RPVCCA_CC_SR_2013_05_07_D_KOA_Corp_AgreementCITY OF
MEMORANDUM
RANCHO PALOS VERDES
TO:
FROM:
DATE:
SUBJECT:
REVIEWED:
Project Manager:
HONORABLE MAYOR &CITY COUNCIL MEMBERS
LES JONES,INTERIM DIRECTOR OF PUBLIC WO
May 7,2013
PROFESSIONAL SERVICES AGREEMENT WITH
CORPORATION
CAROLYN LEHR,CITY MANAGER 09-
Ron Dragoo,Senior EngineeM50
RECOMMENDATION
1.Authorize the Mayor and City Clerk to execute a Professional Services
Agreement with KOA Corporation to provide engineering design services for the
realignment of the eastern end of Palos Verdes Drive South (approximately 900
feet)at the eastern most boundary of the Portuguese Bend Landslide.
2.Adopt Resolution No._a Resolution of the City Council of the City of Rancho Palos
Verdes,amending Resolution 2012-43,the budget appropriation for Fiscal Year
2012-13,for a budget adjustment to the City's Portuguese Bend Road Maintenance
Program within the Street Maintenance Fund,in the amount of $41 ,425 and
authorizing expenditure of this amount for design services.
BACKGROUND
Palos Verdes Drive South is the only major east-west arterial across southern Rancho
Palos Verdes.Palos Verdes Drive South is a primary access route for citizens and
commuters traveling in and out of the City.Access to the City of Los Angeles,the port
and Interstate 110 to the east is needed to facilitate those who commute to employment
centers,visit RPV's many scenic destinations and to provide for the passage of
emergency vehicles.This arterial crosses the Klondike Canyon,Portuguese Bend,and
Abalone Cove Landslides where the roadway is subjected to the differential land
movement of the three landslide areas.
The point where Palos Verdes Drive South crosses the slip surface of the Portuguese
Bend and Klondike Canyon Landslides is notable when driving in either direction,as the
roadway veers toward the ocean at this location (See Attachment C)Location Map).
The deformation of the roadway surface has taken place over several years as the
Portuguese Bend Landslide slips toward the ocean at a much faster rate than the
Klondike Canyon Landslide.The land movement over time has resulted in the need to
D-1
realign this section of roadway putting put the asphalt back within its right of way and to
address a safety concern.
DISCUSSION
The roadway is becoming more difficult to negotiate as it continues to move in
conjunction with the landslides ..The soils immediately beneath the roadway surface
have been disturbed through years of landslide movement and new mechanical
compaction of these soils (which will be part of the construction project)will likely help
slow the movement which is exacerbated by groundwater.A project to realign the
entire length of Palos Verdes Drive South through the landslides is anticipated in the
near future;this project will only address safety concerns at the eastern portion of the
landslide road where Palos Verdes Drive South crosses the boundary of the Klondike
Canyon and Portuguese Bend Landslides and construction efforts will place the asphalt
back within the roadway right-of-way.
The Los Angeles Department of Public Works -Department of Water Resources
publishes a precipitation map on-line.A fairly accurate report of annual rainfall can be
obtained through this source once you locate the area you are interested in.One of the
automatic reporting gauges within this network is located near the lighthouse.During
the most recent rainfall season for the period between October 1,2012 and April 19,
2013 the site has recorded 5.28 accumulated inches of rainfall.The site shows the
normal rainfall for the season to date at this location is 11.07 inches.Geologists tell us
one of the common components of land movement is groundwater.With the lack of
rainfall in the recent years,the Roadway movement has slowed;however,the
movement which has occurred over the past several years is significant enough to
require a project to move the roadway back into its right-of-way and somewhat
straighten the alignment of the road.Staff's preliminary estimate for the construction of
the project is $500,000;however this report is not seeking to fund the construction
piece of the project.Funding for the construction of the roadway realignment is
included in the draft FY2013-14 budget.This report is specific to the Civil design which
is required to relocate this section of the roadway.
The design of the project will provide the specific information necessary for a contractor
to develop and submit his/her proposal to perform the project work.The work
associated with the design of the project will consist of performing a detailed survey of
the area,creating a topographic map,develop the alignment of the roadway
improvements including all details and specification,and incorporating this information
into a set of plans and specifications for the project.
This project has not been funded,however the need for the project has become
evident,which is why Staff is asking the City Council to authorize the Professional
Services Agreement in the not to exceed amount of $41 ,425,and to appropriate the
funds necessary to design the project.
Several design firms were contacted regarding this project,two responded to Staff's
request for proposals.KOA Corporation was selected as the most qualified to design
this project.Staff has worked with KOA Corporation on other projects within Rancho
Palos Verdes and is comfortable they have the technical staff available to develop the
documents required and meet the requirements of the agreement.
D-2
CONCLUSIONS
Adopting staff's recommendations will authorize the Mayor and City Clerk to execute
the attached Professional Services Agreement and adopting the resolution will provide
the funds needed to perform the design.
FISCAL IMPACT
The draft FY20 13-14 budget includes a proposed allocation for the construction of the
project that will be designed if the City Council adopts Staff's recommendations.
Adopting the attached Resolution will amend Resolution 2012-43,the budget appropriation
for Fiscal Year 2012-13,and provide for a budget adjustment to the City's Street
Improvements Program in the Capital Improvement Projects Fund,in the amount of $41 ,425.
Attachments:A)
B)
C)
Agreement
Resolution
Location Map
D-3
Attachment A)
CITY OF RANCHO PALOS VERDES
DESIGN PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT ("Agreement")is made and entered into this 5th day of March,
2013 by and between the City of Rancho Palos Verdes (hereinafter referred to as the
"CITY")and KOA Corporation (hereafter referred to as "CONSULTANT").
IN CONSIDERATION of the covenants hereinafter set forth,the parties hereto
agree as follows:
ARTICLE 1
SCOPE OF SERVICES
1.1 Project Description
The project (hereinafter "Project")is described as follows:CONSULTANT
shall provide civil design services for the realignment of a section of roadway
approximately 900 feet long along Palos Verdes Drive South,including evaluating the
project area,reviewing existing documents,performing a land survey of the Project
area,preparing construction-related plans and details,specifications and a cost
estimate,and assisting the City in preparing the final bid documents.
1.2 Description of Services
CONSULTANT shall perform design services required to realign the
section of roadway located on Palos Verdes Drive South at the intersection of the
Klondike Canyon and Portuguese Bend Landslides approximately 2200 feet east of
Schooner Drive,including attending all required meetings and preparation of the
documents necessary to solicit contractors for construction proposals.CONSULTANT
is responsible for accurate and effective communication and record-keeping.These
services are more fully described in CONSULTANT's Proposal,which is attached
hereto as Exhibit "A"and incorporated herein by this reference.In the event of any
conflict between the terms of this Agreement and any incorporated documents,the
terms of this Agreement shall control.
1.3 Schedule of Work
Upon receipt of written Notice to Proceed from the CITY,CONSULTANT
shall perform with due diligence the services requested by the CITY.Time is of the
essence in this Agreement.CONSULTANT shall not be responsible for delay,nor shall
CONSULTANT be responsible for damages or be in default or deemed to be in default
by reason of strikes,lockouts,accidents,or acts of God,or the failure of CITY to furnish
timely information or to approve or disapprove CONSULTANT's work promptly,or delay
or faulty performance by CITY,other consultants/contractors,or governmental
agencies,or any other delays beyond CONSULTANT's control or without
Page 1 of 11
R6876-0001 \1557062v2 .doc Agreement for Design Professional Services
D-4
CONSULTANT's fault.
ARTICLE 2
COMPENSATION
2.1 Fee
CITY agrees to compensate CONSULTANT an amount not to exceed
forty-one thousand four hundred twenty-five dollars and no cents ($41,425.00)for
services as described in Article 1.
2.2 Terms of Compensation
CONSULTANT shall submit monthly invoices for the percentage of work
completed in the previous month.CITY agrees to authorize payment for all undisputed
invoice amounts within thirty (30)days of receipt of each invoice.CITY agrees to use
its best efforts to notify CONSULTANT of any disputed invoice amounts or claimed
completion percentages within ten (10)days of the receipt of each invoice.However,
CITY's failure to timely notify CONSULTANT of a disputed amount or claimed
completion percentage shall not be deemed a waiver of CITY's right to challenge such
amount or percentage.
Additionally,in the event CITY fails to pay any undisputed amounts due
CONSULTANT within forty-five (45)days after invoices are received by CITY then CITY
agrees that CONSULTANT shall have the right to consider said default a total breach of
this Agreement and be terminated by CONSULTANT without liability to CONSULTANT
upon ten (10)working days advance written notice.
2.3 Additional Services
CITY may request additional specified work under this Agreement.All
such work must be authorized in writing by the CITY's Director of Public Works prior to
commencement.CONSULTANT shall perform such services,and CITY shall pay for
such additional services in accordance with CONSULTANT's Schedule of Hourly Rates,
which is within Exhibit "A".The rates in Exhibit "A"shall be in effect through the end of
this Agreement.
2.4 Term of Agreement
This Agreement shall commence upon execution by both parties and shall
terminate on December 31,2013,unless sooner terminated pursuant to Article 4 of this
Agreement.
Page 2 of 11
R6876-0001 \1557062v2.doc Agreement for Design Professional Services
D-5
ARTICLE 3
INDEMNIFICATION AND INSURANCE
3.1 Indemnification.Hold Harmless.and Duty to Defend
(a)Indemnity for Design Professional Services.In connection with its
design professional services and to the maximum extent permitted by law,
CONSULTANT shall hold harmless and indemnify CITY,and its officials,officers,
employees,agents and independent contractors serving in the role of CITY officials,
and designated volunteers (collectively, "Indemnitees"),with respect to any and all
claims,demands,causes of action,damages,injuries,liabilities,losses, costs or
expenses,including reimbursement of attorneys'fees and costs of defense (collectively,
"Claims"hereinafter),including but not limited to Claims relating to death or injury to any
person and injury to any property,which arise out of,pertain to,or relate to in whole or
in part to.the negligence,recklessness,or willful misconduct of CONSULTANT or any of
its officers,employees,subcontractors,or agents in the performance of its design
professional services under this Agreement.
(b)Other Indemnities.In connection with any and all claims,demands,
causes of action,damages,injuries,liabilities,losses,costs or expenses,including
attorneys'fees and costs of defense (collectively,"Damages"hereinafter)not covered
by Section 3.1 (a),and to the maximum extent permitted by law,CONSULTANT shall
defend,hold harmless and indemnify the Indemnitees with respect to any and all
Damages,inclUding but not limited to,Damages relating to death or injury to any person
and injury to any property,which arise out of,pertain to,or relate to the acts or
omissions of CONSULTANT or any of its officers,employees,subcontractors,or agents
in the performance of this Agreement,except for such loss or damage arising from the
sole negligence or willful misconduct of the CITY,as determined by final arbitration or
court decision or by the agreement of the parties.CONSULTANT shall defend
Indemnitees in any action or actions filed in connection with any such Damages with
counsel of CITY's choice,and shall pay all costs and expenses,including all attorneys'
fees and experts'costs actually incurred in connection with such defense.Consultant's
duty to defend pursuant to this Section 3.1 (b)shall apply independent of any prior,
concurrent or subsequent misconduct,negligent acts,errors or omissions of
Indemnitees.
(c)All duties of CONSULTANT under Section 3.1 shall survive
termination of this Agreement.
3.2 General Liability
CONSULTANT shall at all times during the term of the Agreement carry,
maintain,and keep in full force and effect,a policy or policies of Commercial General
Liability Insurance,with minimum limits of one million dollars ($1,000,000)for each
occurrence and two million dollars ($2,000,000)general aggregate for bodily injury,
Page 3 of 11
R6876-0001 \1557062v2.doc Agreement for Design Professional Services
D-6
death,loss or property damage for products or completed operations and any and all
other activities undertaken by CONSULTANT in the performance of this Agreement.
Said policy or policies shall be issued by an insurer admitted to do business in the State
of California and rated in A.M.Best's Insurance Guide with a rating of A:VII or better.
3.3 Professional Liability
CONSULTANT shall at all times during the term of this Agreement,carry,
maintain,and keep in full force and effect a policy or policies of professional liability
insurance with a minimum limit of one million dollars ($1,000,000)per claim and
aggregate for errors and/or omissions of CONSULTANT in the performance of this
Agreement.Said policy or policies shall be issued by an insurer admitted to do business
in the State of California and rated in Best's Insurance Guide with a rating of A:VII or
better.If a "claims made"policy is provided,such policy shall be maintained in effect
from the ·date of performance of work or services on the CITY's behalf until three (3)
years after the date of work or services are accepted as completed.Coverage for the
post-completion period may be provided by renewal or replacement of the policy for
each of the three (3)years or by a three-year extended reporting period endorsement,
which reinstates all limits for the extended reporting period.If any such policy and/or
policies have a retroactive date,that date shall be no later than the date of first
performance of work or services on behalf of the CITY.Renewal or replacement
policies shall not allow for any advancement of such retroactive date.
3.4 Automobile Liability
CONSULTANT shall at all times during the term of this Agreement obtain,
maintain,and keep in full force and effect,a policy or policies of Automobile Liability
Insurance,with minimum of one million dollars ($1,000,000)per claim and occurrence
and two million dollars ($2,000,000)in the aggregate for bodily injuries or death of one
person and five hundred thousand dollars ($500,000)for property damage arising from
one incident.
3.5 Worker's Compensation
CONSULTANT agrees to maintain in force at all times during the
performance of work under this Agreement worker's compensation insurance as
required by the law.CONSULTANT shall require any subcontractor similarly to provide
such compensation insurance for their respective employees.
3.6 Notice of Cancellation
(a)All insurance policies shall provide that the insurance coverage
shall not be cancelled or modified by the insurance carrier without thirty (30)days prior
written notice to CITY,or ten (10)days notice if cancellation is due to nonpayment of
premium.Additionally,CONSULTANT shall provide immediate notice to the City if it
Page 4 of 11
R6876-0001 \1557062v2.doc Agreement for Design Professional Services
D-7
receives a cancellation or policy revision notice from the insurer.
(b)CONSULTANT agrees that it will not cancel or reduce any required
insurance coverage.CONSULTANT agrees that if it does not keep the aforesaid
insurance in full force and effect,CITY may either immediately terminate this Agreement
or,if insurance is available at a reasonable cost,CITY may take out the necessary
insurance and pay,at CONSULTANT's expense,the premium thereon.
3.7 Entire Policy and Certificate of Insurance
At all times during the term of this Agreement,CONSULTANT shall
maintain on file with the CITY Clerk both a copy of the entire policy and a certificate of
insurance showing that the aforesaid policies are in effect in the required amounts.The
commercial general liability policy shall contain endorsements naming the CITY,its
officers,agents and employees as additional insureds.
3.8 Primary Coverage
.The insurance provided by CONSULTANT shall be primary to any
coverage available to CITY.The insurance policies (other than workers compensation
and professional liability)shall include provisions for waiver of subrogation.
ARTICLE 4
TERMINATION
4.1 Termination of Agreement
(a)This Agreement may be terminated at any time,with or without
cause,by the CITY upon thirty (30)days prior written notice.This Agreement may be
terminated by CONSULTANT only for cause upon ninety (90)days prior written notice.
Notice shall be deemed served if completed in compliance with Section 6.14.
(b)In the event of termination or cancellation of this Agreement by
CONSULTANT or CITY,due to no fault or failure of performance by CONSULTANT,
CONSULTANT shall be paid compensation for all services performed by
CONSULTANT,in an amount to be determined as follows:for work satisfactorily done
in accordance with all of the terms and provisions of this Agreement as determined by
the CITY,CONSULTANT shall be paid an amount equal to the percentage of services
performed prior to the effective date of termination or cancellation in accordance with
the work items;provided,in no event shall the amount of money paid under the
foregoing provisions of this paragraph exceed the amount which would have been paid
to CONSULTANT for the full performance of the services described in this Agreement.
Page 5 of 11
R6876-0001\1557062v2.doc Agreement for Design Professional Services
D-8
ARTICLE 5
OWNERSHIP OF DOCUMENTS
5.1 Ownership of Documents and Work Product
All documents,plans,specifications,reports,information,data,exhibits,
photographs,images,video files and media created or developed by CONSULTANT
pursuant to this Agreement ("Written Products")shall be and remain the property of the
CITY without restriction or limitation upon its use,duplication or dissemination by the
CITY.All Written Products shall be considered "works made for hire,"and all Written
Products and any and all intellectual property rights arising from their creation,
including,but not limited to,all copyrights and other proprietary rights,shall be and
remain the property of the CITY without restriction or limitation upon their use,
duplication or dissemination by the CITY.CONSULTANT shall not obtain or attempt to
obtain copyright protection as to any Written Products.
CONSULTANT hereby assigns to the CITY all ownership and any and all
intellectual property rights to the Written Products that are not otherwise vested in the
CITY pursuant to the paragraph directly above this one.
CONSULTANT warrants and represents that it has secured all necessary
licenses,consents or approvals to use any instrumentality,thing or component as to
which any intellectual property right exists,including computer software,used in the
rendering of the services and the production of all Written Products produced under this
Agreement,and that the CITY has full legal title to and the right to reproduce the Written
Products.CONSULTANT shall defend,indemnify and hold the CITY,and its elected
officials,officers,employees,servants,attorneys,designated volunteers,and agents
serving as independent contractors in the role of CITY officials,harmless from any loss,
claim or liability in any way related to a claim that CITY's use of any of the Written
Products is violating federal,state or local laws,or any contractual provisions,or any
laws relating to trade names,licenses,franchises,copyrights,patents or other means of
protecting intellectual property rights and/or interests in products or inventions.
CONSULTANT shall bear all costs arising from the use of patented,copyrighted,trade
secret or trademarked documents,materials,equipment,devices or processes in
connection with its provision of the services and Written Products produced under this
Agreement.In the event the use of any of the Written Products or other deliverables
hereunder by the CITY is held to constitute an infringement and the use of any of the
same is enjoined,CONSULTANT,at its expense,shall:(a)secure for CITY the right to
continue using the Written Products and other deliverables by suspension of any
injunction,or by procuring a license or licenses for CITY;or (b)modify the Written
Products and other deliverables so that they become non-infringing while remaining in
compliance with the requirements of this Agreement.This covenant shall survive the
termination of this Agreement.
Upon termination,abandonment or suspension of the Project,the
Page 6 of 11
R6876-0001 \1557062v2.doc Agreement for Design Professional Services
D-9
CONSULTANT shall deliver to the CITY all Written Products and other deliverables
related to the Project without additional cost or expense to the CITY.If CONSULTANT
prepares a document on a computer,CONSULTANT shall provide CITY with said
document both in a printed format and in an electronic format that is acceptable to the
CITY.
ARTICLE 6
GENERAL PROVISIONS
6.1 Representation
The CITY representative shall be the Director of Public Works or his or her
designee,and CONSULTANT shall notify CITY of CONSULTANT's designated
representative.These individuals shall be the primary contact persons for the parties
regarding performance of this Agreement.
6.2 Fair Employment Practices/Equal Opportunity Acts
In the performance of this Agreement,CONSULTANT shall comply with all
applicable provisions of the California Fair Employment Practices Act (California
Government Code Sections 12940-48),the applicable equal employment provisions of
the Civil Rights Act of 1964 (42 U.S.C.200e-217),and the Americans with Disabilities
Act of 1992 (42 U.S.C.§11200,et seq.).
6.3 Personnel
CONSULTANT represents that it has,or shall secure at its own expense,
all personnel required to perform CONSULTANT's services under this Agreement.Any
person who performs engineering services pursuant to this Agreement shall be licensed
as a Civil Engineer by the State of California and in good standing.CONSULTANT
shall make reasonable efforts to maintain the continuity of CONSULTANT's'staff who
are assigned to perform the services hereunder and shall obtain the approval of the
Director of Public Works of all proposed staff members who will perform such services.
CONSULTANT may associate with or employ associates or subcontractors in the
performance of its services under this Agreement,but at all times shall CONSULTANT
be responsible for its associates and subcontractors'services.
6.4 CONSULTANT's Representations
CONSULTANT represents,covenants and agrees that:a)CONSULTANT
is licensed,qualified,and capable of furnishing the labor,materials,and expertise
necessary to perform the services in accordance with the terms and conditions set forth
in this Agreement;b)there are no obligations,commitments,or impediments of any kind
that will limit or prevent CONSULTANT's full performance under this Agreement;c)to
the extent required by the standard of practice,CONSULTANT has investigated and
Page 7 of 11
R6876-0001 \1557062v2.doc Agreement for Design Professional Services
D-10
considered the scope of services performed,has carefully considered how the services
should be performed,and understands the facilities,difficulties and restrictions
attending performance of the services under this Agreement.
6.5 Conflicts of Interest
CONSULTANT agrees not to accept any employment or representation
during the term of this Agreement or within twelve (12)months after completion of the
work under this Agreement which is or may likely make CONSULTANT "financially
interested"(as provided in California Government Code Sections 1090 and 87100)in
any decisions made by CITY on any matter in connection with which CONSULTANT
has been retained pursuant to this Agreement.
6.6 Legal Action
(a)Should either party to this Agreement bring legal action against the
other,the validity,interpretation,and performance of this Agreement shall be controlled
by and construed under the laws of the State of California,excluding California's choice
of law rules.Venue for any such action relating to this Agreement shall be in the Los
Angeles County Superior Court.
(b)If any legal action or other proceeding,including action for
declaratory relief,is brought for the enforcement of this Agreement or because of an
alleged dispute,breach,default or misrepresentation in connection with this Agreement,
the prevailing party shall be entitled to recover reasonable attorneys'fees,experts'fees,
and other costs,in addition to any other relief to which the party may be entitled.
(c)Should any legal action about a project between CITY and a party
other than CONSULTANT require the testimony of CONSULTANT when there is no
allegation that CONSULTANT was negligent,CITY shall compensate CONSULTANT
for its testimony and preparation to testify at the hourly rates in effect at the time of such
testimony.
6.7 Assignment
Neither this Agreement nor any part thereof shall be assigned by
CONSULTANT without the prior written consent of the CITY.Any such purported
assignment without written consent shall be null and void,and CONSULTANT shall hold
harmless,defend and indemnify the CITY and its officers,officials, employees,agents
and representatives with respect to any claim,demand or action arising from any
unauthorized assignment.
Notwithstanding the above,CONSULTANT may use the services of
persons and entities not in CONSULTANT's direct employ,when it is appropriate and
customary to do so.Such persons and entities include,but are not necessarily limited
Page 8 of 11
R6876-0001\1557062v2.doc Agreement for Design Professional Services
D-11
to,surveyors,specialized consultants,and testing laboratories.CONSULTANT's use of
subcontractors for additional services shall not be unreasonably restricted by the CITY
provided CONSULTANT notifies the CITY in advance.
6.8 Independent Contractor
CONSULTANT is and shall at all times remain,as to the CITY,a wholly
independent contractor.Neither the CITY nor any of its agents shall have control over
the conduct of CONSULTANT or any of the CONSULTANT's employees,except as
herein set forth,and CONSULTANT is free to dispose of all portions of its time and
activities which it is not obligated to devote to the CITY in such a manner and to such
persons,firms,or corporations as the CONSULTANT wishes except as expressly
provided in this Agreement.CONSULTANT shall have no power to incur any debt,
obligation,or liability on behalf of the CITY or otherwise act on behalf of the CITY as an
agent.CONSULTANT shall not,at any time or in any manner,represent that it or any of
its agents,servants or employees,are in any manner agents,servants or employees of
CITY.CONSULTANT agrees to pay all required taxes on amounts paid to
CONSULTANT under this Agreement,and to indemnify and hold the CITY harmless
from any and all taxes,assessments,penalties,and interest asserted against the CITY
by reason of the independent contractor relationship created by this Agreement.
CONSULTANT shall fully comply with the workers'compensation law regarding
CONSULTANT and its employees.CONSULTANT further agrees to indemnify and
hold the CITY harmless from any failure of CONSULTANT to comply with applicable
workers'compensation laws.The CITY shall have the right to offset against the amount
of any fees due to CONSULTANT under this Agreement any amount due to the CITY
from CONSULTANT as a result of its failure to promptly pay to the CITY any
reimbursement or indemnification arising under this Article.
6.9 Titles
The titles used in this Agreement are for general reference only and are
not part of the Agreement.
6.10 Entire Agreement
This Agreement,including any other documents incorporated herein by
specific reference,represents the entire and integrated agreement between CITY and
CONSULTANT and supersedes all prior negotiations,representations or agreements,
either written or oral.This Agreement may be modified or amended,or provisions or
breach may be waived,only by subsequent written agreement signed by both parties.
6.11 Construction
In the event of any asserted ambiguity in,or dispute regarding the
interpretation of any matter herein,the interpretation of this Agreement shall not be
Page 9 of 11
R6876-0001 \1557062v2.doc Agreement for Design Professional Services
D-12
resolved by any rules of interpretation providing for interpretation against the party who
causes the uncertainty to exist or against the party who drafted the Agreement or who
drafted that portion of the Agreement.
6.12 Non-Waiver of Terms,Rights and Remedies
Waiver by either party of anyone or more of the conditions of performance under
this Agreement shall not be a waiver of any other condition of performance under this
Agreement.In no event shall the making by the CITY of any payment to
CONSULTANT constitute or be construed as a waiver by the CITY of any breach of
covenant,or any default which may then exist on the part of CONSULTANT,and the
making of any such payment by the CITY shall in no way impair or prejudice any right or
remedy available to the CITY with regard to such breach or default.
6.13 Severability
If any term or portion of this Agreement is held to be invalid,illegal,or otherwise
unenforceable by a court of competent jurisdiction,the remaining provisions of this
Agreement shall continue in full force and effect.
6.14 Notice
Except as otherwise required by law,any payment,notice or other
communication authorized or required by this Agreement shall be in writing and shall be
deemed received on (a)the day of delivery if delivered by hand or overnight courier
service during CONSULTANT's or CITY's regular business hours or (b)on the third
business day following deposit in the United States mail,postage prepaid,to the
addresses listed below,or at such other address as one party may notify the other:
To CITY:
Les Jones,Interim Director of Public Works
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes,CA 90275
To CONSULTANT:
Chuck Stephan
KOA Corporation
1411 W.190th Street,Suite 525
Gardena,CA 90248
Page 10 of 11
R6876-0001\1557062v2.doc Agreement for Design Professional Services
D-13
IN WITNESS WHEREOF,the parties hereto have executed this Agreement as of
the date and year first above written.
Dated:_
Dated:_
ATIEST:
By:_
City Clerk
KOA CORPORATION
("CONSULTANT")
By:_
Printed Name:---------
Title:------------
By:_
Printed Name:_
Title:_
CITY OF RANCHO PALOS VERDES
("CITY")
By:_
Mayor
APPROVED AS TO FORM:
By:_
City Attorney
R6876-0001\1557062v2.doc
Page 11 of 11
Agreement for Design Professional Services
D-14
Exhibit "A":
Consultant's Proposal,including Schedule of Hourly Rates
Exhibit "A"
R6876-0001 \1557062v2 .doc
D-15
4 KOA CORPORATION
••,~~\ll\"~I1!illn~~_~;!;!\l!;!"_~!<~!PX_~
CBM Consulting
March 29,2013
City of Rancho Palos Verdes
Department of Public Works
30940 Hawthorne Blvd
Rancho Palos Verdes,CA 90275
Attention:Mr.Ron Dragoo
RE:Proposal for Engineering Design Services for the
Palos Verdes Drive South Realignment At Portuguese Bend
Dear Mr.Dragoo:
141 1 W.I90th St.•Suite 525
Gardena.CA 90248
t:310.329.0102 f:310.329.1021
www.koacorporation.com
KOA Corporation ("KOA"),appreciates the opportunity to submit qualifications to the City of Rancho
Palos Verdes for Civil Engineering Design services.KOA has the expertise and resources required to
assist the City of Rancho Palos Verdes for the design of the Palos Verdes Drive South Realignment at
Portuguese Bend in a timely and effiCient manner.We are committed to working seamlessly with your
staff and project team to ensure the successful delivery of this project.KOA has teamed with KDM
Meridian to provide survey services for this project.
The KOA team,our project systems,and our entire management structure are geared to providing
flexible services to agencies such as yours.Descriptions of similar projects and respective references for
these projects are included in our proposal.We assure that our key personnel will be aSSigned to the
project for its duration and will not be removed or replaced by us without concurrence from the City
of Rancho Palos Verdes.Every member of our proposed team is available to be committed to the
projects assigned to us beginning the start date.
Chuck Stephan,P.E.,LEED AP will be the Management Contact and Project Manager for this contract.
The contract would be managed though the South Bay office at 141 1 W.190th Street,Suite 525,
Gardena,CA,90248;Phone:310.329.0 I02;Fax:310.329.1021;Email:cstephan@koacorporation.com.
Thank you for this opportunity to offer our services to the City of Rancho Palos Verdes.Should you
have questions during the selection process,please contact me at 310.329.0102.
Sincerely,
KOA Consulting,Inc.
Chuck Stephan,P.E.(CA RCE C5048I)
V.P.of South Bay Operations
LOS ANGELES ONTARIO ORANGE SAN DIEGO SOUTH BAY
D-16
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend
Proposal
for the
City of Rancho Palos Verdes
Engineering Services
for the
Palos Verdes Drive South
Realignment at Portuguese Bend
Table of Contents
I.KEY INDiViDUALS 3
1.1 ORGANIZATION CHART 3
1.2 PROJECT MANAGER ,4
1.3 PROJECT TEAM 6
2.FIRM EXPERIENCE 8
2.1 FIRM PROFILE 8
2.2 PROJECT EXPERIENCE 9
2.3 REFERENCES I3
3.APPROACH AND SCOPE OF WORK 14
3.I PROJECT ApPROACH 14
4.FEE SCHEDULE 19
Page 2D-17
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend
I.Key Individuals
I.Key Individuals
KOA proposes Chuck Stephan,P.E.as the project manager for the Palos Verdes Drive South Bicycle
Compatible Lane Improvement Project.Chuck has extensive experience with arterial street pavement
rehabilitation and improvement projects,conventional and ARHM pavement materials.Christine
Kaskara,P.E.will provide design and field engineering tasks.Derry MacMahon will provide
constructability review services for this project.
KDM Meridian already has some preliminary aerial topographic survey work in the area as a part of a
separate project.Detailed field survey work will be required to provide sufficient survey detail for the
construction plans,and we propose utilizing KDM for those services.
GeoEnvironmental Inc.has already completed a geotechnical engineering investigation and evaluation
adjacent to the proposed project area.We propose utilizing the findings from their previous
investigation as a basis for the roadway design section.If desired,we could obtain additional geotechnical
investigation data at an added cost.
1.1 ORGANIZATION CHART
PrinCipal Project Managerl
Sentor Engineer
jChuck stephan,P.E.,LEEDAPI
KOA Finn Principal
Senior Design I Project Manager
Engineering Survey
Rich Maher,PLS
Principal Surveyor
Patrick Earl,PlS
Survey Manager
KDM Meridian
MKOA CORPORATION
COM Consulting
Engineering Design
Christine Kaskara,PE,QSD
Design Engineer
cBM consultlngl
KOA Corporation
Constructabihty Review
Deny MacMahon
Construction Manager
CBM consulting!
KOA Corporation
Page 3D-18
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend I.Key Individuals
1.2 PROJECT MANAGER
CHUCK STEPHAN,PE,LEED AP
VP of South Bay Operations
Principal-In-Charge I Design Engineer I Project
Manager
Education
BS,Agricultural Engineering,California
Polytechnic State University,San Luis
Obispo (/982)
LEED Accredited Professional (2007)
Registrations
Prof.Engineer (Civil)CA #C5048I
(/993)
Prof.Engineer (Civil)OR #1 872PE
(1995)
Prof.Engineer (Civil)HI #PE.-8432(CE)
(/996)
Professional Affiliations
American Public Works Association
American Society of Civil Engineers
Year Entered Profession
1982
Year Started with Firm
2000
Specializing in Project Management,Civil
Engineering Design,and Construction Management
for municipal Capital Improvement Projects,
including pavement design and rehabilitation;ADA
improvements;water pipelines;storm drain and
sanitary sewers;medians and landscaping;parking
lots;site improvements;plan checking;NPDES
requirements.
Providing staff assistance to municipal engineering departments on temporary or part-time basis
as needed;provide staff training in project management,design,and construction management
skills.
Manage various funding sources including local,state,and federal-aid projects;SR2S;SRTS;STPL;
various grant applications and reimbursement requests.
•
•
•
Professional Experience
Chuck Stephan has thirty years of extensive experience in
civil engineering design and project management on projects
for many municipalities and private firms.He has diverse
project experience in planning,design,management,and
construction of transportation,educational,institutional,
industrial:aerospace,municipal,residential and commercial
projects.Mr.Stephan works in multiple capacities as
Principal-In-Charge,project manager,project engineer,lead
engineer,design engineer,and construction engineer in
both the civil and construction management disciplines.
Project Experience
Arterial Roads Rehabilitation Project Fiscal Year 2010-2011,Rancho Palos Verdes,CA:
Project Manager &Design Engineer.Prepared Plans,Specifications and Estimate for the rehabilitation of
Palos Verdes (PV)Drive South in the City of Rancho Palos Verdes.PV Drive South is a challenging
arterial highway winding along the bluffs of the Palos Verdes peninsula overlooking the Pacific Ocean.
The street varies from a fully developed 4-lane divided highway with bicycle path,to a 2 lane highway
over unstable creeping subgrade soils.Rehabilitation strategies included selective removal and
replacement (R&R)areas,asphalt rubber hot mix (ARHM)and conventional asphalt overlays,and
microsurface application.Work included the relocation and improvement of bus pads and shelters,
retaining walls,PCC repairs,striping and markings.A comprehensive traffic sign field review and
replacement plan was prepared to bring all traffic signs into uniformity and conformance with MUTCD
requirements.Construction Cost $2,000,000.
PI KOA CORPORATION
CBM Consulting Page 4D-19
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend I.Key Individuals
Residential Streets Improvement Project,FY2009-20 I0 Area 4 and Area 8,Rancho Palos
Verdes,CA:Project Manager &Design Engineer.Prepared Plans,Specifications and Estimate for the
rehabilitation of various residential streets in the City of Rancho Palos Verdes.Project included Type II
Slurry Seal and Cape Seal rehabilitation methods,associated concrete curb,gutter,sidewalk,and curb
access ramp construction,and replacement of signs,striping and markings.Construction Cost $2M.
City of La Habra Engineering Services -Program Management,Project Management,
Design,Construction Management,La Habra,CA 2003 to Present:Provided engineering
services to the City of La Habra Department of Public Works for the management,design,and
construction of various public works capital improvement projects and studies.Projects included annual
pavement rehabilitation projects and annual water main replacement projects.
Residential &Arterial Overlay 20 II Design,Thousand Oaks,CA:Design Engineer.Prepared
Plans,Specifications and Estimate for the City's 3 year Pavement Rehabilitation Project.Work included
field review,documentation,and photographing of all street sections and repair locations;determination
of rehabilitation strategies;preparation of plans,specifications,and estimate for bid;and bid support.
The project included 50,000 tons of asphalt pavement reconstruction and Asphalt Rubber Hot Mix
overlay on 30 miles of local,collector,and arterial streets.All work was completed in a compressed
time schedule of 4 weeks.Construction Cost $7,000,000.
Sun Valley EDA Public Improvement Project,Los Angeles,CA:Project Manager &Design
Engineer.Engineering design services to develop Plans,Specifications,and Estimate (PS&E)for the repair
and rehabilitation of 2 major arterial highways and 5 major intersections in the City of Los Angeles.
Work included removal and replacement of failed AC and PCC pavement sections;reconstruction of
driveways and curb access ramps to meet ADA reqUirements;milling and overlay of PCC and AC
pavement;and complete reconstruction of intersections with cross gutters,grading,and paving.
Construction Cost $3,000,000.
Sepulveda Boulevard Pedestrian Improvements,Culver City,CA:Project Manager &Design
Engineer.Prepared the Plans,Specifications,and Estimate (PS&E)for the enhancement of a Y2 mile
section of Sepulveda Blvd in a busy commercial area of Culver City.The project included the challenging
installation of landscaped areas with trees,plants,benches,curb access ramps,and driveway and
sidewalk replacements in a fully developed area with outdoor dir:"ing and retail shops.Construction Cost
$350,000.
City of Hermosa Beach pavement rehabilitation projects,Hermosa Beach,CA 200 I-
present:Project Manager I Engineer.Provided project management,design,and construction
management for various pavement improvement projects including residential streets,and arterial
streets with federal-aid funding.Project included sidewalk repairs,ADA curb access ramps,storm drain
repairs,curb &gutter replacement,grinding,asphalt pavement,and striping.
"KOA CORPORATION
CBM Consulting Page 5D-20
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend I.Key Individuals
1.3 PROJECT TEAM
CHRISTINE KASKARA,P.E.,QSD
Design Engineer
Professional Experience
Ms.Kaskara has nearly 10 years of experience in
engineering including structural and civil assignments.At
KOA,she prepares civil engineering plans,specifications and
estimate (PS&E);assists in construction inspection,
construction management and project management;obtains
field information as necessary;and prepares Safe Route to
School (SR2S)grant applications.She previously worked for
both the ·County of Riverside Department of Building and
Safety and the Community Redevelopment Agency of Los
Angeles.Her experience encompasses street design,site
plans,base maps,storm drain design,construction
management,construction observation,contract
administration,and educational!commercial!residential
building design.Christine is proficient in AutoCAD and
familiar with APWA and Caltrans Standards and Building
Codes.She received her QSD Certification in 20 I I.
E.ducation
M.S.,Civil Engineering,University of
Southern California,Los Angeles,CA,
(2004)
B.S.,Civil Engineering,Cal Poly Pomona,
Pomona,CA,(2002)
Year E.ntered Profession
2002
Year started with Firm
2009
Registrations
Prof.Engineer (Civil)CA #C75585
(2010)
Certifications
Qualified SWPPP Developer (QSD)!
Qualified SWPPP Practitioner (QSP)
#20336
ProfeSSional Affiliations
Chi Epsilon,Civil Engineering Honor
Society
Project Experience
La Habra 2009-20 I0 Street Rehab,La Habra,CA.
Assistant Design Engineer.Provided overall project
management,engineering design,and construction management services for the City of La Habra's
annual street rehabilitation project for fiscal year 2008-2009.Work included initial project area selection
and field review,utility research,funding allocations,engineering design,coordination of surveying and
geotechnical services,bidding and award,and construction management throughout completion.Work
included preparing City Council items and coordination with City staff.
Sun Valley EDA Public Improvement Project,Los Angeles,CA:Design Engineer.Engineering
design services to develop Plans,Specifications,and Estimate (PS&E)for the repair and rehabilitation of 2
major arterial highways and 5 major intersections in the City of Los Angeles.Work included removal
and replacement of failed AC and PCC pavement sections;reconstruction of driveways and curb access
ramps to meet ADA requirements;milling and overlay of PCC and AC pavement;and complete
reconstruction of intersections with cross gutters,grading,and paving.Construction Cost $3,000,000.
Annual Residential Overlay and Slurry Seal,Rancho Palos Verdes,CA:Assistant Construction
Manager.KOA Consulting prOVided project and construction management services for the City of
Rancho Palos Verdes 20 I0 pavement rehabilitation project,which included street repairs consisting of
Cape Seal,slurry seal,and reconstruction,ADA improvements,PCC curb,gutter,sidewalk and
driveway repairs,signage,and striping.This project rehabilitated 92 residential and collector streets.
Construction Cost $1,500,000.
PI KOA CORPORATION
CBM Consulting Page 6D-21
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend I.Key Individuals
Education
B.S.Accounting
State University of New York at
Binghamton,Binghamton,NY (2002)
Certifications
Qualified SWPPP Practitioner (QSP)
#22268
Certified Erosion,Sediment and Storm
Water Inspector (CESSWI)#2496
NASSCO Inspector Training and
Certification Program for the Inspection
of Cured-In-Place-Pipe (CIPP)
Installation
OSHA 10-hour Occupational Safety and
Health Training Course in Construction
Safety &Health #000391966 dated
5110104
Year Entered Profession
2002
Year Started with Firm
2004
Torrance Blvd Rehabilitation,T-43/44,Torrance,
CA:Construction Observer.The scope of work consisted
of the grinding and removal of existing pavement,concrete
and asphalt paving,pavement slurry seal,removal and
reconstruction of sections of the street,construction of
curb and gutter,sidewalks,driveways,ADA ramps,Professional Affiliations
irrigation and landscaping of existing medians,striping and American Public Works Association
adjustment of utilities and other work.In addition to the
above the project involved the removal and replacement of 50,500 SF of residential sidewalks,and the
removal and replacement of cross gutters at 9 intersections.
Professional Experience
Scott Neumann's responsibilities include construction field
management;coordination between owner and engineer;
contract administration/documentation;scheduling of crews
and subcontractors;pay applications;subcontractor
management;project cost controls;analyze and report
current project financial status and cost to complete;
attendance at weekly construction meetings;field
reportingllogs,submittals;Request for Information;Change
Order Requests;Change Orders;and effective
communication between all parties involved on assigned
projects.Working on-staff with the CRA/LA,Mr.Neumann
has extensive management experience for public and
redevelopment projects between LACDPW and Los
Angeles City.
SCOTT NEUMANN,QSP
Construction Manager/Construction Observer
City Wide Street Improvements Project,City of Hawthorne,CA:Construction Observer for
street and sidewalk rehabilitation at multiple sites throughout the City of Hawthorne.The project
included removal and reconstruction of sections of the roadway,grind and overlay,sidewalk and curb
ramp replacement,new signage and striping and construction of new landscaped medians.Project
funded by the ARRA requiring compliance with all federal regulations.Construction Cost $2,300,000.
Street Rehabilitation,2007/2008,La Habra,CA:Construction Observer.Provided project
management,design engineering,and construction management services to complete the annual street
rehabilitation project.The project pulverized existing asphalt concrete in place and regraded as base
material at significant savings and waste avoidance;constructed curb access ramps for ADA compliance;
and upgraded fire hydrants.Included 12,000 tons of asphalt concrete placement,42 curb access ramps,
and 400,000 SF of pulverized pavement.Construction Cost $3,000,000.
~KOA CORPORATION
CBM Consulting Page 7D-22
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend
2.Firm Experience
2.1 FIRM PROFILE
2.Firm Experience
KOA Corporation
South Bay Office
1411 W I90th Street
Suite 525
Gardena,CA 90248
Tel:310.329.0 I 02
Fax:310.329.1021
KOA Corporation ("KOA")is a multi-disciplined engineering
consulting firm that has been providing Civil Engineering Design,
Traffic Engineering and Planning.Project Management,Construction
Management and Observation,Grant Application Processing and
NPDES Program Implementation services to private.commercial.
industrial and municipal clients collaboratively for twenty years.Our
extraordinary team combines a passion for design and management
with a commitment to successful project delivery.
Our professional planning and engineering staff members are
available to provide the follOWing services:
Corporate Office
1055 Corporate Center Dr
Suite 300
Monterey Park,CA 91754
Tel:323.260.4703
Fax:323.260.4705
www.koacorporation.com
Over 20 Years in Business
A California Corporation since
1995
Six Offices in California:
Monterey Park
Gardena
West Los Angeles
Orange
Ontario
San Diego
ill KOA CORPORATION
CBM Consulting
Civil Engineering
Project Management
Construction Management &Observation
Staff Assistance
NPDES Program Implementation
ADA Assessment &Improvements
Plan Checking
Transportation Planning!Analysis
Highway &Infrastructure Design
Traffic Signal!Lighting Design
Storm Drainage &Design
Intelligent Transportation Systems Design
Signing and Striping Plans
Transit!Rail Planning
Circulation and Parking Studies
Parking Design &Analysis
Traffic &Parking Impact Studies
Pedestrian &Bikeway Design
Transportation Modeling
Travel Demand Forecasting!Modeling
Page 8D-23
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend
2.2 PROJECT EXPERIENCE
2.Firm Experience
Residential &:Arterial Overlay 20 II Design
Thousand Oaks,California
KOA Cost:
Construction Cost:
Owner:
Completion Date:
Design Engineers:
Contact:
$291,720
$7 million
City of Thousand Oaks
May 2011
Chuck Stephan,P.E.
Nicolas Hsieh,P.E.
Christine Kaskara,P.E.
Tom Pizza,P.E.
(805)449-2430
Prepared Plans,Specifications and Estimate for the City's 3 year Pavement Rehabilitation Project.Work
included field review,documentation,and photographing of all street sections and repair locations;
determination of rehabilitation strategies;preparation of plans,specifications,and estimate for bid;and
bid support.The project included 50,000 tons of asphalt pavement reconstruction and Asphalt Rubber
Hot Mix overlay on 30 miles of local,collector,and arterial streets.All work was completed in a
compressed time schedule of 4 weeks.
long Beach Transit Mall
Long Beach,California
McGrow~""lill/f.NR California Project of the Year 20 i 8·
Transportation
Construction Cost:
Owner:
Completion Date:
Contact:
Design Engineer:
Const.Support:
$5,000,000
Long Beach Transit Authority
March 2011
MIG,Inc.,Darren Rector
Phone:(714)449-8935
darrenr@migcom.com
Chuck Stephan,P.E.
Nicolas Hsieh,P.E.
KOA provided civil and traffic engineering and design services,and construction support services as a
subconsultant to MIG,Inc.for the Long Beach Transit Mall project.This project completely
reconstructed sidewalks and bus stations on First Street from Long
Beach Blvd to Pine Avenue.Subsequently the project was extended
to Pacific Avenue in cooperation with the Long Beach
Redevelopment Agency.This landmark project includes state of the
art post-tensioned fabric bus shelter structures,contemporary art
.features,"living area"pedestrian furniture and amenities,full ADA
compliance,and landscape and irrigation improvements.
"KOA CORPORATION
CBM Consulting Page 9D-24
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend 2.Firm Experience
$70.000
$2 million
City of Rancho Palos Verdes
July 2011
Chuck Stephan.P.E.
Chuck Stephan.P.E.
Nicolas Hsieh.P.E.
Nicole Jules.P.E.
Senior Engineer
310.544.5275
Contact:
Consultant Cost:
Construction Cost:
Owner:
Completion Date:
Project Manager:
Design Engineer:
Arterial Roads Rehabilitation Project Fiscal Year 20 I 0-20 II
Rancho Palos Verdes.California
Prepared Plans.Specifications and Estimate for the rehabilitation of Palos Verdes (PV)Drive South in the
City of Rancho Palos Verdes.PV Drive South is a challenging arterial highway winding along the bluffs of
the Palos Verdes peninsula overlooking the Pacific Ocean.The street varies from a fully developed 4
lane divided highway with bicycle path.to a 2 lane highway over unstable creeping subgrade soils.
Rehabilitation strategies included selective removal and replacement (R&R)areas.asphalt rubber hot
mix (ARHM)and conventional asphalt overlays.and microsurface application.Work included the
relocation and improvement of bus pads and shelters.retaining walls.PCC repairs.striping and
markings.A comprehensive traffic sign field review and replacement plan was prepared to bring all traffic
signs into uniformity and conformance with MUTCD requirements.
Sun Valley EDA Public Improvement Project
Los Angeles.California
Consultant Cost:
Construction Cost:
Owner:
Completion Date:
Project Manager:
Design Engineers:
Contact:
$265.000
$3 million
Community Redevelopment
Agency of Los Angeles
July 2011
Chuck Stephan.P.E.
Chuck Stephan.P.E.
Nicolas Hsieh.P.E.
Christine Kaskara.P.E.
Dora Huerta
Assistant Project Manager
818.623.1060
Engineering design services to develop Plans.Specifications.and Estimate (PS&E)for the repair and
rehabilitation of 2 major arterial highways and 5 major intersections in the City of Los Angeles.Work
included removal and replacement of failed AC and PCC pavement sections;reconstruction of
driveways and curb access ramps to meet ADA requirements;milling and overlay of PCC and AC
pavement;and complete reconstruction of intersections with cross gutters.grading.and paving.
~KOA CORPORATION
CBM Consulting Page 10D-25
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend
La Habra Annual Street Rehabilitation Fiscal Years 2005·20 II
La Habra,California
2.Firm Experience
Construction Cost:
Owner:
Contact:
Design Engineers:
Construction Observers:
-$3.5 million annually
City of La Habra
Sam Makar,P.E.
Principal Civil Engineer
562.905.9720
Chuck Stephan,P.E.
Nicolas Hsieh,P.E.
Christine Kaskara,P.E.
Nicolas Hsieh,P.E.
Mauricio Zeledon,P.E.
KOA has provided engineering design and project management services for the City of La Habra's
annual street rehabilitation and water main replacement projects since 2005.The pavement
rehabilitation scope of work includes a complete assessment of pavement condition,geotechnical
investigation,analysis of rehabilitation options and cost tradeoffs,development of plans,specifications
and estimate,and management of the project throughout construction.Work included removal and
replacement of curb,gutter,sidewalk,and driveways;construction of ADA curb acces.s ramps;
replacement of water pipelines,valves,hydrants,and services;full depth asphalt,and asphalt overlay.
Residential Road Rehabilitation Project Fiscal Year 2009·20 I0
Rancho Palos Verdes,CA
Cost:
Owner:
Completion Date:
Contact:
Principal-In-Charge:
Project Manager:
Design Engineer:
Construction Manager:
Construction Observer:
$1.3 million
City of Rancho Palos Verdes
2010
Nicole Jules,P.E.
Senior Engineer
(310)377 -0360
Chuck Stephan,P.E.
Chuck Stephan,P.E.
Nicolas Hsieh,P.E.
Chuck Stephan,P.E.
Cris Cole
KOA Consulting prOVided project and construction management services for the City of Rancho Palos
Verdes 20 I 0 pavement rehabilitation project,which included street repairs consisting of Cape Seal,
slurry seal,and reconstruction,ADA improvements,PCC curb,gutter,sidewalk and driveway repairs,
signage,and striping.This $1.3 million project rehabilitated 92 residential and collector streets (15
miles).
PI KOA CORPORATION
CBM Consulting Page IID-26
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend 2.Firm Experience
Pier Avenue Improvement Project
Hermosa Beach,California
Construction Cost:
Owner:
Start Date:
Completion Date:
Contact:
Design Engineers:
$250,000
City of Hermosa Beach
April 2010
September 20 I0
Frank Senteno
(310)318-0211
Chuck Stephan,P.E.
Nicolas Hsieh,P.E.
Christine Kaskara,P.E.
KOA prepared plans,specifications and cost estimates,for street improvements on Pier Ave from Valley
to Pacific Coast Highway.KOA also assisted Hermosa Beach in preparing all Federal documents in an
expedited manner.The project consisted of the following:construction of curb and gutter,construction
of curb access ramps,cold milling and AC overlay,and striping.KOA managed subconsultants for survey
and soils testing.KOA provided construction engineering services for this job at the request of
Hermosa Beach.
Harbor Boulevard Rehabilitation Project;
Harbor Boulevard &La Habra Boulevard Improvement Project
La Habra,California
Cost:
Owner:
Completion Date:
Contact:
Project/Const Manager:
Construction Observer:
Construction Observer:
Funding Source:
$2,400,000
City of La Habra
September 2009
Sam Makar
Senior Civil Engineer
(562)905-9720
Chuck Stephan,P.E.
Mauricio Zeledon,P.E.
Nicolas Hsieh,P.E.
STPL
This federally-funded STPL project rehabilitated one mile of Harbor Blvd from Lambert Rd to Whittier
Blvd,and improved the intersection at La Habra Blvd by widening the street and installing additional
right and left turn lanes.This project was constructed in conjunction with a Rule 20 utility
undergrounding project,and commercial improvements at adjoining properties.Work included storm
drain box culvert;storm drains;curb,gutter,sidewalks,driveways;water pipelines,meter and fire
hydrant relocations;bore casing under railroad right-of-way;traffic signals;pavement construction and
asphalt rubber hot mix overlay.
fI KOA CORPORATION
CBM Consulting Page 12D-27
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend
2.3 REFERENCES
2.Firm Experience
City of Buena Park
6650 Beach Boulevard
Buena Park.California 90622
Jim Biery.City Engineer
City of Hermosa Beach
I3 15 Valley Drive
Hermosa Beach.California 90254-3885
Frank Senteno,Public Works Director/City Engineer
City of La Habra
20 I E.La Habra Blvd
La Habra California 90633-0337
Sam Makar,Senior Civil Engineer
City of Long Beach
333 West Ocean Boulevard
Long Beach,California 90802
Sandra Gonzalez.Manager,Planning &Development Bureau
Parks,Recreation &Marine
City of Manhattan Beach
1400 Highland Avenue
Manhattan Beach.California 90266
Steve Finton.City Engineer
City of Signal Hill
2175 Cherry Avenue
Signal Hill.California 90755-3799
Charlie Honeycutt.Deputy City Manager
(714)562-3672
(310)3 18-021 I
(562)905-9720
(562)570-3210
(310)802-5352
(562)989-7356
MKOA CORPORATION
CBM Consulting Page 13D-28
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend
3.Approach and Scope of Work
3.1 PROJECT ApPROACH
Understanding
3.Approach and Scope of Work
The City of Rancho Palos Verdes plans to realign a portion of Palos Verdes Drive South at Portuguese
Bend.The project will straighten an approximately 900 foot long section of roadway that has been
misaligned by years of movement due to a long term creeping landslide in the area.
The existing roadway consists of various layers of overlaid asphalt concrete pavement.with dirt
shoulders and an adjacent above-ground utility pipe.It is proposed that the roadway be straightened by
constructing a new roadway section to the north.Signing,striping and markings will be in accordance
with the current California Manual of Uniform Traffic Control Devices (Ca MUTCD)requirements.
The City plans to obtain the services of an experienced professional civil engineering design firm to
evaluate the project area,prepare construction plans,specifications,and cost estimate,and assist the
City in preparing this project for bid.
KDM Meridian will perform a detailed topographic survey for this project.
[:I KOA CORPORATION
CBM Consulting Page 14D-29
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend
Field Inventory I Preliminary Design
3.Approach and Scope of Work
The design team will inspect the project area to assess the current site conditions,and develop
proposed alignments for the proposed improvements.We will consult with City staff to discuss the
various alternatives,and select the most desirable option before proceeding with final design work.
Topographic Survey
KDM is proposing to provide a detailed field survey consisting of the following:
Beginning approximately 2,100 feet northwesterly from Schooner Drive,our proposed field survey will
collect 50'interval cross-sections,from edge of pavement on the ocean side,and extending
approximately thirty feet (30')past edge of pavement on the northerly side,for a total length of one
thousand·feet (1,000').Due to the existing heavy vegetation along the northerly side of the.street,we
will supplement the sections with spot elevations sufficient to provide a representative topographic
surface within the limits of the survey.
Because of the existing geological conditions of continuous southerly movement of the land within this
area,we are not able to tie this survey to existing record monuments or maps,nor indicate record
center line or right of way.
I)Control Data
a)Horizontal:California State Plane Zone 5 (NAD83).
b)Vertical:NAVD 88.
2)Control Survey
a)Establish horizontal and vertical control points within and adjacent to project.
3)Field Survey (see attached exhibit "A")
a)Collect topographic data at 50'interval cross-sections for the project street reaches from limits
as described above.Sections will be within limits as described.
b)Supplement cross-sections in heavy vegetation areas with spot shots of clear ground.
4)Mapping
a)Topographic
i)Prepare standard mapping of survey detail collected.
5)Deliverables to consist of:
a)AutoCAD drawing files of collected survey data,with related point files.
b)Signed and sealed bond copy of site map.
Geotechnical Survey
We recommend utilizing the findings form previous geotechnical investigations for the design of the
pavement section.However,we could provide additional investigation at an added cost if desired.
Ciyil Design Services
From the field review and preliminary alignment,topographic survey,and geotechnical data,KOA will
complete the initial design plan.We will return to the field to verify the accuracy of our base plan and
MKOA CORPORATION
CBM Consulting Page 15D-30
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend 3.Approach and Scope of Work
update site information,surface topography,utility locations,and other details as are relevant to the
scope of work.
KOA will obtain and review existing record data,including street plans,utilities,traffic plans,assessor
maps,storm water runoff facility plans,street base maps,etc.Utility companies will be requested to
submit utility information,and advised to complete any planned work prior to street construction.We
will utilize previously obtained record data that we have on file already.
The project will be documented in plan view on 24"x36"plan sheets,at a scale of 1"=40'.Finer scale will
be included in details if necessary for clarification.Typical sections and notes will designate pavement
type and thickness,materials,and cross section dimensions.Plan views will include notes,symbols,lines,
or hatching designating construction features as necessary for clarity or instruction to the contractor.
Photographs will be taken throughout the project area for use during design and as a pre-construction
baseline reference.
Plans will be developed using AutoCAD.Plans will be submitted in printed format,and in digital format
as .dwg and .pdf files in a format compatible with the City's GIS system.
Engineer's Estimate
Upon determination and approval of pavement rehabilitation methods and extents,construction
quantities will be determined,and an estimated construction cost prepared.Costs will be based upon
nominal unit costs experienced on similar projects within the past year.The estimate will be prepared in
spreadsheet format in MS Excel.The estimate will be submitted in printed form and digitally in .xls and
.pdf formats.
Technical Specifications and Special Provisions
KOA will prepare specifications and provisions as necessary to describe the project,include adequate
requirements for the work and performance of the contractor,and to define bid items.Specifications
will include provisions to conform with the Americans with Disabilities Act,National Pollution
Discharge Elimination System and Clean Water Act.It is assumed that the City will provide the
necessary environmental documentation,and notification to the SWRQCB.Specifications will be
prepared using MS Word.Specifications will be delivered to the City in printed form and digitally in .doc
and .pdf formats.
Preconstruction Meeting
KOA will attend the preconstruction meeting;conduct meetings with City staff during the design phase;
and provide nominal additional materials or meetings as necessary to finalize the project documents.
KOA staff will be made available to answer questions of the City during the bid period.
(f)Final Deliverables and As Built Record Plans
Plans will be provided on 24"x36"sheets for construction,and after construction in an "as Built"format
based on marked up plans to be provided by the Contractor and/or City.Specifications and Estimate will
be printed on 8.5"x II"bond paper.Digital files will be provided in AutoCAD and PDF format for plans,
and MS Office and Excel for specifications,tables,and estimates on CD format.
~KOA CORPORATION
CBM Consulting Page 16D-31
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend 3.Approach and Scope of Work
Clerical services,minor incidental costs,travel,copying,printing,telephone,gas,computer,and
photographic costs are incidental and included in the basic hourly rates.
Utility Notification
KOA recommends notifying existing utility companies of the project so that any planned work can be
completed before construction begins.
Plans,Specifications and Estimate (PS&E)
The project will be shown in plan view on 24"x36"plan sheets,with details as necessary for clarification.
Typical sections and notes will designate pavement type and thickness,materials,and cross section
dimensions.Street work will be designated by hatching and notes.Detail plans will be provided where
needed (or clarity.Plan views will include notes,symbols,lines,or hatching designating construction
features as necessary for clarity or instruction to the contractor.
Traffic Control Plans and Construction Phasing Plans will be prepared ..
Draft plans will be submitted on bond sheets marked "DRAFT"for City review.At least two
preliminary plan submittals will be delivered for review and comment by City staff.The final signed plan
set will be submitted in printed and electronic format.Electronic format shall include .pdf files,and .dwg
files compatible with the City's GIS format.
The Engineer's Estimate of construction cost will include a description of each construction bid item,
quantity,unit price,and total construction price.A construction contingency of 5%will be shown for
the total estimated cost.The Estimate will be delivered to the City in both printed and electronic
format.Electronic files will include .xls,and .pdf versions.
Project specifications will be based on the City's boilerplate document.KOA will prepare complete
specifications to include the project Special Provisions that will describe specific project requirements,
and a complete description of each bid item and incidental work.Worksheets will be included as
addenda to the specifications.Specifications will be delivered to the City in both printed and electronic
format.Electronic files will include .doc,.xls,and ,pdf versions as applicable.Specifications for this
project will contain requirements consistent with provisions of the National Pollutant Discharge
Elimination System (NPDES),the Clean Water Act,the Standard Plans for Public Works Construction
(SPPWC)and Caltrans.
All computer generated documents,including plans and calculations,will be submitted on CD in a
format acceptable to the City of Rancho Palos Verdes.
Preconstruction Services
KOA will provide pre-construction support services including answering pre-bid questions and providing
a construction bid analysis.
mKOA CORPORATION
COM Consulting Page 17D-32
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend
Final Deliverables and As-Built Records
3.Approach and Scope of Work
KOA will prepare one set of reproducible plans for construction.After completion of construction,
KOA will prepare "As-Built"mylars plan sheets and submit final drawings electronically on CD in .dwg
and .pdf formats.
Desi~n Limitations
We acknowledge that the project area is located on an active creeping landslide,that is expected to be
unstable for the foreseeable future.While KOA will provide a conventional roadway surfacing and
structural section.It should be expected that the roadway will continue to move,and that future
overlays,adjustments,and realignment work should be expected,and that we cannot warranty stability
of the underlying geography.
"KOA CORPORATION
CBM Consulting Page 18D-33
City of Rancho Palos Verdes
Palos Verdes Drive South Realignment at Portuguese Bend
4.Fee Schedule
4.Fee Schedule
City d Rancho Palos ~rdes ,Palos ~rdes Drive South I ~2'RoadwIy Realignrrent at Portuguese Bend j .~
i I 'i g81 ~.~~~iitII:
DetaIed Field Raiiew and Stuc:ti
C<n::ePuaI Pligmert 8
Delaled field sllVS'f KDMM!ridan 2
DESIGN PHASE
RaAEw ecistirg recordsI Wily CoordrSion 4 '8 8
rnpEI'e construc:tia'l planslTralfic Ca1roI and A1asirg Aans 16 40 60 32 4
rnpEI'e ergineers estlmetes 2 8 4 2 2
specificaions and pl'Qlisials 4 24 24 4 2
Preca1stru::Iia fvbetirg 4
final deliverab1es and as blilts 2 4 8 2
TarA.HOURS:36 108 114 38 15
RATE:$155 $110 $90 $110 $65
SUBTarA.S:$5,580 $11,800 $10,200 $4,180 $975 $41,42.5
~KOA CORPORATION
CBM Consulting Page 19D-34
Attachment B)
RESOLUTION NO.2013·
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO PALOS
VERDES, AMENDING RESOLUTION 2012-43,THE BUDGET APPROPRIATION
FOR FISCAL YEAR 2012-13,FOR A BUDGET ADJUSTMENT TO THE CITY'S CAPITAL
IMPROVEMENT PROJECTS FUND IN THE STREET IMPROVEMENTS PROGRAM
WHEREAS,Section 3.32 of the Rancho Palos Verdes Municipal Code provides that all expenditures
in excess of budgeted allocations must be by supplemental appropriation of the City Council;and
WHEREAS,on June 19,2012,the City Council of the City of Rancho Palos Verdes adopted
Resolution 2012-43,approving a spending plan and authorizing a budget appropriation for the 2012-
2013 fiscal year;and
WHEREAS,a section of Palos Verdes Drive South crosses the Portuguese Bend and Klondike
Canyon Landslides;and
WHEREAS,a result of the landslide has caused the roadway to move out of its right-of-way at the
location where the Klondike Canyon and Portuguese Bend Landslides meet;and
WHEREAS,a Professional Services Agreement is required for the design services which are
necessary to prepare the plans specifications and estimate necessary to advertise a project to
receive proposals from contractors,and
WHEREAS,a budget increase of $41,452 to the City's Capital Improvement Projects Fund in the
Street Improvements Program.
BE IT,THEREFORE,RESOLVED BY THE CITY COUNCIL OF THE CITY OF RANCHO PALOS
VERDES:
The following adjustment(s)be made to the following fund(s):
Street Improvements Program in the Capital Improvement Projects Fund:
Street Improvements Program 330-3031-461-32-00 $41,425
Verified by Finance:---UO-
Resolution No.2013-__
PASSED,APPROVED,AND ADOPTED THIS i h DAY OF MAY 2013.
MAYOR
ATTEST:
CITY CLERK
Page 1 of 2
D-35
State of California )
Cou nty of Los Angeles )ss
City of Rancho Palos Verdes )
I,CARLA MORREALE,City Clerk of The City of Rancho Palos Verdes,hereby certify that the above
Resolution No.2013-_was duly and regularly passed and adopted by the said City Council at a
regular meeting thereof held on May 7,2013.
CITY CLERK
CITY OF RANCHO PALOS VERDES
Resolution No.2013-----
Page 2 of 2
D-36
Attachment C)
D-37