Loading...
AMG and Associates Inc (Change Order 006)'A.9 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworksC&rpyca.gov CHANGE ORDER MEMORANDUM TO: RAMZI AWWAD, DIRECTOR OF PUBLIC WORKS FROM: ERIN JONES, GRIFFIN STRUCTURES DATE: SEPTEMBER 1, 2022 SUBJECT: LADERA LINDA COMMUNITY PARK CONSTRUCTION CHANGE ORDER NUMBER: 6 Description of Construction Change Order Add a kick plate to the playground gate to comply with disabled access code. Justification The Architect issued a bulletin (ASI 10) that added a metal kick plate at the playground gate in order for the gate to meet disabled access code. Cost Analysis Griffin Structures performed a quantity take -off to confirm accuracy of the deleted and added steel materials. The material pricing is in line with published pricing. The labor hours are reasonable for the work required, and the labor rate is in line with published State of California rates. Schedule Analysis No time extension was requested by the contractor, and work is expected to be completed within the original construction timeframe. Attachments: Construction Contract Change Order Form Construction Contract Change Order Summary Sheet Contractor's Change Order Proposal City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 IRL(310)544-5252 www. ublicworks r vca, ov CONSTRUCTION CHANGE ORDER SUMMARY SHEET PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 PREPARED BY: JAMES O'NEILL CONTRACTOR NAME: AMG & Associates, Inc. CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 ACCOUNT NUMBER: 330-400-8405-8403 ORIGINAL CONTRACT AMOUNT: $13,721,000.00 TOTAL CHANGE ORDERS COST. $124,693.86 DATE: 09/01/22 ORIGINAL CONTINGENCY AMOUNT: $1,029,075.00 NEW CONTRACT AMOUNT: $13,845,693.86 REMAINING CONTINGENCY AMOUNT: $904,381.14 ORIGINAL COMPLETION DATE: 07/27/23 TOTAL SCHEDULE CHANGE ORDERS: 11 Working Days NEW CONTRACT COMPLETION DATE: 08/11/23 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE C0#1 $54,534.52 0 Working Days 05/27/22 CO#2 $12,628.58 0 Working Days 08/09/22 CO#3 $53,526.25 11 Working Days 08/31/22 CO#4 $8,558.42 0 Working Days 09/01/22 CO#5 -$5,378.25 0 Working Days 09/01/22 CO#6 $824.34 0 Working Days 09/01/22 CO#7 Working Days CO#8 'Working Days CO#9 1 Working Days CO#10 I Working Days 1of1 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 IqL(310)544-5252 www. ublicworks r vca. ov CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 CHANGE ORDER NUMBER: 6 CONTRACTOR NAME: AMG & Associates, Inc. DESCRIPTION AND LOCATION OF PROPOSED WORK PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 Add a kick plate to the playground gate to comply with disabled access code. DATE: 09/01/22 SUMMARY OF QUANTITY CHANGES ITEM SPEC ORIGINALNEW QUANTITY UNIT PRICE ADDITIONAL NO. CODE DESCRIPTION QUANTITY QUANTITY DIFFERENCE I PRICE DIFFERENCE WORKING DAYS AMG PCO 9 - ASI 10 Furnish and install kick plate on Gate 1 323110 201. 0.0 LS 1.0 LS 1.0 LS $824.34 $824.34 0 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 1$0.00 Totalsj $824.34 1 0 A TIME EXTENSION OF 0 WORKING DAYS WILL BE ALLOWED FOR THIS WORK ORIGINAL CONTRACT AMOUNT: $13,721,000.00 ORIGINAL COMPLETION DATE: 07/27/23 TOTAL OF CHANGE ORDER #1-5:1$123,869.52 TOTAL OF TIME EXTENSIONS #1-5:1 11 Working Days TOTAL OF CHANGE ORDER #S: $824.34 NEW CONTRACT AMOUNT: $13,845,693.86 TOTAL OF TIME EXTENSIONS #f: 0 Working Days NEW COMPLETION DATE: 08/11/23 1of2 City of Rancho Palos Verdes Department of Public Works LA 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rovca-gov CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 GHANGE ORDER NUMBER: 6 CONTRACTOR NAME: AMG & Associates, Inc. PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 By signing this Change Order, Contractor understands and agrees that it is accepting the specified sums and adjustment of contract time of completion (if any) set forth herein as full, final and complete satisfaction of any and all claims by Contractor for all costs and expenses of Contractor and anyone for whom Contractor may be responsible for the work referred to herein, including but not limited to costs or expenses of the Contractor or any of its subcontractors, materials suppliers, vendors or anyone else for whom Contractor is responsible, for labor, materials, services or equipment, no matter how characterized, whether known or unknown to Contractor, including but not limited to, all field and home office overhead, delay costs/claims, acceleration costs/claims, unabsorbed or under -absorbed home office overhead, extended field costs, general conditions, claim preparation costs, inefficiencies, or the like, no matter how characterized. Contractor further understands and agrees by signing this Change Order that any attempt by Contractor to purportedly reserve rights to claim additional time or compensation for the work referred to herein, is void. Except as set forth, all terms and provisions of the contract and all prior change orders remain in full force and effect. Recommended: Erin Jones Construction Manager, Griffin Structures Signature Date: 09/01/22 Execution of this Change Order by both parties constitutes a binding agreement. This document constitutes the entire agreement between the parties. The person signing this Change Order for Contractor hereby represents and warrants that he/she is fully authorized to sign this Agreement on behalf of Contractor. Di9 itally signed by Anthony R. Contractor: Anthony R. Traverso Vice President/Secretary/Treasurel Accepted and Executed by: City: Ramzi Awwad Contractor Officer Ramzi Awwad Public Works Director Trang Nguyen Finance Director Anthony R. Traverso Traverso Date: 2022.09.0610:05:49-07'00' Date Signature 11, LI E t. 2of2 Date: C) 1 0�/�' Date: Date: �O i� S I&V iew 9r2 A -MG AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Fax: (661) 251-7405 PCO #009 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Prime Contract Potential Change Order #009: CE #024 - Bulletin ASI #010 TO: City of Rancho Palos Verdes FROM: AMG & Associates, Inc. 03-000.S General.Commitment 30940 Hawthorne Blvd. $752.24 26535 Summit Circe $752.24 Rancho Palos Verdes, California 90275 $52.66 Santa Clarita, California 91350 PCO NUMBERIREVISION: 00910 CONTRACT City Project No. 8405 - Ladera Linda $824.34 Community Park Project REQUEST RECEIVED FROM: Amy Tsui (ACE Fence Company) CREATED BY: Christopher Tumasone (AMG & Associates, Inc.) STATUS: Pending - In Review CREATED DATE: 7/15/2022 REFERENCE: ASI #10 PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $824.34 POTENTIAL CHANGE ORDER TITLE: CE 0024 - Bulletin ASI #010 CHANGE REASON: ASI #10 POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract /s Changed As Follows) CE }1024 — Bulletin A$1_1 0 This change event covers the cost for additional work per Bulletin ASI #10. ATTACHMENTS: Fence Cosl.pdf , Joe Amar RE ASI 10,pdf , _JF -Bulletin ASI- _10.gdf # Budget Code Description Amount 1 03-000.S General.Commitment cost to fumish and install kick plate on FNCA Gate 201 per detail 7/A1.32 $752.24 Subtotal: $752.24 Overhead (7.00% Applies to all line Rem types.): $52.66 Insurance (1.50% Applies to all line item types.): $11.28 Bonding (1.00% Applies to all line item types.): $8.16 Grand Total: $824.34 City of Rancho Palos Verdes AMG & Associates, Inc. 30940 Hawthorne Blvd. 26535 Summit Circle Rancho Palos Verdes, Califomia 90275 Santa Clarita, California 91350 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE AMG & Associates Inc. Page 1 of 1 Printed On: 7/15/2022 11:23 AM e RCHiTEUTURE URBAti IE5!GD Bulletin ASI 0010 Project LADERA LINDA COMMUNITY CENTER Contract No. 1803 To AMG & ASSOCIATES Office No. No. of Pages 2 Subject Playground Gate & Door Schedule Clarifications Sender Ingrid Dennert, Johnson Favaro Date 6/17/22 This Bulletin is issued to define Scope of Revisionsl clarifications to the Drawings and/or Specifications. The Contractor shall carry out the Work in aocordance with the following supplemental instructions without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will be no change in the Contract Sum or Contract Time. Brief Description of Revisions/ Clarifications: 1. Playground gate revised for accessibility requirements. Revisions include added kickplate to gate to meet ADA requirements. 2. Reduced 6'-0" wide doors 104 & 106 to 5'-8 %" to clear coiling door rails. 3. Door 201 is a single door and shown as single door, but incorrectly labeled as double on the door schedule. Corrected to say single door. 4. Door 204.5 hardware set was listed as 16.8 in the bid set but improperly changed in the for construction set. Correction made to match what was documented in the bid set. 5. Door 205.1 & 206 hardware set was listed as 16.5 in the bid set but improperly changed in the for construction set. Correction made to match what was documented in the bid set." Attachments: Al. 32 — Site Details A7.11— Door & Gate Schedule 5B98 BLACKWELDER STREET CULVER CITY CA 90232 r 310.559.5120 r 310.559.8220 www.iohnsoflfavaro.com o' U2-6 'o o,l Rf \� FaLL� it TE .H ba -2 A W, A 2 Q a x g H z a (� -) - , - .■ (\\� \\\�```K\ `; � \ � � ' ��_® Li � ams w t \ \\ °| U) LU 12 ( < Cf! 0 ma �e LLz \� FaLL� it TE .H ba -2 A W, A 2 Q a x g H z a (� -) - , - .■ (\\� \\\�```K\ A w §C) z LLI LL LL S2 2L 0 �7 � | (\ ( § } LU LLI ! � § | } \ \ § Li ams w t U) LU < Cf! 0 m (D �e LLz §p A w §C) z LLI LL LL S2 2L 0 �7 � | (\ ( § } LU LLI ! � § | } \ \ § F! it 1 EYE i moi-hnn n who oww : ML ACE FENCE COMPANY 727 NORTH GLENDORA AVENUE, LA PUENTE, CA 91744 PHONE (626) 333-0727 • FAX (626) 333-7843 _�r- CERTIFIED AS DBE/SBE/MBEfWBE FIRM, UNION COMPANY, LACMTA Pre -Qualified to Bid ""Whor 'Awarded Minority Contractor of the Year by the City of Los Angeles for Excellence in Quality and Services" "We Are An Equal Opportunity Employer" CHANGE ORDER #2 TO AMG ATTN Chris Tumasone FAX # 661.251-7405; email - ctumasone@arngassociatesinc.com DATE 7113122 FROM Romeo La os 1 Pablo Lee PAGES 1 PROJECT Ladera Linda Community Park 32201 Forrestal Dr-, Ranchos Palos Verdes CA BID DATE 6124122 - 5:00 P.M - SPECS Per Plan & Specs (see notes & qualifications below) ADDENDUM: ITEM DESCRIPTION Unit Qty Unit Price Amount BULLETIN ASI 0010 DATED 6.17.22 PLAYGROUND GATE & DOOR SCHEDULE CLARIFICATION ADDITIONAL COST - FURNISH & INSTALL KICK PLATE ON FNC-A GATE 201 PER DETAIL 7/A1.32 1 Fumish & install Kick Plate on FNC-4 Gate 201 detail EA 1 $ 752.24 $ 752.24 7/A1.32 2 Appfaval-gate�tibmittal-Productsdata and welding LS I —S- 425:90 S ------4J25-.00 �rDGBduts sABicatiorlE f81�eiew $-approval TOTAL AMOUNT: $ 1.477.24- 752.24 NOTE: PROPOSAL IS AS A PACKAGE UNLESS DISCUSSED PRIOR TO BID OUR PROPOSAL IS PER LINE ITEM AND NOT LUMPSUM, CONTRACTOR IS RESPONSIBLE FOR THEIR OWN TAKE -OFF. AWARD MUST HAPPEN WITHIN 30 DAYS. COPY OF ACE FENCE COMPANY's BID TO BE PART OF THE FINAL CONTRACT AGREEMENT. COPY OF GENERAL's PAYMENT & PERFORMANCE BONDS TO BE ATTACHED TO THE CONTRACT AGREEMENT. EXCLUDE: GATE HANDLE & LOCKSET; PUSH BAR EXIT DEVICE, MOWCUR8, CURB, HEADER OR ANY CONCRETE WORKS (except for post footings); KNOX BOX; KEY FOB ACCESS SENSOR; GATE CLOSER & COVER PAN; GATE STOP; EXIT HARDWARE; RE -BARS; FORMWORKS; DEMOLITION WORKS; CLEARING & GRUBBING; REMOVAL OF FENCING & GATES, VEGETATION OR ANY OBSTRUCTIONS; EXTRA DIRT FOR BACKFILL: GRADING; STAKING & LAY -OUT; ROCK DRILLING, CONCRETE CUTTING, BREAKING & CORE DRILLING; PAVEMENT REPAIR OR ASPHALT PATCHING; POTHOLING OR LOCATING UTILITIES; MAINTENANCE OR REPAIR TO DAMAGES CAUSED BY OTHERS & TO UNMARKED UTILITY LINES; GROUNDING & ELECTRICAL WORKS; ENGINEERING OR STRUCTURAL CALCULATIONS; SURVEYS FOR ALIGNMENT & ELEVATIONS; COSTS FOR INSPECTIONS & TESTING; BOND COST; SWPPP; BEST MANAGEMENT PRACTICES; ASBESTOS & LEAD COMPLIANCE PLAN & ANY RELATED WORKS; PERMITS/FEES; DUST CONTROL; K -RAILS; TEMPORARY FENCES & SAFETY RAILING; TRAFFIC CONTROL & SIGNS; FLAGMEN; LANE CLOSURE; NIGHWORK; HAULING OF SPOILS (spoils from our excavation are to be scattered In the immediate vicinity of our work, relocation of spolls will be considered a change order) INSURANCE: GENERAL LIABILITY - $ 1,000,000 - $ 2,000,000 AGGREGATE; AUTOMOBILE - $ 1,000,000; WORKMAN COMPENSATION - $ 1,000,000. OCIP / CCIP PROJECTS - WCs PREMIUMS ALREADY DEDUCTED. ADDITIONAL INSURANCE REQUIREMENTS ARE SUBJECT TO EXTRA PREMIUMS. LICENSE # A,19i,C-13,C-29, C-31 -996577 - EXP. 9-30.22 DIR Reg. #1000004092, DBE #34153 - UNION SUBJECT TO ACCEPTANCE WITHIN 30 DAYS CO -2 -quote -Add Kick Plate on Gate DATE OF WORK PERFORMED: CONTRACTORIOWNER: AMG Ladera Linda Community Park 32201 Forrestal Dr. Ranchos Palos Verdes CA 1) Furnish & Install Kick plate on Gate (201) Per A1.32 -- Bulletin ASI 0010 Plan A1.07 PROJECT: DESCRIPTION OF WORK: i,142,14.4r_1161 COST BREAKDOWN PAGE: 1 OF ATM: Chris Tumascne ITEM DESCRIPTION UNIT UNIT COST QUANTITY COST FNC4 GATE 201 Gate Frame 1.5" x 1.5 x 5' EA $ 49.73 2 $ (99.45) Hol Dipped galvanized LBS $ 0.95 77 $ (72.68) Sanblasbng LBS $ 0.45 77 $ (34.43) Kick Plate a x 10" x 3/16" x 5' `� EA $ 153.72 , 1 $ 153.72 Gate Frame Hot Dipped galvanizedLBS Sanblasting Powder Coat 4" x 3/8" x 5' F�a>< ha r re EA LBS LS $ 45.90 $ 0.95 $ 0.45 $ 10000 2 136 136 1 $ 91.80 $ 129.58 $ 61.38 $ 100.00 Misc LS $ 75.00 1 $ 75.00 SUB -TOTAL COST $ 404.93 TAX 10.00% $ 40.49 MATERIAL STANDARD MARK-UP 15% $ 66.81 SUS TOTAL AMOUNT $ 512.24 EQUIPMENT ITEM DESCRIPTION Units HOURS HOURLY RATE AMOUNT SUB -TOTAL EQUIPMENT USAGE COST $ - EQUIPMENT STANDARD MARK-UP 15% $ SUBTOTAL AMOUNT $ - LABOR NAME OF WORKERS NO. OF HOURS JOB CLASSIFICATION HOURLY RATE EXTENSION WORKER -YARD 4 FABRICATOR (YARD) $ 50.00 $ 200.00 PRIME CONTRACTOR: ACE FENCE COMPANY V