CC RES 2019-011 RESOLUTION NO. 2019-11
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO PALOS VERDES ADOPTING A LIST OF
PROJECTS FOR FISCAL YEAR 2019-20 FUNDED BY SB
1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF
2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the
Governor in April 2017 in order to address the significant multi-modal transportation
funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will
ensure the residents of Rancho Palos Verdes are aware of the projects proposed for
funding in our community and which projects have been completed each fiscal year; and
WHEREAS, the City of Rancho Palos Verdes must adopt by resolution a list of all
projects proposed to receive funding from the Road Maintenance and Rehabilitation
Account (RMRA), created by SB 1, which must include a description and location of each
proposed project, a proposed schedule for the project's completion, and the estimated
useful life of the improvement; and
WHEREAS, the City of Rancho Palos Verdes will receive an estimated $707,136
in RMRA funding in FY 2019-20 from SB 1; and
WHEREAS, this is the third year in which the City of Rancho Palos Verdes is
receiving SB 1 funding and will enable the City of Rancho Palos Verdes to continue
essential road maintenance and rehabilitation projects, safety improvements, repairing
and replacing aging bridges, and increasing access and mobility options for the traveling
public that would not have otherwise been possible without SB 1; and
WHEREAS, the City of Rancho Palos Verdes has undergone a robust public
process to ensure public input into our community's transportation priorities/the project
list; and
WHEREAS, the City of Rancho Palos Verdes used a Pavement Management
System to develop the SB 1 project list to ensure revenues are being used on the most
high-priority and cost-effective projects that also meet the community's priorities for
transportation investment; and
WHEREAS, the funding from SB 1 will help the City of Rancho Palos Verdes
maintain and rehabilitate 2 major boulevards within the City this year and many similar
projects into the future; and,
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs
Assessment found that the City of Rancho Palos Verdes streets and roads are in a "good"
condition and this revenue will help us increase the overall quality of our road system and
over the next decade will bring our streets and roads into an "excellent" condition; and
WHEREAS, the SB 1 project list and overall investment in the City's local streets
and roads infrastructure with a focus on basic maintenance and safety, investing in
complete streets infrastructure and, using cutting-edge technology, materials, and
practices, will have significant positive co-benefits statewide.
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by
the City Council of the City of Rancho Palos Verdes, State of California, as follows:
1. The foregoing recitals are true and correct.
2. The following list of proposed projects will be funded in-part or solely with fiscal
year 2019-20 with Road Maintenance and Rehabilitation Account revenues:
Program/Project Arterial Road Rehabilitation Program
Type
Road Crenshaw Boulevard
Limits Seacrest Drive to 100' south of Silver Spur Road
Start Date September 2019
Completion Date June 2021
Estimated Useful 20 years
Life
Amount and Phase FY19-20 $200,000 Pre-construction (design)
Description The project will overlay Crenshaw Boulevard with a
rubber asphalt surface and make necessary repairs
to existing curbs, gutters, and sidewalks. Minor root
pruning and ADA compliant access ramps may also
be included. The infrastructure improvement project
will also include updating traffic signs/signals (as
necessary), striping, and curb painting.
3. The following previously proposed and adopted projects may utilize fiscal year
2019-20 Road Maintenance and Rehabilitation Account revenues in their delivery.
With the relisting of these projects in the adopted fiscal year resolution, the City is
Resolution No. 2019-11
Page 2 of 3
reaffirming to the public and the State our intent to fund these projects with Road
Maintenance and Rehabilitation Account revenues:
Program/Project Median Beautification
Type
Road Hawthorne Boulevard
Limits Palos Verdes Drive South to Crest Road
Start Date January 2019
Completion Date June 2020
Estimated Useful 20 years
Life
Amount and Phase FY18-19 $729,000
FY19-20 $507,136
Description The project removes the existing green asphalt in the
median, installing drought tolerant landscaping.
Project will consider installing bio-swales and other
water catchment features.
PASSED, APPROVED AND ADOPTED this 2nd day of April 2019.
so.
d Apo Mayor
ATTEST:
ity Clerk
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss
CITY OF RANCHO PALOS VERDES )
I, Emily Colborn, City Clerk of the City of Rancho Palos Verdes, do hereby certify that the
above Resolution No. 2019-11, was duly and regularly passed and adopted by the said
City Council at a regular meeting thereof held on April 2, 2019.
•
City Cle
Resolution No. 2019-11
Page 3 of 3