CC SR 20231219 04 - City Council Goals FY23-24 Second Quarter CITY COUNCIL MEETING DATE: 12/19/2023 AGENDA REPORT AGENDA HEADING: Regular Business AGENDA TITLE: Consideration and possible action to receive a quarterly status report on Fiscal Year 2023-24 City Council Goals. RECOMMENDED COUNCIL ACTION: (1) Receive and file a second-quarter status report on the FY 2023-24 City Council Goals. FISCAL IMPACT: None. Amount Budgeted: N/A Additional Appropriation: N/A Account Number(s): N/A ORIGINATED BY: Enyssa Sisson, Administrative Analyst REVIEWED BY: Same as below APPROVED BY: Ara Mihranian, AICP, City Manager ATTACHED SUPPORTING DOCUMENTS: A. FY 2023-24 Second Quarter City Council Goals Worksheet (page A-1) BACKGROUND: On March 15, 2023, the City Council held its first in a series of budget workshops for FY 2023-24. At this workshop, the City Council received a presentation on the proposed FY 2023-24 City Council Goals inclusive of Staff, Planning Commission, and advisory board recommendations. The workshop allowed the City Council and Staff to formulate City Council Goals for FY 2023-24. Most importantly, the workshop allows goals, which often require funding, to align with the City’s budget. On June 20, 2023, the City Council approved FY 2023-24 City Council Goals concurrent with adopting the City budget to ensure funding of the goals. The City Council received the first quarter report at its September 19, 2023 meeting, and in response directed Staff to proceed with the following: 1 • Move Project 9 - Develop Citywide Small Wireless Facilities Master Plan from Maintain and Improve Public Infrastructure to Public Safety and make it a priority. • Reduce the project timeline for long-term solutions for Project 5 Complete Streetscape Beautification Master Plan regarding the Western Avenue construction. • Continue to pursue monies from Project 8 Secure Grant Funding to Underground One Mile of Utility Lines within the City’s Open Space Areas. This evening, Staff is presenting the second quarterly update on the 18 projects that fall under the six overarching goals for FY 2023-24 with directives given to improve the development of projects. DISCUSSION: Second Quarter Status Report on FY 2023-24 Goals Below, Staff highlights the 18 projects and their status. A more detailed description of each of the 18 projects and associated tasks can be found in the attached Gantt chart (Attachment A). For tracking purposes, the goals are categorized based on the following: “completed” means just that, the project has been completed; "in progress” indicates that the project and its associated tasks and subtasks are moving along; "at risk" are projects that appear to be falling behind due to, among other things, staffing challenges or reprioritizing staff assignments; and lastly “not started” are projects that have not begun or are contingent on beginning after the preceding project or task has been completed. The following table summarizes how many of the 18 projects fall within each of the categories for this fourth-quarter update: Public Safety – 4 Projects • Implement strategies enhancing resident readiness and response during an emergency. In Progress • Enhance public safety through crime reduction and traffic safety engagement strategies. In Progress • Allocate resources to establish certain public safety services in-house. In Progress • Develop a Citywide Small Wireless Facilities Master Plan. In Progress COLOR DESCRIPTION AND COUNTS 2 Completed 14 In progress 0 At risk 2 Not started 2 Maintain and Improve all Public Infrastructure (including transportation systems, parking, utilities, storm drains, and sewers) – 4 Projects. • Complete the Portuguese Bend Landslide Remediation Project plans for Council review. In Progress • Create a detailed inventory and maintenance schedule of the City’s public infrastructure and assets. In Progress • Complete project plans to improve traffic flow on Western Avenue. In Progress • Secure grant funding to underground one mile of utility lines within the City’s open space areas. In Progress City Land and Facilities – 4 Projects • Implement the remaining components of the Natural Communities Conservation Plan/Habitat Conservation Plan (NCCP/HCP). In Progress • Adopt the updated Trails Network Plan (TNP). In Progress • Complete Civic Center Project Feasibility and Site Planning and Financing (Phase I), Design Solicitation (Phase II) & Schematic Design (Phase III) In Progress • Pursue acquisition of Coast Guard properties of Battery Barnes and the Point Vicente Lighthouse. In Progress Citizen Involvement and Public Outreach - Engage residents and community partners in assisting the City Council, City Committees/Commissions, and City Staff facilitate the decision-making process. – 1 Project • Implement a Students in Local Government Program. Complete Quality of Life – Maintain and improve the quality of life for RPV residents – 4 Projects • Complete the Arterial Fences and Walls Master Plan and identify implementation strategies. Not Started • Complete Streetscape Beautification Master Plan. Not Started • Support local businesses and grow businesses with high-quality jobs in RPV. In Progress • Street Sign Improvements. In Progress Government Efficiency, Transparency, and Accountability - Maximize the use of each tax dollar and optimize services delivered to RPV residents. – 1 Project • Reimagine the City’s website utilizing intuitive tools and links to allow for a more user-friendly experience. Complete CONCLUSION: Staff recommends the City Council receive and file the second quarter report of the FY 2023-24 Goals. 3 City of Rancho Palos Verdes Start Date:July 1, 2023 Status Report:City Council Proposed FY 2023-2024 Goals Updated:December 12, 2023 Week Starting 6/ 2 6 / 2 3 7/ 3 / 2 3 7/ 1 0 / 2 3 7/ 1 7 / 2 3 7/ 2 4 / 2 3 7/ 3 1 / 2 3 8/ 7 / 2 3 8/ 1 4 / 2 3 8/ 2 1 / 2 3 8/ 2 8 / 2 3 9/ 4 / 2 3 9/ 1 1 / 2 3 9/ 1 8 / 2 3 9/ 2 5 / 2 3 10 / 2 / 2 3 10 / 9 / 2 3 ## # # # # # # ## # # # # # # ## # # # # # # 11 / 6 / 2 3 ## # # # # # # ## # # # # # # ## # # # # # # 12 / 4 / 2 3 ## # # # # # # ## # # # # # # ## # # # # # # 1/ 1 / 2 4 1/ 8 / 2 4 1/ 1 5 / 2 4 1/ 2 2 / 2 4 1/ 2 9 / 2 4 2/ 5 / 2 4 2/ 1 2 / 2 4 2/ 1 9 / 2 4 2/ 2 6 / 2 4 3/ 4 / 2 4 3/ 1 1 / 2 4 3/ 1 8 / 2 4 3/ 2 5 / 2 4 4/ 1 / 2 4 4/ 8 / 2 4 4/ 1 5 / 2 4 4/ 2 2 / 2 4 4/ 2 9 / 2 4 5/ 6 / 2 4 5/ 1 3 / 2 4 5/ 2 0 / 2 4 5/ 2 7 / 2 4 6/ 3 / 2 4 6/ 1 0 / 2 4 6/ 1 7 / 2 4 6/ 2 4 / 2 4 7/ 1 / 2 4 7/ 8 / 2 4 7/ 1 5 / 2 4 7/ 2 2 / 2 4 7/ 2 9 / 2 4 8/ 5 / 2 4 8/ 1 2 / 2 4 8/ 1 9 / 2 4 8/ 2 6 / 2 4 9/ 2 / 2 4 9/ 9 / 2 4 9/ 1 6 / 2 4 9/ 2 3 / 2 4 Assigned To Start End # of Days Status % Complete Public Safety - Maintain a High Level of Public Safety with Public Engagement 2 2/1/22 6/30/24 629 In progress 27%u 2-1 Establish RPV Evacuation Zones (EVZ) and Safe Refuge Areas (SRA)Administration 2/1/22 6/30/24 629 Completed 100%u 2-2 Inform residents of their EVZ and SRA Administration 4/1/23 6/30/24 325 In progress 75%u 2-3 Double the number of residents registered for Alert SouthBay and MyRPV Administration 7/1/22 6/30/24 521 In progress 65%u 2-4 Engage an experienced vendor to develop emergency evacuation plans in collaboration with staff and Public Safety Agencies. Administration 7/1/23 6/30/24 260 In progress 25%l u 3 7/1/23 6/30/24 260 In progress 40%l u 3-1 Manage overtime patrols by LASD for crime enforcement and traffic suppression Administration 7/1/23 6/30/24 260 In progress 42%l u Request and direct LASD OT patrols, in consultation with Public Safety Subcommittee; monitor results Administration 7/1/23 6/30/24 260 In progress 42%l u 3-2 Implement public safety reimbursement program Administration 7/1/23 6/30/24 260 In progress 42%l u Accept and Evaluate applications and notify awardees; issue reimbursements when project completed Administration 7/1/23 6/30/24 260 In progress 42%l u 3-3 Engage residents in Driver Safety Week Administration 7/1/23 1/31/24 153 In progress 50%l u Prepare and release PSA; enhance traffic enforcement in conjunction with engagement strategies Administration 7/1/23 1/31/24 153 In progress 20%l u 4 6/29/23 6/30/24 262 In progress 42%l u 4-1 Establish a Public Safety Division within the Administration Department Administration 7/1/23 6/30/24 260 In progress 0%l u Implement Organizational Chart Administration 7/19/23 6/30/24 248 In progress 50%l u Coordinate meetings with Los Angeles Sheriff's Department on new division logistics (training, access to radio frequency, etc.) Administration 7/24/23 9/1/23 30 In progress 20%l u Establish and implement Public Safety Outreach Campaign Administration 7/19/23 6/30/24 248 In progress 75%l u Coordinate and host four town hall meetings with the community (Neighborhood watch, HOAs, businesses, residents, etc.) on Public Safety Division Administration 7/19/23 6/30/24 248 In progress 10%l u Development of Public Safety programs (Volunteers on Patrol, Community Safety Liaisons, etc.)Administration 8/1/23 1/31/24 132 In progress 10%l u Present Division to City Council for approval inclusive of budget Administration 3/1/24 3/29/24 21 Completed 100%l u Begin recruitment of Public Safety classifications Administration 5/1/24 5/31/24 23 In progress 40%l u Implement public safety division Administration 7/19/23 6/30/24 248 In progress 10%l u 9 12/31/20 6/30/24 912 In progress 34%u 9-1 Identify needed equipment for cell sites with cellular companies and their consultants Public Works 12/31/20 6/30/24 912 In progress 25%u 9-2 Meet with HOA's to review equipment requirements and preferences.Public Works 7/1/24 12/31/24 132 Not started 0% 9-3 Develop a Master Deployment Plan with cellular companies and their consultants Public Works 1/1/25 6/30/25 129 In progress 10% 9-4 Identify any needed changes to the Municipal Code Public Works 6/30/24 9/1/24 45 Completed 100% Comments: Develop Citywide Small Wireless Facilities Master Plan 4-1-9 4-1-4 4-1-5 4-1-6 4-1-7 4-1-8 4-1-3 3-3-1 3-2-1 PROJECT: Allocate resources to establish certain public safety services in-house 4-1-2 PROJECT: Enhance public safety through crime reduction and traffic safety engagement strategies 3-1-1 PROJECT: Implement strategies enhancing resident readiness and response during an emergency 2023 FIRST QUARTER FY 2023-24 SECOND QUARTER FY 2023-24 202320232023 Jul Aug THIRD QUARTER FY 2023-24 FOURTH QUARTER FY 2023-24 FIRST QUARTER FY 2024-25 2024 2024 2024 20242024202420242024202420232023 The City's Consultant in Public Works is working with Crown Castle to identify coverage gaps in the City as part of the master plan including within the Portguese Bend Landslide and near schools and other institutional sites in the City. CITY COUNCIL GOAL Jul Aug Sep Tasks Jan Feb Mar Apr May JunSepOctNovDec P:\7 City Council\Draft Staff Report Review 20231219\4. Final\04. CLERK COMPLETE - Second Quarterly Goals\1. FY23_24 City Council goals GANTT chart - Public Safety RJA- use 1 of 1A-1 City of Rancho Palos Verdes Start Date:July 1, 2023 Status Report:City Council Proposed FY 2023-2024 Goals Updated:December 12, 2023 Week Starting 6/ 2 6 / 2 3 7/ 3 / 2 3 7/ 1 0 / 2 3 7/ 1 7 / 2 3 7/ 2 4 / 2 3 7/ 3 1 / 2 3 8/ 7 / 2 3 8/ 1 4 / 2 3 8/ 2 1 / 2 3 8/ 2 8 / 2 3 9/ 4 / 2 3 9/ 1 1 / 2 3 9/ 1 8 / 2 3 9/ 2 5 / 2 3 10 / 2 / 2 3 10 / 9 / 2 3 10 / 1 6 / 2 3 10 / 2 3 / 2 3 10 / 3 0 / 2 3 11 / 6 / 2 3 11 / 1 3 / 2 3 11 / 2 0 / 2 3 11 / 2 7 / 2 3 12 / 4 / 2 3 12 / 1 1 / 2 3 12 / 1 8 / 2 3 12 / 2 5 / 2 3 1/ 1 / 2 4 1/ 8 / 2 4 1/ 1 5 / 2 4 1/ 2 2 / 2 4 1/ 2 9 / 2 4 2/ 5 / 2 4 2/ 1 2 / 2 4 2/ 1 9 / 2 4 2/ 2 6 / 2 4 3/ 4 / 2 4 3/ 1 1 / 2 4 3/ 1 8 / 2 4 3/ 2 5 / 2 4 4/ 1 / 2 4 4/ 8 / 2 4 4/ 1 5 / 2 4 4/ 2 2 / 2 4 4/ 2 9 / 2 4 5/ 6 / 2 4 5/ 1 3 / 2 4 5/ 2 0 / 2 4 5/ 2 7 / 2 4 6/ 3 / 2 4 6/ 1 0 / 2 4 6/ 1 7 / 2 4 6/ 2 4 / 2 4 7/ 1 / 2 4 7/ 8 / 2 4 7/ 1 5 / 2 4 7/ 2 2 / 2 4 7/ 2 9 / 2 4 8/ 5 / 2 4 8/ 1 2 / 2 4 8/ 1 9 / 2 4 8/ 2 6 / 2 4 9/ 2 / 2 4 9/ 9 / 2 4 9/ 1 6 / 2 4 9/ 2 3 / 2 4 Assigned To Start End # of Days Status % Complete CITY COUNCIL GOAL Maintain and Improve all Public Infrastructure (including transportation systems, paring, utilities, storm drains, and sewers) 1 10/4/22 9/30/26 1,042 In progress 21% 1-1 Certify EIR Public Works 10/4/22 9/30/24 520 In progress 75% 1-2 Public Works 7/1/23 9/30/24 326 In progress 30%l 1-3 Public Works 10/1/24 6/30/25 195 Not started 0% 1-4 Bid and award Public Works 7/1/25 9/30/25 66 Not started 0% 1-5 Construction Public Works 10/1/25 9/30/26 261 Not started 0% 2 7/1/21 12/31/24 914 In progress 44% 2-1 Create a Detailed Inventory and Maintenance Schedule of City's Transportation Infrastructure Public Works 7/1/21 12/31/24 914 In progress 90% Prioritization, cost estimating, and maintenance schedule Public Works 7/1/22 12/31/24 653 In progress 90% 2-2 Create a Detailed Inventory and Maintenance Schedule of City's Storm Drain Infrastructure Public Works 7/1/22 6/30/24 521 In progress 10%u Inventory and condition assessment Public Works 7/1/22 6/30/24 521 Not started 0%u Prioritization, cost estimating, and maintenance schedule Public Works 7/1/23 6/30/24 260 Not started 0%l u 2-3 Create a detailed Inventory and Maintenance Schedule of City’s Sanitary Sewer Infrastructure Public Works 7/1/22 6/30/24 521 In progress 50%u Inventory and condition assessment Public Works 7/1/22 6/30/24 521 In progress 75%u Prioritization, cost estimating, and maintenance schedule Public Works 7/1/23 6/30/24 260 Not started 0%l u 2-4 Create a detailed Inventory and Maintenance Schedule of City’s Facilities Public Works 7/1/21 12/31/23 652 Completed 100%u 6 9/30/22 12/31/26 1,110 In progress 15% 6-1 Procure traffic study/concept plan and environmental consultant Public Works 9/30/22 4/30/23 151 Completed 100% 6-2 Complete traffic study/concept plan and environmental review Public Works 5/1/23 3/31/24 240 In progress 20%u 6-3 Procure final design consultant Public Works 4/1/24 7/31/24 88 Not started 0%l u 6-4 Complete final design Public Works 8/1/24 3/31/25 173 Not started 0%l 6-5 Obtain Caltrans permit and interagency agreements Public Works 4/1/25 9/30/25 131 Not started 0% 6-6 Procure construction contractor Public Works 10/1/25 1/31/26 88 Not started 0% 6-7 Construction Public Works 2/1/26 12/31/26 239 Not started 0% 8 7/1/23 6/30/25 521 In progress 9%l 8-1 Apply for Federal Hazard Mitigation Grant Program (HMGP) Funding Administration 7/1/23 6/30/25 521 In progress 35%l 2-3-2 FIRST QUARTER FY 2023-24 SECOND QUARTER FY 2023-24 2023202320232023 PROJECT: Complete the Portuguese Bend Landslide Remediation Project plans for Council review PROJECT: Create a detailed inventory and maintenance schedule of the City’s public infrastructure and assets 2-1-2 2-2-1 2-2-3 2-3-1 2023 2023 Jul Aug Final engineering and construction documents Partnering agreements and permitting PROJECT: Complete project plans to improve traffic flow on Western Avenue PROJECT: Secure grant funding to underground one mile of utility lines within the City’s open space areas. THIRD QUARTER FY 2023-24 FOURTH QUARTER FY 2023-24 FIRST QUARTER FY 2024-25 2024 2024 2024 202420242024202420242024 Jul Aug Sep Tasks Jan Feb Mar Apr May JunSepOctNovDec Comments:Project #9 "Develop Citywide Small Wireless Facilities Master Plan" moved to Public safety goal on 9/20/23. ProJect 8 - due to the increased movement in the Portuguese Bend Landslide, some utility lines along Burma Road have been deactivated and will be removed in the coming weeks by SCE. P:\7 City Council\Draft Staff Report Review 20231219\4. Final\04. CLERK COMPLETE - Second Quarterly Goals\2. FY23_24 City Council goals GANTT chart - Maintain and Improve Public Infrastructure RJA- use 1 of 1A-2 City of Rancho Palos Verdes Start Date:July 1, 2023 Status Report:City Council Proposed FY 2023-2024 Goals Updated:December 12, 2023 Week Starting 6/ 2 6 / 2 3 7/ 3 / 2 3 7/ 1 0 / 2 3 7/ 1 7 / 2 3 7/ 2 4 / 2 3 7/ 3 1 / 2 3 8/ 7 / 2 3 8/ 1 4 / 2 3 8/ 2 1 / 2 3 8/ 2 8 / 2 3 9/ 4 / 2 3 9/ 1 1 / 2 3 9/ 1 8 / 2 3 9/ 2 5 / 2 3 10 / 2 / 2 3 10 / 9 / 2 3 ## # # # # # ## # # # # # ## # # # # # 11 / 6 / 2 3 ## # # # # # ## # # # # # ## # # # # # 12 / 4 / 2 3 ## # # # # # ## # # # # # ## # # # # # 1/ 1 / 2 4 1/ 8 / 2 4 1/ 1 5 / 2 4 1/ 2 2 / 2 4 1/ 2 9 / 2 4 2/ 5 / 2 4 2/ 1 2 / 2 4 2/ 1 9 / 2 4 2/ 2 6 / 2 4 3/ 4 / 2 4 3/ 1 1 / 2 4 3/ 1 8 / 2 4 3/ 2 5 / 2 4 4/ 1 / 2 4 4/ 8 / 2 4 4/ 1 5 / 2 4 4/ 2 2 / 2 4 4/ 2 9 / 2 4 5/ 6 / 2 4 5/ 1 3 / 2 4 5/ 2 0 / 2 4 5/ 2 7 / 2 4 6/ 3 / 2 4 6/ 1 0 / 2 4 6/ 1 7 / 2 4 6/ 2 4 / 2 4 7/ 1 / 2 4 7/ 8 / 2 4 7/ 1 5 / 2 4 7/ 2 2 / 2 4 7/ 2 9 / 2 4 8/ 5 / 2 4 8/ 1 2 / 2 4 8/ 1 9 / 2 4 8/ 2 6 / 2 4 9/ 2 / 2 4 9/ 9 / 2 4 9/ 1 6 / 2 4 9/ 2 3 / 2 4 Assigned To Start End # of Days Status % Complete CITY COUNCIL GOAL City Land & Facilities 2 4/30/20 6/4/24 1,069 In progress 21%u 2-1 Management Agreement amendment Recreation and Parks 12/31/21 6/4/24 633 In progress 15%u 2-3 Update Preserve Public Use Master Plan Recreation and Parks 1/3/22 6/4/24 632 In progress 35%u 2-4 Preserve access protocol creation Recreation and Parks 12/31/21 6/4/24 633 In progress 50%u 3 1/15/19 5/21/24 1,396 In progress 15%u 3-1 Complete draft document and corresponding GIS layers Recreation and Parks 1/15/19 1/31/24 1,317 In progress 90%u 3-2 Release the draft plan for public review Recreation and Parks 1/31/24 1/31/24 1 Not started 0%l 3-3 Conduct public workshop #1 Recreation and Parks 2/21/24 2/21/24 1 Not started 0%l 3-4 Conduct public workshop #2 Recreation and Parks 3/20/24 3/20/24 1 Not started 0%l 3-5 Planning Commission approval Recreation and Parks 4/23/24 4/23/24 1 Not started 0%l 3-6 City Council approval Recreation and Parks 5/21/24 5/21/24 1 Not started 0%l 4 4/1/22 6/18/24 578 In progress 76%u 4.1 Review of revised site plan by federal agencies Administration 7/28/22 11/15/23 340 In progress 90%u 4.2 Project scheduling (Program Level)Administration 4/1/22 10/17/23 403 In progress 70%u 4.3 Delivery analysis Administration 4/1/22 10/17/23 403 Completed 50%u 4.4 Revise and prepare site plan for City Council Administration 8/16/22 10/17/23 306 Completed 100%u 4.5 Project estimate and budgeting; Funding Plan Administration 8/16/22 10/17/23 306 Completed 100%u 4.6 Present site plan, program schedule, budget, and funding plan to City Council Administration 8/16/23 10/17/23 45 Completed 100%l u 4.7 Obtain services of architecture firm to work towards design development Public Works 10/17/23 6/18/24 176 In progress 25%l u 4.8 Proceed with design development towards CEQA Process Public Works 6/19/24 6/17/25 260 Not started 0%l 4.9 Procure CEQA Consultant and Complete CEQA Process Public Works 6/18/25 6/18/26 262 Not started 0% 4.10 Finalize Design for Construction Document Preparation Public Works 6/19/26 12/31/26 140 Not started 0% 5 2/23/23 6/30/24 352 In progress 18%u 5-1 Continue outreach to U.S. Coast Guard to explore possiblity of acquisition of either or both properties Administration 2/23/23 6/30/24 352 In progress 25%u 5-2 Conduct outreach campaign to elected officials to garner support for acquistion effort Administration 2/23/23 6/30/24 352 In progress 10%u PROJECT : Complete Civic Center Project Feasibility and Site Planning and Financing (Phase I), Design Development (Phase II) & Complete CEQA Process and Finalize Design (Phase III) PROJECT: Pursue acquisition of Coast Guard properties of Battery Barnes and the Point Vicente Lighthouse 2023 2023 2023 2023 2023 2024 2024 2024 2024 Jul Aug Sep Oct FIRST QUARTER FY 2023-2024 SECOND QUARTER FY 2023-24 THIRD QUARTER FY 2023-24 FOURTH QUARTER FY 2023-24 FIRST QUARTER FY 2024-25 Sep Tasks Jan Feb Mar Apr May JunNovDec Jul Aug 2024 2024 2024202320242024 PROJECT: Implement the remaining components of the Natural Communities Conservation Plan/Habitat Conservation Plan (NCCP/HCP) PROJECT: Adopt the Updated Trails Network Plan (TNP) P:\7 City Council\Draft Staff Report Review 20231219\4. Final\04. CLERK COMPLETE - Second Quarterly Goals\3. FY23_24 City Council goals GANTT chart - City Land and Facilities RJA- use 1 of 1A-3 City of Rancho Palos Verdes Start Date:July 1, 2023 Status Report:City Council Proposed FY 2023-2024 Goals Updated:December 12, 2023 Week Starting 6/ 2 6 / 2 3 7/ 3 / 2 3 7/ 1 0 / 2 3 7/ 1 7 / 2 3 7/ 2 4 / 2 3 7/ 3 1 / 2 3 8/ 7 / 2 3 8/ 1 4 / 2 3 8/ 2 1 / 2 3 8/ 2 8 / 2 3 9/ 4 / 2 3 9/ 1 1 / 2 3 9/ 1 8 / 2 3 9/ 2 5 / 2 3 10 / 2 / 2 3 10 / 9 / 2 3 ## # # # # # ## # # # # # ## # # # # # 11 / 6 / 2 3 ## # # # # # ## # # # # # ## # # # # # 12 / 4 / 2 3 ## # # # # # ## # # # # # ## # # # # # 1/ 1 / 2 4 1/ 8 / 2 4 1/ 1 5 / 2 4 1/ 2 2 / 2 4 1/ 2 9 / 2 4 2/ 5 / 2 4 2/ 1 2 / 2 4 2/ 1 9 / 2 4 2/ 2 6 / 2 4 3/ 4 / 2 4 3/ 1 1 / 2 4 3/ 1 8 / 2 4 3/ 2 5 / 2 4 4/ 1 / 2 4 4/ 8 / 2 4 4/ 1 5 / 2 4 4/ 2 2 / 2 4 4/ 2 9 / 2 4 5/ 6 / 2 4 5/ 1 3 / 2 4 5/ 2 0 / 2 4 5/ 2 7 / 2 4 6/ 3 / 2 4 6/ 1 0 / 2 4 6/ 1 7 / 2 4 6/ 2 4 / 2 4 7/ 1 / 2 4 7/ 8 / 2 4 7/ 1 5 / 2 4 7/ 2 2 / 2 4 7/ 2 9 / 2 4 8/ 5 / 2 4 8/ 1 2 / 2 4 8/ 1 9 / 2 4 8/ 2 6 / 2 4 9/ 2 / 2 4 9/ 9 / 2 4 9/ 1 6 / 2 4 9/ 2 3 / 2 4 Assigned To Start End # of Days Status % Complete CITY COUNCIL GOAL Citizen Involvement & Public Outreach - Engage residents and community partners in assisting the City Council, City Committees/Commissions, and City Staff facilitate the decision-making process.2-14 50th Anniversary Dinner Banquet Administration Removed 3 PROJECT: Implement a Students in Local Government Program 7/1/23 6/30/24 260 In progress 86%l u 1-3 Administration 7/1/23 6/30/24 260 Completed 100%l u Create program Administration 8/1/23 8/31/23 23 Completed 100%l u Coordinate with Palos Verdes Unified School District for membership Administration 9/1/23 9/30/23 21 Completed 100%l u Develop student outreach campaign Administration 9/1/23 10/31/23 43 Completed 100%l u Recruit students to participate in program Administration 11/6/23 11/30/23 19 Completed 100%l u Select Students Administration 12/4/23 12/15/23 10 In progress 90%l u Host first Youth Advisory Council meeting Administration 1/20/24 2/6/24 12 In progress 10%l u Comments: 1-3-3 1-3-4 1-3-5 1-3-6 Implement a Youth Advisory Council 1-3-1 1-3-2 Jul Aug Sep Tasks Jan Feb Mar Apr May Jun 2024 2024 2024 2024 Jul Aug Sep Oct Nov Dec 2023 2024 2024 2024 2024 2024 FIRST QUARTER FY 2023-24 SECOND QUARTER FY 2023-24 THIRD QUARTER FY 2023-24 FOURTH QUARTER FY 2023-24 FIRST QUARTER FY 2024-25 2023 2023 2023 2023 2023 P:\7 City Council\Draft Staff Report Review 20231219\4. Final\04. CLERK COMPLETE - Second Quarterly Goals\4. FY23_24 City Council goals GANTT chart - Citizen Involvement and Public Outreach 1 of 1A-4 City of Rancho Palos Verdes Start Date:July 1, 2023 Status Report:City Council Proposed FY 2023-2024 Goals Updated:December 12, 2023 Week Starting 6/ 2 6 / 2 3 7/ 3 / 2 3 7/ 1 0 / 2 3 7/ 1 7 / 2 3 7/ 2 4 / 2 3 7/ 3 1 / 2 3 8/ 7 / 2 3 8/ 1 4 / 2 3 8/ 2 1 / 2 3 8/ 2 8 / 2 3 9/ 4 / 2 3 9/ 1 1 / 2 3 9/ 1 8 / 2 3 9/ 2 5 / 2 3 10 / 2 / 2 3 10 / 9 / 2 3 ## # # # # # ## # # # # # ## # # # # # 11 / 6 / 2 3 ## # # # # # ## # # # # # ## # # # # # 12 / 4 / 2 3 ## # # # # # ## # # # # # ## # # # # # 1/ 1 / 2 4 1/ 8 / 2 4 1/ 1 5 / 2 4 1/ 2 2 / 2 4 1/ 2 9 / 2 4 2/ 5 / 2 4 2/ 1 2 / 2 4 2/ 1 9 / 2 4 2/ 2 6 / 2 4 3/ 4 / 2 4 3/ 1 1 / 2 4 3/ 1 8 / 2 4 3/ 2 5 / 2 4 4/ 1 / 2 4 4/ 8 / 2 4 4/ 1 5 / 2 4 4/ 2 2 / 2 4 4/ 2 9 / 2 4 5/ 6 / 2 4 5/ 1 3 / 2 4 5/ 2 0 / 2 4 5/ 2 7 / 2 4 6/ 3 / 2 4 6/ 1 0 / 2 4 6/ 1 7 / 2 4 6/ 2 4 / 2 4 7/ 1 / 2 4 7/ 8 / 2 4 7/ 1 5 / 2 4 7/ 2 2 / 2 4 7/ 2 9 / 2 4 8/ 5 / 2 4 8/ 1 2 / 2 4 8/ 1 9 / 2 4 8/ 2 6 / 2 4 9/ 2 / 2 4 9/ 9 / 2 4 9/ 1 6 / 2 4 9/ 2 3 / 2 4 Assigned To Start End # of Days Status % Complete CITY COUNCIL GOAL Quality of Life - Maintain and improve the quality of life for RPV residents 2 4/1/23 9/30/24 391 Not started 8% 2-2 Public outreach to local homeowners associations Community Development 3/1/24 4/30/24 43 Not started 0%l u 2-3 Preparation of draft plan and materials Community Development 4/1/23 7/31/24 348 In progress 30%u 2-4 City Council approval Community Development 8/1/24 8/30/24 22 Not started 0%l u 2-5 Plan implementation Community Development 9/1/24 9/30/24 21 Not started 0%l 5 7/1/22 6/30/24 521 Not started 0%u 5-1 Complete Streetscape Beautification Master Plan Public Works 7/1/22 6/30/24 521 Not started 0%u 6 9/12/22 6/30/24 470 In progress 12%u Engage with Los Angeles County Economic Development Corporation (LAEDC) on economic development Administration 7/1/23 6/30/24 260 In progress 10%l u Preparation of Draft MOUD Community Development 9/12/22 5/30/24 449 In progress 40%u Virtual open house #2 Community Development 2/1/24 2/28/24 20 Not started 0%l u Environmental review Community Development 9/12/22 5/30/24 449 In progress 20%u Planning Commission consideration Community Development 5/1/24 5/30/24 22 Not started 0%l u City Council consideration Community Development 5/1/24 5/30/24 22 Not started 0%l u 7 7/1/23 11/4/25 612 In progress 0%l 7-1 Procure consultant to design street signs Public Works 7/1/23 6/30/24 260 Not started 0%l u 7-2 Design street signs Public Works 7/1/24 6/30/25 261 Not started 0%l 7-3 Award construction contract to implement new street signs Public Works 7/1/25 11/4/25 91 Not started 0% Comments: Jul Aug Sep Tasks Jan Feb Mar Apr May JunSepOctNovDecJulAug THIRD QUARTER FY 2023-24 FOURTH QUARTER FY 2023-24 FIRST QUARTER FY 2024-25 2024 2024 2024 202420242024202420242024 6-3 2023 2023 FIRST QUARTER FY 2023-24 SECOND QUARTER FY 2023-24 2023202320232023 6-1 PROJECT: Street Sign Improvements Project No. 7 - the City's Recreation and Parks Department, who is assisting Public Works, received a proposal to replace street signs in the median. As a result, the City will open the RFP process to be more competitive. PROJECT: Complete the Arterial Fences and Walls Master Plan and identify implementation strategies PROJECT: Complete Streetscape Beautification Master Plan PROJECT: Support local businesses and grow business with high-quality jobs in RPV 6-4 6-5 6-6 6-2 P:\7 City Council\Draft Staff Report Review 20231219\4. Final\04. CLERK COMPLETE - Second Quarterly Goals\5. FY23_24 City Council goals GANTT chart - Quality of Life RJA 1 of 1A-5 City of Rancho Palos Verdes Start Date:July 1, 2023 Status Report:City Council Proposed FY 2023-2024 Goals Updated:December 12, 2023 Week Starting 6/ 2 6 / 2 3 7/ 3 / 2 3 7/ 1 0 / 2 3 7/ 1 7 / 2 3 7/ 2 4 / 2 3 7/ 3 1 / 2 3 8/ 7 / 2 3 8/ 1 4 / 2 3 8/ 2 1 / 2 3 8/ 2 8 / 2 3 9/ 4 / 2 3 9/ 1 1 / 2 3 9/ 1 8 / 2 3 9/ 2 5 / 2 3 10 / 2 / 2 3 10 / 9 / 2 3 10 / 1 6 / 2 3 10 / 2 3 / 2 3 10 / 3 0 / 2 3 11 / 6 / 2 3 11 / 1 3 / 2 3 11 / 2 0 / 2 3 11 / 2 7 / 2 3 12 / 4 / 2 3 12 / 1 1 / 2 3 12 / 1 8 / 2 3 12 / 2 5 / 2 3 1/ 1 / 2 4 1/ 8 / 2 4 1/ 1 5 / 2 4 1/ 2 2 / 2 4 1/ 2 9 / 2 4 2/ 5 / 2 4 2/ 1 2 / 2 4 2/ 1 9 / 2 4 2/ 2 6 / 2 4 3/ 4 / 2 4 3/ 1 1 / 2 4 3/ 1 8 / 2 4 3/ 2 5 / 2 4 4/ 1 / 2 4 4/ 8 / 2 4 4/ 1 5 / 2 4 4/ 2 2 / 2 4 4/ 2 9 / 2 4 5/ 6 / 2 4 5/ 1 3 / 2 4 5/ 2 0 / 2 4 5/ 2 7 / 2 4 6/ 3 / 2 4 6/ 1 0 / 2 4 6/ 1 7 / 2 4 6/ 2 4 / 2 4 7/ 1 / 2 4 7/ 8 / 2 4 7/ 1 5 / 2 4 7/ 2 2 / 2 4 7/ 2 9 / 2 4 8/ 5 / 2 4 8/ 1 2 / 2 4 8/ 1 9 / 2 4 8/ 2 6 / 2 4 9/ 2 / 2 4 9/ 9 / 2 4 9/ 1 6 / 2 4 9/ 2 3 / 2 4 Assigned To Start End # of Days Status % Complete CITY COUNCIL GOAL Government Efficiency, Transparency, and Accountability - Maximize the use of each tax dollar and optimize services delivered to RPV residents 5 PROJECT: Reimagine the City’s website utilizing intuitive tools and links to allow for a more user-friendly experience 3/1/23 9/8/23 138 Completed 100%u 5-1 Coordinate meetings with Departments on website/webpage content Administration 3/1/23 6/30/23 88 Completed 100%u 5-2 Schedule one-on-one training with Departments on use of website/webpage Administration 4/3/23 5/30/23 42 Completed 100% 5-3 Conduct website/webpage testing for content and visibility Administration 6/1/23 6/30/23 22 Completed 100%u 5-4 Implement outreach campaign to promote launch of new website/webpage Administration 6/30/23 9/8/23 51 Completed 100%l u 5-5 Go live with latest website/webpage content Administration 7/11/23 9/8/23 44 Completed 100% Comments: 2023 2023 Jul Aug 2023 2023 2023 Jul Aug Sep Tasks Jan Feb Mar FIRST QUARTER FY 2022-23 SECOND QUARTER FY 2022-23 2023 THIRD QUARTER FY 2022-23 FOURTH QUARTER FY 2022-23 2024 2024 2024 2024 2024 FIRST QUARTER FY 2023-24 2024 2024 2024 2024 Apr May JunSepOctNovDec P:\7 City Council\Draft Staff Report Review 20231219\4. Final\04. CLERK COMPLETE - Second Quarterly Goals\6. FY23_24 City Council goals GANTT chart - Govt Efficiency, Transparency_Acctbilty 1 of 1A-6