Loading...
CC SR 20231114 J - Griffin Ladera Linda Contract Extension CITY COUNCIL MEETING DATE: 11/14/2023 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA TITLE: Consideration and possible action to extend the term of the professional services agreement with Griffin Structures for project management and construction management services for the Ladera Linda Community Park Project. RECOMMENDED COUNCIL ACTION: (1) Ratify a change order executed by the City Manager thereby extending the term of the professional services agreement with Griffin Structures for project management and construction management services for the Ladera Linda Community Park Project, at no additional cost to the City, until December 31, 2023. FISCAL IMPACT: None Amount Budgeted: $759,000 Additional Appropriation: N/A Account Number(s): 333-400-8405-8001 (ARPA – Ladera Linda Community Park – Professional Services) VR ORIGINATED BY: James O’Neill, Project Manager REVIEWED BY: Ramzi Awwad, Public Works Director APPROVED BY: Ara Mihranian, AICP, City Manager ATTACHED SUPPORTING DOCUMENTS: A. Change Order No. 3 to Griffin Structures Professional Services Agreement (page A-1) BACKGROUND AND DISCUSSION: The City entered into a professional services agreement (PSA) with Griffin Structures (Griffin) for project management and construction management Services for the Ladera Linda Community Park Project on September 7, 2021. Griffin has been providing construction management services to oversee the construction of this park project. Construction started on March 28, 2022, starting with mobilization and demolition of the existing buildings. Since then, work on the new building and parks grounds are nearly 1 - complete. The foundation and framing as well as the interior walls have been constructed. The roof, exterior glazing, exterior tile, and stucco of the new building is nearly complete. Power has been established and the heating, ventilation, and air conditioning system is operational. Additionally, the storage shed is nearly complete along with the trash and utility enclosure. Site improvements that have been completed include the new driveway and parking lot, the accessible switchback ramp between the middle and upper tier, and new fencing with gates. The new basketball court has been constructed, playground areas established, and many of the trail areas have been built. The existing fence along the oceanside of the park has been trimmed, new bioswales built, and the new post and cable fence is nearly complete. Finally, the irrigation system and new sod has been placed along with the majority of landscaping. 2 3 4 At the time of publication of this staff report, the remaining work includes interior finishes in the main building such as cabinetry, wall paneling, countertops, flooring finishes, and ceiling tiles. Additionally, audio-visual systems installation and the security shutters need to be finished. On site, the remaining work to be completed includes landscaping, parking lot pavement marking, and installation of playground equipment. Construction is expected to be completed in December 2023 and Griffin’s services continue to be needed. However, the term of the PSA including extensions within the Director of Public Works’ authority were reached on November 3, 2023. City Council authorization is now required for further term extensions. Staff intended to request authorization for extending the term at the City Council meeting originally scheduled for November 7, 2023. However, because that meeting was postponed until November 14, 2023, after conferring with the City Attorney’s Office, the City Manager executed a change order (Attachment A) to allow for continuing construction management and inspection coverage at no additional cost to the City until the City Council can formally approve the change order. The City Council is now being asked to ratify the City Manager’s executed change order. CONCLUSION: Staff therefore recommends the City Council ratify the change order executed by the City Manager extending the term of the Griffin PSA . 5 ADDITIONAL INFORMATION: Staff has begun planning for the opening of the community building and park grounds, as well as a ribbon-cutting ceremony. Although a date has not been set, it will likely occur before the holiday break. Additional information on the opening will be disseminated through the City’s various communication channels. ALTERNATIVES: In addition to the Staff recommendation, the following alternative action s are available for the City Council’s consideration: 1. Do not ratify the change order executed by the City Manager and direct Staff to contract with another construction management and inspection firm. This action would cause a disruption to the continuity of construction management and inspection services while a new firm is contracted and familiarized with the project. 2. Take other action, as deemed appropriate. 6 DocuSign Envelope ID: DDB3050B-7D08-4190-8ABE-1EB6288D8353 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 1 of 2 PROFESSIONAL SERVICES AGREEMENT CHANGE ORDER FORM CONTRACT NUMBER: FY2022-008 PROJECT NAME: Ladera Linda Community Park PURCHASE ORDER NUMBER: 20220115 PROJECT CODE: 8405 CONTRACTOR NAME: Griffin Structures DESCRIPTION AND LOCATION OF PROPOSED WORK Time extension SUMMARY OF QUANTITY CHANGES ITEM NO. DESCRIPTION ORIGINAL QUANTITY NEW QUANTITY QUANTITY DIFFERENCE UNIT PRICE PRICE DIFFERENCE ADDITIONAL WORKING DAYS Principal in Charge 0 Hrs 0 Hrs 0.0 Hrs $275.00 $0.00 0 Project Executive 153 Hrs 153.0 Mo 0.0 Hrs $210.00 $0.00 0 Sr. Prog. & Const. Mgr 396.5 Hrs 396.5 Hrs 0.0 Hrs $185.00 $0.00 0 Construction Manager 3,674 Hrs 3,673.5 Hrs 0.0 Hrs $175.00 $0.00 37 Estimating 0 Units 0.0 Units 0.0 Units $13,200.00 $0.00 0 Reimburseables 0.85 Units 0.9 Units 0.0 Units $12,500.00 $0.00 0 Totals $0.00 37 A TIME EXTENSION OF 37 WORKING DAYS WILL BE ALLOWED FOR THIS WORK ORIGINAL CONTRACT AMOUNT: $660,000.00 ORIGINAL COMPLETION DATE: 09/29/23 TOTAL OF CHANGE ORDERS #1-2: $98,970.00 TOTAL OF TIME EXTENSIONS #1-2: 90 Working Days TOTAL OF CHANGE ORDER #3: $0.00 TOTAL OF TIME EXTENSION #3: 37 Working Days NEW CONTRACT AMOUNT: $758,970.00 NEW COMPLETION DATE: 12/31/23 CHANGE ORDER NUMBER: 3 DATE: 10/30/23 A-1 DocuSign Envelope ID: DDB3050B-7D08-4190-8ABE-1EB6288D8353 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 2 of 2 PROFESSIONALSERVICES AGREEMENT CHANGE ORDER FORM CONTRACT NUMBER: FY2022-008 PROJECT NAME: Ladera Linda Community Park PURCHASE ORDER NUMBER: 20220115 CONTRACTOR NAME: Griffin Structures By signing this Change Order, Contractor understands and agrees that it is accepting the specified sums and adjustment of contract time of completion (if any) set forth herein as full, final and complete satisfaction of any and all claims by Contractor for all cos ts and expenses of Contractor and anyone for whom Contractor may be responsible for the work referred to herein, including but not limited to costs or expenses of the Contractor or any of its subcontractors, materials suppliers, vendors or anyone else for whom Contractor is responsibl e, for labor, materials, services or equipment, no matter how characterized, whether known or unknown to Contractor, including but not limi ted to, all field and home office overhead, delay costs/claims, acceleration costs/claims, unabsorbed or under -absorbed home office overhead, extended field costs, general conditions, claim preparation costs, inefficiencies, or the like, no matter how characterized. Contracto r further understands and agrees by signing this Change Order that any attempt by Contractor to purportedly reserve rights to claim additional time or compensation for the work referred to herein, is void. Except as set forth, all terms and provisions of the contract and all prior change orders remain in full force and effect. Recommended: Signature Date: 11/1/2023 Execution of this Change Order by both parties constitutes a binding agreement. This document constitutes the entire agreemen t between the parties. The person signing this Change Order for Contractor hereby represents and warrants that he/she is fully authoriz ed to sign this Agreement on behalf of Contractor. Contractor: Signature Date: 11/01/2023 Accepted and Executed by: City: Date: 11/1/2023 Signature Date: 11/1/2023 Date: Signature 11/3/2023 CHANGE ORDER NUMBER: 3 PROJECT CODE: 8405 James O'Neill Project Manager Jon Hughes President Derek Wieske Public Works (interim) Deputy Director Signature Ramzi Awwad Public Works Director Ara Mihranian City Manager A-2 ~ DocuSigned by: 9--(J 'ne,.,tt 4286245FSE794E7 ... r DocuS ign e d by: ~~ lfDo cuS ign e d by: L~