Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
AMG and Associates Inc (Change Order 018)
City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov CHANGE ORDER MEMORANDUM TO: RAMZI AWWAD, DIRECTOR OF PUBLIC WORKS FROM: ERIN JONES, GRIFFIN STRUCTURES DATE: FEBRUARY 9, 2023 SUBJECT: LADERA LINDA COMMUNITY PARK CONSTRUCTION CHANGE ORDER NUMBER: 18 Description of Construction Change Order This change order is for the cost to extend roof drain plumbing piping per RFI 21. Justification The project roof design is comprised of a flat structure with tapered roof insulation on top to create a drainage pattern and direct water to the roof drains. The original design would have required custom cutting the underside of the tapered insulation to achieve specified slopes. The installer and manufacturer said such trimming is not possible, so the Architect revised the drainage pattern on the roof to utilize stock tapered insulation materials. This required relocation of the roof drains, resulting in additional plumbing piping material and labor. Cost Analysis Griffin Structures and Johnson Favaro reviewed the scope and pricing of the proposal. The quantity of extra materials is correct and documented by supplier’s quote. The labor hours are reasonable for the work required and the labor rates are in line with State of California published rates. Schedule Analysis No time extension was requested by the contractor, and work is expected to be completed within the original construction timeframe. Attachments: Construction Contract Change Order Form Construction Contract Change Order Summary Sheet Contractor’s Change Order Proposal DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 8405 11 0 0 11 0 0 0 0 0 0 0CO#10 $42,918.80 Working Days 11/09/22 CO#8 $6,437.02 Working Days 09/27/22 CO#9 $1,818.52 Working Days 11/09/22 CO#6 $824.34 Working Days 09/01/22 CO#7 $10,202.36 Working Days 09/27/22 CO#4 $8,558.42 Working Days 09/01/22 CO#5 -$5,378.25 Working Days 09/01/22 CO#2 $12,628.58 Working Days 08/09/22 CO#3 $53,526.25 Working Days 08/31/22 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE CO#1 $54,534.52 Working Days 05/27/22 ORIGINAL COMPLETION DATE:07/27/23 TOTAL SCHEDULE CHANGE ORDERS:Working Days NEW CONTRACT COMPLETION DATE:08/11/23 $1,029,075.00 TOTAL CHANGE ORDERS COST:$294,680.11 NEW CONTRACT AMOUNT:$14,015,680.11 REMAINING CONTINGENCY AMOUNT:$734,394.89 PURCHASE ORDER NUMBER:20220215 ACCOUNT NUMBER:330-400-8405-8403 ORIGINAL CONTRACT AMOUNT:$13,721,000.00 ORIGINAL CONTINGENCY AMOUNT: PREPARED BY:JAMES O'NEILL CONTRACTOR NAME:AMG & Associates, Inc. CONTRACT NUMBER:FY2022-050 CONSTRUCTION CHANGE ORDER SUMMARY SHEET PROJECT NAME:Ladera Linda Community Park DATE:02/0 /23 PROJECT CODE: 1 of 2 9 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 3/2/2023 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO#29 Working Days CO#30 Working Days CO#27 Working Days CO#28 Working Days CO#25 Working Days CO#26 Working Days CO#23 Working Days CO#24 Working Days CO#21 Working Days CO#22 Working Days CO#19 Working Days CO#20 Working Days CO#17 $12,582.87 Working Days 02/03/23 CO#18 $16,546.62 Working Days 02/0 /23 CO#15 -$3,117.01 Working Days 01/17/23 CO#16 $59,788.90 Working Days 02/02/23 CO#13 $0.00 Working Days 12/30/22 CO#14 -$20,112.42 Working Days 12/30/22 CO#11 $33,868.27 Working Days 12/01/22 CO#12 $9,052.32 Working Days 12/01/22 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE 2 of 2 $9 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 8405 18 0.0 LS 1.0 LS 1.0 LS 0.0 LS 1.0 LS 1.0 LS 0.0 LS 1.0 LS 1.0 LS 0.0 LS 1.0 LS 1.0 LS 0 11 0 NEW CONTRACT AMOUNT:$14,015,680.11 NEW COMPLETION DATE:08/11/23 TOTAL OF CHANGE ORDER #1-17:$278,133.49 TOTAL OF TIME EXTENSIONS #1-17:Working Days TOTAL OF CHANGE ORDER #18:$16,546.62 TOTAL OF TIME EXTENSIONS #18:Working Days Totals $16,546.62 0 A TIME EXTENSION OF WORKING DAYS WILL BE ALLOWED FOR THIS WORK ORIGINAL CONTRACT AMOUNT:$13,721,000.00 ORIGINAL COMPLETION DATE:07/27/23 4 012600 AMG Bonding $163.83 $163.83 0 3 012600 AMG Insurance $226.49 $226.49 0 2 012600 AMG Overhead $1,056.95 $1,056.95 0 ADDITIONAL WORKING DAYS 1 221413 AMG PCO 27 - Added Plumbing Piping per RFI 21 $15,099.35 $15,099.35 0 This change order is for the cost to extend roof drain plumbing piping for the roof drains that were relocated per RFI 21. Reference AMG PCO 27. SUMMARY OF QUANTITY CHANGES ITEM NO. SPEC CODE DESCRIPTION ORIGINAL QUANTITY NEW QUANTITY QUANTITY DIFFERENCE UNIT PRICE PRICE DIFFERENCE CHANGE ORDER NUMBER:DATE: CONTRACTOR NAME:AMG & Associates, Inc. DESCRIPTION AND LOCATION OF PROPOSED WORK CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER:FY2022-050 PROJECT NAME:Ladera Linda Community Park PURCHASE ORDER NUMBER:20220215 PROJECT CODE: 02/0 /239 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 18 Recommended: Erin Jones Date: Construction Manager, Griffin Structures Signature Contractor:Date: Signature City:Date: Signature Date: Public Works Director Signature Ara Mihranian Date: City Manager Signature Lincoln Lo Contract Officer Ramzi Awwad By signing this Change Order, Contractor understands and agrees that it is accepting the specified sums and adjustment of contract time of completion (if any) set forth herein as full, final and complete satisfaction of any and all claims by Contractor for all costs and expenses of Contractor and anyone for whom Contractor may be responsible for the work referred to herein, including but not limited to costs or expenses of the Contractor or any of its subcontractors, materials suppliers, vendors or anyone else for whom Contractor is responsible, for labor, materials, services or equipment, no matter how characterized, whether known or unknown to Contractor, including but not limited to, all field and home office overhead, delay costs/claims, acceleration costs/claims, unabsorbed or under-absorbed home office overhead, extended field costs, general conditions, claim preparation costs, inefficiencies, or the like, no matter how characterized. Contractor further understands and agrees by signing this Change Order that any attempt by Contractor to purportedly reserve rights to claim additional time or compensation for the work referred to herein, is void. Except as set forth, all terms and provisions of the contract and all prior change orders remain in full force and effect. Execution of this Change Order by both parties constitutes a binding agreement. This document constitutes the entire agreement between the parties. The person signing this Change Order for Contractor hereby represents and warrants that he/she is fully authorized to sign this Agreement on behalf of Contractor. Anthony R. Traverso Vice President/Secretary/Treasurer Accepted and Executed by: PURCHASE ORDER NUMBER:20220215 CHANGE ORDER NUMBER:PROJECT CODE:8405 CONTRACTOR NAME:AMG & Associates, Inc. CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER:FY2022-050 PROJECT NAME:Ladera Linda Community Park 2/7/23 Anthony R. Traverso Digitally signed by Anthony R. Traverso Date: 2023.02.09 14:23:06 -08'00' DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 2/27/2023 3/2/2023 3/2/2023 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Fax: (661) 251-7405 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Prime Contract Potential Change Order #027: CE #061 - RFI #21 TO: City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, California 90275 FROM: AMG & Associates, Inc. 26535 Summit Circle Santa Clarita, California 91350 PCO NUMBER/REVISION: 027 / 0 CONTRACT:City Project No. 8405 - Ladera Linda Community Park Project REQUEST RECEIVED FROM: Edric Jafari (ABQ Inc.)CREATED BY: Christopher Tumasone (AMG & Associates, Inc.) STATUS: Pending - In Review CREATED DATE: 12/20/2022 REFERENCE: PRIME CONTRACT CHANGE ORDER: None FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $16,546.62 POTENTIAL CHANGE ORDER TITLE: CE #061 - RFI #21 CHANGE REASON: RFI #21 POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #061 - RFI #21 This change event covers the cost for additional work per RFI #21. Roof drains have shifted resulting in added material and labor. A sketch is attached showing the new route of the roof drains totaling an additional 270 LF of piping. ATTACHMENTS: GENERAL PREVAILING WAGE DETERMINATION - LOS-2022-2.pdf , Roof Drian Reciept_.pdf , Ladera Linda - Original Roof Drain_.pdf , RFI 21_JF rev 082522.pdf , Change Order - Ladera Linda Community Park - Revised main building roof drains from original plan.pdf #Budget Code Description Amount 1 15-100.S Plumbing.Commitment cost of additional labor and material per RFI #21 $15,099.35 Subtotal:$15,099.35 Overhead (7.00% Applies to all line item types.):$1,056.95 Insurance (1.50% Applies to all line item types.):$226.49 Bonding (1.00% Applies to all line item types.):$163.83 Grand Total:$16,546.62 City of Rancho Palos Verdes AMG & Associates, Inc. 30940 Hawthorne Blvd. 26535 Summit Circle Rancho Palos Verdes, California 90275 Santa Clarita, California 91350 ProcoreArchitectSignHere ProcoreArchitectSignedDate ProcoreOwnerSignHere ProcoreOwnerSignedDate ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE AMG & Associates Inc.Page 1 of 1 Printed On: 1/4/2023 03:37 PM PCO #027 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 COP Break Down Cost Material Cost (Material difference from original plan to revised plans) 270 Linear ft - 4” Cast Iron pipe 4” No-Hub Coupling Heavy duty 4” Extra Cast Iron fittings 4” Extra pipe hangers and supports Replacing 1 - 3” roof drain to 4” roof drain $9,122.19 Labor Cost (Added Labor from original plan to revised plans) 1 Pipelayer for 32 Hours @ $66.72 per hour - $2,135.04 1 Tradesman for 32 Hours @ $33.52 per hour - $1,072.64 $3,207.68 Equipment (Added equipment time with change) Scissor lift $800.00 Subtotal $13,129.87 Overhead and Profit (15%) $1,969.48 Total Cost of Change Order $15,099.35 LIC #: 1081727 - C36 DIR #: 1000833272 Office: (310) 299-6251 Cell: (818) 921-5152 Email: Info@abqla.comABQ INC. ____________________________________________________________________________ 6200 Canoga Ave #205, Woodland Hills, CA 91367 December 5, 2022 AMG & Associates Inc. Attn: Chris Tumasone Project: Ladera Linda Community Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Re: Change Order Proposal ( COP #02) Scope: Revised main building roof drains, from original plan. Exclusions: Demolition, framing, patching, cleaning, concrete coring, and any other items aren’t included in the above scope. _______________________________ _______________________________ Approved By: Signature DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 Invoice:VIP-594551 Sammy Nader 8360 Deering Ave Canoga Park, CA 91304 8186142457 info@abqla.com ACTUAL_DURATION INVOICE TOTAL 1 Month $1,378.61 Customer:Sammy Nader PO Number:Payment Terms: Invoice ID: VIP-594551 Ship To:Contract Type:New 32201 Forrestal Dr Contract Date:11/28/2022 2:44 PM Rancho Palos Verdes, CA 90275 2 Hour Delivery Start Time:11/29/2022 7:00 AM Pickup: 12/20/2022 7:00 AM Notes: Equipment Description 19' Scissor Lift - DC Charges Amount 1-LIFT CHARGE $744.00 1-LIFT PICKUP $125.00 1-SOCK CHARGE $125.00 1-LIFT DELIVERY $125.00 1-DIAPER CHARGE $50.00 1-SAFETY HARNESS $90.00 Subtotal $1,259.00 Rental Subtotal $1,259.00 Discounts $0.00 Total Tax $119.61 Invoice Total $1,378.61 Please remit payment to: HOME DEPOT RENTAL MAIL CODE 7966 PO BOX 7247 PHIADELPHIA, PA 19170-7966 Weekly rental rates DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 12/8/22, 4:53 PMGENERAL PREVAILING WAGE DETERMINATION - LOS-2022-2 Page 2 of 7https://www.dir.ca.gov/oprl/2022-2/pwd/Determinations/Subtrades/LOS.html #ELECTRICIAN: TRANSPORTATION SYSTEMS ELECTRICIAN (CABLE SPLICING, WELDING, AND NETA TESTING) 08/22/2022 01/29/2023**$60.060 $13.240 $15.320 R $0.000 S $0.810 $0.550 ELECTRICIAN:TRANSPORTATION SYSTEMS TECHNICIAN T 08/22/2022 01/29/2023**$42.900 $13.240 $15.320 R $0.000 S $0.810 $0.550 #FIELD SURVEYOR: CHIEF OF PARTY (018.167-010)U 02/22/2022 09/30/2022*$55.260 $11.850 $13.150 $4.820 G $1.150 $0.150 #FIELD SURVEYOR: INSTRUMENTMAN (018.167-034)U 02/22/2022 09/30/2022*$51.860 $11.850 $13.150 $4.650 G $1.150 $0.150 #FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010)U 02/22/2022 09/30/2022*$51.280 $11.850 $13.150 $4.600 G $1.150 $0.150 #GLAZIER 08/22/2022 05/31/2023*$53.000 V $8.250 W $14.850 $0.000 X $0.770 $0.980 #MARBLE FINISHER 08/22/2022 12/31/2022**$37.870 Z $9.000 $4.270 $0.000 $0.870 $0.400 #PAINTER:PAINTER, LEAD ABATEMENT AD 08/22/2022 06/30/2023**$36.420 M $9.000 $5.440 $3.050 $0.750 $1.010 #PAINTER:PAINTER, LEAD ABATEMENT AF 08/22/2022 06/30/2023**$31.980 M $9.000 $5.440 $2.910 $0.750 $1.010 #PAINTER:INDUSTRIAL PAINTER AD 08/22/2022 06/30/2023**$39.070 M $9.000 $5.440 $3.350 $0.850 $1.010 PAINTER: GRAFFITI REMOVAL WORKER JOURNEYMAN (APPLIES ONLY TO PAINT-OVER METHOD) AG 08/22/2022 01/31/2023*$24.000 $8.400 $1.000 $0.000 $0.750 $0.000 PAINTER: GRAFFITI REMOVAL WORKER 1 (APPLIES ONLY TO PAINT-OVER METHOD) AH 08/22/2022 01/31/2023*$16.500 $8.400 $1.000 $0.000 $0.750 $0.000 PAINTER: GRAFFITI REMOVAL WORKER 2 (APPLIES ONLY TO PAINT-OVER METHOD) AI 08/22/2022 01/31/2023*$17.370 $8.400 $1.000 $0.000 $0.750 $0.000 #PLASTERER 08/22/2022 07/31/2023**$40.430 $9.380 $9.020 $6.940 AJ $1.240 $1.190 #PLASTER TENDER AM 08/22/2022 08/01/2023**$41.470 $8.750 $10.220 $5.300 AN $1.100 $0.960 PLASTER TENDER PLASTER CLEAN-UP LABORER 08/22/2022 08/01/2023**$38.920 $8.750 $10.220 $5.300 AN $1.100 $0.960 #PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 08/22/2022 08/31/2023**$55.180 AQ $9.260 $14.200 AR $0.000 AS $2.800 $1.400 #PLUMBER:SEWER AND STORM DRAIN PIPELAYER 08/22/2022 08/31/2023**$42.290 AQ $9.150 $11.350 AR $0.000 AS $2.530 $1.400 PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN AV 08/22/2022 08/31/2023**$20.880 AW $9.400 $0.380 $0.000 $1.610 $1.250 #PLUMBER:LANDSCAPE/IRRIGATION FITTER 08/22/2022 08/31/2023**$38.200 Z $9.260 $14.200 AR $0.000 AS $2.190 $1.200 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 3"RD-1/OD-1 (915SF) 4"RD-1/OD-1 (2510SF) 4"RD-1/OD-1 (2510SF) 4"RD-1/OD-1 (2510SF) 4"RD-1/OD-1 (2510SF) 4"RD-1/OD-1 (2170SF) 4"VTR HB-3 HB-3 M.1LKJHGFEDC 4.1 3 X DO NOT USE 1.1 B 2 M 1 4 AA.1 B.1 L.2 2.1 3.1 2"VTR 1"CW DN 1"CW DN N N mag. north BIM LADERA LINDA COMMUNITY PARK PROJECT: CITY OF RANCHO PALOS VERDES: A r c h i t e c t u r e a n d U r b a n D e s i g n5898 Blackwelder Street, Ground Floor Culver City, CA 90232 (Tel) 310-559-5720 (Fax) 310-559-8220 ARCHITECT CONSULTANTS ARCHITECT'S / ENGINEER'S STAMP The drawings and specifications, ideas, designs, and arrangements are and shallremain the property of the architect. No part thereof shall be copied or used in connection with any work or project other than the specific project for which they have been prepared without the written consent of the architect. Visual contact with these drawings or specifications shall constitute evidence of acceptance of these restrictions. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job and this office must be notified of any variation from the dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrication. © MDA Johnson Favaro 2017 CHECKED BY: No.Issue DRAWN BY: Date TITLE: SHEET: PROJECT #: SCALE: DATE: CITY APPROVALS PROJECT 32201 Forrestal Drive Rancho Palos Verdes, CA 90275 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 620 N. Brand Blvd. Suite 404 Glendale, CA 91203 www.novusdesignstudio.com 12/23/2021 P2018-41 12/23/2021 8:51:56 PMP2.02 PLUMBING ROOF PLAN REF. SCALE:P2.02 3/32" = 1'-0" PLUMBING ROOF PLAN 1 4"VTR 3/32"=1'-0" NDS TEAM ML ISSUES/REVISIONS 100% DD 11.21.19 50% CD 06.01.21 CD PROGRESS 07.15.21 PERMIT SUBMITTAL 10.18.21 PERMIT RESUBMITTAL 12.23.21 Exp. 06-30-22 No. M 34147MICHAEL C .S. LE UNGMECHA N ICAL STATE OF C A L I F ORN I AREGISTERED P R O F E SS IONAL E NGI NEER3” RD-1 changed to 4” RD-1 and relocated All Roof drains have been relocated in revised plans TextText TextTextText TextTextTextTextTextTextTextTextTextTextTextTextTextText All added piping due to relocation of roof drains. DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Fax: (661) 251-7405 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Tapered Insulation Design TO:Chandra Sutton (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91350 FROM:Christopher Tumasone (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91355 CREATED DATE:06/03/ 2022 STATUS:Open LOCATION:DUE DATE:06/20/2022 COST CODE:REFERENCE: COST IMPACT:SCHEDULE IMPACT: DRAWING NUMBER:SPEC SECTION: RECEIVED FROM:Alex Huezo (Golden State Roofing) COPIES TO: Dustin Hartman (AMG & Associates, Inc.), Randy Hartman (AMG & Associates, Inc.), Anthony Traverso (AMG & Associates, Inc.) , Christopher Tumasone (AMG & Associates, Inc.) SUGGESTION: Question from Christopher Tumasone (AMG & Associates, Inc.) at 08:29 AM on 06/03/2022 Please see attached email from Beacon Engineers. Due to the extreme slopes, the tapered insulation layout as designed is not possible without creating ponding water. Please advise on how to proceed. Attachments: GSR RFI-01 Taper Design.pdf BY DATE COPIES TO AMG & Associates Inc.Page 1 of 1 Printed On: 06/03/2022 08:30 AM RFI #21 Please see attached markup. We are able to ease the angle of the slope at the north side of the roof. The outer roof drains can be shifted inboard to be over the flat section of deck to simplify sloping at the perimeter, this change will come in a forthcoming ASI. Should Beacon Engineers have a different solution they can propose we can review and provide comment. Kimberly Castillo, JF 6/23/2022 SEE ATTACHED TAPERED INSULATION LAYOUT REVISED IN ORDER TO AVOID TRIMMING THE UNDERSIDE OF THE TAPERED INSULATION. ROOF DRAINS HAVE SHIFTED AWAY FROM THE EDGE OF THE BUILDING TO COORDINATE WITH INSULATION LAYOUT. -INGRID DENNERT, JF, 8/25/22 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 M.1LKJHGFEDC 4.1 3 1.1 B 1 A3.11 3 A3.11 3 A3.12 1 A3.13 11" 12' - 6 1/2" 4' - 11 1/2" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 4' - 11 1/2" 12' - 6 1/2" 11" 2 3 13/16"11' - 8 5/16" 29' - 11 5/8" 11' - 7 15/16"3 13/16"53' - 11 1/2"M 1 4 AA.1 2 A3.11 1 A3.12 2 A3.12 4 A3.12 B.1 L.2 2.1 3.1 252' - 10" 5 A3.13 2 A3.22 5 A3.11 1 2 FUTURE PV SOLAR AREA 555 SF A4.35 4 3 INSTALLATION OF ROOFING SHALL BE IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS8' - 0"FUTURE PV SOLAR AREA 473 SF FUTURE PV SOLAR AREA 427 SF 8' - 5 1/8"FUTURE PV SOLAR AREA 470 SF TOTAL SOLAR AREA 2171 SF 14' - 3 1/4"FUTURE PV SOLAR AREA 246 SF4 2 9' - 9 3/8"12' - 2 1/2"13' - 4 1/2"38' - 3 3/4"40' - 4 1/4"37' - 8 1/4"35' - 5 7/8"38' - 6 3/4" MATERIAL LEGEND 1/2" PER FOOT TAPERED INS-3 UNDER RF-1 AND ROOF BOARD NONCOMBUSTIBLE WALKWAY PAD 1/4" PER FOOT TAPERED INS-3 UNDER RF-1 AND ROOF BOARD 3/8" PER FOOT TAPERED INS-3 UNDER RF-1 AND ROOF BOARD INSULATION IS 1 1/2" AT LOW POINTS (DRAINS) BIM LADERA LINDA COMMUNITY PARK PROJECT: CITY OF RANCHO PALOS VERDES: A r c h i t e c t u r e a n d U r b a n D e s i g n5898 Blackwelder Street, Ground Floor Culver City, CA 90232 (Tel) 310-559-5720 (Fax) 310-559-8220 ARCHITECT CONSULTANTS . ARCHITECT'S / ENGINEER'S STAMP The drawings and specifications, ideas, designs, and arrangements are and shall remain the property of the architect. No part thereof shall be copied or used in connection with any work or project other than the specific project for which they have been prepared without the written consent of the architect. Visual contact with these drawings or specifications shall constitute evidence of acceptance of these restrictions. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job and this office must be notified of any variation from the dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrication. © MDA Johnson Favaro 2017 CHECKED BY: No.Issue DRAWN BY: Date TITLE: SHEET: PROJECT #: SCALE:DATE: CITY APPROVALS PROJECT 32201 Forrestal Drive Rancho Palos Verdes, CA 90275 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 8/12/22 SIGNED 12/30/21 8/25/2022 11:36:09 AMA2.02 ROOF PLAN N N mag. northREF. SCALE:A2.02 A3.011/8" = 1'-0" ROOF PLAN 1 KEYNOTES KEY VALUE KEYNOTE TEXT 1 ROOF VENT, SEE MECHANICAL DRAWINGS 2 INTEGRATED ROOF DRAIN WITH OVERFLOW, SEE 1/A4.01 AND PLUMBING DRAWINGS 3 ROOFTOP VENTILATORS PER MECHANICAL (TYP.) 4 TIEBACK ROOF ANCHORS FOR MAINTENANCE GENERAL NOTES: 1. PER CEC SECTION 110.10, THE SOLAR ZONE FOR FUTURE PHOTOVOLTAICS SHALL BE COMPRISED OF AREAS THAT HAVE NO DIMENSIONS LESS THAN 5 FT AND ARE NO LESS THAN 80 SF FOR BUILDINGS WITH ROOF AREAS LESS THAN OR EQUAL TO 100,000 SF. 2. THE SOLAR ZONE SHALL HAVE A TOTAL AREA OF NO LESS THAN 15% OF THE TOTAL ROOF AREA OF THE BUILDING. 3. NO OBSTRUCTIONS, INCLUDING BUT NOT LIMITED TO VENTS, CHIMNEYS, ARCHITECTURAL FEATURES, AND ROOF MOUNTED EQUIPMENT, SHALL BE LOCATED IN THE SOLAR ZONE. 4. ANY OBSTRUCTIONS LOCATED ON THE ROOF SHALL BE LOCATED AT LEAST TWICE THE DISTANCE, MEASURED IN THE HORIZONTAL PLANE, OF THE HEIGHT DIFFERENCE BETWEEN THE HIGHEST POINT OF THE OBSTRUCTION AND THE HORIZONTAL PROJECTION OF THE NEAREST POINT OF THE SOLAR ZONE, MEASURED IN THE VERTICAL PLANE, WITH THE EXCEPTION OF ANY ROOF OBSTRUCTION THAT IS ORIENTED NORTH OF ALL POINTS ON THE SOLAR ZONE. TOTAL ROOF AREA: 13,343 SF 15% OF ROOF AREA: 2002 SF TOTAL SOLAR AREA PROVIDED: 2171 SF FOR ADDITIONAL MATERIAL INFORMATION REFER TO A7.31 -MATERIAL AND EQUIPTMENT SCHEDULE CLASS A ROOF PER ICC-ES EVALUATION REPORT ESR-1157, SEE G1.31 AND G1.32 21R ISSUES/REVISIONS 100% SD 07.14.19 50%DD 10.14.19 100%DD 11.21.19 PERMIT RESUBMITAL 12.28.21 21R RFI 21 8.12.22 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 4"SD #1; (2700SF); IE+446.5' REFER TO CIVIL FOR CONT FIRE LINE; IE+445.0' REFER TO CIVIL FOR CONT 4"SD #2; (2000SF); IE+446.5' REFER TO CIVIL FOR CONT 2"CW; IE+446.5' REFER TO CIVIL FOR CONT 4"SD #3; (2300SF); IE+446.0' REFER TO CIVIL FOR CONT 4"SD #4; (3700SF); IE+446.0' REFER TO CIVIL FOR CONT 4"SD #5; (2700SF); IE+446.5' REFER TO CIVIL FOR CONT 2"W #2; IE+446.25' REFER TO CIVIL FOR CONT 4"W #1; IE+445.0' REFER TO CIVIL FOR CONT 3/4"CW 3"W; IE+446.83' 3"SD; IE+448.0' 2"V UP FD-2 HB-2 N N m ag. north BIM LADERA LINDA COMMUNITY PARK PROJECT: CITY OF RANCHO PALOS VERDES: A r c h i t e c t u r e a n d U r b a n D e s i g n 5898 Blackwelder Street, Ground Floor Culver City, CA 90232 (Tel) 310-559-5720 (Fax) 310-559-8220 ARCHITECT CONSULTANTS ARCHITECT'S / ENGINEER'S STAMP The drawings and specifications, ideas, designs, and arrangements are and shall remain the property of the architect. No part thereof shall be copied or used in connection with any work or project other than the specific project for which they have been prepared without the written consent of the architect. Visual contact with these drawings or specifications shall constitute evidence of acceptance of these restrictions. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job and this office must be notified of any variation from the dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrication. © MDA Johnson Favaro 2017 CHECKED BY: No.Issue DRAWN BY: Date TITLE: SHEET: PROJECT #: SCALE: DATE: CITY APPROVALS PROJECT 32201 Forrestal Drive Rancho Palos Verdes, CA 90275 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 620 N. Brand Blvd. Suite 404 Glendale, CA 91203 www.novusdesignstudio.com 12/23/2021 P2018-41 8/25/2022 3:23:00 PMP1.02 PLUMBING SITE PLAN REF. SCALE:P1.02 1" = 10'-0" PLUMBING SITE PLAN 1 ISSUES/REVISIONS 100% DD 11.21.19 50% CD 06.01.21 CD PROGRESS 07.15.21 PERMIT SUBMITTAL 10.18.21 PERMIT RESUBMITTAL 12.23.21 RFI #21 08.25.22 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 446.41446.20446.40446.38447.10447.41447.18447.06446.99447.15457.86457.45457.65446.53447.53447.45457.65458.01446.53446.88446.88447.19447.22447.20447.51447.24447.39447.63446.54446.35446.20446.88446.95447.22446.70447.32447.50447.19445.77445.84446.72445.69445.47446.40446.50446.45447.15446.48446.37446.16446.42446.42446.49446.44446.57446.86446.51446.73446.87446.92447.06447.09447.10447.08447.12447.19447.18446.72446.44446.67446.87446.91447.07447.08447.08447.07446.76446.78447.22447.34447.24447.26447.44447.44447.43447.26447.14447.12447.13447.05447.00447.04447.07447.13445.95447.13447.20447.33447.38447.39447.38447.41447.12446.47446.41446.20446.40446.38447.10447.41447.18447.06446.99447.15457.86457.45457.65446.53447.53447.45457.65458.01446.53446.88446.88447.19447.22447.20447.51447.24447.39447.63446.54446.35446.20446.88446.95447.22446.70447.32447.50447.19445.77445.84446.72445.69445.47446.40446.50446.45447.15446.48446.37446.16446.42446.42446.49446.44446.57446.86446.51446.73446.87446.92447.06447.09447.10447.08447.12447.19447.18446.72446.44446.67446.87446.91447.07447.08447.08447.07446.76446.78447.22447.34447.24447.26447.44447.44447.43447.26447.14447.12447.13447.05447.00447.04447.07447.13445.95447.13447.20447.33447.38447.39447.38447.41447.12446.47446.41446.20446.40446.38447.10447.41447.18447.06446.99447.15457.86457.45457.65446.53447.53447.45457.65458.01446.53446.88446.88447.19447.22447.20447.51447.24447.39447.63446.54446.35446.20446.88446.95447.22446.70447.32447.50447.19445.77445.84446.72445.69445.47446.40446.50446.45447.15446.48446.37446.16446.42446.42446.49446.44446.57446.86446.51446.73446.87446.92447.06447.09447.10447.08447.12447.19447.18446.72446.44446.67446.87446.91447.07447.08447.08447.07446.76446.78447.22447.34447.24447.26447.44447.44447.43447.26447.14447.12447.13447.05447.00447.04447.07447.13445.95447.13447.20447.33447.38447.39447.38447.41447.12446.47446.41446.20446.40446.38447.10447.41447.18447.06446.99447.15457.86457.45457.65446.53447.53447.45457.65458.01446.53446.88446.88447.19447.22447.20447.51447.24447.39447.63446.54446.35446.20446.88446.95447.22446.70447.32447.50447.19445.77445.84446.72445.69445.47446.40446.50446.45447.15446.48446.37446.16446.42446.42446.49446.44446.57446.86446.51446.73446.87446.92447.06447.09447.10447.08447.12447.19447.18446.72446.44446.67446.87446.91447.07447.08447.08447.07446.76446.78447.22447.34447.24447.26447.44447.44447.43447.26447.14447.12447.13447.05447.00447.04447.07447.13445.95447.13447.20447.33447.38447.39447.38447.41447.12446.474"W UP 4"SD FR ABV (2700SF) 4"SD FR ABV (3700SF)4"SD FR ABV (2000SF) 4"SD FR ABV (2300SF) 4"SD #1; (2700SF) REFER TO P1.02 FOR CONT FIRE LINE REFER TO P1.02 FOR CONT 4"SD #2; (2000SF) REFER TO P1.02 FOR CONT 2"CW, REFER TO P1.02 FOR CONT 4"SD #3; (2300SF) REFER TO P1.02 FOR CONT 4"SD #4; (3700SF) REFER TO P1.02 FOR CONT 4"SD #5; (2700SF) REFER TO P1.02 FOR CONT 4"W #1, IE+445.0' REFER TO P1.02 FOR CONT 4"SD FR ABV (2700SF) P3.00 2 Sim (KS) 2"W UP 2"W #2; IE+446.25' REFER TO P1.02 FOR CONT N N m ag. north BIM LADERA LINDA COMMUNITY PARK PROJECT: CITY OF RANCHO PALOS VERDES: A r c h i t e c t u r e a n d U r b a n D e s i g n 5898 Blackwelder Street, Ground Floor Culver City, CA 90232 (Tel) 310-559-5720 (Fax) 310-559-8220 ARCHITECT CONSULTANTS ARCHITECT'S / ENGINEER'S STAMP The drawings and specifications, ideas, designs, and arrangements are and shall remain the property of the architect. No part thereof shall be copied or used in connection with any work or project other than the specific project for which they have been prepared without the written consent of the architect. Visual contact with these drawings or specifications shall constitute evidence of acceptance of these restrictions. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job and this office must be notified of any variation from the dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrication. © MDA Johnson Favaro 2017 CHECKED BY: No.Issue DRAWN BY: Date TITLE: SHEET: PROJECT #: SCALE: DATE: CITY APPROVALS PROJECT 32201 Forrestal Drive Rancho Palos Verdes, CA 90275 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 620 N. Brand Blvd. Suite 404 Glendale, CA 91203 www.novusdesignstudio.com 12/23/2021 P2018-41 8/25/2022 3:23:01 PMP2.00 PLUMBING UNDERGROUND PLAN REF. SCALE:P2.00 3/32" = 1'-0" PLUMBING UNDERGROUND PLAN 1 3/32"=1'-0" NDS TEAM ML ISSUES/REVISIONS 100% DD 11.21.19 50% CD 06.01.21 CD PROGRESS 07.15.21 PERMIT SUBMITTAL 10.18.21 PERMIT RESUBMITTAL 12.23.21 RFI #21 08.25.22 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 4"SD/OD FR ABV (2700SF) 4"SD/OD FR ABV (2000SF) 4"SD/OD FR ABV (2300SF) 4"SD/OD FR ABV (1850SF) 4"SD/OD FR ABV (1850SF) 4"SD/OD FR ABV (2700SF) 4"SD DN (3700SF) CO FIRE CONTROL VALVE BEH AP 4"SD DN (2000SF)4"SD DN (2700SF) EWH 4 4"OD TO TERMINATE 12" AFF, PROVIDE ODC-1 4"OD TO TERMINATE 12" AFF, PROVIDE ODC-1 P3.00 1 4"OD DN TO TERMINATE 12"AFF, PROVIDE ODC-1 HB-1 HB-1 1" CW UP 1" CW UP 2"V UP FD-2 HB-2 3/4" CW DN 3/4"CW 3"W 3"SD M.1LKJHGFEDC 4.1 3 X DO NOT USE 1.1 B 2 M 1 4 AA.1 B.1 L.2 2.1 3.1 2"V UP 3/4"CW DN S-2 1"CD DN TO TAILPIECE 1/2"CW DN TO ICE MAKER PROVIDE ASSE1022 BACKFLOW & FILTER 1"CD 1"CD 1"CD 1"CD 1"CD 1" CW1" CW 8 P5.01 TEST DRAIN TO OUTSIDE GROUND 4"SD DN (2300SF) 4"OD TO TERMINATE 12" AFF, PROVIDE ODC-1 4"OD TO TERMINATE 12" AFF, PROVIDE ODC-1 N N m ag. north BIM LADERA LINDA COMMUNITY PARK PROJECT: CITY OF RANCHO PALOS VERDES: A r c h i t e c t u r e a n d U r b a n D e s i g n 5898 Blackwelder Street, Ground Floor Culver City, CA 90232 (Tel) 310-559-5720 (Fax) 310-559-8220 ARCHITECT CONSULTANTS ARCHITECT'S / ENGINEER'S STAMP The drawings and specifications, ideas, designs, and arrangements are and shall remain the property of the architect. No part thereof shall be copied or used in connection with any work or project other than the specific project for which they have been prepared without the written consent of the architect. Visual contact with these drawings or specifications shall constitute evidence of acceptance of these restrictions. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job and this office must be notified of any variation from the dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrication. © MDA Johnson Favaro 2017 CHECKED BY: No.Issue DRAWN BY: Date TITLE: SHEET: PROJECT #: SCALE: DATE: CITY APPROVALS PROJECT 32201 Forrestal Drive Rancho Palos Verdes, CA 90275 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 620 N. Brand Blvd. Suite 404 Glendale, CA 91203 www.novusdesignstudio.com 12/23/2021 P2018-41 8/25/2022 3:23:04 PMP2.01 PLUMBING FIRST FLOOR PLAN REF. SCALE:P2.01 3/32" = 1'-0" PLUMBING FIRST FLOOR PLAN 1 3/32"=1'-0" NDS TEAM ML ISSUES/REVISIONS 100% DD 11.21.19 50% CD 06.01.21 CD PROGRESS 07.15.21 PERMIT SUBMITTAL 10.18.21 PERMIT RESUBMITTAL 12.23.21 RFI #21 08.25.22 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 4"RD-1/OD-1 (2700SF) 4"RD-1/OD-1 (1850SF) 4"RD-1/OD-1 (1850SF) 4"RD-1/OD-1 (2300SF) 4"RD-1/OD-1 (2000SF) 4"RD-1/OD-1 (2700SF)4"VTR HB-3 HB-3 M.1LKJHGFEDC 4.1 3 X DO NOT USE 1.1 B 2 M 1 4 AA.1 B.1 L.2 2.1 3.1 2"VTR 1"CW DN 1"CW DN N N m ag. north BIM LADERA LINDA COMMUNITY PARK PROJECT: CITY OF RANCHO PALOS VERDES: A r c h i t e c t u r e a n d U r b a n D e s i g n 5898 Blackwelder Street, Ground Floor Culver City, CA 90232 (Tel) 310-559-5720 (Fax) 310-559-8220 ARCHITECT CONSULTANTS ARCHITECT'S / ENGINEER'S STAMP The drawings and specifications, ideas, designs, and arrangements are and shall remain the property of the architect. No part thereof shall be copied or used in connection with any work or project other than the specific project for which they have been prepared without the written consent of the architect. Visual contact with these drawings or specifications shall constitute evidence of acceptance of these restrictions. Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job and this office must be notified of any variation from the dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrication. © MDA Johnson Favaro 2017 CHECKED BY: No.Issue DRAWN BY: Date TITLE: SHEET: PROJECT #: SCALE: DATE: CITY APPROVALS PROJECT 32201 Forrestal Drive Rancho Palos Verdes, CA 90275 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 620 N. Brand Blvd. Suite 404 Glendale, CA 91203 www.novusdesignstudio.com 12/23/2021 P2018-41 8/25/2022 3:23:05 PMP2.02 PLUMBING ROOF PLAN REF. SCALE:P2.02 3/32" = 1'-0" PLUMBING ROOF PLAN 1 4"VTR 3/32"=1'-0" NDS TEAM ML ISSUES/REVISIONS 100% DD 11.21.19 50% CD 06.01.21 CD PROGRESS 07.15.21 PERMIT SUBMITTAL 10.18.21 PERMIT RESUBMITTAL 12.23.21 RFI #21 08.25.22 DocuSign Envelope ID: E54EA306-BDE8-4351-A37B-716CFD6AA3C7 Certificate Of Completion Envelope Id: E54EA306BDE84351A37B716CFD6AA3C7 Status: Completed Subject: DocuSign: 8405 Ladera Linda CCO 18.pdf Source Envelope: Document Pages: 17 Signatures: 3 Envelope Originator: Certificate Pages: 5 Initials: 1 James O'Neill AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 joneill@rpvca.gov IP Address: 72.34.97.146 Record Tracking Status: Original 2/27/2023 1:40:33 PM Holder: James O'Neill joneill@rpvca.gov Location: DocuSign Signer Events Signature Timestamp Lincoln Lo llo@rpvca.gov Public Works Deputy Director City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 47.147.159.165 Sent: 2/27/2023 1:46:44 PM Viewed: 2/27/2023 2:01:41 PM Signed: 2/27/2023 2:08:40 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ramzi Awwad rawwad@rpvca.gov Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 104.174.65.192 Sent: 2/27/2023 2:08:52 PM Viewed: 3/2/2023 10:50:19 AM Signed: 3/2/2023 10:51:30 AM Electronic Record and Signature Disclosure: Accepted: 3/2/2023 10:45:19 AM ID: 3242b72d-4755-489d-8e5f-7c62dc360470 Trang Nguyen tnguyen@rpvca.gov Director of Finance City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 23.114.210.132 Sent: 3/2/2023 10:51:40 AM Viewed: 3/2/2023 11:48:02 AM Signed: 3/2/2023 11:49:52 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ara Mihranian aram@rpvca.gov Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 72.34.97.146 Sent: 3/2/2023 11:50:00 AM Viewed: 3/2/2023 5:01:41 PM Signed: 3/2/2023 5:02:36 PM Electronic Record and Signature Disclosure: Accepted: 3/2/2023 5:01:41 PM ID: a6c4d246-6b84-41c5-81c0-5acb12bdc0f6 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Erin Jones ejones@griffinstructures.com Security Level: Email, Account Authentication (None) Sent: 3/2/2023 5:02:44 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Lorna Cloke lornac@rpvca.gov Security Level: Email, Account Authentication (None) Sent: 3/2/2023 5:02:47 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign City Clerk cityclerk@rpvca.gov Security Level: Email, Account Authentication (None) Sent: 3/2/2023 5:02:49 PM Viewed: 3/2/2023 5:16:26 PM Electronic Record and Signature Disclosure: Accepted: 2/1/2023 3:10:58 PM ID: 505eed45-7ed0-4db8-aae6-ef6eedfef03d Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 2/27/2023 1:46:44 PM Certified Delivered Security Checked 3/2/2023 5:01:41 PM Signing Complete Security Checked 3/2/2023 5:02:36 PM Completed Security Checked 3/2/2023 5:02:49 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Rancho Palos Verdes (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronicall y through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made av ailable electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/15/2021 5:55:39 PM Parties agreed to: Ramzi Awwad, Ara Mihranian, City Clerk Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Rancho Palos Verdes: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: terit@rpvca.gov To advise City of Rancho Palos Verdes of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at terit@rpvca.gov and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from City of Rancho Palos Verdes To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to terit@rpvca.gov and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Rancho Palos Verdes To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to terit@rpvca.gov and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that: You can access and read this Electronic Record and Signature Disclosure; and You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and Until or unless you notify City of Rancho Palos Verdes as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Rancho Palos Verdes during the course of your relationship with City of Rancho Palos Verdes.