CC SR 20200212 01 - City Council 2020 Goals
CITY COUNCIL MEETING DATE: 02/12/2020
AGENDA REPORT AGENDA HEADING: Regular Business
AGENDA DESCRIPTION:
2020 City Council Goal-Setting Workshop
RECOMMENDED COUNCIL ACTION:
(1) Review the status of the City Council’s 2019 goals, including input from Staff and
the City’s advisory boards;
(2) Discuss and provide direction to Staff to formulate a list of City Council goals for
2020; and,
(3) Continue this matter to the regular City Council meeting of March 4, 2020, for
approval of the final list of City Council goals for 2020.
FISCAL IMPACT: There is no direct fiscal impact associated with conducting this
goal-setting workshop. However, the final list of 2020 City Council goals may include
items that will require future allocations in the FY20-21 budget and beyond.
Amount Budgeted: N/A
Additional Appropriation: N/A
Account Number(s): N/A
ORIGINATED BY: Kit Fox, AICP, Interim Deputy City Manager
REVIEWED BY: Same as above
APPROVED BY: Ara Mihranian, AICP, Interim City Manager
ATTACHED SUPPORTING DOCUMENTS:
A. List of 2019 City Council Goals (page A-1)
B. Draft 2020 City Council Goals Worksheet (page B-1)
BACKGROUND AND DISCUSSION:
2019 Goals Review
The 2019 City Council goals (Attachment A) include fifty-five (55) line items grouped
under the following six (6) general goal categories:
Public Safety: Maintain a high level of public safety with public engagement.
1
Infrastructure: Assess, prioritize and plan for the maintenance and improvement
of all public infrastructure (including transportation systems, parking, utilities,
storm drains, and sewers).
City Land and Facilities: Assess, prioritize and plan for the maintenance and
improvement of all City-owned properties.
Quality of Life: Maintain and improve the quality of life for RPV residents.
Citizen Involvement and Public Outreach: Engage residents and community
partners in assisting the City Council, City Committees/Commissions and City
Staff facilitate the decision-making process.
Government Efficiency and Transparency: Ensure the City is maximizing the
use of each tax dollar and optimizing service delivery to RPV residents.
Eighteen (18) of the fifty-five (55) line items were completed by the end of 2019
(highlighted in yellow in the attached table) including but not limited to:
Item 1: Reduce residential burglaries by 20% annually
Item 18: Acquire and retrofit Southern California Edison streetlights
Item 20: Resolve civic center land use restrictions with National Park Service
Item 22a: Approve the Ladera Linda Community Center schematic design
Item 27: Revise the Special Event Permit Ordinance
Item 30: Receive updates on the Coyote Management Plan
Item 31: Update the Wireless Telecommunications Facilities Ordinance
Item 34: Create Advisory Board Work Plans
Item 37: Present transient occupancy tax (TOT) trends and opportunities to
Finance Advisory Committee (FAC)
Item 45: Consider a charter city proposal
Item 46: Adopt the NCCP/HCP
Item 47: Adopt Zone 2 code amendment for non-Monks lots
The comments section of the 2019 goals table includes explanations of the reasons why
the remaining line items were at various states of completion by the end of 2019.
2020 City Council Goals
Staff recommends starting the 2020 goal-setting exercise with a “blank slate.” As a
starting point, however, the City Council may wish to retain or augment (adding,
deleting, or amending) the following six (6) general goal categories:
Public Safety
Infrastructure
City Land and Facilities
Quality of Life
Citizen Involvement and Public Outreach
Government Efficiency and Transparency
2
The City Council may then consider which, if any, 2019 goals to carry over into 2020,
followed by a discussion of new goals to include in 2020. At recent meetings of the
City’s advisory boards, members were asked to review the City Council’s 2019 goals
and to provide suggestions for goals to be continued and/or added in 2020. The ir
suggestions, as well as some Staff-initiated suggestions, are summarized in the draft
2020 goals table (Attachment B), and also summarized below to facilitate the workshop
discussion:
Civic Center Advisory Committee:
Land-use swapping agreement with DOJ and FEMA
Emergency Preparedness Committee:
Enhanced Emergency Communication
Emergency Evacuation Plan
Wildfire Hardening
Public Safety Power Shutoff
CalFire Risk Assessment and Insurance Rates
Finance Advisory Committee:
Lobby Public Utility Commission to modify the requirements for Rule 20A to
include high fire risk areas
Present TOT rate options to City Council
Prepare a pension policy
Infrastructure Management Advisory Committee:
Emergency Sanitation Plan for Palos Verdes Drive South/Landslide Area
Enhanced Traffic Flow along Western Avenue during construction
Planning Commission:
Establish a new Public Safety Committee/Commission related to Fire and
Police services
Develop Public Sewer Program
Develop Palos Verdes Nature Preserve Master Plan
Housing State Laws and 6th Regional Housing Needs Assessment (RHNA)
Consider a Mixed-Use Zoning District
Support Accessory Dwelling Units
Update the Sign and Wireless (private property) Facilities Ordinance
Update the City’s Public Notice template
Encourage e-filing of planning applications
Form a joint commission with neighboring cities to address Peninsula-wide
issues
Traffic Safety Committee:
Citywide Speed Mitigation Plan
3
Staff Suggestions:
Modernize the City’s entry monument signs
Create a City Master Sign Plan
Explore a partnership with the Coast Guard for use of the Point Vicente
Lighthouse property and buildings
Develop a brand for Western Avenue
Establish a neighborhood emergency preparedness captain program
Complete the Trails Network Plan Update
Establish an arterial street beautification program
ADDITIONAL INFORMATION:
Staff recommends accepting public comments from workshop attendees regarding both
the 2019 and 2020 goals. This may include comments from individual members of the
City’s advisory boards and other interested parties.
The goal-setting workshop will be held at Point Vicente Interpretive Center at 6:00 PM
on Wednesday, February 12, 2020. A public announcement of the workshop was issued
to “Breaking News” listserv subscribers, posted on the City’s social media platforms,
and featured on the City’s website.
CONCLUSION:
In conclusion, Staff seeks direction for the City Council to develop a final list of 2020
City Council goals. Staff intends to compile and present this final list to the City Council
for its approval at the regular meeting of March 4, 2020.
4
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
1 Reduce residential burglaries by 20% (below 90 annually).CM 12/31/2019 12/31/2019 100%This goal was met.No The first two quarters of 2019 showed 23 residential burglaries in
Quarter 1, and 13 in Quarter 2, for a total of 36 residential burglaries
the first half of calendar year 2019. In the second half of the year,
there were 21 burglaries in Quarter 3 and 27 burglaries in Quarter 4,
for a total of 84 in calendar yaer 2019. As such, we met this goal.
2 Implement revised Public Safety Strategic Plan remaining elements.CM 9/30/2019 6/30/2020 75%Revised Public Safety Strategic Plan adopted in April
2016. Remaining items include: ALPR along Western (in
progress), Predictive Policing software being worked on
by LASD; Sheriff Substation at Civic Center; Pilot
Neighborhood Watch in Multi-Family Neighborhoods;
Pilot Program with Ring App (in progress)
No 6/18/19 - Sheriff Substation has been included as an element in the
Civic Center program; Social media, booth and WOAD, and contest to
promote Ring App. See #5 and #6 for updates on ALPR along Western.
8/14/19 - On August 20, 2019, Staff and the Sheriff will update the
Council on the status of the remaining element in the Public Safety
Strategic Plan, along with recommendations and new enhancements
that we are reviewing.
11/13/19 - The plan has been updated and revised to include more
elements, including looking at Flock ALPR cameras.
3 Develop a plan with CHOA, Neighborhood Watch, and other organizations to
promote neighborhood safety.
CM 9/30/2019 12/31/2020 10%Lack of consist staffing and resource support since the
retirement of the previous emergency services
coordinator in December 2018 has delayed
implementation of this item. Staff expects a new
emergency services coordinator to be on board in Q1
of 2020, which will allow Staff to move forward with
this initiative.
No 8/14/19 - A Regional Emergency Preparedness Committee, comprised
of members from RH, RHE, and RPV, met on 8/8/19 and were updated
on regional emergency preparedness efforts. Plans are still in place to
participate in joint exercises. RPV is currently recruiting for an
Emergency Preparedness Analyst to train and lead the cities in those
exercises.
11/13/19 - In process of recruiting for the Public Safety Analyst
position and expect to fill the position in November, at which point
this person will start to working on these plans.
12/10/19 - Public Safety Analyst position has been filled and this
person is tentatively scheuled to begin in January.
4 Engage in a regional emergency preparedness plan and exercise with all four
Peninsula cities.
CM 11/30/2019 12/31/2020 10%Lack of consist staffing and resource support since the
retirement of the previous emergency services
coordinator in December 2018 has delayed
implementation of this item. Staff expects a new
emergency services coordinator to be on board in Q1
of 2020.
No 6/18/19 - A Peninsula Emergency Preparedness Committee, similar to
Regional Law, was approved at the June 4th meeting. Rolling Hills and
Rolling Hills Estates will partially fund the City's Emergency
Preparedness Analyst to help their staff and elected officials prepare,
and will participate in joint exercises and coordination. PVE has also
expressed interest. It is recommened to roll-over this goal for 2020.
5 Install and commission Phase 1 of Western Ave. ALPR camera project.CM 9/30/2019 6/30/2020 50%No Poles in bid specifications are currently backordered, but foundations
are being poured and the poles are scheduled to arrive by March
2020.
6 Install and commission Phase 2 of Western Ave. ALPR camera project.CM 12/31/2019 6/30/2020 25%No SCE streetlights were acquired June 3. City Council approved the
purchase of cameras at its 12/3/19 meeting however Vigilant was
acquired by Motorola who is requesting amendments to the purchase
agreement for Council consideration in early 2020. Staff is working on
bid package for installation.
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
Last updated: 2/6/2020
A-1
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
7 Arterial Fence and Wall Draft Master Plan: To create a draft master plan
retaining neighborhood identity that describes the type (material and height) of
fence or wall, if any, placed along major arterial streets in the City.
CDD 12/31/2019 10%Potentially include collector streets in the future.No 6/18/19 - On February 1st, a RFP was issued to several local design
firms but no proposals were received by the March 4th submittal
deadline. In light of this, on March 11th, another RFP was issued to
local planning consulting firms but no proposals were received by the
April 10th deadline. Staff is currently working with NV5 design firm to
develop a proposal for the Council's consideration.
8/13/19 - Staff sent a RFP to NV5 Design firm and received a proposal
in the amount of approximately $120,000.
9/11/19 - Due to the NV5 Design proposal amount, Staff is seeking
another cost proposal with a specific scope of work from the design
firm Ardurra (Bob Merriell) before considering completing the Master
Plan in-house.
11/13/19 - The City received a proposal from Ardurra in the amount of
approximately $25,000. Staff is reviewing the scope of work. 1/28/20-
Planning Commission-recommended carry-over goal with further
refinement which includes working to find a way to reduce cost of
Master Plan and present to the plan to the City Council in 2020.
8 ABALONE COVE SEWER: AB Cove Sewer – Prepare new financial plan that
reduces City subsidy by at least 50% for City Council consideration.
FIN/PW 12/31/2019 40%Staff has estimated long-range costs for maintenance,
operations, and capital costs of the system. The 18-year
historical costs have provided a good baseline for
future costs. Additionally, staff has identified capital
improvements that will be likely be needed in the next
5-10 years, due to the wear and tear on the pipes,
grinder pumps, and lift stations. Staff will continue to
work with the Abalone Cove residents to address the
future Sewer Rates in order to reduce the City subsidy.
Yes Staff met with stakeholders and Portuguese Community Association
Board Members to discuss the current fee structure codified in
Chapter 13.06 of the RPVMC. At these meetings, discussion ensued on
funding options to reduce the City subsidy. This goal is recommended
to roll-over for 2020.
9 LANDSLIDE - SEWER AND STORM DRAIN IN ROLLING HILLS: Develop a program
with Rolling Hills to intercept sanitary sewer discharge and control storm water
runoff from direct infiltration into the ground in an effort to reduce ground
movement within the landslide area of the City.
PW 12/31/2019 35%Working on available option associated with installing a
sanitary sewer collection system to be installed by the
City of Rolling Hills for the area within the City of
Rolling Hills and an estimated cost of a system by which
the influent can be transferred to the RPV sewer
system.
No Staff is working with NV5 Consulting Firm for a feasibility study
regarding and underground sanitary sewer collection system to be
installed in the City of Rolling Hills. On 12/10/19, the feasibility study
agreement was executed and teh study is scheduled to be completed
by March 2020.
10 LANDSLIDE FEASIBILITY STUDY - CONSTRUCTION IMPLEMENTATION: Have
construction implementation plan ready for City Council consideration, break
ground on phased plan if approved.
PW 12/31/2019 12/17/2019 100%A public outreach meeting was held on May 29, 2019,
valuable input was provided to the consulting firm; An
additional meeting was held with two activist from the
neighborhood to share their knowledge with the design
team on June 11, 2019; working with coastal
commission regarding this project and constuction of a
potential box culvert which would drain local drainage
through PVDS into the ocean. Second outreach
meeting is scheduled for Oct. 7, 2019.
No On December 17, 2019, the City Council approved a phased design
plan and directed staff to begin the environmental review process for
consideration by the City Council at a futiure meeting.
INFRASTRUCTURE
Goal: Assess, prioritize & plan for the maintenance and improvement of all public infrastructure (including transportation systems, parking, utilities, storm drains, and sewers).
Last updated: 2/6/2020
A-2
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
11 MAINTENANCE SCHEDULE AND PLAN FOR ALL ASSETS: Create detailed
inventory of public infrastructure and assets, along with appropriate
maintenance schedule, and annually provide adequate funding for Operations
and Maintenance.
PW 6/30/2019 65%This maintenance schedule and plan for all
maintenance of all City owned assets has been
prepared and implemented.
Yes A preventive maintenance program has been developed and been
implemented as of June 1, 2019. As of December 31, 2019, Staff is in
the process of developing a complete list of City assets and
maintenance program. Further, Staff is evaluating to utilize
"Cityworks" modular for this function.
This is an IMAC recommended goal to the City Council for 2020.
12 UNDERGROUNDING UTILITIES: Create list of fires caused by facilities belonging
to SCE and/or its contractors. Along with estimated damage costs to present to
SCE. Establish a program for maintenance /undergrounding its utilities that can
cause a serious threat to safety.
PW 6/30/2019 6/2/2019 100%Staff worked with SCE to underground the overhead
utilities along PVDS from La Rotonda to the city limits;
and Crenshaw Blvd. from Crest Rd. to Valley View Rd..
These two projects will be advertised by SCE in late
summer of 2019 and are scheduled to be completed by
the end of 2019. Also, worked very closely with SCE to
implement an aggressive vegetation maintenance
program as well as performing significant repairs and
upgrades to their facilities. SCE has implented these
plans and the work is on-going. Staff tried to purchase
funding from other cities to do more undergrounding
to no avail. However, these efforts will continue.
Yes 6/18/19 - A list of fire events for the last ten years has been prepared.
Staff is working with SCE to underground the overhead utilities in two
areas.
7/9/19 - SCE is in the process of implementing their aggressive plan of
action for vegetation management and the necessary
repairs/upgrades of their facilities in RPV to reduce the risk of wildfire.
12/30/19 - SCE is revising the plans per coordination with Cox. Projects
are shceduled to start by early Summer 2020 and will be completed by
end of Summer 2020.
13 Identify neighborhoods willing to relocate utilities underground, and schedule
with Southern California Edison.
PW 6/30/2019 6/18/2019 100%Staff participated in a PUC (Public Utilities Commission)
hearing so that SCE policy can be revised to allow SCE
to underground overhead utilities in residential
neighborhoods at no cost to the residents. Currently,
the residents have to pay for the cost of
undergrounding in residential neighborhoods at a rate
of $40,000 to $60,000 per property.
No Staff has publicized this program, but no neighborhood has shown any
interest at this time. Staff will continue to work with residents
regarding this program.
14 Identify cities to purchase Rule 20A funds from and, with City Council approval,
execute agreements for undergrounding utilities.
FIN/PW 12/31/2019 8/13/2019 100%Staff sent out inquiries to see what cities were
interested in the exchange. As of August 2019, no city
was interested in exchanging the funds/credits. Mayor
is working with the California League of Cities to revise
the legislature which would allow the Public Utilities
Commission to revise the criteria for use of the 20A
funds for undergrounding utilities to include wild fire
prevention as a criteria.
This is an IMAC recommended goal to the City Council.
Yes At this time, there are no cities interested in exchanging Rule 20A
credits. Staff will continue to check with cities in 2020.
15 Storm Drain Deficiency Improvements Program (SDDIP) - Design for the
replacement or rehabilitation of existing underground storm drain system
(lateral pipes, main storm sewer pipes and box culverts) and drainage inlets,
catch basins and manholes which were identified in the 2015 Master Plan of
Drainage.
PW 12/31/2019 75%The 2015 Master Plan of Drainage identified, needed
improvements of existing underground storm drain
system. Staff identifies these needed improvements as
part of the CIP program based on priority of needed
improvements. This is an on-going effort till such time
that all identified improvements are performed.
The engineering designs for the drainage improvements at
Marguerite/Lower Barkentine/ Seacove and 6309 Via Colinita/Sacred
Cove are complete and utility coordination is underway. The
construction fo these improvements is scheduled to start in fall 2019.
The engineering design for the drainage improvements at PVDS and
Peppertree/Hawthorne and Hawkhurst is underway. The construction
is scheduled for early next year.
16 HAWTHORNE - GREEN ASPHALT: Beautify Hawthorne Boulevard by removing
the existing green asphalt and installing aesthetic/landscaping.
PW 12/31/2019 12/31/2019 50%A powerpoint presentation regaring this item was
agendized and was presented to the City Council. The
City Council preferred the third option.
Yes On August 20, 2019, the City Council approved a final design, and
subsequently this project was advertised for construction.
Construction award of this project is on the March 17, 2020 City
Council agenda with work commencing soon after.
Last updated: 2/6/2020
A-3
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
17 TRAFFIC IMPROVEMENTS ON WESTERN AVENUE: Establish action plan that
would reduce delay and enhance traffic circulation.
PW 12/31/2019 25%Coordination with the City of Los Angeles and CalTrans
is underway to speed up the establishment of this
action plan. These are on-going efforts.
No 7/9/19 - The engineering efforts are on-going by Willdan which is the
City's consulting firm on this project.
10/8/19 - Coordination underway with Caltrans, City of L.A. and City of
Lomita.
12/10/19 - Staff held several meetings with City of L.A., COG, and
Caltrans staff; the needed info is being compiled to be sent to
Caltrans.
18 STREET LIGHTS: SCE Streetlight Acquisition and Conversion. Change out the
existing street lights to LED’s and install a smart light system.
PW 12/31/2019 12/10/2019 100%The street light acquisition was finalized on June 3,
2019.
Yes Street light acquisition was finalized and Siemens switched the 1,764
lights to LED. SCE will initiate switching the 542 streetlights that they
own (and that the City could not purchase) starting 11/6/2019 and
finish by end of November. All street light luminaires have been
switched to LED.
19 Neighborhood Streetlight Installation: Establish funding mechanism and
program for consideration by the City Council for neighborhoods who wish to
install street lights for safety purposes.
FIN/PW 12/31/2019 50%Staff will report implementation options to City Council
on 2/18/20 for consideration. Once City Council adopts
one of the recommended options, staff will establish a
funding mechanism for City Council consideration. FAC
would like to consider adding language that prohibits
City subsidies for this program.
Yes 11/13/19 - Agendized for 12/17/2019 City Council meeting.
12/10/19 - This item is on the 1/21/19 City Council agenda.
12/30/19 - This item is on the 2/18/20 City Council agenda.
20 CIVIC CENTER: Resolve land use issue with NPS.CM 4/30/2019 9/9/2019 100%No Received approval from both DOJ and FEMA to change public benefit
conveyance from NPS, enabling the City to build public safety facilities
on the area previously under NPS conservation easements.
20a CIVIC CENTER: Develop and present draft Civic Center Master Plan and financing
options to the City Council for consideration.
FIN/CM 12/31/2019 12/30/2020 TBD Intermediate goal of having Program Document Goal
finalized on Committee level and approved by City
Council took longer than originally anticipated. Once
the Civic Center Advisory Committee has been
assembled, they will d‐hoc committee to be formed to
recommend a conceptual design to city council;
conceptual design follows, after we get a preliminary
estimate based on the conceptual drawing, our
Financial Advisory Consultant Kosmont can move
forward with looking for funding options.
Yes 6/18/19 - CCAC developing recommended program for Council
approval. 9/10/19 - Civic Center: Develop and present draft Civic
Center Master Plan and financing options to the City Council for
consideration.
8/14/19 - (CM) CCAC is scheduled to present the program to the
Council in September.
9/10/19 – Presentation of Civic Center program by CCAC, Gensler, and
staff scheduled for 10/15/19. 10/15/19 Civic Center
Program Document Approved by City Council Council Council
directed Staff to authorize a Civic Center environmental impact report
and develop a Request for Proposal for master plan design services
and construction drawings
11/13/19 - (Finance) At 10/15/19 Meeting, City Council approved
consultants Kosmont Group to evaluate financing options.
21 CIVIC CENTER: Develop plans for new EOC with possible Peninsula-wide
partnership.
CM 12/1/2019 12/30/2020 10%No 10/15/2020 EOC is part tof the program document approved by City
Council.
22 LADERA LINDA PARK: With Council approval, break ground on new Ladera Linda
Park and Community Center.
R&P 2/28/2020 12/31/2020 50%No Timeline for this project has been extended due to a number of
factors including a longer-than expected public outeach process,
unanticipated delays in obtaining geologic surveys, and the additiion a
Conditional Use Permit review process and an environmental review
(CEQA) process before construction documents can be finalized.
CITY LAND AND FACILITIES
Goal: Assess, prioritize and plan for the maintenance and improvement of all City-owned properties.
Last updated: 2/6/2020
A-4
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
22a LL: Refined schematic design prepared by Consultant for City Council
consideration.
R&P 6/30/2019 8/20/2019 8/20/2019 100%No Goal Complete: Master plan design approved by City Council on
August 20, 2019. Park and overall building design approved. Goal
Complete although design changes may be needed dependent on the
outcome of the CUP/CEQA processes.
22b LL: Construction-ready documents prepared by Consultant for City Council
consideration.
R&P 11/30/2019 9/15/2020 50%Completion date extended to allow for completion of
CUP/CEQA processes before construction documents
are prepared. Development design documents being
reviewed.
No 9/10/19 - Consultant directed by Council on August 20, 2019 to
proceed with developing construction ready documents.
10/8/19 - Discussion and approval of Community Center roof type to
be reviewed by City Council on October 15th meeting.
11/13/19 - Council directed Staff to begin an RFP process to solicit
solar roof proposals. Staff has held multiple meetings with contractor.
12/11/19 - Contract amendment extending Johnson Favaro contact
and adding funds for CUP/CEQA process going to City Council for
consideration on December 17, 2019. Revised date: June 15, 2020
22c LL: Bid process for construction firm completed and contract ready for City
Council consideration.
R&P 1/15/2020 12/15/2020 Goal pending completion of 22.B goal:completion of
construction ready documents.
Yes
23 Upper Hesse Turf Project: Redesign and install a new natural turf area
(approximately 123,000 square feet) for active recreation use at Upper Hesse.
R&P 7/1/2019 TBD Based on
CC Direction
Goal Pending. The project was placed on hold during
2019, first due to the original contractor being removed
from the project due to concerns about the project’s
rising costs. Alternatives for addressing this project
continue to be explored. Project not completed in
2019 due to ongoing discussions regarding the most
efficacious course of action. Staff is currently analyzing
the financial, aesthetic, and functional pros and cons of
proceeding with either natural or artificial turf. Target
date TBD based on Council direction.
Yes 6/18/19 - Project currently on hold.
9/10/19 - Plans and specifications being revised and updated with
expectation of project completion by late spring 2020. Completion
date TBD.
24 Lower Hesse Park Improvements Phase II: Present concepts for the remaining 12
acres of Lower Hesse to the City Council.
R&P N/A N/A N/A N/A Project was removed from 19-20 budget, but is being
considered for inclusion as a future CIP project.
Yes 6/18/19 - Project removed from FY 19-20 budget. No completion
date.
10/8/19 - Shade structures are scheduled to be installed summer
2019.
11/13/19 - Shade structures scheduled to be installed in fall 2019.
25 Present comprehensive preserve parking plan that addresses positive and
negative impacts to the Preserve and surrounding communities.
R&P 9/30/2019 9/30/2019 100%The comprehensive Preserve Parking plan was
presented to Council. Multiple parking and access
projects were were implemented following that
meeting, particularly in the Ladera Linda and Del Cerro
neighborhoods. Other projects are currently in process
for 2020 including the installation of gates at Burma
and Rattlesnake. The plan continues to be a guide for
future projects related to Preserve parking and access.
Yes Various improvements made to Del Cerro and Forrestal Preserve
parking and access.
26 TRAILS NETWORK PLAN UPDATE: Present a comprehensive update to the City’s
Trails Network Plan that is relevant and user-friendly by providing improved trail
descriptions with graphics and detailed maps that illustrate trail routes and uses
in a clear and concise manner based on existing legal trails, community input,
and feasible trails to the City Council for consideration.
CDD 12/31/2019 15%No 6/18/19 - An Administrative Draft of the proposed Trails Network Plan
update was received on June 5th and is currently being reviewed.
9/11/19 - Staff comments should be provided to the Consultant by the
end of September.
11/13/19 - Staff continues to review the draft document. 1/28/20-
Planning Commission-recommended carry-over goal with further
refinement includes assignment of project manager and present the
plan to the City Council in 2020.
Last updated: 2/6/2020
A-5
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
27 Implement revised Special Event Permit Ordinance. (must specifically identify
applicability and exemptions.)
R&P 6/30/2019 10/18/2019 10/18/2019 100%Goal Complete: Policy Implemented No Council approved Ordinance on September 3, 2019. Second reading
held on September 17, 2019. Ordinance went into effect on October
18, 2019.
Last updated: 2/6/2020
A-6
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
28 BARKING DOGS: Assess the effectiveness and responsiveness of the County’s
amended Barking Noise Program to determine whether the City should
implement its own in‐house program for the City Council’s consideration.
CDD 10/31/2019 75%Yes 6/18/19 - Code Enforcement is working with residents who have
recently filed a complaint with the County under the amended
program to assess its effectiveness.
9/11/19 - On August 26 & 28, the Code Enforcement Officers attended
a meeting held by the L.A. County Department of Animal Care and
Control (DACC) to discuss their operational effectiveness for animal
control services. This opportunity was used to express the City's
concerns regarding the County’s procedures related to barking dog
complaints and the effectiveness of the recently amended procedures.
Two tentative workshops are scheduled for November for contract
cities.
11/13/19 - Tentative workshop dates with LA County pending for
November.
12/10/2019 - Tentative workshop dates with LA County pending for
Mid-December. 1/28/20- Planning Commission-recommended carry-
over goal with further refinement which includes 1) evaluate County
report when available and bring report to City Council with
recommendations in 2020.
29 SHORT TERM RENTALS ENFORCEMENT: Provide a semi-annual status report
with data on the effectiveness of the City's aggressive enforcement program
upholding the City’s prohibition to advertise or operate a short‐term rental in
the City’s single‐family and multi‐family residential zoning districts.
CDD 12/31/2019 12/3/2019 100%No 6/18/19 - A status report was received and filed by the Council on
February 5th and a second report will be provided in December.
11/13/19 - The City is exploring hiring Host Compliance to assist with
monitoring short-term rental activity in the City at a cost not to exceen
$8,000 per year. A status report will be provided to the Council on
December 3rd.
12/10/2019- STR status update presented to the City Council on
December 3, 2019. A contract with Host Compliance was executed on
December 5, 2019 for STR monitoring services. 2/3/20- semi-annual
reports have been presented to the City Council. Goal should be
completed.
30 COYOTE MANAGEMENT PLAN: Provide a quarterly status report with data on
the implementation and effectiveness of the City’s Coyote Management Plan.
CDD 12/31/2019 12/3/2019 100%This goal has been met. No 9/11/19 - Status reports provided to the City Council at its June 4th
and September 3rd meetings, and a third quarter report will be
provided in December.
11/13/19 - Staff continues to conduct neighborhood meetings and a
status report will be provided to the Council at its December 3rd
meeting.
12/10/2019 - On December 3, 2019, Code Enforcement Staff
presented a quarterly update to the City Council related to the City's
Coyote Management Plan. Code Enforcement staff continues to
conduct public outreach efforts.
QUALITY OF LIFE
Goal: Maintain and improve the quality of life for RPV residents.
Last updated: 2/6/2020
A-7
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
31 WIRELESS TELECOMMUNICATION FACILITIES: Update the City’s Wireless
Telecommunication Ordinances as it relates to wireless facilities in the public
right-of-way (Title 8) and on private property (Title 17) to reflect current Federal
and State laws and FCC orders, and to ensure applications are processed timely
and that the least intrusive location and design is utilized, followed by
continuous monitoring.
CDD 4/14/2019 4/1/2019 100%This goal has been met. No 6/18/19 - The City Council repealed and replaced the Wireless
Telecommunication Facilities Ordinance in the Public Right-of-Way
(Chapter 12.18) in April 2019.
9/11/19 - A status report was provided on June 18th, and a second
status report will be provided at the September 17th City Council
meeting. This goal has been met.
11/13/19 - Quarterly status updates will be provided to City Council.
12/10/2019 - Quarterly status update will be provided to the City
Council on December 17th.
32 EMISSIONS REDUCTION ACTION PLAN (ERAP): Encourage Citywide, region-wide,
and State-wide measures to reduce emissions in accordance to the City Council-
adopted Emissions Reduction Action Plan (ERAP).
CDD 12/31/2019 65%Directed Staff to break up into individual goals. No 7/9/19 - Staff is working with the SBCCOG on the second phase of the
ERAP, which includes the preparation of a Climate Adaption Plan. Staff
is currently reviewing the draft of the sub-region plan.
8/13/19 - SBCCOG submitted draft City-specific Vulnerability Study/
Assessment, which City Staff is currently reviewing. Draft comments
are due to SBCCOG by August 16, 2019.
9/11/19 - City Staff presented comments on the SBCCOG's Draft
Vulnerability Assessment on 8/19/19. SBCCOG Staff presented revised
copy on 8/21/19 and both parties met on 8/22/19 to discuss next
steps for the assessment.
11/13/19 - Vulnerability Assessment to be presented to the City
Council on December 17, 2019 prior to commencing work on the
Adaption Strategies (Phase 2).
On 11/20/19 - Planning Division Staff attended a SBCCOG workshop
regarding the preparation of adaptation strategies related to the
regional Climate Adapation Plan.
32a ERAP: Encourage and support the market for EV Vehicles TWO SEPARATE GOALS
o Adopt new development standards related to Electronic Vehicle (EV)
charging stations.(COMMUNITY DEVELOPMENT GOAL)
o Install charging stations in City-owned lots. (PUBLIC WORKS GOAL)
CDD 12/31/2019 50%6/18/19 - Through the SolSmart grant program, the City is assessing
the installation of EV charging stations at Hesse Park and/or Lower
Point Vicente. Code amendment language may be pending to
streamline the EV charging station entitlement process.
9/11/19 - EcoMotion has assessed the feasibility of installing EV/PV
charging stations at Hesse Park as part of the parking lot expansion
project based on, among other things, SCE usage data and field
studies. The City Council initiated code amendment proceedings to
Chapter 17.83 of the RPVMC to facilitate the installation of EV/PV
charging stations with relevant development standards. Ecomotion
submitted EV/Solar Feasibility Study on 7/26/19 and CDD staff will be
coordinating a meeting with PW Staff to discuss implementation of
the report's recommendations. Staff is moving forward with designing
the expanded parking lot at Hesse Park with EV charging stations that
may be powered by photovoltaic panels. 1/28/20- Planning
Commission-recommended carry-over goal with further refinement
which includes bringing adaptation strategies and recommendations
to the City Council in 2020.
Last updated: 2/6/2020
A-8
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
32b ERAP: Increase Energy Efficiency in Residential Units
o Amend the Municipal Code to develop a robust Green Building Program.
o Partner with Peninsula Cities or the SBBCOG for an Energy Efficiency Fair.
o Create an online resource center for the promotion of Energy Efficiency
that would consolidate information found throughout the City’s website into a
one-stop shop for renewable energy financing (PACE), permitting, regional
efforts and public education. (COMPLETE)
CDD 12/31/2019 60%6/18/19 - Code amendment proceedings are pending. Staff is currently
working with the SBCCOG on updating the City's website to provide an
online resource center. This will be presented to the Council on July
16th.
7/9/19 - Staff is coordinating with the SBCCOG for a possible energy
efficient workshop and training in the community. 9/11/19 - Staff
revamped the City's website to create a "one-stop" shop for
information on green building initiatves which was presented to the
City Council at its July 16th meeting. At that meeting, the City Council
initiated code amendment proceedings to update Chapter 17.83 of
the RPVMC to support green building construction and Staff is
currently completing research regarding Green Building best pratices.
"Go Green RPV" section of the City's website was revamped and
launched in July and will be announced in the Fall 2019 Quarterly
Newsletter. Continuous update of City's Go Green RPV website and
monitoring for new energy efficiency workshops in the area in order
to share with community.
11/13/19 - Coordinating with SBCCOG Staff for the City to host an
energy/landscape efficiency workshop in the fall of 2019.
12/10/2019 - Planning Division Staff conducted a survey of Green
Building Programs in neighboring jursidictions and prepared a memo
outlining recommended updates to the City's Green Building Program.
2/3/20- Present proposed code amendment language to the City
Council in 2020 and host energy efficiency fair in 2020.
32c ERAP: Support Energy Generation and Storage in the Community
o Amend the Zoning Code to integrate additional policies supporting
renewable and alternative energy sources in residential, commercial and
institutional zoning districts by utilizing EcoMotion consultant services, made
available by the SolSmart grant application.
CDD 12/31/2019 40%6/18/19 - Code amendment proceedings are pending. The City was the
recipient of a Gold designation SolSmart Award at the 2019 National
Planning Conference in San Francisco for making it faster, easier and
more affordable for homes and businesses in the community to go
solar. The SolSmart program is led by the Solar Foundation and the
International City/County Management Association and funded by the
U.S. Department of Energy.
7/9/19 - The City Council will be asked to initiate code amendment
proceedings to Chapter 17.83 of the RPVMC to support relevant green
building construction.
8/13/19 - The City Council at its July 16th meeting initiated code
amendment proceedings to Chapter 17.83 of the RPVMC to support
relevant green building construction.1/28/20- Planning Commission-
recommended carry-over goal with further refinement which includes
1) complete evaluation of Zoning Code and 2) propose appropriate
amendments in 2020.
Last updated: 2/6/2020
A-9
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
33 WESTERN AVENUE REDEVELOPMENT STRATEGY: Prepare a redevelopment
strategy for Western Avenue that supports economic growth, aesthetic
enhancements, sustainability of retail establishments, and connectivity to retail
outlets and residents for the City Council’s consideration.
CM/CDD 6930/2019 35%Yes 6/18/19 - Staff has met with the Council Subcommittee and presented
an assessment of potential redevelopment opportunities along
Western Ave. A meeting is pending with Larry Kosmont. Staff is
working with CalTrans and the City of LA on potential traffic mitigation
measures.
7/9/19 - Staff has met with two prospective developers.
8/13/19 - A meeting will be held with officials from the City of Los
Angeles on August 19th to discuss roadway improvements associated
with the Highpark project.
9/11/19 - On September 3, Staff met with the Planning Deputy from
City of Los Angeles Councilman Buscaino's office and the Highpark
project developer to discuss streetscape improvements associated
with the development.
10/8/19 - Staff met with representatives from the City of Los Angeles
to discuss overall traffic mitigation along Westerm Avenue in
preparation for a meeting with Caltrans. Staff has also met with 2
additional developers and received preliminary landscape plans for
Western Avenue by the Highpark developer for the City's review.
11/13/19 - Staff is continuing the dialogue with City of Los Angeles to
plan out a uniform landscape plan along Western Avenue as part of
the Highpark project, and also engage in discussions over how to
conduct traffic congestion improvement studies for implemention that
will require Caltrans review and approval. In addition, Staff drafted a
letter to be sent out to potential developers who may be interested in
the City's redevelopment opportunities along Western Avenue.
1/28/20- Planning Commission-recommended carry-over goal with
further refinement to include street beautification component with
implementation to occur in future years.
34 Develop and share information regarding new goals and work plans
representative of the current City Council’s vision and values with residents and
local media outlets.
CM 4/30/2019 6/18/2019 100%No 6/18/19 - Goals approved by Council on March 5. Staff creating web
page for goals, and link to goals will be published in City's Summer
newsletter.
35 Establish Bi-Annual Leadership Academy for residents.CM 12/31/2019 No Staff did not schedule a Leadership Academy at this time due to the
number of events occurring this election season.
36 Re-establish Annual Community Breakfast for HOA presidents and committee
chairs to provide an update in July of each year of city future plans.
CM 7/31/2019 9/30/2019 9/21/2019 100%yes Breakfast meeting was held on September 21, 2019, where
community leaders were updated by the Council and Staff on current
issues.
CITIZEN INVOLVEMENT & PUBLIC OUTREACH
Goal: Engage residents and community partners in assisting the City Council, City Committees/Commissions and City Staff facilitate the decision-making process.
Last updated: 2/6/2020
A-10
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
37 FISCAL SUSTAINABILITY: Present research and conclusions on TOT trends and
opportunities to FAC.
FIN 12/31/2019 11/14/2019 100%Staff presented the most current TOT Trends and hotel
opportunities to FAC on 9/26/19 and 11/14/19.
Included in the presentation were surrounding cities'
TOT rate increase measures, success rate, and impact
on each city's TOT revenue.
Yes 12/11/19 - Presented TOT trends, rates for neighboring cities and
opportunities to FAC 9/24/19 and follow-up questions were addressed
11/14/19.
38 Perform updated Fee study for consideration by the City Council and use in FY
19-20 budget.
FIN 6/30/2019 50%Report was finalized April 2019. Staff will present final
report results and recommendations to FAC for review.
At the March 25 budget workshop, staff will also ask
City Council direction on whether to bring back fee
increase/decrease recommendations to City Council
with the FY 2020-21 Preliminary Budget.
Yes Fee study was completed but was not presented to the City Council,
but will be included in the budget workshop for FY 2020-2021.
39 Prepare draft funding plan for at least 50% of elements of Portuguese Bend
Landslide Feasibility Plan for City Council consideration.
FIN 12/31/2019 The Portuguese Bend Landslide Feasibility Study will
first go through the Environmental Impact Review(EIR).
Once the EIR is completed and costs have been
estimated, Staff will draft funding plan. Staff has also
contracted with Grants Management consultant to
help identify grant opportunities for this project.
Yes 8/13/19 - Still too early in the process-No update at this time.
40 Prepare pension liability and revenue/expense inversion mitigation plan for the
five year model for FY 2019-20.
FIN 12/31/2019 Yes 6/18/19 - Revenue and expense plan initiated and completed in the FY
2019-20 budget $2.2 M in expenditure reductions. Pension liability
plan-currently no update.
41 ENHANCED INTERNAL AND EXTERNAL CUSTOMER SERVICE: Enhance internal
and external customer service and efficiency so that all inquiries are
acknowledged within the day received and that, when surveyed, internal
customers indicate 100% satisfaction with responsiveness by colleagues, and
external customers indicate 95% satisfaction with responsiveness by Staff.
CDD/PW 12/31/2019 25%No 6/18/19 - On-going customer service training.
11/13/19 - CDD will coordinate a meeting with new PW staff in
January 2020. 1/28/20- Planning Commission recommended carry-
over goal with further refinement which includes: Restablish
employee group and consider revising the goal to achieve 95% internal
and external statisfaction in 2020.
42 INFORMATION TECHNOLOGY: Implement new Geocortex application to enable
residents to reach city services more quickly.
CM 12/31/2019 3/31/2020 10%No 6/18/19 - On May 31, the City received an updated proposal from
Geocortex utilizing most current solutions which eliminated the need
for some expensive software licensing. IT Department is working on
finalizing the contract.
12/10/2019 - Due to the TrakIt platform taking longer than expected
and Geocortex being dependant on TrakIt's proper implementation,
the target date for Geocortex has been moved to Q1 2020. In the
interim, a modern web-based service request platform has been
deployed utilizing ESRI’s Survey123 solution.
43 EFFICIENT DEVELOPMENT PROCESS: Establish an efficient development process
between the Community Development and Public Works Departments that
manages expectations and provides improved internal and external customer
service by: 1) preparing a policy memorandum that commits each department
to provide consistent information; 2) preparing a comprehensive Uniform
Development Process public handout; and 3) decreasing the review time for
applications to no more than 10 business days.
CDD/PW 12/31/2019 20%No 6/18/19 - CDD is meeting with Public Works to develop a new policy.
8/13/19 - CDD Staff assessing whether this effort is eligible to receive
SB2 Planning Grant funds to improve efficiency.
9/11/19 - A conference call with a consultant occured on August 13th
to to discuss grant opportunities to develop a streamline development
review process. 1/28/20 - Planning Comission recommended carry-
over goal with further refinement which includes 1)work on
documenting the development process and 2) prepare written
guidelines in 2020.
GOVERNMENT EFFICIENCY & TRANSPARENCY
Goal: Ensure the City is maximizing the use of each tax dollar and optimizing service delivery to RPV residents.
Last updated: 2/6/2020
A-11
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
44 TRAKiT PERMIT SOFTWARE IMPLEMENTATION: Full implementation of TRAKiT
customer relationship software that allows customers to track service requests
and to submit all appropriate requests and applications online.
CM 10/31/2019 3/31/2020 40%No 6/18/19 - A Trakit consultant will be here 6/22-6/25 to perform an
onsite business process review to review current processes, workflows
and provide feedback on how Trakit can be used to streamline the
flow of tasks and information. Additional admin training will also be
provided to power users to ensure Trakit is being updated to meet
changing business requirements of City departments.
12/10/2019 - Continuous improvements are being made to Trakit
configuration to specifically adhere to PW Department's business
needs. Advanced Business License module is almost completed and
should greatly streamline business license renewal during the next
cycle. eTrakit module has six pilot permits configured and should be
ready to test soon. iPads are now being used by CDD Inspectors to
finalize and document inspections, the same program is being
implemented at the PW Department.
45 CHARTER CITY: Agendize consideration of charter city item for possible
placement on the November 2019 ballot at a regular meeting.
CM 6/30/2019 5/7/2019 100%This goal has been met.No 6/18/19 - At the 5/7/19 CC mtg, the Council received and filed the
report presented by the City Attorney with no further action at this
time; and directed the City Attorney to report back on research as it
pertains to other remedies as discussed.
46 NCCP/HCP ADOPTION: Obtain permits by the California Department of Fish and
Wildlife and the U.S. Department Fish and Wildlife (collectively called the
Wildlife Agencies) for the City Council's consideration to adopt the NCCP/HCP
CDD/R&P 6/30/2019 3/20/2020 11/19/2019 100%Staff is working with the Wildlife Agencies and the
Palos Verdes Peninsula Land Conservancy on the
following steps: Initiate code amendments, direct Staff
to prepare the Preserve Access Protocol, and to
authorize Staff to record the conservation easements.
The wildlife agencies are in the process of making their
permit decisions.
No 6/18/19 - (CDD) The public comment period on the Environmental
Assessment concluded in May 2019. (R&P) Staff and Wildlife Agencies
are continuing to work on responses to public comments. Draft
document currently being reviewed by wildlife agencies.
9/11/19 - Staff is preparing the responses to comments that is
tentatively scheduled to be released to the public the beginning of
October and presented to the City Council for its consideration at a
specialy meeting tentatively scheduled for October 29, 2019.
10/8/19 - the City's responses to comments will be released along with
the final version of the NCCP/HCP for public review in advance of the
October 29, 2019 City Council meeting. Additionally, on 10/14/19, the
City will conduct the quarterly Public Preserve Forum meeting to
discuss frequently asked questions (FAQs) regarding the NCCP/HCP.
11/13/19 - (CDD) The public comment periods on the NCCP/HCP
concluded in May 2019, and the City and U.S. Fish and Wildlife Service
(USFWS) released the responses to public comments on October 11,
2019. The City held a Public Forum on October 14, 2019 to share
information and solicit feedback on the NCCP/HCP. Updates to the
NCCP/HCP document have been posted on the City's website. The
originally scheduled October 29, 2019 public hearing on the NCCP/HCP
was continued to November 19, 2019 to allow additional time for the
California Department of Fish and Wildlife to vet certain aspects of the
NCCP/HCP.
On November 19, 2019 - The City Council adopted a resolution
adopting the NCCP/HCP (continued below)
This goal has been met.12/10/19 - and directed Staff to work with the Wildlife Agencies and
the Palos Verdes Peninsula Land Conservancy on the following steps:
Initiate code amendments, direct Staff to prepare the Preserve Access
Protocol, and to authorize Staff to record the conservation easements.
The wildlife agencies are in the process of making their permit
decisions.
Last updated: 2/6/2020
A-12
2019 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
47 ZONE 2 OF THE LANDSLIDE MORATORIUM AREA CODE AMENDMENT: Update
and recirculate the Environmental Impact Report prepared in 2014 for the City
Council’s consideration to amend Section 15.20.040 of the RPVMC to expand
Exception Category “P” to consider allowing the development of single‐family
residences on the vacant non-Monks lots in Zone 2 of the Landslide Moratorium
Area.
CDD 10/31/2019 11/19/2019 100%This goal has been met.No On November 19, 2019, the City Council adopted a resolution
certifying the EIR and introduced an ordinance amending Section
15.20.040 of the RPVMC to allow for the residential development of
31 lots in Zone 2 of the City's Landslide Moratorium Area.
48 91% of RPV Employees say RPV is a great place to work CM 12/31/2019 25%6/18/19 - First survey received an 89% satisfaction rate in November
2018.
7/9/19 - Second survey released in June 2019, results are pending.
Last updated: 2/6/2020
A-13
2020 Goals and Action PlanLine Item NumberPROJECT / OBJECTIVE/OUTCOME/TASKRESPONSIBLE DEPARTMENTTARGET DATE FOR COMPLETIONREVISED DATE FOR COMPLETIONACTUAL DATE OF COMPLETIONSTATUS (%)COMMENTSBUDGET ITEMSTATUS UPDATE• Emergency Communication◦ Work with local Sheriff and Fire teams to develop formal emergency communication protocol with focus on primary and secondary public communication system that crosses social, age, and generational ability to receive emergency info that works even when power and cell towers are not operating; redundant and diverse tools to consistently reach public with current infoCMNew goal recommended by EPC• Evacuation Planning◦ Work with local Sheriff and Fire teams to create playbook of detailed pre‐incident evacuation plans including pre‐prepared traffic evacuation plans/scenarios, including traffic engineering capacity, pre‐defined routes, estimated time frame to alert/evacuate, trigger points, that can adapt to road closures in fast paced disaster; preplan evacuation procedure◦ Identify residential developments in hazard area that do not have at least 2 emergency evacuation routes. There are many neighborhoods along PV Drive East and in Portuguese Bend that only have one ingress/egress and border wildland/canyons, which create an additional hazard for getting fire trucks/personnel in to the area when simultaneously evacuating residents.◦ Include local HOA(s) in cross‐city Functional Emergency Prep Exercises, such as partnering with local HOA to stage a mock evacuation drillCMNew goal recommended by EPC• Wildfire “hardening”◦ Identify state grants/tax incentives for:▪ Residents interested in fire hardening homes (roofs, vent screens, etc.)▪ Upgrade of cell towers as required to operate without power for 8 to 48 hrs▪ Utilities fire harden transmission infrastructure, including options in addition to undergrounding lines (e.g., insulation)▪ Residential power back‐up (generators, etc.)▪ Fire hardening of strategically located Public Access buildings that can be used by residents if required to shelter in placeCMNew goal recommended by EPCPUBLIC SAFETYGoal: Maintain a high level of public safety with public engagement. Last updated: 2/6/2020B-1
2020 Goals and Action PlanLine Item NumberPROJECT / OBJECTIVE/OUTCOME/TASKRESPONSIBLE DEPARTMENTTARGET DATE FOR COMPLETIONREVISED DATE FOR COMPLETIONACTUAL DATE OF COMPLETIONSTATUS (%)COMMENTSBUDGET ITEMSTATUS UPDATE• Power Safety Shutdown◦ Work with local utilities to establish robust Power Safety Shutdown protocol that ensures robust communication process prior to and during incident and provides detailed up‐to‐date list of residents/facilities who are dependent on power for health/safety residents; include grant/financial help to needy residents to purchase back‐up generators or similar optionsCM New goal recommended by EPC• CalFire Risk Assessment and Insurance Rates◦ Coordinate with State Insurance Commissioner and Local Underwriters/Actuaries on mitigation steps that residents can take to reduce fire risk that will reduce insurance rates, including Firewise program, local red flag day protocols, fire hardening, etc.◦ Coordinate cross‐city with CalFire on fire risk assessment updates (e.g., areas within cities that have increased development may be considered lower risk)CM New goal recommended by EPCEstablish a new Public Safety Committee/Commission related to Fire and Police services (50% completion in 2020, milestones may include: Coordinate with Fire & Police Services; Staff research and report preparation; and presentation to City Council)CM New goal recommended by PCEstablish a neighborhood emergency preparedness captain programCM New goal recommended by StaffLast updated: 2/6/2020B-2
2020 Goals and Action PlanLine Item NumberPROJECT / OBJECTIVE/OUTCOME/TASKRESPONSIBLE DEPARTMENTTARGET DATE FOR COMPLETIONREVISED DATE FOR COMPLETIONACTUAL DATE OF COMPLETIONSTATUS (%)COMMENTSBUDGET ITEMSTATUS UPDATEDevelop Public Sewer ProgramPWNew goal recommended by PCAs submitted by Commissioner Perestam: Implement the adopted 2018 Rancho Palos Verdes General Plan that specifically states, as one of its five goals, to “Work with other jurisdictions and agencies to ensure that there are adequate storm drains, water systems, and sewer systems to serve the public.” Currently, an estimated 700‐1100 houses in RPV are served by on‐site septic systems. The goal is to provide a reasonable cost, public system option for residents as on‐site systems age, fail or as a preferred alternative. The approach may be similar to undergrounding utility lines. Financing the construction of sewer laterals would be provided by the creation of special assessment sewer districts, while individual homeowners would pay directly for connections and private property pipes. The initial step may require a census of dwelling units that currently utilize on‐site sewer systems (multi‐year goal, 50% completion in 2020, milestones may include: Staff research and assessment of various sewer projects; and public outreach).The City Council to initiate a dialogue with Palos Verdes Estates and the Sanitation District(s) regarding the sanitary sewer lines along PVDS and developed an emergency plan of action in case of roadway failure due to a landslide or an earthquake or any catastrophic event.PWNew goal recommended by IMACNoLobby PUC to modify the requirements for 20A to include high fire risk areas. FINNew goal recommended by FACThis would enable the city to use our funds/credits to underground power lines in the preserve.Enhance the efficiency of traffic flow along Western Avenue (alternate routes during construction/lane closures, traffic signal light synchronization, efforts to reduce delay during peak hours).PW New goal recommended by IMACInvestigate measures to mitigate problems associated with speed and congestion.PW New goal recommended by TSC YesINFRASTRUCTUREGoal: Assess, prioritize & plan for the maintenance and improvement of all public infrastructure (including transportation systems, parking, utilities, storm drains, and sewers).CITY LAND AND FACILITIESGoal: Assess, prioritize and plan for the maintenance and improvement of all City‐owned properties.Last updated: 2/6/2020B-3
2020 Goals and Action PlanLine Item NumberPROJECT / OBJECTIVE/OUTCOME/TASKRESPONSIBLE DEPARTMENTTARGET DATE FOR COMPLETIONREVISED DATE FOR COMPLETIONACTUAL DATE OF COMPLETIONSTATUS (%)COMMENTSBUDGET ITEMSTATUS UPDATEPursue “land‐use swapping” agreement with DOJ and FEMA to address the broad constraints on land use that are still in place and allow for the possibility of exchanging or “swapping” equivalent sections of the “general government use” area to allow for maximum flexibility in placing components. Goal to also include pursuing the possible acquisition of the 4.5‐acre Coast Guard property at Upper Point Vicente, which is a possible candidate parcel to swap between “passive open space” and “general government” use.CM 10/1/2020 New goal recommended by CCACDevelop Palos Verdes Nature Preserve Master PlanCDD/PWNew goal recommended by PCAs submitted by Commissioner Perestam: Historically, the City has addressed the needs of the Nature Preserve on a topic by topic basis. This approach has addressed individual, specific issues, such as trail usage & maintenance, and natural habitat restoration. However, dramatic increases in visitors over the past few years, and increased fire risk has added to the complexity of how to plan for and manage the Nature Preserve’s future. The changing volume of visitors and types of usage, along with parking impacts, moving and/or burying of utility lines, etc. necessitates a broader and more comprehensive approach to the sustainable long term direction and management of the Preserve. In brief, the development of a Master Plan is necessary to balance the changing demands of the public with the protection of the Palos Verdes Nature Preserve (multi‐year goal, 25% completion in 2020, milestones may include: assessment of various projects in the preserve).Explore a partnership with the Coast Guard for use of the Point Vicente Lighthouse property and buildingsCM New goal recommended by StaffComplete the Trails Network Plan Update CDD New goal recommended by StaffLast updated: 2/6/2020B-4
2020 Goals and Action PlanLine Item NumberPROJECT / OBJECTIVE/OUTCOME/TASKRESPONSIBLE DEPARTMENTTARGET DATE FOR COMPLETIONREVISED DATE FOR COMPLETIONACTUAL DATE OF COMPLETIONSTATUS (%)COMMENTSBUDGET ITEMSTATUS UPDATEEvaluate the City’s Housing Element and Zoning Code to ensure compliance with the City’s housing goals and policies as well as with State housing requirements including, but not limited to, Accessory Dwelling Units (multi‐year goal, 75% completion in 2020, milestones may include: Staff research and coordination with the City Attorney’s Office; Monitor regional housing matters; and conduct public outreach).New goal recommended by PCWork collaboratively with State and Regional Planning agencies to ensure that the City’s 6th RHNA allocation for the development of affordable housing during the planning period of 2021‐2029 is consistent with the goals and policies identified in the City’s General Plan (75% completion in 2020, milestones may include: Preparation of RHNA Methodology Appeal)CDD New goal recommended by PCQUALITY OF LIFEGoal: Maintain and improve the quality of life for RPV residents.Last updated: 2/6/2020B-5
2020 Goals and Action PlanLine Item NumberPROJECT / OBJECTIVE/OUTCOME/TASKRESPONSIBLE DEPARTMENTTARGET DATE FOR COMPLETIONREVISED DATE FOR COMPLETIONACTUAL DATE OF COMPLETIONSTATUS (%)COMMENTSBUDGET ITEMSTATUS UPDATE• Support the development of Accessory Dwelling Units (ADU) per the City’s Municipal Code by:o Developing an ADU handout and cut‐sheet to streamline the review and permitting of ADUs.o Create an ADU homepage on the City’s website for the most up‐to‐date news on ADU requirements in the City (100% completion in 2020).CDD New goal recommended by PCDevelop a mixed‐use zoning district for commercial zones to allow forresidential and live‐work housing units (multi‐year goal, 30% completionin2020, milestones may include: Staff research and analysis; Code initiationrequest to the City Council; Preparation of draft language; Search of grantopportunities; and preliminary review of CEQA). CDD New goal recommended by PCComplete a comprehensive update to the City’s sign ordinance to be consistent with current sign and lighting technologies (100% completion in 2020).CDD New goal recommended by PCUpdate the City’s antennae ordinance for wireless facilities on private property to be consistent with the FCC (100% completion in 2020).CDD New goal recommended by PCModernize the City’s entry monument signs CDD/PW New goal recommended by StaffCreate a City Master Sign PlanCDD/PWNew goal recommended by StaffDevelop a brand for Western Avenue CDDNew goal recommended by StaffEstablish an arterial street beautification programCDD/PWNew goal recommended by StaffCITIZEN INVOLVEMENT & PUBLIC OUTREACHGoal: Engage residents and community partners in assisting the City Council, City Committees/Commissions and City Staff facilitate the decision‐making process.Last updated: 2/6/2020B-6
2020 Goals and Action PlanLine Item NumberPROJECT / OBJECTIVE/OUTCOME/TASKRESPONSIBLE DEPARTMENTTARGET DATE FOR COMPLETIONREVISED DATE FOR COMPLETIONACTUAL DATE OF COMPLETIONSTATUS (%)COMMENTSBUDGET ITEMSTATUS UPDATEForm joint commissions with other Peninsula communities in order to tackle joint issues or concerns (50% completion in 2020, milestones include: Meeting with Peninsula Cities; Staff research and report preparation; and presentation to the City Council; Public outreach).TBD New goal recommended by PCUpdate the Department of Community Development’s Public Notice form to be more user‐friendly through the incorporation of maps, diagrams and enhanced graphics (100% completion in 2020).CDD New goal recommended by PCEncourage electronic filing of development permits and applications by developing additional paperless applications and a more customer‐friendly submittal portal (multi‐year goal, 45% completion in 2020 and possible consideration to incorporate into existing 2019 Goal No. 41). CDD New goal recommended by PCLast updated: 2/6/2020B-7
2020 Goals and Action PlanLine Item NumberPROJECT / OBJECTIVE/OUTCOME/TASKRESPONSIBLE DEPARTMENTTARGET DATE FOR COMPLETIONREVISED DATE FOR COMPLETIONACTUAL DATE OF COMPLETIONSTATUS (%)COMMENTSBUDGET ITEMSTATUS UPDATEFISCAL SUSTAINABILITY: At council direction, present TOT rate options to FAC for recommendation to City Council FIN 6/30/2020 New goal recommended by FACPrepare a Pension Policy that provides a financial plan to address the City's outstanding Pension Liability and CalPERS' continuous change in valuation methodology.FIN 12/31/2020 New goal recommended by FAC YesGOVERNMENT EFFICIENCY & TRANSPARENCYGoal: Ensure the City is maximizing the use of each tax dollar and optimizing service delivery to RPV residents.Last updated: 2/6/2020B-8
2020 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
• Emergency Communication
◦ Work with local Sheriff and Fire teams to develop formal emergency
communication protocol with focus on primary and secondary public
communication system that crosses social, age, and generational ability to
receive emergency info that works even when power and cell towers are not
operating; redundant and diverse tools to consistently reach public with current
info
CM New goal recommended by EPC
• Evacuation Planning
◦ Work with local Sheriff and Fire teams to create playbook of detailed pre-
incident evacuation plans including pre-prepared traffic evacuation
plans/scenarios, including traffic engineering capacity, pre-defined routes,
estimated time frame to alert/evacuate, trigger points, that can adapt to road
closures in fast paced disaster; preplan evacuation procedure
◦ Identify residential developments in hazard area that do not have at least 2
emergency evacuation routes. There are many neighborhoods along PV Drive
East and in Portuguese Bend that only have one ingress/egress and border
wildland/canyons, which create an additional hazard for getting fire
trucks/personnel in to the area when simultaneously evacuating residents.
◦ Include local HOA(s) in cross-city Functional Emergency Prep Exercises, such as
partnering with local HOA to stage a mock evacuation drill
CM New goal recommended by EPC
• Wildfire “hardening”
◦ Identify state grants/tax incentives for:
▪ Residents interested in fire hardening homes (roofs, vent screens, etc.)
▪ Upgrade of cell towers as required to operate without power for 8 to 48 hrs
▪ Utilities fire harden transmission infrastructure, including options in addition
to undergrounding lines (e.g., insulation)
▪ Residential power back-up (generators, etc.)
▪ Fire hardening of strategically located Public Access buildings that can be used
by residents if required to shelter in place
CM New goal recommended by EPC
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
Last updated: 2/6/2020B-1
2020 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
• Power Safety Shutdown
◦ Work with local utilities to establish robust Power Safety Shutdown protocol
that ensures robust communication process prior to and during incident and
provides detailed up-to-date list of residents/facilities who are dependent on
power for health/safety residents; include grant/financial help to needy
residents to purchase back-up generators or similar options
CM New goal recommended by EPC
• CalFire Risk Assessment and Insurance Rates
◦ Coordinate with State Insurance Commissioner and Local
Underwriters/Actuaries on mitigation steps that residents can take to reduce
fire risk that will reduce insurance rates, including Firewise program, local red
flag day protocols, fire hardening, etc.
◦ Coordinate cross-city with CalFire on fire risk assessment updates (e.g., areas
within cities that have increased development may be considered lower risk)
CM New goal recommended by EPC
Establish a new Public Safety Committee/Commission related to Fire and Police
services (50% completion in 2020, milestones may include: Coordinate with Fire
& Police Services; Staff research and report preparation; and presentation to
City Council)
CM New goal recommended by PC
Establish a neighborhood emergency preparedness captain program CM New goal recommended by Staff
Last updated: 2/6/2020B-2
2020 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
Develop Public Sewer Program PW New goal recommended by PC As submitted by Commissioner Perestam: Implement the adopted
2018 Rancho Palos Verdes General Plan that specifically states, as one
of its five goals, to “Work with other jurisdictions and agencies to
ensure that there are adequate storm drains, water systems, and
sewer systems to serve the public.” Currently, an estimated 700-1100
houses in RPV are served by on-site septic systems. The goal is to
provide a reasonable cost, public system option for residents as on-
site systems age, fail or as a preferred alternative. The approach may
be similar to undergrounding utility lines. Financing the construction
of sewer laterals would be provided by the creation of special
assessment sewer districts, while individual homeowners would pay
directly for connections and private property pipes. The initial step
may require a census of dwelling units that currently utilize on-site
sewer systems (multi-year goal, 50% completion in 2020, milestones
may include: Staff research and assessment of various sewer projects;
and public outreach).
The City Council to initiate a dialogue with Palos Verdes Estates and the
Sanitation District(s) regarding the sanitary sewer lines along PVDS and
developed an emergency plan of action in case of roadway failure due to a
landslide or an earthquake or any catastrophic event.
PW New goal recommended by IMAC No
Lobby PUC to modify the requirements for 20A to include high fire risk areas. FIN New goal recommended by FAC This would enable the city to use our funds/credits to underground
power lines in the preserve.
Enhance the efficiency of traffic flow along Western Avenue (alternate routes
during construction/lane closures, traffic signal light synchronization, efforts to
reduce delay during peak hours).
PW New goal recommended by IMAC
Investigate measures to mitigate problems associated with speed and
congestion.
PW New goal recommended by TSC Yes
INFRASTRUCTURE
Goal: Assess, prioritize & plan for the maintenance and improvement of all public infrastructure (including transportation systems, parking, utilities, storm drains, and sewers).
Last updated: 2/6/2020B-3
2020 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
Pursue “land-use swapping” agreement with DOJ and FEMA to address the
broad constraints on land use that are still in place and allow for the possibility
of exchanging or “swapping” equivalent sections of the “general government
use” area to allow for maximum flexibility in placing components. Goal to also
include pursuing the possible acquisition of the 4.5-acre Coast Guard property
at Upper Point Vicente, which is a possible candidate parcel to swap between
“passive open space” and “general government” use.
CM 10/1/2020 New goal recommended by CCAC
Develop Palos Verdes Nature Preserve Master Plan CDD/PW New goal recommended by PC As submitted by Commissioner Perestam: Historically, the City has
addressed the needs of the Nature Preserve on a topic by topic basis.
This approach has addressed individual, specific issues, such as trail
usage & maintenance, and natural habitat restoration. However,
dramatic increases in visitors over the past few years, and increased
fire risk has added to the complexity of how to plan for and manage
the Nature Preserve’s future. The changing volume of visitors and
types of usage, along with parking impacts, moving and/or burying of
utility lines, etc. necessitates a broader and more comprehensive
approach to the sustainable long term direction and management of
the Preserve. In brief, the development of a Master Plan is necessary
to balance the changing demands of the public with the protection of
the Palos Verdes Nature Preserve (multi-year goal, 25% completion in
2020, milestones may include: assessment of various projects in the
preserve).
Explore a partnership with the Coast Guard for use of the Point Vicente
Lighthouse property and buildings
CM New goal recommended by Staff
Complete the Trails Network Plan Update CDD New goal recommended by Staff
CITY LAND AND FACILITIES
Goal: Assess, prioritize and plan for the maintenance and improvement of all City-owned properties.
Last updated: 2/6/2020B-4
2020 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
Evaluate the City’s Housing Element and Zoning Code to ensure compliance with
the City’s housing goals and policies as well as with State housing requirements
including, but not limited to, Accessory Dwelling Units (multi-year goal, 75%
completion in 2020, milestones may include: Staff research and coordination
with the City Attorney’s Office; Monitor regional housing matters; and conduct
public outreach).
New goal recommended by PC
Work collaboratively with State and Regional Planning agencies to ensure that
the City’s 6th RHNA allocation for the development of affordable housing during
the planning period of 2021-2029 is consistent with the goals and policies
identified in the City’s General Plan (75% completion in 2020, milestones may
include: Preparation of RHNA Methodology Appeal)
CDD New goal recommended by PC
• Support the development of Accessory Dwelling Units (ADU) per the City’s
Municipal Code by:
o Developing an ADU handout and cut-sheet to streamline the review and
permitting of ADUs.
o Create an ADU homepage on the City’s website for the most up-to-date news
on ADU requirements in the City (100% completion in 2020).
CDD New goal recommended by PC
Develop a mixed-use zoning district for commercial zones to allow for
residential and live-work housing units (multi-year goal,30%completion in
2020,milestones may include:Staff research and analysis;Code initiation
request to the City Council;Preparation of draft language;Search of grant
opportunities; and preliminary review of CEQA).
CDD New goal recommended by PC
Complete a comprehensive update to the City’s sign ordinance to be consistent
with current sign and lighting technologies (100% completion in 2020).
CDD New goal recommended by PC
Update the City’s antennae ordinance for wireless facilities on private property
to be consistent with the FCC (100% completion in 2020).
CDD New goal recommended by PC
Modernize the City’s entry monument signs CDD/PW New goal recommended by Staff
Create a City Master Sign Plan CDD/PW New goal recommended by Staff
Develop a brand for Western Avenue CDD New goal recommended by Staff
Establish an arterial street beautification program CDD/PW New goal recommended by Staff
QUALITY OF LIFE
Goal: Maintain and improve the quality of life for RPV residents.
Last updated: 2/6/2020B-5
2020 Goals and Action Plan
Line Item
Number
PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE
DEPARTMENT
TARGET DATE
FOR COMPLETION
REVISED DATE
FOR COMPLETION
ACTUAL DATE OF
COMPLETION
STATUS (%)COMMENTS BUDGET
ITEM
STATUS UPDATE
PUBLIC SAFETY
Goal: Maintain a high level of public safety with public engagement.
Form joint commissions with other Peninsula communities in order to tackle
joint issues or concerns (50% completion in 2020, milestones include: Meeting
with Peninsula Cities; Staff research and report preparation; and presentation
to the City Council; Public outreach).
TBD New goal recommended by PC
Update the Department of Community Development’s Public Notice form to be
more user-friendly through the incorporation of maps, diagrams and enhanced
graphics (100% completion in 2020).
CDD New goal recommended by PC
Encourage electronic filing of development permits and applications by
developing additional paperless applications and a more customer-friendly
submittal portal (multi-year goal, 45% completion in 2020 and possible
consideration to incorporate into existing 2019 Goal No. 41).
CDD New goal recommended by PC
FISCAL SUSTAINABILITY: At council direction, present TOT rate options to FAC
for recommendation to City Council
FIN 6/30/2020 New goal recommended by FAC
Prepare a Pension Policy that provides a financial plan to address the City's
outstanding Pension Liability and CalPERS' continuous change in valuation
methodology.
FIN 12/31/2020 New goal recommended by FAC Yes
GOVERNMENT EFFICIENCY & TRANSPARENCY
Goal: Ensure the City is maximizing the use of each tax dollar and optimizing service delivery to RPV residents.
CITIZEN INVOLVEMENT & PUBLIC OUTREACH
Goal: Engage residents and community partners in assisting the City Council, City Committees/Commissions and City Staff facilitate the decision-making process.