Loading...
RPVCCA_CC_SR_2012_03_06_A_Abalone_Cove_Sewer_Pump_Station_RepairsMEMORANDUM TO: FROM: DATE: SUBJECT: REVIEWED: STAFF LlASON: HONORABLE MAYOR AND CITY COUNCIL MEMBERS DIRECTOR OF PUBLIC WORKS 1P--" MARCH 6,2012 V ABALONE COVE SEWER PUMP STATION REPAIRS CAROLYN LEHR,CITY MANAGER ~ RON DRAGOO,SENIOR ENGIN~ RECOMMENDATIONS:Review and reconfirm by four/fifths (4/5)vote,the City Council's previous action taken on February 21,2012,authorizing staff to continue with the actions taken to perform emergency repairs to the Abalone Cove Sewer Pump Station located within the Abalone Cove Shoreline Park. BACKGROUND On February 21,2012,the City Council found that an emergency exists,which will not permit a delay arising from a competitive solicitation for bids to enter into a contract with a contractor,to perform emergency sewer pump and electrical control panel repairs which are needed to repair the failing sewer pump station at Abalone Cove's Shoreline Park. Accordingly,the City Council approved a contract with Multi W Systems,Inc.to re-establish a safe and operational sewer pump station. DISCUSSION Approval of the emergency for this work required a four-fifths (4/5)vote of the City Council under Public Contract Code Section 22050(a)(1).In addition,Public Contract Code Section 22050(c)(1)requires that when a governing body takes action under Section 22050(a)(1),it must review this action and reaffirm it by a four-fifths (4/5)vote at each subsequent regularly scheduled meeting until the work is completed and accepted. Accordingly,because at the time of writing this report,the sewer pumps and three phase electrical control panel and converter have been ordered but not yet received and installed, staff has placed this item on tonight's agenda.This item will be placed on each subsequent agenda until all the work is completed and the City Council accepts the project as complete. Delivery of the pumps and control panel are anticipated during the week of April 23,2012. A-1 Two days are needed to complete the installation of the components;consequently,work should be completed by May 3,2012. CONCLUSION Staff recommends that the City Council review and reconfirm by four/fifths (4/5)vote,their previous action taken on February 21,2012,authorizing staff to continue with the actions taken to perform emergency repairs to the Abalone Cove Sewer Pump Station located within the Abalone Cove Shoreline Park. A-2