CC SR 20230905 E - Ladera Linda AV Vendor Change CITY COUNCIL MEETING DATE: 09/05/2023 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA TITLE: Consideration and possible action to change the audio-visual equipment vendor for the Ladera Linda Community Park Project. RECOMMENDED COUNCIL ACTION: (1) Authorize using AMG & Associates, the project’s primary general contractor and the existing project budget, to procure and install audio-visual equipment for the Ladera Linda Community Park project by increasing the contract contingency in the amount of $179,119.98 above the existing 7.5% contingency. FISCAL IMPACT: The recommended action will be funded from the available unspent existing budget from other line items including, but not limited to, furniture, fixtures, and equipment. Amount Budgeted: $18,770,084 Additional Appropriation: N/A Account Number(s): 330-400-8405-XXXX (CIP Funds – Ladera Linda Community Park) 333-400-8405-XXXX (ARPA Funds – Ladera Linda Community Park) 334-400-8405-XXXX (Quimby Funds – Ladera Linda Community Park) VR ORIGINATED BY: James O’Neill, Public Works Project Manager REVIEWED BY: Ramzi Awwad, Director of Public Works APPROVED BY: Ara Mihranian, AICP, City Manager ATTACHED SUPPORTING DOCUMENTS: A. March 1, 2022 City Council Staff Report BACKGROUND AND DISCUSSION: On March 1, 2022, the City Council approved a project budget of $18,770,084 for the Ladera Linda Community Park Project. The budget included $140,000 for audio-visual equipment procurement, installation, and associated work. At the time of project budget approval, the audio-visual equipment work was planned to be executed through a vendor who specializes in audio-visual equipment, rather than the primary construction 1 contractor, AMG & Associates (AMG), because of the special nature of the work. A vendor had not yet been solicited at the time of budget approval because it would have been too early to bring on an audio-visual equipment vendor, as that part of construction would be occurring in the latter stages. Table 1 shows the approved project budget. Table 1- Approved Ladera Linda Community Park Project Budget As construction of the project progressed, the architect, consultant construction manager, and Staff considered contracting for the audio-visual equipment work through AMG rather than a separate vendor as had originally been envisioned. The benefit of this approach is a reduction in the risk of schedule disruption that may occur when two separate vendors need to work in the same physical space. Furthermore, adding the audio-visual equipment work into AMG’s contract assigns the responsibility of work coordination to AMG entirely, and the City would not be subject to potential conflicts that may arise from the coordination of two different contractors. Furthermore, having all work done under one contract allows for the overlapping of some of the work, which could save time. The cost for AMG to procure and install the audio-visual equipment is $179,119.98. The project consultant construction manager (Griffin) performed an independent cost estimate and found the proposed cost of $179,119.98 to be fair and reasonable. The cost of audio- 2 visual equipment is already included in the original project budget, and no additional appropriation is necessary. Although $140,000 was originally estimated to procure and install the equipment, the actual cost will be $179,119.98. The cost is greater than originally estimated because the original estimate undervalued the work and because inflation has been greater than expected. The difference between the original estimate and the actual cost will be covered by savings in the existing budget line items for furniture, fixtures, and equipment because the cost for that work is lower than originally estimated. The savings are more than sufficient to cover the $39,119.98 difference between the original audio-visual equipment budget and the current cost. Although the funds for this work are available within the project budget, the construction contingency was not anticipated to include this work and would therefore be depleted to the detriment of resolving issues that come up during construction, such as changed field conditions. Therefore, Staff recommends that the City Council use the existing appropriated budget to increase the contract contingency with AMG to include audio - visual equipment procurement, installation, and associated work in the amount of $179,119.98 above the existing 7.5% contingency. CONCLUSION: Staff recommends the City Council use the existing appropriated budget to increase the contract contingency with AMG to include audio -visual equipment procurement, installation, and associated work in the amount of $179,119.98 above the 7.5% contingency to complete the work using the primary construction contractor rather than a separate vendor, reducing coordination and scheduling risk. ALTERNATIVES: In addition to the Staff recommendation, the following alternative actions are available for the City Council’s consideration: 1. Do not increase the construction contract contingency and direct Staff to return for a contingency increase only after all contingency has been used, risking delays to the construction schedule and associated costs to be borne by the City. 2. Take other action, as deemed appropriate. 3