Loading...
CC SS 20191119 01 - Tentative Agendas and City Council GoalsTENTATIVE AGENDASAgenda items listed below will be presented to the City Council for their considerationDEPARTMENT AGENDA SECTIONAGENDA TITLEESTIMATED TIMEDecember 3, 2019 6:00 PMCITY COUNCIL REGULAR MEETING ‐ CLOSED SESSION CLOSED SESSION December 3, 2019 7:00 PMCITY COUNCIL REGULAR MEETING 2:50AGENCY MEETINGSuccessor Agency Meeting (SA) 0:05AGENCY MEETING (IA)Improvement Authority Meeting (IA) 0:05ADMIN ELECTION Presentation to outgoing Council Members 0:20ADMIN ELECTION Certification of November 5 election results 0:05ADMIN ELECTION Swearing in and Seating of Newly Elected Council Members 0:10ADMIN ELECTION Council Reorganization ‐ Selection of Mayor and Mayor Pro Tem 0:05ADMIN ELECTION Reception for outgoing and incoming Council Members0:30ADMIN CONSENT CALENDAR MinutesFINANCE CONSENT CALENDAR Warrant RegisterCDDCONSENT CALENDARShort Term Rental enforcement updateCDDCONSENT CALENDAR2nd Reading/Adoption of Zone 2 OrdinancePUBLIC WORKSCONSENT CALENDARNOC for Conestoga TrailPUBLIC HEARINGNO ITEMS SCHEDULED AT THIS TIMECDDREGULAR BUSINESSCoyote Management Program update 0:15December 17, 2019 6:00 PM CITY COUNCIL REGULAR MEETING ‐ CLOSED SESSION/STUDY SESSION CLOSED SESSION STUDY SESSION  Study Session DiscussionDecember 17, 2019 7:00 PM CITY COUNCIL REGULAR MEETING 5:10ADMINCONSENT CALENDAR MinutesADMINCONSENT CALENDAR Border Issues Status ReportFINANCECONSENT CALENDAR Warrant RegisterCDDCONSENT CALENDAR Wireless quarterly reportPUBLIC WORKSCONSENT CALENDAR NOC for ADA Access Improvements for Area 9/ CDBG (Avenida Aprenda) 2018‐19PUBLIC WORKSCONSENT CALENDAR Authorization for CDBG Funding for 2020‐21/ Public NoticePUBLIC WORKSCONSENT CALENDAR New Policy Regarding Streetlight Installation for Neighborhoodscontinued on  next page1:001:0011/13/20191 TENTATIVE AGENDASAgenda items listed below will be presented to the City Council for their considerationDEPARTMENT AGENDA SECTIONAGENDA TITLEESTIMATED TIMEPUBLIC HEARINGNO ITEMS SCHEDULED AT THIS TIMEFINANCE REGULAR BUSINESS Year End Report0:20CDDREGULAR BUSINESSCommunity Choice Aggregation options 0:45CDD REGULAR BUSINESSClimate Adaptation Plan/Vulnerability Assessments 0:15PUBLIC WORKSREGULAR BUSINESS PB Landslide engineering recommendations 1:30PUBLIC WORKS REGULAR BUSINESS PVDW at Berry Hill Dr. Pedestrian Crossing 0:20PUBLIC WORKS REGULAR BUSINESS Traffic light at Via Rivera and Hawthorne Blvd intersection 0:30PUBLIC WORKS REGULAR BUSINESS Award design contract for PVIC Park Improvement Master Plan 0:15January 7, 2020 CITY COUNCIL REGULAR MEETING ‐ CANCELEDJanuary 21, 2020 6:00 PM CITY COUNCIL REGULAR MEETING ‐ CLOSED SESSION/STUDY SESSION CLOSED SESSION NO ITEMS SCHEDULED AT THIS TIMESTUDY SESSION  Study Session DiscussionJanuary 21, 2020 7:00 PM CITY COUNCIL REGULAR MEETING 4:00ADMINCONSENT CALENDAR MinutesADMINCONSENT CALENDAR Timeline for advisory body recruitmentFINANCECONSENT CALENDAR Warrant RegisterPUBLIC WORKSCONSENT CALENDAR Award of Contract Storm Drain Point RepairPUBLIC WORKSCONSENT CALENDAR Award Design of 2018 CDBG Project, (Caddington) 2019‐20CDDPUBLIC HEARINGGreen Hills Annual Review1:00CDDPUBLIC HEARINGTrump National ‐ annual review of maintenance activities0:15CDDREGULAR BUSINESSCensus 2020 presentation0:15REC & PARKSREGULAR BUSINESSConsideration of re‐initiation of "Bubbles" renovation project0:20REC & PARKSREGULAR BUSINESSConsideration of Tongva Memorial at Abalone Cove0:20PUBLIC WORKSREGULAR BUSINESSTree Master Plan Policy for Arterials & Policy for Tree Replacement0:20ADMINREGULAR BUSINESSCity Council Committee Assignments0:15THIS MEETING HAS BEEN CANCELED DUE TO THE HOLIDAY BREAK1:0011/13/20192 TENTATIVE AGENDASAgenda items listed below will be presented to the City Council for their considerationDEPARTMENT AGENDA SECTIONAGENDA TITLEESTIMATED TIMEFebruary 4, 2020 6:00 PMCITY COUNCIL REGULAR MEETING ‐ CLOSED SESSIONCLOSED SESSION NO ITEMS SCHEDULED AT THIS TIMESTUDY SESSION Study Session DiscussionFebruary 4, 2020 7:00 PMCITY COUNCIL REGULAR MEETING 3:45ADMINCONSENT CALENDAR MinutesFINANCECONSENT CALENDAR Warrant RegisterPUBLIC HEARINGNO ITEMS SCHEDULED AT THIS TIMEALLREGULAR BUSINESSAdvisory Body bi‐annual reports per CC Policy No. 541:00PUBLIC WORKSREGULAR BUSINESSConsideration of a 3‐way stop sign at Crestridge and Middlecrest0:45REC & PARKSREGULAR BUSINESSForrestal security options0:45February 18, 2020 6:00 PMCITY COUNCIL REGULAR MEETING ‐ CLOSED SESSION/STUDY SESSION CLOSED SESSION NO ITEMS SCHEDULED AT THIS TIMESTUDY SESSION Study Session DiscussionFebruary 18, 2020 7:00 PMCITY COUNCIL REGULAR MEETING 2:35ADMINCONSENT CALENDAR MinutesFINANCECONSENT CALENDAR Warrant RegisterADMIN/ITCONSENT CALENDAR Security as a service vendorPUBLIC HEARINGNO ITEMS SCHEDULED AT THIS TIMEFINANCE/PUBLIC WORKSREGULAR BUSINESSAbalone Cove Sewer Financing Options1:00PUBLIC WORKS REGULAR BUSINESSPVDE Roadway Widening and equestrian trail from Bronco to Sunnyside Ridge0:20March 3, 20206:00 PMCITY COUNCIL REGULAR MEETING ‐ CLOSED SESSIONCLOSED SESSION NO ITEMS SCHEDULED AT THIS TIMEMarch 3, 20207:00 PMCITY COUNCIL REGULAR MEETING 1:15ADMINCONSENT CALENDAR MinutesFINANCECONSENT CALENDAR Warrant RegisterPUBLIC HEARINGNO ITEMS SCHEDULED AT THIS TIMEREGULAR BUSINESSNO ITEMS SCHEDULED AT THIS TIME1:001:001:0011/13/20193 TENTATIVE AGENDASAgenda items listed below will be presented to the City Council for their considerationDEPARTMENT AGENDA SECTIONAGENDA TITLEESTIMATED TIMEMarch 17, 20206:00 PMCITY COUNCIL REGULAR MEETING ‐ CLOSED SESSION/STUDY SESSION CLOSED SESSION NO ITEMS SCHEDULED AT THIS TIMESTUDY SESSION Study Session DiscussionMarch 17, 20207:00 PMCITY COUNCIL REGULAR MEETING 1:15ADMINCONSENT CALENDAR MinutesFINANCECONSENT CALENDAR Warrant RegisterPUBLIC HEARINGNO ITEMS SCHEDULED AT THIS TIMEREGULAR BUSINESSNO ITEMS SCHEDULED AT THIS TIMERequest Date:Requested By:8/6/2019Dyda9/17/2019DuhovicStudy Session/Tentative Agendas methodology0:15Request Date:Requested By:Item:Scheduled Date:4/2/2019 & 9/3/19Brooks Tree Master Plan Policy for Arterials & Policy for tree replacement (using flame resistant trees)1/21/20207/16/2019Dyda Abalone Cove Sewer Financing Options 2/18/20207/16/2019Cruikshank Satellite locations for Council meetings TBD9/3/2019Alegria  Eastview beautification plans/options 1/21/20209/17/2019Brooks Bubbles1/21/20209/17/2019Dyda Consideration of Tongva Memorial Plaque  1/21/202010/15/2019Cruikshank West Basin Water District report TBDFUTURE AGENDA ITEMS TO BE AGENDIZED1:00Item:FUTURE AGENDA ITEMS ‐ Identified at Council meetings and pending receipt of memo from CouncilmemberPolicy on recording/memorializing Council's requests/direction for future agenda items.  11/13/20194 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE 1 Reduce residential burglaries by 20% (below 90 annually).CM 12/31/2019 No 8/14/19 - The first two quarters of 2019 are showing promise with 13 residential burglaries in Quarter 1 and 24 in Quarter 2, for a total of 37 residential burglaries the first half of calendar year 2019. If this trend continues, the City has a good chance of meeting this goal. 2 Implement revised Public Safety Strategic Plan remaining elements.CM 09/30/2019 Revised Public Safety Strategic Plan adopted in April 2016. Remaining items include: ALPR along Western (in progress), Predictive Policing software being worked on by LASD; Sheriff Substation at Civic Center; Pilot Neighborhood Watch in Multi-Family Neighborhoods; Pilot Program with Ring App (in progress) No 6/18/19 - Sheriff Substation has been included as an element in the Civic Center program; Social media, booth and WOAD, and contest to promote Ring App. See #5 and #6 for updates on ALPR along Western. 8/14/19 - On August 20, 2019, Staff and the Sheriff will update the Council on the status of the remaining element in the Public Safety Strategic Plan, along with recommendations and new enhancements that we are reviewing. 11/13/19 - The plan has been updated and revised to include more elements, including looking at Flock ALPR cameras. 3 Develop a plan with CHOA, Neighborhood Watch, and other organizations to promote neighborhood safety. CM 09/30/2019 No 8/14/19 - A Regional Emergency Preparedness Committee, comprised of members from RH, RHE, and RPV, met on 8/8/19 and were updated on regional emergency preparedness efforts. Plans are still in place to participate in joint exercises. RPV is currently recruiting for an Emergency Preparedness Analyst to train and lead the cities in those exercises. 11/13/19 - In process of recruiting for the Public Safety Analyst position and expect to fill the position in November, at which point this person will start to working on these plans. 4 Engage in a regional emergency preparedness plan and exercise with all four Peninsula cities. CM 11/30/2019 10%No 6/18/19 - A Peninsula Emergency Preparedness Committee, similar to Regional Law, was approved at the June 4th meeting. Rolling Hills and Rolling Hills Estates will partially fund the City's Emergency Preparedness Analyst to help their staff and elected officials prepare, and will participate in joint exercises and coordination. PVE has also expressed interest. 5 Install and commission Phase 1 of Western Ave. ALPR camera project.CM 09/30/2019 25%No 6/18/19 - Project is being awarded to low bidder on June 18, 2019. 7/9/19 - Project was awarded to low bidder on June 18, 2019. Work is still on-going. Installation of cameras is scheduled to be complete by Fall 2019. 11/13/19 - Poles in bid specifications currently backordered 20 weeks and staff reviewing options for comparable substitute poles. PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. Last updated: 11/13/2019 1 5 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 6 Install and commission Phase 2 of Western Ave. ALPR camera project.CM 12/31/2019 20%No 6/18/19 - SCE streetlights were acquired June 3. Developing contract with ALPR Camera vendor. 7/9/19 - Installation of cameras is scheduled to be complete by the end of the year. 8/14/19 - Staff has been discussing with Vigilant Solutions the possibility of using their new cameras that are lower cost because they were designed for lower speeds (like residential neighborhood streets) for the Phase 2 Eastview ALPR project. 9/10/19 - Install and commission phase 2 of Western Ave. ALPR camera project – 9/9/19 – Staff reviewing Vigilant proposal and preparing agreement for October meeting. Last updated: 11/13/2019 2 6 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 7 Arterial Fence and Wall Draft Master Plan: To create a draft master plan retaining neighborhood identity that describes the type (material and height) of fence or wall, if any, placed along major arterial streets in the City. CDD 12/31/2019 10%Potentially include collector streets in the future.No 6/18/19 - On February 1st, a RFP was issued to several local design firms but no proposals were received by the March 4th submittal deadline. In light of this, on March 11th, another RFP was issued to local planning consulting firms but no proposals were received by the April 10th deadline. Staff is currently working with NV5 design firm to develop a proposal for the Council's consideration. 8/13/19 - Staff sent a RFP to NV5 Design firm and received a proposal in the amount of approximately $120,000. 9/11/19 - Due to the NV5 Design proposal amount, Staff is seeking another cost proposal with a specific scope of work from the design firm Ardurra (Bob Merriell) before considering completing the Master Plan in-house. 11/13/19 - The City received a proposal from Ardurra in the amount of approximately $25,000. Staff is reviewing the scope of work. 8 ABALONE COVE SEWER: AB Cove Sewer – Prepare new financial plan that reduces City subsidy by at least 50% for City Council consideration. FIN/PW 12/31/2019 20%Working on different options to reduce the City subsidy and working with City Attorney regarding these options. Yes 7/9/19 - Efforts are on-going. 10/8/19 – (Finance) Meeting (date TBD) w/stakeholders to discuss the three funding options before presenting them to council. 11/13/19 - (PW) Two meetings were held with stakeholders to discuss the funding options to reduce the City subsidy. (Finance & PW) This item is scheduled to heard by City Council on February 18, 2020. 9 LANDSLIDE - SEWER AND STORM DRAIN IN ROLLING HILLS: Develop a program with Rolling Hills to intercept sanitary sewer discharge and control storm water runoff from direct infiltration into the ground in an effort to reduce ground movement within the landslide area of the City. PW 12/31/2019 25%Working on available option associated with installing a sanitary sewer collection system to be installed by the City of Rolling Hills for the area within the City of Rolling Hills and an estimated cost of a system by which the influent can be transferred to the RPV sewer system. No 8/13/19 - Efforts are on-going, including drainage related issues. 11/13/19 - Staff is working with NV5 Consulting Firm for a feasibility study regarding and underground sanitary sewer collection system to be installed in the City of Rolling Hills. 10 LANDSLIDE FEASIBILITY STUDY - CONSTRUCTION IMPLEMENTATION: Have construction implementation plan ready for City Council consideration, break ground on phased plan if approved. PW 12/31/2019 95%A public outreach meeting was held on May 29, 2019, valuable input was provided to the consulting firm; An additional meeting was held with two activist from the neighborhood to share their knowledge with the design team on June 11, 2019; working with coastal commission regarding this project and constuction of a potential box culvert which would drain local drainage through PVDS into the ocean. Second outreach meeting is scheduled for Oct. 7, 2019. No 7/9/19 - Design efforts are on-going. 11/13/19 - Final plans are expected to be submitted by mid November 2019. INFRASTRUCTURE Goal: Assess, prioritize & plan for the maintenance and improvement of all public infrastructure (including transportation systems, parking, utilities, storm drains, and sewers). Last updated: 11/13/2019 3 7 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 11 MAINTENANCE SCHEDULE AND PLAN FOR ALL ASSETS: Create detailed inventory of public infrastructure and assets, along with appropriate maintenance schedule, and annually provide adequate funding for Operations and Maintenance. PW 06/30/2019 05/30/2019 100%This maintenance schedule and plan for all maintenance of all City owned assets has been prepared and implemented. Yes 6/18/19 - A preventive maintenance program has been developed and been implemented as of June 1, 2019. 12 UNDERGROUNDING UTILITIES: Create list of fires caused by facilities belonging to SCE and/or its contractors. Along with estimated damage costs to present to SCE. Establish a program for maintenance /undergrounding its utilities that can cause a serious threat to safety. PW 06/30/2019 06/02/2019 100%Staff worked with SCE to underground the overhead utilities along PVDS from La Rotonda to the city limits; and Crenshaw Blvd. from Crest Rd. to Valley View Rd.. These two projects will be advertised by SCE in late summer of 2019 and are scheduled to be completed by the end of 2019. Also, worked very closely with SCE to implement an aggressive vegetation maintenance program as well as performing significant repairs and upgrades to their facilities. SCE has implented these plans and the work is on-going. Staff tried to purchase funding from other cities to do more undergrounding to no avail. However, these efforts will continue. Yes 6/18/19 - A list of fire events for the last ten years has been prepared. Staff have worked with SCE to underground the overhead utilities in two areas. 7/9/19 - SCE is in the process of implementing their aggressive plan of action for vegetation management and the necessary repairs/upgrades of their facilities in RPV to reduce the risk of wildfire. 13 Identify neighborhoods willing to relocate utilities underground, and schedule with Southern California Edison. PW 06/30/2019 100%Staff participated in a PUC (Public Utilities Commission) hearing so that SCE policy can be revised to allow SCE to underground overhead utilities in residential neighborhoods at no cost to the residents. Currently, the residents have to pay for the cost of undergrounding in residential neighborhoods at a rate of $40,000 to $60,000 per property. No 6/18/19 - Staff has publicized this program, but no neighborhood has shown any interest at this time. 7/9/19 - Staff will continue to work with residents regarding this program. 14 Identify cities to purchase Rule 20A funds from and, with City Council approval, execute agreements for undergrounding utilities. Fin/PW 12/31/2019 100%Yes 6/18/19 - Currently there are no cities interested in exchanging Rule 20A credits. Staff will continue to check with cities throughout the year. 8/13/19 - No cities are interested in exchanging. 15 Storm Drain Deficiency Improvements Program (SDDIP) - Design for the replacement or rehabilitation of existing underground storm drain system (lateral pipes, main storm sewer pipes and box culverts) and drainage inlets, catch basins and manholes which were identified in the 2015 Master Plan of Drainage. PW 12/31/2019 75%The 2015 Master Plan of Drainage identified, needed improvements of existing underground storm drain system. Staff identifies these needed improvements as part of the CIP program based on priority of needed improvements. This is an on-going effort till such time that all identified improvements are performed. 6/18/19 - Efforts are on-going. 7/9/19 - The engineering designs for the drainage improvements at Marguerite/Lower Barkentine/ Seacove and 6309 Via Colinita/Sacred Cove are complete and utility coordination is underway. The construction fo these improvements is scheduled to start in fall 2019. The engineering design for the drainage improvements at PVDS and Peppertree/Hawthorne and Hawkhurst is underway. The construction is scheduled for early next year. 16 HAWTHORNE - GREEN ASPHALT: Beautify Hawthorne Boulevard by removing the existing green asphalt and installing aesthetic/landscaping. PW 12/31/2019 95.00%A powerpoint presentation regaring this item was agendized and was presented to the City Council. The City Council preferred the third option. Yes 6/18/19 - Design efforts are on-going. 7/9/19 - The design is underway in accordance with the City Council chosen option and directives. 8/13/19 - This item is on the August 20, 2019 City Council agenda. A presentation will be made to CC regarding the final design, and subsequently this project will be advertised for construction. 9/10/19 - Final plans were presented to CC on Aug. 20, 2019. The specifications are being prepared and engineering plans are scheduled to be advertised for construction soon. Last updated: 11/13/2019 4 8 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 17 TRAFFIC IMPROVEMENTS ON WESTERN AVENUE: Establish action plan that would reduce delay and enhance traffic circulation. PW 12/31/2019 20%Coordination with the City of Los Angeles and CalTrans is underway to speed up the establishment of this action plan. No 7/9/19 - The engineering efforts are on-going by Willdan which is the City's consulting firm on this project. 10/8/19 - Coordination underway with Caltrans, City of L.A. and City of Lomita. 18 STREET LIGHTS: SCE Streetlight Acquisition and Conversion. Change out the existing street lights to LED’s and install a smart light system. PW 12/31/2019 80%The street light acquisition was finalized on June 3, 2019. Yes 6/18/19 - Timing will depend on when SCE street light acquisition is finalized. 7/9/19 - Street light acquisition has been finalized. The Eaton luminare has been selected to replace the existing luminares. Staff is working with Siemens to implement this conversion. 8/13/19 - Siemens is working on development of a schedule for replacing the luminares. 11/13/19 - Siemens is scheduled to switch the 1,764 lights to LED starting 11/7/2019 and are scheduled to complete the work by end of the year. SCE will initiate switching the 542 streetlights that they own (and that the City could not purchase) starting 11/6/2019 and finish by end of November. 19 Neighborhood Streetlight Installation: Establish funding mechanism and program for consideration by the City Council for neighborhoods who wish to install street lights for safety purposes. FIN/PW 12/31/2019 Staff to develop policy by end of October 2019.Yes 11/13/19 - Agendized for 12/17/2019 City Council meeting. 20 CIVIC CENTER: Resolve land use issue with NPS.CM 04/30/2019 75%No 6/18/19 - Received approval from DOJ and awaiting approval from FEMA to conveyance property from NPS. 9/10/19 - Civic Center: Resolve land use issue with NPS. 9/9/19 – Received approval from both DOJ and FEMA to change public benefit conveyance from NPS, enabling the City to build public safety facilities on the area previously under NPS conservation easements. 20a CIVIC CENTER: Develop and present draft Civic Center Master Plan and financing options to the City Council for consideration. FIN/CM 12/31/2019 Yes 6/18/19 - CCAC developing recommended program for Council approval. 9/10/19 - Civic Center: Develop and present draft Civic Center Master Plan and financing options to the City Council for consideration. 8/14/19 - (CM) CCAC is scheduled to present the program to the Council in September. 9/10/19 – Presentation of Civic Center program by CCAC, Gensler, and staff scheduled for 10/15/19. 11/13/19 - (Finance) At 10/15/19 Meeting, City Council approved consultants Kosmont Group to evaluate financing options. 21 CIVIC CENTER: Develop plans for new EOC with possible Peninsula-wide partnership. CM 12/01/2019 No 22 LADERA LINDA PARK: With Council approval, break ground on new Ladera Linda Park and Community Center. R&P 02/28/2020 05/15/2020 No CITY LAND AND FACILITIES Goal: Assess, prioritize and plan for the maintenance and improvement of all City-owned properties. Last updated: 11/13/2019 5 9 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 22a LL: Refined schematic design prepared by Consultant for City Council consideration. R&P 06/30/2019 08/20/2019 No 6/18/19 - Consultant has prepared draft refined schematic design based on feedback received at a series of meetings in February 2019 with adjacent HOAs, Interested groups, and individual Councilmembers. Follow-up meetings are being conducted this month with these same groups and individuals, allowing for feedback and reaction to conceptual plan in preparation for a community-wide workshop. 7/9/19 - Consultant has prepared draft refined schematic design based on feedback received at a series of meetings in February 2019 with adjacent HOAs, Interested groups, and individual Councilmembers. Follow-up meetings conducted in June with these same groups and individuals, allowing for feedback and reaction to conceptual plan. Community Workshop scheduled for July 10th at Ladera Linda. 8/13/19 - Community Workshop held on July 10, 2019. Consultant has prepared draft refined schematic design based on meetings with interested parties and the workshop. 9/10/19 - Master plan design approved by City Council on August 20, 2019. Park and overall building design approved. 22b LL: Construction-ready documents prepared by Consultant for City Council consideration. R&P 11/30/2019 01/15/2020 No 9/10/19 - Consultant directed by Council on August 20, 2019 to proceed with developing construction ready documents. 10/8/19 - Discussion and approval of Community Center roof type to be reviewed by City Council on October 15th meeting. 11/13/19 - Council directed Staff to begin an RFP process to solicit solar roof proposals. Staff has held multiple meetings with contractor. 22c LL: Bid process for construction firm completed and contract ready for City Council consideration. R&P 01/15/2020 03/15/2020 Yes 23 Upper Hesse Turf Project: Redesign and install a new natural turf area (approximately 123,000 square feet) for active recreation use at Upper Hesse. R&P 07/01/2019 TBD Yes 6/18/19 - Project currently on hold. 9/10/19 - Plans and specifications being revised and updated with expectation of project completion by late spring 2020. Completion date TBD. 24 Lower Hesse Park Improvements Phase II: Present concepts for the remaining 12 acres of Lower Hesse to the City Council. R&P N/A N/A N/A N/A Project removed from FY 19-20 budget.Yes 6/18/19 - Project removed from FY 19-20 budget. No completion date. 10/8/19 - Shade structures are scheduled to be installed summer 2019. 11/13/19 - Shade structures scheduled to be installed in fall 2019. 25 Present comprehensive preserve parking plan that addresses positive and negative impacts to the Preserve and surrounding communities. R&P 09/30/2019 Yes 6/18/19 - No changes. 26 TRAILS NETWORK PLAN UPDATE: Present a comprehensive update to the City’s Trails Network Plan that is relevant and user-friendly by providing improved trail descriptions with graphics and detailed maps that illustrate trail routes and uses in a clear and concise manner based on existing legal trails, community input, and feasible trails to the City Council for consideration. CDD 12/31/2019 15%No 6/18/19 - An Administrative Draft of the proposed Trails Network Plan update was received on June 5th and is currently being reviewed. 9/11/19 - Staff comments should be provided to the Consultant by the end of September. 11/13/19 - Staff continues to review the draft document. Last updated: 11/13/2019 6 10 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 27 Implement revised Special Event Permit Ordinance. (must specifically identify applicability and exemptions.) R&P 06/30/2019 10/17/2019 100%No 6/18/19 - Scheduled for City Council Meetings on July 16 and August 20th (first and second readings) 8/13/19 - Status Report received by City Council on July 16th. Scheduled to return for first reading on September 3rd. 9/10/19 - Council approved Ordinance on September 3, 2019. Second reading scheduled for September 17, 2019. Revised date for completion: October 17, 2019. 10/8/19 - Second reading held on September 17, 2019. 11/13/19 - Ordinance went into effect on October 18, 2019. Last updated: 11/13/2019 7 11 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 28 BARKING DOGS: Assess the effectiveness and responsiveness of the County’s amended Barking Noise Program to determine whether the City should implement its own in-house program for the City Council’s consideration. CDD 10/31/2019 60%Yes 6/18/19 - Code Enforcement is working with residents who have recently filed a complaint with the County under the amended program to assess its effectiveness. 9/11/19 - On August 26 & 28, the Code Enforcement Officers attended a meeting held by the L.A. County Department of Animal Care and Control (DACC) to discuss their operational effectiveness for animal control services. This opportunity was used to express the City's concerns regarding the County’s procedures related to barking dog complaints and the effectiveness of the recently amended procedures. Two tentative workshops are scheduled for November for contract cities. 11/13/19 - Tentative workshop dates with LA County pending for November. 29 SHORT TERM RENTALS ENFORCEMENT: Provide a semi-annual status report with data on the effectiveness of the City's aggressive enforcement program upholding the City’s prohibition to advertise or operate a short-term rental in the City’s single-family and multi-family residential zoning districts. CDD 12/31/2019 50%No 6/18/19 - A status report was received and filed by the Council on February 5th and a second report will be provided in December. 11/13/19 - The City is exploring hiring Host Compliance to assist with monitoring short-term rental activity in the City at a cost not to exceen $8,000 per year. A status report will be provided to the Council on December 3rd. 30 COYOTE MANAGEMENT PLAN: Provide a quarterly status report with data on the implementation and effectiveness of the City’s Coyote Management Plan. CDD 12/31/2019 85%No 9/11/19 - Status reports provided to the City Council at its June 4th and September 3rd meetings, and a third quarter report will be provided in December. 11/13/19 - Staff continues to conduct neighborhood meetings and a status report will be provided to the Council at its December 3rd meeting. 31 WIRELESS TELECOMMUNICATION FACILITIES: Update the City’s Wireless Telecommunication Ordinances as it relates to wireless facilities in the public right-of-way (Title 8) and on private property (Title 17) to reflect current Federal and State laws and FCC orders, and to ensure applications are processed timely and that the least intrusive location and design is utilized, followed by continuous monitoring. CDD 04/14/2019 04/01/2019 100%This goal has been met. No 6/18/19 - The City Council repealed and replaced the Wireless Telecommunication Facilities Ordinance in the Public Right-of-Way (Chapter 12.18) in April 2019. 9/11/19 - A status report was provided on June 18th, and a second status report will be provided at the September 17th City Council meeting. This goal has been met. 11/13/19 - Quarterly status updates will be provided to City Council. QUALITY OF LIFE Goal: Maintain and improve the quality of life for RPV residents. Last updated: 11/13/2019 8 12 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 32 EMISSIONS REDUCTION ACTION PLAN (ERAP): Encourage Citywide, region-wide, and State-wide measures to reduce emissions in accordance to the City Council- adopted Emissions Reduction Action Plan (ERAP). CDD 12/31/2019 50%Directed Staff to break up into individual goals. No 7/9/19 - Staff is working with the SBCCOG on the second phase of the ERAP, which includes the preparation of a Climate Adaption Plan. Staff is currently reviewing the draft of the sub-region plan. 8/13/19 - SBCCOG submitted draft City-specific Vulnerability Study/ Assessment, which City Staff is currently reviewing. Draft comments are due to SBCCOG by August 16, 2019. 9/11/19 - City Staff presented comments on the SBCCOG's Draft Vulnerability Assessment on 8/19/19. SBCCOG Staff presented revised copy on 8/21/19 and both parties met on 8/22/19 to discuss next steps for the assessment. 11/13/19 - Vulnerability Assessment to be presented to the City Council on December 17, 2019 prior to commencing work on the Adaption Strategies (Phase 2). 32a ERAP: Encourage and support the market for EV Vehicles o Adopt new development standards related to Electronic Vehicle (EV) charging stations. o Install charging stations in City-owned lots. CDD 12/31/2019 50%6/18/19 - Through the SolSmart grant program, the City is assessing the installation of EV charging stations at Hesse Park and/or Lower Point Vicente. Code amendment language may be pending to streamline the EV charging station entitlement process. 9/11/19 - EcoMotion has assessed the feasibility of installing EV/PV charging stations at Hesse Park as part of the parking lot expansion project based on, among other things, SCE usage data and field studies. The City Council initiated code amendment proceedings to Chapter 17.83 of the RPVMC to facilitate the installation of EV/PV charging stations with relevant development standards. Ecomotion submitted EV/Solar Feasibility Study on 7/26/19 and CDD staff will be coordinating a meeting with PW Staff to discuss implementation of the report's recommendations. Staff is moving forward with designing the expanded parking lot at Hesse Park with EV charging stations that may be powered by photovoltaic panels Last updated: 11/13/2019 9 13 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 32b ERAP: Increase Energy Efficiency in Residential Units o Amend the Municipal Code to develop a robust Green Building Program. o Partner with Peninsula Cities or the SBBCOG for an Energy Efficiency Fair. o Create an online resource center for the promotion of Energy Efficiency that would consolidate information found throughout the City’s website into a one-stop shop for renewable energy financing (PACE), permitting, regional efforts and public education. CDD 12/31/2019 50%6/18/19 - Code amendment proceedings are pending. Staff is currently working with the SBCCOG on updating the City's website to provide an online resource center. This will be presented to the Council on July 16th. 7/9/19 - Staff is coordinating with the SBCCOG for a possible energy efficient workshop and training in the community. 9/11/19 - Staff revamped the City's website to create a "one-stop" shop for information on green building initiatves which was presented to the City Council at its July 16th meeting. At that meeting, the City Council initiated code amendment proceedings to update Chapter 17.83 of the RPVMC to support green building construction and Staff is currently completing research regarding Green Building best pratices. "Go Green RPV" section of the City's website was revamped and launched in July and will be announced in the Fall 2019 Quarterly Newsletter. Continuous update of City's Go Green RPV website and monitoring for new energy efficiency workshops in the area in order to share with community. 11/13/19 - Coordinating with SBCCOG Staff for the City to host an energy/landscape efficiency workshop in the fall of 2019. 32c ERAP: Support Energy Generation and Storage in the Community o Amend the Zoning Code to integrate additional policies supporting renewable and alternative energy sources in residential, commercial and institutional zoning districts by utilizing EcoMotion consultant services, made available by the SolSmart grant application. CDD 12/31/2019 40%6/18/19 - Code amendment proceedings are pending. The City was the recipient of a Gold designation SolSmart Award at the 2019 National Planning Conference in San Francisco for making it faster, easier and more affordable for homes and businesses in the community to go solar. The SolSmart program is led by the Solar Foundation and the International City/County Management Association and funded by the U.S. Department of Energy. 7/9/19 - The City Council will be asked to initiate code amendment proceedings to Chapter 17.83 of the RPVMC to support relevant green building construction. 8/13/19 - The City Council at its July 16th meeting initiated code amendment proceedings to Chapter 17.83 of the RPVMC to support relevant green building construction. Last updated: 11/13/2019 10 14 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 33 WESTERN AVENUE REDEVELOPMENT STRATEGY: Prepare a redevelopment strategy for Western Avenue that supports economic growth, aesthetic enhancements, sustainability of retail establishments, and connectivity to retail outlets and residents for the City Council’s consideration. CM/CDD 6930/2019 35%Yes 6/18/19 - Staff has met with the Council Subcommittee and presented an assessment of potential redevelopment opportunities along Western Ave. A meeting is pending with Larry Kosmont. Staff is working with CalTrans and the City of LA on potential traffic mitigation measures. 7/9/19 - Staff has met with two prospective developers. 8/13/19 - A meeting will be held with officials from the City of Los Angeles on August 19th to discuss roadway improvements associated with the Highpark project. 9/11/19 - On September 3, Staff met with the Planning Deputy from City of Los Angeles Councilman Buscaino's office and the Highpark project developer to discuss streetscape improvements associated with the development. 10/8/19 - Staff met with representatives from the City of Los Angeles to discuss overall traffic mitigation along Westerm Avenue in preparation for a meeting with Caltrans. Staff has also met with 2 additional developers and received preliminary landscape plans for Western Avenue by the Highpark developer for the City's review. 11/13/19 - Staff is continuing the dialogue with City of Los Angeles to plan out a uniform landscape plan along Western Avenue as part of the Highpark project, and also engage in discussions over how to conduct traffic congestion improvement studies for implemention that will require Caltrans review and approval. In addition, Staff drafted a letter to be sent out to potential developers who may be interested in the City's redevelopment opportunities along Western Avenue. 34 Develop and share information regarding new goals and work plans representative of the current City Council’s vision and values with residents and local media outlets. CM 04/30/2019 100%No 6/18/19 - Goals approved by Council on March 5. Staff creating web page for goals, and link to goals will be published in City's Summer newsletter. 35 Establish Bi-Annual Leadership Academy for residents.CM 12/31/2019 No 8/14/19 - Staff is unable to schedule the Leadership Academy at this time due to the number of events occurring this election season. 36 Re-establish Annual Community Breakfast for HOA presidents and committee chairs to provide an update in July of each year of city future plans. CM 07/31/2019 09/30/2019 No 6/18/19 - Discussed with Mayor, and event moving to September due to summer events and residents being out of town. 8/14/19 - Breakfast is tentatively scheduled for September 21, 2019. 11/13/19 - Breakfast meeting was September 21, 2019, where community leaders were updated by the Council and Staff on current issues. Citizen Involvement & Public Outreach Goal: Engage residents and community partners in assisting the City Council, City Committees/Commissions and City Staff facilitate the decision-making process. Last updated: 11/13/2019 11 15 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 37 FISCAL SUSTAINABILITY: Present research and conclusions on TOT trends and opportunities to FAC. FIN 12/31/2019 Yes 38 Perform updated Fee study for consideration by the City Council and use in FY 19-20 budget. FIN 06/30/2019 Yes 6/18/19 - Fee study is complete and on the August 20th City Council agenda for consideration. 7/9/19 - Fee Study has been pushed back to the September 17th City Council agenda. 8/13/19 - This item will be included in the budget workshop for FY 2020-2021. 39 Prepare draft funding plan for at least 50% of elements of Portuguese Bend Landslide Feasibility Plan for City Council consideration. FIN 12/31/2019 Yes 8/13/19 - Still too early in the process-No update at this time. 40 Prepare pension liability and revenue/expense inversion mitigation plan for the five year model for FY 2019-20. FIN 12/31/2019 Yes 6/18/19 - Revenue and expense plan initiated and completed in the FY 2019-20 budget $2.2 M in expenditure reductions. Pension liability plan-currently no update. 41 ENHANCED INTERNAL AND EXTERNAL CUSTOMER SERVICE: Enhance internal and external customer service and efficiency so that all inquiries are acknowledged within the day received and that, when surveyed, internal customers indicate 100% satisfaction with responsiveness by colleagues, and external customers indicate 95% satisfaction with responsiveness by Staff. CDD/PW 12/31/2019 25%No 6/18/19 - On-going customer service training. 11/13/19 - CDD will coordinate a meeting with new PW staff in January 2020. 42 INFORMATION TECHNOLOGY: Implement new Geocortex application to enable residents to reach city services more quickly. CM 12/31/2019 No 6/18/19 - On May 31, the City received an updated proposal from Geocortex utilizing most current solutions which eliminated the need for some expensive software licensing. IT Department is working on finalizing the contract. 43 EFFICIENT DEVELOPMENT PROCESS: Establish an efficient development process between the Community Development and Public Works Departments that manages expectations and provides improved internal and external customer service by: 1) preparing a policy memorandum that commits each department to provide consistent information; 2) preparing a comprehensive Uniform Development Process public handout; and 3) decreasing the review time for applications to no more than 10 business days. CDD/PW 12/31/2019 20%No 6/18/19 - CDD is meeting with Public Works to develop a new policy. 8/13/19 - CDD Staff assessing whether this effort is eligible to receive SB2 Planning Grant funds to improve efficiency. 9/11/19 - A conference call with a consultant occured on August 13th to to discuss grant opportunities to develop a streamline development review process. 44 TRAKiT PERMIT SOFTWARE IMPLEMENTATION: Full implementation of TRAKiT customer relationship software that allows customers to track service requests and to submit all appropriate requests and applications online. CM 10/31/2019 No 6/18/19 - A Trakit consultant will be here 6/22-6/25 to perform an onsite business process review to review current processes, workflows and provide feedback on how Trakit can be used to streamline the flow of tasks and information. Additional admin training will also be provided to power users to ensure Trakit is being updated to meet changing business requirements of City departments. 45 CHARTER CITY: Agendize consideration of charter city item for possible placement on the November 2019 ballot at a regular meeting. CM 06/30/2019 100%This goal has been met.No 6/18/19 - At the 5/7/19 CC mtg, the Council received and filed the report presented by the City Attorney with no further action at this time; and directed the City Attorney to report back on research as it pertains to other remedies as discussed. GOVERNMENT EFFICIENCY & TRANSPARENCY Goal: Ensure the City is maximizing the use of each tax dollar and optimizing service delivery to RPV residents. Last updated: 11/13/2019 12 16 2019 Goals and Action Plan Number PROJECT / OBJECTIVE/OUTCOME/TASK RESPONSIBLE DEPARTMENT TARGET DATE FOR COMPLETION REVISED DATE FOR COMPLETION ACTUAL DATE OF COMPLETION STATUS (%)COMMENTS BUDGET ITEM STATUS UPDATE PUBLIC SAFETY Goal: Maintain a high level of public safety with public engagement. 46 NCCP/HCP ADOPTION: Obtain permits by the California Department of Fish and Wildlife and the U.S. Department Fish and Wildlife (collectively called the Wildlife Agencies) for the City Council's consideration to adopt the NCCP/HCP CDD/R&P 06/30/2019 09/17/2019 90%No 6/18/19 - (CDD) The public comment period on the Environmental Assessment concluded in May 2019. (R&P) Staff and Wildlife Agencies are continuing to work on responses to public comments. Draft document currently being reviewed by wildlife agencies. 9/11/19 - Staff is preparing the responses to comments that is tentatively scheduled to be released to the public the beginning of October and presented to the City Council for its consideration at a specialy meeting tentatively scheduled for October 29, 2019. 10/8/19 - the City's responses to comments will be released along with the final version of the NCCP/HCP for public review in advance of the October 29, 2019 City Council meeting. Additionally, on 10/14/19, the City will conduct the quarterly Public Preserve Forum meeting to discuss frequently asked questions (FAQs) regarding the NCCP/HCP. 11/13/19 - (CDD) The public comment periods on the NCCP/HCP concluded in May 2019, and the City and U.S. Fish and Wildlife Service (USFWS) released the responses to public comments on October 11, 2019. The City held a Public Forum on October 14, 2019 to share information and solicit feedback on the NCCP/HCP. Updates to the NCCP/HCP document have been posted on the City's website. The originally scheduled October 29, 2019 public hearing on the NCCP/HCP was continued to November 19, 2019 to allow additional time for the California Department of Fish and Wildlife to vet certain aspects of the NCCP/HCP. 47 ZONE 2 OF THE LANDSLIDE MORATORIUM AREA CODE AMENDMENT: Update and recirculate the Environmental Impact Report prepared in 2014 for the City Council’s consideration to amend Section 15.20.040 of the RPVMC to expand Exception Category “P” to consider allowing the development of single-family residences on the vacant non-Monks lots in Zone 2 of the Landslide Moratorium Area. CDD 10/31/2019 90%No 6/18/19 - The Administrative Draft EIR prepared by Rincon is currently being reviewed by Staff. The Draft EIR is tentatively scheduled to be released in July 2019. 7/9/19 - The Administrative Draft EIR has been provided to board members of the Portuguese Bend Community Association (PBCA) to review for accuracy based on comments expressed in 2014 under the original document. 9/11/19 - The updated Draft EIR was released for public circulation on August 22nd and will conclude on October 7, 2019. The City Council will conduct a public meeting to receive comments on the Draft EIR at its September 17th meeting. Based on the breadth and scope of the public comments, Staff anticipates completing the Final EIR for City Council consideration in November 2019. 11/13/19 - 10/2019 - The Final EIR and associated code amendment ordinance will be considered for certification and adoption by the City Council at its November 19th meeting. 48 91% of RPV Employees say RPV is a great place to work CM 12/31/2019 6/18/19 - First survey received an 89% satisfaction rate in November 2018. 7/9/19 - Second survey released in June 2019, results are pending. Last updated: 11/13/2019 13 17