Loading...
Area 1 Bus Stops_PhotoFacility_20130509-115336City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 1 Bus StopsReporting: 11 of 4367 Rcds Author: Vaish, B 02.13A - Bus Stop Shelter - Clear Floor Area - Clear floor area of 30” by 48” is not completely within the shelter. Existing Condition: No WC space provided within the shelter. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 2 for corrective action. Corrective Action Photo # 1 1991 ADAAG 10.2.1(2) 2004 ADAAG 810.3 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 1 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Silver Spur Rd./ Basswood Ave. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 14" deep seat, 14" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench & relocate for clear WC seating space. Corrective Action Photo # 1 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 2 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Silver Spur Rd./ Basswood Ave. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 1 of 6 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 1 Bus StopsReporting: 11 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 2.1% to 2.9% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 3 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $1,440 3 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Silver Spur Rd./ Basswood Ave. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:75 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 3.0% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 12 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $864 4 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Highridge Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:45 SF Page 2 of 6 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 1 Bus StopsReporting: 11 of 4367 Rcds Author: Vaish, B 02.12B - Bus Stop Pad Slope Perpendicular to Roadway - Bus stop pad slope perpendicular to the roadway exceeds 2%. Existing Condition: 8% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 13 1991 ADAAG 10.2.1 2004 ADAAG 810.2.4 2007 CBC 1121B.2.1 Other Priority: Total Cost $230 5 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Grayslake Rd. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:12 SF 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 6' long x 5' wide. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 13 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $1,920 6 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Grayslake Rd. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:100 SF Page 3 of 6 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 1 Bus StopsReporting: 11 of 4367 Rcds Author: Vaish, B 02.11A - Bus Stop Pad Size - Bus stop pad does not measure 8’ long (measured from the curb or vehicle roadway edge) by 5’ wide (measured parallel to the vehicle roadway). Existing Condition: Bus pad 7'-1" long by 5' wide. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 15 1991 ADAAG 10.2.1 2004 ADAAG 810.2.2 2007 CBC 1121B.1 Other Priority: Total Cost $230 7 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Basswood Ave./ Silver Spur Elementary (WB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:12 SF 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: Bench (16" high seat, 14" deep seat, 14 1/2" high back support). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Provide compliant bench. Corrective Action Photo # 8 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 8 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:E DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Indian Peak Rd. (SB) Planned Completion Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 4 of 6 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 1 Bus StopsReporting: 11 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 3.1% to 4.3% CS. 006 - Concrete Walk - Remove non-compliant pavement and replace with new concrete (area as shown on the drawings). The walkway slope shall not exceed 5% along the POT and cross slope shall not exceed 2%. Additional Comments: Corrective Action Photo # 9 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $768 9 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty High Location: Hawthorne Blvd./ Indian Peak Rd. (SB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:40 SF 02.13A - Bus Stop Shelter - Clear Floor Area - Clear floor area of 30” by 48” is not completely within the shelter. Existing Condition: No WC space provided within the shelter. 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: See Keynote 11 for corrective action. Corrective Action Photo # 10 1991 ADAAG 10.2.1(2) 2004 ADAAG 810.3 2007 CBC 1121B.2.1 Other Priority: Total Cost $0 10 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Highridge Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 5 of 6 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA City of Rancho Palos Verdes Rancho Palos Verdes ADA Assessment Facility Report with Photos Facility ID: # Area 1 Bus StopsReporting: 11 of 4367 Rcds Author: Vaish, B 02.17 - Other - Passenger Loading Zones - See Additional Comments Existing Condition: 2 benches provided, 0 accessible (17" high back support, 14" deep seat). 027 - Site Work - Miscellaneous - See Additional Comments Additional Comments: Remove one bench to allow for 30"x48" wheelchair seating space and provide one new compliant bench. Corrective Action Photo # 10 1991 ADAAG - 2004 ADAAG - 2007 CBC - Other Priority: Total Cost $600 11 Field Condition Status Not Complete As of 05/09/2013 Keynote Costs and Funding Plan Nbr:DBB Use:PV Severity:C DOJ Location Type:1 Level of Difficulty Moderate Location: Hawthorne Blvd./ Highridge Rd. (NB) Planned Completion 6/30/2031 Classification Implementation Funding Received $0 Status Update (check one) Completed □ In Progress □ Not Complete □ As of _____________ By ____________ Reported By Qty ...Of:1 EA Page 6 of 6 Printed 2013-05-09App: ©2010 BOA Architecture 877-225-4ADA