RPVCCA_CC_SR_2012_06_19_03_CIPCITY OF MEMORANDUM RANCHO PALOS VERDES TO: FROM: DATE: SUBJECT: REVIEWED BY: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCI~ DENNIS McLEAN,DIRECTOR OF FINANCE &INFORMATION TECHNOLOGY JUNE 19,2012 2012 FIVE-YEAR CAPITAL IMPROVEMENT PLAN (Supports 2012 City Council Goals of Public Infrastructure &Government Efficiency,Fiscal Control,and Transparency) CAROLYN LEHR,CITY MANAGER c9-- Project Managers:Kathryn Downs,Deputy Director of Finance &Information Technology to CS\ Ryan Mills,Senior Administrative Analyst\V RECOMMENDATION Adopt the 2012 Five Year Capital Improvement Plan (CIP). EXECUTIVE SUMMARY The Capital Improvement Plan (CIP)is a guide for the efficient and effective provision of resources for improving and maintaining public infrastructure and facilities.The CIP is segregated into both funded and unfunded projects and includes detail "project sheets"that provide a description,project type (ex.Roadway Infrastructure),location,department responsible,estimates of cost and the justification (ex.safety,Council goal or essential service).The CIP document does not include any projects with estimated costs below $100,000. Projects are generally added to the funding schedule as available funding sources are identified (ex.grant funds).Projects are usually funded first from restricted funds,such as Proposition C and TDA Article 3 funds,so as to be conservative in allocating General Fund monies only when necessary. Although the CIP document presents project funding for five years,the City Council approves CIP projects for the upcoming fiscal year only.This gives the City Council the 3-1 2012 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 19,2012 Page 2 ability to shift priorities when needed,while at the same time identify future projects and their funding mechanisms. 2012 CIP The 2012 CIP includes Five-Year CIP Funded Schedule (page 12 ofthe attached CIP)that has been integrated into the 2012 Five-Year Financial Model that is also on the June 19, 2012 agenda.New "funded"projects include: ~Marguerite Open Channel (storm drain improvement);and ~Ryan Park Restrooms Improvement &Accessibility Compliance. Projects in the FY12-13 column of the Five-Year CIP Funded Schedule total $3,382,642, and are included in the proposed FY12-13 budget.The Five-YearCIP Funded Schedule within the CIP document does not include any projects with estimated costs below the $100,000 capitalization threshold;however,the Five-Year Model on this same agenda includes all projects regardless ofthe cost estimate (see Exhibits C and 0 of the Five-Year Model). Based on feedback from the City Council on June 5,2012,a FY11-12 column has been added to the five-year summary schedule of funded projects (page 12 of the CIP document).This column includes all FY11-12 appropriations for projects with cost estimates of $100,000 or more,as well as a project status for the FY11-12 projects included with this staff report (see below for highlights and Attachment B). Council Feedback -Prioritization At the June 5,2012 City Council meeting,feedback was given regarding the prioritization of CIP projects;specifically unfunded projects.A CIP project that is justified with both a public safety concern and is a Council goal is of a greater priority than a project that is not. In order to retain the flexibility needed to address infrastructure issues as they arise,Staff has added additional columns noting important public safety projects and projects that support Council goals in both the schedules offunded and unfunded projects.Reliance on a straight numeric ranking system could lead to misunderstandings,flawed analysis and possibly flawed decisions and its inclusion would be redundant to the established CIP Criteria justifications. Council Feed back -Cross-Referencing In addition,the City Council requested that the Funded and Unfunded CIP project matrices be cross referenced with the CIP project sheets.This has been completed and can be found on Page 11 (Funded Projects)and Page 36 (Unfunded Projects). 3-2 2012 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 19,2012 Page 3 Lower Hesse Park and Grandview Park Based on City Council feedback,the Grandview/Lower Hesse Improvements project was moved from the Funded List to the Unfunded List.In the 2011 CIP Document,$2.4 million was included for the Grandview/Lower Hesse Improvements project in the FY13-14 column with a use of General Fund money as a placeholder.Staff expects to present its findings resulting from the preparation of the Mitigated Negative Declaration (MND)environmental review for the Lower Hesse Park project at meeting in July 2012.The presentation of the MND affords an opportunity for the City Council to provide Staff with ideas and feedback about possible project revisions (ex.migration to more passive uses)for further project scoping,including revisions of cost estimates. BACKGROUND AND DISCUSSION The CIP is a guide for the efficient and effective provision of resources for improving and maintaining public infrastructure and facilities.Programming capital facilities and improvements over time can promote better use of the City's limited financial resources, reduce costs and assist in the coordination of public and private development.Based on the guidelines of the framework and those set forth by the City Council,Staff developed an inventory of capital projects.This inventory was compiled through a comprehensive review of existing reports,infrastructure plans,community input and City Council direction.Some of these plans include the following:the Pavement Management System,Vision Plan, Sanitary Sewer Master Plan,Public Use Master Plan,Trails Network Plan,Storm Drain Master Plan and the General Plan. As required by state law,the Planning Commission conducted its review of the CIP at its meeting on June 12,2012.The Planning Commission adopted a resolution,finding that the City's 2012 CIP is consistent with the goals and policies of the General Plan. The purpose of this presentation is to provide the City Council with an overview of projects which have been proposed for the Five-Year CIP,and to present any changes that are being proposed.As new information has become available,some cost estimates and funding sources have been updated from 2011.Although the Five-Year CIP includes capital projects consistent with prior years (i.e.Storm drain projects,residential and arterial roadway projects and minimal projects for recreation facilities),other projects may be included in the schedule during the next fiscal year if additional funding sources are identified. PRIORITIZING CAPITAL IMPROVEMENT PROJECTS At the June 5,2012 City Council meeting,feedback was given regarding the prioritization of CIP projects;specifically unfunded projects.Staff has evaluated every project during the establishment and update of the CIP and established CIP Criteria justifications that are reflected on each project sheet.These CIP Criteria justification categories include:safety, support of essential City services,support of Council plan goals,economy and efficiency, 3-3 2012 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 19,2012 Page 4 outside funding,and community quality/sustainability.The CIP Criteria justifications,or a combination of,as well as the availability of restricted (non-General Fund)monies,should be utilized to establish the priority level of CIP projects.Staff has included columns on the Funded and Unfunded lists (pages 11 &36 of the document)to indicate whether the project supports public safety or another City Council priority. Using the San Ramon Canyon Stabilization project as an example,the project sheet justification (Page 65 of 79)indicates that the completion of the project satisfies a public safety concern,is one of the Council highest goals,is partially funded and will provide community sustainability upon its completion.A CIP project that is justified with both a public safety concern and is a Council goal is of a greater priority than a project that is not. In order to retain the flexibility needed to address infrastructure issues as they arise,Staff suggests utilizing the additional columns noted above to indicate projects that are important for safety'purposes and projects that support Council goals. Reliance on a straight numeric ranking system could lead to misunderstandings,flawed analysis and possibly flawed decisions and its inclusion would be redundant to the established CIP Criteria justifications.To assist in the ranking process,numerical scores could be assigned to each project based on criteria that is established.Although such quantitative approaches seem attractive at first,the process could suffer from a high degree of subjectivity,with a bias toward one criterion.The two-column approach noted above will help to avoid potential mis-ranking of projects that could occur with a rigid scoring system.To reflect this proposed change in ranking methodology,Staff has replaced the CIP Categories (1-4)with use of the CIP Criteria justifications for establishing CIP project priorities in the CIP document. In the past,Staff has recommended the funding of CIP projects based on the availability of funding mechanisms,such as the availability of restricted revenues and accumulated restricted funds,so as to be conservative with the allocation of general fund monies.This is consistent with Government Finance Officers'Association's (GFOA)Best Practice that states: "When integrating plans with financial policies,governments should consider both the costs and revenue streams.Possible revenue streams include bond programs,pay as you go alternatives,grants,impact fees,and public private partnership alternatives.Reviewing the revenue generating potential under the plan assumptions will help identify the capability to finance needed capital projects as well as any gaps in the ability to do so.Moreover,the plan's vision should be balanced between the financial capacities to meet the stated goals,or at a minimum,should clearly identify the financial implications of a vision that may conflict with the jurisdiction's financial policies and capacity.til 1 GFOA Best Practice "The Role of Master Plans in Capital Improvement Planning"(2008). http://www.gfoa.org/index.php?option=com content&task=view&id=1600 3-4 2012 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 19,2012 Page 5 However,once the San Ramon Stabilization project is funded,the Council may wish to consider the level of CIP Reserves in conjunction with other priority unfunded CIP projects and judiciously utilize CIP Reserves for future CIP funding. PROJECTS ADDED TO FUNDED LIST There were two projects that were added to the CIP Funded List: 1)The Marguerite Open Channel Project has been added to the funded CIP with an estimated construction cost of $350,000 in FY13-14.This project addresses the excessive erosion in a portion of open natural drainage channel,which connects two piped systems between PVDW and the bluff.Storm Drain User Fees are aV~i1able to fund this project. 2)Staff has also included the Ryan Park Restrooms &Accessibility Compliance Project in the FY12-13 column of the CIP.The restrooms are aged,in poor condition and have not had any major improvements since they were built. Additionally,the lower parking lot,the ramp and the restrooms are not ADA compliant.The park is heavily used by the community over the weekends,during the holidays and in the summer.The recent athletic field improvement has increased the community's interest in using the park during athletic seasons.These improvements are necessary for enhancing service to the community by implementing corrective work at the lower parking lot and ramp,and,making the restrooms accessible,safe and sanitary.Staff has identified accumulated fund balance in the Capital Improvement Projects Fund that is available for this project. HIGHLIGHTS FROM FY11-12 APPROPRIATED PROJECTS In FY11-12,over $19 million in various funds (CIP accumulated balance,General Fund, Water Quality &Flood Protection funds,etc.)was appropriated for Capital Improvement Projects,a majority of which are continuing appropriations from items related to Public Works projects.Many of these projects are performed in the summer months to avoid the rainy season (e.g.street overlay projects)or are large projects that take several years to complete (e.g.General Plan Update).Some of the highlights from these projects include: 1.Arterial Overlay and Slurry Seal on Palos Verdes Drive East (from Miraleste Drive to the Northern City Limits)-FY11-12 Budget:$2,380,000 In 2010,initial preliminary engineering work was completed for Safety Improvements, including roadway resurfacing,sidewalk improvements,tree trimming,shrubbery reduction, visibility improvements,sign enhancements and striping improvements.Design work and plan production are in process for the improvements along PVDE.Staff is working on executing an engineering design contract,and construction is expected to begin in late Summer or early Fall 2012 with an estimated completion date of Summer 2013. 3-5 2012 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 19,2012 Page 6 2.Palos Verdes Drive West/Palos Verdes Drive South (PVDW/PVDS)Median Improvements -FY11-12 Budget:$500,500 This project will install sustainable landscaping so as to require minimal maintenance. Development will also include the installation of irrigation systems and controllers, hardscape and decorative stone.This project is currently in the design phase.Staff expects to solicit bids in June 2012 with construction starting in July/August 2012. 3.Hawthorne Boulevard Traffic Signal Synchronization -FY11-12 Budget:$785,532 This project will synchronize 7 traffic signals along Hawthorne Boulevard,while installing 24 pedestrian countdown heads at 3 intersections.Staff is currently soliciting proposals for project design and is in the process of obtaining clearances from Caltrans in order to proceed ..Project design is expected to begin in June 2012. 4.Storm Drain Lining -FY11-12 Budget:$1,146,698 City Council awarded a construction contract in April 2012 for the 2012 Storm Drain Rehabilitation and Lining Project.City Council awarded professional service agreements for inspection and mapping services in May 2012.Once these agreements are executed, notice to proceed (NTP)will be given to the contractor.Staff anticipates the work will be completed about three months after NTP is given.Staff is beginning to develop a list of pipes to be investigated and potentially lined in FY12-13.These pipes are predominately on the City's west side and will include diameters up to 84 inches.The budgeted amounts of the yearly Storm Drain Lining projects are consistent with the amounts identified in the Storm Drain Master Plan .. 5.Abalone Cove Shoreline Park -FY11-12 Budget:$665,176 This project proposes to add landscaping,trails,interpretive signage,shade structures, picnic areas,viewing stations and an exploration play area at Abalone Cove Shoreline Park.In December 2011,the City was awarded a one to one grant from the Office of Grants and Local Services (OGALS)for this project in the amount of $310,830.City Council approved an appropriation for this project on February 21,2012.A design contract will be proposed to City Council in Fall 2012. CHANGES TO THE UNFUNDED LIST The median improvement project for Hawthorne Blvd from Via Rivera to City Hall has been moved to the Unfunded list,as the accumulated Beautification fund balance is not sufficient to provide funding for this project. The Gateway Park Development Project was moved from the Funded List to the Unfunded List due a shift in a grant funding opportunity.Portions of the Gateway Park Development Project and the California Coastal Trails Project have been combined,in which funding 3-6 2012 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 19,2012 Page 7 from the California Coastal Trails Project grant will be used.Because the grant money will be mostly applied to the scope of work for the California Coastal Trails Project,the Gateway Park Development Project is on hold and has been moved to the Unfunded List. The Salvation Army Trail Segment has been removed from the Unfunded List due to a change in the cost of the project.The cost of this project has fallen below the $100,000 capitalization threshold that causes a project to be addressed in the Plan Document,and is expected to be funded with a FY11-12 appropriation continued to FY12-13. The PVDE Arterial Street project,the Bikeway Improvements project,and the Hesse Park/Hawthorne Traffic Circulation project have all been removed from the Unfunded list, as these improvements are each funded with FY11-12 appropriations that will likely be continued to FY12-13. Three Arterial Street projects have been added to the Unfunded List:Crenshaw,Indian Peak,and Miraleste. Changes have been made to various Roadway Infrastructure projects from the 2011 CIP due to refinements in project scopes.Project scopes are modified frequently to continuously understand and meet the needs of the community.For example,the PVDE at Bronco Drive Improvements project was refined into Traffic Safety Improvements at Bronco Drive,as the former project would better address the issues at the intersection. Staff expects that additional unfunded projects will be identified upon the completion of both the Storm Drain Master Plan Update and the Pavement Management System Update. The Storm Drain Master Plan Update is in its beginning stages,while the Pavement Management System Update is scheduled for completion in FY12-13. Attachments Attachment A -Proposed 2012 Five-Year capital Improvement Plan Attachment B -Status of FY11-12 Capital Improvement Projects 3-7 Attachment A RANCHO PALOS VERDES Proposed 2012 Five-Year Capital Improvement Plan 3-8 TABLE OF CONTENTS INTRODUCTION,3 FUNDED PROJECTS 11 BUILDINGS AND OTHER FACILITY IMPROVEMENTS 12 INTANG IBLE CAPITAL OUTLAY 14 ROADWAY INFRASTRUCTURE 16 PUBLIC UTILITIES 24 STORM DRAIN SySTEM 25 RECREATION,PARKS &OPEN SPACE 31 UNFUNDED PROJECTS 35 BUILDINGS AND OTHER FACILITY IMPROVEMENTS 37 INTANGIBLE CAPITAL OUTLAY 46 ROADWAY INFRASTRUCTURE 47 PUBLIC UTILITIES 57 STORM DRAIN SySTEM 62 RECREATION,PARKS &OPEN SPACE 67 Page 2 of 77 3-9 INTRODUCTION A Capital Improvement Plan (CIP)is a guide toward the efficient and effective provision of public infrastructure and facilities.Programming capital facilities and improvements over time can promote better use of the City's limited financial resources,reduce costs and assist in the coordination of public and private development.In addition,the planning process is valuable as a means of coordinating and taking advantage of joint planning and development of facilities and infrastructure where possible.Careful management of these assets keeps the City poised for flexible and responsive strategic planning that allows the City to proactively prepare the groundwork for capital projects so when funding opportunities arise,a plan is ready to be implemented.By looking beyond year-to-year budgeting and projecting what,where,when and how capital investments should be made,capital planning enables public organizations to maintain an effective level of service for the present and future population. THE CAPITAL IMPROVEMENT PLAN (CIP) The result of this continuing planning process is the CIP,which is the City's five-year roadmap for creating,maintaining,and funding present and future infrastructure requirements.The CIP addresses the City's needs relating to the acquisition,expansion,and rehabilitation of long-lived facilities and infrastructure.The CIP serves as a planning instrument in conjunction with the City's General Plan and the City Council's Goals to identify needed capital projects and coordinate the financing and timing of improvements in a way that maximizes the return to the public.It provides a planned systematic approach to utilizing the City's financial resources in the most responsive and efficient manner to meet its service and facility needs.It serves as the "blueprint"for the future of the community and is a management and planning tool,rather than a binding document. The underlying strategy of the CIP is to plan for necessary land acquisition,construction and maintenance of public facilities necessary for the safe and efficient provision of public services in accordance with City policies and objectives adopted in the City's General Plan.A critical element of a balanced CIP is the provision of funds to both preserve or enhance existing facilities and provide new assets to respond to changing service needs and community growth.While the program serves as the long range plan,it is reviewed and revised bi-annually in conjunction with the budget.Priorities may be changed due to funding opportunities or circumstances that cause a more rapid deterioration of an asset.Projects may be revised for significant costing variances. The CIP is primarily a planning document to assist in the City's long-term planning.As such,the projects and their scopes are subject to change from year to year as the needs of the community become more defined and projects move closer to final implementation.The adoption of the CIP is neither a commitment to a particular project nor a limitation to a particular cost.As a basic tool for scheduling anticipated capital projects,it is also a key element in planning and controlling future capital financing.For this reason,the CIP includes some "unfunded"projects in which needs have been identified,but specific solutions and funding have not been determined. When adopted,the CIP provides the framework for the City's management team and the City Council with respect to investment planning,project planning and managing any debt.This document is independent of the City Council's goals and is intended to serve as a long-term planning document. THE CIP PROCESS The capital plan and budget is the result of an ongoing infrastructure planning process. Infrastructure planning decisions must be made with regard to both existing and new facilities and equipment.For existing facilities,the planning process addresses appropriate capital renewal strategies and repair-versus-replacement of facilities.New service demands are also considered since they often affect capital facility requirements.Planning for the five-year CIP period and subsequent five years,includes linking the General Plan to the capital plan requirements, conducting needs assessments and allowing for flexibility to take advantage of opportunities for Page 3 of 77 3-10 capital investment.The FY12.,13 through FY16.,17 CIP is developed through input by professional staff,citizens of Rancho Palos Verdes,and elected or appointed City officials. CIP REVIEW TEAM A CIP Review team is responsible for annually reviewing capital project requests and providing recommendations to the City Manager.This team is comprised of staff from the Office of the City Manager,Finance and Information Technology,Public Works,Community Development,and Recreation and Parks departments,and the City Attorney.This team conducts an in-depth analysis of the impact of the CIP on cash flow and financial obligations,as well as the City's ability to finance,process,design,and ultimately maintain projects.The team will also analyze the fiscal impact for each individual project;including future maintenance and replacement costs, associated monetary benefits (e.g.future maintenance savings),as well as any applicable future revenue opportunities.The team meets periodically throughout the year to evaluate the progress of projects,and examine future needs of the City. The overall goal of the CIP Review Team is to develop CIP recommendations that: •preserve the past,by investing in the continued upgrade of City assets and infrastructure; •Protect the present with improvements to City facilities and infrastructure; •Plan for the future. Projects are identified by staff,professional consultants,residents or elected officials.There are typically more proposals than can be funded in the five-year CIP period,so the team conducts an internal project ranking process.The criteria used in this internal ranking includes,but is not limited to,safety,support of essential City services,support of City's goals,economy and efficiency,outside funding committed or eligible,and community quality/sustainability.Projects are prioritized and scored based on the criteria outlined in this plan in the following section.If a project receives a lower ranking,there is no reason to believe that any damages will occur if the project has not been completed.While ratings are important in determining recommended projects,the realities of the City's financial situation are critical to all decisions. CIP CRITERIA Safety:Enhance or improve the overall safety of the City and delivery of services.Protect the health and welfare of residents. Supports Essential City Services:Maintenance and development of existing or new facilities and infrastructure which allows the City to deliver essential services to residents of Rancho Palos Verdes. Supports City Goals:Supports the goals annually established by the City Council in the Council Plan.Meets citywide long-term goals and is in compliance with the City's General Plan. Economy and Efficiency:Maintain and enhance the economy and efficiency of providing services in Rancho Palos Verdes.This criterion would include projects which improve business processes and overall efficiency while also evaluating environmental impacts. Outside Funding Committed or Eligible:Support a project which outside funding has been committed to or may be obtained through restricted revenue sources. Community Quality/Sustainability:Maintain and enhance the infrastructure and services which supports our residential and business community.This criterion would include projects which preserve and enhance the overall quality of life in Rancho Palos Verdes and projects which ensure economic viability to support a sustainable community. Page 4 of 77 3-11 THE CIP CALENDAR August-October November-January February-May May-June May-June Departments prepare CIP requests CIP Team reviews requests Recommendations developed to be included in the Five-Year Model and Draft Budget Planning Commission Review Recommendations presented to the City Council for approval Additional forms and methods of public outreach will be conducted as directed by the City Council. PROJECT LISTS The CIP.includes a comprehensive listing of all projects contained in the Five-Year CIP and also projects beyond the Five-Year Period.Detailed project sheets are contained in the plan for all projects included in the CIP.Another list of unfunded projects is also contained in the plan to highlight the City's needs beyond the five year period.Projects which are included in the CIP were evaluated based on the criteria approved by the City Council and are in compliance with the goals set forth in the City's General Plan.Application of these criteria ensures that each project recommended for Council consideration does indeed support the policy objectives of the City's long-term planning documents and identifies a basis for scheduling and allocation of resources. Cost estimates have been developed for each project based on preliminary project descriptions, and include all estimated costs for land acquisition,permits and inspections,project management and project engineering,consultant design,construction,utilities,information technology infrastructure and other associated project fees.Estimates are in today's dollars. CAPITAL IMPROVEMENT POLICIES Time Period The Finance and Information Technology Department,in cooperation with all other City Departments and the City Attorney,shall produce a working document designed to identify capital needs bi-annually in conjunction with the budget process.This Five-Year Capital Improvement Plan (CIP)is submitted to the City Council to utilize in reviewing and prioritizing capital projects. Type of Project Definition of a capital asset:An asset with a cost in excess of $5,000 and an expected useful life of more than one year,such as automobiles,equipment,and furniture.These items will continue to be included in the operating budget.Items such as automobiles,minor equipment,and furniture will continue to be accounted for and funded using the Equipment Replacement Fund and are not included in the capital improvement plan. Definition of a capital project:A project expected to have a useful life greater than ten years and an estimated cost of $100,000 or more.Capital projects include the construction,acquisition,or major renovation of buildings,utility systems,or other structures,purchase of land,and major landscaping projects. Projects meeting the above definition will be included in the CIP document in addition to the City's two-year budget document.The information will be tied to the capital budget and totals for each project in the CIP will be included in the capital budget. Page 5 of 77 3-12 Selecting the Projects for the CIP The comprehensive capital project planning process has the following essential components: •The General Plan (Long-term Plan-10 Years) •The Capital Improvement Plan (Mid-term Plan-5 Years) •The Capital Budget (Short-term Plan-1 Year) •City Council Plan (Long-term and Short-term-evaluated each year) All projects selected for the CIP should be consistent with the goals identified in the City Council Plan or as outlined in the City's General Plan.The project selection process strives to achieve a balanced plan for the community to include all necessary and high priority projects,while also enhancing City services and facilities. Operating Budget Impact Identified in the CIP The operating impact of proposed capital projects,including personnel,operating expenditures, capital outlay,and debt service,as applicable,will be identified in the CIP document and considered in preparing the annual operating budget and Five-Year Financial Model. Moving Projects from the CIP to the Capital Budget All projects approved in the annual capital budget are appropriated at the estimated cost to complete the project.At the end of each fiscal year,the remaining appropriation for uncompleted portions of the project will be carried forward to subsequent fiscal years. Staff will identify the estimated costs,potential funding sources,operating impact,and project schedule for each capital project proposal before it is submitted to the City Council. Staff will coordinate development of the capital improvement budget with the development of the operating bUdget.All costs for internal professional services needed to implement the CIP will be included in the capital budget as part of the two-year budget document for the years the CIP is to be implemented. Cost tracking for components of the capital improvement program will be updated semi-annually to ensure project completion against budget and established time lines. Definition of Capital Budget Year A capital budget year runs concurrent to the operating budget fiscal year beginning July 1st and ending June 30 th . Types of Financing The nature and cost of the project generally determine financing options as do projected revenue resources.The following financing instruments could be used in the following preferred order: •Outside funding that does not require repayment,including grants,federal,state and county restricted funding (i.e.transportation funding),and donations; •Developer Fees; •City restricted revenue imposed by voters (i.e.environmental excise tax,storm drain user fee); •Accumulated Fund Balances in Restricted Funds; •General Fund; •Debt secured by a Restricted Revenue Source;and •General Obligation Debt. Remaining Balances It is the City's policy to apply restricted funding sources after a project is completed and final cost is identified,or at the close of each fiscal year,whichever occurs first. Evaluation of Capital Projects Page 6 of 77 3-13 Capital project and program reviews are to monitor existing project performance and to update the five year CIP.Each project must be actively managed and semi-annual reports on the physical and fiscal status of each project should be made available to the City Council in conjunction with the budget adoption and Mid-Year Review. Green Building Standards As a way to create a more sustainable way of life,the City of Rancho Palos Verdes requires the incorporation of green building principles and practices into the design,construction,and operation of all City facilities,and to evaluate all land purchases for future development on the basis of reducing environmental impacts whenever feasible. Standards for Maintenance It is important to have standards in place for the various infrastructure systems throughout the City to maintain this investment and be positioned to provide adequate services for the residents of Rancho Palos Verdes.Staff will develop maintenance standards and schedules as appropriate. Contingency Policy The need for contingencies will be evaluated with each project and be included in the CIP on a case-by-case basis. Project Change Orders Project change orders will be made in accordance with the policy stated in Section 02.44.25 of the Municipal Code.This policy requires that specific purchasing procedures be followed and City Council approval obtained for any amount over twenty-five thousand dollars. GENERAL PLAN GOALS The goals stated below are included in the City's General Plan which serves as the City's long- term strategic planning tool.The General Plan is currently undergoing its first update since its adoption.The Director of Community Development has advised the CIP Team that none of the proposed revisions that have been under consideration will significantly impact the draft CIP Framework.Staff has elected to refer to the current General Plan in the conjunction with the development of the CIP Framework.All CIP projects should contribute to fulfilling one or more of the goals listed below to create a balanced,sustainable community. Natural Environment Element •It is the goal of the City of Rancho Palos Verdes to conserve,protect,and enhance its natural resources,beauty,and open space for the benefit and enjoyment of its residents and the residents of the entire region.Future development shall recognize the sensitivity of the natural environmental and be accomplished in such a manner as to maximize the protection of it. Socio/Cultural Element •The City shall strive to protect and preserve all significant archaeological,paleontological and historical resources within the City. Cultural Resources •The City shall strive to protect and preserve all significant archaeological,paleontological and historical resources with in the City. Current Social,Service,and Cultural Organizations •Work toward a coordinated program to aid in matching the facility needs of the many and diverse groups in the community with existing and future facility resources throughout the City. Social Services Page 7 of 77 3-14 •Encourage programs for community involvement,participation,and action to minimize the sense of isolation and powerlessness felt by many individuals in the community. •Encourage programs for recreation,social services,and cultural and educational achievement. •Encourage a framework for interaction among the four cities of the peninsula and between the peninsula and its surrounding communities to solve common problems. Urban Environment Element •It is the goal of the City to carefully control and direct future growth towards making a positive contribution to all elements of the community.Growth in Rancho Palos Verdes should be a cautious,evolutionary process that follows a well-conceived set of general guidelines which respond to both holding capacity limitations for the region and environmental factors on the peninsula. Activity Areas •rt is the goal of the City of Rancho Palos Verdes to preserve and enhance the community's quality living environment;to enhance the visual character and physical quality of existing neighborhoods;and to encourage the development of housing in a manner which adequately serves the needs of all present and future residents of the community. •The City shall discourage industrial and major commercial activities due to the terrain and environmental characteristics of the City.Commercial development shall be carefully and strictly controlled,and limited to consideration of convenience or neighborhood service facilities. •The City shall encourage the development of institutional facilities to serve the political, social,and cultural needs of its citizens. •The City shall endeavor to provide,develop,and maintain recreational facilities and programs of various types to provide a variety of activities for persons of all age groups and in all areas of the community. •Agricultural uses within the City shall be encouraged,since they are desirable for resource management and open space. Infrastructure •It shall be a goal of the City to ensure adequate pUblic utilities and communications services to al residents,while maintaining the quality of the environment. •It shall be a goal of the City to provide residents with a safe and efficient system of roads, trails and paths. •It shall be a goal of the City to encourage the increased mobility of residents through the development of an adequate public transportation system. Safety •It shall be a goal of the City to provide for the protection of life and property from both natural and man-made hazards within the community. •It shall be a goal of the City to provide for the protection of the public through effective law enforcement and fire protection programs. Page 8 of 77 3-15 •It shall be a goal of the City to develop and enforce health and sanitation,emergency communications,and disaster preparedness programs to ensure the overall health and safety of all residents. •It shall be a goal of the City to protect life and property and reduce adverse economic, environmental,and social impacts resulting from any geologic activity. Sensory Environment •It shall be the goal of the City of Rancho Palos Verdes through proper land use planning and regulations,to provide for a quiet and serene residential community with a minimum of restriction on citizen activity. •Palos Verdes peninsula is graced with views and vistas of the surrounding Los Angeles basin and coastal region.Because of its unique geographic form and coastal resources, these views and vistas are a significant resource to residents and to many visitors,as they provide a rare means of experiencing the beauty of the peninsula and the Los Angeles region.It is the responsibility of the City to preserve these views and vistas fro the public benefit and,where appropriate,the City should strive to enhance and restore these resources,the visual character of the City,and provide and maintain access for the benefit and enjoyment of the pUblic. Land Use Plan •It is the goal of the City of Rancho Palos Verdes to provide for land uses which will be sensitive to and enhance the natural environment and character of the community,supply appropriate facilities to serve residents and visitors,promote a range of housing types, promote fiscal balance,and protect the general health,safety,and welfare of the community. Fiscal Element •It shall be a goal of the City to hold the property tax to a minimum and to continually explore and analyze the advantages and disadvantages of alternate or new sources of revenue. •It shall be a goal of the City to explore cooperative financing strategies that might be undertaken in association with other jurisdictions. •It shall be a goal of the City to take maximum advantage of regulatory legislation to obtain contributions,dedications and reservations (Le.,easements). •It shall be a goal of the City to ascertain that all revenues generated by growth are sufficient to cover costs related to growth. •It shall be a goal of the City to thoroughly evaluate capital acquisition and operating expenditures and their impacts before implementation of programs. Page 9 of 77 3-16 (THIS PAGE IS BLANK) Page 10 of 77 3-17 ""0 Q) (0 CD ............ sa, "'""'" Rancho Palos Verdes Five Year Capital Improvement Plan ~Funded Council Project Page Safety Goal Priority FY11-12 FY12-13 FY13-14 FY14-15 FY15-16 FY16-17 Identified Funding Source ADA Compliance Projects 13 X $100,000 $100,000 $100,000 EET Hesse Park Drop Ceiling Retrofit/Replacement X $152,500 Building Replacement Fund Pavement Management Program Update 15 X X $120,000 $120,000 CIP accumulated balance Storm Drain Master Plan Update X $697,789 WQF?User Fees Ladera Linda Site Master Plan $100,000 General Fund Residential Rehabilitation Zone 3 &Zone 5 X X $3,120,000 General Fund,TDA Article 3 for $50,000 Residential Rehabilitation Zone 1 &Zone 9 17 X X $1,600,000 General Fund,TDA Article 3 for $25,000 Residential Rehabilitation Zone 2 18 X X $1,500,000 General Fund,TDA Article 3 for $25,000 Residential Rehabilitation Zone 6 19 X X $1,500,000 General Fund,TDA Article 3 for $25,000 Residential Rehabilitation Zone 7 20 X X $1,600,000 General Fund,TDA Articie 3 for $25,000 Residential Rehabilitation Zone 8 21 X X $1,500,000 General Fund,TDA Article 3 for $25,000 Arterial Rehabilitation -PVDE (Miraleste to North City Limits)X X $2,380,000 Measure RlSTPL Arterial Rehabilitation -PVOS X X $2,349,949 Measure RlSTPL Arterial Rehabilitation -To be determined 22 X X $2,300,000 Future Measure RlSTPL funding Hawthorne Blvd.Median Improvements (Via Rivera to City Hall)23 $250,000 Beautification Fund PVDW/PVDS Median Improvements $500,500 Beautification Fund Traffic Signal R Crenshaw/Crestridge X $242,082 GrantlCIP accumulated balance Hawthorne Blvd.Traffic Signal Synchronization X $785,532 HSIP Grant /10%CIP accumulated balance Pedestrian Improvements on Hawthorne Blvd.X $1,422,581 GranVCIP accumulated balance PVOE Safety Improvements -Early Action Improvements (Guardrails)X $273,114 GrantlCIP accumulated balance PVDS Bikeway Safety Project X $794,245 GranVCI?accumulated balance I Storm Drain Lining 26 X X $1,146,698 $324,642 $329,881 $335,278 $340,836 $347,653 WQF?User Fees PVOE Lower Switchbacks 27 X X $485,000 WQF?User Fees PVDE San Pedro Canyon Backbone System X X $570,000 WQFP User Fees PVOS (North of Barkentine)28 X X $446,000 WQFP User Fees Lower San Ramon Canyon Stabilization (Design)X X $867,575 WQF?User Fees Roan System (Via Colinita Vickery Canyon)X X $242,500 WQFPUser Fees South HawthorneNia Frascati 29 X X $440,000 WQFP User Fees Marguerite Open Channel 30 X X $350,000 WQFP User Fees Via Canada Storm Drain Rehab X X $100,000 WQFP User Fees PVDE Sewer Relocation I I $114,450 I I I I I I Ryan Park.Restrooms Improvement &Accessibility Compliance 32 X $223,000 CIP accumulated balance Ryan Park Southern Entrance Road 33 X $20,000 $220,000 CIP accumUlated balance California Coastal Trail 34 X $280,000 $280,000 GrantlCIP accumulated balance Gateway Park.Development Project:Phase I and II $200,000 GrantlCIP accumulated balance Abalone Cove Shoreline Park.X X $665,176 GranVCIP accumulated balance Lower Hesse/Grandview Improvements $1,990,836 General FundlCIP accumulated balance Eastview Park Playground Improvements $240,000 Knabe's Measure A Grant/CIP accumulated balance Totals'';';"-'~~::::ii~:-'-'i$'1~;~t~~2i ~.'~.3ti2;a.i2 $/2;725.ll!Il t·2;<&~8 $2,040;836 ~4.14'i';65a.···'· 3-18 BUILDINGS AND OTHER FACILITY IMPROVEMENTS Buildings and other facility improvements may include any proposed new City facility or renovation or improvement of any existing City facilities.The City owns and maintains twelve public buildings,including: •City Hall Administration Building at Upper Point Vicente Park •City Hall Community Development Building at Upper Point Vicente Park •City Hall trailer leased by Palos Verdes on the Net at Upper Point Vicente Park •City Hall Emergency Communications Center trailer at Upper Point Vicente Park •Fred Hesse Jr.Community Center Building •Pointe Vicente Interpretive Center (PVIC) •Ryan Park Building •Ladera Linda Community Center Buildings (5) Except for PVIC,these buildings are 25 years old or older and showing the signs of daily use.Many of the facilities were purchased from the school district or transferred to the City from the federal government,and little to no improvements have been made since their acquisition.It is important to perform adequate maintenance to extend the life of these facilities.It will be necessary to renovate these buildings as they age to meet the needs of the community and ensure that all building and safety guidelines are satisfied.Point Vicente Interpretive Center, the most recently remodeled City facility,was built in 1984 and expanded in 2005.The City Hall buildings and Ladera Linda Community Center buildings are the best examples of buildings that are in great need of renovation to meet organizational needs,comply with safety and code requirements,and comply with all Americans with Disabilities Act (ADA)guidelines.The projects listed on the following pages have been developed based on individual staff assessments, input from the community and professional consultants'assessments and studies. Page 12 of 77 3-19 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: ..........•I \"v;:>I ADA COMPLIANCE PROJECTS BUildings and Other Facility Improvements Public works The Citywide ADA Self-Evaluation and Transition Plan has been completed,and is expected to be presented to the City Council in coordination with the City's capital improvements strategic goals. The Plan has a preliminary implementation cost estimate of $6,675,000.This estimate does not include ADA improvements for the City Hall and Ladera Linda Community Center since any potential improvements at those sites are expected to make the facilities fully accessible.Additionally,this cost does not include the side walks and curb ramps which are not at the intersections, as those improvements are expected to be included in the roadway resurfacing programs.The cost for programs and services accessibility is expected to be covered through operating budgets and therefore is not included in this total cost,either.The annual request of $100,000 will cover highest priority improvements as set by the Department of Justice guidelines. The first program will partially cover the cost of providing ADA compliance access to City facilities starting with the removal of safetv hazards and severe barriers. ,I>i>.......>>«........ "'AT ACQUISITION ENGINEERING/DESIGN V"",A"...._._- I 1';1'\1'.I .......'"...,1:::1'\",)YEAR 4 YEAR 5 CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT $100,000 $100,000 $100,000 LEGAL TOTAL .......- ,I ..._............;$"nn nnn Funding and/or Grant Information:Environmental Excise Tax JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X SUPPORTS ESSENTIAL CITY SERVICES X SUPPORTS COUNCIL PLAN GOALS OTHER PROJECT INFORMATION: ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY X X Page 13 of 77 3-20 INTANGIBLE CAPITAL OUTLAY Intangible Capital Outlay improvements may not have significant physical substance,but they have more than minimal value and help the City in improving operations or planning for the future.Projects that could be classified as intangible capital outlay include the update or development of major planning processes and documents,significant software purchases that may improve the efficiency of business processes or large technology purchases that may improve or enhance service delivery to citizens.This category includes an update to the Pavement Management Program. Page 14 of 77 3-21 PROJECT:PAVEMENT MANAGEMENT PROGRAM UPDATE TYPE:Intangible Capital Outlay LOCATION:N/A DEPARTMENT:Public Works The Pavement Management System (PMS)is updated every three years to evaluate the condition of the City's roadway system and to DESCRIPTION:identify Citywide Arterial Rehabilitation and Residential Rehabilitation projects.The Metropolitan Transit Authority (Metro) requires the PMS update in order for the City to continue receiving Proposition C monies . ·canlECTCOST Jft'<)/«......./« I..'AI ___..........)/)< ••••• ,yeAR/i ••.•.•.YEARZ YeAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $120,000 CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAI.._.< .....~_r.L IN ••~..:1«)<......./<)«<>••••••• N/A JUSTIFICATION FOR1NCI..USfON ON 5YEARCIP· SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALlTY/SUSTAINABILlTY X OTHER PROJECT INFORMATION: Funding and/or Grant Information:Accumulated fund balance in the Capital Improvement Projects Fund Page 15 of 77 3-22 ROADWAY INFRASTRUCTURE Roadway infrastructure is one of the most widely used major capital investments of a municipality.Without a well-maintained street system,the transportation needs of the public,business,industry and government cannot be met.The roads are also part of a critical public safety need,and they contribute to the general health and welfare of the community.Maintaining quality roadway infrastructure is also important in maintaining property values.It has been shown that property values tend to suffer from poorly maintained streets.Roadway infrastructure includes residential streets,arterial streets and traffic safety improvements.In the City of Rancho Palos Verdes,there are 33.68 miles of arterial streets,6.46 miles of collector streets and 103.31 miles of residential streets.The total for all streets and alleys mileage is 143.44 centerline miles. To manage the City's residential and arterial streets,the City hires a consultant to complete a full detailed assessment of all streets every three years.This report,known as the Pavement Management System,helps to identify any serious issues and provides the City with a rating for each street.The report includes the overall Pavement Condition Index (PCI).The City of Rancho Palos Verdes minimum standard for PCI for a municipal street system is 80.The City's current PCI is 84.2 based upon the PMS report prepared by Willdan & Associates in 2009.Since 1997,the City has maintained a pavement rating between 80 and 90.The report also helps in defining a schedule to complete the work.The City has been divided into nine zones for residential streets,but in the case of some areas,zones may be completed together in one year for added efficiency. Page 16 of 77 3-23 PROJECT:RESIDENTIAL REHABILITATION TYPE:Roadway Infrastructure LOCATION:Zone 1 &Zone 9 DEPARTMENT:Public Works DESCRIPTION: ACQUISITION . As part of the City's Pavement Management System (PMS),Zones 1 &9 of the residential rehabilitation program is scheduled for implementation during the FY12-13 budget cycle.This project will include microsurfacing,slurry seal,overlay,curb repair,root removals and ADA compliance updates of the streets and sidewalks in Zones 1 &9.This infrastructure enhancement will also include u datin traffic si stri in ,curb aintin and house numberin . 4 YEAR 5 ENGINEERING/DESIGN CONSTRUCTION $1,600,000 PROJECT MANAGEMENT/OVERSIGHT Funding and/or Grant Information:General Fund and TDA Article 3 for $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP. SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE XCOMMUNITYQUALITY/SUSTAINABILITYSUPPORTSCOUNCILPLANGOALSX==~~==========~ This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY12-13.This project is funded by General Fund monies and ensures a safety rating of 87 percent or higher. Zone 1:Residential streets in the most northern part of the City,north of Hawthorne Blvd and west of Silver Spur Road. Zone 9:Comproses streets on the eastern side of the City including neighborhoods such as Eastview, South Eastview,Peninsula Verde and Rolling Hills Riviera. Page 17 of 77 3-24 PROJECT:RESIDENTIAL REHABILITATION TYPE:Roadway Infrastructure LOCATION:Zone 2 DEPARTMENT:Public Works YEARSYEAR4YEAR2 As part of the City's Pavement Management System (PMS),Zone 2 of the residential rehabilitation program is scheduled for implementation during the FY13-14 budget cycle.This project will include microsurfacing,slurry seal,overlay,curb repair,root removals and ADA compliance updates of the streets and sidewalks in Zone 2.This infrastructure enhancement will also include u datin traffic si ns,stri in ,curb aintin and house numberin . DESCRIPTION: CATEGORY YEAR 1 ACQUISITION . PROJECT COST ESTIMATES (IF KNOWN) ENGINEERING/DESIGN CONSTRUCTION $1,500,000 PROJECT MANAGEMENT/OVERSIGHT Funding and/or Grant Information:General Fund and TDA Article 3 for $25,000 JUSTIFICATION FOR INCLUSiON ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X SUPPORTS COUNCIL PLAN GOALS X OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY x This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY13-14.This project is funded by General Fund monies and ensures a safety rating of 87 percent or higher. LOCATION DESCRIPTION Zone 2:Residential streets in the northwestern part of the City between Crest Road and Grayslake Road, east and west of Hawthorne Blvd. Page 18 of 77 3-25 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL RESIDENTIAL REHABILITATION Roadway Infrastructure Zone 6 Public Works As part of the City's Pavement Management System (PMS),Zone 6 of the residential rehabilitation program is scheduled for implementation during the FY14-15 budget cycle.This project will include microsurfacing,slurry seal,overlay,curb repair,root removals and ADA compliance updates of the streets and sidewalks in Zone 6.This infrastructure enhancement will also include updating traffic signs,striping,curb painting and house numberin . $1,500,000 Funding and/or Grant Information:General Fund and TDA Article 3 for $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X SUPPORTS ESSENTIAL CITY SERVICES X SUPPORTS COUNCIL PLAN GOALS X OTHER PROJECT INFORMATION: ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY X This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY14-15.This project is funded by General Fund monies and ensures a safety rating of 87 percent or higher. Zone 6:Residential streets in the southern part of the City encompassing all neighborhoods to the east of Point Vicente Park and west of Trump National including Crestmont,Tramonto,Seaview, Barkentine,Seacove,Wayfarer's Chapel,the Landslide Zone and Portuguese Bend neighborhoods. Page 19 of 77 3-26 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: RESIDENTIAL REHABILITATION Roadway Infrastructure Zone 7 Public Works As part of the City's Pavement Management System (PMS),Zone 7 of the residential rehabilitation program is scheduled for implementation during the FY15-16 budget cycle.This project will include microsurfacing,slurry seal,overlay,curb repair,root removals and ADA compliance updates of the streets and sidewalks in Zone 7.This infrastructure enhancement will also include u datin traffic si ns,stri in ,curb aintin and house numberin . PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL YEAR 2 YEAR 3 YEAR 4 $1,600,000 YEAR 5 Funding and/or Grant Information:General Fund and TDA Article 3 for $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X SUPPORTS ESSENTIAL CITY SERVICES X SUPPORTS COUNCIL PLAN GOALS X OTHER PROJECT INFORMATION: ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY X This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY15-16.This project is funded by General Fund monies and ensures a safety rating of 87 percent or higher. Zone 7:The Ladera Linda community,Ganado Area, streets near Mira Catalina School,San Ramon and Calle Aventura. Page 20 of?? 3-27 PROJECT:RESIDENTIAL REHABILITATION TYPE:Roadway Infrastructure LOCATION:Zone 8 DEPARTMENT:Public Works DESCRIPTION: As part of the City's Pavement Management System (PMS),Zone 8 of the residential rehabilitation program is scheduled for implementation during the FY16-17 budget cycle.This project will include microsurfacing,slurry seal,overlay,curb repair,root removals and ADA compliance updates of the streets and sidewalks in Zone 8.This infrastructure enhancement will also include updating traffic signs,striping,curb painting and house numberin PROJECT COST ESTIMATES (IF KNOWN) CATEGORY •YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $1,500,000 PROJECT MANAGEMENT/OVERSIGHT $1,500,000 Funding and/or Grant Information:General Fund and TDA Article 3 for $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE XCOMMUNITYQUALITY/SUSTAINABILITYSUPPORTSCOUNCILPLANGOALSX~~-;--_....-..I-.._..I--__----=":------l.---j This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY16-17.This project is funded by General Fund monies and ensures a safety rating of 87 ercent or hi her. LOCATION DESCRIPTION Zone 8:Residential neighborhoods off of Palos Verdes Drive East in the northern and eastern parts of the City .. Page 21 of 77 3-28 PROJECT:ARTERIAL REHABILITATION (LOCATION TO BE DETERMINED) TYPE:Roadway Infrastructure LOCATION:Tb Be Determined DEPARTMENT:Public Works As part of the City's Pavement Management System (PMS),an DESCRIPTION:arterial will be resurfaced.The project will include milling and overlay,roadway patching,crack filling,curb and gutter repair, sidewalk repair and ADA upgrades. Don •"""'...'..........ft ....i<V <,•.,'••...........,~..........,..'" 1.!~1 i,i<>It:~~1 IYI:AR2 ,.,.VEAR3 YEAR 4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL.i ~......."........>ii<iii $2,300,000..'........ii<iii......,......IVN Funding and/or Grant Information:STPL Grant and Measure R JUSTIFICATION••·FOR.·INCLUSION.·ON.·S·YEAR.CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X VI Ntl'(·'·'···ii /i<ii •••••••'<< MAP /,"..'..,....,.',..,,'i .,......<<i "....,......../ Page 22 of 77 3-29 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: HAWTHORNE BLVD.MEDIAN IMPROVEMENTS (VIA RIVERA TO CITY HALL) Roadway Infrastructure Hawthorne Blvd.(Via Rivera to City Hall) Public Works The development of this median would include installing sustainable landscaping which will require minimal maintenance. Development will also include the installation of irrigation systems and controllers,hardscape,and decorative stone. ACQUISITIO'N ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL $250,000 YEAR 4 YEAR 5 Funding and/or Grant Information:Beautification Fund. $12,000 per year. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP Ongoing median maintenance is estimated to be SAFETY SUPPORTS ESSENTIAL CITY SERVICES SUPPORTS COUNCIL PLAN GOALS OTHER PROJECT INFORMATION: ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY x Page 23 of?? 3-30 PUBLIC UTILITIES Public utilities improvements include the maintenance and development of utility projects such as the City's sanitary sewer system or the undergrounding of utility lines.The City's sanitary sewer system is essential for City operations,yet it has not required significant expenditures in past years due to an inter-local agreement with Los Angeles County for maintenance activities.The City owns the system,but the County has the primary responsibility for ongoing maintenance.The County collects a sewer fee from the City's property owners that Staff believes is inadequate to maintain the system.Although the County maintains the City's sewer system,the City retains responsibility for its operation, public safety and welfare.The City,not the County,maintains legal and regulatory responsibility (i.e.any state or federal fines resulting from spillage). In preparation for this change,the City conducted a survey of the system,and in 2004 the Sanitary Sewer Master Plan was created to help in the management of this asset.The study examined sample areas throughout the City and assessed the overall system as "fair."The inspection revealed root intrusion in the pipes and cracking in the pipes,in addition to accumulated fats and grease clogging certain areas.It appeared that the County had not been performing adequate maintenance over the years.Without regular maintenance,overflows due to root and grease blockages will occur.To minimize the potential for overflow and to restore and maintain the system in "good"condition,a significant investment in pipeline inspection,repair and maintenance is required.Because the County is still primarily responsible for maintenance of the system,no projects have been included for this system.However,the Sanitary Master Plan Update was received and filed by the City Council on November 1?,2009.Future projects may be proposed based on this assessment. NO PROJECTS CURRENTLY IDENTIFIED Page 24 of?? 3-31 STORM DRAIN SYSTEM In June 2004,the City's consulting engineers prepared an Update to the Storm Drain Master Plan.The updated plan identified serious storm drain deficiencies that required significant repair.The update identified 38 high-priority projects, which were the basis for establishing a "user fee."Since then,some projects have been completed,and others have been reassessed to meet changing priorities and needs.The 38 projects have been reevaluated resulting in grouping the projects into 12 project areas.These are based on identifiable drainage areas/systems,most of which are tied to natural canyon drainage systems.Each project has been grouped into a project area.The areas are as follows: Area 1: Area 2:' Area 3: Area 4: Area 5: Area 6: Area ?: Area 8: Area 9: Area 10: Area 11: Area 12: Sunnyside Ridge McCarrell Canyon Storm Drain System Lower San Ramon CanyonlTarapaca Canyon Altamira Canyon Palos Verdes Drive East/Miraleste Canyon San Pedro and Averill Canyons Via Colinita Vickery Canyon Miraleste and Chandeleur Palos Verdes Drive East Switchbacks Hawthorne Boulevard Palos Verdes Drive South Citywide Storm Drain Programs The FY11-12 Budget includes an update to the 2004 Storm Drain Master Plan Update Study.The new update will add data regarding the actual field condition of the storm drains,consider the efforts of projects already implemented,and create a method for storing,retrieving,and updating this type of data electronically using the City's GIS System. Page 25 of?? 3-32 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: ACQUISITION ENGINEERING/DESIGN STORM DRAIN LINING Storm Drain System Project Area 12 Public Works All CMP storm drain lines within the City have reached their design life expectancy and need to be lined to extend their life another 30+years.CMP dating back to the 1940s have been discovered and require maintenance along with those most recently installed in the 1970s.A large number of drainage problems citywide can be overcome by relining deteriorated pipes and improving inlets and outlet structures. CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL $324,642 $329.881 $335,278 $340,836 $347,653 Funding and/or Grant Information:WQFP user fees.Ongoing maintenance costs should decrease,as pipes which have been lined generally require less maintenance resulting in a cost savings. X SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY OTHER ~~==~lIS===========~n Page 26 of?? 3-33 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL PALOS VERDES DRIVE EAST LOWER SWITCHBACKS Storm Drain System Project Area 9 Public Works Several drainage systems in the hairpin bends area above San Ramon Canyon drain into the canyon.Work within this project area includes the installation of new drainage within the Palos Verdes Drive East switchbacks and installing a pipe into the canyon.This project will also modify existing inlets,outlets and pipes. $485.000 Funding and/or Grant Information:WQFP user fees Page 27 of 77 3-34 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: PALOS VERDES DRIVE SOUTH (NORTH OF BARKENTINE) Storm Drain System Project Area 11 Public Works This project area includes several storm drain systems that cross Palos Verdes Drive South at various locations.Drainage capacity will be increased with improvement to inlets and outlet structures. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT YEAR 2 $446,000 YEAR 3 YEAR 4 YEARS Funding and/or Grant Information:WQFP user fees JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X SUPPORTS ESSENTIAL CITY SERVICES X SUPPORTS COUNCIL PLAN GOALS X ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY X Page 28 of?? 3-35 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: SOUTH HAWTHORNENIA FRASCATI Storm Drain System Project Area 10 Public Works This project will improve drainage across Hawthorne Boulevard by replacing two existing 18"pipes with one 24"and one 30"RCP pipes.Additionally,a second location on South Hawthorne will be evaluated after episodes of flooding in recent years.A curb and gutter project on Via Frascati will serve to direct drainage into the street and existing catch basins,which drain into the San Pedro Canyon. ACQUISITION ENGINEERING/DESIGN YEAR4 YEARS CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL $440,000 TOTAL IMPACT ON Funding and/or Grant Information:WQFP user fees JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X SUPPORTS ESSENTIAL CITY SERVICES X SUPPORTS COUNCIL PLAN GOALS X OTHER PROJECT INFORMATION: ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY X Page 29 of 77 3-36 PROJECT:MARGUERITE OPEN CHANNEL TYPE:Storm Drain System LOCATION:Between PVDW and the Bluff DEPARTMENT:Public works Staff has become aware of excessive erosion in a portion of open natural drainage channel,which connects two piped systems DESCRIPTION:between PVDW and the bluff.Studies of the issue are scheduled for FY 12-13 with implementation of any recommendations for improvement tentatively scheduled the following year. •.PDnlECTcQaT ••••.•.>>.\ .•CA·............,,,,•••••.••..i>\••.•.•i\\\·.vI=iAR1>\....to'll'<lo.YEAR 3 YEAR 4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $350,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL ••••••••\\»••••.••.••••••.\>••.••...••••••\ ,.............\i >\\i,,.,•.-......1 ......,~•.•.~>....... Funding and/or Grant Information:WQFP user fees JUSTIFICATION••FOR••INCLOSJQN·.ON ••S••YEAR.CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGI BLE SUPPORTS COUNCIL PLAN GOALS X COMMUNITY XQUALITY/SUSTAINABILITY OTHER.PROJECTlNFORMATION: TJ£:;A 1 IN <<>..••.•••»>.>.•.•.•..•••.•...•...•.•••>\<•..•.••••••I Page 30 of 77 3-37 RECREATION,PARKS &OPEN SPACE The development and maintenance of community parks,recreational areas and open space has been established as a top priority for the City as stated in the General Plan and various other planning documents.The General Plan states, "It is the goal of the City of Rancho Palos Verdes to conserve,protect and enhance its natural resources,beauty and open space for the benefit and enjoyment of its residents and the residents of the entire region.Future development shall recognize the sensitivity of the natural environment and be accomplished in such a manner as to maximize the protection of it." Many park sites and open space areas have been acquired throughout the City, and some have been developed for use by the general public.Some sites remain'vacant or underutilized.The City Council approved the Vision Plan in September 2008 which outlines various trail and park projects which have been included in this plan.The Public Use Master Plan has also outlined a strategy for the development of trails which has also been incorporated into the CIP list. These recreational projects add to the vibrancy of the community and they are designed to contribute to all residents'quality of life.Parks and other open spaces have been carefully planned to take advantage of the beautiful coastline and natural landscape of the peninsula. Page 31 of 77 3-38 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT RYAN PARK RESTROOMS IMPROVEMENT &ACCESSIBILITY COMPLIANCE Recreation,Parks and Open Space Ryan Park Public works The existing building and restrooms at Ryan Park were constructed in 1970 by L.A.County.The restrooms are aged,in poor condition and have not had any major improvements since they were built.Additionally,the lower parking lot,the ramp and the restrooms are not ADA compliant.The park is heavily used by the community over the weekends,during the holidays and in the summer.The recent athletic field improvement has increased the community's interest in using the park during athletic seasons. These improvements are necessary for enhancing service to the community by implementing corrective work at the lower parking lot and ramp,and,making the restrooms accessible,safe and sanitary. $223,000 SUPPORTS ESSENTIAL CITY SERVICES LEGAL SAFETY SUPPORTS COUNCIL PLAN GOALS x x Page 32 of?? x 3-39 PROJECT:RYAN PARK SOUTHERN ENTRANCE ROAD TYPE:Recreation,Parks and Open Space LOCATION:Ryan Park DEPARTMENT:Public works The steep southern entrance of Ryan Park is at a sharp angle with Hawthorne Blvd.The geometries of this entrance cause difficulty for motorists who drive southbound on Hawthorne Blvd and want to make a right turn onto the driveway entrance.The parking lot DESCRIPTION:accessed through this driveway is exclusively used for ADA compliant parking spaces.This increases the need to realign the entrance.Design of this improvement is the first step toward addressing this issue and will provide a more realistic cost estimate for the project. pgn 'ECTCOSl"t:~1 ,..........H<.<...•••i............. •••••• CA'....",,,,,..<••••«<...~~~«yr!!!A .........<YEAR 3 ............YEAR 5f1;;1'\1''''' ACQUISITION ENGINEERING/DESIGN CONSTRUCTION 220,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL ........««<<1<...>.......<....................... •••••••• •••••...............<............1 ...,..... Funding and/or Grant Information:CIP accumulated fund balance (originally General Fund money)/General Fund. JUSTIFICATiON FORlNCI..USIONoN5YEARClP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECTINFORMATION: Page 33 of?? 3-40 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL IMPACT 0 .. CALIFORNIA COASTAL TRAIL Recreation,Parks,&Open Space City's Coastal Border Community Development/Public Works One of the goals of the City Council approved Vision Plan is the development of a continuous marked Coastal Access Trail along the coast between the City's border with San Pedro and the City's border with Palos Verdes Estates.The proposal is to provide a safe and comfortable connection along the bluffs (where possible) and at access points down to the shoreline.The approved Vision Plan identifies an alignment for the California Coastal Trail (Coastal Access Trail)which,when implemented and identified with signage,would complete the RPV coast segment of this key recreational facility that has been envisioned and championed by the State Coastal Conservancy.Along with the trail,this project includes parking improvements and a trailhead. =====~~ Funding and/or Grant Information:California Coastal Conservancy grant of $500,000 (awarded 10/21/10). Matching requirement of $60,000 from CIP accumulated fund balance (originally General Fund money). Total ro'ect is $560,000 with half bud eted in FY11-12 and half ro osed for FY12-13. SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITIED/ELIGIBLE X SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X I / Page 34 of 77 3-41 UNFUNDED PROJECTS The following projects are those which have been identified as capital needs through various planning processes,but currently there are not resources to complete the projects.As funding becomes available and the City Council prioritizes and approves projects,they may be moved into the funded Five-Year CIP schedule. Page 35 of?? 3-42 RPV Capital Improvement Plan -Unfunded Projects Safety City Council Cost Range Goal Priori Minimum Maximum 69 $2400,000 $2,400,000 70 x $100,000 $130,000 72 x $820000 $1,100000 73 x $600,000 $740,000 74 x $400,000 $450000 75 x $250,000 $300,000 76 $475,000 $475,000 Hesse Park Parkin Lot Resurface 77 x 39 x x $20,500000 40 x x $1,000000 $2,000,000 42 x $300000 $1000,000 43 $180000 $270,000 44 $300000 $470000 ,200,000 Arterial Rehabilitation -Silver Spur Road (Hawthorne Blvd.to Drybank Dr.48 x x $500,000 $500000 Arterial Rehabilitation -Crenshaw Blvd (Northern City Limits to Burma Rd.49 x x $600,000 $600,000 Arterial Rehabilitation -Indian Peak Road (Crenshaw Blvd.to City Limits 50 x x $300000 $300,000 Arterial Rehabilitation -Miraleste Drive 51 x x $700000 $700,000 Traffic Safety Improvements - PVDE at Miraleste Drive 52 x x $200,000 $300000 Operational Improvements at Crenshaw &Crest 53 x x $270,000 $320,000 Traffic Safety Improvements - PVDE at Bronco Drive 54 x x $200000 $300,000 Lower Point Vicente Park Access Modification Pro'ect 55 x x $100,000 $150000 PVDE Multi-Modal 1m rovements 56 x $2,800000 $4450000 Hawthorne Blvd.Median 1m rovements Ci Hall to Vallon 57 ~ijl'JfijiJftU , Utility Undergrounding at 25th Street 58 $1,000000 $1 100,000 Potential Rule 20A fundin Utility Undergrounding at PVDS and Terranea Wa 59 $150000 $200,000 Potential Rule 20A fundin Utility Undergrounding at Fisherman's Access 60 $150,000 $200,000 Potential Rule 20A fundin Utility Undergrounding at Entrance to PVIC 61 $150000 x Page 36 of?? 3-43 BUILDINGS AND OTHER FACILITY IMPROVEMENTS UNFUNDED PROJECTS Page 3?of?? 3-44 PROJECT:COMMUNITY CENTER TYPE:BUildings and Other Facility Improvements LOCATION:Upper Point Vicente/Civic Center DEPARTMENT:City Manager/Public Works Originally studied by the Open Space Planning,Recreation and Parks Task Force in 2004,the concept for this facility was later refined during the redevelopment of the Coast Vision Plan. DESCRIPTION:Adopted by the City Council in 2008,the latest concept calls for a 20,000 square foot community center that could accommodate meeting space for community groups,recreational facilities, classroom space and full-sized recreational pool. .'..........T t1F~~VV.NJ</ii<•.••.•..•.•• CA',,;;;~...,~,i'.••.•./....~2 YEAR3 YEAR4 YEARS.......'''''~''''.........l';;;l'\~ ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL ·TQTAI-«1/ii<i>••··•··•..••·•••li/...... .., r,...IVN ...._,I •••.•••.•.•<ii ........., Impact will need to be assessed. JUSTIFICATION••FOR.INCLUSION.·ON••S.YEAR••CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: COST ESTIMATE:$3,000,000 -$8,000,000 Page 38 of 77 3-45 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: CITY HALL (NEW CONSTRUCTION) Buildings and Other Facility Improvements Upper Point Vicente/Civic Center City Manager/Public Works Currently,City Hall is located at the Upper Point Vicente Park site in the former Nike Missile barracks constructed by the military in 1956. Due to their age,many safety and building code compliance issues exist and are not well suited for the general office needs and space requirements.In addition to these deficiencies,the buildings do not meet ADA guidelines,which may create a significant risk and liability for the City.The concept of a new Civic Center has been studied intermittently since 1976,with the acquisition of the property from the Federal Government,although the latest concept was adopted by the City Council in 2008 as part of the Coast Vision Plan.A new or remodeled City Hall would also include a City Council chamber, main lobby,conference rooms,Emergency Operations Center (EOC),and other support space.Approximately 36,000 square feet would be optimal for this building to meet current and future needs. The Civic Center will include an Emergency Operations Center (EOC). ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT COST ESTIMATE:$20,500,000 -$35,000,000 Page 39 of 77 3-46 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: •••;.··.·••p~Q..,IQ19111,11:·......··•.••'PATJ;$QR't'{n··.·.···.·)··.·.·i ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT INFRASTRUCTURE IMPROVEMENTS AT UPPER POINT VICENTE Buildings and Other Facility Improvements 30940 Hawthorne Blvd. City Manager/Public Works Currently,the Upper Point Vicente Park site is the location for City Hall and the City's maintenance yard.There have been various proposed developments for the site through many community planning efforts.Although a Civic Center Master plan has not been developed,it is necessary to address several infrastructure improvement needs ahead of time.These include:installation of a sewer pipeline,installation of a piped storm drain system to channel storm water to PVDS,and relocation of the existing mono- pole.There is no gas service to the site;therefore,future development may require that .•.gas access be made available through connection in the ROW on PVDS.Access to the site is only permitted from Hawthorne Blvd and it is possible that a traffic study will require the installatiOn··of.a traffic signal on·Hawthorne Blvd.The·cost estimate is conceptually based at this time. SpecificcosLestimates can be prepared when programming and ninfortheseJm rovementsare com leted.±:i'~~~"""",,======rl:::),)::~~:<::::::::::::<.>:.....:.....".)::::1:::::::::::::~]::\::V:::,:!]::"::1!:]:::::::)]::) Page 40 of?? 3-47 Page 41 of?? 3-48 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL MAINTENANCE YARD RELOCATION Buildings and Other Facility Improvements Various Locations throughout the City City Manager/Public Works It has been proposed that City maintenance services be spread citywide in strategic locations with a central office in City Hall.The existing maintenance yard is located on the Upper Point Vicente Park site which had been identified for various other community uses due to its prime location.Staff is proposing the creation of a central location for the maintenance yard with satellite locations throughout the City,serving the maintenance and other construction needs of the Public Works Department.The central location of the maintenance yard will be situated at or near City Hall for administrative purposes.This central location will control all satellite locations through the use of maintenance personnel and throu h the efficient use of the Cit's network.~=========-I The satellite locations will fulfill the following roles:there will be an office trailer at each location;a construction yard for contractors located throughout the City (possibly generating rental income for the City); possible satellite EOC centers for access throughout the City;and storage space for various eqUipment. COST ESTIMATE:$300,000 -$1,000,000 Page 42 of?? 3-49 PROJECT:FIBER OPTIC CABLING:HESSE PARK TYPE:Buildings and Other Facility Improvements LOCATION:Hesse Park DEPARTMENT:Finance and Information Technology This project includes the installation of fiber optic cabling between City facilities within the public right-of-way which will directly DESCRIPTION:connect Hesse Park to the City's phone and information network. Associated asphalt will be removed and replaced at roadway crossing points.Vaults will be placed adjacent to the roadway within the public right-of-way. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL i.Ii )i><<)<•••..•...........,.......,1<i<.......«<./ii........~-,I ... JUSTIFfCATIONFORINC·LUSIONON5YEARC1P SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT IN FORMATl·ON: Ryan Park could also be connected to the network in the same project for an additional cost of $30,000. COST ESTIMATE:$180,000 to $270,000 Page 43 of?? 3-50 PROJECT:FIBER OPTIC CABLING:LADERA LINDA TYPE:Buildings and Other Facility Improvements LOCATION:Ladera Linda DEPARTMENT:Finance and Information Technology This project includes the installation of fiber optic cabling between City facilities within the public right-of-way which will directly DESCRIPTION:connect Ladera Linda Community Center to the City's phone and information network.Associated asphalt will be removed and replaced at roadway crossing points.Vaults will be placed adjacent to the roadway within the pUblic right-of-way. cgn ...."'....."",,,..............,»i >(;(J:"i...,1:;:)\11"'».,.."..-CA1 ...__"\1\,\\»VCAO'J >YSAR4 VSAR5»>........,...., ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL »>\.......[\.".. \>i ,...../,.."., JUSTIFICATION FORJNCLU$lONON 5YEARClp· SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X VI ».....,.\\>"",> Abalone Cove Park could also be connected to the network in the same project for an additional cost of $41,500. COST ESTIMATE:$300,000 to $470,000 Page 44 of 77 3-51 PROJECT:SOLAR POWER SYSTEMS FOR CITY PARK FACILITIES TYPE:Buildings and Other Facility Improvements LOCATION:Various DEPARTMENT:Public works Installation of lightweight and advanced solar energy generating systems over the roof of City buildings to reduce power consumption with occasional opportunities to sell power to the DESCRIPTION:grid.This project will help the City with its energy savings goal.It will reduce considerable amounts of emissions and,typically,the savings can cover the cost of projects of this scale in an estimated eriod of 20 to 25 ears. ~s~».......III _."><>'...."""'...~.........:/tt::At<;,VEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL.I_} ••••••• ,>I<i><> I ii Ii ·I«.......-......""1 ••••••••> Estimated cost is $200,000 -$400,000 for each facility ($600,000 -$1,200,000 total) Funding:Will seek Federal/State Energy Savings Grants JUSTIFICATION.FOR.INCt.USION••ON.S·YEARCIP SAFETY ECONOMY AND EFFICIENCY X SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X ••Vl ....,,~.,) Page 45 of?? 3-52 INTANGIBLE CAPITAL OUTLAY UNFUNDED PROJECTS NO PROJECTS CURRENTLY IDENTIFIED. Page 46 of?? 3-53 ROADWAY INFRASTRUCTURE UNFUNDED PROJECTS Page 47 of 77 3-54 ARTERIAL REHABILITATION-SILVER PROJECT:SPUR ROAD (HAWTHORNE BLVD.TO DRYBANK DRIVE) TYPE:Roadway Infrastructure LOCATION:Silver Spur Road (Hawthorne Blvd.to Drybank Drive) DEPARTMENT:Public Works After the street right of way was transferred back to the City,Silver Spur Road will be resurfaced to mitigate roadway distress and DESCRIPTION:degradation that has occurred over the years.This project will require milling and overlay,root removal,asphalt patching,curb and gutter repair,sidewalk repair,ADA ramps and re-striping. ......//....../......./••••••••'."'U~I V..- CAt ...""""",••....<>«........'....."".,,•.....""I'''.YEAR3·YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAI.•..••..•»><//.................,'../................ ,,,......•<•••••••••<><.<••••••<)............"""".....•••••• There is no impact on the operating budget. JUSTIFICATION.·FOR ••INCLUSION ••ON··.S.·YEAR ••CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECTJNFORMATION: COST ESTIMATE:$500,000 Page 48 of?? 3-55 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: ARTERIAL REHABILITATION- CRENSHAW BLVD.(NORTHERN CITY LIMITS TO BURMA RD) Roadway Infrastructure Crenshaw Blvd.(Northern City Limits to Burma Rd.) Public Works As part of the City's Pavement Management System (PMS), Crenshaw Blvd will be resurfaced.The project will include milling and overlay,roadway patching,crack filling,curb and gutter repair, sidewalk repair and ADA upgrades. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 .YEAR 2 YEAR 3 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL·I IM""'...._I .1 . There is no impact on the operating budget. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP YEAR 4 YEAR 5 SAFETY X SUPPORTS ESSENTIAL CITY SERVICES X SUPPORTS COUNCIL PLAN GOALS X OTHER PROJECT INFORMATION: This cost range includes safety costs. COST ESTIMATE:$600,000 ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY x X Page 49 of??3-56 ARTERIAL REHABILITATION-INDIAN PROJECT:PEAK ROAD (CRENSHAW BLVD.TO CITY LIMITS) TYPE:Roadway Infrastructure LOCATION:Indian Peak Road (Crenshaw Blvd.to City Limits) DEPARTMENT:Public Works After the street right of way was transferred back to the City, Indian Peak Road will be resurfaced to mitigate roadway distress DESCRIPTION:and degradation that has occurred over the years.This project will require milling and overlay,crack sealing,asphalt patching, sidewalk repair,ADA ramps and re-striping. n",,'" 1 ...."'9i <'iii>......•."••••.••> CAe /i I.>l"'#'\,,~i ..........YEAR5,...,..."""... ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL ··TOTAL ii li/............./i ......./<.•.... I ..............»•.••..•ii·•••••••>".,~_.,",N ,I .".., .., There is no impact on the operating bUdget. JUSTIFICATION.·FORi.INCLUSION••oNiiS·YEARCIP > SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X .ur.....".i»~i ./><)..... COST ESTIMATE:$300,000 Page 50 of?? 3-57 PROJECT:ARTERIAL REHABILITATION - MIRALESTE DRIVE TYPE:Roadway Infrastructure LOCATION:Miraleste Drive DEPARTMENT:Public Works As part of the City's Pavement Management System (PMS), Miraleste Drive will be resurfaced.The project will require milling DESCRIPTION:and overlay,roadway patching,crack filling,curb and gutter repair, sidewalk repair and ADA upgrades. •DDrilE:t"'T'CO$T >i >V <... \"10\1 <V>......»>«':::....:;'<I YeAR 2 V YEAR 4 YEAR 5/110;""'''.,. ACQUISITION ENGINEERII\JG/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL>.V,,·V ···········>·······<V >••••••• ••••••• ••~••'C"'_T '»«/.........................0f8TI.............•..•••••.•••••••••••.....•«/< There is no impact on the operating bUdget. JUSTIF1CAT1ON ••FOR·INCI..USION·.ON ••S.YEAR ••CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X ·Vl na:;f'\.,..,,'../><.V COST ESTIMATE:$700,000 Page 51 of 77 3-58 TRAFFIC SAFETY IMPROVEMENTS - PROJECT:PALOS VERDES DRIVE EAST AT MIRALESTE DRIVE TYPE:Traffic Improvements LOCATION:PVDE at Miraleste Drive DEPARTMENT:Public Works Improve intersection operations to create improved traffic flow, DESCRIPTION:vehicle and pedestrian safety.Operational improvements could include traffic signal controls or a roundabout as warranted. P~(\-<i ... ....... i ...YEAR 4 YEAR 5"'AI .........i<'...,-,..../..•.•••·••l~'"'rt~ ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL ...........·····i..\<<.....\\\\«......~<•.·.•··i ..>ii·<.•••.••..-,...,Jv" JUSTI.FICATION.·FORINCLUSION.·ON.S.YEARClp SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECTlNFORMATION:..........<••...••••••••••••• Have applied and will continue to apply for external funding for traffic safety. COST ESTIMATE:$200,000 -$300,000 Page 52 of?? 3-59 PROJECT: OPERATIONAL IMPROVEMENTS· CRENSHAW BLVD.AND CREST DRIVE TYPE:Roadway Infrastructure LOCATION:Crenshaw Blvd.and Crest Drive DEPARTMENT:Public Works DESCRIPTION: "'......................--, \,;A ' Currently this intersection is a four-way stop controlled intersection.During the AM and PM peak hours,the westbound left-turn lanes back up for several hundreds of feet creating extensive delay and long vehicle queues.An operational improvement to the intersection is required to improve traffic flow. A study is being conducted to determine the best solution. 0"i<>i>>...'..< iEARi~T1.""....."3>•',,·YEAR4 YEAR 5 A('()I IIIUN ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT ,' I 'I LEGAL ~I ....,........ JUSi ..,,- SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS COUNCIL PLAN GOALS X VI ru::n.' COMMUNITY QUALITY/SUSTAINABILITY X COST ESTIMATE:$270,000 -$320,000 Page 53 of?? 3-60 PROJECT: TYPE: LOCATION: DEPARTMENT: TRAFFIC SAFETY IMPROVEMENTS - PALOS VERDES DRIVE EAST AT BRONCO DRIVE IMPROVEMENTS Traffic Improvements PVDE @ Bronco Drive Public Works DESCRIPTION: Dcn L.U~I ~~I ....~•__(IF Improve portions of PVDE to provide wider travel lanes in each direction,a shared-use equestrian and pedestrian path located behind the existing guardrail,a high visibility marked equestrian crossing at Bronco Drive complete with flashing beacons, augmented crossing signage and advanced crossing signage with flashing beacons,installation of safety barriers and railing to reduce vehicle collisions and cross-over accidents. >(-,<..•.•. \"10'1 ACQUISITION YEAR 1 YEAR 2 I YEAR 3 YEAR 4 YEAR 5 ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TnTAI I.I JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY VincI"!..I ._,.,. Have applied and will continue to apply for external funding for traffic safety.This location has the highest accident rate in the City,which exceeds the average accident rate for the State of California. COST ESTIMATE:$200,000 TO $300,000 Page 54 of 77 3-61 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: LOWER POINT VICENTE PARK ACCESS MODIFICATION PROJECT Traffic Improvements PVDW/PVDS at Lower Point Vicente Park entrance Public Works Improve access into and out of the Lower Point Vicente park area by restricting turn movements to right turn only out of the site at the southern entrance/exit to minimize vehicle conflicts while negotiating turn movements. ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL COST ESTIMATE:$100,000 -$150,000 Page 55 of?? 3-62 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: PVDE MULTI-MODAL IMPROVEMENTS Roadwa Infrastructure PVDE Various Locations Public Works As part of the Palos Verdes Drive East Preliminary Study,the report concluded that implementation of four (4)priority projects will help achieve a multi-modal status. YEAR 2 YEAR 3 YEAR 4 YEARS If all four priority projects (projects #6 through #9)were realized at the same time,the anticipated budget would range from $2,800,000 to $4,450,000.Staff anticipates seeking external funding to help offset the cost of project im lementation. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X SUPPORTS ESSENTIAL CITY SERVICES X SUPPORTS COUNCIL PLAN GOALS OTHER PROJECT INFORMATION:. ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY X X Page 56 of?? 3-63 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: HAWTHORNE BLVD.MEDIAN IMPROVEMENTS (CITY HALL TO VALLON) Roadway Infrastructure Hawthorne Blvd.(City Hall to Vallon) Public Works The development of this median would include installing sustainable landscaping which will require minimal maintenance. Development will also include the installation of irrigation systems and controllers,hardscape,and decorative stone.This would be the second segment of median improvements. ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP YEARS SAFETY SUPPORTS ESSENTIAL CITY SERVICES SUPPORTS COUNCIL PLAN GOALS ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY x Page 57 of 77 3-64 PUBLIC UTILITIES UNFUNDED PROJECTS Page 58 of?? 3-65 PROJECT:UTILITY UNDERGROUNDING AT 25 1H STREET TYPE:Public Utilities LOCATION:25th Street DEPARTMENT:Public Works This project includes the removal of overhead wires and DESCRIPTION:coordination of undergrounding all utilities at this location.The City will coordinate with the associated utility companies (electrical,communications,etc.)to locate all wires underground. Dcn·....·.IvV;:)l J;;.Q'..•...<•.•.•.•ii \"A ........."•.<·iiiii i ....i<1<11;~1"t ••~.•••••••.•YEAR3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL fl'ITAl.<i .......i~<······i»i i>>...•.•... '/<\·C</i •••••......~.....IVN .... This project could be funded through Southern California Edison's Rule 20A Funding. JUSTIFICATION•••FOR..INCLUSION ••ONS.YEAR.CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER.PR.OJECTINFOR.MATIONt COST ESTIMATE:$1,000,000 to $1,100,000 Page 59 of?? 3-66 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: UTILITY UNDERGROUNDING AT PVDS AND TERRANEA WAY Public Utilities PVDS and Terranea Way Public Works This project includes the removal of overhead wires and coordination of undergrounding all utilities at this location.The City will coordinate with the associated utility companies (electrical,communications,etc.)to locate all wires underground. ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL This project could be funded through Southern California Edison's Rule 20A Funding. COST ESTIMATE:$150,000 to $200,000 Page 60 of 77 3-67 PROJECT:UTILITY UNDERGROUNDING AT FISHERMAN'S ACCESS TYPE:Public Utilities LOCATION:Palos Verdes Drive South (between Terranea and Coast Guard Property) DEPARTMENT:Public Works This project includes the removal of overhead wires and DESCRIPTION:coordination of undergrounding all utilities at this location.The City will coordinate with the associated utility companies (electrical,communications,etc.)to locate all wires underground. ~i /<><....•. .v~ii >>I<YI;AK2 ../•••••Jf;;;",,,3i YEAR4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL <./</i i .....·ii ••••• ••/iii .... This project could be funded through Southern California Edison's Rule 20A Funding. JUSTIFICATiON FOFfiNCLUSIONON5iYEARClP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: COST ESTIMATE:$150,000 to $200,000 Page 61 of 77 3-68 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: UTILITY UNDERGROUNDING AT ENTRANCE TO PVIC Public Utilities Palos Verdes Drive South (at PVIC) Public Works This project includes the removal of overhead wires and coordination of undergrounding all utilities at this location.The City will coordinate with the associated utility companies (electrical,communications,etc.)to locate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL YEAR 2 YEAR 3 YEAR 4 YEAR 5 TOTAL ======J-r===:=l=====t===.====!I=======t====lt~~~~~~~~~~- This project could be funded through Southern California Edison's Rule 20A Funding. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY SUPPORTS ESSENTIAL CITY SERVICES SUPPORTS COUNCIL PLAN GOALS VI COST ESTIMATE:$150,000 to $200,000 ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY x Page 62 of?? 3-69 STORM DRAIN SYSTEM UNFUNDED PROJECTS Page 63 of?? 3-70 PROJECT:SAN RAMON CANYON STABILIZATION PROJECT TYPE:Storm Drain System LOCATION:Project Area 3 DEPARTMENT:Public Works This project will include a finalized bid package for soliciting bids, awarding a construction contract for the project,obtaining construction management and inspection services,construction of DESCRIPTION:the drainage system,installation of riparian re-vegetation and other required mitigation and project close out.The project is expected to be completed within two years.Design has been completed. ••........'"''''''''''CQST ./1 ...<if).1 'I ••••• \JAI l:\:IUtH •••.•.••••••••.....>•..•.•.)>Yf:AR1 ······Yf:AR2 I YEA~3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL Tt"'i"l'AI»_«)..........1/·/.···.·.·••••• ••••• ...".........1 .""........»i············.·..·....... JUSTIFICATION.FORINCtUSIONON5YEARCIP" SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X VincI'('.IIIJ'N .••...•••••..'...<><•..••.>/ •••••••• The City has been awarded a Prop 1E grant for $9.5 million.A Tiger IV grant application for $3 million has been filed.The City is awaiting the award announcement. COST ESTIMATE:$19,000,000 TO $20,000,000 Page 64 of 77 3-71 PROJECT:ALTAMIRA CANYON TYPE:Storm Drain System LOCATION:Project Area 4 DEPARTMENT:Public Works This project includes the installation of protective measures to DESCRIPTION:minimize further erosion in the Altamira Canyon.This project could range from stabilization at bends in stream beds,with limited velocity controls,to channeled stabilization. Den ....,........,.........»•..•••••.•..•..••........... .1 ....'1,1...,1 i>.·.·.·.iii .................. ••••••• i.i >(i >ill:.l'n.2 i CYEAR3 YEAR 4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAl...••••••••••••.•••/Iii)Ii ii 7 ........LVN....o.c.~•..••••i<···········ii ...... JUSTIFICATION ••FOR.1NCl"USION ••ON••S.YEAR••CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER ......./.......iii)............)•••••• This estimate does not include right of way costs.A previously designed and funded project was abandoned due to right of way issues and owners lack of support. COST ESTI MATE:$1,250,000 to $5,000,000 Page 65 of 77 3-72 PROJECT:PVDE-MIRALESTE CANYON TYPE:Storm Drain System LOCATION:Project Area 5 DEPARTMENT:Public Works Work within this project area includes storm drainage systems along Palos Verdes Drive East at the Northern end of PVDE, DESCRIPTION:South Coach,Rocking Horse,Clevis,North Colt,South Colt,Via Canada,and at South Via Canada.This project includes the installation of a number of pipelines and re-grading of roads and surface drainage systems to drain into Miraleste Canyon. "DDn >ii /ii •••••• .•> i>.....................................""",,,...:0 YEARS>·.I~I"\~.--.i)'''''I"\I''~ ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAl.>>««i ii<i·· •••••• 1--.ION ,.>/i/<../..... JUSTIFICATION FORfHCI.:.USION ON5YEARCIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHERPROJECTINFORMATfON: COST ESTI MATE:$2,500,000 to $3,200,000 Page 66 of??3-73 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: SAN PEDRO &AVERILL CANYONS Storm Drain Systems Project Area 6 Public Works Work within this project area would include storm drainage systems at Miraleste,South Miraleste,North Corsine,Via Colin ita, La Vista,Vista Mesa,and a curb and gutter project on Via Frascati.This project would include the installation of a number of pipelines and regarding of roads and surface drainage systems to drain into the San Pedro and Averill Canyons.A project at Miraleste Plaza is currently under desiQn. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY .YEAR 1 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL YEAR 2 YEAR 3 YEAR 4 YEAR 5 .iOTAL -----r I I !MP~_I ~. .JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X SUPPORTS ESSENTIAL CITY SERVICES X SUPPORTS COUNCIL PLAN GOALS X U I Mt:K.....I COST ESTIMATE:$2,700,000 to $3,300,000 ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY X Page 67 of 77 3-74 RECREATION,PARKS AND OPEN SPACE UNFUNDED PROJECTS Page 68 of??3-75 PROJECT: TYPE: LOCATION: DEPARTMENT: GRANDVIEW/LOWER HESSE IMPROVEMENTS Recreation,Parks,&Open Space Grandview Park &Lower Hesse Park City Manager/Public Works This project would encompass the next phase of improvements at the park sites.Proposed improvements include upgrading the trail DESCRIPTION:system,improved landscaping,a basketball court,tennis courts,a restroom and improved parking.All improvements would be in compliance with all ADA regulations . ...~"I~'«'1111''1''" ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL~!I ' I ....~.........'"f>E ,_• JUS".""("II:) SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER." Council has directed staff to complete the environmental review process for the Pacific Plan.Cost Estimate for improvements is $2,400,000. Page 69 of?? 3-76 PROJECT:TRAILHEAD/OVERLOOKNISTA POINT DEVELOPMENT TYPE:Recreation,Parks,&Open Space LOCATION:Various Locations DEPARTMENT:Public Works/Community Development The Vision Plan identifies the construction of major trail heads at key entrances to the existing City trail system.It is proposed that trail heads be located at widened areas near the start of trails,with a permeable surface pad made up of decomposed granite,gravel or bark mulch.Furnishings would include a bench,a plastic bag kiosk for dog owners,and trash and recycling receptacles. Signage will include a Trailhead sign or possibly a freestanding kiosk for trail notices.Small native trees for shade and pockets of native shrubs,where appropriate,are also envisioned at trailhead locations.Phase 1 would involve the development of the trail head location at Shoreline Park/25th Street.Phase 2 would involve the development of the following trail head locations:Cul-de-sac next to St.Paul's Church,Del Cerro Park,and the end of Ocean Terrace.Phase 3 would involve the development of a trail head location at the Switchbacks/PVDE Turnout. DESCRIPTION:The Vision Plan identifies the construction of overlooks and vista points either in the Preserve or on other pUblic lands within the Vision Plan project area.It is proposed that overlooks/vista points be placed on decomposed granite,or other permeable material pad with flush stone edging.Furnishings at overlooks/vista points are to include a semicircle bench as well as a stone pilaster displaying any information,such as the name of any donor being recognized.A stone clad retaining wall,less than 3 feet in height, may also be incorporated into the overlook/vista point as necessary.Plant pockets of native shrubs are also envisioned. Phase 1 would involve the development of Inspiration Point and Eagles Nest overlooks/vista points.Phase 2 would involve the development of the following overlooks/vista points:Cul-de-sac next to St.Paul's Church,Del Cerro Park and the end of Ocean Terrace.Phase 3 would involve the development of the following overlooks/vista points:Switchbacks/PVDE Turnout,Paintbrush ...............,........~Can von/Burma ~c d.and Burma Road above Gatewav Park . ~...........)</•••••• )/'...... ••• \,,;AI ...........)/.,.,..','.....,."....,.....,.!>..'.....,I """,' YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOtAL ••'••..•.••'<..'.'.../ ...,...)i«<)<••••.•••<>.....,..,..........< ••••••• ,'...,.."....,.....,...'. Page?O of?? 3-77 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECTJNFORMATION: COST ESTIMATE:$100,000 to $130,000 Page 71 of 77 3-78 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT PUMP TRAIL IMPLEMENTATION Recreation,Parks,&Open Space Palos Verdes Nature Preserve Community Development/Public Works In April 2008,the City Council adopted the Preserve Trails Plan (PTP)for the NCCP's Palos Verdes Nature Preserve.The Council -adopted PTP identifies the trail routes and trail uses for the ten sub-areas that make-up the greater Preserve.It is proposed that the Preserve Trails Plan be implemented in phases through a series of projects for each of the nine sub-areas.(Portuguese Bend Reserve Trails has been separated as an individual project but is also part of the PTP)The sub-areas include:Vista del Norte Reserve,Agua Amarga Reserve,Alta Vicente Reserve, Vicente Bluffs Reserve,Abalone Cove Reserve,San Ramon RA~~Ar\IA Forrestal Reserve and Three Sisters Reserve . ....,..,."=:;..c..,,..===-i COST ESTIMATE:$820,000 to $1,100,000 Page?2 of?? 3-79 PROJECT:PORTUGUESE BEND RESERVE TRAILS TYPE:Recreation,Parks,&Open Space LOCATION:Portuguese Bend Reserve DEPARTMENT:Community Development/Public Works The Portuguese Bend Reserve consists of a 399-acre portion of the Peacock Flats parcel purchased by the City from Barry Hon in 2005 and the 17-acre Del Cerro Park buffer parcel.The following proposed trails will be improved:Fire Station Trail (RH Crossing), Rim Trail (relocate trail),Pine Grove Trail,North Sandbox Trail, DESCRIPTION:Peacock Flats Trail and Overlook Trail (launch pad).As part of this project,the trailheads will be improved with the following:entry signs,benches,trash bins,mutt mitts,drinking fountain,parking and landscaping. f)l;)n ·.......-;Gl.lSI •••.••••.<<.)<<..... /..•.•.IY""AtS .......·./</11:1\1'\,)YEAR 4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL '<..•.«<.........«<.......«i << •••..•........ON RI //.r_1 ......................... , JUSTIFICATION·.FORINCl.USION··ON·'••VEAR.CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: COST ESTIMATE:$600,000 to $740,000 Page 73 of 77 3-80 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: SUNNYSIDE TRAIL SEGMENT PROJECT Recreation,Parks,&Open Space Sunnyside Ridge Road (Intersection of Sunnyside Ridge Trail and the Sol Vista Se ment Trail Community Development/Public Works The Sunnyside Segment Trail is a point-to-point trail segment that begins on Sunnyside Ridge Road at the intersection of the Sunnyside Ridge Trail and the currently unused Sol Vista Segment Trail on the old Narbonne Right-of-Way,as indicated in the City's Conceptual Trail Plan.The proposal is to provide a usable trail linkage for pedestrians and equestrians within a recorded trail segment that traverses a privately owned lot that is currently developed with a single-family residence that was formally part of an old City right-of-way.The trail connection would involve the provision of a 5-foot wide decom osed ranite surface trail. ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL ECONOMY AND EFFICIENCY OUTSIDE FUNDING COMMITTED/ELIGIBLE COMMUNITY QUALITY/SUSTAINABILITY X COST ESTIMATE:$400,000 to $450,000 Page 74 of 77 3-81 PROJECT:BATHROOM AT DEL CERRO PARK TYPE:Recreation,Parks,&Open Space LOCATION:Del Cerro Park DEPARTMENT:Recreation and Parks/Community Development This project would include the construction of a bathroom at Del DESCRIPTION:Cerro park to serve the park visitors and the users of the trails in the Portuguese Bend Open Space. •••.•I)~n t »\••••••••.? CA",c\:IIvru .......>•••.•..••.•••••••>•••••••>/»\\/,.........,•••<>"........YEAR 4 YEAR 5.<.l........".......·•..•••.JCA"'~ ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL •Tt"ITAI........>\I>.......>>I> ~"\••••••••.••••••>....".."'._. JUSTIFICATION FORlNCLUSIONON5YEARCIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X VIMt:K.i.·....»»\>< COST ESTIMATE:$250,000 -$300,000 Page 75 of 77 3-82 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL GATEWAY PARK DEVELOPMENT PROJECT PHASE I &II Recreation,Parks,&Open Space PVDS in the Portuguese Landslide Area Public Works/Community Development The Vision Plan includes a proposed Gateway Park,a 25-acre site within the City's Landslide Moratorium area just north of PVDS between the Portuguese Bend residential community and Klondike Canyon.Under the Vision Plan,the site has been approved for a combination of uses such as a "gateway park"for users of the Nature Preserve's trail system,an outdoor education/nature appreciation center for school and community groups and an equestrian center.In Phase 1,it is proposed to develop the following components of the approved concept plan for the site: Trail head,signage,fencing,and public parking area,overlook, picnic areas and PVDS pedestrian crossing.In Phase 2,it is proposed to develop the following components of the approved concept plan for the site:outdoor welcome center with re-Iocatable equestrian amenities,outdoor education area with demonstration garden and an outdoor classroom with roof and storage shed. Page 76 of 77 3-83 PROJECT:HESSE PARK PARKING LOT RESURFACING TYPE:Recreation,Parks and Open Space LOCATION:Hesse Park DEPARTMENT:Public works Hesse Park parking lot is one of the most frequently used City facilities.The pavement at this parking lot is deteriorated and DESCRIPTION:needs resurfacing.Delaying this improvement will add to the cost of work due to the extension of cracks'depth,requiring a more comprehensive fix. DOn ••••••••••••••••••••• .........\....}...... ;AI ./•••••••• }//yeAR 3 I YEAR 4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL •,TOTAL ••••••///////................... ........"'...ON }i/....../nO'.~...I .......... JUSTIFICATION FORiINCl.lJSIONONSVeARCJP SAFETY ECONOMY AND EFFICIENCY X SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS COUNCIL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHERPROJECT1NFORMATION: COST ESTIMATE $200,000 Page 77 of 77 3-84 -1-_-'-'X_--+-_ x x x x x 152,500 Project completed. This update is expected to begin during 120,000 summer 2012. Many scanned plan drawings are now linked to the current Graphic Information System (GIS),allowing point &click retrieval.Links to existing storm drain video and the 697,789 remaining drawings is underway. Staff expects to bring this matter to the City Council for reconsideration in the future; 100,000 therefore,this project is currently on hold. This project has been combined with FY11- 12 Residential Overlay and Slurry Seal - Zones 3.The combined project is currently 1,520,000 in design. Status of FY11·12 Capital Improvement Projects Ladera Linda Site Master Planning &Community Outreach Storm Drain Master Plan Update Pavement Management Program Update Residential Overlay and Slurry Seal (10-11 Program)-Zone 5 x x x x X--+---- x x The project is currently in the design phase, and Staff expects to solicit bids soon with 500,500 construction starting in July/August 2012. Staff is currently soliciting proposals for project design,and is in process of obtaining clearances from Caltrans to proceed.The design effort is expected to begin during 785,532 summer 2012. The Zone 5 project (described above)is expected to be carried forward from FY10-11 and combined With the Zone 3 project appropriated in FY11-12.This project is 1,600,000 currently in design. Staff is working towards the execution of an engineering design contract.Construction is expected in later summer or fall of 2012 - 2,380,000 depending on weather conditions. 2,349,949 This project is substantially complete. PVDW/PVDS Median Improvements Hawthorne Blvd.Traffic Signal Synchronization Residential Overlay and Slurry Seal -Zones 3 Arterial Overlay and Slurry Seal PVDE (Miraleste to North City Limits) PVDS/PVDW Arterial Improvements Hawthorne Blvd.Pedestrian improvements 1,422,581 This project is currently in the design phase._-1----:.X.:...--l- The scope of this project is being amended to include another segment of PVDS and L' ~P~V:..:D::.:S=--:--=B~ik::e~W~a'Ly...:S:;:a~fe:::tY~--=----=c:--------:-+-__---.:7---=9--;.4~,2:..:4.:::5tex:.::C:::lu:::d:::e:..:t::.:h:=e...:L::a:.:,:n:=ds::-:l::id:=e...:a::.:re:::a::.+----------:X--:---__ _ Crestridge/Crenshaw Traffic Signal 242,082 Project completed.X PVDE Traffic Safety Improvements The project is currently in the design phase, (Guardrails)273,114 and Staff expects to solicit bids in July 201?~_ PVDE Sewer Line Relocation 114,450 Project completed.X X~=~':;=:~:::":-==:'::::':"--+--~~~+-:;--~::':;::::.:;.':::--:-=--::=-:"'-;-;---;--------:--:-;-----+--:-:----i---------- Storm Drain Lining 1,146,698 This project is currently in construction.X X PVDE San Pedro Canyon Backbone System 570,000 This project is currently in the design phase.X X Roan System (Via Colinita Vickery Canyon)242,500 This project is currently in the design phase.XI-=c:~.::.:..:,~---------+-------=~=.::::...+~=----r::::.:::!=:..:=..=.;.=~..:.:.:...=-=--==~:.:.:.::=-+---- Via Canada 100,000 Project completed.X X-------- X This project is near the end of the design 867,575 phase.X X 3-85 Status of FY11-12 Capital Improvement Projects The Lower Hesse Park Project is in the environmental review process.Staff has tentatively scheduled the presentation of the Grandview Park &Lower Hesse Environmental Review Report to the City Park Development 1,990,836 Council in July 2012. The feasibility study,preliminary design and cost estimate is completed.Design work will begin in July 2012.Construction is expected to begin in January 2013 and be completed Ryan Park Southern Entrance by March 2013,during which time the park Road 20,000 will be closed.X City Council awarded the project design contract on February 7,2012.Staff expects California Coastal Trail 280,000 that construction will begin by fall 2012.X The project is currently on hold.Although the California Coastal Trail project will include some elements of the Gateway Project,including parking and trailhead improvements,other elements will be deferred.The FY1-12 appropriation for Phase 1 was expected to be funded with a $160,000 grant and a $40,000 matching contribution from the CIP Reserve.Because the grant award was not received,this FY11- Gateway Park Development 12 appropriation will lapse.This project has Project:Phase I and II 200,000 been transferred to the unfunded CIP list. The City Council approved this project appropriation on February 21,2012.A design contract will be proposed to City Abalone Cove Shoreline Park 665,176 Council in fall 2012.X X Construction will begin in early May 2012, Eastview Park Playground and and is expected to be completed in August ADA Access 2012. 3-86