Loading...
CC SR 20181107 L - PVIC ExhibitsRANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 11/07/2018 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA DESCRIPTION: Consideration and possible action to award construction contract for the Point Vicente Interpretive Center Exhibits Replacement (PVIC Exhibits) Project to Taylor Studios Inc. (Taylor Studios) for $207,087, and authorize a project contingency of $20,709. RECOMMENDED COUNCIL ACTION: 1) Award a construction contract to Taylor Studios in the amount of $207,087; 2) Authorize the City Manager or Director of Finance to execute amendments for project contingency up to an additional 10% ($20,709) of the project budget for a total construction authorization of $227,796; and, 3) Authorize an additional appropriation of $11,796 4) Authorize the Mayor and City Clerk to execute the construction contract; subject to approval as to form by the City Attorney. FISCAL IMPACT: The recommended action will result in a total authorized expenditure of up to $207,087, plus a 10% contingency of $20,709. Additional funding is necessary to complete this work outside of the approved budget within the Donor Restricted Fund Balance. Amount Budgeted: $197,000 Additional Appropriation: $144,320 Account Number(s): 228-400-8501-8403 332-400-8501-8403 ($144,320) Grant Expense 332-300-0000-3302 ($144,320) Grant Revenue ORIGINATED BY: Natalie Chan, PE, Senior Engineer Daniel Trautner, Deputy Director of Recreation and Parks REVIEWED BY: Elias Sassoon, PE, Director of Public Works APPROVED BY: Doug Willmore, City Manager ATTACHED SUPPORTING DOCUMENTS: A. Grant Agreement (page A-1) B. Design Renderings (page B-1) BACKGROUND AND DISCUSSION: The City of Rancho Palos Verdes was awarded a grant from the California Cultural and Historical Endowment Museum Grant Program (Attachment A). The Grant funds and the City’s matching funds are for the design and construction of two permanent exhibits 1 at the Point Vicente Interpretive Center (PVIC). The two exhibits will focus on whaling and the Point Vicente Lighthouse Fresnel lens (Attachment B). These two exhibits are part of a larger “Phase II” concept to incorporate new exhibits at PVIC that explore the human and natural history of the Palos Verdes Peninsula. The following table for summarizes the budgetary amounts for this project. Total Construction Cost $227,796 Budgeted project amount $216,000 Grant funds to be given to City after project completion (as per Attachment A) $144,320 Final City contribution from Donor Restricted Funds $83,476 The project was publicly advertised in the Daily Breeze and sent out to various bid houses. Staff also sent the Invitation for Bids (IFB) to 5 exhibit fabrication companies. As summarized in the table below, a mandatory pre-submittal conference was held to answer all questions in which 3 companies participated. One bid was received by Taylor Studios. Date October 2, 2018 Bid Advertisement October 9, 2018 Mandatory Pre-Bid Call-In Meeting October 18, 2018 Bid Opening Staff has verified Taylor Studios’ references and found their past performance on jobs of similar size and scope to be satisfactory. Taylor Studios was hired by the City in 2005 to fabricate and install a variety of murals and dioramas at PVIC. Taylor Studios designed and installed the kelp forest; plant and animal models, mannequins, and the grass hut, the interactive and multimedia walkthrough sea cave, tide pool, the interactive gray whale, a “Pepper’s Ghost” interactive, and a short video production. Taylor Studios has also created exhibits for other California venues, including the USS Midway Museum in San Diego, Channel Islands Boating Center in Oxnard, Marshall Gold Discovery State Historic Park in Coloma, Nimbus Fish Hatchery in Gold River, San Bernardino County Museum, Santa Clara County Parks and Recreation Department, and Orange County Parks. Taylor Studios proposal did not account for the prevailing wage requirement. Taylor Studios requested an allowance for a bid schedule revision. Staff has worked with the City Attorney’s office to account for this change. The revision adds an additional $7,362 to the bid amount for a total revised bid amount of $207,087. Sunbeam Consulting will be used for inspection services during construction through the City’s existing on-call contract for a not to exceed amount of $5,000. 2 Adopting Staff’s recommendations will award a construction contract, subject to City attorney’s approval to form, to Taylor Studios in the amount of $207,087, and authorize Staff to utilize 10% of the project contract amounts ($20,709) as contingency for unforeseen circumstances. ALTERNATIVES: In addition to the Staff recommendations, the following alternative action is available for the City Council’s consideration: 1. Reject all bids and re-advertise the construction project. Staff does not recommend this alternative as the low bid received is within the budgeted amount and re-bidding the project could take approximately two months to complete and may result in an increase in bid prices. 3 A-1 A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-9 A-10 A-11 A-12 B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-10