RPVCCA_SR_2011_05_03_03_Contract_Amd_Point_ViewCrrvOF MEMORANDUM RANCHO PALOS VERDES TO: FROM: DATE: SUBJECT: HONORABLE MAYOR &CITY C UNCIL MEMBERS JOEL ROJAS,COMMUNI VELOPMENT DIRECTOR MAY 3,2011 CONTRACT AMENDMENT FOR THE ENVIRONMENTAL REVIEW OF THE PROPOSED POINT VIEW AGRICULTURE,GOLF COURSE AND EVENT GARDEN MASTER PLAN PROJECT REVIEWED:CAROLYN LEHR,CITY MANAGER Project Manager:Eduardo Schonborn,AICP.Senior Plann$ RECOMMENDATION Authorize the Mayor and the City Clerk to sign an amendment to the professional services agreement with PCR Services Corporation for an additional amount not to exceed $10,930.00 to complete the environmental review of the Point View Agriculture and Golf Course Master Plan Project on property located at 6001 Palos Verdes Drive South (known commonly as the Point View property),which will be paid for by the applicant (York Point View Properties,LLC). BACKGROUND On January 18,2011,the City Council approved a contract with PCR Services Corporation in the amount of $64,707.00 to prepare an environmental analysis of the Point View Agriculture and Golf Course Master Plan project.Based on feedback from the City's Public Works Staff,additional traffic impact analysis is needed that is beyond the scope of the original contract.Therefore,a contract amendment for additional services in the amount of $10,930 has been prepared for the City Council's approval. DISCUSSION The attached "Scope of Additional Services"(dated April 14,2011) prepared by PCR requests $10,930 for additional traffic impact analysis for the Point View master plan 3-1 Case No.ZON2010-00087 Amendment to Contract for Services -PCR May 3,2011 project.As indicated in the attachment,the following additional services are warranted based on input from the City's Public Works Staff: •Extend the 24-hour machine counts period on South Palos Verdes Drive east of Seacove Drive from one day to three days (Friday,Saturday and Sunday) •Conduct new intersection turning movement counts for one additional study intersection (Hawthorne Boulevard and Via Rivera)on a Friday afternoon from 4:00pm to 6:00pm,and on a Saturday midday from noon to 2:00pm •Conduct traffic analysis for Existing Plus Project scenario (both Friday afternoon peak hour and Saturday midday peak hour) •Conduct project traffic impact analysis for one additional intersection (Hawthorne Boulevard and Via Rivera) Based on the results of the 24-hour machine counts over the Friday through Monday period,Public Works Staff may also request additional traffic impact analysis and documentation for a Sunday mid-day scenario.As a result,the proposed $10,930 increase in contract cost accounts for this additional task should it be necessary.This request will bring the total cost of the environmental analysis for the Point View master plan project to $75,637.The total cost of this analysis will be borne by the applicant. CONCLUSION Staff recommends that the City Council authorize the Mayor and the City Clerk to sign an amendment to the professional services agreement with PCR Services Corporation for an additional amount not to exceed $10,930.00 to complete the environmental analysis for the Point View Agriculture and Golf Course Master Plan Project. Attachments: •Amended Agreement for Environmental Consulting Services •Addendum Proposal,dated April 14,2011 3-2 First Amendment to Agreement between the City of Rancho Palos Verdes and PCR Services Corporation This agreement is an amendment to the environmental consulting services agreement between the City of Rancho Palos Verdes ("CITY")and PCR Services Corporation ("CONSULTANT"),dated January 18,2011 ("Agreement").This amendment to the Agreement is effective as of May 3,2011 and is being made to expand the scope of services in order to conduct an additional traffic impact analyses for the Point View Agriculture and Golf Course Master Plan Project. Section 1.Section 1 of the Agreement is hereby amended to read as follows: "Section 1.CONSULTANT's Services.Consultant shall perform professional services by preparing Environmental Documentation for the Point View Agriculture and Golf Course Master Plan,as set forth in the "Scope of Work"in the CONSULTANTS proposal dated as received on December 3,2010 and attached hereto as Exhibit 'A'and incorporated herein by this reference.Consultant shall also perform the additional professional services related to traffic impacts for the Point View Agriculture and Golf Course Master Plan project that are specified in the "Scope of Additional Services"dated April 14,2011,which is attached hereto as Exhibit 'B'and incorporated herein by this reference.These services shall include but not be limited to the following: (a)CONSULTANT,shall prepare,under consultation with the CITY,the following for the proposed project;(1)data collection and project description,(2)Draft Initial Study (IS)/Mitigated Negative Declaration (MND) and Supporting Documentation (3)Revise IS/MND and Circulate Draft IS/MND,(4)a Response to Comments on the Draft IS/MND,(5)a Final IS/MND,(6)a Mitigation Monitoring and Reporting Program,and (7)a Notice of Determination as specified in Pages 6 though 15,inclusive,of Exhibit "A'. The IS/MND shall be prepared in compliance with the "Scope of Services"attached as Pages 6 though 15,inclusive,of Exhibit 'A'and shall contain all items and Notices required by CEQA (as amended),the State Guidelines,and CITY'S Local CEQA Guidelines. (b)When requested,CONSULTANT shall attend and participate in meetings with CITY staff as well as Public Hearings,which are necessary for the preparation and completion of the environmental documentation.Any meeting for which CONSULTANT is requested to attend by CITY beyond the number of meetings identified in the "Scope of Services",CONSULTANT shall be compensated on a time and materials basis at the rates set forth in the "Attachment -Key Personnel &Rate Sheet"contained in Exhibit 'A', R6876-000 1\1349792v2.doc 3-3 which is attached hereto and incorporated herein by reference. (c)CONSULTANT shall supply CITY with the deliverables described in the "Scope of Services"attached as Exhibit lA',including the following documents for the proposed project: (1)Administrative Draft Initial Study/Mitigated Negative Declaration (IS/MND) (2)Final Initial Study/Mitigated Negative Declaration (IS/MND) (3)Draft and Final Responses to Comments (4)Mitigation Monitoring and Reporting Program (5)Notice of Determination (6)Computer files for all documentation,with processing documents in a format useable for the City's Website. (d)All reports,information,data and exhibits prepared or assembled by CONSULTANT or any subconsultants in connection with the performance of its services pursuant to this Agreement are confidential until released by CITY to the public,and CONSULTANT agrees that they shall not be made available to any individual or organization without prior written consent of the CITY prior to such release.All such reports,information,data and exhibits shall be delivered to CITY upon demand without additional cost or expense to CITY.All charts,tables,figures,and maps,which are prepared with computer-based mapping or spreadsheet programs,shall be provided to CITY in their original formats. (e)CONSULTANT shall respond to those comments raised by CITY staffs review of the documents in order to facilitate completion thereof. Consultant shall also respond to all comments from the public,responsible agencies,and/or other interested parties regarding the IS/MND.Letters identifying the response shall be sent to each commenting party. (f)This agreement and the scope of work to be performed by CONSULTANT may only be amended in a written document executed by both of the parties to this agreement." Section 2.Section 3 of the Agreement is hereby amended to read as follows: "Section 3.Compensation.CITY agrees to compensate CONSULTANT in full satisfaction for the services described in Exhibit lA'a fixed fee not to exceed sixty-four thousand,seven hundred and seven dollars ($64,707)and a fixed fee not to exceed ten thousand,nine hundred and thirty dollars ($10,930)forthe additional environmental analysis for the Point View Agriculture and Golf Course Master Plan project described in Exhibit 'B,'including the optional task,for a grand total of seventy-five thousand,six 2 R6876-0001 \1349792v2.doc 3-4 hundred and thirty-seven dollars ($75,637),which includes all labor and subconsultant costs,as described in Exhibits 'A'and 'B'and all expenses for printing,word processing,delivery,fax,phones,mileage,etc.Prior to printing of any documents,CONSULTANT shall verify with CITY the total number of documents to reproduce. Not included in this fixed fee are expenses incurred for attending meetings beyond those specified in Section 1(b)of this contract;analysis of key issues in addition to those identified within the attached "Scope of Work", changes in the project description,plans,or scope of work requiring additional work;and printing additional copies of any document beyond the number of copies specified in Page 2 of Exhibit 'A'. The actual costs of CONSULTANT'S services and expenses shall be itemized on the Invoice form,and CITY shall pay CONSULTANT for said undisputed services and expenses.Payments shall be made based upon Consultant's monthly invoices up to the maximum amounts set forth in the following schedule: Data Collection/Preparation of Project Description $4,400.00 +expenses Draft IS/MND and Supporting Documents $54,437.00 +expenses (Technical Studies)/Workshop Revisions to IS/MND and Public Circulation Response to Comments/MMRP Receipt of Notice of Determination $57,437.00 +expenses $65,437.00 (including all expenses) Release of 5%Retention and final invoice Any work approved pursuant to Section 1(f)of this agreement shall be included in the appropriate segment of the foregoing schedule,as determined by the City,and the maximum billing amounts shall be adjusted accordingly. 1The maximum amount of each payment serves as a cap on the payments for work performed pursuant to Exhibit 'A'until the correlated benchmark item is completed to the satisfaction of City Staff. Therefore completion of one benchmark item allows for billing up to the maximum identified for the following benchmark item.All amounts of payments shall be less the 5%retention,unless sixty (60)consecutive days of delays occur as the result of event(s),which the CITY determines were beyond CONSULTANT'S control.In such case,CITY shall release to CONSULTANT the full amount of the payment for the benchmark item(s)that have been completed to the satisfaction of City Staff. 3 R6876-0001 \1349792v2.doc 3-5 Five percent (5%)of each bill submitted by CONSULTANT shall be held by CITY in a retention account.The retained funds will be released to CONSULTANT when the environmental documentation project is successfully completed by the submittal ofthe final Notice of Determination. If CONSULTANT is requested by CITY to revise or supplement the environmental documentation with additional data,information or analysis solely as a result of the CONSULTANT'S failure to comply with the requirements of CEQA,or the State or local CEQA Guidelines (hereafter referred to collectively as "CEQA"),CONSULTANT shall provide such revision or supplement at no additional cost to the CITY.For purposes of this Section,CONSULTANT'S "failure to comply"shall be based upon a written communication from CITY to CONSULTANT advising CONSULTANT of the particular items of CONSULTANT'S work that do not comply with the provisions of CEQA,and which shall not be based on unwritten interpretations of CEQA that were not delivered to CONSULTANT upon commencement of this Agreement. If changes to existing laws,rules,regulations or policies of any state, federal or local governmental authority having jurisdiction over the project occur,new,unforeseen issues arise,or comments on the documents are received from attorneys other than the City Attorney during or following the circulation of the draft environmental document,during the term of this Agreement that require modification of the environmental documentation, .CONSULTANT will perform such additional services on a time-and-materials basis,at the rates set forth within Attachment of Exhibit "A'. The CITY and CONSULTANT hereby acknowledge and agree that the terms of CONSULTANT'S compensation are not dependent upon the CITY'S final action on these Projects." Section 3.Except as expressly amended by this amendment to the Agreement,all of the other provisions of the Agreement shall remain in full force and effect as written in the Agreement. 4 R6876-0001 \1349792v2.doc 3-6 IN WITNESS WHEREOF,the parties hereto have executed this Agreement as of the date and year first above written. CITY OF RANCHO PALOS VERDES ("CITY") By:_ Mayor ATTEST: By:_ City Clerk PCR SERVICES CORPORATION ("CONSULTANT") Signature:_ Printed Name:_ Title:_ 5 R6876-0001 \1349792v2.doc 3-7 R6876-0001 \1349792v2.doc Exhibit 'B':Scope of Additional Services 6 3-8 April J4,2011 SCOPE OF ADDITIONAL SERVICES TRAFFIC STUDY FOR THE POINT VIEW MASTER PLAN PROJECT RANCHO PALOS VERDES,CALIFORNIA SCOPE OF ADDITIONAL SERVICES Per the request from the City of Rancho Palos Verdes staff,the following are additional services beyond the original scope and budget necessary to support the environmental clearance for the proposed Point View Master Plan project: Mandatory Tasks •Extend the 24-hour machine counts period on South Palos Verdes Drive east of Seacove Drive from one day to three days (Friday,Saturday and Sunday)1 •Conduct new intersection turning movement counts for one additional study intersection ( Hawthorne Boulevard and Via Rivera)on a Friday afternoon from 4:00PM to 6:00PM and on a Saturday midday from Noon to 2:00PM •Conduct traffic analysis for Existing Plus Project scenario (both Friday afternoon peak hour and Saturday midday peak hour) •Conduct project traffic impact analysis for one additional intersection (Hawthorne Boulevard and Via Rivera) Optional Task (Sunday mid-day analysis) Based on the results of the 24-hour machine counts over the Friday through Monday period,the City may also request traffic impact analysis and documentation for a Sunday mid-day scenario. The optional task will require additional intersection traffic turning movement counts at the following study intersections for a 2-hour Sunday midday peak period: •Palos Verdes Dr West &Hawthorne BINia Vicente •Palos Verdes Dr South &Palos Verdes Dr East •Hawthorne BI &Via Rivera •The U-turn movement at the unsignalized T -intersection of Wayfarers Chapel driveway &Palos Verdes Drive South •The U-turn movement at the unsignalized intersection of Seacove Drive and Palos Verdes Drive South BUDGET The estimated cost to complete the scope for the mandatory tasks contained in this amendment is $6,930,including $4,830 for additional labor cost and $1,400 for additional traffic count data collection. This will increase the previously approved contract amount of $10,870 to $17,800. In addition,the estimated cost to conduct the optional task (Sunday mid-day analysis)is $4,000,including $3,300 for additional labor cost and $700 for additional traffic count data collection for a Sunday midday 2-hour period. 1 Fehr &Peers have reviewed the event schedules at the Wayfarer Chapel and for the local school districts in April. The earliest date the new traffic count data can be collected would be on Friday,April 29,2011. 3-9 ATTACHMENT A FEHR &PEERS COST ESTIMATE TRAFFIC STUDY FOR THE POINT VIEW MASTER PLAN PROJECT 4/14/2011 Project Manager Project Engineer (Sr.Associate)(Senior Engineer)GraphiclAdminl EMPLOYEE Netai Basu Jill Liu Technician TOTAL TOTAL HOURLY RATE'$195 $150 $120 HOURS COSTS Task 1 Project Initiation and Coordination 2 4 2 8 $1,230 Task 2 Site Reconnaissance &Data Collection 4 4 $600 Task 3 Existing Conditions 12 12 $1,800 Task 4 Future Traffic Conditions 22 22 $3,300 Task 5 Traffic Impact Assessment &Mitigation Measures 4 20 24 $3,780 Task 6 Internal Circulation &Site Access Analysis"2 6 8 $1,290 Task 7 Documentation 2 12 8 22 $3,150 TOTAL HOURS 10 80 10 109 -- LABOR COSTS $1,950 $12,000 $1,200 -$15,150 OTHER DIRECT COSTS: New Traffic Counts'"$1,850 Travel &Mileage $100 TOTAL TRAFFIC STUDY COST WITH MANDATORY TASKS $17,800 PREVIOUSL YAPPROVED CONTRACT AMOUNT Labor Costs $10,320 Other Direct Costs (Counts,Travel &Mileage)$550 Subtotal $10,870 PROPOSED CONTRACT AMENDMENT FOR MANDATORY TASKS Labor Costs $4,830 Other Direct Costs (Counts,Travel &Mileage)$1,400 Subtotal for Proposed Amendment 1$6,930 I PROPOSED CONTRACT AMENDMENT FOR OPTAIONAL TASKS: Sunday midday traffic analysis 2 18 2 22 $3,300 New traffic count for a Sunday midday period $700 $4,000 Please note:rates above are for bUdget estimate purposes only;actual individual billing rates may vary within the ranges shown on the atiached Hourly Billing Rates sheet. To address the residenfs concern for a potential "runaway"vehicle from the project driveway,we will conduct a quicl<review of the applicanfs recent project site plan and provide our recommendations for the physical/operational measures that can be incorporated into the future project driveway intersection design (curb radii,median,etc)as appropriate. The scope of work assumes that new traffint data would be collected at three intersections (Palos Verdes Dr West &Hawthorne BlNia Vicente,Palos Verdes Dr South &Palos Verdes Dr East,Hawthorne BI &Via Rivera),the V-tum movements at the unsignalized T-intersection of Wayfarers Chapel driveway/Palos Verdes Drive South and at the unsignalized intersection of Seacove Drive and Palos Verdes Drive South,and one street segment (Palos Verdes Drive South east of Seacove Drive).The intersection turning movement count would cover a 2-hour PM peak period on a typical weekday and a 2-hour Saturday midday peak period.The segment count data will cover a three-<lay period (Friday, Saturday,Sunday). 3-10