Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
AMG and Associates Inc (Change Order 094)
City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 CHANGE ORDER MEMORANDUM TO: RAMZI AWWAD, DIRECTOR OF PUBLIC WORKS FROM: ALAN BRAATVEDT, SUNBEAM CONSULTING DATE: March 19, 2024 SUBJECT: LADERA LINDA COMMUNITY PARK CONSTRUCTION CHANGE ORDER NUMBER: 94 (PCO 58) Description of Construction Change Order (1) In accordance with City’s response to RFI#33: modify the bio-basin on the middle tier to eliminate the need to remove two existing mature trees. (2) In accordance with City’s response to RFI#59: install additional connecting drainage from the switchbacks and tiered seating walls between middle and upper tiers. Justification Per the original contract drawings and specifications, bio-swales on each of the park’s 3-tiers were designed/sized to comply with the South Coast Regional Water Quality Control Board’s storm water runoff best management practices guidelines for Low Impact Development (LID). The bio-swales’ design specified the removal of two existing mature trees to accommodate the footprint of the middle tier bio-basin. The contractor issued RFI #33, which drew the City’s attention to consider preservation of the mature trees. The City’s response to RFI#33 resulted in the bio-basin being redesigned as two (2) separate basins with modifications to satisfy the above-described LID criteria, while preserving the existing trees. Drainage questions were subsequently raised by the Contractor during the construction of the switchbacks, resulting in the issuance of RFI#59. The City’s response to RFI#59 resulted in the issuance of new plans to address the drainage issues in that area and to pick up subsoil drainage behind the tiered seating and rerouted to the bio-basin. The additional design provisions also addressed necessary additional storm drain connections between the two middle tier bio-basins located at the mid-to-upper tier switchback ramp. The direction provided via the above-described City’s response to RFI nos. 33 and 59 resulted in changes to the original contract scope of work (plans), as well as a net of extra work (labor, equipment, and materials) to be performed that was not a part of the Contractor’s corresponding bid. Therefore, a change order needs to be issued to account for the changes to the contract drawings and the associated net-additional cost to construct the changes. DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 Cost Analysis The Contractor issued PCO 58 to account for the additional costs to perform the work as part of this change order. However, the PCO was rejected by the City on the grounds that no credit was provided for the smaller bio-basin dictated by the City’s response to RFI#33. This led to initiating a Meet and Confer process between the Contractor, City, Architect and Construction Manager. The conclusion of that meet and confer process was that the additional cost for the storm drain modifications / additions were acceptable in merit, but the Contractor’s revised pricing was to include the deleted portions of the original contract-specified bio-swale. Sunbeam prepared a counter-offer for the expected cost savings associated with the bio-swale modifications, and with several rounds of negotiations, the following determinations were made: (1) There were no cost savings (credit) associated with the grading effort for 2 smaller bio-swales compared with the original for a single/larger bio-swale, which was verified through Sunbeam’s evaluation of time and materials (T&M) tickets. (2) There were no savings for the reduced vegetation planting in the 2 bio-swales, as the corresponding quantity of displaced plants were relocated to other areas of the park. (3) There was a savings for the export of dirt and the reduced area of the filter fabric and filtration media installed for the 2 smaller swales. Sunbeam’s calculated savings of $5,617.19 (credit). The Contractor issued revised PCO 58 (R1) in accordance with the above-described determinations. In summary, the cost of PCO 58-R1 is representative of Sunbeam’s verification of T&M records for extra work, as well as Sunbeam’s calculated counter- offer for the above credit (item 3). Therefore, SunBeam recommends that the City authorize the revised costs agreed with the Contractor. Schedule Analysis As this work is being authorized long after the authorized completion date for the overall project, a schedule analysis has not been performed by SunBeam for this scope of work. An analysis of the schedule impact of this work will be addressed for this work as part of a meet and confer process for overall completion of the project. This approach is consistent with the changes to the standard change order provisions as approved by the City Attorney. Attachments: Construction Contract Change Order Form Construction Contract Change Order Summary Sheet Contractor’s Change Order Proposal SunBeam’s Cost Assessment DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 (1) In accordance with City’s response to RFI#33: modify the bio-swale on the middle tier to eliminate the need to remove two existing mature trees. (2) In accordance with City’s response to RFI#59: install additional connecting drainage from the switchbacks and tiered seating walls between middle and upper tiers. DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 4/18/2024 4/18/2024 5/1/2024 8405 44 0 0 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO#23 $4,094.67 Working Days 02/23/23 CO#24 $19,573.51 Working Days 03/07/23 CO#21 $10,075.07 Working Days 02/21/23 CO#22 $3,178.42 Working Days 02/22/23 CO#19 $17,562.82 Working Days 02/09/23 CO#20 $3,679.17 Working Days 02/16/23 CO#17 $12,582.87 Working Days 02/03/23 CO#18 $16,546.62 Working Days 02/09/23 CO#15 -$3,117.01 Working Days 01/17/23 CO#16 $59,788.90 Working Days 02/02/23 CO#13 $0.00 Working Days 12/30/22 CO#14 -$20,112.42 Working Days 12/30/22 CO#11 $33,868.27 Working Days 12/01/22 CO#12 $9,052.32 Working Days 12/01/22 CO#10 $42,918.80 Working Days 11/09/22 CO#8 $6,437.02 Working Days 09/27/22 CO#9 $1,818.52 Working Days 11/09/22 CO#6 $824.34 Working Days 09/01/22 CO#7 $10,202.36 Working Days 09/27/22 CO#4 $8,558.42 Working Days 09/01/22 CO#5 -$5,378.25 Working Days 09/01/22 CO#2 $12,628.58 Working Days 08/09/22 CO#3 $53,526.25 Working Days 08/31/22 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE CO#1 $54,534.52 Working Days 05/27/22 07/27/23 TOTAL SCHEDULE CHANGE ORDERS:Working Days NEW CONTRACT COMPLETION DATE:08/24/23 $1,029,075.00 TOTAL CHANGE ORDERS COST:$1,070,429.49 REVISED CONTINGENCY AMOUNT:$1,208,194.98 NEW CONTRACT AMOUNT:$14,791,429.49 REMAINING CONTINGENCY AMOUNT:$137,765.49 CONSTRUCTION CHANGE ORDER SUMMARY SHEET PROJECT NAME:Ladera Linda Community Park DATE:03/19/24 PROJECT CODE: PURCHASE ORDER NUMBER:20220215 ACCOUNT NUMBER:330-400-8405-8403 ORIGINAL CONTRACT AMOUNT:$13,721,000.00 ORIGINAL CONTINGENCY AMOUNT: PREPARED BY:JAMES O'NEILL CONTRACTOR NAME:AMG & Associates, Inc. CONTRACT NUMBER:FY2022-050 ORIGINAL COMPLETION DATE: DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 4/19/2024 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24 0 0 0 0 0 0 0 0 0 0 0 0CO #79 $4,979.68 Working Days 02/12/24 CO #77 $7,240.93 Working Days 02/12/24 CO #78 $7,616.16 Working Days 02/12/24 CO #75 $11,058.04 Working Days 02/12/24 CO #76 $5,111.88 Working Days 02/12/24 CO #73 $1,376.77 Working Days 02/12/24 CO #74 $4,408.47 Working Days 02/12/24 CO #71 $9,892.05 Working Days 02/12/24 CO #72 $10,556.39 Working Days 02/12/24 CO #69 $4,599.28 Working Days 02/12/24 CO #70 $5,364.69 Working Days 02/12/24 CO #67 $36,343.87 Working Days 02/12/24 CO #68 $3,203.68 Working Days 02/12/24 CO #65 $251.55 Working Days 02/12/24 CO #66 $47,423.41 Working Days 02/12/24 CO #63 $690.91 Working Days 02/12/24 CO #64 $2,200.00 Working Days 02/12/24 CO #61 $5,590.13 Working Days 01/11/24 CO #62 $2,674.08 Working Days 02/12/24 CO #59 $8,890.83 Working Days 01/02/24 CO #60 $9,524.04 Working Days 01/10/24 CO #57 $8,575.63 Working Days 12/28/23 CO #58 $982.98 Working Days 12/28/23 CO #55 -$19,277.91 Working Days 12/14/23 CO #56 -$35,244.14 Working Days 12/21/23 CO #53 -$2,446.03 Working Days 12/05/23 CO #54 $1,807.98 Working Days 12/05/23 CO #51 -$44,040.60 Working Days 10/10/23 CO #52 $6,575.10 Working Days 10/12/23 CO #49 -$3,253.37 Working Days 10/10/23 CO #50 $246.57 Working Days 10/10/23 CO #47 $0.00 Working Days 10/10/23 CO #48 $0.00 Working Days 10/10/23 CO #45 $35,792.08 Working Days 10/10/23 CO #46 -$6,270.83 Working Days 10/10/23 CO #43 $1,647.09 Working Days 08/24/23 CO #44 $23,867.61 Working Days 08/29/23 CO #41 $630.12 Working Days 07/26/23 CO #42 $6,466.62 Working Days 08/03/23 CO #39 $24,530.09 Working Days 07/25/23 CO #40 $11,002.33 Working Days 07/26/23 CO # 37 $3,561.51 Working Days 06/16/23 CO #38 $23,527.90 Working Days 07/12/23 CO #35 $3,765.15 Working Days 06/08/23 CO #36 $697.56 Working Days 06/16/23 CO #33 $10,095.54 Working Days 05/31/23 CO #34 $179,119.98 Working Days 06/08/23 CO#31 $2,104.03 Working Days 05/18/23 CO#32 $2,291.43 Working Days 05/19/23 CO#29 $1,055.31 Working Days 05/09/23 CO#30 $3,682.06 Working Days 05/18/23 CO#27 $136,226.21 Working Days 05/03/23 CO#28 $10,819.96 Working Days 05/05/23 CO#25 $8,909.82 Working Days 04/06/23 CO#26 $21,061.12 Working Days 04/25/23 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0CO # Working Days 02/24/24 CO # Working Days 02/24/24 CO # Working Days 02/24/24 CO # Working Days 02/24/24 CO # Working Days 02/24/24 CO # Working Days 02/24/24 CO # Working Days 02/24/24 CO # Working Days 02/24/24 CO # Working Days 02/24/24 CO # Working Days 02/24/24 CO # Working Days 02/24/24 CO # 93 $15,295.33 Working Days 02/24/24 CO #94 $20,070.50 Working Days 02/24/24 CO #91 $8,378.63 Working Days 02/24/24 CO #92 $1,279.29 Working Days 02/24/24 CO #89 VOID Working Days 02/24/24 CO #90 $0.00 Working Days 02/24/24 CO #87 $4,895.73 Working Days 02/12/24 CO #88 $12,307.50 Working Days 02/24/24 CO #85 $8,985.97 Working Days 02/12/24 CO #86 $8,604.89 Working Days 02/12/24 CO #83 $8,438.05 Working Days 02/12/24 CO #84 $14,145.08 Working Days 02/12/24 CO #81 $1,532.95 Working Days 02/12/24 CO #82 $4,861.51 Working Days 02/12/24 CO #80 $1,284.55 Working Days 02/12/24 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Prime Contract Potential Change Order #058: CE #118 - RFI 33/59 TO: City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, California 90275 FROM: AMG & Associates, Inc. 26535 Summit Circle Santa Clarita, California 91350 PCO NUMBER/REVISION: 058 / 0 CONTRACT:City Project No. 8405 - Ladera Linda Community Park Project REQUEST RECEIVED FROM: Adrian Barba (Cal Empire Engineering Inc.) CREATED BY: Christopher Tumasone (AMG & Associates, Inc.) STATUS: Pending - In Review CREATED DATE: 6/6/2023 REFERENCE: PRIME CONTRACT CHANGE ORDER: None FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $25,687.69 POTENTIAL CHANGE ORDER TITLE: CE #118 - RFI 33/59 CHANGE REASON: RFI's POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #118 - RFI 33, 59 and 61 This change event covers the costs for extra work related to RFI's 33 and 59. RFI 33- Additional storm drain routing and catch basins at biofiltration basins RFI 59- Additional 4" at switchback ramp ATTACHMENTS: RFI 33 R1-KPFF_JF (12).pdf , RFI 59-KPFF Response (9).pdf , 22-0088_AMG_Ladera Linda COR #9.pdf #Budget Code Description Amount 1 02-500.S Utility Services.Commitment extra work related to RFI's 33 and 59 $23,440.89 Subtotal:$23,440.89 Overhead (7.00% Applies to all line item types.):$1,640.86 Insurance (1.50% Applies to all line item types.):$351.61 Bonding (1.00% Applies to all line item types.):$254.33 Grand Total:$25,687.69 City of Rancho Palos Verdes AMG & Associates, Inc. 30940 Hawthorne Blvd. 26535 Summit Circle Rancho Palos Verdes, California 90275 Santa Clarita, California 91350 ProcoreArchitectSignHere ProcoreArchitectSignedDate ProcoreOwnerSignHere ProcoreOwnerSignedDate ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE AMG & Associates Inc.Page 1 of 1 Printed On: 6/6/2023 10:19 AM PCO #058 PCO 58 is rejected: RFI 33 deleted a section of bioswale approx 115 feet long (excavation, liner, fill, perforated pipe) and replaced it with storm drain piping. No credit has been offered for the deleted work associated with this change. RFI 59 - Preceding related RFI 53 eliminated two segments of storm drain above the ramp wall by the playgrounds. No credit has been offered for this deleted pipe. Further, on 2/28/23 AMG confirmed there would be no additional cost associated with RFI 59. REJECTED DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 $130.33 $108.86 $108.86 $1,042.64 $870.88 $870.88 Sand $365.13 $250.00 $649.06 $342.16 $4,425.75 RFI #59 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 $130.33 $108.86 $108.86 $1,042.64 $870.88 $870.88 $42.77 $55.24 $342.16 $441.92Backhoe $3,568.48 RFI #59 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 $130.33 $108.86 $108.86 $1,042.64 $870.88 $870.88 $42.77 $55.24 $342.16 $441.92 $4,934.81 Piping Materials Sand $1,166.33 $200 RFI #59 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 $130.33 $108.86 $108.86 $1,042.64 $870.88 $870.88 $42.77 $55.24 $342.16 $441.92 $7,814.25 Piping Materials Catch Basin Sand $2,267.71 $1,778.06 $200.00 RFI #33 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 $130.33 $108.86 $42.77 $55.24 $1,042.64 $870.88 $342.16 $441.92 $2,697.60 RFI #33 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Fax: (661) 251-7405 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Mid Tier Existing Tree TO:Chandra Sutton (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91350 FROM:Christopher Tumasone (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91355 CREATED DATE:06/20/ 2022 STATUS:Open LOCATION:DUE DATE:07/05/2022 COST CODE:REFERENCE: COST IMPACT:SCHEDULE IMPACT: DRAWING NUMBER:C1.42, C5.01 SPEC SECTION: RECEIVED FROM: COPIES TO: Dustin Hartman (AMG & Associates, Inc.), Christopher Tumasone (AMG & Associates, Inc.) SUGGESTION: Question from Christopher Tumasone (AMG & Associates, Inc.) at 01:56 PM on 06/20/2022 See attached drawings C1.42 and C5.01. Reference the clouded area on C1.42. The drawings are showing the new storm drain line to run directly into the path of an existing tree. (SD1) The Bio-Filtration Planter is also shown to be constructed in the location of the same existing tree. These conflict with the mulberry tree just west of the clouded section as well. Please advise. Reference details 5 and 6 on C5.01. Please confirm the length and width of the Bio Filtration Planters as it is not shown within the details. (Where it states per plan) Attachments: C5.01_ CIVIL DETAILS Rev.0.pdf C1.42_ STORM DRAIN PLAN Rev.1 markup.pdf BY DATE COPIES TO AMG & Associates Inc.Page 1 of 1 Printed On: 06/21/2022 08:58 AM RFI #33 KPFF RESPONSE: BOTH EXISTING TREES ARE TO BE PROTECTED IN PLACE, PLEASE SEE ATTACHED MARKUPS FOR PROPOSED BIOFILTRATION PLANTER DESIGN AVOIDING TREES. LENGTH AND WIDTH OF BIOFILTRATION PLANTERS ARE SHOWN ON C1.45 AS WELL ON MARKUP ATTACHED K FINCH 07/13/2022 JF, 07/14/2022 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 BIM LADERA LINDA COMMUNITY PARK PROJECT: CITY OF RANCHO PALOS VERDES: A r c h i t e c t u r e a n d U r b a n D e s i g n 5898 Blackwelder Street, Ground Floor Culver City, CA 90232 (Tel) 310-559-5720 (Fax) 310-559-8220 ARCHITECT CONSULTANTS . ARCHITECT'S / ENGINEER'S STAMP The drawings and specifications, ideas, designs, and arrangements are and shall remain the property of the architect. No part thereof shall be copied or used in connection with any work or project other than the specific project for which they have been prepared without the written consent of the architect. Visual contact with these drawings or specifications shall constitute evidence of acceptance of these restrictions. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job and this office must be notified of any variation from the dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrication. © MDA Johnson Favaro 2017 CHECKED BY: DM ISSUE / REVISIONS No.Issue DRAWN BY: MN Date TITLE: SHEET: PROJECT #: 1800609 SCALE: PER PLAN DATE: 10/15/2019 CITY APPROVALS PROJECT 32201 Forrestal Drive Rancho Palos Verdes, CA 90275 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 P: \ 2 0 1 8 \ 1 8 0 0 6 0 9 L a d e r a L i n d a C o m m u n i t y P a r k \ D W G \ S H E E T \ 1 8 0 0 6 0 9 - C 1 . 3 4 G P . d w g , J u l 1 3 , 2 0 2 2 - 6 : 2 1 p m 700 South Flower Street Suite 2100 Los Angeles, CA 90017 O:213.418.0201 F:213.266.5294 www.kpff.com 100% SD 07.14.19 50%DD 10.14.19 100%DD 11.21.19 50%CD 06.01.21 75%CD 07.15.21 BID SET 12.30.21 2ND PERMIT RESUBMITTAL 01.28.22 BID ADDENDUM 1 02.01.22 C1.34 GRADING PLAN RFI 33 07.12.22 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 72 72 * * * * * * 72 72 * * * * * * 40 32 24 16 8 40 32 24 16 8 FORRESTAL DRIV E℄ BIM LADERA LINDA COMMUNITY PARK PROJECT: CITY OF RANCHO PALOS VERDES: A r c h i t e c t u r e a n d U r b a n D e s i g n 5898 Blackwelder Street, Ground Floor Culver City, CA 90232 (Tel) 310-559-5720 (Fax) 310-559-8220 ARCHITECT CONSULTANTS . ARCHITECT'S / ENGINEER'S STAMP The drawings and specifications, ideas, designs, and arrangements are and shall remain the property of the architect. No part thereof shall be copied or used in connection with any work or project other than the specific project for which they have been prepared without the written consent of the architect. Visual contact with these drawings or specifications shall constitute evidence of acceptance of these restrictions. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job and this office must be notified of any variation from the dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrication. © MDA Johnson Favaro 2017 CHECKED BY: DM ISSUE / REVISIONS No.Issue DRAWN BY: MN Date TITLE: SHEET: PROJECT #: 1800609 SCALE: PER PLAN DATE: 10/15/2019 CITY APPROVALS PROJECT 32201 Forrestal Drive Rancho Palos Verdes, CA 90275 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 P: \ 2 0 1 8 \ 1 8 0 0 6 0 9 L a d e r a L i n d a C o m m u n i t y P a r k \ D W G \ S H E E T \ 1 8 0 0 6 0 9 - C 1 . 4 2 U T . d w g , J u l 1 4 , 2 0 2 2 - 1 0 : 4 3 a m 700 South Flower Street Suite 2100 Los Angeles, CA 90017 O:213.418.0201 F:213.266.5294 www.kpff.com 100% SD 07.14.19 50%DD 10.14.19 100%DD 11.21.19 50%CD 06.01.21 75%CD 07.15.21 BID SET 12.30.21 2ND PERMIT RESUBMITTAL 01.28.22 BID ADDENDUM 1 02.01.22 C1.42 STORM DRAIN PLAN BID ADDENDUM 1 02.01.22 ASI 13 07.08.22 RFI 33 07.12.22 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 72 72 * * * * ** 72 72 * * * * ** 40 32 24 16 8 40 32 24 16 8 BIM LADERA LINDA COMMUNITY PARK PROJECT: CITY OF RANCHO PALOS VERDES: A r c h i t e c t u r e a n d U r b a n D e s i g n 5898 Blackwelder Street, Ground Floor Culver City, CA 90232 (Tel) 310-559-5720 (Fax) 310-559-8220 ARCHITECT CONSULTANTS . ARCHITECT'S / ENGINEER'S STAMP The drawings and specifications, ideas, designs, and arrangements are and shall remain the property of the architect. No part thereof shall be copied or used in connection with any work or project other than the specific project for which they have been prepared without the written consent of the architect. Visual contact with these drawings or specifications shall constitute evidence of acceptance of these restrictions. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job and this office must be notified of any variation from the dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrication. © MDA Johnson Favaro 2017 CHECKED BY: DM ISSUE / REVISIONS No.Issue DRAWN BY: MN Date TITLE: SHEET: PROJECT #: 1800609 SCALE: PER PLAN DATE: 10/15/2019 CITY APPROVALS PROJECT 32201 Forrestal Drive Rancho Palos Verdes, CA 90275 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 P: \ 2 0 1 8 \ 1 8 0 0 6 0 9 L a d e r a L i n d a C o m m u n i t y P a r k \ D W G \ S H E E T \ 1 8 0 0 6 0 9 - C 1 . 4 5 L I D . d w g , J u l 1 3 , 2 0 2 2 - 4 : 4 6 p m 700 South Flower Street Suite 2100 Los Angeles, CA 90017 O:213.418.0201 F:213.266.5294 www.kpff.com 100% SD 07.14.19 50%DD 10.14.19 100%DD 11.21.19 50%CD 06.01.21 75%CD 07.15.21 BID SET 12.30.21 2ND PERMIT RESUBMITTAL 01.28.22 BID ADDENDUM 1 02.01.22 C1.45 LOW IMPACT DEVELOPMENT (LID) PLAN BID ADDENDUM 1 02.01.22 RFI 33 07.12.22 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Fax: (661) 251-7405 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Switchback Ramp Trench Drains Routing TO:Chandra Sutton (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91350 FROM:Christopher Tumasone (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91355 CREATED DATE:08/11/ 2022 STATUS:Open LOCATION:DUE DATE:08/26/2022 COST CODE:REFERENCE: COST IMPACT:SCHEDULE IMPACT: DRAWING NUMBER:C1.42 SPEC SECTION: RECEIVED FROM:Christopher Tumasone (AMG & Associates, Inc.) COPIES TO: Dustin Hartman (AMG & Associates, Inc.), Christopher Tumasone (AMG & Associates, Inc.) SUGGESTION: Question from Christopher Tumasone (AMG & Associates, Inc.) at 09:22 AM on 08/11/2022 Per RFI #53 response from the Design Team, please advise on the routing of the trench drains within the switchback ramp. Attachments: BY DATE COPIES TO AMG & Associates Inc.Page 1 of 1 Printed On: 08/11/2022 09:22 AM RFI #59 KPFF RESPONSE: PLEASE SEE UPDATED SHEET C1.42 FOR TRENCH DRAIN ROUTING. PRODUCT SPECIFICATION FOR TRENCH DRAIN IS ALSO ATTACHED K.FINCH 8/12/2022 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 72 72 * * * * * * 72 72 * * * * * * 40 32 24 16 8 40 32 24 16 8 FORRESTAL DRIV E℄ BIM LADERA LINDA COMMUNITY PARK PROJECT: CITY OF RANCHO PALOS VERDES: A r c h i t e c t u r e a n d U r b a n D e s i g n 5898 Blackwelder Street, Ground Floor Culver City, CA 90232 (Tel) 310-559-5720 (Fax) 310-559-8220 ARCHITECT CONSULTANTS . ARCHITECT'S / ENGINEER'S STAMP The drawings and specifications, ideas, designs, and arrangements are and shall remain the property of the architect. No part thereof shall be copied or used in connection with any work or project other than the specific project for which they have been prepared without the written consent of the architect. Visual contact with these drawings or specifications shall constitute evidence of acceptance of these restrictions. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job and this office must be notified of any variation from the dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrication. © MDA Johnson Favaro 2017 CHECKED BY: DM ISSUE / REVISIONS No.Issue DRAWN BY: MN Date TITLE: SHEET: PROJECT #: 1800609 SCALE: PER PLAN DATE: 10/15/2019 CITY APPROVALS PROJECT 32201 Forrestal Drive Rancho Palos Verdes, CA 90275 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 P: \ 2 0 1 8 \ 1 8 0 0 6 0 9 L a d e r a L i n d a C o m m u n i t y P a r k \ D W G \ S H E E T \ 1 8 0 0 6 0 9 - C 1 . 4 2 U T . d w g , A u g 1 2 , 2 0 2 2 - 3 : 4 4 p m 700 South Flower Street Suite 2100 Los Angeles, CA 90017 O:213.418.0201 F:213.266.5294 www.kpff.com 100% SD 07.14.19 50%DD 10.14.19 100%DD 11.21.19 50%CD 06.01.21 75%CD 07.15.21 BID SET 12.30.21 2ND PERMIT RESUBMITTAL 01.28.22 BID ADDENDUM 1 02.01.22 C1.42 STORM DRAIN PLAN BID ADDENDUM 1 02.01.22 ASI 13 07.08.22 RFI 33 07.12.22 RFI 49 07.28.22 RFI 35 R2 07.29.22 RFI 53 08.08.22 RFI 59 08.12.22 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 www.acousa.com AC O S p e c i f i c a t i o n I n f o r m a t i o n 22.67” (576mm) 29 . 0 3 ” ( 7 3 7 m m ) 10.06” (255mm)5.12” (130mm) 3.98” (100mm) l m r sqp i j g h e f n o k 19.69” (500mm) ACO DRAIN February 2019 Type K901G In-line catch basin One meter channel Half meter channel End Cap Outlet Product Outlet size Invert GPM CFS (Sch. 40) Depth a a b b c c d d e f g h i j k l m n o p q r s Bottom outlet - K00 Bottom outlet - K40 Bottom outlet - K00 Bottom outlet - K40 End outlet - K20 End outlet - K40 K1-308-6 6" outlet cap K1-408-6 6" outlet cap Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G Type K1-901G 3.94" 11.81" 3.94" 11.81" 7.87" 11.81" 9.84" 11.81" 20.68" 27.17" 18.99" 27.17" 19.30" 25.67" 19.99" 19.36" 27.30" 26.43" 26.43" 27.30" 25.85" 18.56" 25.30" 108 187 177 306 132 171 233 264 235 226 265 263 222 586 269 227 604 505 593 1051 273 235 224 0.24 0.42 0.39 0.68 0.29 0.38 0.52 0.59 0.52 0.50 0.59 0.59 0.49 1.30 0.60 0.51 1.35 1.12 1.32 2.34 0.61 0.52 0.50 4" round 4" round 6" oval 6" oval 4" round 4" round 6" oval 6" oval 4" round 4" round 4" round 6" round 4" round 4" round 6" round 4" round 6" round 4" round 6" round 8" round 6" round 4" round 4" round Note: These are the pipe flow rates at the specified outlet, NOT channel flow rates. Catch basin flow rates are without trash bucket - using trash bucket reduces flow. Outlet flow rates KlassikDrain - K100 Galvanized steel edge rail channel system Total capacity = 10.49 gallons E 12 . 4 1 " ( 3 1 5 m m ) 0.125" (3mm) 1.85" (47mm) Bell end to fit 4" Sch. 40 pipe C K304/308 11.02" (280mm) K404/408 12.99" (330mm) 1.2" (30mm) 5.3" (134mm) Plain end to fit 6" Sch. 40 pipe D E 3.94” (100mm) to 11 .81” (300mm) 4.72” (120mm) to 12.60” (320mm) 5.12” (130mm) 3.94” (100mm) 39.37" (1 meter) 3.74” (95mm) 1.33” (34mm) 6.69” (170mm) 8.66” (220mm) 10.63” (270mm) 12.60” (320mm) 19.69” (0.5 meter) Knock-outs included on every 5th channel J 6" Oval inlet cap K1-0103 K1-0203 K1-0303 K1-0403 6" Oval outlet cap DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 www.acousa.com AC O S p e c i f i c a t i o n I n f o r m a t i o n SPEC I N F O Specifications General The surface drainage system shall be ACO Drain K100 complete with gratings secured with ‘QuickLok’ locking as manufactured by ACO, Inc. or approved equal. Materials The trench system bodies shall be manufactured from polyester polymer concrete with the minimum properties as follows: Compressive strength: 14,000 psi Flexural strength: 4,000 psi Water absorption 0.07% Frost proof YES Salt proof YES Dilute acid and alkali resistant YES The nominal clear opening shall be 4" (100mm) with overall width of 5.12" (130mm). Pre-cast units shall be manufactured with either an invert slope of 0.5% or with neutral invert and have a wall thickness of at least 0.50" (13mm). Each unit will feature a partial radius in the trench bottom and a male to female interconnecting end profile. Units shall have horizontal cast in anchoring keys on the outside wall to ensure maximum mechanical bond to the surrounding bedding material and pavement surface. The galvanized steel edge rail will be integrally cast in by the manufacturer to ensure maximum homogeneity between polymer concrete body and edge rail. Each edge rail shall be at least 3/32" (2.5mm) thick. Grates Grates shall be specified. See separate ACO Spec Info grate sheets for details. After removal of grates and ‘QuickLok’ bar there shall be uninterrupted access to the trench to aid maintenance. Installation The trench drain system shall be installed in accordance with the manufacturer’s installation instructions and recommendations. ACO, Inc. Northeast Sales Office 9470 Pinecone Drive Mentor, OH 44060 Tel: (440) 639-7230 Toll free: (800) 543-4764 Fax: (440) 639-7235 West Sales Office 825 W. Beechcraft St. Casa Grande, AZ 85122 Tel: (520) 421-9988 Toll Free: (888) 490-9552 Fax: (520) 421-9899 Electronic Contact: info@acousa.com www.acousa.com © February 2019 ACO, Inc. This information is believed to be accurate but it is not guaranteed to be so. We cannot assume liability for results that buyer obtains with our product since conditions of use are beyond the control of the company. It is the customer’s responsibility to evaluate suitability and safety of product for his own use. ACO, Inc. reserves the right to change the product and specifications without notice. v1.1 Notes: 1. This channel offers a bottom knockout feature; 4" round/6" oval. 2. Inverts shown are for the male end; for female invert depth subtract 5mm (≈0.2") from the male invert (except for neutral channels, where it will be same as male invert). To calculate the overall channel depth add 20mm (≈0.8") to invert depth. 3. This catch basin kit includes a polymer concrete top, removable Quicklok locking bar, trash bucket and plastic base. Select an appropriate grate. 4. This catch basin kit includes a polymer concrete top, removable Quicklok locking bar, deep trash bucket, plastic riser and plastic base. Select an appropriate grate. Southeast Sales Office 4211 Pleasant Road Fort Mill, SC 29708 Toll free: (800) 543-4764 Fax: (803) 802-1063 ACO DRAIN KlassikDrain - K100 Galvanized steel edge rail channel system February 2019 Description Part No.Inches2 mm2 Weight Lbs. K1-00 Neutral channel - 39.37" (1m)1 74041 3.94 100 28.1 K1-1 Sloped channel - 39.37" (1m)74001 4.13 105 28.1 K1-2 Sloped channel - 39.37" (1m)74002 4.33 110 28.9 K1-3 Sloped channel - 39.37" (1m)74003 4.53 115 29.7 K1-4 Sloped channel - 39.37" (1m)74004 4.72 120 30.5 K1-5 Sloped channel - 39.37" (1m) 1 74005 4.92 125 31.3 K1-6 Sloped channel - 39.37" (1m)74006 5.12 130 32.1 K1-7 Sloped channel - 39.37" (1m)74007 5.31 135 32.9 K1-8 Sloped channel - 39.37" (1m)74008 5.51 140 33.7 K1-9 Sloped channel - 39.37" (1m)74009 5.71 145 34.5 K1-10 Sloped channel - 39.37" (1m)1 74010 5.91 150 35.3 K1-010 Neutral channel - 39.37" (1m)1 74043 5.91 150 35.3 K1-0103 Neutral channel - 19.69" (0.5m)1 74044 5.91 150 17.0 K1-11 Sloped channel - 39.37" (1m)74011 6.10 155 36.1 K1-12 Sloped channel - 39.37" (1m)74012 6.30 160 36.9 K1-13 Sloped channel - 39.37" (1m)74013 6.50 165 37.7 K1-14 Sloped channel - 39.37" (1m)74014 6.69 170 38.5 K1-15 Sloped channel - 39.37" (1m)1 74015 6.89 175 39.3 K1-16 Sloped channel - 39.37" (1m)74016 7.09 180 40.1 K1-17 Sloped channel - 39.37" (1m)74017 7.28 185 40.9 K1-18 Sloped channel - 39.37" (1m)74018 7.48 190 41.7 K1-19 Sloped channel - 39.37" (1m)74019 7.68 195 42.5 K1-20 Sloped channel - 39.37" (1m)1 74020 7.87 200 43.4 K1-020 Neutral channel - 39.37" (1m)1 74045 7.87 200 43.4 K1-0203 Neutral channel - 19.69" (0.5m)1 74046 7.87 200 20.5 K1-21 Sloped channel - 39.37" (1m)74021 8.07 205 44.2 K1-22 Sloped channel - 39.37" (1m)74022 8.27 210 45.0 K1-23 Sloped channel - 39.37" (1m)74023 8.46 215 45.8 K1-24 Sloped channel - 39.37" (1m)74024 8.66 220 46.6 K1-25 Sloped channel - 39.37" (1m)1 74025 8.86 225 47.4 K1-26 Sloped channel - 39.37" (1m)74026 9.06 230 48.2 K1-27 Sloped channel - 39.37" (1m)74027 9.25 235 49.0 Description Part No.Inches2 mm2 Weight Lbs. K1-28 Sloped channel - 39.37" (1m)74028 9.45 240 49.8 K1-29 Sloped channel - 39.37" (1m)74029 9.65 245 50.6 K1-30 Sloped channel - 39.37" (1m) 1 74030 9.84 250 51.4 K1-030 Neutral channel - 39.37" (1m)1 74047 9.84 250 51.4 K1-0303 Neutral channel - 19.69" (0.5m)1 74048 9.84 250 24.0 K1-31 Sloped channel - 39.37" (1m)74031 10.04 255 52.2 K1-32 Sloped channel - 39.37" (1m)74032 10.24 260 53.0 K1-33 Sloped channel - 39.37" (1m)74033 10.43 265 53.8 K1-34 Sloped channel - 39.37" (1m)74034 10.63 270 54.6 K1-35 Sloped channel - 39.37" (1m)1 74035 10.83 275 55.4 K1-36 Sloped channel - 39.37" (1m)74036 11.02 280 56.2 K1-37 Sloped channel - 39.37" (1m)74037 11.22 285 57.0 K1-38 Sloped channel - 39.37" (1m)74038 11.42 290 57.9 K1-39 Sloped channel - 39.37" (1m)74039 11.61 295 58.7 K1-40 Sloped channel - 39.37" (1m)1 74040 11.81 300 59.5 K1-040 Neutral channel - 39.37" (1m)1 74049 11.81 300 59.5 K1-0403 Neutral channel - 19.69" (0.5m)1 74050 11.81 300 27.5 K1-901G In-line catch basin - 19.69" (0.5m)3 94608 28.81 701.9 52.6 K1-621G catch basin - 19.69" (0.5m)3 94617 28.84 732.5 55.8 K1-631G catch basin - 19.69" (0.5m)4 94631 40.84 1037.4 65.8 K1-Series 600 Optional plastic riser 99902 --10.0 Foul air trap - fits both 900 & 600 series basins 90854 --1.2 K1-304-6 6" Inlet Cap 96839 9.84 250 5.2 K1-308-6 6" Outlet Cap 96840 9.84 250 5.0 K1-404-6 6" Inlet Cap 96834 11.81 300 6.0 K1-408-6 6" Outlet Cap 96836 11.81 300 5.8 Universal end cap 96822 11.81 300 0.4 Debris strainer for 4" bottom knockout 93488 --0.2 4" Oval to 6" round outlet adapter 95140 --1.1 K1-Installation device 97477 --2.8 Grate removal tool 01318 --0.3 K1-QuickLok locking bar 02899 --0.1 Invert Invert E DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Prime Contract Potential Change Order #058: CE #118 - RFI 33/59 TO: City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, California 90275 FROM: AMG & Associates, Inc. 26535 Summit Circle Santa Clarita, California 91350 PCO NUMBER/REVISION: 058 / 1 CONTRACT:City Project No. 8405 - Ladera Linda Community Park Project REQUEST RECEIVED FROM: Adrian Barba (Cal Empire Engineering Inc.) CREATED BY: Christopher Tumasone (AMG & Associates, Inc.) STATUS: Pending - In Review CREATED DATE: 6/6/2023 REFERENCE: PRIME CONTRACT CHANGE ORDER: None FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $20,070.50 POTENTIAL CHANGE ORDER TITLE: CE #118 - RFI 33/59 CHANGE REASON: RFI's POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #118 - RFI 33, 59 and 61 This change event covers the costs for extra work related to RFI's 33 and 59. RFI 33- Additional storm drain routing and catch basins at biofiltration basins RFI 59- Additional 4" at switchback ramp UPDATE: REVISED - Revised PCO amount from $25,687.69 to $20,070.50 per CM review comments attached. Credit provided for media surface area. AMG to adjust internally by removing OH&P and providing balance as a credit. No reduction to subcontractor pricing. ATTACHMENTS: PCO#58 Assessment - Revised 3-18.pdf , _EXTERNAL__Re_ _EXTERNAL__Re_ FW_ _EXTERNAL__RE_ _EXTERNAL__Re_ _EXTERNAL__Ladera Linda PCO #58 Response.msg , PCO #058 - RFI 3359 Storm Drain_rejected.pdf , PCO #058 - RFI 33,59 Storm Drain.pdf , RFI 33 R1-KPFF_JF (12).pdf , RFI 59-KPFF Response (9).pdf , 22-0088_AMG_Ladera Linda COR #9.pdf #Budget Code Description Amount 1 02-500.S Utility Services.Commitment extra work related to RFI's 33 and 59 $20,070.50 Subtotal:$20,070.50 Overhead (0.00% Applies to all line item types.):$0.00 Insurance (0.00% Applies to all line item types.):$0.00 Bonding (0.00% Applies to all line item types.):$0.00 Grand Total:$20,070.50 AMG & Associates Inc.Page 1 of 2 Printed On: 3/19/2024 01:47 PM PCO #058 R-1 DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 Sunbeam Consulting 1817 Josie Avenue Long Beach, California Independent Cost Estimate CO #94 - Additiona Storm Drains and Reduced size of bio-basins SUBCONTRACTOR 1- Cal Empire Hrs Rate Install Additional Storm Drains 1,710.80$ 615.13$ 72 108.86$ 7,837.92$ 649.06$ 1,166.33$ 40 130.33$ 5,213.20$ 1,767.68$ 435.00$ -$ -$ -$ 2,267.71$ -$ -$ -$ 1,778.06$ -$ -$ -$ -$ -$ -$ Subtotal 4,127.54$ 6,262.23$ 13,051.12$ 23,440.89$ Sales Tax Included Insurance 351.61$ Markup 1,640.86$ Bond 254.33$ Total Subcontractor Cost 25,687.70$ CONTRACTOR - AMG Hrs Rate Reduced Size of bioswayles -$ -$ -$ (5,617.21)$ See Page 2 for Basis of Lump Sum Credit -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Subtotal -$ -$ (5,617.21)$ Subcontractor Cost (5,617.21)$ Subtotal 25,687.70$ Total Cost 20,070.49$ Contractor agreed to Revise PCO 58 to this final value, factoring in the above credit for reduced size of bio swayles Equipment cost Equipment cost Material cost Lab cost Material cost Labor cost DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 PCO #58 Assessment – Revised 3/18/24 Docs: PCO#58 RFI#33 Storm Drain and CB – Biofilter Basins RFI#59 Switchback drain RFI #33 Top Tier and Bottom Tier Bio Swales: Remain unchanged Middle Tier Bio Swale/s Original RFI#33 Difference Bio #1 Bio #2 Dimensions 250’ x 12’ 63’ x 12’ 76’ x 12’ 25’ vs 139’: 55% of original Surface Area 1,841 sf 769 sf 743 sf 1,512 sf: 82% of original Swale bottom 444’ 444’ 444’ Unchanged Final Grade 445.3’ 445.56’ 445.44’ Increased marginally Top of Grate 444.33’ 445.31’ 445.18’ Increased substantially Volume Excavated 48.1cy 14.6cy 16.2cy 64% of original The total average volume of excavation/sf of pond remained largely the same. The LID surface area requirement was made up through increasing the elevation of the drainage grates and therefore the capacity of retained water/sf of pond. The total volume excavated for grading reduced by 17.3cy and the graded area by 1,320sf. If the dirt was exported at a cost of $85/cy and grading cost $5/sf, the value of the reduced scope of work = $8,070 $1,470.50 The combined surface area of the bioswales was reduced by 331 sf, which reduced the area of the media and planting by that amount. An estimated cost of that media and planting is $20 $10/sf = $6,620 $3,310 RFI #59 The costs for the additional drainage work remains unchanged. Conclusion: The total value of the reduction of scope of RFI #58 amounts to $14,690 $8,090 is $4,780.50, which amounts to $5,617.09 after mark-up. We therefore recommend a revised value of $17,597 $20,070.50 for this PCO. DocuSign Envelope ID: C371554E-E655-434A-8A8D-5ED6F20AC1E9 Certificate Of Completion Envelope Id: C371554EE655434A8A8D5ED6F20AC1E9 Status: Completed Subject: Complete with DocuSign: LL_CO.94_Compiled_2024.04.18.pdf Source Envelope: Document Pages: 24 Signatures: 3 Envelope Originator: Certificate Pages: 5 Initials: 1 James O'Neill AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 joneill@rpvca.gov IP Address: 72.34.97.146 Record Tracking Status: Original 4/18/2024 5:54:40 PM Holder: James O'Neill joneill@rpvca.gov Location: DocuSign Signer Events Signature Timestamp David Copp dcopp@rpvca.gov Deputy Director of Public Works City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 70.187.140.94 Sent: 4/18/2024 5:56:43 PM Viewed: 4/18/2024 6:38:30 PM Signed: 4/18/2024 6:39:49 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ramzi Awwad rawwad@rpvca.gov Director of Public Works City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 72.34.97.146 Sent: 4/18/2024 6:39:55 PM Viewed: 4/18/2024 7:21:48 PM Signed: 4/18/2024 7:23:54 PM Electronic Record and Signature Disclosure: Accepted: 3/2/2023 10:45:19 AM ID: 3242b72d-4755-489d-8e5f-7c62dc360470 Vina Ramos vramos@rpvca.gov Director of Finance City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 172.117.19.238 Signed using mobile Sent: 4/18/2024 7:23:58 PM Viewed: 4/19/2024 8:14:34 AM Signed: 4/19/2024 8:14:51 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ara Mihranian aram@rpvca.gov City Manager City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 104.34.113.36 Sent: 4/19/2024 8:14:58 AM Resent: 4/29/2024 2:20:20 PM Viewed: 5/1/2024 3:19:22 PM Signed: 5/1/2024 3:19:59 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp City Clerk cityclerk@rpvca.gov Security Level: Email, Account Authentication (None) Sent: 5/1/2024 3:20:04 PM Viewed: 5/10/2024 3:44:03 PM Electronic Record and Signature Disclosure: Accepted: 2/1/2023 3:10:58 PM ID: 505eed45-7ed0-4db8-aae6-ef6eedfef03d Lorna Cloke lornac@rpvca.gov Security Level: Email, Account Authentication (None) Sent: 5/1/2024 3:20:05 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Alan Braatvedt alan@sunbeamtech.net Security Level: Email, Account Authentication (None) Sent: 5/1/2024 3:20:06 PM Electronic Record and Signature Disclosure: Accepted: 2/27/2024 8:10:15 PM ID: 0b746f99-ced5-4219-9c03-ed8862c26e90 Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 4/18/2024 5:56:43 PM Certified Delivered Security Checked 5/1/2024 3:19:22 PM Signing Complete Security Checked 5/1/2024 3:19:59 PM Completed Security Checked 5/1/2024 3:20:06 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Rancho Palos Verdes (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronicall y through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made av ailable electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/15/2021 5:55:39 PM Parties agreed to: Ramzi Awwad, City Clerk, Alan Braatvedt Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Rancho Palos Verdes: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: terit@rpvca.gov To advise City of Rancho Palos Verdes of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at terit@rpvca.gov and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from City of Rancho Palos Verdes To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to terit@rpvca.gov and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Rancho Palos Verdes To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to terit@rpvca.gov and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that: You can access and read this Electronic Record and Signature Disclosure; and You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and Until or unless you notify City of Rancho Palos Verdes as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Rancho Palos Verdes during the course of your relationship with City of Rancho Palos Verdes.