Loading...
RPVCCA_CC_SR_2013_06_18_05_2013_Five-Year_Capital_Improvement_PlanCITY OF MEMORANDUM TO: FROM: DATE: SUBJECT: REVIEWED BY: HONORABLE MAYOR AND MEMBERS OF THE CITY COLIN~ DENNIS McLEAN, DIRECTOR OF FINANCE & INFORMATIO TECHNOLOGY JUNE 18, 2013 2013 FIVE-YEAR CAPITAL IMPROVEMENT PLAN (Supports 2013 City Council Goals of Public Infrastructure & Government Efficiency, Fiscal Control, and Transparency) CAROLYN LEHR, CITY MANAGER G9- Project Managers: Kathryn Downs, Deputy Director of Finance & Information ((./J Technology t,?.')) Ryan Mills, Senior Administrative Analyst ~ RECOMMENDATION Adopt the 2013 Five -Year Capital Improvement Plan (CIP). EXECUTIVE SUMMARY The 2013 Capital Improvement Plan (CIP) has been reviewed by the City Council during both the May 7, 2013 and June 1, 2013 Council Meetings. On both occasions, the City Council has given comments and edits for the CIP, which Staff has included in the 2013 CIP document. The following adjustments were made as a result of the May 7, 2013 City Council meeting; 1. The estimate for the Hesse Park Multi-Purpose Room Improvements, included in FY13-14, has been reduced from $250,000 to $175,000; and 2. The construction of 2 new dewatering wells has been added to FY14-15. As a result of the June 1, 2013 City Council meeting, the following adjustments were made; 1. The renaming of the Hesse Park Multi-Purpose Room Improvements to the John McTaggart Memorial Hall and Council Chambers Improvements. 5-1 2013 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 18, 2013 Page 2 2. Minor textual edits offered by Mayor Pro Tempore Duhovic that does not change the substance of any project description or funding structure. Attachments: A) Final 2013 Five-Year Capital Improvement Plan 5-2 Draft 2013 Five-Year Capital Improvement Plan 5-3 TABLE OF CONTENTS INTRODUCTION 3 FUNDED PROJECTS 11 FIVE YEAR GIP FUNDED GRID 12 BUILDINGS AND OTHER FACILITY IMPROVEMENTS 13 INTANGIBLE CAPITAL OUTLAY 20 ROADWAY INFRASTRUCTURE.. 22 UTILITY UNDERGROUNDING 36 STORM DRAIN SYSTEM 38 LANDSLIDE MITIGATION PROJECTS 43 STORM WATER QUALITY 45 SEWER PROJECTS 48 RECREATION, PARKS & OPEN SPACE 58 UNFUNDED PROJECTS 65 UNFUNDED GRID 66 BUILDINGS AND OTHER FACILITY IMPROVEMENTS 67 INTANGIBLE CAPITAL OUTLAY 73 ROADWAY INFRASTRUCTURE.. 74 UTILITY UNDERGROUNDING 83 STORM DRAIN SYSTEM 87 LANDSLIDE MITIGATION PROJECTS 93 RECREATION, PARKS & OPEN SPACE 97 2 5-4 INTRODUCTION A Capital Improvement Plan (CIP) is a guide toward the efficient and effective provision of public infrastructure and facilities. Programming capital facilities and improvements over time can promote better use of the City's limited financial resources, reduce costs and assist in the coordination of public and private development. In addition, the planning process is valuable as a means of coordinating and taking advantage of joint planning and development of facilities and infrastructure where possible. Careful management of these assets keeps the City poised for flexible and responsive strategic planning that allows the City to proactively prepare the groundwork for capital projects so when funding opportunities arise, a plan is ready to be implemented. By looking beyond year-to-year budgeting and projecting what, where, when and how capital investments should be made, capital planning enables public organizations to maintain an effective level of service for the present and future population. THE CAPITAL IMPROVEMENT PLAN (CIP) The result of this continuing planning process is the CIP, which is the City's five-year plan for infrastructure projects. The CIP addresses the City's needs relating to the acquisition, expansion, and rehabilitation of long-lived facilities and infrastructure. The CIP serves as a planning instrument in conjunction with the City's General Plan and the City Council's Goals to identify needed capital projects and coordinate the financing and timing of improvements in a way that maximizes the return to the public. It provides a planned systematic approach to utilizing the City's limited financial resources in the most responsive and efficient manner to meet its service and infrastructure needs. It serves as the "blueprint" for the future of the community and is a management and planning tool, rather than a binding document. The underlying strategy of the CIP is to plan for necessary land acquisition, construction and maintenance of public facilities necessary for the safe and efficient provision of public services in accordance with City policies and objectives adopted in the City's General Plan. A critical element of a balanced CIP is the provision of funds to both preserve or enhance existing facilities and provide new assets to respond to changing needs and community growth. While the program serves as a long range plan, it is reviewed and revised annually in conjunction with the budget. Priorities may be changed due to funding opportunities or circumstances that propel a project to a higher importance. Along the way, projects may be revised for significant costing variances. The CIP is primarily a document that assists in addressing the City's long-term needs. As such, the projects and their scopes are subject to change from year to year as the needs of the community become more defined and projects move closer to final implementation. The adoption of the CIP is neither a commitment to a particular project nor a limitation to a particular cost. As a basic tool for scheduling anticipated capital projects, it is also a key element in controlling future capital financing. For this reason, the CIP includes some "unfunded" projects in which needs have been qualified, but specific solutions and funding sources have not been determined. When adopted, the CIP provides the framework for the City's management team and the City Council with respect to investment planning, project planning and the managing of any debt. This document is independent of the City Council's goals and is intended to serve as a mid-term planning document. THE CIP PROCESS The capital improvement plan and budget is the result of an ongoing infrastructure planning process. Infrastructure planning decisions must be made with regard to both existing and new facilities and equipment. For existing facilities, the planning process addresses appropriate capital renewal strategies and repair-versus-replacement of facilities. New service demands are also considered since they often affect capital facility requirements. Planning for the five-year CIP period and subsequent years, includes linking the General Plan to the capital plan requirements, conducting needs assessments and allowing for flexibility to take advantage of 3 5-5 opportunities for capital investment. The FY13-14 through FY17-18 CIP is developed through input from professional staff, citizens of Rancho Palos Verdes, and elected or appointed City officials. CIP REVIEW TEAM A CIP Review team is responsible for annually reviewing capital project requests and providing recommendations to the City Manager. This team is comprised of staff from the Office of the City Manager, Finance and Information Technology, Public Works, Community Development, and Recreation and Parks departments, and the City Attorney. This team conducts an in-depth analysis of the impact of the CIP on present and future cash flows and financial obligations, as well as the City's ability to finance, process, design, and ultimately maintain projects. The team will also analyze the fiscal impact for each individual project; including future maintenance and replacement costs, associated monetary benefits (e.g. future maintenance savings), as well as any applicable future revenue opportunities. The team meets periodically throughout the year to evaluate the progress of projects, and examine future needs of the City. The overall goal of the CIP Review Team is to develop CIP recommendations that: • Preserve the past by investing in the continued upgrade of City assets and infrastructure; • Protect the present with improvements to City facilities and infrastructure; • Plan for the future. Projects are identified by staff, professional consultants, residents and/or elected officials. There are typically more proposals than can be funded in the five-year CIP period, so the team conducts an internal project ranking process. The criteria used in this internal ranking includes, but is not limited to, safety, support of essential City services, support of City Council's goals, economy and efficiency, outside funding committed (or eligible for), and community quality/sustainability. Projects are prioritized based on the criteria outlined in this plan in the following section. If a project receives a lower ranking, it just means that other projects in that period of time are more critical for the City to address. While ratings are important in determining recommended projects, the realities of the City's financial situation are critical to all decisions. CIP CRITERIA Safety: Enhance or improve the overall safety of the City and delivery of services. Protect the health and welfare of residents. Supports Essential City Services: Maintenance and development of existing or new facilities and infrastructure which allows the City to deliver essential services to residents of Rancho Palos Verdes. Supports City Council Goals: Supports the goals annually established by the City Council in the CITY COUNCIL. Meets citywide long-term goals and is in compliance with the City's General Plan. Economy and Efficiency: Maintain and enhance the economy and efficiency of providing services in Rancho Palos Verdes. This criterion would include projects which improve business processes and overall efficiency while also evaluating environmental impacts. Outside Funding Committed or Eligible: Support a project which outside funding has been committed to or may be obtained through restricted revenue sources. Community Quality/Sustainability: Maintain and enhance the infrastructure and services which supports our residential and business community. This criterion would include projects which preserve and enhance the overall quality of life in Rancho Palos Verdes and projects which ensure economic viability to support a the community. 4 5-6 THE CIP CALENDAR August-October November-January February-May May-June May-June Departments prepare CIP requests CIP Team reviews requests Recommendations developed to be included in the Five-Year Model and Draft Budget Planning Commission Review Recommendations presented to the City Council for approval Additional forms and methods of public outreach will be conducted as directed by the City Council. PROJECT LISTS The CIP includes a comprehensive listing of all projects contained in the Five-Year Plan and also projects beyond the five-year period. Detailed project sheets are contained in the plan for all projects included in the CIP. Another list of unfunded projects is also contained in the plan to highlight quantified projects beyond the five-year period. Projects which are included in the CIP were evaluated based on the criteria approved by the City Council and are in compliance with the goals set forth in the City's General Plan. Application of these criteria ensures that each project recommended for Council consideration does indeed support the policy objectives of the City's long-term planning documents and identifies a basis for scheduling and allocation of resources. Cost estimates have been developed for each project based on preliminary project descriptions, and include all estimated costs for land acquisition, permits and inspections, project management and project engineering, consultant design, construction, utilities, information technology infrastructure and other associated project fees. Estimates are in today's dollars. CAPITAL IMPROVEMENT POLICIES Time Period The Finance and Information Technology Department, in cooperation with all other City Departments and the City Attorney, shall produce a working document designed to identify capital needs annually in conjunction with the budget process. This Five-Year Capital Improvement Plan (CIP) is submitted to the City Council to utilize in reviewing and prioritizing capital projects. After adoption by Council during the budget process, the CIP becomes the City's plan for capital improvements for the next five years, adjusted annually. Type of Project Definitions Capital asset: An asset with a cost in excess of $5,000 and an expected useful life of more than one year, such as automobiles, equipment, and furniture. These items will continue to be included in the operating budget. Items such as automobiles, minor equipment, and furniture will continue to be accounted for and funded using the Equipment Replacement Fund and are not included in the capital improvement plan. Capital project: A project expected to have a useful life greater than ten years and an estimated cost of $100,000 or more. Capital projects include the construction, acquisition, or major renovation of buildings, roadways, utility systems, or other structures, purchase of land, and major landscaping projects. 5 5-7 Projects meeting the above definition will be included in the CIP document in addition to the City's budget document. The information will be tied to the capital budget and totals for each project in the CIP will be included in the capital budget. Selecting the Projects for the CIP The comprehensive capital project planning process has the following essential components: • The General Plan (Long-term Plan-10 Years) • The Capital Improvement Plan (Mid-term Plan-5 Years) • The Capital Budget (Short-term Plan-1 Year) • City Council Goals (Long-term and Short-term evaluated each year) All projects selected for the CIP should be consistent with the goals identified by the City Council or as outlined in the City's General Plan. The project selection process strives to achieve a balanced plan for the community to include all necessary and high priority projects, while also enhancing City services and facilities. Operating Budget Impact Identified in the CIP The operating impact of proposed capital projects, including personnel, operating expenditures, capital outlay, and debt service, as applicable, will be identified in the CIP document and considered in preparing the annual operating budget and Five-Year Financial Model. Moving Projects from the CIP to the Capital Budget All projects approved in the annual capital budget are appropriated at the estimated cost to complete the project. At the end of each fiscal year, the remaining appropriation for uncompleted portions of the project will be carried forward to subsequent fiscal years. Staff will identify the estimated costs, potential funding sources, operating impact, and project schedule for each capital project proposal before it is submitted to the City Council. Staff will coordinate development of the capital improvement budget with the development of the operating budget. All costs for internal professional services needed to implement the CIP will be included in the capital budget as part of the budget document for the years the CIP is to be implemented. Cost tracking for components of the capital improvement program will be updated semi-annually to ensure project completion against budget and established time lines. Funding of the CIP Reserve Fund through Transient Occupancy Tax (TOT) On April 19, 2011, the City Council adopted Policy No. 41 regarding the City's Reserve Policies. Within Policy No. 41, Council approved of a minimum $3 million reserve level, as well as the transfer of the total annual TOT revenue into the CIP fund, which currently is approximately $3.6 million. Definition of Capital Budget Year A capital budget year runs concurrent to the operating budget fiscal year beginning July 1st and ending June 30th. Types of Financing The nature and cost of the project generally determines the financing options as do projected revenue resources. The following financing instruments could be used in the following preferred order: • Outside funding that does not require repayment, including grants, federal, state and county restricted funding (i.e. transportation funding), and donations; 6 5-8 • Developer Fees; • City restricted revenue imposed by voters (i.e. environmental excise tax, storm drain user fee); • Accumulated Fund Balances in Restricted Funds; • General Fund; • Debt secured by a Restricted Revenue Source; and • General Obligation Debt. Remaining Balances It is the City's policy to apply restricted funding sources after a project is completed and final cost is identified, or at the close of each fiscal year, whichever occurs first. Evaluation of Capital Projects Capital project and program reviews are to monitor existing project performance and to update the Five-Year CIP. Each project must be actively managed and semi-annual reports on the physical and fiscal status of each project should be made available to the City Council in conjunction with the budget adoption and Mid-Year Financial Review. Green Building Standards The City of Rancho Palos Verdes requires the incorporation of green building principles and practices into the design, construction, and operation of all City facilities, and to evaluate all land purchases for future development on the basis of reducing environmental impacts whenever feasible. Standards for Maintenance It is important to have standards in place for the various infrastructure systems throughout the City to maintain this investment and be positioned to provide adequate services for the residents of Rancho Palos Verdes. Staff will develop maintenance standards and schedules as appropriate. Contingency Policy The need for contingencies will be evaluated with each project and be included in the CIP on a case-by-case basis. Project Change Orders Project change orders will be made in accordance with the policy stated in Section 02.44 of the Municipal Code. . GENERAL PLAN GOALS The goals stated below are included in the City's General Plan which serves as the City's long- term strategic planning tool. All CIP projects should contribute to fulfilling one or more of the goals listed below. Natural Environment Element • It is the goal of the City of Rancho Palos Verdes to conserve, protect, and enhance its natural resources, beauty, and open space for the benefit and enjoyment of its residents and the residents of the entire region. Future development shall recognize the sensitivity of the natural environmental and be accomplished in such a manner as to maximize the protection of it. Socio/Cultural Element • The City shall strive to protect and preserve all significant archaeological, paleontological and historical resources within the City. Cultural Resources 7 5-9 • The City shall strive to protect and preserve all significant archaeological, paleontological and historical resources within the City. Current Social, Service, and Cultural Organizations • Work toward a coordinated program to aid in matching the facility needs of the many and diverse groups in the community with existing and future facility resources throughout the City. Social Services • Encourage programs for community involvement, participation, and action to minimize the sense of isolation and powerlessness felt by many individuals in the community. • Encourage programs for recreation, social services, and cultural and educational achievement. • Encourage a framework for interaction among the four cities of the peninsula and between the peninsula and its surrounding communities to solve common problems. Urban Environment Element • It is the goal of the City to carefully control and direct future growth towards making a positive contribution to all elements of the community. Growth in Rancho Palos Verdes should be a cautious, evolutionary process that follows a well-conceived set of general guidelines which respond to both holding capacity limitations for the region and environmental factors on the peninsula. Activity Areas • It is the goal of the City of Rancho Palos Verdes to preserve and enhance the community's quality living environment; to enhance the visual character and physical quality of existing neighborhoods; and to encourage the development of housing in a manner which adequately serves the needs of all present and future residents of the community. • The City shall discourage industrial and major commercial activities due to the terrain and environmental characteristics of the City. Commercial development shall be carefully and strictly controlled, and limited to consideration of convenience or neighborhood service facilities. • The City shall encourage the development of institutional facilities to serve the political, social, and cultural needs of its citizens. • The City shall endeavor to provide, develop, and maintain recreational facilities and programs of various types to provide a variety of activities for persons of all age groups and in all areas of the community. • Agricultural uses within the City shall be encouraged, since they are desirable for resource management and open space. Infrastructure • It shall be a goal of the City to ensure adequate public utilities and communications services to all residents, while maintaining the quality of the environment. • It shall be a goal of the City to provide residents with a safe and efficient system of roads, trails and paths. • It shall be a goal of the City to encourage the increased mobility of residents through the development of an adequate public transportation system. 8 5-10 Safety • It shall be a goal of the City to provide for the protection of life and property from both natural and man-made hazards within the community. • It shall be a goal of the City to provide for the protection of the public through effective law enforcement and fire protection programs. • It shall be a goal of the City to develop and enforce health and sanitation, emergency communications, and disaster preparedness programs to ensure the overall health and safety of all residents. • It shall be a goal of the City to protect life and property and reduce adverse economic, environmental, and social impacts resulting from any geologic activity. Sensory Environment • It shall be the goal of the City of Rancho Palos Verdes through proper land use planning and regulations, to provide for a quiet and serene residential community with a minimum of restriction on citizen activity. • Palos Verdes peninsula is graced with views and vistas of the surrounding Los Angeles basin and coastal region. Because of its unique geographic form and coastal resources, these views and vistas are a significant resource to residents and too many visitors, as they provide a rare means of experiencing the beauty of the peninsula and the Los Angeles region. It is the responsibility of the City to preserve these views and vistas for the public benefit and, where appropriate, the City should strive to enhance and restore these resources, the visual character of the City, and provide and maintain access for the benefit and enjoyment of the public. Land Use Plan • It is the goal of the City of Rancho Palos Verdes to provide for land uses which will be sensitive to and enhance the natural environment and character of the community, supply appropriate facilities to serve residents and visitors, promote a range of housing types, promote fiscal balance, and protect the general health, safety, and welfare of the community. Fiscal Element • It shall be a goal of the City to hold the property tax to a minimum and to continually explore and analyze the advantages and disadvantages of alternate or new sources of revenue. • It shall be a goal of the City to explore cooperative financing strategies that might be undertaken in association with other jurisdictions. • It shall be a goal of the City to take maximum advantage of regulatory legislation to obtain contributions, dedications and reservations (i.e., easements). • It shall be a goal of the City to ascertain that all revenues generated by growth are sufficient to cover costs related to growth. • It shall be a goal of the City to thoroughly evaluate capital acquisition and operating expenditures and their impacts before implementation of programs. 9 5-11 (THIS PAGE IS BLANK) 10 5-12 FUNDED PROJECTS The following projects are those which have been identified as capital needs through various planning processes along with a proposed funding source. Because the City Council approves CIP projects for the upcoming year, proposed future funding sources could change in subsequent years. 11 5-13 ....... I\) Rancho Palos Verdes Five Year Capital Improvement Plan -Funded ! Council l Project ! Page Safety Goal Priority FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 Identified i=11nrlinn Source eUildings and OthQr"Facllity improvement$':·.·.··.· .· .• ··:. ·•f""'i3\· ...... ·· ........... ···••/;,.:< ·....--...: •••. :.:..:· . • .•. ... . .. •·•· ..... ... , ........... "'•"•"•" ••••• •/•: , ........ : •. /•:···· / •· •· •.•• •·• // ..... : • . ............. · 77 Citywide ADA Transition Aan Implementation I X $ 400,000 $ 400,000 $ 200,000 $ 150,000 $ 150,000 EEflCIPReserves, CDBGfunds Fiber Optic Cabling: Hesse Park/Ryan Park i $ 60,000 $ 260,000 CIP Reserve Fiber Optic -Ab Cove Sew er Lift Stations/Shoreline Park/Ladera Linda i $ 1,600,000 CIP Reserve John rvtTaggart fv1emorial Hall and Council Charrt>ers Improvements I $ 175,000 CIP Reserve Ladera Linda Comm.mity center lrrprovements x I CIPReserve ln~glbie::oapltal ()4tlay"c:•:-.· ......... :c..::: .. :::c: c/20/c' .,....... . . ............................ . Pavement Management Program Update X X $ 120,000 CIP accurrulated balance •Rc>iii:i~liY'Jntras#ii~\ire'•·•· •:• · .............. · ...... ·. ···•."·•:••. :<:<:<:::•:••:•'•'}"•:•: •>u•.:":" •""' ...... · Residential Street Rehabilitation Zone 9 X X $1,900,000 General Fund, TDA Article 3 funds Residential Street Rehabilitation Zone 2 & 6 I I X I X I I $ 2,100,000 I I I !General Fund, TDA Article 3 funds Residential Street Rehabilitation Zone 7 i I X I X I I I $ 1,800,000 I I I General Fund, TDA Article 3 funds Residential Street Rehabilitation Zone 8 I X X I $1,800,000 General Fund, TDA Article 3 funds ResidentialStreetRehabilltationZone3&4 I X X $ 2.100,000 General Fund, TDAArticle3funds Arterial Rehabilitation -Mraleste Drive X X $ 70,000 $ 2,630,000 Measure R, Prop A. Prop C, CIP Reserve Arterial Rehabilitation -Crenshaw Boulevard X X $ 70,000 $ 2,730,000 f\i1easure R. A-op A, A-op C, OP Reserve Arterial Rehabilitation -Indian Peak Road X X $ 1,500,000 Measure R, A-op C, CIP Reserve P\/DS -East End of Landslide X X $ 500,000 CIP Reserve Pl/DE Bronco -Headland Safety Improvements I X X $ 41,700 $ 500,300 HSIP, General Fund (90110) :i; ;.::40,uuu 1 $ 3,510,000 P\/DS Road Way Realignment and Drainage A'"oject X X - Pl/DE Mllti Modal Improvements I x x I I I $ 3,20 0.000 Western Avenue Traffic lfll>rovements I x x I $ 3,200,000 50-50 cost share, CIP Reserve :'•::.::.i::;:'~if•': I I st<i:rnforili'i·~~m=n•::') :::::::•'•>•'• .............. ,.,,.,, .................. , ...... ,,, ....• , ....... , ........ ,. ........ ,,., •.•. ''""'""""•<: •::::u::::: .•·•· •.•. , · ................... ,.~.,:. ,,,,,, •••• ,,, .. , .... . Storm Drain Lining X X Pl/OS (East of Barkentine) X X south Haw thorneNia Frascati X X rvlarguerite Open Channel X X "\;.7g;m71':0m'fff!I'TJ3If1ff'rnF?''iF'f%i~IEI)7@'8:8WT'?r:;r:: slide Dew atering Wells (2) x x ~'i'ii~WY"!!~F®'i'!iiY.0~'~'''7l'7m>z:~;:,p:;:;::77g:;T'.%Vi7?:: N'i;?,•:::::::: Drainage Area Monitoring System Storm Water Quality Regional ll'Yllrovement A'"oject aew•r;~!?1•~i!': :,::.•·•'•''· .•• , ... ,, .......... , ..... ::::::::~:::;:: ::;::~:~:;:::;::~ :::::::f;~:::: Basswood Avenue x x West General Street x x Abalone Cove x x lronw ood Street x x P\/DS at Schooner Drive x x P\/DS at Sea cove Drive x x Ginger Root Lane x x l'v1a.laga Canyon x x Mscellaneous A"ojects x x ~-;>i;iti<i>:i\Ifiai'kii:"'i!ii<i'QPj;it"spac ... · F':;77:·77:;nFTTT'?'.TS:?:•::•:'ff'f:g:;;,F;::7;;0;T@'!•·"•" .'·" . Abalone Cove Shoreline Park Parking Lot fnllrovement Abalone Cove Shoreline Park Staff Building, Restrooms and Orivew ay fnllrovements 1-iesse Park Parking Lot Resurfacing Point Vicente Interpretive center (Pl/lC) Building Identification Sign/Screening Wall Ryan Park Parking Lot Expansion i Salvation Army Trail I x x x ,200 Rule 20A funds 329,8· :•::;.;:•:o;:;·::::••'::::fo;:::.:: .;:.:;::.o•::•::•;c'.:::t•::;:<• •':"'::\::•:•:::••:::Ji:::•:: ::':•:::•:;:••::?::•:::••::•:•:•j...,::•:•:::::::'\:':':•\::::::-.<:•:::t:c::...::······>··· .·.· ........................... , ..•••• •:•:::•••::j -.35,278 . $ 340,836 $ 347 ,653 $ 350,000 WQFP User Fees $ 446,000 WQFP User Fees $ 440,000 WQFP User Fees $ 350,000 170,000 I $ 170,000 CIPReserve X·/.•:·> ;;;••:f0@EI'.'.~?~'I'''•tf":" "('•'}(::'}••f:•:('•:\•'.•:•••:•<·•····· ···:·;;:::::--;.::::;:~-;::;:~-. -::;~:::::-'.'::-:°"-'"'"·-''·-'''''"'>p,V,""'"""'·'"'-'""'>"•' 200.000 I $ 300.000 CIPReserve 200.000 I $ 300,000 OP Reserve (.;at-' i-<eserve .ooo CIPReserve $ 567,000 CIPReserve $ 247,275 CIPReserve $ 603,000 CIPReserve $ 199,000 CIPReserve $ 203,000 CIPReserve $ 407,000 CIPReserve $ 465,000 CIPReserve ~~:·:·:::·:~:7:;.o::?.>:< i?l-::~:'."::~:c:-.:;.~. $ 332,000 CIP Reserves, Quirrby Funds $ 108,000 CIP Reserves, Quirrt>y Funds $ 190,000 CIP Reserves, Quirrt>y Funds $ 110,000 CIP Reserves, Quirrt>y Funds $ 400,000 CIP Reserves, Quirrt>y Funds $ 103,000 CIP Reserves, Quirrt>y Funds !TOta1s· ......... . ···::·:::::~'.c::~;:;;'.>:-'"7 <'"'."''.-::::;-:-:~::~::-:"'.":·::: '-'7"''"'"··,.,...'::~""~::.:-·r::::<<·" t :-· · >I· . . ' T~S:oa:t:86& f $10;745;278 Ts 6,e41,1361"'$5.4!i2;663 J$12;!iclo;ooo r ·77:~7···· 7 " 5 - 1 4 BUILDINGS AND OTHER FACILITY IMPROVEMENTS Buildings and other facility improvements may include any proposed new City facility or renovation or improvement of any existing City facilities. The City owns and maintains twelve public buildings, including: • City Hall Administration Building at Upper Point Vicente Park • City Hall Community Development Building at Upper Point Vicente Park • City Hall trailer leased by Palos Verdes on the Net at Upper Point Vicente Park • City Hall Emergency Communications Center trailer at Upper Point Vicente Park • Fred Hesse Jr. Community Center Building • Pointe Vicente Interpretive Center (PVIC) at Lower Point Vicente Park • Robert Ryan Park Building • Ladera Linda Community Center Buildings (5) • Cable Television Building Studio Except for PVIC, these buildings are 25 years old or older and showing the signs of daily use. Many of the facilities were purchased from the school district or transferred to the City from the federal government, and little to no improvements have been made since their acquisition. It is important to perform adequate maintenance to extend the life of these facilities. It will be necessary to renovate these buildings as they age to meet the needs of the community and ensure that all building and safety guidelines are satisfied. PVIC, the most recently remodeled City facility, was built in 1984 and expanded in 2005. The City Hall buildings and Ladera Linda Community Center buildings are the best examples of buildings that are in great need of renovation to meet organizational needs, comply with safety and code requirements, and comply with all Americans with Disabilities Act (ADA) guidelines. The projects listed on the following pages have been developed based on individual staff assessments, input from the community and professional consultants' assessments and studies. In November 2010, the City's consultants completed a Civic Center Facilities Assessment, which offered alternatives and general cost estimates for building improvements to serve municipal functions, as well as optional public amenities with a view to the long-term needs of the City. The alternatives identified range widely from a "no-frills" structural, HVAC and ADA retrofit to the existing administration facility--to newly-constructed civic facilities which could incorporate community-serving amenities (public meeting rooms, community center, etc.). In light of competing CIP demands, the City Council has directed Staff to focus on cost-effective renovation of existing City Hall buildings. Therefore, the full- expansion, new construction alternative is not included in the Unfunded List. The City Council ad-hoc subcommittee for the Upper Point Vicente/Civic Center Master Plan is working with Staff on a critical needs assessment, including the seismic retrofit of City Hall buildings, improvements to address ADA compliance 13 5-15 throughout the campus, as well as heating, ventilation, and air conditioning. Once those projects are fully considered by the Council, the project description and associated costs will be incorporated in accordance with Council's direction into the CIP schedule. 14 5-16 PROJECT: CITYWIDE ADA TRANSITION PLAN IMPLEMENTATION TYPE: Buildings and Other Facility Improvements LOCATION: Various DEPARTMENT: Public works The Citywide ADA Transition Plan identifies projects with total cost estimates of $11.8 million. This estimate includes $2.6 million of roadway curb ramps and bus stops to be addressed with future roadway projects; $1.7 million of access improvements at Ladera Linda to be addressed with any future rehabilitation of the Ladera Linda Community Center; and $1.3 million of access improvements at the Civic Center to be addressed with any future DESCRIPTION: rehabilitation of the City Hall campus. The remaining $6.2 million of identified projects are to improve ADA compliance at various other City-owned properties. The projects totaling $1.3 million scheduled for the next five years are from this list, and address issues categorized as "potential hazard" and "severe". The remaining $4.9 million of this list, as well as the amounts noted above for roadways, Ladera Linda, and the Civic Center remain unfunded. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN $35,000 $35,000 $17,500 $10,000 $10,000 CONSTRUCTION $365,000 $365,000 $282,500 $140,000 $140,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $400,000 $400,000 200,000 150,000 150,000 IMPACT ON OPERATING BUDGET Funding Source: The CIP Reserve funded with General Fund Money, EET and CDBG grants. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 15 5-17 PROJECT: FIBER OPTIC CABLING: HESSE/RYAN PARK TYPE: Buildings and Other Facility Improvements LOCATION: Hesse Park/Ryan Park DEPARTMENT: Finance and Information Technology This project includes the installation of fiber optic cabling for the City's phone and information network between City facilities within the public right-of-way which will run adjacent to Ryan Park and directly on to Hesse Park. DESCRIPTION: To reduce costs, this project will be strategically aligned with the Hawthorne Traffic Signal Synchronization Project that will begin in 2013 to take advantage of the asphalt being dug up from the other project. Vaults will be placed adjacent to the roadway within the public right-of-way. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN $60,000 CONSTRUCTION $260,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $60,000 $260,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 16 5-18 FIBER OPTIC CABLING: ABALONE PROJECT: COVE SEWER LIFT STATIONS/ SHORELINE PARK/LADERA LINDA TYPE: Buildings and Other Facility Improvements LOCATION: Ladera Linda/Abalone Cove Shoreline Park DEPARTMENT: Finance and Information Technology This project includes the installation of fiber optic cabling for unified communications and data transmission between remote City park and infrastructure facilities and the Civic Center administration facility. It is essential to establish communications to Abalone Cove Shore Line Park, the Abalone Cove Sewer Lift Stations and Ladera Linda Park. Improved connectivity with Ladera Linda is essential to provide full communication services to the eastside community park in conjunction with its rehabilitation. The entire fiber optic run could occur by a combination of aerial and underground line placement. The project includes running a single line of fiber optic cabling on its DESCRIPTION: own network from City Hall to Abalone Cove Shoreline Park, Abalone Cove Sewer lift stations and on to Ladera Linda Park, with the cost of approximately $1.6M. The work would entail installing 24-48 strand fiber in 3" conduit within the public right of way along Palos Verdes Drive South by either open cut or boring construction methods. Due to challenges with running fiber through the landslide area, the option of leasing fiber from an Internet Service Provider between the Civic Center and Ladera Linda will be included in the scope of the project. Cox Communications currently has fiber that connects to users along the road adjacent to Ladera Linda . PROJECT COST ESTIMATES (IF KNOWN). ... ... < . .. CATEGORY YEAR 1 YEAR2 YEAR3 ·YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $1,600,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,600,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 17 5-19 JOHNE MCTAGGART MEMORIAL PROJECT: HALL AND COUNCIL CHAMBERS IMPROVEMENTS TYPE: Maintenance/Upgrade LOCATION: Hesse Park DEPARTMENT: RPVTV McTaggart Hall is used for City Council meetings, Planning Commission meetings as well as numerous other uses that are broadcast on public television. The lighting, the background, and the cameras need to be replaced to make these public meetings more visually appealing. The new cameras would be High DESCRIPTION: Definition (HD) and would require full HD integration of the directors booth or production control (the black room). This would require an upgrade including, but not limited to, an audio mixer, HD remote camera cables, digital video switcher, live video feed distribution computer, on air graphics computer, digital back up svstem and DVD burners. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $250,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $250,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY x SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 18 5-20 PROJECT: LADERA LINDA PARK & COMMUNITY CENTER BUILDINGS REPLACEMENT TYPE: Buildings and Other Facility Improvements LOCATION: Ladera Linda Park DEPARTMENT: Public Works The initial stage of this project, for which a budget is appropriated, is to create a master plan which will lay the groundwork for the site's long-term redevelopment and phased implementation. This stage involves a study of community needs through public outreach along with contemplating the City's needs for public service facilities. This work will be followed by programming, quantifying the needs, planning and preparing a feasibility report to create a master plan which can be phased for design and construction. The cost calculation for Ladera Linda Buildings Replacement DESCRIPTION: project is based on an estimated need for 12,000 square-feet of buildings to replace the existing 18,000 square-feet. The anticipated square footage can cover park restrooms, a staff building, multipurpose room, activity rooms, discovery room and a Park Ranger/Deputy Sheriff drop-in office. Other improvements include park grounds landscaping & irrigation, picnic tables, benches and an emergency generator. The project can be divided in three phases. The first phase will include Hazmat abatement, removal of all buildings, installation of all utility infrastructures, the construction of 6,000 SF of new building, park grounds, landscaping & improvements. The second and third phase will include 3,000 SF of new buildinQs each. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $4,000,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $4,000,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. Phase I -$4 Million in CIP Reserves Total Cost: $7.2 Million JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY x SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: 19 5-21 INTANGIBLE CAPITAL OUTLAY Intangible Capital Outlay improvements may not have significant physical substance, but they have more than minimal value and help the City in improving operations or planning for the future. Projects that could be classified as intangible capital outlay include the update or development of major planning processes and documents, significant software purchases that may improve the efficiency of business processes or large technology purchases that may improve or enhance service delivery to citizens. This category includes an update to the Pavement Management Program. 20 5-22 PROJECT: PAVEMENT MANAGEMENT PROGRAM UPDATE TYPE: Intangible Capital Outlay LOCATION: NIA DEPARTMENT: Public Works The Pavement Management System (PMS) is updated every three years to evaluate the condition of the City's roadway system and to DESCRIPTION: identify Citywide Arterial Rehabilitation and Residential Rehabilitation projects. The Metropolitan Transit Authority (Metro) requires the PMS update in order for the City to continue receiving Proposition C monies. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN $120,000 CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $120,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 21 5-23 ROADWAY INFRASTRUCTURE Roadway infrastructure is one of the most widely used major capital investments of a municipality. Without a well-maintained street system, the transportation needs of the public, business, industry and government cannot be met. The roads are also part of a critical public safety need, as they contribute to the general health and welfare of the community. Maintaining quality roadway infrastructure is also important for maintaining property values. It has been shown that property values tend to suffer from adjacent poorly maintained streets. Roadway infrastructure includes residential streets, arterial streets and traffic safety improvements. In the City of Rancho Palos Verdes, there are 33.68 miles of arterial streets, 6.46 miles of collector streets and 103.31 miles of residential streets. The total for all streets and alleys mileage is 143.44 centerline miles. To manage the City's residential and arterial streets, the City hires a consultant that completes a full-detailed assessment of all streets every three years. This report, known as the Pavement Management System, helps to identify any serious issues and provides the City with .a rating for each street. The report includes the overall Pavement Condition Index (PCI). The City of Rancho Palos Verdes maintains a minimum standard for PCI for a municipal street system at 80. The City's current PCI is 84.2 based upon the PMS report prepared by Willdan & Associates in 2009. Since 1997, the City has maintained a pavement rating between 80 and 90. The report also helps in defining a schedule to complete the work. The City has been divided into nine zones for residential streets, but in the case of some areas, zones may be completed together in one year for added efficiency. 22 5-24 PROJECT: TYPE: LOCATION: DEPARTMENT: RESIDENTIAL REHABILITATION Roadway Infrastructure Zone 9 Public Works As part of the City's Pavement Management System (PMS), Zone 9 of the residential rehabilitation program is scheduled for implementation during the FY13-14 budget cycle. This project will DESCRIPTION: include micro-surfacing, slurry seal, overlay, curb repair, root removals and ADA compliance updates of the streets and sidewalks in Zone 9. This infrastructure enhancement will also include u datin traffic si ns, stri in , curb aintin and house numberin . PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $1,900,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,900,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDA Article 3 for $26,586 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY13-14. This project is funded by General Fund monies and ensures a pavement condition of 85 or higher, which is considered "Very Good Condition" or higher. 23 Zone 9: Composed of streets on the eastern side of the City including neighborhoods such as Eastview, South Eastview, Peninsula Verde and Rolling Hills Riviera. 5-25 PROJECT: RESIDENTIAL REHABILITATION TYPE: Roadway Infrastructure LOCATION: Zone 2 & 6 DEPARTMENT: Public Works As part of the City's Pavement Management System (PMS), Zone 2 & 6 of the residential rehabilitation program are scheduled for implementation during the FY14-15 budget cycle. This project will DESCRIPTION: include slurry seal, overlay, curb repair, root removals and ADA compliance updates of the streets and sidewalks in Zones 2 & 6. This infrastructure enhancement will also include updating traffic si ns, stri in , curb aintin and house numberin . PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR a YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $2,100,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $2,100;000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDAArticle 3 of approximately $25,000 JUSTIFICATION FOR INCLUSION ON SYEAR Cf P SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION.: This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY14-15. This project is funded by General Fund monies and ensures a pavement condition of 85 or higher, which is considered "Very Good Condition" or higher. 24 Zone 2: Residential streets in the northwestern part of the City between Crest Road and Grayslake Road, east and west of Hawthorne Blvd. Zone 6: Residential streets in the southern part of the City encompassing all neighborhoods to the east of Point Vicente Park and west of Trump National including Crestmont, Tramonte, Seaview, Barkentine, Seacove, Wayfarer's Chapel, the Landslide Zone and Portuguese Bend neighborhoods. 5-26 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: RESIDENTIAL REHABILITATION Roadway Infrastructure Zone 7 Public Works As part of the City's Pavement Management System (PMS), Zone 7 of the residential rehabilitation program is scheduled for implementation during the FY15-16 budget cycle. This project will include micro-surfacing, slurry seal, overlay, curb repair, root removals and ADA compliance updates of the streets and sidewalks in Zone 7. This infrastructure enhancement will also include updating traffic signs, striping, curb painting and house numberin PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION. ENGINEERING/DESIGN CONSTRUCTION $1,800,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,800,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDA Article 3 of approximately $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY15-16. This project is funded by General Fund monies and ensures a pavement condition of 85 or higher, which is considered "Very Good Condition" or higher. 25 Zone 7: The Ladera Linda community, Ganado Area, streets near Mira Catalina School, San Ramon and Calle Aventura. 5-27 PROJECT: RESIDENTIAL REHABILITATION TYPE: Roadway Infrastructure LOCATION: Zone 8 DEPARTMENT: Public Works As part of the City's Pavement Management System (PMS), Zone 8 of the residential rehabilitation program is scheduled for implementation during the FY16-17 budget cycle. This project will DESCRIPTION: include micro-surfacing, slurry seal, overlay, curb repair, root removals and ADA compliance updates of the streets and sidewalks in Zone 8. This infrastructure enhancement will also include u datin traffic si ns, stri , curb aintin and house numberin . PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERINGtDESIGN CONSTRUCTION $1,800,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,800,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TOA Article 3 of approximately $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY16-17. This project is funded by General Fund monies and ensures a pavement condition of 85 or higher, which is considered "Very Good Condition" or higher. 26 LOCATION DESCRIPTION Zone 8: Residential neighborhoods off of Palos Verdes Drive East in the northern and eastern parts of the City .. 5-28 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: RESIDENTIAL REHABILITATION Roadway Infrastructure Zone 3 & 4 Public Works As part of the City's Pavement Management System (PMS), Zones 3 & 4 of the residential rehabilitation program is scheduled for implementation during the FY17-18 budget cycle. This project will include micro-surfacing, slurry seal, overlay, curb repair, root removals and ADA compliance updates of the streets and sidewalks in Zones 3 & 4. This infrastructure enhancement will also include updating traffic signs, striping, curb painting and house numberin . PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $2,100,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $2,100,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDA Article 3 of approximately $25,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY17-18. This project is funded by General Fund monies and ensures a pavement condition of 85 or hi her, which is considered "Ver Good Condition" or hi her. 27 Zone 3: Residential streets north of Silverspur Rd and east of Hawthorne Blvd, including the Blackhorse community, Silver Arrow, Longhill and Beech gate Zone 4: Residential streets bordering Crenshaw Blvd and Crest Road, including the Sea Crest, Sea Breeze, Island View, and Ridgecrest communities 5-29 PROJECT: ARTERIAL REHABILITATION - MIRALESTE DRIVE TYPE: Roadway Infrastructure LOCATION: Miraleste Drive DEPARTMENT: Public Works As part of the City's Pavement Management System (PMS), DESCRIPTION: Miraleste Drive arterial will be resurfaced. The project will include milling and overlay, roadway patching, crack filling, curb and gutter repair, sidewalk repair and ADA upgrades. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN $70,000 $2,630,000 CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $70,000 $2,630,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Proposition C, Proposition A, Measure R and CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEARCIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: This project and ensures a pavement condition of 85 or higher, which is considered "Very Good Condition" or higher 28 5-30 PROJECT: ARTERIAL REHABILITATION - CRENSHAW BLVD TYPE: Roadway Infrastructure LOCATION: Crenshaw Blvd. DEPARTMENT: Public Works As part of the City's Pavement Management System (PMS), DESCRIPTION: Crenshaw Blvd. arterial will be resurfaced. The project will include milling and overlay, roadway patching, crack filling, curb and gutter repair, sidewalk repair and ADA upgrades. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $70,000 $2,730,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $70,000 $2,730,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Proposition C, Measure Rand CIP Reserves. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP · ·. ' SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: This project ensures a pavement condition of 85 or higher, which is considered "Very Good Condition" or higher 29 5-31 PROJECT: ARTERIAL REHABILITATION -INDIAN PEAK ROAD TYPE: Roadway Infrastructure LOCATION: Indian Peak Road DEPARTMENT: Public Works As part of the City's Pavement Management System (PMS), DESCRIPTION: Indian Peak Road arterial will be resurfaced. The project will include milling and overlay, roadway patching, crack filling, curb and gutter repair, sidewalk repair and ADA upgrades. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY. YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $1,500,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,500,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve and Measure R funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: This project ensures a pavement condition of 85 or higher, which is considered "Very Good Condition" or higher 30 5-32 PROJECT: PVDS -EAST END OF LANDSLIDE TYPE: Roadway Infrastructure LOCATION: N/A DEPARTMENT: Public Works This project will realign the east end of the landslide road along PVDS to correct for the land movement that has taken place over DESCRIPTION: the past several years. The left and right turning deflections within the traveled way will be removed and the roadway will be moved back into the right-of-way along the eastern 800 feet of the landslide road. PROJECT CQST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN $50,000 CONSTRUCTION $450,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $500,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY x SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: This project will correct the unsafe condition that has developed at the east end of the landslide road. The roadway in this area has migrated onto the Palos Verdes Bay Club property; the realignment will correct this problem as well. Construction estimate is approximately $450,000 due to the addition of the Gateway parking lot and mitigation required for a fissure in the project area. 31 5-33 PROJECT: TYPE: LOCATION: DEPARTMENT: TRAFFIC SAFETY IMPROVEMENTS PALOS VERDES DRIVE EAST AT BRONCO DRIVE Traffic Improvements PVDE @ Bronco Drive Public Works Improve portions of PVDE to provide wider travel lanes in each direction, a shared use equestrian and pedestrian path located behind the existing guardrail, a high visibility equestrian crossing DESCRIPTION: at Bronco Drive complete with flashing beacons, augmented crossing signage and advanced crossing signage with flashing beacons, installation of safety barriers and railing to reduce vehicle collisions and cross-over accidents PROJECT· COST ·esTIMATES (IF KN()WN) > .. ACQUISITION ENGINEERING/DESIGN $41,700 CONSTRUCTION $500,300 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $500.~00 IMPACT ON OPERATrNG BUDGET Staff attained an HSIP grant that entails a 10% local match from CIP Reserve. The total project cost is $542,000 with a local match of $487,800. JUSTIFICATION FOR INCLUSION ON 5 YEAR. CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY 32 5-34 PROJECT: PVDS ROAD WAY REALIGNMENT AND DRAINAGE PROJECT TYPE: Landslide Project LOCATION: PVDS DEPARTMENT: Public Works The PVDS Roadway Realignment project and the Ski Jump Drainage project would be designed through this project. The project would aid in the passive drainage of runoff that is now trapped due to ground movement and re-align approximately 1.6 miles of Palos Verdes Drive South which is located within and DESCRIPTION: traverses the Abalone Cove, Portuguese Bend, and Klondike Canyon Landslides. The location of the roadway is constantly moving as the sub-soils within the landslide move. Extensive grading is needed to re-establish (relocate) the roadway within the right-of-way. The preliminary estimated design cost for these projects are $245,000, with construction costs of $3,510,000. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN $245,000 CONSTRUCTION $3,510,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $245,000 $~;510,000· IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Design for the PVDS re-alignment and drainage project is required in FY 13-14 to accommodate the needed roadway alignment and drainage project in FY 14-15. 33 5-35 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: PVDE MUL Tl-MODAL IMPROVEMENTS Public Works As part of the Palos Verdes Drive East Preliminary Study, the report concluded that implementation of four (4) priority projects will help achieve a multi-modal status. PROJECT COST ESTIMATES IF KNOWN CATEGORY YEAR 1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $3,200,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $3,200,000 IMPACT ON OPERATING BUDGET Staff attained an 80/20 grant. The City's local match of $640,000 will be funded through the CIP Reserve JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: 34 5-36 WESTERN AVENUE TRAFFIC PROJECT: IMPROVEMENTS (2007 WESTERN AVE. CORRIDOR IMPROVEMENT PLAN) TYPE: Roadway Infrastructure LOCATION: Western Avenue DEPARTMENT: Public Works The Western Avenue Task Force group was formed consisting of RPV, City LA, and Caltrans. Since its inception, the working group completed a Western Avenue Corridor Study which is a strategic DESCRIPTION: action plan that: • Identified the current and future deficiencies in the multi-modal transportation system within the corridor • Recommended consensus-based solutions (including required strategies) to address the deficiencies. PROJEGT CQST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION 3,200,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL 3,200,000 IMPACT ON OPERATING BUDGET 50-50 sharing agreement with City contribution coming from CIP Reserve. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: ,. WESTERN CORRIDOR IMPROVEMENT PROJECT lnU>l'ffl:tlQ11G«mitttielmpt'(IVll!IMl.lt$ OriWMRtl! .... i!ll..O{SIW:1Sjtl'llmlllh51Jftt(PM"'9) k-'"'*l~~bf.HQl'f;fitf!M~l-41 --.·,z ' !'l ~ . ·-"\ J '~ ~~ \ --~ -:~ --·' •. . i r'f~~""'-:·! ~~,,.::r~>. G~~-·it ...... ~ ~-ar !!t ~:~ .. ..... ~-,._ ..... ,, ... 4 35 5-37 UTILITY UNDERGROUNDING Pursuant to a formula set out in Tariff Rule 20A by the California Public Utilities Commission (CPUC), Southern California Edison is required to set aside an annual amount for the purpose of undergrounding electrical utilities within each city. To qualify, cities must determine that • Undergrounding will avoid or eliminate an unusually heavy concentration of overhead electric facilities • The street or road or right-of-way is extensively used by the general public and carries a high volume of pedestrian or vehicle traffic. • The street, road or right-of-way adjoins or passes through a civic area or public recreation area or an area of unusual scenic interest to the general public. • The street or road or right-of-way is considered an arterial street or major collector as defined in the Governor's Office of Planning and Research General Plan Guidelines. Under the tariff, allocations not committed to a qualifying project in one year are carried over to the next year. Annually, the City receives approximately $80,000 in Rule 20A funds. As of May 2012, the City's Rule 20A fund balance was $839,749. In 2009, the CPUC amended the code to allow for governments to "mortgage" their current year's allocation up to an additional five years in order to able to undertake a qualifying Rule 20A project sooner than otherwise possible. The following project(s) has been identified that meet the criterion for the usage of Rule 20A funds and would benefit the City as whole. 36 5-38 PROJECT: TYPE: LOCATION: DEPARTMENT: CRENSHAW BLVD UTILITY UNDERGROUNDING PROJECT Public Utilities Crenshaw Blvd at Crest Road Public Works DESCRIPTION: The project will underground overhead utility lines along Crenshaw Blvd south of Crest Road. This project qualifies for Rule 20A funding. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN $120,000 CONSTRUCTION $1,080,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1,200,000 IMPACT ON OPERATING BUDGET There is no impact on the operating budget. This project is entirely funded by Rule 20A funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 37 5-39 STORM DRAIN SYSTEM In June 2004, the City's consulting engineers prepared an Update to the Storm Drain Master Plan. The updated plan identified serious storm drain deficiencies that required significant repair. The update identified 38 high-priority projects, which were the basis for establishing a "user fee." Since then, some projects have been completed, and others have been reassessed to meet changing priorities and needs. The 38 projects have been reevaluated resulting in grouping the projects into 12 project areas. These are based on identifiable drainage areas/systems, most of which are tied to natural canyon drainage systems. Each project has been grouped into a project area. The areas are as follows: Area 1: Area 2: Area 3: Area 4: Area 5: Area 6: Area 7: Area 8: Area 9: Area 10: Area 11: Area 12: Sunnyside Ridge Mccarrell Canyon Storm Drain System Lower San Ramon Canyon/Tarapaca Canyon Altamira Canyon Palos Verdes Drive East/Miraleste Canyon San Pedro and Averill Canyons Via Colinita Vickery Canyon Miraleste and Chandeleur Palos Verdes Drive East Switchbacks Hawthorne Boulevard Palos Verdes Drive South Citywide Storm Drain Programs 38 5-40 PROJECT: TYPE: LOCATION: DEPARTMENT: STORM DRAIN LINING Storm Drain System Project Area 12 Public Works All CMP storm drain lines within the City have reached their design life expectancy and need to be lined to extend their life another 30+ years. CMP dating back to the 1940s have been discovered DESCRIPTION: and require maintenance along with those most recently installed in the 1970s. A large number of drainage problems citywide can be overcome by relining deteriorated pipes and improving inlets and outlet structures. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTl0N $329,881 $335,278 $340,836 $347,653 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $329,881 $335,278 $340,836 $347,653 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: WQFP user fees. Ongoing maintenance costs should decrease, as pipes which have been lined generally require less maintenance resulting in a cost savings. Because the Storm Drain User Fee sunsets in FY15-16, funding sources will have to be identified to fund further storm drain lining projects JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 39 5-41 PROJECT: PALOS VERDES DRIVE SOUTH (EAST OF BARKENTINE) TYPE: Storm Drain System LOCATION: Project Area 11 DEPARTMENT: Public Works This project area includes several storm drain systems that cross DESCRIPTION: Palos Verdes Drive South at various locations. Drainage capacity will be increased with improvement to inlets and outlet structures. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEA~1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $446,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $446,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: WQFP user fees JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: .· 40 5-42 PROJECT: SOUTH HAWTHORNENIA FRASCATI TYPE: Storm Drain System LOCATION: Project Area 10 DEPARTMENT: Public Works This project will improve drainage across Hawthorne Boulevard by replacing two existing 18" pipes with one 24" and one 30" RCP pipes. Additionally, a second location on South Hawthorne will be DESCRIPTION: evaluated after episodes of flooding in recent years. A curb and gutter project on Via Frascati will serve to direct drainage into the street and existing catch basins, which drain into the San Pedro Canyon. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION 440,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL 440,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: WQFP user fees JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 41 5-43 PROJECT: MARGUERITE OPEN CHANNEL TYPE: Storm Drain System LOCATION: Between PVDW and the Bluff DEPARTMENT: Public works Staff has become aware of excessive erosion in a portion of open natural drainage channel, which connects two piped systems DESCRIPTION: between PVDW and the bluff. Studies of the issue are scheduled for FY 12-13 with implementation of any recommendations for improvement tentatively scheduled the following year. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $350,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $350,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: WQFP user fees JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY x QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: 42 5-44 LANDSLIDE MITIGATION PROJECTS The City's Landslide Mitigation Projects refers to projects that lessen the effect of erosion on the Portuguese Bend Landslide, which is continuously active landslide in the United States. 43 5-45 PROJECT: INSTALLATION OF LANDSLIDE DEWATERING WELLS (2) TYPE: Landslide Project LOCATION: NIA DEPARTMENT: Public Works Dewatering Wells are a high priority and are considered to be the next most effective method of minimizing runoff from entering the landslide, which helps slow land movement within the landslide. All runoff that percolates into the ground eventually becomes part of the groundwater and will cause an increase in the depth of the groundwater table. Removing groundwater through dewatering wells helps to lower the groundwater table, relieving soil pressures DESCRIPTION: at depth and minimizing the negative effects groundwater has on the landslide. Three new upslope wells in Portuguese Bend and two new wells in Abalone Cove are initially planned during this phase of the system's expansion. These new wells should improve the system's effectiveness by increasing the system's water removal capacity and by removing water more rapidly. Two new dewatering well projects should be scheduled annually until the five have been installed. The cost to install each well is estimated to be $85,000. PROJECT COST ESTIMATES (IF KNOWN) ·•· CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $170,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $1.70,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 44 5-46 STORM WATER QUALITY In order to comply with the new MS4 Permit requirements, the Peninsula cities are working together to address storm water quality issues by developing an Enhanced Watershed Management Plan, including the development of a structural treatment project and to monitor water quality in storm drain outfalls in both dry and wet weather. To meet data standards, it is anticipated that automated data collection systems will need to be designed and installed in several locations in the various watersheds of the City. 45 5-47 PROJECT: DRAINAGE AREA MONITORING SYSTEM TYPE: Stormwater Quality Project LOCATION: City wide, at storm drain outfalls DEPARTMENT: Public Works In response to a new MS4 permit requirement, the City will need to monitor water quality in storm drain outfalls in both dry and wet DESCRIPTION: weather. To meet data standards, it is anticipated that automated data collection systems will need to be designed and installed in several locations in the various watersheds of the City. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN 50,000 50,000 CONSTRUCTION 150,000 200,000 PROJECT MANAGEMENT/OVERSIGHT 50,000 LEGAL TOTAL $200,000 $300,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: This project is required as part of the MS4 Permit 46 5-48 PROJECT: STORM WATER QUALITY IMPROVEMENT PROJECT TYPE: Stormwater Quality Project LOCATION: TBD DEPARTMENT: Public Works In order to comply with the new MS4 Permit requirements, the Peninsula cities will work together to address storm water quality issues by developing an Enhanced Watershed Management Plan, DESCRIPTION: including the development of a structural treatment project. This is an estimate of the City's share of the cost to build a Storm Water Quality improvement project. The project must be built within 30 months of receipt of the water quality monitorinq results. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION 50,000 ENGINEERING/DESIGN 50,000 50,000 CONSTRUCTION 100,000 200,000 PROJECT MANAGEMENT/OVERSIGHT 50,000 LEGAL TOTAL $200,000 $300,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Required as part of MS4 Permit Enhanced Watershed Management Plan. Location to be determined once pollutant monitoring studies are underway. 47 5-49 SEWER PROJECTS The City's sanitary sewer system is essential for City operations, yet it has not required significant expenditures in past years due to an inter-local agreement with Los Angeles County for maintenance activities. The City owns the system, but the County has the primary responsibility for ongoing maintenance. The County collects a sewer fee from the City's property owners that Staff believes is inadequate to maintain the system. Although the County maintains the City's sewer system, the City retains responsibility for its operation, public safety and welfare. The City, not the County, maintains legal and regulatory responsibility (i.e. any state or federal fines resulting from spillage). In preparation for this change, the City conducted a survey of the system, and in 2004 the Sanitary Sewer Master Plan was created to help in the management of this asset. The study examined sample areas throughout the City and assessed the overall system as "fair." The inspection revealed root intrusion in the pipes and cracking in the pipes, in addition to accumulated fats and grease clogging certain areas. It appeared that the County had not been performing adequate maintenance over the years. Without regular maintenance, overflows due to root and grease blockages will occur. To minimize the potential for overflow and to restore and maintain the system in "good" condition, a significant investment in pipeline inspection, repair and maintenance is required. The projects identified herein were included in the City's Wastewater Master Plan Update which was completed in 2009. The City's desire to contribute to a more proactive approach to maintenance of the City's sewer system was originally funded in FY07- 08. The program account for the cost of updating the Sewer System Master Plan, industrial waste monitoring, filming, and investigating, cleaning sewer pipes, and addressing capacity issues throughout the City. Not only does this work enable the City to propose capital improvement projects to the County and perform small crack repair discovered during pipe filming, any roots or obstructions discovered during the video inspections are removed which minimizes the opportunity for overflows 48 5-50 PROJECT: SEWER REPLACEMENT PROJECT- BASSWOOD AVENUE TYPE: Sewer System LOCATION: N/A DEPARTMENT: Public Works This section of the City's sewer system has been determined to be under capacity. This project will replace 564 feet of 8 inch sewer pipe. The pipe will be replaced with a 12 inch vitrified clay DESCRIPTION: pipeline. The pipeline runs along Basswood Avenue between Mossbank Drive and Shorewood Road. This section of pipeline is over capacity when analyzed considering the factor of safety and PCAP rating. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 (FY) ACQUISITION ENGINEERING/DESIGN $10,000 CONSTRUCTION $99,000 PROJECT MANAGEMENT/OVERSIGHT $5,000 LEGAL TOTAL $114,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 49 5-51 PROJECT: SEWER REPLACEMENT PROJECT- WEST GENERAL STREET TYPE: Sewer System LOCATION: NIA DEPARTMENT: Public Works This section of the City's sewer system has been determined to be under capacity. This project will replace 560 feet of 8 inch sewer pipe. The pipe will be replaced with a 12 inch vitrified clay DESCRIPTION: pipeline. The pipeline runs on West General Street between Bernice Drive and West Crestwood Street. This section of pipeline is over capacity when analyzed considering the factor of safety flow run. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION ENGINEERING/DESIGN $17,000 CONSTRUCTION $98,000 PROJECT MANAGEMENT/OVERSIGHT $7,000 LEGAL TOTAL $122,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 50 5-52 PROJECT: ABALONE COVE SEWER SYSTEM PROJECTS TYPE: Sewer System LOCATION: NIA DEPARTMENT: Public Works Water Board requirements mandate the City prepare a Sewer System Management Plan for the Abalone Cove Sewer System - estimated cost is $80,000. Three Pump Stations in the Abalone Cove area need to be modified to allow the use of more reliable pumps estimated cost is $65,000 each. Approximately 300 feet of braided stainless steel low pressure line needs to be repaired/replaced at an approximate cost of $30,000. Forty DESCRIPTION: manholes throughout the system need cleaning and to be lined using a mastic treatment at a cost of approximately $80,000. Approximately fifty low pressure grinder pumps are used throughout the system to aid in overcoming grade differences. These grinder pumps are nearing (or are at) the end of their useful lives. Replacing each pump is estimated to cost $2,000 -the total grinder pump budget need is $100,000. The project will also require $60,000 in design and $22,000 for project management. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION ENGINEERING/DESIGN $60,000 CONSTRUCTION $485,000 PROJECT MANAGEMENT/OVERSIGHT $22,000 LEGAL TOTAL $567,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Project Costs are based on similar projects performed within the Abalone Cove System. Estimated Cost: $567 ,000 51 5-53 PROJECT: SEWER REPLACEMENT PROJECT- IRONWOOD STREET TYPE: Sewer System LOCATION: N/A DEPARTMENT: Public Works This section of the City's sewer system has been determined to be under capacity. This project will replace 930 feet of 8 inch sewer pipe which does not have the hydraulic capacity to accommodate existing flows. The pipe will be replaced with a 15 inch vitrified DESCRIPTION: clay pipe. The pipeline runs partly along Ironwood Street and runs through the easement along Silver Spur Road. This reach of pipeline is given a high priority ranking due the assigned PACP rating of 5 and it is over capacity for existing, future and factor of safety flow conditions. PROJECT CQST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION ENGINEERING/DESIGN $35,000 CONSTRUCTION $202,275 PROJECT MANAGEMENT/OVERSIGHT $10,000 LEGAL TOTAL $247,275 IMPACT ON OPERATING BUDGET ·• /•• • Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: ... ·· . As funding becomes available, projects should be performed in the order they are ranked in the Wastewater Master Plan Update. This project is ranked number 1 of the 8 identified Capital Improvement Projects in the plan. 52 5-54 PROJECT: SEWER REPLACEMENT PROJECT- PVDS at SCHOONER TYPE: Sewer System LOCATION: N/A DEPARTMENT: Public Works This section of the City's sewer system has been determined to be under capacity. This project will replace 2,377 feet of 8 AND 10 inch sewer pipes which do not have the hydraulic capacity to accommodate existing flows. The pipes will be replaced with an DESCRIPTION: 18 inch vitrified clay pipeline. The pipeline runs along Palos Verdes Drive South between Conqueror Drive and Schooner Drive. 25% of this pipeline is over capacity for existing flow conditions and 50 % of the pipeline is over capacity for future flow conditions. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS CFYl ACQUISITION ENGINEERING/DESIGN $65,000 CONSTRUCTION $517,000 PROJECT MANAGEMENT/OVERSIGHT $21,000 LEGAL TOTAL $603,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: As funding becomes available, projects should be performed in the order they are ranked in the Wastewater Master Plan Update. This project is ranked number 2 of the 8 identified Capital Improvement Projects in the plan. 53 5-55 PROJECT: SEWER REPLACEMENT PROJECT- PVDS at SEA COVE TYPE: Sewer System LOCATION: N/A DEPARTMENT: Public Works This section of the City's sewer system has been determined to be under capacity. This project will replace 748 feet of 8 inch sewer pipe which does not have the hydraulic capacity to accommodate DESCRIPTION: existing flows. The pipe will be replaced with a 15 inch vitrified clay pipeline. The pipeline runs along Palos Verdes Drive South between Sea Cove Drive and Abalone Cove Shoreline Park. This section of pipeline is over capacity for existing flow conditions. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 (FY) ACQUISITION ENGINEERING/DESIGN $29,000 CONSTRUCTION $163,000 PROJECT MANAGEMENT/OVERSIGHT $7,000 LEGAL TOTAL $199,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: As funding becomes available, projects should be performed in the order they are ranked in the Wastewater Master Plan Update. This project is ranked number 3 of the 8 identified Capital Improvement Projects in the plan. 54 5-56 PROJECT: SEWER REPLACEMENT PROJECT- GINGER ROOT LANE TYPE: Sewer System LOCATION: N/A DEPARTMENT: Public Works This section of the City's sewer system has been determined to be under capacity. This project will replace 952 feet of 8 inch sewer pipe. The pipe will be replaced with a 15 inch vitrified clay DESCRIPTION: pipeline. The pipeline runs along Ginger Root Lane between Narcissa Drive and Cinnamon Lane. This section of pipeline is over capacity when analyzed considering the factor of safety flow run. PROJECT CQST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS CFYl ACQUISITION ENGINEERING/DESIGN $29,000 CONSTRUCTION $166,000 PROJECT MANAGEMENT/OVERSIGHT $8,000 LEGAL TOTAL $203,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: As funding becomes available, projects should be performed in the order they are ranked in the Wastewater Master Plan Update. This project is ranked number 7 of the 8 identified Capital Improvement Projects in the plan. 55 5-57 PROJECT: SEWER REPLACEMENT PROJECT- MALAGA CANYON TYPE: Sewer System LOCATION: N/A DEPARTMENT: Public Works This section of the City's sewer system has been determined to be under capacity. This project will replace 1,850 feet of 1 O inch sewer pipe. The pipe will be replaced with a 15 inch vitrified clay DESCRIPTION: pipeline. The pipeline runs behind properties in Malaga Canyon parallel to Basswood Avenue between Mossbank Drive and Mazur Drive. This section of pipeline is over capacity when analyzed considering the factor of safety flow run. PROJECT COST ESTIMATES (IF KNOWN) CATEGO~Y YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION ENGINEERING/DESIGN $59,000 CONSTRUCTION $335,000 PROJECT MANAGEMENT/OVERSIGHT $13,000 LEGAL TOTAL $407,000 IMPACT ON OPERATING BUDGET .·· Funding and/or Grant Information: CIP Reserve funds. JUSTlFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: As funding becomes available, projects should be performed in the order they are ranked in the Wastewater Master Plan Update. This project is ranked number 5 of the 8 identified Capital Improvement Projects in the plan. 56 5-58 PROJECT: SEWER REPLACEMENT PROJECT- MISCELLANEOUS PROJECTS TYPE: Sewer System LOCATION: NIA DEPARTMENT: Public Works Several smaller locations throughout the City require repairs. These sections of the City's sewer system have been determined to be under capacity. These projects will replace 1,951 feet of 8 DESCRIPTION: inch sewer pipe. The pipes will be replaced with 12 inch vitrified clay pipelines. The pipelines are located in several locations throughout the City. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 (FY) ACQUISITION ENGINEERING/DESIGN $75,000 CONSTRUCTION $340,000 PROJECT MANAGEMENT/OVERSIGHT $50,000 LEGAL TOTAL $465,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: GIP Reserve funds. JUSTIFICATION FOR INCLUSION ON 5YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: As funding becomes available, projects should be performed in the order they are ranked in the Wastewater Master Plan Update. This project is ranked number 8 of the 8 identified Capital Improvement Projects in the plan. 57 5-59 RECREATION, PARKS & OPEN SPACE The development and maintenance of community parks, recreational areas and open space has been established as a top priority for the City as stated in the General Plan and various other planning documents. The General Plan states, "It is the goal of the City of Rancho Palos Verdes to conserve, protect and enhance its natural resources, beauty and open space for the benefit and enjoyment of its residents and the residents of the entire region. Future development shall recognize the sensitivity of the natural environment and be accomplished in such a manner as to maximize the protection of it." Many park sites and open space areas have been acquired throughout the City, and some have been developed for use by the general public. Some sites remain·vacant or underutilized. The City Council approved the Vision Plan in September 2008 which outlines various trail and park projects which have been included in this plan. The Public Use Master Plan has also outlined a strategy for the development of trails which has also been incorporated into the CIP list. These recreational projects add to the vibrancy of the community and they are designed to contribute to all residents' quality of life. Parks and other open spaces have been carefully planned to take advantage of the beautiful coastline and natural landscape of the peninsula. 58 5-60 PROJECT: ABALONE COVE SHORELINE PARK PARKING LOT IMPROVEMENTS TYPE: Recreation, Parks & Open Space LOCATION: Abalone Cove Shoreline Park DEPARTMENT: Public works With the expected completion of the Land and Water Conservation Fund grant funded improvement project at Abalone Cove Shoreline Park in 2014, public usage of this park is anticipated to increase significantly. The grant funded improvements do not include the existing parking lot. Thus, this will necessitate improving the existing parking lot to accommodate the anticipated public demand. The scope of this project's work includes paving (with crushed aggregate base/binder) of the 60,500 square-feet of the frontage lot; DESCRIPTION: installation of wheel stops and striping; creating spaces for bus drop off, turnaround and parking; asphalt concrete ADA parking spaces; removal and replacement of existing wood pylons with boulders; fencing, landscaping & irrigation around the power generator and propane tank; landscaping & Irrigation along Palos Verdes Drive South; removal of light bollards at Annie's Stand and opening up the area; vegetation removal; and installation of an automated entrance and exit system. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 Yl:AR · YEAR3 YEAR4 YEARS 2 ACQUISITION ENGINEERING/DESIGN 30,000 CONSTRUCTION 302,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $332,000 IMPACT ON OPERATING BUDGET •· Funding and/or Grant Information: Quimby Funding. JUSTIFICATION FOR INCLUSION IN FY 13-14 BUDGET SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY x OUTSIDE FUNDING SERVICES COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY x QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: 59 5-61 ABALONE COVE SHORELINE PARK PROJECT: STAFF BUILDING, RESTROOMS AND DRIVEWAY IMPROVEMENTS TYPE: Buildings and Other Facility Improvements LOCATION: Abalone Cove Shoreline Park DEPARTMENT: Public works With the expected completion (2014) of the grant funded improvement project at Abalone Cove Shoreline Park, usage of DESCRIPTION: this park will increase significantly. The staff building and restrooms are in poor condition; however the grant fund excludes improvements to this building. The improvements will enhance the condition of this facility and also make it ADA compliant. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN 18,000 CONSTRUCTION 90,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL 108,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Quimby Funding. JUSTIFICATION FOR INCLUSION IN FY 13-14 BUDGET SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 60 5-62 PROJECT: HESSE PARK PARKING LOT RESURFACING TYPE: Recreation, Parks and Open Space LOCATION: Hesse Park DEPARTMENT: Public works Hesse Park parking lot is one of the frequently used City facilities. The AC pavement at this parking lot is deteriorating and needs DESCRIPTION: resurfacing. Delaying this improvement will add to the cost of work due to extension of cracks into the depth of the existing pavement caused by motorists' usage. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN $10,000 CONSTRUCTION $180,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $190,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Quimby Funding. JUSTIFICATION FOR INCLUSION IN FY 14-15 BUDGET SAFETY ECONOMY AND EFFICIENCY x SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 61 5-63 POINT VICENTE INTERPRETIVE PROJECT: CENTER (PVIC) BUILDING IDENTIFICATION SIGN I SCREENING WALL TYPE: Buildings and Other Facility Improvements LOCATION: PVIC DEPARTMENT: Public works In order to provide a building identification sign that will also screen the existing above ground power generator, gas tank, electrical DESCRIPTION: panels/ transformers, a 100-foot long concrete serpentine shaped wall is proposed to be installed in the lawn area adjacent to the pedestrian walkway. This decorative screening wall will include the following building identification: Point Vicente Interpretive Center PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN $15,000 CONSTRUCTION $95,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $110,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Quimby Funding. JUSTIFICATION FOR INCLUSION IN FY 13-14 BUDGET SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT JNFORMATION: 62 5-64 PROJECT: RYAN PARK UPPER PARKING LOT EXPANSION TYPE: Recreation, Parks and Open Space LOCATION: Ryan Park DEPARTMENT: Public works The capacity of the existing upper parking lot at Ryan Park is limited to 38 vehicles. With events scheduled at this park on weekends, the parking lot becomes full and up to 25 vehicles of the overflow need to park on Hawthorne Blvd. Parking on this sharply curved and steep segment of the Hawthorne Blvd creates a potentially unsafe situation for park users who drop off their youth to use the athletic fields. Additionally, drivers who use the southern driveway entrance face a potentially unsafe condition due insufficient sight clearance. The southern driveway of Ryan Park is budgeted for realignment to improve ingress and egress. DESCRIPTION: However, with a row of vehicles parked along the western side of Hawthorne Boulevard, the existing unsafe condition not be completely addressed. Widening of the upper parking lot will create another 30 parking spaces with a space for bus drop-off and turn-around. Additionally, the upper driveway will be connected to the lower driveway. This will make it possible for vehicles in the parking lot to move to the lower entrance if the drivers intend to be on southbound Hawthorne Boulevard. Increasing the capacity of the parking lot combined with restricting parking on this segment of Hawthorne Boulevard will enhance safety and convenience for drivers, bicycle riders and park users PROJECT COST ESTIMATES (IF KNOWN) ) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $400,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $400,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Quimby Funding. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 63 5-65 PROJECT: SALVATION ARMY TRAIL IMPROVEMENT POROJECT TYPE: Recreation, Parks and Open Space LOCATION: Between Palos Verdes Drive West & the Southerly Boundary of Salvation Army property. DEPARTMENT: Public Works The route of the Salvation Army Trail is based on the City's Conceptual Trails Plan and the Council adopted Vision Plan which is considered high priority for public benefit. This 2,200 feet Trail will connect Tramonto trail to Prickly Bear and other trails in Alta Vicente Reserve. The existing FY12-13 fund earmarked for trails DESCRIPT!ON: improvement in the Recreation, Parks, & Open Space program is $90,000. The cost estimated for construction and design work is $193,000. In order to complete this project, it is necessary to appropriate the balance of $103,000. PROJECT COST ESTIMATES {IF KNOWN) CATEGORY YEAR 1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION SURVEYING/ENGINEERING/DESIGN CONSTRUCTION $103,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL* $103,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Existing Budget $90,000 FY 13-14 Budget Request: $103,000 JUSTIFICATION FOR INCLUSION IN FY 13-14 BUDGET SAFETY ECONOMY AND EFFICIENCY x SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 64 5-66 UNFUNDED PROJECTS The following projects are those which have been identified as capital needs through various planning processes, but currently there are not resources to complete the projects. As funding becomes available and the City Council prioritizes and approves projects, they may be moved into the funded Five-Year CIP schedule. 65 5-67 RPV Capital Improvement Plan· Unfunded Projects Potential Safety City Council Cost Range Proiect Page Funding Goal Prioritv Minimum Maximum Identified Funding Sources Buildings aod Other !'.!jcU•lY ····· > :<&i> : > ············?\ 1ru I•• 1••• >. i n ?••·•••••••<••••••• i r····· ······• ... Improvements ..... ••·•·•· Citywide ADA Transition Plan lmolementation x x $4,900 000 $4 900,000 Limited CDBG funds $160,000 Ginsburg Donation for Point Vicente Park Communitv Center $3,000,000 $8,000,000 "PerforminQ Arts" buildina. Storaae Yard Relocation $300,000 $1,000,000 Solar Park Systems for Hesse Park Buildina x $350,000 $350,000 Potential Qrant fundina Solar Park System for Point Vicente lnteroretive Center IPVICl x $410,000 $410,000 Potential Qrant fundina rntanail:Jlll canltaltl\lttav< ~: ~: ~:::~:~:~:~:'.: :~~'.~) :~~w: 13\ •%/ I : :i 1::· : .l rn • ::::•:•· n ::r:::··· JF• :::•·•·n > No Proiects Currentlv Identified Roa'd'wav.1nti'il$ti'wl>tuijj; ~~~~ :} ~::~: ::~r~~:~~~~ ~~ (:~~:~~ff~~ >t4 •·•:: (: 1: : :•:: !:: ::: ttfi•: ;•••'}}}fi'}}ii{ :r:::• ::::::n i: ·•t .. ? Arterial Rehabilitation· Silver Spur Road llHawthorne Blvd. to Drvbank Dr.) x x $500,000 $500,000 Hawthorne Blvd. Median Improvements I !Via Rivera to Citv Hall)' $250 000 $250 000 Lower Point Vicente Park Access Modification Proiect IPVDW at PVICl x x x $250,000 $300,000 Potential Qrant fundina Operational Improvements at Crenshaw & Crest x x x $470,000 $520 000 Potential Qrant fundina Crenshaw Blvd Extension Parking lmorovements x $125,000 $150,000 Hawthorne Blvd. Right of Way Beautification x x x $2,200 000 $2,600,000 Hawthorne Blvd. Bike Lane Gao Closure x x $1,200,000 $1,500,000 Traffic Safety Improvements -PVDE at Miraleste Drive x x x $200,000 $300,000 Potential Qrant fundina Utilitv llndera·-··i.dlrilli•:•·>•••·'•·••·>·•••••.•••••:>·•·••••••·· 1·83::{ k/t/{.:•· r• /?''••'• i/{••< <•6 ? )/••· •:\i}:l:f? y .. ,:: .. <t•·>n•• ?·'•:}•(••./ ••• .,.,., )<> . . . Utilitv Underaroundina at 25th Street $1,000,000 $1,100,000 Potential Rule 20A fundina Utility Undergrounding at Entrance to PVIC $150,000 $200,000 Potential Rule 20A fundina Utility Undergrounding at PVDS and Terranea Wav $150 000 $200 000 Potential Rule 20A fundina stcirm.ora1nsv$tem•··•· •·•·••••• <•·.::• ·: >•····•st: ••!> > n I ?•?? r. /'.}'t Vt::•: f::r:;. lf~··t?J"Vi•) m:1~;:rnrn•0sn00::ss~ Altamira Canvon x $1 250,000 $5 000 000 Interim Altamira Canvon x x $356,000 $356,000 Paintbrush Canvon Drainaae x x $2,568,000 $2,568,000 PVDE -Miraleste Canyon x x $2 500,000 $3,200,000 San Pedro & Averill Canyons x x $2,700 000 $3,300 000 LJnd$iide MitiiiatiohJ>fotll¢1'$?.•<•• &Ii<aa ·········••{'.{ < .. , .... IX •\?'it :•:••::::?x:·;:v·:; ;:::•::))\ iN•• ?<> ·· .. · < Installation of New Dewaterina Wells x x $255 000 $255 000 Rehabilitation of Dewaterina Wells x x $1,634 000 $1,704,000 Instrument Wells $121.000 $121 000 Recreation Parks & oi:>en Sl:iace >> ')91> ~::~~::~:::::;:::;::· ::::·-:::;:;:::: ::;:::::~:;::::::~/:;:-::::;:: ... ;:;'.:::;: ?/~{ H ::::::•:? i·M•'·•? :;:: Vi i?D:.· ;n ;m::zw•····•···•••·•·······•········•·•• ;-:·:·:<·:·:·:-:~· .·.·.·.·.·-: Restroom at Del Cerro Park $250,000 $300,000 Gatewav Park Development Project $450,000 $475,000 Potential Qrant opportunitv Grandview Park lmorovements (Phase 1) $635,000 $635,000 Lower Hesse Park Improvements (Phase 1) $660 000 $720 000 Preserve Trail Plan -New Trail lmolementation x x $150,000 $150,000 Potential Qrant opportunitv Lower Point Vicente Park Improvement Project x x $2,400,000 $2,400,000 Potential Qrant opportunitv Sunnvside Trail Seament Project $400,000 $450,000 Coast Vision Plan - Trailhead/OverlookNista Point Develooment x $100,000 $130,000 Potential grant opportunitv Totals (Min. and Max.I I . .. ....... : : ........................... $31884.ooo ..... $44,044 000 : .... ::.:::::··•.::·:···.···· 66 5-68 BUILDINGS AND OTHER FACILITY IMPROVEMENTS UNFUNDED PROJECTS 67 5-69 PROJECT: CITYWIDE ADA TRANSITION PLAN IMPLEMENTATION TYPE: Buildings and Other Facility Improvements LOCATION: Various DEPARTMENT: Public works The Citywide ADA Transition Plan identifies projects with total cost estimates of $11.8 million. This estimate includes $2.6 million of roadway curb ramps and bus stops to be addressed with future roadway projects; $1.7 million of access improvements at Ladera Linda to be addressed with any future rehabilitation of the Ladera Linda Community Center; and $1.3 million of access improvements at the Civic Center to be addressed with any future DESCRIPTION: rehabilitation of the City Hall campus. The remaining $6.2 million of identified projects are to improve ADA compliance at various other City-owned properties. The funded section of this document includes $1.3 million of projects scheduled for the next five years from this list, and address issues categorized as "potential hazard" and "severe". The remaining $4.9 million of this list, as well as the amounts noted above for roadwavs, Ladera Linda, and the Civic Center remain unfunded. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET Possible future CDBG funding available. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $4.9 million 68 5-70 PROJECT: POINT VICENTE PARK COMMUNITY CENTER TYPE: Buildings and Other Facility Improvements LOCATION: Upper Point Vicente/Civic Center DEPARTMENT: City Manager/Public Works Originally studied by the Open Space Planning, Recreation and Parks Task Force in 2004, the concept for this facility was later refined during the redevelopment of the Coast Vision Plan. DESCRIPTION: Adopted by the City Council in 2008, the latest concept calls for a 20,000 square-foot community center that could accommodate meeting space for community groups, recreational facilities, classroom space and full-sized recreational pool. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET Impact will need to be assessed. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $3,000,000 -$8,000,000 69 5-71 PROJECT: STORAGE YARD RELOCATION TYPE: Buildings and Other Facility Improvements LOCATION: Various Locations throughout the City DEPARTMENT: City Manager/Public Works It has been proposed that City maintenance services be spread citywide in strategic locations with a central office in City Hall. The existing storage yard is located on the Upper Point Vicente Park site which had been identified for various other community uses due to its prime location. DESCRIPTION: Staff is proposing the creation of a central location for the storage yard with satellite locations throughout the City, serving the storage and other construction needs of the Public Works Department. The central location of the storage yard will be situated at or near City Hall for administrative purposes. This central location will control all satellite locations through the use of maintenance personnel and through the efficient use of the City's network. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY x SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: The satellite locations will fulfill the following roles: there will be an office trailer at each location; a construction yard for contractors located throughout the City (possibly generating rental income for the City); possible satellite EOC centers for access throughout the City; and storage space for various equipment. Estimated Cost: $300,000 -$1,000,000 70 5-72 PROJECT: SOLAR POWER SYSTEM FOR HESSE PARK BUILDING TYPE: Buildings and Other Facility Improvements LOCATION: Various DEPARTMENT: Public works Installation of lightweight and advanced solar energy generating systems over the roof of Hesse Park to reduce power consumption with occasional opportunities to sell power to the grid. This project DESCRIPTION: will help the City with its energy savings goal and will reduce considerable amounts of emissions. Typically the energy savings can cover the cost of projects of this scale in an estimated period of 15 to 20 years. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY x SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $350,000 71 5-73 SOLAR POWER SYSTEM FOR POINT PROJECT: VICENTE INTERPRETIVE CENTER (PVIC) TYPE: Buildings and Other Facility Improvements LOCATION: Various DEPARTMENT: Public works Installation of lightweight and advanced solar energy generating systems over the roof of PVIC to reduce power consumption with occasional opportunities to sell power to the grid. This project will DESCRIPTION: help the City with its energy savings goal and will reduce considerable amounts of emissions. Typically the energy savings can cover the cost of projects of this scale in an estimated period of 15 to 20 years. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET Estimated cost is $200,000 -$400,000 for each facility ($600,000 -$1,200,000 total) Funding: Will seek Federal/State Energy Savings Grants JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY x SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $410,000 72 5-74 INTANGIBLE CAPITAL OUTLAY UNFUNDED PROJECTS NO PROJECTS CURRENTLY IDENTIFIED 73 5-75 ROADWAY INFRASTRUCTURE UNFUNDED PROJECTS 74 5-76 ARTERIAL REHABILITATION-SILVER PROJECT: SPUR ROAD (HAWTHORNE BLVD. TO DRYBANK DRIVE) TYPE: Roadway Infrastructure LOCATION: Silver Spur Road (Hawthorne Blvd. to Drybank Drive) DEPARTMENT: Public Works After the street right of way was transferred back to the City, Silver Spur Road will be resurfaced to mitigate roadway distress and DESCRIPTION: degradation that has occurred over the years. This project will require milling and overlay, root removal, asphalt patching, curb and gutter repair, sidewalk repair, ADA ramps and re-striping. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY· YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET There is no impact on the operating budget. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $500,000 75 5-77 HAWTHORNE BLVD. MEDIAN PROJECT: IMPROVEMENTS (VIA RIVERA TO CITY HALL) TYPE: Roadway Infrastructure LOCATION: Hawthorne Blvd. (Via Rivera to City Hall) DEPARTMENT: Public Works The development of this median would include installing draught tolerant landscaping which will require minimal maintenance .. DESCRIPTION: Development will also include the installation of irrigation systems and controllers, hardscape, and decorative stone. This would be the second segment of median improvements. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $250,000 76 5-78 PROJECT: LOWER POINT VICENTE PARK ACCESS MODIFICATION PROJECT TYPE: Traffic Improvements LOCATION: PVDW/PVDS at Lower Point Vicente Park entrance DEPARTMENT: Public Works Improve access into and out of the Lower Point Vicente park area by DESCRIPTION: restricting turn movements to right turn only out of the site at the southern entrance/exit to minimize vehicle conflicts while negotiating turn movements. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: Estimated Cost: $250,000 -$300,000 77 5-79 OPERATIONAL IMPROVEMENTS- PROJECT: CRENSHAW BLVD. AND CREST DRIVE TYPE: Roadway Infrastructure LOCATION: Crenshaw Blvd. and Crest Drive DEPARTMENT: Public Works Currently this intersection is a four-way stop controlled intersection. During the AM and PM peak hours, the westbound DESCRIPTION: left-turn lanes back up for several hundreds of feet creating extensive delay and long vehicle queues. An operational improvement to the intersection is required to improve traffic flow. A study is being conducted to determine the best solution. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $470,000 • $520,000 78 5-80 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: CRENSHAW BOULEVARD EXTENSION PARKING IMPROVEMENTS Roadway Infrastructure Crenshaw Blvd (Valley View Rd to Burma Rd) Public Works In an effort to improve safety, parking and access to the Nature Preserve entrance near Del Cerro Park, parking improvements and restrictions are needed to accommodate the growing user demand and need for emergency vehicle access. PROJECT cost ESTIMATES (IF KNOWN) CATEGORY . YEAR 1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET There is no impact on the operating budget. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $125,000 -$150,000 79 5-81 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: HAWTHORNE BLVD RIGHT OF WAY BEAUTIFICATION Roadway Infrastructure Hawthorne Blvd (City Hall to Northerly City Limits) Public Works The City's Right of Way along Hawthorne Blvd will be beautified by landscaping and masking blight conditions created by failed fences, walls and other private improvements. The medians in this area will be improved by landscape and/or hardscape enhancements. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION · ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET There is no impact on the operating budget. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $2,200,00 -$2,600,000 80 5-82 PROJECT: TYPE: LOCATION: DEPARTMENT: HAWTHORNE BLVD BIKE LANE GAP CLOSURE Roadway Infrastructure Hawthorne Blvd (Vallon Drive to Dupre Road) Public Works DESCRIPTION: This project will improve roadway safety and complete a bike lane gap closure that exists due to on-street parking demand, roadway configuration and existing median barriers. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION · ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET There is no impact on the operating budget. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: 81 5-83 TRAFFIC SAFETY IMPROVEMENTS - PROJECT: PALOS VERDES DRIVE EAST AT MIRALESTE DRIVE TYPE: Traffic Improvements LOCATION: PVDE at Miraleste Drive DEPARTMENT: Public Works Improve intersection operations to create improved traffic flow, DESCRIPTION: vehicle and pedestrian safety. Operational improvements could include traffic signal controls or a roundabout as warranted. PROJECT COST ESTIMATES (IF KNOWN) CATl:GORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEARCIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: Have applied and will continue to apply for external funding for traffic safety. Estimated Cost: $200,000 -$300,000 82 5-84 UTILITY UNDERGROUNDING UNFUNDED PROJECTS 83 5-85 PROJECT: UTILITY UNDERGROUNDING AT 25 1 H STREET TYPE: Public Utilities LOCATION: 251h Street DEPARTMENT: Public Works This project includes the removal of overhead wires and DESCRIPTION: coordination of undergrounding all utilities at this location. The City will coordinate with the associated utility companies (electrical, communications, etc.) to locate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET This project could be funded through Southern California Edison's Rule 20A Funding. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $1,000,000 -$1, 100,000 84 5-86 PROJECT: UTILITY UNDERGROUNDING AT ENTRANCE TO PVIC TYPE: Public Utilities LOCATION: Palos Verdes Drive South (at PVIC) DEPARTMENT: Public Works This project includes the removal of overhead wires and DESCRIPTION: coordination of undergrounding all utilities at this location. The City will coordinate with the associated utility companies (electrical, communications, etc.) to locate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET This project could be funded through Southern California Edison's Rule 20A Funding. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $150,000 -$200,000 85 5-87 PROJECT: UTILITY UNDERGROUNDING AT PVDS AND TERRANEA WAY TYPE: Public Utilities LOCATION: PVDS and Terranea Way DEPARTMENT: Public Works This project includes the removal of overhead wires and DESCRIPTION: coordination of undergrounding all utilities at this location. The City will coordinate with the associated utility companies (electrical, communications, etc.) to locate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET This project could be funded through Southern California Edison's Rule 20A Funding. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $150,000 -$200,000 86 5-88 STORM DRAIN SYSTEM UNFUNDED PROJECTS 87 5-89 PROJECT: ALTAMIRA CANYON TYPE: Storm Drain System LOCATION: Project Area 4 DEPARTMENT: Public Works This project includes the installation of protective measures to DESCRIPTION: minimize further erosion in the Altamira Canyon. This project could range from stabilization at bends in stream beds, with limited velocity controls, to channeled stabilization. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: This estimate does not include right of way costs. A previously designed and funded project was abandoned due to right of way issues and owners lack of support. Estimated Cost: $1,250,000 -$5,000,000 88 5-90 PROJECT: INTERIM AL TAMIRA CANYON PROJECT TYPE: Storm Drain System LOCATION: NIA DEPARTMENT: Public Works A project within lower Altamira Canyon to aid in slowing the damage being caused by storm water runoff through the entire reach of the DESCRIPTION: Canyon is needed. The installation of Gabion type erosion control structures within lower Altamira Canyon are needed to help control runoff velocities and minimize erosion within the canyon. PROJECT c9sT ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Note: An Altamira Canyon project is included in the 2012 CIP as an unfunded project ranging between $1.25 Million and $5 Million. The Altamira Canyon project has been studied and analyzed over the past decades; however the need to minimize runoff from entering the ground in Altamira Canyon still remains. This interim project will provide a temporary solution within the lower reaches of the canyon until the full project can be programmed. Estimated Cost: $356,000 89 5-91 PROJECT: PAINTBRUSH CANYON DRAINAGE TYPE: Storm Drain System LOCATION: N/A DEPARTMENT: Public Works The Paintbrush Canyon Drainage System project will capture runoff at the head of the Portuguese Bend landslide in three DESCRIPTION: locations, transfer that runoff via surface mounted High Density Polyethylene (HOPE) pipe under Palos Verdes Drive South, (through an existing steel tunnel) and continue along the existing storm drain pipe alignment to the ocean. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Preventing runoff water from entering the landslide has been shown to directly affect land movement in landslide areas. This project is expected to help slow movement within the Portuguese Bend landslide, eventually affecting the land movement at Palos Verdes Drive South. Estimated Cost: $2,568,000 90 5-92 PROJECT: PVDE-MIRALESTE CANYON TYPE: Storm Drain System LOCATION: Project Area 5 DEPARTMENT: Public Works Work within this project area includes storm drainage systems along Palos Verdes Drive East at the Northern end of PVDE, South DESCRIPTION: Coach, Rocking Horse, Clevis, North Colt, South Colt, Via Canada, and at South Via Canada. This project includes the installation of a number of pipelines and re-setting surface drainage systems to drain into Miraleste Canyon. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION . ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $2,500,000 -$3,200,000 91 5-93 PROJECT: SAN PEDRO & AVERILL CANYONS TYPE: Storm Drain Systems LOCATION: Project Area 6 DEPARTMENT: Public Works Work within this project area would include storm drainage systems at Miraleste, South Miraleste, North Corsine, Via Colinita, La Vista, Vista Mesa, and a curb and gutter project on Via DESCRIPTION: Frascati. This project would include the installation of a number of pipelines and regarding of roads and surface drainage systems to drain into the San Pedro and Averill Canyons. A project at Miraleste Plaza is currently under design. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $2,700,000 -$3,300,000 92 5-94 LANDSLIDE MITIGATION PROJECTS UNFUNDED 93 5-95 PROJECT: INSTALLATION OF NEW DEWATERING WELLS TYPE: Landslide Project LOCATION: NIA DEPARTMENT: Public Works Dewatering Wells are a high priority and are considered to be the next most effective method of minimizing runoff from entering the landslide, which helps slow land movement within the landslide. All runoff that percolates into the ground eventually becomes part of the groundwater and will cause an increase in the depth of the groundwater table. Removing groundwater through dewatering wells helps to lower the groundwater table, relieving soil pressures DESCRIPTION: at depth and minimizing the negative effects groundwater has on the landslide. Three new upslope wells in Portuguese Bend and two new wells in Abalone Cove are initially planned during this phase of the system's expansion. These new wells should improve the system's effectiveness by increasing the system's water removal capacity and by removing water more rapidly. Two new dewatering well projects should be scheduled annually until the five have been installed. The cost to install each well is estimated to be $85,000. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Removing groundwater at depth from the landslide has been shown to directly affect land movement in landslide areas. This project will expand the existing system and is expected to help slow movement within the Portuguese Bend landslide, eventually affecting the land movement along Palos Verdes Drive South. Estimated Cost: $255,000 94 5-96 PROJECT: REHABILITATION OF DEWATERING WELLS TYPE: Landslide Project LOCATION: N/A DEPARTMENT: Public Works Dewatering Wells are a high priority and are considered to be the next most effective method of minimizing runoff from entering the landslide, which helps slow land movement within the landslide. Up to sixteen existing wells in Abalone Cove and three wells in Portuguese Bend require routine maintenance and will likely need DESCRIPTION: to be rehabilitated over the next fifteen years, as will the five new wells that are planned. Rehabilitation of dewatering wells will ensure the system's continued effectiveness by maintaining the system's water removal capacity. Well rehabilitation projects should be scheduled one or two per year as needed following the installation of the five new dewatering wells. The cost to rehabilitate one well is $70,000. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FO.R INCLUSION ON 5 YEAR CIP SAFETY x ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Removing groundwater at depth from the landslide has been shown to directly affect land movement in landslide areas. This project will help maintain the existing system which has shown to help slow movement within the Abalone Cove landslide. It is expected that the rehabilitation of wells will eventually affect the land movement along Palos Verdes Drive South. Estimated Cost: $1,634,000 -$1, 704,000 95 5-97 PROJECT: INSTRUMENT WELLS TYPE: Landslide Project LOCATION: N/A DEPARTMENT: Public Works Instrument Wells are needed to monitor groundwater levels and landslide movement. These wells will provide information that can be valuable to engineers and scientists when a project to minimize land movement is designed or when analyzing movement to help determine where potential projects will be most useful. Collecting DESCRIPTION: the data would require a person to visit the equipment once monthly to download the information, transport the information to a host computer where it would be saved and analyzed. The cost to install a piezometer and/or inclinometer in a well at depth is currently estimated to be $100,000, costs associated with the ongoing data collection and analysis could be an additional $25,000 per year. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS (FY) ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: The cost of ongoing data collection and analysis required to facilitate this capital expenditure would need to be programmed annually when the Automatic GPS Monitoring Station is funded. Estimated Cost: $121,000 96 5-98 RECREATION, PARKS AND OPEN SPACE UNFUNDED PROJECTS 97 5-99 PROJECT: RESTROOM AT DEL CERRO PARK TYPE: Recreation, Parks, & Open Space LOCATION: Del Cerro Park DEPARTMENT: Recreation and Parks/Community Development This project would include the construction of a restroom at Del DESCRIPTION: Cerro park to serve the park visitors and the users of the trails in the Portuguese Bend Open Space. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION . ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $250,000 -$300,000 98 5-100 PROJECT: TYPE: LOCATION: DEPARTMENT: DESCRIPTION: GATEWAY PARK DEVELOPMENT PROJECT Recreation, Parks, & Open Space PVDS in the Portuguese Landslide Area Public Works/Community Development The Vision Plan includes a proposed Gateway Park, a 23-acre site within the City's Landslide Moratorium area just north of PVDS between the Portuguese Bend residential community and Klondike Canyon. Under the Vision Plan, the site has been approved for a combination of uses such as a "gateway park" for users of the Nature Preserve's trail system, an outdoor education/nature appreciation center for school and community groups and an equestrian center. The following components of the approved concept plan are being developed as part of the California Coastal Trail Project and PVDS Landslide East End Road Realignment Project: Trail head, signage, fencing, and public parking area. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $450,000 -$475,000 99 5-101 PROJECT: GRANDVIEW PARK IMPROVEMENTS (PHASE 1) TYPE: Recreation, Parks & Open Space LOCATION: Grandview Park DEPARTMENT: Public works The scope of work of the proposed 'phase one' of Grandview park includes construction of a natural parking lot, restrooms/office, DESCRIPTION: play area, picnic area and some landscaping. These basic items are chosen from the concept plan option "Sycamore" which was selected by the City Council. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY' YEAR 1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $635,000 100 5-102 PROJECT: LOWER HESSE PARK IMPROVEMENTS(PHASE1) TYPE: Recreation, Parks & Open Space LOCATION: Lower Hesse Park DEPARTMENT: Public works The scope of work of the proposed 'phase one' of Lower Hesse Park includes construction of a natural parking lot, restrooms, DESCRIPTION: basketball court, play area, picnic area and some landscaping. These basic items are chosen from the concept plan option "Pacific" which was selected by the City Council. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITIED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $660,000-$720,000 101 5-103 PROJECT: PRESERVE TRAILS PLAN -NEW TRAIL IMPLEMENTATION TYPE: Recreation, Parks, & Open Space LOCATION: Palos Verdes Nature Preserve DEPARTMENT: Community Development/Public Works In October 2012, the City Council adopted an updated Preserve Trails Plan (PTP) for the NCCP's Palos Verdes Nature Preserve which identifies trail routes and trail uses within the Preserve. Pursuant to the approved management agreement between the City and PVPLC, the PVPLC is responsible for maintenance and repair of existing unimproved trails in the Preserve while the City is responsible for the construction of new trails identified in the PTP. DESCRIPTION: According to the PTP, there are 3 approved trail routes that currently do not exist and need to be constructed at some point by the City. Since projects are moving forward on two of the three new trails needed (the Smugglers Trail in the Abalone Cove Reserve and the Switchback Trail in the San Ramon Reserve, construction of the Crystal Trail (.12 mile) in the Forrestal Reserve remains as the only new trail that needs construction. In addition, the Rim Trail will need to be relocated since the current route passes over private property in Rolling Hills. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $150,000 102 5-104 PROJECT: LOWER POINT VICENTE PARK IMPROVEMENT PROJECT TYPE: Recreation Parks & Trails Improvements LOCATION: Lower Point Vicente DEPARTMENT: Public Works The park improvement plan for Lower Point Vicente derives from an extensive public outreach process associated with the City Council adopted Vision Plan. The scope of work consists of constructing DESCRIPTION: new decomposed granite trails, overlooks, reconfigured and new parking spaces (including new upper terrace parking lot), drainage facilities (including a bioswale), landscaping, fencing, way finding signs and minor site grading to accommodate the improvements (excavation cannot occur in areas capped for the lead remediation.) PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR.1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY x SUPPORTS ESSENTIAL CITY SERVICES x OUTSIDE FUNDING COMMITTED/ELIGIBLE x SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $2,400,000 103 5-105 PROJECT: SUNNYSIDE TRAIL SEGMENT PROJECT TYPE: Recreation, Parks, & Open Space LOCATION: Sunnyside Ridge Road (Intersection of Sunnyside Ridge Trail and the Sol Vista SeQment Trail) DEPARTMENT: Community Development/Public Works The Sunnyside Segment Trail is a point-to-point trail segment that begins on Sunnyside Ridge Road at the intersection of the Sunnyside Ridge Trail and the currently unused Sol Vista Segment Trail on the old Narbonne Right-of-Way, as indicated in the City's DESCRIPTION: Conceptual Trail Plan. The proposal is to provide a usable trail linkage for pedestrians and equestrians within a recorded trail segment that traverses a privately owned lot that is currently developed with a single-family residence that was formally part of an old City right-of-way. The trail connection would involve the provision of a 5-foot wide decomposed granite surface trail. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEAR5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $400,000 -$450,000 104 5-106 COAST VISION PLAN PROJECT: TRAILHEAD/OVERLOOKNISTA POINT DEVELOPMENT TYPE: Recreation, Parks, & Open Space LOCATION: Various Locations DEPARTMENT: Public Works/Community Development The Vision Plan identifies the construction of trailheads at key entrances to the existing City trail system along with overlooks and vista points within the Vision Plan project area. The trailheads would consist of a permeable surface pad, a bench, a plastic bag kiosk for dog owners, trash and recycling receptacles, signage, a freestanding kiosk for trail notices, small native trees for shade and pockets of native shrubs, where appropriate. The overlooks/vista points would be placed on decomposed granite or other permeable material with flush stone edging and could include a semicircle bench, a stone DESCRIPTION: pilaster displaying pertinent information, a stone clad wall less than 3 feet in height and pockets of native shrubs. Phase 1 would involve a trail head at Shoreline Park/251 h and overlooks/vista points at Inspiration Point and Eagles Nest. Phase 2 would involve trail heads and overlooks/vistas at the cul-de-sac next to St. Paul's Church, Del Cerro Park, and the end of Ocean Terrace. Phase 3 would involve a trail head at the Switchbacks/PVDE Turnout and overlooks/vista points at the Switch backs/PVD E Turnout, Paintbrush Canyon/Burma Road, and Burma Road above Gateway Park. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR1 YEAR2 YEAR3 YEAR4 YEARS ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS x COMMUNITY QUALITY/SUSTAINABILITY x OTHER PROJECT INFORMATION: Estimated Cost: $100,000 -$130,000 105 5-107