CC SR 20181218 J - NOC Hawthorne Blvd Arterial Wall BeautificaitonRANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 12/18/2018 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA DESCRIPTION: Consideration and possible action to authorize the City Clerk to file a Notice of Completion for the Hawthorne Boulevard Arterial Wall Beautification Project No. RW2017-03. RECOMMENDED COUNCIL ACTION: (1) Accept the work as complete; (2) Authorize the City Clerk to file a Notice of Completion with the Los Angeles County Registrar-Recorder’s Office and, if no claims are filed within 35 days after recordation, and upon the contractor posting an acceptable warranty bond, notice the surety company to exonerate the Performance Bond; and, (3) Authorize the Director of Public Works to release the retention payment to Metrocell Construction Inc., 35 days after recordation of the Notice of Completion, contingent upon no claims being filed on the project and the contractor posting an acceptable warranty bond with the City. FISCAL IMPACT: The final construction cost was $242,745. Amount Budgeted: $265,745 Additional Appropriation: N/A Account Number(s): 330-400-8811-8802 $265,745 (Construction + Contingency) ORIGINATED BY: Nadia Carrasco, Assistant Engineer REVIEWED BY: Elias Sassoon, PE, Director of Public Works APPROVED BY: Doug Willmore, City Manager ATTACHED SUPPORTING DOCUMENTS: A. Notice of Completion (Page A-1) BACKGROUND AND DISCUSSION: In an effort to help beautify the City’s arterial streets and improve the overall visual character of the City, a construction contract for the Hawthorne Boulevard Arterial Wall Beautification Project was awarded to Metrocell Construction, Inc. by the City Council on December 19, 2017. The project consisted of removing of more than 5,245 linear feet of deteriorated and unsafe chain link fences, pilasters, and vegetation debris that had eroded into the public right-of-way along Hawthorne Boulevard. More than 70 property owners along Hawthorne Boulevard from Indian Valley Road to the northerly 1 City limits with the City of Rolling Hills Estates participated in the City’s Arterial Fences and Wall Program. The following table summarizes the construction costs: Hawthorne Boulevard Arterial Wall Beautification Project No. RW2017-03 Council Authorization (construction + contingency) $ 265,745.00 Construction Costs Construction Contract $241,586.00 Change Orders $686.91 Total Construction Cost $242,272.91 Total Construction Savings $23,472.09 Therefore, Staff recommends accepting the project as complete and filing a Notice of Completion with the Los Angeles County Registrar-Recorder’s Office. If no claims are filed within 35 days after recordation, the City will release the retention payment, and, upon the contractor posting an acceptable warranty bond, notice the surety company to exonerate the Performance Bond. 2 A-1 A-2