Loading...
Area 9 Bus Stops_PhotoFacility_20130509-115951City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (15 1/2" deep seat). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 1 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 1 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Peninsula Verde Dr. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 4.3% to 4.7% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 1 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $960 2 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Peninsula Verde Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:50 SF Page 1 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" deep seat). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 3 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 3 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ J. Montgomery Dr. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 4.4% to 5.2% RS at bus pad, 4.8% to 5.3% RS at the road. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 5 for corrective action. Corrective Action Photo # 3 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 4 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ J. Montgomery Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 2 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 10.6% to 12.4% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 3 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $960 5 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ J. Montgomery Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:50 SF 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 6' long by 5' wide. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 5 for corrective action. Corrective Action Photo # 3 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $0 6 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ J. Montgomery Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 3 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 14" deep seat, 12" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 7 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 7 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Ave. Aprenda (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 7 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $4,500 8 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Western Ave./ Ave. Aprenda (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:150 SF Page 4 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (17" deep seat) 3 benches, 0 accessible. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 9 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 9 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Westmont Dr. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 7' long by 5' wide. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 11 for corrective action. Corrective Action Photo # 9 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $0 10 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Westmont Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 5 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.4% to 3.8% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 9 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 11 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Westmont Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench ( 16" high seat, 14" deep seat, 14" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 12 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 12 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Delasonde Dr. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 6 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 3.1% to 4.3% RS at bus pad. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 14 for corrective action. Corrective Action Photo # 12 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 13 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Delasonde Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.3% to 3.6% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 12 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 14 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Delasonde Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 7 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 11" deep seat, 14" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 15 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 15 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Toscanini Dr. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.6% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 15 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 16 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Toscanini Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 8 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 7'-8" long by 5' wide. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 16 for corrective action. Corrective Action Photo # 15 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $0 17 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Toscanini Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bus signal button has non-compliant Braille. 039 - Operable Parts - Miscellaneous - See Additional Comments Additional Comments: Replace with compliant Braille. Corrective Action Photo # 18 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $300 18 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Toscanini Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 9 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (12" - 15" high seat, 14" deep seat, 16" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 19 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 19 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Toscanini Dr. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 3.0% to 6.6% at bus pad, 4.4% to 4.5% RS at the road. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 19 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 20 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Toscanini Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 10 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.2% to 3.3% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 20 for corrective action. Corrective Action Photo # 19 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 21 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Toscanini Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16 1/4" high seat). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 22 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 22 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Caddington Dr. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 11 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 3.0% RS at bus pad, 2.0% to 2.5% RS at the road. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 22 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 23 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Caddington Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.5% to 3.3% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 23 for corrective action. Corrective Action Photo # 22 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 24 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Caddington Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 12 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16 1/2" high seat, 14" deep seat, 14" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 25 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 25 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Caddington Dr. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 3.05 to 3.5% RS at bus pad, 2.3% to 2.5% RS at the road. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 25 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 26 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Caddington Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 13 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 3.5% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 26 for corrective action. Corrective Action Photo # 25 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 27 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Caddington Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench ( 16" high seat, 14 1/2" deep seat, 14" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 28 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 28 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Trudie Dr. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 14 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 2.9% to 3.0% RS at bus pad, 0.8% to 0.9% RS at the road. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 28 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 29 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Trudie Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 3.2% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 29 for corrective action. Corrective Action Photo # 28 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 30 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Trudie Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 15 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (14 1/2" deep seat). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 31 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 31 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Capitol Dr. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 1.4% to 2.3% RS at bus pad , 0.8% to 1.0% RS at the road. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 31 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 32 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Capitol Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 16 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.2% to 2.4% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 32 for corrective action. Corrective Action Photo # 31 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 33 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Capitol Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench ( 16" high seat, 14" deep seat, 15" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 34 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 34 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Park Western Dr. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 17 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 3.9% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 34 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $960 35 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Park Western Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:50 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (14" deep seat, 15 1/2" high back support, 9" shoulder alignment). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench and relocate to allow 12" shoulder alignment. Corrective Action Photo # 36 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 36 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Crestwood St. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 18 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 3.7% to 5.7% RS at bus pad, 3.8% to 4.5% RS at the road. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 37 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 37 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Crestwood St. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.8% to 4.0% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 37 for corrective action. Corrective Action Photo # 37 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 38 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Crestwood St. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 19 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (14 1/2" deep seat). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 39 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 39 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Summerland Ave. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 4.1% to 4.7% RS at bus pad, 3.5% to 3.7% RS at the road. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 40 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 40 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Western Ave./ Summerland Ave. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 20 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 9 Bus StopsReporting: 41 of 4367 Rcds Author: Vaish, B 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.7% to 3.8% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 40 for corrective action. Corrective Action Photo # 40 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 41 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Western Ave./ Summerland Ave. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 21 of 21 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA