Loading...
CC SR 20190521 H - NOC for Annual Sidewalk Repair FY 17-18 RANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 05/21/2019 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA DESCRIPTION: Consideration and possible action to authorize the City Clerk to file a Notice of Completion for the Annual Sidewalk Program FY 2017-18 RECOMMENDED COUNCIL ACTION: (1) Accept the project as complete; (2) Authorize the City Clerk to file a Notice of Completion for the project with the Los Angeles County Registrar-Recorder’s Office; and if no claims are filed within 35 days after recordation, send a notice to the surety company to exonerate the Performance Bond; and, (3) Authorize the Director of Public Works to release the 5% construction retention payment to United Irrigation, Inc., 35 days after recordation of the Notice of Completion by the Los Angeles County Registrar-Recorder’s Office, contingent upon no claims being filed on the project, and the contractor posting an acceptable warranty bond with the City. (4) Alternately discuss and take other action related to this item FISCAL IMPACT: $189,826.50 Amount Budgeted: $250,000 Additional Appropriation: N/A Account Number(s): 220-400-8801-8010 Sidewalk Repair and Replacement Program ORIGINATED BY: Charles Eder, PE, Senior Engineer REVIEWED BY: Elias Sassoon, PE, Director of Public Works APPROVED BY: Doug Willmore, City Manager ATTACHED SUPPORTING DOCUMENTS: A. Notice of Completion (page A-1) B. List of sidewalk repair locations (page B-1) BACKGROUND AND DISCUSSION: Construction of the Annual Sidewalk Repair Program FY2017-18 was authorized by the City Council on July 17, 2018, in the amount of $203,711.50. The scope of work included repairing damaged sidewalk, driveways, and curbs and gutters citywide (Attachment B). The following table summarizes the project cost: 1 CONSTRUCTION COST SUMMARY ITEM AMOUNT Council Authorization (construction + 10% contingency) $ 226,960.00 Inspection Services $ 23,040.00 Total Authorized Budget $ 250,000.00 Construction Costs Construction Contract $ 189,826.50 Inspection Services $ 28,032.00 Total Construction Costs $ 217,858.50 Project Savings $ 32,141.50 The project was successfully completed in March 2019 by United Irrigation, Inc. in accordance with the specifications and within budget for a total construction cost of $189,826.50 (plus $28,032 in Inspection Services). Therefore, Staff recommends accepting the project as complete and filing a Notice of Completion with the Los Angeles County Registrar-Recorder’s Office. If no claims are filed within 35 days after recordation, the City will release the 5% retention, and upon the contractor posting an acceptable warranty bond, notice the surety company to exonerate the Performance Bond. ALTERNATIVES: In addition to the Staff recommendation, the following alternative action is available for the City Council’s consideration: 1. Discuss and take other action related to this item 2 A-1 A-2 6078 Grove Oak 28327 Lomo 5867 Finecrest 6940 Maycroft 28040 Lomo 5903 Finecrest 3586 Seaglen 28046 Lomo 5925 Finecrest 6512 Monero 5096 Silver Arrow 5947 Finecrest 30104 Via Borica 57527 Longhill 5142 Elkmont 27122 Pembina 27519 Longhill 5147 Elkmont 27122 Freeport 27507 Longhill 26609 Shadow Wood 26529 Mazur 4822 Elkridge 26625 Shadow Wood 2653 Mazur 4830 Elkridge 26631 Shadow Wood 26509 Mazur 4911 Brown deer 26703 Shadow Wood 5720 Capeswood 27609 Longhill 26711 Shadow Wood 5726 Capeswood 3144 Barkentine 26717 Shadow Wood 5745 Capeswood 3136 Barkentine 26735 Shadow Wood 26144 Barkstone 6030 Montemalaga 26761 Shadow Wood 26150 Barkstone 5703 Ironwood 26656 Whitehorn 26113 Barkstone 5730 Ironwood 26677 Whitehorn 26125 Barkstone 5742 Ironwood 26637 Shadow Wood 5728 Wildbriar 5740 Wildbriar 26630 Shadow Wood 5739 Wildbriar 26303 Birch field 26613 Shadow Wood 5721 Wildbriar 26905 Fond du lac 26760 Shadow Wood 26326 Grayslake 0 Elkmont 26745 Shadow Wood 26338 Grayslake 5138 Elkmont 26723 Shadow Wood 0 Grayslake 5116 Elkmont 26757 Shadow Wood 5736 Ironwood 5108 Elkmont 26745 Shadow Wood 5762 Ironwood 2669 Elkmont 26740 Shadow Wood 5703 Ironwood 2016 MacArthur 26726 Shadow Wood 26207 Barkstone 5107 Elkmont 26712 Shadow Wood 26429 Ashfork place 2017 Macauthor 26704 Shadow Wood 26419 Ashfork 2030 Macauthor 26624 Shadow Wood 26409 Ashfork 2036 Macauthor 26612 Shadow Wood 26405 Ashfork 2011 Macauthor 26603 Elkmont 51 Sea Breeze 1957 Macauthor 5260 Elkmont 51 Sea Breeze 1960 Macauthor 5235 Elkmont 57 Sea Breeze 1960 Macauthor 5227 Elkmont 76 Sea Breeze 28021 Ella 2509 Elkmont 72 Sea Breeze 4104 Miraleste Dr 5133 Elkmont 72 Sea Breeze 5940 Finecrest 26612 Whitehorn 42 Sailview 5936 Finecrest 0 Elkmont 6320 Tarragon 5932 Finecrest 3240 Nautilus 6331 Tarragon 5920 Finecrest 26748 Shadow Wood 30123 Via Rivera 5914 Finecrest 26754 Shadow Wood 29020 Doveridge 5864 Finecrest 26712 Tarrasa Annual Sidewalk Repair Program FY 17-18 Locations B-1