Loading...
CC SR 20181107 I - PVDW Median Beautification Project Change OrderRANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 11/07/2018 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA DESCRIPTION: Consideration and possible action to authorize an amendment to the agreement with United GLI, Inc. (United) and to authorize amending the agreement with DCA Civil Engineering Group, Inc. (DCA) for construction management and inspection services associated with the Palos Verdes Drive West Median Beautification Project (PVDW Beautification) extending the limits of this project one block to the north, and authorizing an additional appropriation of $148,535. RECOMMENDED COUNCIL ACTION: 1) Authorize amending the agreement with United for the PVDW Beautification Project, contingent upon the City Attorney’s approval as to form, to extend the project northward to complete the California Coastal Trail in this area, and approve an additional appropriation in the amount of $125,435.00; and, 2) Authorize amending the agreement with DCA, contingent upon the City Attorney’s approval as to form, for construction management and inspection services associated with the additional work, and authorize an additional appropriation in the amount of $23,100. FISCAL IMPACT: The recommended action will result in a total authorized expenditure of up to $148,535. Amount Budgeted: $475,000 Additional Appropriation: $148,535 Account Number(s): 212-400-8820-8002 $125,435 212-400-8820-8006 $23,100 ORIGINATED BY: Natalie Chan, PE, Senior Engineer REVIEWED BY: Elias Sassoon, PE, Director of Public Works APPROVED BY: Doug Willmore, City Manager ATTACHED SUPPORTING DOCUMENTS: A. Construction Plan (page A-1) BACKGROUND AND DISCUSSION: This project includes the installation of irrigation and landscaping on the PVDW median. The City Council approved the construction contract with United for $394,545 and the construction management and inspection contract with DCA for $31,920 at its meeting on June 5, 2018. A section of the median from roughly 80’ north of the City limit with 1 Palos Verdes Estates (PVE) to Marguerite Dr. was not included in the original scope of this project. This section is approximately 400’ total in length, and is part of a larger trail connection project to complete the California Coastal Trail. The City and the Palos Verdes Peninsula Land Conservancy (PVPLC) previously applied for and received grant funds from the California Coastal Conservancy (CCC) to complete this trail work. The City matching funds were not available at the time so the trail connection work was de- scoped. However, the City entered into a Memorandum of Understanding (MOU) with the CCC and is still contractually obligated to complete this work. Staff has coordinated with the City of Palos Verdes Estates and the project has been cleared through its City Council and Parks Commission. The City Council previously approved the additional design scope for the PVDW Beautification Project on October 16, 2018. Penco was hired to perform professional services and has completed the design of this additional section of the median. Staff now recommends that the City Council authorize an amendment to the current United and DCA contracts to include this scope of work. Adopting Staff’s recommendations will authorize an amendment to the existing construction contract with United and an amendment to the existing professional services contract with DCA for construction management and inspection services. Both contracts will be executed only with the City Attorney’s approval as to form, and will authorize an additional appropriation of $148,535 for the proposed work. ALTERNATIVES: In addition to the Staff recommendations, the following alternative action is available for the City Council’s consideration: 1. Reject the Staff recommendations and address the trail and landscaping for this segment of the PVDW median in a future CIP project. 2 MARGUERITE DRIVEALIDA PLACE PALOS VER D E S D R I V E W E S T L U N A D A V I S T A • • 280.00-10+0011+00 1 2 + 0 0 1 3 + 0 0 277.50-275.00-272.50-270.00267.50-265.00- 1 4 + 0 0 L E G E N D C O N S T R U C T I O N N O T E S : M E D I A N T Y P I C A L S E C T I O N ± A - 1