Loading...
CC SR 20220215 F - NOC for Catch Basin Inserts CITY COUNCIL MEETING DATE: 02/15/2022 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA TITLE: Consideration and possible action to authorize the City Clerk to file a Notice of Completion for the Catch Basins Collector Screen Insert Project. RECOMMENDED COUNCIL ACTION: (1) Accept the project as complete; (2) Authorize the City Clerk to file a Notice of Completion for the project with the Los Angeles County Registrar-Recorder’s Office; and if no claims are files within 35 days after recordation, send a notice to the surety company to exonerate the Performance Bond; and (3) Authorize the Director of Public Works to release the 5% construction retention payment to United Stormwater, Inc., 35 days after recordation of the Notice of Completion by the Los Angeles County Registrar-Recorder’s Office, contingent upon no claims being files on the project, and the contractor posting an acceptable warrant bond with the City. FISCAL IMPACT: The total project cost is $818,961.85. Amount Budgeted: $1,046,118 Additional Appropriation: N/A Account Number(s): Various accounts ORIGINATED BY: James O'Neill, Project Manager REVIEWED BY: Ramzi Awwad, Public Works Director APPROVED BY: Ara Mihranian, AICP, City Manager ATTACHED SUPPORTING DOCUMENTS: A. Notice of Completion (page A-1) BACKGROUND AND DISCUSSION: In November 2017, the City of Rancho Palos Verdes and the State Water Resources Control Board (State Board) executed a grant agreement, under which $600,000 was awarded for the installation of approximately 1,368 connector pipe screens to reduce storm water pollution by preventing trash from flowing into the Santa Monica Bay. This 1 CfTYOF RANCHO PALOS VERDES ' - award was based on a January 2016 application from the Cities of Rancho Palos Verdes (RPV), Palos Verdes Estates (PVE), and Rolling Hills Estates (RHE), and subsequent authorizations by PVE and RHE for RPV to act on their behalf to enter into and implement the agreement with the State Board. In June 2018, the cities of RPV, PVE, and RHE entered into a Memorandum of Understanding (MOU). Each city agreed to collectively share and fully fund the local match of the project and any additional costs of implementing the agreement in excess of the grant funds. Local-share costs among the cities were based on the percentage of catch basins for the project located in each city’s respective jurisdiction. On October 2, 2018, RPV awarded contracts to United Storm Water for construction and PSOMAS for construction management. Of the originally anticipated 1,368 catch basins, connector pipe screens could only be installed at 1,112 locations. The catch basins at 31 locations were too small for the connector pipe screens to be installed, and the configuration of 225 locations do not allow for the installation of collector pipe screens. As a result, the scope of work for United Storm Water was reduced, and construction was completed in July 2020. A financial summary of the project is in the following table: The City is being reimbursed up to $600,000 from the State Water Board, and approximately 40% of the balance of expenditures through a MOU with the cities of Palos Verdes Estates and Rolling Hills estates. Continued on Next Page 8705 - Connector Pipe Screens Project (SM Bay Prop. 84 Program) Budget Actual Available Balance Notes Project Budget: Original Project Budget $1,046,118.00 Approved by CC 10/2/2018 Total Current Project Budget $1,046,118.00 Project Costs: 8807 Construction $744,943.00 $581,046.30 $163,896.70 8807 Contingency $74,495.00 $14,553.05 $59,941.95 8004 Inspection $226,680.00 $223,362.50 $3,317.50 Total Project Costs $1,046,118.00 $818,961.85 $227,156.15 Project Total $1,046,118.00 $818,961.85 $227,156.15 Description 2 I I I Example catch basin before construction: Example catch basin after construction: CONCLUSION: The construction contractor, United Stormwater, Inc., has completed all work in accordance with the specifications and construction contract. Therefore, Staff recommends accepting the project as complete and filing a Notice of Completion with the Los Angeles County Registrar-Recorder’s Office. If no claims are filed within 35 days after 3 recordation, the City will release the 5% retention, and upon the contractor posting an acceptable warranty bond, notify the surety company to exonerate the Performance Bond. ALTERNATIVES: In addition to Staff recommendation, the following alternative action are available for the City Council’s consideration: 1. Direct Staff not to file the Notice of Completion for United Stormwater, Inc. 2. Take other action as deemed appropriate. 4 Revised 05/2019  To be recorded with County Recorder within 15 days after completion. No recording fee. RECORDING REQUESTED BY: City of Rancho Palos Verdes Attn: City Clerk 30940 Hawthorne Blvd Rancho Palos Verdes, CA 90275 AND WHEN RECORDED MAIL TO: Same as above THIS SPACE FOR RECORDERS USE ONLY NOTICE OF COMPLETION (CA Civil Code 9204- Public Works) Notice is hereby given by the undersigned owner, a public entity of the State of California, that a public work of improvement has been completed, as follows: Project title or description of work: Date of completion: Nature of owner: Interest or estate of owner: Address of owner: Name of contractor: Address of contractor: Street address or legal description of site: Dated: ___________________________ Owner: City of Rancho Palos Verdes (Name of Public Entity) By: Title: ____________________________ Ara Mihranian, City Manager State of California ) County of Los Angeles ) ss City of Rancho Palos Verdes ) I am the City Clerk of the City of Rancho Palos Verdes, the public entity which executed the foregoing notice and on whose behalf I make this verification; I have read said notice, know its contents, and the same is true. I certify under penalty of perjury that the foregoing is true and correct. , California on (Date) Executed at Rancho Palos Verdes By: Title: Teresa Takaoka, City Clerk A-1