Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Area 6 Bus Stops_PhotoFacility_20130509-115807
City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 1 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 1 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. S/ Barkentine Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 1 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 2 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Barkentine Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 1 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16 3/4" high seat, 14 1/2" deep seat). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench with clear WC seating space. Corrective Action Photo # 3 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 3 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Tramonto Rd. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 4 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $18,000 4 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. S/ Tramonto Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:600 SF Page 2 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 5 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 5 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Tramonto Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 2.9% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 5 for corrective action. Corrective Action Photo # 5 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $0 6 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Tramonto Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 3 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 4'-11" long by 5' wide. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 8 for corrective action. Corrective Action Photo # 7 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $0 7 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Crestmont Ln. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 7.6% RS at bus pad , 5.6% RS at the road. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 7 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 8 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Crestmont Ln. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 4 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 3'-7" long by 5' wide. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 9 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 9 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Barkentine Rd. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Corrective Action Photo # 10 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $0 10 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Barkentine Rd. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 EA Page 5 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 11 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 11 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Seacove Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 11 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 12 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. S/ Seacove Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF Page 6 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 13 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 13 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Narcissa Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 13 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 14 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. S/ Narcissa Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF Page 7 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (13" high seat, 16" deep seat, 15 1/2" high back support, 9" shoulder alignment). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 15 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 15 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Narcissa Dr. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 16 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 16 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Narcissa Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 8 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 16 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 17 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. S/ Narcissa Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 18 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 18 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Peppertree Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 9 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 18 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 19 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. S/ Peppertree Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 20 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 20 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ P B Bay Club (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 10 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 20 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 21 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. S/ P B Bay Club (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (15 1/4" deep seat, 15 1/4" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 20 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 22 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ P B Bay Club (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 11 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 15 1/2" deep seat, 15 1/2" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 23 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $0 23 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Conqueror Dr. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 4'-9" long by 5' wide. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 27 for corrective action. Corrective Action Photo # 23 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $0 24 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Conqueror Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 12 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 27 for corrective action. Corrective Action Photo # 23 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $0 25 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Conqueror Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 4.1% to 4.4% RS at bus pad, 4.0% RS at the road. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 27 for corrective action. Corrective Action Photo # 23 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 26 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Conqueror Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 13 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 3.5% to 6.0% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 23 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $1,920 27 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Conqueror Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:100 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 14 1/2" deep seat, 14" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 28 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 28 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Schooner Dr. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 14 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 28 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 29 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Schooner Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 28 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 30 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. S/ Schooner Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF Page 15 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 31 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 31 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Peppertree Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.11B - Bus Stop Pad and Accessible Route - Bus stop pad is not connected to an accessible route. Existing Condition: No accessible route to bus stop. 001A - Accessible Route - Provide new accessible route. Additional Comments: Corrective Action Photo # 31 1991 ADAAG 10.2.1 2004 ADAAG 810.2.3 2007 CBC 1121B.1 Other Priority: Total Cost $15,000 32 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Palos Verdes Dr. S/ Peppertree Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:500 SF Page 16 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 15 1/2" deep seat, 15 1/2" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench with clear WC seating space. Corrective Action Photo # 33 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 33 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Seahill Dr. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.1% to 2.3% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 33 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $1,920 34 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Seahill Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:100 SF Page 17 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.13A - Bus Stop Shelter - Clear Floor Area - Clear floor area of 30” by 48” is not completely within the shelter. Existing Condition: No WC space provided within the shelter. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 33 for corrective action. Corrective Action Photo # 33 1991 ADAAG 10.2.1(2) 2004 ADAAG 810.3 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 35 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Seahill Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 7'-1" long by 5' wide. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 37 for corrective action. Corrective Action Photo # 36 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $0 36 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Seacove Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 18 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 6 Bus StopsReporting: 38 of 4367 Rcds Author: Vaish, B 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 6.9% to 7.9 RS at bus pad, 5.1% to 7.7% RS at the road.. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 36 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 37 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Palos Verdes Dr. S/ Seacove Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 3.7% to 4.4% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 37 for corrective action. Corrective Action Photo # 36 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 38 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Palos Verdes Dr. S/ Seacove Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 19 of 19 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA