RPVCCA_CC_SR_2012_03_20_02C_FY2012-13_Budget_Meeting_12
C
-
1
2
C
-
2
FISCAL YEAR 2012-13 BUDGET MEETING 1
March 20,2012
Page 3 of 6
Generation,Current Service Levels,and Discretionary;
~Page references to the full budget document;
~The percentage of total General Fund expenditures;and
~Initial program metrics.
An Excel worksheet electronic file with General Fund Expenditures has been emailed to
City Council separately.
The list of current vendor contracts funded with General Fund money,as provided on
January 31 st,has been included for reference purposes (Attachment B).This information
will be useful for the City Council to take a targeted approach,and direct Staff to focus
analysis on certain expenditure activities for the 2012 process.
Employee Compensation Information
Rancho Palos Verdes continues to have low employee compensation costs when
compared with other cities.
Carson
Rolling Hills
Palos Verdes Estates
Rolling Hills Estates
Lomita
Lawndale
Rancho Palos Verdes
Employee Compensation Budget
as a percentage of Citywide Budget
54°Jb
36°Jb
34%
320/0
25°Jb
25°Jb
12%
Population Served per Full-Time Employee
..----~~~~-
2C-3
FISCAL YEAR 2012-13 BUDGET MEETING 1
March 20,2012
Page 4 of 6
Employee Compensation Per Capita..---------~-----
Following is a 1O-year history of employee salary and bonus costs at the City of Rancho
Palos Verdes.
Actual 0/0 of Total Salary Bonus
Budgeted Actual vs.Budget City Increase Pool
Salaries Salaries Ratio Expenditures Pool (one-time cash)
FY02-03 2,933,680 2,455,521 84%14%5.10 %39,160
FY03-04 3,041,131 2,529,310 83%14%3.90%27,000
FY04-05 3,157,031 3,099,319 98%150/0 3.90%28,000
FY05-06 3,704,600 3,442,920
93%160/0 7.00%49,000
FY06-07 4,083,930 3,752,537 92 %16 %7.00 %52,900
FY07-08 4,366,407 4,100,249 94 %18%7.00%70,280
FY08-09 5,151,309 4,913,854 950/0 19%6.50%75,200
FY09-10 5,182,331 5,213,649 101%170/0 3.50 %79,911
FY10-11 5,581,440 5,544,400
99%22 %3.50 %81,100
FY11-12 5,720,090 N/A N/A 12 %4.60 %114,300
The FY12-13 draft budget per the two-year document currently includes a provision for a
Cost of Living Allowance (COLA,estimated 3%salary increase that will be based on the
increase in the Consumer Price Index for the 12 months ended March 2012 for Los
Angeles/Riverside/Orange counties).The FY12-13 draft budget also includes an average
2%merit salary increase (tied to annual employee evaluations),and a $119,700 bonus
pool (one-time cash payments based on the City Council approved results of the 2012-13
Employee Incentive Program).
Capital Improvement Plan
A Capital Improvement Plan (CIP)is a guide for the efficient and effective provision of
resources for improving and maintaining public infrastructure and facilities.Programming
capital facilities and improvements over time can promote better use of the City's limited
financial resources,reduce costs and assist in the coordination of public and private
development.Based on the guidelines of the framework and those set forth by the City
Council,Staff developed an inventory of capital projects.This inventory was compiled
2C-4
2
C
-
5
2
C
-
6
2
C
-
7
2
C
-
8
2
C
-
9
2
C
-
1
0
2
C
-
1
1
2
C
-
1
2
2
C
-
1
3
2
C
-
1
4
2
C
-
1
5
2
C
-
1
6
2
C
-
1
7
2
C
-
1
8
2
C
-
1
9
2
C
-
2
0
2
C
-
2
1
2
C
-
2
2
2
C
-
2
3
2
C
-
2
4
2
C
-
2
5
2
C
-
2
6
2
C
-
2
7
2
C
-
2
8
2
C
-
2
9
2
C
-
3
0
2
C
-
3
1
2
C
-
3
2
2
C
-
3
3
2
C
-
3
4
2
C
-
3
5
2
C
-
3
6
2
C
-
3
7
2
C
-
3
8
2
C
-
3
9
2
C
-
4
0
2
C
-
4
1
2
C
-
4
2
2
C
-
4
3
Attachment C
2011
Five-Year Capital Improvement Plan
March 20, 2012 Update
2C-44
TABLE OF CONTENTS
INTRODUCTION 3
FUNDED PROJECTS...………………………………………………………… 11
BUILDINGS AND OTHER FACILITY IMPROVEMENTS 12
INTANGIBLE CAPITAL OUTLAY 15
ROADWAY INFRASTRUCTURE 20
PUBLIC UTILITIES 31
STORM DRAIN SYSTEM 32
RECREATION, PARKS & OPEN SPACE 41
UNFUNDED PROJECTS…………………………………………………..……49
BUILDINGS AND OTHER FACILITY IMPROVEMENTS 50
INTANGIBLE CAPITAL OUTLAY 60
ROADWAY INFRASTRUCTURE 61
PUBLIC UTILITIES 72
STORM DRAIN SYSTEM 77
RECREATION, PARKS & OPEN SPACE 82
Page 2 of 90 2C-45
INTRODUCTION
A Capital Improvement Plan (CIP) is a guide toward the efficient and effective provision of public
infrastructure and facilities. Programming capital facilities and improvements over time can
promote better use of the City’s limited financial resources, reduce costs and assist in the
coordination of public and private development. In addition, the planning process is valuable as a
means of coordinating and taking advantage of joint planning and development of facilities and
infrastructure where possible. Careful management of these assets keeps the City poised for
flexible and responsive strategic planning that allows the City to proactively prepare the
groundwork for capital projects so when funding opportunities arise, a plan is ready to be
implemented. By looking beyond year-to-year budgeting and projecting what, where, when and
how capital investments should be made, capital planning enables public organizations to
maintain an effective level of service for the present and future population.
THE CAPITAL IMPROVEMENT PLAN (CIP)
The result of this continuing planning process is the CIP, which is the City’s five-year roadmap for
creating, maintaining, and funding present and future infrastructure requirements. The CIP
addresses the City’s needs relating to the acquisition, expansion, and rehabilitation of long-lived
facilities and infrastructure. The CIP serves as a planning instrument in conjunction with the
City’s General Plan and the City Council’s Tactical Goals to identify needed capital projects and
coordinate the financing and timing of improvements in a way that maximizes the return to the
public. It provides a planned systematic approach to utilizing the City’s financial resources in the
most responsive and efficient manner to meet its service and facility needs. It serves as the
“blueprint” for the future of the community and is a management and planning tool, rather than a
binding document.
The underlying strategy of the CIP is to plan for necessary land acquisition, construction and
maintenance of public facilities necessary for the safe and efficient provision of public services in
accordance with City policies and objectives adopted in the City’s General Plan. A critical
element of a balanced CIP is the provision of funds to both preserve or enhance existing facilities
and provide new assets to respond to changing service needs and community growth. While the
program serves as the long range plan, it is reviewed and revised bi-annually in conjunction with
the budget. Priorities may be changed due to funding opportunities or circumstances that cause
a more rapid deterioration of an asset. Projects may be revised for significant costing variances.
The CIP is primarily a planning document to assist in the City’s long-term planning. As such, the
projects and their scopes are subject to change from year to year as the needs of the community
become more defined and projects move closer to final implementation. The adoption of the CIP
is neither a commitment to a particular project nor a limitation to a particular cost. As a basic tool
for scheduling anticipated capital projects, it is also a key element in planning and controlling
future capital financing. For this reason, the CIP includes some “unfunded” projects in which
needs have been identified, but specific solutions and funding have not been determined.
When adopted, the CIP provides the framework for the City’s management team and the City
Council with respect to investment planning, project planning and managing any debt. This
document is independent of the City Council’s tactical goals and is intended to serve as a long-
term planning document.
THE CIP PROCESS
The capital plan and budget is the result of an ongoing infrastructure planning process.
Infrastructure planning decisions must be made with regard to both existing and new facilities and
equipment. For existing facilities, the planning process addresses appropriate capital renewal
strategies and repair-versus-replacement of facilities. New service demands are also considered
since they often affect capital facility requirements. Planning for the five-year CIP period and
subsequent five years, includes linking the General Plan to the capital plan requirements,
conducting needs assessments and allowing for flexibility to take advantage of opportunities for
Page 3 of 90 2C-46
capital investment. The FY11-12 through FY15-16 CIP is developed through input by
professional staff, citizens of Rancho Palos Verdes, and elected or appointed City officials.
CIP REVIEW TEAM
A CIP Review team is responsible for annually reviewing capital project requests and providing
recommendations to the City Manager. This team is comprised of staff from the Office of the City
Manager, Finance and Information Technology, Public Works, Community Development, and
Recreation and Parks departments, and the City Attorney. This team conducts an in-depth
analysis of the impact of the CIP on cash flow and financial obligations, as well as the City’s
ability to finance, process, design, and ultimately maintain projects. The team will also analyze
the fiscal impact for each individual project; including future maintenance and replacement costs,
associated monetary benefits (e.g. future maintenance savings), as well as any applicable future
revenue opportunities. The team meets periodically throughout the year to evaluate the progress
of projects, and examine future needs of the City.
The overall goal of the CIP Review Team is to develop CIP recommendations that:
Preserve the past, by investing in the continued upgrade of City assets and infrastructure;
Protect the present with improvements to City facilities and infrastructure;
Plan for the future.
Projects are identified by staff, professional consultants, residents or elected officials. There are
typically more proposals than can be funded in the five-year CIP period, so the team conducts an
internal project ranking process. The criteria used in this internal ranking includes, but is not
limited to, safety, support of essential City services, support of City’s goals, economy and
efficiency, outside funding committed or eligible, and community quality/sustainability. Projects
are prioritized and scored based on the criteria outlined in this plan in the following section. If a
project receives a lower ranking, there is no reason to believe that any damages will occur if the
project has not been completed. While ratings are important in determining recommended
projects, the realities of the City’s financial situation are critical to all decisions.
CIP CRITERIA
Safety: Enhance or improve the overall safety of the City and delivery of services. Protect the
health and welfare of residents.
Supports Essential City Services: Maintenance and development of existing or new facilities and
infrastructure which allows the City to deliver essential services to residents of Rancho Palos
Verdes.
Supports City Goals: Supports the goals annually established by the City Council in the Tactical
Plan. Meets citywide long-term goals and is in compliance with the City’s General Plan.
Economy and Efficiency: Maintain and enhance the economy and efficiency of providing services
in Rancho Palos Verdes. This criterion would include projects which improve business processes
and overall efficiency while also evaluating environmental impacts.
Outside Funding Committed or Eligible: Support a project which outside funding has been
committed to or may be obtained through restricted revenue sources.
Community Quality/Sustainability: Maintain and enhance the infrastructure and services which
supports our residential and business community. This criterion would include projects which
preserve and enhance the overall quality of life in Rancho Palos Verdes and projects which
ensure economic viability to support a sustainable community.
Page 4 of 90 2C-47
CATEGORIES
Category 1: The project is urgent and/or mandated, and must be completed quickly. The City
could face severe consequences if the project is delayed, possibly impacting the health, safety, or
welfare of the community, or having a significant impact on the financial wellbeing of the City.
The project must be initiated or financial/opportunity losses will result.
Category 2: The project is important and addressing it is necessary. The project impacts safety,
law enforcement, health, welfare, economic base, and/or quality of life in the community.
Category 3: The project would enhance the quality of life and would provide a benefit to the
community. Completion of the project would improve the community providing cultural,
recreational, and/or aesthetic effects.
Category 4: The project would be an improvement to the community, but need not be completed
within a five-year CIP.
THE CIP CALENDAR
August-October Departments prepare CIP requests
November- January CIP Team reviews requests
February Recommendations developed to be included in the Five-Year
Model and Two-Year Budget
May Planning Commission Review
May Recommendations presented to the City Council for approval
Additional forms and methods of public outreach will be conducted as directed by the City
Council.
PROJECT LISTS
The CIP includes a comprehensive listing of all projects contained in the Five-Year CIP and also
projects beyond the Five-Year Period. Detailed project sheets are contained in the plan for all
projects included in the CIP. Another list of unfunded projects is also contained in the plan to
highlight the City’s needs beyond the five year period. Projects which are included in the CIP
were evaluated based on the criteria approved by the City Council and are in compliance with the
goals set forth in the City’s General Plan. Application of these criteria ensures that each project
recommended for Council consideration does indeed support the policy objectives of the City’s
long-term planning documents and identifies a basis for scheduling and allocation of resources.
Cost estimates have been developed for each project based on preliminary project descriptions,
and include all estimated costs for land acquisition, permits and inspections, project management
and project engineering, consultant design, construction, utilities, information technology
infrastructure and other associated project fees. Estimates are in today’s dollars.
CAPITAL IMPROVEMENT POLICIES
Time Period
The Finance and Information Technology Department, in cooperation with all other City
Departments and the City Attorney, shall produce a working document designed to identify capital
needs bi-annually in conjunction with the budget process. This Five-Year Capital Improvement
Plan (CIP) is submitted to the City Council to utilize in reviewing and prioritizing capital projects.
Page 5 of 90 2C-48
Type of Project
Definition of a capital asset: An asset with a cost in excess of $5,000 and an expected useful life
of more than one year, such as automobiles, equipment, and furniture. These items will continue
to be included in the operating budget. Items such as automobiles, minor equipment, and
furniture will continue to be accounted for and funded using the Equipment Replacement Fund
and are not included in the capital improvement plan.
Definition of a capital project: A project expected to have a useful life greater than ten years and
an estimated cost of $100,000 or more. Capital projects include the construction, acquisition, or
major renovation of buildings, utility systems, or other structures, purchase of land, and major
landscaping projects.
Projects meeting the above definition will be included in the CIP document in addition to the City’s
two-year budget document. The information will be tied to the capital budget and totals for each
project in the CIP will be included in the capital budget.
Selecting the Projects for the CIP
The comprehensive capital project planning process has the following essential components:
The General Plan (Long-term Plan- 10 Years)
The Capital Improvement Plan (Mid-term Plan- 5 Years)
The Capital Budget (Short-term Plan- 1 Year)
City Council Tactical Plan (Long-term and Short-term- evaluated each year)
All projects selected for the CIP should be consistent with the goals identified in the City Council
Tactical Plan or as outlined in the City’s General Plan. The project selection process strives to
achieve a balanced plan for the community to include all necessary and high priority projects,
while also enhancing City services and facilities.
Operating Budget Impact Identified in the CIP
The operating impact of proposed capital projects, including personnel, operating expenditures,
capital outlay, and debt service, as applicable, will be identified in the CIP document and
considered in preparing the annual operating budget and Five-Year Financial Model.
Moving Projects from the CIP to the Capital Budget
All projects approved in the annual capital budget are appropriated at the estimated cost to
complete the project. At the end of each fiscal year, the remaining appropriation for uncompleted
portions of the project will be carried forward to subsequent fiscal years.
Staff will identify the estimated costs, potential funding sources, operating impact, and project
schedule for each capital project proposal before it is submitted to the City Council.
Staff will coordinate development of the capital improvement budget with the development of the
operating budget. All costs for internal professional services needed to implement the CIP will be
included in the capital budget as part of the two-year budget document for the years the CIP is to
be implemented.
Cost tracking for components of the capital improvement program will be updated semi-annually
to ensure project completion against budget and established time lines.
Definition of Capital Budget Year
A capital budget year runs concurrent to the operating budget fiscal year beginning July 1st and
ending June 30th.
Types of Financing
The nature and cost of the project generally determine financing options as do projected revenue
resources. The following financing instruments could be used in the following preferred order:
Page 6 of 90 2C-49
Outside funding that does not require repayment, including grants, federal, state and
county restricted funding (i.e. transportation funding), and donations
Developer Fees
City restricted revenue imposed by voters (i.e. environmental excise tax, storm drain user
fee)
Accumulated Fund Balances in Restricted Funds
General Fund
Debt secured by a Restricted Revenue Source
General Obligation Debt.
Remaining Balances
It is the City’s policy to apply restricted funding sources after a project is completed and final cost
is identified, or at the close of each fiscal year, whichever occurs first.
Evaluation of Capital Projects
Capital project and program reviews are to monitor existing project performance and to update
the five year CIP. Each project must be actively managed and semi-annual reports on the
physical and fiscal status of each project should be made available to the City Council in
conjunction with the budget adoption and Mid-Year Review.
Green Building Standards
As a way to create a more sustainable way of life, the City of Rancho Palos Verdes requires the
incorporation of green building principles and practices into the design, construction, and
operation of all City facilities, and to evaluate all land purchases for future development on the
basis of reducing environmental impacts whenever feasible.
Standards for Maintenance
It is important to have standards in place for the various infrastructure systems throughout the
City to maintain this investment and be positioned to provide adequate services for the residents
of Rancho Palos Verdes. Staff will develop maintenance standards and schedules as
appropriate.
Contingency Policy
The need for contingencies will be evaluated with each project and be included in the CIP on a
case-by-case basis.
Project Change Orders
Project change orders will be made in accordance with the policy stated in Section 02.44.25 of
the Municipal Code. This policy requires that specific purchasing procedures be followed and
City Council approval obtained for any amount over twenty-five thousand dollars.
GENERAL PLAN GOALS
The goals stated below are included in the City’s General Plan which serves as the City’s long-
term strategic planning tool. The General Plan is currently undergoing its first update since its
adoption. The Director of Community Development has advised the CIP Team that none of the
proposed revisions that have been under consideration will significantly impact the draft CIP
Framework. Staff has elected to refer to the current General Plan in the conjunction with the
development of the CIP Framework. All CIP projects should contribute to fulfilling one or more of
the goals listed below to create a balanced, sustainable community.
Natural Environment Element
It is the goal of the City of Rancho Palos Verdes to conserve, protect, and enhance its
natural resources, beauty, and open space for the benefit and enjoyment of its residents
and the residents of the entire region. Future development shall recognize the sensitivity
of the natural environmental and be accomplished in such a manner as to maximize the
protection of it.
Page 7 of 90 2C-50
Socio/Cultural Element
The City shall strive to protect and preserve all significant archaeological, paleontological
and historical resources within the City.
Cultural Resources
The City shall strive to protect and preserve all significant archaeological, paleontological
and historical resources with in the City.
Current Social, Service, and Cultural Organizations
Work toward a coordinated program to aid in matching the facility needs of the many and
diverse groups in the community with existing and future facility resources throughout the
City.
Social Services
Encourage programs for community involvement, participation, and action to minimize
the sense of isolation and powerlessness felt by many individuals in the community.
Encourage programs for recreation, social services, and cultural and educational
achievement.
Encourage a framework for interaction among the four cities of the peninsula and
between the peninsula and its surrounding communities to solve common problems.
Urban Environment Element
It is the goal of the City to carefully control and direct future growth towards making a
positive contribution to all elements of the community. Growth in Rancho Palos Verdes
should be a cautious, evolutionary process that follows a well-conceived set of general
guidelines which respond to both holding capacity limitations for the region and
environmental factors on the peninsula.
Activity Areas
It is the goal of the City of Rancho Palos Verdes to preserve and enhance the
community's quality living environment; to enhance the visual character and physical
quality of existing neighborhoods; and to encourage the development of housing in a
manner which adequately serves the needs of all present and future residents of the
community.
The City shall discourage industrial and major commercial activities due to the terrain and
environmental characteristics of the City. Commercial development shall be carefully and
strictly controlled, and limited to consideration of convenience or neighborhood service
facilities.
The City shall encourage the development of institutional facilities to serve the political,
social, and cultural needs of its citizens.
The City shall endeavor to provide, develop, and maintain recreational facilities and
programs of various types to provide a variety of activities for persons of all age groups
and in all areas of the community.
Agricultural uses within the City shall be encouraged, since they are desirable for
resource management and open space.
Infrastructure
It shall be a goal of the City to ensure adequate public utilities and communications
services to al residents, while maintaining the quality of the environment.
Page 8 of 90 2C-51
It shall be a goal of the City to provide residents with a safe and efficient system of roads,
trails and paths.
It shall be a goal of the City to encourage the increased mobility of residents through the
development of an adequate public transportation system.
Safety
It shall be a goal of the City to provide for the protection of life and property from both
natural and man-made hazards within the community.
It shall be a goal of the City to provide for the protection of the public through effective
law enforcement and fire protection programs.
It shall be a goal of the City to develop and enforce health and sanitation, emergency
communications, and disaster preparedness programs to ensure the overall health and
safety of all residents.
It shall be a goal of the City to protect life and property and reduce adverse economic,
environmental, and social impacts resulting from any geologic activity.
Sensory Environment
It shall be the goal of the City of Rancho Palos Verdes through proper land use planning
and regulations, to provide for a quiet and serene residential community with a minimum
of restriction on citizen activity.
Palos Verdes peninsula is graced with views and vistas of the surrounding Los Angeles
basin and coastal region. Because of its unique geographic form and coastal resources,
these views and vistas are a significant resource to residents and to many visitors, as
they provide a rare means of experiencing the beauty of the peninsula and the Los
Angeles region. It is the responsibility of the City to preserve these views and vistas fro
the public benefit and, where appropriate, the City should strive to enhance and restore
these resources, the visual character of the City, and provide and maintain access for the
benefit and enjoyment of the public.
Land Use Plan
It is the goal of the City of Rancho Palos Verdes to provide for land uses which will be
sensitive to and enhance the natural environment and character of the community, supply
appropriate facilities to serve residents and visitors, promote a range of housing types,
promote fiscal balance, and protect the general health, safety, and welfare of the
community.
Fiscal Element
It shall be a goal of the City to hold the property tax to a minimum and to continually
explore and analyze the advantages and disadvantages of alternate or new sources of
revenue.
It shall be a goal of the City to explore cooperative financing strategies that might be
undertaken in association with other jurisdictions.
It shall be a goal of the City to take maximum advantage of regulatory legislation to obtain
contributions, dedications and reservations (i.e., easements).
It shall be a goal of the City to ascertain that all revenues generated by growth are
sufficient to cover costs related to growth.
It shall be a goal of the City to thoroughly evaluate capital acquisition and operating
expenditures and their impacts before implementation of programs.
Page 9 of 90 2C-52
(THIS PAGE IS BLANK)
Page 10 of 90 2C-53
Ra
n
c
h
o
P
a
l
o
s
V
e
r
d
e
s
F
i
v
e
Y
e
a
r
C
a
p
i
t
a
l
I
m
p
r
o
v
e
m
e
n
t
P
l
a
n
Up
d
a
t
e
d
3
/
6
/
1
2
Pr
o
j
e
c
t
FY
1
1
-
1
2
*
F
Y
1
2
-
1
3
F
Y
1
3
-
1
4
F
Y
1
4
-
1
5
F
Y
1
5
-
1
6
Id
e
n
t
i
f
i
e
d
F
u
n
d
i
n
g
S
o
u
r
c
e
Bu
i
l
d
i
n
g
s
a
n
d
O
t
h
e
r
F
a
c
i
l
i
t
y
I
m
p
r
o
v
e
m
e
n
t
s
He
s
s
e
P
a
r
k
D
r
o
p
C
e
i
l
i
n
g
R
e
t
r
o
f
i
t
/
R
e
p
l
a
c
e
m
e
n
t
15
2
,
5
0
0
$
Bu
i
l
d
i
n
g
R
e
p
l
a
c
e
m
e
n
t
F
u
n
d
Ci
t
y
w
i
d
e
A
D
A
S
e
l
f
E
v
a
l
u
a
t
i
o
n
a
n
d
T
r
a
n
s
i
t
i
o
n
P
l
a
n
40
0
,
0
0
0
$
40
0
,
0
0
0
$
40
0
,
0
0
0
$
40
0
,
0
0
0
$
C
I
P
R
e
s
e
r
v
e
In
t
a
n
g
i
b
l
e
C
a
p
i
t
a
l
O
u
t
l
a
y
St
o
r
m
D
r
a
i
n
M
a
s
t
e
r
P
l
a
n
U
p
d
a
t
e
69
7
,
7
8
9
$
30
,
0
0
0
$
30
,
0
0
0
$
30
,
0
0
0
$
30
,
0
0
0
$
W
Q
F
P
U
s
e
r
F
e
e
s
Pa
v
e
m
e
n
t
M
a
n
a
g
e
m
e
n
t
P
r
o
g
r
a
m
U
p
d
a
t
e
12
0
,
0
0
0
$
12
0
,
0
0
0
$
Ge
n
e
r
a
l
F
u
n
d
La
d
e
r
a
L
i
n
d
a
S
i
t
e
M
a
s
t
e
r
P
l
a
n
n
i
n
g
&
C
o
m
m
u
n
i
t
y
O
u
t
r
e
a
c
h
10
0
,
0
0
0
$
Ge
n
e
r
a
l
F
u
n
d
Ro
a
d
w
a
y
I
n
f
r
a
s
t
r
u
c
t
u
r
e
Re
s
i
d
e
n
t
i
a
l
O
v
e
r
l
a
y
a
n
d
S
l
u
r
r
y
S
e
a
l
Z
o
n
e
5
1,
5
2
0
,
0
0
0
$
Ge
n
e
r
a
l
F
u
n
d
Re
s
i
d
e
n
t
i
a
l
O
v
e
r
l
a
y
a
n
d
S
l
u
r
r
y
S
e
a
l
Z
o
n
e
3
1,
6
0
0
,
0
0
0
$
Ge
n
e
r
a
l
F
u
n
d
,
T
D
A
A
r
t
i
c
l
e
3
f
o
r
$
2
5
,
0
0
0
Re
s
i
d
e
n
t
i
a
l
O
v
e
r
l
a
y
a
n
d
S
l
u
r
r
y
S
e
a
l
Z
o
n
e
1
1,
6
0
0
,
0
0
0
$
Ge
n
e
r
a
l
F
u
n
d
,
T
D
A
A
r
t
i
c
l
e
3
f
o
r
$
2
5
,
0
0
0
Re
s
i
d
e
n
t
i
a
l
O
v
e
r
l
a
y
a
n
d
S
l
u
r
r
y
S
e
a
l
Z
o
n
e
2
1,
6
0
0
,
0
0
0
$
Ge
n
e
r
a
l
F
u
n
d
,
T
D
A
A
r
t
i
c
l
e
3
f
o
r
$
2
5
,
0
0
0
Re
s
i
d
e
n
t
i
a
l
O
v
e
r
l
a
y
a
n
d
S
l
u
r
r
y
S
e
a
l
Z
o
n
e
9
1,
5
0
0
,
0
0
0
$
Ge
n
e
r
a
l
F
u
n
d
,
T
D
A
A
r
t
i
c
l
e
3
f
o
r
$
2
5
,
0
0
0
Re
s
i
d
e
n
t
i
a
l
O
v
e
r
l
a
y
a
n
d
S
l
u
r
r
y
S
e
a
l
Z
o
n
e
7
1,
5
0
0
,
0
0
0
$
Ge
n
e
r
a
l
F
u
n
d
,
T
D
A
A
r
t
i
c
l
e
3
f
o
r
$
2
5
,
0
0
0
PV
D
S
/
P
V
D
W
A
r
t
e
r
i
a
l
I
m
p
r
o
v
e
m
e
n
t
s
2,
3
4
9
,
9
4
9
$
Pr
o
p
1
B
/
M
e
a
s
u
r
e
R
/
P
r
o
p
C
/
G
r
a
n
t
/
C
I
P
f
u
n
d
b
a
l
Ar
t
e
r
i
a
l
O
v
e
r
l
a
y
a
n
d
S
l
u
r
r
y
S
e
a
l
P
V
D
E
(
M
i
r
a
l
e
s
t
e
t
o
N
o
r
t
h
C
i
t
y
L
i
m
i
t
s
)
2,
3
8
0
,
0
0
0
$
Pr
o
p
C
,
S
T
P
L
,
M
e
a
s
u
r
e
R
,
G
e
n
e
r
a
l
F
u
n
d
PV
D
W
/
P
V
D
S
M
e
d
i
a
n
I
m
p
r
o
v
e
m
e
n
t
s
50
0
,
5
0
0
$
Be
a
u
t
i
f
i
c
a
t
i
o
n
F
u
n
d
Ha
w
t
h
o
r
n
e
B
l
v
d
.
M
e
d
i
a
n
I
m
p
r
o
v
e
m
e
n
t
s
(
V
i
a
R
i
v
e
r
a
t
o
C
i
t
y
H
a
l
l
)
25
0
,
0
0
0
$
Be
a
u
t
i
f
i
c
a
t
i
o
n
F
u
n
d
Ha
w
t
h
o
r
n
e
B
l
v
d
.
M
e
d
i
a
n
I
m
p
r
o
v
e
m
e
n
t
s
(
C
i
t
y
H
a
l
l
t
o
V
a
l
l
o
n
)
25
0
,
0
0
0
$
B
e
a
u
t
i
f
i
c
a
t
i
o
n
F
u
n
d
Ha
w
t
h
o
r
n
e
B
l
v
d
.
T
r
a
f
f
i
c
S
i
g
n
a
l
S
y
n
c
h
r
o
n
i
z
a
t
i
o
n
78
5
,
5
3
2
$
HS
I
P
G
r
a
n
t
/
1
0
%
C
I
P
a
c
c
u
m
u
l
a
t
e
d
b
a
l
a
n
c
e
Ha
w
t
h
o
r
n
e
B
l
v
d
.
P
e
d
e
s
t
r
i
a
n
I
m
p
r
o
v
e
m
e
n
t
s
1,
4
2
2
,
5
8
1
$
80
%
H
S
I
P
G
r
a
n
t
/
C
I
P
&
S
t
r
e
e
t
M
n
t
f
u
n
d
b
a
l
a
n
c
e
PV
D
S
B
i
k
e
w
a
y
S
a
f
e
t
y
79
4
,
2
4
5
$
80
%
T
I
P
G
r
a
n
t
/
C
I
P
f
u
n
d
b
a
l
a
n
c
e
Cr
e
s
t
r
i
d
g
e
/
C
r
e
n
s
h
a
w
T
r
a
f
f
i
c
S
i
g
n
a
l
24
2
,
0
8
2
$
88
%
H
S
I
P
G
r
a
n
t
/
C
I
P
f
u
n
d
b
a
l
a
n
c
e
PV
D
E
T
r
a
f
f
i
c
S
a
f
e
t
y
I
m
p
r
o
v
e
m
e
n
t
s
(
G
u
a
r
d
r
a
i
l
s
)
27
3
,
1
1
4
$
92
%
H
S
I
P
G
r
a
n
t
/
C
I
P
f
u
n
d
b
a
l
a
n
c
e
Pu
b
l
i
c
U
t
i
l
i
t
i
e
s
PV
D
E
S
e
w
e
r
L
i
n
e
R
e
l
o
c
a
t
i
o
n
11
4
,
4
5
0
$
Ge
n
e
r
a
l
F
u
n
d
St
o
r
m
D
r
a
i
n
S
y
s
t
e
m
St
o
r
m
D
r
a
i
n
L
i
n
i
n
g
1,
1
4
6
,
6
9
8
$
32
4
,
6
4
2
$
32
9
,
8
8
1
$
33
5
,
2
7
8
$
34
0
,
8
3
6
$
W
Q
F
P
U
s
e
r
F
e
e
s
PV
D
E
S
a
n
P
e
d
r
o
C
a
n
y
o
n
B
a
c
k
b
o
n
e
S
y
s
t
e
m
57
0
,
0
0
0
$
WQ
F
P
U
s
e
r
F
e
e
s
Ro
a
n
S
y
s
t
e
m
(
V
i
a
C
o
l
i
n
i
t
a
V
i
c
k
e
r
y
C
a
n
y
o
n
)
24
2
,
5
0
0
$
W
Q
F
P
U
s
e
r
F
e
e
s
PV
D
E
L
o
w
e
r
S
w
i
t
c
h
b
a
c
k
s
48
5
,
0
0
0
$
WQ
F
P
U
s
e
r
F
e
e
s
PV
D
S
(
N
o
r
t
h
o
f
B
a
r
k
e
n
t
i
n
e
)
44
6
,
0
0
0
$
WQ
F
P
U
s
e
r
F
e
e
s
So
u
t
h
H
a
w
t
h
o
r
n
e
/
V
i
a
F
r
a
s
c
a
t
i
44
0
,
0
0
0
$
W
Q
F
P
U
s
e
r
F
e
e
s
Vi
a
C
a
n
a
d
a
10
0
,
0
0
0
$
W
Q
F
P
U
s
e
r
F
e
e
s
Lo
w
e
r
S
a
n
R
a
m
o
n
C
a
n
y
o
n
D
e
s
i
g
n
86
7
,
5
7
5
$
W
Q
F
P
U
s
e
r
F
e
e
s
Re
c
r
e
a
t
i
o
n
,
P
a
r
k
s
,
a
n
d
O
p
e
n
S
p
a
c
e
Gr
a
n
d
v
i
e
w
P
a
r
k
&
L
o
w
e
r
H
e
s
s
e
P
a
r
k
D
e
v
e
l
o
p
m
e
n
t
1,
9
9
0
,
8
3
6
$
2,
4
0
0
,
0
0
0
$
Ge
n
e
r
a
l
F
u
n
d
/
C
I
P
R
e
s
e
r
v
e
f
o
r
f
u
t
u
r
e
p
r
o
j
e
c
t
s
Ry
a
n
P
a
r
k
S
o
u
t
h
e
r
n
E
n
t
r
a
n
c
e
R
o
a
d
20
,
0
0
0
$
22
0
,
0
0
0
$
CI
P
a
c
c
u
m
u
l
a
t
e
d
b
a
l
a
n
c
e
/
G
e
n
e
r
a
l
F
u
n
d
Ca
l
i
f
o
r
n
i
a
C
o
a
s
t
a
l
T
r
a
i
l
28
0
,
0
0
0
$
28
0
,
0
0
0
$
Gr
a
n
t
/
1
2
%
M
a
t
c
h
f
r
o
m
C
I
P
a
c
c
u
m
u
l
a
t
e
d
b
a
l
a
n
c
e
Ga
t
e
w
a
y
P
a
r
k
D
e
v
e
l
o
p
m
e
n
t
P
r
o
j
e
c
t
:
P
h
a
s
e
I
a
n
d
I
I
20
0
,
0
0
0
$
27
5
,
0
0
0
$
Gr
a
n
t
/
C
i
t
y
2
0
%
M
a
t
c
h
f
r
o
m
C
I
P
R
e
s
e
r
v
e
Ab
a
l
o
n
e
C
o
v
e
S
h
o
r
e
l
i
n
e
P
a
r
k
66
5
,
1
7
6
$
15
0
,
0
0
0
$
Gr
a
n
t
/
C
i
t
y
5
0
%
M
a
t
c
h
G
e
n
e
r
a
l
F
u
n
d
/
C
I
P
F
u
n
d
Ea
s
t
v
i
e
w
P
a
r
k
P
l
a
y
g
r
o
u
n
d
a
n
d
A
D
A
A
c
c
e
s
s
I
m
p
r
o
v
e
m
e
n
t
s
24
0
,
0
0
0
$
Me
a
s
u
r
e
A
G
r
a
n
t
/
C
I
P
a
c
c
u
m
u
l
a
t
e
d
b
a
l
a
n
c
e
To
t
a
l
s
19
,
3
7
5
,
5
2
7
$
4,
0
1
4
,
6
4
2
$
5,
2
0
5
,
8
8
1
$
2,
8
2
5
,
2
7
8
$
2,
5
2
0
,
8
3
6
$
* F
Y
1
1
-
1
2
i
n
c
l
u
d
e
s
a
p
p
r
o
p
r
i
a
t
i
o
n
s
c
a
r
r
i
e
d
f
o
r
w
a
r
d
f
r
o
m
F
Y
1
0
-
1
1
.
Page 11 of 90 2C-54
BUILDINGS AND OTHER FACILITY IMPROVEMENTS
Buildings and other facility improvements may include any proposed new City
facility or renovation or improvement of any existing City facilities. The City owns
and maintains twelve public buildings, including:
City Hall Administration Building at Upper Point Vicente Park
City Hall Community Development Building at Upper Point Vicente Park
City Hall trailer leased by Palos Verdes on the Net at Upper Point Vicente
Park
City Hall Emergency Communications Center trailer at Upper Point
Vicente Park
Fred Hesse Jr. Community Center Building
Pointe Vicente Interpretive Center (PVIC)
Ryan Park Building
Ladera Linda Community Center Buildings (5)
Except for PVIC, these buildings are 25 years old or older and showing the signs
of daily use. Many of the facilities were purchased from the school district or
transferred to the City from the federal government, and little to no improvements
have been made since their acquisition. It is important to perform adequate
maintenance to extend the life of these facilities. It will be necessary to renovate
these buildings as they age to meet the needs of the community and ensure that
all building and safety guidelines are satisfied. Point Vicente Interpretive Center,
the most recently remodeled City facility, was built in 1984 and expanded in
2005. The City Hall buildings and Ladera Linda Community Center buildings are
the best examples of buildings that are in great need of renovation to meet
organizational needs, comply with safety and code requirements, and comply
with all Americans with Disabilities Act (ADA) guidelines. The projects listed on
the following pages have been developed based on individual staff assessments,
input from the community and professional consultants’ assessments and
studies.
Page 12 of 90 2C-55
PROJECT: HESSE PARK DROP CEILING
RETROFIT/REPLACEMENT
TYPE: Buildings and Other Facility Improvements
LOCATION: Hesse Park
DEPARTMENT: Public works
DESCRIPTION:
The drop ceiling at Hesse park consists of 1’X1’ heavy tiles
connected through a tongue-&-groove mesh. The ceiling is old
and deteriorating. In the past, portions of this ceiling showed signs
of failure and were repaired; however, the future sporadic failures
cannot be prevented unless the ceiling is replaced. Additionally,
the ceiling does not appear to be earthquake resistant. The tiles
are heavy and any abrupt failure of the ceiling tiles can cause
serious damage. This system is outdated and currently, most
architects do not recommend it. When compared to T-Bar type
ceilings, access to inside of the ceiling for maintenance purposes
is very labor intensive and, for major work, may need assistance
from ceiling installers.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN 15,000
CONSTRUCTION 130,000
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL 145,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: Building Replacement Fund
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
Page 13 of 90 2C-56
PROJECT:
CITYWIDE ADA SELF EVALUATION
AND TRANSITION PLAN
IMPLEMENTATION
TYPE: Buildings and Other Facility Improvements
LOCATION:
DEPARTMENT: Public works
DESCRIPTION:
The Citywide ADA Self-Evaluation and Transition Plan has been
completed, and is expected to be presented to the City Council in
coordination with the City’s capital improvements strategic goals.
The Plan has a preliminary implementation cost estimate of
$6,675,000. This estimate does not include ADA improvements
for the City Hall and Ladera Linda Community Center since any
potential improvements at those sites are expected to make the
facilities fully accessible. Additionally, this cost does not include
the side walks and curb ramps which are not at the intersections,
as those improvements are expected to be included in the
roadway resurfacing programs. The cost for programs and
services accessibility is expected to be covered through operating
budgets and therefore is not included in this total cost, either. The
annual request of $400,000 will cover highest priority
improvements as set by the Department of Justice guidelines.
The first program will cover the cost of providing ADA compliance
access to City facilities starting with the removal of safety hazards
and severe barriers.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION 400,000 400,000 400,000 400,000
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL 400,000 400,000 400,000 400,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: CIP Reserve for Projects
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
Page 14 of 90 2C-57
INTANGIBLE CAPITAL OUTLAY
Intangible Capital Outlay improvements may not have significant physical
substance, but they have more than minimal value and help the City in improving
operations or planning for the future. Projects that could be classified as
intangible capital outlay include the update or development of major planning
processes and documents, significant software purchases that may improve the
efficiency of business processes or large technology purchases that may improve
or enhance service delivery to citizens. This category includes two very
important projects, updates to the Storm Drain Master Plan and Pavement
Management Program, which both benefit the entire City.
Page 15 of 90 2C-58
PROJECT: STORM DRAIN MASTER PLAN
UPDATE
TYPE: Intangible Capital Outlay
LOCATION: N/A
DEPARTMENT: Public Works
DESCRIPTION:
This project will improve the current Master Plan Update
developed in 2004. That plan provided an inventory of drains and
identified hydraulic deficiencies. The consultant identified projects
to correct these deficiencies, many of which were included in the
City’s Water Quality Flood Protection Program. The revenue from
the user fee collected through this program has been used to
develop solutions for many of these projects. This proposed
escalation will add data regarding the actual field condition of the
storm drains, consider the effects of projects already implemented,
and create a method for storing, retrieving and updating this type
of data electronically, using the City’s existing GIS system. The
goal is to provide a current and updateable model of the City’s
drainage system to better support identification and prioritization of
projects and maintenance efforts.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1
(FY 11-12) YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN $225,000 $30,000 $30,000 $30,000 $30,000
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $225,000 $30,000 $30,000 $30,000 $30,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: WQFP Fund
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
Page 16 of 90 2C-59
PROJECT: PAVEMENT MANAGEMENT PROGRAM
UPDATE
TYPE: Intangible Capital Outlay
LOCATION: N/A
DEPARTMENT: Public Works
DESCRIPTION:
The Pavement Management System (PMS) is updated every three
years to evaluate the condition of the City’s roadway system and to
identify Citywide Arterial Rehabilitation and Residential
Rehabilitation projects. The Metropolitan Transit Authority (Metro)
requires the PMS update in order for the City to continue receiving
Proposition C monies.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN $120,000 $120,000
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $120,000 $120,000
IMPACT ON OPERATING BUDGET
N/A
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
Funding and/or Grant Information: General Fund
LOCATION PHOTO MAP
Page 17 of 90 2C-60
PROJECT: LADERA LINDA SITE MASTER
PLANNING
TYPE: Buildings and Other Facility Improvements
LOCATION: 32201 Forrestal Drive, Rancho Palos Verdes, CA 0275
DEPARTMENT: Public Works
DESCRIPTION:
A park master plan is a conceptual plan that will lay the groundwork
for the site’s long-term redevelopment and potential phased
implementation. The first step of this project involves a study of
community needs through public outreach along with contemplating
the City’s needs for public service facilities (examples of which are
public safety outpost, park ranger station, multipurpose rooms,
existing sports fields and trail head improvements, etc). The
second step will include programming and quantifying those needs,
followed by planning and preparing a concept master plan which
may be phased. The next step will be preparation of detailed design
plans and specifications for the improvements and demolition of the
existing buildings for which additional funds may be required.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
STUDY/PLANNING &
PROGRAMMING/PRELIMINARY
DESIGN/DEMOLITION
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
Estimate of $100,000
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
MAP
Page 18 of 90 2C-61
Page 19 of 90 2C-62
ROADWAY INFRASTRUCTURE
Roadway infrastructure is one of the most widely used major capital investments
of a municipality. Without a well-maintained street system, the transportation
needs of the public, business, industry and government cannot be met. The
roads are also part of a critical public safety need, and they contribute to the
general health and welfare of the community. Maintaining quality roadway
infrastructure is also important in maintaining property values. It has been shown
that property values tend to suffer from poorly maintained streets. Roadway
infrastructure includes residential streets, arterial streets and traffic safety
improvements. In the City of Rancho Palos Verdes, there are 33.68 miles of
arterial streets, 6.46 miles of collector streets and 103.31 miles of residential
streets. The total for all streets and alleys mileage is 143.44 centerline miles.
To manage the City’s residential and arterial streets, the City hires a consultant
to complete a full detailed assessment of all streets every three years. This
report, known as the Pavement Management System, helps to identify any
serious issues and provides the City with a rating for each street. The report
includes the overall Pavement Condition Index (PCI). The City of Rancho Palos
Verdes minimum standard for PCI for a municipal street system is 80. The City’s
current PCI is 84.2 based upon the PMS report prepared by Willdan &
Associates in 2009. Since 1997, the City has maintained a pavement rating
between 80 and 90. The report also helps in defining a schedule to complete the
work. The City has been divided into nine zones for residential streets, but in the
case of some areas, zones may be completed together in one year for added
efficiency.
Traffic signalization is also an important component to manage traffic safety in
the City. The City wholly owns fourteen traffic signals and nine other traffic
signals are jointly owned with neighboring jurisdictions. The Vision Plan adopted
by the City Council in 2008 calls for improvements of various traffic signals for
pedestrian safety and enhancement of trails network. Many of the projects
identified by the Vision Plan have been included in this plan.
Page 20 of 90 2C-63
PROJECT: RESIDENTIAL OVERLAY
TYPE: Roadway Infrastructure
LOCATION: Zone 3
DEPARTMENT: Public Works
DESCRIPTION:
As part of the City’s Pavement Management System (PMS), Zone 3
of the residential overlay program has been combined with the Zone
5 project carried forward from FY2010-11. This project will include
slurry seal, overlay, curb repair and ADA compliance updates. This
infrastructure enhancement will also include the update of traffic
striping, curb painting, and painting of house numbers.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $1,600,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: General Fund and TDA Article 3 for $25,000
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
This project is part of the annual residential street overlay and slurry seal program. This project is funded by
General Fund monies and maintains the safety ratings of the streets at “very good” to “excellent”.
LOCATION PHOTO LOCATION DESCRIPTION
Zones 3 & 5: Zone 3 includes residential streets in
the northwestern part of the City, east of Hawthorne
between Silver Spur and Blackhorse. Zone 5
includes residential streets in the most western part
of the City, off Hawthorne, between Crest and Palos
Verdes Drive West.
Page 21 of 90 2C-64
PROJECT: RESIDENTIAL OVERLAY
TYPE: Roadway Infrastructure
LOCATION: Zone 1
DEPARTMENT: Public Works
DESCRIPTION:
As part of the City’s Pavement Management System (PMS), Zone 1
of the residential overlay program will include slurry seal, overlay,
curb repair and ADA compliance updates. This infrastructure
enhancement will also include the update of traffic striping, curb
painting, and painting of house numbers.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $1,600,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: General Fund and TDA Article 3 for $25,000
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
This project is part of the annual residential street overlay and slurry seal program. This project is funded by
General fund monies and keeps the safety ratings of the streets at “very good” to “excellent”.
LOCATION PHOTO LOCATION DESCRIPTION
Zone 1: Residential streets in the most northern part
of the City, north of Hawthorne Blvd and west of
Silver Spur Road.
Page 22 of 90 2C-65
PROJECT: RESIDENTIAL OVERLAY
TYPE: Roadway Infrastructure
LOCATION: Zone 2
DEPARTMENT: Public Works
DESCRIPTION:
As part of the City’s Pavement Management System (PMS), Zone 2
of the residential overlay program will include slurry seal, overlay,
curb repair and ADA compliance updates. This infrastructure
enhancement will also include the update of traffic striping, curb
painting, and painting of house numbers.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $1,600,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: General Fund and TDA Article 3 for $25,000
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
This project is part of the annual residential street overlay and slurry seal program. This project is funded by
General fund monies, and keeps the safety ratings of the streets at “very good” to “excellent”.
LOCATION PHOTO LOCATION DESCRIPTION
Zone 2: Residential streets in the northwestern part
of the City between Crest Road and Grayslake Road,
east and west of Hawthorne Blvd.
Page 23 of 90 2C-66
PROJECT: RESIDENTIAL OVERLAY
TYPE: Roadway Infrastructure
LOCATION: Zone 9
DEPARTMENT: Public Works
DESCRIPTION:
As part of the City’s Pavement Management System (PMS), Zone
9 of the residential overlay program will include slurry seal,
overlay, curb repair and ADA compliance updates of the streets.
This infrastructure enhancement will also include the update of
traffic striping, curb painting, and painting of house numbers.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $1,500,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: General Fund and TDA Article 3 for $25,000
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
This project is part of the annual residential street overlay and slurry seal program. This project is funded by
General fund monies and keeps the safety rating of the streets at “very good” to “excellent”.
LOCATION PHOTO LOCATION DESCRIPTION
Zone 9: Residential streets in the most eastern part
of the City, near Western Avenue.
Page 24 of 90 2C-67
PROJECT: RESIDENTIAL OVERLAY
TYPE: Roadway Infrastructure
LOCATION: Zone 7
DEPARTMENT: Public Works
DESCRIPTION:
As part of the City’s Pavement Management System (PMS), Zone
7 of the residential overlay program will include slurry seal,
overlay, curb repair and ADA compliance updates. This
infrastructure enhancement will also include the update of traffic
striping, curb painting, and painting of house numbers.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $1,500,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: General Fund and TDA Article 3 for $25,000
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
This project is part of the annual residential street overlay and slurry seal program. This project is funded by
General fund monies and keeps the safety rating of the streets at “very good” to “excellent”.
LOCATION PHOTO LOCATION DESCRIPTION
Zone 7: Residential streets in the southern part of
the City, near Palos Verdes Drive South and Palos
Verdes Drive East.
Page 25 of 90 2C-68
PROJECT:
ARTERIAL OVERLAY AND SLURRY
SEAL PVDE (MIRALESTE TO NORTH
CITY LIMITS)
TYPE: Roadway Infrastructure
LOCATION: PVDE (from Miraleste Drive to the North City Limits)
DEPARTMENT: Public Works
DESCRIPTION:
As part of the City’s Pavement Management System (PMS), Palos
Verdes Drive East throughout various segments will be completed
as shown in the map below to maintain this section of the arterial
street. This construction will require milling and overlay, including
curbs and gutters, ADA ramps and striping.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $2,380,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: Federal STPL Grant, Proposition C and Measure R
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
MAP
Page 26 of 90 2C-69
PROJECT:
HAWTHORNE BLVD. MEDIAN
IMPROVEMENTS (VIA RIVERA TO
CITY HALL)
TYPE: Roadway Infrastructure
LOCATION: Hawthorne Blvd. (Via Rivera to City Hall)
DEPARTMENT: Public Works
DESCRIPTION:
The development of this median would include turning the existing
median landscaping and vegetation to sustainable landscaping,
which would require minimal maintenance. Development could
also include the installation of irrigation systems/controllers,
hardscaping and installation of decorative stone. This will be the
first segment of median improvements for the Palos Verdes Drive
West entrance to the City of Rancho Palos Verdes.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $250,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: Beautification Fund. Ongoing median maintenance is estimated to be
$12,000 per year.
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
MAP
Page 27 of 90 2C-70
PROJECT:
HAWTHORNE BLVD. MEDIAN
IMPROVEMENTS (CITY HALL TO
VALLON)
TYPE: Roadway Infrastructure
LOCATION: Hawthorne Blvd. (City Hall to Vallon)
DEPARTMENT: Public Works
DESCRIPTION:
The development of this median would include turning the existing
median landscaping and vegetation to sustainable landscaping
which would require minimal maintenance. Development could
also include the installation of irrigation systems and controllers,
and hardscaping and installation of decorative stone. This will be
the second segment of median improvements for the Palos
Verdes Drive West entrance to the City of Rancho Palos Verdes.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $250,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: Beautification Fund. Ongoing median maintenance is estimated to be
$12,000 per year.
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
MAP
Page 28 of 90 2C-71
Page 29 of 90 2C-72
PROJECT: HAWTHORNE BOULEVARD TRAFFIC
SIGNAL SYNCHRONIZATION
TYPE: Roadway Infrastructure
LOCATION: Hawthorne Boulevard
DEPARTMENT: Public Works
DESCRIPTION:
Synchronize 7 traffic signals (50% of all of the City's traffic signals)
along heavily traveled Hawthorne Boulevard; install 24 pedestrian
countdown heads at 3 intersections.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN $55,000
CONSTRUCTION $670,612
PROJECT MANAGEMENT/OVERSIGHT $59,920
LEGAL
TOTAL $785,532
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: HISP and CIP Balance (10% match). The HSIP funded project is through
Caltrans (granting agency). Total project cost is $785,532 of which $706,979 are federal funds. Maintenance
required as a result of the project will be realized through the traffic signal maintenance contract and will be
negligible. General Fund matching contribution: $78,553.
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
Page 30 of 90 2C-73
PUBLIC UTILITIES
Public utilities improvements include the maintenance and development of utility
projects such as the City’s sanitary sewer system or the undergrounding of utility
lines. The City’s sanitary sewer system is essential for City operations, yet it has
not required significant expenditures in past years due to an inter-local
agreement with Los Angeles County for maintenance activities. The City owns
the system, but the County has the primary responsibility for ongoing
maintenance. The County collects a sewer fee from the City’s property owners
that Staff believes is inadequate to maintain the system. Although the County
maintains the City’s sewer system, the City retains responsibility for its operation,
public safety and welfare. The City, not the County, maintains legal and
regulatory responsibility (i.e. any state or federal fines resulting from spillage).
In preparation for this change, the City conducted a survey of the system, and in
2004 the Sanitary Sewer Master Plan was created to help in the management of
this asset. The study examined sample areas throughout the City and assessed
the overall system as “fair.” The inspection revealed root intrusion in the pipes
and cracking in the pipes, in addition to accumulated fats and grease clogging
certain areas. It appeared that the County had not been performing adequate
maintenance over the years. Without regular maintenance, overflows due to root
and grease blockages will occur. To minimize the potential for overflow and to
restore and maintain the system in “good” condition, a significant investment in
pipeline inspection, repair and maintenance is required. Because the County is
still primarily responsible for maintenance of the system, no projects have been
included for this system. However, the Sanitary Master Plan Update was
received and filed by the City Council on November 17, 2009. Future projects
may be proposed based on this assessment.
Page 31 of 90 2C-74
STORM DRAIN SYSTEM
In June 2004, the City’s consulting engineers prepared an Update to the Storm
Drain Master Plan. The updated plan identified serious storm drain deficiencies
that required significant repair. The update identified 38 high-priority projects,
which were the basis for establishing a “user fee.” Since then, some projects
have been completed, and others have been reassessed to meet changing
priorities and needs. The 38 projects have been reevaluated resulting in
grouping the projects into 12 project areas. These are based on identifiable
drainage areas/systems, most of which are tied to natural canyon drainage
systems. Each project has been grouped into a project area. The areas are as
follows:
Area 1: Sunnyside Ridge
Area 2: McCarrell Canyon Storm Drain System
Area 3: Lower San Ramon Canyon/Tarapaca Canyon
Area 4: Altamira Canyon
Area 5: Palos Verdes Drive East/Miraleste Canyon
Area 6: San Pedro and Averill Canyons
Area 7: Via Colinita Vickery Canyon
Area 8: Miraleste and Chandeleur
Area 9: Palos Verdes Drive East Switchbacks
Area 10: Hawthorne Boulevard
Area 11: Palos Verdes Drive South
Area 12: Citywide Storm Drain Programs
This CIP document includes an update to the 2004 Storm Drain Master Plan
Update Study. The new update, expected to be completed by 2012, will add
data regarding the actual field condition of the storm drains, consider the efforts
of projects already implemented, and create a method for storing, retrieving, and
updating this type of data electronically using the City’s GIS System.
Page 32 of 90 2C-75
PROJECT: STORM DRAIN LINING
TYPE: Storm Drain System
LOCATION: Project Area 12
DEPARTMENT: Public Works
DESCRIPTION:
All CMP storm drain lines within the City have reached their design
life expectancy and need to be lined to extend their life another
30+ years. CMP dating back to the 1940s have been discovered
and require maintenance along with those most recently installed
in the 1970s. A large number of drainage problems citywide can
be overcome by relining deteriorated pipes and improving inlets
and outlet structures.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1
(FY 11-12)
YEAR 2
(FY 12-13)
YEAR 3
(FY 13-14)
YEAR 4
(FY 14-15)
YEAR 5
(FY 15-16
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION $319,555 $324,642 $329,881 $335,278 $340,836
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $319,555 $324,642 $329,881 $335,278 $340,836
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: WQFP user fees. Ongoing maintenance costs should decrease, as pipes
which have been lined generally require less maintenance resulting in a cost savings.
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
LOCATION PHOTO MAP
Page 33 of 90 2C-76
PROJECT: SAN PEDRO CANYON STORM
DRAINS
TYPE: Storm Drain System
LOCATION: Project Area 6
DEPARTMENT: Public Works
DESCRIPTION:
The project in San Pedro Canyon lies east of Palos Verdes Drive
East and is crossed several times by residential streets. This
project has become a priority due to flooding in the area resulting
from sediment and debris accumulation in potentially undersized
debris basins and degraded pipes and inlet/outlet structures. Staff
has engaged a consultant to provide hydrologic and hydraulic
analyses and design recommendations, including construction
drawings. New County of Los Angeles standards for hydrology
assumptions complicate the design process from replacement of “in-
kind” to “upsizing” of pipes, which has downstream consequences.
Staff is working with consultant to develop solutions to address
known or anticipated capacity issues based on field observations,
with an emphasis on restricting hydro-modification (i.e. effects on
downstream areas).
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1
(FY 11-12) YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION $200,000
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $200,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: WQFP user fees
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
Page 34 of 90 2C-77
LOCATION PHOTO MAP
Page 35 of 90 2C-78
PROJECT: VIA COLINITA VICKERY CANYON
TYPE: Storm Drain System
LOCATION: Project Area 7
DEPARTMENT: Public Works
DESCRIPTION:
This project area includes various pipelines in the Via Colinita area
that drain into the Vickery Canyon. The project will also include the
rehabilitation of several pipelines draining into Vickery Canyon.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1
(FY 11-12) YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION $242,500
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $242,500
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: WQFP user fees
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
MAP
Page 36 of 90 2C-79
PROJECT: PALOS VERDES DRIVE EAST LOWER
SWITCHBACKS
TYPE: Storm Drain System
LOCATION: Project Area 9
DEPARTMENT: Public Works
DESCRIPTION:
Several drainage systems in the hairpin bends area above San
Ramon Canyon drain into the canyon. Work within this project
area includes the installation of new drainage within the Palos
Verdes Drive East switchbacks and installing a pipe into the
canyon. This project will also modify existing inlets, outlets and
pipes.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2
(FY 12-13) YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $485,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: WQFP user fees
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
LOCATION PHOTO MAP
Page 37 of 90 2C-80
PROJECT: PALOS VERDES DRIVE SOUTH
(NORTH OF BARKENTINE)
TYPE: Storm Drain System
LOCATION: Project Area 11
DEPARTMENT: Public Works
DESCRIPTION:
This project area includes several storm drain systems that cross
Palos Verdes Drive South at various locations. Drainage capacity
will be increased with improvement to inlets and outlet structures.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION $446,000
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $446,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: WQFP user fees
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
LOCATION PHOTO MAP
Page 38 of 90 2C-81
PROJECT: SOUTH HAWTHORNE/VIA FRASCATI
TYPE: Storm Drain System
LOCATION: Project Area 10
DEPARTMENT: Public Works
DESCRIPTION:
This project will improve drainage across Hawthorne Boulevard by
replacing two existing 18” pipes with one 24” and one 30” RCP
pipes. Additionally, a second location on South Hawthorne will be
evaluated after episodes of flooding in recent years. A curb and
gutter project on Via Frascati will serve to direct drainage into the
street and existing catch basins, which drain into the San Pedro
Canyon.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $440,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: WQFP user fees
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
LOCATION PHOTO MAP
Page 39 of 90 2C-82
PROJECT: VIA CANADA STORM DRAIN
TYPE: Storm Drain System
LOCATION: N/A
DEPARTMENT: Public Works
DESCRIPTION:
This project will improve an existing storm drain system allowing
the storm runoff from the surrounding Via Canada neighborhoods
to be captured and transmitted underground to an improved
channel, minimizing localized flooding.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1
(FY 11-12) YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN $100,000
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $100,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: WQFP user fees
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
Page 40 of 90 2C-83
RECREATION, PARKS & OPEN SPACE
The development and maintenance of community parks, recreational areas and
open space has been established as a top priority for the City as stated in the
General Plan and various other planning documents. The General Plan states,
“It is the goal of the City of Rancho Palos Verdes to conserve, protect and
enhance its natural resources, beauty and open space for the benefit and
enjoyment of its residents and the residents of the entire region. Future
development shall recognize the sensitivity of the natural environment and
be accomplished in such a manner as to maximize the protection of it.”
Many park sites and open space areas have been acquired throughout the City,
and some have been developed for use by the general public. Some sites
remain vacant or underutilized. The City Council approved the Vision Plan in
September 2008 which outlines various trail and park projects which have been
included in this plan. The Public Use Master Plan has also outlined a strategy for
the development of trails which has also been incorporated into the CIP list.
These recreational projects add to the vibrancy of the community and they are
designed to contribute to all residents’ quality of life. Parks and other open
spaces have been carefully planned to take advantage of the beautiful coastline
and natural landscape of the peninsula.
Page 41 of 90 2C-84
PROJECT: GRANDVIEW/LOWER HESSE
IMPROVEMENTS
TYPE: Recreation, Parks, & Open Space
LOCATION: Grandview Park & Lower Hesse Park
DEPARTMENT: Public Works
DESCRIPTION:
This project would encompass the next phase of improvements at
the park sites. Proposed improvements include upgrading the trail
system, improved landscaping, a basketball court, tennis courts, a
restroom and improved parking. All improvements would be in
compliance with all ADA regulations.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $2,400,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: General Fund. Annual maintenance costs will be approximately $65,000.
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
Council has directed staff to complete the environmental review process for the Pacific Plan. After the
environmental review is complete, staff will bring the results to Council for direction on phase budgeting,
engineering and final design plans. Council has also directed staff to reopen the public outreach process to
consider a skate park facility.
Page 42 of 90 2C-85
PROJECT: RYAN PARK SOUTHERN ENTRANCE
ROAD
TYPE: Recreation, Parks and Open Space
LOCATION: Ryan Park
DEPARTMENT: Public works
DESCRIPTION:
The steep southern entrance of Ryan Park is at a sharp angle with
Hawthorne Blvd. The geometrics of this entrance cause difficulty
for motorists who drive southbound on Hawthorne Blvd and want
to make a right turn onto the driveway entrance. The parking lot
accessed through this driveway is exclusively used for ADA
compliant parking spaces. This increases the need to realign the
entrance. Design of this improvement is the first step toward
addressing this issue and will provide a more realistic cost
estimate for the project.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN 20,000
CONSTRUCTION 220,000
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL 20,000 220,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: CIP accumulated fund balance (originally General Fund money)/General
Fund.
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
Page 43 of 90 2C-86
PROJECT: CALIFORNIA COASTAL TRAIL
TYPE: Recreation, Parks, & Open Space
LOCATION: City’s Coastal Border
DEPARTMENT: Planning/Public Works
DESCRIPTION:
One of the goals of the City Council approved Vision Plan is the
development of a continuous marked Coastal Access Trail along
the coast between the City’s border with San Pedro and the City’s
border with Palos Verdes Estates. The proposal is to provide a
safe and comfortable connection along the bluffs (where possible)
and at access points down to the shoreline. The linkage should be
off-street wherever possible. The approved Vision Plan identifies
an alignment for the California Coastal Trail (Coastal Access Trail)
which, when implemented and identified with signage, would
complete the RPV coast segment of this key recreational facility
that has been envisioned and championed by the State Coastal
Conservancy.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $280,000 $280,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: California Coastal Conservancy grant of $500,000 (awarded 10/21/10).
Matching requirement of $60,000 from CIP accumulated fund balance (originally General Fund money).
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
LOCATION PHOTO MAP
Page 44 of 90 2C-87
PROJECT: GATEWAY PARK DEVELOPMENT
PROJECT PHASE I & II
TYPE: Recreation, Parks, & Open Space
LOCATION:
DEPARTMENT: Public Works/Planning
DESCRIPTION:
The Vision Plan includes a proposed Gateway Park, a 25-acre site
within the City’s Landslide Moratorium area just north of PVDS
between the Portuguese Bend residential community and Klondike
Canyon. Under the Vision Plan, the site has been approved for a
combination of uses such as a “gateway park” for users of the
Nature Preserve’s trail system, an outdoor education/nature
appreciation center for school and community groups and an
equestrian center. In Phase 1, it is proposed to develop the
following components of the approved concept plan for the site:
Trail head and public parking area, overlook, picnic areas and
PVDS pedestrian crossing. In Phase 2, it is proposed to develop
the following components of the approved concept plan for the site:
outdoor welcome center with re-locatable equestrian amenities,
outdoor education area with demonstration garden and an outdoor
classroom with roof and storage shed.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $200,000 $275,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: Grant with 20% match from CIP Reserve for future projects.
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
MAP
Page 45 of 90 2C-88
PROJECT: ABALONE COVE SHORELINE PARK
TYPE: Recreation, Parks, & Open Space
LOCATION:
DEPARTMENT: Public Works/Planning
DESCRIPTION:
The City’s Abalone Cove Shoreline Park provides direct access to
the ocean and the Portuguese Bend Preserve trails. Under the
Vision Plan, the concept presented and approved for Abalone
Cove seeks to enhance public access and aesthetics with some
modest improvements to the site. It is envisioned that all of the
improvements identified in the Vision Plan for Abalone Cove can
be completed in Phase 1. These improvements consist of the
following: new park amenities such as picnic tables, shade
features, benches and trash receptacles; an ADA accessible bluff
top trail, an overlook at the bluff edge and an improved trail head;
replanting portions of the site with native vegetation and instituting
an invasive species removal program; and signage marking trail
connections and/or beach access.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL $100,000 $150,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: Grant with 20% match from CIP Reserve for future projects.
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
LOCATION PHOTO MAP
Page 46 of 90 2C-89
PROJECT: EASTVIEW PARK PLAYGROUND &
ACCESSIBILITY IMPROVEMENTS
TYPE: Recreation, Parks and Open Space
LOCATION: Eastview Park
DEPARTMENT: Public works
DESCRIPTION:
In compliance with the safety requirements of the code, these
improvements will enhance the playground at Eastview Park. The
project includes removal and replacement of the existing
playground equipment to comply with the Americans with
Disabilities Act (ADA) and meet safety requirements. The
improvements will also improve ADA compliance for access to the
park and restrooms.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN 25,000
CONSTRUCTION 215,000
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL 240,000
IMPACT ON OPERATING BUDGET
Funding and/or Grant Information: $90,000 CIP Reserve; 150,000 County Fund (Measure A)
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
Page 47 of 90 2C-90
UNFUNDED PROJECTS
The following projects are those which have been identified as capital needs
through various planning processes, but currently there are not resources to
complete the projects. As funding becomes available and the City Council
prioritizes and approves projects, they may be moved into the funded Five-Year
CIP schedule.
Page 48 of 90 2C-91
RPV Capital Improvement Plan - Unfunded Projects
Project Minimum Maximum Identified Funding Sources
Buildings and Other Facility
Improvements
Community and Aquatic Center $3,000,000 $8,000,000
$180,000 Ginsburg Donation for
"Performing Arts" building.
City Hall $20,500,000 $35,000,000
$500,000 in Building Replacement
Fund.
Infrastructure Improvements at
Upper Point Vicente $1,000,000 $2,000,000
Maintenance Yard Relocation $300,000 $1,000,000
Fiber Optic Cabling: Hesse Park $180,000 $270,000
Fiber Optic Cabling: Ladera Linda $300,000 $470,000
Solar Power Systems for 3 City
Park Facilities $600,000 $1,200,000
Intangible Capital Outlay
No Projects Currently Identified
Roadway Infrastructure
Arterial Improvements - Silver Spur
Road $1,300,000 $1,500,000
Arterial Improvements - Palos
Verdes Drive East $1,900,000 $2,200,000
Traffic Improvement - PVDE &
Miraleste Drive $280,000 $340,000
Bikeway Improvements: Phase I
and II $5,000,000 $8,000,000
Operational Improvements at
Crenshaw & Crest $270,000 $320,000
Hesse Park/Hawthorne Blvd.
Traffic Circulation & Safety
Improvement $100,000 $200,000
PVDE at Bronco Drive
Improvements $205,000 $230,000
Lower Point Vicente Park Access
Modification Project $930,000 $1,100,000
Switchbacks Traffic Safety
Improvements $1,750,000 $2,000,000
PVDE Multi-Modal Improvements $2,800,000 $4,450,000
Public Utilities
Utility Undergrounding at 25th
Street $1,000,000 $1,100,000
Utility Undergrounding at PVDS
and Terranea Way $150,000 $200,000
Utility Undergrounding at
Fisherman's Access $150,000 $200,000
Utility Undergrounding at Entrance
to PVIC $150,000 $200,000
Storm Drain System
San Ramon Canyon Stabilization $19,000,000 $20,000,000 Prop 1E grant of $9.5 million
Altamira Canyon $1,250,000 $5,000,000
PVDE - Miraleste Canyon $2,500,000 $3,200,000
San Pedro & Averill Canyons $2,700,000 $3,300,000
Recreation, Parks & Open Space
Trailhead/Overlook/Vista Point
Development $100,000 $130,000
PUMP Trail Implementation $820,000 $1,100,000
Portuguese Bend Reserve Trails $600,000 $740,000
Sunnyside Trail Segment Project $400,000 $450,000
Salvation Army Trail Segment $120,000 $150,000
Bathroom at Del Cerro Park $250,000 $300,000
Hesse Park Parking Lot Resurface $200,000 $200,000
Totals (Min. and Max.)$69,805,000 $104,550,000
Cost Range
Page 49 of 90 2C-92
BUILDINGS AND OTHER FACILITY IMPROVEMENTS
UNFUNDED PROJECTS
Page 50 of 90 2C-93
PROJECT: COMMUNITY AND AQUATIC CENTER
TYPE: Buildings and Other Facility Improvements
LOCATION: TBD
DEPARTMENT: Public Works
DESCRIPTION:
The Open Space Planning Recreation and Parks Task Force
described a facility which would include a sports/fitness center
(gymnasium), an indoor 50-meter pool with retractable enclosure,
an outdoor children’s wading pool, a therapy pool and park and
picnic facilities in their 2004 report to the City Council.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
Impact will need to be assessed.
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $3,000,000 - $8,000,000
Page 51 of 90 2C-94
PROJECT: CITY HALL
TYPE: Buildings and Other Facility Improvements
LOCATION: TBD
DEPARTMENT: Public Works
DESCRIPTION:
Currently, City Hall is located at the Upper Point Vicente Park site
in the former Nike Missile barracks constructed by the military in
1956. The building is not well-suited for the general office needs
and space requirements as specified in greater detail below.
There are also many safety and building code compliance issues
that exist. In addition to these deficiencies, the building also does
not meet ADA guidelines, which may create a significant risk and
liability for the City. The City currently has 58 full-time positions
housed in the main City Hall Building and the Community
Development Department annex. In addition to the 58 full-time
positions, the City contracts with outside consultants for some City
services and employs part-time staff and utilizes volunteers for
various tasks. These positions require an additional 8 work
stations and a work space for visiting City Council members
should also be included for remodeling/rebuilding purposes,
bringing the total to 9 additional spaces. These calculations do not
account for future positions which could be necessary to address
increased service demands from the community, additional
recreational facilities, increased regulation and continued
regulatory demands from other public agencies. The existing
buildings have a total of 20,489 square feet. The suggested
space requirement according to the U.S. General Administration
Office of Government-wide Policy for the 67 positions is 19,263
square feet. There is a shortage of storage space for planning
records which requires approximately 690 square feet. A new or
remodeled City Hall would also include a City Council chamber,
main lobby, conference rooms and other support space.
Approximately 34,210 square feet would be optimal for this
building to meet current and future needs. The Civic Center will
include an Emergency Operations Center (EOC).
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
Page 52 of 90 2C-95
OTHER PROJECT INFORMATION:
COST ESTIMATE: $20,500,000 - $35,000,000
Page 53 of 90 2C-96
PROJECT: INFRASTRUCTURE IMPROVEMENTS
AT UPPER POINT VICENTE
TYPE: Buildings and Other Facility Improvements
LOCATION: 30940 Hawthorne Blvd.
DEPARTMENT: Public Works
DESCRIPTION:
Currently, the Upper Point Vicente Park site is the location for City
Hall and the City’s maintenance yard. There have been various
proposed developments for the site through many community
planning efforts. Although a Civic Center Master plan has not
been developed, it is necessary to address several infrastructure
improvement needs ahead of time. These include: installation of a
sewer pipeline, installation of a piped storm drain system to
channel storm water to PVDS, and relocation of the existing mono-
pole. There is no gas service to the site, therefore, future
development may require that gas access be made available
through connection in the ROW on PVDS. Access to the site is
only permitted from Hawthorne Blvd and it is possible that a traffic
study will require the installation of a traffic signal on Hawthorne
Blvd. The cost estimate is conceptually based at this time.
Specific cost estimates can be prepared when programming and
planning for these improvements are completed.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
COST ESTIMATE $1,000,000 - $2,000,000
MAP
Page 54 of 90 2C-97
Page 55 of 90 2C-98
PROJECT: MAINTENANCE YARD RELOCATION
TYPE: Buildings and Other Facility Improvements
LOCATION: Various Locations throughout the City
DEPARTMENT: Public Works
DESCRIPTION:
It has been proposed that City maintenance services be spread
citywide in strategic locations with a central office in City Hall. The
existing maintenance yard is located on the Upper Point Vicente
Park site which had been identified for various other community
uses due to its prime location. Staff is proposing the creation of a
central location for the maintenance yard with satellite locations
throughout the City, serving the maintenance and other
construction needs of the Public Works Department. The central
location of the maintenance yard will be situated at or near City
Hall for administrative purposes. This central location will control
all satellite locations through the use of maintenance personnel
and through the efficient use of the City’s network.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
The satellite locations will fulfill the following roles: there will be an office trailer at each location; a
construction yard for contractors located throughout the City (possibly generating rental income for the City);
possible satellite EOC centers for access throughout the City; and storage space for various equipment.
COST ESTIMATE: $300,000 - $1,000,000
Page 56 of 90 2C-99
PROJECT: FIBER OPTIC CABLING: HESSE PARK
TYPE: Buildings and Other Facility Improvements
LOCATION: Hesse Park
DEPARTMENT: Finance and Information Technology
DESCRIPTION:
This project includes the installation of fiber optic cabling between
City facilities within the public right-of-way which will directly
connect Hesse Park to the City’s phone and information network.
Associated asphalt will be removed and replaced at roadway
crossing points. Vaults will be placed adjacent to the roadway
within the public right-of-way.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
Ryan Park could also be connected to the network in the same project for an additional cost of $30,000.
COST ESTIMATE: $180,000 to $270,000
Page 57 of 90 2C-100
PROJECT: FIBER OPTIC CABLING: LADERA
LINDA
TYPE: Buildings and Other Facility Improvements
LOCATION: Ladera Linda
DEPARTMENT: Finance and Information Technology
DESCRIPTION:
This project includes the installation of fiber optic cabling between
City facilities within the public right-of-way which will directly
connect Ladera Linda Community Center to the City’s phone and
information network. Associated asphalt will be removed and
replaced at roadway crossing points. Vaults will be placed
adjacent to the roadway within the public right-of-way.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
Abalone Cove Park could also be connected to the network in the same project for an additional cost of
$41,500.
COST ESTIMATE: $300,000 to $470,000
Page 58 of 90 2C-101
PROJECT: SOLAR POWER SYSTEMS FOR CITY
PARK FACILITIES
TYPE: Buildings and Other Facility Improvements
LOCATION: Various
DEPARTMENT: Public works
DESCRIPTION:
Installation of lightweight and advanced solar energy generating
systems over the roof of City buildings to reduce power
consumption with occasional opportunities to sell power to the
grid. This project will help the City with its energy savings goal. It
will reduce considerable amounts of emissions and, typically, the
savings can cover the cost of projects of this scale in an estimated
period of 20 to 25 years.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
Estimated cost is $200,000 - $400,000 for each facility
Funding: Will seek Federal/State Energy Savings Grants
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY X
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
Page 59 of 90 2C-102
INTANGIBLE CAPITAL OUTLAY
UNFUNDED PROJECTS
NO PROJECTS CURRENTLY IDENTIFIED.
Page 60 of 90 2C-103
ROADWAY INFRASTRUCTURE
UNFUNDED PROJECTS
Page 61 of 90 2C-104
PROJECT: ARTERIAL IMPROVEMENTS- SILVER
SPUR ROAD
TYPE: Roadway Infrastructure
LOCATION: Silver Spur Road (partial segment of Highridge; Crest Rd. from
PVDE to Ganado)
DEPARTMENT: Public Works
DESCRIPTION:
As part of the City’s Pavement Management System (PMS), Silver
Spur Road and a portion of Highridge Road throughout various
segments will be completed as shown in the map below to
maintain this section of the arterial street. This construction will
require milling and overlay, including curb and gutter, ADA ramps
and striping.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $1,300,000 - $1,500,000
Page 62 of 90 2C-105
PROJECT: ARTERIAL IMPROVEMENTS- PALOS
VERDES DRIVE EAST
TYPE: Roadway Infrastructure
LOCATION: Palos Verdes Drive East (from PVDS to Miraleste)
DEPARTMENT: Public Works
DESCRIPTION:
As part of the City’s Pavement Management System (PMS), Palos
Verdes Drive East throughout various segments will be completed
as shown in the map below to maintain this section of the arterial
street. This construction will require milling and overlay, including
curb and gutter, ADA ramps and striping.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
This cost range includes safety costs.
COST ESTIMATE: $1,900,000 - $2,200,000
Page 63 of 90 2C-106
PROJECT:
TRAFFIC IMPROVEMENT- PALOS
VERDES DRIVE EAST AND
MIRALESTE DRIVE
TYPE: Roadway Infrastructure
LOCATION: Palos Verdes Drive East and Miraleste Drive
DEPARTMENT: Public Works
DESCRIPTION:
A new traffic signal will be installed at Palos Verdes Drive East
and Miraleste Drive. The new signal will be equipped with
pedestrian count heads, LED lights, 12” vehicle heads and LED
internally illuminated street name signs, a battery back-up system
and emergency vehicle pre-emption and modification of the traffic
signal controller cabinet to include the installation of modem and
cable and all necessary auxiliary equipment to provide future
communication capability for synchronization of all traffic signals.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $280,000 - $340,000
Page 64 of 90 2C-107
PROJECT: BIKEWAY IMPROVEMENTS: PHASE I
& II
TYPE: Roadway Infrastructure
LOCATION: Palos Verdes Drive South/West
DEPARTMENT: Public Works
DESCRIPTION:
The Vision Plan includes the provision of a continuous marked
bikeway along Palos Verdes Drive West and Palos Verdes Drive
South to enhance bike safety and provide greater separation
between the roadway edge and cars on the roadway. Phase 1
would involve improvement of the following bikeway: PVE border
to Narcissa. Phase 2 would involve improvement of the following
bikeway: Schooner to San Pedro.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $5,000,000 to $8,000,000
Page 65 of 90 2C-108
PROJECT:
HESSE PARK/HAWTHORNE BLVD.
TRAFFIC CIRCULATION & SAFETY
IMPROVEMENT
TYPE: Roadway Infrastructure
LOCATION: Hesse Park
DEPARTMENT: Public Works
DESCRIPTION:
With plans to improve Lower Hesse Park and current traffic
concerns relating to access and vehicular circulation, actions are
needed to improve left-turn access from Verde Ridge Road and
Locklenna Lane onto Hawthorne Blvd. Additionally, pedestrian
access across Hawthorne Blvd from Doverridge Drive to Hesse
Park is a concern. Lastly, park parking and parking along
Locklenna Lane is a concern to neighboring residents especially
when the park improvements are realized. A study is currently
being conducted to develop a preliminary plan to address the
current issues. Once the park improvements are designed, a
supplemental traffic study will be prepared to address specific
demand generated by the park’s proposed uses.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $100,000 to $200,000
Page 66 of 90 2C-109
PROJECT:
OPERATIONAL IMPROVEMENTS-
CRENSHAW BLVD. AND CREST
DRIVE
TYPE: Roadway Infrastructure
LOCATION: Crenshaw Blvd. and Crest Drive
DEPARTMENT: Public Works
DESCRIPTION:
Currently this intersection is a four-way stop controlled
intersection. During the AM and PM peak hours, the westbound
left-turn lanes back up for several hundreds of feet creating
extensive delay and long vehicle queues. An operational
improvement to the intersection is required to improve traffic flow.
A study is being conducted to determine the best solution.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $270,000 - $320,000
Page 67 of 90 2C-110
PROJECT: PALOS VERDES DRIVE EAST AT
BRONCO DRIVE IMPROVEMENTS
TYPE: Traffic Improvements
LOCATION: PVDE @ Bronco Drive
DEPARTMENT: Public Works
DESCRIPTION:
Improve portions of PVDE to provide wider travel lanes in each
direction, a shared-use equestrian and pedestrian path located
behind the existing guardrail, a high visibility marked equestrian
crossing at Bronco Drive complete with flashing beacons,
augmented crossing signage and advanced crossing signage with
flashing beacons.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $205,000 TO $230,000
Page 68 of 90 2C-111
PROJECT: LOWER POINT VICENTE PARK
ACCESS MODIFICATION PROJECT
TYPE: Traffic Improvements
LOCATION: PVDW/PVDS at Lower Point Vicente Park entrance
DEPARTMENT: Public Works
DESCRIPTION:
Improve access into and out of the Lower Point Vicente park area by
modifying the existing drive entrance by removing the skewed
approach and creating a 90-degree approach which improves
visibility and safety. Project also includes signalizing the intersection
and creating appropriate turn pockets, bus-stops, pedestrian
crosswalks and trails.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS X COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $930,000 TO $1,100,000
Page 69 of 90 2C-112
PROJECT: SWITCHBACKS TRAFFIC SAFETY
IMPROVEMENTS
TYPE: Roadway Infrastructure
LOCATION: Palos Verdes Drive East
DEPARTMENT: Public Works
DESCRIPTION:
This project plans to narrow the travel lanes and widen the
roadway to provide bike lanes. This project would be completed in
conjunction with the catch basin and guardrail improvements if
possible.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $1,750,000 - $2,000,000
Page 70 of 90 2C-113
PROJECT: PVDE MULTI-MODAL IMPROVEMENTS
TYPE: Roadway Infrastructure
LOCATION: PVDE (Various Locations)
DEPARTMENT: Public Works
DESCRIPTION:
As part of the Palos Verdes Drive East Preliminary Study, the
report concluded that implementation of four (4) priority projects will
help achieve a multi-modal status.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
If all four priority projects (projects #6 through #9) were realized at the same time, the anticipated budget would
range from $2,800,000 to $4,450,000. Staff anticipates seeking external funding to help offset the cost of project
implementation.
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY X ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
MAP
Page 71 of 90 2C-114
PUBLIC UTILITIES
UNFUNDED PROJECTS
Page 72 of 90 2C-115
PROJECT: UTILITY UNDERGROUNDING AT 25TH
STREET
TYPE: Public Utilities
LOCATION: 25th Street
DEPARTMENT: Public Works
DESCRIPTION:
This project includes the removal of overhead wires and
coordination of undergrounding all utilities at this location. The
City will coordinate with the associated utility companies
(electrical, communications, etc.) to locate all wires underground.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $1,000,000 to $1,100,000
Page 73 of 90 2C-116
PROJECT: UTILITY UNDERGROUNDING AT PV
DRIVE SOUTH AND TERRANEA WAY
TYPE: Public Utilities
LOCATION: PVDS and Terranea Way
DEPARTMENT: Public Works
DESCRIPTION:
This project includes the removal of overhead wires and
coordination of undergrounding all utilities at this location. The
City will coordinate with the associated utility companies
(electrical, communications, etc.) to locate all wires underground.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $150,000 to $200,000
Page 74 of 90 2C-117
PROJECT: UTILITY UNDERGROUNDING AT
FISHERMAN’S ACCESS
TYPE: Public Utilities
LOCATION: Palos Verdes Drive South (between Terranea and Coast Guard
Property)
DEPARTMENT: Public Works
DESCRIPTION:
This project includes the removal of overhead wires and
coordination of undergrounding all utilities at this location. The
City will coordinate with the associated utility companies
(electrical, communications, etc.) to locate all wires underground.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $150,000 to $200,000
Page 75 of 90 2C-118
PROJECT: UTILITY UNDERGROUNDING AT
ENTRANCE TO PVIC
TYPE: Public Utilities
LOCATION: Palos Verdes Drive South (at PVIC)
DEPARTMENT: Public Works
DESCRIPTION:
This project includes the removal of overhead wires and
coordination of undergrounding all utilities at this location. The
City will coordinate with the associated utility companies
(electrical, communications, etc.) to locate all wires underground.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $150,000 to $200,000
Page 76 of 90 2C-119
STORM DRAIN SYSTEM
UNFUNDED PROJECTS
Page 77 of 90 2C-120
PROJECT: SAN RAMON CANYON
STABILIZATION PROJECT
TYPE: Storm Drain System
LOCATION: Project Area 3
DEPARTMENT: Public Works
DESCRIPTION:
This project will include a finalized bid package for soliciting bids,
awarding a construction contract for the project, obtaining
construction management and inspection services, construction of
the drainage system, installation of riparian re-vegetation and
other required mitigation and project close out. The project is
expected to be completed within two years.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $19,000,000 TO $20,000,000
Page 78 of 90 2C-121
PROJECT: ALTAMIRA CANYON
TYPE: Storm Drain System
LOCATION: Project Area 4
DEPARTMENT: Public Works
DESCRIPTION:
This project includes the installation of protective measures to
minimize further erosion in the Altamira Canyon. This project
could range from stabilization at bends in stream beds, with limited
velocity controls, to channeled stabilization.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
This estimate does not include right of way costs. A previously designed and funded project was abandoned
due to right of way issues and owners lack of support.
COST ESTIMATE: $1,250,000 to $5,000,000
Page 79 of 90 2C-122
PROJECT: PVDE- MIRALESTE CANYON
TYPE: Storm Drain System
LOCATION: Project Area 5
DEPARTMENT: Public Works
DESCRIPTION:
Work within this project area includes storm drainage systems
along Palos Verdes Drive East at the Northern end of PVDE,
South Coach, Rocking Horse, Clevis, North Colt, South Colt, Via
Canada, and at South Via Canada. This project includes the
installation of a number of pipelines and re-grading of roads and
surface drainage systems to drain into Miraleste Canyon.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $2,500,000 to $3,200,000
Page 80 of 90 2C-123
PROJECT: SAN PEDRO & AVERILL CANYONS
TYPE: Storm Drain Systems
LOCATION: Project Area 6
DEPARTMENT: Public Works
DESCRIPTION:
Work within this project area would include storm drainage
systems at Miraleste, South Miraleste, North Corsine, Via Colinita,
La Vista, Vista Mesa, and a curb and gutter project on Via
Frascati. This project would include the installation of a number of
pipelines and regarding of roads and surface drainage systems to
drain into the San Pedro and Averill Canyons.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $2,700,000 to $3,300,000
Page 81 of 90 2C-124
RECREATION, PARKS AND OPEN SPACE
UNFUNDED PROJECTS
Page 82 of 90 2C-125
PROJECT: TRAILHEAD/OVERLOOK/VISTA POINT
DEVELOPMENT
TYPE: Recreation, Parks, & Open Space
LOCATION:
DEPARTMENT: Public Works/Planning
DESCRIPTION:
The Vision Plan identifies the construction of major trailheads at
key entrances to the existing City trail system. It is proposed that
trailheads be located at widened areas near the start of trails, with
a permeable surface pad made up of decomposed granite, gravel
or bark mulch. Furnishings would include a bench, a plastic bag
kiosk for dog owners, and trash and recycling receptacles.
Signage will include a Trailhead sign or possibly a freestanding
kiosk for trail notices. Small native trees for shade and pockets of
native shrubs, where appropriate, are also envisioned at trailhead
locations. Phase 1 would involve the development of the trail
head location at Shoreline Park/25th Street. Phase 2 would involve
the development of the following trail head locations: Cul-de-sac
next to St. Paul’s Church, Del Cerro Park, and the end of Ocean
Terrace. Phase 3 would involve the development of a trail head
location at the Switchbacks/PVDE Turnout.
The Vision Plan identifies the construction of overlooks and vista
points either in the Preserve or on other public lands within the
Vision Plan project area. It is proposed that overlooks/vista points
be placed on decomposed granite, or other permeable material
pad with flush stone edging. Furnishings at overlooks/vista points
are to include a semicircle bench as well as a stone pilaster
displaying any information, such as the name of any donor being
recognized. A stone clad retaining wall, less than 3 feet in height,
may also be incorporated into the overlook/vista point as
necessary. Plant pockets of native shrubs are also envisioned.
Phase 1 would involve the development of Inspiration Point and
Eagles Nest overlooks/vista points. Phase 2 would involve the
development of the following overlooks/vista points: Cul-de-sac
next to St. Paul’s Church, Del Cerro Park and the end of Ocean
Terrace. Phase 3 would involve the development of the following
overlooks/vista points: Switchbacks/PVDE Turnout, Paintbrush
Canyon/Burma Road, and Burma Road above Gateway Park.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
Page 83 of 90 2C-126
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $100,000 to $130,000
Page 84 of 90 2C-127
PROJECT: PUMP TRAIL IMPLEMENTATION
TYPE: Recreation, Parks, & Open Space
LOCATION: Palos Verdes Nature Preserve
DEPARTMENT: Planning/Public Works
DESCRIPTION:
In April 2008, the City Council adopted the Preserve Trails Plan
(PTP) for the NCCP’s Palos Verdes Nature Preserve. The Council
-adopted PTP identifies the trail routes and trail uses for the ten
sub-areas that make-up the greater Preserve. It is proposed that
the Preserve Trails Plan be implemented in phases through a
series of projects for each of the nine sub-areas. (Portuguese
Bend Reserve Trails has been separated as an individual project
but is also part of the PTP) The sub-areas include: Vista del
Norte Reserve, Agua Amarga Reserve, Alta Vicente Reserve,
Vicente Bluffs Reserve, Abalone Cove Reserve, San Ramon
Reserve, Forrestal Reserve and Three Sisters Reserve.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $820,000 to $1,100,000
Page 85 of 90 2C-128
PROJECT: PORTUGUESE BEND RESERVE
TRAILS
TYPE: Recreation, Parks, & Open Space
LOCATION: Portuguese Bend Reserve
DEPARTMENT: Planning/Public Works
DESCRIPTION:
The Portuguese Bend Reserve consists of a 399-acre portion of
the Peacock Flats parcel purchased by the City from Barry Hon in
2005 and the 17-acre Del Cerro Park buffer parcel. The following
proposed trails will be improved: Fire Station Trail (RH Crossing),
Rim Trail (relocate trail), Pine Grove Trail, North Sandbox Trail,
Peacock Flats Trail and Overlook Trail (launch pad). As part of
this project, the trailheads will be improved with the following: entry
signs, benches, trash bins, mutt mitts, drinking fountain, parking
and landscaping.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $600,000 to $740,000
Page 86 of 90 2C-129
PROJECT: SUNNYSIDE TRAIL SEGMENT
PROJECT
TYPE: Recreation, Parks, & Open Space
LOCATION: Sunnyside Ridge Road (Intersection of Sunnyside Ridge Trail and
the Sol Vista Segment Trail)
DEPARTMENT: Planning/Public Works
DESCRIPTION:
The Sunnyside Segment Trail is a point-to-point trail segment that
begins on Sunnyside Ridge Road at the intersection of the
Sunnyside Ridge Trail and the currently unused Sol Vista Segment
Trail on the old Narbonne Right-of-Way, as indicated in the City’s
Conceptual Trail Plan. The proposal is to provide a usable trail
linkage for pedestrians and equestrians within a recorded trail
segment that traverses a privately owned lot that is currently
developed with a single-family residence that was formally part of an
old City right-of-way. The trail connection would involve the provision
of a 5-foot wide decomposed granite surface trail.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $400,000 to $450,000
Page 87 of 90 2C-130
PROJECT: SALVATION ARMY TRAIL SEGMENT
TYPE: Recreation, Parks, & Open Space
LOCATION: PVDS (between Upper Point Vicente and Tramonto Residential
Development)
DEPARTMENT: Planning/Public Works
DESCRIPTION:
The CTP calls for a multi-purpose trail along the north side of PVDS
on the Salvation Army property, between the City’s Upper Pt.
Vicente property and the Tramonto residential development
(approximately 2,000 feet). The City and the Salvation Army are
currently in discussions regarding the Salvation Army’s potential
offer to donate the necessary trail easement on their property to
allow for this important trail connection. If the trail easement is
dedicated, the City will need to construct the actual trail within the
easement.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $120,000 to $150,000
Page 88 of 90 2C-131
PROJECT: BATHROOM AT DEL CERRO PARK
TYPE: Recreation, Parks, & Open Space
LOCATION: Del Cerro Park
DEPARTMENT: Recreation and Parks
DESCRIPTION:
This project would include the construction of a bathroom at Del
Cerro park to serve the park visitors and the users of the trails in the
Portuguese Bend Open Space.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY
SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY
OTHER PROJECT INFORMATION:
COST ESTIMATE: $250,000 - $300,000
Page 89 of 90 2C-132
Page 90 of 90
PROJECT: HESSE PARK PARKING LOT
RESURFACING
TYPE: Recreation, Parks and Open Space
LOCATION: Hesse Park
DEPARTMENT: Public works
DESCRIPTION:
Hesse Park parking lot is one of the most frequently used City
facilities. The pavement at this parking lot is deteriorated and
needs resurfacing. Delaying this improvement will add to the cost
of work due to the extension of cracks’ depth, requiring a more
comprehensive fix.
PROJECT COST ESTIMATES (IF KNOWN)
CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
ACQUISITION
ENGINEERING/DESIGN
CONSTRUCTION
PROJECT MANAGEMENT/OVERSIGHT
LEGAL
TOTAL
IMPACT ON OPERATING BUDGET
JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP
SAFETY ECONOMY AND EFFICIENCY X
SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE
SUPPORTS TACTICAL PLAN GOALS COMMUNITY QUALITY/SUSTAINABILITY X
OTHER PROJECT INFORMATION:
COST ESTIMATE $200,000
2C-133
Status of FY11-12 Capital Improvement Projects Attachment 0
Retrofit/Replacement
Storm Drain Master Plan Update
Pavement Management Program
Update
Ladera Linda Site Master Planning &
Community Outreach
Residential Overlay and Slurry Seal
(10-11 Program)
Residential Overlay and Slurry Seal
Zones 3 &5
PVDS/PVDW Arterial Improvements
Arterial Overlay and Slurry Seal
PVDE (Miraleste to North City Limits)
PVDW/PVDS Median Improvements
Hawthorne Blvd.Traffic Signal
Synchronization
Hawthorne Blvd.Pedestrian
Improvements
PVDS Bikeway Safety
Crestridge/Crenshaw Traffic Signal
PVDE Traffic Safety Improvements
(Guardrails)
PVDE Sewer Line Relocation
Storm Drain Lining
PVDE San Pedro Canyon Backbone
System
Roan System (Via Colinita Vickery
Canyon)
Via Canada
Lower San Ramon Canyon Design
Grandview Park &Lower Hesse Park
Development
Ryan Park Southern Entrance Road
California Coastal Trail
Gateway Park Development Project:
Phase I and II
Abalone Cove Shoreline Park
Eastview Park Playground and ADA
Access
152,500 Project completed.
Many scanned plan drawings are now linked to the current Graphic
Information System (GIS),allowing point &click retrieval.Links to existing
storm drain video and the remaining drawings is underway.Upgrading the
GIS and archiving data are necessary precursors to a robust GIS-based
storm water tool.The City engaged RBF Consultants to assess the current
system and assist Staff in creating a planning document for the storm water
697,789 program.
120,000 This update is expected to begin summer 2012.
This project is currently on hold pending the City Council's capital
100,000 improvements strategic goals.
The Request for Proposals is currently being written,and Staff expects that
1,520,000 the combined project will be in the design phase in March 2012.
The Zone 5 project carried forward from FY1 0-11 and the Zone 3 project
originally appropriated in FY11-12 have been combined.The Request for
Proposals is currently being written,and Staff expects that the combined
1,600,000 project will be in the design phase in April 2012.
The project is currently in construction,and is expected to be completed in
2,349,949 March 2012.
2,380,000 Staff expects the project to be in the design phase in April 2012.
The project is currently in the design phase,and Staff expects to solicit bids
500,500 in March with construction starting in April 2012.
Staff is currently soliciting proposals for project design,and is in process of
obtaining clearances from Caltrans to proceed.The design effort is
785,532 expected to begin in March 2012.
Staff is currently soliciting proposals for project design,and is in process of
obtaining clearances from Caltrans to proceed.The design effort is
1,422,581 expected to begin in March 2012.
In light of recent landslide activity &repair considerations,project feasibility
794,245 is being re-assessed.
242,082 Project completed.
The project is currently in the design phase,and Staff expects to solicit bids
273,114 in May 2012.
114,450 Project completed.
1,146,698 The City is currently soliciting bids for this project.
570,000 This project is currently in the design phase.
242,500 This project is currently in the design phase.
100,000 Project completed.
867,575 This project is currently in the design phase.
This project is in the environmental review process,to be completed
1,990,836 summer 2012.
The feasibility study,preliminary design and cost estimate is expected to be
20,000 completed by May 2012.
City Council awarded the project design contract on February 7,2012.
280,000 Staff expects that construction will begin by fall 2012.
This project is currently on hold pending a geological review that will likely
200,000 be completed in summer 2012.
The City Council approved this project appropriation on February 21,2012.
Staff expects that the Request for Qualifications process will take about 5
months,and that a design contract will be proposed to City Council in July
665,176 2012.
Staff expects that construction will begin as early as May 2012,and
in 2012.
2C-134