Department of Transportation (CALTRANS) - FY2022-089-01 07-LA-213-0.0/8.0 EA: 30661 EFIS# 0718000286 Agreement 07-5232-A1 1 AMENDMENT NO. 1 TO LOCAL IMPROVEMENT AGREEMENT 07-5232 This Amendment No. 1 (AMENDMENT) to Agreement 07-5232 (AGREEMENT), executed on and effective from _________________, is between the State of California, acting through its Department of Transportation, referred to as CALTRANS, and: City of Rancho Palos Verdes, a body politic and municipal corporation or chartered city of the State of California, referred to hereinafter as CITY. RECITALS 1. CALTRANS and CITY, collectively referred to as PARTIES, entered into AGREEMENT on December 1, 2021, defining the terms and conditions for upgrading existing curb ramps to comply with current American with Disabilities Act (ADA) standards along State Route 213 (Western Avenue) from 25th Street to Carson Street in the cities of Los Angeles, Ranchos Palos Verdes, Lomita, and Torrance at PM 0.0/8.0, referred to as PROJECT. 2. The AGREEMENT established that CITY desired to contribute $105,000 of Local Funds towards the Construction Capital phase of PROJECT. 3. CITY now seeks to increase the contribution of Local Funds towards to Construction Capital phase by $50,937, for a total contribution of $155,937 towards the Construction Capital phase, in order to match the shortfall from the lowest bid cost for CITY’s portion of work. IT IS THEREFORE MUTUALLY AGREED: 4. Article 4, SECTION III, in the AGREEMENT is replaced in its entirety to read as follows: CITY’s total obligation for IMPROVEMENTS is estimated in the amount of $250,937. 5. Article 7, SECTION III, in the AGREEMENT is replaced in its entirety to read as follows: Thereafter, CALTRANS will invoice and CITY will reimburse for an additional lump sum (single payment) of $180,937 after the contract has been awarded and forty-five (45) working days prior to the commencement of Construction. 2023 March, 13 07-LA-213-0.0/8.0 EA: 30661 EFIS# 0718000286 Agreement 07-5232-A1 2 CALTRANS needs CITY approval before proceeding with WORK that exceeds $20,000 above the costs defined below.” 6. A revised SCOPE SUMMARY No. 2 and FUNDING SUMMARY FOR IMPROVEMENTS No. 2 is attached and made part of the AGREEMENT. Any reference to the SCOPE SUMMARY or FUNDING SUMMARY FOR IMPROVEMENTS No. 1 in the AGREEMENT is deemed to refer to the revised SCOPE SUMMARY No. 2 and FUNDING SUMMARY FOR IMPROVEMENTS No. 2 attached herein. 7. All other terms and conditions of the AGREEMENT shall remain in full force and effect. 8. This AMENDMENT is deemed to be included and made a part of the AGREEMENT. 07-LA-213-0.0/8.0 EA: 30661 EFIS# 0718000286 Agreement 07-5232-A1 3 SCOPE SUMMARY No. 2 Project Location: Along State Route 213 in Los Angeles County in the city of Rancho Palos Verdes. Scope of Work: Design, administration, and construction of a right turn lane on Northbound Western Avenue at the intersection of Westmont Drive in City of Rancho Palos Verdes at PM 3.2. FUNDING TABLE FOR IMPROVEMENTS No. 2 All Funds Shown Are Estimates. IMPLEMENTING AGENCY CALTRANS CALTRANS CALTRANS Totals Source Fund Type PS&E Construction Support Construction Capital LOCAL Local $70,000 $25,000 $155,937 $250,937 Totals $70,000 $25,000 $155,937 $250,937 07-LA-213-0.0/8.0 EA: 30661 EFIS# 0718000286 Agreement 07-5232-A1 4 SIGNATURES PARTIES are authorized to enter into this AMENDMENT and have delegated to the undersigned the authority to execute this AMENDMENT on behalf of the respective agencies and hereby covenants to have followed all the necessary legal requirements to validly execute this AMENDMENT. By signing below, the PARTIES each expressly agree to execute this AMENDMENT electronically. The PARTIES acknowledge that executed copies of this AMENDMENT may be exchanged by facsimile or email, and that such copies shall be deemed to be effective as originals. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION ______________________________ For Gloria Roberts D7 Acting District Director VERIFIED OF FUNDS & AUTHORITY: ______________________________ Vickie Murphy District Budget Manager CERTIFIED AS TO FINANCIAL TERMS & POLICIES: ______________________________ Darwin Salmos HQ Accounting Supervisor CITY OF RANCHO PALOS VERDES ______________________________ Ara Mihranian City Manager APROVED AS TO FORM & PROCEDURE: ______________________________ William W. Wynder City Attorney william W wynder (Mar 2, 2023 11:11 PST) william W wynder 07-LA-213-0.0/8.0 EA: 30661 EFIS# 0718000286 Agreement 07-5232-A1 5 CONTACT INFORMATION The information provided below indicates the primary contact information for each PARTY to this AGREEMENT. PARTIES will notify each other in writing of any personnel or location changes. Contact information changes do not require an amendment to this AGREEMENT. CALTRANS Nader Abdelmalek, Project Manager 100 S Main Street Los Angeles, CA 90012 Office Phone: (213) 598-6789 Email: Nader.Abdelmalek@dot.ca.gov CITY OF RANCHO PALOS VERDES Ramzi Awwad, Director of Public Works 30940 Hawthorne Boulevard Rancho Palos Verdes, CA 90275 Office Phone: (310) 544-5292 Email: RAwwad@rpvca.gov 07-LA-213-0.0/8.0 EA: 30661 Project Number: 0718000286 Agreement 07-5232 1 COOPERATIVE AGREEMENT FOR LOCAL IMPROVEMENTS This AGREEMENT, executed on and effective from ________________, is between the State of California, acting through its Department of Transportation, referred to as CALTRANS, and: City of Rancho Palos Verdes, a body politic and municipal corporation or chartered city of the State of California, referred to hereinafter as CITY. RECITALS 1. CALTRANS and CITY, collectively referred to as PARTIES, pursuant to California Streets and Highways Code Sections 114, 130 and 131 are authorized to enter into a Cooperative Agreement for improvements on State highways within the City of Rancho Palos Verdes. 2. For this AGREEMENT, upgrading existing curb ramps to comply with current American with Disabilities Act (ADA) standards along State Route 213 (Western Avenue) from 25th Street (PM 0.0) to Carson Street (PM 8.0) in the Cities of Los Angeles, Ranchos Palos Verdes, Lomita, and Torrance will be referred to hereinafter as CALTRANS PROJECT. 3. CITY has requested, or CALTRANS needs, to incorporate the work described in the Scope Summary as part of the CALTRANS PROJECT, referred to herein as IMPROVEMENTS and CITY is willing to reimburse all costs associated with it, as documented in the Funding Summary. The Scope Summary and Funding Summary are attached to and made an express part of this AGREEMENT. 4. All obligations and responsibilities assigned in this AGREEMENT to complete the IMPROVEMENTS will be referred to hereinafter as WORK. 5. PARTIES intend to define herein the terms and conditions under which WORK for IMPROVEMENTS are performed and financed. Dec 1, 2021 07-LA-213-0.0/8.0 EA: 30661 Project Number: 0718000286 Agreement 07-5232 2 SECTION I CALTRANS AGREES: 1. To administer the construction contract for the CALTRANS PROJECT and have the contractor complete the IMPROVEMENTS as a part of the CALTRANS PROJECT. 2. To segregate accumulated charges for all costs to be paid by CITY towards IMPROVEMENTS pursuant to this AGREEMENT. 3. If CALTRANS anticipates that funding will be insufficient to complete WORK, CALTRANS will promptly notify CITY. CALTRANS may be required to stop WORK until additional funding is secured. 4. After PARTIES agree that WORK is complete for the IMPROVEMENTS, CALTRANS will submit a final accounting for all costs. Based on the final accounting, CALTRANS will refund or invoice as necessary in order to satisfy the financial commitments of this AGREEMENT. SECTION II CITY AGREES: 1. To be responsible for establishing the scope of the IMPROVEMENTS, as defined in the Scope Summary. 2. To fund IMPROVEMENTS as provided in the Funding Summary of this AGREEMENT. 3. To make all arrangements and provide CALTRANS’ contractor with permits to enter and perform work outside of CALTRANS’ right-of-way if such permits are necessary to work on IMPROVEMENTS. SECTION III IT IS MUTUALLY AGREED: 1. All portions of this AGREEMENT, including the Recitals Section, are enforceable. 2. All CALTRANS’ obligations under this AGREEMENT are subject to the appropriation of resources by the Legislature, the State Budget Act authority, programming, and allocation of funds by the California Transportation Commission (CTC). 07-LA-213-0.0/8.0 EA: 30661 Project Number: 0718000286 Agreement 07-5232 3 3. The cost of IMPROVEMENTS performed by CALTRANS includes all direct and applicable indirect costs. CALTRANS calculates indirect costs based solely on the type of funds used to pay support costs. State and federal funds administered by CALTRANS are subject to the current Program Functional Rate. All other funds are subject to the current Program Functional Rate and the current Administration Rate. The Program Functional Rate and Administration Rate are adjusted periodically. In accordance with California Senate Bill 848, the Administration Rate is capped at 10 percent until January 1, 2022, for Self-Help Counties with a countywide sales tax measure dedicated to transportation improvements. 4. CITY’s total obligation for IMPROVEMENTS is estimated in the amount of $200,000. 5. IMPROVEMENTS costs shall not be increased unless it is a result of: • Material modifications based on approved plans and specifications by CITY. • The failure by CITY to perform its obligations under this AGREEMENT following written notice from CALTRANS to CITY. • Unforeseen conditions that are discovered during the performance of the IMPROVEMENTS. • If all responsible bids come over the engineer’s estimate and CALTRANS chooses to award the contract. 6. CALTRANS will invoice and CITY will reimburse for a deposit of $70,000 after execution of this AGREEMENT. This deposit is the estimated cost of PS&E WORK. 7. Thereafter, CALTRANS will invoice and CITY will reimburse for an additional lump sum (single payment) of $130,000 after the contract has been awarded and forty-five (45) working days prior to the commencement of Construction. CALTRANS needs CITY approval before proceeding with WORK that exceeds $20,000 above the costs defined below. 8. CITY will pay invoices within forty-five (45) calendar days of receipt of invoice when not paying with Electronic Funds Transfer (EFT). When paying with EFT, CITY will pay invoices within five (5) calendar days of receipt of invoice. 9. In the event the costs of IMPROVEMENTS exceed the estimate per the terms of AGREEMENT, CALTRANS may submit supplemental billings to CITY requesting additional funds. CALTRANS will provide detailed accounting of all costs with each billing. Should those additional costs remain unpaid, CALTRANS reserves right to stop WORK on 07-LA-213-0.0/8.0 EA: 30661 Project Number: 0718000286 Agreement 07-5232 4 IMPROVEMENTS until additional funding is secured or complete IMPROVEMENTS and commence legal means to recover those costs. 10. CALTRANS will accept operation, maintenance and ownership or title to all materials or equipment installed as part of IMPROVEMENTS. 11. HM-1 is hazardous material (including, but not limited to, hazardous waste) that may require removal and disposal pursuant to federal or state law, whether it is disturbed by the CALTRANS PROJECT or not. HM-2 is hazardous material (including, but not limited to, hazardous waste) that may require removal and disposal pursuant to federal or state law only if disturbed by the CALTRANS PROJECT. The management activities related to HM-1 and HM-2, including and without limitation, any necessary manifest requirements and disposal facility designations are referred to herein as HM-1 MANAGEMENT and HM-2 MANAGEMENT respectively. 12. If HM-1 or HM-2 is found the discovering PARTY will immediately notify all other PARTIES. 13. CALTRANS, independent of the CALTRANS PROJECT, is responsible for any HM-1 found within the existing State Highway System right-of-way. CALTRANS will undertake, or cause to be undertaken, HM-1 MANAGEMENT with minimum impact to the CALTRANS PROJECT schedule. CALTRANS will pay, or cause to be paid, the cost of HM-1 MANAGEMENT for HM-1 found within the existing State Highway System right-of-way with funds that are independent of the funds obligated in this AGREEMENT. 14. CALTRANS is responsible for HM-2 MANAGEMENT within the CALTRANS PROJECT limits. CITY and CALTRANS will comply with the Soil Management Agreement for Aerially Deposited Lead Contaminated Soils (Soil Management Agreement) executed between CALTRANS and the California Department of Toxic Substances Control (DTSC). Under Section 3.2 of the Soil Management Agreement, CALTRANS, and CITY each retain joint and severable liability for noncompliance with the provisions of the Soil Management Agreement. CITY will assume all responsibilities assigned to CALTRANS in the Soil Management Agreement during CALTRANS PROJECT COMPONENTS for which they are the IMPLEMENTING AGENCY except for final placement and burial of soil within the State right-of-way, per Section 4.5 of the Soil Management Agreement, which is subject to CALTRANS concurrence and reporting to DTSC which will be performed by CALTRANS. Each PROJECT COMPONENT is defined in the CALTRANS Workplan Standards Guide as a distinct group of activities/products in the project planning and development process. 07-LA-213-0.0/8.0 EA: 30661 Project Number: 0718000286 Agreement 07-5232 5 The IMPLEMENTING AGENCY is the PARTY responsible for managing the scope, cost, schedule, and quality of the work activities and products of a PROJECT COMPONENT. 15. CALTRANS’ acquisition or acceptance of title to any property on which any HM-1 or HM-2 is found will proceed in accordance with CALTRANS’ policy on such acquisition. 16. CITY, independent of the CALTRANS PROJECT, is responsible for any HM-1 found within the CALTRANS PROJECT limits and outside the existing State Highway System right-of- way. CITY will undertake, or cause to be undertaken, HM-1 MANAGEMENT with minimum impact to the CALTRANS PROJECT schedule. CITY will pay, or cause to be paid, the cost of HM-1 MANAGEMENT for HM-1 found within the CALTRANS PROJECT limits and outside of the existing State Highway System right-of-way with funds that are independent of the funds obligated in this AGREEMENT. 17. Neither CALTRANS nor any officer or employee thereof is responsible for any injury, damage, or liability occurring by reason of anything done or omitted to be done by CITY, its contractors, sub-contractors and/or its agents under or in connection with any work, authority, or jurisdiction conferred upon CITY or under this AGREEMENT. It is understood and agreed that CITY, to the extent permitted by law, will defend, indemnify, and save harmless CALTRANS and all of its officers and employees from all claims, suits, or actions of every name, kind and description brought forth under, but not limited to, tortious, contractual, inverse condemnation, or other theories or assertions of liability occurring by reason of anything done or omitted to be done by CITY, its contractors, sub-contractors and/or its agents under this AGREEMENT. 18. Neither CITY nor any officer or employee thereof is responsible for any injury, damage, or liability occurring by reason of anything done or omitted to be done by CALTRANS, its contractors, sub-contractors and/or its agents under or in connection with any work, authority, or jurisdiction conferred upon CALTRANS or under this AGREEMENT. It is understood and agreed that CALTRANS, to the extent permitted by law, will defend, indemnify, and save harmless CITY and all of its officers and employees from all claims, suits, or actions of every name, kind and description brought forth under, but not limited to, tortious, contractual, inverse condemnation, or other theories or assertions of liability occurring by reason of anything done or omitted to be done by CALTRANS, its contractors, sub-contractors and/or its agents under this AGREEMENT. 18. This AGREEMENT will terminate upon completion of the CALTRANS PROJECT and all parties have met all scope, cost, and schedule commitments included in this AGREEMENT and have signed a Cooperative Agreement Closure Statement, which is a document signed by parties that verifies the completion of WORK for IMPROVEMENTS. However, all indemnification, document, retention, audit, claims, environmental commitment, legal challenge, hazardous material, operation, maintenance, and ownership articles will remain in effect until terminated or modified in writing by mutual agreement. 07-LA-213-0.0/8.0 EA: 30661 Project Number: 0718000286 Agreement 07-5232 6 CONTACT INFORMATION The information provided below indicates the primary contact information for each PARTY to this AGREEMENT. PARTIES will notify each other in writing of any personnel or location changes. Contact information changes do not require an amendment to this AGREEMENT. CALTRANS Bartt R. Gunter, Project Manager 100 S Main Street Los Angeles, CA 90012 Phone: (213) 793-9281 Email: Bartt.Gunter@dot.ca.gov CITY OF RANCHO PALOS VERDES Ron Dragoo, City Engineer 30940 Hawthorne Boulevard Rancho Palos Verdes, CA 90275 Phone: (310) 544-5252 Email: Rond@rpvca.gov Ramzi Awwad, Director of Public Works 30940 Hawthorne Boulevard Rancho Palos Verdes, CA 90275 Office Phone (310) 544-5292 Mobile Phone (310) 544-5275 Email: Rawwad@rpvca.gov 07-LA-213-0.0/8.0 EA: 30661 Project Number: 0718000286 Agreement 07-5232 7 SIGNATURES PARTIES are authorized to enter into this AGREEMENT and have delegated to the undersigned the authority to execute this AGREEMENT on behalf of the respective agencies and hereby covenants to have followed all the necessary legal requirements to validly execute this AGREEMENT. The PARTIES acknowledge that executed copies of this AGREEMENT may be exchanged by facsimile or email, and that such copies shall be deemed to be effective as originals. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION By: Tony Tavares District Director VERIFIED OF FUNDS & AUTHORITY: By: Vickie Murphy District Budget Manager APPROVED AS TO FORM & PROCEDURE: By: Meera Danday Attorney for Department of Transportation CERTIFIED AS TO FINANCIAL TERMS & POLICIES: By: ______________________________ Darwin Salmos HQ Accounting Supervisor CITY OF RANCHO PALOS VERDES By: Eric Alegria City Mayor ATTEST: By: Teresa Takaoka City Clerk APPROVED AS TO FORM & PROCEDURE: By: William W. Wynder City Attorney Meera Danday (Oct 19, 2021 09:36 PDT) Eric Alegria (Oct 26, 2021 13:47 PDT) Teresa Takaoka (Nov 9, 2021 13:50 PST) Teresa Takaoka 07-LA-213-0/8 EA: 30661 Project Number: 0718000286 Agreement 07-5232 8 SCOPE SUMMARY Project Location: District 7 on State Route-213 in Los Angeles County in the City of Rancho Palos Verdes Scope of Work: Design, administration, and construction of a right turn lane on Northbound Western Avenue at the intersection of Westmont Drive in the City of Rancho Palos Verdes at PM 3.2 FUNDING TABLE FOR IMPROVEMENTS No. 1 All Funds Shown Are Estimates. IMPLEMENTING AGENCY CALTRANS CALTRANS CALTRANS Totals Source Fund Type PS&E Construction Support Construction Capital LOCAL Local $70,000 $25,000 $105,000 $200,000 Totals $70,000 $25,000 $105,000 $200,000 Coop 07-5232 [EXECUTE] Final Audit Report 2021-12-01 Created:2021-10-14 By:Suzanne Lewis (s144415@dot.ca.gov) Status:Signed Transaction ID:CBJCHBCAABAADlDc6Y8yw9TbbNO9AXCTZ23SgKIuEEDW "Coop 07-5232 [EXECUTE]" History Document created by Suzanne Lewis (s144415@dot.ca.gov) 2021-10-14 - 10:52:17 PM GMT Document emailed to Vickie Murphy (vickie.murphy@dot.ca.gov) for signature 2021-10-14 - 10:54:16 PM GMT Email viewed by Vickie Murphy (vickie.murphy@dot.ca.gov) 2021-10-19 - 3:47:20 PM GMT- IP address: 149.136.17.253 Document e-signed by Vickie Murphy (vickie.murphy@dot.ca.gov) Signature Date: 2021-10-19 - 3:50:42 PM GMT - Time Source: server Document emailed to Tharshiga Renganathan (tharshiga.renganathan@dot.ca.gov) for approval 2021-10-19 - 3:50:45 PM GMT Document emailed to Darwin Salmos (darwin.salmos@dot.ca.gov) for signature 2021-10-19 - 3:50:45 PM GMT Document emailed to Meera Danday (meera.danday@dot.ca.gov) for signature 2021-10-19 - 3:50:46 PM GMT Email viewed by Darwin Salmos (darwin.salmos@dot.ca.gov) 2021-10-19 - 3:57:19 PM GMT- IP address: 149.136.17.251 Email viewed by Meera Danday (meera.danday@dot.ca.gov) 2021-10-19 - 4:35:37 PM GMT- IP address: 149.136.17.248 Document e-signed by Meera Danday (meera.danday@dot.ca.gov) Signature Date: 2021-10-19 - 4:36:05 PM GMT - Time Source: server- IP address: 149.136.17.248 Email viewed by Tharshiga Renganathan (tharshiga.renganathan@dot.ca.gov) 2021-10-19 - 5:35:38 PM GMT- IP address: 149.136.17.251 Document approved by Tharshiga Renganathan (tharshiga.renganathan@dot.ca.gov) Approval Date: 2021-10-19 - 5:36:08 PM GMT - Time Source: server Document e-signed by Darwin Salmos (darwin.salmos@dot.ca.gov) Signature Date: 2021-10-19 - 5:40:05 PM GMT - Time Source: server Document emailed to Kristen Huang (kristen.huang@dot.ca.gov) for approval 2021-10-19 - 5:40:07 PM GMT Email viewed by Kristen Huang (kristen.huang@dot.ca.gov) 2021-10-19 - 6:38:08 PM GMT- IP address: 47.229.68.73 Document approved by Kristen Huang (kristen.huang@dot.ca.gov) Approval Date: 2021-10-19 - 6:38:21 PM GMT - Time Source: server- IP address: 47.229.68.73 Document emailed to Eric Alegria (eric.alegria@rpvca.gov) for signature 2021-10-19 - 6:38:24 PM GMT Email viewed by Eric Alegria (eric.alegria@rpvca.gov) 2021-10-26 - 8:46:13 PM GMT- IP address: 174.193.200.138 Document e-signed by Eric Alegria (eric.alegria@rpvca.gov) Signature Date: 2021-10-26 - 8:47:08 PM GMT - Time Source: server- IP address: 174.193.200.138 Document emailed to Teresa Takaoka (terit@rpvca.gov) for signature 2021-10-26 - 8:47:12 PM GMT Document e-signed by Teresa Takaoka (terit@rpvca.gov) Signature Date: 2021-11-09 - 9:50:48 PM GMT - Time Source: server Document emailed to William Wynder (wwynder@awattorneys.com) for signature 2021-11-09 - 9:50:50 PM GMT Email viewed by William Wynder (wwynder@awattorneys.com) 2021-11-10 - 6:27:48 AM GMT Email viewed by William Wynder (wwynder@awattorneys.com) 2021-11-23 - 10:11:13 PM GMT- IP address: 172.226.7.54 Document e-signed by William Wynder (wwynder@awattorneys.com) Signature Date: 2021-12-01 - 1:16:11 AM GMT - Time Source: server Document emailed to Kristen Huang (kristen.huang@dot.ca.gov) for approval 2021-12-01 - 1:16:14 AM GMT Email viewed by Kristen Huang (kristen.huang@dot.ca.gov) 2021-12-01 - 1:23:51 AM GMT- IP address: 149.136.33.246 Document approved by Kristen Huang (kristen.huang@dot.ca.gov) Approval Date: 2021-12-01 - 1:23:58 AM GMT - Time Source: server- IP address: 149.136.33.246 Document emailed to Greg Farr (greg.farr@dot.ca.gov) for approval 2021-12-01 - 1:24:00 AM GMT Email viewed by Greg Farr (greg.farr@dot.ca.gov) 2021-12-01 - 1:24:49 AM GMT Document approved by Greg Farr (greg.farr@dot.ca.gov) Approval Date: 2021-12-01 - 4:10:57 AM GMT - Time Source: server Document emailed to Robert So (robert.so@dot.ca.gov) for signature 2021-12-01 - 4:10:59 AM GMT Email sent to Robert So (robert.so@dot.ca.gov) bounced and could not be delivered 2021-12-01 - 4:11:06 AM GMT Suzanne Lewis (s144415@dot.ca.gov) replaced signer Robert So (robert.so@dot.ca.gov) with Tony Tavares (Tony.Tavares@dot.ca.gov) 2021-12-01 - 4:00:54 PM GMT- IP address: 67.182.169.244 Document emailed to Tony Tavares (Tony.Tavares@dot.ca.gov) for signature 2021-12-01 - 4:00:55 PM GMT Email sent to Robert So (robert.so@dot.ca.gov) bounced and could not be delivered 2021-12-01 - 4:01:01 PM GMT Email viewed by Tony Tavares (Tony.Tavares@dot.ca.gov) 2021-12-01 - 6:44:44 PM GMT- IP address: 149.136.33.249 Document e-signed by Tony Tavares (Tony.Tavares@dot.ca.gov) Signature Date: 2021-12-01 - 6:47:08 PM GMT - Time Source: server Agreement completed. 2021-12-01 - 6:47:08 PM GMT