Loading...
Area 2 Bus Stops_PhotoFacility_20130509-115429City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 14" deep seat, 15" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench & relocate for clear WC seating space. Corrective Action Photo # 1 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 1 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Ridgegate Dr.(NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.13A - Bus Stop Shelter - Clear Floor Area - Clear floor area of 30” by 48” is not completely within the shelter. Existing Condition: No WC space provided within the shelter. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 1 for corrective action. Corrective Action Photo # 2 1991 ADAAG 10.2.1(2) 2004 ADAAG 810.3 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 2 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Ridgegate Dr.(NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 1 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.12A - Bus Stop Pad Slope Parallel to Roadway - Bus stop pad is not at the same slope as the roadway in the direction parallel to the roadway. Existing Condition: 5.3% RS at bus pad , 3.2% RS at the road. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 3 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 3 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Granvia Altamira (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 3.3% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 3 for corrective action. Corrective Action Photo # 3 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 4 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Granvia Altamira (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 2 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 5' long x 5' wide. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 5 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $288 5 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Seamount Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:15 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 4.0% to 4.5% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 6 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $1,920 6 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Seamount Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:100 SF Page 3 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.13A - Bus Stop Shelter - Clear Floor Area - Clear floor area of 30” by 48” is not completely within the shelter. Existing Condition: No WC space provided within the shelter. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 8 for corrective action. Corrective Action Photo # 7 1991 ADAAG 10.2.1(2) 2004 ADAAG 810.3 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 7 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Seamount Dr. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 14" deep seat, 15" high back rest). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide new compliant bench and relocate to allow for 30"x48" wheelchair seating space. Corrective Action Photo # 7 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 8 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Seamount Dr. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 4 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 4' long x 5' wide. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 10 for corrective action. Corrective Action Photo # 9 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $0 9 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Eddinghill Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 3.0% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 10 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 10 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Eddinghill Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 5 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 14" deep seat, 14" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 11 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 11 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Verde Ridge Rd. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 2.5% to 2.8% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 12 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $1,382 12 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Verde Ridge Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:72 SF Page 6 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 6' long x 5' wide. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 12 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $192 13 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Verde Ridge Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:10 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 14" deep seat, 14 1/2" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 14 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 14 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Hesse Park (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 7 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 5' long x 5' wide. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 15 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $288 15 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Hesse Park (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:15 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 2.6% to 3.6% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 16 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $768 16 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Hesse Park (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 8 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 4.3% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 17 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $845 17 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Indian Valley Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:44 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 14" deep seat, 15" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 18 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 18 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Indian Valley Rd. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 9 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 3.0% to 4.3% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 17 for corrective action. Corrective Action Photo # 17 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $0 19 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Indian Valley Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 76" headroom clearance to bus sign. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Raise sign to allow compliant headroom clearance. Corrective Action Photo # 20 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $60 20 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:A DOJ Location Type:1 Level of Difficulty Moderate Location: Highridge Rd./ Hilltop Circle (NB) Planned Completion 6/30/2026 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 10 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 1 1/2" level change and gap at asphalt/ concrete transition. 004A - Asphalt Paving - Remove non-compliant pavement and replace with new asphalt paving (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 21 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $163 21 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate to High Location: Highridge Rd./ Hilltop Circle (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:16 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 14" deep seat, 15" high back support, no 12" shoulder alignment). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 22 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $0 22 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Country Ln. (NB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 11 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 5' long by 5' wide. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 22 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 23 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Country Ln. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.2% CS. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 23 for corrective action. Corrective Action Photo # 22 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 24 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Country Ln. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 12 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 4' long by 5' wide. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 26 for corrective action. Corrective Action Photo # 25 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $0 25 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Ocean Crest Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 2.4% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 25 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $768 26 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Ocean Crest Dr. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 13 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 2 Bus StopsReporting: 27 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: None provided (grass). 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 27 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $768 27 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Highridge Rd./ Armaga Spring Rd. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF Page 14 of 14 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA