Loading...
CC SR 20211102 02 - Caltrans Bike Lane CITY COUNCIL MEETING DATE: 11/02/2021 AGENDA REPORT AGENDA HEADING: Regular Business AGENDA TITLE: Consideration and possible action to receive a presentation from the California Department of Transportation (Caltrans) on its proposed Western Avenue Bicycle Pedestrian Improvement Project. RECOMMENDED COUNCIL ACTION: (1) Receive and file the presentation from Caltrans on its proposed Western Avenue Bicycle Pedestrian Improvement Project project to install bicycle lanes and pedestrian access improvements on Western Avenue; (2) Provide, if warranted, feedback to Caltrans; and (3) Request that Caltrans work with City Staff to make any adjustments to the project based on City Council and public feedback. FISCAL IMPACT: None. Caltrans will fund the bike lane and pedestrian project. ORIGINATED BY: Sean Lopez, Assistant Engineer REVIEWED BY: Ramzi Awwad, Public Works Director APPROVED BY: Ara Mihranian, AICP, City Manager ATTACHMENTS: A. Caltrans RPV Western Ave Traffic Presentation (page A-1) BACKGROUND: On October 19, 2021, the City Council was scheduled to hear a presentation from the California Department of Transportation (Caltrans) on the proposed Western Avenue Bicycle Pedestrian Improvement Project. However, due to time constraints, the presentation was rescheduled to tonight’s City Council meeting. Caltrans proposes installing bicycle lanes and pedestrian improvements on Western Avenue between 25th Street in San Pedro to Carson Street in Torrance as part of the Western Avenue Bicycle Pedestrian Improvement Project. This portion of Western Avenue is owned, operated, and maintained by Caltrans as part of the state highway system. 1 CITYOF RANCHO PALOS VERDES Within the City limits, Phase One of the project (currently in construction), will install seven curb ramps that are compliant with Americans with Disabilities Act (ADA) standards. Phase Two, which is tentatively scheduled to begin construction in August 2022, will include nine more ADA-compliant curb ramps within the City and a northbound right-turn lane at Westmont Drive/Delasonde Drive. Phase Two proposes to re-purpose existing parking lanes in the City (see Figure 1 below) into a Class II bikeway, with some exceptions. A Class II bikeway is defined as a bikeway with pavement markings and signage to delineate a portion of a roadway for bicycle travel. The limits of the Class II bikeway are from 25th Street in San Pedro to Palos Verdes Drive North at the RPV/Lomita/Harbor City border, a length of 4.2 miles. Within Rancho Palos Verdes City limits, there are about 2.2 miles in the southbound direction (between Palos Verdes Drive North and Summerland Street/Summerland Avenue) and 0.5 miles in the northbound direction (between Capitol Drive and Westmont Drive). Figure 1: Typical cross section of existing roadway converted to a Class II Bike Lane Figure 1 above shows a typical cross-section of the existing roadway. Highlighted in yellow is where the existing 8-foot-wide parking lane will be replaced by a 6-feet-wide bike lane with a 2-feet-wide bike buffer adjacent to a 12-feet-wide vehicular lane. The number of lanes and the width of the lanes remain unchanged. The map below from a previous Caltrans presentation on the project shows the s tretch of Western Avenue where Class II bike lanes are proposed (25th Street to Palos Verdes Drive North). 2 R/1>' ' I , •. SI DEUL\ r -------L _____ _ 6' 2' Bib lane .§ 1 I .. l , .. ,.. ,,· LANE •I SOUTHBOUND 'A[S,t[J;:N ,t.~[. "&" LINE ' ! .. w l ,,. E XISTI NG CROSS SECT ION .. 12' 2' NORT HBOUND 6' lC ' -----, ------· DISCUSSION: Staff has expressed concern to Caltrans about the loss of parking at certain locations and requested presentations to the Traffic Safety Committee (TSC), the general public and the City Council. Caltrans presented to TSC on March 8, 2021, with Committee members asking questions and expressing concern over the loss of street parking that serves businesses. Members of TSC also asked if traffic signals would be modified to prioritize bicycles over vehicles, and expressed concern that doing so could increase congestion. In response to Staff and TSC concerns, Caltrans modified the bike lane component of the project between Summerland Street and Crestwood Street (where there is a restaurant that relies on street parking because of a relatively small parking lot). Caltrans will preserve on-street parking in this area by widening the southbound roadway lanes into the median to make space for the bike lane without the removal of parking. Caltrans indicated to Staff that it is still evaluating options for signal timing with respect to bicycle prioritization and has not yet reached a conclusion. Caltrans presented its plan for the proposed project to the public in a virtual format on September 30, 2021. Attendees generally supported the project. It should be noted that the City has no jurisdiction over Western Avenue. The City can share feedback and public concerns at forums such as tonight’s Cit y Council meeting for Caltrans to consider. ADDITIONAL INFORMATION: This project will incorporate a right-turn lane at Westmont Drive/Delasonde Drive. The City Council approved a cooperative agreement with Caltrans for this right-turn lane on September 21, 2021 (link to Staff Report). 3 Class II 25 th St Palos Verdes DrN A-1 PRESENTED TO T . .. Slll':ETY COUNcl:il:c~l~ 2l~os VERDES TRAmc R JE T Western Avenue PRE ~ENTED BY C!LTR!NS DISTRIC11 "· MEDIRDO DE L! CRU!} PE · 1 • CUO NC 'fRINH 6 ' \DESIGN• MA.NICER BARTT GUNTEl.rl01RKt&~N~/iff iPED COORDINATOR - INTRODUCTION AND THOUGHT PROCESS BEHIND THE PROJECT CONSTITUENT FEEDBACK VIDEO PROJECT LAYOUT AND SPECIFICS COMPATIBILITY WITH CITY PLANS AND SUMMARY A-2 AGENDA ▪Western Ave north of 25th St to the 405 is California State Highway 213 ▪Operations, maintenance, and construction of new projects fall under the purview of Caltrans. ▪Included in our operational authority is the ability to add bicycle lanes to our State Highways. A-3 WESTERN AVE STATE ROUTE 213 ▪Caltrans has a proposed project that begins at 25th St and ends at Carson St. ▪Within those limits, we are proposing: ▪To upgrade curb ramps to American with Disabilities Act or ADA standards ▪Add flashing beacons ▪Construct new sidewalks ▪Add bicycle lanes. ▪Those scope items will be explained in greater detail later in the presentation. ▪The focus of this presentation will be on the bicycle lanes. A-4 WESTERN AVE PROJECT LIMITS Palos Verdes Dr N PM 4.31 Carson St PM 8.0 Class III limits: Palos Verdes Dr N to Carson St A-5 int Vicente ~te Marine nservation Area Ht:UU UU Abalone Cove State Marine Conservation Area Torrance I.,,.,~ , ... .,,,, ,I a,,,,, Wlom~•Blvd I NORTHWEST SAN PEDRO SAN PEDRO ~251hSt COASTAL SAN PEDRO - Cabrillo Beach f G o g le E2281h: AVA . LIMITS OF t • SHARED BIKE LANES 25th St Palos Verdes Dr N Class II limits: 25th St Palos Verdes Dr N* (*except where Class III currently exist) A-6 int Vicente ~te Marine nservation Area Point Vicen Abalone Cove State Marine Conservation Area \:::::7 '-'1'-' Forrestaf Natl re Res,•rve Harbor-UC LA c;. Medical Cente r W223rdSt West Carson W2281hSt , ... .,,,, ,.,, I ~.a,..., Wlom~•Blvd NORTHWEST SAN PEDRO SAN PEDRO ~251hSt COASTAL SAN PEDRO • Carson W220lhSt - Cabrillo Beach f G o g le ~ • : • E2281h: AVA . LIMITS OF t • DEDICATED WAn.MimSt BIKE EANES Palos Verdes Dr N Summerland Ave Mileage within Rancho Palos Verdes Southbound Lanes (SB)2.2 mi Northbound Lanes (NB)0.5 mi Total Project (NB+SB)16.0 mi A-7 ! 0 IMITS OF BIKE ANES PV ▪Existing ADA Project ▪The Western Avenue Corridor Study which was prepared for the City of Rancho Palos Verdes ▪Complete Street Reservation created by Caltrans ▪Compatibility with existing and planned community bicycle facilities. A-8 WHY WAS WESTERN AVE CHOSEN? CONFLUENCE OF FOUR EVENTS Build curb Ramps to meet American’s with Disabilities Act specification. Phase 1 currently being constructed, Phase 2 is being discussed in this presentation.A-9 -------------- -- --- ---------· ADA CURB RAMP UPGRADE ▪Existing ADA Project ▪The Western Avenue Corridor Study which was prepared for the City of Rancho Palos Verdes ▪Complete Street Reservation created by Caltrans ▪Compatibility with existing and planned community bicycle facilities. A-10 WHY WAS WESTERN AVE CHOSEN? CONFLUENCE OF FOUR EVENTS This is a project for the City of Rancho Palos Verdes and the City of Los Angeles, with funding provided by the Southern California Association of Governments (SCAG) Study initiated in 2012 to improve Western Avenue for residents, businesses, and visitors alike A-11 WESTERN AVENUE CORRIDOR STUDY: STREET ENHANCEMENT STRATEGY . ; AECOM ~ •' N oEP\ This is a projectfortheCityofRanchoPakis VerdesandtheCltyoftos~, Withfurid,rcprovided by the SOuthemca~fornia AssoclalionofGovernments(SCAG) Sustainability Program. The Sustaf11abiijty Program is a keySCAG l111tianve for lmplemeotlnt the Regional Traosportatlon Plal'I/Sustamable COmmu!'lities Strategy (RTP/SCS), combining COmpass Blueprint assistance for Integrated land vse and transponatk)n planl'llog With new Green Region lnltianve asslstal'l(e aimed at local sustaioablhty a/Id Active Transportation assistal'!Oe for bicycle and pedestrt.Jn plaMiog efforts. Sustainability Projects are intended to provide SCAG-member Jufisdlctiotls the resources to Implement relliONI policies at the local level, focusinl on voluntary efforts that will meet kxal rieeds and contribute to implemef'ltlng ttie RTP/SCS, reducina greenhouse gas {GHG) emlsslons,andprovldi1"1thera1"1eof1ocalandreglonalbeoefttsoutlioedlntheRTP/SCS. The preparation of this report h.ls been financed In part thrqh grant(s) from the f«leral Transit Administration {FTA.) through the U.S. Department ofTranspcwtatlon (OOTI In acoordanc:ewiththeprovlslonsundertheMetro!)Ol1tanPlilnnircPr0&ramassetlorthl115ectlon104{f}oflltle23oftheU.S.COde.TheooriteotsofthlsreportreflecttheYlewsof the111thorv.1'10bresponlibleforthef.lctsandaceuracyofthedati1Pfesentedhefein. The contents do not necessarily reflect the official views°' policies of SCAG, DOT or the Stilte ofcabfornia. SCAGshalnolberesponsiblefortheaty'sfutureuseoradaptiltionoftherepoft. A-12 THE TEAM HELD COMMUNITY MEETINGS nrm..-DURING THE COMPLETION OF THE ~~, ... ~--..«• ~ . ~--CORRIDOR STUDY tb/trans• Bike Lanes In 2015, the findings were released, and included bike lanes throughout the length of Western from 25th to Palos Verdes Dr N. A-13 ~ PL 0 1 I \ I I 12'-0" I i 16'-7" I I ! I I I I I I i I I i Pt I i OUTCOME ~~ OF THE CITY'S STUDY ▪Existing ADA Project ▪The Western Avenue Corridor Study which was prepared for the City of Rancho Palos Verdes ▪Complete Street Reservation created by Caltrans ▪Compatibility with existing and planned community bicycle facilities. A-14 WHY WAS WESTERN AVE CHOSEN? CONFLUENCE OF FOUR EVENTS A-15 CALTRANS RESERVATION TO ADD BICYCLE, ~ nrm.. ......... PEDESTRIAN, AND TRANSIT OPTIONS TO ~:~·1 '~~~ ~',.'.~:EXISTING PROJECTS ~-.. , -· .•i,.;~~~ ~db,..',.:". ~ tbltrans· ▪Existing ADA Project ▪The Western Avenue Corridor Study which was prepared for the City of Rancho Palos Verdes ▪Complete Street Reservation created by Caltrans ▪Compatibility with existing and planned community bicycle facilities. A-16 WHY WAS WESTERN AVE CHOSEN? CONFLUENCE OF FOUR EVENTS Western Ave Bike Lanes are preferred by the City and County of Los Angeles. Without the Rancho Palos Verdes section, there is a gap in their plans. One of the purposes of this project is to create a continuous Bicycle facility from the surrounding residential areas, along the existing east-west routes, and into the commercial centers along Western, and recreational centers along the coast. A-17 CITY AND COUNTY PLANS --Bicyc le Path --Bicyc le Lane --Bicyc le Route --Bicyc le Friend ly Street ,.. tizltmn6· .,,,. .,,,. \ \ \ \ .,,,. .,,,. 2010 BICYCLE PLAN Photo credit: City of Beverly Hills Caltrans management chose the ADA project and added $1.5 MM to the budget to include some of the complete street elements that were listed in the study. These elements are being added at no cost to the City. A-18 WESTERN AVE IS CHOSEN FOR COMPLETE STREET FUNDING A-19CONSTITUENT FEEDBACK ▪Caltrans Operations and Planning staff received correspondence ▪Area resident who rides a bicycle on Western through Rancho Palos Verdes to commute to work ▪Constituent inquired as to whether Western Avenue would receive a bicycle lane along entire corridor ▪Felt unsafe due to fast-moving vehicles tailing or driving closely to bicyclists, due to lack of a bicycle lane ▪Noted that drivers attempt to overtake slower-moving vehicles in other travel lanes by passing on the right ▪Mentioned that without adequate facilities, bicyclists would ride on the sidewalk ▪Gaps in sidewalk exist, therefore sidewalk riding is not possible in all locations ▪Safety concerns as drivers do not always notice approaching sidewalk bicyclists A-20 CONSTITUENT FEEDBICI{ --=~-- 25th St Carson St Palos Verdes Drive N Existing Class III Lane (NB) Constituent feedback led Caltrans to stripe a Class III bike facility between Avenida Aprenda, and the entrance to the Green Hills Cemetery. A-21 RECENTLY IMPLEMENTED BI_KE LANES ;r.~:·~:~ WITHIN RANCHO PALOS VERDES .. ,, .. ,, ,~~. ORRANCE : '"'•· I J S,,,,11 Wlomll.•8/Yd Lomita ' "'"': 'I ~ COASTAL """~: - 25th St Carson St Palos Verdes Drive N Existing Class II Lane (SB) As part of that project Caltrans also installed a bicycle lane on the opposite side, south of the Cemetery. A-22 RECENTLY IMPLEMENTED BI_KE LANES ;r.~:·~:~ WITHIN RANCHO PALOS VERDES .. ,, .. ,, ,~~. ORRANCE : '"'•· I J S,,,,11 Wlomll.•8/Yd Lomita ' "'"': 'I vr COASTAL """~: - Med came across a resident waiting on his driveway for his buddy to come along and join him along Western. Casually dressed, they appeared to be meeting up for an errand at a local destination. He mentioned that most riders can be found along Palos Verdes Drive. Next Med rode up to 4 riders on a group ride. They chose to ride Western because it is a less hilly route and was better suited for the riders’ based on experience and fitness level. In our experience, most casual riders would prefer to do the same. They were from a bicycle group call Major Motion from SW Los Angeles. Lastly, Med remained socially distant and spoke with a resident who was having a garage sale. She said that she would welcome having a bike lane along Western because she likes to bike to Cabrillo Beach on her E-bike. A-23 CONSTITUENT FEEDBICI{ -THREE STORIES FROM I SATURDAY RIDE ▪Western Avenue is the only continuous N/S street in the South Bay between the cities of Torrance, Lomita, Rancho Palos Verdes, Los Angeles and the ocean ▪Less elevation/ grade changes and terrain challenges ▪Less port-related truck traffic than streets to the east ▪Improve safety, access and circulation for bicyclists and pedestrians ▪Continuous bicycle facility allows those to ride within and between communities ▪Supported by the South Bay Bicycle Coalition ▪Continuous pedestrian facility allows for safe travel without being forced to walk on the street A-24 WHY WESTERN AVENUE? https://youtu.be/rfVcMRmVAtY A-25 PROJECT VIDEO A-26 , PROJECT LAYOUT AND ~· SPECIFICS · 9 CURB RAMP LOCATIONS IN RANCHO PALOS VERDES 53 CURB RAMP LOCATIONS –PHASE 2 1200’ NEW PAVED SIDEWALK 3 PEDESTRIAN CROSSINGS W/ HIGH INTENSITY CROSSWALK BEACON PROJECT CURRENTLY IN CONSTRUCTION: 106 CURB RAMPS –PHASE 1 7 CURB RAMP LOCATIONS IN RANCHO PALOS VERDES A-27 SOUTHEAST TORRANCE Harbor-UC LA ~ Medical Center T •.. .. ✓ ** itf r.:t ,s,mow< , .. w111St :r.s, SAN PEDRO ll-2SthSt COASTAL SAN PEDRO Carson Cabrillo Beach I G o g le PROJECT OUTPUTS The class II bike lane will connect 6 intersecting east- west bike lanes from 25th street to Palos Verdes Drive North. Bikers can use Western to reach destinations along the coast from Vicente, White Point Park, Point Fermin Park, Cabrillo Beach, and the San Pedro Marina and markets. A-28 r, ' l \..J ·. it · t ,... ) te~Mallo~· ·· ··············~······· \WILMI G T /z. ',;~•• moo, ' l \ w~L\ ;/4,_ rs, WA~~~~;~.s•L..!--1+-J.JH-+PT--r---.. _/ f ' J<a.:r .Wi,!11~~1,,d. ...J "rt,-Wii ' Park r I I Es 0 ' ~ • E•DRO ;,._-· ... ~-::: , . . 1 -I .., ---~ ,\ I i!).~··.. ~ Vincent Thoma~ Bri dge .J ·, ' op. ' _) ·. ~~ t ~ ... . ·:;f ... ····-··1i~~·~~~~r t Tf:~~~a l 1ei"''"''. · ~ C owne Plaza Los NT R L T A fieles Harbor Ho tel P.EDRO r,,, ·l; ;E ·R·0 ···················•···~1 San Pedro -Market ! 1 -------W'A'·13th·St------f--.. , .. ; ........................... .. : ; ···-r ·...JL..j ..... · ....................... . en ............ t ······· : ; " l j t .. ~- ·.:::. i:--···········:.. .:·: .. ::·::::·· r---·· ...... < •• •• - ' ··· \. ··· ··· ·i .... -···· ·'··· DoubleTrJi\y Hilton ,: .j ' [' Hotel San f.~dro · Port .sT~.i. , , 1 PEltRO .lJ .. l Korean Frie er~,.ar, _ .. •··'· BIKE LANE CONNECTIONS ,.. tbJtrans· This proposed cross section is similar to what is shown in the RPV study. The number of lanes and the width of the lanes remain unchanged. The Bike lanes and the buffer are added within the width of the reclaimed parking spaces. A-29 -f-- ;;; Q w ~ ~ -f-- -f--- z ~ ~ ~ z ~ C, L.. 0 Ill § 11,1 ,. Q I ' ... z ~ R/W 10' SID EWA L K TC 8' E X I ST PARK I NG 50' 12' 1 2· L ANE #2 LAN E #1 WESTERN AV E "A" LI NE I ! 8' Exis t RA IYD ME.DI ANN ' I ' I ' 50' 12' 1 2' L AN E #1 L AN E #2 8' E XJST PARK I NG TC R/W 10' SIDEWA L K I ,---------r, ~ ~ r,-------~-------~ t t 7 ---------7 , _ -----t--1=: :==: :==::::=== :==:::====r : r:===::::::: ::==::::=:::;:::=JJ----·· ___ j R/W 10' SID EWA L K TC 6' 2' BI KE LAN E g5 ai t:: :J a, SOU TH BOUND NOR TH BOUND l-EJ EXISTING CROSS SECTJON BET WEE N GR EE NHILL S AND 300' SOU TH OF PA LOS VERD ES DR NOR TH 50' 12' 12' L AN E #2 LAN E :tt 1 SOU TH BOUND WESTERN AV E "A" LI NE I 8' 50' 12' 12 ' L AN E ,n L AN E #2 NOR TH BOUND 2' 6' TC g~ BI KE L AN E :c t:: :J "' R/W 10' SlOEWA L K OisTI COUNTY I ROU TE I 1J'1°AtT P~d6ffc r l5 HNEoE.Tl sTHOETlh 07 I L A I 21 3 I 0 .0/8 .0 I I REGI STE RED CI VIL ENG INEE R 1:!~-eZO ~-.,<>~<~~ fl, ____ \_,~ P L ANS APPROVA L DATE \\~~-; -t, Exp __ • THE STATE OF CALIFORNIA OR /fS OFFICEHS ,t CI Vl %l'fi:1[J,A?f,-'~ ~ff,1~~Lfcff:o 1;,'t Qj' c,.L~--~ COPIES OF THIS PUN SHffT. TYP ICA L EXISTI NG PAV EMENT STRUC TUR E SECTI ONS ~ ,45' HMA 0 .5' AB , 1' AS I ~ L.. 0 ~ • £;; PROPOS ED Bl KE LAN E CROSS SECTI ON ww ~-~--------~--------B-E-T-WE_E_N-GR_E_E_N_HI_L_L_S _A_N_D_3-r-0-0_'_SO_U_T_H_O_F_P_AL_O_S_VE_R_D_E_S _D_R_N_O_R_T_H ______ ~------~-T-Y_P_I_C_A_L __ c_~o-o-s_~_AL_~ __ S_E_C_Tx_l_~_4_N_S_~~~~~----I, - BORD ER L AS T REV I SED 712/2010 I US ERNAME •>s 1 ◄8698 I REL ATI VE BORD ER SCA LE O 1 2 3 I UNIT 1794 I PROJ ECT NU MBER & PH AS E 07 1 80002861 ., DGN FILE •> RPV -X.dgn I S I N I NC HE S A-30 .. I I \ \ I . .,\ r .~ I ii I_. ., .'} : ., •;_.:a.:-· 1'-f UTILIZE RECLAIMED CURBSIDE PARKING ADEQUATE ON-SITE PARKING EXISTING LANE WIDTH AND CONFIGURATION IS MAINTAINED. TERRACES SHOPPING CENTER A-31 ADDED RIGHT-TURN ONLY LANE AT CAPITOL RECLAIMED PARKING APPROACHING CAPITOL. DELINEATED 4’ BIKE LANE BETWEEN THE TRAVELED LANE REDUCED MEDIAN TO ACCOMMODATE LANE SHIFT ENHANCED CAPACITY AND SAFETY This is the existing street view just south of Capitol. In order to place a Right-turn-only lane and a 4’ bike lane. Parking was Reclaimed and the median was reduced. A-32 no retail destinations, already has a Class II bike lane and Class III bike lane. A-33 _SQUildERN MIDDLE _~-~ORiblER~~ I SEGMENT SEGMENT I SEGMENT I , t------A __ ct __ iv __ e ,._, v __ is ...... it __ or __ s __ e __ rv __ in_g __ e d_..g,._e __ s _ ___.1 ____ O __ n __ e __ a __ ct __ iv .... e ,._v ___ is .... ito __ r __ s __ e r .... v .... in...,g .... e d_..g._.e /._O .... n __ e __ in __ ac __ t __ iv .... e .... ed_..g._e _,__. Inactive ed,:es I ..-).E >-E ) 0 .75 miles/•15-minute walk 0.9 miles/·20-minute walk 0 .6 miles/•10-minute walk I c: • "the heart Avenue" ·B I ~ .'6 ~ ·~ • • Active cluster of businesses i • • • Reverse surf ace lot/street edge relationship Active businesses on east 1• Backyard of homes on west WESTERN AVENUE Corridor Vision OPEN""AOUSE I -~ <II E •o 00 .., C: •O .~ C: •..C: .~ <II .2: 0 -~ Auto-oriented experienc Inactive street edges on east and west SOUTHERN SEGMENT SUMERLANDPARK PLAZA TERRACES Notice the large parking lots available at Park Plaza and the Terraces shopping center. There are 60 SB street parking spaces and 80 NB street parking spaces available but generally underutilized by the adjacent business customers. A-34 This is a closer view of the PARK PLAZA shopping center. A-35 There are a only a few cars parked on the Street side even though there are plenty of parking spaces available inside the parking lot. Because of the high profile, high visibility of the street location, the majority cars parked in this area are to advertise a business or are for sale. This is an example within the red circle. The City of LA asked us to reclaim parking in their portions to eliminate these blights. A-36 Street view on a Saturday Morning. These spaces are not preferred by customers. Convenient parking is located in large parking lots, near the businesses. A bike lane could be instrumental in removing unwanted advertisement parking, and would enhance the street side aesthetics. A-37 MIDDLE SEGMENT ALBERTSON’S SMART & FINAL This is the Middle Segment with businesses on one side and residential back yards on the other side. A-38 The southbound Curbside parking is virtually unused. There are existing no stopping hours in effect. The Rancho Palos Verdes Corridor Study recommends reclaiming parking spaces for a class II bike lane in this segment. A-39 Similar to the South Segment, northbound parking is being used by advertisements and cars for sale. The worst is right in front of Albertson’s A-40 USAGE OF EXISTING PARKING SPICES The North Segment is already using most of the unused parking spaces as a Class II and Class III bike lane. However, there are still portions of the North Segment which can be converted to a Class II Bike lane. A-41 . NORTH SEGMENT, SB CLASS II ~,-: NB CLASS III BIKE LINES, , · ; ;~. ▪Western is a community artery ▪Community Goals from RPV study ▪Improvement of storefronts ▪Enhancing the quality of the public realm ▪Expanding mobility options ▪Developing a well-functioning and harmonious perception of the corridor. ▪No funding by the City for Bike Lanes (there may be funding for a right turn lane). A-42 P,L I I i I i ,r~~~ r-.:\ . -.--~ ~~ l'lff£~ ' \ ', ~ \ ·~-""" ~\ ~ 12'-0" ~ , 0• 12·- 12- PL COMPATIBILITY WITH THE CITY OF RANCHO PALOS VERDES CORRIDOR Pl Pl ; I ; I ; I i I i I i I i I i I i ▪Rancho Palos Verdes commissioned a study on how to improve the Western Avenue corridor. ▪Caltrans, as part of our complete street initiative, took that study and is proposing to implement a piece of it, bike lanes. ▪Caltrans has shown that new bike lanes will not reduce the car and truck capacity of the street. ▪When cyclists use the bike lanes instead of their cars to commute or shop, there could even be reduction in car and truck demand. ▪Caltrans has explored the consequences of adding bicycle lanes, primarily that some parking spaces will be reclaimed. ▪Caltrans has shared some of the other beneficial features for pedestrians and vehicles that we are adding on the project A-43 SUMMARY Tentative Construction Schedule Start Construction August 2022 End Construction April 2023 A-44 ~ I