual basis. This option generates no additional funding. b. Set a Rate up to $23.50, which was the rate on the effective date of Proposition 218 (July 1, 1997). This action requires a noticed public hearing but would be exempt from the requirements of Proposition 218 because the assessment predates, and would not have been increased since, the effective date of Proposition 218. This option generates approximately $325,000 to $350,000 in additional funding. c. Set a Rate Greater than $23.50, which requires voter approval in compliance with the requirements of Proposition 218 because the assessment would be greater than the rate on the effective date of Proposition 218. The levy for this option could be set to an amount high enough to generate all expenses eligible for funding through the LLMD, which is up to $3,752,000 in FY 2025-26. Should the City Council decide to levy an assessment at a rate greater than zero, Staff proposes using the revenue generated to offset street landscaping and tree maintenance currently funded through the Gas Tax, as this is in keeping with the City’s past practice of using LLMD funds to pay for street landscaping and tree maintenance. This also allows more Gas Tax funds to be available for street pavement rehabilitation projects through the Capital Improvement Program (CIP), which are currently not expected to be fully funded with available balances and annual revenues for FY 2025-26. Alternatively, the additional revenue could be used to offset the General Fund’s estimated annual costs of $2.16 million or for future maintenance needs that the General Fund is unable to support due to limited funding. Following direction from the City Council, the Director of Public Works will order the preparation of an Engineer’s Report based on the rate directed by the City Council. Upon completion of the Engineer’s Report, the City Council will be asked to consider a Resolution of Intent to levy annual assessments (at a rate of zero or greater) for the Citywide LLMD, with a subsequent public hearing; which will tentatively be scheduled for June 2025. Staff recommends the preparation of an Engineer’s Report and to conduct a public hearing, even if the City Council direction is to set the rate to zero, because this would preserve the ability to set the assessment in the future, should the City Council desire to do so. It should be noted that after receiving the Engineer's Report, the Council retains the ability to reconsider its preferred option for eventual adoption at a duly noticed public hearing. ADDITIONAL INFORMATION: On April 3, 2025, as part of the FY 2025-26 budget process, the Finance Department presented the draft budget assumptions to the Finance Advisory Committee (FAC). In line with the City Council direction from the March 17, 2025 City Council Goals Workshop, Staff presented potential financial sustainability strategies, including a review of existing revenue sources, suspended revenues, financial assistance programs, and cost- 5 containment measures. At the conclusion of the meeting, the FAC recommended, among other things, that the City Council consider reinstating the levy at a rate above $0, not to exceed $23.50—the amount set in 1996. There was consensus that the potential revenue of over $300,000 would reduce the subsidy from General Fund, considering the City’s recent allocation of $36.3 million in the budget for emergency response and landslide mitigation efforts. CONCLUSION: Staff recommends the City Council provide direction to Staff on setting the assessment rate of the LLMD for FY 2025-26 and direct Staff to prepare the Engineer’s Report accordingly. ALTERNATIVES: In addition to the Staff recommendations, the following alternative actions are available for the City Council’s consideration: 1. Direct the Director of Public Works not to prepare the Engineer’s Report for the Citywide LLMD for FY 2025-26. 2. Take other action, as deemed appropriate. 6 RESOLUTION NO. 92 -85 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES ORDERING THE FORMATION OF A CITYWIDE LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT AND THE CONSOLIDATION OF SUCH DISTRICT WITH LANDSCAPE AND OPEN SPACE MAINTENANCE DISTRICT NO, 1 AND LANDSCAPE AND OPEN SPACE MAINTENANCE DISTRICT NO. 2 AND CONFIRMING A DIAGRAM AND ASSESSMENT FOR THE 1992 -93 FISCAL YEAR IN CONNECTION WITH SUCH CITYWIDE LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT PURSUANT TO THE PROVISIONS OF PART 2 OF DIVISION 15 OF THE CALIFORNIA STREETS AND HIGHWAYS CODE THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES HEREBY FINDS, DETERMINES, RESOLVES AND ORDERS AS FOLLOWS: Section 1. The City Council has previously formed Landscape and Open Space Maintenance District No. 1 and Landscape and Open Space Maintenance District No. 2.pursuant to the provisions of the Landscaping and Lighting Act of 1972, being Part 2 of Division 15 of the California Streets and Highways Code the "Act ") . Landscape and Open Space Maintenance District No. 1 is comprised of the area within Tract Map No. 32673. Landscape and Open Space Maintenance District No. 2 is comprised of the area within Tract Map No. 31617. Section 2.. Pursuant to the provisions of the Act, the City Council of the City of Rancho Palos Verdes, by its Resolution Nos. 92 -72 and 92 -74, initiated proceedings for and declared its intention to order the formation of a Citywide landscaping and lighting maintenance district designated as the Citywide Landscaping and Lighting Maintenance District" (the District ") , to consolidate such District with Landscape and Open Space Maintenance District No. 1 and Landscape and Open Space Maintenance District No. 2, and to levy an assessment against lots and parcels of property within such District for the f fiscal year commencing July 1, 1992 and ending June 30, 1993. The City Council, by its Resolution No. 92 - 72 ordered the Engineer to prepare and file a written report in accordance with Article 4 of Chapter 1 of the.Act and, by its Resolution No. 92 -73, approved such Engineer's Report. Section 3. Subsequent to the approval of the Engineer's Report by the City Council, the Engineer has modified the Engineer's Report. Such modifications have not changed the total assessment for the estimated costs of the improvements or the amounts of the individual assessments against lots and parcels of land within the District, as shown on the assessment roll on file in the office of the City Clerk. A-1 Section 4. Following notice duly given b publication and mail, the City ouncil has Y p • Y its held a full and fair publichearingregardingitsResolutionNo. 92 -74 the Engineer'sReport, as modified, the formation of the District the consolidation of the District with Landscape and Open SpacepppeMaintenanceDistrictNo, 1 and Landscape and Open Space Maintenance District No. 2 and the levy and collectionon of the . proposed assessment within the District for fiscal year 1992 -93 expenses to pay for the costs and ex Y p s of the improvements describedinSection8below, pursuant to the terms and r ' p ovisions of theAct. All interested persons were afforded the opportunityhearandbeheardregarding . pp Y to g g protests and objections to theformationofthe-District, the consolidation of the ' District withLandscapeandOpenSpaceMaintenanceDistrictNo. 1 and LandscapeandOpenSpaceMaintenanceDistrictNo. 2 and the levytheproposed andcollectionofppdassessmentagainstlotsorparcels of property within the District. The City Council considered alloralandwrittenstatements ' , protests and communications made orfiledbyinterestedpersons. Written protests have beenn filedandnotwithdrawnrepresentingntingpropertyownersowninglessthanfiftypercentoftheareaofassessablelandwithintheproposedDistrict. All oral and written protests and objections the C' ] tionsareherebyoverruledbyCityCouncil. Section 5. Based upon its review of the Engineer'sReport, as modified, a co of which g copy ch has been presented to theCityCouncilandwhichhasbeenfiledwiththeCitylerkotherreportsandinformationY , and the City Council hereby finds anddeterminesthat (i) the district of land within t • be benefitted by het he District will improvements described in Section 8 below, ii) the District includes all of the lands so ben ' of fitted, andiii) the net amount to be assessed upon the lands within theDistrictforthe1992 -93 fiscal ear in accordanceante with theEngineer's Report, described above is apportioned and method which fairly p ned by a formula rly distributes the net amount among allassessablelotsorparcelsinproportiontotheestimatedbenefitstobereceivedbyeachsuchlotorparcelfromtheimprovements. Section 6, The City Council hereby orders theformationoftheCitywideLandscapingandLightingMaintenanceDistrict, Section 7, The City Council hereby orders theconsolidationofLandscapeandOpenSpaceMaintenance ' a p ance DistrictNo. 1 and Landscape and Open Space Maintenance District No. 2withtheCitywideLandscapingandLightingMaintenance ' The resulting single g. • Hance District® g g assessment district is designated "Cit wideLandscapingandsightingMaintenanceDistrict" Y rict and Landscape andOpenSpaceMaintenanceDistrictNo. 1 and Landscape and OpenSpaceMaintenanceDistrictNo. 2 no longer exist as separatedistricts. 2 Resol. No. 92 -85A-2 Section 8. The City Council hereby orders the proposed improvements to be made as described in the Engineer's Report, as modified, which improvements are briefly described as follows: the operation, maintenance and servicing of landscaping, including trees, shrubs, grass and other ornamental vegetation, and appurtenant facilities, including irrigation systems and drainage devices; the operation, maintenance and servicing of, public lighting facilities, including traffic signals, and appurtenant facilities; and the operation, maintenance and servicing of park and recreational improvements, including lights, athletic fields, playgrounds, playground equipment, public restrooms, park furniture, site amenities and appurtenant facilities. Section 9, The Engineer's Report, as modified, and now on file in the office of the City Clerk, is hereby approved. The City Council hereby confirms the diagram and assessment set forth in such Engineer's Report. Section 10. The assessment is in compliance with the provisions of the Act. Section 11. The assessment is levied without regard to property valuation. Section 12. Public property owned by any public agency and in use in the performance of a public function which is included within the boundaries of the District shall not be subject to assessment to be made under these proceedings to pay for any of the costs and expenses of the improvements. Section 13. The assessment is levied for the purpose of paying the costs and expenses of the improvements described in Section 8 above for fiscal year 1992 -93. Section 14. The improvements described in Section 8 above shall be performed pursuant to law and the County Auditor of Los Angeles County shall enter on the County Assessment Roll opposite each lot or parcel of land the amount of the assessment and such assessments shall then be collected at the same time and in the same manner as the County taxes are collected. After collection. by the County, the net amount of the assessments shall be paid to the City Treasurer. N Section 15, The City Treasurer shall deposit all moneys representing assessments collected by the County to the credit of a special fund known as Improvement Fund, Citywide Landscaping and Lighting Maintenance District. Section 16, constitutes the levy of parcels of land in the July 1, 1992 and ending The adoption of this Resolution an assessment against the lots and District for the fiscal year commencing June 30, 19934D 3 Resol. No. 92 -85 A-3 Section 17. The City Clerk is hereby authorized and directed to file the diagram and assessment, or a certified copy of the diagram and assessment, with the County Auditor, together with a certified copy of this Resolution upon its adoption. Section 18. A certified copy of the assessment and diagram shall be filed in the Department of Public Works, with a duplicate copy on file in the office of the City Clerk and open for public inspection. PASSED, APPROVED and ADOPTED this 4th day of August, 1992. ATTEST: City Clerk State of California County of Los Angeles ) ss City of Rancho Palos Verdes I, JO PURCELL, City Clerk of the City of Rancho Palos Verdes, hereby certify that the above Resolution No. 92 -85 was duly and regularly passed and adopted by the said City Council at a regular meeting thereof held on August 4, 1992.0 City€ Clerk, City of Rancho Pal 4 Resol. No. 92 -85 A-4