Loading...
RPVCCA_SR_2011_05_03_11_Lease_Ladera_LindaCITY OF RANCHO PALOS VERDES TO: FROM: DATE: SUBJECT: REVIEWED: MAYOR LONG AND MEMBERS OF THE CITY COUNCIL TOM ODOM,DIRECTOR OF RECREATION ~~~4D PARKS/PUBLIC WORKS DEPUTY DIRECT~~ MAY 3,2011 LEASE OF PORTION OF THE LADERA LINDA FACILITY BY THE MONTESSORI SCHOOL CAROLYN LEHR,CITY MANAGER ~ RECOMMENDATION Receive and file. DISCUSSION The Ladera Linda Community Center is located at 32201 Forrestal Drive.This former elementary school is designated as an Active/Community Park.The property was purchased from the Palos Verdes Peninsula Unified School District after much community involvement and input.Payment for the site included a trade of the Loma Del Mar School Site,previously purchased by the City,and cash paid over a three year period.Purchase was completed in fiscal year 1985-86.The acquisition cost was $730,000.The site is approximately 11 acres in size with 5 buildings for a total square footage of 18,879 square feet. The uses for the Ladera Linda Community Center include a number of recreational classes offered by independent contractors,such as dance classes,dog obedience classes,chess camps,outdoor adventure camps and a preschool.The preschool is operated by Montessori School of Manhattan Beach/Rancho Palos Verdes and is under a lease agreement with the City that expires on September 21,2011.The Montessori School of Manhattan Beach/Rancho Palos Verdes has leased a portion of the facility for a preschool for over 15 years.The lease area includes:two small bathrooms (5'x5'and 5'x8')and Room A in Building E,together with the non-exclusive right to use the adjoining playground in common with others;Room L in Building A,along with the exclusive right to use the adjacent fenced area;and Rooms 0,E,and F in Building B,together with the non- exclusive right to use the grass area located directly behind Building B in common with others. 11-1 The City has had significant maintenance issues at this facility for the past several years primarily due to the age of the facility,which was built over 30 years ago.A number of these issues relate to an aging infrastructure,such as gas,water and wastewater lines that require replacement at a significant cost of several hundred thousands dollars and in addition,costs such as design,preparing bids and project management.Furthermore,the time needed for construction would result in several months'closure of the preschool while construction is occurring on the buildings. Due to the age of the infrastructure at the site and the extensive work and cost to bring the buildings up to an acceptable standard,the City Council directed on March 1,2011 to give notice to the preschool that the City will not be renewing the lease.City Staff has met with the owners of the preschool and their attorney both before and after the written notice of non renewal was sent.At those meetings,Montessori School representatives advised Staff that the school would like to continue operating for two more years and would be willing to make a contribution to correct some of the deficiencies at the building.However, given the magnitude of the improvements that are needed,the school owners were unable to commit to such a large investment. The structures that are at the Ladera Linda Community Center are past their useful life, are generally deteriorated and would require replacement;therefore,renovation,due to the existing conditions,is not recommended. CONCLUSION In order to lease a City building to a preschool,the building should be in compliance with relevant codes and in an acceptable condition.Unfortunately,due to the current condition of the buildings and the significant financial expenditure that would be needed to improve their condition to an acceptable level,staff does not recommend that the current lease be extended beyond the end of the current lease,which expires in September. Additional factors for the basis of nonrenewal of the lease included consequences of an unplanned closure,duration of a long term closure while under construction,cost of renovation estimated to be several million dollars and meeting the high standard for preschool facilities. 1351780-1 11-2