CC SR 20210921 03 - City Council Goals (First Quarter)
CITY COUNCIL MEETING DATE: 09/21/2021
AGENDA REPORT AGENDA HEADING: Regular Business
AGENDA TITLE:
Consideration and possible action to receive and file a quarterly status report on Fiscal
Year 2021-2022 City Council goals.
RECOMMENDED COUNCIL ACTION:
(1) Receive and file a quarterly status report on the FY 2021-2022 City Council goals.
FISCAL IMPACT: The FY 2021-22 City Council goals that require funding is included
in FY 2021-22 budget.
Amount Budgeted: N/A
Additional Appropriation: N/A
Account Number(s): N/A
ORIGINATED BY: Karina Bañales, Deputy City Manager
REVIEWED BY: Same as above
APPROVED BY: Ara Mihranian, AICP, City Manager
ATTACHED SUPPORTING DOCUMENTS:
A. FY 2021-22 City Council Goals Worksheet (page A-1)
BACKGROUND AND DISCUSSION:
As part of this year’s budget process that began in February 2021, the City Council held
a workshop on February 22, 2021, to begin formulating the goals for FY 2021-22. This
was a change in past practices so that the goals, which in many cases require funding,
can align with the budget. On June 15, 2021, the City Council approved FY 2021-22 City
Council goals concurrent with the adoption of the City budget to ensure funding of the
goals.
There are 56 City Council goals for FY2021-22. This staff report provides the first quarterly
update on the status of the goals, including complete or near-complete goals, an
explanation of highlighted goals, and additional information on what to expect in the
upcoming quarterly updates.
1
City Council Goal Rubric and Categories
The City Council goals utilize the “SMART” rubric: Specific, Measurable, Achievable,
Realistic, Timely. The following are descriptions of the six general goal categories.
• Public Safety: Maintain a high level of public safety with public engagement.
• Infrastructure: Maintain and improve all public infrastructure (including
transportation systems, parking, utilities, storm drains, and sewers).
• City Land and Facilities: Maintain and improve all City-owned properties.
• Quality of Life: Maintain and improve the quality of life for RPV residents.
• Citizen Involvement and Public Outreach: Engage residents and community
partners in assisting the City Council, City Committees/Commissions, and City
Staff facilitate the decision-making process.
• Government Efficiency, Transparency, and Accountability: Maximize the use
of each tax dollar and optimize services delivered to RPV residents.
The attached worksheet maintains the goal categories used in FY 2020-21, as described
above, and includes numbers based on the subcategories as supporting goals to achieve
the overarching goal, as illustrated below:
Public Safety: Maintain a high level of public safety with public engagement
1. Law Enforcement
1a. Reduce Part I Crime by 5% for FY 2021-22 compared to FY 2020-21
1b. Expand Neighborhood Watch to five new communities annually
1c. Provide $30,000 in grants to residents and neighborhood groups for the
acquisition of safety-enhancing tools and technologies
First Quarter Presentation of the City Council Goals
This first quarterly review of the 56 City Council goals is to track the progress of the goals
since July 1. Since many of these goals are carried over from the previous year, staff has
retained past comments and updated the goals table in red to reflect current information
(Attachment A). This will allow for tracking the historical record of each goal, while
providing updated information.
Each City Council goal corresponds to a color spectrum and description that identifies
each goal’s status. The five colors identify if the goal is at risk of falling behind the target
date, on schedule to meet the target date, near completion, completed, and not
recommended at this time or no longer necessary. Within each color spectrum is a
number that represents how many of the 56 goals fall within the respective color
specxtrum. It is important to note that since this is the first quarterly report as of July 1,
several of the 42 goals in the “red” spectrum (behind schedule or at risk) are still in the
planning or development stages and are anticipated to move out of this spectrum in future
quarterly updates. See the color spectrum on the next page.
2
As of tonight’s presentation, two City Council goals are complete, and 12 are close to
completion or on an accelerated completion schedule.
FY 2021-2022 Completed or Near Completion City Council Goals
Completed Goals:
Category - Quality of Life:
Goal: Maintain and improve the quality of life for RPV residents.
Item 19. Community Programs; Launch a “Keep RPV Clean” campaign throughout the
City’s open space areas.
Several "Keep RPV Clean" resident-generated clean-up efforts have taken place
throughout the City and will continue throughout the year. In addition, staff has
established a Keep RPV Clean Volunteer Program. Most recently, RPV Clean Volunteers
assisted with the RPV Beach clean-up, Upper Point Vicente Park/Civic Center clean-up
day, weed and spread of mulch around picnic areas at Lower Hesse Park, and assisted
with the Native Plant Garden at Point Vicente Interpretive Center. This has been a
successful program benefitting the community, and these efforts will continue throughout
the year.
Category - Citizen Involvement and Public Outreach:
Goal: Engage residents and community partners in assisting the City Council, City
Committees/Commissions, and City Staff facilitate the decision-making process.
Item 20b: Host five City-sponsored events or activities at the Civic Center throughout the
fiscal year
Well over 4,000 people attended special events at the Civic Center this summer, including
900 people who attended two Movies in the Park, almost 1,000 people who attended two
public concerts, and 2,500 people who attended the City's Fourth of July event. In
addition, staff is developing Fall/Winter programs such as a trunk or treat and an ice
skating-in-park event this winter.
Accelerated/Near Completion:
Category: City Land and Facilities
Goal: Maintain and Improve all City-owned properties.
COLOR DESCRIPTION AND COUNTS
2 100% - completed
2 56% - 99% - accelerated/near completion
10 26% - 55% - on target/on schedule
42 0% - 25% - behind schedule/at risk
0 N/A - not recommended/not necessary
3
Item 13. Natural Communities Conservation Plan/Habitat Conservation Plan
(NCCP/HCP)
Supporting Goal – Line Item 13e: Prepare a Preserve Master Parking Plan identifying
parking opportunities to accommodate visitors to the Preserve that minimizes impacts on
neighborhoods and resources.
Staff has established parking solutions specific to Crenshaw Boulevard and Park Place,
increased parking enforcement, establishing a reservation and fee-based parking
system, increased parking citation fines, installed access gates at Burma Road, and
beautified Alta Vicente Reserve/Civic Center among other things. Staff will continue to
work on this goal throughout FY 2021-22.
Category: Quality of Life
Goal: Maintain and improve the quality of life for RPV residents.
Item 18. Municipal Code Amendments
Supporting Goal – Line Item 18a: Update the City’s Sign Ordinance (Section 17.76.050)
The Planning Commission has conducted two hearings on updating the City’s Sign
Ordinance, and it is anticipated that the Planning Commission will make final
recommendations on September 14, 2021. Staff will bring the Planning Commission’s
recommendation to the City Council for their consideration on November 2, 2021.
Highlighted Goals
Top priority goals are highlighted in yellow in Attachment A. Top priority goals are
considered as exceeding the threshold bar and equal in terms of priority. These goals
were selected based on public benefit, available resources, including staff time and funds,
and being realistic and achievable. Staff has identified 26 goals as top priority, which fall
under the following subcategories:
• Law Enforcement (Public Safety)
• Emergency Preparedness (Public Safety)
• Portuguese Bend Landslide (Infrastructure)
• Asset Management (Infrastructure)
• Small Wireless Facilities (Infrastructure)
• Sanitary Utilities (Infrastructure)
• Roadways (Infrastructure)
• Ladera Linda Park and Community Center (City Land and Facilities)
• Civic Center Master Plan (City Land and Facilities)
• Trails Network Plan Update (City Land and Facilities)
• Natural Communities Conservation Plan/Habitat Conservation Plan (NCCP/HCP)
(City Land and Facilities)
• Park Improvement (City Land and Facilities)
• Western Avenue Redevelopment (Quality of Life)
• Municipal Code Amendments (Quality of Life)
• Community Programs (Quality of Life)
4
• Operations and Customer Service (Government, Efficiency, Transparency, and
Accountability)
ADDITIONAL INFORMATION
City Council Goals Appendix Worksheet
As part of the FY 2021-22 City Council Goals Worksheet, items that were originally
identified as a goal in the past, but are now considered an action item were placed in an
appendix worksheet for institutional and tracking knowledge. Staff will continue to
maintain this worksheet.
City Council Webpage
Staff has revamped the FY 2021-22 City Council goals webpage to reflect the current
goals. Additionally, the homepage now includes a video clip featuring Mayor Alegria
highlighting some of the City Council Goals for FY 2021-22 in the RPVtv “City Talk” July
2021 video series. Staff intends to update the webpage after each City Council goals
quarterly presentation with their status.
To view the FY 2021-22 City Council webpage, please visit rpvca.gov/goals.
CONCLUSION:
Staff recommends the City Council receive and file a quarterly status report on FY 2021-
2022 City Council goals.
ALTERNATIVES:
In addition to the Staff recommendation, the following alternative action is available for
the City Council’s consideration:
1. Provide input on the status of the FY 21-22 City Council goals for consideration as
part of the second quarterly update.
5
2021-2022 Goals and Action Plan
2 100% - completed
2 56% - 99% - accelerated/near completion
10 26% - 55% - on target/on schedule
41 0% - 25% - behind schedule/at risk
0 N/A - not recommended/not necessary
26 Priority Goals
Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT BUDGET ITEM TARGET DATE FOR
COMPLETION
REVISED DATE FOR
COMPLETION
ACTUAL DATE OF
COMPLETION STATUS (%)COMMENTS/STATUS UPDATE
1. Law Enforcement
1a Reduce Part I Crime by 5% for FY 2021-22 compared to FY 2020-21 Admin 06/30/2022 25%
The City continues to take a proactive approach in addressing crime, including providing
grants to neighborhood groups to purchase security cameras, renting in-home security
cameras to residents on vacation or undergoing home construction, and directing
additional overtime patrols provided by the Sheriff's Station to address areas of specific
concerns. Comparing Part I Crimes from January-July of 2020 and 2021, the City has seen a
34% increase of Part I Crimes.
1b Expand Neighborhood Watch to five new communities.Admin 06/30/2022 25%
Staff is continuing discussions with the City's Neighborhood Watch Coordinator to explore
expanding the program to include multi-family and advertise specifically to communities
not currently participating in the program. A report will be provided to the City Council in
November or December 2021.
1c Provide $30,000 in grants to residents and neighborhood groups for the
acquisition of safety-enhancing tools and technologies Admin 06/30/2022 25%
Safety enhancing tools and technologies may include Ring doorbells and continuing the
matching grant program for the Flock Safety cameras. Staff has prepared a preliminary
draft of the new grant program which incorporates the Ring doorbell and Flock Safety
components in addition to some new tools. The program will go before the City Council
once the existing security camera grant program has been completed.
2. Emergency Preparedness
2a
Prepare a Landslide Emergency Sanitation Plan in coordination with LA County
Sanitation District on how to respond to an emergency break in the above-ground
sanitation line located on Palos Verdes Drive South within the Landslide Area.
PW 6/30/2021 TBD 0%
The Sanitation District is working with a consultant to prepare an Emergency Sanitation
Plan. City Staff has had preliminary discussions with the Sanitation District on elements to
be included in the plan. This goal may be addressed with the completion of the utility
white paper being prepared for the Peninsula Public Safety Committee.
COLOR DESCRIPTION AND COUNTS
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
Last updated: 06/08/2021
1 of 10A-1
2021-2022 Goals and Action Plan
Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT BUDGET ITEM TARGET DATE FOR
COMPLETION
REVISED DATE FOR
COMPLETION
ACTUAL DATE OF
COMPLETION STATUS (%)COMMENTS/STATUS UPDATE
2b
Implement at least two of the EPC-recommended action items to mitigate wildfire
risk in RPV, including: Enhanced Emergency Communication; Emergency
Evacuation Plan/Peninsula-wide and school district emergency preparedness plan;
Wildfire Hardening; Public Safety Power Shutoff response; and Cal Fire Risk
Assessment and Insurance Rates
Admin 6/30/2022 10%
On October 8 and October 12, 2020 the Emergency Services Coordinator and Emergency
Preparedness Committee Members met with the City of Malibu and the Topanga Coalition
for Emergency Preparedness (T-CEP) for guidance on communication systems best
practices and lessons learned. On Wednesday, April 7, 2021 City Staff and Emergency
Preparedness Committee Members met with representatives from the California
Department of Insurance (CDI) to discuss available resources for residents experiencing
premium hikes and reduced homeowner insurance availability. On April 20, 2021, City staff
and Emergency Preparedness Committee Members met with representatives from the
Montecito Fire Protection District for the gleaning of lessons learned in responding to the
Thomas and Woolsey Fires. On February 25, 2021, the Emergency Services Coordinator
conducted a Peninsula wide Virtual Emergency Preparedness Tabletop Exercise in
coordination with the four Peninsula Cities. This Tabletop Exercise also included
participation by representatives from the following public safety agencies serving the Palos
Verdes Peninsula: The Los Angeles County Fire Department, The Los Angeles County
Sheriff Department -Lomita Station and the Palos Verdes Estates Police Department. This
exercise was designed to improve coordination, communication, and response efforts
among Peninsula Cities and first responder agencies in the event of a disaster affecting the
Palos Verdes Peninsula. City staff has drafted and presented an After-Action Review report
identifying lessons learned from this exercise during the quarterly meeting of Peninsula
Public Safety Committee (PPSC) on Thursday, May 13, 2021. At the Peninsula Public Safety
Committee's (PPSC) meeting on August 12, 2021, the City of Rancho Palos Verdes'
Emergency Preparedness Coordinator presented the Committee with a draft map
highlighting the Peninsula's four egress and ingress points, as well as a strategy for
developing Peninsula-wide mass egress and ingress points. Following the Committee's
discussion, the PPSC directed that a Request for Proposals be developed and published for
an independent third-party consultant to develop a comprehensive plan for the entire
Palos Verdes Peninsula.
3. Portuguese Bend Landslide
3a
Complete the EIR for the Portuguese Bend Landslide Remediation Project for
certification by the City Council PW 12/31/2021 4/30/2022 25%
On May 19, 2020, the City Council approved a professional services agreement with the
Chambers Group to prepare the environmental document. The Draft Initial Study was
published for public review between November 12, 2020 and January 15, 2021. A public
scoping meeting was held on December 19, 2020. The City's consultant has started work
on the draft EIR. The Draft EIR is expected to be published in the Fall of 2021.
3b Prepare funding opportunities for Phases 1 & 2 of the Portuguese Bend Landslide
Feasibility Plan for City Council consideration. FIN 6/30/2022 10%
Staff is pursuing various potential funding opportunities for this project. The South Santa
Monica Bay (SSMB) Watershed Area Steering Committee (WASC) met on May 19, 2020.
WASC reviews all projects for Measure W funding. A Measure W application was
submitted to the County for the Portuguese Bend Landslide Remediation Project in
October 2020. Staff is also working with Blais and Associates to identify potential grants
for this project, and City Staff has embarked on a writing campaign for funding
opportunities with state and federal legislators including securing federal inftrastructure
funding. The City is in the process of hiring a program manager for this project who may
help identify funding and grant opportunities.
3c
Develop a mitigation plan to address land movement at Altamira Canyon based on
the following phases:
Phase One - Perform the drainage/erosion analysis for the entire canyon and its
tributaries and establish a priority list based on current erosion.
Phase Two - Prepare detailed engineering plans to resolve the erosion and making
sure there is positive drainage along the canyon.
Phase Three - Award construction contract for the proposed improvements.
PW Phase One: 6/30/2022 0%
On November 4, 2020, the City Council approved a professional services agreement with
Harris and Associates to perform the Phase One work. Notice to proceed was issued on
February 24, 2021. Surveying work is complete and drainage/erosion analysis is underway.
INFRASTRUCTURE
Goal: Maintain and improve all public infrastructure (including transportation systems, parking, utilities, storm drains, and sewers).
Last updated: 06/08/2021
2 of 10A-2
2021-2022 Goals and Action Plan
Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT BUDGET ITEM TARGET DATE FOR
COMPLETION
REVISED DATE FOR
COMPLETION
ACTUAL DATE OF
COMPLETION STATUS (%)COMMENTS/STATUS UPDATE
3d
Develop a feasibility analysis with Rolling Hills for installation of an underground
sanitary sewer system to replace the existing septic tanks to reduce ground water
seepage within Portuguese Bend landslide.
PW 12/31/2021 0%
Comments from Rolling Hills on the draft feasibility study were received on June 18, 2020
and provided to the consultant. The Draft Rolling Hills Sewer Concept Design (feasibility
study) has been received and preliminary discussions with Rolling Hills were held. Review
of the draft concept design has identified the need for further analysis of concept viability
before finalizing the feasibility study for public review. Further work on this goal has been
deferred until more information is gathered on the overall Portuguese Bend Landslide
Remediation project.
4. Asset Management
4a Create a detailed inventory and maintenance schedule of the City's public
infrastructure and assets.PW 6/30/2023 0%
The Fiscal Year 2021-22 CIP includes funding to start an asset management program for
the City's Facilities, Storm Sewer System, Pavement, Sidewalks, and Traffic Signs.
Proposals have been received for a condition assessment and maintenance schedule of the
City's facilities and work is expected to begin in the next quarter. Proposals for a condition
assessment and maintenance schedule for the City's pavement, sidewalks, and traffic signs
will be solicited in the next quarter.
5. Small Wireless Facilities
5a
Develop a Citywide 5G Small Wireless Facilities (SWF) Master Plan that identifies
the preferred and least intrusive locations to install small wireless facilities
including co-locations.
PW Yes 12/31/2021 06/31/2022 0%
The primary 5G SWF engineering and construction company on the Peninsula has
developed a plan of locations for SWF facilities. Staff is soliciting proposals from qualified
consultants to evaluate the plan for optimization of co-location, gap analysis, aesthetic
impacts, compliance with City policies, and development of recommended alternatives
when feasible.
6. Electric Utilities
6a
In coordination with SCE, develop a Utility Resilient Advancement Master Plan to
harden above-ground utility lines including a tentative timeline to potentially
underground utilities; and continue to lobby the California Public Utilities
Commission to modify the requirements for Rule 20A undergrounding funds to
include high fire risk areas.
PW Yes 6/30/2022 0%
Southern California Edison's current plan is development of specific Circuit Reliability
projects to harden infrastructure in particular areas of RPV, rather than an overall master
plan. Public Works Staff is coordinating public information distribution as these projects
are further developed.
6b
Identify alternative energy resources with the capability to store energy or sell it
back to the grid system, which could power the City. The first phase is to identify
potential alternative energy and the cost associated with this plan.
PW Yes 6/30/2022 0%
Work on this goal has been deferred until certain Public Works projects in queue have
been completed.
6c
Reduce the threat of a fire hazard proximately caused by downed or damaged
overhead power lines through the undergrounding of one mile of utility lines
within the City’s open space areas.
Admin 06/30/2022 10%
Staff is working to identify potential grants and funding opportunities for this project. On
May 7, 2021, the City submitted a Notice of Interest (NOI) to the California Governor's
Office of Emergency Services (Cal OES) Hazard Mitigation Grant Program (HMGP) towards
the securing of funds for this goal. On May 24, 2021, Cal OES notified the City that the
proposed undergrounding of overhead powerlines project is an eligible HMGP activity and
has formally invited the City to submit a full sub-application for consideration of funding.
Staff is currently compiling data for this application, which is due on June 18, 2021. On June
18, 2021, Staff submitted a sub-application to the California Governor's Office of
Emergency Services (Cal OES) Hazard Mitigation Grant Program to secure funding for this
goal. Staff is currently coordinating with representatives from Cal OES to respond to a
request for additional information for this grant.
7. Sanitary Utilities
7a
Develop a public sewer program to encourage on-site sanitary sewer systems to
connect to the public sanitary sewer system based on the following phases:
Phase 1: Map areas in the City that are served by a sanitary sewer system or on-
site sanitary sewer system.
Phase 2: Feasibility study of the areas which are not currently being served and
prioritize the need for installation of the sewer system and identify costs to
connect to the sewer system.
Phase 3: Design the sewer system.
Phase 4: Installation of the system.
PW 6/30/2021 6/30/2022 0%
Based on information available at City Hall and from LA County Environmental Health, Staff
will be working with the City's GIS Staff to finalize a map showing areas of the City served
by onsite waste water sewer systems (Phase 1).
Last updated: 06/08/2021
3 of 10A-3
2021-2022 Goals and Action Plan
Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT BUDGET ITEM TARGET DATE FOR
COMPLETION
REVISED DATE FOR
COMPLETION
ACTUAL DATE OF
COMPLETION STATUS (%)COMMENTS/STATUS UPDATE
7b Prepare a new financial plan for the Abalone Cove annual sewer rates that reduces
City maintenance subsidy by at least 50% for City Council consideration.FIN 6/30/2022 0%
Staff has estimated long-range costs for maintenance, operations, and capital costs of the
system. The 18-year historical costs have provided a good baseline for future costs.
Additionally, staff has identified capital improvements that will likely be needed in the next
5-10 years, due to the wear and tear on the pipes, grinder pumps, and lift stations. Staff is
working with Abalone Cove residents to address the future Sewer Rates in order to reduce
the City subsidy. On October 6, the City Council amended the Municipal Code with the
current CPI-U and approved a connection fee. Staff is working with a consultant to perform
an evaluation and assessment of the sewer system. This will provide staff with an updated
annual maintenance cost estimate to properly prepare a financial plan.
8. Roadways
8a Develop a Citywide Speed Mitigation Plan for reducing vehicular speed within City
streets (traffic calming)PW 6/30/2022 TBD 0%
Funding for development of the masterplan is included in the Fiscal 2021-22 CIP and work
will begin when key staff vacancies are filled.
9. City Beautification
9a
Develop an Arterial Fences and Walls Master Plan for the City Council's
consideration that retains neighborhood identity and describes the type (material
and height) of fence or wall, if any, to be placed along major arterial streets in the
City.
CDD Yes 6/30/2023 0%
Staff continues to seek a consultant to assist with preparing a draft plan.
Carryover to FY 2021-22 if funded in FY 2021-22 budget.
Staff will be utilizing internal resources to implement update of Master Plan. Work on this
in-house plan is scheduled to kick-off in October.
9b
Create a City Entry Master Sign Plan at various points of entry to the City utilizing
the following phases:
Phase 1: Issue an RFP for the design.
Phase 2: Design.
Phase 3: Construction.
PW 06/30/2021 06/30/2022 0%
This project was not funded as part of the Fiscal Year 2021-22 CIP. Funding will continue to
be pursued in future CIP cycles and with other funding sources, such as the American
Rescue Plan Act (ARPA).
10. Ladera Linda Community Center and Park
10b Complete construction-ready documents for City Council consideration.PW 9/30/2021 11/30/2021 50%
The City's Architecture/Engineering consultant is preparing construction documents, which
are expected to be completed in the Fall of 2021. A program manager and construction
manager, Griffin and Associates, were hired by the City on September 7, 2021.
10c Complete bid process for construction firm and present contract to the City
Council consideration.PW 12/31/2021 12/21/2021 0%
The bid process will begin upon completion of the construction documents.
10d Break ground on construction based on Council-approved plans.PW 12/31/2021 3/31/2022 0%
Ground breaking will commence after successful completion of the bidding process and
issuance of a Notice to Proceed.
11. Civic Center Master Plan
11a Present Civic Center development financing options to the City Council for
consideration.FIN 6/30/2022 10%
In March, City Staff initiated discussions with Kosmont Transaction Services (KTS), but
paused further discussions due to changes in the leadership team and to reassess the
financial impacts of the economic downturn. Staff has developed a preliminary budget for
this project that was confirmed as reasonable estimates by KTS. On October 15, Staff met
with KTS to discuss funding options for the project. Staff has requested additional
information and is working with Blais and Associates on identifying grant opportunities.
Additionally, since September 2020, Staff has been meeting with consultants from various
aspects of the development sector including project management consultants, developers,
and other agency representatives to further understand, among other things, financing
and product delivery options. Staff and the CCAC are working on putting together a public
financing workshop for the community, council, advisory boards, and staff to be well
versed in the financing options for this project. The workshop is tentatively scheduled for
October/November.
CITY LAND AND FACILITIES
Goal: Maintain and Improve all City-owned properties.
Last updated: 06/08/2021
4 of 10A-4
2021-2022 Goals and Action Plan
Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT BUDGET ITEM TARGET DATE FOR
COMPLETION
REVISED DATE FOR
COMPLETION
ACTUAL DATE OF
COMPLETION STATUS (%)COMMENTS/STATUS UPDATE
11b Initiate discussions with DOJ and FEMA for a land-use swapping agreement as a
part of the Civic Center Master Plan process.Admin 12/31/2021 5%
Communication with respective agencies established. Additional dialogue to continue in
FY 2021-22 once the program vaildation has been completed.
11d
Explore potential Civic Center partnerships that are compatible with the City
Council approved program document, and coordinate appropriate usage with civic,
business, and non-profit agencies to consider locating at the civic center
Admin 03/30/2022 10%
In August 2021, the City signed a contract with Gensler to conduct a program validation of
the Civic Center program document that includes potential civic center partnerships. The
program validation is in response to interest expressed to consider expanded uses at the
site such as restaurants, museum and low-income housing.
11e Present draft Civic Center Master Plan for City Council consideration which will
include a new possible Peninsula-wide EOC, Sheriff substation, and fire station.Admin 06/31/2022 10%
Requires hiring a design firm to prepare a master plan and a robust public engagement
process. Earlier this year, the Civic Center Advisory Committee (CCAC) prepared a draft
Design & Architectural Services RFP. The City Council Subcommittee also reviewed the RFP.
During this process, Staff realized that issuing an RFP to onboard a design firm, at this
time, is premature until financing options is considered by the City Council. This is because
the financing model the City Council finds most palatable will determine the development
process including the master planning. Since September 2020, Staff has been meeting with
consultants from various aspects of the development sector including project management
consultants, developers, and other agency representatives to further understand, among
other things, financing options, before issuing an RFP. At this time, Staff is considering
issuing a Request for Interest (RFI) to glean more information on the development process
for the Civic Center. City Council approved CCAC requests on Feb. 2 to proceed with a) an
RFP for a project management consultant firm and b) facilitate a public workshop
addressing municipal financial capital projects. A project manager will determine when to
proceed with developing a master site plan. Staff has begun discussions with Captain
Powers to obtain a written commitment that the LASD is interested in a substation at the
Civic Center site. In 2018, L.A. County Sheriff Jim McDonnell sent letters indicating his
support to place a facility at the Civic Center site. On December 9, 2020, Captain James
Powers of the Lomita Sheriff Station provided verbal support of the project but cautioned
that staff must receive support from Sheriff Villanueva before proceeding. A site tour was
scheduled for January 2021 but was postponed for Spring 2021 due to current health
orders. Staff is discussing opportunities with LASD and LA Co. Fire. In June and August
2021, Staff met with both the LA County Sheriff's Department and LA County Fire
Department to discuss potential commitments on a police and fire station onsite. Staff will
continue the discussions with their respective finance and planning departments.
12. Trails Network Plan Update
12a
Complete the Consultant's review of the draft update to the Trails Network Plan
that provides user-friendly trail descriptions with graphics and detailed maps
illustrating trail routes and uses in a clear and concise manner based on existing
legal trails, community input, and feasible trails.
R&P 7/31/2021 10/13/2021 50%
City Council goal carried over from 2018-2019. City working group and IMAC Trails
Subcommittee coordinating on content of document, and updating process. The
consultant continues to update the draft document which is now anticipated to be
completed and released for public review in October 2021.
12b Conduct two public workshop to solicit community feedback on draft plan.R&P 8/31/2021 11/10/2021 and
1/19/22 15%
Based on City Council direction on June 16 2020, there will be one additional public
outreach meeting led by Staff to solicit community feedback on draft plan. Over the next
several months, Staff, with the assistance of the Alta Planning and Design consultant will
prepare and disseminate information to maximize public awareness and involvement.
Staff continues to work with its consultant on the format and presentations for the
upcoming workshops. The first public workshop is tentatively scheduled for November 10,
2021 and the second public workshop is tentatively scheduled for January 19, 2022.
12c Adopt the Updated Trails Network Plan R&P 12/31/2021 6/7/2022 0%
Staff and the consultant will update the draft TNP to include Planning Commission input
prior to presenting to City Council. The date that the TNP will be presented to City Council
will be finalized, but is anticipated to occur June 7, 2022, and the document will be
released three weeks prior to meeting.
13. Natural Communities Conservation Plan / Habitat Conservation Plan (NCCP/HCP)
13a Amend the Management Agreement with the PVPLC to reflect the City Council-
adopted NCCP/HCP.R&P 12/31/2021 5%
Over the next several months, Staff will coordinate with the City Attorney's Office and the
PVPLC to continue identifying potential amendments for the City Council's consideration
in December 2021.
Last updated: 06/08/2021
5 of 10A-5
2021-2022 Goals and Action Plan
Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT BUDGET ITEM TARGET DATE FOR
COMPLETION
REVISED DATE FOR
COMPLETION
ACTUAL DATE OF
COMPLETION STATUS (%)COMMENTS/STATUS UPDATE
13b
Create the NCCP/HCP-required Preserve Access Protocol to establish appropriate
vehicular access to the Preserve including provisions for access during weather
events (red flag days, tidal conditions, rain etc.)
R&P 12/31/2021 40%
These protocols are required to be completed within a designated period of time after the
City receives the NCCP/HCP permits from the state and federal wildlife agencies. The City
has received its federal permit, and is awaiting the state's permit decision. Staff is
currently working with the Wildlife Agencies to proceed with these documents. Park
Rangers are educating authorized agencies about appropriate vehicular access and
installing signage.
13c Record the NCCP/HCP-approved conservation easements over all Preserve
properties.R&P 11/30/2021 50%
The City is required to place conservation easements over the Preserve properties after
the City receives the NCCP/HCP permits from the state and federal wildlife agencies. The
City has received its federal permit, and is awaiting the state's permit decision. In January
2021, the City Council approved a contract with a surveyor to create property descriptions
for the conservation easements. The surveying was has been completed.
13d Update the Public Use Master Plan for the Palos Verdes Nature Preserve to reflect
the Council-adopted NCCP/HCP.R&P 3/31/2022 10%
Staff is making advance preparations for updating the Public Use Master Plan, including
referencing appropriate sections of the NCCP/HCP and updating trail maps.
13e
Prepare a Preserve Master Parking Plan identifying parking opportunities to
accommodate visitors to the Preserve that minimizes impacts on neighborhoods
and resources.
R&P 12/31/2021 80%
On March 17, 2020, the City Council received a report on parking improvements at Del
Cerro trailhead. Staff continues to research options and explore alternatives to minimize
impacts on neighborhood parking and residents' quality of life both short-term and long-
term. At the August 18, 2020 and September 1, 2020 meetings the City Council directed
Staff to continue social medial campaign to inform and educate public and direct visitors to
alternative locations including Alta Vicente. SEO contract with Tripepi Smith approved.
Modified a two-month temporary parking moratorium along Crenshaw south of Crest.
Public informed via listserve, website, and social media. Burma and Rattlesnake trailhead
gate contracts approved. Staff directed to research alternatives for parking enforcement
and pay system options. Staff directed to look at holistic approach to Preserve parking.
Preserve public forums were held on October 13, 2020, January 27, April 14, 2021, and July
21, 2021. A City Council meeting was held on October 20, 2020. The City Council provided
direction on a number of issues including holistic Preserve parking analysis, parking
enforcement and a parking reservation system, a 60-day extension of parking moratorium
on a section of Crenshaw, a citation/fee analysis, Preserve capacity study, and Alta Vicente
trailhead beautification. Holistic planning continued at meetings on January 19, February
16, 2021, March 16, April 20, 2021, and May 18, 2021. As a result, the following elements
of a holistic approach to Preserve Parking and Access are underway:
• Preserve capacity analysis: The City Council received and filed an update on capacity
analysis alternatives at the March 16, 2021.
• Web and social media campaign: Staff is working with a Search Engine Optimization
consultant. The work will be completed November 2021.
• Traffic and parking analysis: The Public Works Department worked with a traffic
engineering consultant completed an expedited traffic analysis for Crenshaw Blvd. south of
Crest Rd. Results were presented to the City Council on March 16, 2021. Parking was
restricted to provide recommended site distances. Larger scale parking studies will be
completed in late 2021.
CONTINUED
Last updated: 06/08/2021
6 of 10A-6
2021-2022 Goals and Action Plan
Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT BUDGET ITEM TARGET DATE FOR
COMPLETION
REVISED DATE FOR
COMPLETION
ACTUAL DATE OF
COMPLETION STATUS (%)COMMENTS/STATUS UPDATE
80%
• Parking solutions specific to Crenshaw Boulevard and Park Place
• Increasing parking enforcement: The City is in the process of recruiting part-time park
rangers/parking ambassadors
• Establishing reservation and fee-based parking system: The City Council approved a
contract with ParkMobile in April 2021. Staff is working with ParkMobile to configure the
RPV parking system, and will begin formal implementation in July 2021.
• Increasing parking citation fines: Parking violations were increased from $50 to $110 for
the following violations: 1) Park by permit, 2) Failure to obey signage, and 3) Passenger
loading zone.
• Installing access gates at Burma Road and Rattlesnake trailheads: Burma Gate was
installed, and Rattlesnake is forthcoming.
• Dispersing public use to alternative reserve locations
• Beautifying Alta Vicente Reserve/Civic Center: Improvements were made to the site.
• Establishing a Preserve Pilot Shuttle program: the Pilot Shuttle Program began in April
and will run 90 days.
14. Park Improvements
14a
Explore establishing a partnership, joint use, and/or lease agreement with the U.S.
Coast Guard for the Point Vicente Lighthouse property, buildings, and WW II
Battery Barnes outpost owned by Coast Guard, Facility-commonly referred to as
Coast Guard bunker (located at the Civic Center).
R&P 12/31/2021 50%
Staff has reached out to the Coast Guard to initiate dialogue about the future use of these
properties. Staff and several City Council members took tours of Coast Guard properties
with USCG personnel in October 2020 and held informal discussions of potential
acquisition and partnership. The USCG expressed a strong interest in developing a
partnership with the City. Additional meetings are being planned to begin brainstorming
partnership arrangements. Staff continued discussions with Coast Guard personnel during
a recent Civic Center tour. Staff has been informed that a new Commander is coming on
board in late May and staff plans to reach out to her to continue discussions by mid-June.
Staff continues to work with Coast Guard staff and new Commander to explore options for
both sites.
15. Western Avenue Redevelopment
15a
Develop a SWOT analysis of commercial properties along Western Avenue to
identify economic development opportunities to enhance retail establishments
and create mixed-use projects.
CDD Yes 6/30/2021 6/30/2022 50%
The City prepared a potential redevelopment site analysis and has met with four potential
developers to explore mixed use projects. In May, the City was awarded a $160k from the
SB 2 grant fund to develop a mixed use plan for Western Avenue. Additionally, the City
applied for the Local Early Action Planning (LEAP) grant to seek an additional $150k to
support mixed use planning efforts that will enhance economic development opportunities
in the City. Phase I feasibility analysis of select properties has been completed and
presented to City Council and Planning Commission; City Council authorized the expansion
of the study to incorporate additional properties on Western Avenue and Silver Spur,
among other sites, on September 7, 2021.
15b
Create a Traffic Flow Improvement Plan in coordination with Lomita, Los Angeles,
and Caltrans to improve traffic flows and provide connectivity between retail
outlets and residents.
PW Concept Plan Report:
12/31/2022 0%
Metro Board approved $1.33 million for Western Avenue Congestion Improvement Project
to be used for a concept plan report. Staff is further refining the scope of work and
coordinating with the California Department of Transportation; who owns Western
Avenue and has approval rights over any work in the corridor. The timeline of this project
is subject to the CalTrans coordination, review times, and approval timelines. The City
Council will consider a Funding Agreement at its September 21, 2021 meeting.
15c Develop a streetscape beautification plan to enhance the aesthetic character of
Western Avenue.PW 6/30/2023 0%
The CIP for FY 2020-21 includes funding for a concept design of the Western Avenue
Beautification Project. Staff received proposals in response to an RFP for the concept
design of the beautification of Western Ave and selected a qualified firm. Fee negotiations
are ongoing and a professional services agreement will be brought to Council when fee
negotiations conclude. Funding for final design will be requested for future CIP cycles, or
as funding opportunities become available such as the American Rescue Plan Act (ARPA).
16. Economic Development
QUALITY OF LIFE
Goal: Maintain and improve the quality of life for RPV residents.
Last updated: 06/08/2021
7 of 10A-7
2021-2022 Goals and Action Plan
Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT BUDGET ITEM TARGET DATE FOR
COMPLETION
REVISED DATE FOR
COMPLETION
ACTUAL DATE OF
COMPLETION STATUS (%)COMMENTS/STATUS UPDATE
16a
Create a promotional economic development campaign to improve RPV's
jobs/housing balance by supporting home-based businesses and encouraging
business with high-quality jobs to locate in RPV.
Admin 6/30/2022 25%
City Staff is in the early stages of developing a branding campaign for Western Avenue that
will incorporate Goal No. 47 of FY 2020-21. The branding campaign will bring together the
traffic flow, beautification, and economic development projects for Western Avenue. Staff
is collecting information on potential marketing consultants. In August 2021, Staff joined
the Los Angeles Economic Development Corporation (LAEDC) to assist the City in
highlighting current businesses and attract new businesses to the City. This will also
include Western Avenue.
17. Environmental Sustainability
17a Electric Vehicles: Adopt streamlined EV permitting policies in compliance with AB
1236 CDD 6/30/2022 26%
Initial research underway; tentative workplan in development.
Initial research and analysis is complete. Development of draft code language is in process.
17b
Water Conservation: Develop and publish a Low Impact Development (LID)
Standards Guidebook as resource to the development community to comply with
the City's storm water ordinance and LID standards.
CDD 06/30/2022 5%
Existing standards and guidelines currently under review for compliance current and
anticipated stormwater regulations.
17c Develop program in collaboration with EDCO to recycle/divert organic waste from
residential waste PW 06/30/2022 0%
This goal supports Measure Solid Waste A2. Diversion/recycling of organic waste reduces
green house gas emissions by reducing methane gas produced when organic waste
decomposes in landfills.
18. Municipal Code Amendments
18a Update the City's Sign Ordinance (Section 17.76.050)CDD 9/30/2021 11/02/2021 75%
Staff is working with the City Attorney's Office on the preparation of a draft code
amendment for review by the Planning Commission. Draft regulations in development
stage. Planning Commission likely to consider in January 2021. Staff is working with the
City Attorney's Office on the preparation of a draft code amendment for review. Planning
Commission to begin consideration of new code standards in February. On February 9,
2021, the Planning Commission directed the Zoning Subcommittee to work with Staff and
the City Attorney's office on the development of an updated sign code. Preliminary text to
be presented to PC on July 27th.
The Planning Commission has conducted two hearings; it is anticipated that The Planning
Commission will make final recommendations on September 14, 2021; City Council to
consider Planning Commission recommendations on November 2, 2021.
18b Update the Wireless (private property) Facilities Ordinance (Section 17.76.020) CDD 10/31/2021 1/31/2022 0%
Staff will begin updating the wireless facilities section of the code in early 2021. Staff is
working with the City Attorney’s Office on the preparation of draft language for review.
The Planning Commission likely to consider before Summer 2021. This goal is
recommended to be continued to FY2021-22.
Deferred until completion of Sign Ordinance update.
18c
Initiate remaining text amendments to complete the comprehensive update to
Title 17 (Zoning Code) of RPVMC and Zoning Map. Target completion of 50% of
updates by end of FY.
CDD 06/30/2022 0%
Pending completion of Sign Ordinance and misc. code amendments to comply with
NCCP/HCP.
19. Community Programs
19a Provide services for aging and disabled members of the community through the of
a new Aging and Disability Resources Connection (ADRC) program Admin 12/31/2021 35%
The City Council approved the ADRC on June 15, 2021. Staff has implemented a pilot
version of the ADRC, evaluating programs as needed, to provide resources and programs
for aging and disabled members of the community, establishing a volunteer network to
assist with the programs including reinstating the Handyman Program, and creating a
Special Needs Registry to have information for community members in the event of an
emergency. Budget may be required for Handyman and Special Needs Registry program
and will be assessed at the conclusion of the pilot program. To date, there have only been
two volunteers but no registered participants. Staff is currently reassessing the program to
be more effective.
Last updated: 06/08/2021
8 of 10A-8
2021-2022 Goals and Action Plan
Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT BUDGET ITEM TARGET DATE FOR
COMPLETION
REVISED DATE FOR
COMPLETION
ACTUAL DATE OF
COMPLETION STATUS (%)COMMENTS/STATUS UPDATE
19b Launch a “Keep RPV Clean” campaign throughout the City’s open space areas R&P 12/31/2021 8/15/2021 100%
Work with community partners by launching a community cleanup program which includes
a social media campaign, monthly volunteer events, and developing and distributing
information and incentive packets for families and/or neighborhoods to keep City Parks,
Preserve, Beaches and streets clean of litter. Staff has ordered some cleanup-related
materials, is working on an outreach campaign including branding, and has identified
several upcoming dates and locations: RPV BEACH on June 19, Ocean Trails on July 17
Lower Hesse Park on August 21. Several "Keep RPV Clean" resident-generated cleanup
efforts have taken place throughout the City. This opportunity has been advertised via
Listserv, the City website, and the City Newsletter. Additionally, volunteers have
participated in numerous City-sponsored events City events with high levels of volunteer
attendance. The City intends to continue implementing the program throughout the year.
20a Host Annual Leadership Academy for residents.Admin 06/30/2021 11/01/2021 50%
A new version of the Leadership Academy (RPVLA) has been launched and its first cohort
will begin in October 2021.
20b Host five City sponsored events or activities at the Civic Center throughout the
fiscal year R&P Yes 06/30/2022 8/28/2021 100%
Three concerts in the Park are scheduled for July 4, July 17 and August 28. Three Movies in
the Park will be held June 19, July 17 and August 14. In the fall, the annual trunk or treat
event and a scarecrow decorating contest are scheduled. R&P staff are currently reaching
out to vendors for a winter ice skating rink. Well over 4,000 people attended special events
at the Civic Center this summer, including 900 people who attended two Movies in the
Park, almost 1,000 people who attended two public concerts and 2,500 people who
attended the City's Fourth of July event. Fall/Winter events are in the planning stages
including trunk or treat and an ice skating-in-the-park event this winter.
21. Operations & Customer Service
21a Review View Restoration Ordinance and bring options to the Planning Commission
and City Council to consider amending the guidelines.CDD 12/30/2021 30%
Staff is reviewing the existing ordinance and guidelines to determine the scope of the
proposed amendments. Staff is reviewing the existing ordinance and guidelines to
determine the scope of the proposed amendments. Scheduled for Planning Commission
review in Fall 2021.
22b Present Transient Occupancy Tax (TOT) rate options to FAC and City Council FIN 6/30/2022 15%
Staff presented the TOT trends and analysis to FAC on Sept. 26, 2019. Due to the economic
downturn and the recent impact on the travel/hospitality industry, staff and FAC continued
this item to FY 2021-22. Staff has started to collect data and will be scheduling a meeting
with FAC late in the fall to present the information.
23c
Enhance internal and external customer service and efficiency so that all inquiries
are acknowledged within the day received and that, when surveyed, internal
customers indicate 95% satisfaction with responsiveness by colleagues, and
external customers indicate 95% satisfaction with responsiveness by Staff.
Admin 10/31/2021 5%
Work will commence in fall Progress is limited based on staffing levels. Carry over goal.
Staff anticipates preparing memorandum regarding findings before Fall 2021. An employee
(internal customer service) survey was issued on September 30, 2020 with a deadline date
of October 14. Staff tallied the results and generally speaking employees are somewhat
satisfied. Department Heads are assessing the results of the employee results to identify
areas to improve employee satisfaction. A follow-up survey will be issued in Fall 2021 to
compare results after enhanced measures are implemented. In addition to the resident
survey presented to the Council on February 16, 2021, Staff is preparing a specific
customer service survey. It should be noted that in the resident survey 71.8% of
respondents indicated that they were somewhat or very satisfied. Staff is in the planning
stages of establishing a method to send and receive responses.
CITIZEN INVOLVEMENT & PUBLIC OUTREACH
Goal: Engage residents and community partners in assisting the City Council, City Committees/Commissions and City Staff facilitate the decision-making process.
GOVERNMENT EFFICIENCY, TRANSPARENCY & ACCOUNTABILITY
Goal: Maximize the use of each tax dollar and optimize services delivered to RPV residents.
Last updated: 06/08/2021
9 of 10A-9
2021-2022 Goals and Action Plan
Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT BUDGET ITEM TARGET DATE FOR
COMPLETION
REVISED DATE FOR
COMPLETION
ACTUAL DATE OF
COMPLETION STATUS (%)COMMENTS/STATUS UPDATE
24d
Establish an efficient and streamlined development process between the
Community Development and Public Works Departments to decrease the initial
review time for applications to no more than 10 business days. Enhance the one-
stop permit process.
CDD 3/31/2022 10%
Staff is in process of implementating online permit application processing. To date the
following permits are available to be applied for online: Electric Panel Upgrade, Reroof,
Water Heater, Solar, Plumbing, Dumpster, Haul Route, Film Permit, Residential Parking,
Recreational Parking Del Cerro, Oversized Vehicle Parking.
25e Reassess the Study Session Admin 12/31/2021 0%Activity on this goal is pending further review of the City's study session policy.
26f 91% of RPV Employees say RPV is "a great place to work." Admin 11/30/2021 04/29/2022 25%
Survey was sent on September 30, 2020 with a deadline date of October 14. Staff is tallying
the results. Human Resources tallied the results and determined 79% of RPV employees
would say "it is a great place to work." Department Heads are assessing the results of the
employee results to identify areas to improve employee satisfaction. Human Resources
developed a new program that supports this goal called "HR on the Go." HR will meet with
department staff on a one-on-one basis to learn more about employees and thier
satisfaction working at RPV.
Last updated: 06/08/2021
10 of 10A-10
Appendix A
City Council Goals
Task Tracking Worksheet
Goal Category Department Task Description Status Update
Public Safety Admin Obtain written commitments from Public Safety for substation or fire house at the Civic Center Combined with Goal No. 31 of FY2021/22 Goals and Action Plan
Emergency Prepardness Admin Engage in a regional emergency preparedness plan and conduct an exercise with all four
Peninsula cities.
Day-to-day task
Emergency Prepardness Admin
Establish a pilot neighborhood emergency preparedness "block captain" program to serve as a
conduit between the EOC and neighborhood residents (particularly residents who are most
vulnerable during emergencies due to age, mobility challenges and cognitive limitations).
Day-to-day task
Infrastructure - Utilities PW
Design for the replacement and rehabilitation of storm sewer at PVDS at Peppertree Dr., and
Hawthorne Blvd. at Hawkhurst Dr. pursuant to the City's Storm Drain Deficiency Improvements
Program (SDDIP):
Day-to-day task: Referred to Goal #15 in 2019. The design for PVDS
at Peppertree is at 75% plans have been designed and will be going
out to bid in fall. The and the design for Hawthorne Blvd at
Hawkhurst is at 90%. Funding for construction will be requested
through the CIP process. plans are under design and will be
completed by December 2020
Infrastructure - Utilities PW Establish a Citywide Neighborhood Streetlight Installation Program and/or ordinance for
consideration by the City Council for neighborhoods who wish to install new street lights.
Referred to Goal #19 in 2019. On February 18, 2020, the City Council
directed Staff to proceed with an agreement with Harris and
Associates to develop a citywide street lighting policy. Staff is
preparing a scope of work for a consultant to develop the process
and parameters for a Neighborhood Streetlight Program -
Cruikshank stated to remove
Infrastructure - Utilities R&P Present to the City Council concepts for the remaining 12 acres of Lower Hesse Park as the
Phase II improvements
Pending inclusion in FY 20-21 CIP Not included in FY 20-21 CIP. To
be deferred to a fiscal year to be determined. Staff continues to
communicate regularly with Lower Hesse Park residents to discuss
their concerns and to identify ways to enhance maintenance and
aesthetics. Recommendation: Defer goal pending Council
direction and funding in the CIP.
Infrastructure - Roadways PW
Develop a Construction Coordination Plan working with neighboring Peninsula cities, as well as
Lomita, Los Angeles, and Torrance to identify measures to avoid concentrating street
construction projects in areas that will impact traffic flows. Present plan to City Council.
On July 8, the Public Works Director met with a representative from
Caltrans as part of their newly created Ambassador program to
assist the City in improving communication on roadway projects.
This will frame the Plan being developed with neighboring cities. On
December 16, 2020, staff hosted a Project Coordination Meeting
with representatives of utility companies and other Peninsula cities;
and discussed each agency's upcoming projects as well as strategies
to time projects to avoid concentrating traffic impacts. Meetings
will continue on a regular basis. A meeting between the CalTrans
Ambassador and Peninsula cities is tentatively being scheduled for
March 2021.
1 of 7 A-11
Appendix A
City Council Goals
Task Tracking Worksheet
Goal Category Department Task Description Status Update
City Land & Facilities - Ladera Linda FIN Present financing options for the construction and delivery of the Ladera Linda Community Park.
In March, City Staff held meetings with Kosmont Transaction
Services (KTS) and Associates that was temporarily paused due to
changes in the leadership team and to reassess the financial
impacts of the economic downturn. Staff met with KTS to discuss
funding options for the project on October 15. Staff has requested
additional information from KTS and is working with Blais and
Associates on identifying grant opportunities (i.e. Prop 68 grant
funds for outdoor improvements). Staff received a presentation
from Kosmont on January 29, and the options will be presented to
FAC on February 25. Staff anticipates having funding options for the
City Council's consideration by May 2021. Project is on schedule and
will be completed by 6/30/2021.
City Land & Facilities - Ladera Linda CDD Complete the CUP/CEQA planning entitlement processes.
Staff deemed the application complete for processing. At this time,
it has been determined that the project is categorical exempt
pursuant to CEQA. Public hearings on the planning entitlements
(CUP, etc.) occurred on January 23, 2021 and February 23, 2021.
Planning Commission approved entitlements on February 23. City
Council voted to appeal the Planning Commission approval at its
March 2 meeting. City Council appeal hearing to be held on April 6,
2021. City Council upheld PC approvals on April 6, 2021. This task is
complete.
City Land & Facilities R&P
Explore establishing a partnership, joint use, and/or lease agreement with the U.S. Coast Guard
for the Point Vicente Lighthouse property, buildings, and WW II Battery Barnes outpost owned
by Coast Guard, Facility-commonly referred to as Coast Guard bunker (located at the Civic
Center).
Staff has reached out to the Coast Guard to initiate dialogue about
the future use of these properties. Staff and several City Council
members took tours of Coast Guard properties with USCG
personnel in October 2020 and held informal discussions of
potential acquisition and partnership. The USCG expressed a strong
interest in developing a partnership with the City. Additional
meetings are being planned to begin brainstorming partnership
arrangements.
City Land & Facilities R&P Present the draft Trails Network Plan Update to the Planning Commission for its input and
recommendation.
Staff and the consultant will update the draft TNP based on public
input, including feedback from the two community workshops.
Dates that the TNP will be presented to Planning Commission will
be finalized, but anticipated to occur in September and October
2021, and the document will be released 3 weeks prior to meetings.
Combined goal
2 of 7 A-12
Appendix A
City Council Goals
Task Tracking Worksheet
Goal Category Department Task Description Status Update
City Land & Facilities R&P Present to the City Council alternative turf options (approximately 123,000 square feet) for
active recreation use at Upper Hesse Park.
Referred to Goal #23 in 2019.
Council direction needed to approve recommended alternative.
Project was originally going to be natural turf but Staff is currently
analyzing the financial, aesthetic and functional pros and cons of
different alternatives for this site. Originally included in the FY 20-
21 CIP, this project was deferred by the City Council to a fiscal year
to be determined Staff will continue to investigate alternatives for
future consideration. Recommendation: Discontinue goal
pending Council direction.
City Land & Facilities R&P
ABALONE COVE PARK IMPROVEMENTS PHASE II: Develop and present a design to Council for
improvements to the reminder of Abalone Cove Park, including additional landscaping,
irrigation, park amenities, and trail improvements
Project was not selected for FY 20-21 CIP. It has been put on hold
and will be re-evaluated next year. Recommendation: Discontinue
goal pending Council direction.
Quality of Life R&P Prepare appropriate code amendments for Accessory Dwelling Units for the Planning
Commission's review and the City Council's for consideration
The Planning Commission began reviewing draft language at its July
14 meeting and forwarded its recommendation to the City Council.
The City Council considered code amendments recommended by
the Planning Commission on September 1 and 15; and will consider
Planning Commission further recommendations to select code
language on November 17. First reading for Ordinance No. 640 was
introduced on December 15 and the second reading on January 19,
2021. The ordinance went into effect on February 18, 2021.
Quality of Life CCD
Stay informed on new State Housing Laws, bring new laws and issues to Planning Commission
and City Council's attention and amend codes and ordinances in the RPV way where appropriate
to meet the new laws. File an appeal of the 6th Regional Housing Needs Assessment (RHNA)
Not recommended as a goal for 2020 because this is part of daily
operations. On October 26, Staff filed an appeal of the 6th cycle
RHNA. Appeal hearing occured on January 13, 2021, and the City's
appeal was denied. are set to begin in January 2021. Staff presented
the City Council with housing legislation in August 2020. The City
created a Legislation Corner homepage on the website to track
current legislation. Additionally, Staff is working with the three
other Peninsula cities to on-board a lobbyist.
Quality of Life CCD
Assess the effectiveness of the County’s amended Barking Noise Program and bring report City
Council with recommendations for consideration to either continue with the County or develop
other alternatives.
Not recommended for 2020. Referred to Goal #28 in 2019.
Quality of Life - Housing CCD Conduct a housing "brainstorming" public workshop to identify creative solutions.
Staff is developing a plan to host a virtual workshop/forum on
housing. Staff anticipates completing this goal as part of the 2021-
2029 Housing Element Update. Staff issued Housing Element
Update Request for Proposals (RFP) in October 2020 to procure
professional services and a service agreement will be considered at
the March 2, 2021 CIty Council Meeting. At this meeting, the Council
will also consider establising a support committee. Deleted - This
task has to/will be done as part of the housing element update by
ESA (CC awarded contract on 3/2.
3 of 7 A-13
Appendix A
City Council Goals
Task Tracking Worksheet
Goal Category Department Task Description Status Update
Quality of Life - Housing CCD
Develop a Council approved program for identifying housing opportunities pursuant to RHNA,
including affordable housing, such as creating a Mixed-Use Zoning District, accessory dwelling
units, school district housing, and senior housing.
City awarded $160k SB 2 Grant for preparation of mixed-use
housing overlay zone; Staff to prepare RFP for project consultant
selection
City awarded $160k SB 2 Grant for preparation of mixed-use
housing overlay zone. Staff to issue RFP in late February 2021. The
City also submitted an additional LEAP grant application for funding
the CEQA process in the amount of $150k. Deleted - This task has
to/will be done as part of the housing element update by ESA (CC
awarded contract on 3/2.
Quality of Life - Enviornmental Sustainability CCD Adopt new development standards related to Electronic Vehicle (EV) charging stations.
Referred to Goal #32a in 2019.
Previously this goal included a second goal that was actually a PW
goal, Install charging stations in City-owned lots; Staff is in the
process of preparing new code language to present to the City's
Planning Commission. Goal to be completed by May 2021. Deleted -
goal will be completed this FY.
Quality of Life - Enviornmental Sustainability CCD Amend the Municipal Code to develop a robust Green Building Program.
Referred to Goal #32b in 2019; Staff continues to assess existing
Green Building Program to determine whether the Municipal Code
needs updating. Staff will be preparing a memorandum regarding
findings.
Goal to be completed by June 2021. Deleted - This task has to/will
be done as part of the housing element update by ESA (CC awarded
contract on 3/2.
Quality of Life - Enviornmental Sustainability CCD Amend the ERAP to include appropriate adaptation strategies and bring to City Council for
consideration
Referred to Goal #32 in 2019; Staff analyzed and selected a list of
potential strategies and provided them to the SBCCOG on July 10.
Goal to be completed by May 2021.Deleted - This task has to/will be
done as part of the housing element update by ESA (CC awarded
contract on 3/2.
Quality of Life - Enviornmental Sustainability CCD Partner with SBCCOG to Host an Energy Efficiency Fair
Referred to Goal #32b in 2019; Staff is reviewing options to host
virtual energy efficiency fair.
Do not carry over goal. Similar goal can be included in future years
when SBCCOG resumes in person events. Deleted - This task has
to/will be done as part of the housing element update by ESA (CC
awarded contract on 3/2.
Quality of Life - Enviornmental Sustainability CCD
ERAP: Support Energy Generation and Storage in the Community
o Amend the Zoning Code to integrate additional policies supporting renewable and
alternative energy sources in residential, commercial and institutional zoning districts by
utilizing EcoMotion consultant services, made available by the SolSmart grant application.
Referred to Goal #32c in 2019; Progress is limited based on limited
staffing, but a summer intern is assisting in identifying potential
code amendments. Do not carry over. Installation of renewable
energy system is covered by the building code and generally do not
pose zoning conflicts. Staff is preparing a memo memorializing
findings. Deleted - This task has to/will be done as part of the
housing element update by ESA (CC awarded contract on 3/2.
4 of 7 A-14
Appendix A
City Council Goals
Task Tracking Worksheet
Goal Category Department Task Description Status Update
Quality of Life - Western Avenue Admin Establish a "brand" for the Western Avenue Commercial Corridor
City Staff is in the early stages of developing a brand program for
Western Avenue that will bring together the traffic flow,
beautification, and economic redevelopment projects. Staff is
collecting information on potential marketing consultants.
Combined this goal with goal No. # 53. This goal supports
Citizen Involvement & Public Outreach CCD Provide and encourage e-filing of planning applications
Staff established "virtual counter hours" to assist the public that is
framing the e-filing program.
Complete. Staff established “virtual counter hours” to assist the
public in electronic project submittals. Currently all applications are
being accepted electronically.
Citizen Involvement & Public Outreach Admin Conduct a Citizen Satisfaction survey.
Referred to Goal #41 in 2019. Staff presented draft survey
questions and a distribution plan to the City Council on November
4, 2020, which were finalized on November 17, 2020. The survey
was distributed online and via mail in December 2020/January 2021
and results were presented to the City Council on February 16,
2021.
Citizen Involvement & Public Outreach Admin Create a Citizen Environmental Committee.Not recommended or necessary; Quarterly Public Forums for the
Palos Verdes Nature Preserve already provide this function
Citizen Involvement & Public Outreach Admin Form a joint commission with neighboring cities to address Peninsula-wide issues Not recommended or necessary; the Regional Law Enforcement
Committee already provides this function
Citizen Involvement & Public Outreach CCD Update the City’s Public Notice template Staff collected examples of notices from other jurisdictions - Alegria
and Dyda recommended to remove
Government Efficiency, Transparency and
Accountability FIN
Assess City Fees and Taxes, including the 2019 Cost of Services Study to identify, among other
things, opportunities to lower fees and taxes for consideration by the FAC and City Council.
(Merged with Goal #74)
Referred to Goal #38 in 2019. Study was finalized and staff reviewed
the results with FAC; at the 3/12 FAC meeting, staff reviewed in
greater detail selected fees and adjustment recommendations to
FAC. FAC requested additional research at the March 12 meeting.
Another meeting occurred on Sept. 17 to review the Cost Fee Study
with FAC. This item was also by the FAC in October 2020. FAC
approved two of the three recommendations from staff at the
September meeting. FAC approved 100% cost recovery for the
Community Development, except for View Restoration, and Public
Works fees. FAC also formed a subcommittee and met with the
Recreation and Parks Department to further understand the fees of
operation of the department. The subcommittee is to present
options/findings at a future FAC meeting. The 2019 Cost of Services
Study is tenatively schedule for the March 2nd City Council meeting.
The 2019 Cost of Services Study was recieved by the City Council on
March 2. The City Council provided Staff with direction to prepare a
proposed fees for consideration at a duly noticed meeting April 20,
2021. This goal is expected to be completed by June 30, 21 and is
not recommended to continue into FY 21-22.
5 of 7 A-15
Appendix A
City Council Goals
Task Tracking Worksheet
Goal Category Department Task Description Status Update
Government Efficiency, Transparency and
Accountability FIN Prepare a Pension Policy that provides a financial plan to address the City's outstanding Pension
Liability and CalPERS' continuous change in valuation methodology.
Referred to Goal #40 in 2019. Staff have been doing research and
working with GovInvest to consider all options for the Pension
Policy. However, due to the current fiscal climate, Staff waited for
the latest annual Actuarial Valuation Report (AVR) and investment
return from CalPERS to reassess the City's pension liability. The AVR
and investment return was released by CalPERS this summer. FAC
supported staff recommendations on a possible Pension guidelines
at the September meeting. FAC reviewed and provided feedback to
the draft Pension Guideline on October 29. Staff presented the draft
guideline to the City Council on January 19 and the guideline was
updated and approved by the City Council on February 2.
Government Efficiency, Transparency and
Accountability Admin Implement new Internet or app-based application to enable residents to reach city services
more quickly.
The mobile app vendor has been identified and funds budgeted for
FY 20/21. The implementation project started in July 2020. The
project team is currently finishing the initial core functionality
configuration and graphics used in the app. The mobile app called
"MyRPV" is now available on Apple and Andriod devices and it
offers a convinient way of submitting service requests and to access
relevant City information, from City Council meeting agendas and
videos, to information on how to get in touch with City
departments, visiting parks, trails, and more.
Government Efficiency, Transparency and
Accountability Admin
Implement eTRAKiT customer relationship software that allows customers to track service
requests and submit service requests and permit applications online with at least 20% of City
permits being issued online.
eTrakit portal has now 12 permits types and all Business License
types configured and ready to be tested internally. During testing,
some major programming issues were discovered. The IT
Department is currently working with the vendor on updating all
the TrakIt servers operating system and the TrakIt software version
to a newer release. All compatibility and integration issues are now
resolved and the eTrakit portal is currently open for selected
contractors, businesses and residents to conduct limited public
testing. This phase is expected to be completed in March 2021.
Government Efficiency, Transparency and
Accountability PW Require a project sign be installed for all City construction project describing, among other
things, the project and citing contact information.
A conceptual design was provided to Staff by Councilman Dyda. A
sign template has been developed and the first deployment was for
the Hawthorne Median Beautification Project.
Government Efficiency, Transparency and
Accountability - Intergovernmental Relations Admin Pursue annexation of the Eastview area into PVPUSD for voting
On March 4, 2020, the City Council received and filed a report form
the City Attorney’s Office regarding protocols for the possible
Eastview community detachment from Los Angeles Unified School
District (LAUSD) and attachment of this community to the Palos
Verdes Peninsula Unified School District (PVPUSD). The Council
directed no further action to be taken on this matter.
6 of 7 A-16
Appendix A
City Council Goals
Task Tracking Worksheet
Goal Category Department Task Description Status Update
Government Efficiency, Transparency and
Accountability Admin Lobby the California Public Utilities Commission to modify the requirements for Rule 20A
undergrounding funds to include high fire risk areas.
October 2019, the City brought a resolution to the League of
California Cities Annual Conference calling on the CPUC to expand
the Rule 20 program to include wildfire mitigation as an eligible
project. The resolution won the support of fire-prone cities across
the state and was referred to two of the League’s policy committees
so language revisions could be reconciled. Ultimately, the League’s
Board of Directors adopted our proposal as an official League policy.
The League is now advocating for this change to the CPUC, which is
in the process of revising the Rule 20 program, and wildfire
prevention criteria was included among proposed changes from
CPUC staff. In April 2020, the City advocated for including wildfire
prevention criteria in comments on the CPUC staff proposal. On July
21, 2020, the City Council supported legislation (SB 1312) that would
have implemented this change by requiring the CPUC to amend
Rule 20 to allow undergrounding in high fire threat areas for wildfire
mitigation, though the bill did not advance in the legislative session.
Following direction from the City Council, on September 16, 2020,
Staff sent a letter to SB 1312 author Senator Mike McGuire offering
the City's support for continued efforts to make this change. Staff
continues to monitor the CPUC's ongoing rulemaking process. Staff
is monitoring current legislation that supports undergrounding.
Moved from Government Efficiency & Transparency -
Intergovernmental Relations Goal No. 81 and to moved to
Infrastracture - Electric Utilities and combined with 6a as it
supports the effort of advancing undergrounding projects.
7 of 7 A-17