Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Abalone Cove Shoreline Park_CorrectiveActionSummaryReport_20130509-112844
Reporting: 200 of 4367 Rcds Author: Vaish, BFacility ID # 01 - Abalone Cove Shoreline Park City of Rancho Palos Verdes Corrective Action Summary Report Rancho Palos Verdes ADA Assessment Group Total Cost -- Count -- $546,101.40Summary for Group 020 - Site Work:40 $300.00Summary for Group 309 - Operable Parts:3 $149,574.00Summary for Group 404 - Doors:44 $17,280.00Summary for Group 405 - Ramps:1 $21,600.00Summary for Group 502 - Parking Spaces:10 $3,960.00Summary for Group 602 - Drinking Fountains:4 $61,320.00Summary for Group 603 - Toilet and Bathing Rooms:51 $9,600.00Summary for Group 608 - Shower Compartments:1 $13,260.00Summary for Group 703 - Signs:33 $3,120.00Summary for Group 803 - Dressing, Fitting, and Locker Rooms:3 $6,000.00Summary for Group 804 - Kitchens and Kitchenettes:2 $4,320.00Summary for Group 902 - Dining Surfaces and Work Surfaces:1 $9,600.00Summary for Group 904 - Check-Out Aisles and Sales and Service Counters:4 $9,060.00Summary for Group 1700 - Miscellaneous:3 Page 1 of 2 Printed 2013-05-09Application: ©2010 BOA Architecture - 877-225-4ADA DISCLAIMER: Costs are ESTIMATES! See full disclaimer statement at the end of this report. Reporting: 200 of 4367 Rcds Author: Vaish, BFacility ID # 01 - Abalone Cove Shoreline Park City of Rancho Palos Verdes Corrective Action Summary Report Rancho Palos Verdes ADA Assessment Group Total Cost -- Count -- $855,095.40Totals for All Groups:200 DISCLAIMER: Cost Factor calculates the full project cost where Construction Cost is based on an estimate of what a contractor may charge in 2011 to correct identified potential accessibility barriers. Cost Factors will vary and reflect variable delivery approaches. Please note that these reports do not include an assessment of concealed conditions. (Extended Costs) Page 2 of 2 Printed 2013-05-09Application: ©2010 BOA Architecture - 877-225-4ADA DISCLAIMER: Costs are ESTIMATES! See full disclaimer statement at the end of this report.