Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Area 8 Bus Stops_PhotoFacility_20130509-115929
City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 1 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 1 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. E/ Conestoga Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 1 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 2 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. E/ Conestoga Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF Page 1 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.16 - Hazardous Vehicular Area - Where a walk crosses or adjoins the vehicular way and the walking surface is not separated by curbs, railings, or other elements between the pedestrian areas and vehicular areas, the boundary between the areas is not defined by a continuous detectable warning at least 36” wide complying with CBC 1121B.3.1 item 8(a). (i.e., the warning surface shall contrast visually with adjoining surfaces, either light on dark or dark on light, and shall differ from adjoining walking surfaces in resiliency or sound on cane contact. Color: yellow conforming to Federal Color No. 33538, Table IV/ Standard No. 595B. Where the color value contrast between the yellow warning and the main walking surface is less than 70 percent, a 1" wide black strip shall separate the yellow warning from the main walking surface.) Existing Condition: No boundary between shoulder and road. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 2 for corrective action. Corrective Action Photo # 1 1991 ADAAG 4.29.5 2004 ADAAG - 2007 CBC 1133B.8.5 Other Priority: Total Cost $0 3 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. E/ Conestoga Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 2 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (12" high seat, 14" deep seat, 14" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench with clear WC seating space. Corrective Action Photo # 4 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 4 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. E/ Mustang Rd. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 8' long by 3'-2" wide. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 4 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $864 5 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. E/ Mustang Rd. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:45 SF Page 3 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 4 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 6 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. E/ Mustang Rd. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF Page 4 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.16 - Hazardous Vehicular Area - Where a walk crosses or adjoins the vehicular way and the walking surface is not separated by curbs, railings, or other elements between the pedestrian areas and vehicular areas, the boundary between the areas is not defined by a continuous detectable warning at least 36” wide complying with CBC 1121B.3.1 item 8(a). (i.e., the warning surface shall contrast visually with adjoining surfaces, either light on dark or dark on light, and shall differ from adjoining walking surfaces in resiliency or sound on cane contact. Color: yellow conforming to Federal Color No. 33538, Table IV/ Standard No. 595B. Where the color value contrast between the yellow warning and the main walking surface is less than 70 percent, a 1" wide black strip shall separate the yellow warning from the main walking surface.) Existing Condition: No boundary from bus stop to road. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 6 for corrective action. Corrective Action Photo # 4 1991 ADAAG 4.29.5 2004 ADAAG - 2007 CBC 1133B.8.5 Other Priority: Total Cost $0 7 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. E/ Mustang Rd. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 5 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench ( 15" deep seat, 5" shoulder alignment). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench and relocate to allow 12" shoulder alignment. Corrective Action Photo # 8 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 8 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. E/ Miraleste Library (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 8' long by 4' wide. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 9 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $192 9 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. E/ Miraleste Library (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:10 SF Page 6 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 7" drop. 012 - Concrete Curb - Saw-cut concrete curb and remove. Grind all edges smooth so adjacent floor surfaces align flush. Additional Comments: Corrective Action Photo # 9 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $46 10 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. E/ Miraleste Library (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:19 LF 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.3% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 9 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $960 11 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. E/ Miraleste Library (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:50 SF Page 7 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 4.9% RS at bus pad , 3.8% RS at the road. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 12 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 12 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. E/ Miraleste Library (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.3% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 12 for corrective action. Corrective Action Photo # 12 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 13 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. E/ Miraleste Library (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 8 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 15 1/2" deep seat, 15 1/2" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench with clear WC seating space. Corrective Action Photo # 14 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 14 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. E/ Miraleste Dr. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 15 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $1,056 15 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. E/ Miraleste Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:55 SF Page 9 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 16 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 16 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. E/ Miraleste Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 4' long by 5' wide. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 17 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $384 17 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Via Colinita/ Enrose Ave. (EB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:20 SF Page 10 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant curb ramp. Corrective Action Photo # 18 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $3,600 18 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Via Colinita/ Enrose Ave. (EB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Uneven surface at bus stop. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 19 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $96 19 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Miraleste Dr./ Via Bramante (EB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:5 SF Page 11 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant curb ramp. Corrective Action Photo # 20 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $3,600 20 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Miraleste Dr./ Via Bramante (EB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Car obstructs access to bus stop. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide red curb. Corrective Action Photo # 21 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $120 21 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Miraleste Dr./ Via Bramante (EB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 12 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench ( 14" deep seat, 16" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench with clear WC seating space. Corrective Action Photo # 22 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 22 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. E/ Via Canada (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.13A - Bus Stop Shelter - Clear Floor Area - Clear floor area of 30” by 48” is not completely within the shelter. Existing Condition: No WC space provided within the shelter. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 22 for corrective action. Corrective Action Photo # 22 1991 ADAAG 10.2.1(2) 2004 ADAAG 810.3 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 23 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. E/ Via Canada (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 13 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 5 1/2" drop 012 - Concrete Curb - Saw-cut concrete curb and remove. Grind all edges smooth so adjacent floor surfaces align flush. Additional Comments: Corrective Action Photo # 24 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $10 24 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. E/ Via Canada (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:4 LF 07.07A - Level Landings - Landings at the top or bottom of each ramp or each ramp run is not level (slope is greater than 2% in some or all directions). Existing Condition: 3.6% slope at top ramp landing. 008 - Concrete Landing - Remove non-compliant pavement and replace with new concrete. The landing slope shall not exceed 2% in any direction. Additional Comments: Corrective Action Photo # 25 1991 ADAAG 4.8.4 2004 ADAAG 405.7; 405.7.1 2007 CBC 1133B.5.4.1 Other - Priority: Total Cost $672 25 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. E/ Via Canada (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:35 SF Page 14 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Uneven surface. 004A - Asphalt Paving - Remove non-compliant pavement and replace with new asphalt paving (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 24 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $510 26 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. E/ Via Canada (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:50 SF 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 27 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 27 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. E/ Intermediate School (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 15 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 8 Bus StopsReporting: 28 of 4367 Rcds Author: Vaish, B 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 27 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $6,000 28 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. E/ Intermediate School (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:200 SF Page 16 of 16 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA