Loading...
RPVCCA_CC_SR_2012_07_17_02_WQFPP_Annual _User_Fee_Rate_FY12-13PUBLIC HEARING Date:July 17,2012 Subject:Water Quality and Flood Protection Program -Annual User Fee Rate -FY 12-13 Location:Citywide 1.Declare the Hearing Open:Mayor Misetich 2.Report of Notice Given:City Clerk Morreale 3.Staff Report &Recommendation:Director of Finance &IT McLean 4.Public Testimony: Appellant:N/A Applicant:N/A 5.Council Questions: 6.Rebuttal: 7.Declare Hearing Closed:Mayor Misetich 8.Council Deliberation: 9.Council Action: 2-1 CITY OF MEMORANDUM RANCHO PALOS VERDES TO: FROM: DATE:. SUBJECT: REVIEWED: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL DENNIS McLEAN,DIRECTOR OF FINANCE AND INFORMATION TECHNOLOGY l[~rn otu (.. JULY 17,2012 PUBLIC HEARING·WATER QUALITY AND FLOOD PROTECTION PROGRAM -ANNUAL USER FEE RATE -FY12· 13 (Supports 2012 City Council Goal for Public Infrastructure) CAROLYN LEHR,CITY MANAGER G9-- Staff Coordinators: RECOMMENDATION Ron Dragoo,PE,Senior Engineer Andy Winje,PE,Associate Engineer 1)Receive,review and file the independent Water Quality and Flood Protection Program Annual Report,dated June 27,2012,prepared by the Oversight Committee for the storm drain program. 2)Conduct a public hearing pursuant to Health and Safety Code Section 5473.2 and Section 3.44.40 of the Rancho Palos Verdes Municipal Code on July17,2012 on the Annual Report prepared by Harris &Associates,the Annual Report prepared by the Oversight Committee and information provided by Staff,and determine whether to collect the Storm Drain User Fee (the "Fee")for FY12-13,and if so,the rate per Equivalent Residential Unit ("ERU")for FY12-13. 3)At the conclusion of the Public Hearing determine the existence or absence of a majority protest. 4)In the absence of a majority protest,Staff recommends that the Council determine that the rate per ERU for FY12-13 shall be $94.38 as set forth in the Annual Report,adopt the attached Resolution No.2012-; A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES FINALLY ADOPTING A REPORT,AS FILED,IN CONNECTION WITH THE STORM DRAIN USER FEE ESTABLISHED 2-2 PUBLIC HEARING·WATER QUALITY AND FLOOD PROTECTION PROGRAM -ANNUAL USER FEE RATE -FY12·13 July 17,2012 Page 2 of 4 PURSUANT TO CHAPTER 3.44 OF THE RANCHO PALOS VERDES MUNICIPAL CODE;DETERMINING THE AMOUNT OF SUCH FEE FOR FY12-13;AND ORDERING THAT SUCH FEE BE COLLECTED ON THE COUNTY OF LOS ANGELES TAX ROLL FOR FY12-13. 5)In the event of a majority protest,direct Staff to present to City Council at a subsequent meeting a resolution determining the amount of the Storm Drain User Fee for FY12-13 and providing for an alternative method of collecting the Storm Drain User Fee for FY12-13. EXECUTIVE SUMMARY Staff has timely published public notices for this Public Hearing in the Palos Verdes Peninsula News on July 5,2012 and July 12,2012.During the Public Hearing,the City Council shall make a decision whether to collect the User Fee for FY12-13.Prior to this Public Hearing,Staff updated the Committee on April 10,2012,May 9,2012 (see staff report included as Attachment B to the Oversight Committee's Annual Report)and June 27,2012,including the status of storm drain capital projects,storm drain lining projects, catch basin filtration devices and other expenses for the program.At a public hearing conducted on June 27,2012,Staff presented to the Committee the proposed project plan and budget for the Storm Drain program for FY12-13,excerpts from the 2012 Five-Year Financial Model,the 2012 Five-Year Capital Improvement Plan,as well as the 5-Year Storm Drain Plan.During the public hearing,staff presented its recommendation to increase the User Fee by 2%from $92.53/ERU to $94.38,the maximum increase allowed. Upon concluding the public hearing,the Committee unanimously recommended to increase the Fee to $94.38,the maximum allowable by the City's Ordinance. If the Council elects to collect the Fee during FY12-13,it must decide whether to: ~Follow the recommendation of the Oversight Committee and Staff to increase the User Fee to the maximum rate:$94.38/ERU;or ~Maintain the current Fee rate at $92.53/ERU;or ~Set the Fee rate at some other amount not to exceed $94.38;or If the Council elects to not collect the Fee during FY12-13,it must decide whether to: ~Reduce the Fee to zero for FY12-13;or ~Repeal Chapter 3.44 (the User Fee Ordinance). The City Council's decision should be based upon Staff's recommendation,the recommendation from the Oversight Committee,its own review of the Fee rate,as well as Staffs estimates of other revenue and current and projected expenditures (including the 2-3 PUBLIC HEARING·WATER QUALITY AND FLOOD PROTECTION PROGRAM -ANNUAL USER FEE RATE -FY12·13 July 17,2012 Page 3 of4 storm drain program),the current and projected General Fund Reserve and the fund balance in the WQFP enterprise fund. Staff's Finding and Recommendation After the User Fee sunsets in 2016,there will be no dedicated funding source for maintenance and repair of storm drains.The storm drain program will compete with other projects and services for General Fund money,which currently has a structurally balanced budget.In addition,other infrastructure projects remain unfunded.The dedicated funding for arterial streets is insufficient;there is no dedicated funding for sewers;and at least $63 million of identified infrastructure projects remain unfunded (as outlined in the 2012 Five- Year Capital Improvement Plan).Although the General Fund is contributing about $3 million annually into the Capital Improvement Projects Reserve (using transient occupancy tax received from the Terranea Resort),it is not enough to pay for the City's infrastructure needs.The estimated CIP Reserve at June 30,2013 will only be $11.4 million and the San Ramon drainage project has a funding gap of at least $10 million. In light of the significance of the multi-million dollar amount of unfunded CIP projects and the City's Reserve Policy to set-aside funds to help pay for a portion of the future projects, Staff recommends an increase of the Fee from $92.53/ERU to $94.38 forthe FY12-13,an increase of 2%,as authorized under Chapter 3.44 of the Municipal Code. At the time this report was finalized,no protests regarding the Fee had been received. BACKGROUND AND DISCUSSION Overview of Scope and Purpose for the Oversight Committee A revised Scope and Purpose was approved by the City Council on May 5,2009,to be effective with the 2009 Fee Review process.The process was outlined in the Resolution as follows: As described in Section 3.44.080 A.,"The committee shall hold at least one public hearing and issue a report,on at least an annual basis,to inform city residents and the City Council regarding how storm drain user fee revenues are being spent and to make recommendations to the city council regarding future expenditures of the storm drain user fee revenues."Staff expects to use maps,pictures,video and financial information regarding the storm drain program to assist the Oversight Committee's understanding. The Committee's review will include the following information provided by Staff: ~a comparison of budget v.actual accounting for the current fiscal year; ~a construction project status report,including information about expenditures to date and major contract status (i.e.design and construction contracts); ~the proposed budget (including major projects)for the forthcoming year; 2-4 PUBLIC HEARING·WATER QUALITY AND FLOOD PROTECTION PROGRAM -ANNUAL USER FEE RATE -FY12·13 July 17,2012 Page 4 of 4 ~an excerpt of the Five-Year Financial Model for the storm drain program,including the estimated ending balance,if any,in the Water Quality and Flood Protection fund; ~an excerpt of the Five-Year Financial Model regarding the projected revenues ofthe General Fund of the City for the current and forthcoming fiscal years,including but not limited to, property taxes,sales taxes and transient occupancy taxes;the projected expenditures ofthe General Fund of the City for the current and forthcoming fiscal years;and the estimated ending General Fund reserves for the current and forthcoming fiscal years;and ~Staff's recommendation regarding the User Fee rate for the forthcoming year. Staff believes that its presentations to the Oversight Committee made on April 10,2012, May 9,2012 and June 27,2012 satisfied the provisions of Municipal Code section 3.44.080 that outlines the information to be annually reviewed by the Oversight Committee. Passage of Measure C -November 6,2007 On November 6,2007,the voters approved an amendment to the User Fee ordinance to include a voter enacted Oversight Committee and a 1O-year sunset of the storm drain user fee.When the User Fee rate was established by the property owners in 2005,the total User Fees to be collected over 30 years was estimated to be about $50 million to pay for known construction projects,storm drain lining,maintenance,staffing and engineering. Based upon the 1O-year sunset established with the passage of Measure C,the maximum total User Fees that could be collected is estimated to be about $13 million.It appears as though it will be necessary to secure other funding sources to continue the Storm Drain program when the User Fee expires on June 30,2016. ATTACHMENTS RESOLUTION NO.2012-A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES FINALLY ADOPTING A REPORT,AS FILED,IN CONNECTION WITH THE STORM DRAIN USER FEE ESTABLISHED PURSUANT TO CHAPTER 3.44 OF THE RANCHO PALOS VERDES MUNICIPAL CODE;DETERMINING THE AMOUNT OF SUCH FEE FOR FISCAL YEAR 12-13;AND ORDERING THAT SUCH FEE BE COLLECTED ON THE COUNTY OF LOS ANGELES TAX ROLL FOR FISCAL YEAR 12-13 Annual Report of the Water Quality and Flood Protection Program,dated June 27, 2012,prepared by the Oversight Committee for the storm drain program Annual Report for the Storm Drain User Fee -FY12-13,prepared by Harris & Associates 2-5 RESOLUTION NO.2012-__ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES FINALLY ADOPTING A REPORT,AS FILED,IN CONNECTION WITH THE STORM DRAIN USER FEE ESTABLISHED PURSUANT TO CHAPTER 3.44 OF THE RANCHO PALOS VERDES MUNICIPAL CODE;DETERMINING THE AMOUNT OF SUCH FEE FOR FISCAL YEAR 2012-13;AND ORDERING THAT SUCH FEE BE COLLECTED ON THE COUNTY OF LOS ANGELES TAX ROLL FOR FISCAL YEAR 2012-13 THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES HEREBY FINDS,DETERMINES,ORDERS AND RESOLVES AS FOLLOWS: S~ction 1.The City Council finds: A.Pursuant to Ordinance No.418 of the City Council of the City of Rancho Palos Verdes (the "City Council"),adopted on August 16,2005,and Chapter 3.44 of the Rancho Palos Verdes Municipal Code (the "Municipal Code"),the City Council is authorized to levy an annual Storm Drain User Fee on each parcel of real property in the City of Rancho Palos Verdes (the "City")that drains into City-maintained storm drain infrastructure.The Storm Drain User Fee is levied to fund the City's Water Quality and Flood Protection Program. B.Pursuant to Section 5473 of the California Health and Safety Code, the City elected in Ordinance No.418 to have the Storm Drain User Fee collected for each fiscal year on the County of Los Angeles tax roll in the same manner,by the same person,and at the same time as,together with,and not separately from the general taxes of the City. C.A written report (the "Report")entitled,"Annual Report for the Storm Drain User Fee,FY 2012-13"has been prepared by Harris &Associates and has been filed with the City Clerk.The Report contains a description of each parcel of real property in the City that drains into the City's storm drain system and the proposed amount of the Storm Drain User Fee for each such parcel for Fiscal Year 2012-13 (commencing July 1,2012 and ending June 30,2013),computed in conformity with Chapter 3.44 of the Municipal Code.Such Report is on file in the office of the City Clerk and incorporated herein by reference. D.The City Clerk caused notice of a hearing on the Report to be published in the Palos Verdes Peninsula News on July 5,2012,and July 12,2012. E.The City Council held a public hearing on the Report on July 17, 2012 (the "Public Hearing").In addition,pursuant to Section 3.44.40 of the Municipal Code,at the Public Hearing the City Council considered whether to collect the Storm Drain User Fee for Fiscal Year 2012-13,and the rate per Equivalent Residential Unit ("ERU")for Fiscal Year 2012-13.In that regard,the City Council took into account the current and projected revenues of the City for Fiscal Year 2012-13,including but not -1- 2-6 limited to,property taxes,sales taxes and transient occupancy taxes;the current and projected expenditures of the City for Fiscal Year 2012-13,including,but not limited to, proposed expenditures in connection with the City's storm drain system;the balance,if any,in the Water Quality and Flood Protection Program Enterprise Fund;and the current and projected General Fund reserves.In addition,the City Council took into account any report and recommendation submitted by the Oversight Committee established by the City Council in connection with the City's Water Quality and Flood Protection Program. F.All interested persons were given an opportunity to attend the Public Hearing and express opinions about the Report and the proposed levy of the Storm Drain User Fee for Fiscal Year 2012-13.The City Council heard and considered all protests and objections against the Report and all testimony regarding the proposed levy of the Storm Drain User Fee for Fiscal Year 2012-13. G.No majority protest against the Report,determined in accordance with Health and Safety Code Section 5473.2,exists. Section 2.The City Council hereby overrules all protests and objections; hereby approves and finally adopts the Report as filed;hereby determines that the Storm Drain User Fee for Fiscal Year 2012-13 against each parcel described in the Report shall be as described in the Report;and orders that the Storm Drain User Fee shall be collected for Fiscal Year 2012-13 on the County of Los Angeles tax roll in the same manner,by the same person,and at the same time as,together with,and not separately from the general taxes of the City. Section 3.The City Clerk is di~ected to file a copy of the Report,with a statement endorsed on the Report over the City Clerk's signature that the Report has been approved and finally adopted by the City Council,with the City Treasurer on or before August 10,2012 pursuant to Section 4 of Ordinance No.418. Section 4.The City Clerk is directed to file a copy of the Report,with a statement endorsed on the Report over the City Clerk's signature that the Report has been approved and finally adopted by the City Council,with the Auditor of the County of Los Angeles on or before August 10,2012 pursuant to Section 5 of Ordinance No.418. PASSED,APPROVED and ADOPTED this 17th day of July,2012. Mayor ATTEST: City Clerk -2- 2-7 State of California ) County of Los Angeles )ss City of Rancho Palos Verdes ) I,CARLA MORREALE,City Clerk of the City of Rancho Palos Verdes,hereby certify that the above Resolution No.2012-was duly and regularly passed and adopted by the said City Council at a regular meeting thereof held on July 17,2012. City Clerk -3- 2-8 2012 ANNUAL REPORT ON THE WQFP PROGRAM JUNE 27,2012 INTRODUCTION An Oversight Committee was established by the Rancho Palos Verdes City Council in 2007 to annually review project expenditures and plans for the Water Quality and Flood Protection (WQFP) Program and to recommend a User Fee Rate for each fiscal year.The Committee consists ofthe following members: Lowell Wedemeyer (Chair) Frank Lyon (Vice Chair) Krista Johnson YiHwaKim Elizabeth Sala The Committee met several times with the City's Finance and Information Technology and Public Works staffs over the past couple months to review WQFP Program activities in FY 11-12 and planned projects and budgeted expenditures in FY 12-13.Staff also provided the Committee with their proposed Storm Drain Plan through FY 16-17,excerpts from the City's 2012 Five-Year Financial Model,the 2012 Capital Improvement Plan (CIP),and Staffs recommendation for the FY 12-13 User Fee Rate. This report conveys the Committee's conclusions and recommendations in accordance with its responsibilities designated by the City Council on May 5,2009 and documented in RPV Municipal Code Section 3.44.080. FY 11-12 EXPENDITURES The WQFP Program expenditure plan (i.e.budget)approved by the City Council for FY 11-12 totaled $4.15 million.Based upon the staff report,dated June 27,2012,$1.96 million had been spent or committed through June 30,2012.Fiscal year expenditures are summarized by the Staff in the Storm Drain Plan through FY16-17 (Attachment A).Major projects are described in the Schedule of Project Descriptions in the Staff report dated May 9,2012 (Attachment B). Staff estimates that there will be carryover from the Fiscal Year 11-12 budget to the Fiscal Year 12-13 budget in the approximate amount of $2.187 million.Based upon Staff reports to the Committee the variance of $2.187 million,between the $4.15 million 11-12 budget and the estimated 11-12 expenditures of about $1.96 million,is primarily attributable to the following projects (in order of the size ofthe variance): 1)The total carryover to fiscal year 12-13 for project areas 6 and 7 is $767,550.The estimated carryover to fiscal year 12-13 on project area 6,the PVDE San Pedro Canyon project,is $525,050. The estimated carryover to fiscal year 12-13 on project area 7,the Via Colinita System Project,is $242,500.As reported by Staff to the WQFP Committee and the Council in May last year,Staff decided to re-scope the PVDE San Pedro Canyon project during fiscal year 11-12 to achieve savings. 2-9 Accordingly,during fiscal year 11-12 this budget item was divided into two separate design projects: Miraleste Plaza Storm Drain Improvement Project (project area 6)and Via Colinita Improvements Project (project area 7).The Miraleste Plaza drain project is currently being advertised for bids and a bid opening is scheduled for July 24,2012.The Via Colinita project is currently at about 80%design stage with construction anticipated this Fall.Staff expects to have both projects completed before the next rainy season.That is,the $767,550 carryover from fiscal year 11-12 should be committed early in fiscal year 12-13.Re-scoping of the projects to address only structural deficiencies will yield savings for these projects.However,issues of system capacity in these canyons are still to be addressed during the master planning process in future years. 2)The estimated carryover on project area 12,the update of the Drainage Master Plan,will be $697,789.This is because the Drainage Master Plan Program is intended to be integrated into the City's Geographic Information System ("GIS"),which Staff reports is planned to be upgraded in the near future,subject to Council approval.The City's Geographic Information System is beyond the purview of the WQFP Committee.The Committee concurs that it is prudent to upgrade the Geographic Information System before further integration of the Drainage Master Plan into that system. 3)The carryover on project area 12,Storm Drain/Filtration Maintenance is estimated to be $274,556 due to lower than expected storm costs.Staff reported that the carryover is expected to be used for near-term,urgent expenditures. 4)The carryover on the Storm Drain Lining,Other,portion of the fiscal year 11-12 budget, project area 12,is estimated to be $259,795.On April 17,2012,the City Council awarded an $805,000 construction contract to Sancon Engineering.The City Council also awarded contracts for inspection and mapping services.Staff reported the carryover is because the construction schedule proposed by the Contractor has a completion date of August 31. 5)The carryover on the San Ramon Canyon Stabilization Project from fiscal year 11-12 to 12- 13 is estimated to be $141,114.The design of the San Ramon Canyon Stabilization project is 98% complete.However,the $10 million short-fall in project funding could delay implementation of the design. FY 11-12 User Fee collections are estimated to be about $1.28 million during fiscal year 11-12. The Committee believes that all WQFP Program costs to date for FYll-12,including User Fee revenues,have been properly spent to discover and mitigate storm drain problems in the City. HISTORICAL SUMMARY OF USER FEE RATES,COLLECTIONS AND FUNDING. The WQFP Committee evaluated an historical,financial summary of the User Fee from inception in 2007 to the end of the current Fiscal Year 11-12.A summary table entitled USER FEE RATE HISTORY was prepared by Staff upon request.It is appended as Attachment C.The summary shows that over the five fiscal years to date,the City has spent or committed an estimated $17.6 million through the Water Quality Flood Protection Fund ("WQFP Fund"),of which approximately $7 million, or 40%,was funded by User Fee collections. 2-10 The summary also shows the effect of the 2%cap which the RPV ordinance imposes upon the calculation of the maximum User Fee rate increase.Attachment C shows that inflation according to the federal CPI totals 12.4%,for the five-year period.However,the RPV 2%cap,as actually applied, has limited the fee increases to 9.4%.That is,the User Fee currently lags inflation by 3%over the five-year period as a result ofRPV's 2%cap. The cumulative total of actual collections attributable to annual CPI increases in the User Fee over the five fiscal years is estimated to be $85,507,which is an average increase in user fee collections of about $17,100 per year. The Committee also evaluated the methodology for applying the RPV 2%cap when calculating the maximum annual User Fee rate increase. The WQFP Committee concurs with Staff that the existing method of calculation is the proper application ofthe RPV 2%cap on annual User Fee increases. PLANS FORFY 12-13 Staff presented the Committee with a proposed FY 12-13 Storm Drain expenditure plan (see Attachment A).There is $1.34 million newly budgeted,not including previously authorized but unspent funds.With the expected $2.187 million to be carried forward from FY 11-12,total WQFP Program expenditures in FY 11-12 are projected to be about $3.5 million. Major planned projects in FY 11-12 are described in Attachment B. All planned projects appear necessary and are being funded appropriately under the present circumstances. USER FEE RATE FOR FY 12-13. By unanimous vote,the WQFP Committee recommends that the annual Storm Drain User Fee be increased by the 2%cap,which is less than the annual CPI inflation as of March 1,2012. This will increase the Fee from $92.53 ERU in FY 2011-2012 to $94.38 ERU for FY 2012-2013. OTHER COMMENTS 1)The Committee continues to believe that currently planned resources are inadequate to address known storm drain repair needs in the City.Experience has shown that additional unknown needs are likely to arise,requiring immediate attention.The San Ramon Canyon Stabilization Project alone is estimated to cost around $19.4 million,of which a grant for $9.4 million was awarded by the State Department of Water Resources,but definite sources for the remaining $10 million in costs are currently unknown. 2)Taking note ofthe historic importance of the User Fee collections in funding critical WQFP projects,as showed by Attachment C,the Committee again recommends that planning begin now for funding long-term maintenance of the City's storm drain system beyond 2016,when the Storm Drain 2-11 User Fee sunsets.The Committee recommends that such funding plans be included in future Five- Year Financial Models. Attachment A:Storm Drain Plan through FY 16-17 Attachment B:Description of Storm Drain Projects. Attachment C:User Fee Rate History 2-12 City of Rancho Palos Verdes Storm Drain Plan through FY16-17 Attachment A 2 McCarreH Canyon ;7,487,716 McCarrell Canyon,Tarragon Property i i2Acquisition1,403,500 1,403,500 1 Sunnyside Ridge 417,361 .417,361 3 lovver San Ramon Canyon Stabilization 646,507 867,575 726,461 '141,114 '1,514,082 2,240,000 5 PVDE Miraleste Canyon System ·2,839,637 6 PVOE San Pedro Canyon System 570,000 44,950 525,050 570,000 2,438,992 4 Attamira Canyon ·1,750,000 Pi e Lining · 12 Phase I 532,000 532,000 10 Phase II (Monero Stann Drain)174,723 I I 174,723 2 PVDS (from Cfipper to Seacove)210,000 210,000 10 Crest to Crestridge 59,700 59,700 10 Hawthorne to Silver Arrow 130,000 130,000 9 Tarapaca Drive 80,000 I I 80,000 5 Pontevedra Drive 317,792 317,792 12 Stann Drain lining,Othe.!.-1,155,452 1,146,698 81l6,903 :259,795 :324,642 329,881 335,278 340,836 347,653 3,980,440 - Capacity &Secondary System Projects 7tVia Colinita System Projects I 204,2281 242,500 I ~242,500 :~_.I _l I I 446,728 Hawthorne Blvd.(closed FY1Q..ll,re- allocated to the San Pedro Canyon Storm 2 Drain Project) 9 PVDE Lower Switchbacks ·485,000 485,000 6 South HawthomeNia Frascati ·440,000 440,000 11 Middlecrest Road Projecl ··1 139,160 3 PVDS (North of Barkentine)·446,000 446,000 · Filtration Systems · 12 Catch Basin Filtration Devices 354,734 13,756 .13,756 73,000 441,490 2 30502 PVDW Catch Basin 8,600 I ~8,600 ·-----'I Other Projects McCarreU Canyon Interim, 2 Barkentine/Seacove 135,000 I I 135,000 McCarrell Canyon Interim,Gabion &Timber I I2Walls119,213 119,213 Palos Verdes Bay Club Interim i i2Improvements185,000 185,000 10 PVDS Salvation Army Ouijet 26,000 26,000 6 Bronco Drive 66,000 66,000 5 Noble View Canyon 27,000 27,000 12 Citywide Interim,Other 7,400 7,400 10 Alida Place Storm Drain Relocation 98,480 98,480 3 Tarapaca Landslide Stud~6,377 6,377 6 PVOE Engineering Reserve 20,360 20,360 6 PVDE Inlets ·· 10 Mossbank Storm Drain Rehabilitation 245,885 !I 245,885 4 PVDS @ A1tamira Canyon ·· 5 Via Canada 17,533 100,000 73,184 '26,816 '117,533 11 Marguerite Open Channel ·50,000 350,000 400,000 Miscellaneous Repairs &Maintenance 12lMiscellaneous Repairs 145,470 145,470 Storm Drain/Filtration Maintenance (inclUdes'l I I ' , Hawthorne,Montemalaga &Video I I 12l1nspeclion/Cleaning)562,864 366,036 91,480 i 274,556 i 222,162l_~~229,7271 231,§181 245,5441 250,4551 2,114,306 11,813 171,645 1,720,842 30,000 870,000 166,646 30,000 161,792 30,000 157,080 30,000 6,311 i 149,218 697,789 i 30,000 140,606 11,813 767,544 146,917 22,211 697,789 12 Administr 12 Drainage IVla;UCI riel"r1uy":UII 12 Storm Water Enterprise Asset Registry 12 Asset Maintenance Management Systerr 12 Hydrologic,Hydraulic &Pol-'~Jant Modelling 121Purchase of Push Camera :ltion (contracVst~ IJI__'_#nl__n_. 12lAnalysis &PrioritazionofDeficiencies 12lCapitallmproveme:nf Programming ~~IPriigiio6j:¢li$~:'-'"-''';-'''''';'''"-'-"""""'>""7',"1.lIi64ili'f$al':4i~51;111'r':;'\ji~2,187,687 F~';'3;,a(iQ.2l'i"''1;5~;liaa:'I'''1~llit$!li!'1,:":~~a;Q.2t!;:':'';:':''l'1l1II1sa""'2f;~1;a1'fr'::,''a;4lI1~a~1 Note:This schedule reffects actual costs and does not include depreciation or capitalization ofstorm drain improvements,which are included in the City's financial statements. 2 - 1 3 CITY OF MEMORANDUM Presented May 9,2012 Attachment B RANCHO PALOS VERDES TO: FROM: DATE: SUBJECT: HONORABLE CHAIR AND MEMBERS OF THE OVERSIGHT COMMITTEE FOR THE WATER QUALITY AND FLOOD PROTECTION PROGRAM TOM ODOM,DIRECTOR OF PUBLIC WORKS DENNIS McLEAN,DIRECTOR OF FINANCE AND INFORMATION TECHNOLOGY MAY 9,2012 WATER QUALITY AND FLOOD PROTECTION PROGRAM - DRAFT FY 12-13 BUDGET AND 5-YEAR PLAN Project Manager:Ron Dragoo,Senior Engineer Andy Winje,Associate Engineer BACKGROUND AND DISCUSSION This report contains a brief update regarding the major projects included in the Water Quality and Flood Protection program including the FY12-13 budget and 5-Year plan,both in draft form. PROGRAM HIGHLIGHTS Only two updates are noteworthy since the FY11-12 Midyear Report,dated April 10,2012 are as follows: 1)City Council awarded a construction contract to Sancon engineering on April 17, 2012 for the 2012 Storm Drain Rehabilitation and Lining Project;and 2)The addition of the Marguerite Open Channel project in FY12-13 and FY23-14. Both updates are described later in this Report. San Ramon Canyon (PVDE/PVDS Roadway)Stabilization Project Final design is now about 98%complete with an expected completion date in May 2012. Regulatory permits are still pending but expected in late spring.Staff expects that 2-14 Presented May 9,2012 Attachment B WATER QUALITY AND FLOOD PROTECTION PROGRAM -DRAFT FY 12-13 BUDGET AND 5-YEAR PLAN May 9,2012 Page 2 of 6 advertising of the project to obtain competitive construction bids will begin in June,with construction tentatively scheduled to begin in late Summer or early Fall. The project has received a grant in an amount up to $9.46 Million from the State's Department of Water Resources Stormwater Flood Management Grant (Prop 1E)program. The remainder of the funds for the project are yet to be formally identified.The City has received notification that it was not invited to submit a formal application for the FEMA Hazard Mitigation Grant that was being pursued.Staff is still awaiting the decision regarding the TIGER IV grant ($10 million application),which is due in June or July.Staff, the City's advisors and the City Council are pursuing other federal funding opportunities as well as help from local agencies (City of Los Angeles and County of Los Angeles)whose constitue'nts will also receive benefits from the project.No commitments from these other agencies have yet been received. Please see the City's website to view updates regarding the project at http://www.palosverdes.com/rpv/publicworks/San-Ramon/index.cfm. Stormwater Master Plan Program The upgrading of the GIS system and the archiving of data to be available through the GIS system are understood and necessary precursors to a robust GIS-based stormwater tool. A consultant's report provided a list of nine tasks to developing our anticipated end product and staff is working on to complete the first three,which are data collection and assessment,field verification and of inventory,and development of a database storage and reporting system.These efforts will continue into next fiscal year.The final tasks have to do with technical analysis of the system modeled against County standard rainfall events and water quality requirements of the Regional Board,identifying and prioritizing capital projects and reporting and will occur in following years. Storm Drain Lining City Council awarded a construction contract to Sancon engineering on April 17,2012 for the 2012 Storm Drain Rehabilitation and Lining Project.City Council awarded professional service agreements to CDM Consulting,Inc,and John M.Cruikshank Consultants,Inc.for inspection and mapping services,respectively,on May 1,2012.Once these agreements are executed,notice to proceed (NTP)will be given to the contractor.Staff anticipates the work will be completed about three months after NTP is given. Staff is beginning to develop a list of pipes to be investigated and potentially lined in FY12- 13.These pipes are predominately on the City's west side and will include diameters up to 84 inches. PVDE/San Pedro Canyon System Staff has broken this project into two design efforts to allow for concurrent work by distinct consultants.Staff has received 95%level design effort for the Miraleste Plaza Storm Drain 2-15 Presented May 9,2012 Attachment B WATER QUALITY AND FLOOD PROTECTION PROGRAM -DRAFT FY 12-13 BUDGET AND 5-YEAR PLAN May 9,2012 Page 3 of 6 Improvement project and expects similar submittal for the Via Colinita Improvements Project soon.Upon review and finalization of the design documents,the projects will be advertised for competitive bid and,hopefully,awarded and this summer.Staff intends to complete these improvements prior to next year's rainy season. FY12-13 Draft Budget and 5-Year Plan Additional budget items for both FY12-13 and the five-year plan are described in the project updates and on the attached spreadsheet entitled Storm Drain Plan through FY16-17. PROJECT UPDATES Project Name:San Ramon Canyon Stabilization Proiect Project Area:Project Area 3 Budgeted Cost (Design &EIR):$1,514,082 Contract Award (Design &EIR):$1,342,000 Total/Estimated Costs:$19.4M (construction costs,partiallv unfunded) Percentage Completion:90%(pre-construction activities only) Project DescriptiOn: City Council approved the recommended alternative (Tunnel Alignment)in March,2011,the design of which is now about 95%complete.City Council certified the environmental (CEQA and NEPA) documents and Coastal Development permit on Dec 20,2011 and applications for regulatory permits have been submitted.Anticipated date to begin construction is dependant on funding;however, construction could begin as early as late Summer to early Fall,2012.City was awarded a $9.46 Million grant from the State Department of Water Resources for the project.City Staff,its advisors and the City Council are actively pursuing Federal funding opportunities and contributions from City of LA and County of LA. Project Name:Storm Drain Lining Project Area:Project Area 12 BUdgeted Cost:$1,146,698 (including $839,617 carryover from FY10-11) Contract Award:$1,080,565 Total/Estimated Costs:$1,080,565 Percentage Completion:0% Project Description: City Council awarded a $805,000 construction contract to Sancon Engineering on April 17,2012. Approximately 6,000 linear feet of CMP are included in this year's program.All unlined,City owned corrugated metal pipes not already lined or scheduled for alternate repairs on the east side of the City will be included in this year's program,ranging in diameter from 12 inches to 54 inches.Work includes CCTV investigation,cleaning,lining by CIPP or paved invert methods,point repairs,ancillary facilities,inspection,mapping and documentation exportable to GIS format. Project Name:Catch Basin Filtration Devices Project Area:Project Area 12 Budgeted Cost:$13,756 Contract Award:$0 Final/Estimated Costs:TBD Percentage Completion:60% Project Description: 2-16 Presented May 9,2012 Attachment B WATER QUALITY AND FLOOD PROTECTION PROGRAM -DRAFT FY 12-13 BUDGET AND 5-YEAR PLAN May 9,2012 Page 4 of 6 Retrofitting of catch basins with filtration screens in this area of the City is required by the Regional Board to address the trash problems at Lake Machado in Los Angeles.The City has until 2016 to install screens in the 111 catch basin contributing to this drainage.Sixty eight (68)catch basins have been retrofitted in FY 2010-11 at a cost of about $27,000,a savings of 78%over original estimates. The City's compliance response is about 60%;therefore,ahead of schedule.The remaining basins in this drainage are county owned and will require an MOU for maintenance with Los Angeles County. Installation of these will be performed after an MOU is authorized by both agencies.The remaining 40%of the basins will come at a higher cost due to involvement of LA County and cost for completing their flood permits.The City is partnering with other South Bay Cities to apply for a State Grant (Prop 84)that,if awarded,would cover at least a portion of the costs for the remaining catch basins to be retrofitted.The project was on the short list published April 30,2012 and a full application will be submitted with City of Torrance in the lead.Work done to date by the City may be counted as the City's "match"allowing a large portion of the remaining basins to be covered by the grant,if awarded. The project will be on hold until it is determined if qrant fundinq will be awarded. Project Name:Roan System Project Area:Proiect Area 7 Budaeted Cost:$242,500 Contract Award:TBD Total/Estimated Costs:$446,728 Percentage Completion:0% Project Description: The Via Colin ita portion of this project is being addressed under the San Pedro Canyon Storm Drain project and $50,000 was transferred to that project in FY11-12.The remaining portion is for addressing the physical deficiencies in the Roan road area system Project Name:Miscellaneous Repairs &Storm Drain Filtration Maintenance Project Area:Proiect Area 12 Budgeted Cost:$366,036 Contract Award:$107,462 Total/Estimated Costs:TBD Percentage Completion:Ongoing/Annual Project Description: As a result of this program and the following maintenance activities,the City of Rancho Palos Verdes has not received a single "after-hours"callout to address a rain related emergency during the past four years.The lack of rain this year has resulted in not needing to perform any emergency miscellaneous repairs this year. ~29 catch basins in the City with filtration devices installed were cleaned in November 2011 ; ~The City contracts with LA County for annual clearing of City-owned catch basins.The County process is cumbersome and makes financial planning and required reporting difficult.Staff has developed bid documents to engage the use of private contractors for future years if costs can be justified; ~Repaired leaking CMP behind home on Ronsard Road.A new manhole and CIPP liner was installed in an 18-inch CMP line after leaking was detected by a resident.The manhole is needed to provide access to the one-off liner installation that was completed in February,2012. ~A catch basin on PVDS adjacent to Wayfarer's Chapel was rebuilt. ~Design is completed for a point repair on a 12-inch concrete pipe on Via De Anzar.Field work will begin as soon as access to private property can be obtained. ~Cleaned and video inspected 4,110 linear feet of CMP to date in FY11-12 2-17 Presented May 9,2012 Attachment B WATER QUALITY AND FLOOD PROTECTION PROGRAM -DRAFT FY 12-13 BUDGET AND 5-YEAR PLAN May 9,2012 Page 5 of 6 Project Name:Drainaqe Master Plan Proqram Project Area:Project Area 12 Budaeted Cost:$697,789 Contract Award:$0 Total/Estimated Costs:TBD Percentage Completion:5% Project Description: The City is upgrading its GIS platform and PW Staff will continue improving GIS data and best practices to maximize use for stormwater management planning.Many available as-built drawings have been scanned and linked to existing GIS database.Establishing links to inspection video and remaining drawings is underway. Staff engaged RBF ConSUlting Engineers to develop a planning document to guide our efforts to build a sustainable and useful management tool.Staff anticipates engaging a consultant in late Spring or early Summer to verify existing atlas data in the field,develop data where gaps exist,and build a digital library (database)that is compatible with and transferrable to the City's anticipated GIS platform when it is acquired. Project Name:San Pedro Canyon Storm Drains Proiect Area:Project Area 6 Budaeted Cost:$570,000 (Re-allocated from Hawthorne Blvd.proiect) Contract Award:$49,900 (to date for desiqn) Final/Estimated Costs:TBD Percentage Completion:10% Project Description: This project in San Pedro Canyon lies east of PVDE and is crossed several times by residential streets.This project has become a priority due to observed flooding in the area,sediment and debris accumulation in potentially undersized debris basins and degraded pipes and inlet/outlet structures. Staff has engaged a consultant to provide design recommendations to rehabilitate existing facilities, including construction drawings.The project has been broken into two pieces,Miraleste Plaza Storm Drain Improvements and Via Colinita Storm Drain Improvements to facilitate concurrent design and construction.The New County standards for hydrology assumptions suggest upsizing of pipes may be necessary.However,that may have undesirable downstream consequences.Staff is working with consultant to develop solutions to address known or anticipated deficiency issues based on field observations,with a mind to restrict hydromodification (Le.effects on downstream areas)until a larger stUdy can be performed (as part of the next master plan).Analysis and design work is underway,to be followed bv construction of improvements. 2-18 Presented May 9,2012 Attachment B WATER QUALITY AND FLOOD PROTECTION PROGRAM -DRAFT FY 12-13 BUDGET AND 5-YEAR PLAN May 9,2012 Page 6 of 6 Project Name:Via Canada Drainage Study &Repair Project Area:Project Area 6 Budgeted Cost:$100,000 Contract Award:$73,185 Total/Estimated Costs:$90,700 (desiQn,construction and inspection) Percentage Completion:95% Proiect DescriDtion: This project east of PVDE and north of Miraleste Canyon results from observed flooding at the bottom of Via Canada (cul-du-sac)during moderate to heavy rain events.This drain in question is County owned and the flooding issue was brought to their attention 10 years ago.Since no action had been taken,the impacted homeowners have requested the City do something. The hydraulic study and engineering design were completed in Fall 2011.The solution is installation of two new.catch basins and connecter pipes to allow more water to enter the subsurface county drain before it reaches the cul-du-sac.Construction began in November 2011 and a Notice of Completion of construction was filed with the County on February 1,2012.The total cost for engineering,inspection and construction totals about $91,000.The remaining funds from this project will be re-allocated in the prOQram. Proiect Name:Marguerite Open Channel Project Area:Proiect Area 6 Budgeted Cost:$400,00 Contract Award:TBD Total/Estimated Costs:TBD Percentage Completion:0% Project DescriDtion: Staff has become aware of excessive erosion in a portion of open natural drainage channel,which connects two piped systems between PVDW and the bluff.Studies of the issue are scheduled for FY 12-13 with implementation of any recommendations for improvement tentatively scheduled the following year. Attachment Storm Drain Plan through FY16-17 2-19 City of Rancho Palos Verdes Storm Drain Plan through FY16-17 Presented May 9,2012 Attachment 8 Backbone I"rolects I I I I 21McCarreil Canyon 1 7,487,716 McCarrell Canyon,Tarragon Property 21Acquisition 11Sunnyside Ridge 31 Lower San Ramon Canyon Stabilization 51PVDE Miraleste Canyon System 61pVDE San Pedro Canyon System 41Altamira Canyon 1,403,500 417,361 646,507 867,575 570,000 693,579 49,900 I 7,467,716 1,403,500 417,361 173,996 !I I I I I 1,514,082 1 2,240,000 1 I -2,839,637 520,100 !I I I. I I 570,000 I 2,438,992 I 1,750,000 Storm Drain/Filtration Maintenance~includes b I i Hawthorne,Montemalaga &Video , 12I1nspectionICleaning}...562,864 366,036 107,286 I 121Miscellaneous Repairs I 145,470 Capacitv &Secondarv Svstem Proiects 80,000 59,700 130,000 446,728 210,000 317,792 347,653 I 3,980,440340,836 .-'7 ~x 440,000 --~ 335,278 'f'.),-#'1-"'A-~ 174,723 532,000 31815 f I ~I -'I,i 50,000 350000 --1 'If I 258,750!222,162 I ..229,727\237,518\245,5441 250,4551 2,114,306 485,000 440,000 ---1139;160 446,000.-,-----.-1 I I 44{490 8,600 -- 135,000 119,213 I I 185,000 26,000 66,000 27,000 7,400 98,480 6,377 20,360 245,885 I I 117,533 400,000 145,470 68,185 ! "=r=I ~i l 1,146,698 1,101,965 I 44,733 l 324,642 I 329,881 I I 1 204,228 242,500 ! I ir 485,000 Ir I 446,000 -.\. \..1 I 354,734 1=7568,600 135,000 "'-bion &Timber 1 119,213 185,000 26,000 66,000 27,000 7,400 98,480 6,377 20,360 245,885 17,;331 100,:: 91Tarapaca Drive 51Pontevedra Drive 21pVDS (frolTl g1ipper to Seacove) 61South HawthomeNia Frascati 61Bronco Drive Hawthorne Blvd.(closed FY10-11,re- allocated to the San Pedro Canyon Storm 21Drain Project) 31PVDS (North of Barkentine) Pipe Lining 51Via Canada 2\Palos Verdes Bay Club Interim Improvements 31Tarapaca Landslide Study 71"ia GeliAita &Roan System Projects 51 Noble View Canyon 91pVDE Lower Switchbacks Miscellaneous Repairs &Maintenance 41PVDS @Altamira Canyon 61pVDE Engineering Reserve 61PVDE Inlets 6INE'!v ~t",1arguente Open Channel 121Phase I 10lHawthorne to Silver Arrow 121Storm Drain Lining,Other 10lPhase II (Monero Storm Drain} 111 Middlecrest Road Project 10lAIIda Place Storm Drain Relocation 10lCrest to Crestridge 10lMossbank Storm Drain Rehabilitation 101 PVDS Salvation Army Outlet 121Citywide Interim,other ··•••·SubtOlli'p.roJect·&·Maliitenan¢e·'CoSt$'·~~'··cT1.4;844;89~;565.1~•••2;020,915·.'1,285,650 r5'1';'1~'ll04':'··'1l355;608.I.~!tM2i196··"';""586;38(["""""'S98;'108,1','22;fl59,;jME'£&;ilOT,1'81i" 121Purchase of Push Camera 121Administration (contracUstaff engineer) 121Drainage Master Plan Program 11,813 767,544 22,211 146,917 697,789 i 111,196 ' 11,813 35,721'153,518 1,725,142 697,789 ~30,000 870,000 121 Storm Water Enterprise Asset Registry 12 Asset Maintenance Management System I ...f I-_ 12 Hydrologic,Hydraulic &Pollutant Modeling I i I I----tl----I I I I 12 AnalySIS &Pnontlztng of DefiCIenCIes i .'. ....... 12 Caoitallmorovement Proorammino ' 2,019,160 (:·1;331Ii322·'····'1iM2;68!J':1;204;588.·'·c "·183;Qt&:,ili7't99;T..s3¥'·25;466';t.11.Y:;::9;!lO'Tilali·' Note:This schedule reflects actual costs and does not include depreciation or capitalization of storm drain improvements,which are included in the City's financial statements. 2 - 2 0 User Fee Rate History Attachment C Note:CPllndex based upon LA -Oran~e -Riverside CPI-U (Urban City)Annual Change User Fee Estimated Index User Fee Incremental (Increase Rate Estimated Cumulative %limited to Maximum Adopted by Annual User Fee Increase Annual Change 2%User Fee City Revenue -Not Revenue from CPllndex CPI annually)FY Rate/ERU Council Actual CPI Feb 2006 rate enacted by the voters)$86.00 $86.00 $1,118,439 2007 214.76 3.5%2.0%FY07-08 $87.72 $87.72 $1,140,808 $22,369 2008 221.431 3.1%2.0%FY08-09 $89.47 $89.47 $1,163,624 $45,185 2009 221.439 0.0%0.0%FY09-10 $89.47 $89.47 $1,163,624 $45,185 2010 224.62 1.4%1.4%FY10-11 $90.72 $90.72 $1,180,340 $61,901 2011 229.729 2.3% 2.0%FY11-12 $92.53 $92.53 $1,203,946 $85,507 2012 234.537 2.1%2.0%FY12-13 $94.39 ? 12.4%9.4%$260,147 Conservative estimate of user fee collected over 6 years $6,970,781 Estimated spent or committed in the WOFP fund throuqh 6/30/2012 $17,600,000 Percentaqe spent or committed in the WOFP fund from user fee collected 40% 2-21 Annual Report for the Water Quality and Flood Protection Program Storm Drain User Fee FY 2012·13 For the City of Rancho Palos Verdes Los Angeles County,California July 2,2012 2-22 City of Rancho Palos Verdes Water Quality and Flood Protection Program Storm Drain User Fee Annual Report -FY 2012·13 TABLE OF CONTENTS Certificates Pg.1 Introduction Pg.2 Cost Estimates Pg.3 Annual Fee Rate Calculations Pg.4 Sample Calculations Pg.6 Assessment Roll Under Separate Cover July 2,2012 Q:\RPV\SD Fee Admin\FY 12-13\reports\SD Fee Rpt 12-13 Final2Ju112.doc III Harris &Associates2-23 City of Rancho Palos Verdes Water Quality and Flood Protection Program Storm Drain User Fee Annual Report -FY 2012-13 FY 2012-13 Annual Report City of Rancho Palos Verdes Storm Drain User Fee The undersigned respectfully submits the enclosed report as directed by the City Council. DATED:July 2,2012 July 2,2012 Page 1 I HEREBY CERTIFY that the enclosed Annual Report,together with Assessment Roll thereto attached, was filed with me on the __day of ,2012. Carla Morreale,City Clerk, City of Rancho Palos Verdes Los Angeles County,California By _ I HEREBY CERTIFY that the enclosed Annual Report,together with Assessment Roll thereto attached was finally adopted and confirmed by the City Council of the City of Rancho Palos Verdes,California,on the __day of ,2012. Carla Morreale,City Clerk, City of Rancho Palos Verdes Los Angeles County,California By _ Q:\RPV\SD Fee Admin\FY 12-I3\reports\SD Fee Rpt 12-13 Final 2Jul12.doc III Harris &Associates2-24 City of Rancho Palos Verdes Water Quality and Flood Protection Program Storm Drain User Fee Annual Report -FY 2012·13 INTRODUCTION July 2,2012 Page 2 To insure a flow of funds for the Water Quality and Flood Protection Program,the City of Rancho Palos Verdes established a user fee in September 2005.This Fee ensures a fair and equitable levying of the costs of the Water Quality and Flood Protection Program. Pursuant to Section 3.44.40 of the City's Municipal Code,at a public hearing,the City Council will consider whether to collect the Storm Drain User Fee for Fiscal Year 2012-13 (July 1,2012 through June 30,2013),and,if so,establish the rate per Equivalent Residential Unit for Fiscal Year 2012-13. In making its determinations,the City Council will take into account the current and projected revenues of the City for Fiscal Year 2012-13,including but not limited to,property taxes,sales taxes and transient occupancy taxes;the current and projected expenditures of the City for Fiscal Year 2012-13,including,but not limited to,proposed expenditures in connection with the City's storm drain system;the balance,if any,in the Water Quality and Flood Protection Program Enterprise Fund;and the current and projected General Fund reserves.In addition,the City Council will consider any report and recommendation submitted by the Oversight Committee established by the City Council in connection with the City's Water Quality and Flood Protection Program. This report,as signed and presented to the Council for approval,has been prepared according to the methodology and rates approved by the City Council in 2005. The Storm Drain User Fee is levied under the authority of the California Health and Safety Code Section 5471 et seq.(the "Code").Payment of the fees for each parcel will be made in the same manner and at the same time as payments are made for property taxes for each property. This report contains the necessary data required to establish the annual fee rates and is submitted for filing in the office of the City Clerk,where it shall remain open for public inspection. Q:\RPv\SD Fee Admin\FY 12-13\reports\SD Fee Rpt 12-13 Final 2Jull2.doc III Harris &Associates 2-25 City of Rancho Palos Verdes Water Quality and Flood Protection Program Storm Drain User Fee Annual Report -FY 2012·13 COST ESTIMATE July 2,2012 Page 3 The estimated annual costs to fund the Water Quality and Flood Protection Program are provided below in Table 1. Table 1-Estimated Annual Costs BEGINNING FUND BALANCE (7/1/12) ESTIMATED REVENUES Annual Fee Levy Interest Earnings City Contribution ESTIMATED EXPENDITURES Storm Drain Master Plan Backbone Projects Pipe Lining Secondary Projects Other Projects Miscellaneous Repairs &Maintenance Filtration Device Installation Reserve for Anticipated Additional Costs Administration (contracVstaff engineer) ENDING FUND BALANCE (6/30/13) The ending fund balance constitutes a Reserve for Future Projects. Q:\RPV\SD Fee Admin\FY 12-13\reports\SD Fee Rpt 12-13 Final2Ju1l2.doc $494,145 $1,394,473 $2,500 $0 $1,396,973 $30,000 $0 $324,642 $485,000 $50,000 $222,162 $73,000 $0 $149,218 $1,334,022 $557,096 III Harris &Associates2-26 City of Rancho Palos Verdes Water Quality and Flood Protection Program Storm Drain User Fee Annual Report -FY 2012·13 ANNUAL FEE RATE CALCULATIONS July 2,2012 Page 4 By definition,all properties that drain into the City's storm drain system use the storm drain system. The amount of use attributed to each parcel is measurable by the amount of storm runoff contributed by the property,which is directly proportional to the amount of impervious area on a parcel (such as buildings and concrete).The more impervious area on a property,the more storm runoff the property generates.Vacant,unimproved parcels are still in their natural states and do not contribute any additional runoff to burden the system,therefore these parcels are not charged a storm drain fee. Table 2 shows the estimated Impervious Percentages for single-family residential (SFR)properties of various size ranges.These Impervious Percentages are the estimated percent impervious cover on a property based on a ten percent data sampling of SFR parcels within the City of Rancho Palos Verdes when the fee was initially adopted. Because of the variations in condominiums and non-SFR properties,which include multi-family residential,institutional (such as churches and private schools)and government-owned properties, these properties were reviewed individually using the City GIS and Aerial photography to determine the actual Impervious cover for each parcel. Table 2-SFR Impervious Percentages Land Impervious Use Percentage SFR Size Ranges SFR1 74.0%0.01 -0.16 acres (-1 sf --7,012 sf) SFR2 58.0%0.161 -0.20 acres (-7,013 sf --8,755 sf) SFR3 48.5%0.201 -0.28 acres (-8,756 sf --12,239 sf) SFR4 41.0%0.281 -0.54 acres (-12,240 sf --23,565 sf) SFR5 34.5%0.541 -2.99**acres (-23,566 sf --130,680 sf) SFR6 n/a*3.0 acres and greater *the actual ImpervIous percentage IS used for each parcel. **the actual impervious percentage is used for SFR5 over 3/4 AC if less than originally noticed. The amount each parcel uses the storm drain system is computed by the following formula: (Parcel Area)x (Impervious Percentage)=Drainage Units The more Drainage Units a parcel has,the more storm run-off it generates,and the more it uses the storm drain system. It is often convenient to relate other land uses to a developed single family home,instead of working exclusively with Drainage Units.Since 85%of the parcels within the City are designated as Single Family Residential (SFR)parcels,and the median number of Drainage Units is 0.118 for all SFR parcels,it makes sense to relate all parcels to this median residential property.Therefore,0.118 Drainage Units is set equal to one Equivalent Residential Unit (ERU). Parcels within the City that have runoff flowing out of the City without going through any City- maintained drainage infrastructure are not included in this fee.There are also a number of County- maintained pipes within the City.Ifproperties drain exclusively to these pipes and the pipe system Q:\RPV\SD Fee Admin\FY 12-13\reports\SD Fee Rpt 12-13 Final 2Ju1l2.doc III Harris &Associates2-27 City of Rancho Palos Verdes Water Quality and Flood Protection Program Storm Drain User Fee Annual Report -FY 2012·13 July 2,2012 Page 5 does not include any City-maintained infrastructure,then they are not included in the fee.These areas,which consist of approximately 3,043 parcels,are excluded from the Storm Drain User Fee. For the purposes of this report,City-maintained infrastructure includes pipes,inlets,outlets,and natural drainage courses,and is also referred to as the "City's storm drain system." Inventory of Parcels Table 3,below,provides a summary of parcels by land use and shows the total estimated Drainage Units and ERUs for the City. Table 3-Drainage Unit Summary Table Land Imperv.Drainage Use Parcels Acreage Percent Units ERU Land Use Description SFR1 1,113 162.57 74.0%120.056 1,017.4318 SFR:0.01 -0.16 acres (-0 sf --7,012 sf) SFR2 1,f)00 349.85 58.0%202.768 1,718.4219 SFR:0.161 -0.20 acres (-7,013 sf --8,755 sf) SFR3 3,096 736.60 48.5%357.307 3,028.0663 SFR:0.201 -0.28 acres (-8,756 sf --12,239 sf) SFR4 2,801 1,104.30 41.0%449.727 3,811.2507 SFR:0.281 -0.54 acres (-12,240 sf --23,565 sf) SFR5 946 742.70 34.5%"213.013 1,805.1949 SFR:0.541 -2.99 acres (-23,566 sf --130,680 sf) SFR6 10 52.38 actual"3.551 30.0930 SFR:3.0 acres and greater CNDO 1,846 139.48 actual"95.727 811.2726 Condominiums MFR 39 53.69 actual"41.736 353.6949 Multi-Family Residential COM 45 143.21 actual"74.414 630.6270 Commercial INST 20 114.80 actual"64.692 548.2371 Churches,Private Schools,Institutions GOV 47 490.24 actual"120.454 1,020.7963 Government-owned parcels 11,863 4,089.82 1,743.445 14,775.0865 "the actual impervious percentages have been used for parcels with these land uses which includes SFR5 parcels>.75 AC The parcel areas for condominiums are calculated by dividing the total area of the condominium complex (which includes the common area)by the number of condominium units,and the total imperviousness of the entire complex is attributed to each individual condo parcel in the complex. (This divides the runoff of the entire complex to each of the individual units.)Because the condominium common areas are taken into consideration in this manner,they are exempt from the charge. Annual Fee Rate Table 4 provides the calculation of the Maximum Annual Fee Rate for FY 2012-13 and shows the actual proposed Fee Rate. Q:\RPV\SD Fee Admin\FY 12-13\reports\SD Fee Rpt 12-13 Final2Jull2.doc III Harris &Associates2-28 City of Rancho Palos Verdes Water Quality and Flood Protection Program Storm Drain User Fee Annual Report -FY 2012·13 Table 4 -Annual Fee Rate July 2,2012 Page 6 CPI CPI 2%Max.Actual Increase Rate Rate Rate Rate Base Year -FY 2006-07 $86.00 $86.00 FY 2007-08 3.8%$89.27 $87.72 $87.72 $87.72 FY 2008-09 3.3%$90.61 $89.47 $89.47 $89.47 FY 2009-10 0.0%$89.47 $91.26 $89.47 $89.47 FY 2010-11 1.4%$90.72 $91.26 $90.72 $90.72 FY 2011-12 2.3%$92.81 $92.53 $92.53 $92.53 FY 2012·13 2.1%$94.47 $94.38 $94.38 $94.38 The maximum rate will increase automatically on an annual basis by an amount equal to the annual change in Consumer Price Index for all Urban Consumers (CPI)for the Los Angeles,Riverside, Orange County Areas including all items as published by the U.S.Bureau of Labor Statistics as of March 1 of each year,not to exceed a maximum increase of two percent (2%)per year. The actual rate to be levied each year will be as approved by the City Council at a public hearing, after they consider an Annual Fee Report outlining the estimated annual costs of the program. Table 5 provides sample fee calculations for various land uses and parcel sizes based on the proposed Actual Fee Rate. Q:\RPv\SD Fee Admin\FY 12-13\repOlis\SD Fee Rpt 12-13 Final2Jul12.doc III Harris &Associates 2-29 City of Rancho Palos Verdes Water Quality and Flood Protection Program Storm Drain User Fee Annual Report -FY 2012-13 Table 5-Sample Calculations July 2,2012 Page 7 Est.FY 12-13 Annual land Use Parcel Parcel Imperv.Drainage Fee Rate/ERU Designation Area (sf)Area (ac)x Percent =Units I 0.118 =ERU's $94.38 SFR1 3,500 0.08 x 0.740 =0.059 /0.118 =0.5000 $47.19 SFR2 7,400 0.17 x 0.580 =0.099 I 0.118 =0.8390 $79.18 SFR2 8,300 0.19 x 0.580 =0.110 I 0.118 =0.9322 $87.98 SFR3 9,200 0.21 x 0.485 =0.102 /0.118 =0.8644 $81.58 SFR3 10,000 0.23 x 0.485 =0.112 10.118 =0.9492 $89.59 SFR3 11,300 0.26 x 0.485 =0.126 /0.118 =1.0678 $100.78 SFR4 13,500 0.31 x 0.410 =0.127 /0.118 =1.0763 $101.58 SFR4 17,000 0.39 x 0.410 =0.160 /0.118 =1.3559 $127.97 SFR4 21,400 0.49 x 0.410 =0.201 /0.118 =1.7034 $160.77 SFR5 52,300 1.20 x 0.345 =0.414 /0.118 =3.5085 $331.13 CNDO*1,307 0.03 x 0.800 =0.024 /0.118 =0.2034 $19.20 CNDO*3,049 0.07 x 0.850 =0.060 /0.118 =0.5085 $47.99 Non-SFR 13,068 0.30 x 0.820 =0.246/0.118=2.0847 $196.75 Non-SFR 13,068 0.30 x 0.700 =0.210 /0.118 =1.7797 $167.97 Non-SFR 29,185 0.67 x 0.350 =0.235 /0.118 =1.9915 $187.96 Non-SFR 29,185 0.67 x 0.700 =0.469 /0.118 =3.9746 $375.12 Non-SFR 71,874 1.65 x 0.650 =1.073 /0.118 =9.0932 $858.22 Non-SFR 71,874 1.65 x 0.850 =1.403 /0.118 =11.8898 $1,122.16 Non-SFR 135,907 3.12 x 0.400 =1.248 /0.118 =10.5763 $998.19 Non-SFR 135,907 3.12 x 0.600 =1.872 /0.118 =15.8644 $1,497.28 0.118 =Drainage Units per median SFR ERU =Equivalent Residential Unit *Condominium parcel areas =the area of the entire complex divided by the total number of units in the complex. The Preliminary Fee Roll,which is a listing of each parcel to be charged a fee and the maximum and actual fee for FY 2012-13,is on file in the office of the City Clerk. Appeals Process If a property owner disagrees with the calculation of his or her fee,based on the parcel area and estimated impervious percentage assigned to the property,then the property owner may appeal the calculation as follows: 1.Property owner must provide written documentation explaining the reason why the charge should be changed.This documentation must include: a.The name,phone number,mailing address,and email address,if available,of the property owner. b.The Assessor's Parcel Number (APN)of the property in question. Q:\RPV\SD Fee Admin\FY 12-13\reports\SD Fee Rpt 12-13 Final2Jul12.doc III Harris &Associates2-30 City of Rancho Palos Verdes Water Quality and Flood Protection Program Storm Drain User Fee Annual Report -FY 2012·13 July 2,2012 Page 8 c.To-scale drawings of the property in question and the impervious areas located on it with accompanying calculations.The to-scale drawings shall include the square footage and labels for each impervious area (i.e.house,garage,driveway,patio,tool shed,carport,etc.). 2.If additional documentation is required or insufficient documentation was submitted,a representative of the Public Works Department or his or her designee (Staff)will notify the property owner in writing within two (2)weeks of receipt of the appeal. 3.Once Staff has determined that sufficient documentation has been submitted,Staff will perform the initial review.Staffwill notify the property owner in writing within four (4)weeks from the time sufficient documentation was submitted as to whether or not the fee amount will be changed. a.If the determination is to change the fee amount,then the new fee amount will be do.cumented within the City's fee database. b.If the determination is that the fee should not be changed,the property owner can appeal Staffs decision to the Director of Public Works (Director).The appeal must be made in writing and returned no later than four (4)weeks from the date of mailing of Staff s initial review decision.The Director will notify the property owner in writing within four (4) weeks from the date of receipt of the appeal as to whether or not the fee amount will be changed. If the Director's determination is that the fee should not be changed,the property owner can appeal this decision to the City Council.The appeal must be made in writing and returned no later than four (4)weeks from the date of mailing of the Director's appeal decision.The City Clerk shall fix a time and place for hearing the appeal and shall give notice in writing to the appellant in the manner prescribed in Section 3.16.090 for service of notice of hearing. The City Council's determination on the appeal shall be final. Appeals will be accepted annually up until June 30 for inclusion on the following fiscal year's property tax roll submittal.However,if an appeal is granted by Staff,the Director or the City Council that does not permit inclusion for the following fiscal year's property tax roll submittal,a reimbursement will be provided to the property owner by the City. Q:\RPV\SD Fee Admin\FY 12-13\reports\SD Fee Rpt 12-13 Final2Ju1l2.doc III Harris &Associates2-31