Loading...
RPVCCA_CC_SR_2012_06_05_04_Draft_2012_Five-Year_Capital_Improvement_PlanCITY OF MEMORANDUM Rt\NCHO PALOS VERDES TO: FROM: DATE:. SUBJECT: REVIEWED BY: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNC~L DENNIS McLEAN,DIRECTOR OF FINANCE &INFORMATION . TECHNOLOGY JUNE 5,2012 DRAFT 2012 FIVE-YEAR CAPITAL IMPROVEMENT PLAN (Supports 2012 City Council Goals of Public Infrastructure & Government Efficiency,Fiscal Control,and Transparency) CAROLYN LEHR,CITY MANAGER ~ Project Managers:Kathryn Downs,Deputy Director of Finance &Information Technology Ryan Mills,Senior Administrative Analyst RECOMMENDATION 1.Receive and file the draft 2012 Five-Year Capital Improvement Plan (CIP);and 2.Provide direction regarding the proposed projects in the funded CIP. EXECUTIVE SUMMARY The draft 2012 Five-Year CIP (see attachment A)has been integrated into the draft 2012 Five-Year Financial Model.New projects include: >-Marguerite Open Channel (storm drain improvement);and >-Ryan Park Restrooms Improvement &Accessibility Compliance. Projects in the FY12-13 column of the CIP total $3,657,642,and are included in the draft FY12-13 budget.The CIP document does not include any projects with estimated costs below $100,000;however,the Five-Year Model on this same agenda includes all projects regardless of the cost estimate (see Exhibits C and D of the Five-Year Model). 4-1 DRAFT 2012 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 5,2012 Page 2 Projects are added to the funding schedule as available monies are identified.Projects are usually funded first from restricted funds,such as Proposition C and TDA Article 3 funds, so as to be conservative in allocating General Fund monies only when necessary. Although the CIP document presents project funding for five years,the City Council approves CIP projects for the upcoming fiscal year only.This gives the City Council the ability to shift priorities when needed,while at the same time identify future projects and their funding mechanisms. BACKGROUND AND DISCUSSION A Capital Improvement Plan (GIP)is a guide for the efficient and effective provision of resources for improving and maintaining public infrastructure and facilities.Programming capital facilities and improvements over time can promote better use of the City's limited financial resources,reduce costs and assist in the coordination of public and private development.Based on the guidelines of the framework and those set forth by the City Council,Staff developed an inventory of capital projects.This inventory was compiled through a comprehensive review of existing reports,infrastructure plans,community input and City Council direction.Some of these plans include the following:the Pavement Management System,Vision Plan,Sanitary Sewer Master Plan,Public Use Master Plan, Trails Network Plan,Storm Drain Master Plan and the General Plan. The Draft 2012 Five-Year CIP Schedule (page 11 of the attached CIP)has been integrated into the Draft 2012 Five-Year Financial Model that will be presented to the Council during the June 5th Budget Workshop.As required by state law,the Planning Commission will conduct its review of the CIP at its meeting on June 12,2012.The Planning Commission will be required to adopt a resolution,finding that the City's 2012 CIP is consistent with the goals and policies of the General Plan. The purpose of this presentation is to provide the City Council with an overview of projects which have been proposed for the Five-Year CIP,to present any changes that are being proposed and to receive input and further direction from the Council on these projects.As new information has become available,some cost estimates and funding sources have been updated from 2011.Although the draft of the Five-Year CIP includes capital projects consistent with prior years (i.e.Storm drain projects,residential and arterial roadway projects and minimal projects for recreation facilities),other projects may be included in the schedule if additional funding sources are identified. Projects Added to Funded List There were two projects that were added to the CIP Funded List: 1)The Marguerite Open Channel Project has been added to the funded CIP with an estimated construction cost of $350,000 in FY13-14.This project addresses the excessive erosion in a portion of open natural drainage channel,which connects 4-2 DRAFT 2012 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 5,2012 Page 3 two piped systems between PVDW and the bluff.Storm Drain User Fees are available to fund this project. 2)Staff has also included the Ryan Park Restrooms &Accessibility Compliance Project in the FY12-13 column of the CIP.The restrooms are aged,in poor condition and have not had any major improvements since they were built. Additionally,the lower parking lot,the ramp and the restrooms are not ADA compliant.The park is heavily used by the community over the weekends,during the holidays and in the summer.The recent athletic field improvement has increased the community's interest in using the park during athletic seasons.These improvements are necessary for enhancing service to the community by implementing corrective work at the lower parking lot and ramp,and,making the restrooms accessible,safe and sanitary.Staff has identified accumulated fund ) balance in the Capital Improvement Projects Fund that is available for this project. Projects Moved to the Unfunded List Based on City Council feedback,the Grandview/Lower Hesse Improvements project was moved from the Funded List to the Unfunded List.In the 2011 CIP Document,$2.4 million was included for the Grandview/Lower Hesse Improvements project in the FY13-14 column with a use of General Fund money as a placeholder. No other projects have been added to the Unfunded List.Staff expects that additional unfunded projects will be identified upon the completion of both the Storm Drain Master Plan Update and the Pavement Management System Update.The Storm Drain Master Plan Update is in its beginning stages,while the Pavement Management System Update is scheduled for completion in FY12-13. 4-3 Attachment A DRAFT 2012 Five-Year Capital Improvement Plan 4-4 Page 2 of 80 TABLE OF CONTENTS INTRODUCTION 3 FUNDED PROJECTS...………………………………………………………… 11 BUILDINGS AND OTHER FACILITY IMPROVEMENTS 12 INTANGIBLE CAPITAL OUTLAY 14 ROADWAY INFRASTRUCTURE 16 PUBLIC UTILITIES 25 STORM DRAIN SYSTEM 26 RECREATION, PARKS & OPEN SPACE 32 UNFUNDED PROJECTS…………………………………………………..……37 BUILDINGS AND OTHER FACILITY IMPROVEMENTS 39 INTANGIBLE CAPITAL OUTLAY 49 ROADWAY INFRASTRUCTURE 50 PUBLIC UTILITIES 61 STORM DRAIN SYSTEM 66 RECREATION, PARKS & OPEN SPACE 71 4-5 Page 3 of 80 INTRODUCTION A Capital Improvement Plan (CIP) is a guide toward the efficient and effective provision of public infrastructure and facilities. Programming capital facilities and improvements over time can promote better use of the City’s limited financial resources, reduce costs and assist in the coordination of public and private development. In addition, the planning process is valuable as a means of coordinating and taking advantage of joint planning and development of facilities and infrastructure where possible. Careful management of these assets keeps the City poised for flexible and responsive strategic planning that allows the City to proactively prepare the groundwork for capital projects so when funding opportunities arise, a plan is ready to be implemented. By looking beyond year-to-year budgeting and projecting what, where, when and how capital investments should be made, capital planning enables public organizations to maintain an effective level of service for the present and future population. THE CAPITAL IMPROVEMENT PLAN (CIP) The result of this continuing planning process is the CIP, which is the City’s five-year roadmap for creating, maintaining, and funding present and future infrastructure requirements. The CIP addresses the City’s needs relating to the acquisition, expansion, and rehabilitation of long-lived facilities and infrastructure. The CIP serves as a planning instrument in conjunction with the City’s General Plan and the City Council’s Tactical Goals to identify needed capital projects and coordinate the financing and timing of improvements in a way that maximizes the return to the public. It provides a planned systematic approach to utilizing the City’s financial resources in the most responsive and efficient manner to meet its service and facility needs. It serves as the “blueprint” for the future of the community and is a management and planning tool, rather than a binding document. The underlying strategy of the CIP is to plan for necessary land acquisition, construction and maintenance of public facilities necessary for the safe and efficient provision of public services in accordance with City policies and objectives adopted in the City’s General Plan. A critical element of a balanced CIP is the provision of funds to both preserve or enhance existing facilities and provide new assets to respond to changing service needs and community growth. While the program serves as the long range plan, it is reviewed and revised bi-annually in conjunction with the budget. Priorities may be changed due to funding opportunities or circumstances that cause a more rapid deterioration of an asset. Projects may be revised for significant costing variances. The CIP is primarily a planning document to assist in the City’s long-term planning. As such, the projects and their scopes are subject to change from year to year as the needs of the community become more defined and projects move closer to final implementation. The adoption of the CIP is neither a commitment to a particular project nor a limitation to a particular cost. As a basic tool for scheduling anticipated capital projects, it is also a key element in planning and controlling future capital financing. For this reason, the CIP includes some “unfunded” projects in which needs have been identified, but specific solutions and funding have not been determined. When adopted, the CIP provides the framework for the City’s management team and the City Council with respect to investment planning, project planning and managing any debt. This document is independent of the City Council’s tactical goals and is intended to serve as a long- term planning document. THE CIP PROCESS The capital plan and budget is the result of an ongoing infrastructure planning process. Infrastructure planning decisions must be made with regard to both existing and new facilities and equipment. For existing facilities, the planning process addresses appropriate capital renewal strategies and repair-versus-replacement of facilities. New service demands are also considered since they often affect capital facility requirements. Planning for the five-year CIP period and subsequent five years, includes linking the General Plan to the capital plan requirements, conducting needs assessments and allowing for flexibility to take advantage of opportunities for 4-6 Page 4 of 80 capital investment. The FY12-13 through FY16-17 CIP is developed through input by professional staff, citizens of Rancho Palos Verdes, and elected or appointed City officials. CIP REVIEW TEAM A CIP Review team is responsible for annually reviewing capital project requests and providing recommendations to the City Manager. This team is comprised of staff from the Office of the City Manager, Finance and Information Technology, Public Works, Community Development, and Recreation and Parks departments, and the City Attorney. This team conducts an in-depth analysis of the impact of the CIP on cash flow and financial obligations, as well as the City’s ability to finance, process, design, and ultimately maintain projects. The team will also analyze the fiscal impact for each individual project; including future maintenance and replacement costs, associated monetary benefits (e.g. future maintenance savings), as well as any applicable future revenue opportunities. The team meets periodically throughout the year to evaluate the progress of projects, and examine future needs of the City. The overall goal of the CIP Review Team is to develop CIP recommendations that: ƒ Preserve the past, by investing in the continued upgrade of City assets and infrastructure; ƒ Protect the present with improvements to City facilities and infrastructure; ƒ Plan for the future. Projects are identified by staff, professional consultants, residents or elected officials. There are typically more proposals than can be funded in the five-year CIP period, so the team conducts an internal project ranking process. The criteria used in this internal ranking includes, but is not limited to, safety, support of essential City services, support of City’s goals, economy and efficiency, outside funding committed or eligible, and community quality/sustainability. Projects are prioritized and scored based on the criteria outlined in this plan in the following section. If a project receives a lower ranking, there is no reason to believe that any damages will occur if the project has not been completed. While ratings are important in determining recommended projects, the realities of the City’s financial situation are critical to all decisions. CIP CRITERIA Safety: Enhance or improve the overall safety of the City and delivery of services. Protect the health and welfare of residents. Supports Essential City Services: Maintenance and development of existing or new facilities and infrastructure which allows the City to deliver essential services to residents of Rancho Palos Verdes. Supports City Goals: Supports the goals annually established by the City Council in the Tactical Plan. Meets citywide long-term goals and is in compliance with the City’s General Plan. Economy and Efficiency: Maintain and enhance the economy and efficiency of providing services in Rancho Palos Verdes. This criterion would include projects which improve business processes and overall efficiency while also evaluating environmental impacts. Outside Funding Committed or Eligible: Support a project which outside funding has been committed to or may be obtained through restricted revenue sources. Community Quality/Sustainability: Maintain and enhance the infrastructure and services which supports our residential and business community. This criterion would include projects which preserve and enhance the overall quality of life in Rancho Palos Verdes and projects which ensure economic viability to support a sustainable community. 4-7 Page 5 of 80 CATEGORIES Category 1: The project is urgent and/or mandated, and must be completed quickly. The City could face severe consequences if the project is delayed, possibly impacting the health, safety, or welfare of the community, or having a significant impact on the financial wellbeing of the City. The project must be initiated or financial/opportunity losses will result. Category 2: The project is important and addressing it is necessary. The project impacts safety, law enforcement, health, welfare, economic base, and/or quality of life in the community. Category 3: The project would enhance the quality of life and would provide a benefit to the community. Completion of the project would improve the community providing cultural, recreational, and/or aesthetic effects. Category 4: The project would be an improvement to the community, but need not be completed within a five-year CIP. THE CIP CALENDAR August-October Departments prepare CIP requests November- January CIP Team reviews requests February-May Recommendations developed to be included in the Five-Year Model and Draft Budget May-June Planning Commission Review May-June Recommendations presented to the City Council for approval Additional forms and methods of public outreach will be conducted as directed by the City Council. PROJECT LISTS The CIP includes a comprehensive listing of all projects contained in the Five-Year CIP and also projects beyond the Five-Year Period. Detailed project sheets are contained in the plan for all projects included in the CIP. Another list of unfunded projects is also contained in the plan to highlight the City’s needs beyond the five year period. Projects which are included in the CIP were evaluated based on the criteria approved by the City Council and are in compliance with the goals set forth in the City’s General Plan. Application of these criteria ensures that each project recommended for Council consideration does indeed support the policy objectives of the City’s long-term planning documents and identifies a basis for scheduling and allocation of resources. Cost estimates have been developed for each project based on preliminary project descriptions, and include all estimated costs for land acquisition, permits and inspections, project management and project engineering, consultant design, construction, utilities, information technology infrastructure and other associated project fees. Estimates are in today’s dollars. CAPITAL IMPROVEMENT POLICIES Time Period The Finance and Information Technology Department, in cooperation with all other City Departments and the City Attorney, shall produce a working document designed to identify capital needs bi-annually in conjunction with the budget process. This Five-Year Capital Improvement Plan (CIP) is submitted to the City Council to utilize in reviewing and prioritizing capital projects. 4-8 Page 6 of 80 Type of Project Definition of a capital asset: An asset with a cost in excess of $5,000 and an expected useful life of more than one year, such as automobiles, equipment, and furniture. These items will continue to be included in the operating budget. Items such as automobiles, minor equipment, and furniture will continue to be accounted for and funded using the Equipment Replacement Fund and are not included in the capital improvement plan. Definition of a capital project: A project expected to have a useful life greater than ten years and an estimated cost of $100,000 or more. Capital projects include the construction, acquisition, or major renovation of buildings, utility systems, or other structures, purchase of land, and major landscaping projects. Projects meeting the above definition will be included in the CIP document in addition to the City’s two-year budget document. The information will be tied to the capital budget and totals for each project in the CIP will be included in the capital budget. Selecting the Projects for the CIP The comprehensive capital project planning process has the following essential components: ƒ The General Plan (Long-term Plan- 10 Years) ƒ The Capital Improvement Plan (Mid-term Plan- 5 Years) ƒ The Capital Budget (Short-term Plan- 1 Year) ƒ City Council Tactical Plan (Long-term and Short-term- evaluated each year) All projects selected for the CIP should be consistent with the goals identified in the City Council Tactical Plan or as outlined in the City’s General Plan. The project selection process strives to achieve a balanced plan for the community to include all necessary and high priority projects, while also enhancing City services and facilities. Operating Budget Impact Identified in the CIP The operating impact of proposed capital projects, including personnel, operating expenditures, capital outlay, and debt service, as applicable, will be identified in the CIP document and considered in preparing the annual operating budget and Five-Year Financial Model. Moving Projects from the CIP to the Capital Budget All projects approved in the annual capital budget are appropriated at the estimated cost to complete the project. At the end of each fiscal year, the remaining appropriation for uncompleted portions of the project will be carried forward to subsequent fiscal years. Staff will identify the estimated costs, potential funding sources, operating impact, and project schedule for each capital project proposal before it is submitted to the City Council. Staff will coordinate development of the capital improvement budget with the development of the operating budget. All costs for internal professional services needed to implement the CIP will be included in the capital budget as part of the two-year budget document for the years the CIP is to be implemented. Cost tracking for components of the capital improvement program will be updated semi-annually to ensure project completion against budget and established time lines. Definition of Capital Budget Year A capital budget year runs concurrent to the operating budget fiscal year beginning July 1st and ending June 30th. Types of Financing The nature and cost of the project generally determine financing options as do projected revenue resources. The following financing instruments could be used in the following preferred order: 4-9 Page 7 of 80 ƒ Outside funding that does not require repayment, including grants, federal, state and county restricted funding (i.e. transportation funding), and donations; ƒ Developer Fees; ƒ City restricted revenue imposed by voters (i.e. environmental excise tax, storm drain user fee); ƒ Accumulated Fund Balances in Restricted Funds; ƒ General Fund; ƒ Debt secured by a Restricted Revenue Source; and ƒ General Obligation Debt. Remaining Balances It is the City’s policy to apply restricted funding sources after a project is completed and final cost is identified, or at the close of each fiscal year, whichever occurs first. Evaluation of Capital Projects Capital project and program reviews are to monitor existing project performance and to update the five year CIP. Each project must be actively managed and semi-annual reports on the physical and fiscal status of each project should be made available to the City Council in conjunction with the budget adoption and Mid-Year Review. Green Building Standards As a way to create a more sustainable way of life, the City of Rancho Palos Verdes requires the incorporation of green building principles and practices into the design, construction, and operation of all City facilities, and to evaluate all land purchases for future development on the basis of reducing environmental impacts whenever feasible. Standards for Maintenance It is important to have standards in place for the various infrastructure systems throughout the City to maintain this investment and be positioned to provide adequate services for the residents of Rancho Palos Verdes. Staff will develop maintenance standards and schedules as appropriate. Contingency Policy The need for contingencies will be evaluated with each project and be included in the CIP on a case-by-case basis. Project Change Orders Project change orders will be made in accordance with the policy stated in Section 02.44.25 of the Municipal Code. This policy requires that specific purchasing procedures be followed and City Council approval obtained for any amount over twenty-five thousand dollars. GENERAL PLAN GOALS The goals stated below are included in the City’s General Plan which serves as the City’s long- term strategic planning tool. The General Plan is currently undergoing its first update since its adoption. The Director of Community Development has advised the CIP Team that none of the proposed revisions that have been under consideration will significantly impact the draft CIP Framework. Staff has elected to refer to the current General Plan in the conjunction with the development of the CIP Framework. All CIP projects should contribute to fulfilling one or more of the goals listed below to create a balanced, sustainable community. Natural Environment Element ƒ It is the goal of the City of Rancho Palos Verdes to conserve, protect, and enhance its natural resources, beauty, and open space for the benefit and enjoyment of its residents and the residents of the entire region. Future development shall recognize the sensitivity of the natural environmental and be accomplished in such a manner as to maximize the protection of it. 4-10 Page 8 of 80 Socio/Cultural Element ƒ The City shall strive to protect and preserve all significant archaeological, paleontological and historical resources within the City. Cultural Resources ƒ The City shall strive to protect and preserve all significant archaeological, paleontological and historical resources with in the City. Current Social, Service, and Cultural Organizations ƒ Work toward a coordinated program to aid in matching the facility needs of the many and diverse groups in the community with existing and future facility resources throughout the City. Social Services ƒ Encourage programs for community involvement, participation, and action to minimize the sense of isolation and powerlessness felt by many individuals in the community. ƒ Encourage programs for recreation, social services, and cultural and educational achievement. ƒ Encourage a framework for interaction among the four cities of the peninsula and between the peninsula and its surrounding communities to solve common problems. Urban Environment Element ƒ It is the goal of the City to carefully control and direct future growth towards making a positive contribution to all elements of the community. Growth in Rancho Palos Verdes should be a cautious, evolutionary process that follows a well-conceived set of general guidelines which respond to both holding capacity limitations for the region and environmental factors on the peninsula. Activity Areas ƒ It is the goal of the City of Rancho Palos Verdes to preserve and enhance the community's quality living environment; to enhance the visual character and physical quality of existing neighborhoods; and to encourage the development of housing in a manner which adequately serves the needs of all present and future residents of the community. ƒ The City shall discourage industrial and major commercial activities due to the terrain and environmental characteristics of the City. Commercial development shall be carefully and strictly controlled, and limited to consideration of convenience or neighborhood service facilities. ƒ The City shall encourage the development of institutional facilities to serve the political, social, and cultural needs of its citizens. ƒ The City shall endeavor to provide, develop, and maintain recreational facilities and programs of various types to provide a variety of activities for persons of all age groups and in all areas of the community. ƒ Agricultural uses within the City shall be encouraged, since they are desirable for resource management and open space. Infrastructure ƒ It shall be a goal of the City to ensure adequate public utilities and communications services to al residents, while maintaining the quality of the environment. 4-11 Page 9 of 80 ƒ It shall be a goal of the City to provide residents with a safe and efficient system of roads, trails and paths. ƒ It shall be a goal of the City to encourage the increased mobility of residents through the development of an adequate public transportation system. Safety ƒ It shall be a goal of the City to provide for the protection of life and property from both natural and man-made hazards within the community. ƒ It shall be a goal of the City to provide for the protection of the public through effective law enforcement and fire protection programs. ƒ It shall be a goal of the City to develop and enforce health and sanitation, emergency communications, and disaster preparedness programs to ensure the overall health and safety of all residents. ƒ It shall be a goal of the City to protect life and property and reduce adverse economic, environmental, and social impacts resulting from any geologic activity. Sensory Environment ƒ It shall be the goal of the City of Rancho Palos Verdes through proper land use planning and regulations, to provide for a quiet and serene residential community with a minimum of restriction on citizen activity. ƒ Palos Verdes peninsula is graced with views and vistas of the surrounding Los Angeles basin and coastal region. Because of its unique geographic form and coastal resources, these views and vistas are a significant resource to residents and to many visitors, as they provide a rare means of experiencing the beauty of the peninsula and the Los Angeles region. It is the responsibility of the City to preserve these views and vistas fro the public benefit and, where appropriate, the City should strive to enhance and restore these resources, the visual character of the City, and provide and maintain access for the benefit and enjoyment of the public. Land Use Plan ƒ It is the goal of the City of Rancho Palos Verdes to provide for land uses which will be sensitive to and enhance the natural environment and character of the community, supply appropriate facilities to serve residents and visitors, promote a range of housing types, promote fiscal balance, and protect the general health, safety, and welfare of the community. Fiscal Element ƒ It shall be a goal of the City to hold the property tax to a minimum and to continually explore and analyze the advantages and disadvantages of alternate or new sources of revenue. ƒ It shall be a goal of the City to explore cooperative financing strategies that might be undertaken in association with other jurisdictions. ƒ It shall be a goal of the City to take maximum advantage of regulatory legislation to obtain contributions, dedications and reservations (i.e., easements). ƒ It shall be a goal of the City to ascertain that all revenues generated by growth are sufficient to cover costs related to growth. ƒ It shall be a goal of the City to thoroughly evaluate capital acquisition and operating expenditures and their impacts before implementation of programs. 4-12 Page 10 of 80 (THIS PAGE IS BLANK) 4-13 Page 11 of 80 Ra n c h o P a l o s V e r d e s F i v e Y e a r C a p i t a l I m p r o v e m e n t P l a n Pr o j e c t FY 1 2 - 1 3 F Y 1 3 - 1 4 F Y 1 4 - 1 5 F Y 1 5 - 1 6 F Y 1 6 - 1 7 I d e n t i f i e d F u n d i n g S o u r c e Bu i l d i n g s a n d O t h e r F a c i l i t y I m p r o v e m e n t s AD A C o m p l i a n c e P r o j e c t s 10 0 , 0 0 0 $ 10 0 , 0 0 0 $ 10 0 , 0 0 0 $ EE T In t a n g i b l e C a p i t a l O u t l a y Pa v e m e n t M a n a g e m e n t P r o g r a m U p d a t e 12 0 , 0 0 0 $ CI P a c c u m u l a t e d b a l a n c e Ro a d w a y I n f r a s t r u c t u r e Re s i d e n t i a l O v e r l a y a n d S l u r r y S e a l Z o n e 1 1, 6 0 0 , 0 0 0 $ Ge n e r a l F u n d , T D A A r t i c l e 3 f o r $ 2 5 , 0 0 0 Re s i d e n t i a l O v e r l a y a n d S l u r r y S e a l Z o n e 2 1, 6 0 0 , 0 0 0 $ Ge n e r a l F u n d , T D A A r t i c l e 3 f o r $ 2 5 , 0 0 0 Re s i d e n t i a l O v e r l a y a n d S l u r r y S e a l Z o n e 9 1, 5 0 0 , 0 0 0 $ Ge n e r a l F u n d , T D A A r t i c l e 3 f o r $ 2 5 , 0 0 0 Re s i d e n t i a l O v e r l a y a n d S l u r r y S e a l Z o n e 6 1, 5 0 0 , 0 0 0 $ Ge n e r a l F u n d , T D A A r t i c l e 3 f o r $ 2 5 , 0 0 0 Re s i d e n t i a l O v e r l a y a n d S l u r r y S e a l Z o n e 7 1, 5 0 0 , 0 0 0 $ Ge n e r a l F u n d , T D A A r t i c l e 3 f o r $ 2 5 , 0 0 0 Ar t e r i a l O v e r l a y a n d S l u r r y S e a l P V D E ( M i r a l e s t e t o N o r t h C i t y L i m i t s ) 2, 3 0 0 , 0 0 0 $ Me a s u r e R / S T P L Ha w t h o r n e B l v d . M e d i a n I m p r o v e m e n t s ( V i a R i v e r a t o C i t y H a l l ) 25 0 , 0 0 0 $ Be a u t i f i c a t i o n F u n d Ha w t h o r n e B l v d . M e d i a n I m p r o v e m e n t s ( C i t y H a l l t o V a l l o n ) 25 0 , 0 0 0 $ Be a u t i f i c a t i o n F u n d Pu b l i c U t i l i t i e s St o r m D r a i n S y s t e m St o r m D r a i n L i n i n g 32 4 , 6 4 2 $ 32 9 , 8 8 1 $ 33 5 , 2 7 8 $ 34 0 , 8 3 6 $ 34 7 , 6 5 3 $ W Q F P U s e r F e e s PV D E L o w e r S w i t c h b a c k s 48 5 , 0 0 0 $ W Q F P U s e r F e e s PV D S ( N o r t h o f B a r k e n t i n e ) 44 6 , 0 0 0 $ WQ F P U s e r F e e s So u t h H a w t h o r n e / V i a F r a s c a t i 44 0 , 0 0 0 $ WQ F P U s e r F e e s Ma r g u e r i t e O p e n C h a n n e l 35 0 , 0 0 0 $ WQ F P U s e r F e e s Re c r e a t i o n , P a r k s , a n d O p e n S p a c e Ry a n P a r k R e s t r o o m s I m p r o v e m e n t & A c c e s s i b i l i t y C o m p l i a n c e 22 3 , 0 0 0 $ CI P a c c u m u l a t e d b a l a n c e Ry a n P a r k S o u t h e r n E n t r a n c e R o a d 22 0 , 0 0 0 $ CI P a c c u m u l a t e d b a l a n c e Ca l i f o r n i a C o a s t a l T r a i l 28 0 , 0 0 0 $ Gr a n t / C I P a c c u m u l a t e d b a l a n c e Ga t e w a y P a r k D e v e l o p m e n t P r o j e c t : P h a s e I a n d I I 27 5 , 0 0 0 $ Gr a n t / C I P a c c u m u l a t e d b a l a n c e To t a l s 3, 6 5 7 , 6 4 2 $ 2, 8 2 5 , 8 8 1 $ 2, 4 9 5 , 2 7 8 $ 2, 1 9 0 , 8 3 6 $ 4, 1 4 7 , 6 5 3 $ 4-14 Page 12 of 80 BUILDINGS AND OTHER FACILITY IMPROVEMENTS Buildings and other facility improvements may include any proposed new City facility or renovation or improvement of any existing City facilities. The City owns and maintains twelve public buildings, including: ƒ City Hall Administration Building at Upper Point Vicente Park ƒ City Hall Community Development Building at Upper Point Vicente Park ƒ City Hall trailer leased by Palos Verdes on the Net at Upper Point Vicente Park ƒ City Hall Emergency Communications Center trailer at Upper Point Vicente Park ƒ Fred Hesse Jr. Community Center Building ƒ Pointe Vicente Interpretive Center (PVIC) ƒ Ryan Park Building ƒ Ladera Linda Community Center Buildings (5) Except for PVIC, these buildings are 25 years old or older and showing the signs of daily use. Many of the facilities were purchased from the school district or transferred to the City from the federal government, and little to no improvements have been made since their acquisition. It is important to perform adequate maintenance to extend the life of these facilities. It will be necessary to renovate these buildings as they age to meet the needs of the community and ensure that all building and safety guidelines are satisfied. Point Vicente Interpretive Center, the most recently remodeled City facility, was built in 1984 and expanded in 2005. The City Hall buildings and Ladera Linda Community Center buildings are the best examples of buildings that are in great need of renovation to meet organizational needs, comply with safety and code requirements, and comply with all Americans with Disabilities Act (ADA) guidelines. The projects listed on the following pages have been developed based on individual staff assessments, input from the community and professional consultants’ assessments and studies. 4-15 Page 13 of 80 PROJECT: ADA COMPLIANCE PROJECTS TYPE: Buildings and Other Facility Improvements LOCATION: DEPARTMENT: Public works DESCRIPTION: The Citywide ADA Self-Evaluation and Transition Plan has been completed, and is expected to be presented to the City Council in coordination with the City’s capital improvements strategic goals. The Plan has a preliminary implementation cost estimate of $6,675,000. This estimate does not include ADA improvements for the City Hall and Ladera Linda Community Center since any potential improvements at those sites are expected to make the facilities fully accessible. Additionally, this cost does not include the side walks and curb ramps which are not at the intersections, as those improvements are expected to be included in the roadway resurfacing programs. The cost for programs and services accessibility is expected to be covered through operating budgets and therefore is not included in this total cost, either. The annual request of $100,000 will cover highest priority improvements as set by the Department of Justice guidelines. The first program will cover the cost of providing ADA compliance access to City facilities starting with the removal of safety hazards and severe barriers. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $100,000 $100,000 $100,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $100,000 $100,000 $100,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Environmental Excise Tax JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: 4-16 Page 14 of 80 INTANGIBLE CAPITAL OUTLAY Intangible Capital Outlay improvements may not have significant physical substance, but they have more than minimal value and help the City in improving operations or planning for the future. Projects that could be classified as intangible capital outlay include the update or development of major planning processes and documents, significant software purchases that may improve the efficiency of business processes or large technology purchases that may improve or enhance service delivery to citizens. This category includes an update to the Pavement Management Program. 4-17 Page 15 of 80 PROJECT: PAVEMENT MANAGEMENT PROGRAM UPDATE TYPE: Intangible Capital Outlay LOCATION: N/A DEPARTMENT: Public Works DESCRIPTION: The Pavement Management System (PMS) is updated every three years to evaluate the condition of the City’s roadway system and to identify Citywide Arterial Rehabilitation and Residential Rehabilitation projects. The Metropolitan Transit Authority (Metro) requires the PMS update in order for the City to continue receiving Proposition C monies. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $120,000 CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $120,000 IMPACT ON OPERATING BUDGET N/A JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Funding and/or Grant Information: Accumulated fund balance in the Capital Improvement Projects Fund 4-18 Page 16 of 80 ROADWAY INFRASTRUCTURE Roadway infrastructure is one of the most widely used major capital investments of a municipality. Without a well-maintained street system, the transportation needs of the public, business, industry and government cannot be met. The roads are also part of a critical public safety need, and they contribute to the general health and welfare of the community. Maintaining quality roadway infrastructure is also important in maintaining property values. It has been shown that property values tend to suffer from poorly maintained streets. Roadway infrastructure includes residential streets, arterial streets and traffic safety improvements. In the City of Rancho Palos Verdes, there are 33.68 miles of arterial streets, 6.46 miles of collector streets and 103.31 miles of residential streets. The total for all streets and alleys mileage is 143.44 centerline miles. To manage the City’s residential and arterial streets, the City hires a consultant to complete a full detailed assessment of all streets every three years. This report, known as the Pavement Management System, helps to identify any serious issues and provides the City with a rating for each street. The report includes the overall Pavement Condition Index (PCI). The City of Rancho Palos Verdes minimum standard for PCI for a municipal street system is 80. The City’s current PCI is 84.2 based upon the PMS report prepared by Willdan & Associates in 2009. Since 1997, the City has maintained a pavement rating between 80 and 90. The report also helps in defining a schedule to complete the work. The City has been divided into nine zones for residential streets, but in the case of some areas, zones may be completed together in one year for added efficiency. 4-19 Page 17 of 80 PROJECT: RESIDENTIAL OVERLAY TYPE: Roadway Infrastructure LOCATION: Zone 1 DEPARTMENT: Public Works DESCRIPTION: As part of the City’s Pavement Management System (PMS), Zone 1 of the residential overlay program will include slurry seal, overlay, curb repair and ADA compliance updates. This infrastructure enhancement will also include the update of traffic striping, curb painting, and painting of house numbers. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $1,600,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,600,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDA Article 3 for $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program. This project is funded by General fund monies and keeps the safety ratings of the streets at “very good” to “excellent”. LOCATION PHOTO LOCATION DESCRIPTION Zone 1: Residential streets in the most northern part of the City, north of Hawthorne Blvd and west of Silver Spur Road. 4-20 Page 18 of 80 PROJECT: RESIDENTIAL OVERLAY TYPE: Roadway Infrastructure LOCATION: Zone 2 DEPARTMENT: Public Works DESCRIPTION: As part of the City’s Pavement Management System (PMS), Zone 2 of the residential overlay program will include slurry seal, overlay, curb repair and ADA compliance updates. This infrastructure enhancement will also include the update of traffic striping, curb painting, and painting of house numbers. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $1,600,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,600,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDA Article 3 for $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program. This project is funded by General fund monies, and keeps the safety ratings of the streets at “very good” to “excellent”. LOCATION PHOTO LOCATION DESCRIPTION Zone 2: Residential streets in the northwestern part of the City between Crest Road and Grayslake Road, east and west of Hawthorne Blvd. 4-21 Page 19 of 80 PROJECT: RESIDENTIAL OVERLAY TYPE: Roadway Infrastructure LOCATION: Zone 9 DEPARTMENT: Public Works DESCRIPTION: As part of the City’s Pavement Management System (PMS), Zone 9 of the residential overlay program will include slurry seal, overlay, curb repair and ADA compliance updates of the streets. This infrastructure enhancement will also include the update of traffic striping, curb painting, and painting of house numbers. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $1,500,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,500,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDA Article 3 for $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program. This project is funded by General fund monies and keeps the safety rating of the streets at “very good” to “excellent”. LOCATION PHOTO LOCATION DESCRIPTION Zone 9: Residential streets in the most eastern part of the City, near Western Avenue. 4-22 Page 20 of 80 PROJECT: RESIDENTIAL OVERLAY TYPE: Roadway Infrastructure LOCATION: Zone 6 DEPARTMENT: Public Works DESCRIPTION: As part of the City’s Pavement Management System (PMS), Zone 6 of the residential overlay program will include slurry seal, overlay, curb repair and ADA compliance updates. This infrastructure enhancement will also include the update of traffic striping, curb painting, and painting of house numbers. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $1,500,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,500,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDA Article 3 for $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program. This project is funded by General fund monies and keeps the safety ratings of the streets at “very good” to “excellent”. LOCATION PHOTO LOCATION DESCRIPTION 4-23 Page 21 of 80 PROJECT: RESIDENTIAL OVERLAY TYPE: Roadway Infrastructure LOCATION: Zone 7 DEPARTMENT: Public Works DESCRIPTION: As part of the City’s Pavement Management System (PMS), Zone 7 of the residential overlay program will include slurry seal, overlay, curb repair and ADA compliance updates. This infrastructure enhancement will also include the update of traffic striping, curb painting, and painting of house numbers. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $1,500,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,500,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDA Article 3 for $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program. This project is funded by General fund monies and keeps the safety rating of the streets at “very good” to “excellent”. LOCATION PHOTO LOCATION DESCRIPTION Zone 7: Residential streets in the southern part of the City, near Palos Verdes Drive South and Palos Verdes Drive East. 4-24 Page 22 of 80 PROJECT: ARTERIAL OVERLAY AND SLURRY SEAL PVDE (MIRALESTE TO NORTH CITY LIMITS) TYPE: Roadway Infrastructure LOCATION: PVDE (from Miraleste Drive to North City Limits) DEPARTMENT: Public Works DESCRIPTION: As part of the City’s Pavement Management System (PMS), Palos Verdes Drive East throughout various segments will be completed as shown in the map below to maintain this section of the arterial street. This construction will require milling and overlay, including curbs and gutters, ADA ramps and striping. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $2,300,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $2,300,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: STPL Grant and Measure R JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: MAP 4-25 Page 23 of 80 PROJECT: HAWTHORNE BLVD. MEDIAN IMPROVEMENTS (VIA RIVERA TO CITY HALL) TYPE: Roadway Infrastructure LOCATION: Hawthorne Blvd. (City Hall to Vallon) DEPARTMENT: Public Works DESCRIPTION: The development of this median would include turning the existing median landscaping and vegetation to sustainable landscaping which would require minimal maintenance. Development could also include the installation of irrigation systems and controllers, and hardscaping and installation of decorative stone. This will be the first segment of median improvements for the Palos Verdes Drive West entrance to the City of Rancho Palos Verdes. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $250,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $250,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Beautification Fund. Ongoing median maintenance is estimated to be $12,000 per year. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: MAP OTHER PROJECT INFORMATION: 4-26 Page 24 of 80 PROJECT: HAWTHORNE BLVD. MEDIAN IMPROVEMENTS (CITY HALL TO VALLON) TYPE: Roadway Infrastructure LOCATION: Hawthorne Blvd. (City Hall to Vallon) DEPARTMENT: Public Works DESCRIPTION: The development of this median would include turning the existing median landscaping and vegetation to sustainable landscaping which would require minimal maintenance. Development could also include the installation of irrigation systems and controllers, and hardscaping and installation of decorative stone. This will be the second segment of median improvements.. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $250,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $250,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Beautification Fund. Ongoing median maintenance is estimated to be $12,000 per year. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: MAP 4-27 Page 25 of 80 PUBLIC UTILITIES Public utilities improvements include the maintenance and development of utility projects such as the City’s sanitary sewer system or the undergrounding of utility lines. The City’s sanitary sewer system is essential for City operations, yet it has not required significant expenditures in past years due to an inter-local agreement with Los Angeles County for maintenance activities. The City owns the system, but the County has the primary responsibility for ongoing maintenance. The County collects a sewer fee from the City’s property owners that Staff believes is inadequate to maintain the system. Although the County maintains the City’s sewer system, the City retains responsibility for its operation, public safety and welfare. The City, not the County, maintains legal and regulatory responsibility (i.e. any state or federal fines resulting from spillage). In preparation for this change, the City conducted a survey of the system, and in 2004 the Sanitary Sewer Master Plan was created to help in the management of this asset. The study examined sample areas throughout the City and assessed the overall system as “fair.” The inspection revealed root intrusion in the pipes and cracking in the pipes, in addition to accumulated fats and grease clogging certain areas. It appeared that the County had not been performing adequate maintenance over the years. Without regular maintenance, overflows due to root and grease blockages will occur. To minimize the potential for overflow and to restore and maintain the system in “good” condition, a significant investment in pipeline inspection, repair and maintenance is required. Because the County is still primarily responsible for maintenance of the system, no projects have been included for this system. However, the Sanitary Master Plan Update was received and filed by the City Council on November 17, 2009. Future projects may be proposed based on this assessment. NO PROJECTS CURRENTLY IDENTIFIED 4-28 Page 26 of 80 STORM DRAIN SYSTEM In June 2004, the City’s consulting engineers prepared an Update to the Storm Drain Master Plan. The updated plan identified serious storm drain deficiencies that required significant repair. The update identified 38 high-priority projects, which were the basis for establishing a “user fee.” Since then, some projects have been completed, and others have been reassessed to meet changing priorities and needs. The 38 projects have been reevaluated resulting in grouping the projects into 12 project areas. These are based on identifiable drainage areas/systems, most of which are tied to natural canyon drainage systems. Each project has been grouped into a project area. The areas are as follows: Area 1: Sunnyside Ridge Area 2: McCarrell Canyon Storm Drain System Area 3: Lower San Ramon Canyon/Tarapaca Canyon Area 4: Altamira Canyon Area 5: Palos Verdes Drive East/Miraleste Canyon Area 6: San Pedro and Averill Canyons Area 7: Via Colinita Vickery Canyon Area 8: Miraleste and Chandeleur Area 9: Palos Verdes Drive East Switchbacks Area 10: Hawthorne Boulevard Area 11: Palos Verdes Drive South Area 12: Citywide Storm Drain Programs The FY11-12 Budget includes an update to the 2004 Storm Drain Master Plan Update Study. The new update will add data regarding the actual field condition of the storm drains, consider the efforts of projects already implemented, and create a method for storing, retrieving, and updating this type of data electronically using the City’s GIS System. 4-29 Page 27 of 80 PROJECT: STORM DRAIN LINING TYPE: Storm Drain System LOCATION: Project Area 12 DEPARTMENT: Public Works DESCRIPTION: All CMP storm drain lines within the City have reached their design life expectancy and need to be lined to extend their life another 30+ years. CMP dating back to the 1940s have been discovered and require maintenance along with those most recently installed in the 1970s. A large number of drainage problems citywide can be overcome by relining deteriorated pipes and improving inlets and outlet structures. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $324,642 $329.881 $335,278 $340,836 $347,653 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $324,642 $329,881 $335,278 $340,836 $347,653 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: WQFP user fees. Ongoing maintenance costs should decrease, as pipes which have been lined generally require less maintenance resulting in a cost savings. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: LOCATION PHOTO MAP LOCATION PHOTO MAP 4-30 Page 28 of 80 PROJECT: PALOS VERDES DRIVE EAST LOWER SWITCHBACKS TYPE: Storm Drain System LOCATION: Project Area 9 DEPARTMENT: Public Works DESCRIPTION: Several drainage systems in the hairpin bends area above San Ramon Canyon drain into the canyon. Work within this project area includes the installation of new drainage within the Palos Verdes Drive East switchbacks and installing a pipe into the canyon. This project will also modify existing inlets, outlets and pipes. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $485.000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $485,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: WQFP user fees JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: LOCATION PHOTO MAP 4-31 Page 29 of 80 PROJECT: PALOS VERDES DRIVE SOUTH (NORTH OF BARKENTINE) TYPE: Storm Drain System LOCATION: Project Area 11 DEPARTMENT: Public Works DESCRIPTION: This project area includes several storm drain systems that cross Palos Verdes Drive South at various locations. Drainage capacity will be increased with improvement to inlets and outlet structures. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $446,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $446,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: WQFP user fees JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: LOCATION PHOTO MAP 4-32 Page 30 of 80 PROJECT: SOUTH HAWTHORNE/VIA FRASCATI TYPE: Storm Drain System LOCATION: Project Area 10 DEPARTMENT: Public Works DESCRIPTION: This project will improve drainage across Hawthorne Boulevard by replacing two existing 18” pipes with one 24” and one 30” RCP pipes. Additionally, a second location on South Hawthorne will be evaluated after episodes of flooding in recent years. A curb and gutter project on Via Frascati will serve to direct drainage into the street and existing catch basins, which drain into the San Pedro Canyon. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $440,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $440,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: WQFP user fees JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: LOCATION PHOTO MAP 4-33 Page 31 of 80 PROJECT: MARGUERITE OPEN CHANNEL TYPE: Storm Drain System LOCATION: Project Area 6 – Between PVDW and the Bluff DEPARTMENT: Public works DESCRIPTION: Staff has become aware of excessive erosion in a portion of open natural drainage channel, which connects two piped systems between PVDW and the bluff. Studies of the issue are scheduled for FY 12-13 with implementation of any recommendations for improvement tentatively scheduled the following year. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $350,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $350,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: WQFP user fees JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: LOCATION PHOTO 4-34 Page 32 of 80 RECREATION, PARKS & OPEN SPACE The development and maintenance of community parks, recreational areas and open space has been established as a top priority for the City as stated in the General Plan and various other planning documents. The General Plan states, “It is the goal of the City of Rancho Palos Verdes to conserve, protect and enhance its natural resources, beauty and open space for the benefit and enjoyment of its residents and the residents of the entire region. Future development shall recognize the sensitivity of the natural environment and be accomplished in such a manner as to maximize the protection of it.” Many park sites and open space areas have been acquired throughout the City, and some have been developed for use by the general public. Some sites remain vacant or underutilized. The City Council approved the Vision Plan in September 2008 which outlines various trail and park projects which have been included in this plan. The Public Use Master Plan has also outlined a strategy for the development of trails which has also been incorporated into the CIP list. These recreational projects add to the vibrancy of the community and they are designed to contribute to all residents’ quality of life. Parks and other open spaces have been carefully planned to take advantage of the beautiful coastline and natural landscape of the peninsula. 4-35 Page 33 of 80 PROJECT: RYAN PARK RESTROOMS IMPROVEMENT & ACCESSIBILITY COMPLIANCE TYPE: Recreation, Parks and Open Space LOCATION: Ryan Park DEPARTMENT: Public works DESCRIPTION: The existing building and restrooms at Ryan Park were constructed in 1970 by L.A. County. The restrooms are aged, in poor condition and have not had any major improvements since they were built. Additionally, the lower parking lot, the ramp and the restrooms are not ADA compliant. The park is heavily used by the community over the weekends, during the holidays and in the summer. The recent athletic field improvement has increased the community’s interest in using the park during athletic seasons. These improvements are necessary for enhancing service to the community by implementing corrective work at the lower parking lot and ramp, and, making the restrooms accessible, safe and sanitary. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $223,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $223,000 IMPACT ON OPERATING BUDGET None. Funding source is accumulated fund balance in the Capital Improvement Projects Fund. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: 4-36 Page 34 of 80 PROJECT: RYAN PARK SOUTHERN ENTRANCE ROAD TYPE: Recreation, Parks and Open Space LOCATION: Ryan Park DEPARTMENT: Public works DESCRIPTION: The steep southern entrance of Ryan Park is at a sharp angle with Hawthorne Blvd. The geometrics of this entrance cause difficulty for motorists who drive southbound on Hawthorne Blvd and want to make a right turn onto the driveway entrance. The parking lot accessed through this driveway is exclusively used for ADA compliant parking spaces. This increases the need to realign the entrance. Design of this improvement is the first step toward addressing this issue and will provide a more realistic cost estimate for the project. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION 220,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL 220,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP accumulated fund balance (originally General Fund money)/General Fund. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: 4-37 Page 35 of 80 PROJECT: CALIFORNIA COASTAL TRAIL TYPE: Recreation, Parks, & Open Space LOCATION: City’s Coastal Border DEPARTMENT: Planning/Public Works DESCRIPTION: One of the goals of the City Council approved Vision Plan is the development of a continuous marked Coastal Access Trail along the coast between the City’s border with San Pedro and the City’s border with Palos Verdes Estates. The proposal is to provide a safe and comfortable connection along the bluffs (where possible) and at access points down to the shoreline. The linkage should be off-street wherever possible. The approved Vision Plan identifies an alignment for the California Coastal Trail (Coastal Access Trail) which, when implemented and identified with signage, would complete the RPV coast segment of this key recreational facility that has been envisioned and championed by the State Coastal Conservancy. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $280,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: California Coastal Conservancy grant of $500,000 (awarded 10/21/10). Matching requirement of $60,000 from CIP accumulated fund balance (originally General Fund money). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Total project is $560,000 with half budgeted in FY11-12 and half proposed for FY12-13. LOCATION PHOTO MAP 4-38 Page 36 of 80 PROJECT: GATEWAY PARK DEVELOPMENT PROJECT PHASE I & II TYPE: Recreation, Parks, & Open Space LOCATION: DEPARTMENT: Public Works/Planning DESCRIPTION: The Vision Plan includes a proposed Gateway Park, a 25-acre site within the City’s Landslide Moratorium area just north of PVDS between the Portuguese Bend residential community and Klondike Canyon. Under the Vision Plan, the site has been approved for a combination of uses such as a “gateway park” for users of the Nature Preserve’s trail system, an outdoor education/nature appreciation center for school and community groups and an equestrian center. In Phase 1, it is proposed to develop the following components of the approved concept plan for the site: Trail head and public parking area, overlook, picnic areas and PVDS pedestrian crossing. In Phase 2, it is proposed to develop the following components of the approved concept plan for the site: outdoor welcome center with re-locatable equestrian amenities, outdoor education area with demonstration garden and an outdoor classroom with roof and storage shed. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $275,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Grant with 20% match from CIP accumulated fund balance. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: MAP 4-39 Page 37 of 80 UNFUNDED PROJECTS The following projects are those which have been identified as capital needs through various planning processes, but currently there are not resources to complete the projects. As funding becomes available and the City Council prioritizes and approves projects, they may be moved into the funded Five-Year CIP schedule. 4-40 Page 38 of 80 RPV Capital Improvement Plan - Unfunded Projects Project Minimum Maximum Identified Funding Sources Buildings and Other Facility Improvements Community and Aquatic Center $3,000,000 $8,000,000 $160,000 Ginsburg Donation for "Performing Arts" building. City Hall $20,500,000 $35,000,000 $820,000 in Building Replacement Fund. Infrastructure Improvements at Upper Point Vicente $1,000,000 $2,000,000 Maintenance Yard Relocation $300,000 $1,000,000 Fiber Optic Cabling: Hesse Park $180,000 $270,000 Fiber Optic Cabling: Ladera Linda $300,000 $470,000 Solar Power Systems for 3 City Park Facilities $600,000 $1,200,000 Intangible Capital Outlay No Projects Currently Identified Roadway Infrastructure Arterial Improvements - Silver Spur Road $1,300,000 $1,500,000 Arterial Improvements - Palos Verdes Drive East $1,900,000 $2,200,000 Traffic Improvement - PVDE & Miraleste Drive $280,000 $340,000 Bikeway Improvements: Phase I and II $5,000,000 $8,000,000 Hesse Park/Hawthorne Blvd. Traffic Circulation & Safety Improvement $100,000 $200,000 Operational Improvements at Crenshaw & Crest $270,000 $320,000 PVDE at Bronco Drive Improvements $205,000 $230,000 Lower Point Vicente Park Access Modification Project $930,000 $1,100,000 Switchbacks Traffic Safety Improvements $1,750,000 $2,000,000 PVDE Multi-Modal Improvements $2,800,000 $4,450,000 Public Utilities Utility Undergrounding at 25th Street $1,000,000 $1,100,000 Utility Undergrounding at PVDS and Terranea Way $150,000 $200,000 Utility Undergrounding at Fisherman's Access $150,000 $200,000 Utility Undergrounding at Entrance to PVIC $150,000 $200,000 Storm Drain System San Ramon Canyon Stabilization $19,000,000 $20,000,000 Prop 1E grant of $9.5 million Altamira Canyon $1,250,000 $5,000,000 PVDE - Miraleste Canyon $2,500,000 $3,200,000 San Pedro & Averill Canyons $2,700,000 $3,300,000 Recreation, Parks & Open Space Grandview/Lower Hesse Improvements $2,400,000 $2,400,000 Trailhead/Overlook/Vista Point Development $100,000 $130,000 PUMP Trail Implementation $820,000 $1,100,000 Portuguese Bend Reserve Trails $600,000 $740,000 Sunnyside Trail Segment Project $400,000 $450,000 Salvation Army Trail Segment $120,000 $150,000 Bathroom at Del Cerro Park $250,000 $300,000 Hesse Park Parking Lot Resurface $200,000 $200,000 Totals (Min. and Max.)$72,205,000 $106,950,000 Cost Range 4-41 Page 39 of 80 BUILDINGS AND OTHER FACILITY IMPROVEMENTS UNFUNDED PROJECTS 4-42 Page 40 of 80 PROJECT: COMMUNITY AND AQUATIC CENTER TYPE: Buildings and Other Facility Improvements LOCATION: TBD DEPARTMENT: Public Works DESCRIPTION: The Open Space Planning Recreation and Parks Task Force described a facility which would include a sports/fitness center (gymnasium), an indoor 50-meter pool with retractable enclosure, an outdoor children’s wading pool, a therapy pool and park and picnic facilities in their 2004 report to the City Council. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET Impact will need to be assessed. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $3,000,000 - $8,000,000 4-43 Page 41 of 80 PROJECT: CITY HALL TYPE: Buildings and Other Facility Improvements LOCATION: TBD DEPARTMENT: Public Works DESCRIPTION: Currently, City Hall is located at the Upper Point Vicente Park site in the former Nike Missile barracks constructed by the military in 1956. The building is not well-suited for the general office needs and space requirements as specified in greater detail below. There are also many safety and building code compliance issues that exist. In addition to these deficiencies, the building also does not meet ADA guidelines, which may create a significant risk and liability for the City. The City currently has 58 full-time positions housed in the main City Hall Building and the Community Development Department annex. In addition to the 58 full-time positions, the City contracts with outside consultants for some City services and employs part-time staff and utilizes volunteers for various tasks. These positions require an additional 8 work stations and a work space for visiting City Council members should also be included for remodeling/rebuilding purposes, bringing the total to 9 additional spaces. These calculations do not account for future positions which could be necessary to address increased service demands from the community, additional recreational facilities, increased regulation and continued regulatory demands from other public agencies. The existing buildings have a total of 20,489 square feet. The suggested space requirement according to the U.S. General Administration Office of Government-wide Policy for the 67 positions is 19,263 square feet. There is a shortage of storage space for planning records which requires approximately 690 square feet. A new or remodeled City Hall would also include a City Council chamber, main lobby, conference rooms and other support space. Approximately 34,210 square feet would be optimal for this building to meet current and future needs. The Civic Center will include an Emergency Operations Center (EOC). PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY 4-44 Page 42 of 80 OTHER PROJECT INFORMATION: COST ESTIMATE: $20,500,000 - $35,000,000 4-45 Page 43 of 80 PROJECT: INFRASTRUCTURE IMPROVEMENTS AT UPPER POINT VICENTE TYPE: Buildings and Other Facility Improvements LOCATION: 30940 Hawthorne Blvd. DEPARTMENT: Public Works DESCRIPTION: Currently, the Upper Point Vicente Park site is the location for City Hall and the City’s maintenance yard. There have been various proposed developments for the site through many community planning efforts. Although a Civic Center Master plan has not been developed, it is necessary to address several infrastructure improvement needs ahead of time. These include: installation of a sewer pipeline, installation of a piped storm drain system to channel storm water to PVDS, and relocation of the existing mono- pole. There is no gas service to the site, therefore, future development may require that gas access be made available through connection in the ROW on PVDS. Access to the site is only permitted from Hawthorne Blvd and it is possible that a traffic study will require the installation of a traffic signal on Hawthorne Blvd. The cost estimate is conceptually based at this time. Specific cost estimates can be prepared when programming and planning for these improvements are completed. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: COST ESTIMATE $1,000,000 - $2,000,000 MAP 4-46 Page 44 of 80 4-47 Page 45 of 80 PROJECT: MAINTENANCE YARD RELOCATION TYPE: Buildings and Other Facility Improvements LOCATION: Various Locations throughout the City DEPARTMENT: Public Works DESCRIPTION: It has been proposed that City maintenance services be spread citywide in strategic locations with a central office in City Hall. The existing maintenance yard is located on the Upper Point Vicente Park site which had been identified for various other community uses due to its prime location. Staff is proposing the creation of a central location for the maintenance yard with satellite locations throughout the City, serving the maintenance and other construction needs of the Public Works Department. The central location of the maintenance yard will be situated at or near City Hall for administrative purposes. This central location will control all satellite locations through the use of maintenance personnel and through the efficient use of the City’s network. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: The satellite locations will fulfill the following roles: there will be an office trailer at each location; a construction yard for contractors located throughout the City (possibly generating rental income for the City); possible satellite EOC centers for access throughout the City; and storage space for various equipment. COST ESTIMATE: $300,000 - $1,000,000 4-48 Page 46 of 80 PROJECT: FIBER OPTIC CABLING: HESSE PARK TYPE: Buildings and Other Facility Improvements LOCATION: Hesse Park DEPARTMENT: Finance and Information Technology DESCRIPTION: This project includes the installation of fiber optic cabling between City facilities within the public right-of-way which will directly connect Hesse Park to the City’s phone and information network. Associated asphalt will be removed and replaced at roadway crossing points. Vaults will be placed adjacent to the roadway within the public right-of-way. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: Ryan Park could also be connected to the network in the same project for an additional cost of $30,000. COST ESTIMATE: $180,000 to $270,000 4-49 Page 47 of 80 PROJECT: FIBER OPTIC CABLING: LADERA LINDA TYPE: Buildings and Other Facility Improvements LOCATION: Ladera Linda DEPARTMENT: Finance and Information Technology DESCRIPTION: This project includes the installation of fiber optic cabling between City facilities within the public right-of-way which will directly connect Ladera Linda Community Center to the City’s phone and information network. Associated asphalt will be removed and replaced at roadway crossing points. Vaults will be placed adjacent to the roadway within the public right-of-way. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: Abalone Cove Park could also be connected to the network in the same project for an additional cost of $41,500. COST ESTIMATE: $300,000 to $470,000 4-50 Page 48 of 80 PROJECT: SOLAR POWER SYSTEMS FOR CITY PARK FACILITIES TYPE: Buildings and Other Facility Improvements LOCATION: Various DEPARTMENT: Public works DESCRIPTION: Installation of lightweight and advanced solar energy generating systems over the roof of City buildings to reduce power consumption with occasional opportunities to sell power to the grid. This project will help the City with its energy savings goal. It will reduce considerable amounts of emissions and, typically, the savings can cover the cost of projects of this scale in an estimated period of 20 to 25 years. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET Estimated cost is $200,000 - $400,000 for each facility Funding: Will seek Federal/State Energy Savings Grants JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY X SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: 4-51 Page 49 of 80 INTANGIBLE CAPITAL OUTLAY UNFUNDED PROJECTS NO PROJECTS CURRENTLY IDENTIFIED. 4-52 Page 50 of 80 ROADWAY INFRASTRUCTURE UNFUNDED PROJECTS 4-53 Page 51 of 80 PROJECT: ARTERIAL IMPROVEMENTS- SILVER SPUR ROAD TYPE: Roadway Infrastructure LOCATION: Silver Spur Road (partial segment of Highridge; Crest Rd. from PVDE to Ganado) DEPARTMENT: Public Works DESCRIPTION: As part of the City’s Pavement Management System (PMS), Silver Spur Road and a portion of Highridge Road throughout various segments will be completed as shown in the map below to maintain this section of the arterial street. This construction will require milling and overlay, including curb and gutter, ADA ramps and striping. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $1,300,000 - $1,500,000 4-54 Page 52 of 80 PROJECT: ARTERIAL IMPROVEMENTS- PALOS VERDES DRIVE EAST TYPE: Roadway Infrastructure LOCATION: Palos Verdes Drive East (from PVDS to Miraleste) DEPARTMENT: Public Works DESCRIPTION: As part of the City’s Pavement Management System (PMS), Palos Verdes Drive East throughout various segments will be completed as shown in the map below to maintain this section of the arterial street. This construction will require milling and overlay, including curb and gutter, ADA ramps and striping. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: This cost range includes safety costs. COST ESTIMATE: $1,900,000 - $2,200,000 4-55 Page 53 of 80 PROJECT: TRAFFIC IMPROVEMENT- PALOS VERDES DRIVE EAST AND MIRALESTE DRIVE TYPE: Roadway Infrastructure LOCATION: Palos Verdes Drive East and Miraleste Drive DEPARTMENT: Public Works DESCRIPTION: A new traffic signal will be installed at Palos Verdes Drive East and Miraleste Drive. The new signal will be equipped with pedestrian count heads, LED lights, 12” vehicle heads and LED internally illuminated street name signs, a battery back-up system and emergency vehicle pre-emption and modification of the traffic signal controller cabinet to include the installation of modem and cable and all necessary auxiliary equipment to provide future communication capability for synchronization of all traffic signals. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $280,000 - $340,000 4-56 Page 54 of 80 PROJECT: BIKEWAY IMPROVEMENTS: PHASE I & II TYPE: Roadway Infrastructure LOCATION: Palos Verdes Drive South/West DEPARTMENT: Public Works DESCRIPTION: The Vision Plan includes the provision of a continuous marked bikeway along Palos Verdes Drive West and Palos Verdes Drive South to enhance bike safety and provide greater separation between the roadway edge and cars on the roadway. Phase 1 would involve improvement of the following bikeway: PVE border to Narcissa. Phase 2 would involve improvement of the following bikeway: Schooner to San Pedro. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $5,000,000 to $8,000,000 4-57 Page 55 of 80 PROJECT: HESSE PARK/HAWTHORNE BLVD. TRAFFIC CIRCULATION & SAFETY IMPROVEMENT TYPE: Roadway Infrastructure LOCATION: Hesse Park DEPARTMENT: Public Works DESCRIPTION: With plans to improve Lower Hesse Park and current traffic concerns relating to access and vehicular circulation, actions are needed to improve left-turn access from Verde Ridge Road and Locklenna Lane onto Hawthorne Blvd. Additionally, pedestrian access across Hawthorne Blvd from Doverridge Drive to Hesse Park is a concern. Lastly, park parking and parking along Locklenna Lane is a concern to neighboring residents especially when the park improvements are realized. A study is currently being conducted to develop a preliminary plan to address the current issues. Once the park improvements are designed, a supplemental traffic study will be prepared to address specific demand generated by the park’s proposed uses. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $100,000 to $200,000 4-58 Page 56 of 80 PROJECT: OPERATIONAL IMPROVEMENTS- CRENSHAW BLVD. AND CREST DRIVE TYPE: Roadway Infrastructure LOCATION: Crenshaw Blvd. and Crest Drive DEPARTMENT: Public Works DESCRIPTION: Currently this intersection is a four-way stop controlled intersection. During the AM and PM peak hours, the westbound left-turn lanes back up for several hundreds of feet creating extensive delay and long vehicle queues. An operational improvement to the intersection is required to improve traffic flow. A study is being conducted to determine the best solution. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $270,000 - $320,000 4-59 Page 57 of 80 PROJECT: PALOS VERDES DRIVE EAST AT BRONCO DRIVE IMPROVEMENTS TYPE: Traffic Improvements LOCATION: PVDE @ Bronco Drive DEPARTMENT: Public Works DESCRIPTION: Improve portions of PVDE to provide wider travel lanes in each direction, a shared-use equestrian and pedestrian path located behind the existing guardrail, a high visibility marked equestrian crossing at Bronco Drive complete with flashing beacons, augmented crossing signage and advanced crossing signage with flashing beacons. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $205,000 TO $230,000 4-60 Page 58 of 80 PROJECT: LOWER POINT VICENTE PARK ACCESS MODIFICATION PROJECT TYPE: Traffic Improvements LOCATION: PVDW/PVDS at Lower Point Vicente Park entrance DEPARTMENT: Public Works DESCRIPTION: Improve access into and out of the Lower Point Vicente park area by modifying the existing drive entrance by removing the skewed approach and creating a 90-degree approach which improves visibility and safety. Project also includes signalizing the intersection and creating appropriate turn pockets, bus-stops, pedestrian crosswalks and trails. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $930,000 TO $1,100,000 4-61 Page 59 of 80 PROJECT: SWITCHBACKS TRAFFIC SAFETY IMPROVEMENTS TYPE: Roadway Infrastructure LOCATION: Palos Verdes Drive East DEPARTMENT: Public Works DESCRIPTION: This project plans to narrow the travel lanes and widen the roadway to provide bike lanes. This project would be completed in conjunction with the catch basin and guardrail improvements if possible. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $1,750,000 - $2,000,000 4-62 Page 60 of 80 PROJECT: PVDE MULTI-MODAL IMPROVEMENTS TYPE: Roadway Infrastructure LOCATION: PVDE (Various Locations) DEPARTMENT: Public Works DESCRIPTION: As part of the Palos Verdes Drive East Preliminary Study, the report concluded that implementation of four (4) priority projects will help achieve a multi-modal status. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET If all four priority projects (projects #6 through #9) were realized at the same time, the anticipated budget would range from $2,800,000 to $4,450,000. Staff anticipates seeking external funding to help offset the cost of project implementation. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: MAP 4-63 Page 61 of 80 PUBLIC UTILITIES UNFUNDED PROJECTS 4-64 Page 62 of 80 PROJECT: UTILITY UNDERGROUNDING AT 25TH STREET TYPE: Public Utilities LOCATION: 25th Street DEPARTMENT: Public Works DESCRIPTION: This project includes the removal of overhead wires and coordination of undergrounding all utilities at this location. The City will coordinate with the associated utility companies (electrical, communications, etc.) to locate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $1,000,000 to $1,100,000 4-65 Page 63 of 80 PROJECT: UTILITY UNDERGROUNDING AT PV DRIVE SOUTH AND TERRANEA WAY TYPE: Public Utilities LOCATION: PVDS and Terranea Way DEPARTMENT: Public Works DESCRIPTION: This project includes the removal of overhead wires and coordination of undergrounding all utilities at this location. The City will coordinate with the associated utility companies (electrical, communications, etc.) to locate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $150,000 to $200,000 4-66 Page 64 of 80 PROJECT: UTILITY UNDERGROUNDING AT FISHERMAN’S ACCESS TYPE: Public Utilities LOCATION: Palos Verdes Drive South (between Terranea and Coast Guard Property) DEPARTMENT: Public Works DESCRIPTION: This project includes the removal of overhead wires and coordination of undergrounding all utilities at this location. The City will coordinate with the associated utility companies (electrical, communications, etc.) to locate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $150,000 to $200,000 4-67 Page 65 of 80 PROJECT: UTILITY UNDERGROUNDING AT ENTRANCE TO PVIC TYPE: Public Utilities LOCATION: Palos Verdes Drive South (at PVIC) DEPARTMENT: Public Works DESCRIPTION: This project includes the removal of overhead wires and coordination of undergrounding all utilities at this location. The City will coordinate with the associated utility companies (electrical, communications, etc.) to locate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $150,000 to $200,000 4-68 Page 66 of 80 STORM DRAIN SYSTEM UNFUNDED PROJECTS 4-69 Page 67 of 80 PROJECT: SAN RAMON CANYON STABILIZATION PROJECT TYPE: Storm Drain System LOCATION: Project Area 3 DEPARTMENT: Public Works DESCRIPTION: This project will include a finalized bid package for soliciting bids, awarding a construction contract for the project, obtaining construction management and inspection services, construction of the drainage system, installation of riparian re-vegetation and other required mitigation and project close out. The project is expected to be completed within two years. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $19,000,000 TO $20,000,000 4-70 Page 68 of 80 PROJECT: ALTAMIRA CANYON TYPE: Storm Drain System LOCATION: Project Area 4 DEPARTMENT: Public Works DESCRIPTION: This project includes the installation of protective measures to minimize further erosion in the Altamira Canyon. This project could range from stabilization at bends in stream beds, with limited velocity controls, to channeled stabilization. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: This estimate does not include right of way costs. A previously designed and funded project was abandoned due to right of way issues and owners lack of support. COST ESTIMATE: $1,250,000 to $5,000,000 4-71 Page 69 of 80 PROJECT: PVDE- MIRALESTE CANYON TYPE: Storm Drain System LOCATION: Project Area 5 DEPARTMENT: Public Works DESCRIPTION: Work within this project area includes storm drainage systems along Palos Verdes Drive East at the Northern end of PVDE, South Coach, Rocking Horse, Clevis, North Colt, South Colt, Via Canada, and at South Via Canada. This project includes the installation of a number of pipelines and re-grading of roads and surface drainage systems to drain into Miraleste Canyon. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $2,500,000 to $3,200,000 4-72 Page 70 of 80 PROJECT: SAN PEDRO & AVERILL CANYONS TYPE: Storm Drain Systems LOCATION: Project Area 6 DEPARTMENT: Public Works DESCRIPTION: Work within this project area would include storm drainage systems at Miraleste, South Miraleste, North Corsine, Via Colinita, La Vista, Vista Mesa, and a curb and gutter project on Via Frascati. This project would include the installation of a number of pipelines and regarding of roads and surface drainage systems to drain into the San Pedro and Averill Canyons. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $2,700,000 to $3,300,000 4-73 Page 71 of 80 RECREATION, PARKS AND OPEN SPACE UNFUNDED PROJECTS 4-74 Page 72 of 80 PROJECT: GRANDVIEW/LOWER HESSE IMPROVEMENTS TYPE: Recreation, Parks, & Open Space LOCATION: Grandview Park & Lower Hesse Park DEPARTMENT: Public Works DESCRIPTION: This project would encompass the next phase of improvements at the park sites. Proposed improvements include upgrading the trail system, improved landscaping, a basketball court, tennis courts, a restroom and improved parking. All improvements would be in compliance with all ADA regulations. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: Council has directed staff to complete the environmental review process for the Pacific Plan. Cost Estimate for improvements is $2,400,000. 4-75 Page 73 of 80 PROJECT: TRAILHEAD/OVERLOOK/VISTA POINT DEVELOPMENT TYPE: Recreation, Parks, & Open Space LOCATION: DEPARTMENT: Public Works/Planning DESCRIPTION: The Vision Plan identifies the construction of major trailheads at key entrances to the existing City trail system. It is proposed that trailheads be located at widened areas near the start of trails, with a permeable surface pad made up of decomposed granite, gravel or bark mulch. Furnishings would include a bench, a plastic bag kiosk for dog owners, and trash and recycling receptacles. Signage will include a Trailhead sign or possibly a freestanding kiosk for trail notices. Small native trees for shade and pockets of native shrubs, where appropriate, are also envisioned at trailhead locations. Phase 1 would involve the development of the trail head location at Shoreline Park/25th Street. Phase 2 would involve the development of the following trail head locations: Cul-de-sac next to St. Paul’s Church, Del Cerro Park, and the end of Ocean Terrace. Phase 3 would involve the development of a trail head location at the Switchbacks/PVDE Turnout. The Vision Plan identifies the construction of overlooks and vista points either in the Preserve or on other public lands within the Vision Plan project area. It is proposed that overlooks/vista points be placed on decomposed granite, or other permeable material pad with flush stone edging. Furnishings at overlooks/vista points are to include a semicircle bench as well as a stone pilaster displaying any information, such as the name of any donor being recognized. A stone clad retaining wall, less than 3 feet in height, may also be incorporated into the overlook/vista point as necessary. Plant pockets of native shrubs are also envisioned. Phase 1 would involve the development of Inspiration Point and Eagles Nest overlooks/vista points. Phase 2 would involve the development of the following overlooks/vista points: Cul-de-sac next to St. Paul’s Church, Del Cerro Park and the end of Ocean Terrace. Phase 3 would involve the development of the following overlooks/vista points: Switchbacks/PVDE Turnout, Paintbrush Canyon/Burma Road, and Burma Road above Gateway Park. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET 4-76 Page 74 of 80 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $100,000 to $130,000 4-77 Page 75 of 80 PROJECT: PUMP TRAIL IMPLEMENTATION TYPE: Recreation, Parks, & Open Space LOCATION: Palos Verdes Nature Preserve DEPARTMENT: Planning/Public Works DESCRIPTION: In April 2008, the City Council adopted the Preserve Trails Plan (PTP) for the NCCP’s Palos Verdes Nature Preserve. The Council -adopted PTP identifies the trail routes and trail uses for the ten sub-areas that make-up the greater Preserve. It is proposed that the Preserve Trails Plan be implemented in phases through a series of projects for each of the nine sub-areas. (Portuguese Bend Reserve Trails has been separated as an individual project but is also part of the PTP) The sub-areas include: Vista del Norte Reserve, Agua Amarga Reserve, Alta Vicente Reserve, Vicente Bluffs Reserve, Abalone Cove Reserve, San Ramon Reserve, Forrestal Reserve and Three Sisters Reserve. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $820,000 to $1,100,000 4-78 Page 76 of 80 PROJECT: PORTUGUESE BEND RESERVE TRAILS TYPE: Recreation, Parks, & Open Space LOCATION: Portuguese Bend Reserve DEPARTMENT: Planning/Public Works DESCRIPTION: The Portuguese Bend Reserve consists of a 399-acre portion of the Peacock Flats parcel purchased by the City from Barry Hon in 2005 and the 17-acre Del Cerro Park buffer parcel. The following proposed trails will be improved: Fire Station Trail (RH Crossing), Rim Trail (relocate trail), Pine Grove Trail, North Sandbox Trail, Peacock Flats Trail and Overlook Trail (launch pad). As part of this project, the trailheads will be improved with the following: entry signs, benches, trash bins, mutt mitts, drinking fountain, parking and landscaping. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $600,000 to $740,000 4-79 Page 77 of 80 PROJECT: SUNNYSIDE TRAIL SEGMENT PROJECT TYPE: Recreation, Parks, & Open Space LOCATION: Sunnyside Ridge Road (Intersection of Sunnyside Ridge Trail and the Sol Vista Segment Trail) DEPARTMENT: Planning/Public Works DESCRIPTION: The Sunnyside Segment Trail is a point-to-point trail segment that begins on Sunnyside Ridge Road at the intersection of the Sunnyside Ridge Trail and the currently unused Sol Vista Segment Trail on the old Narbonne Right-of-Way, as indicated in the City’s Conceptual Trail Plan. The proposal is to provide a usable trail linkage for pedestrians and equestrians within a recorded trail segment that traverses a privately owned lot that is currently developed with a single-family residence that was formally part of an old City right-of-way. The trail connection would involve the provision of a 5-foot wide decomposed granite surface trail. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $400,000 to $450,000 4-80 Page 78 of 80 PROJECT: SALVATION ARMY TRAIL SEGMENT TYPE: Recreation, Parks, & Open Space LOCATION: PVDS (between Upper Point Vicente and Tramonto Residential Development) DEPARTMENT: Planning/Public Works DESCRIPTION: The CTP calls for a multi-purpose trail along the north side of PVDS on the Salvation Army property, between the City’s Upper Pt. Vicente property and the Tramonto residential development (approximately 2,000 feet). The City and the Salvation Army are currently in discussions regarding the Salvation Army’s potential offer to donate the necessary trail easement on their property to allow for this important trail connection. If the trail easement is dedicated, the City will need to construct the actual trail within the easement. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $120,000 to $150,000 4-81 Page 79 of 80 PROJECT: BATHROOM AT DEL CERRO PARK TYPE: Recreation, Parks, & Open Space LOCATION: Del Cerro Park DEPARTMENT: Recreation and Parks DESCRIPTION: This project would include the construction of a bathroom at Del Cerro park to serve the park visitors and the users of the trails in the Portuguese Bend Open Space. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: COST ESTIMATE: $250,000 - $300,000 4-82 Page 80 of 80 PROJECT: HESSE PARK PARKING LOT RESURFACING TYPE: Recreation, Parks and Open Space LOCATION: Hesse Park DEPARTMENT: Public works DESCRIPTION: Hesse Park parking lot is one of the most frequently used City facilities. The pavement at this parking lot is deteriorated and needs resurfacing. Delaying this improvement will add to the cost of work due to the extension of cracks’ depth, requiring a more comprehensive fix. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY X SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: COST ESTIMATE $200,000 4-83