AMG and Associates Inc (Change Order 003)City of Rancho Palos Verdes
Department of Public Works
30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275
(310)544-5252
www.DublitworksCc)rpvca.gov
CHANGE ORDER MEMORANDUM
TO: RAMZI AWWAD, DIRECTOR OF PUBLIC WORKS
FROM: ERIN JONES, GRIFFIN STRUCTURES
DATE: AUGUST 31, 2022
SUBJECT: LADERA LINDA COMMUNITY PARK
CONSTRUCTION CHANGE ORDER NUMBER: 3
Description of Construction Change Order
The work includes hazardous materials removal and disposal of the existing underground
water lines that were discovered to contain asbestos.
Justification
The plans called for removal of the existing underground domestic water lines. During
excavation the existing pipes were found to contain asbestos, requiring application for a
separate AQMD permit and special handling and disposal of the material.
Cost Analysis
Due to the unknown extent of the asbestos piping, the work was performed on a time and
material basis. Griffin Structures reviewed work tickets each day to confirm accuracy of
labor hours, equipment hours, and materials used. The labor and equipment rates are in
line with State of California published rates, and the charges for materials and disposal
are substantiated with actual receipts.
Schedule Analysis
The contractor presented a Time Impact Analysis demonstrating that the hazardous
materials removal delayed the start of survey and grading for the building pad (critical
path activities). Griffin Structures compared the contractor's analysis to the actual timeline
of events, and discussed with contractor who agreed to an impact of 11 Working Days.
Attachments:
Construction Contract Change Order Form
Construction Contract Change Order Summary Sheet
Contractor's Change Order Proposal
City of Rancho Palos Verdes
Department of Public Works
30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275
IRL(310)544-5252
www. ublicworks r vca. ov
CONSTRUCTION CHANGE ORDER SUMMARY SHEET
PROJECT NAME: Ladera Linda Community Park
PROJECT CODE: 8405
PREPARED BY: JAMES O'NEILL
CONTRACTOR NAME: AMG & Associates, Inc.
CONTRACT NUMBER: FY2022-050
PURCHASE ORDER NUMBER: 20220215
ACCOUNT NUMBER: 330-400-8405-8403
ORIGINAL CONTRACT AMOUNT: $13,721,000.00
TOTAL CHANGE ORDERS COST: $120,689.35
DATE: 08/31/22
ORIGINAL CONTINGENCY AMOUNT: $1,029,075.00
NEW CONTRACT AMOUNT: $13,841,689.35 REMAINING CONTINGENCY AMOUNT: $908,385.65
ORIGINAL COMPLETION DATE: 07/27/23
TOTAL SCHEDULE CHANGE ORDERS: 11 Working Days
NEW CONTRACT COMPLETION DATE: 08/11/23
CHANGE ORDER
NUMBER
COST AMOUNT
SCHEDULE
EXTENSION
DATE
C0#1
$54,534.52
0 Working Days
05/27/22
CO#2
$12,628.58
0 Working Days
08/09/22
CO#3
$53,526.25
11 Working Days
08/31/22
CO#4
Working Days
CO#5
Working Days
CO#6
Working Days
CO#7
Working Days
CO#8
Working Days
CO#9
Working Days
C0#10
Working Days
1of1
City of Rancho Palos Verdes
Department of Public Works
LA 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275
(310)544-5252
www. ublicworks r vca. ov
CONSTRUCTION CHANGE ORDER FORM
CONTRACT NUMBER: FY2022-050
PURCHASE ORDER NUMBER: 20220215
CHANGE ORDER NUMBER: 3
CONTRACTOR NAME: AMG & Associates, Inc.
DESCRIPTION AND LOCATION OF PROPOSED WORK
PROJECT NAME: Ladera Linda Community Park
PROJECT CODE: 8405
DATE: 08/31/22
Hazardous materials removal and disposal of existing underground water lines that were found to contain asbestos.
SUMMARY OF QUANTITY CHANGES
ITEM
SPEC
ORIGINAL
NEW
QUANTITY
UNIT
PRICE
ADDITIONAL
NO.
CODE
DESCRIPTION
QUANTITY
QUANTITY
DIFFERENCE
PRICE
DIFFERENCE
WORKING DAYS
AMG PCO 7 - RFI 13
- Remove
unforeseen transite
1
24119
pipe
0.0 LF
582.0 LF
582.0 LF
$91.97
$53,526.25
11
0
0.0 0
$0.00
0
0.0 0
$0.00
0
0.0 0
$0.00
0
0.0 0
$0.00
0
0.0 0
$0.00
Totals
$53,526.25
11
A TIME EXTENSION OF 11 WORKING DAYS WILL BE ALLOWED FOR THIS WORK
ORIGINAL CONTRACT AMOUNT: $13,721,000.00 ORIGINAL COMPLETION DATE: 07/27/23
TOTAL OF CHANGE ORDER #1-2: $67,163.10 TOTAL OF TIME EXTENSIONS #1-2: 0 Working Days
TOTAL OF CHANGE ORDER #3: $53,526.25
NEW CONTRACT AMOUNT $13,841,689.35
TOTAL OF TIME EXTENSIONS #3: 11 Working Days
1 of 2
NEW COMPLETION DATE: 08/11123
City of Rancho Palos Verdes
Department of Public Works
30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275
IqL(310)544-5252
www. t1t]Iiok orks P rpvca gov
CONSTRUCTION CHANGE ORDER FORM
CONTRACT NUMBER: FY2022-050
PURCHASE ORDER NUMBER: 20220215
CHANGE ORDER NUMBER: 3
CONTRACTOR NAME: AMG & Associates, Inc.
PROJECT NAME: Ladera Linda Community Park
PROJECT CODE: 8405
By signing this Change Order, Contractor understands and agrees that it is accepting the specified sums and adjustment of contract time of
completion (if any) set forth herein as full, final and complete satisfaction of any and all claims by Contractor for all costs and expenses of
Contractor and anyone for whom Contractor may be responsible for the work referred to herein, including but not limited to costs or expenses
of the Contractor or any of its subcontractors, materials suppliers, vendors or anyone else for whom Contractor is responsible, for labor,
materials, services or equipment, no matter how characterized, whether known or unknown to Contractor, including but not limited to, all field
and home office overhead, delay costs/claims, acceleration costs/claims, unabsorbed or under -absorbed home office overhead, extended
field costs, general conditions, claim preparation costs, inefficiencies, or the like, no matter how characterized. Contractor further understands
and agrees by signing this Change Order that any attempt by Contractor to purportedly reserve rights to claim additional time or compensation
for the work referred to herein, is void.
Except as set forth, all terms and provisions of the contract and all prior change orders remain in full force and effect.
Recommended
Erin .tones 1��� Date: 8/31122
Construction Manager, Griffin Structures Signature
Execution of this Change Order by both parties constitutes a binding agreement. This document constitutes the entire agreement between the
parties. The person signing this Change Order for Contractor hereby represents and warrants that he/she is fully authorized to sign this
Agreement on behalf of Contractor.
Digitally signed by Anthony R.
Anthony R. Traverso Traverso
Date: 202209.0111:43:00-07'00' Date
Contractor: Anthony R. Traverso
Vice President/Secretary/Treasurel Signature
Accepted and Executed by: )
City: Ramzi Awwad Date: _ 0 C 2 -
Contractor Officer §7ignature
�&/—
Ramzi Awwad Date: 2- %-:2—
Public Works Director Signature
Trang Nguyen t Date:
Finance Director Slg ature,'
2of2
AG
PCO #007
AMG & Associates Inc. Project: 01-22-157 - Ladera Linda Community Center and Park
26535 Summit Circle 32201 Forrestal Dr.
Santa Clarita, California 91350 Rancho Palos Verdes, California 90275
Phone: (661) 251-7401
Fax: (661) 251-7405
Prime Contract Potential Change Order #007: CE #008 - RFI 13- Existing
Asbestos Water Line
TO: City of Rancho Palos Verdes FROM:
30940 Hawthorne Blvd.
Rancho Palos Verdes, California 90275
PCO NUMBER/REVISION: 007/2 CONTRACT:
REQUEST RECEIVED FROM: Janet Estrada (Interior Demolition Inc.) CREATED BY:
STATUS: Pending - In Review CREATED DATE:
REFERENCE: PRIME CONTRACT
CHANGE ORDER:
FIELD CHANGE: No
LOCATION:
SCHEDULE IMPACT: 15 days
EXECUTED: No
AMG & Associates, Inc.
26535 Summit Circle
Santa Clarita, California 91350
City Project No. 8405 - Ladera Linda
Community Park Project
Christopher Tumasone (AMG &
Associates, Inc.)
6/27/2022
None
ACCOUNTING METHOD: Amount Based
PAID IN FULL:
SIGNED CHANGE ORDER
RECEIVED DATE:
TOTAL AMOUNT:
POTENTIAL CHANGE ORDER TITLE: CE #008 - RFI 13- Existing Asbestos Water Line
CHANGE REASON: Unforeseen Condition
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE #00.8 - RFI 13- Existing Asbestos Water Line
No
$53,526.25
ATTACHMENTS:
PCO #007 R2y_df , _PCO #007_ R1 RFI 13 AsbeSlo� Water Li_ne.pdf , _Chafe Order 3 - Asbestos Water Line_Change Order CREDIT,pdf , PCO #007
FI 1 Existing as r Lint Removes p�f , Chance Order 2 - Removal pf Transile Pipe.011 , 655-001-01 Invoice.odf , T&M 6-3_2022
Tra_nsite Pipe Removal .pdf , TRM6-2-20 Transite PiM mQy4f pf , T&M 6-1-2022 Transite Ppe Removal .pdf , T&M 5.3t-2f�22Lran i e P
Removal.pdf , T&M 5-23-2012 Tran%Pto Removal odf , Directive- Erin,_gnes Re &t!p tos 3 Line Ft�mQv�l.oaf , RFI 13-KPFF_ _ ri
Re_sponse.pdf , jmpact No 4-2022.gd1 , T8M 5 4-2022 _TTAwikhP Removv,0LW
#
Budget Code
Description
Amount
1
02-220.S Site Demolition.Commitment
cost to remove the unforeseen transite pipe
$22,293.13
2
02-0003 General.Commitment
cost for survey around unforeseen pipe
$1,980.00
3
02-000.S General.Commitment
AMG General Conditions: Time Extension of 15 Calendar Days.
$25,768.65
4
02-220.S Site Demolition.Commitment
credit for removal of water line per original documents
$(1,197.28)
Subtotal:
$48,844.50
Overhead (7.00% Applies to all line item types.):
$3,419.12
Insurance (1.50% Applies to all line item types.):
$732.67
Bonding (1.00% Applies to all line item types.):
$529.96
Grand Total: 1
$53,526.25
AMG & Associates Inc. Page 1 of 2 Printed On: 8/19/2022 01:40 PM
i"
J
AMG
SIGNATURE
DATE
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes, California 90275
SIGNATURE
AMG & Associates Inc. Page 2 of 2
DATE
PCO #007
AMG a Associates, Inc.
26535 Summit Circle
Santa Clarita, California 91350
SIGNATURE DATE
Printed On: 8/16/2022 08:25 AM
qrwk'
IN DEMOL/T/ON, INC
DEMOL/T/ON •ABA TEMENT•EAR7NWOR/r
L/00 d05409 - /8/81249.4932
Change Order 2
June 22, 2022 REVISED 08/1212022
Between the Owner. AMG & ASSOCIATES, INC
28296 Constalation Rd.
Santa Clarita, CA 91355
And the Contractor: Interior Demolition, Inc.
2621 Honolulu Ave.
Montrose, California 91020
United States
CSLB# 603409
818.249.4932
For the Change Order: Change Order 2
Corporate armee
2621 flono/ulc/ .9venue
1I4717trose, 6191020
c v ww • Ire terivrdema I 'tion • ne t
For the Project: 2207* 32201 Forrestal Dr. Rancho Palos Verdes, CA 90275
Listed below is an itemized description for the above mentioned Proposal Request.
Description:
Time and Material of the removal of Transite Pipe.
Name
Descriptlon
CAY
05/23/2022
$97.05
Each
Leonardo Caro
Laborer
8
Jose Cosme Lopez
Operator
8
300 Excavator
Each
8
05/31/2022
$125.97
Each
Leonardo Caro
Asbestos Worker
7
Frank Medina
Asbestos Worker
4
David Chavez
Asbestos Worker
7
06101/2022
$125.97
Each
Leonardo Caro
Asbestos Worker
8
David Chavez
Asbestos Worker
8
Frank Medina
Asbestos Worker
8
cost
Unit
Martaip
Amount
$97.05
Each
$116.46
$892.86
$128.68
Each
$154.42
$1,183.86
$210.00
Each
$252.00
$1,932.00
$125.97
Each
$132.27
$1,014.06
$125.97
Each
$75.58
$579.46
$125.97
Each
$132.27
$1,014.06
$125.97
Each
$151.16
$1,158.92
$125.97
Each
$151.16
$1,158.92
$125.97
Each
$151.16
$1,158.92
Jose Cosme Lopez
Operator
2 l
$128.68
Each
$38.60
$295.96
Francisco Espinoza
Asbestos Worker
2
$125.97
Each
$37.79
$289.73
Excavator
2
$210.00
Each
$63.00
$483.00
Service Truck Delivery
1 1
$450.00
Each
$67.50
$517.50
06/02/2022
Frank Medina
Asbestos Worker
8
$125.97
Each
$151.16
$1,158.92
David Chavez
Asbestos Worker
8
$125.97
Each
$151.16
$1,158.92
Fernando Garcia
Asbestos Worker
8 v"
$125.97
Each
$151.16
$1,158.92
06/0312022
Fernando Garcia
Asbestos Worker
6
$125.97
Each
$113.37
$869.19
David Chavez
Asbestos Worker
6✓
$125.97
Each
$113.37
$869.19
Frank Medina
Asbestos Worker
6'�
$125.97
Each
$113.37
$869.19
973
3
$157.00
Each
$70.65
$541.65
Material & Disposal
,
6 MIL 20X100 FLAME
RETARDANT POLY
4
$108.00
Each
$64.80
$496.80
2U/PLT
INLINE SUPER SPRAY
GLUE CARB COMPLIANT 10
S
$38.80
Each
$5.82
$44.62
OZ (12EA/CS)(126CS/PL7)
INLINE 48MM 10 MIL TEAL
DUCT TAPE 24/CS 27CS(PL
$126.00 `
Each
$18.90
$144.90
T311
PROTEGA P2
'
POLYPROPYLENE 2oz XL
10
$1.90 o-
Each
$2.85
$21.85
HOOD B BOOT SUIT WHITE
251CS
FIBERLOCKFIBERSET
1
$54,80.-
Each
$8.22
$63.02
PM WHITE ENCAP 7470
4 MIL 20X100 FLAME
f
RETARDANT POLY
1
$74 OO "
Each
$11.10
$85.10
351PL T
WM Disposal
r
1 W
$1,523.14 "
Each
$228.47
$1,751.61
40 Yd Dumpster
IDI Equipment
1 -,/
$1,200.00
Each
$180.00
$1,380.00
TOTALS
$2,907.80
$22,293.13
CONTRACTOR ACCEPTANCE SIGNATURE DATE
OWNER ACCEPTANCE SIGNATURE DATE
Mir AF% MW
/LATER/OR d!G'MOLITIaN, /NC.
m6w MME
oe"mI7/ON•4&.a rxn"--Vr-C4R r"wcwm
L/Ct Qo"C-v - /aJa/z-1049 2
PROJECT NAME
CONTRACTOR
Interior pe mol6)n. Inc.
HOURLY LABOR RATE WORKSHEET
TRADE: 2E2ralor Eng. CLASSIFICATION:
Corporate Of,rce
2627 Nolo/u/u Avenue
/l9ontrose, CA 97020
www •/nteriardemo/'titin •ne t
PROJECT NO.
CONTRACT ND.
DATE
Item % Rah
Rrevalling
Wage Rate
Notes
Regular Time
Overtime
I Double Time
Base Labor Rate
$ 52.21
$ 78.32
$ 104.42
Pi:ne�r eenalk
Paw PMvidad
Fringe Benefits: (na x ti woke e04
Pension' x
l 13.15
13.15
13.15
'
HealthlVllelfare x11
' 11.65
11.85
11.85
TraininglCertification'x
1.05
1.05
1.05
VacabonlHoliday' x
(^
3.60
3.60
3.60
ODW x
0.39
0.39
0.39
Fringe Benefits Subtotal
S 30.04
$ 30.04
$ 30.04
Total Hourly Rate
S 82.25
$ 108.36
$ 134.46
° Base Labor Rail + Benefits Paid . Benefits
Provided
Total Paid Hourly Rate
S 82.25
$ 108.36
$ 134.46
Base Labor Rare + Benefits Paid
Burden: Taxes d Insurance
FICA 0.062
5.10
6.72
8.34
Medicare 0.0145
1.19
157
1.95
Federal Unemployment O.D06
0.49
0.65
0.81
California Unemployment 0.062
5.10
6.72
6.34
Workers Compensation' 0.131
10.77
14.19
1781
General Liability Insurance 0.289
2377
31.31
38.86
Burden Subtotal
S 46.43
S 61.17
S 75.90
TOTAL HOURLY RATE (Total Hourly Rate + Burden)
$ 128.68.
S 169.52
$ 210.36
= Amount Contractor paid to employee
ConsfmvWn Argrm
103 33 - We
MWmpqb qw
/LATER/ORO.EMdLIT?'ON. /NC.
mmu Mow M&1
ocw0ti7742iv•aearz76fAwr•e AvrrrwcPmA
It. aosaos • /sus/ran iwz
PROJECT NAME
CONTRACTOR
Interior Demolition. Inc.
HOURLY LABOR RATE WORKSHEET
TRADE: Asbestos Laborer
CLASSIFICATION:
Corporate 0,-71-ee
2621 Nolo/u/u Avenue
/Jfo�trose, Cf/ 91020
www•/ntcrrordcmaJr't�bf� •net
PROJECT NO.
CONTRACT NO.
DATE
Rem %Rate
Pre►rsilina
Wage Rate
Notes
Regular Time
Overtime
Double Time
✓
Sase Labor Rate
$ 37.49
$ 5624
S 74.98
Beram Beek
Paid Rodded
Fringe Benefits: (pdxlrrappwWoba4
Pension' x
S 10.07
'� 10.07
10.07
HealthlWeHare' x
�}
8.10
'� 6.10
8.10
Training/Certification' xLn'
0.75
/ 0.75
0.75
VacationMoliday' x
OL 4.97
i 4.97
4.97
Other x
0.51
0S1
0.51
Fringe Benefits Subtotal
$ 24.40
24.40
$ 24.40
Total Hourly Rate
$ 61.69
�S/
5 60.64
S 99.38
= Base Labor Rate + 8enerds Paid + BenefAs
Provided
Total Paid Hourly Rate
$ 61.89
5 80.64
S 99.38
- Bam LaborRate + Benerds Peid
eurden� Taxes & Insurance
FICA 0.062
3.84
5.00
6.16
Medicare 0.0145
0.90
1.17
1.44
Federal Unemployment 0.006
0.37
0.48
0.60
California Unemployment 0.062
3.84
5.00
6.16
Workers Compensation' 0.447
27.66
36.04
44.42
General Liability Insurance 0.444
27.47
35.79
44.11
Burden Subtotal
S 64.08
S 83.49
$ 102.90
TOTAL HOURLY RATE (Total Hourly Rate + Burden)
$ 125.97
164.12
$ 20226
I= Amount Contractor paid to employee
Construction Mgft.
70333 • 100
MWwMOP
/LATER/OR OEMOL/T/ON, /NC.
Amff
nEwrac�r�cv-.aeare�vrwr �a�rrrrrrowx
ucr so,r;ov • /s�s/a�p fps
PROJECT NAME
CONTRACTOR
interior0emabon, Inc.
HOURLY LABOR RATE WORKSHEET
eorPorote Of�;ce
2621 1-!0,70/u/u Vmeo we
/Montrose, eA 91020
www-/,7teriordemo/'tion •ne t
PROJECT NO.
CONTRACT NO.
DATE
TRADE: Laborer CLASSIFICATION: GnT 1
Canshwben Mgnt
703.33 - IWO
P'revelling
Wap Rate
Item
% Rete
Notes
Regular Time
$ 37.4
Overtime I
$ 56,15
Double Time
$ 74.86
Base Labor Rate
Bin Bennet
Paid Presided
Fringe Benefits: ipaixnepp�opnaieaaxl
Pension' x
I ,��`j� 10.32
10.32
10.32
HeaIWWebre' x
L . / 8.10
8.10
8.10
Training(Certftition' x
1'I
V 0.70
0.70
0.70
VacatiorJHoliday' x
4.87
4.87
4.87
Other x
0.61
0.61
0.61
FrirW Benefits Subtotal
$ 24.60
$ 24.60
$ 24.60
To la! Hourly Rate
$ 62.03
60.75
$ 99.46&
+ 8enerits Paid+
S
To i a! Paid Hourly Rate
$ 62.03
$ 80.75
$ 99.46
=Base Labor Rate +9wWbPaid
Burden. Taxes & Insurance
FICA
0.0620
3.85
5.01
6.17
Medicare
0.0145
0.90
1.17
1.44
Federal Unemployment
0.006
0.37
0.48
0.60
California Unemployment
0.062
3.85
5.01
6.17
Workers Compensation'
0.131
8.13
10.58
13.03
General Liability Insurance
0.289
17.93
23.34
28.74
Burden Subtotal
$ 35.02
$ 45M
$ 56.15
TOTAL HOURLY RATE (Total Hourly Rate + Burden)
$
126,33111
155.61
= Amount COnlrador paid to empto
Canshwben Mgnt
703.33 - IWO
Mir Ab MW
/LATER/OR OEMOL/T/ON, /NC
MMFMEFMM
OENOL/770"-d Ba TLNEWT---AJ?rYW0,90
zl"v do"Cpp • /e/Q/2tDtDJ2
PROJECT NAME
Corparate Office
2621 Hono/u/a Avenue
/!/o�trose, CA 81020
www•%teribrsemo/'titin •ne t
PROJECT NO.
CONTRACTOR Interior Demolition, Inc. CONTRACT NO.
DATE
HOURLY LABOR RATE WORKSHEET
TRADE: Drrvar CLASSIFICATION:
Construction MOW
703.33 - 1000
P-yevallingWa Rate
Rem
% Rate
Notes
Regular Time
Overtime I
Double Time
Base labor Rate
$ 22.54
$ 33.81
$ 45.08
tler� tlenefa
Pae Proviaea
Fringe Benefits: (w X in swovutehu)
Pension' x
$ 0.08
0.08
0.08
HeatthlWelfana x
2.05
2.05
2.05
TraininglCertificationx
-
-
-
VocationlHoliday' x
0.33
0.33
0.33
Other x
.
Fringe Benefits Subtotal
S 2.46
S 2.46
$ 2.46
Total Hourly Rate
$ 25.00
S 36.27
S 47.54
a Base Labor Rate + BenefAs Pad + Bewfits
Provided
Total Paid Hourly Rate
S 25.00
$ 3627
$ 47.54
-Base Labor Rde + Swrds Pad
Surd on: Taxes 8 Insurance
FICA
0.062
1.55
2.25
2.95
Medicare
0.0145
0.36
0.53
OAS
Federal Unemployment
0.006
0.15
022
029
California Unemployment
0.052
1.55
2.25
2.95
Workers Compensation'
0.184
4.60
6.67
8.75
General Liability Insurance
0.315
7.87
11.41
14.96
Burden Subtotal
S 16.08
S 23.33
$ WAS
TOTAL HOURLY RATE (rota) Hourly Rate + Burden)
$ 41AB
$ 59.60
$ Tl.12
= Amount Contractor paid to employee
Construction MOW
703.33 - 1000
End Dump Trucking Charge
FUEL Fatal Rauntrip Miles 6 Miles per Gallon $7 per Gallon+
120 20 $140
Depreciation Equiptment per day SIN
Driver jOn/Off-Hauling To/From 1 Hourly Rate Hours Total
1 $41.08 8 $328.64
qr MF% qr
IN OEMOL/T/ON, INC
11
,,.
DEMOLI rlom ABA rEMENr• EAR7wwoRK
L/CO 605409 • /B1B/249.4P"
EFFECTIVE: JANUARY 2022
HOURLY EQUIPMENT LIST
Corporate 0#1-ce
2627 Ralialu/u Avenue
Iftl7trose, 6191020
www•//Jterinrder, �dI tion •/!et
EQUIPMENT
RATE
CAT 300 EXCAVATOR
$210.00
CAT 320 EXCAVATOR
$225.00
CAT 320 EXCAVATOR W/BREAKER
$280.00
CAT 325 EXCAVATOR
$225.00
CAT 325 EXCAVATOR W1 BREAKER
$340.00
CAT 336 EXCAVATOR
$240.00
CAT 336 EXCAVATOR W/BREAKER
$330.00
CAT 345 EXCAVATOR
$350.00
CAT 345 EXCAVATOR W/BREAKER
$400.00
CAT 345 EXCAVATOR W/PULVERIZER
$380.00
CAT 345 EXCAVATOR W/SHEAR
$380.00
CAT 973 TRACK LOADER
$210.00
BOBCAT 225
$155.00
BOBCAT 225 W/BREAKER
$190.00
NEW HOLLAND BACKHOE 75B
$185.00
NEW HOLLAND BACKHOE 75B W/BREAKER
$220.00
SEMI END DUMP
$450.00
40 Yard Container (Special Waste)
$1200.00
1. ALL EQUPMENT RATES ARE OPERATED AND MAINTAINED.
2. RATES ARE STRAIGHT TIME: OVERTIME WILL BE CHARGED WHEN
APPLICABLE
3. PRICES TO MOBILIZE EQUIPMENT $750.00
SERVICES REOUESTED•
BDC SPECIAL WASTE SERVICES
SERVICE PRDFR
EIR0I DNRI5 REL C LIVE ❑
A WASTE MANAGEMENT COMPANY
- - 0
❑ YES
QUANTITY t AIN
NQpaS L1apER F
ACCOUNTVABE
J
544 2263
1211 W. GLADSTONE ST AZUSA. CALIFORNIA 91702
WOO 245289
i 20 R.T ❑
(626) 224-9128 (626) 224-9129 (626) 224-9134
40 C.T C 40 S.T f -I S S 1
ORDER DATE/TIME.
• CUSTOMER: PHONE
C}TR PLACED BY
&7:2022
INTERIOR DEMO 818-248-4932
MICHELLE
SER►+IGEf]ATE171ME
J09 NAME OF RPV
GENERATOR TIOR DEMO CITY OF RPALOS VERDES
SERVTCE 46DRESS
-
ADDRESS
REQUIRED ONO
32201 FORREST AL DRIVE
CITY, STATE, ZIP CODE
13.-4r TOTAL
HOURS
CITY, STATE, ZIP CODE
AM L
1 L'
��R� PM /
RANCHO PALOS VERDE! CAE 90275
TOTAL
SITE #
SIT7Rn �ga502
GEN CONTACT:
GEN CONT PHONE p
FRANC
CUSTOMER SIGNATURE
SITE CONTACT *2
I SITE PHONE M.
Il
E.ZA p
AI.�0031724' 7
SERVICES REOUESTED•
T
DEL ❑ SIO D
EIR0I DNRI5 REL C LIVE ❑
1_ � �•
PO N - DEL
GIN NUMBERS.
❑ YES
QUANTITY t AIN
2 D BIN
❑ NO DEL
BIN TYPE LOIBOY C_l
20 O T O 20 S B ❑ 20 S T
i 20 R.T ❑
40 O T 40 R T 9
40 C.T C 40 S.T f -I S S 1
PAJ
r PACKER -
DISPOSAL BILLED TO
i PROFILE 9
OTHER
I BDC ❑ CUSTOMER r
1
Damage pictures taken?
MANIFEST3j%
iA&S X YES
BIN LINERS 4 YES
1 / % S
C NO
REQUIRED ONO
Cube Van ❑ Roll -OB {� Semi❑ F
_•". iy SIZE t BIN fl SIZE
VA QT # QTv ~ MAN'FEST r, OTY
T� PF TSDFIWASTE TYPE
JOB fi CONTAINER INSPECTION
YOU MUST WEAR YOUR RESPIRATOR ANYTIME YOU
r_- HAVE TO GO INSIDE OF THE BOX TO CLEAN IT OR LINE ITI
1_ � �•
PO N - DEL
GIN NUMBERS.
aRIF1ER5 NAME
-
L 3 Do all dour, Inds and b!nders work properly?
--- Is the inside of the container clean and free of holes?
- -
-
(ILTST[3MER EMAIL -
- -
_ Is there graffiti on the container?
y
acn�il E5 e'EHrUKM V Ave there BDL; SWS suckers on ad four s)des"
Document all stand-by times,
Damage pictures taken?
Yes
HAZARD MANIFEST )NON -HAZARD MANWES
r� ;
1 / % S
Start Leave Job Site Job Site J :posa Disposal Yard Stop
Time Ya•d ,. r,vai t?eF.aR Arrival Denart- Aval Tie
mm
13.-4r TOTAL
HOURS
_
AM AM Af►1 AM Att '�gIL4
/) yJ
PM PM PM PM PM / PM Pr.V PM
AM L
1 L'
��R� PM /
DAY 2 Date UNIT d TRAILER :
TOTAL
HOURS
AM AM AM AM AM AM AMS AM
AM
PM PM Phi PM PM PMi PM PM
A
PM _
CUSTOMER SIGNATURE
O M'71
3
�Azusa Land
Reclamation
Original
t �L 1211 W. Gladstone St.
Ticket#
1258917
wwenwuwMS'S"M Azusa, CA, 91702
Ph: 626-224-9127
Customer Name WM BDC WM BDC SPECIAL
WASTE S Carrier
BDC WM BDC
Ticket Date 06/09/2022
Vehicle#
412569
Volume
40.0
Payment Type Credit Account
VehicleLicense: 81,54189
Manual Ticket#
Container
Hauling Ticket#
Check#
Manifest 023154271JJK
Billing#
0000025
Generator 144 -VARIOUS VARIOUS LOCA11ONS
POM
Profile CA304450 (FRIABLE ASBESTOS)
Time Scale
Operator
Inbound
Gross
37440
lb
In 06/09/2022 10:45:37 Scale 3
JAREBALC
Tare
31460
Ib
Out 06/09/2022 11:02:44 Scale 3
JHOLSTAD
Net
5980
lb
Tons
2.99
Comments
Product =O+
Qty UOM
Rate Tax
Amount
Origin
-
1Asb Friable -BIN -Asbestos 130
1.00 Each
-
Rancho
Pa
2 MFE-e-Manifest (Landfill 100
1.00 Each
Rancho
Pa
Total Tax
Total Ticket
Drivers Signature
or
erewnMftftr ID
UNFORM KWRDOUS 1.
tlurrba
WASTE MANFEST
5 cwfolallwi NVM MW
c -fry, (J RpVCMi AMAMLOG krLRL-S
307MO 144WHORNE BUT,
R04 C A 0 PAJQS t14** S A M21,:
:
4 t
MIX
SOC' S?aC�- A' WkFTE SERvfc-&s.
I Tmx" 2 CwvM N�
8 DmW41ad FacAq N" and Sib Ad&=
A —7 U S A U J .1 D R E, : L ;, W T 'I L L, , lith.
1211 W GLAOSTC#JS ST
.-.2.,:...v
-12- -1..; 1- , 'i , , ,
FadlfsPhoae: .R
gd-17 7T
ga gh U S- DOT Desai idm [rdArg Pmpat ShopiV Harm Kam Class. ID Mynbor.
Md wall Podwv C-0 (I ar441
N A 2 217 A SMSTOIF P W
0
uj
uj
z z
w
mm
Form AMeDvea. OMB No- 20540039
oloiT3 —Dmgwwy ReWw ftwe " "w"
151
.7 1 JJK
CITY OF RMJC'#iC) F,,%;
312011 FORRESTALORNM
RANCHO PAL C S VERDES CA QW745
CIAROOD'Ie"OPI
LIS EPA ON~
U—S EPA Narrtber
C A D 0 0 M 0 7 6 2 (
110 CWK*M 11 TOW 12- Unk 13. W13b Coda
IJo Tete ouw* I WLNOL
751
CAA y I--
1211 W. Glad-Qw-A 99, Av-4z CE 9t. 702 (628)Z24 -4I29 F,of.1v0--;,31U4450
15 GEMERATORVIDIFFERORS CERTRIDATION: I hmby dedwe ft ft oordetb of ft am*rtmwd 8m k* &W a=Faidy dasaI m abow by re pow arippht nam, aird am d3wNW. packaged
-&Ud and blmWVz=rded, and an in al msp" n pow wratim for Vvispon aomrdM b atppl>cabk nbmaiam and nabti pave mserttti repiabo n M e mart szeprrrmrt "IwnftP"wv
EKPDdK I =* 141 tM =*M d ft =WrdrAM aatbne Io ft leans of 1* alldW EN Admw&drwt of ca"t
condy IrM the v95W niffnizal!w slabft &-MAW in 40 CFR Mj?(m I I am a large (Nartly perimby or (b fe, I arm a si,.ai! Quanbly generatorl is
L V -Aa
O~bUS OE-pwift—mus Pcd d @"at
a. -WL -,- f)-- - Li c
84 Dwewwy ndcmm space a
iT� Ras" ❑ 11.,o Reled.1
ur&,? q Ram R
US EPA if) Mxrkw
LL F
Sgutom 'Allierraim Facillitf Gwerm
19 Iftwifts Waste Repoli MwapffwK Meowd Corks o cAm br huwftn wask troutymd, dspos4 any rwyclin systems
2D Nsgolled Fan llity Nm or Operabr Url*a5on d MOO & tOZ"X'j ffMKMl$ WMW by the rtts is1 moepi as nmed n Isom I Ea
EPA Form MCv,%, 12-17f tv*0.s edoDm are obsOce u T Owy
wwme
WASTE IYIA YAMEMENT
i
Visitwm-Com
To setup yw 0**profil- 9P W for paperiez
statements, mwege Your aaoa nt, view tdday srdnedufes
payyur kNoiceor sdxAkapidw
w w 0
Customer Service:
(800)221-4232
INVOICE
Customer ID:
Customer Name:
Service Period:
Invoice Date:
Invoice Number:
Due Upon Receipt
0 full pVw" a(theirmwmd amm" ns not reakvd
v&nynur cora: ua! terms.ym may bedurgWa
morrft knedw9eof 2-5% of the urpaidamaur%w+th a
nwryun m nft charge of $ 5. or sudn We charge
alowW under applicable law, regulatlm or contract
Page 1 of 2
26-30829-33005
INTERIOR DEMOLITION INC
06/01/22-06/15/22
06/16/2022
7957714-0149-9
$12,449.13
Previous Balance Payments Adjustments Current Invoice TotalAccount
Charges Balance Due
10,925.99 E 0.00 0.00 1,523.14 712,449.13
Details for Service Location: Customer ID: 26-30829-33005
Interior Demo City Of Rancho Palos Verdes, 32201 Forrestal Dr, Rancho
Palos Verdes CA 90275-6162
Description Date Ticket Quantity _ Amount
40 YD SPECIAL WASTE 06/09/22 830678 1.00 1,148.00
023154271JJK 2.99TNS 0.00
E- MANIFEST FEE 1.00 25.00
MANIFEST PREP & DEL CHG SP WST 1.00 8.20
MANIFEST PREP & DEL CHG SP WST 100.00 20.00
LABELS 0.00
GOVT FRAN REG FEE SP WASTE PER 1.00 26.41
Tkket Total 1.227.61
FUEL/ENVIRONMENTAL CHARGE
Late Paymen1Charge for 05/02/2022 Invoice 7957267
06/01/22
253.46
42.07
--------------------------------- Please detach and send the lower portion with payment - - - (no cash or staples) - - - - - - - - - - - - - - - . -
WASTR ann,wA86000 T
USA WASTE OF CALIFORNIA, INC
BDC/BIG DISPOSAL
PO BOX 43530
PHOENIX, AZ 85080
(800)221-4232
(626)334-3386 FAX
06/16/2022
Payment Terms
Due Upon Receipt
7957714-0149-9
Total Due
$12,449.13
26-30829-33005
Amount
0149000263082933005079577140000015231400001244913 5
10149038
INTERIOR DEMOLITION INC Remit To: WM CORPORATE SERVICES, INC.
2621 HONOLULU AVE AS PAYMENT AGENT
MONTROSE CA 91020-1706 PO BOX 541065
LOS ANGELES, CA 90054-1065
THINK GREEN:
C
U
f'
® cc
Printed on
Details for Service Location:
Interior Demo City Of Rancho Palos
Palos Verdes CA 90275-6162
Description
Total Current Charges
i6ji
2 of 2
Verdes, 32201 Forrestal Dr, Rancho
Customer ID: 26-30829-33005
Date I Ticket I Quantity 1 Amount
--1 1,523.14
HOW TO READ YOURINVOICE
5 EASY WAYS TO • .
List your new billing information below For a change of service address,
please contact WM.
Automatic Payment
C~"
Set up recurring payments with us at
City
win com/myaccount
Pay Through Your Financial Institution
Zip
Make a payment from your financial institution using
Management Anything beyond that date may
your Customer ID
Bank Account
Holder Signature
One -Time Payment
Date Valid
At your desk or on the go, use win com or our WM
At your
VISIt wm.eom
mobile app for a quick and easy payment
$124.73
Pay by Phone
total amount of current charges and any
Payable 24/7 using our automated system at
866-964-2729
Mall It
ilpp 0
Write it, sluff it, stamp it. mad it Envelope provided
Customer ID: 26-30829-33005
Date I Ticket I Quantity 1 Amount
--1 1,523.14
HOW TO READ YOURINVOICE
❑ Check Here to Sign Up for Automatic Payment Enrollment
List your new billing information below For a change of service address,
please contact WM.
If I enroll in Automatic Payment services, I authorize WM to pay my invoice by electronically
deducting money from my bank account I can cancel authorization by notifying WM at
wm.com or by calling the customer service number listed on my Invoice. Your enrollment
could take 1-2 billing cycles for Automatic Payments to take effect. Continue to submit
payment until page one or you invoice reflects that your payment will be deducted.
Address 1
Address 2
City
States the date payment is due to waste
State
S
Zip
Date
Management Anything beyond that date may
Email
Bank Account
Holder Signature
Date Valid
incur additional charges Your Total Due is the
VISIt wm.eom
August 19, 2017
$124.73
total amount of current charges and any
* ^"previous
ap)1n,•tn,r$
unpaid balances combined
ilpp 0
A�--•-••-••• ��•
„•.,..,,� .„ ,..
126.-te,
oen9rtea sus.w
,,,,,,.,. �...-,..,....r,
Previous balance is the fatal due from your
previous invoice We subtract any Payments
L
Recelved/Adjustme nts and add your
Current Charges from this billing cycle to
tx +
9„11
+
non
+
�. xr
=
taa.xs
get a Total Due on this invoke. If you have
wiwi,. s«.,r. t•r«...
r,•v.,.riu r.xxr9o-a+tn
not paid all or a portion of your previous
]ii Ndro"br� 5iodmn[x 9sxOS
ro w.e•. .569,
balance. please pay the entire Total out to
e..
�,.
...,..
mlo
avoid a late charge or service interruption
y
* p
•+,n ••.
umn•
w
Service location details the total current
....eo,
charges of this invoice
Get More
with My WM
Scan to enroll in AutoPay & Paperless Billing,
�s manage your services, view your pick up schedule
and see your pick up ETA, all in one place.
Scan the QR code
to get started today)
%Ij
Visit wm.com/MywM
If your service is suspended for non-payment, you maybe charged a Resume charge to restart your service For each returned check, a charge will be assessed on your next invoice equal to the maximum amount permtted by
applicable state law-
[:]
aw
❑ Check Here to Change Contact Info
❑ Check Here to Sign Up for Automatic Payment Enrollment
List your new billing information below For a change of service address,
please contact WM.
If I enroll in Automatic Payment services, I authorize WM to pay my invoice by electronically
deducting money from my bank account I can cancel authorization by notifying WM at
wm.com or by calling the customer service number listed on my Invoice. Your enrollment
could take 1-2 billing cycles for Automatic Payments to take effect. Continue to submit
payment until page one or you invoice reflects that your payment will be deducted.
Address 1
Address 2
City
Email
State
S
Zip
Date
Email
Bank Account
Holder Signature
Date Valid
NOTICE: By sending your check, you are authorizing the Company to use information on your check to make a one -lime electronK debit to your account at the financial insildUmn indicated on your check The
electronic debit is be for the amount of your check and may occur as soon as the same day we receive your check
In order for us to servx:e your account or to collect any amounts you may owe (for non -marketing or solicitation purposes), we may contact you by telephone at any telephone number that you provided in connection
with your account. including wNeiess telephone numbers, which could resit in charges to you Methods of contact may include text messages and using pre-recorded/artificial voice messages andlor use of an
automatic eliaing device, as applicable We may also contact you by email or other methods as provided in our contract
Please send all bankruptcy correspondence to RMCbankruptcyPwm com or Po Box 43290 Phoenix, A7 85080 Using the email option will expedite your request (this language ism compliance with 11 USC 342(4(2)
of the Ranknimry mile)
a.�
a -
REMIT TO:
Inline Distributing Company
14093 Balboa Blvd,
Sylmar, CA 91342
P: 818 768.33331 inlineco.com
BILL TO:
INTERIOR DEMOLITION
2621 HONOLULU AVE
MONTROSE, CA 91020
Los Angeles
Houston
INVOICE
San Francisco
Orlando
INVOICE NO. PAGE INVOICE DATE CUSTNO.
Seattle
New York
1198972-00 1 of 1 05104122 5872
Denver
Boston
CUSTOMER PO PO DATE UPC i
Atlanta
Dallas
2207 000000 1
Detroit
441073
_ ""' DELIVERY_ INSTRUCTIONS
74 00
29600
DELIVER WED 514 @730AM
5
800239
SHIP TO:
6
660040
FORRESTAL DR
32201 FORRESTAL DR
ALEJANDRO 562-528-2436
RANCHO PALOS VERDES, CA 90275
INLINE JOB# 554
DATE SHIPPED SHIP VIA 1 SHIP POINT SALESPERSON TERMS
05/04/22 IDC Inline - Sylmar Div 1 1000 N30
LINE ITEM 0 DESCRIPTIONICOMMENTS UIM ORQTY BACK O7Y UNIT AMOUNT
DERED BACK
SHIPPED. PRICE •
1 660048 6 MIL 20X100 FLAME RETARDANT POLY RL 10 0 10 108.00 108000
CS 1 0 5 3880 19400
CS
0
20/PLT
2
880913
INLINE SUPER SPRAY GLUE CARB COMPLIANT
125 0
125
10 OZ 112EA/CS Ii 126C S/PL T I
3
880100
! INLINE 48MM 10 MIL TEAL DUCT TAPE 241CS
I
54 80
27CSIPLT 311
4
441073
PROTEGA P2 POLYPROPYLENE 20Z XL HOOD 8
74 00
29600
BOOT SUIT WHITE 25iCS
5
800239
FIBERLOCK FIBERSET PM WHITE ENCAP 7470
6
660040
4 MIL "10X100 FLAME RETARDANT POLY
35iPL T
CS 1 0 5 3880 19400
CS
0
3
12600
37800
EA
125 0
125
1 90
237 50
5G
1 0
1
54 80
54 80
RL
t 0
74 00
29600
Total
T
ES iUT4L •
224030
Delivery Chg
2000
2 5°/ Srvc 5urcriarge
5601
Taxes
218 17
Invoice To! al
253448
1IME5H07 SHIPPED WEIGHTFREIGHT CHARGE5 ORDER
1043.800001 0.00 VALUE 2534.48
"' FOR CHEMICAL EMERGENCY CALL (800) 424-9300 .,e i , ^` � 1S A9_L ciiA.RGES
N �:FG IN T•IF CRFE'1i AVP
I�NIIIIIIIIIIIIIIIIIIII 1116111111111111111111111111111111111111111�11111111111111
INV 1198972-00
WW% W
/NTER/OR OEMOL/TION /NC.
aft m6p Ia
onvauracsv•A�ea�ar rr-E"MOW^
uD s AA •/ersl v.�asr
)1'mon A.M.,o)
INTERIOR DEMOLITION. INC
� 11 �5 l
I�J�G�iJ�►�� t "w"y ��ii%
EMPLOYEES
ID AILY TIME AND
MATERIAL
DATE -
EMPLOYEE NAME TRADE RATE HOURS WORK ACCOMPLISHED
�� ABe2
MATERIAL I SUPPLIES
DESCRIPTION OF MATERIAL RECEIVED I OTY f OUANTITY ( MATERIAL USED
EQUIPMENT
OWNED MAINTENANCE/REPAIRS RENTED RATE HOURS
DISCRIPTION
i I ti UL 1
atawl♦ _
WWrwin
,, r
wMF% qr
/N TER/OR O£MOL/T/ON. //VC
AF M60 mmF
Vj^foLIffOH AHS rzI fr I LAMP rHWOA'n
ue'e evi'eov /eye/ riv a vs�
IN FEl IOR 1-1 ION INC'
PLOYEES
DAILY TIME AND
DA I I
fir...^.
MATERIAL
MATERIAL / SUPPLIES
EQUIPMENT
OWNED MAINTENANCE! REPAIRS RENTED RATE HOURS
IIISCRI DTIC)N
Customer Appro%al x YermommwrbOA- "We*
Poeitim
DIM5 3
AVAF% w
/NTER/OROEMOL/T/ON, INC
mm, MEP mm,
Of^fOLMOA/ CBA TCMCIVI CARTMWONn
LAC70603I00 /4/O/2J91D3:
IN 1 LRIOR DI.M()I I I K&,
INC'
EMPLOYEES
DAILY TIME AND
MATERIAL
- � a
EMPLOYEE NAME TRADE
RATE HOURS WORK ACCOMPLISHED
%Q9 r p �4 r paef
f..�. \
Ere✓
Ac_ 3ZNVl 4-4
21
MATERIAL / SUPPLIES
DESCRIPTIO(] OF MATERIAL RECEIVED QTY QUANTITY( MATERIAL USED
� ►rC71. �7 �i �" r • 1
Lt
k S . n
i
c'
EQUIPMENT
OWNED MAINTENANC&REPAIRS RENTED RATE HOURS
CSE t V 1 C 1. i-�.Lt
IIICCDIDTIAIU
Customer Approval X
V�ci�a+i1M�1■w �■ii� air•
Dow �yv»
qrMF% qp
//VTER/ORDEMOL/T/O/V, //VC.
Ar Mop Ia
ocreour aw APA rt rr.+■ CAWYHW0WA
Loco 6E+3/ov-/a/p/"r do"
IN'I-EIZIoR Df Nl(lI 1110N. INC
IAdd, .!1
EMPLOYEES
DA IT
DAILY TIME AND
MATERIAL
iP �G h., U!p.
EMPLOYEE NAME TRADE
RATE HOURS WORK ACCOMPLISHED
CSI @
J
MATERIAL / SUPPLIES
DESCRIPTION OF MATERIAL RECEIVED OTY QUANTITY! MATERIAL USED
2
EQUIPMENT
OWNED MAINTENANCE! REPAIRS RENTED RATE HOURS
M100"010Tif%hi
Aw Am-. - -
Customer Approval: X
nun .�Nelwr+nmv.e � r
5!x!uni!rl !� hf I I LJ r"Ci S',
AWMF% qF
INTi6741OROEMOLMON AVC.
mam6F Mob
owwea�� fvs�iov sr uEsup� �
INIT.RIOR DEMOLITION. INC'
, Donn, n i
FM PLOYEES
DAILY TIME AND
MATERIAL
DA H
RCaaihn lrhr• �,¢ndi.aM �•,�ru lro r.
rPu,. •�,pi h,i LarRa•:
MATERIAL / SUPPLIES
DESCRIPTION OF MATERIAL RECEIVED OTY / QUAN-71 Y / MATERIAL USED
yJid
'� 2 ticrilL 4 I t VT Cti Z
f111+/�CIf1T1A 41
ViNowdadlrmrMF aa►.
Customer ApprovaV x
rrtrn ,icrps Q A.Y..a«
�`4354�1LtFi:
y •.
For mak'(-Ials
�[
Los Angeles
Houston
INVOICE i
An
San Francisco
Orlando
INVOICE NO. ;PAGE INVOICE DATE MUST NO.
��
Seattle
New York
1198972-00 11 Of 1 05/04122 5872
Denver
Boston
CUSTOMER PO PO DATE UPC
REMIT TO:
Atlanta
Dallas
2207
Inline Distributing Company
14093 Balboa Blvd.
Detrol)
�1 _OOOOD0
""' DELIVERY INSTRUCTIONS
Sylmar, CA 91342
DELIVER WED 514 @730AM
P: 818.768.33331Inlineco.com
I�
— -
BILL TO:
SHIP TO:
INTERIOR DEMOLITION
FORRESTAL DR
2621 HONOLULU AVE
32201 FORRESTAL DR
MONTROSE, CA 91020
ALEJANDRO 562-528-2436
LINE ITEM #
1
2
3
4
5
6
RANCHO PALOS VERDES, CA 90275
INLINE JOB# 554
DATE SHIPPED SHIP VIA SHIP POINT SALESPERSON _TERMS
05104/22 I IDC Inline -Sylmar Div 1 1000 N30
QTY I NICK QTY I UNIT AMOUNT
DESCRIPTIONICOMMENTS U/M ORDEUD 0li0 P
' I
660048 6 MIL 20X100 FLAME RETARDANT POLY RL 4,10
201PL7 1
880913 INLINE SUPER SPRAY GLUE CARS COMPLIANT CS I
10 OZ (12EA/ )(126CS/PLT) 12 e0! Q�
880100 INLINE 48MM 10 MIL TEAL DUCT TAPE 24/CS f " CS
27CS:PLT 311 27 peer, v
441073 PI ROTEGA P2 POLYPROPYLENE 20Z XL HOOD B EA
BOOT SUIT WHITE 251CS
800239 FIBERLOCK FIBERSET PM WHITE ENCAP 7470 513
66OD40 4 MIL 20X100 FLAME RETARDANT POLY RL
35/PLT
0 10
0 5
0 3
OI 125
108.00
01
1080.00
38.80
54.80
194.00
126.00
4
378.00
1.90
237.50
1
01
1
54.80
54.80
F
i !
0
4
74.00
296.00
Total
Delivery C49
f r, 2.5% Srvc $utchwge
r0} ;Taxes 1
JInvoice TOT
W j
ll� oLk/L
c0( d o M an C-
1 � �
4 i
wNR+Fstti T CNaRGES ORDER —
224030
20.00
5601
21817
2534.48
UMES TGT —i++u7
6 1043.80000 0.00 VALUE 2534.48
`•' FOR CHEMICAL EMERGENCY CALL (800) 424-9300 •.. " PLUSTTO TERMSS AND CONTAINED APPLICABLE
THE PPING
CHARGES"
*'S UaJECT TO TERMS CONTAINED IN TME CREDn APP "
11111l1N 11 IN�Ilggqql q�lglq�l lull
INV 1198972-00
On Point Land Surveying, Inc.
1906 Orange Tree Lane
Suite 240
Redlands, Ca 92374
Bill To
AMG & Associates. Inc.
i 26535 Summit Circle
Santa Clarita, CA 91350
r
POINT
L A N D S U R V F Y I N G. I N C
Project
655-001 Ladera Linda Park, Rancho PV
Description
05-25-22- Calcs and cut sheets for building envelope staking. Prep for field work at the request of client.
(2.0 hours office @$I20/hr
05-26-22- Verify control and set control for construction staking purooses. Construction staking for
building envelope at the request of client. (5.0 hours field S240/hr 4.5 hours travel CS 120/hr)
Thank you for your business.
(909)792-2221
sharia onpointlandsurvo ing.com
Invoice
Date Invoice #
5/31/2022 655-001-01
P.O. No. Terms
Amount
240.00
1.740.00
Balance Due
fax (909) 783-1836
wwa .onpointlandsurvey ing.com
S1.980.00
/LATER/OR DEMOL/T/ON,, //VC.
DEMOL1TION -A &A MAZENr•EARMWORK
L/CO 603409 • f$/8JZ49.4932
Change Order 3
July 26, 2022
Between the Owner: AMG & ASSOCIATES, INC
28296 Constalation Rd.
Santa Clarita, CA 91355
Contact Primary Telephone
And the Contractor: Interior Demolition, Inc.
2621 Honolulu Ave.
Montrose, California 91020
United States
CSLB# 603409
818.249.4932
For the Change Order: Change Order 3 - Credit
Carparaee Office
26211-Ionolu/u Atrel7ae
lftl7e,nose, CA 91424
www -hieriordemol -tion - 17e t
For the Project: 2207" 32201 Forrestal Dr. Rancho Palos Verdes, CA 90275
Listed below is an itemized description for the above mentioned Proposal Request.
Description:
Asbestos Water Line Change Order Credit
Name Descdpbon MY Cost Unit Amount
Operator 8 $123.41 Each -$987.28
Excavator 1 $210.00 Each -$210.00
TOTALS 51.197.28
Nr
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
LM
0
0
0
0
0
0
0
0
0
0
N
Ln
O
O
O
O
O
O
Ln
Ln
O
i
�`i
Ln
O
�O
N
N
--
Jo:).
Jol�.
JZ4
J24
�
FQ4
j2Pr
�
46�
J
W
w
C!
W
_J
J
F—
O
L
0
o
cn
L
Q.
ZD
W
J
c0
U_
+-'
U
C
0
N
-Q
c
Q
y
Q
C
C_
C
w
J
L
t
C.J
O
a�
C
4,
r
LU
L
cLC
C_
C..
L
v
O
V
CV..
CL
cn
p
ca
U
IW-
>
cn
Q
0-
V
V
V
V
V
V
V
V
U
V
V
U
V
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
O
i
�`i
AG
AMG 6 Associates Inc.
26535 Summit Circle
Santa Clarita, California 91350
Phone: (661) 251-7401
Fax: (661) 251-7405
RFI #13
Project: 01-22-157 - Ladera Linda Community Center and Park
32201 Forrestal Dr.
Rancho Palos Verdes, California 90275
Existing 3" Asbestos Water Line
TO: Chandra Sutton (AMG 6 Associates, Inc.) FROM: Christopher Tumasone (AMG & Associates,
26535 Summit Circle Inc.)
Santa Clarita, California 91350 26535 Summit Circle
Santa Clarita, California 91355
CREATED DATE: 05/04/2022
LOCATION:
COST CODE:
COSTIMPACT.
DRAWING NUMBER:
RECEIVED FROM:
STATUS: Open
DUE DATE: 05/19/2022
REFERENCE,
SCHEDULEIMPACT.
SPEC SECTION:
COPIES TO:
Dustin Hartman (AMG & Associates, Inc.), Chandra Sutton (AMG & Associates, Inc.), Christopher Tumasone (AMG & Associates, Inc.)
SUGGESTION:
On May 4th, 2022 the underground utilities contractor was performing site investigation to cut and cap the existing 3" water line and provide a
temporary water POC for course of construction. During investigation, the existing 3" water line was found to be asbestos pipe. The demolition plans
require that the waterline to be demolished and removed. The pipe is not identified as asbestos pipe. Please provide direction on for this unforeseen
condition.
Attachments:
KPFF RESPONSE:
THE WATER LINE WOULD BE CONSIDERED A HAZARDOUS MATERIAL AND WOULD
REQUIRE A LICENSED DEMOLITION SUB TO PERFORM THE WORK. THE PIPE WOULD NEED
TO BE REMOVED, WRAPPED, LOGGED AND TAKEN TO A SPECIAL SITE. WATER LINE
FALLS UNDER CALWATER JURSIDICITON AND THEY MAY HAVE SPECIFIC DETAILS OR
PROTOCOLS FOR CONNECTIONS. KPFF WILL REACH OUT TO CALWATER TO DETERMINE
REQUIREMENTS FOR CONNECTION.
K. FINCH 5/11/2022
Additional Response 5/12/22, Griffin Structures:
The attached laboratory report confirms the presence of asbestos in the sampled water pipes.
Proceed with AQMD notification and removal of transite piping per the attached "Procedure 5" prepared by H2
Environmental. Provide a copy of AQMD approval prior to removal.
In accordance with Article 1 10 c (iii) track the work related to RFI 13 on time and materials tickets, and submit to Griffin
Structures daily for verification.
BY
DATE
COPIES TO
AMG & Associates Inc. Page 1 of 1 Printed On: 05/04/2022 01:09 PM
LA Testi ng
5431 Industrial Drive Huntington Beach, CA 92649
TESTING Tel/Fax: (714) 6284999 I (714) 828-4944
http://www LATesting.com f gardengrovelab@latesting.com
Attention: Thomas Haley
H2 Environmental Consulting Services
13122 6th Street
Chino, CA 91710
Project: Griffin Strictures 2307122AM
LA Testing Order: 332210283
Customer ID: 321-12EN50
Customer PO: 2307122AN
Project ID:
Phone:
(909) 322-9100
Fax:
(909) 613-5845
Received Date:
05/05/2022 3:20 PM
Analysis Date:
05/06/2022
Collected Date:
05/05/2022
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Noe sMs ey n� tt s Asbestos
Sample Doscription Appearance %Fibrous %Non -Fibrous %Type
01-01 Northside building #1 Brown/Gray/White 80% Non-fibrous (Other) 15% Chrysotile
- Transits pipe Fibrous 5% Crocidolite
3322102630001 Heterogeneous
01-02 Northside buAdtng #1 Brown/GrayMlhite
- Transits pipe Fibrous
3322102630002 HelelOgenei
01-03 Northside building #1 Browrti
- Trensite pipe Fibrous
3322102630003
Analyst(s)
Alexis Rodriguez (1)
Jeffrey Wang (2)
84% Non-fibrous (Other) 12% Chrysotile
4% Crocidolite
83% Non-fibrous (Other) 12% Chrysotile
5% Crocidolite
---------------
J
Michael Chapman. Laboratory Manager
or Other Approved Signatory
LA Teeing ma+nta:ns liability limited to cast Of analysis . Irnerpretalron and use of t0st resulls art the respo%brbN of the client ThrS report relalc5 Only to the samples reported soave, and may nol be
reproduced, except In full, mlWuI writlen appoval by Lok Tosting. LA Testing bears no responsMity tow samp10 mRection "Witias OF analytical method Lmixaliohs The report refleO4 the mmiptas as
received. Results are generated from the field sampling data (sampling volumes and areas, localions, etc.) provided by the client on the Crain of Custody. Samples are withvt quality oontrod criteria
and met method specifications union otherwise noted. The above analyses were performed In general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 6001M4-s2-020'Interim
Method-) but augmented with procedures outlined M the 1943 ("lira/") version or the method This report mutt not be used by the diets to clam producl cemfication, approval, or endorsemeru by
NVLAP, NIST or any agency of the f0deral govemmenl hon4 iable ofganmcatly bound motenads present a pmWm matrix and therefore LA To"nq recommends grawraetric reduction prior to analysis
Unless requested by the client, building materials menufaetured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample Estimation of uncertainty Is avaflebte on request -
Samples analyzed by LA Testing Huntington Beach, CA NVLAP Lab Code 101384-0. CA ELAP 1406
J
Initial report from: 05/06/2022 17:42:16
ASB Pl rr 0008 0001 - 1 78 Printed: 5/62022 2:42 PM Page 1 of 1
May 11, 2022
Attn: Asbestos Toxic Supervisor
South Coast Air Quality Management District FAX: 909-396-3342
Air Toxics Unit
21885 East Copely Drive
Diamond Bar, CA 91765-4182
Re: Asbestos Toxic Supervisor — 2307122 P5
The City of Rancho Palos Verdes
Asbestos Piping — Ladera Linda Park
32201 Forrestal Drive, Rancho Palos Verdes, CA 90275
300 SF 4" Transite Pipe
Subject: Request for Review and Approval of Proposed Work Practices Procedure 5
Removal and clean-up of Transite piping
(300 SF of 4" Transite Pipe)
Dear Asbestos Toxic Supervisor,
For technical questions or comments regarding this report please feel free to
contact Thomas Haley at Thomas@h2env.com or by cell phone 909-322-9100.
The City of Rancho Palos Verdes will begin work on the pipe located at 32201 Forrestal
Drive, Rancho palos Verdes, CA. The City of Rancho Palos Verdes hired Interior
Demolition to perform Clean-up activities at this location. Transite piping was discovered
near the Ladera Linda Park Building #1 construction area. The City of Rancho Palos
Verdes has located approximately 300 SF of 4" Buried Transite Pipe.
The City of Rancho Palos Verdes then contacted H2 Environmental to have the material
inspected, survey, write and receive an approved SCAQMD Procedure 5 work plan, then
conduct project oversight for the asbestos abatement project.
H2 Environmental was hired by The City of Rancho Palos Verdes to assess the project
and if it was determined to be asbestos containing, then write up the Procedure 5 work
plan for this project.
Site Findings
On May 5, 2022 H2 Environmental's Mr. W. Thomas Haley (CAC) walked the site during
the inspection and was informed that there was suspect buried transits piping that was to
be sampled and removed as a part of this Project. Asbestos samples were collected of
the piping, collected for PLM analysis and submitted for laboratory analysis by Polarized
Light Microscopy (PLM) utilizing the EPA 600/R-93/116 method to LA Testing Laboratories
(NVLAP Huntington Beach #101384-0), a licensed California State Laboratory located at 5431
Industrial Drive, Huntington Beach, CA 92649. (714)828-4999.
13122 6th Street • Chino, CA 91710
(909) 628-0369 • Fax(909)613-5845 0 H2 Environmental. com
H2 Environmental dispatched Mr. W. Thomas Haley (CAC) to the above referenced site. The
following material was discovered and a total of (3) samples were collected for PLM analysis
and submitted for laboratory analysis by Polarized Light Microscopy (PLM) utilizing the EPA 600/R-
93/116 method to LA Testing Laboratories (NVLAP Huntington Beach #101384-0), a licensed
California State Laboratory located at 5431 Industrial Drive, Huntington Beach, CA 92649.
(714)828-4999.
Asbestos Bulk Sample Results
MATERIAL
LOCATION
F/NFA
% ACM EST. QUANTITY
DESCRIPTION
4" Transite Pipe
North Side of
Building #1
NF 715% Chrysotile
300 SF
"During the inspection of the work area where the Transite pipe was discovered,
the piping was disturbed and was assumed to be asbestos by a Certified Asbestos
Consultant.
The material was assumed to be Asbestos (Transite Pipe) per Our Certified
Asbestos Consultant (CAC No. 95-1702) Mr. W. Thomas Haley on this pipe is ACM
per SCAQMD Rule 1403, and should be abated as such.
13122 6th Street • Chino, CA 91710
(909) 628-0369 • Fax(909)613-5845 • H2Environmental.com
I am providing you with an overview of proposed work practices that summarizes a
conversation between H2 and the contractor. The City of Rancho Palos Verdes is
planning to use Interior Demolition, as the asbestos abatement contractor to complete this
work.
WORK AREA IS: To remove and dispose of approx. 300 SF of 4" Transite Pipe.
1. Install asbestos danger tape around the perimeter of the excavated work area to
construct a regulated area.
2. Construct a remote 2 stage decontamination unit with wash station near the
regulated area but inside the fenced lot so the area can be left secure.
3. Perimeter monitoring will be conducted by H2 Environmental.
4. The proper removal and disposal of Transite material from the staging area.
(Approx. 300 SF) of Transite pipe line is to be removed and put into clear double
6 -mil polyethylene waste bags or place burrito wrapped large pieces in 2 layer E-
mil polyethylene sheeting with asbestos labels and markings and sealed prior to
being put into the waste dumpster. Bags, Burrito wrapped shall be labeled with
manifest number, generator name and address where it was removed from.
4A The Transite pipe is to be uncovered using a backhoe. The transite shall be
protected during this process using a spotter and the depth verified by hand shovel.
No Damage to pipe is acceptable.
4B If the aid of the backhoe is required to lift piping only Nylon Strap is acceptable but
must be protected with poly sheeting or disposed of. 'Chains or pipe clamp lifts
are NOT ACCEPTABLE'.
5. Apply wet removal techniques to entire clean-up process. No excessive water
shall be used, use an airless sprayer and mist the air and pipe. Any additional
water shall be collected using rags and disposed of as ACM.
6. The Asbestos Containing Waste Material (ACWM) consists of 12 SF Transite
Pipe. All Asbestos Containing Waste Material (ACWM) will be double bagged
in clear labeled 6 -mil polyethylene bags or place burrito wrapped large pieces in
6 -mil polyethylene and disposed of as hazardous waste in a (2) layer 6 -mil lined
end dump container, labeled in accordance with OSHA. The waste materials will
be transported by a licensed waste hauler to an approved landfill.
6.5 Should any pipe be damaged or found to be damaged during this process a
minimum of 12" of soil shall be removed and disposed of in a radius of 2 feet
from damage.
7. Receive and successfully pass a visual inspection of all trenches by H2
Environmental.
8. Apply encapsulant to trenches
9. There are no stored items in these areas that will require disposal.
10. H2 Environmental will thoroughly inspect all trenches and surfaces inside the
regulated and adjacent to the regulated area prior to it being turned over to the
General Contractor or removal of all signage or danger tape.
13122 6th Street - Chino. CA 91710
(909) 628-0369 - Fax(909)613-5845 - H2Environmental.com
J5 Y' "11 A&F, "rA1-
J PROJECT OBJECTIVE:
The objective of this work plan is to provide a work procedure that will ensure that
the asbestos debris clean-up will not cause a further contamination to the site.
This work plan will discuss the approach necessary to achieve the above goals
using the best controls available within the guidelines set forth under Rule 1403.
Further, all work for this project will comply with all applicable Federal. State and
Local regulations.
DESCRIPTION OF WORK:
Remove all asbestos containing debris from the affected areas, according to
procedures outlined in Cal/OSHA Title 8 CCR1529.1 asbestos, AQMD Rule 1403
& FED/OSHA 29 CFR1926.1101.
WORKER PROTECTION:
All personnel entering the work area will be equipped with Type A, Half Face
Respirators at a minimum. Workers will be required to wear two (2) tyvek suits.
Bodily decontamination will be completed as described in FED/OSHA 29CFR
1926.1101 and Cal/OSHA 1529.1 asbestos. Worker decontamination will be
accomplished in a decontamination unit affixed to the work area.
EQUIPMENT:
The work site equipment will consist of, but not limited to, the following items:
6 mil polyethylene sheeting, HEPA vacuum must have SCAQMD permits (current
proof of certs. Must be onsite),
Airless sprayers, Hand tools, Roll away carts, PPE, Decontamination Units,
Scaffolding, Ladders, backhoe.
ABATEMENT PROCEDURES:
Prior to the abatement procedure, the work areas will be thoroughly pre -wetted
and continually wetted throughout the abatement process with the use of airless
sprayers. All visible, loose asbestos debris will be removed and hard surfaces will
be decontaminated using HEPA vacuums and wet methods. After all asbestos
material within the unit are removed, and pass a visual; clearance. The abated
substrate will be encapsulated with an approved substrate encapsulant material.
DISPOSAL:
Once the removal is completed. ACWM will be properly bagged and labeled
and placed into properly lined (2 layers, 6 mil) Asbestos approved dumpster.
All asbestos containing materials will be disposed of as hazardous waste,
according to SCAQMD Rule 1403 and Cal/OSHA CCR Title 8, at an approved
Asbestos Landfill.
13122 6th Street • Chino, CA 91710
(909) 628-0369 e Fax(909)613-5845 - H2Environmental.com
FNVf F,9NJA-F,,tJ-FAJ-
TRANSPORTATION:
All Asbestos Waste shall be transported by a California Department of Toxic
Substances Control (DTSC) Transporter.
AIR MONITORING AND INSPECTION PROCEDURES:
H2 Environmental will provide a California Certified Consultant/Site Surveillance
Technician to complete benchmark (background) air monitoring, daily work area
monitoring and final air clearances. Daily work area and containment inspections
will be completed. Pre work commencement inspections, pre -encapsulation and
final visual inspections will be conducted to ensure compliance with EPA, OSHA
and CCR Title 8 regulations. Perimeter monitoring to insure that there is no fiber
migration. The final clearance criteria are established at 0.01f/cc for this project.
Results of any and all clearances (visual, air, wipe, etc.) will be documented and
such documentation will provided to both the client and the abatement contractor.
Asbestos Contractor: Interior Demolition
Consulting Company (CAC): H2 Environmental Consultina Services
W. Thomas Haley, CAC
At this time we are requesting a favorable review and approval of this Procedure 5 Plan.
Work is scheduled to begin TBD and take TBD days to complete, based on the
notification.
If after your review you have any questions or require additional assistance, please do not
hesitate to telephone our office at (909) 628-0369.
Sincerely,
H2 Environmental Consulting Services
W. Thomas Haley
Vice -President
Certified Asbestos Consultant #95-1702
SCAQMD Approval:
APPROVAL NUMBER #
DATE
DATE
Asbestos Toxic Supervisor
South Coast Air Quality Management District Air Toxics Unit
May 11, 2022
May 11, 2022
13122 6th Street a Chino, CA 91710
(909) 628-0369 - Pax(909)613-5845 0 H2Environmental.com
Date: May 5th, 2022
Griffin Structures
Project: Ladera Linda Community Center and Park
32201 Forrestal Dr.
Rancho Palos Verdes, CA 90275
Re: Impact Notice: #1
ISSUE: Existing 3" Asbestos Water Line
Via E-mail: ejones@griffinstructures.com
On May 4th, 2022 the underground utilities contractor was performing site investigation to cut and cap the existing 3" water
line and provide a temporary water PDC for course of construction. During investigation, the existing 3" water line was found to
be asbestos pipe. The demolition plans require that the waterline is to be demolished and removed. The pipe is not identified
as asbestos pipe. Please note that there will be a potential time and cost impact related to the discovery of this existing
asbestos water line pending further direction as requested under RFI #13.
The Impact is as follows:
The following activities have a potential delay:
1. Demolition
2. Earthwork
Please reference the following documents attached:
Pictures and RFI #13 are attached for reference.
Please contact the undersigned directly if you have any further questions or comments regarding this
matter -
Regards,
Chris Tumasone Project Engineer
Dustin Hartman Project Superintendent
Anthony Traverso Vice President
Randy Hartman Vice President of Construction
28296 Summit Circle Santa Clarita, CA 91350 Ph: 661.251.7401 Fax:661.251.7405
www.am associatesinc.com