Loading...
AMG and Associates Inc (Change Order 049)City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov CHANGE ORDER MEMORANDUM TO: RAMZI AWWAD, DIRECTOR OF PUBLIC WORKS FROM: ERIN JONES, GRIFFIN STRUCTURES DATE: SEPTEMBER 26, 2023 SUBJECT: LADERA LINDA COMMUNITY PARK CONSTRUCTION CHANGE ORDER NUMBER: 49 Description of Construction Change Order This change order provides a credit for substituting the specified exterior insulation board that was discontinued with a similar product. Justification Reference RFI 183. The manufacturer discontinued the specified exterior insulation board product, and the Contractor proposed a substitution. The architect deemed the substitution acceptable, and the change resulted in a cost savings. Cost Analysis Griffin Structures reviewed the proposal scope and pricing. Reference the attached pricing analysis. Schedule Analysis No time extension was requested by the contractor, and work is expected to be completed within the original construction timeframe. Attachments: Construction Contract Change Order Form Construction Contract Change Order Summary Sheet Contractor’s Change Order Proposal OCTOBER 10, 2023 DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 8405 20 0 0 11 0 0 0 0 0 0 0 CONSTRUCTION CHANGE ORDER SUMMARY SHEET PROJECT NAME:Ladera Linda Community Park DATE:10/10/23 PROJECT CODE: PURCHASE ORDER NUMBER:20220215 ACCOUNT NUMBER:330-400-8405-8403 ORIGINAL CONTRACT AMOUNT:$13,721,000.00 ORIGINAL CONTINGENCY AMOUNT: PREPARED BY:JAMES O'NEILL CONTRACTOR NAME:AMG & Associates, Inc. CONTRACT NUMBER:FY2022-050 $1,029,075.00 TOTAL CHANGE ORDERS COST:$854,173.09 REVISED CONTINGENCY AMOUNT:$1,208,194.98 NEW CONTRACT AMOUNT:$14,575,173.09 REMAINING CONTINGENCY AMOUNT:$354,021.89 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE CO#1 $54,534.52 Working Days 05/27/22 ORIGINAL COMPLETION DATE:07/27/23 TOTAL SCHEDULE CHANGE ORDERS:Working Days NEW CONTRACT COMPLETION DATE:08/24/23 CO#4 $8,558.42 Working Days 09/01/22 CO#5 -$5,378.25 Working Days 09/01/22 CO#2 $12,628.58 Working Days 08/09/22 CO#3 $53,526.25 Working Days 08/31/22 CO#8 $6,437.02 Working Days 09/27/22 CO#9 $1,818.52 Working Days 11/09/22 CO#6 $824.34 Working Days 09/01/22 CO#7 $10,202.36 Working Days 09/27/22 CO#10 $42,918.80 Working Days 11/09/22 1 of 3 DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 10/25/2023 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 6 1 CO#11 $33,868.27 Working Days 12/01/22 CO#12 $9,052.32 Working Days 12/01/22 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE CO#15 -$3,117.01 Working Days 01/17/23 CO#16 $59,788.90 Working Days 02/02/23 CO#13 $0.00 Working Days 12/30/22 CO#14 -$20,112.42 Working Days 12/30/22 CO#19 $17,562.82 Working Days 02/09/23 CO#20 $3,679.17 Working Days 02/16/23 CO#17 $12,582.87 Working Days 02/03/23 CO#18 $16,546.62 Working Days 02/09/23 CO#23 $4,094.67 Working Days 02/23/23 CO#24 $19,573.51 Working Days 03/07/23 CO#21 $10,075.07 Working Days 02/21/23 CO#22 $3,178.42 Working Days 02/22/23 CO#27 $136,226.21 Working Days 05/03/23 CO#28 $10,819.96 Working Days 05/05/23 CO#25 $8,909.82 Working Days 04/06/23 CO#26 $21,061.12 Working Days 04/25/23 CO#31 $2,104.03 Working Days 05/18/23 CO#32 $2,291.43 Working Days 05/19/23 CO#29 $1,055.31 Working Days 05/09/23 CO#30 $3,682.06 Working Days 05/18/23 CO #35 $3,765.15 Working Days 06/08/23 CO #36 $697.56 Working Days 06/16/23 CO #33 $10,095.54 Working Days 05/31/23 CO #34 $179,119.98 Working Days 06/08/23 CO #39 $24,530.09 Working Days 07/25/23 CO #40 $11,002.33 Working Days 07/26/23 CO # 37 $3,561.51 Working Days 06/16/23 CO #38 $23,527.90 Working Days 07/12/23 CO #43 $1,647.09 Working Days 08/24/23 CO #44 $23,867.61 Working Days 08/29/23 CO #41 $630.12 Working Days 07/26/23 CO #42 $6,466.62 Working Days 08/03/23 CO #47 $0.00 Working Days 10/10/23 CO #48 $0.00 Working Days 10/10/23 CO #45 $35,792.08 Working Days 10/10/23 CO #46 -$6,270.83 Working Days 10/10/23 2 of 3 DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 0 CO #52 CO #53 CO #54 CO #55 CO #56 CO #57 CO #58 CO #59 CO #60 CO #49 CO #50 CO #51 -$3,253.37 Working Days 10/10/23 3 of 3 DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 GRIFFIN STRUCTURES PRICING ANALYSIS - ESTIMATED COST OF WORK RFI 183 - Credit for Insluation Board Substitution Description Qty Unit Rate Cost Note 1-Inch Polystyrene Insulation Board with R4 Value (9,150) SF 0.2800 (2,562.00) Material pricing from RS Means for Comparison (Ref 072113130600)* 1-Inch Polystyrene Insulation Board with R4 Value 9,150 SF 0.2800 2,562.00 Material pricing from RS Means for Comparison (Ref 072113130600)* - Subtotal - *Note that RS Means does not supply pricing for specific manufacturers or R values Material pricing provided by the supplier in attached email will be more accurate AS SUBMITTED PCO 54 - RFI 183 - Credit for Insluation Board Substitution MATERIAL LABOR EQUIP QTY Rate Cost QTY Rate Cost Qty Rate Cost -9150 1.3125 -12009.38 0 0 9150 1.0250 9378.75 0 0 0.00 0 0 -2630.63 0 0 tax -249.91 SUBTOTAL (2,630.63) Sales Tax (9.5%)(249.91) Markup SUB (5%)(144.03) SUBTOTAL (3,024.57) AMG OH&P (5%)(151.23) AMG Insurance (1.5%)(45.37) AMG Bond (1%)(32.21) TOTAL (3,253.38) DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 8405 49 0.0 LS -1.0 LS -1.0 LS 0.0 LS -1.0 LS -1.0 LS 0.0 LS -1.0 LS -1.0 LS 0.0 LS -1.0 LS -1.0 LS 0 20 0 NEW CONTRACT AMOUNT:$14,575,173.09 NEW COMPLETION DATE:08/24/23 TOTAL OF CHANGE ORDER #1-48:$857,426.46 TOTAL OF TIME EXTENSIONS #1-48:Working Days TOTAL OF CHANGE ORDER #49:($3,253.37)TOTAL OF TIME EXTENSIONS #49:Working Days ORIGINAL CONTRACT AMOUNT:$13,721,000.00 ORIGINAL COMPLETION DATE:07/27/23 5 012600 AMG Bonding $32.21 -$32.21 0 Totals -$3,253.37 0 A TIME EXTENSION OF WORKING DAYS WILL BE ALLOWED FOR THIS WORK 0 3 012600 AMG Overhead $151.23 -$151.23 0 4 012600 AMG Insurance $45.37 -$45.37 ADDITIONAL WORKING DAYS 1 072100 AMG PCO 54 - RFI 183 - Insulation Board Substitution $3,024.56 -$3,024.56 0 This change order provides a credit for substituting the specified exterior insulation board that was discontinued with a similar product. Referene RFI 183 and AMG PCO 54. SUMMARY OF QUANTITY CHANGES ITEM NO. SPEC CODE DESCRIPTION ORIGINAL QUANTITY NEW QUANTITY QUANTITY DIFFERENCE UNIT PRICE PRICE DIFFERENCE DESCRIPTION AND LOCATION OF PROPOSED WORK CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER:FY2022-050 PROJECT NAME:Ladera Linda Community Park PURCHASE ORDER NUMBER:20220215 PROJECT CODE: CHANGE ORDER NUMBER:DATE:10/10/23 CONTRACTOR NAME:AMG & Associates, Inc. DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 49 Recommended: Erin Jones Date: Construction Manager, Griffin Structures Signature Contractor:Date: Signature City:Date: Signature Date: Public Works Director Signature Ara Mihranian Date: City Manager Signature Ramzi Awwad Contract Officer Ramzi Awwad By signing this Change Order, Contractor understands and agrees that it is accepting the specified sums and adjustment of contract time of completion (if any) set forth herein as full, final and complete satisfaction of any and all claims by Contractor for all costs and expenses of Contractor and anyone for whom Contractor may be responsible for the work referred to herein, including but not limited to costs or expenses of the Contractor or any of its subcontractors, materials suppliers, vendors or anyone else for whom Contractor is responsible, for labor, materials, services or equipment, no matter how characterized, whether known or unknown to Contractor, including but not limited to, all field and home office overhead, delay costs/claims, acceleration costs/claims, unabsorbed or under-absorbed home office overhead, extended field costs, general conditions, claim preparation costs, inefficiencies, or the like, no matter how characterized. Contractor further understands and agrees by signing this Change Order that any attempt by Contractor to purportedly reserve rights to claim additional time or compensation for the work referred to herein, is void. Except as set forth, all terms and provisions of the contract and all prior change orders remain in full force and effect. Execution of this Change Order by both parties constitutes a binding agreement. This document constitutes the entire agreement between the parties. The person signing this Change Order for Contractor hereby represents and warrants that he/she is fully authorized to sign this Agreement on behalf of Contractor. Anthony R. Traverso Vice President/Secretary/Treasurer Accepted and Executed by: CONTRACTOR NAME:AMG & Associates, Inc. CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER:FY2022-050 PROJECT NAME:Ladera Linda Community Park PURCHASE ORDER NUMBER:20220215 CHANGE ORDER NUMBER:PROJECT CODE:8405 10/10/23 Signature Anthony R. Traverso Digitally signed by Anthony R. Traverso Date: 2023.10.10 16:13:28 -07'00' DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 10/25/2023 10/25/2023 10/30/2023 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Prime Contract Potential Change Order #054: CE #113 - RFI 183 Credit - INS Board Substitution TO: City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, California 90275 FROM: AMG & Associates, Inc. 26535 Summit Circle Santa Clarita, California 91350 PCO NUMBER/REVISION: 054 / 0  CONTRACT:City Project No. 8405 - Ladera Linda Community Park Project   REQUEST RECEIVED FROM: Ruben Contreras (Platinum Construction, Inc.) CREATED BY: Christopher Tumasone (AMG & Associates, Inc.) STATUS: Pending - In Review CREATED DATE: 5/11/2023 REFERENCE: PRIME CONTRACT CHANGE ORDER:  None   FIELD CHANGE: No   LOCATION: ACCOUNTING METHOD: Amount Based   SCHEDULE IMPACT: PAID IN FULL: No   EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE:   TOTAL AMOUNT: ($3,253.37) POTENTIAL CHANGE ORDER TITLE: CE #113 - RFI 183 Credit - INS Board Substitution CHANGE REASON: RFI 183 POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #113 - RFI 183 Credit - INS Board Substitution Pricing for the costs associated to changing the 1" XPS foam to a 1" EPS foam, please note that the change was required as we had been notified that the initial 1" XPS foam was no longer manufactured in the 1" thickness.  ATTACHMENTS: 22002 - CO #018 - Credit for XPS to EPS.pdf #Budget Code Description Amount 1 09-250.S Gypsum Wallboard.Commitment credit per RFI 183 $(3,024.56) Subtotal:$(3,024.56) Overhead (5.00% Applies to all line item types.):$(151.23) Insurance (1.50% Applies to all line item types.):$(45.37) Bonding  (1.00% Applies to all line item types.):$(32.21) Grand Total:$(3,253.37)    City of Rancho Palos Verdes  AMG & Associates, Inc.  30940 Hawthorne Blvd. 26535 Summit Circle    Rancho Palos Verdes, California 90275  Santa Clarita, California 91350             ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate  ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE  SIGNATURE DATE  SIGNATURE DATE AMG & Associates Inc.Page 1 of 1 Printed On: 5/11/2023  12:59 PM PCO #054 DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 To: Date: 05/11/23 Job:Revise: COR # RE: Scope: Material Cost (2,630.63)$ Tax @ 9.5%(249.91)$ (2,880.53)$ Equipment Cost -$ Tax @ 9.5%-$ -$ Carpenter -$ Finisher -$ Plasterer -$ Working Foreman -$ -$ -$ -$ (2,880.53)$ 5%(144.03)$ 5%-$ 0%-$ (3,024.56)$ Sincerely, Project Manager Chris Tumasone Ladera Linda Community Center 3) This work quoted will add (1) day(s) to the schedule. 4) This work quoted does not include repair of work damaged by others 5) This work quoted is to be performed under standard work hours and without overtime or shiftwork. Ruben Contreras Total Subcontractor Cost Change Order Request Total OH&P OH&P Sub Bond Subtotal 018 Qualifications: 1) The price indicated is for this change only and does not include any compensation for costs which may be incurred as a result of a delay or acceleration. Total Labor Cost Total Equipment Cost Total Material Cost 2) This price quoted is valid for thirty (30) days. Material Equipment Labor RFI #183 - Insulation board substitution Pricing for the costs associated to changing the 1" XPS foam to a 1" EPS foam, please note that the change was required as we had been notified that the initial 1" XPS foam was no longer manufactured in the 1" thickness. Subcontractor DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 To: Chris Tumasone Date: 05/11/23 Job:Ladera Linda Community Center Revise: COR #018 RE: Scope: Quantity Unit Price Cost 9150SF (1.31)$ (12,009.38)$ 9150SF 1.03$ 9,378.75$ Subtotal (2,630.63)$ Tax 9.5%(249.91)$ (2,880.53)$ Labor Quantity Unit Type Daily ProductionMan Hours Rate Cost 0 82.95$ -$ 0 82.95$ -$ 0.0 82.95$ -$ 0 81.46$ -$ 0 82.95$ -$ 0 81.23$ -$ 0 82.95$ -$ 0 82.95$ -$ 0 86.57$ -$ -$ (2,880.53)$ OH&P Sub 5% -$ OH&P 5%(144.03)$ GRAND TOTAL (3,024.56)$ CHANGE ORDER REQUEST SUBTOTAL Layout Framing Drywall Tape/Finish Lath and Trim Plaster Cleanup Stocking Working Foreman MATERIAL TOTAL LABOR TOTAL XPS Credit EPS Add RFI #183 - Insulation board substitution Pricing for the costs associated to changing the 1" XPS foam to a 1" EPS foam, please note that the change was required as we had been notified that the initial 1" XPS foam was no longer manufactured in the 1" thickness. Material DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 07 2400 Insulation Board Substitution TO:Chandra Sutton (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91350 FROM:Christopher Tumasone (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91355 CREATED DATE:04/19/ 2023 STATUS:Open LOCATION:DUE DATE:05/04/2023 COST CODE:REFERENCE: COST IMPACT:SCHEDULE IMPACT: DRAWING NUMBER:SPEC SECTION: RECEIVED FROM:Ruben Contreras (Platinum Construction, Inc.) COPIES TO: Dustin Hartman (AMG & Associates, Inc.), Christopher Tumasone (AMG & Associates, Inc.) SUGGESTION: Question from Christopher Tumasone (AMG & Associates, Inc.) at 09:22 AM on 04/19/2023 We have been informed by the material provider that the 1” XPS foam that was submitted and approved is no longer available in the thickness that we require. Attached is a substitution request form for the foam recommended by the manufacturer (1” EPS Foam). Please confirm the substitution is acceptable. Attachments: 07 2400 - Substitution Request Form_.pdf BY DATE COPIES TO AMG & Associates Inc.Page 1 of 1 Printed On: 04/19/2023 09:22 AM RFI #183 1" EPS with min R value of 3.4 will be acceptable substitution for the XPS only. We understand that EPS is less expensive than XPS. Please provide a credit to the Owner. -ID/JF 4/25/23 DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 Page 1 of 2 PRODUCT BULLETIN Sto Expanded Polystyrene (EPS) Insulation Board PRODUCT DESCRIPTION Sto Expanded Polystyrene (EPS) Insulation Board is a rigid cellular expanded polystyrene insulation board intended for use in StoTherm® ci Systems. It is made by licensed Sto EPS Insulation Board molders in accordance with ASTM E2430, and ASTMC 578 requirements for Type 1 EPS. REGULATORY COMPLIANCE • Complies with ASTM C578, Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation, as nominal 1lb/ft3 (16kg/m3) Type 1 thermal insulation • Complies with ASTM E2430 / 2430M, Standard Specification for Expanded Polystyrene (“EPS”) Thermal Insulation Boards for Use in Exterior Insulation and Finish Systems (“EIFS”), Compliant with 2012, 2015, and 2018 IBC, IRC, and IECC when used as a component of StoTherm ci System wall assemblies, Refer to ICC ESR 1748, StoTherm ci, StoPanel Classic ci, StoPanel Impact ci, StoPanel XPS, and StoPan el Classic NExT ci • Meets requirements of the National Building Code of Canada-2010 and 2015 as a component of StoTherm ci Systems wall assemblies , refer to Intertek Design Listings STO/WEIFS 15-01 and 25-01 for compliance with Clause 3.2.3.8.(1)(b) and Article 3.1.5.5. • Meets requirements of National Building Code of Canada-2015 as a component of StoTherm ci Systems, refer to CCMC Evaluation Report 12416-R, StoTherm ci Lotusan, StoTherm ci Classic, StoTherm ci Essence Exterior Insulation and Finish FEATURES BENEFITS Lightweight, easy to cut, score, shape, and rasp Worker friendly, easy to achieve aesthetics Fully tested for fire exposure and durability in StoTherm ci Systems Built-in compatibility of wall system components, peace of mind, for use on all Types of construction Continuous insulation when used in StoTherm ci Systems and StoPanel Systems Simplifies design to achieve required R-value or U-factor in wall construction PACKAGING and SIZES Packaged in yellow polyethylene bags, 2x4 ft (~609x1219mm) sheets at 1-12 inch (~25.4- 305mm) thickness in increments of 1/2in (12.7mm) SHELF LIFE: 18 months, if properly stored in original packaging STORAGE: The product is combustible. Protect or store away from sources of high heat, ignition, sparks, flames, flammable or volatile materials. Store in original packaging off the ground in a dry location. Protect form UV exposure and avoid covering with dark colored tarps or other coverings which can cause heat build-up and surface deformation. LIMITATIONS • Service temperature limit: -65 to +165°F (-53.9 to +73.9°C) • A protective barrier or thermal barrier is required as specified in the appropriate building code to separate this product from interior space • For other limitations of use with respect to building codes refer to ICC ESR 1748 INSTALLATION Refer to StoTherm ci System specification as www.stocorp.com DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 Page 2 of 2 Sto Corp. 3800 Camp Creek Parkway Building 1400, Suite 120 Atlanta, GA 30331 Tel: 404-346-3666 Toll Free: 1-800-221-2397 Fax: 404 346-3119 www.stocorp.com Revision Number: 000 Date: 05/2020 ATTENTION This product is intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. It should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on -site inspections, for its products applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, or for other construction activities beyond Sto’s control. Improper use of this product or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to this product, and to the structure of the building or its components. STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean -up, mixing and other specifications and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com . DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20   To: Sto Corp. Distributors Sto Corp. Sales Sto Corp. Technical Sto Corp. Customer Service From: Richard Martens, Director – Business Development Date: March 3, 2023 RE: Owens Corning Foamular CI-C and NGX CI-C Insulation Effective immediately, Sto Corp. will no longer offer Owens Corning Foamular CI-C and Foamular NGX CI-C extruded polystyrene insulation board for use within StoTherm ci XPS wall systems. DuPont PC-20/ST-100 extruded polystyrene insulation remains fully available. It is acceptable for use as part of StoTherm ci XPS wall systems in all 50 states. DuPont PC-20/ST-100 is available in 1.5”, 2”, 3”, and 4” thicknesses. Consolidating the StoTherm-approved XPS product line to one supplier of 50 state- compliant XPS insulation will improve inventory turnover and supply chain efficiency. Note that Owens Corning Foamular and Foamular NGX (not CI-C grade) Type IV XPS remains available for use within StoPowerwall ci systems. This board is available directly from Owens Corning. Please contact your local Sto Corp. sales representative if you have any questions regarding XPS insulation. DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 1 Ruben Contreras Subject:FW: XPs foam From: Rueda, Abraham <Abraham.Rueda@fbmsales.com> Sent: Tuesday, May 2, 2023 2:46 PM To: James Waggoner <james@platconinc.com>; Ruben Contreras <rcontreras@platconinc.com> Cc: Koski, Derek <Derek.Koski@fbmsales.com>; Vazquez, Eduardo <Eduardo.Vazquez@fbmsales.com> Subject: RE: XPs foam I will find out what the lead time for the 1” EPS and get back to you. The costs are…. 1” XPS = $1.31 per SF 1” EPS = $1.03 per SF Please advise, thank you Abraham Rueda | Abraham.Rueda@fbmsales.com Ph: (562) 949-9730 | Office Hours: M-F 5:30am-3:30pm 12900 N Firestone Blvd. Santa Fe Springs, CA 90670 From: James Waggoner <james@platconinc.com> Sent: Tuesday, April 25, 2023 2:28 PM To: Rueda, Abraham <Abraham.Rueda@fbmsales.com>; Ruben Contreras <rcontreras@platconinc.com> Cc: Koski, Derek <Derek.Koski@fbmsales.com>; Vazquez, Eduardo <Eduardo.Vazquez@fbmsales.com> Subject: RE: XPs foam EXTERNAL EMAIL: This message originated from outside of FBM. Take caution when opening links, downloading attachments, or responding. 9,000 sf I have it on PO #22002-024, line item #1. What is the lead time for this? And what is the cost difference between the two? Regards, James Waggoner DocuSign Envelope ID: E4F469E8-A242-4644-BBA7-26953668AC20 Certificate Of Completion Envelope Id: E4F469E8A2424644BBA726953668AC20 Status: Completed Subject: Complete with DocuSign: 8405 Ladera Linda CCO 49_rev1.pdf Source Envelope: Document Pages: 17 Signatures: 3 Envelope Originator: Certificate Pages: 5 Initials: 1 James O'Neill AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 joneill@rpvca.gov IP Address: 72.34.97.146 Record Tracking Status: Original 10/23/2023 3:41:44 PM Holder: James O'Neill joneill@rpvca.gov Location: DocuSign Signer Events Signature Timestamp Ramzi Awwad rawwad@rpvca.gov Director of Public Works City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 92.253.30.50 Sent: 10/23/2023 3:44:23 PM Viewed: 10/25/2023 6:50:34 AM Signed: 10/25/2023 6:51:12 AM Electronic Record and Signature Disclosure: Accepted: 3/2/2023 10:45:19 AM ID: 3242b72d-4755-489d-8e5f-7c62dc360470 Vina Ramos vramos@rpvca.gov Deputy Director of Finance City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 23.241.181.171 Signed using mobile Sent: 10/25/2023 6:51:13 AM Viewed: 10/25/2023 6:58:23 AM Signed: 10/25/2023 6:59:01 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ara Mihranian aram@rpvca.gov City Manager City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 104.34.113.36 Sent: 10/25/2023 6:59:02 AM Resent: 10/30/2023 9:14:18 AM Viewed: 10/30/2023 10:10:09 AM Signed: 10/30/2023 10:10:32 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Carbon Copy Events Status Timestamp Erin Jones ejones@griffinstructures.com Security Level: Email, Account Authentication (None) Sent: 10/30/2023 10:10:32 AM Viewed: 10/30/2023 10:29:40 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Lorna Cloke lornac@rpvca.gov Security Level: Email, Account Authentication (None) Sent: 10/30/2023 10:10:33 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign City Clerk cityclerk@rpvca.gov Security Level: Email, Account Authentication (None) Sent: 10/30/2023 10:10:34 AM Viewed: 11/2/2023 8:47:31 AM Electronic Record and Signature Disclosure: Accepted: 2/1/2023 3:10:58 PM ID: 505eed45-7ed0-4db8-aae6-ef6eedfef03d Derek Wieske DWieske@rpvca.gov Security Level: Email, Account Authentication (None) Sent: 10/30/2023 10:10:34 AM Electronic Record and Signature Disclosure: Accepted: 11/1/2023 1:43:01 PM ID: f1b07a1a-cdaa-4f66-af6c-837e6955c501 Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 10/23/2023 3:44:23 PM Certified Delivered Security Checked 10/30/2023 10:10:09 AM Signing Complete Security Checked 10/30/2023 10:10:32 AM Completed Security Checked 10/30/2023 10:10:34 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Rancho Palos Verdes (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronicall y through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made av ailable electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/15/2021 5:55:39 PM Parties agreed to: Ramzi Awwad, City Clerk, Derek Wieske Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Rancho Palos Verdes: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: terit@rpvca.gov To advise City of Rancho Palos Verdes of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at terit@rpvca.gov and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from City of Rancho Palos Verdes To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to terit@rpvca.gov and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Rancho Palos Verdes To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to terit@rpvca.gov and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:  You can access and read this Electronic Record and Signature Disclosure; and  You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and  Until or unless you notify City of Rancho Palos Verdes as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Rancho Palos Verdes during the course of your relationship with City of Rancho Palos Verdes.