Department of Transportation (CALTRANS) - FY2022-089-01 07-LA-213-0.0/8.0
EA: 30661
EFIS# 0718000286
Agreement 07-5232-A1
1
AMENDMENT NO. 1 TO LOCAL IMPROVEMENT AGREEMENT 07-5232
This Amendment No. 1 (AMENDMENT) to Agreement 07-5232 (AGREEMENT), executed on
and effective from _________________, is between the State of California, acting through its
Department of Transportation, referred to as CALTRANS, and:
City of Rancho Palos Verdes, a body politic and municipal corporation or
chartered city of the State of California, referred to hereinafter as CITY.
RECITALS
1. CALTRANS and CITY, collectively referred to as PARTIES, entered into AGREEMENT
on December 1, 2021, defining the terms and conditions for upgrading existing curb ramps
to comply with current American with Disabilities Act (ADA) standards along State Route
213 (Western Avenue) from 25th Street to Carson Street in the cities of Los Angeles,
Ranchos Palos Verdes, Lomita, and Torrance at PM 0.0/8.0, referred to as PROJECT.
2. The AGREEMENT established that CITY desired to contribute $105,000 of Local Funds
towards the Construction Capital phase of PROJECT.
3. CITY now seeks to increase the contribution of Local Funds towards to Construction
Capital phase by $50,937, for a total contribution of $155,937 towards the Construction
Capital phase, in order to match the shortfall from the lowest bid cost for CITY’s portion of
work.
IT IS THEREFORE MUTUALLY AGREED:
4. Article 4, SECTION III, in the AGREEMENT is replaced in its entirety to read as follows:
CITY’s total obligation for IMPROVEMENTS is estimated in the amount of $250,937.
5. Article 7, SECTION III, in the AGREEMENT is replaced in its entirety to read as follows:
Thereafter, CALTRANS will invoice and CITY will reimburse for an additional lump sum
(single payment) of $180,937 after the contract has been awarded and forty-five (45)
working days prior to the commencement of Construction.
2023 March, 13
07-LA-213-0.0/8.0
EA: 30661
EFIS# 0718000286
Agreement 07-5232-A1
2
CALTRANS needs CITY approval before proceeding with WORK that exceeds $20,000
above the costs defined below.”
6. A revised SCOPE SUMMARY No. 2 and FUNDING SUMMARY FOR
IMPROVEMENTS No. 2 is attached and made part of the AGREEMENT. Any reference
to the SCOPE SUMMARY or FUNDING SUMMARY FOR IMPROVEMENTS No. 1 in
the AGREEMENT is deemed to refer to the revised SCOPE SUMMARY No. 2 and
FUNDING SUMMARY FOR IMPROVEMENTS No. 2 attached herein.
7. All other terms and conditions of the AGREEMENT shall remain in full force and effect.
8. This AMENDMENT is deemed to be included and made a part of the AGREEMENT.
07-LA-213-0.0/8.0
EA: 30661
EFIS# 0718000286
Agreement 07-5232-A1
3
SCOPE SUMMARY No. 2
Project Location: Along State Route 213 in Los Angeles County in the city of Rancho Palos Verdes.
Scope of Work: Design, administration, and construction of a right turn lane on Northbound Western
Avenue at the intersection of Westmont Drive in City of Rancho Palos Verdes at PM 3.2.
FUNDING TABLE FOR IMPROVEMENTS No. 2
All Funds Shown Are Estimates.
IMPLEMENTING
AGENCY CALTRANS CALTRANS CALTRANS
Totals
Source Fund
Type PS&E Construction
Support
Construction
Capital
LOCAL Local $70,000 $25,000 $155,937 $250,937
Totals $70,000 $25,000 $155,937 $250,937
07-LA-213-0.0/8.0
EA: 30661
EFIS# 0718000286
Agreement 07-5232-A1
4
SIGNATURES
PARTIES are authorized to enter into this AMENDMENT and have delegated to the
undersigned the authority to execute this AMENDMENT on behalf of the respective agencies
and hereby covenants to have followed all the necessary legal requirements to validly execute
this AMENDMENT. By signing below, the PARTIES each expressly agree to execute this
AMENDMENT electronically.
The PARTIES acknowledge that executed copies of this AMENDMENT may be exchanged by
facsimile or email, and that such copies shall be deemed to be effective as originals.
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
______________________________
For Gloria Roberts
D7 Acting District Director
VERIFIED OF FUNDS & AUTHORITY:
______________________________
Vickie Murphy
District Budget Manager
CERTIFIED AS TO FINANCIAL
TERMS & POLICIES:
______________________________
Darwin Salmos
HQ Accounting Supervisor
CITY OF RANCHO PALOS VERDES
______________________________
Ara Mihranian
City Manager
APROVED AS TO FORM & PROCEDURE:
______________________________
William W. Wynder
City Attorney
william W wynder (Mar 2, 2023 11:11 PST)
william W wynder
07-LA-213-0.0/8.0
EA: 30661
EFIS# 0718000286
Agreement 07-5232-A1
5
CONTACT INFORMATION
The information provided below indicates the primary contact information for each PARTY to
this AGREEMENT. PARTIES will notify each other in writing of any personnel or location
changes. Contact information changes do not require an amendment to this AGREEMENT.
CALTRANS
Nader Abdelmalek, Project Manager
100 S Main Street
Los Angeles, CA 90012
Office Phone: (213) 598-6789
Email: Nader.Abdelmalek@dot.ca.gov
CITY OF RANCHO PALOS VERDES
Ramzi Awwad, Director of Public Works
30940 Hawthorne Boulevard
Rancho Palos Verdes, CA 90275
Office Phone: (310) 544-5292
Email: RAwwad@rpvca.gov
07-LA-213-0.0/8.0
EA: 30661
Project Number: 0718000286
Agreement 07-5232
1
COOPERATIVE AGREEMENT FOR LOCAL IMPROVEMENTS
This AGREEMENT, executed on and effective from ________________, is between the State of
California, acting through its Department of Transportation, referred to as CALTRANS, and:
City of Rancho Palos Verdes, a body politic and municipal corporation or
chartered city of the State of California, referred to hereinafter as CITY.
RECITALS
1. CALTRANS and CITY, collectively referred to as PARTIES, pursuant to California Streets
and Highways Code Sections 114, 130 and 131 are authorized to enter into a Cooperative
Agreement for improvements on State highways within the City of Rancho Palos Verdes.
2. For this AGREEMENT, upgrading existing curb ramps to comply with current American
with Disabilities Act (ADA) standards along State Route 213 (Western Avenue) from 25th
Street (PM 0.0) to Carson Street (PM 8.0) in the Cities of Los Angeles, Ranchos Palos
Verdes, Lomita, and Torrance will be referred to hereinafter as CALTRANS PROJECT.
3. CITY has requested, or CALTRANS needs, to incorporate the work described in the Scope
Summary as part of the CALTRANS PROJECT, referred to herein as IMPROVEMENTS
and CITY is willing to reimburse all costs associated with it, as documented in the Funding
Summary. The Scope Summary and Funding Summary are attached to and made an express
part of this AGREEMENT.
4. All obligations and responsibilities assigned in this AGREEMENT to complete the
IMPROVEMENTS will be referred to hereinafter as WORK.
5. PARTIES intend to define herein the terms and conditions under which WORK for
IMPROVEMENTS are performed and financed.
Dec 1, 2021
07-LA-213-0.0/8.0
EA: 30661
Project Number: 0718000286
Agreement 07-5232
2
SECTION I
CALTRANS AGREES:
1. To administer the construction contract for the CALTRANS PROJECT and have the
contractor complete the IMPROVEMENTS as a part of the CALTRANS PROJECT.
2. To segregate accumulated charges for all costs to be paid by CITY towards
IMPROVEMENTS pursuant to this AGREEMENT.
3. If CALTRANS anticipates that funding will be insufficient to complete WORK,
CALTRANS will promptly notify CITY. CALTRANS may be required to stop WORK until
additional funding is secured.
4. After PARTIES agree that WORK is complete for the IMPROVEMENTS, CALTRANS will
submit a final accounting for all costs. Based on the final accounting, CALTRANS will
refund or invoice as necessary in order to satisfy the financial commitments of this
AGREEMENT.
SECTION II
CITY AGREES:
1. To be responsible for establishing the scope of the IMPROVEMENTS, as defined in the
Scope Summary.
2. To fund IMPROVEMENTS as provided in the Funding Summary of this AGREEMENT.
3. To make all arrangements and provide CALTRANS’ contractor with permits to enter and
perform work outside of CALTRANS’ right-of-way if such permits are necessary to work on
IMPROVEMENTS.
SECTION III
IT IS MUTUALLY AGREED:
1. All portions of this AGREEMENT, including the Recitals Section, are enforceable.
2. All CALTRANS’ obligations under this AGREEMENT are subject to the appropriation of
resources by the Legislature, the State Budget Act authority, programming, and allocation of
funds by the California Transportation Commission (CTC).
07-LA-213-0.0/8.0
EA: 30661
Project Number: 0718000286
Agreement 07-5232
3
3. The cost of IMPROVEMENTS performed by CALTRANS includes all direct and applicable
indirect costs. CALTRANS calculates indirect costs based solely on the type of funds used to
pay support costs. State and federal funds administered by CALTRANS are subject to the
current Program Functional Rate. All other funds are subject to the current Program
Functional Rate and the current Administration Rate. The Program Functional Rate and
Administration Rate are adjusted periodically.
In accordance with California Senate Bill 848, the Administration Rate is capped at 10
percent until January 1, 2022, for Self-Help Counties with a countywide sales tax measure
dedicated to transportation improvements.
4. CITY’s total obligation for IMPROVEMENTS is estimated in the amount of $200,000.
5. IMPROVEMENTS costs shall not be increased unless it is a result of:
• Material modifications based on approved plans and specifications by CITY.
• The failure by CITY to perform its obligations under this AGREEMENT following
written notice from CALTRANS to CITY.
• Unforeseen conditions that are discovered during the performance of the
IMPROVEMENTS.
• If all responsible bids come over the engineer’s estimate and CALTRANS chooses to
award the contract.
6. CALTRANS will invoice and CITY will reimburse for a deposit of $70,000 after execution
of this AGREEMENT. This deposit is the estimated cost of PS&E WORK.
7. Thereafter, CALTRANS will invoice and CITY will reimburse for an additional lump sum
(single payment) of $130,000 after the contract has been awarded and forty-five (45) working
days prior to the commencement of Construction.
CALTRANS needs CITY approval before proceeding with WORK that exceeds $20,000
above the costs defined below.
8. CITY will pay invoices within forty-five (45) calendar days of receipt of invoice when not
paying with Electronic Funds Transfer (EFT). When paying with EFT, CITY will pay
invoices within five (5) calendar days of receipt of invoice.
9. In the event the costs of IMPROVEMENTS exceed the estimate per the terms of
AGREEMENT, CALTRANS may submit supplemental billings to CITY requesting
additional funds. CALTRANS will provide detailed accounting of all costs with each billing.
Should those additional costs remain unpaid, CALTRANS reserves right to stop WORK on
07-LA-213-0.0/8.0
EA: 30661
Project Number: 0718000286
Agreement 07-5232
4
IMPROVEMENTS until additional funding is secured or complete IMPROVEMENTS and
commence legal means to recover those costs.
10. CALTRANS will accept operation, maintenance and ownership or title to all materials or
equipment installed as part of IMPROVEMENTS.
11. HM-1 is hazardous material (including, but not limited to, hazardous waste) that may require
removal and disposal pursuant to federal or state law, whether it is disturbed by the
CALTRANS PROJECT or not.
HM-2 is hazardous material (including, but not limited to, hazardous waste) that may require
removal and disposal pursuant to federal or state law only if disturbed by the CALTRANS
PROJECT.
The management activities related to HM-1 and HM-2, including and without limitation, any
necessary manifest requirements and disposal facility designations are referred to herein as
HM-1 MANAGEMENT and HM-2 MANAGEMENT respectively.
12. If HM-1 or HM-2 is found the discovering PARTY will immediately notify all other
PARTIES.
13. CALTRANS, independent of the CALTRANS PROJECT, is responsible for any HM-1
found within the existing State Highway System right-of-way. CALTRANS will undertake,
or cause to be undertaken, HM-1 MANAGEMENT with minimum impact to the
CALTRANS PROJECT schedule.
CALTRANS will pay, or cause to be paid, the cost of HM-1 MANAGEMENT for HM-1
found within the existing State Highway System right-of-way with funds that are
independent of the funds obligated in this AGREEMENT.
14. CALTRANS is responsible for HM-2 MANAGEMENT within the CALTRANS
PROJECT limits. CITY and CALTRANS will comply with the Soil Management Agreement
for Aerially Deposited Lead Contaminated Soils (Soil Management Agreement) executed
between CALTRANS and the California Department of Toxic Substances Control (DTSC).
Under Section 3.2 of the Soil Management Agreement, CALTRANS, and CITY each retain
joint and severable liability for noncompliance with the provisions of the Soil Management
Agreement. CITY will assume all responsibilities assigned to CALTRANS in the Soil
Management Agreement during CALTRANS PROJECT COMPONENTS for which they are
the IMPLEMENTING AGENCY except for final placement and burial of soil within the
State right-of-way, per Section 4.5 of the Soil Management Agreement, which is subject to
CALTRANS concurrence and reporting to DTSC which will be performed by CALTRANS.
Each PROJECT COMPONENT is defined in the CALTRANS Workplan Standards Guide as
a distinct group of activities/products in the project planning and development process.
07-LA-213-0.0/8.0
EA: 30661
Project Number: 0718000286
Agreement 07-5232
5
The IMPLEMENTING AGENCY is the PARTY responsible for managing the scope, cost,
schedule, and quality of the work activities and products of a PROJECT COMPONENT.
15. CALTRANS’ acquisition or acceptance of title to any property on which any HM-1 or HM-2
is found will proceed in accordance with CALTRANS’ policy on such acquisition.
16. CITY, independent of the CALTRANS PROJECT, is responsible for any HM-1 found within
the CALTRANS PROJECT limits and outside the existing State Highway System right-of-
way. CITY will undertake, or cause to be undertaken, HM-1 MANAGEMENT with
minimum impact to the CALTRANS PROJECT schedule.
CITY will pay, or cause to be paid, the cost of HM-1 MANAGEMENT for HM-1 found
within the CALTRANS PROJECT limits and outside of the existing State Highway System
right-of-way with funds that are independent of the funds obligated in this AGREEMENT.
17. Neither CALTRANS nor any officer or employee thereof is responsible for any injury,
damage, or liability occurring by reason of anything done or omitted to be done by CITY, its
contractors, sub-contractors and/or its agents under or in connection with any work,
authority, or jurisdiction conferred upon CITY or under this AGREEMENT. It is understood
and agreed that CITY, to the extent permitted by law, will defend, indemnify, and save
harmless CALTRANS and all of its officers and employees from all claims, suits, or actions
of every name, kind and description brought forth under, but not limited to, tortious,
contractual, inverse condemnation, or other theories or assertions of liability occurring by
reason of anything done or omitted to be done by CITY, its contractors, sub-contractors
and/or its agents under this AGREEMENT.
18. Neither CITY nor any officer or employee thereof is responsible for any injury, damage, or
liability occurring by reason of anything done or omitted to be done by CALTRANS, its
contractors, sub-contractors and/or its agents under or in connection with any work,
authority, or jurisdiction conferred upon CALTRANS or under this AGREEMENT. It is
understood and agreed that CALTRANS, to the extent permitted by law, will defend,
indemnify, and save harmless CITY and all of its officers and employees from all claims,
suits, or actions of every name, kind and description brought forth under, but not limited to,
tortious, contractual, inverse condemnation, or other theories or assertions of liability
occurring by reason of anything done or omitted to be done by CALTRANS, its contractors,
sub-contractors and/or its agents under this AGREEMENT.
18. This AGREEMENT will terminate upon completion of the CALTRANS PROJECT and all
parties have met all scope, cost, and schedule commitments included in this AGREEMENT
and have signed a Cooperative Agreement Closure Statement, which is a document signed by
parties that verifies the completion of WORK for IMPROVEMENTS.
However, all indemnification, document, retention, audit, claims, environmental
commitment, legal challenge, hazardous material, operation, maintenance, and ownership
articles will remain in effect until terminated or modified in writing by mutual agreement.
07-LA-213-0.0/8.0
EA: 30661
Project Number: 0718000286
Agreement 07-5232
6
CONTACT INFORMATION
The information provided below indicates the primary contact information for each PARTY to
this AGREEMENT. PARTIES will notify each other in writing of any personnel or location
changes. Contact information changes do not require an amendment to this AGREEMENT.
CALTRANS
Bartt R. Gunter, Project Manager
100 S Main Street
Los Angeles, CA 90012
Phone: (213) 793-9281
Email: Bartt.Gunter@dot.ca.gov
CITY OF RANCHO PALOS VERDES
Ron Dragoo, City Engineer
30940 Hawthorne Boulevard
Rancho Palos Verdes, CA 90275
Phone: (310) 544-5252
Email: Rond@rpvca.gov
Ramzi Awwad, Director of Public Works
30940 Hawthorne Boulevard
Rancho Palos Verdes, CA 90275
Office Phone (310) 544-5292
Mobile Phone (310) 544-5275
Email: Rawwad@rpvca.gov
07-LA-213-0.0/8.0
EA: 30661
Project Number: 0718000286
Agreement 07-5232
7
SIGNATURES
PARTIES are authorized to enter into this AGREEMENT and have delegated to the undersigned
the authority to execute this AGREEMENT on behalf of the respective agencies and hereby
covenants to have followed all the necessary legal requirements to validly execute this
AGREEMENT.
The PARTIES acknowledge that executed copies of this AGREEMENT may be exchanged by
facsimile or email, and that such copies shall be deemed to be effective as originals.
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
By:
Tony Tavares
District Director
VERIFIED OF FUNDS & AUTHORITY:
By:
Vickie Murphy
District Budget Manager
APPROVED AS TO FORM & PROCEDURE:
By:
Meera Danday
Attorney for Department of Transportation
CERTIFIED AS TO FINANCIAL TERMS &
POLICIES:
By: ______________________________
Darwin Salmos
HQ Accounting Supervisor
CITY OF RANCHO PALOS VERDES
By:
Eric Alegria
City Mayor
ATTEST:
By:
Teresa Takaoka
City Clerk
APPROVED AS TO FORM & PROCEDURE:
By:
William W. Wynder
City Attorney
Meera Danday (Oct 19, 2021 09:36 PDT)
Eric Alegria (Oct 26, 2021 13:47 PDT)
Teresa Takaoka (Nov 9, 2021 13:50 PST)
Teresa Takaoka
07-LA-213-0/8
EA: 30661
Project Number: 0718000286
Agreement 07-5232
8
SCOPE SUMMARY
Project Location: District 7 on State Route-213 in Los Angeles County in the City of Rancho
Palos Verdes
Scope of Work: Design, administration, and construction of a right turn lane on Northbound
Western Avenue at the intersection of Westmont Drive in the City of Rancho Palos Verdes at
PM 3.2
FUNDING TABLE FOR IMPROVEMENTS No. 1
All Funds Shown Are Estimates.
IMPLEMENTING
AGENCY CALTRANS CALTRANS CALTRANS
Totals
Source Fund
Type PS&E Construction
Support
Construction
Capital
LOCAL Local $70,000 $25,000 $105,000 $200,000
Totals $70,000 $25,000 $105,000 $200,000
Coop 07-5232 [EXECUTE]
Final Audit Report 2021-12-01
Created:2021-10-14
By:Suzanne Lewis (s144415@dot.ca.gov)
Status:Signed
Transaction ID:CBJCHBCAABAADlDc6Y8yw9TbbNO9AXCTZ23SgKIuEEDW
"Coop 07-5232 [EXECUTE]" History
Document created by Suzanne Lewis (s144415@dot.ca.gov)
2021-10-14 - 10:52:17 PM GMT
Document emailed to Vickie Murphy (vickie.murphy@dot.ca.gov) for signature
2021-10-14 - 10:54:16 PM GMT
Email viewed by Vickie Murphy (vickie.murphy@dot.ca.gov)
2021-10-19 - 3:47:20 PM GMT- IP address: 149.136.17.253
Document e-signed by Vickie Murphy (vickie.murphy@dot.ca.gov)
Signature Date: 2021-10-19 - 3:50:42 PM GMT - Time Source: server
Document emailed to Tharshiga Renganathan (tharshiga.renganathan@dot.ca.gov) for approval
2021-10-19 - 3:50:45 PM GMT
Document emailed to Darwin Salmos (darwin.salmos@dot.ca.gov) for signature
2021-10-19 - 3:50:45 PM GMT
Document emailed to Meera Danday (meera.danday@dot.ca.gov) for signature
2021-10-19 - 3:50:46 PM GMT
Email viewed by Darwin Salmos (darwin.salmos@dot.ca.gov)
2021-10-19 - 3:57:19 PM GMT- IP address: 149.136.17.251
Email viewed by Meera Danday (meera.danday@dot.ca.gov)
2021-10-19 - 4:35:37 PM GMT- IP address: 149.136.17.248
Document e-signed by Meera Danday (meera.danday@dot.ca.gov)
Signature Date: 2021-10-19 - 4:36:05 PM GMT - Time Source: server- IP address: 149.136.17.248
Email viewed by Tharshiga Renganathan (tharshiga.renganathan@dot.ca.gov)
2021-10-19 - 5:35:38 PM GMT- IP address: 149.136.17.251
Document approved by Tharshiga Renganathan (tharshiga.renganathan@dot.ca.gov)
Approval Date: 2021-10-19 - 5:36:08 PM GMT - Time Source: server
Document e-signed by Darwin Salmos (darwin.salmos@dot.ca.gov)
Signature Date: 2021-10-19 - 5:40:05 PM GMT - Time Source: server
Document emailed to Kristen Huang (kristen.huang@dot.ca.gov) for approval
2021-10-19 - 5:40:07 PM GMT
Email viewed by Kristen Huang (kristen.huang@dot.ca.gov)
2021-10-19 - 6:38:08 PM GMT- IP address: 47.229.68.73
Document approved by Kristen Huang (kristen.huang@dot.ca.gov)
Approval Date: 2021-10-19 - 6:38:21 PM GMT - Time Source: server- IP address: 47.229.68.73
Document emailed to Eric Alegria (eric.alegria@rpvca.gov) for signature
2021-10-19 - 6:38:24 PM GMT
Email viewed by Eric Alegria (eric.alegria@rpvca.gov)
2021-10-26 - 8:46:13 PM GMT- IP address: 174.193.200.138
Document e-signed by Eric Alegria (eric.alegria@rpvca.gov)
Signature Date: 2021-10-26 - 8:47:08 PM GMT - Time Source: server- IP address: 174.193.200.138
Document emailed to Teresa Takaoka (terit@rpvca.gov) for signature
2021-10-26 - 8:47:12 PM GMT
Document e-signed by Teresa Takaoka (terit@rpvca.gov)
Signature Date: 2021-11-09 - 9:50:48 PM GMT - Time Source: server
Document emailed to William Wynder (wwynder@awattorneys.com) for signature
2021-11-09 - 9:50:50 PM GMT
Email viewed by William Wynder (wwynder@awattorneys.com)
2021-11-10 - 6:27:48 AM GMT
Email viewed by William Wynder (wwynder@awattorneys.com)
2021-11-23 - 10:11:13 PM GMT- IP address: 172.226.7.54
Document e-signed by William Wynder (wwynder@awattorneys.com)
Signature Date: 2021-12-01 - 1:16:11 AM GMT - Time Source: server
Document emailed to Kristen Huang (kristen.huang@dot.ca.gov) for approval
2021-12-01 - 1:16:14 AM GMT
Email viewed by Kristen Huang (kristen.huang@dot.ca.gov)
2021-12-01 - 1:23:51 AM GMT- IP address: 149.136.33.246
Document approved by Kristen Huang (kristen.huang@dot.ca.gov)
Approval Date: 2021-12-01 - 1:23:58 AM GMT - Time Source: server- IP address: 149.136.33.246
Document emailed to Greg Farr (greg.farr@dot.ca.gov) for approval
2021-12-01 - 1:24:00 AM GMT
Email viewed by Greg Farr (greg.farr@dot.ca.gov)
2021-12-01 - 1:24:49 AM GMT
Document approved by Greg Farr (greg.farr@dot.ca.gov)
Approval Date: 2021-12-01 - 4:10:57 AM GMT - Time Source: server
Document emailed to Robert So (robert.so@dot.ca.gov) for signature
2021-12-01 - 4:10:59 AM GMT
Email sent to Robert So (robert.so@dot.ca.gov) bounced and could not be delivered
2021-12-01 - 4:11:06 AM GMT
Suzanne Lewis (s144415@dot.ca.gov) replaced signer Robert So (robert.so@dot.ca.gov) with Tony Tavares
(Tony.Tavares@dot.ca.gov)
2021-12-01 - 4:00:54 PM GMT- IP address: 67.182.169.244
Document emailed to Tony Tavares (Tony.Tavares@dot.ca.gov) for signature
2021-12-01 - 4:00:55 PM GMT
Email sent to Robert So (robert.so@dot.ca.gov) bounced and could not be delivered
2021-12-01 - 4:01:01 PM GMT
Email viewed by Tony Tavares (Tony.Tavares@dot.ca.gov)
2021-12-01 - 6:44:44 PM GMT- IP address: 149.136.33.249
Document e-signed by Tony Tavares (Tony.Tavares@dot.ca.gov)
Signature Date: 2021-12-01 - 6:47:08 PM GMT - Time Source: server
Agreement completed.
2021-12-01 - 6:47:08 PM GMT