CC SR 20210119 I - NOC's for Residential Street Rehabilitation Areas 3 and 4 CITY COUNCIL MEETING DATE: 01/19/2021 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA TITLE: Consideration and possible action to file a Notice of Completion for the Residential Street Rehabilitation Project Phase I and Phase II, Areas 3 and 4 PCC Improvements and AC Repairs Project, Project Code #8834. RECOMMENDED COUNCIL ACTION: (1) Accept the project as complete; (2) Authorize the City Clerk to file Notices of Completion for the project with the Los Angeles County Registrar-Recorder’s Office; and if no claims are filed within 35 days after recordation, send a notice to the surety company to exonerate the Performance Bond; and, (3) Authorize the Deputy Director of Public Works to release the 5% construction retention to Hardy & Harper, Inc., a California corporation, 35 days after recordation of the Notice of Completion by the Los Angeles County Registrar- Recorder’s Office, contingent upon no claims being filed on the project, and the contractor posting an acceptable warranty bond with the City. (4) Authorize the Deputy Director of Public Works to release the 5% construction retention to American Asphalt South, Inc., a California corporation, 35 days after recordation of the Notice of Completion by the Los Angeles County Registrar- Recorder’s Office, contingent upon no claims being filed on the project, and the contractor posting an acceptable warranty bond with the City. FISCAL IMPACT: The total budget is $3,717,303.40, which includes the construction budget of $2,780,435. The final construction cost of $2,778,998 was within the authorized construction budget. Amount Budgeted: $3,717,303.40.00 Additional Appropriation: N/A Account Number(s): 330-400-8834-8005 - $499,309.40 (CIP - Residential Street Rehab – Area 3&4/Engineering Design) 330-400-8834-8805- $3,058,479 (CIP – Residential Street Rehab – Area 3&4/Improvements) 330-400-8834-8001 - $109,240 (CIP – Residential Street Rehab – Area 3&4/Prof/Tech Services) 330-400-8834-8006 - $50,275 (CIP – Residential Street Rehab – Area 3&4/Inspection) ORIGINATED BY: Charles Eder, PE, Senior Engineer REVIEWED BY: Ramzi Awwad, Deputy Director of Public Works APPROVED BY: Ara Mihranian, AICP, City Manager 1 ATTACHED SUPPORTING DOCUMENTS: A. Notice of Completion (page A-1) B. Notice of Completion (page B-1) C. Map of Areas 3 and 4 (page C-1) BACKGROUND AND DISCUSSION: The City has completed construction of the Residential Street Rehabilitation Project Phase I, Areas 3 and 4 PCC Improvements and AC Repairs Project, Project Code #8834. The construction work consisted of primarily street repaving, with some replacement of sidewalk, curb ramps, driveway aprons, curb and gutter, and some asphalt repairs. A portion of the project is within the City of Rolling Hills Estates (RHE). The City entered into a Memorandum of Understanding (MOU) with RHE to complete this area of the work. The MOU stated that RHE will pay for construction, inspection, construction management, and community outreach services associated with work in RHE. Construction activities were completed in June 2020. The final construction for Phase II consisted of placing slurry seal and new pavement markings. Construction activities were completed in July 2020. The contract includes a 12-month warranty period requiring the contractor to remedy any defective work. The project area will be monitored for the duration of the warranty period. A complete list of the Residential Street Rehabilitation project budget is as follows: 8834 - City of Rancho Palos Verdes Project Cost Summary Budget Actual Balance Notes Project Budget - Rancho Palos Verdes 3,717,303.40 - - 8005 Engineering Design 499,309.40 353,104.40 146,205.00 Balance of $146,205 required for Project's road monumentation work 8001 Professional/Technical Services 109,240.00 108,713.50 526.50 8006 Inspection 50,275.00 50,887.50 (612.50) 8805 Residential Street Improvements (Phase1)1,652,000.00 1,652,000.00 - 8805 Contingency (Phase1)165,200.00 - 165,200.00 8805 Residential Street Improvements (Phase 2)1,128,435.00 1,126,998.00 1,437.00 8805 Contingency (Phase 2)112,844.00 - 112,844.00 Subtotal 3,217,994.00 2,938,599.00 279,395.00 -$ 3,291,703.40$ 425,600.00$ Description Project Budget City of Rancho Palos Verdes Phase 1 & 2 Project Total City of Rancho Palos Verdes 2 CONCLUSION: The construction contractors, Hardy & Harper, Inc. and American Asphalt South, Inc., have successfully completed all work in accordance with the specifications and construction contract. Therefore, the work should be accepted as complete and a Notice of Completion filed. ALTERNATIVES: In addition to the Staff recommendations, the following alternative action is available for the City Council’s consideration: 1. Take other action, as deemed appropriate. Budget Actual Balance Notes Project Budget - Rolling Hills Estates 199,181.00 - - 8001 Professional/Technical Services 2,500.00 2,500.00 - 8006 Inspection 4,775.00 4,775.00 - 8805 Residential Street Improvements (Phase 1)174,460.00 174,460.00 - 8805 Contingency (Phase1)17,446.00 - 17,446.00 To be returned to the City of Rolling Hills Estates Subtotal 199,181.00 181,735.00 17,446.00 -$ 181,735.00$ 17,446.00$ Project Total City of Rolling Hills Estates City of Rolling Hills Estates Phase 1 Description Project Budget 8834 - City of Rolling Hills Estates 3 Revised 05/2019  To be recorded with County Recorder within 15 days after completion. No recording fee. RECORDING REQUESTED BY: City of Rancho Palos Verdes Attn: City Clerk 30940 Hawthorne Blvd Rancho Palos Verdes, CA 90275 AND WHEN RECORDED MAIL TO: Same as above THIS SPACE FOR RECORDERS USE ONLY NOTICE OF COMPLETION (CA Civil Code 9204- Public Works) Notice is hereby given by the undersigned owner, a public entity of the State of California, that a public work of improvement has been completed, as follows: Project title or description of work: Date of completion: Nature of owner: Interest or estate of owner: Address of owner: Name of contractor: Address of contractor: Street address or legal description of site: Dated: ___________________________ Owner: City of Rancho Palos Verdes (Name of Public Entity) By: Title: ____________________________ Ara Mihranian, City Manager State of California ) County of Los Angeles ) ss City of Rancho Palos Verdes ) I am the City Clerk of the City of Rancho Palos Verdes, the public entity which executed the foregoing notice and on whose behalf I make this verification; I have read said notice, know its contents, and the same is true. I certify under penalty of perjury that the foregoing is true and correct. Executed at Rancho Palos Verdes , California on (Date) By: Title: Emily Colborn, City Clerk A-1 Revised 05/2019  To be recorded with County Recorder within 15 days after completion. No recording fee. RECORDING REQUESTED BY: City of Rancho Palos Verdes Attn: City Clerk 30940 Hawthorne Blvd Rancho Palos Verdes, CA 90275 AND WHEN RECORDED MAIL TO: Same as above THIS SPACE FOR RECORDERS USE ONLY NOTICE OF COMPLETION (CA Civil Code 9204- Public Works) Notice is hereby given by the undersigned owner, a public entity of the State of California, that a public work of improvement has been completed, as follows: Project title or description of work: Date of completion: Nature of owner: Interest or estate of owner: Address of owner: Name of contractor: Address of contractor: Street address or legal description of site: Dated: ___________________________ Owner: City of Rancho Palos Verdes (Name of Public Entity) By: Title: ____________________________ Ara Mihranian, City Manager State of California ) County of Los Angeles ) ss City of Rancho Palos Verdes ) I am the City Clerk of the City of Rancho Palos Verdes, the public entity which executed the foregoing notice and on whose behalf I make this verification; I have read said notice, know its contents, and the same is true. I certify under penalty of perjury that the foregoing is true and correct. Executed at Rancho Palos Verdes , California on (Date) By: Title: Emily Colborn, City Clerk B-1 ROAD DISTRICT NO. 3: PENINSULA CENTER Beechgate Dr Blackhorse Rd Browndeer Ln Deepbrook Dr Delacroix Rd Diamond Head Ln Elkridge Dr Elmbridge Dr Falcon Rock PI Fawnskin Dr Flaming Arrow Dr Golden Arrow Dr Hales Corner Rd Hawkhurst Dr Hawthorne Blvd Honey Creek Rd Larchbluff Dr Littlewood Dr Lone Valley Dr Longhill Dr Nokomis Rd Oaklon Dr Oconto Av Rockhurst Ln Rockvalley Rd Seashell Way Silver Arrow Dr Silver Moon Ln Silver Spur Rd Sunny Point PI Warrior Dr C-1 ROAD DISTRICT NO. 4: CREST ROAD Amber Sky Dr Anacapa Beachside Dr Burrell Ln Canal Coveview Dr Crenshaw Blvd Crest Rd Crestridge Rd Crestwind Dr Highridge Rd Meadowdale Ln Mela Ln Middlecrest Rd Mistridge Dr Moonmist Dr Mora Bay Dr Newstar Dr Northbay Rd Ocean Terrace Dr Oceanaire Dr Oceanport Rd Oceanridge Dr Pacifica Dr Park PI Pinecastle Dr Quailwood Dr Robinview Ln San Clemente Dr Santa Barbara Dr Santa Catalina Dr Scotwood Dr Sea Ridge Circle Seacrest Dr Seaside Heights Dr Stonecrest Rd Sunmist Dr Valley View Rd Whitecliff Dr Whitley Collins Dr C-2