Loading...
CC SR 20181218 I - Hesse Park Athletic Field ImprovementsRANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 12/18/2018 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA DESCRIPTION: Consideration and possible action to approve a Contract Amendment with Jon David Cicchetti to design the Hesse Field – Park Improvements Project. RECOMMENDED COUNCIL ACTION: (1) Authorize the City Manager and City Clerk to execute a contract amendment with Jon David Cicchetti for the Hesse Field – Park Improvements Project not to exceed $28,300, contingent upon the City Attorney’s approval as to form. FISCAL IMPACT: N/A Amount Budgeted: $28,300 Additional Appropriation: $0 Account Number(s): 330-400-8419-8005 ORIGINATED BY: James Flannigan, Assistant Engineer REVIEWED BY: Elias Sassoon, P.E. Director of Public Works APPROVED BY: Doug Willmore, City Manager ATTACHED SUPPORTING DOCUMENTS: A. Draft contract amendment with Jon David Cicchetti (page A-1) B. Proposal from Jon David Cicchetti (page B-1) BACKGROUND AND DISCUSSION: The Hesse Field – Park Improvements Project is part of the City of Rancho Palos Verdes 2018 Capital Improvement Plan (CIP). This project will create an athletic field at Hesse Park. The project aims to remove existing turf and underlying soil/rock, install an improved irrigation system for adequate sprinkler coverage, and install new topsoil and turf for athletic use. Staff solicited Statements of Qualifications (SOQs) from qualified consultant firms for the FY18-19 Capital Improvement Program projects. A total of 21 consultant firms, including Jon David Cicchetti (Cicchetti), participated in the process and submitted SOQs. Cicchetti was selected for this project based on their expertise, performance and experience and provided a proposal for the project. The submitted proposal for the development of the concept and alternatives (Attachment B) was negotiated to the not- to-exceed amount of $28,300. 1 Staff recommends that the City Council approve an amendment to the On-call Agreement with Cicchetti to develop plans for the field improvements for the Hesse Field – Park Improvements Project, in the not-to-exceed amount of $28,300, subject to City Attorney’s approval of the agreement as to form (Attachment A). ALTERNATIVES: In addition to the Staff recommendation, the following alternative actions are available for the City Council’s consideration: 1. Direct Staff to modify the scope of the project and renegotiate the revised services needed, returning with a modified project. 2. Take other action as deemed appropriate by the City Council. 2 AMENDMENT NO. 2 TO AGREEMENT FOR CONTRACTUAL SERVICES THIS AMENDMENT TO THE AGREEMENT FOR CONTRACTUAL SERVICES (“Amendment No. 2”) by and between the CITY OF RANCHO PALOS VERDES (“City”) and JON DAVID CICCHETTI, a sole proprietorship (“Consultant”), is effective as of the 18th day of December, 2018. RECITALS A. City and Consultant entered into that certain Agreement for Contractual Services dated August 4, 2015 through June 30, 2021 the (“Agreement”), whereby Consultant agreed to provide on-call Landscape Architectural Services for an annual not-to-exceed amount of $60,000. B. City and Consultant entered into an amendment to the Agreement, dated July 31, 2018, to increase compensation for Fiscal Year 2018-19 to $200,000 to accommodate Landscape Architectural Services associated with the Hawthorne Boulevard Beautification Project (Amendment No. 1). C. City and Consultant now wish to further amend the Agreement to articulate the scope of work for Landscape Architectural Services for the Hesse Park Improvements Project; no change to the annual compensation is required. TERMS 1. Contract Changes. The Agreement, as amended, is again amended as provided herein. Deleted text is indicated in strikethrough and added text in bold italics. a. Section 1.1, Project Description, of Article 1, Scope of Services, is amended to read: “The Project is described as on-call services as follows: providing Landscape Architectural services. CONSULTANT shall, in addition, provide landscape architectural services for the following projects during FY 2018-19: (1) Hawthorne Boulevard Landscape Median Project, during FY 2018-19 in conformance with Exhibit “A-1” to this Agreement, attached hereto and incorporated by reference; (2) Hesse Park Improvement Project, in conformance with Exhibit “A-2” to this Agreement, attached hereto and incorporated by reference.” b. Exhibit “A-2”, Scope of Services and Compensation for the Hesse Park Improvement Project, FY 2018-19, is added to the Agreement as follows: A-1 “EXHIBIT “A-2” Scope of Services and Compensation for the Hesse Park Improvement Project, FY 2018-19 1. SCOPE OF WORK Provide Landscape Architectural Services for the Hesse Park Improvement Project. The services of the Consultant shall be phased and completed as follows. The City’s Contract Officer shall furnish site and building information as necessary. A. Site Inventory and Analysis Phase (30%). (1) Prepare landscape base sheets using plans and data provided by the City of Rancho Palos Verdes. (2) Project kickoff meeting: attend a kickoff meeting at the City and prepare a meeting agenda including lines of communication between the City, Consultant, utility agencies, and other agencies involved in the project and discuss the project requirements, scope of work, and schedule. Prepare and distribute meeting minutes highlighting any action items. (3) Review existing records: Review existing records, including but not limited to the Hesse Park Master Plan, street base maps, and community meeting notes. (4) Utility Coordination: Coordinate with utility agencies throughout the design phase. If the proposed improvements interfere with existing utilities, consultant will arrange for potholing by the utility to accurately represent its location on the construction documents. If required, obtain any permit(s) that may be required for creation of construction documents for the Project, from any agency or utility. (5) Perform site visit to observe existing conditions. B. Design Phase (70%). (1) Based on approved improvement program, prepare design plans. Prepare overall preliminary plan depicting landscape concepts for City review. Provide color renderings of design plan. Includes blow-ups and sections to illustrate details of the scheme. (2) Coordinate with Public Works staff on storm water treatment concept. (3) Prepare preliminary opinion of probable costs. (4) Attend two City/Team meetings. Deliverables: 01203.0006/523023.4 -2- A-2 a. 1” = 20’ scale plan delineating planting and hardscape areas b. Preliminary detailing and blow up plans c. Catalogue cuts and materials specifications C. Construction Document Phase (100%). (1) Update base sheets per approved design plan. Construction document package shall include: a. Demolition Plan b. Landscape construction and drainage plan and details. (LID and WELO included) (Park Signage) c. Planting plan and details d. Irrigation plan and details (2) Attend two City/Team meetings Note: Structural, Mechanical, Electrical, Civil Engineering services are not included. D. Construction Phase. (1) Review plant material which can include visiting nurseries and/or coordination with nursery representative to secure quality plant material. (2) If authorized by the City’s Contract Officer, Consultant will make visits to the site to familiarize himself generally with the progress and quality of the work and to determine in general if the work is proceeding in accordance with the contract documents. On the basis of his on-site observations, Consultant he will keep the City’s Contract Officer informed of the progress of the work, and will endeavor to guard the City against any defects or deficiencies in the work of the construction contractor. Consultant will not be responsible for construction means, methods, techniques, sequences of procedures, or for safety precautions and programs in connection with the work and he shall not be responsible for the construction contractor’s failure to carry out the Work in accordance with the Contract Documents. (3) Construction administration, which includes providing Field Reports as required by the City’s Contract Officer, coordination, and shop drawing review. E. Deliverables. 01203.0006/523023.4 -3- A-3 (1). All plans shall be delivered to the City’s Contract Officer in both printed and electronic formats. Electronic submittals shall include *.pdf and *.dwg files and shall be compatible with the City’s GIS system. (2) Prepare Engineer’s Estimate: a. Consultant shall submit preliminary quantities and construction cost estimate at the 30% and final design submittals. Unit prices will be based upon the most current cost information for a recent, similar project. The final quantity/cost estimate will be based on the final construction plans and submitted with the 100% submittal. Cost estimates shall include a 5% contingency. b. Note: The engineering design budget for this project is $50,000. Consultant shall compare its estimated construction costs for the 30% and 100% submittal to the available budget. If Consultant’s estimated costs exceed the available budget, Consultant shall inform the City’s Contract Officer and provide recommendations for costs reduction or adjustment. (3) Prepare technical specifications and special provisions: a. Specifications shall be delivered to the City both in printed format and electronically. All documents shall be prepared in Microsoft Word format. Any other computer generated documents, including plans and calculations, shall be submitted electronically in a format acceptable to the City of Rancho Palos Verdes (i.e. spreadsheets - Microsoft Excel and CAD drawings - AutoCAD). a. Specifications for this project shall contain requirements of the contractor consistent with the provisions of the National Pollutant Discharge Elimination System (NPDES), the Clean Water Act, and the APWA Green Book. (4) Final Deliverables & As-Builts: Prepare one set of reproducible plans for construction. At the end of the construction, prepare “As-Built” mylars and submit final drawings electronically on CD in CAD & PDF formats at the close of the project (5) Construction Project Schedule: Consultant shall create the schedule using in MicroSoft Project or similar and must submit the schedule in both electronic and hard copy format to the City’s Contract Officer. Scheduling shall take into account City holidays, street sweeping, and trash collection days. 01203.0006/523023.4 -4- A-4 (6) Construction Assistance: During the construction phase, the construction contractor may have design questions, RFI’s, or submittal reviews that can best be answered by Consultant. Consultant shall provide responses as needed. 2. COMPENSATION A. Site inventory Phase (30%) $4,500 B. Design Phase (70%) $6,800 C. Construction Document Phase (100%) $12,000 D. Construction Phase - Time and Materials Basis Not to Exceed $5,000 TOTAL $28,300 E. Payment (1) Project to be invoiced monthly based on percentage of work completed. (2) Invoices are due and payable upon receipt. 3. ADDITIONAL SERVICES A. If, after a scheme has been approved, City makes a decision which, for its proper execution, involves additional services and expenses for changes to the drawings or other documents, or if Consultant be put to labor or expense by delays caused by City or a Consultant, or by the delinquency or insolvency of either, the Consultant is to be equitably paid by City for such additional service and expense. B. Compensation for additional services shall be at the following hourly rates: Principal $150 Planner $120 Landscape Architect $120 Senior Staff $100 Draftsperson $80 Clerical $50 01203.0006/523023.4 -5- A-5 2. Continuing Effect of Agreement. Except as amended by this Amendment No. 2, all provisions of the Agreement, as amended, shall remain unchanged and in full force and effect. From and after the date of this Amendment No. 2, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement, as amended by Amendment Nos. 1 & 2 to the Agreement. 3. Affirmation of Agreement; Warranty Re Absence of Defaults. City and Consultant each ratify and reaffirm each and every one of the respective rights and obligations arising under the Agreement, as amended. Each party represents and warrants to the other that there have been no written or oral modifications to the Agreement, as amended, other than as provided herein. Each party represents and warrants to the other that the Agreement is currently an effective, valid, and binding obligation. Consultant represents and warrants to City that, as of the date of this Amendment No. 2, City is not in default of any material term of the Agreement, as amended, and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement, as amended. City represents and warrants to Consultant that, as of the date of this Amendment No. 2, Consultant is not in default of any material term of the Agreement, as amended, and that there have been no events that, with the passing of time or the giving of notice, or both, would constitute a material default under the Agreement, as amended. 4. Adequate Consideration. The parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment No. 2. 5. Authority. The persons executing this Amendment No. 2 on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Amendment No. 2 on behalf of said party, (iii) by so executing this Amendment No. 2 , such party is formally bound to the provisions of this Amendment No. 2 , and (iv) the entering into this Amendment No. 2 does not violate any provision of any other agreement to which said party is bound. [SIGNATURES ON FOLLOWING PAGE] 01203.0006/523023.4 -6- A-6 IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 2 on the date and year first-above written. CITY: CITY OF RANCHO PALOS VERDES, a municipal corporation ____________________________________ City Manager ATTEST: _________________________________ City Clerk APPROVED AS TO FORM: ALESHIRE & WYNDER, LLP _________________________________ City Attorney CONSULTANT: Jon David Cicchetti By: ________________________________ Name: Jon David Cicchetti Title: Principal Address: 140 Linden Avenue, Suite 286 Long Beach, CA 90802 Two corporate officer signatures required when Consultant is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. CONSULTANT’S SIGNATURES SHALL BE DULY NOTARIZED, AND APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS MAY BE REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONSULTANT’S BUSINESS ENTITY. 01203.0006/523023.4 -7- A-7 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT STATE OF CALIFORNIA COUNTY OF LOS ANGELES On __________, 2018 before me, ________________, personally appeared ________________, proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature: _____________________________________ OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT INDIVIDUAL CORPORATE OFFICER _______________________________ TITLE(S) PARTNER(S) LIMITED GENERAL ATTORNEY-IN-FACT TRUSTEE(S) GUARDIAN/CONSERVATOR OTHER_______________________________ ______________________________________ SIGNER IS REPRESENTING: (NAME OF PERSON(S) OR ENTITY(IES)) _____________________________________________ _____________________________________________ ___________________________________ TITLE OR TYPE OF DOCUMENT ___________________________________ NUMBER OF PAGES ___________________________________ DATE OF DOCUMENT ___________________________________ SIGNER(S) OTHER THAN NAMED ABOVE A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. 01203.0006/523023.4 A-8 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT STATE OF CALIFORNIA COUNTY OF LOS ANGELES On __________, 2018 before me, ________________, personally appeared ________________, proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature: _____________________________________ OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT INDIVIDUAL CORPORATE OFFICER _______________________________ TITLE(S) PARTNER(S) LIMITED GENERAL ATTORNEY-IN-FACT TRUSTEE(S) GUARDIAN/CONSERVATOR OTHER_______________________________ ______________________________________ SIGNER IS REPRESENTING: (NAME OF PERSON(S) OR ENTITY(IES)) _____________________________________________ _____________________________________________ ___________________________________ TITLE OR TYPE OF DOCUMENT ___________________________________ NUMBER OF PAGES ___________________________________ DATE OF DOCUMENT ___________________________________ SIGNER(S) OTHER THAN NAMED ABOVE A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. 01203.0006/523023.4 A-9 PROPOSAL FOR LANDSCAPE ARCHITECTURAL SERVICES DATE: October 1, 2018 PROJECT: Hesse Park Improvements CONSUL TANT: Jon David Cicchetti/Landscape Architects 140 Linden Avenue, Suite 286 CLIENT: Long Beach, CA. 90802 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 ATTENTION: Mr. James Flannigan Assistant Engineer JamesF@rpvca.gov Project Scope: Provide landscape architectural services for Hesse Park 1. The services of the Consultant shall be phased and completed as noted below and as described exhibit A. A. Site Inventory and Analysis Phase (30%) (1) Prepare landscape base sheets using plans and data provided by the City of Rancho Palos Verdes. (2) Project Kickoff meeting: attend a kick-off meeting at the City and prepare a meeting agenda including lines of communication between the City, Design Consultant, utility agencies, and other agencies involved in the project and discuss the project requirements, scope of work , and schedule. Prepare and distribute meeting minutes highlighting any action items. (3) Review existing records: Review existing records, including but not limited to the Hesse Park Master Plan, street base maps, and community meeting notes. These documents are on file with the Public Works Department. (4) Utility Coordination: Coordinate with utility agencies throughout the design phase. If the proposed improvements interfere with existing utilities, consultant will arrange for potholing by the utility to accurately represent its location on the construction documents. If required, obtain any permit(s) that may be required for creation of construction documents for the Project, from any agency or utility. (5) Perform site visit to observe existing conditions. B-1 Proposal for Landscape Architectural Services City of Rancho Palos Verdes Hesse Park Improvements October 2 , 2018 Page 2 of 5 B. Design Phase (70%) (1) Based on approved improvement program prepare design plans. Prepare overall preliminary plan depicting landscape concepts for Client review. Provide color rendering of design plan . Includes blow-ups and sections to illustrate details of the scheme . (2) Coordinate with Public Works staff on storm water treatment concept. (3) Prepare preliminary opinion of probable costs. (4) Attend Two (2) Client/ Team meetings. Package to include : a . 1 "=20 ' scale plan delineating planting and hardscape areas b. Preliminary detailing and blow up plans c. Catalogue cuts and materia ls specifications C. Construct ion Document Phase (100 %) (1) Update base sheets per approved design plan . Construction document package shall include: a. Demolition Plan b . Landscape construction and drainage plan and deta ils . (LID and WELO included) (Park Signage) c . Planting plan and details d. Irrigation plan and details (2) Attend two (2) Client I Team meetings (3) City submittals and coordination Note: Structural, Mechanical, Electrical, Civ il Engineering services are not included . B-2 Proposal for Landscape Arch itectural Services City of Rancho Palos Verdes Hesse Park Improvements October 2 , 2018 Page 3 of 5 D. Construction Phase (1) review plant material which can include visiting nurseries and/or coordination with nursery representative to secure quality plant material. (2) If authorized by Client, the Consultant will make visits to the site to familiarize himself generally with the progress and quality of the Work and to determine in general if the Work is proceeding in accordance with the Contract Documents. On the basis of his on -site observations as a Consultant he will keep the Client informed of the progress of the Work, and will endeavor to guard the Client against any defects or deficiencies in the Work of the Contractor. The Consultant will not be responsible for construction means, methods, techniques, sequences of procedures, or for safety precautions and programs in connection with the Work and he will not be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents. (3) Construction administration , which includes Field Reports, coordination and shop drawing review . 2. COMPENSATION FOR THESE SERVICES SHALL BE AS FOLLOWS: A. Site inventory Phase (30%) $4 ,500.00 B . Design Phase (70%) $6,800.00 C . Construction Document Phase (100%) 12,000.00 Total : $23,300.00 D . Plan Processing -Time and Materials Basis Not to Exceed $3,000.00 E. Construction Phase -Time and Materials Basis Not to Exceed $5 ,000.00 F. Payment (1) Project to be invoiced monthly based on percentage of work completed. (2) Invoices are due and payable upon receipt. 3 . RESPONSIBILITIES OF THE CLIENT SHALL INCLUDE: A. Furnish site and building information. B. Payment of contract fees, reimbursable expenses , and any charges for approved add itional services. B-3 Proposal for Landscape Architectural Services City of Rancho Pa los Verdes Hesse Park Improvements October 2 , 2018 Page 4 of 5 C. Payment of fees for securing approval of authorities having jurisdiction over the project. 4. ADDITIONAL SERVICES A. If, after a scheme has been approved , the Client makes a decision which, for its proper execution, involves additional services and expenses for changes to the drawings or other documents, or if the Consultant be put to labor or expense by delays caused by the Client or a Contractor, or by the delinquency or insolvency of either, the Consultant is to be equitably paid by the Client for such additional service and expense . B. Compensation for additional services shall be at the following rates : Principal Planner Landscape Architect Senior Staff Draftsperson Clerical $150.00 I hr 120.00 I hr 120.00 I hr 100.00 I hr 80.00 I hr 50.00 I hr BY ~~ Jon Cic ttl:c.N. 2191 DATE._/o--'-/__,f ,,__)/_;:__e, ___ _ Landscape Architect Mr. James Flannigan City of Rancho Palos Verdes Assistant Engineer B-4 Proposal for Landscape Architectural Services City of Rancho Palos Verdes Hesse Park Improvements October 2, 2018 Page 5 of 5 Exhibit A • All plans shall be delivered to the City in both printed and electronic formats. Electronic submittals shall include *.pdf and *.dwg files and shall be compatible with the City's GIS system. • Prepare Engineer's Estimate: o Constultant shall submit preliminary quantities and construction cost estimate at the 30% and final design submittals. Unit prices will be based upon the most current cost information for a recent, similar project. The final quantity/cost estimate will be based on the final construction plans and submitted with the 100% submittal. Cost estimates shall include a 5% contingency . o Note: The engineering design budget for this project is $50,000. The consultant shall compare its estimated construction costs for the 30% and 100% submittal to the available budget. If the consultant's estimated costs exceed the available budget, the consultant shall inform the City and provide recommendations for costs reduction or adjustment. • Prepare technical specifications and special provisions: o Specifications shall be delivered to the City both in printed format and electronically. All documents shall be prepared in Microsoft Word format. Any other computer generated documents, including plans and calculations, shall be submitted electronically in a format acceptable to the City of Rancho Palos Verdes (i.e. spreadsheets -Microsoft Excel and CAD drawings -AutoCAD). o Specifications for this project shall contain requirements of the contractor consistent with the provisions of the National Pollutant Discharge Elimination System (NPDES), the Clean Water Act, and the APWA Green Book. • Final Deliverables & As-Builts: o Prepare one set of reproducible plans for construction. At the end of the construction, prepare "As-Built" mylars and submit final drawings electronically on CD in CAD & PDF formats at the close of the project • Construction Project Schedule : o Design Consultant shall create the schedule using in Microsoft Project or similar and must submit the schedule in both electronic and hard copy format to the City. Scheduling shall take into account City holidays, street sweeping, and trash collection days. • Construction Assistance: o During the construction phase, the Construction contractor may have design questions, RFl's, or submittal reviews that can best be answered by the Design Consultant. The Design Consultant is asked to help with these as needed . B-5