20220419 Late Correspondence1
Subject:Agenda Item #3, Hatano Farm site
From: Yahoo inc <afranz@pacbell.net>
Sent: Tuesday, April 19, 2022 7:11 PM
To: CityClerk <CityClerk@rpvca.gov>
Subject: Agenda Item #3, Hatano Farm site
CAUTION: This email originated from outside of the City of Rancho Palos Verdes.
Mayor Bradley, City Council, and Staff,
I write as a supporter of the PVPLC regarding item #3 on this evening’s agenda--
regarding the disposition of the Hatano Farm site.
I heartily support consideration of historical status for the site at both state and federal
levels.
I am concerned, though, about the manner of use the City may support.
The historic Japanese farms of the peninsula produced, almost exclusively, vegetables--
not Barbary figs--destined for the produce markets in Los Angeles, San Pedro, and
intermediate communities. The Barbary figs grown in recent times are not “traditional,”
but an adaptation to changing market conditions in recent decades—and changes in the
frequency and density of the ground fogs that previously allowed productive dry-
farming.
Barbary figs are native to Central Mexico—not the South Bay—and have become the
cactus equivalent of a Big Mac: generic, cheap to produce, and spread around the world.
However, they actually pose a threat, through possible hybridization, to the Peninsula’s
native Opuntia—and to species like the Coastal Cactus Wren, which are specifically
adapted to the native Opuntia with their more prominent spines and other distinctive
features. Diluting the genetics of native species can be deleterious to the viability of the
species—and to other organisms that depend on them.
3
2
Using the Hatano Farm site to produce native plants—including native Opuntia—would
be more consistent with the site’s historic ecology, the conditions of the Peninsula’s
NCCP/HCP, and the NPS’s POU for the area. Mr. Martinez has expressed willingness to
work with the PVPLC on such a project. Such use would retain educational value in
preserving farming operations, and would in fact jibe better with current state
educational standards regarding natural sciences.
Continuing production of Barbary figs—which per the POU cannot be done
commercially—would be economically untenable, biologically detrimental to native
species, and a misrepresentation of the historical Japanese farming community which
the City hopes to honor.
Thank you for your consideration.
Allen Franz
310 850-7189
TO:
FROM:
DATE:
SUBJECT:
CITYOF RANCHO PALOS VERDES
HONORABLE MAYOR & CITY COUNCIL MEMBERS
CITY CLERK
APRIL 19, 2022
ADDITIONS/REVISIONS AND AMENDMENTS TO AGENDA
Attached are revisions/additions and/or amendments to the agenda material presented
for tonight's meeting.
Item No.
B
H
3
Description of Material
Correction to Draft Minutes for April 5, 2022 (Regular Meeting)
Corrected Attachment B (Employee Compensation and Benefit Analysis
Report)
Email exchanges between Deputy City Manager Banales and: Mayor
Bradley and Diana Heffernan Schrader (Palos Verdes School Gardens);
David Siegenthaler (National Park Service); Adrienne Mohan (PVPLC)
Emails from: Heather Schmalbach and Mary Beth Woulfe (CA Dept. of
Fish & Wildlife)
** PLEASE NOTE: Materials attached after the color page(s) were submitted
through Monday, April 18, 2022.**
Respectfully submitted,
L:ILATE CORRESPONDENCE\202212022 Coversheets\20220419 additions revisions to agenda.docx
From:
Sent:
To:
Subject:
Attachments:
Please add to late corr:
Teresa Takaoka
Tuesday, April 19, 2022 12:39 PM
CityClerk
20220405 CC MINS_IA Meeting .docx
20220405 CC MINS_IA Meeting .docx
Correction to votes as stated on page 8 for item No. 2 Appointment to Civic Center Advisory Committee.
You need only include page 8 for late corr.
Thank you
Teri
1
A YES: Cruikshank, Dyda, Ferraro, and Mayor Bradley
RECUSED: Alegria
NOES: None
Councilmember Alegria returned to Council Chambers and rejoined the meeting at
at 8:21 p.m.
REGULAR BUSINESS:
2. Consideration and possible action to appoint one member to the Civic Center
Advisory Committee. (Takaoka)
City Clerk Takaoka announced that ballots were distributed earlier in the evening to
appoint one member to the Civic Center Advisory Committee.
After one round of balloting, the following appointment was made:
Mickey Radich was appointed to the Civic Center Advisory Committee, with a term
ending in June 2024 (Councilmember Cruikshank, Councilmember Dyda, Mayor
Bradley voting Radich; Mayor Pro Tern Ferraro and Councilmember Alegria for
Hevener).
3. Consideration and possible action to approve a Memorandum of
Understanding with the Palos Verdes Peninsula Land Conservancy to act as
"co-buyers" in the purchase and management of the Lower Filiorum and
Plumtree properties. (Wynder)
City Clerk Takaoka noted that late correspondence was received, and there were
three requests to speak.
City Manager Mihranian shared a Staff report and PowerPoint presentation.
Discussion ensued among Council Members and Staff.
The following member of the public addressed the City Council: Noel Park, David
Snow, and Barbara Sattler.
Discussion ensued among Council Members and Staff.
Mayor Bradley moved, seconded by Councilmember Alegria, to approve staff
recommendation as follows: 1) Approved the Memorandum of Understanding
("MOU") by and between the City of Rancho Palos Verdes and the Palos Verdes
Peninsula Land Conservancy ("PVPLC"), dated April 5, 2022; and, 2) Authorized the
Mayor to execute the same following approval as to form by the City Attorney.
The motion passed on the following roll call vote:
City Council Regular and IA Minutes
April 5, 2022
Page 8 of 10
From: Trang Nguyen <Tnguyen@rpvca.gov>
Sent: Tuesday, April 19, 2022 2 :20 PM
To: David Bradley <david.bradley@rpvca.gov>; Barbara Ferraro <barbara.ferraro@rpvca.gov>; Ken Dyda
<Ken.Dyda@rpvca.gov>; John Cruikshank <John .Cruikshank@rpvca.gov>; Eric Alegria
< Eric.Alegria@rpvca.gov>
Cc: Teresa Takaoka <TeriT@rpvca.gov>; Nathan Zweizig <NathanZ@rpvca.gov>; Ara Mihranian
<AraM@rpvca .gov>; Vina Ramos <Vramos@rpvca.gov>; Karina Banales <kbana les@ rpvca.gov>
Subject: Late correspondence -item H
Good afternoon honorable Mayor and City Councilmembers,
Attached is a late correspondence to the consent item H, the 2021 City employee
compensation report. Councilman Dyda was kind enough to point out an error on the
column heading for attachment B, see below.
ACNAL CITY PM> llNUllS lMPtOYIE'S EAIINlO HOUIS
SIU V:11atl0ft Ito
This column is the total wages and benefits, not benefits . We have updated the column
heading to reflect the correct title, please see the attachment. No other changes were
made.
ACTUAL CITY PAID BENUIIS
l!:i tA
Med f.SS
00.
tlf.t! ib:'titc!e
II ASU n.11 ce IH I:! ihtt
E!s1.iirna.tec1 l
e. £:ill
Please let me know if you have any questions.
Thank you,
Trang Nguyen
Director of Finance
tnguyen@rpvca.gov
Phone -(310 ) 544-5278
EMJ
!IA_,au 9
Avoilob le in tt-.e App Slont and Googl• P lo y
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes, CA 90275
Website: www.rpvca.gov
I (Ju1,n l o .1d (lfl 1"t'
• AppStor e
GET I i C~~
• Google Play
This e-mail message contains information belonging to the City of Rancho Palos Verdes, which may be privileged, confidential and/or
protected from disclosure. The information is intended only for use of the individual or entity named. Unauthorized dissemination,
distribution, or copying is strictly prohibited. If you received this email in error, or are not an intended recipient, please notify the sender
immediately, Thank you for your assistance and cooperation,
ATTACHMENT B
EMPLOYEE COMPENSATION
AND BENEFIT ANALYSIS REPORT
(DETAILED REPORT)
CALENDAR VEAR 2021
EMPLOYEE INFORMATION
Emp I Annual Salary! Annual Salary
last Na me Flm Title FTorPT IFull Yr?I Minimum
Ace ro
Acosta
A~ia
Al-sherif
Rosario IParkRan_1er
Jairo
Eric
Nasser
Main tenance
Worker I/II
City Council
Member
Recreation
Leaderll
FT
FT
El
PT
Alvarez John 5eniorPlannerl FT
Amum:kon I Diane
Accounting
Technician
Resources
Augustine lvonetta· \Analyst
Awwad Ramzi
Bailiff Cheri
Banales Ka rina
Banuelos I Bruno
Director of
Public Works
Permit
Technician
Deputy City
Mana.1er
Maintenance
Wo rker I/II
Administrative
FT
F7
FT
FT
FT
Barnes Me_~an Analyst FT
Bashmakian IArtashes l5eniorP1anner I PT
Recreation
Bautista Claudio !Leader
Program
Beri Andrew )5u~rvisor ll
Ber mudez I Jason
Recreation
Leader ·
Boyle James
Bradl~ David
Rec reation
Specialist
City Council
Member
Administrative
PT
FT
PT
El
Bri£ht Mckenzie IArialystl FT
Brown PT
Permit
Brown Jamaal lrechnician FT
fS-enlOr
Administ ra tive
Browning lchristopher !Analyst I FT
Buchwald ILukasz
Campbell I Melvin
nformation
Technology
Mana.1er
Recreation
Leaderll
FT
44,857
52,223
4_!00
31,335
93,279
59,3 10
67,808
104,749
58,668
119,322
52,223
87,849
93!.279
29,443
74,214
29_,_443
38,719
4!.800
67!.812
29/65
58,668
87,849
98!075
31,335
Ma 11imum
58,265
67,889
4!.800
38,542
121~152
77,052
101,879
177,360
76,164
202~729
67,889
114~115
121.152
31,419
96,380
31!.419
50,305
4!.800
88p63
68!.203
76,164
114,115
166,064
38,542
W-2
Medi care
W.i_!es
41,549
52,361
8!.665
15,775
111!.568
26,517
46,166
181,932
58~993
164_,_221
64,340
90,421
28!.595
2,157
71,629
3!.561
31,663
8~665
68_,_492
4p5o
64,156
98!.523
153,042
3,233
Salary or
W.i_!e s
41,830
52,178
4!.800
16,582
121,050
27 ,701
39,781
188,475
61,586
164_,_696
67,832
93,060
28!.595
2,050
85,774
3!.487
33,708
4!.800
67!.848
4p5o
65,174
110,021
148,878
3,269
OT/C..11
o"'
1,360
5,459
312
728
4,446
107
376
1~151
2,751
126
City of Ranc ho Palos Verdes
Employee Compensation and Benefit Analysis Report
Ca lenda r Year 2021
ACTUAL CITY PAID WAGES
Aoto
Allo w
1,500
1!.800
Declined
Health lnsr
3!.865
1,932
3!865
3,865
Bonus/
Merit
Bonus
3,000
2,996
4,000
1,250
3_,_000
2,250
4,000
1,000
275
4,000
2,000
3,000
Other/Retro/ Total ACTUAL
P.iy/ l eave Buy Oty Paid
Adj Out W.i&es
1,154 44,344
60.e_37
8_,_665
16_&94
124,045
952 2s_e_53
7,527 49,241
193~75
63!.564-
6_,_409 175,904
74~28
256 206 97,521
282_95
2!157
86!.774
74 3,_561
34,359
8!665
82 73,!)80
4,050
290 805 69!.020
56 112,076
1!.347 7,297 164!.387
3,495
lof7
Pension
(PERS)•
3,358
4!179
1,370
27,320
2_,_505
3,594
12,288
4,921
12~218
15!.336
7,423
7,882
7,653
5,421
5,226
10,123
11,913
791
Mediul
Vis/Den
Insura nce
8,366
21,732
18,664
7_,_480
440
15!.983
13,365
9~478
21,732
9,478
23,335
15,568
9,478
21,732
14
ACTUAL cnY PAID BENEFITS
FICA
Med/SS
603
759
423
229
1,618
385
669
2,638
855
2!.381
933
1,311
415
165
1,039
272
459
423
993
310
930
1,429
2,219
47
Workers life
Comp lnsur.ince
(estimat ed) (estimat edl
887 268
1,214 333
173
338
2,491 1!.019
577 243
987 331
3!.881 1,118
1!.275 497
3!.525 999
1,504 565
1,953 580
572
43
1,738 705
71
687
173 177
1,463 428
81
1,382 421
2,245 894
3,294 917
70
Retiree
He.ilth
Savin!!_
133
1,712
652
847
1,712
1/12
1!.712
1,712
1,712
1,645
133
1,386
1,712
1,712
D•f
Com~
600
180
398
1,885
720
1_,_647
720
660
660
720
1!.502
Subtotal
Be oefib
14!.082
Z.8,350
597
1,937
52!.823
12!.021
7_?66
39!.510
23!.346
31!.960
41!.783
23,177
987
208
37i>04
344
8l99
773
24!.007
391
19,483
38!.854
21!.571
908
EMPLOYEE'S EARNED HOURS
Total ACTUAL
CltyPakl Wagesl WellNess l Admin
&Benefits l e .ive Le.ive
58!.426
88,987 14
9!.26 1
18,831
176~ 62
40!.674
,._,..
233!.485 80
86!.910
207,864 23 80
116!.311
120,699 27 62
29,582
2,365
123!.778 62
3!.904
43!.158
9,438
97!.087 14
4!.441
88,503 23
150~30 25 62
185~57 62
4~3
Tot,I
Comp l H~n
Sick I V.iation I Holid.iy\ Hrs Ea rned
85 71 20 185
96 80 27 226
36 ,.
96 134 315
37 46 92
48 61 123
96 142 340
96 96 201
96 160 367
96 145 268
96 91
92 92 264
46 ..
96 80 199
96 80 208
96 96 288
96 120 287
City of Rancho Palos Verdes
Employee Compensation and Benefit Analysis Report
Calendar Year 2021
EMPLOYEE INFORMATION ACTUAL CITY PAID WAGES ACTUAL CITY PAID BENEFITS EMPLOYEE'S EARNED HOURS
W-2 Bonus/ Other/Retro/ Total ACTUAL Medical Workers Life Retiree Tobi ACTUAL I Tm,1
Emp Annu:alS:aLuy Annu:1115.iLuy Medicare 5.lilaryor OT/Call A .. , Declined Merit P;ay/ Leave Buy City Paid Pension Vis/Den F1CA Comp Insurance Health o,, Subtotal City Pa id W;aa:es WetlNess Admin Comp Hours
LutN;ame First r11:1e Flor PT Full Yr? Minimum Muimum W:aa:es Waa:es O•t Allow Heatthtnsr Bonus Adj o., W:aa:es (PERS)* lnsur:ance ~d/SS (estim:ated) lestim;ated) 5.livings Comp ....... &~n_e~ leave Leave Sick Vacation Holiday Hrs Euned
Staff Assistant I
Carbajal '"" -PT PT y 45,927 59,675 34,~59 _ -~565 344 750 I I 36,659 j 2,866 I 497 I 733] I I -1 __ 4,096 J 40,755 I 521 52
Planning
Chura David Commissioner AP y 1,620 1,620 1,620 1,620 I I -I I 1,620 I I 124 1 " I -I I ,,. I 1,n6
Recrea1ion
Clark I Noah lteader PT y 29,443 31,419 5,664 ,.,,. I I I I -I __ tl ---=-~I I I 433 ] 1ul I I 547 I 6,211 I I -I nl I -I 13
enior
Administrative
Cloke [Lorna !Analyst FT y 87,849 114,115 95,206 107,264 1,000 66 108,330 24,231 21,732 1,380 2,193 881 1,712 52,129 160,459 I 181 621 "I 120 I ,1 "''
Colborn !Emily City Clerk FT y 98,07S 166,064 8,480 0 15,632 15,632 123 313 41 4n 16,109
Staff Ass istant I
Correa !Cla rissa -PT PT N 45,927 59,675 12,025 12,025 j -I I I -J_ ___ _:_J I 12,0ZS I -I 0201 2411 1,1~ __ !3,taSI -I 161 16
Recreation
'" lsus an I s pecia list PT y 38,719 50,30S 23,834 24,63S1 ss,I I ml I I 25,497 1 2,001 \ I 3461 s10I , ... ,1 28,359 I 391 I I 39
City Council
Cruikshank !John I Member EL y 4,800 4,800 4,800 , .... 1 I 27,893[ I 96 I 174j I J _ za.1~L_ ___ ~
o, IL•
\Recreation
!Leader PT N 29.443 31,419 7,818 7,372 445 ,.au l -I ,,. I 156] I I I 154 I 1.s12 I 111 -I -I -I 17
Staff Assistant I
4,1491 -I -I , .. 1 s3 I I -I -I 341 I Del Campo lsarah -PT _lM __ -y 45,927 59,675 _4_,_~_ 4,149 4,495
L,. uman
Resources
oeziel ~~_J__ 104,149 L 111,350 t 138~~ -L I 3(8~s I _4,""'U_ 1,362 1 6,237 I 149,01• I -~2~~_1_ 1,498 I 2.00, I 2,9891 8361 1,112 I 1.3SO I 22,190 I 171,1641 21 I "I 961 160 I , I I 354
Recreation
Donnelly Cynthia leader II PT y 31,335 38,542 12,508 12,879 385 275 13,538 2,962 181 271 3,414 16,9521 -I ,s I -I -I -I 25
Principal Civil
Dragoo Ronald Engineer FT y 98,075 166,064 140,396 155,303 155,303 35,033 21,732 2,036 3,186 1,258 1,712 64,956 220,259 I 141 621 961 160 I ,1 -I 340
City Council
Dyda Kenneth Member EL y 4'00 4,800 8,665 4$00 3,865 8,665 423 173 174 771 9,436
Senior
Eder Charles Engineer FT y 105,928 137,556 128,499 137,440 1,361 138,801 10,905 13,422 1,863 2,784 1,137 1.712 720 32,543 171,344 I 23 1 621 96 I 1201 ,1 I 310
Recreation
Falcon lsandra !Leader PT y 29,443 31,419 12,250 11,847 345 57 12,250 912 245 1,157 13,401 I 21 I 27
lrhomas
[Recreation
Ferrari !Leader · PT N 29,443 31,419 3,070 3,070 3,070 235 61 296 3,366
!Barbara
ICityCouncil
Ferraro !Member EL y 4,800 4,800 8,665 4$00 3,865 .... , 423 173 177 m 9,431
Recreation
Flores !Joseph leadt'r II PT y 31,335 38,542 18,15<1 19,070 371 19,441 1,563 263 389 2,215 21.656 I -I 39 I I 39
Fourmy !Jennifer
Recreation
Leader PT y 29,443 31,419 13,193 13,119 75 13,193 995 264 1,259 14,4S2 I 301 I I "'
'" \Taylor Park Ranger FT y 44,857 58,_2§5 ---~.525 50,515 3,601 ~-~----54,296 4,061 1_!~ __ _____?2! __ 1,087 327 1.321 no _ ______!1,!!!_----_ 75,909 I SI 961 SOI 100 I ,.,
Recreatfon
fo, !Cameron !Leader PT y 29,443 31,419 12,273 12,849 210 88 13,147 1,083 178 263 1,524 14,671 I I 311 I 31
Recreation
Fo, !Adam lteaderll PT N 31,335 38,542 2,012 2,012 2,012 154 40 194 2,206
Recreation
fo, I Francine lteadern PT y 31,335 38,542 26,744 28,416 246 ,.,.., 2,302 388 573 3,263 31,92S I so I -I so
2 of7
City of Rancho Palos Verdes
Employee Compensation and Benefit Analysis Report
Calendar Year 2021
EMPLOYEE INFORMATION ACTUAL CITY PAID WAGES ACTUAL CTTY PAID BENEFITS EMPLOYEE'S EARNED HOURS
I I W-2 Bonus/ Ct.her/Retro/ Tot.ii ACTUAL Medic.ii Workers life Retiree ToblACTUAL,I ,I ·1 I ~l I Tobi Emp An nu.ilS.ililry Annu.ilS.ililry Medic.ire Sill.iryor OT/C.ilt .... Declined Merit P.iy/ lnH Buy CityP.ild Pension Vis/Den FICA Comp lnsur.ince Health o,, Subtotal Ctty Pa id Wages Well Ness Ad min Comp Hours
Last Name First rrtl, FT or PT Full Yr? Minimum Maximum Wages Wages Oot Allow Healthlnsr Bonus Adj Oot Wages (PERS)• lnsur.inee Med/SS (estim.ited) (estim.it ed) Silvings Comp ....... & Benefits Le.ive Le .ive Sick Va_~_tion Holldil'i'._ Hrs Euned
!Richard
!Recreation
33,119 I Fo. lspe<:ia lfst PT y 38,719 50,305 27,970 27,901 847 1,105 29,853 2,2.63 406 597 3,266 451 45
Recreation
_Ganser !sherry Specia list PT N 38,719 50,305 21,130 22,814 141 22,955 5,193 306 459 5,959 28,914 I "I I 36
Admin ist ra tive
_Ga rrett lusa Ana lyst II FT y 67,815 101,875 90,253 89,564 10,316 1,000 1,530 102,411 20,230 21,732 1,309 2,062 710 1,712 47,754 lS0,1641 231 96 I 1201 91 171 264
Associate
_Giang lsteven Planner FT N 81,074 105,300 38,429 41,149 41,149 3,253 3,145 557 824 249 8,028 49,177] SI "I 371 91 101 104
l,,v,,,,, Recreation
_Givens Leader PT y 29,443 31,419 16,043 16,386 388 250 133 17,158 1,366 233 343 1,942 19,099 I 40 I 40
Recreation
_Gonez I Alan !Leader PT y 29,443 31,419 20,987 20,344 579 65 20,987 1,573 420 1,993 22,980 I "I 39
uman
Resources
Gonzalez loe nise Analyst FT N 67,808 101,879 39,095 40,893 1,000 41,893 3,854 3,313 567 839 257 409 9,239 Sl,132! SI 621 44 1 5'1 91 I 174
;Gonzalez-
Mestas [Edgar Park Range r FT y 44,857 58 ,265 40,292 41,970 691 184 42,845 3,070 6,973 809 858 245 11,954 54,799 I 1'1 "I 65 I 50 I 2U
loavid
Recreation
Gregg Leader PT N 29.443 31,419 8,679 8,507 172 8,679 664 174 838 9,5171 211 21
Staff Assistant I
Grieco I Jennifer -PT PT y 45,927 59,675 30,758 30,757 1,000 31,757 1,188 1,427 635 3,250 3S,0071 43 I 43
Recreation
Guzman !Jose I specialist PT N 38,719 50,305 235 252 252 22 3 5 31 ml
Pla nning
l,776j Hamm !Julie I commissioner AP y 1,620 1,620 1,620 1,620 1,620 124 33 156
!Juan
\Maintenance
Hernandez !superintendent FT y 99,092 128,692 97,806 109,406 4,000 308 113,714 10,Q89 16,647 1,418 2,278 897 1,712 720 33,760 147,474 I SI 621 96 I 96 I 91 267
Hernandez /cra~g ____
(ecreation
Leader PT N 29,443 31,419 211 211 211 16 20 2311
Ad minist rative
109,4061 Hirsch IMary JstaffAssistant FT 58,559 76,042 66,954 75 ,390 222 "7 76,059 6,:)45 21,732 971 1,552 615 1,712 720 33,347 231 "I 120 1 91 "I 331
Recreation
Howder lcheyenne lspecialist PT y 38,719 50,305 1,803 1,933 1,933 163 26 39 228 2,161
Hristova IMarieta 1:;:;:1:!~n PT y 38,719 50,305 15,799 16,943 16,943 1,380 229 339 , .... 18,891 I 241 24
Hunter Jeith Park Ranger FT y 44,857 58,265 40,054 48,097 2,797 50,894 3,857 16,647 581 1,019 307 1,712 720 24,841 7S,7351 SI 96 I 80 I 100 I 281
Recreation
Jacob IKrfstine !Leade r PT y 29,443 31,419 1,582 1,570 11 1,582 121 32 153 1,734
Pla nning
lames lwilliam lcommfssioncr AP y 1,620 1,620 1,49S 1,4 95 1,495 114 30 144 1,640
Recreation
Johnson leiena I Leader II PT y 31,335 38,542 10,749 11,324 331 11,655 2,605 156 233 2,994 14,649 I 221 -I -I 22
Recreation
Jo ncich I Neda ILeaderll PT N 31,335 38,542 552 552 552 42 11 53 605
1<.0ae
Enforceme nt
Jones l1vett lomcer FT y 68,351 88,767 17,997 20,224 55 804 21,083 1,593 4,262 261 423 128 120 6,788 27,871 I SI 26 I 221 91 21 62
Recreation
Kahn lrherese ls~cia!ist PT N 38,719 50,305 13,531 14,303 19< 14,496 1,147 196 290 1,633 1&,130 I "I -I 23
3of7
EMPLOYEE INFORMATION
Emp I Annual Salary I Annual 5.al.ary
last Name First Title FT or PT I Full Yr? I Minimum
Kalscheuer !Vance
Kalsche1Jer !Trent
Recreation
Leader
Recreation
Leader II
Recreation
Klein Michelle !Leader
Krin_!en
Kulmac-
butler
Kulmac-
butler
Laybon
Li_!htner
Lin
Linder
Lopez
scon
Er in
Joshua
David
An_!ela
l ane
(O_!Y
Sean
Recreation
Leader II
Recreation
leader
Recreation
Leader
Recreation
Leaderll
Re<:reation
Leader
Senior
Accountant
,irectoro
Parks&
Recreation
Assistant
En_!ineer
Administrative
PT
PT
PT
PT
PT
PT
PT
PT
FT
FT
FT
Lozano Katherine !Analyst FT
Macias
Ma_!ee
Martin
Nubia
Pem
Program
Supervisor!
Recreation
S~cialist
Permit
Kath!Y_n lrechnicial'I
Carlo
Accounting
Technician
Maintenance
Mccormack I Michael !worker l_lll
Recreation
Mccormack lcaro.!Y_n !Leader II
Recreation
M!i_ia Andrew lteader II
MesichH !Scott
Recreation
Leader
FT
PT
FT
FT
FT
PT
PT
PT
M ihranian IAra Cit_vManager " I FT
Mink
Molina
Momoli
Sally_
Recreation
Leader
Building
PT
Desirea lins~ctor l FT
En~sa
Administrative
StaffAssistant I FT
29,443
31.335
29,443
31,335
29,443
29,443
31,335
29,443
83,621
119!.322
85,112
87,849
58,559
38,719
58,668
S9_,_310
52,223
31,335
31_,_335
29,443
215_,250
29,443
68_,_807
58_,_5S9
Maximum
31.419
38,542
31_,_419
38,542
:n_,_419
31_,_419
38,542
31.419
109,476
202_,_729
110,530
114,115
76,042
50,305
76,164
77,052
67,889
38,542
38_,_542
31,419
215,250
31,419
89_,_333
76,042
W-2
Medicare
Wa_!es
9,038
7,597
1~97
13,743
1,055
947
13_,_484
24,641
102,922
166_,_629
77,963
110,724
68,523
10,192
83,602
50,745
56~752
17,434
2_,_728
428
234,995
15,550
64,399
59_,_516
Salary or
Wa_!H
8_,_420
7_?55
1,897
14_,_198
1,025
921
13_,_8 35
24_,_667
109,384
184,885
88,388
107_,_974
67_,_401
10,930
76,100
53,337
53,170
18,552
2_,_728
449
220_,_137
14,895
74_,_8 67
60,532
OT/Call
o"'
343
366
503
583
695
3,165
921
4,474
367
581
417
3,148
City of Rancho Palos Verdes
Employee Compensation and Benefit Analysis Report
Calendar Year 2021
ACTUAL 01Y PAID WAGES
....
Allow
1_,_800
8,400
Decli ned
Health lnsr
3,865
Bonus/
Merit
Bonus
275
275
4,873
3,500
1,000
2,384
3,000
1,000
Other/Retro/ Total ACTUAL
Pay/ leave Buy City Paid
Adj Out Waa:es
9_,_038
8,121
1~97
14,701
30 1,055
26 947
14,418
" 25219
2_,_554 116~12
,..,...,
as~
2_,_792 2,362 120,493
174 1~929 73,669
10,930
900 8,609 87,993
54,258
187 60~32
18,918
2,723
458
25,442 253,979
74 15,550
75,284
250 64,931
4of7
Pension
lPERS)•
553
1_,_182
1,150
1,283
24!593
16,955
7,035
25,Xl4
5,393
885
17,401
4,267
4,270
4,239
48
49,630
5,368
,1,gs1
Medical
Vis/Den
Insurance
21_,_876
16,259
13,226
14
15,983
13,365
13~061
13,365
13,365
21_,_675
8,609
ACTUAL CITY PAID BENEFITS
FICA
MedLSS
691
110
145
1gg
81
72
196
901
1_,_492
2,416
l!.130
l_,_605
994
148
1,212
736
823
253
209
3,408
1,168
934
863
Workers life
Comp Insurance
(estimated) (estimated)
181
162
38
294
21
19
288
514
2,354 880
3,765 1,513
1_,_770 549
2,414 873
1~475 417
219
1,810 627
1,087 m
1.218 319
378
55
5,096 1,498
311
1_,_508 598
1,300 371
Retiree
Health
Savin~
1,712
1,712
533
1,712
l_,_712
1,712
1.712
o,,
Com_e_
1,849
720
120
1,712 [ 11,007
1,712 720
1,712 720
Subtotal
Benefits
872
926
m
1_&75
102
91
1_&34
2,698
53!.006
44!.468
24_,_243
31!.623
26!.694
1~52
36_,_127
19,545
21,707
4,170
263
63
85,716
1~79
33_,_115
11,431
EMPLOYEE'S EARNED HOURS
Total ACTUAL
City Paid Wages! WellNess l Admin
&Benefits leave leave
9,911
9,046
2,0l<J
16.2_76
1,157
1~038
16~52
28,417
169~18 18 62
231_~153 80
112e_32
152!.116 14 62
100~2
12,182
124,120
73~3
82,539 14
23,7U
2,991
S21
339,695 80
17~29
108~
83,362
Tobi
Compl Hours
Sick I Vacation I Holida_!I Hrs I Earned
21 21
15 15
29 ,.
" 24
45 45
96 160 345
96 160 354
96 80 20 209
96 120 301
96 80 194
19 19
96 160 276
83 55 152
96 89 26 233
34 34
96 160 349
35 35
96 120 230
96 94 252 460
EMPLOYEE INFORMATION
last Name First Totl,
Emp I AnnualSalaryl AnnualSalary
FTorPT j FullYr? Minimum Maximum
Monroy
ode
Enforcemerit
Rodolfo I Officer FT
Monsivaiz !Erick
Building
Inspector 1 FT
Recreation
Morales Melanie lteaderll PT
Recreation
Ndubaku !Rowland lteader PT
Nemeth
N!':!'t_en
N!':!'t_en
Nulman
Nunez
Robert
Tr an_£
Lina
Eric
Associate
Planner
Director of
Finance
/t:ieographic
Information
5~tcms
FT
FT
FT
Planning
Commissioner ] AP
Recreation
Jonathan lteader II PT
Recreation
68.!.351 88,767
68,807 89,333
31,335 38,542
29,443 31,419
81,074 105,300
119.!.322 202/29
85,096 110,536
1,620 1,620
31.335 38,S42
Medicare
Wa_!eS
81,763
68.!.482
2,985
12.!.578
117,097
179.!.791
31.023
125
6,588
Salary or
Wa_!H
83,462
73,646
2.!.985
13,198
104!115
178,470
29,851
125
6,827
OT/Call
o"'
1.!.210
21)4
24,865
222
City of Rancho Palos Verdes
Employee Compensation and Benefit Analysis Report
Calendar Year 2021
ACTUAL CITY PAID WAGES
... ,
Allow
1,800
Dedined
Health lnsr
Bonus/
Merit
Bonus
2,750
750
169
4,000
Other/Retro/ Total ACTUAL
Pay/ leave Buy City Paid
Adj Out Waaes
1,321 88,743
74,396
2,985
l1 13_~74
751 129,901
3.!.8 10 12.!.866 200!.945
4,906 34,757
125
7,048
Pension
(PERS)•
7,809
5,872
1,104
8,275
16,726
2!.39 1
574
Medical
Vis/Den
Insurance
13.!.689
13,689
21.985
23,901
ll!.672
ACTUAL CITY PAID BENEFITS
FICA
MedLSS
1,186
993
224
182
1!.698
2.!.607
450
10
96
Workers life
Comp Insurance
{estimated) (estimated)
1,777 663
1.!.490 609
60
269
2,604 85'
4.!.026 1!.391
695 252
141
RetirH
Health
Savin_!S
1,712
1,712
1,712
l!.712
521
o,,
eom_e_
720
720
720
1.!.823
240
Subtotal
Benefits
27.!.S56
25, ...
,..
1.2_56
37~7
52!.186
16!.222
12
110
EMPLOYEE'S EARNED HOURS
Total ACTUAL
CttyPaldWagesl WellNess l Admin
&Benefits leave Leave
116,298
99,482
3~69
15!.029
167,748
253.!.131 18 80
50~79
137
7,859
,,..,
Comp l Hours
Sick ! Vacation I Holiday ! Hrs I Earned
96 96 127 337
96 96 20S
32 32
96 120 230
96 154 357
30 30 58
14 14
Okstad Karen Specialisl PT Y 38,719 50,305 31,563 33,136 328 750 34,214 7,522 458 684 8,664 42,87& 50 SO
O'neill
Pantola
Penate
James
Project
Mana_!er
Rec reation
FT
Jocelyn I Leader PT
Nancy
Administrative
StaffAssistant I FT
Planning
Perestam l5te_e_hen !commissioner I AP
Perry
Pinto
Proch
Proch
Qazi
G"Y
Jose~
Rec rea1ion
Leader
Recreation
leader
Accounting
5ovanna lrechnician
Recreation
Richard I leader
Recreation
Zaynab lteaderll
enior
Administrative
PT
PT
FT
PT
PT
Ramezani I Lauren Analyst FT
Ramos
Rasor
Ratliff
Vina
David
,el)Uty
Director of
Finance
Building
!ns?!ctorll
Recreation
Ma_!Y_lane lteaderll
Razepoor I Nasser
Associate
En_!ineer
FT
FT
PT
FT
94,579 122,812
29,443 31,419
58,559 76,042
1,620 1,620
29!.443 31,419
29,443 31,419
59,310 77,052
29,443 31,419
31,335 38,542
87,849 114,115
104,749 177!360
77,050 100,069
31,335 38,542
94,579 122,812
100,869 103,500 3,865 1,500 lOS,165
6,032 5,588 343 6,032
67,061 71.!.968 500 72t168
1,620 1,620 1,620
12!.980 12,425 258 250 47 U!.980
1.!.357 1!.185 172 1~57
55,860 68,164 425 265 58 .. 54
9,805 10,123 286 85 10,494
20,932 21.412 965 ll,3n
101,673 114,019 114,019
150.!.702 148,897 3,865 3})00 987 5!.646 162.2_9S
81,268 81!.762 1,281 3,865 442 87,350
3,074 3,296 3!.296
22,711 19,644 3,865 23,509
5of7
9,520 879 1,463 2,183 635 1,712 720 11,111 125,976 22 62 96 81 270
451 121 S71 6~3 12 12
5.!.740 15.!.983 972 1!.453 576 1.!.712 720 27!.156 99_ezs 14 96 96 10 22S
124 33 156 1!.n6
993 260 l!.253 14,233 31 31
104 27 131 l!.488
5,431 24,836 810 1,380 531 1,712 720 35,420 104,274 14 96 96 214
859 142 210 1,211 11,705 24 24
1,751 304 448 2~2 24~79 40 40
25,736 20,462 1,474 2,309 962 1,712 52,6SS 166,675 62 96 160 327
13,761 879 2.!.185 3!.254 1!.156 1,712 1,499 24!.445 116)!40 62 96 135 302
6,547 14 1,178 1~750 520 1,386 11,396 98,_74S 96 80 190
279 45 66 389 3,686
1,573 13 329 485 377 326 120 3,222 26,732 52 18 18 108
City of Rancho Palos Verdes
Employee Compensation and Benefit Analysis Report
Calendar Vear 2021
EMPLOYEE INFORMATION ACTUAL CITY PAID WAGES ACTUAL Ct1Y PAID BEN EFITS EMPLOYEE'S EARNED HOURS
I I W-2 Bonus/ 01he r/Retro/ Total ACTUAL Workers Life Retiree ToblACTVA',I •1 I I ,I I I Tobi 1 M•dkal Emp AnnualS..bry AnnualSabry Mediare 5.i laryor OT/UIII A"'• Declined Merit Pav/ Leave Buy City Paid Pension Vis/Den FICA Comp Insurance Health D•f Subtotal City Paid Wages WellNess Admin Comp Hours
Last Name First I Titl e Flor PT Full Yr ? Minimum Maximum Wa ges Wages Dot Allow Health lnsr Bonus Ad j Dot Wages (PERS)• Insurance Med/55 (estimated) (estimated) 5.lvings Comp Be nefits & Benefits Leave Leave Sick Vae;i t ion Holiday Hrs Earned
!Amber
I Recreation
167 44 Reed !Leader PT N 29,443 31,419 2,188 2,188 2,188 211 2,399
ILucia
IParkRanger -,_,..1 I I nl I -I Rivera IPT PT N 44,8S7 S8,26S 8,434 7.862 572 8,434 636 169 aos ,._,
]carlos
!Television
Rivera I Producer PT y 37,326 74,672 46,182 53,422 SOD 53,922 4,274 12,958 670 1,078 "·"° 72.902 I I I 56 I -I -I I 56
I Nelson
I Planning
Robert !commissioner AP N 1,620 1,620 125 125 125 10 3 12 137
!Jacob
!Recreation
31,4191 "·'°' I 14,584 I 2471 -I -I -I ,,1 -I 14,906 1 -I -1 1,136 1 2981 -I -I -I 1,435 1 Rochte !Leader PT y 29,443 16,341 I -I I 351 I I 35
1;~rca1on
74,_21_4 ---~6,3801 72.991 I_ ~~-~l j l l qsJ ___ ,l 2.06~L-__ 79.n21 17,2791 ~3.3~ -1~~81_ 5691 1;?_121 ~_!_15,3531
rogram
Rodin IEmil_v ___ lt~:::~~~~\11 FT V 201 621 96 I 1011 81 ,.,
Community
Rukavina !Kenn eth I Development FT V 119,322 202,729 168,976 174,7S7 1,800 176,557 12,248 13,36S 2,4SO 3,622 1,061 1,712 1,7481 36,206 I 212,7621 23 [ 80[ 96 I 160 I 91 I 367
Planning
Saadatnejadi Lan Commissioner AP V 1,620 1,620 1,620 1,620 1,620 124 33 -I 156 I 1,776
l~a~arnaga-Assistant
720~13L 96,8641 gu1llean Maricela Planner FT V 71,347 92,668 70,581 72.761 3,390 ~ --. ~9~ 9,478 1,023 1,S24 4~ --_!,z.!_2 96 I a, I 9[ ,o I 221
ecreat1on
lSaldana Program
Lopez Norma Supervisor! FT V S8,SS9 76,042 58,604 S9,341 1,899 1,000 913 63,153 4,744 9,478 850 1,264 362 1,712 720 19,129 82,282 I 5[ 96 [ 80[ 9[ -I 190
lsanchez
Park Ranger -
!Moris IPT PT N 44,8S7 S8,26S 4,207 4,207 4,207 322 84 406 4,613
lsantarosa
Planning
Romolo Commissioner AP V 1,620 1,620 1,620 1,620 1,620 '" 33 156 1,776
lseecatv Amy Senior Planner FT V 93,279 121,1S2 97,637 112,841 1,277 1,440 115,557 2S,761 24,836 1,416 2,316 960 1,712 57 ,001 172,558 I 62[ 96 I 120 I 91 ,.,
Recreation
l5~ David Leader PT N 29,443 31,419 8,264 7,796 193 275 8,264 632 165 "" 9,062 I I 191 19
Rec reation
Serna IMa rc05 ILeaderll PT N 31,33S 38,S42 1,200 1.200 1,200 92 24 116 1,316
!Evan
!Recreation
Sichan ]Leaderl! PT V 31,33S 38,542 25,970 2S,921 1,798 27,719 2,lOS 377 554 3,036 30 ,1ss I 481 -I -I 48
loctavio
l~~::rof
Silva I community FT y 104,749 177,360 134,676 146,472 4,500 2,850 153,322 13,44S 17,632 1,953 3,082 1,083 1,712 1,130 40,037 193,359 I 12[ 62[ 96 I 120 I 91 299
Sin~~n joaniel
1~arkRanger -
PT PT N 44,8S7 S8,26S 222 222 222 17 21 243
!Paulina
I Recreation
Skelin !specialist PT V 38,719 50,305 286 306 306 29 6 " 346
Recreation
Smith !Erica !Leader II PT V 31,33S 38,S42 4,914 4,78S 129 4,914 376 98 474 5,3891 -I 10 I 10
Rec reation
Smith !Audrey ]Leaderll PT y 31,33S 38,S42 19,601 20,646 348 20,994 1,691 284 420 2,395 23,390 I 441 ..
States !Timothy
IRecrea~ion
Leader PT 29,443 31,419 4,0S3 3,849 182 21 4,053 310 81 391 4,444
Stoker
I Recreation
lcoleman Leader PT N 29,443 31,4 19 6,037 6,037 6,037 456 121 S76 6,613 I 141 14
Recreation
Stricklen IMaya jspecialist _PT N 38,719 50,305 2~--~~6-770 21,956 1,724 298 439 2,460 24,417 I I -I 351 I 35
6of7
City of Rancho Palos Verdes
Employee Compensation and Benefit Analysis Report
Calendar Vear 2021
EMPLOVE:INFOR~::· Ao,oalSaa ,v .... ,,,, . .., M.:;:,. s.,,..,., OT/Call :.~AL::.:IDW;~;, O,h•;::r•1I , ...... ,[To~A~Al Pension I :s~~:~ I FICA ACTUI ~~;;r,,:;,;.~r::!:· [ Dof I '"''°"' c:::,:c:.:~.1w.11Nm l Adm~MIPLOYEEl'SEARNrHOURSICompl :::~
LastName I First I r1t1e FTorPT FullYr? Minimum Muimum wa·ges Wages Out Allow He.althlnsr Bonus Adj I Out WaaH (PERS)• Insurance Med/SS (estimated)l (estimated)I Savings Comp Benefits &Benefits s l Leave
5
1 Leave Sick Vacation ! Holiday Hrs Euned
\Television
Swan5on IElilabeth !Producer PT Y 37,326 7/J,672 40,780 40,280 500 I I 40,780 [ J [ 3,100 I 8 16 [ I I \ 3,915 I 44,695 I I I 33 I I I 33
loeputyCity
Ta kaoka ]Teresa !Clerk FT Y 69,176 89,871 108,879 110,451 I 6,603 I ! I 9,165 I I I 126,218 I 24 ,936 [ 24,836 j 1,579 j _ 2,534 I 848 I 1,712 I I 56,445 I 182,663 I 5 I 62 I 96 I 160 I 9 I l 331
Recreation J
TangestanifarlParkhideh Leader PT Y 29,443 31,419 15,413 15,674 429 [ ] J _ l 8~_L _ ___:__l__ 16,929 [ -I -I 223 [ 308 [ I \ I 532 [ 17,461 I I I 33 I I I 33
1 Recreation
Thelen Quentin >-''-''-'-'---+_PT_f-Y-t--'~'·-"-'+---'~'·-"-'+-1_,_,~•"-'-+l -~14,729 [ 254[ I I -I 70 [ I 15,052 [ 745[ I 562 1 301[ I -I I 1,608j __ 16,6601 I I 301 I -) 30
Torrey [Dana l::~:~tlilon PT Y 31,335 38,5421 24,7711 26,5641 I [ I ] ] J __ 2~.-~ __ -1_~?2 L I 359 I 531 [ I I I 3,0451 29,609 I I I s1 I I I 51
I
Depuly
Director of
Recreation &
Trautner I Daniel !Parks FT Y 104,749 177,360 138,277 145,338 3,000 8,483 156,821 13,342 16,818 2,005 3,142 1,193 1,712 1,453 39,664 196,485 I 13 [ 80 I 96 [ 122 I 9 I 320
Recreation
Ugalde Andrew Leader PT Y 29,443 31,419 869 828 41 869 67 17 84 953
Ulutas Kadir ::;::~lion PT Y 29,44 3 31,419 10,000 9,231 658 111 10,000 I I I 744 1 200 I -I -I -I 9441 10,944 J -\ -I 21 I I -I I 21
Valencia Stephanie AccountClerk FT Y 52,398 68,029 39,567 41,522 1,249 42,7711 3,3321 5,9081 5741 8~6_1 !9_J ___ -1 42_9l _____!!,~-~._0541 141 -1 731 461 91 _ j 142
Recreation
Ventouras [George Leader PT Y 29,443 31,419 786 830 25 855 207 11 17 235 1,090
enmr
Villalpando liesse :~:~:~Slrative FT Y 87,849 114,115 87,407 90,250 4,000 94,250 7,182 9,063 1,267 1,887 576 1,321 660 21,955 116,206 I I 62 I 96 I 80 I 9 I I 247
1 A::~~istrative
Waters Matthew r•~··~'""'----t~FT~1-•~1---''~'·~"~'+--~"~'~·""'+--"'"'"~·'"'"+--'"''~·D"L9+---+--+---+---''""''"'"+------,~--1---''="cc••cc"+-"'""'''-'""'-'+---'"D"',OO<"-+---''~•'=,"+---''""''""+--'"'"-' t---''"'''-""+---l---''""''"""'+---''=''"',950 I 18 I 62 I 96 I 160 I 9 I I 345
Recreation
Welstead [Lisa [specialist PT Y 38,719 50,305 8,970 8,955 345 275 9,574 766 130 191 1,088 10,662 I I I 14 I I -l I 14
l~~foercement
Whitten !Gerri !Officer FT N 68,351 88,767 25,576 29,827 280 30,107 2,363 8,661 371 603 188 300 12,486 42,593 I 9 I I 41 I 34 I 9 I 7 I 99
I Recreation
Williamson [Leslie [specialist PT Y 38,719 50,305 5,049 5,414 5,414 459 73 108 641 6,054
Senio r Account
!wright lselena Technician FT Y 66,428 86,297 78,393 86,225 3,561 89,786 19,478 13,115 1,137 1,808 726 1,712 37,975 127,761 I SI I 96 I 160 I 9 I I 269
lvoon jJae Hee Senior Planner FT Y 93,279 121,152 91.359 104,389 2,000 106,389 8,298 24,074 1,325 2,131 740 1,712 720 38,999 14S,388 I 9 I 62 I 96 I 96 j 9 I -I 272
Assistant
Yost jKrista !Planner FT N 71,347 92,668 30,872 33,073 33,073 2,620 3,488 448 662 201 7,419 40,492 I I I 44 ( 37 I 9 I 8 I 98
I Recreation
Zellers IAnn !specialist PT Y 38,719 50,305 27,334 28,881 403 29,284 2,340 396 586 3,322 32,606 j I I 46 I I I I 46
Zweizig I Nathan :t~;i;:::~:~~ FT Y 58,559 76,042 80,639 74,011 12,338 500 373 87,222 16,799 13,365 1,169 1,747 588 1,712 35,380 122,602 I 14 I -I 96 I 120 I 9 I 96 / 33S
TOTAL I I I $8,280,480 $11,031,361 $6,850,609 $7,080,030 $118,394 $17,100 $44,443 $113,634 $ 20,844 $129,365 $ 7,523,811 $826,503 $920,190 $119,295 $151,063 $ 45,056 $88,936 $46,179 $ 2,197,221 $ 9,721,032 I 681 J 2,048 I 7,590 I 6,847 I 84S I 734 I 18,745
•Pension (PERS) meludes Employer's Normol Cost and estimated portion of the Employer's Payment of Unfunded L,abiflty•
7of7
From:
Sent:
To:
Subject:
Please include as late corr.
Karina Banales
Tuesday, April 19, 2022 11 :30 AM
CityClerk
FW: Hatano Farm Property
From: David Bradley <david.bradley@rpvca.gov>
Sent: Saturday, April 16, 2022 8:23 AM
To: Karina Banales <kbanales@rpvca.gov>
Cc: Ara Mihranian <AraM@rpvca.gov>; Cory Linder <CoryL@rpvca.gov>; Daniel Trautner <DanielT@rpvca.gov>;
dheffernan@pvschoolgardens.org; John Cruikshank <John.Cruikshank@rpvca.gov>
Subject: FW: Hatano Farm Property
Karina,
As we work to develop a long term solution for Hatano Farm and Mr. Martinez, I think there is real potential to work
with and incorporate a long term educational component into the plan. Diana reached out to me and volunteered to
work with us on defining some educational components into the long term plan. I think if we could work with Diana,
and the PVPUSD to incorporate historical as well as farm educational/ nutritional components into the programing, we
could foster some fantastic experiential educational opportunities for our local students.
Please include Diana and the Palos Verdes School Gardens initiative into our planning as we move forward.
Thanks!
Dave
David Bradley
Mayor and Council member -Rancho Palos Verdes
david. brad ley@rpvca.gov
(310) 487-2418 Cell Phone
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes, CA 90275
From: PV School Gardens <dheffernan@pvschoolgardens.org>
Sent: Friday, April 15, 2022 2:20 PM
To: David Bradley <david.bradley@rpvca.gov>
Subject: Hatano Farm Property
Hello David,
1 3
I hope that this email finds you well. It was great speaking with you recently about the Hatano Farm property in Rancho
Palos Verdes.
As we discussed, the non-profit Sustainable Palos Verdes Schools Foundation works on the peninsula and surrounding
areas bringing outdoor classroom experiences to our K-12 schools via the Palos Verdes School Gardens edible education
program in PVPUSD. Our program involves connecting our community through food and nature by providing weekly
lessons in science, history, engineering, culinary arts, nutrition, environmental sustainability and much more, via the lens
of the school farm and garden. In addition, we have community partnerships with local restaurants, resorts, museums
and local businesses that support these same educational objectives, where people that do not have young children in
our school systems can still participate and learn together.
When we heard the recent news about the Hatano Farm property possibly shutting down for good, I wanted to reach
out to propose a way to not only create a community location for outdoor education, but also to be able to host a site
that served as a hands on educational living and working history of the Palos Verdes Peninsula. Our school garden
lessons already include teaching our students about the native Tongva Gabrielino tribes, the european explorers and
missionaries, the Ranchos de las Palos Verdes, the Japanese farmers that leased and farmed the peninsula and the
Vanderlip family's contributions to the development of the peninsula we know today.
The current Hatano Farm property as it exists is a valuable piece of history remaining on the hill. I propose that we
collaborate on an educational wing of the property that includes hands-on education that can serve the community in
food and flower production, job training, environmental awareness, historical preservation and most of all highlight the
many individuals that have played a role in shaping the peninsula.
Some of our potential collaborators for this initiative could be:
Palos Verdes Library District
Palos Verdes Peninsula Unified School District (Education, Sustainability Committee, Nutrition & Wellness Committee)
PV Art Center
CA Assemblyman Al Muratsuchi's office
Peninsula Education Foundation
Terranea Resort
Sushi Chef Institute
SCROC
I would love to schedule a time to visit the space with you and any other interested individuals you feel would want to
be a part of this conversation.
Thank you for your consideration.
All the best,
Diana Heffernan Schrader
Executive Director, Palos Verdes School Gardens
310--528--
7146 I dheffernan@pvschoolgardens.org I pvschoolgardens.orgJ
PO Box 2653, Palos Verdes Peninsula, CA 90274
2
From:
Sent:
To:
Subject:
Please include as late corr
Karina Banales
Tuesday, April 19, 2022 1 :54 PM
CityClerk
FW: [EXTERNAL] FW: Hatano -Option
From: Siegenthaler, David <David_Siegenthaler@nps.gov>
Sent: Monday, April 18, 2022 4:52 PM
To: Karina Banales <kbanales@rpvca.gov>
Cc: Megan Barnes <mbarnes@rpvca.gov>
Subject: RE: [EXTERNAL] FW: Hatano -Option
Hi Karina,
Thanks for sending the agenda with background information and this question about the cactus garden idea.
I would need more information to determine the acceptability of a cactus garden approach to achieving what must be a
public park and recreation purpose.
The public park need and use rationale needs more discussion and detail. Are you thinking of a 5-acre cactus
monoculture or is this to be a site of diverse native vegetation (e.g. coastal sage scrub and chaparral) dominated by
cactus? How does that compare to what is known to be a characteristic composition of native plants in that area and
how does it align with the habitat conservation plan and Palos Verdes Nature Preserve requirements? Are the cactus
used to replace other, more fire-prone native plants? What would day-to-day public participation look like -what
facilities would be provided for daily public visitation? Would this approach be similar to the "Native Habitat Restoration
Site" alternative? Also, what irrigation and farm soil maintenance would be required for this approach since cacti are
adapted to low moisture environments and generally grow without much difficulty? Is the objective to produce farm
yields of cactus for sale? If conducted as a farm operation I doubt it would be acceptable. If conducted as a fire resistant
native vegetation demonstration area with trails through naturalized areas that would be desirable to the public for
recreation, it may be acceptable.
Thanks,
David
David Siegenthaler
Regional Program Manager
Federal Lands to Parks
National Park Setvice
909 Fitst Ave, Suite 500
Seattle, WA 98104
(206) 220-4083
1 3.
From: Karina Banales <kbanales@rpvca.gov>
Sent: Monday, April 18, 2022 1:27 PM
To: Siegenthaler, David <David Siegenthaler@nps.gov>
Cc: Megan Barnes <mbarnes@rpvca.gov>
Subject: [EXTERNAL] FW: Hatano -Option
This email has been received from outside of DOI -Use caution before clicking on links, opening attachments, or
responding.
Good Afternoon Mr. Siegenthaler,
I wanted to check in with you regarding the attached and below.
Below is the Cacti Garden option. Could you let me know your thoughts?
Option D -Cacti Garden
To assist with the City's fuel modification program and planting cacti in open space areas designated as high fire hazard
zones, the City Council could enter into an agreement with Mr. Martinez to grow and maintain the cacti to fulfill the
City's initiative of planting cacti in high fire hazard zone. Placing cacti in a fuel modification zone can reduce fire risk and
provide wildlife habitat. The City could retain the services of Mr. Martinez as a consultant to manage the cacti for the City
and perhaps including replanting certain areas. Such a contract would have to go before the City Council for
consideration if desired.
Should the City Council decide not to enter into a contract with Mr. Martinez, the City may consider creating a part-time,
permanent part-time or full-time job of a "farmer" to maintain the cacti garden at UPV. This position would also require
a compensation and job description study to ensure the level of work meets the time spent and meets the needs of the
City, and that the duties are clearly outlined in the job description and analysis. Mr. Martinez and others could apply for
this position and undergo the employment eligibility process.
The role of a farmer at UPV would be to preserve current cacti, cultivate native plants, irrigate farm soil and maintain
ditches or pipes and pumps, operate and service farm machinery and tools, among other responsibilities. This may be a
viable option since the City is conducting a classification and compensation study and an organizational review of its
current City operations. It is important to note that if the City Council chooses to create a new job description to maintain
UPV, filling the position would need to align with City policies and state and federal fair employment practices.
This option would not require a lease as the City owns the land. It will, however, need someone with experience and
knowledge of the land to ensure it can be applied toward the City's fuel modification program. This would also comply
with the POU as it is not used for commercial purposes. However, this option would need to include a recreational
component to comply with the POU.
2
Both Megan and I are available for a quick chat. Please let us know when we can meet.
Thank you,
Karina
Karina Bafia/es
Deputy City Manager
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes, CA 90275
(310) 544-5203
kbanales@rpvca.gov
Please consider the environment before printing this e-mail
To limit public contact and help prevent the spread of COVID-19, City Hall is temporarily closed to the
public, but services are available by telephone, email, online and limited curbside service. Some
employees are working on rotation and may be working remotely. Please note that our response to your
inquiry could be delayed. For a list of department phone numbers, visit the Staff Directory on the City website.
From: Megan Barnes <mbarnes@rpvca.gov>
Sent: Tuesday, April 12, 2022 3:43 PM
To: Siegenthaler, David <David Siegenthaler@nps.gov>
Cc: Karina Banales <kbanales@rpvca.gov>
Subject: FW: Hatano -Option
Hi Mr. Siegenthaler,
We are preparing an update on the Hatano Farm for our April 19 City Council meeting and wanted to follow-up on our
question a few months ago about the proposed cacti garden at UPV. Are you available to chat?
Let us know, thank you.
Megan
From: Karina Banales <kbanales@rpvca.gov>
Sent: Monday, February 14, 2022 8:39 AM
To: Siegenthaler, David <David Siegenthaler@nps.gov>
Cc: Megan Barnes <mbarnes@rpvca.gov>
Subject: Hatano -Option
Good Morning David,
Happy Monday.
I wanted to check in with you regarding a new option being presented to City Council tomorrow night. I sent the staff
report to you and Dr. Jackson-Rotonda lat week Thursday and didn't pose the question at that time. I've attached again.
3
Below is the Cacti Garden option. Could you let me know your thoughts?
Option D -Cacti Garden
To assist with the City's fuel modification program and planting cacti in open space areas designated as high fire hazard
zones, the City Council could enter into an agreement with Mr. Martinez to grow and maintain the cacti to fulfill the
City's initiative of planting cacti in high fire hazard zone. Placing cacti in a fuel modification zone can reduce fire risk and
provide wildlife habitat. The City could retain the services of Mr. Martinez as a consultant to manage the cacti for the
City and perhaps including replanting certain areas. Such a contract would have to go before the City Council for
consideration if desired.
Should the City Council decide not to enter into a contract with Mr. Martinez, the City may consider creating a part-time,
permanent part-time or full-time job of a "farmer" to maintain the cacti garden at UPV. This position would also require
a compensation and job description study to ensure the level of work meets the time spent and meets the needs of the
City, and that the duties are clearly outlined in the job description and analysis. Mr. Martinez and others could apply for
this position and undergo the employment eligibility process.
The role of a farmer at UPV would be to preserve current cacti, cultivate native plants, irrigate farm soil and maintain
ditches or pipes and pumps, operate and service farm machinery and tools, among other responsibilities. This may be a
viable option since the City is conducting a classification and compensation study and an organizational review of its
current City operations. It is important to note that if the City Council chooses to create a new job description to
maintain UPV, filling the position would need to align with City policies and state and federal fair employment practices.
This option would not require a lease as the City owns the land. It will, however, need someone with experience and
knowledge of the land to ensure it can be applied toward the City's fuel modification program. This would also comply
with the POU as it is not used for commercial purposes. However, this option would need to include a recreational
component to comply with the POU.
Thank you!
Karina Bafia/es
Deputy City Manager
kbanales@rpvca.gov
Phone -{310) 544-5203
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes, CA 90275
Website: www.rpvca.gov
.
•
DOWNLOAD
'Hl1r
Available in tha> App Stonl' and G009lcr Play
.. GETITON
~· Google Play
, his e-mail message contains information belonC)in~J to the City of Rancho Palos Verdes, which may be privileged, co11fidential and/or pmtrxtecl from
disclosure. The information is intended only for use of the individual or entity named. Unauthorized dissemination, clis1ribution, rn· copyrnq is ,;t;-ic,ly prohibited. 1f
you received this ernail in Nrnr, or are not ,!f'I intended recipient, please notify the sender irnrnecliately. Thank you for your assistance ancl cooperation.
Due to the current surge of the COV/0-19 Omicron Variant, Rancho Palos Verdes City Hall will be closed to walk-in visitors
through February 28, 2022, unless further notification is provided. Several members of the City's workforce are being asked
to work remotely during this time. Inquiries will continue to be reviewed on a daily basis. Please be patient with us as there
may be delays or minor inconveniences in responding to your inquiry.
4
From:
Sent:
To:
Subject:
Good Afternoon Adrienne,
Karina Banales
Tuesday, April 19, 2022 4:18 PM
Adrienne Mohan; CC; CityClerk; Ara Mihranian
RE: Item 3, Hatano Farm
Thank you again for speaking with me today and for sharing your feedback and ideas below. Before tonight's meeting, I
would just like to clarify a few items we discussed.
First, the City wholeheartedly agrees that we do not intend to introduce any plant species that would cause harm to the
local natural resources in the Preserve. Also, we did not assert that field trips would be required. In some of our early
discussions with Mr. Siegenthaler, he suggested that having an educational component could satisfy the recreational use
requirement. Therefore, this was included only as a possible option as we explore future uses. In speaking with the
School District, field trips have to meet a specific requirement based on State standards to be considered a site for
students to visit. We understand this is all very early in the process, and a lot has to be vetted out. Additionally, we share
your desire to clarify what type of cactus is currently grown on the site, to avoid any further issues of non-compliance.
Finally, regarding the question of land use restrictions and historic designation, tonight's recommendation, if approved,
would jumpstart the process to obtain that very clarification.
We will look into these very important questions further based on the City Council's direction.
Thank you for your continued collaboration and for always being available to speak with me.
Sincerely,
Karina
Karina Bafia/es
Deputy City Manager
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes, CA 90275
{310) 544-5203
kbanales@rpvca.gov
Please consider the environment before printing this e-mail
To limit public contact and help prevent the spread of COV!D-19, City Hall is temporarily closed to the
public, but services are available by telephone, email, online and limited curbside service. Some
employees are working on rotation and may be working remotely. Please note that our response to your
inquiry could be delayed. For a list of department phone numbers, visit the Staff Directory on the City website.
From: Adrienne Mohan <amohan@pvplc.org>
Sent: Tuesday, April 19, 2022 12:12 PM
1 3
To: Karina Banales <kbanales@rpvca.gov>; CC <CC@rpvca.gov>; CityClerk <CityClerk@rpvca.gov>; Ara Mihranian
<Ara M@rpvca.gov>
Subject: re: Item 3, Hatano Farm
Hello City Council and staff,
I am submitting a comment under late correspondence regarding the Hatano Farm on the April 19th Regular Agenda
(Item #3).
After reading the staff report and with conversations with City staff as well as the Wildlife Agencies, I would like to raise
to your attention to three concerns: 1) the nonnative cactus farmed at the Hatano Farm site, and the inappropriate use
of this nonnative cultivated species for City fuel modification restoration in the Preserve and 2) how the PVPUSD field
trip destination would be carefully coordinated and executed in order to comply with the NCCP/HCP and sensitivities of
the site, and 3) the potential inconsistency of the Historic designation with the NPS Program of Utilization (POU) as well
as the NCCP/HCP. I offer for your consideration a solution.
Cactus:
The current majority of cactus farmed is the Barbary fig (Opuntia Ficus-/ndica) cactus, which is an edible variety largely
used in agricultural applications for nopal flesh or tuna fruit consumption, but is not native to the region. There are
three species of native cactus to the Peninsula --coast prickly pear (Opuntia /ittoralis), chaparral prickly pear (Opuntia
oricola), and coastal cholla (Cylindropuntia prolifera). My understanding is that Mr. Martinez does not currently
cultivate any of these species in his farm area, although they are found in the slopes of the Preserve surrounding the
farm --and are very important habitat for current nesting cactus wren pairs. I want to ensure that there is clarity that
the current Ficus-lndica variety currently cultivated cannot be used for Preserve projects.
Further, how might the City address the remaining area that does not have cactus? Since commercial flower cultivation
is no longer allowed, the staff report does not clearly address what will be cultivated on the plowed lands. It must be
considered that the farm is in a Nature Preserve and therefore should not introduce plants that would harm the local
natural resources.
Field trips:
I want to address the misunderstanding in the staff report that the National Park Service's Program of Utilization (POU)
requires field trips. The POU requires "passive recreation" which is in fact already provided for by way of hiking trails in
the farm area. Active school field trips are not required to fulfill the POU requirements, and may present more
challenges than is necessary to contemplate for the future activities on the farm.
The staff report addresses the desire to host field trips for the benefit of PVPUSD students. While we agree this is a
good idea in concept, the details for how this would be coordinated and conducted to ensure there is compliance with
Section 5.4.2 of the NCCP/HCP and the PUMP. Firstly, it is not clear in the report who will be coordinating the field trips.
The Land Conservancy's education staff and docents can attest to the tremendous time and coordination required to
provide a meaningful learning experience without logistical snafus.
Inconsistency of land use restrictions with Historic designation:
There is insufficient information provided in the staff report to clarify the historic site designation and what is required
to maintain the designation, and therefore there is concern this is inconsistent with the requirements of the NPS POU
and the NCCP/HCP --two plans that take precedence over the historic designation. It was not contemplated in the NCCP
nor in the NPS POU that farming activity would take place on the land long term, but rather that when the commercial
farming ended that the land would revert to native plants consistent with the purpose of the Nature Preserve in which it
resides.
PVPLC's Recommendation:
2
There is a solution that meets the goals of council to provide for education as well as comply with the land use
restrictions already in place.
Propose the cultivation of native wildflowers (such as poppies, lupine, milkweed, etc) to provide for the color and beauty
of the farm that would mimic the commercial flower cultivation, but which support our diverse array of local pollinators
since this land is in the Nature Preserve. The growing of native wildflowers would be consistent with the National and
State Heritage designations as well as the NPS POU. The Land Conservancy would engage Mr. Martinez to operate the
native plant farming operation, eliminating that annual new expense to the City.
The Land Conservancy can fulfill the Council and community's desires for educational opportunities through field trips
and volunteer activities coordinated by our staff and docents. Since the land is in the Preserve, it conforms with the
Management Agreement that the Land Conservancy would provide for education opportunities in a way that complies
with the sensitivities of the habitat and nesting bird species. This would also alleviate any City costs to allocate staff
time or resources to conducting field trips on the farm, and would ensure the site does not suffer unmitigated damage
through many user groups conflicting with the Preserve's mandate.
The native wildflower farm is also more in line with the educational curriculum in the schools, which teachers now focus
more on drought tolerance, water conservation, biodiversity and the importance of supporting local species though
native plants. A native wildflower farm would boost the educational potential of the land and would demonstrate the
City's leadership in embracing conservation while honoring the Japanese Farming legacy of the Hatano family.
This allowed use for native wildflower farming would be compatible with the City's effort to pursue a historic
designation and would deliver on the goals to provide a pathway for Mr. Martinez, provide educational opportunities,
and control costs borne by the City.
Thank you for allowing me to comment on this important issue.
Adrienne
Adrienne Mohan
Executive Director
Palos Verdes Peninsula Land Conservancy
916 Silver Spur Road #207
Rolling Hills Estates, CA 90274
www.pvplc.org
(3 I 0) 541-7613 x203
(310) 930-4332 (cell)
Preserving land and restoring habitat for the education and enjoyment of all.
join our mailing list
Join us on
3
From:
Sent:
To:
Subject:
Late corr ..
Teresa Takaoka
Tuesday, April 19, 2022 8:55 AM
CityClerk
FW: Hatano Farm public comment
From: Schmalbach, Heather@Wildlife <Heather.Schmalbach@Wildlife.ca.gov>
Sent: Tuesday, April 19, 2022 8:54 AM
To: Karina Banales <kbanales@rpvca.gov>
Cc: CC <CC@rpvca.gov>; marybeth_woulfe@fws.gov; Drewe, Karen@Wildlife <Karen.Drewe@wildlife.ca.gov>; Porter,
Eric <Eric_Porter@fws.gov>; Mayer, David@Wildlife <David.Mayer@wildlife.ca.gov>; Sarabia, Cris
<csarabia@pvplc.org>; Adrienne Mohan <amohan@pvplc.org>; Ara Mihranian <AraM@rpvca.gov>; Katie Lozano
<KatieL@rpvca.gov>
Subject: Hatano Farm public comment
To Karina Banales:
The California Department of Fish and Wildlife (Department) and U.S. Fish and Wildlife Service (Service), collectively the
Wildlife Agencies, have been informed that the Rancho Palos Verdes City Council will again be considering future uses
for Hatano Farm at the meeting on April 19, 2022. The Wildlife Agencies provided prior comments on this topic as late
correspondence to the Council's meeting on February 15, 2022. The property is located within the Alta Vicente Preserve,
a part of the larger Palos Verdes Nature Preserve (Preserve) pursuant to the City's adopted and federally permitted
Natural Community Conservation Plan/Habitat Conservation Plan (NCCP/HCP).
The land was transferred from the Federal National Parks Service (NPS) to the City and is regulated by the Program of
Utilization (POU) that established land use restrictions. We understand that the City has been notified by NPS that the
lease agreement is it out of compliance with the terms of the POU due the property being used for commercial
purposes. We have reviewed the Staff Report for the April 19th meeting that discusses potential future uses for the site.
The current on-site farming operation is allowed under the NCCP/HCP's Public Use Master Plan (PUMP). As part of the
Preserve, any future use of the site needs to remain consistent with Section 5.4.2 of the NCCP/HCP and PUMP. The
Wildlife Agencies do not support the proposed use of nonnative cactus species currently grown at Hatano Farm in fuel
modification areas. Any cactus species cultivated for use within fuel modification areas need to be native to the
Preserve. We are aware of the regional need for native seeds and plants for restoration projects within the Preserve and
urge the Council to consider the Hatano Farm site for native seed and plant propagation and as a potential restoration
area. Cultivation of drought tolerant, native plants would not only fulfill a current need, but also avoid negative impacts
1
to the Preserve from other types of crops requiring higher levels of water use. Increased water usage within and
adjacent to the Preserve can facilitate the spread of nonnative Argentine ants, which are very difficult to control and can
negatively impact native wildlife.
Options for future use that increase public access to the site, such as a community garden, would also be considered
inconsistent with the protection and enhancement of biological resources set forth in the NCCP/HCP. The current hiking
trail traversing the site should meet the passive recreation requirement of the NPS deed restriction. We are concerned
that the Staff Report does not contain details on the expected level of proposed use by field trips. Specifically, there are
nesting cactus wren on the site that could be negatively impacted by increased levels of public use. While some level of
educational activities may be compatible, they would need to consistent with the conservation goals set forth in the
PUMP.
We appreciate the opportunity to provide additional comments to the City Council as they weigh options for the Hatano
Farm site.
Regards,
Heather Schmalbach (Department) and Mary Beth Woulfe (Service)
Heather Schmalbach
Environmental Scientist
Habitat Conservation Planning
California Department of Fish & Wildlife
South Coast Region
3883 Ruffin Road
San Diego, CA 92123
Office: (858) 637-5511
2
TO: HONORABLE MAYOR & CITY COUNCIL MEMBERS
FROM: CITY CLERK
DATE: APRIL 18, 2022
SUBJECT: ADDITIONS/REVISIONS AND AMENDMENTS TO AGENDA
_____________________________________________________________________
Attached are revisions/additions and/or amendments to the agenda material received through
Monday afternoon for the Tuesday, April 19, 2022 City Council meeting:
Item No. Description of Material
5 Attachment A (Proposed FY 2022-23 City Council Goals Worksheets)
Respectfully submitted,
__________________
Teresa Takaoka
L:\LATE CORRESPONDENCE\2022\2022 Coversheets\20220419 additions revisions to agenda thru Monday.docx
1
Subject:FW: City Council Goals - On Granicus
Attachments:Attachment A DRAFT Gantt Chart Template of City Council Goals V2.pdf
From: Karina Banales <kbanales@rpvca.gov>
Sent: Friday, April 15, 2022 11:58 AM
Cc: Ara Mihranian <AraM@rpvca.gov>; CityClerk <CityClerk@rpvca.gov>
Subject: City Council Goals ‐ On Granicus
Good Morning Honorable Mayor Bradley and City Council,
Staff posted the City Council goals workbook yesterday afternoon for your review. I have attached the staff report and
the Goals workbook and have provided the link to our website.
http://www.rpvca.gov/772/City‐Meeting‐Video‐and‐Agendas
Thank you, and have a great weekend!
Karina
Sincerely,
Karina Bañales
Deputy City Manager
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes, CA 90275
(310)544‐5203
kbanales@rpvca.gov
.
City Hall is open to the public during regular business hours. To help prevent the spread of COVID‐19, visitors are required
to wear face coverings and adhere to physical distancing guidelines. Some employees are working on rotation and may be
working remotely. If you need to visit City Hall, please schedule an appointment in advance by calling the appropriate
department and follow all posted directions during your visit. Walk‐ups are limited to one person at a time. Please note
that our response to your inquiry could be delayed. For a list of department phone numbers, visit the Staff Directory on the
City website.
5
TIMELINE TEMPLATES by Vertex42.com
https://www.vertex42.com/ExcelTemplates/timeline.html
Tips for Using this Template
• Insert and delete entire rows when editing the data tables
• Avoid leaving the label column blank
• Format the horizontal axis to set min/max bounds
• Enter a vertical position between -100 and 50
• Format individual data labels or markers to highlight specific events
Other Notes
• Milestone leader lines are Y Error bars
• Task leader lines are Y Error bars
• Task durations are X Error bars
Manage overtime patrols by LASD for crime
enforcement and traffic suppression
Implement Public Safety Reimbursement Program
(Cycle 2)
Double the number of residents registered for Alert
SB and MyRPV
Inform residents of their EVZ and SRA
Develop and distribute RPV "Emergency Survival
Guide"
Reduce Part I Crime by 5% for FY 2022-23 compared
to FY 2021-22
Implement strategies enhancing resident readiness
and response during an emergency
March-22 June-22 September-22 December-22 March-23 June-23 September-23
Public Safety
Maintain a High Level of Public Safety with Public Engagement
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Public Safety - Page 1 of 2
A-1
Public Safety
Maintain a High Level of Public Safety with Public Engagement
Milestones
Target Date Description Prev. Date
6/30/2023 Reduce Part I Crime by 5% for FY 2022-23 compared to FY 2021-22
6/30/2023 Implement strategies enhancing resident readiness and response during an emergency
Tasks
Start Date End Date Duration Description
7/1/2022 6/30/2023 364 Manage overtime patrols by LASD for crime enforcement and traffic suppression
2/15/2022 12/31/2022 319 Implement Public Safety Reimbursement Program (Cycle1)
1/1/2023 12/31/2023 364 Implement Public Safety Reimbursement Program (Cycle 2)
7/1/2022 6/30/2023 364 Double the number of residents registered for Alert SB and MyRPV
2/1/2022 9/1/2022 212 Establish RPV Evacuation Zones (EVZ) and Safe Refuge Areas (SRA)
9/1/2022 6/30/2023 302 Inform residents of their EVZ and SRA
2/1/2023 6/30/2023 149 Develop and distribute RPV "Emergency Survival Guide"
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Public Safety - Page 2 of 2
A-2
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 0 100% - completed
Public Safety 1 56% - 99% - accelerated/near completion
Updated:April 14, 2022 1 26% - 55% - on target/on schedule
14 0% - 25% - behind schedule/at risk
0 N/A - not recommended/not necessary
Goal No.Start Date Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
1a 7/1/2022 6/30/2023 0%Public Safety Admin Directed overtime patrols provided by the Sheriff's
Department for crime suppression.
Overtime requests are ongoing; requests for FY 22-23 will begin on July 1, 2022
1a 2/15/2022 12/31/2022 18%Public Safety Admin Neighborhood grants for purchase of public safety
technology (1st cycle)
The Public Safety Reimbursement Program was authorized by the City Council on
February 15, 2022. Staff is currently accepting applications for the program.
1a 1/1/2023 12/31/2023 0%Public Safety Admin Neighborhood grants for purchase of public safety
technology (2nd cycle)
The second cycle of the Public Safety Reimbursement Program is anticipated to begin in
2023.
1a 7/1/2022 6/30/2023 0%Public Safety Admin Providing short-term rental in-home security cameras to
residents.
Staff is currently accepting applications for homeowners to rent a security camera from
the City for up to 30 days.
1a 1/1/2023 6/30/2023 0%Public Safety Admin Monitoring of LASD deployment information via LASD-
created Mobile Digital Dashboard (MDD)
LASD is in development of the MDD system. City access is anticipated in early 2023.
1b 7/1/2022 6/30/2023 0%Public Safety Admin Directed overtime patrols provided by the Sheriff's
Department for traffic enforcement.
Overtime requests are ongoing; requests for FY 22-23 will begin on July 1, 2022
1b 7/1/2022 12/31/2022 0%Public Safety Admin
Creation of Public Safety Announcements with the Traffic
Safety Committee, LASD, and RPVtv to enhance traffic
safety.
Staff, in collaboration with the Traffic Safety Committee, will begin development and
production of traffic safety PSAs in FY 22-23.
1b 1/1/2023 6/30/2023 0%Public Safety Admin Distribute traffic safety PSAs through the City's networks.PSAs are anticipated to be publicized in early 2023.
1c 2/1/2022 9/1/2022 63%Public Safety Admin Establish RPV Evacuation Zones (EVZ)EVZs are anticipated to be published in September 2022
1c 2/1/2022 9/1/2022 49%Public Safety Admin Establish RPV Safe Refuge Areas (SRA)SRAs are anticipated to be published in September 2023
1c 5/1/2022 6/30/2022 4%Public Safety Admin Work w/ Peninsula Cities to integrate EVZ/SRA data
Once the Peninsula Cities have completed initial edits to the EVZ/SRA zone boundaries, all
four cities, along with the Los Angeles County Fire, the LA County Sheriff's Department,
the Palos Verdes Estates Police Department, and the Zonehaven team, intend to
coordinate joint meetings to discuss integrating of EVZ/SRA data on a Peninsula Wide
level to determine if any additional edits are needed.
1c 9/1/2022 6/30/2023 0%Public Safety Admin Perform resident outreach to improve alert signup and
informing of EVZs and SRAs
With assistance from the Zone Haven Team, staff will begin resident outreach with the goal of
increasing alert signup and informing of established EVZs and SRAs tentatively scheduled to begin
in September 2022.
1c 9/1/2022 11/30/2022 0%Public Safety Admin Implement procedures that address multilingual emergency
communications considerations.
Staff intends to consider notification methods for the non-English speaking
population,as well as a strategy for emergency communications translation,
tentatively scheduled to begin in December 2022.
1c 12/1/2022 1/31/2023 0%Public Safety Admin Implement top 3 multimode communication methods for
RPV
Staff intends to Identify and implement 3 robust primary and secondary multi-channel
emergency communication system anticipating possible utility outages in FY 22-23.
1c 12/1/2022 1/31/2023 0%Public Safety Admin Implement/staff RPV Emergency Webpage to provide up-to-
date emergency communications
Staff intends to implement an emergency status webpage in FY 22-23, that residents can
easily access prior to, during, and immediately following an emergency situation and
revamping of the emergency preparedness webpage, adding value, and ensuring ease of
access to the webpage.
1c 2/1/2023 6/30/2023 0%Public Safety Admin
Develop/Publish and mail an RPV "Survival Guide" to all
residents, informing them of established EVZ, SRA, and
Emergency Communications resources.
Staff intends to mail a city-developed "survival guide" to all residents by the end of FY 22-
23, ensuring residents are aware of their Evacuation Zone, the nearest Safe Refuge, and
where to obtain current, reliable multi-language information, both with and without
commercial power.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Public Safety Appendix - Page 1 of 1
A-3
TIMELINE TEMPLATES by Vertex42.com
https://www.vertex42.com/ExcelTemplates/timeline.html
Tips for Using this Template
• Insert and delete entire rows when editing the data tables
• Avoid leaving the label column blank
• Format the horizontal axis to set min/max bounds
• Enter a vertical position between -100 and 50
• Format individual data labels or markers to highlight specific events
Other Notes
• Milestone leader lines are Y Error bars
• Task leader lines are Y Error bars
• Task durations are X Error bars
Final Construction Documents for
Portuguese Bend Landslide
Sanitary Sewer Asset Mgmt Plan
Drainage System Asset Mgmt Plan
Draft Citywide 5G Small Wireless
Facilities Master Plan
Respond to CalOES inquires for
undergrounding grant
Develop Arterial Speed Mitigation
Strategies
Complete Western Ave Congestion
Mitigation Concept Plan
Portuguese Bend Landslide
Remediation EIR
Altamira Canyon Improvements
(erosion)
Detailed Inventory and Maintenance
Schedule of City’s Public Infrastructure
and Assets
Develop Citywide 5G Small Wireless
Facilities Master Plan
Underground one mile of utility lines
within the City’s open space areas
Prepare New Financial Plan for Abalone
Cove Annual Sewer Rates
Citywide Speed Mitigation Plan
Minimize Congestion on Western
Avenue
March-22 June-22 September-22 December-22 March-23 June-23 September-23
INFRASTRUCTURE
Maintain and improve all public infrastructure (including transportation systems, parking, utilities, storm drains,
and sewers).
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Infrastructure - Page 1 of 2A-4
INFRASTRUCTURE
Milestones
Target Date Description Original Date
12/31/2022 Portuguese Bend Landslide Remediation EIR 12/31/2021
6/30/2022 Altamira Canyon Improvements (erosion) 12/31/2021
6/30/2023 Detailed Inventory and Maintenance Schedule of City’s Public
Infrastructure and Assets 12/31/2021
6/30/2023 Develop Citywide 5G Small Wireless Facilities Master Plan 12/31/2021
6/23/2022 Underground one mile of utility lines within the City’s open space areas 12/31/2022
6/30/2023 Prepare New Financial Plan for Abalone Cove Annual Sewer Rates 6/30/2022
6/30/2023 Citywide Speed Mitigation Plan 6/30/2022
6/30/2023 Minimize Congestion on Western Avenue 6/30/2023
Tasks
Start Date End Date Duration Decription
4/1/2020 12/31/2022 1004 Complete EIR for Portuguese Bend Landslide Remediation
1/1/2023 12/31/2023 364 Final Construction Documents for Portuguese Bend Landslide
3/1/2021 12/31/2022 670 Complete Altamira Cyn Concept Report
12/31/2021 12/31/2022 365 Roadway Asset Mgmt Plan
12/31/2021 12/31/2022 365 Facilities Asset Mgmt Plan
7/1/2022 6/30/2023 364 Sanitary Sewer Asset Mgmt Plan
7/1/2022 6/30/2023 364 Drainage System Asset Mgmt Plan
7/1/2022 6/30/2023 364 Draft Citywide 5G Small Wireless Facilities Master Plan
7/1/2022 12/31/2022 183 Respond to CalOES inquires for undergrounding grant
6/30/2023 6/30/2023 0 Abalone Cove reduce City maintenance subsidy by at least 50%
7/1/2022 6/30/2023 364 Develop Arterial Speed Mitigation Strategies
7/1/2022 6/30/2023 364 Update Neighborhood Traffic Calming Program
7/1/2022 6/30/2023 364 Complete Western Ave Congestion Mitigation Concept Plan
Maintain and improve all public infrastructure (including transportation systems, parking, utilities, storm drains, and sewers).
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Infrastructure - Page 2 of 2A-5
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 0 100% - completed
Infrastructure 0 56% - 99% - accelerated/near completion
Updated:April 14, 2022 2 26% - 55% - on target/on schedule
3 0% - 25% - behind schedule/at risk
9 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
3a 12/31/2021 Proposed to be
removed N/A Portuguese Bend Landslide PW
Complete the EIR for the Portuguese
Bend Landslide Remediation Project
for certification by the City Council
On May 19, 2020, the City Council approved a professional services agreement with the
Chambers Group to prepare the environmental document. The Draft Initial Study was
published for public review between November 12, 2020 and January 15, 2021. A public
scoping meeting was held on December 19, 2020. The City's consultant has started work
on the draft EIR. The Draft EIR is expected to be published in the Fall of 2021. The Draft
EIR is expected to be published in the Spring Summer of 2022. Additionally, this will
allow time for the City Council to consider contracting with a program management
company to assist the City with reviewing and processing the Draft EIR and Final EIR.
This will allow time for the City's environmental consultant to analyze alternatives
raised during the scoping meeting and the City's recently contracted program manager
to review the analysis. Staff recommends removing this from goals because it is a CIP
project and is considered part of the City’s routine operations.
3b 6/30/2022 Proposed to be
removed N/A Portuguese Bend Landslide FIN
Prepare funding opportunities for
Phases 1 & 2 of the Portuguese Bend
Landslide Feasibility Plan for City
Council consideration.
Staff is pursuing various potential funding opportunities for this project. The South
Santa Monica Bay (SSMB) Watershed Area Steering Committee (WASC) met on May 19,
2020. WASC reviews all projects for Measure W funding. A Measure W application was
submitted to the County for the Portuguese Bend Landslide Remediation Project in
October 2020. Staff is also working with Blais and Associates to identify potential grants
for this project, and City Staff has embarked on a writing campaign for funding
opportunities with state and federal legislators including securing federal infrastructure
funding. The City Council is in the process of hired a program manager for this project
who may help identify funding and grant opportunities. Staff presented the goal to the
FAC on 2/17. FAC recommended to continue the goal into FY 2022-23 but committee
will continue to research on finance options in preparation for the funding opportunities
when this project is ready. FAC also ranked this as priority #3 because of the
progress/the current stage of the project. Staff recommends this item be remove from
the City Council goals and be folded in to the budget process for the capital projects
program.
3c 6/30/2022 N/A Portuguese Bend Landslide PW
Develop a mitigation plan to address
land movement at Altamira Canyon
based on the following phases:
Phase One - Perform the
drainage/erosion analysis for the
entire canyon and its tributaries and
establish a priority list based on
current erosion.
Phase Two - Prepare detailed
engineering plans to resolve the
erosion and making sure there is
positive drainage along the canyon.
Phase Three - Award construction
contract for the proposed
improvements.
On November 4, 2020, the City Council approved a professional services agreement
with Harris and Associates to perform the Phase One work. Notice to proceed was
issued on February 24, 2021. Surveying work is complete and drainage/erosion analysis
is underway. Work on the Design Concept Report has been ongoing and a draft is
expected to be published in the Spring of 2022. This will include time for the City's
recently contracted program manager to review a draft of the Design Concept Report.
Staff recommends removing this goal because it is a CIP project and is considered part
of the City’s routine operations. Staff recommends carrying over goal.
3d 12/31/2021
11/30/2022 (staff
recommends to
carry over)
0%Portuguese Bend Landslide PW
Develop a feasibility analysis with
Rolling Hills for installation of an
underground sanitary sewer system
to replace the existing septic tanks to
reduce ground water seepage within
Portuguese Bend landslide.
Comments from Rolling Hills on the draft feasibility study were received on June 18,
2020 and provided to the consultant. The Draft Rolling Hills Sewer Concept Design
(feasibility study) has been received and preliminary discussions with Rolling Hills were
held. Review of the draft concept design has identified the need for further analysis of
concept viability before finalizing the feasibility study for public review. Further work on
this goal has been deferred until more information is gathered on the overall
Portuguese Bend Landslide Remediation project.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Infrastructure Appendix - Page 1 of 4
A-6
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 0 100% - completed
Infrastructure 0 56% - 99% - accelerated/near completion
Updated:April 14, 2022 2 26% - 55% - on target/on schedule
3 0% - 25% - behind schedule/at risk
9 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
3a 12/31/2021 Proposed to be
removed N/A Portuguese Bend Landslide PW
Complete the EIR for the Portuguese
Bend Landslide Remediation Project
for certification by the City Council
On May 19, 2020, the City Council approved a professional services agreement with the
Chambers Group to prepare the environmental document. The Draft Initial Study was
published for public review between November 12, 2020 and January 15, 2021. A public
scoping meeting was held on December 19, 2020. The City's consultant has started work
on the draft EIR. The Draft EIR is expected to be published in the Fall of 2021. The Draft
EIR is expected to be published in the Spring Summer of 2022. Additionally, this will
allow time for the City Council to consider contracting with a program management
company to assist the City with reviewing and processing the Draft EIR and Final EIR.
This will allow time for the City's environmental consultant to analyze alternatives
raised during the scoping meeting and the City's recently contracted program manager
to review the analysis. Staff recommends removing this from goals because it is a CIP
project and is considered part of the City’s routine operations.
4a 6/30/2022 Proposed to be
removed N/A Asset Management PW
Create a detailed inventory and
maintenance schedule of the City's
public infrastructure and assets.
The Fiscal Year 2021-22 CIP includes funding to start an asset management program for
the City's Facilities, Storm Sewer System, Pavement, Sidewalks, and Traffic Signs.
Proposals have been received for a condition assessment and maintenance schedule of
the City's facilities and work is expected to begin in the next quarter. Proposals for a
condition assessment and maintenance schedule for the City's pavement, sidewalks,
and traffic signs will be solicited in the next quarter. Council has awarded a professional
services agreements for the creation of a detailed inventory and maintenance schedule
of the Condition assessments of the City's facilities, pavement, sidewalks, guardrails,
and traffic signs have started. Work is expected to be complete within 6 months. Draft
reports are expected in the summer of 2022. A similar asset management program for
the City's storm sewer system and sanitary sewers will be started in Fiscal 2022-2023
when staff vacancies are filled. Staff recommends removing this goal because it is a CIP
project and is considered part of the City’s routine operations.
5a 12/31/2024 Proposed to be
removed N/A Small Wireless Facilities PW
Develop a Citywide 5G Small
Wireless Facilities (SWF) Master Plan
that identifies the preferred and
least intrusive locations to install
small wireless facilities including co-
locations.
The primary 5G SWF engineering and construction company on the Peninsula has
developed a plan of locations for SWF facilities. Staff is soliciting proposals from
qualified consultants to evaluate the plan for optimization of co-location, gap analysis,
aesthetic impacts, compliance with City policies, and development of recommended
alternatives when feasible. At this time, Staff recommends removing this goal due to
staff vacancies.
6a 6/30/2022 Proposed to be
combined with 6c N/A Electric Utilities PW
In coordination with SCE, develop a
Utility Resilient Advancement Master
Plan to harden above-ground utility
lines including a tentative timeline to
potentially underground utilities and
continue to lobby the California
Public Utilities Commission to modify
the requirements for Rule 20A
undergrounding funds to include high
fire risk areas.
Southern California Edison's current plan is development of specific Circuit Reliability
projects to harden infrastructure in particular areas of RPV, rather than an overall
master plan. Public Works Staff is coordinating public information distribution as these
projects are further developed. Work on this goal has been deferred until certain Public
Works projects in queue have been completed. Staff recommends to remove this goal
item as the City is limited ability to influence SCE infrastructure. Staff recommends to
remove this line item as it is captured in line item 6c
6b 6/30/2022 0%Electric Utilities PW
Identify alternative energy resources
with the capability to store energy or
sell it back to the grid system, which
could power the City. The first phase
is to identify potential alternative
energy and the cost associated with
this plan.
Work on this goal has been deferred until certain Public Works projects in queue have
been completed.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Infrastructure Appendix - Page 2 of 4
A-7
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 0 100% - completed
Infrastructure 0 56% - 99% - accelerated/near completion
Updated:April 14, 2022 2 26% - 55% - on target/on schedule
3 0% - 25% - behind schedule/at risk
9 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
3a 12/31/2021 Proposed to be
removed N/A Portuguese Bend Landslide PW
Complete the EIR for the Portuguese
Bend Landslide Remediation Project
for certification by the City Council
On May 19, 2020, the City Council approved a professional services agreement with the
Chambers Group to prepare the environmental document. The Draft Initial Study was
published for public review between November 12, 2020 and January 15, 2021. A public
scoping meeting was held on December 19, 2020. The City's consultant has started work
on the draft EIR. The Draft EIR is expected to be published in the Fall of 2021. The Draft
EIR is expected to be published in the Spring Summer of 2022. Additionally, this will
allow time for the City Council to consider contracting with a program management
company to assist the City with reviewing and processing the Draft EIR and Final EIR.
This will allow time for the City's environmental consultant to analyze alternatives
raised during the scoping meeting and the City's recently contracted program manager
to review the analysis. Staff recommends removing this from goals because it is a CIP
project and is considered part of the City’s routine operations.
6c 6/30/2022 12/31/2022 26%Electric Utilities Admin
Reduce the threat of a fire hazard
proximately caused by downed or
damaged overhead power lines
through the undergrounding of one
mile of utility lines within the City’s
open space areas.
Staff continues to identify potential funding opportunities for this project.
On August 17, 2021 The City Council Authorized the Mayor to sign a letter to SCE’s chief
executive officer calling for the prioritization of funding for undergrounding projects.
On January 27, 2022, the City submitted a Notice of Interest (NOI) to the California
Governor's Office of Emergency Services (Cal OES) Hazard Mitigation Grant Program
(HMGP) towards the securing of funds for this goal.
On February 1, 2022, Cal OES notified the City that the proposed undergrounding of
overhead powerlines project is an eligible HMGP activity and has formally invited the
City to submit a full sub-application for consideration of funding. Staff is currently
compiling data for this application, which is due on April 8, 2022.
7a 6/30/2021 Proposed to be
removed 0%Sanitary Utilities PW
Develop a public sewer program to
encourage on-site sanitary sewer
systems to connect to the public
sanitary sewer system based on the
following phases:
Phase 1: Map areas in the City that
are served by a sanitary sewer
system or on-site sanitary sewer
system.
Phase 2: Feasibility study of the areas
which are not currently being served
and prioritize the need for
installation of the sewer system and
identify costs to connect to the sewer
system.
Phase 3: Design the sewer system.
Phase 4: Installation of the system.
Based on information available at City Hall and from LA County Environmental Health,
Staff will be working with the City's GIS Staff to finalize a map showing areas of the City
served by onsite waste water sewer systems (Phase 1). Work on this goal has been
deferred until certain Public Works projects in queue have been completed. Staff
recommends removing this from the goals until other priority goals are completed.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Infrastructure Appendix - Page 3 of 4
A-8
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 0 100% - completed
Infrastructure 0 56% - 99% - accelerated/near completion
Updated:April 14, 2022 2 26% - 55% - on target/on schedule
3 0% - 25% - behind schedule/at risk
9 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
3a 12/31/2021 Proposed to be
removed N/A Portuguese Bend Landslide PW
Complete the EIR for the Portuguese
Bend Landslide Remediation Project
for certification by the City Council
On May 19, 2020, the City Council approved a professional services agreement with the
Chambers Group to prepare the environmental document. The Draft Initial Study was
published for public review between November 12, 2020 and January 15, 2021. A public
scoping meeting was held on December 19, 2020. The City's consultant has started work
on the draft EIR. The Draft EIR is expected to be published in the Fall of 2021. The Draft
EIR is expected to be published in the Spring Summer of 2022. Additionally, this will
allow time for the City Council to consider contracting with a program management
company to assist the City with reviewing and processing the Draft EIR and Final EIR.
This will allow time for the City's environmental consultant to analyze alternatives
raised during the scoping meeting and the City's recently contracted program manager
to review the analysis. Staff recommends removing this from goals because it is a CIP
project and is considered part of the City’s routine operations.
7b 6/30/2022
staff recommends
carryover from FY
2021-22
N/A Sanitary Utilities FIN
Prepare a new financial plan for the
Abalone Cove annual sewer rates
that reduces City maintenance
subsidy by at least 50% for City
Council consideration.
Staff has estimated long-range costs for maintenance, operations, and capital costs of
the system. The 18-year historical costs have provided a good baseline for future costs.
Additionally, staff has identified capital improvements that will likely be needed in the
next 5-10 years, due to the wear and tear on the pipes, grinder pumps, and lift stations.
Staff is working with Abalone Cove residents to address the future Sewer Rates in order
to reduce the City subsidy. On October 6, the City Council amended the Municipal Code
with the current CPI-U and approved a connection fee. Staff is working with a consultant
to perform an evaluation and assessment of the sewer system. This will provide staff
with an updated annual maintenance cost estimate to properly prepare a financial plan.
Staff presented the goal to the FAC on 2/17. FAC recommended to continue this item
and formed a sub-committee which consist of member MacAllister and Yourman to
begin reviewing the history of the Abalone Cove Sewer system, rates, and the General
Fund subsidies. When the maintenance estimate is ready, the subcommittee will review
and prepare a recommendation for the FAC and formalize a recommendation to the
City Council. FAC ranked this as priority #1 because of the level of subsidy from the
General Fund. Staff recommends this item continue into FY2022-23 Goals and will
support the FAC subcommittee on the research and analysis.
8a 6/30/2022 N/A Roadways PW
Develop a Citywide Speed Mitigation
Plan for reducing vehicular speed
within City streets (traffic calming)
Funding for development of the masterplan is included in the Fiscal 2021-22 CIP. Staff is
in the process of onboarding on-call consulting traffic engineers to assist the City in
addressing community concerns regarding isolated localized traffic and speed concerns
throughout the City.
9a 6/30/2022 30%City Beautification CDD
Develop an Arterial Fences and Walls
Master Plan for the City Council's
consideration that retains
neighborhood identity and describes
the type (material and height) of
fence or wall, if any, to be placed
along major arterial streets in the
City.
Staff continues to seek a consultant to assist with preparing a draft plan.
Carryover to FY 2021-22 if funded in FY 2021-22 budget.
Staff will be utilizing internal resources to implement update of Master Plan. Work on
this in-house plan is scheduled to kick-off in October. Staff has begun to document and
conduct inventory of arterial fencing along major thoroughfares. Staff has begun to
prepare the Plan utilizing in-house resources including staff.
9b 6/30/2021 9/7/2023 N/A City Beautification R&P
Create a City Entry Master Sign Plan
at various points of entry to the City
utilizing the following phases:
Phase 1: Issue an RFP for the design.
Phase 2: Design.
Phase 3: Construction.
This project was not funded as part of the Fiscal Year 2021-22 CIP. Funding will continue
to be pursued in future CIP cycles and with other funding sources, such as the American
Rescue Plan Act (ARPA). Staff recommends removing this from goals because it is a CIP
project and is considered part of the City’s routine operations. This project is now in the
Recreation and Parks Department and is scheduled to be completed as part of the City's
50th anniversary recognition.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Infrastructure Appendix - Page 4 of 4
A-9
TIMELINE TEMPLATES by Vertex42.com
https://www.vertex42.com/ExcelTemplates/timeline.html
Tips for Using this Template
• Insert and delete entire rows when editing the data tables
• Avoid leaving the label column blank
• Format the horizontal axis to set min/max bounds
• Enter a vertical position between -100 and 50
• Format individual data labels or markers to highlight specific events
Other Notes
• Milestone leader lines are Y Error bars
• Task leader lines are Y Error bars
• Task durations are X Error bars
Pre-Design WorkshopSite Plan Revisions
Delivary Analysis
Project Scheduling
Project Estimate and Budgeting
Site Plan Update Presentations -
Project schedule and Budget
Revise and Prepare Site Plan for City
Council
Complete Consultants review of the
Draft Update
Conduct two public workshops
Obtain Planning Commission
approval
Obtain City Council approval
Civic Center Project Feasibility and Site
Planning -Phase 1
Adopt the Updated Trails Network
Plan (TNP)
Implement NCCP/HCP
March-22 June-22 September-22 December-22 March-23 June-23 September-23
CITY LAND AND FACILITIES
Maintain and Improve all City-owned properties.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx City Land & Facilities - Page 1 of 2A-10
CITY LAND AND FACILITIES
Milestones
Target Date Description Original Date
8/16/2022 Civic Center Project Feasibility and Site Planning - Phase 1 6/30/2022
10/4/2022 Adopt the Updated Trails Network Plan (TNP)12/31/2021
6/30/2023 Implement NCCP/HCP 6/30/2022
Tasks
Start Date End Date Duration Description
3/24/2022 3/24/2022 0 Pre-Design Workshop
4/1/2022 6/30/2022 90 Site Plan Revisions
4/1/2022 6/30/2022 90 Delivary Analysis
4/1/2022 6/30/2022 90 Project Scheduling
4/1/2022 6/30/2022 90 Project Estimate and Budgeting
7/1/2022 7/30/2022 29 Site Plan Update Presentations - Project schedule and Budget
8/16/2022 8/16/2022 0 Revise and Prepare Site Plan for City Council
3/31/2022 10/4/2022 187 Complete Consultants review of the Draft Update
6/1/2022 10/4/2022 125 Conduct two public workshops
9/1/2022 10/4/2022 33 Obtain Planning Commission approval
10/4/2022 10/4/2022 0 Obtain City Council approval
12/30/2021 6/30/2022 182 Management Agreement Amendment
12/30/2021 6/30/2022 182 Preserve Access Protocol Creation
12/30/2021 6/30/2022 182 Record Conservation Easements
12/30/2021 6/30/2022 182 Update Preserve Use Master Plan
Maintain and Improve all City-owned properties.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx City Land & Facilities - Page 2 of 2A-11
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 3 100% - completed
City Land and Facilities 3 56% - 99% - accelerated/near completion
Updated:April 14, 2022 8 26% - 55% - on target/on schedule
1 0% - 25% - behind schedule/at risk
1 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date Revised Completion Date Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
10b 9/30/2021 1/24/2022 100%Ladera Linda Community Park PW
Complete construction-ready
documents for City Council
consideration.
Construction documents were completed on Jan 11, 2022. are expected to be complete
in January 2022. Staff recommends removing this from goals because it is a CIP project
and is considered part of the City’s routine operations.
10c 12/31/2021 3/1/2022 100%Ladera Linda Community Park PW
Complete bid process for
construction firm and present
contract to the City Council
consideration.
An advertisement inviting bids is expected to be issued in January 2022 and the bidding
process is expected to be complete in March 2022. The City Council awarded
construction and associated contracts on March 1, 2022. Staff recommends removing
this from goals because it is a CIP project and is considered part of the City’s routine
operations.
10d 12/31/2021 3/31/2022 0%Ladera Linda Community Park PW Break ground on construction based
on Council-approved plans.
Ground breaking will commence after successful completion of the bidding process and
issuance of a Notice to Proceed. Ground breaking is expected in March 2022. Staff
recommends removing this from goals because it is a CIP project and is considered part
of the City’s routine operations.
11a 6/30/2022 Proposed to be removed N/A Civic Center Master Plan FIN
Present Civic Center development
financing options to the City Council
for consideration.
In March 2020, City Staff initiated discussions with Kosmont Transaction Services (KTS),
but paused further discussions due to changes in the leadership team and to reassess
the financial impacts of the economic downturn. Staff has developed a preliminary
budget for this project that was confirmed as reasonable estimates by KTS. On October
15 2020, Staff met with KTS to discuss funding options for the project. Staff has
requested additional information and is working with Blais and Associates on
identifying grant opportunities. Additionally, since September 2020, Staff has been
meeting with consultants from various aspects of the development sector including
project management consultants, developers, and other agency representatives to
further understand, among other things, financing and product delivery options. Staff
and the CCAC are working on putting together a public financing workshop for the
community, council, advisory boards, and staff to be well versed in the financing
options for this project. The public financing workshop is tentatively scheduled for
March 10, 2022 and the goal was presented to the FAC on 2/17. FAC currently has a
financing subcommittee that consist of Chair Lewis, members MacAllister, and
Yourman that was formed for the Ladera Linda Community Park project and will
continue to support this effort. FAC ranked this as priority #2 based on the progress/the
current stage of the project. Staff recommends this item to continue and will support
the FAC subcommittee on the research and analysis. The CCAC recommended
establishing a budget for the Civic Center Master Plan project based on a preliminary
site plan by August 2022 as its #2 Priority Goal.
11b 12/31/2021 26%Civic Center Master Plan ADMIN
Explore potential Civic Center
partnerships that are compatible
with the City Council approved
program document, and coordinate
appropriate usage with civic,
business, and non-profit agencies to
consider locating at the civic center
Communication with respective agencies established. Additional dialogue to continue
in FY 2021-22 once the program validation has been completed. Program Validation
was presented on December 7, 2021.Griffin Structures, the project manager will assist
with achieving this goal. Staff will continue to follow-up with the CCAC and CCAC
subcommittee on future discussions. The CCAC recommended to continue to reach out
to DOJ and FEMA to formalize a land swapping agreement.
11d 3/30/2022 Proposed to be conined w/
11e 55%Civic Center Master Plan ADMIN
Explore potential Civic Center
partnerships that are compatible
with the City Council approved
program document, and coordinate
appropriate usage with civic,
business, and non-profit agencies to
consider locating at the civic center
In August 2021, the City signed a contract with Gensler to conduct a program validation
of the Civic Center program document that includes potential civic center partnerships.
The program validation is in response to interest expressed to consider expanded uses
at the site such as restaurants, museum and low-income housing. Program Validation
was presented on 12/7 and through that process, staff held various discussions with
respective agencies. Additionally, staff has sought additional partnerships to consider
for the Civic Center Master Plan. Staff plans to work with the on next steps and will
present to City Council in the near future. The CCAC on February 24, 2022
recommended combining this goal with 11e.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx City Land & Facilities Appendix - Page 1 of 4
A-12
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 3 100% - completed
City Land and Facilities 3 56% - 99% - accelerated/near completion
Updated:April 14, 2022 8 26% - 55% - on target/on schedule
1 0% - 25% - behind schedule/at risk
1 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date Revised Completion Date Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
11e 6/31/2022 8/31/20222 26%City Land and Facilities ADMIN
Present draft Civic Center Master
Plan for City Council consideration
which will include a new possible
Peninsula-wide EOC, Sheriff
substation, and fire station.
Requires hiring a design firm to prepare a master plan and a robust public engagement
process. Earlier this year, the Civic Center Advisory Committee (CCAC) prepared a draft
Design & Architectural Services RFP. The City Council Subcommittee also reviewed the
RFP. During this process, Staff realized that issuing an RFP to onboard a design firm, at
this time, is premature until financing options is considered by the City Council. This is
because the financing model the City Council finds most palatable will determine the
development process including the master planning. Since September 2020, Staff has
been meeting with consultants from various aspects of the development sector
including project management consultants, developers, and other agency
representatives to further understand, among other things, financing options, before
issuing an RFP. At this time, Staff is considering issuing a Request for Interest (RFI) to
glean more information on the development process for the Civic Center. City Council
approved CCAC requests on Feb. 2 to proceed with a) an RFP for a project management
consultant firm and b) facilitate a public workshop addressing municipal financial
capital projects. A project manager will determine when to proceed with developing a
master site plan. Staff has begun discussions with Captain Powers to obtain a written
commitment that the LASD is interested in a substation at the Civic Center site. In 2018,
L.A. County Sheriff Jim McDonnell sent letters indicating his support to place a facility
at the Civic Center site. On December 9, 2020, Captain James Powers of the Lomita
Sheriff Station provided verbal support of the project but cautioned that staff must
receive support from Sheriff Villanueva before proceeding. A site tour was scheduled
for January 2021 but was postponed for Spring 2021 due to current health orders. Staff
is discussing opportunities with LASD and LA Co. Fire. In June and August 2021, Staff
met with both the LA County Sheriff's Department and LA County Fire Department to
discuss potential commitments on a police and fire station onsite. Staff will continue
the discussions with their respective finance and planning departments. Staff
presented the Program Validation on December 7, 2021. Griffin Structures and Gensler
will assist staff and the CCAC. The CCAC on February 24, 2022 recommended
combining this goal with goal 11d to include civic, business, and non-profit partnerships
and present to . CCAC listed this as their priority 1 goal.
12a 7/31/2021 3/31/2022 75%Trails Network Master Plan Update Rec & Park
Complete the Consultant's review of
the draft update to the Trails
Network Plan that provides user-
friendly trail descriptions with
graphics and detailed maps
illustrating trail routes and uses in a
clear and concise manner based on
existing legal trails, community
input, and feasible trails.
City Council goal carried over from 2018-2019. City working group and consultant, Alta
Planning and Design, are coordinating on content of document, and the update
process. The consultant continues to update the draft document which is anticipated
to be reviewed by trail co-managers and the IMAC Trails Subcommittee, and then
released for public review in May 2022.
12b 8/31/2021 061/2022 and 7/31/22 26%Trails Network Master Plan Update Rec & Park
Conduct two public workshops to
solicit community feedback on draft
plan.
Based on City Council direction on June 16 2020, there will be one additional public
outreach meeting led by Staff to solicit community feedback on draft plan. Over the
next several months, Staff, with the assistance of the consultant will prepare and
disseminate information to maximize public awareness and involvement. Staff
continues to work with its consultant on the format and presentations for the
upcoming workshops. The first public workshop will be June 1, 2022 and the second
public workshop will be held on July 31, 2022.
12c 12/31/2021 10/4/2022 26%Trails Network Master Plan Update Rec & Park Adopt the Updated Trails Network
Plan
Staff and the consultant will update the draft TNP to include Planning Commission
input and community and stakeholder feedback prior to presenting to City Council.
The date that the TNP will be presented to City Council will be finalized, but is
anticipated to occur on October 4, 2022. The document will be released three weeks
prior to the meeting.
13a 12/31/2021 6/30/2022 26% Natural Communities Conservation Plan /
Habitat Conservation Plan (NCCP/HCP)Rec & Park
Amend the Management Agreement
with the PVPLC to reflect the City
Council-adopted NCCP/HCP.
Over the next several months, Staff will coordinate with the City Attorney's Office and
the PVPLC to continue identifying potential amendments for the City Council's
consideration in June 2022.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx City Land & Facilities Appendix - Page 2 of 4
A-13
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 3 100% - completed
City Land and Facilities 3 56% - 99% - accelerated/near completion
Updated:April 14, 2022 8 26% - 55% - on target/on schedule
1 0% - 25% - behind schedule/at risk
1 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date Revised Completion Date Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
13b 11/30/2021 6/30/2022 40% Natural Communities Conservation Plan /
Habitat Conservation Plan (NCCP/HCP)Rec & Park
Amend the Management Agreement
with the PVPLC to reflect the City
Council-adopted NCCP/HCP.
These protocols are required to be completed within a designated period of time after
the City receives the NCCP/HCP permits from the state and federal wildlife agencies.
The City has received its federal permit, and is awaiting the state's permit decision.
Staff is currently working with the Wildlife Agencies to proceed with these documents.
Park Rangers are educating authorized agencies about appropriate vehicular access and
installing signage. No new updates at this time as staff continues to work on this goal.
13c 3/31/2022 6/30/2022 60% Natural Communities Conservation Plan /
Habitat Conservation Plan (NCCP/HCP)Rec & Park
Record the NCCP/HCP-approved
conservation easements over all
Preserve properties.
The City is required to place conservation easements over the Preserve properties after
the City receives the NCCP/HCP permits from the state and federal wildlife agencies.
The City has received its federal permit, and is awaiting the state's permit decision. In
January 2021, the City Council approved a contract with a surveyor to create property
descriptions for the conservation easements. The surveying has been completed. No
new updates at this time as staff continues to work on this goal.
13d 3/31/2022 6/30/2022 26% Natural Communities Conservation Plan /
Habitat Conservation Plan (NCCP/HCP)Rec & Park
Update the Public Use Master Plan
for the Palos Verdes Nature Preserve
to reflect the Council-adopted
NCCP/HCP.
Staff is making advance preparations for updating the Public Use Master Plan, including
referencing appropriate sections of the NCCP/HCP and updating trail maps. No new
updates at this time as staff continues to work on this goal.
13e 12/31/2021 12/1/2021 100% Natural Communities Conservation Plan /
Habitat Conservation Plan (NCCP/HCP)Rec & Park
Prepare a Preserve Master Parking
Plan identifying parking
opportunities to accommodate
visitors to the Preserve that
minimizes impacts on
neighborhoods and resources.
The City has been engaged in a holistic effort to manage parking and access to the
City’s Nature Preserve to balance the need for public access, protecting Preserve
neighbor quality of life, natural resource protection, and providing safe parking and
access. The City Council has considered agenda items related to this effort on March
17, 2020, August 18, 2020, September 1, 2020, October 6, 2020, October 20, 2020,
December 15, 2020, January 19, 2021, February 16, 2021, March 2, 2021, March 16,
2021, April 20, 2021, May 18, 2021, July 6, 2021, September 7, 2021, and October 5,
2021. Additionally, to engage public participation and maximize transparency, this
issue was discussed at Preserve Public Forums on April 17, 2021, July 21, 2021, and
October 13, 2021. As a result, the following elements of a holistic approach to Preserve
Parking and Access were used:
•Preserve capacity analysis: The City Council received and filed an update on capacity
analysis alternatives at the March 16, 2021 City Council Meeting.
•Web and social media campaign: Staff worked with a Search Engine Optimization
consultant. The work was completed November 2021.
•Traffic and parking analysis: The Public Works Department worked with a traffic
engineering consultant to complete an expedited traffic analysis for Crenshaw Blvd.
south of Crest Rd. Results were presented to the City Council on March 16, 2021.
Parking was restricted to provide recommended site distances. Larger scale parking
studies will be completed in early 2022.
•Increasing parking enforcement: The City has hired part-time park rangers/parking
ambassadors.
•Establishing reservation and fee-based parking system: The City Council approved a
contract with ParkMobile in April 2021, and implemented the system July 2021.
•Increasing parking citation fines: Parking violations were increased from $50 to $110
for the following violations: 1) Park by permit, 2) Failure to obey signage, and 3)
Passenger loading zone.
•Installing access gates at Burma Road and Rattlesnake trailheads: Burma Gate was
installed, and Rattlesnake is forthcoming. Burma gate was damaged in Sept. 2021, and
staff is working to repair it.
•Dispersing public use to alternative reserve locations. This effort was supported
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx City Land & Facilities Appendix - Page 3 of 4
A-14
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 3 100% - completed
City Land and Facilities 3 56% - 99% - accelerated/near completion
Updated:April 14, 2022 8 26% - 55% - on target/on schedule
1 0% - 25% - behind schedule/at risk
1 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date Revised Completion Date Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
14a 12/31/2021 12/31/2022 60%Park Improvements Rec & Park
Explore establishing a partnership,
joint use, and/or lease agreement
with the U.S. Coast Guard for the
Point Vicente Lighthouse property,
buildings, and WW II Battery Barnes
outpost owned by Coast Guard,
Facility-commonly referred to as
Coast Guard bunker (located at the
Civic Center).
Staff has reached out to the Coast Guard to initiate dialogue about the future use of
these properties. Staff and several City Council members took tours of Coast Guard
properties with USCG personnel in October 2020 and held informal discussions of
potential acquisition and partnership. The USCG expressed a strong interest in
developing a partnership with the City. Additional meetings are being planned to begin
brainstorming partnership arrangements. Staff continued discussions with Coast
Guard personnel during a recent Civic Center tour. Staff has been informed that a new
Commander is coming on board in late May and staff plans to reach out to her to
continue discussions by mid-June. Staff continues to work with Coast Guard staff and
new Commander to explore options for both sites. City Staff, Mayor Bradley and
Councilmember Cruikshank toured the site and met with Coast Guard personnel in
October. Follow-up meetings with the Coast Guard Engineering Unit are planned for
January 2022. Staff is in discussion with Coast Guard personnel and their Engineering
Unit to set up follow-up meetings to discuss potential joint uses and/or acquistion of
both sites in March and April. Goal of having an MOU in place with the US Coast Guard
by December 31, 2022.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx City Land & Facilities Appendix - Page 4 of 4
A-15
TIMELINE TEMPLATES by Vertex42.com
https://www.vertex42.com/ExcelTemplates/timeline.html
Tips for Using this Template
• Insert and delete entire rows when editing the data tables
• Avoid leaving the label column blank
• Format the horizontal axis to set min/max bounds
• Enter a vertical position between -100 and 50
• Format individual data labels or markers to highlight specific events
Other Notes
• Milestone leader lines are Y Error bars
• Task leader lines are Y Error bars
• Task durations are X Error bars
Develop Arterial Fences and Walls
Master Plan
Complete Streetscape Beautification
Master Plan
Replace City Entry Master Signs
Drafting EV code language for
Council consideration
Arterial Fences and Walls Master
Plan
Streetscape Beautification Master
Plan
City Entry Monument Signs
Support local businesses and grow
business with high-quality jobs in
RPV
Adopt streamlined Electric Vehicles
(EV) permit policies
Implement Water Conservation
Strategies
March-22 June-22 September-22 December-22 March-23 June-23 September-23
QUALITY OF LIFE
Maintain and improve the quality of life for RPV residents.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Quality of Life - Page 1 of 2A-16
QUALITY OF LIFE
Milestones
Target Date Description Original Date
6/30/2023 Arterial Fences and Walls Master Plan 6/30/2023
6/30/2022 Streetscape Beautification Master Plan 6/30/2023
6/30/2023 City Entry Monument Signs 6/30/2023
6/30/2023 Support local businesses and grow business with high-quality jobs in RPV 6/30/2022
6/30/2023 Adopt streamlined Electric Vehicles (EV) permit policies 6/30/2022
6/30/2023 Implement Water Conservation Strategies 6/30/2022
Tasks
Start Date End Date Duration Decription
7/1/2022 6/30/2023 364 Develop Arterial Fences and Walls Master Plan
7/1/2022 6/30/2023 364 Complete Streetscape Beautification Master Plan
7/1/2022 6/30/2023 364 Replace City Entry Master Signs
8/1/2021 6/30/2023 698 Engage with LAEDC on economic development
3/1/2022 6/30/2023 486 Drafting EV code language for Council consideration
6/30/2021 6/30/2023 730 Implementiond in conjunction changes from the 2012 to the 2021 LA County MS4 NPDES Permit
Maintain and improve the quality of life for RPV residents.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Quality of Life - Page 2 of 2A-17
MS CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 4 100% - completed
Quality of Life 0 56% - 99% - accelerated/near completion
Updated:April 14, 2022 4 26% - 55% - on target/on schedule
2 0% - 25% - behind schedule/at risk
2 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
15a 6/30/2021 6/30/2022 1/15/2022 100%Western Avenue Redevelopment CDD
Develop a SWOT analysis of
commercial properties along
Western Avenue to identify
economic development
opportunities to enhance retail
establishments and create mixed-
use projects.
The City prepared a potential redevelopment site analysis and has met with
four potential developers to explore mixed use projects. In May, the City was
awarded a $160k from the SB 2 grant fund to develop a mixed use plan for
Western Avenue. Additionally, the City applied for the Local Early Action
Planning (LEAP) grant to seek an additional $150k to support mixed use
planning efforts that will enhance economic development opportunities in the
City. Phase I feasibility analysis of select properties has been completed and
presented to City Council and Planning Commission; City Council authorized the
expansion of the study to incorporate additional properties on Western Avenue
and Silver Spur, among other sites, on September 7, 2021. Staff received a
rough draft of Phase II feasibility analysis and a final draft is currently being
prepared for presentation to the City Council in early 2022. The final report will
be presented to City Council in conjunction with the Housing Element public
hearings.
15b 12/31/2022 Proposed to be
removed N/A Western Avenue Redevelopment PW
Create a Traffic Flow
Improvement Plan in
coordination with Lomita, Los
Angeles, and Caltrans to improve
traffic flows and provide
connectivity between retail
outlets and residents.
A funding agreement with the Metro Board for $1.33 million to be used for a
concept plan report has been executed. The timeline of this project is subject to
filling staff vacancies. Staff has started preparing a solicitation for a project
manager to assist the City with progressing this project. Staff recommends
removing this from goals because it is a CIP project and is considered part of the
City’s routine operations. It should be noted that Staff routinely meets with
neighboring cities and representatives from Caltrans to identify means to
improve traffic flow.
15c 06/30/223 6/30/2022 N/A Western Avenue Redevelopment PW
Develop a streetscape
beautification plan to enhance
the aesthetic character of
Western Avenue.
The CIP for FY 2020-21 includes funding for a concept design of the Western
Avenue Beautification Project. Staff recommends removing this from goals
because it is a CIP project and is considered part of the City’s routine
operations. In fact, earlier this last year, Staff began implementing the first
phase of the Western Avenue Street Beautification which included installing
new median and parkway landscaping, enhancing street furniture, and
removing debris. The second phase which includes painting the arterial walls is
being coordinated with the neighboring homeowner’s associations and is
anticipated to be completed in late Spring 2022.
16a 6/30/2022 6/30/2022 30%Economic Development Admin
Create a promotional economic
development campaign to
improve RPV's jobs/housing
balance by supporting home-
based businesses and
encouraging business with high-
quality jobs to locate in RPV.
City Staff is in the early stages of developing a branding campaign for Western
Avenue that will incorporate Goal No. 47 of FY 2020-21. The branding campaign
will bring together the traffic flow, beautification, and economic development
projects for Western Avenue. Staff is collecting information on potential
marketing consultants. In August 2021, Staff joined the Los Angeles Economic
Development Corporation (LAEDC) to assist the City in highlighting current
businesses and attract new businesses to the City. This will also include
Western Avenue. Staff is working with the LAEDC District Director on strategies
to strengthen economic development starting with current RPV businesses.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Quality of Life Appendix - Page 1 of 3
A-18
MS CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 4 100% - completed
Quality of Life 0 56% - 99% - accelerated/near completion
Updated:April 14, 2022 4 26% - 55% - on target/on schedule
2 0% - 25% - behind schedule/at risk
2 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
17a 6/30/2022 6/30/2022 30%Environmental Sustainability CDD
Electric Vehicles: Adopt
streamlined EV permitting
policies in compliance with AB
1236
Initial research underway; tentative workplan in development. Initial research
and analysis is complete. Development of draft code language is in process and
will be presented to the Planning Commission in Spring 2022 before coming to
the City Council for consideration.
17b 6/30/2022 9/30/2022 5%Environmental Sustainability CDD
Water Conservation: Develop
and publish a Low Impact
Development (LID) Standards
Guidebook as resource to the
development community to
comply with the City's storm
water ordinance and LID
standards.
Existing standards and guidelines currently under review for compliance
current and anticipated stormwater regulations. No progress since last update.
However, the City Council received a report from Cal water on water
conservation and will be updating the website with information on rebate
programs. To be implemented in conjunction with future storm water
ordinance updates associated with the changes from the 2012 to the 2021 LA
County MS4 NPDES Permit.
17c 6/30/2022 4/1/2022 50%Environmental Sustainability PW
Develop program in collaboration
with EDCO to recycle/divert
organic waste from residential
waste
State law governs organic waste diversion and the City. The City has retained a
consultant to develop an The first reading of a municipal code revision
requiring diversion of residential organic waste away from landfills was heard
by the City Council on March 1, 2022. A second reading is scheduled for March
15, 2022. The City Council approved a new franchise agreement with the City's
residential waste hauler, EDCO, which includes the diversion of residential
organic waste away from landfills. The agreement includes rate increases,
which are subject to a public protest hearing. The public protest hearing will be
conducted on March 15, 2022. If the new rates are approved, the residential
organic waste program will begin in April 2022. if and waste hauler contract to
become compliant with State law. Staff recommends removing this goal as it is
part of core City operations and a state regulatory requirement rather than a
City Council goal. The City Council will be asked to update the Rancho Palos
Verdes Municipal Code (Chapter 8.20) to implement SB 1383 tentatively at its
January 18, 2022 meeting.
18a 9/30/2021
11/2/2021 (staff
recommend carry over
goal)
11/16/2021 100% Municipal Code Amendments CDD Update the City's Sign Ordinance
(Section 17.76.050)
Staff is working with the City Attorney's Office on the preparation of a draft
code amendment for review by the Planning Commission. Draft regulations in
development stage. Planning Commission likely to consider in January 2021.
Staff is working with the City Attorney's Office on the preparation of a draft
code amendment for review. Planning Commission to begin consideration of
new code standards in February. On February 9, 2021, the Planning
Commission directed the Zoning Subcommittee to work with Staff and the City
Attorney's office on the development of an updated sign code. Preliminary text
to be presented to PC on July 27th.
The Planning Commission has conducted two hearings; it is anticipated that The
Planning Commission will make final recommendations on September 14, 2021;
City Council to consider Planning Commission recommendations on November
2, 2021. On November 16th, the City Council adopted the new Sign Code
(Ordinance No. 652). Goal completed. Staff recommends carrying this goal over
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Quality of Life Appendix - Page 2 of 3
A-19
MS CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 4 100% - completed
Quality of Life 0 56% - 99% - accelerated/near completion
Updated:April 14, 2022 4 26% - 55% - on target/on schedule
2 0% - 25% - behind schedule/at risk
2 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
18b 10/31/2021 7/30/2022 0% Municipal Code Amendments CDD
Update the Wireless (private
property) Facilities Ordinance
(Section 17.76.020)
Staff will begin updating the wireless facilities section of the code in early 2021.
Staff is working with the City Attorney’s Office on the preparation of draft
language for review. The Planning Commission likely to consider before
Summer 2021. This goal is recommended to be continued to FY2021-22.
Deferred until completion of Sign Ordinance update. Sign ordinance was
adopted on November 16 and Staff will begin preparing an ordinance after
January 1. On hold pending review of current state and federal legislation
governing wireless telecommunication facilities and need to update City codes
to eliminate conflicts.
18c 06/30/2022 6/30/2022 9/30/2022 50% Municipal Code Amendments CDD
Initiate remaining text
amendments to complete the
comprehensive update to Title 17
(Zoning Code) of RPVMC and
Zoning Map. Target completion
of 50% of updates by end of FY.
Pending completion of Sign Ordinance and misc. code amendments to comply
with NCCP/HCP. Planning Commission to consider code amendments to the
RPVMC related to NCCP/HCP Updates on December 12 with recommendation
to be presented to the City Council in Early 2022. Work on the comprehensive
update to Title 17 will occur afterwards. Planning Commission public hearing to
review proposed NCCP/HCP updates have been continued to date uncertain to
allow more time to respond to public comments. Staff and city attorney's
office currently reviewing current state legislation governing housing to
determine need to update City codes to eliminate any conflicts.
19a 12/31/2021 02/15/2022 2/15/2022 100% Community Programs Admin
Provide services for aging and
disabled members of the
community through the of a new
Aging and Disability Resources
Connection (ADRC) program
The City Council approved the ADRC on June 15, 2021. Staff has implemented a
pilot version of the ADRC, evaluating programs as needed, to provide resources
and programs for aging and disabled members of the community. The ADRC
was revised to be the RPV Community Action Network, with a focus on
emergency preparedness.
19b 12/31/2021 8/15/2021 100% Community Programs Rec&Park
Launch a “Keep RPV Clean”
campaign throughout the City’s
open space areas
Work with community partners by launching a community cleanup program
which includes a social media campaign, monthly volunteer events, and
developing and distributing information and incentive packets for families
and/or neighborhoods to keep City Parks, Preserve, Beaches and streets clean
of litter. Staff has ordered some cleanup-related materials, is working on an
outreach campaign including branding, and has identified several upcoming
dates and locations: RPV BEACH on June 19, Ocean Trails on July 17 Lower
Hesse Park on August 21. Several "Keep RPV Clean" resident-generated
cleanup efforts have taken place throughout the City. This opportunity has
been advertised via Listserv, the City website, and the City Newsletter.
Additionally, volunteers have participated in numerous City-sponsored events
with high levels of volunteer attendance. A Coastal Cleanup on September 18
drew 93 volunteers. Abalone Cove Park cleanups took place on October 30 and
November 20. An Abalone Cove Beach cleanup is planned for December 18.
Goal completed. While the goal has been completed, additional opportunities
for public cleanup events continue to be offered on a monthly basis. Additional
volunteer opportunities are available at City Special Events such as the skate
rink and the upcoming Whale of a Day.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Quality of Life Appendix - Page 3 of 3
A-20
TIMELINE TEMPLATES by Vertex42.com
https://www.vertex42.com/ExcelTemplates/timeline.html
Tips for Using this Template
• Insert and delete entire rows when editing the data tables
• Avoid leaving the label column blank
• Format the horizontal axis to set min/max bounds
• Enter a vertical position between -100 and 50
• Format individual data labels or markers to highlight specific events
Other Notes
• Milestone leader lines are Y Error bars
• Task leader lines are Y Error bars
• Task durations are X Error bars
Implement Youth at Work Program
Implement Internship Program
50th Anniversary Planning
Uveiling of the Ken Dyda Civic
Center
Harvest Festival Programming
Historic Talk and Walk with RPVtv
Holiday Programming
Historical Scavenger Hunt
History of Rancho Palos Verdes Art
Contest
Celebrate the Palos Verdes Preserve
Whale of the Day
Picnic at the Fourth City Tree Grove
3 Themed Summer Concerts
Fourth of July Fireworks
Sister City Cultural Event
50th Anniversary Dinner Banquet
Establish Two Youth in Government
Programs 50th Anniversary Celebration
March-22 June-22 September-22 December-22 March-23 June-23 September-23
CITIZEN INVOLVEMENT & PUBLIC OUTREACH
Engage residents and community partners in assisting the City Council, City Committees/Commissions and City
Staff facilitate the decision-making process.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Ctzn Invlvmnt & Pub Outreach - Page 1 of 2A-21
CITIZEN INVOLVEMENT & PUBLIC OUTREACH
Milestones
Target Date Description Original Date
4/1/2023 Establish Two Youth in Government Programs 6/30/2023
9/7/2023 50th Anniversary Celebration 9/7/2023
Tasks
Start Date End Date Duration Decription
6/1/2023 8/30/2023 90 Implement Youth at Work Program
4/1/2023 4/1/2023 0 Implement Internship Program
5/1/2022 9/7/2023 494 50th Anniversary Planning
9/7/2022 9/7/2022 0 Uveiling of the Ken Dyda Civic Center
10/1/2022 10/30/2022 29 Harvest Festival Programming
11/1/2022 11/30/2022 29 Historic Talk and Walk with RPVtv
12/1/2022 12/30/2022 29 Holiday Programming
1/15/2023 1/30/2023 15 Historical Scavenger Hunt
2/1/2023 2/28/2023 27 History of Rancho Palos Verdes Art Contest
3/1/2023 3/1/2023 0 Celebrate the Palos Verdes Preserve
4/1/2023 4/1/2023 0 Whale of the Day
5/1/2023 5/1/2023 0 Picnic at the Fourth City Tree Grove
6/1/2023 6/30/2023 29 3 Themed Summer Concerts
7/4/2023 7/4/2023 0 Fourth of July Fireworks
8/4/2023 8/4/2023 0 Sister City Cultural Event
9/9/2023 9/9/2023 0 50th Anniversary Dinner Banquet
Engage residents and community partners in assisting the City Council, City Committees/Commissions and City Staff facilitate
the decision-making process.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Ctzn Invlvmnt & Pub Outreach - Page 2 of 2A-22
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 0 100% - completed
Citizen Involvement & Public Outreach 0 56% - 99% - accelerated/near completion
Updated:April 14, 2022 0 26% - 55% - on target/on schedule
0 0% - 25% - behind schedule/at risk
0 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
6/29/2023 Citizen Involvement & Public
Outreach Admin Establish two Youth in
Government Programs
9/7/2023 Citizen Involvement & Public
Outreach All Depts 50th Anniversary Celebration
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Ctzn Invlvmnt & Pub Outrch Appd - Page 1 of 1
A-23
TIMELINE TEMPLATES by Vertex42.com
https://www.vertex42.com/ExcelTemplates/timeline.html
Tips for Using this Template
• Insert and delete entire rows when editing the data tables
• Avoid leaving the label column blank
• Format the horizontal axis to set min/max bounds
• Enter a vertical position between -100 and 50
• Format individual data labels or markers to highlight specific events
Other Notes
• Milestone leader lines are Y Error bars
• Task leader lines are Y Error bars
• Task durations are X Error bars
Develop City Council Goals Gantt Chart
Present Final Draft of FY 2022-23 City
Council Goals
City Council Approve FY 2022-23 City
Council GoalsImplement FY 2022-23 City Council
Goals
Post Classification and Compensation
Study Employee Survey
Implement FY 2022-23 City Council
Goals Gantt Chart Review View Restoration Ordinance
Enhance the one-stop permit process.
Achieve 91% of RPV Employees say RPV
is "a great place to work."
March-22 June-22 September-22 December-22 March-23 June-23 September-23
GOVERNMENT EFFICIENCY, TRANSPARENCY, AND ACCOUNTABILITY
Maximize the use of each tax dollar and optimize services delivered to RPV Residents
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Gov Eff, Trans & Accountability - Page 1 of 2A-24
GOVERNMENT EFFICIENCY, TRANSPARENCY, AND ACCOUNTABILITY
Maximize the use of each tax dollar and optimize services delivered to RPV Residents
Milestones
Target Date Description Original Date
7/1/2022 Implement FY 2022-23 City Council Goals Gantt Chart 4/19/2022
6/30/2023 Review View Restoration Ordinance 12/31/2020
12/31/2022 Enhance the one-stop permit process.8/31/2020
6/30/2023 Achieve 91% of RPV Employees say RPV is "a great place to work." 12/31/2019
Activities
Start Date End Date Duration Decription
3/1/2022 7/1/2022 122 Develop City Council Goals Gantt Chart
5/17/2022 5/17/2022 0 Present Final Draft of FY 2022-23 City Council Goals
5/18/2022 7/1/2022 44 City Council Approve FY 2022-23 City Council Goals
7/1/2022 6/30/2023 364 Implement FY 2022-23 City Council Goals
12/30/2021 6/30/2023 547 CA review for SB8/330 and Housing Accountability Act Impact
2/15/2022 6/1/2023 471 Review of Planning and Permitting with Consultant
8/10/2021 9/30/2023 781 HR on the Go - Survey one-on-one with Departments
10/1/2022 12/31/2022 91 Post Classification and Compensation Study Employee Survey
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Gov Eff, Trans & Accountability - Page 2 of 2A-25
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 0 100% - completed
Government Efficiency, Transparency, and Accountability 0 56% - 99% - accelerated/near completion
Updated:April 14, 2022 3 26% - 55% - on target/on schedule
1 0% - 25% - behind schedule/at risk
2 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
21a 12/31/2020 6/30/2022 30%
Government Efficiency,
Transparency, and
Accountability - Operations &
Customer Service
CDD
Review View Restoration
Ordinance and bring options
to the Planning Commission
and City Council to consider
amending the guidelines.
Was goal #70. Staff is reviewing the existing ordinance and guidelines to
determine the scope of the proposed amendments. Scheduled for
Planning Commission review in Fall 2021. Reviewing matter with City
Attorney's office to determine impacts of SB8/330 and Housing
Accountability Act.
22b Propose to be
removed 30%
Government Efficiency,
Transparency, and
Accountability - Operations &
Customer Service
FIN
Present Transient Occupancy
Tax (TOT) rate options to FAC
and City Council
Was goal #73. Staff presented the TOT trends and analysis to FAC on
Sept. 26, 2019. Due to the economic downturn and the recent impact
on the travel/hospitality industry, staff and FAC continued this item to
FY 2021-22. Staff presented this goal to the FAC on 2/17. After
discussion between the FAC and staff, both supported removing this
goal from the City Council list and have this item as a routine item on
the FAC annual work plan.
23c 12/31/2019 Propose to be
removed N/A
Government Efficiency,
Transparency, and
Accountability - Operations &
Customer Service
Admin
Enhance internal and external
customer service and
efficiency so that all inquiries
are acknowledged within the
day received and that, when
surveyed, internal customers
indicate 95% satisfaction with
responsiveness by colleagues,
and external customers
indicate 95% satisfaction with
responsiveness by Staff.
Was goal #74. Work will commence in fall Progress is limited based on
staffing levels. Carry over goal. Staff anticipates preparing
memorandum regarding findings before Fall 2021. An employee
(internal customer service) survey was issued on September 30, 2020
with a deadline date of October 14. Staff tallied the results and
generally speaking employees are somewhat satisfied. Department
Heads are assessing the results of the employee results to identify areas
to improve employee satisfaction. A follow-up survey will be issued in
Fall 2021 to compare results after enhanced measures are
implemented. In addition to the resident survey presented to the
Council on February 16, 2021, Staff is preparing a specific customer
service survey. It should be noted that in the resident survey 71.8% of
respondents indicated that they were somewhat or very satisfied. Staff
is in the planning stages of establishing a method to send and receive
responses. Staff recommends removing this goal as a portion of internal
customer service is achieved through goal 26f, and the external
customer service portion is identified as an IT project or assignment.
24d 8/31/2020
12/31/2022 (carry
over from FY 2021-
22)
10%
Government Efficiency,
Transparency, and
Accountability - Operations &
Customer Service
CDD
Establish an efficient and
streamlined development
process between the
Community Development and
Public Works Departments to
decrease the initial review
time for applications to no
more than 10 business days.
Enhance the one-stop permit
process.
Was goal # 75. Staff is in process of implementing online permit
application processing. To date the following permits are available to
be applied for online: Electric Panel Upgrade, Reroof, Water Heater,
Solar, Plumbing, Dumpster, Haul Route, Film Permit, Residential
Parking, Recreational Parking Del Cerro, Oversized Vehicle Parking. Staff
will be presenting a status update at the February 15, 2022 City Council
meeting. The goal includes specific metrics to measure success and
what can be completed in a realistic and timely manner. Staff recently
met with management consultant to discuss project scope and services
requested in order to review planning and permitting processes. This is
tentatively scheduled to be presented to the City Council on June 21,
2022.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Gov Eff, Trans & Accntblty Appd - Page 1 of 2
A-26
CITY OF RANCHO PALOS VERDES COLOR DESCRIPTION AND COUNTS
City Council Goals and Action Plan - Appendix 0 100% - completed
Government Efficiency, Transparency, and Accountability 0 56% - 99% - accelerated/near completion
Updated:April 14, 2022 3 26% - 55% - on target/on schedule
1 0% - 25% - behind schedule/at risk
2 N/A - not recommended/not necessary
Goal No.Original Target
Completion Date
Revised Completion
Date
Actual Completion
Date Status (%)Goal Category Department Task Description Status Update
25e 6/30/2020 Propose to be
removed N/A
Government Efficiency,
Transparency, and
Accountability - Operations &
Customer Service
Admin Reassess the Study Session
Was goal # 78. Activity on this goal is pending further review of the
City's study session policy. Staff recommends removing this goal as it
can be accomplished at the staff level as part of the City’s routine
operations.
26f 12/31/2019 4/29/2022 50%
Government Efficiency,
Transparency, and
Accountability - Operations &
Customer Service
Admin 91% of RPV Employees say
RPV is "a great place to work."
Was goal #79 in 2020. Survey was sent on September 30, 2020 with a
deadline date of October 14. Staff is tallying the results. Human
Resources tallied the results and determined 79% of RPV employees
would say "it is a great place to work." Department Heads are assessing
the results of the employee results to identify areas to improve
employee satisfaction. Human Resources developed a new program
that supports this goal called "HR on the Go." HR will meet with
department staff on a one-on-one basis to learn more about employees
and their satisfaction working at RPV. Human Resources has met with
employees from three of the five departments and is gathering data
from the meetings to assist in achieving 91% of RPV employees saying
RPV is a great place to work.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Gov Eff, Trans & Accntblty Appd - Page 2 of 2
A-27
City Council Goals Appendix
FY 2020-Present
Goal Category Department Task Description Status Update
Public Safety Admin Obtain written commitments from Public Safety for substation or fire house at the Civic Center Combined with Goal No. 31 of FY2021/22 Goals and Action Plan
Public Safety Admin Expand Neighborhood Watch to five new communities.
Staff recommends removing this item as the Neighborhood Watch
Coordinator has indicated that communities wishing to join the
Neighborhood Watch Network are already involved.
Emergency Preparedness Admin Engage in a regional emergency preparedness plan and conduct an exercise with all four Peninsula
cities.
Day-to-day task
Emergency Preparedness Admin
Establish a pilot neighborhood emergency preparedness "block captain" program to serve as a
conduit between the EOC and neighborhood residents (particularly residents who are most
vulnerable during emergencies due to age, mobility challenges and cognitive limitations).
Day-to-day task
Infrastructure - Portuguese Bend Landslide PW Complete the EIR for the Portuguese Bend Landslide Remediation Project for certification by the
City Council
On May 19, 2020, the City Council approved a professional services
agreement with the Chambers Group to prepare the environmental
document. The Draft Initial Study was published for public review
between November 12, 2020 and January 15, 2021. A public scoping
meeting was held on December 19, 2020. The City's consultant has
started work on the draft EIR. The Draft EIR is expected to be published
in the Fall of 2021. The Draft EIR is expected to be published in the
Spring of 2022. Additionally, this will allow time for the City Council to
consider contracting with a program management company to assist
the City with reviewing and processing the Draft EIR and Final EIR. Staff
recommends removing this from goals because it is a CIP project and is
considered part of the City’s routine operations.
Infrastructure - Portuguese Bend Landslide FIN Prepare funding opportunities for Phases 1 & 2 of the Portuguese Bend Landslide Feasibility Plan
for City Council consideration.
Staff is pursuing various potential funding opportunities for this
project. The South Santa Monica Bay (SSMB) Watershed Area Steering
Committee (WASC) met on May 19, 2020. WASC reviews all projects for
Measure W funding. A Measure W application was submitted to the
County for the Portuguese Bend Landslide Remediation Project in
October 2020. Staff is also working with Blais and Associates to identify
potential grants for this project, and City Staff has embarked on a
writing campaign for funding opportunities with state and federal
legislators including securing federal infrastructure funding. The City is
in the process of hiring a program manager for this project who may
help identify funding and grant opportunities. Staff recommends
removing this goal because it is a Finance Department task to identify
appropriate funding for projects as part of routine City business.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 1 of 11A-28
City Council Goals Appendix
FY 2020-Present
Infrastructure - Portuguese Bend Landslide PW
Develop a mitigation plan to address land movement at Altamira Canyon based on the following
phases:
Phase One - Perform the drainage/erosion analysis for the entire canyon and its tributaries and
establish a priority list based on current erosion.
Phase Two - Prepare detailed engineering plans to resolve the erosion and making sure there is
positive drainage along the canyon.
Phase Three - Award construction contract for the proposed improvements.
On November 4, 2020, the City Council approved a professional
services agreement with Harris and Associates to perform the Phase
One work. Notice to proceed was issued on February 24, 2021.
Surveying work is complete and drainage/erosion analysis is underway.
Staff recommends removing this goal because it is a CIP project and is
considered part of the City’s routine operations.
Infrastructure - Utilities PW
Design for the replacement and rehabilitation of storm sewer at PVDS at Peppertree Dr., and
Hawthorne Blvd. at Hawkhurst Dr. pursuant to the City's Storm Drain Deficiency Improvements
Program (SDDIP):
Day-to-day task: Referred to Goal #15 in 2019. The design for PVDS at
Peppertree is at 75% plans have been designed and will be going out to
bid in fall. The and the design for Hawthorne Blvd at Hawkhurst is at
90%. Funding for construction will be requested through the CIP
process. plans are under design and will be completed by December
2020
Infrastructure - Utilities PW Establish a Citywide Neighborhood Streetlight Installation Program and/or ordinance for
consideration by the City Council for neighborhoods who wish to install new street lights.
Referred to Goal #19 in 2019. On February 18, 2020, the City Council
directed Staff to proceed with an agreement with Harris and Associates
to develop a citywide street lighting policy. Staff is preparing a scope of
work for a consultant to develop the process and parameters for a
Neighborhood Streetlight Program - Cruikshank stated to remove
Infrastructure - Asset Management PW Create a detailed inventory and maintenance schedule of the City's public infrastructure and
assets.
The Fiscal Year 2021-22 CIP includes funding to start an asset
management program for the City's Facilities, Storm Sewer System,
Pavement, Sidewalks, and Traffic Signs. Proposals have been received
for a condition assessment and maintenance schedule of the City's
facilities and work is expected to begin in the next quarter. Proposals
for a condition assessment and maintenance schedule for the City's
pavement, sidewalks, and traffic signs will be solicited in the next
quarter. Council has awarded a professional services agreements for
the creation of a detailed inventory and maintenance schedule of the
City's facilities, pavement, sidewalks, guardrails, and traffic signs. Work
is expected to be complete within 6 months. A similar asset
management program for the City's storm sewer system and sanitary
sewers will be started when staff vacancies are filled. Staff
recommends removing this goal because it is a CIP project and is
considered part of the City’s routine operations.
Infrastructure - Electric Utilities PW Develop a Citywide 5G Small Wireless Facilities (SWF) Master Plan that identifies the preferred and
least intrusive locations to install small wireless facilities including co-locations.
The primary 5G SWF engineering and construction company on the Peninsula
has developed a plan of locations for SWF facilities. Staff is soliciting proposals
from qualified consultants to evaluate the plan for optimization of co-location,
gap analysis, aesthetic impacts, compliance with City policies, and development
of recommended alternatives when feasible. At this time, Staff recommends
removing this goal due to staff vacancies.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 2 of 11A-29
City Council Goals Appendix
FY 2020-Present
Infrastructure - Electric Utilities PW
In coordination with SCE, develop a Utility Resilient Advancement Master Plan to harden above-
ground utility lines including a tentative timeline to potentially underground utilities and continue
to lobby the California Public Utilities Commission to modify the requirements for Rule 20A
undergrounding funds to include high fire risk areas.
Southern California Edison's current plan is development of specific Circuit
Reliability projects to harden infrastructure in particular areas of RPV, rather
than an overall master plan. Public Works Staff is coordinating public
information distribution as these projects are further developed. Work on this
goal has been deferred until certain Public Works projects in queue have been
completed. Staff recommends to remove this goal item as the City is limited
ability to influence SCE infrastructure.
Infrastructure - Utilities Admin Reduce the threat of a fire hazard proximately caused by downed or damaged overhead power
lines through the undergrounding of one mile of utility lines within the City’s open space areas.
Staff is working to identify potential grants and funding opportunities for this
project. On May 7, 2021, the City submitted a Notice of Interest (NOI) to the
California Governor's Office of Emergency Services (Cal OES) Hazard Mitigation
Grant Program (HMGP) towards the securing of funds for this goal. On May 24,
2021, Cal OES notified the City that the proposed undergrounding of overhead
powerlines project is an eligible HMGP activity and has formally invited the City
to submit a full sub-application for consideration of funding. Staff is currently
compiling data for this application, which is due on June 18, 2021. On June 18,
2021, Staff submitted a sub-application to the California Governor's Office of
Emergency Services (Cal OES) Hazard Mitigation Grant Program to secure
funding for this goal. Staff is currently coordinating with representatives from
Cal OES to respond to a request for additional information for this grant. Staff
continues to monitor the CPUC's rulemaking process and current legislation
promoting undergrounding. Staff recommends removing this goal item as the
CPUC decided to discontinue ratepayer funding for new projects after
December 31, 2022 and will consider whether to add wildfire safety and
emergency-related undergrounding to Rule 20 project eligibility criteria in the
future.
Infrastructure - Utilities R&P Present to the City Council concepts for the remaining 12 acres of Lower Hesse Park as the Phase II
improvements
Pending inclusion in FY 20-21 CIP Not included in FY 20-21 CIP. To be
deferred to a fiscal year to be determined. Staff continues to
communicate regularly with Lower Hesse Park residents to discuss their
concerns and to identify ways to enhance maintenance and aesthetics.
Recommendation: Defer goal pending Council direction and funding in
the CIP.
Infrastructure - Roadways PW
Develop a Construction Coordination Plan working with neighboring Peninsula cities, as well as
Lomita, Los Angeles, and Torrance to identify measures to avoid concentrating street construction
projects in areas that will impact traffic flows. Present plan to City Council.
On July 8, the Public Works Director met with a representative from
Caltrans as part of their newly created Ambassador program to assist
the City in improving communication on roadway projects. This will
frame the Plan being developed with neighboring cities. On December
16, 2020, staff hosted a Project Coordination Meeting with
representatives of utility companies and other Peninsula cities; and
discussed each agency's upcoming projects as well as strategies to time
projects to avoid concentrating traffic impacts. Meetings will continue
on a regular basis. A meeting between the CalTrans Ambassador and
Peninsula cities is tentatively being scheduled for March 2021.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 3 of 11A-30
City Council Goals Appendix
FY 2020-Present
Sanitation Utilities FIN Prepare a new financial plan for the Abalone Cove annual sewer rates that reduces City
maintenance subsidy by at least 50% for City Council consideration.
Staff has estimated long-range costs for maintenance, operations, and
capital costs of the system. The 18-year historical costs have provided a
good baseline for future costs. Additionally, staff has identified capital
improvements that will likely be needed in the next 5-10 years, due to
the wear and tear on the pipes, grinder pumps, and lift stations. Staff is
working with Abalone Cove residents to address the future Sewer Rates
in order to reduce the City subsidy. On October 6, the City Council
amended the Municipal Code with the current CPI-U and approved a
connection fee. Staff is working with a consultant to perform an
evaluation and assessment of the sewer system. This will provide staff
with an updated annual maintenance cost estimate to properly prepare
a financial plan. Staff recommends removing this goal because it is a
Finance Department task to identify appropriate funding for projects
and is considered part of the City’s routine operations.
City Beautification PW
Create a City Entry Master Sign Plan at various points of entry to the City utilizing the following
phases:
Phase 1: Issue an RFP for the design.
Phase 2: Design.
Phase 3: Construction.
This project was not funded as part of the Fiscal Year 2021-22 CIP.
Funding will continue to be pursued in future CIP cycles and with other
funding sources, such as the American Rescue Plan Act (ARPA). Staff
recommends removing this from goals because it is a CIP project.
City Land & Facilities - Ladera Linda FIN Present financing options for the construction and delivery of the Ladera Linda Community Park.
In March, City Staff held meetings with Kosmont Transaction Services
(KTS) and Associates that was temporarily paused due to changes in the
leadership team and to reassess the financial impacts of the economic
downturn. Staff met with KTS to discuss funding options for the project
on October 15. Staff has requested additional information from KTS
and is working with Blais and Associates on identifying grant
opportunities (i.e. Prop 68 grant funds for outdoor improvements).
Staff received a presentation from Kosmont on January 29, and the
options will be presented to FAC on February 25. Staff anticipates
having funding options for the City Council's consideration by May
2021. Project is on schedule and will be completed by 6/30/2021.
City Land & Facilities - Ladera Linda CDD Complete the CUP/CEQA planning entitlement processes.
Staff deemed the application complete for processing. At this time, it
has been determined that the project is categorical exempt pursuant to
CEQA. Public hearings on the planning entitlements (CUP, etc.)
occurred on January 23, 2021 and February 23, 2021. Planning
Commission approved entitlements on February 23. City Council voted
to appeal the Planning Commission approval at its March 2 meeting.
City Council appeal hearing to be held on April 6, 2021. City Council
upheld PC approvals on April 6, 2021. This task is complete.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 4 of 11A-31
City Council Goals Appendix
FY 2020-Present
City Land & Facilities - Ladera Linda PW Complete construction-ready documents for City Council consideration.
The City's Architecture/Engineering consultant is preparing
construction documents, which are expected to be completed in the
Fall of 2021. A program manager and construction manager, Griffin and
Associates, were hired by the City on September 7, 2021. Construction
documents are expected to be complete in January 2022. Staff
recommends removing this from goals because it is a CIP project and is
considered part of the City’s routine operations.
City Land & Facilities - Ladera Linda PW Complete bid process for construction firm and present contract to the City Council consideration.
The bid process will begin upon completion of the construction
documents. An advertisement inviting bids is expected to be issued in
January 2022 and the bidding process is expected to be complete in
March 2022. Staff recommends removing this from goals because it is a
CIP project and is considered part of the City’s routine operations.
City Land & Facilities - Civic Center Master Plan PW Break ground on construction based on Council-approved plans.
Ground breaking will commence after successful completion of the
bidding process and issuance of a Notice to Proceed. Ground breaking
is expected in March 2022. Staff recommends removing this from goals
because it is a CIP project and is considered part of the City’s routine
operations.
City Land & Facilities - Ladera Linda PW Present Civic Center development financing options to the City Council for consideration.
In March, City Staff initiated discussions with Kosmont Transaction
Services (KTS), but paused further discussions due to changes in the
leadership team and to reassess the financial impacts of the economic
downturn. Staff has developed a preliminary budget for this project
that was confirmed as reasonable estimates by KTS. On October 15,
Staff met with KTS to discuss funding options for the project. Staff has
requested additional information and is working with Blais and
Associates on identifying grant opportunities. Additionally, since
September 2020, Staff has been meeting with consultants from various
aspects of the development sector including project management
consultants, developers, and other agency representatives to further
understand, among other things, financing and product delivery
options. Staff and the CCAC are working on putting together a public
financing workshop for the community, council, advisory boards, and
staff to be well versed in the financing options for this project. The
workshop is tentatively scheduled for October/November. Staff
recommends removing this goal because it is a Finance Department
task to identify appropriate funding for projects and is considered part
of the City’s routine operations.
City Land & Facilities R&P
Explore establishing a partnership, joint use, and/or lease agreement with the U.S. Coast Guard for
the Point Vicente Lighthouse property, buildings, and WW II Battery Barnes outpost owned by
Coast Guard, Facility-commonly referred to as Coast Guard bunker (located at the Civic Center).
Staff has reached out to the Coast Guard to initiate dialogue about the
future use of these properties. Staff and several City Council members
took tours of Coast Guard properties with USCG personnel in October
2020 and held informal discussions of potential acquisition and
partnership. The USCG expressed a strong interest in developing a
partnership with the City. Additional meetings are being planned to
begin brainstorming partnership arrangements.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 5 of 11A-32
City Council Goals Appendix
FY 2020-Present
City Land & Facilities R&P Present the draft Trails Network Plan Update to the Planning Commission for its input and
recommendation.
Staff and the consultant will update the draft TNP based on public
input, including feedback from the two community workshops. Dates
that the TNP will be presented to Planning Commission will be
finalized, but anticipated to occur in September and October 2021, and
the document will be released 3 weeks prior to meetings. Combined
goal
City Land & Facilities R&P Present to the City Council alternative turf options (approximately 123,000 square feet) for active
recreation use at Upper Hesse Park.
Referred to Goal #23 in 2019.
Council direction needed to approve recommended alternative.
Project was originally going to be natural turf but Staff is currently
analyzing the financial, aesthetic and functional pros and cons of
different alternatives for this site. Originally included in the FY 20-21
CIP, this project was deferred by the City Council to a fiscal year to be
determined Staff will continue to investigate alternatives for future
consideration. Recommendation: Discontinue goal pending Council
direction.
City Land & Facilities R&P
ABALONE COVE PARK IMPROVEMENTS PHASE II: Develop and present a design to Council for
improvements to the reminder of Abalone Cove Park, including additional landscaping, irrigation,
park amenities, and trail improvements
Project was not selected for FY 20-21 CIP. It has been put on hold and
will be re-evaluated next year. Recommendation: Discontinue goal
pending Council direction.
Quality of Life R&P Prepare appropriate code amendments for Accessory Dwelling Units for the Planning Commission's
review and the City Council's for consideration
The Planning Commission began reviewing draft language at its July 14
meeting and forwarded its recommendation to the City Council. The
City Council considered code amendments recommended by the
Planning Commission on September 1 and 15; and will consider
Planning Commission further recommendations to select code
language on November 17. First reading for Ordinance No. 640 was
introduced on December 15 and the second reading on January 19,
2021. The ordinance went into effect on February 18, 2021.
Quality of Life CCD
Stay informed on new State Housing Laws, bring new laws and issues to Planning Commission and
City Council's attention and amend codes and ordinances in the RPV way where appropriate to
meet the new laws. File an appeal of the 6th Regional Housing Needs Assessment (RHNA)
Not recommended as a goal for 2020 because this is part of daily
operations. On October 26, Staff filed an appeal of the 6th cycle RHNA.
Appeal hearing occurred on January 13, 2021, and the City's appeal was
denied. are set to begin in January 2021. Staff presented the City
Council with housing legislation in August 2020. The City created a
Legislation Corner homepage on the website to track current
legislation. Additionally, Staff is working with the three other Peninsula
cities to on-board a lobbyist.
Quality of Life CCD
Assess the effectiveness of the County’s amended Barking Noise Program and bring report City
Council with recommendations for consideration to either continue with the County or develop
other alternatives.
Not recommended for 2020. Referred to Goal #28 in 2019.
Roadways PW Develop a Citywide Speed Mitigation Plan for reducing vehicular speed within City streets (traffic
calming)
Funding for development of the masterplan is included in the Fiscal 2021-22
CIP and work will begin when key staff vacancies are filled. At this time, Staff
recommends removing this goal due to staff vacancies. However, Staff is in the
process of onboarding on-call consulting traffic engineers to assist the City in
addressing community concerns regarding isolated traffic and speed concerns
throughout the City.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 6 of 11A-33
City Council Goals Appendix
FY 2020-Present
Quality of Life - Beautification PW Create a Traffic Flow Improvement Plan in coordination with Lomita, Los Angeles, and Caltrans to
improve traffic flows and provide connectivity between retail outlets and residents.
A funding agreement with the Metro Board for approved $1.33 million for
Western Avenue Congestion Improvement Project to be used for a concept
plan report has been executed. Staff is further refining the scope of work and
coordinating with the California Department of Transportation; who owns
Western Avenue and has approval rights over any work in the corridor. The
timeline of this project is subject to filling staff vacancies. the CalTrans
coordination, review times, and approval timelines. The City Council will
consider a Funding Agreement at its September 21, 2021 meeting. Staff
recommends removing this from goals because it is a CIP project.
Quality of Life - Beautification PW Develop a streetscape beautification plan to enhance the aesthetic character of Western Avenue.
The CIP for FY 2020-21 includes funding for a concept design of the Western
Avenue Beautification Project. Work on this goal will begin when staff
vacancies are filled. Staff received proposals in response to an RFP for the
concept design of the beautification of Western Ave and selected a qualified
firm. Fee negotiations are ongoing and a professional services agreement will
be brought to Council when fee negotiations conclude. Funding for final design
will be requested for future CIP cycles, or as funding opportunities become
available such as the American Rescue Plan Act (ARPA). Staff recommends
removing this from goals because it is a CIP project and is considered part of
the City’s routine operations. In fact, earlier this year, Staff began
implementing the first phase of the Western Avenue Street Beautification
which included installing new median and parkway landscaping, enhancing
street furniture, and removing debris. The second phase which includes
painting the arterial walls is being coordinated with the neighboring
homeowner’s associations.
Quality of Life - Environmental Sustainability PW Develop program in collaboration with EDCO to recycle/divert organic waste from residential waste
This goal supports Measure Solid Waste A2. Diversion/recycling of organic
waste reduces green house gas emissions by reducing methane gas produced
when organic waste decomposes in landfills. State law governs organic waste
diversion and the City. The City has retained a consultant to develop an
municipal code revision and waste hauler contract to become compliant with
State law. Staff recommends removing this goal as it is part of core City
operations and a state regulatory requirement rather than a City Council goal.
The City Council will be asked to update the Rancho Palos Verdes Municipal
Code (Chapter 8.20) to implement SB 1383. Staff recommends removing this
goal as it is part of core City operations and a state regulatory requirement
rather than a City Council goal. The City Council will be asked to update the
Rancho Palos Verdes Municipal Code (Chapter 8.20) to implement SB 1383
tentatively at its January 18, 2022 meeting.
Quality of Life - Housing CCD Conduct a housing "brainstorming" public workshop to identify creative solutions.
Staff is developing a plan to host a virtual workshop/forum on housing.
Staff anticipates completing this goal as part of the 2021-2029 Housing
Element Update. Staff issued Housing Element Update Request for
Proposals (RFP) in October 2020 to procure professional services and a
service agreement will be considered at the March 2, 2021 City Council
Meeting. At this meeting, the Council will also consider establishing a
support committee. Deleted - This task has to/will be done as part of
the housing element update by ESA (CC awarded contract on 3/2.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 7 of 11A-34
City Council Goals Appendix
FY 2020-Present
Quality of Life - Housing CCD
Develop a Council approved program for identifying housing opportunities pursuant to RHNA,
including affordable housing, such as creating a Mixed-Use Zoning District, accessory dwelling
units, school district housing, and senior housing.
City awarded $160k SB 2 Grant for preparation of mixed-use housing
overlay zone; Staff to prepare RFP for project consultant selection
City awarded $160k SB 2 Grant for preparation of mixed-use housing
overlay zone. Staff to issue RFP in late February 2021. The City also
submitted an additional LEAP grant application for funding the CEQA
process in the amount of $150k. Deleted - This task has to/will be done
as part of the housing element update by ESA (CC awarded contract on
3/2.
Quality of Life - Environmental Sustainability CCD Adopt new development standards related to Electronic Vehicle (EV) charging stations.
Referred to Goal #32a in 2019.
Previously this goal included a second goal that was actually a PW goal,
Install charging stations in City-owned lots; Staff is in the process of
preparing new code language to present to the City's Planning
Commission. Goal to be completed by May 2021. Deleted - goal will be
completed this FY.
Quality of Life - Environmental Sustainability CCD Amend the Municipal Code to develop a robust Green Building Program.
Referred to Goal #32b in 2019; Staff continues to assess existing Green
Building Program to determine whether the Municipal Code needs
updating. Staff will be preparing a memorandum regarding findings.
Goal to be completed by June 2021. Deleted - This task has to/will be
done as part of the housing element update by ESA (CC awarded
contract on 3/2.
Quality of Life - Environmental Sustainability CCD Amend the ERAP to include appropriate adaptation strategies and bring to City Council for
consideration
Referred to Goal #32 in 2019; Staff analyzed and selected a list of
potential strategies and provided them to the SBCCOG on July 10. Goal
to be completed by May 2021.Deleted - This task has to/will be done as
part of the housing element update by ESA (CC awarded contract on
3/2.
Quality of Life - Environmental Sustainability CCD Partner with SBCCOG to Host an Energy Efficiency Fair
Referred to Goal #32b in 2019; Staff is reviewing options to host virtual
energy efficiency fair.
Do not carry over goal. Similar goal can be included in future years
when SBCCOG resumes in person events. Deleted - This task has to/will
be done as part of the housing element update by ESA (CC awarded
contract on 3/2.
Quality of Life - Environmental Sustainability CCD
ERAP: Support Energy Generation and Storage in the Community
o Amend the Zoning Code to integrate additional policies supporting renewable and alternative
energy sources in residential, commercial and institutional zoning districts by utilizing EcoMotion
consultant services, made available by the SolSmart grant application.
Referred to Goal #32c in 2019; Progress is limited based on limited
staffing, but a summer intern is assisting in identifying potential code
amendments. Do not carry over. Installation of renewable energy
system is covered by the building code and generally do not pose
zoning conflicts. Staff is preparing a memo memorializing findings.
Deleted - This task has to/will be done as part of the housing element
update by ESA (CC awarded contract on 3/2.
Quality of Life - Western Avenue Admin Establish a "brand" for the Western Avenue Commercial Corridor
City Staff is in the early stages of developing a brand program for
Western Avenue that will bring together the traffic flow, beautification,
and economic redevelopment projects. Staff is collecting information
on potential marketing consultants. Combined this goal with goal No. #
53. This goal supports
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 8 of 11A-35
City Council Goals Appendix
FY 2020-Present
Citizen Involvement & Public Outreach CCD Provide and encourage e-filing of planning applications
Staff established "virtual counter hours" to assist the public that is
framing the e-filing program.
Complete. Staff established “virtual counter hours” to assist the public
in electronic project submittals. Currently all applications are being
accepted electronically.
Citizen Involvement & Public Outreach Admin Conduct a Citizen Satisfaction survey.
Referred to Goal #41 in 2019. Staff presented draft survey questions
and a distribution plan to the City Council on November 4, 2020, which
were finalized on November 17, 2020. The survey was distributed
online and via mail in December 2020/January 2021 and results were
presented to the City Council on February 16, 2021.
Citizen Involvement & Public Outreach Admin Create a Citizen Environmental Committee.
Not recommended or necessary; Quarterly Public Forums for the Palos
Verdes Nature Preserve already provide this function
Citizen Involvement & Public Outreach Admin Form a joint commission with neighboring cities to address Peninsula-wide issues
Not recommended or necessary; the Regional Law Enforcement
Committee already provides this function
Citizen Involvement & Public Outreach CCD Update the City’s Public Notice template
Staff collected examples of notices from other jurisdictions - Alegria
and Dyda recommended to remove
Government Efficiency, Transparency and
Accountability FIN
Assess City Fees and Taxes, including the 2019 Cost of Services Study to identify, among other
things, opportunities to lower fees and taxes for consideration by the FAC and City Council.
(Merged with Goal #74)
Referred to Goal #38 in 2019. Study was finalized and staff reviewed
the results with FAC; at the 3/12 FAC meeting, staff reviewed in greater
detail selected fees and adjustment recommendations to FAC. FAC
requested additional research at the March 12 meeting. Another
meeting occurred on Sept. 17 to review the Cost Fee Study with FAC.
This item was also by the FAC in October 2020. FAC approved two of
the three recommendations from staff at the September meeting. FAC
approved 100% cost recovery for the Community Development, except
for View Restoration, and Public Works fees. FAC also formed a
subcommittee and met with the Recreation and Parks Department to
further understand the fees of operation of the department. The
subcommittee is to present options/findings at a future FAC meeting.
The 2019 Cost of Services Study is tentatively schedule for the March
2nd City Council meeting. The 2019 Cost of Services Study was received
by the City Council on March 2. The City Council provided Staff with
direction to prepare a proposed fees for consideration at a duly noticed
meeting April 20, 2021. This goal is expected to be completed by June
30, 21 and is not recommended to continue into FY 21-22.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 9 of 11A-36
City Council Goals Appendix
FY 2020-Present
Government Efficiency, Transparency and
Accountability FIN Prepare a Pension Policy that provides a financial plan to address the City's outstanding Pension
Liability and CalPERS' continuous change in valuation methodology.
Referred to Goal #40 in 2019. Staff have been doing research and
working with GovInvest to consider all options for the Pension Policy.
However, due to the current fiscal climate, Staff waited for the latest
annual Actuarial Valuation Report (AVR) and investment return from
CalPERS to reassess the City's pension liability. The AVR and investment
return was released by CalPERS this summer. FAC supported staff
recommendations on a possible Pension guidelines at the September
meeting. FAC reviewed and provided feedback to the draft Pension
Guideline on October 29. Staff presented the draft guideline to the City
Council on January 19 and the guideline was updated and approved by
the City Council on February 2.
Government Efficiency, Transparency and
Accountability Admin Implement new Internet or app-based application to enable residents to reach city services more
quickly.
The mobile app vendor has been identified and funds budgeted for FY
20/21. The implementation project started in July 2020. The project
team is currently finishing the initial core functionality configuration
and graphics used in the app. The mobile app called "MyRPV" is now
available on Apple and Android devices and it offers a convenient way
of submitting service requests and to access relevant City information,
from City Council meeting agendas and videos, to information on how
to get in touch with City departments, visiting parks, trails, and more.
Government Efficiency, Transparency and
Accountability Admin
Implement eTRAKiT customer relationship software that allows customers to track service requests
and submit service requests and permit applications online with at least 20% of City permits being
issued online.
eTrakit portal has now 12 permits types and all Business License types
configured and ready to be tested internally. During testing, some
major programming issues were discovered. The IT Department is
currently working with the vendor on updating all the TrakIt servers
operating system and the TrakIt software version to a newer release.
All compatibility and integration issues are now resolved and the
eTrakit portal is currently open for selected contractors, businesses and
residents to conduct limited public testing. This phase is expected to be
completed in March 2021.
Government Efficiency, Transparency and
Accountability PW Require a project sign be installed for all City construction project describing, among other things,
the project and citing contact information.
A conceptual design was provided to Staff by Councilman Dyda. A sign
template has been developed and the first deployment was for the
Hawthorne Median Beautification Project.
Government Efficiency, Transparency and
Accountability - Intergovernmental Relations Admin Pursue annexation of the Eastview area into PVPUSD for voting
On March 4, 2020, the City Council received and filed a report form the
City Attorney’s Office regarding protocols for the possible Eastview
community detachment from Los Angeles Unified School District
(LAUSD) and attachment of this community to the Palos Verdes
Peninsula Unified School District (PVPUSD). The Council directed no
further action to be taken on this matter.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 10 of 11A-37
City Council Goals Appendix
FY 2020-Present
Government Efficiency, Transparency and
Accountability Admin
Enhance internal and external customer service and efficiency so that all inquiries are
acknowledged within the day received and that, when surveyed, internal customers indicate 95%
satisfaction with responsiveness by colleagues, and external customers indicate 95% satisfaction
with responsiveness by Staff.
Work will commence in fall Progress is limited based on staffing levels. Carry
over goal. Staff anticipates preparing memorandum regarding findings before
Fall 2021. An employee (internal customer service) survey was issued on
September 30, 2020 with a deadline date of October 14. Staff tallied the results
and generally speaking employees are somewhat satisfied. Department Heads
are assessing the results of the employee results to identify areas to improve
employee satisfaction. A follow-up survey will be issued in Fall 2021 to
compare results after enhanced measures are implemented. In addition to the
resident survey presented to the Council on February 16, 2021, Staff is
preparing a specific customer service survey. It should be noted that in the
resident survey 71.8% of respondents indicated that they were somewhat or
very satisfied. Staff is in the planning stages of establishing a method to send
and receive responses. Staff recommends removing this goal as a portion of
internal customer service is achieved through goal 26f, and the external
customer service portion is identified as an IT project or assignment.
Government Efficiency, Transparency and
Accountability Admin Reassess the Study Session
Activity on this goal is pending further review of the City's study session policy.
Staff recommends removing this goal as it can be accomplished at the staff
level as part of the City’s routine operations.
Government Efficiency, Transparency and
Accountability Admin Lobby the California Public Utilities Commission to modify the requirements for Rule 20A
undergrounding funds to include high fire risk areas.
October 2019, the City brought a resolution to the League of California
Cities Annual Conference calling on the CPUC to expand the Rule 20
program to include wildfire mitigation as an eligible project. The
resolution won the support of fire-prone cities across the state and was
referred to two of the League’s policy committees so language
revisions could be reconciled. Ultimately, the League’s Board of
Directors adopted our proposal as an official League policy. The League
is now advocating for this change to the CPUC, which is in the process
of revising the Rule 20 program, and wildfire prevention criteria was
included among proposed changes from CPUC staff. In April 2020, the
City advocated for including wildfire prevention criteria in comments
on the CPUC staff proposal. On July 21, 2020, the City Council
supported legislation (SB 1312) that would have implemented this
change by requiring the CPUC to amend Rule 20 to allow
undergrounding in high fire threat areas for wildfire mitigation, though
the bill did not advance in the legislative session. Following direction
from the City Council, on September 16, 2020, Staff sent a letter to SB
1312 author Senator Mike McGuire offering the City's support for
continued efforts to make this change. Staff continues to monitor the
CPUC's ongoing rulemaking process. Staff is monitoring current
legislation that supports undergrounding. Moved from Government
Efficiency & Transparency - Intergovernmental Relations Goal No. 81
and to moved to Infrastructure - Electric Utilities and combined with
6a as it supports the effort of advancing undergrounding projects.
Attachment A DRAFT Gantt Chart Template of City Council Goals V2.xlsx Appendix 2020-Present - Page 11 of 11A-38