CC SR 20151006 I - On-call Traffic Engineering Services Agmt Willdan EngineeringTO: HONORABLE MAYOR & CITY COUNCIL MEMBERS FROM: MICHAEL THRONE, DIRECTOR OF PUBLIC WORKST,D"r� DATE: OCTOBER 6, 2015 SUBJECT: AWARD CONTRACT FOR TRAFFIC ENGINEERING ON-CALL PROFESSIONAL SERVICES REVIEWED: DOUG WILLMORE, CITY MANAGER bw Project Manager: Melissa Countryman, Senior Engineer RECOMMENDATIONS 1. Award contract for on-call professional services for traffic engineering services to Willdan Engineering 2. Authorize the Mayor to execute the contract listed in recommendation 1 above. FISCAL IMPACT Budgeted Amount: $100,000 Additional Appropriation: N/A New Amount Balance: N/A Fund Balance: N/A Account Number: 101-3006-431-32-00 Authorizing execution of the attached On -Call Professional Services Agreement will not result in any additional expenditures beyond the approved budget. Funds available are set and have been included in the final adopted budget for FY 2015/16. BACKGROUND/DISCUSSION The Public Works Department (Department) relies on contract professional services to provide services. Services typically include traffic engineering, engineering design, construction observations and inspection, geotechnical engineering, landscape architecture services, contract management, surveying, plan checking and environmental services. 1 When services are required for a capital project, such as a street rehabilitation project or other significant project, the Department circulates a request for proposals (RFP), reviews the proposals, recommends a firm, and prepares a report to the Council to select the firm, award a contract, and authorize expenditures. This process works well for large-scale projects, and the Department will continue to use this process for such projects. The Department, however, also requires services for projects in which this RFP process is not as timely nor as cost-efficient. These are generally small-scale projects, or projects where services are urgently needed. For such projects, the RFP process creates delays, or adds significant administrative cost. Therefore, since 1997, the Department has obtained services for small or urgent projects through the "on-call" process. Under this on-call process, staff selects a firm from an approved list of firms. The City Council pre -selects the consultants that are placed on this approved list, and awards contracts, however, staff has the ability to authorize expenditures, as established by the City Council through the budget process. Willdan Engineering is being recommended to be included in the City's Professional Services on-call list and has been fully vetted by staff. References have been reviewed and they have the proficiency and experience to provide the requisite services. The required funds needed for any of the on-call services provided through this contract are budgeted in the FY2015-16 budget. Staff manages the work awarded through the on-call service contracts, ensuring funds awarded remain within budgeted amounts. When a firm executes an On -Call Professional Services Agreement with the City of Rancho Palos Verdes, the firm is eligible to be called to perform work for the City on a project where the value of the work performed does not exceed $25,000. Prior to executing the on-call Agreement, the consultant will need to provide the required proof of insurance and take out a business license with the City. These required components of the Agreement are completed at the consultant's expense. Once the Agreement is executed, there is no guarantee that the consultant will be asked to perform any services for the City, and the possibility of recuperating costs associated with providing proof of insurance and obtaining the business license will be lost by the consultant. The amount awarded to the firm over the course of the year will be a function of the approved budget, the needs of the department, and the firm's performance. The consultants are used only as they are needed and only if the appropriate funds have been allocated. Accordingly, due to the requirements for the consultant to provide insurance and secure a business license without any guarantee of work, some consultants have chosen in the past, not to execute their approved on-call Agreement with the City. Furthermore, as a control measure and in the interest of equality, the cumulative contract amount with each on-call firm is limited to $60,000 during a fiscal year, and as stated above, each single project awarded to a firm will not exceed $25,000. The one exception to this are any on-call services that are reimbursed by a trust deposit, which will not count towards these maximum amounts. Following City Council approval, a staff member will obtain on-call services by requesting a proposal from an approved on-call consulting firm. The proposal will likely be an estimate for the time and any costs that are incurred in performing the services requested by the City; however, if the project is well-defined, a fixed cost proposal will be requested. A purchase order will be opened and a portion of the Department's budget encumbered. This will all be done without further action by the City Council. K With the inclusion of Willdan Engineering in the active on-call list and following execution of the attached on-call Agreement (Attachment A), staff will have the ability to use this firm on an on-call basis for traffic engineering services and other related Public Works professional services. In congruence with the other on-call professional service agreements recently approved, this on-call professional services agreement will have a term of five years. Staff believes this five-year term achieves a balance between keeping the firms accountable and not requiring staff to unnecessarily solicit new proposals, which increases administrative costs. A copy of the On -Call Professional Services Agreement, and Willdan Engineering's Statement of Qualifications, is attached to this report. CONCLUSIONS Adopting the recommendations will allow staff to perform work by encumbering budgeted funds through the City's on-call services program. The contract amount is limited to $60,000 during a fiscal year, and is not to exceed $25,000 for a single project. Attachments: A) On -Call Professional Services Contract for Willdan Engineering (page 5) 3 ATTACHMENT A On -Call Professional Services Contract for Willdan Engineering 0 CITY OF RANCHO PALOS VERDES ON-CALL PROFESSIONAL/TECHNICAL SERVICES AGREEMENT THIS AGREEMENT ("Agreement") is made and entered into this 6t" day of October, 2015, by and between the City of Rancho Palos Verdes (hereinafter referred to as the "CITY") and Willdan Engineering, a California corporation (hereafter referred to as "CONSULTANT"). IN CONSIDERATION of the covenants hereinafter set forth, the parties hereto agree as follows: ARTICLE 1 SCOPE OF SERVICES 1.1 Project Description The Project is described as on-call services as follows: provide Traffic Engineering services. 1.2 Description of Services CONSULTANT shall provide such on-call traffic engineering consulting services as may be requested by CITY. CONSULTANT acknowledges that this Agreement is for on-call services, and there is no certainty that CONSULTANT will be asked to perform any services pursuant to this Agreement. CONSULTANT's Statement of Qualifications is attached hereto as Exhibit A and incorporated herein by this reference. In the event of any conflict between the terms of this Agreement and incorporated documents, the terms of this Agreement shall control. 1.3 Schedule of Work Upon receipt of written Notice to Proceed from CITY, CONSULTANT shall perform with due diligence the services requested by CITY. Time is of the essence in this Agreement. CONSULTANT shall not be responsible for delay, nor shall CONSULTANT be responsible for damages or be in default or deemed to be in default by reason of strikes, lockouts, accidents, or acts of God, or the failure of CITY to furnish timely information or to approve or disapprove CONSULTANT's work promptly, or delay or faulty performance by CITY, other consultants/contractors, or governmental agencies, or any other delays beyond CONSULTANT's control or without CONSULTANT's fault. 1.4 Term of Agreement This Agreement shall commence on October 6, 2015 and shall terminate on June 30, 2021 unless sooner terminated pursuant to Article 4 of this Agreement. R6876 -0504\1859596v2. doc 5 ARTICLE 2 COMPENSATION 2.1 Rates; Expense Reimbursement 2.1.1. CITY agrees to compensate CONSULTANT in accordance with CONSULTANT's Schedule of Hourly Rates, which is within Exhibit A and shall meet or exceed prevailing wage rates, and in any case an amount not to exceed Sixty Thousand Dollars ($60,000) per fiscal year for services as described in Article 1. On-call services that are reimbursed by a trust deposit shall not count towards the maximum amount CONSULTANT shall be paid for such services. The rates in Exhibit A shall be in effect through the end of the term of this Agreement. 2.1.2 CITY will not reimburse CONSULTANT for costs and expenses unless such costs and expenses are previously approved by CITY. 2.2 Payment of Compensation CONSULTANT shall submit monthly invoices for the work completed in the previous month. CITY agrees to authorize payment for all undisputed invoice amounts within thirty (30) days of receipt of each invoice. CITY agrees to use its best efforts to notify CONSULTANT of any disputed invoice amounts within ten (10) days of the receipt of each invoice. However, CITY's failure to timely notify CONSULTANT of a disputed amount shall not be deemed a waiver of CITY's right to challenge such amount. Additionally, in the event CITY fails to pay any undisputed amounts due CONSULTANT within forty-five (45) days after invoices are received by CITY then CITY agrees that CONSULTANT shall have the right to consider the default a total breach of this Agreement and be terminated by CONSULTANT without liability to CONSULTANT upon ten (10) working days advance written notice. ARTICLE 3 INDEMNIFICATION AND INSURANCE 3.1 Indemnity 3.1.1 Indemnity for Desiqn Professional Services. To the fullest extent permitted by law, CONSULTANT shall, at its sole cost and expense, protect, indemnify, and hold harmless CITY and its elected officials, officers, attorneys, agents, employees, designated volunteers, successors, assigns and those CITY agents serving as independent contractors in the role of CITY officials (collectively "Indemnitees"), from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, judgments, penalties, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith, and reimbursement of attorney's fees and costs of defense (collectively "Liabilities"), whether actual, alleged or threatened, which arise out of, are claimed to arise out of, pertain to, or relate to, in whole or in part, the negligence, recklessness or willful Page 2 of 12 Agreement for On -Call Professional/Technical Services R6876-0504\1859596v2.doc 6 misconduct of CONSULTANT, its officers, agents, servants, employees, subcontractors, material men, contractors or their officers, agents, servants or employees (or any entity or individual that CONSULTANT shall bear the legal liability thereof) in the performance of design professional services under this Agreement by a "design professional," as the term is defined under California Civil Code Section 2782.8(c)(2). 3.1.2 Other Indemnities. (a) Other than in the performance of design professional services, and to the fullest extent permitted by law, CONSULTANT shall, at its sole cost and expense, defend, hold harmless and indemnify the Indemnitees from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, judgments, penalties, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith and the payment of all consequential damages (collectively "Claims"), in law or equity, whether actual, alleged or threatened, which arise out of, are claimed to arise out of, pertain to, or relate to the acts or omissions of CONSULTANT, its officers, agents, servants, employees, subcontractors, materialmen, contractors or their officers, agents, servants or employees (or any entity or individual that CONSULTANT shall bear the legal liability thereof) in the performance of this Agreement, including the Indemnitees' active or passive negligence, except for Claims arising from the sole negligence or willful misconduct of the Indemnitees, as determined by final arbitration or court decision or by the agreement of the Parties. CONSULTANT shall defend the Indemnitees in any action or actions filed in connection with any Claim with counsel of the Indemnitees' choice, and shall pay all costs and expenses, including all attorneys' fees and experts' costs actually incurred in connection with such defense. CONSULTANT shall reimburse the Indemnitees for any and all legal expenses and costs incurred by the Indemnitees in connection therewith. (b) CONSULTANT shall pay all required taxes on amounts paid to CONSULTANT under this Agreement, and indemnify and hold CITY harmless from any and all taxes, assessments, penalties, and interest asserted against CITY by reason of the independent contractor relationship created by this Agreement. CONSULTANT shall fully comply with the workers' compensation law regarding CONSULTANT and CONSULTANT's employees. CONSULTANT shall indemnify and hold CITY harmless from any failure of CONSULTANT to comply with applicable workers' compensation laws. CITY may offset against the amount of any fees due to CONSULTANT under this Agreement any amount due to CITY from CONSULTANT as a result of CONSULTANT's failure to promptly pay to CITY any reimbursement or indemnification arising under this subparagraph (b). (c) CONSULTANT shall obtain executed indemnity agreements with provisions identical to those in this Section 3.1 from each and every subcontractor or any other person or entity involved by, for, with or on behalf of CONSULTANT in the performance of this Agreement. If CONSULTANT fails to obtain such indemnities, CONSULTANT shall be fully responsible and indemnify, hold harmless and defend the Indemnitees from and against any and all Claims in law or equity, whether actual, alleged Page 3 of 12 Agreement for On -Call Professional/Technical Services R6876-0504\1 859596v2.d oc 7 or threatened, which arise out of, are claimed to arise out of, pertain to, or relate to the acts or omissions of CONSULTANT's subcontractor, its officers, agents, servants, employees, subcontractors, materialmen, contractors or their officers, agents, servants or employees (or any entity or individual that CONSULTANT's subcontractor shall bear the legal liability thereof) in the performance of this Agreement, including the Indemnitees' active or passive negligence, except for Claims arising from the sole negligence or willful misconduct of the Indemnitees, as determined by final arbitration or court decision or by the agreement of the Parties. 3.1.3 Workers' Compensation Acts not Limiting. CONSULTANT's obligations under this Article 3, or any other provision of this Agreement, shall not be limited by the provisions of any workers' compensation act or similar act. CONSULTANT expressly waives its statutory immunity under such statutes or laws as to CITY, its officers, agents, employees and volunteers. 3.1.4 Insurance Requirements not Limiting. CITY does not, and shall not, waive any rights that it may possess against CONSULTANT because of the acceptance by CITY, or the deposit with CITY, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provisions in this Article 3 shall apply regardless of whether or not any insurance policies are determined to be applicable to the Liabilities, Claims, tax, assessment, penalty or interest asserted against CITY. 3.1.5 Survival of Terms. The indemnification in this Article 3 shall survive the expiration or termination of this Agreement. 3.2 Insurance 3.2.1 General Liability Insurance CONSULTANT shall at all times during the term of the Agreement carry, maintain, and keep in full force and effect, a policy or policies of Commercial General Liability Insurance, with minimum limits of one million dollars ($1,000,000) for each occurrence and two million dollars ($2,000,000) general aggregate for bodily injury, death, loss or property damage for products or completed operations and any and all other activities undertaken by CONSULTANT in the performance of this Agreement. The policy or policies shall be issued by an insurer admitted or authorized to do business in the State of California and rated in A.M. Best's Insurance Guide with a rating of A:VII or better. 3.2.2 Professional Liabilitv Insurance CONSULTANT shall at all times during the term of this Agreement, carry, maintain, and keep in full force and effect a policy or policies of professional liability insurance with a minimum limit of one million dollars ($1,000,000) per claim and aggregate for errors and/or omissions of CONSULTANT in the performance of this Agreement. The policy or policies shall be issued by an insurer admitted or authorized to do business in the State of California and rated in Best's Insurance Guide with a rating of Page 4 of 12 Agreement for On -Call Professional/Technical Services R6876-0504\1859596v2.doc 8 A:VII or better. If a "claims made" policy is provided, such policy shall be maintained in effect from the date of performance of work or services on CITY's behalf until three (3) years after the date of work or services are accepted as completed. Coverage for the post -completion period may be provided by renewal or replacement of the policy for each of the three (3) years or by a three-year extended reporting period endorsement, which reinstates all limits for the extended reporting period. If any such policy and/or policies have a retroactive date, that date shall be no later than the date of first performance of work or services on behalf of CITY. Renewal or replacement policies shall not allow for any advancement of such retroactive date. 3.2.3 Automobile Liability Insurance CONSULTANT shall at all times during the term of this Agreement obtain, maintain, and keep in full force and effect, a policy or policies of Automobile Liability Insurance, with minimum of one million dollars ($1,000,000) per claim and occurrence and two million dollars ($2,000,000) in the aggregate for bodily injuries or death of one person and five hundred thousand dollars ($500,000) for property damage arising from one incident. The policy or policies shall be issued by an insurer admitted or authorized to do business in the State of California and rated in A.M. Best's Insurance Guide with a rating of A:VII or better. 3.2.4 Worker's Compensation Insurance CONSULTANT agrees to maintain in force at all times during the performance of work under this Agreement worker's compensation insurance as required by the law. CONSULTANT shall require any subcontractor similarly to provide such compensation insurance for their respective employees. 3.2.5 Notice of Cancellation (a) All insurance policies shall provide that the insurance coverage shall not be cancelled or modified by the insurance carrier without thirty (30) days prior written notice, or ten (10) days notice if cancellation is due to nonpayment of premium. CONSULTANT shall provide immediate notice to CITY, if CONSULTANT receives a cancellation or policy revision notice from the insurer. (b) CONSULTANT agrees that it will not cancel or reduce any required insurance coverage. CONSULTANT agrees that if it does not keep the insurance in full force and effect, CITY may either immediately terminate this Agreement or, if insurance is available at a reasonable cost, CITY may take out the necessary insurance and pay, at CONSULTANT's expense, the premium thereon. 3.2.6 Entire Policy and Certificate of Insurance At all times during the term of this Agreement, CONSULTANT shall maintain on file with the City Clerk both a copy of the entire policy and a certificate of insurance showing that the policies are in effect in the required amounts. The commercial general Page 5 of 12 Agreement for On -Call Professional/Technical Services R6876-0504\1859596v2.doc 9 liability policy shall contain endorsements naming CITY, its officers, agents and employees as additional insureds. 3.2.7 Primary Coverage The insurance provided by CONSULTANT shall be primary to any coverage available to CITY. The insurance policies (other than workers compensation and professional liability) shall include provisions for waiver of subrogation. ARTICLE 4 TERMINATION 4.1 Termination of Aareemen (a) This Agreement may be terminated at any time, with or without cause, by CITY upon ten (10) days prior written notice or by CONSULTANT upon ninety (90) days prior written notice. Notice shall be deemed served if completed in compliance with Section 6.15. (b) CONSULTANT shall cease all work under this Agreement on or before the effective date of termination specified in the notice of termination. In the event of termination or cancellation of this Agreement by CONSULTANT or CITY, due to no fault or failure of performance by CONSULTANT, CONSULTANT shall be paid compensation for all services performed by CONSULTANT, in an amount to be determined as follows: for work satisfactorily done in accordance with all of the terms and provisions of this Agreement as determined by CITY, CONSULTANT shall be paid an amount equal to the percentage of services performed prior to the effective date of termination or cancellation in accordance with the work items; provided, in no event shall the amount of money paid under the foregoing provisions of this paragraph exceed the amount which would have been paid to CONSULTANT for the full performance of the services described in this Agreement. ARTICLE 5 OWNERSHIP OF DOCUMENTS 5.1 Ownership of Documents and Work Product All final documents, plans, specifications, reports, information, data, exhibits, photographs, images, video files and media created or developed by CONSULTANT pursuant to this Agreement ("Written Products") shall be and remain the property of CITY without restriction or limitation upon its use, duplication or dissemination by CITY. All Written Products shall be considered "works made for hire," and all Written Products and any and all intellectual property rights arising from their creation, including, but not limited to, all copyrights and other proprietary rights, shall be and remain the property of CITY without restriction or limitation upon their use, duplication or dissemination by CITY. CONSULTANT shall not obtain or attempt to obtain copyright protection as to any Written Products. Page 6 of 12 Agreement for On -Call Professional/Technical Services R6876-0504\1859596v2.doc 10 CONSULTANT hereby assigns to CITY all ownership and any and all intellectual property rights to the Written Products that are not otherwise vested in CITY pursuant to the paragraph directly above this one. CONSULTANT warrants and represents that it has secured all necessary licenses, consents or approvals to use any instrumentality, thing or component as to which any intellectual property right exists, including computer software, used in the rendering of the services and the production of all Written Products produced under this Agreement, and that CITY has full legal title to and the right to reproduce the Written Products. CONSULTANT shall defend, indemnify and hold CITY, and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of CITY officials, harmless from any loss, claim or liability in any way related to a claim that CITY's use of any of the Written Products is violating federal, state or local laws, or any contractual provisions, or any laws relating to trade names, licenses, franchises, copyrights, patents or other means of protecting intellectual property rights and/or interests in products or inventions. CONSULTANT shall bear all costs arising from the use of patented, copyrighted, trade secret or trademarked documents, materials, equipment, devices or processes in connection with its provision of the services and Written Products produced under this Agreement. In the event the use of any of the Written Products or other deliverables hereunder by CITY is held to constitute an infringement and the use of any of the same is enjoined, CONSULTANT, at its expense, shall: (a) secure for CITY the right to continue using the Written Products and other deliverables by suspension of any injunction, or by procuring a license or licenses for CITY; or (b) modify the Written Products and other deliverables so that they become non -infringing while remaining in compliance with the requirements of this Agreement. This covenant shall survive the termination of this Agreement. Upon termination, abandonment or suspension of the Project, the CONSULTANT shall deliver to CITY all Written Products and other deliverables related to the Project without additional cost or expense to CITY. If CONSULTANT prepares a document on a computer, CONSULTANT shall provide CITY with the document both in a printed format and in an electronic format that is acceptable to CITY. ARTICLE 6 GENERAL PROVISIONS 6.1 Representation The CITY representative shall be the Director of Public Works or his or her designee, and CONSULTANT shall notify CITY of CONSULTANT's designated representative. These individuals shall be the primary contact persons for the parties regarding performance of this Agreement. 6.2 Fair Employment Practices/Equal Opportunity Acts In the performance of this Agreement, CONSULTANT shall comply with all applicable provisions of the California Fair Employment Practices Act (California Page 7 of 12 Agreement for On -Call Professional/Technical Services R6876-050411859596v2.doc 11 Government Code Sections 12940-48), the applicable equal employment provisions of the Civil Rights Act of 1964 (42 U.S.C. 200e-217), and the Americans with Disabilities Act of 1990 (42 U.S.C. § 11200, et seg.). 6.3 Audit The CITY or its representative shall have the option of inspecting, auditing or inspecting and auditing all records and other written materials used by CONSULTANT in preparing its billings to CITY as a condition precedent to any payment to CONSULTANT. CONSULTANT will promptly furnish documents requested by CITY. Additionally, CONSULTANT shall be subject to State Auditor examination and audit at the request of CITY or as part of any audit of CITY, for a period of three (3) years after final payment under this Agreement. 6.4 Personnel CONSULTANT represents that it has, or shall secure at its own expense, all personnel required to perform CONSULTANT's services under this Agreement. Any person who performs engineering services pursuant to this Agreement shall be licensed as a Civil Engineer by the State of California and in good standing. CONSULTANT shall make reasonable efforts to maintain the continuity of CONSULTANT's staff who are assigned to perform the services hereunder and shall obtain the approval of the Director of Public Works of all proposed staff members who will perform such services. CONSULTANT may associate with or employ associates or subcontractors in the performance of its services under this Agreement, but at all times shall CONSULTANT be responsible for its associates and subcontractors' services. 6.5 CONSULTANT's Representations CONSULTANT represents, covenants and agrees that: a) CONSULTANT is licensed, qualified, and capable of furnishing the labor, materials, and expertise necessary to perform the services in accordance with the terms and conditions set forth in this Agreement; b) there are no obligations, commitments, or impediments of any kind that will limit or prevent CONSULTANT's full performance under this Agreement; c) to the extent required by the standard of practice, CONSULTANT has investigated and considered the scope of services performed, has carefully considered how the services should be performed, and understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. 6.6 Conflicts of Interest CONSULTANT agrees not to accept any employment or representation during the term of this Agreement or within twelve (12) months after completion of the work under this Agreement which is or may likely make CONSULTANT "financially interested" (as provided in California Government Code Sections 1090 and 87100) in any decisions made by CITY on any matter in connection with which CONSULTANT has been retained pursuant to this Agreement. Page 8 of 12 Agreement for On -Call Professional/Technical Services R6876-0504\1 859596v2.d oc 12 6.7 Legal Action (a) Should either party to this Agreement bring legal action against the other, the validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California, excluding California's choice of law rules. Venue for any such action relating to this Agreement shall be in the Los Angeles County Superior Court. (b) If any legal action or other proceeding, including action for declaratory relief, is brought for the enforcement of this Agreement or because of an alleged dispute, breach, default or misrepresentation in connection with this Agreement, the prevailing party shall be entitled to recover reasonable attorneys' fees, experts' fees, and other costs, in addition to any other relief to which the party may be entitled. (c) Should any legal action about a project between CITY and a party other than CONSULTANT require the testimony of CONSULTANT when there is no allegation that CONSULTANT was negligent, CITY shall compensate CONSULTANT for its testimony and preparation to testify at the hourly rates in effect at the time of such testimony. 6.8 Assignment Neither this Agreement nor any part thereof shall be assigned by CONSULTANT without the prior written consent of CITY. Any such purported assignment without written consent shall be null and void, and CONSULTANT shall hold harmless, defend and indemnify CITY and its officers, officials, employees, agents and representatives with respect to any claim, demand or action arising from any unauthorized assignment. Notwithstanding the above, CONSULTANT may use the services of persons and entities not in CONSULTANT's direct employ, when it is appropriate and customary to do so. Such persons and entities include, but are not necessarily limited to, surveyors, specialized consultants, and testing laboratories. CONSULTANT's use of subcontractors for additional services shall not be unreasonably restricted by CITY provided CONSULTANT notifies CITY in advance. 6.9 Independent Contractor CONSULTANT is and shall at all times remain, as to CITY, a wholly independent contractor. Neither CITY nor any of its agents shall have control over the conduct of CONSULTANT or any of the CONSULTANT's employees, except as herein set forth, and CONSULTANT is free to dispose of all portions of its time and activities which it is not obligated to devote to CITY in such a manner and to such persons, firms, or corporations as the CONSULTANT wishes except as expressly provided in this Agreement. CONSULTANT shall have no power to incur any debt, obligation, or liability on behalf of CITY or otherwise act on behalf of CITY as an agent. CONSULTANT shall not, at any time or in any manner, represent that it or any of its agents, servants or Page 9 of 12 Agreement for On -Call Professional/Technical Services R6876-0504\1 859596v2.d oc 13 employees, are in any manner agents, servants or employees of CITY. CONSULTANT agrees to pay all required taxes on amounts paid to CONSULTANT under this Agreement, and to indemnify and hold CITY harmless from any and all taxes, assessments, penalties, and interest asserted against CITY by reason of the independent contractor relationship created by this Agreement. CONSULTANT shall fully comply with the workers' compensation law regarding CONSULTANT and its employees. CONSULTANT further agrees to indemnify and hold CITY harmless from any failure of CONSULTANT to comply with applicable workers' compensation laws. The CITY shall have the right to offset against the amount of any fees due to CONSULTANT under this Agreement any amount due to CITY from CONSULTANT as a result of its failure to promptly pay to CITY any reimbursement or indemnification arising under this Article. 6.10 Titles The titles used in this Agreement are for general reference only and are not part of the Agreement. 6.11 Entire Agreement This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be modified or amended, or provisions or breach may be waived, only by subsequent written agreement signed by both parties. 6.12 Construction In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement. 6.13 Non -Waiver of Terms, Rights and Remedies Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by CITY of any payment to CONSULTANT constitute or be construed as a waiver by CITY of any breach of covenant, or any default which may then exist on the part of CONSULTANT, and the making of any such payment by CITY shall in no way impair or prejudice any right or remedy available to CITY with regard to such breach or default. Page 10 of 12 Agreement for On -Call Professional/Technical Services R6876-0504\1 859596v2.d oc 14 6.14 Severability If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 6.15 Notice Except as otherwise required by law, any notice, payment or other communication authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during CITY'S regular business hours or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses listed below, or at such other address as one party may notify the other: Responsible Person: Michael Throne, Director of Public Works City of Rancho Palos Verdes 30940 Hawthorne Boulevard Rancho Palos Verdes, CA 90275 To CONSULTANT: Responsible Person: Lew Gluesing, Director of Engineering Willdan Engineering 13191 Crossroads Parkway North, Suite 405 Industry, CA 91746-3443 Page 11 of 12 Agreement for On -Call Professional/Technical Services R6876-0504\1 859596v2.d o c 15 IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date and year first above written. Dated: Willdan Engineering, a California Dated: ATTEST: corporation ("CONSULTANT") By: Printed Name: Title: By: Printed Name: Title: CITY OF RANCHO PALOS VERDES ("CITY") Mayor APPROVED AS TO FORM: By: City Clerk City Attorney Page 12 of 12 Agreement for On -Call Professional/Technical Services R6876-0504\1859596v2.doc 16 Exhibit A Consultant's Statement of Qualifications, including Schedule of Hourly Rates Exhibit "A" R6876-0001\1349487v1.doc R6876-0504\1859596v2.doc 17 W I L L DA N extendinc your Engineering reach September 22, 2015 Ms. Pam Mitchell Administrative Staff Assistant for Ron Dragoo, Senior Engineer City of Rancho Palos Verdes Public Works Department 30940 Hawthorne Boulevard Rancho Palos Verdes, CA 90275-5391 Subject: Statement of Qualifications for On -Call Public Works/Engineering Services Dear Ms. Mitchell: Willdan Engineering (Willdan) is pleased to submit this Statement of Qualifications (SOQ) to the City of Rancho Palos Verdes to provide a full range of municipal engineering services. As a multidisciplinary firm, we have a full complement of resources under one roof to provide a complete range of services to the City of Rancho Palos Verdes. We have assembled a highly experienced and qualified team, all of whom are fully committed to the successful completion of assignments under this contract. Our firm has over four decades of experience providing a wide range of engineering services to local government agencies throughout southern California and the western United States, including civil and traffic engineering, water/wastewater engineering, structural design, landscape architectural, master planning, assessment district engineering, city engineering, special funding administration, geotechnical and material testing, and construction management. Because we focus on the needs of the public sector, we have a perspective on public agency issues that is unique among consulting firms. We believe there are several reasons why Willdan is uniquely qualified to undertake this important assignment for the City of Rancho Palos Verdes: Knowledge of the City— Willdan provided general engineering services to the City of Rancho Palos Verdes on various projects. The services include civil and traffic engineering design, landscape architectural design, survey, pavement engineering, utility coordination, and construction management. For this reason, we have an established working relationship with City staff and a familiarity with City procedures and requirements. Our knowledge of the City will enable us to initiate work quickly and to respond appropriately to issues that arise during the course of this contract. 51+ - Year Track Record — Willdan has extensive experience providing a complete range of engineering services to local agencies on an "as -needed" basis and for specific projects. The firm's capabilities encompass streets and highways, drainage, water/wastewater, signals, traffic programs, bridges and structures, airports, landscaping, and surveys. We provide professional services in all phases of project development, including site analysis and conceptual development; preliminary and final design; and construction observation and administration. Our services also include environmental planning and facility financing, and we employ state-of-the-art computer-aided design. We have direct experience with county, state, and federal processes, regulations, and requirements. Engineering and Planning 1 Energy Efficiency and Sustainability I Financial and Economic Consulting I National Preparedness and Interoperability 562.908.6200 1 800.499.4484 1 fax: 562.695.2120 1 13191 Crossroads Parkway North, Suite 405, Industry, California 91746-3443 1 www.willdan_com City of Rancho Palos Verdes On -Call Public Works/ Engineering Services September 22, 2015 Page 2 ■ Extensive Resources — Willdan's nearly 600 employees are available to meet the City's current needs and to provide a quick response in times of heavy workloads, emergencies, and disasters, such as earthquakes and flooding. ■ Experienced Staff — Willdan's comprehensive engineering services take projects from inception to completion. We will assign appropriately trained and highly qualified individuals to each project. Our staff has extensive experience in providing engineering services for streets and roadways, sewer and water mains, and bridges and structures. ■ Grant Writing and Management— Willdan has assisted in obtaining outside funding totaling over $260 million for our client cities over the past 23 years. ■ Knowledge of Government Agencies — Willdan's knowledge of and familiarity with the requirements of Caltrans, Los Angeles County Department of Public Works (LACDPW), Los Angeles County Community Development Commission (CDC), and Los Angeles County Metropolitan Transportation Authority (Metro) are unmatched. In addition, Willdan is highly experienced in implementing the requirements of the National Pollutant Discharge Elimination System (NPDES) Permit, the Americans with Disabilities Act (ADA), and the Statewide General Waste Discharge Requirements for Sanitary Sewer Systems (WDR). We appreciate this opportunity to submit our SOQ to the City of Rancho Palos Verdes and look forward to working with you. If you have any questions, please contact Mr. Adel M. Freij at 562.364.8486 or afreij@willdan.com. Respectfully submitted, Willdan Engineering Adel M. Freij, PE Principal Project Manager 91005/06-160/Sl 5-003 11798 William C. Pagett, PE Senior Vice President *1*" 19 Table of Contents Executive Summary........... Willdan Group, Inc............ Firm Disciplines ................. Services Capabilities......... Scope of Work .................... Proposed Staff ................... Subconsultants ................. Related Experience............ References ......................... Schedule of Hourly Rates. Insurance ............................ Appendix............................ WILLDAN Engineering ..............................1 ..............................1 ..............................2 ..............................7 ............................12 ............................20 ............................26 ............................27 ............................29 ............................30 ............................33 ............................34 City of Rancho Palos Verdes Statement of Qualifications for Public Wc)rks/ E 2i0erina Sewiccs r<� �� • sP .', � Fes:, � �'�� � i Executive Summary illan Group, Inc. Founded in 1964 and headquartered in Anaheim, California, Willdan Engineering (Willdan), a California corporation, is a subsidiary of Willdan Group, Inc., (WGI) a publicly -traded Delaware corporation. Throughout its 51 -year history, Willdan has dedicated itself to providing public agencies with reliable engineering and consulting services. Combining depth of staffing, state-of-the-art technical resources, and local offices rooted in their communities, Willdan has earned its reputation as a problem solver across a wide range of client interests. We understand the concerns of government agencies — especially those of local government. Willdan offers a broad scope of expertise that uniquely qualifies us to serve the needs of cities, counties, special districts, and state and federal agencies. Willdan has historically concentrated our efforts in the area of public works engineering for cities and counties. Since its establishment, Willdan has expanded in size, location, and service capabilities. We have evolved into a professional consulting firm offering a broad array of services that provide a comprehensive and integrated approach to our clients' needs. The firm has been a consistent industry leader in providing all aspects of municipal and infrastructure engineering, public works contracting, construction management, planning, building safety, public financing, homeland security, environmental investigation and remediation, and energy efficiency and management. WGI's corporate -wide capabilities include: ■ Needs Assessment ■ Environmental Assessment/Audit ■ Soil/Groundwater Investigation ■ Munitions Investigation Energy Solutions • Demand Side Energy Management ■ Renewable Resources/Sustainability ■ Energy Efficiency ■ Water Conservation Today, WGI has nearly 600 employees operating out of 26 offices located throughout the United States. VVWILLDAN City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ EI neering Services ineering 'City ■ Engineering • Civil Design • Contract Staff Augmentation ■ Public Works Observation • NPDES/TMDL Compliance and Administration ■ Program/Construction Management ■ Assessment Engineering ■ Land Development Plan Review ■ Grant Funding Acquisition/Administration ■ Project Management • Disaster Recovery ■ Survey/Mapping/GIS/ROW Engineering ■ Landscape Architecture ■ Structural Design • Planning/Environmental Impact Report Study ■ Traffic and Transportation Design ■ Building Safety ■ Water/Wastewater Design ■ Forensic Geotechnical Investigation ■ Materials Testing ■ Geotechnical/Foundation Testing/Inspection ■ Seismic Hazard Financial ■ Services Assessment District Administration ■ Fiscal Impact Analysis ■ Cost Allocation/ Study ■ Utility Rate Analysis ■ Development Fee Study ■ Arbitrage/Rebate Homeland Solutions ■ Infrastructure Protection ■ Large Event Security ■ Needs Assessment ■ Environmental Assessment/Audit ■ Soil/Groundwater Investigation ■ Munitions Investigation Energy Solutions • Demand Side Energy Management ■ Renewable Resources/Sustainability ■ Energy Efficiency ■ Water Conservation Today, WGI has nearly 600 employees operating out of 26 offices located throughout the United States. VVWILLDAN City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ EI neering Services r Willdan possesses expertise in all facets of the public sector. The services required for the City of Rancho Palos Verdes are directly related to our core competencies. No other firm matches Willdan's combined breadth of directly relevant technical and operational expertise and depth of experience. We are truly the City's one-stop shop to meet virtually any municipal service need. Willdan's engineering disciplines include: ■ Capital Improvements Planning ■ Funding Application Assistance • User Rate Studies • Special Assessments • Planning Commission Services ■ Contract Administration • Construction Project Management and ■ Roadway Design, Inventory, and Inspection Rehabilitation ■ Impact Studies ■ Community Outreach Program Management Services • Planning Approval Assistance • Design Management ■ Funding Assistance • Agency Approval Assistance Construction Management Services ■ Cost Estimating • Constructability Review • Bid Administration • Resident Engineering • Contract Administration • Construction Observation • Claims Review and Investigation ■ Utility Coordination • Federal Labor Compliance • Material Sampling and Testing • Public Relations Construction Inspection Services ■ Documentation of Pre -Construction Conditions • Meetings • Field Inspection ■ Reporting and Documenting ■ Testing Oversight • Punch List Preparation • Civil Pre aration of As -Built Plans ■ Project Closeout Plan Review Development Plan Review • Certificates of Compliance ■ Grading Plans ■ Street Lighting and Traffic Signal Plans ■ Erosion Control Plans ■ Storm Drain Plans ■ Street Improvement Plans ■ Sewer, Water, and Utility Plans • Tentative and Final Subdivision Maps Transportation Airport Engineering ■ Runway and Taxiway Design ■ Runway Modifications ■ Drainage Improvements • Drainage On-site/Off-site • Geology and Geotechnical • Signing and Striping ■ Pavement Management and Rehabilitation • Roadway and Parking Lot Lighting Design ■ Roadway Design • Taxiway and Apron Improvements • T -Hangers • Utilities Airport Planning and Entitlements • Circulation and Traffic Studies • Financial Management ■ Grant Administration ■ Grant Procurement • Master Plans Highway Engineering ■ Project Approval Documents ■ Freeway Interchanges ■ HOV Lanes ■ Highway and Bridge Design ■ Local Streets and Roads ■ Pavement Management and Reconstruction ■ Noise Barriers ■ Seismic Retrofitting ■ Transportation Planning Rail Engineering 'VIV-WI LLDAN 1City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Worcs/ Enaineeririg Services • Railroad Grade Separations ■ Transit Engineering Water Resources Water Supply ■ Master Plans ■ Planning • Design ■ Inspection ■ Evaluation and Studies • Water System Improvements ■ Water and Energy Conservation Wastewater • Master Plans • Planning ■ Design • Inspection • Evaluation and Rehabilitation of Sewage Systems • Sewer System Management • Sewage Lift Stations • Stormwater Program Management Flood Control and Stormwater/NPDES • Master Plans ■ Hydrology Reports • Feasibility Studies • Federal Insurance Studies (LOMR, CLOMR) ■ Storm Water and Drainage Design ■ Channel Improvements ■ Financial, Legal, Political, Regulatory, and • Pollution Discharge Technical Requirements Requirements(NPDES)/Permit Processing ■ Hydraulic Models ■ Scour and Sediment Transport Analysis • Debris Dam and Side Weir Design Disaster Recovery Services ■ Operation of One -Stop Building Permit Centers ■ FEMA Public Assistance • Replacement or Repair of Damaged Storm • Guaranteed Plan Check and Inspection Turn - Drains, Streets, and Bridges Around Performance • Hazard Mitigation Plans ■ Ability to Staff Up and Staff Down with the Workload ■ Street and Storm Drain Clean -Up • Removal of Burned Vehicles ■ Preparation and Implementation of a Near- ■ Establishment and Management of Citywide Term Erosion and Sediment Control Program Debris Removal Program • Fast Mobilization Response Survey and Mapping ■ ALTA Surveys ■ Aerial Mapping ■ Boundary Surveys • Construction Layout • Control Surveys ■ Design Surveys • Easements and Legal Descriptions • Expert Witness ■ Geographic Information Systems • Water Distribution System Mapping and ■ Wastewater Collection System Mapping and Modeling Modeling ■ Stormwater Collection System Mapping and ■ Field Data Collection Modeling • Hydrologic and Hydraulic Modeling ■ Pavement Management • Municipal Planning and Zoning • Land Subdivision ■ Building Permits ■ Transportation Planning and Traffic Analysis • Vehicle Routing • Public Safety — Police, Fire • Disaster Management • NPDES IC/ID Reporting • GASB 34 Asset Inventory ■ Assessment District Management • Maintenance District Mapping ■ Housing Inventory/Blight Analysis • Street Address Assignment V�WILLDAN I 3 City of Rancho Palos Verdes Engineering Siaternent of Qualifications For Public Works/ E.noineering Services Community Development ■ Property Rehabilitation Programs • Redevelopment • Labor Standards Compliance • Interim City/County Staff Assignments ■ On -Call Support ■ Expert/Specialized Staff ■ Staff Training • Grant Applications/Administration • Housing Studies and Programs • Economic Development Contract Staff Services ■ Overload Case Processing ■ Expedited Permit Processing ■ Project Management • Evaluation of Department Staffing and Operations • Start -Up of New Planning Departments Environmental Planning ■ CEQA/NEPA Compliance/Document ■ Technical Studies/Resource Assessments Preparation • Mitigation Monitoring Programs • Agency and Process Coordination ■ Third -Party Environmental Review ■ Legal Challenge Assistance Urban Planning and Design • General Plan Elements ■ Specific Plans • Zoning Ordinances/Development Codes ■ Land -Use Plans and Studies • Community Plans ■ Design Manuals and Guidelines • Site Planning and Analysis ■ GIS Databases and Mapping • Urban Design Plans ■ Smart Growth Programs Landscape Architecture Landscape Design • Recreation Facility Design ■ Parks and Sports Field Design ■ Urban Beautification ■ Construction Documents and Bidding ■ Design Manuals and Guidelines ■ Recreational Trails Design ■ Photographic View Simulations • Native Vegetation Mitigation Landscape Management ■ Construction Management and Administration ■ Landscape Maintenance Contract Updates • Plan Check Services ■ Assessment Districts/Homeowners Associations Inventories • Irrigation Systems Auditing Urban Forestry ■ Street Tree Inventories • Policy and Procedure Developments ■ Management Contract Documentation and • Landscape Planning Administration ■ Site Planning • Resource and Cost Analysis Services ■ Master Planning Structural Engineering Consulting Services ■ Study and Analysis ■ Bridge Advance Planning Studies ■ Bridge Planning/Feasibility Studies • Bridge Evaluations • Bridge Inventory and Operating Rating Study • Bridge Sufficiency Rating Analysis ■ HBRR (now HBP) Funding Application Bridge Preliminary Engineering ■ Bridge Type Selection Report ■ Bridge Preliminary Design ■ Seismic Retrofit Strategy Report Design and Construction ■ Local Bridge Replacement/Rehabilitation ■ Freeway Overcrossing, Undercrossing, and • High -Occupancy Vehicle (HOV) Bridge Ramp Widening ■ Railroad Bridge and Grade Separation • Bridge Seismic Retrofit, WILLDAN Engineering City of Rancho Palos Verdes Stpternent of Qualifications for Public Works/ Enyineeririg Services Plan Review and Inspection ■ Residential • Medical ■ Casinos ■ Solar Installations ■ Plan Reviewers • Counter Support • Code Enforcement Staff Certifications • Architectural • Electrical • Fire • Mechanical • Structural Review, Study, and Analysis of Existing Programs Neighborhood Cleanup and Improvement Programs • Commercial ■ Industrial ■ Schools ■ Correctional Facilities Contract Staffing • Inspectors • Permit Technicians ■ Building Official • ADA • CASp ■ Energy • Green Building • Plumbing ■ Vehicle Abatement and Parking Enforcement ■ Community Education Programs ■ Development of Educational Materials • Provide Project Managers and/or Supervisors as On -Site Employees • Provide Full -Time, Part -Time, Interim and/or • Development, Implementation, and Staffing of Weekend Staff as On -Site Employees Graffiti Abatement Programs ■ Development of Ordinances and Writing of • Assist in Enforcement, including Prosecution Grant Proposals by City and District Attorneys Studies and Analysis • Traffic Impact Analysis • Traffic Impact Fee Development ■ Parking, Circulation, Crosswalk and School - Area Safety • Suggested Route to School Studies • Pedestrian • Engineering and Traffic Surveys City Traffic Engineering • City Traffic Engineer Staffing • Grant Applications to State and Federal Agencies • Operation and Roadway Improvements • Work Area Traffic Control Training Traffic Design and Operations • Geometric Design ■ Signal Interconnect Design • Computer -Assisted Traffic Signal Coordination Timing • Engineering and Traffic Surveys ■ Traffic Signal, Signing and Striping, Design • Commuter Rail Projects ■ Transportation Modeling • Bus Transit Systems ■ Traffic Signal Control System Design, • Street Lighting Systems Implementation, and Operation For any project to be successful, organization and positive management of the consultant team is essential. That is why we assign a senior member of our staff, Mr. William C. Pagett, PE, Senior Vice President, to coordinate with the City's staff for the duration of the contract. Mr. Adel Freij, PE, Principal Project Manager, will act as the primary contact with the City's staff and is responsible for ensuring that the City's needs are met, that work efforts are fully coordinated, and that work performance is at the highest technical level. We have designated skilled employees to our Rancho WILLDAN 5 City of Rancho Palos Verdes Engineering Sttern:,ni of Qualifications =or publicWorks/ Eriaif7eering Services �, &. • • / • r / ' 1' «„"�s �� � � '� � Palos Verdes consultant team project, including individuals available to provide bilingual services to the City. Our team has developed proficient and effective procedures to maintain a high level of service from establishing a course of action and developing a project schedule to enacting and completing the project. State-of-the-art computer hardware and software are combined with and incorporated into every project. With our specialized understanding of governmental agencies' operations, not only at the local level but at the State and Federal level as well, we have been successful in obtaining over $260 million in special funds and grants for our clients. WI LLDAN 6 City of Rancho Palos Verdes Engineering Stateruent of Qualifications for Public Works/ Eineerinq Seri+ices Services Capabilities Willdan is unique among consulting firms due to the range of services we offer and our primary orientation to serving public sector clients. Because we provide multiple municipal engineering services, Willdan can provide comprehensive service even under severe timelines. The resources and expertise of the entire company are available to meet the demands of each assignment. Our staff understands the uniqueness of public agency needs and issues; they serve as city engineers, traffic engineers, planning directors, building officials, and public agency staff members on a contract basis for numerous cities and counties. This orientation provides insights into the issues facing municipalities and other public agencies and enables us to offer relevant and timely solutions. The following highlights our service capabilities. Wilidan's highly trained and experienced civil engineering staff is supported by technical experts in various disciplines throughout the company. As a result, Willdan offers a range of expertise that only a large firm can provide. Willdan's civil design expertise includes: transportation engineering; hydrology, drainage, flood control, and water/wastewater engineering. Transportation Engineering Major Highway Facilities Roadway Improvements Bridges and Structures Curbs, Gutters, and Sidewalks Rail/Transit Systems Airport Development Pavement Management Systems Hydrology, Drainage, Flood Control and Willdan offers a complete range of engineering and Water/Wastewater Engineering Services support services to implement transportation projects. The firm's team of engineering professionals Master Plans combines practical knowledge and technical Feasibility Studies expertise to develop solutions that are unique and Storm Drain/Flood Control Facilities Planning customized to each need. With an extensive staff that Storm Drain/Flood Control Design NPDES Requirements includes civil, structural, traffic, and bridge engineers, Hydraulic Models Willdan has designed numerous types of Scour and Sediment Transport Analysis transportation facilities, has managed transportation Debris Dam and Side Weir Design projects from initial project analysis through final _ Sewer Design design and construction, and has prepared pavement investigation design reports, pavement failure investigation reports, and pavement management system reports. Willdan has expertise in all aspects of hydrology, drainage, and flood control, ranging from local and regional drainage and flood control improvements to hydraulic and sediment transport analyses of major rivers. In addition, Willdan's design experience encompasses virtually every type of water and wastewater system project, including collection systems, disposal facilities, distribution pipelines, master plans, production wells, pump stations, reservoirs, studies, telemetry monitoring systems, and treatment facilities. WI LLDAN 7 City of Rancho Palos Verdes Engineering Stvztement of Ouailificution:; for Public Works/ En in eermg Services Willdan specializes in providing traffic engineering and planning services to governmental agencies. Our services range from responding to citizen complaints to designing and managing multimillion dollar capital improvement projects. Currently, our staff serves as contract city traffic engineers or provides traffic engineering services for approximately 40 cities in the southwest. Traffic Engineering Services Traffic Signal and Control Systems Signing and Striping Plans Circulation Systems Parking Studies/Management Street Lighting Traffic Management Plans (TMPs) Transportation Demand Management (TDM) Analyses Capacity Evaluations Bicycle and Pedestrian Facilities Our front-line knowledge and understanding of Traffic Impact Studies local road and traffic conditions are the Neighborhood Traffic Management cornerstone of our services. Willdan's traffic Suggested Route to School and Pedestrian Studies engineering staff applies state-of-the-art concepts Engineering and Traffic Surveys to confirm the adequacy of transportation facilities, to determine the need for traffic control devices, and to ensure the safe and efficient operation of the transportation system. Our staff of experts conducts traffic surveys and data collection, investigates motorist and vehicle characteristics identifying and making recommendations on traffic safety, utilizes traffic laws and enforcement to determine traffic signal timing, and evaluates highway operations. Willdan prepares traffic engineering designs to warn, regulate, and guide traffic. We develop geometric design and channelization, traffic signal and street lighting plans, parking lot designs, and develop traffic control plans for construction. Willdan currently provides professional subdivision map and engineering plan check services for numerous cities and counties throughout California. These services include preparing and/or reviewing easement documents, lot line adjustments, parcel and tract maps, dedications, and vacations, along with ensuring compliance with the Subdivision Map Act. Willdan's survey and mapping services are provided to many cities and counties throughout California. These services include design survey and construction staking, monument restoration, boundary survey, right- of-way engineering, and ensuring maps and documents are drawn to the Subdivision Map Act standards for recordation. AV i Engineering Subdivision Man/Plan Check Services Easement Documents Lot Line Adjustments Parcel and Tract Maps Review Dedications/Vacations Subdivision Map Act Compliance Improvement Plan Check Su Design Survey and Construction Staking Topographic Survey Monument Restoration Boundary Survey Right -of -Way Acquisition and Engineering Legal Descriptions and Appraisals Geographic Information Systems (GIS) City of Rancho Palos Verdes Staterrrent of 0w).1ificaiions for PLAblic Warks/ El nee~ing Services Willdan's Landscape Architecture Group focuses on Landscape Architectural Services designing landscapes for public improvement projects, such as park and recreational facilities, Landscape Design community centers, and roadway beautification. In Plans, Specifications, and Estimates developing quality projects and plans, our Landscape Studies and Reports landscape architects apply their talents and Irrigation Plans knowledge of site analysis, user needs Plan Checking programming, site design, urban design, landscape Arborist Services Facilities Architecture and Design preservation, land management, water conservation, and land reclamation. With experience, mostly in California, our landscape architects offer an essential array of services and expertise that adds long-term value to projects and communities. Willdan is highly experienced in regulations pertaining to the expenditures of Federal, State, County, and local funds, which include Proposition C, Community Development Block Grant (CDBG), State Transportation Program — Local (STPL), Proposition A, State Gas Tax, and various other grant and funding sources. Willdan has coordinated, prepared, and submitted all necessary documentation to the METRO and Caltrans to assist cities in securing federal authorization and obligation of funds for projects. When requested, Willdan has prepared funding applications, invoices, and other required documentation. Special Funding Administration State Transportation Program — Local (STPL) Proposition C Community Development Block Grant (CDBG) Proposition A Measure R Call for Projects Proposition 42 Proposition IB Safe Routes to School (SR2S & SRTS) Transportation Development Act (TDA) Highway Bridge Program (HBP) Hazard Elimination Safety (HES) American Recovery and Reinvestment Act (ARRA) Willdan's staff has extensive experience in preparing and submitting required documentation to Metro and Caltrans for federal and state funded projects including STPL, SR2S & SRTS, HBP (HBRR), ARRA, and HES. Although each program may encompass different components and requirements, the general process remains the same following the Caltrans Local Assistance Procedures Manual (LAPM). Willdan also keeps informed of revisions (LPPs) to procedures and forms in the LAPM. We have assisted cities at various stages of the federal/state-funded project as follows: ■ FTIP Programming ■ Request to Initiate a Federally Funded Project ■ Request for Authorization to Proceed with Construction ■ Award Submittal ■ Progress Invoice ■ Final Report of Expenditures W""WI L.LDAN 9 City of Rancho Palos Verdes Engineering Siaternenf of Qualifications for Public Works/ Enoineering Services �9 A sample of the required federal documentation includes: ■ TIP New Project Form ■ Obligation Plan ■ Request to Initiate a Federally Funded Project ■ Field Review ■ Preliminary Environmental Study ■ Request for Authorization and Data Sheets ■ Detail Estimate and Summary ■ Finance Letter ■ PS&E Certification ■ No Right -of -Way Certification ■ Local Programs Agreement Checklist ■ Local Agency Contract Award Checklist ■ Resident Engineer's Construction Contract Administration Checklist ■ Federal Report of Expenditures Letter and Checklist ■ Local Agency Final Inspection Form ■ Materials Certificate Willdan also maintains excellent relations with Caltrans' District Local Assistance Engineers and Metro's staff and will answer questions regarding the submittals and status of the projects. City Engineering Services Willdan's City Engineering Group performs general engineering services for many cities in California Capital Improvement Programs Grant Writing and Arizona. Our goal is to come up with solutions and Funding Assistance City Engineer in helping cities serve their constituents; whether ADA/NPDES Requirements temporary, as -needed assistance, or long-term GASB 34 Statement Evaluation assignments. We specialize in preparing capital — improvement programs, annual budgets, assisting in grant writing and funding applications, and researching infrastructure for GASB 34 statement evaluation. Our city engineering staff also provides recommendations for the implementation of National Pollutant Discharge Elimination System (NPDES) and Americans with Disabilities Act (ADA) requirements. Willdan offers a full complement of construction Construction Management Services management, observation, and testing services for public works projects, including streets and Cost Estimating highways, bridges, transit facilities, buildings, parking Constructability Reviews lots, park facilities, utilities, and infrastructure Bid Administration facilities, including sewer, water, and storm drain Resident Engineering systems. We provide skilled resident engineers, Contract Administration Construction Observation construction/project managers, and construction Claims Review and Investigation observers who can monitor and direct activities to Utility Coordination keep construction on schedule and within budget. Federal Labor Compliance Willdan's approach to construction management and Material Sampling and Testing observation establishes a set of guidelines Public Relations specifically tailored to the client's standards and project goals. Document control is also emphasized. Project coordination with adjacent contracts and agencies is stressed to address potential problems and eliminate adverse impacts to construction progress. WI LLDAN 10 City of Rancho Palos Verdes Engineering Statement of Qualifications for t'ublic Works( Sna,neering Services 30 - - Geotechnical and Material Testing Willdan Geotechnical provides geological and Services geotechnical and material testing services for many public agencies in California and the Western United Geotechnical Engineering Slope Stability and Settlement Analysis States. Willdan Geotechnical is equipped with a full- Earthquake and Seismic Hazard Analysis service soils laboratory, licensed by the City of Los Engineering Geology and Hydrogeology Angeles. With extensive experience throughout Los Full -Service Geotechnical Laboratory Angeles, Orange, San Bernardino, Riverside, and Materials Sampling and Testing Ventura Counties, Willdan Geotechnical is intrinsically familiar with local geologic, geotechnical, and seismic conditions VWILLDAN I 11 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public v/Vor ksi En�neerincg Servicer Scope of Work C)u Approach Since 1964, Willdan has provided consulting services to hundreds of public agencies in the western United States. Our depth of experience and broad range of capabilities allow Willdan to offer comprehensive resources for efficient and convenient service. In addition, our expertise in the engineering and planning fields ensures innovative and effective solutions will be applied to all projects undertaken by Willdan. Many of our specialists have a strong background and an intimate understanding of diverse programs for public agencies. This expertise provides the foundation for planning, design, inspection, and administration under agency programs, and offers added value with our unique familiarity with state - and federally -funded programs. We also place strong emphasis on communication and maintaining personal interaction with the community at large. Our project approach begins with designating a complete project management team. Each project management team will be led by a principal representative with full authority to direct operations and commit resources. In addition to the principal representative, the management team will include expert staff specializing in the type of service requested. Our array of in-house experts allows Willdan to develop a specialized management team for each requested project. In addition, Willdan's size gives us the flexibility to undertake large projects and projects on a compressed time schedule. If a project arises that requires immediate or extra attention, Willdan's flexibility allows tasks to be rapidly delegated to an expanded team of staff members. This ensures that the project will receive appropriate attention to detail and be completed in a timely fashion. The first task of Willdan's delegated project management team will be to establish a course of action. This task will begin by coordinating with the City to identify specific project objectives. With these objectives in mind, Willdan's experienced professionals will actively identify areas of need and design solutions to address these needs. Our policy of open and often client coordination will ensure the established course of action and will be consistent with the City's goals. Once the course of action is established, Willdan will develop a project schedule. Each project schedule will be developed with the City's project completion date in mind, and will include a critical path and measurable milestones to ensure the project completion date is met. All project schedules will be submitted to the City to guarantee consistency with the City's timeline. In enacting and completing the course of action, Willdan strives to exceed client expectations for quality of work. Willdan has a history of completing projects on time, within budget, and beyond industry standards. Willdan is committed to providing this level of service to the City. As such, after each project is completed, Willdan will follow-up with the City to gather feedback on the City's satisfaction with the project, and to identify methods to improve future service. Willdan can offer a computer-aided design package using Intergraph or AutoCAD software for design and drafting, Microsoft Word for word processing, Primavera Expedition for project and construction management, and Microsoft Project for project scheduling. Willdan has completed numerous designs with 100 percent CADD drawings for various major projects. Our designers are equipped with high-speed personal computers that are networked to our servers and electrostatic plotters. Regional offices are integrated into a Wide Area Network (WAN) by dedicated high-speed frame -relay data links. Willdan has a T1, high-speed digital connection to the Internet, VWILLDAN 12 City of Rancho Palos Verdes Engineering I Statement of Qualifications for Public Works/ En ineerincg Services 2 r r r which is extended to the staff on Willdan's network. Our experience with this technology makes it possible for Willdan staff to undertake complex projects and utilize it to provide an efficient and effective problem -solving approach to each project. Management Approach From initial project analysis through final design and construction, Willdan is dedicated to meeting client needs with the highest standards of service. Willdan has a proven record of delivering a quality product within budget and on time, achieved because of the following: ■ Strong project management ■ Close communication with clients ■ Sophisticated schedule control ■ Quality control commitment Willdan employs state-of-the-art technology in solving transportation problems, yet we also understand the subtleties beyond the technical challenges. We bring to each project a sensitivity to local concerns and= community issues. ej��ri kms' c:T y oy When Willdan is notified of a potential project, the first task will be for the project manager and appropriate team members to meet with City staff to discuss, in detail, the project, its goals, and its ultimate outcome. Subsequently, the project manager will meet with in-house staff to develop a work program specifically suited to the City's needs. The following is an outline of the typical scope of work for a representative street improvement project. Naturally, the scope of work would be expanded or reduced depending on specific project needs. It is understood that depending on the type of project, additional meetings and/or submittals may be required. Projects such as widenings with right-of-way acquisition, installation of raised medians, intersection modifications, landscaping, etc., typically require a number of conceptual alignments for review prior to final approval, as compared to a typical street resurfacing project. Upon identification of a specific project, a detailed scope of work will be provided for the City's review and approval. Engineering Investigation 1. Attend a pre -design meeting with City representatives to review the project, in detail, and determine requirements and procedures for design, ongoing review, and coordination. 2. Assemble and review available information pertinent to the project, including existing survey data, as -built improvement plans, traffic data, utility information, existing pavement section information, and other available record data. 3. Perform preliminary field reconnaissance, including photography for an overall perspective on field conditions, record general pavement conditions and special deterioration problems, and assess applicability of various rehabilitation strategies. 4. In consultation with City representatives, determine the City's specific requirements concerning street crown, pavement lifespan, preferred rehabilitation strategies, and cost limitations. Surveying 1. A planimetric survey will be performed to identify all existing features, objects, and obstructions, including existing curb and gutter, cross gutters, medians, planters, meters, signs, vaults, manholes, survey monuments, driveways, etc. W1 LLDAN 13 City of Rancho Palos Verdes Engineering Stattmwii of Qualifications for Public Works` Ertg'ineo ring services 2. Elevations of features will be determined by ground survey. For street -type projects, full street sections will be taken at 25 -foot stations (quarter stations) and at all control or critical points, such as BCR, ECR, center of intersection, catch basins, etc., and will include, at a minimum, elevations of the following: ■ Centerlines, at median curbs; at 10 -foot intervals from the centerline on both sides; and at any grade breaks between the 10 -foot intervals; lips of gutters, and/or edges of pavement, flow lines and top of curbs; right-of-way; and 15 feet behind right-of-way and 20 feet at driveways. 3. Identify and locate existing street monuments by either centerline ties or by inspection of each intersection. Provide survey ties to find centerline monuments that have no ties. 4. Perform field measurements to define and to mark, at the time of design, locations of pavement to be patched, reconstructed, or repaired prior to overlay and record for plotting on plans. Field measurements will be provided by the same experienced pavement engineer who determined the overlay thickness. 5. Perform field measurements to record locations of existing traffic features and controls to be restored. Engineering Design 1. Using the City's choice of either Intergraph MicroStation or AutoCAD software, develop base drawings and preliminary plans at horizontal scale 1"=40' for the proposed project area. 2. Develop overlay strategies, based on optional costs, client preferences, and other miscellaneous constraints. 3. Develop preliminary signing, striping, and (where necessary) loop replacement plans, at horizontal scale 1"=40' and vertical scale of V=4', as applicable, using City -selected software. The pians will be prepared using the City's design criteria, as well as Caltrans standard plans and specifications. 4. Develop preliminary traffic signal and traffic signal modification plans (where necessary), at a horizontal scale 1 "=20', using City -selected software. The plans will be prepared using the City's design criteria, as well as Caltrans standard plans and specifications. 5. For storm drain -type projects, prepare drainage study, including hydrology calculations and maps in accordance with Los Angeles County Flood Control District criteria to evaluate the size of the proposed storm drain. 6. Prepare preliminary horizontal and vertical storm drain alignments. Alignment will be set to minimize utility relocation and traffic disruption. 7. Prepare preliminary hydraulic calculations. Hydraulics will be prepared using WSPG/Storm Plus. The hydraulic grade line will be set to minimize mainline sizes while permitting the efficient functioning of catch basins. 8. Develop typical cross sections for the street improvements, including details of cold planning and overlay to maintain drainage and median curb heights. 9. Prepare typical work area traffic control plans for use during project construction. A typical work area traffic control plan at V=40' will be prepared and include advance signing, transitions, delineation, and signing in the vicinity of the current work area, provisions for adjacent site access, intersection controls, and transitions back to existing conditions. A(W I LLDAN 14 City of Rancho Palos Verdes Engineering Sfaternenf Of G?i,alrFice[iWIs for r LANic Works/ En neerinq Services 4 � / • � ' • , • � ��� � "tea `� h'`. Sb t .� �� �, "a AA 10. Plot all utilities with possible interference with proposed construction. Manholes, water valves, utility vaults, and apertures will be identified to be adjusted subsequent to construction. 11. Obtain necessary permits from other agencies, such as the Los Angeles County Flood Control District and Caltrans, as needed. 12. Submit preliminary plans (50 percent), specifications, and cost estimates to the City for review and comment. 13. Based on the City's comments and requirements, revise plans, specifications, and estimates. 14. Submit final plans (90 percent), specifications, and cost estimates to the City for review and comment. 15. Revise plans and specifications and finalize cost estimates for approval by the City. 16. Upon final approval, submit original plans, specifications, and estimates to the City, along with computer files of the final design plans, specifications, and cost estimates. 17. All plans will be signed by a registered civil or traffic engineer, as appropriate. Utility Coordination 1. Submit notification to all affected agencies and utility companies of proposed project. 2. Submit copies of the plans to all affected utilities and agencies. 3. Coordinate with utility companies to implement upgrade of its facilities, as needed, within the project limit. 4. Identify conflicts of proposed construction with utilities and provide preliminary coordination for resolution. 5. Send notification of preconstruction conference to affected utility companies. 6. Provide attendance at the preconstruction conference by the utility coordinator. 7. Review project scope of work with each utility company at the preconstruction conference and review possible conflicts and work with each utility to assure that specific needs of the project are understood. 8. Coordinate with construction observer during construction to expedite the identification of any unknown utilities found during excavation. 9. Coordinate relocation work by utility companies. Construction Management 1. Answer questions and inquiries during the bidding process. 2. Attend pre-bid conferences and/or job walks. 3. Prepare addenda, if required. 4. Prepare bid analysis. 5. Review and respond to bidder submittals, as required by the project specifications. VWILLDAN 15 City of Rancho Palos Verdes Engineering Sraterrnent of Qualifica.flons for Public Works/ Eric�ineer;na Services 6. Answer questions during construction relative to the interpretation of the project plans and specifications. 7. Conduct a field investigation of the project area to become familiar with the existing facilities and the project environment. 8. Become familiar with plans, construction schedule, construction sequence, and permit requirements from other agencies. 9. Meet with City staff to review the scope of work and establish project schedules. 10. Attend preconstruction meeting. 11. Provide full-time construction observation of the work to monitor materials and methods towards compliance with plans, specifications, and contract documents, and address and document non- conforming items as they are discovered. 12. Monitor compliance with Cal OSHA requirements and compliance with all local, state, and federal regulations, including but not limited to, Clean Air Act and Clean Water Act (NPDES). 13. Meet with the contractor at the beginning of each day and review proposed work plans, including specific details that may affect progress. 14. Review actual contractor performance throughout the day and discuss discrepancies with the contractor as they occur. 15. Coordinate activities of engineering support, surveying, and testing. 16. Coordinate contractor's fieldwork with utility companies and other agencies. 17. Attend weekly jobsite meetings and other meetings with City staff, merchants, engineer, public relations personnel, contractor, and construction administrator, as needed. 18. Observe construction safety and public safety and convenience, and report discovered discrepancies to construction administrator and City. 19. Maintain copies of all permits needed to construct the project and enforce special requirements of each. 20. Maintain detailed daily diary on construction progress showing site conditions, weather conditions, traffic control measures taken by the construction contractor, labor, equipment, and materials used during the day, quantity of work performed during the day, and major incidences occurring each day. 21. Prepare weekly statement of working days, and submit to Contractor and City. 22. Prepare clear and concise letters and memorandums, as needed. 23. Maintain field file bound workbooks during construction, including a cumulative record of quantities constructed, daily and weekly reports, working day reports, change order documentation, photographs, and other documentation. 24. Analyze delays and review claims on a timely basis and make recommendations to the City. 25. Review, evaluate, and discuss with the City, all requests for changes of work, including costs involved. WI LLDAN 16 City of Rancho Palos Verdes Engineering S4a.tement of nualificafions for Public Works/ Engineering Services .Ill I ONEAi 26. Maintain all data for change orders, and record information with regards to the time of dispute, time of notification by the contractor, and action taken by the inspector. 27. Provide complete measurements and calculations documented to administer progress payments and make recommendations for payments. 28. Maintain and submit a clean set of plans marked in red for as -built corrections on record drawings to be filed with the City. (Agency will be responsible to transfer the construction observer's record drawings to original Mylar drawings.) 29. Prepare punch list at substantial completion and follow up. 30. Recommend and schedule, with the City and applicable agencies, the final inspection. 31. Upon project completion, provide the finished set of project workbooks to the City. 32. Review and monitor compliance with the City's prepared Quality Assurance Testing Procedure (QAP). 33. Verify posting of required labor information and posters. 34. Conduct employee wage interviews at the job site at a frequency and quantity as required by applicable regulations. (Per Caltrans' requirements, the City's field inspection personnel will provide a list of employees or subcontractors on the project each day.) Federal Labor Compliance 1. Prepare federal labor compliance components of project specifications in accordance with current labor regulations and requirements. 2. If applicable, attend pre-bid conference to present general requirements of bid preparation for the project. 3. Verify applicable wage determination ten days prior to bid opening; document verification as required. If wage determination has changed from what appears in project specifications, provide addendum and proof of receipt by bidders. 4. Verify eligibility of selected contractor and its subcontractors to receive contract awards by confirming current, active license status with Contractors State License Board and non-appearance on Federal List of Parties Excluded (debarment list). 5. Attend preconstruction conference to present federal labor compliance requirements to contractor and subcontractors; prepare minutes and attendance record thereof. 6. Prepare various monitoring and reporting documents as required. 7. Verify and document job -site posting of wage rate information and labor compliance posters. 8. Receive and review labor compliance documentation from public works observers or inspectors and compare with contractor -submitted documents. Monitor weekly payroll documentation on a continuous basis, including certified payroll reports, fringe benefit statements, apprenticeship documentation, and payroll deduction authorizations. 9. Follow up with contractor by telephone and certified mail regarding required document submittals and payroll discrepancies. WI LLDAN ! 17 City of Rancho Palos Verdes Engineering ! Stafernenf of Qualificationsfm Public Works/ Enaineering services 33 - le 10. Coordinate with City staff the withholding of progress and/or retention payments if contractor fails to abide by labor compliance requirements. 11. Receive, pursue, and document labor complaints; recommend special action to be taken if contractor continuously fails to comply with requests and requirements. 12. Maintain content and format of federal labor compliance file in conformance with applicable government requirements. 13. Coordinate project file reviews by authorized county, state, and federal agencies. 14. Submit complete federal labor compliance file to City for retention. (Note: Federal labor compliance files are to be retained for a period of not less than three years.) Asphalt Batch Plant and Field Testing Services 1. Provide asphalt plant inspection services. 2. Check binder content. 3. Check gages and verify viscosity readings. 4. Monitor reaction time. 5. Verify mix aggregate gradation with plant lab technician. 6. Check batching processing (bins, temperature, etc.) 7. Provide field testing during placement of asphalt (temperature, density). Drafting 1. Prepare construction plans using the City's choice of either AutoCAD or Intergraph MicroStation software. 2. Prepare as -built drawings at completion of the project. 3. Prepare maps, diagrams, and concept drawings as directed by the City. Writing Specifications and/or Reports 1. Prepare specifications for improvements, bid package, contract documents, and cost estimates using the City's boilerplate. 2. Provide detailed equipment specifications to ensure good quality control is assured and maintained for asphalt -rubber production, if applicable. 3. Incorporate appropriate federal labor requirements and documentation into the specifications, as required. 4. Develop construction staging requirements to be specified in the special provisions. 5. Prepare as directed by the City, traffic studies and reports, project study reports, master plans, pavement management system reports, and other reports. 6. Prepare funding applications, invoices, and other documentation as directed by the City. Presentations 1. Attend City Council meetings, study sessions, staff meetings, and other public meetings to address V,WILLDAN I 18 City of Rancho Palos Verdes Engineering Statement cf Qualifications for Public Works/ Engineering Services RKWAINNOW 41i �� � F ,•' <`" ,,fir ,'` � � y, ::� . city engineering matters as directed by the City. 2. Meet with residents to discuss proposed projects as directed by the City. Manage Work by Others 1. Assist City in developing scope of work and preparing Request for Proposal. 2. Review proposals and recommend to City award to consultant. 3. Conduct project kickoff meeting and periodic status meetings. 4. Review consultant's product at 30, 60, 90 and 100 percent complete. 5. Recommend to City approval of project for final acceptance and payment by City. Deliverables Provide to City all required items prepared in performance of services including maps, reports, and drawings. 2. Provide all deliverable items in both electronic format and hard copy. WI LLDAN 19 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ Enoineerincg Services 9 � x • ♦ ~ rk�,,,., _ 'Y fpm,. �.-'. ,`-,^,'". f.31 Proposed Staff Willdan offers a highly qualified team of professionals with the technical qualifications and diverse capabilities necessary to meet the as -needed services of the City of Rancho Palos Verdes. We have assembled a team that will be able to respond immediately to the City's requests. Principal -in -Charge Contact Information Newton Armstrong, PE, Director of Engineering, will have overall responsibility for coordinating, assigning, and supervising all civil design engineering services. Mr. Armstrong manages improvement projects for various agencies and municipalities. Mr. Armstrong has served as project manager for various projects such as rail design and bridges. Mr. Armstrong has over 15 years of engineering experience. Ray Wellington, PE, Deputy Director of Engineering, will be in charge of hydrology and hydraulic plan checks. Mr. Wellington joined Willdan in 2006 and brought an extensive and diverse background to the team. He has served both public and private entities in such roles as designer, inspector, traffic engineer, project manager, construction manager, consulting engineer, city engineer, public works director, general manager, and owner. These various roles have involved coordination with boards, councils, commissions, clients, committees, staffs and stakeholder interest groups, and a variety of infrastructure planning, funding, design and improvement construction. Within these roles he has addressed development siting, project economics and funding, rates and fees, subdivision mapping, agreements, facility integration, construction, occupancy, and maintenance of facilities. Periodically he has dealt with matters of litigation, negotiation, regional wastewater agreements, water conservation issues, recycled water usage, historic water rights in groundwater basins and surface flows, plus A/ W1 LLDAN ( 20 City of Rancho Palos Verdes Engineering Sfaternent of Qualifications for Public Works/ I':r4� ring Services William C. Pagett, PE William C. Pagett, PE, Senior Vice President/Director of City Senior Vice President Engineering, will serve as Principal -in -Charge for the City of Rancho Palos Verdes's projects. He will be responsible for 13191 Crossroads Parkway assembling a customized, project specific team on a project -by- North, Suite 405 project basis. Only individuals who possess the required Industry, CA 91746 562.368.4850 phone experience and capabilities for a particular project will be assigned. 562.695.2120 fax In addition, Mr. Pagett will ensure the availability and mobilization of bpagett@willdan.com all resources required for each assignment. Mr. Pagett has over 48 562.364.8486 phone years of city engineering experience for various public agencies, and has overseen numerous projects in Southern California as Senior Vice President for Willdan improvements; water; sewer, flood control and drainage; bridges; Newton Armstrong, PE, Director of Engineering, will have overall responsibility for coordinating, assigning, and supervising all civil design engineering services. Mr. Armstrong manages improvement projects for various agencies and municipalities. Mr. Armstrong has served as project manager for various projects such as rail design and bridges. Mr. Armstrong has over 15 years of engineering experience. Ray Wellington, PE, Deputy Director of Engineering, will be in charge of hydrology and hydraulic plan checks. Mr. Wellington joined Willdan in 2006 and brought an extensive and diverse background to the team. He has served both public and private entities in such roles as designer, inspector, traffic engineer, project manager, construction manager, consulting engineer, city engineer, public works director, general manager, and owner. These various roles have involved coordination with boards, councils, commissions, clients, committees, staffs and stakeholder interest groups, and a variety of infrastructure planning, funding, design and improvement construction. Within these roles he has addressed development siting, project economics and funding, rates and fees, subdivision mapping, agreements, facility integration, construction, occupancy, and maintenance of facilities. Periodically he has dealt with matters of litigation, negotiation, regional wastewater agreements, water conservation issues, recycled water usage, historic water rights in groundwater basins and surface flows, plus A/ W1 LLDAN ( 20 City of Rancho Palos Verdes Engineering Sfaternent of Qualifications for Public Works/ I':r4� ring Services Project Manager Adel M. Freij, PE, Principal Project Manager, is designated as Contact Information the Project Manager. Mr. Freij will work closely with City staff and Willdan staff in order that project commitments are fulfilled. He is Adel Principal Project M. Manager an accomplished Project Manager for public works construction projects, known for providing innovative quality engineering 13191 Crossroads Parkway services and meeting clients' needs in every circumstance. As North, Suite 405 Principal Project Manager, he has more than 26 years of Industry, CA 91746 project/construction management and design experience, including 562.364.8486 phone street reconstruction and rehabilitations; traffic signals 562.695.2120 fax improvements; water; sewer, flood control and drainage; bridges; afreij@wilidan.com infrastructure improvements; and right-of-way acquisition. Newton Armstrong, PE, Director of Engineering, will have overall responsibility for coordinating, assigning, and supervising all civil design engineering services. Mr. Armstrong manages improvement projects for various agencies and municipalities. Mr. Armstrong has served as project manager for various projects such as rail design and bridges. Mr. Armstrong has over 15 years of engineering experience. Ray Wellington, PE, Deputy Director of Engineering, will be in charge of hydrology and hydraulic plan checks. Mr. Wellington joined Willdan in 2006 and brought an extensive and diverse background to the team. He has served both public and private entities in such roles as designer, inspector, traffic engineer, project manager, construction manager, consulting engineer, city engineer, public works director, general manager, and owner. These various roles have involved coordination with boards, councils, commissions, clients, committees, staffs and stakeholder interest groups, and a variety of infrastructure planning, funding, design and improvement construction. Within these roles he has addressed development siting, project economics and funding, rates and fees, subdivision mapping, agreements, facility integration, construction, occupancy, and maintenance of facilities. Periodically he has dealt with matters of litigation, negotiation, regional wastewater agreements, water conservation issues, recycled water usage, historic water rights in groundwater basins and surface flows, plus A/ W1 LLDAN ( 20 City of Rancho Palos Verdes Engineering Sfaternent of Qualifications for Public Works/ I':r4� ring Services groundwater management and negotiations with basin pumpers Peter Miessner, PE, Project Manager, will serve in the capacity of lead design engineer has proven expertise in approvals, design and construction of large-scale infrastructure projects. He possesses an effective management style that contributes to the bottom line while exceeding contract expectations. He has managed numerous high profile, complex projects where his proven leadership and teambuilding skills have maximized employee productivity and client satisfaction. His experience with specific infrastructure includes local, state highways, bridges; light rail; river improvements; master sewer system and treatment plant; master water system, wells, tanks and treatment plant; recycled water supply; agricultural pipeline relocation and supply; electric transmission towers, substation and agreements; high pressure gas mains; oil pipelines; master programming, scheduling and phasing; right of way; cost estimating; funding. Mr. Miessner has managed complex local- and state -funded transportation projects and understands the how to maneuver projects though the funding and permitting processes. He has worked with Caltrans on numerous projects. His experience includes managing site improvement projects for office complexes, hospitals, college campuses, and institutional projects some having included LEED ratings. Roxanne Hughes, PE, Principal Project Manager, will serve as the Lead Engineer for the Pavement Engineering aspect of the project. Her analytical abilities and experience in providing city engineering services on pavement management services, construction management, and federal contract management will bring great value to the City in meeting its current and future needs. In recent years, she has designed and managed the construction of many street maintenance and rehabilitation projects, including federally funded projects. Ms. Hughes has excellent people skills and is capable of managing complex situations in a professional and solution -oriented manner. Abner Catig, Senior Design Manager, will serve in the capacity of lead design engineer on the various design projects assigned. Mr. Catig will be responsible for the design and preparation of plans, specifications, and estimates (PS&E). He has 32 years experience in public works design, including design of street widenings, reconstructions, and streetscape improvements, flood control and drainage improvements, grading and site plans, hydrology studies, sewer improvements, and storm drains. He possesses extensive Caltrans and LACDPW design criteria and guidelines. Mr. Catig works closely with drafters and technicians to develop a comprehensive and accurate product. Elroy Kiepke, PE, City Engineer, will be assigned the responsibility for development review. Mr. Kiepke has over 43 years of experience in the areas of city engineering, building and safety, plan check, NPDES, and ADA requirements. Chris Kelley, PE, Associate Engineer, will serve in the capacity of lead design engineer on the drainage analysis and design. Mr. Kelley has over 9 years of design experience. He is primarily responsible for the design of public works improvement projects, including streets, highways, storm drains, sewers, and waterlines. Lucy Martinez, EIT, Designer II (bilingual), will assist Mr. Catig in preparation of civil design plans. Ms. Martinez's duties at Willdan include assisting in the preparation of PS&E for public works projects, as well as the preparation of geometric plans, project reports, and project study reports. Ms. Martinez is proficient with software such as MicroStation, InRoads, SelectCad, SAP2000, AutoCAD, Windows, and MS Office. Ms. Martinez has over 13 years of civil engineering experience Kenneth Krieger, Senior Designer, will be assigned to assist Mr. Kelley with drainage analysis and design. Mr. Krieger has 26 years of experience at Willdan in the design of drainage related projects. He has run HEC -2 and Storm Plus Hydraulic programs on numerous channels and storm drains. He has calculated hydrology using methodologies from all over Southern California. As a member of the drainage design group, he has worked on most of Willdan's most complex drainage designs. He is also *111"'WI LLDAN 1 21 City of Rancho Palos Verdes Engineering Sta�ernWa of �u�hiicafu>±-)s for Public Workst En ineering Services• �1 fully versed on MicroStation and AutoCAD. Lew Gluesing, PE, TE, PTOE, Director of Engineering, will be directly responsible for the overall conduct of the traffic engineering of the project, including allocation of resources, project coordination, and quality assurance. Mr. Gluesing has more than 50 years of experience in all aspects of traffic and transportation engineering, with specialization in design and operations. Mr. Gluesing is responsible for coordination to implement the transportation design improvements on contract bid documents. To assist Mr. Gluesing, Willdan has assembled the following highly qualified team of traffic and transportation specialists: Vanessa Munoz, PE, TE, PTOE, (bilingual), is a Deputy Director of Engineering at Willdan with 17 years of experience in transportation planning and traffic engineering. Ms. Munoz will assist Mr. Gluesing with the overall conduct of the traffic engineering of projects. Ms. Munoz brings a wide range of abilities equally suited to serving public agencies as well as project management. She is responsible for analysis, coordination, and design of various projects, including preparation of plans, specifications and estimate (PS&E) for traffic and street improvement projects. Ms. Munoz has assisted with various cities' development review process, and preparation and review of traffic impact studies, engineering and traffic (E&T) surveys, traffic signal and stop warrant analysis and has secured funding for various projects through the Safe Routes to School (SR2S) and Highway Safety Improvement Program (HSIP) grants. Ms. Munoz is bilingual, fluent in the Spanish language. Ruth Smith, TE, PTP, Project Manager, will serve as the Traffic Engineer. Ms. Smith has more than 34 years of experience in traffic and transportation engineering. Ms. Smith's duties include performing traffic studies for client cities, such as preparing a neighborhood traffic/parking management plan, and recommending future actions to upgrade a two-lane roadway to a multi -modal corridor. Ms. Smith's experience has included supervising the preparation of traffic impact, parking, trip generation and on- site circulation studies and reports. She prepared studies for a variety of developments, both large and small, including planned communities, commercial developments, warehouses, distribution centers, churches, an asphalt plant, wineries, and PR/PSRs for new and existing freeway interchanges. Joanne Itagaki is a Senior Design Manager, will assist Mr. Gluesing with traffic studies. Ms. Itagaki has been at Willdan for more than 27 years. Her area of expertise includes traffic and transportation engineering. Ms. Itagaki has worked on a variety of projects, including preparation of traffic impact studies, engineering traffic surveys, and design projects. Currently, she serves as Deputy Traffic Engineering Deputy for the Cities of Rosemead and Norwalk. Jeffrey Lau, PE, Associate Engineer, will assist Mr. Gluesing in the traffic engineering design for the project. Mr. Lau has provided fieldwork and CADD design services for street lighting, traffic signals, signing and striping plans. Additionally, he has experience using Caltrans' Standard Plans, Traffic Manual, Manual on Uniform Traffic Control Devices (MUTCD), MUTCD California Supplement, and Highway Design Manual. Mr. Lau offers 10 years of traffic -related experience. Reggie Greene, Associate Engineer, will assist Mr. Gluesing in the traffic engineering design for the project. Mr. Greene provides assistance in traffic design services for a variety of traffic engineering projects for client cities, outside agencies, and California Department of Transportation (Caltrans) projects. Mr. Greene offers 17 years of traffic -related experience including but not limited to traffic signal, signing and striping and interconnect design and has experience using AutoCAD and Microstation. Additionally, he has experience using Caltrans' Standard Plans, Traffic Manual, Highway Design Manual, MUTCD, and MUTCD California Supplement. WI LLDAN 22 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ Er rieerincg Servicos 2 ,:. - AA John Hidalgo, RLA, Principal Project Manager of Landscape Architectural Services, will serve as the Lead Landscape Architect. Mr. Hidalgo has more than 26 years of landscape architecture experience encompassing a variety of activities. These include design development, project management, client and agency coordination, and overseeing projects from conception through completion, as well as construction documentation and observation. He is familiar with various local, state and federal codes, regulations, procedures and standards relating to city planning, construction, safety, park and facility planning, and other building activities. He has successfully completed projects in compliance with these various standards, and while with other firms, has represented the Owner in the review process. Bryan Nguyen, RLA, Senior Landscape Architect, will assist Mr. Hidalgo with the landscape design and will be responsible for production of plans, specifications, and estimates (PS&E). Mr. Nguyen will be responsible for administering the various tasks involved with the landscape development. He has over 19 years of landscape and graphic design experience. Mr. Nguyen's experience includes the development of conceptual landscape plans and the preparation of construction documents, including specifications and estimates. David Knell, PLS, Principal Project Manager, will serve as the City's Land Surveyor. He will be responsible for all phases of survey work and right-of-way engineering. Mr. Knell has been involved in several large redevelopment projects, route surveys, and right-of-way surveying. Responsibility will rest with Mr. Knell to coordinate the proper integration of surveying information with design and to prepare any required legal descriptions and easement documents. Mr. Knell has more than 42 years of experience in the survey and mapping field. Mr. Knell will be assisted by the following survey team: Susy Barrientos, Survey Analyst (bilingual), will assist with survey services. Ms. Barrientos's duties include CAD drafting for various projects, including right-of-way drawings, subdivision maps, and other survey -related drawings. She also has experience with parcel maps, tract maps, and surveys. ManagementConstruction Chris Baca, RCI, Deputy Director of Construction Management, will coordinate the construction management services in the City of Rancho Palos Verdes. Mr. Baca has extensive experience in the construction management of large-scale public works projects. Mr. Baca will supervise, manage, and coordinate field personnel and their activities to ensure that all project requirements are met. He supervises a staff of 38 full-time managers/observers and a number of on-call observers; he will monitor the activities of the construction management team assigned to projects under contract to ensure that project construction files and documentation are complete. Mr. Baca has over 26 years of public works experience. Mike Bustos, PE, ENV SP, Senior Engineer is responsible for design and construction management of projects such as roadway reconstructions, drainage improvements, pipelines, pavement rehabilitation, street improvements, and grading. Mr. Bustos has served as resident engineer for over a dozen federally- and state -funded projects over the last five years. He has gained valuable experience in on-site construction management, off-site construction administration, inspection, design, and plan checking during his 13 years with Willdan. Steve Velasco, Senior Construction Manager, brings more than 25 years of experience as a Project Manager and Construction Manager on public works inspection, contract administration, and construction management projects. He has managed a variety of projects from pavement rehabilitation WI LLDAN I 23 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ Engineering Services to sports parks. Mr. Velasco is an ICBO Certified Building Inspector and licensed landscape contractor. Mr. Velasco has served as the key management individual for all job quality control, client relations, and staff administration. Jason Brown, RCI, Construction Manager, has 25 years of experience in public works observation. Mr. Brown will provide direct oversight of the public works construction observers assigned to the City's projects and will monitor personnel assigned to the various projects to assure proper construction management practices are provided. Ed Cox, Utility Coordinator, provides utility coordination services during the design and construction phases and will work closely with the utility companies. Mr. Cox understands public works construction, project schedules, and the importance of completing projects on schedule without utility delays. Mr. Cox possesses over 32 years of public works experience. Barry Knutson, Senior Public Works Observer has over 33 years of experience in the construction industry here in Southern California. He has worked as a Carpenter's Apprentice, Journeyman Carpenter, Carpenter Foreman, Estimator, Assistant Superintendent, Superintendent, Purchasing Agent, and more specifically as a Senior Construction Administrator on large scale Capital Projects throughout the County of Los Angeles for the last 12 years. Alberto Rosiles, Senior Public Works Observer, (bilingual) has over 31 years of construction observation experience. Mr. Rosiles' experience includes street rehabilitation projects in various cities where his responsibilities include quality control, quantity calculations, and project management. His areas of expertise includes AC heater remix, AC rubber paving, overlay, PCC, slurry seal, underground facilities, cast -in-place pipe, AC and PCC batch plant inspection, roadways, highways, bridges, landscape, and vertical construction. Danny Ayala, Senior Public Works Observer, has 35 years in public works inspection. His areas of expertise include ARHM and AC overlays, general street construction, storm drains, storm drain boxes, sewers, slurries, waterline, traffic signals, and ADA ramps. Many of these projects were federally funded by CDBG and ISTEA funding. Lee Marshall, Senior Public Works Observer, has 14 years in public works observation experience. His areas of expertise include ARHM and AC overlays, general street construction, storm drains, storm drain boxes, sewers, slurries, waterline, traffic signals, and ADA ramps. Many of these projects were federally funded by CDBG and ISTEA funding. Willdan has maintained a pool of 25 to 40 construction observers over the past 26 years, with numerous contracts on an as -needed basis. Ross Khiabani, PE, GE, Principal Engineer, will serve as Geotechnical Engineer. Mr. Khiabani has 35 years of professional experience in performing diversified geotechnical assignments involving soil mechanics and foundation engineering, soil stabilization, landslide analysis and stabilization, settlement evaluations, liquefaction studies, temporary and permanent slope stability analyses, laboratory testing, and onshore and offshore exploration. His familiarity with seismic -related geotechnical computer programs has enabled efficient slope stability, liquefaction, and site -response analyses. Girish Agrawal, JD, PhD, PE, GE, Principal Engineer has more than 20 years of experience with geotechnical engineering, investigation, design, and construction. He has worked on a wide spectrum of public infrastructure, and private commercial, residential, and industrial projects. His particular areas of expertise are seismic hazard analysis and mitigation, pile foundations, earthfills and earth retaining structures, and direct -push testing and sampling for assessment of subsurface conditions. Dr. Agrawal WI LLDAN I 24 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ E14neering Services J Aim has substantial experience with all stages of project planning, performance and management, including managing profit centers and practice areas. He has considerable experience in assisting clients shepherd projects through various city, county, and state review processes and is familiar with governing codes and requirements. Jane Freij, Supervising Labor Compliance Manager, will serve as Labor Compliance Manager for the contract. She will have direct supervision and full responsibility for all federal compliance activities, including managing and coordinating field personnel and maintaining contact with the contractor to ensure that all requirements are met. She will be fully responsible for the labor compliance file, ensuring that the files are properly maintained and assembled by the Labor Compliance Specialist. Ms. Freij has over 18 years of labor compliance experience. Diane Rukavina, PE, City Engineer, will serve as special funding administrator. Ms. Rukavina has 32 years of experience in municipal engineering. Presently, she serves as Project Manager on eight capital improvement projects for the Cities of Paramount and Hawaiian Gardens, and performs various city engineering -related tasks. Ms. Rukavina has processed over 45 federal and state funded projects (STPL, HSIP, SAFETEA-LU, ARRA, SRTS, and SR2S) from request for authorization to final invoicing for 22 cities. Currently, she is coordinating 35 federal and state funded projects at various stages in the funding process. The resumes of our key staff to be assigned to the City of Rancho Palos Verdes are presented in the Appendix. These individuals will be committed to this assignment indefinitely, unless otherwise approved by the City. WI LLDAN 25 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public works/ Er,,ineering Services a Willdan provides full service, in-house professional engineering services for many varied developmental and capital improvement projects, including residential and commercial developments, roadway, grading, drainage, water, sewer, major highway facilities, bridge structures, traffic signals, and signing and striping improvements. As such, we can perform On -Call General Civil Engineering Services requested by the City of Rancho Palos Verdes without the involvement of team sub -consultants. WI LLDAN I26 City of Rancho Palos Verdes Engineering StM.ernen; of Qualifications for Public Works/ Engineering Services Related Experience Over the past 51 years, Willdan has provided municipal services to more than 400 municipalities, for projects involving a broad array of disciplines. The following briefly summarizes some of the firm's relevant on-call services experience performed for various clients. "On Call" Professional Services - City of Rolling Hills Estates Willdan is currently providing civil engineering design, traffic engineering design, construction management, development review, pavement engineering, labor compliance, plan check services, landscape architecture, and surveying services throughout the City of Rolling Hills Estates. General Engineering Services — City of Paramount Willdan has been providing city engineering services to the Paramount for over 30 years, and presently serves as City Engineer and Water Engineer for the City of Paramount. In addition to providing staff augmentation services, Willdan has provided civil engineering, traffic engineering, agency engineering, landscape design services, surrey, contract administration, construction observation, utility coordination, federal labor compliance, pavement engineering, public works permits/inspection, development review, CIP design/inspection, CDBG administration, grant writing, and NPDES. Willdan has overseen the design and construction of more than $15 million in water system improvements for the City including the recent design and construction of two new wells. Other notable projects include the Railroad At -Grade Crossing Treatments at Paramount Boulevard/ Rosecrans Avenue project, which involved providing PS&E services for the removal of multiple at -grade Union Pacific Railroad crossing signals, and the Roundabout Design — Jefferson/Bixler and MadisonNirginia project, which involved providing PS&E services for the construction of various traffic circles. General Engineering Services - City of South Gate Willdan has been providing the City of South Gate with as -needed professional consulting services since 1994, and presently provides professional engineering services for various public works projects. Willdan provides design engineering and architecture, construction management and inspection, staff augmentation, geotechnical engineering, surveying, special funding administration, plan check, right-of- way acquisition (with legal description), assessment district engineering, and community development services throughout the City of South Gate. Willdan oversaw the design and construction of street improvements for the California Avenue Improvement Project. Other notable projects include the construction of Water Well No. 28, Otis Avenue Improvements, and Atlantic Boulevard projects. Engineering Services — City of Lakewood Willdan provides on-call engineering services to the City of Lakewood. Services include city engineering, civil and traffic engineering design, survey, contract administration, construction observation, engineering support, monument restoration, utility coordination, material testing, Caltrans award and invoicing, and federal labor compliance and support staff at City Hall. Willdan provided services for street improvement projects such as the South Street Rehabilitation, Centrelia Street Rehabilitation, Bloomfield Avenue Street Improvements, and the street resurfacing, seven street segments. General Engineering Services, City of La Puente Willdan is currently providing as -needed city and traffic engineering services to the City of La Puente. In addition to serving as the City Engineer and City Traffic Engineer, Willdan also provides engineering design, construction management, project management, development review, pavement engineering, funding administration, plan check services, landscape architecture, surveying, and geotechnical engineering services throughout the City of La Puente. Notable Willdan projects in the City include providing construction management services for the Sewer Phase III, Hacienda Boulevard M/WI LLDAN I 27 City of Rancho Palos Verdes Engineering St7fcrnent of Qualifications for Public Works/ C�erina :services Improvements, Glendora Avenue Improvements, and Street Reconstruction projects. Also, Willdan provided engineering design services for the Valley Boulevard Wall, SR2S Improvements, HSIP Traffic Signal, and ARRA projects. As -Needed Engineering Services, City of Inglewood Willdan Engineering was selected to provide as -needed professional engineering services for the City of Inglewood. Services include civil and traffic engineering services for street improvement projects such as the La Cienega Boulevard Improvement project. Willdan Engineering provided professional on-call traffic engineering services to the City of Inglewood for various projects including ITS phase IV Project; La Brea Avenue TLSP Project; Annual traffic signal Improvements projects and the METRO Crenshaw/LAX LRT Project. As part of the on-call traffic engineering services we attended meeting, coordinated with other consultant, developed studies and PS&E for the implementation of numerous traffic engineering projects. Willdan provided construction management, inspection, material testing, labor compliance, federal invoicing, and survey for the City of Inglewood's $3.5 million La Brea Avenue Phase III Street Beautification Project. The project included new landscaped medians, traffic signal upgrades, curb/gutter, sidewalks, decorative paving, street overlay, street removal and replacement, and other appurtenant work. AAV W1 LLDAN 2$ City of Rancho Palos Verdes Engineering S,at.E,rnenf of 0ii ilificaiior'is for Pi)blic 1Norks/ EEicineering Services 48 References Contact: I Mr. Chris Cash, Public Works Director, (562) 220-2020 Services City Engineering, Traffic Engineering, Water Engineer, Public Works Permits/Inspection, Development Review, CIP and Facilities Design/Inspection, CDBG Administration, Grant Writing, NPDES, Geotechnical Engineering, Community Development, Survey, Landscape Architecture, Construction Management, Right-of- Wav Enaineerina, Map Plan Check. Contact: Mr. David Carmany, City Manager, 626 855-1563 Services City Engineering, Civil Engineering Design, Traffic Engineering Design, Funding Administration, Development Review, Geotechnical Engineering, Survey, Landscape Architecture. Construction Manaaement. Buildina and Safetv Services. Contact: Ms. Lisa Rapp, Director of Public Works, 562 866-9771 Services City Engineering, CIP Design, Project Management Services, Construction Management/Inspection, Pavement Management System, Traffic Engineering, Survev, and Landscape Architecture. Contact: Mr. Ernesto Marquez, City Administrator, 562 420-2641 Services City Engineering, Civil Engineering Design, Traffic Engineering Design, Landscape Architecture, Construction Management/Observation, Program/Funds Administration, S u rvev. Contact: Mr. Greg Grammer, Assistant City Manager, 310 377-1577 Services Civil Engineering, Traffic Engineering, Construction Management, Development Review, Pavement Engineering, Labor Compliance, Plan Check, Landscape Architecture, Survevina WI LLDAN I 29 City of Rancho Palos Verdes Engineering Statement of Quid ifications for Public Works/ E1149 nr,g services p r f t � • � � ♦ 1 � � � W � rte^ A' �� , �' � � � "a., A- Schedule of Hourly Rates WILLDAN ENGINEERING W"WI LLDAN Schedule of Hourly Rates Effective July 1, 2015 to June 30, 2016 Technical Aide 1 59.00 Labor Compliance Specialist 105.00 Senior Construction Permit Specialist 110.00 Technical Aide II 75.00 Labor Compliance Manager 131.00 Supervising Construction Permit Technical Aide III 93.00 Utility Coordinator 138.00 Specialist 115.00 Drafted 94,00 Assistant Construction Manager 131.00 Building Inspector* 115.00 Drafter 11 110.00 Construction Manager 156.00 Supervisor Code Enforcement 126.00 Senior Drafter 12L00 Senior Construction Manager 164.00 Senior Building Inspector 126.00 GIS Analyst 1 126.00 Project Manager IV 181.00 Plans Examiner 126.00 GIS Analyst 11 143.00 Deputy Director 200.00 Supervising Building Inspector 138.00 GIS Analyst 111 159.00 Director 203.00 Senior Plans Examiner 138.00 Designer 1 126.00 ® Inspector of Record 154.00 Public Works Observer 11 81.00 Deputy Building Official 154.00 Designer II 131.00 Public Works Observer II** 89.00 plan Check Engineer 154.00 Senior Designer 1 138.00 Senior Public Works Observer I 97.00 Building Official 159.00 Senior Designer II 145.00 Senior Public Works Observer II* 108.00 Supervising Plan Check Engineer c , 15-) 00 Assistant Engineer I 98,00 Senior Public Works Observer III * 116.00 Principal Project Manager 190.00 Assistant Engineer It 105.00 Senior Public Works Observer IV* 123.00 Deputy Director 200.00 Assi tant Engineer III 116.00 Senior Public Works Observer V* 131.00 Director 203.00 Assistant Engineer IV 125.00 a Associate Engineer)CEMENNOMMMM 132.00 Survey Analyst) 110.00 Associate Engineer 11 139.00 Survey Analyst II 126.00 Community Development 93.00 Associate Engineer 111 146.00 Calculator 1 110.00 Technician 93.00 Planning Technician Design Manager 148.00 Calculator II121.00 Assistar: Planner 115.00 Senior Design Manager 156.00 Calculator III 1:232.01) Assistant Community Development Senior Engineer 149.00 Senior Survey Analyst 143.00 Planner 115.00 Senior Engineer II g 154.00 Supervisor - Survey & Mapping 164.00 Associate Community Development Senior Engineer III 160.00 Principal Project Manager 190.00 Planner 126.00 Senior Engineer IV 173.00 IN Associate Planner 126.00 Supervising Engineer 177.00 Assistant Landscape Architect 110.00 Senior Community Development 143'00 Project Manager) 135.00 Associate Landscape Architect 126.00 Planner Project Manager II 157.00 Senior Landscape Architect 138.00 Senior Planner 143.00 Project Manager 111 174.00 Principal Landscape Architect 159.00 Principal Community Development 159.00 Project Manager IV 190.00 Principal Project Manager 190.00 Planner e ® Principal Planner 159.00 Program Manager 195.00 Assistant Code Enforcement 77 Deputy Director 200.00 Traffic Engineer I 175.00 Off icer .00 Director 203.00 Traffic Engineer II 190.00 Plans Examiner Aide 83.00 , e City Engineer 1 190.00 Assistant ConstrllCtian Permit City Engineer 11 200.00 Specialist 93.00 Administrative Assistant 1 68.110 Principal Project Manager 190.00 Construction Permit Specialist 58,00 Administrative Assistant II 83.00 Deputy Director 200.00 Code Enforcement Officer 88.00 Administrative Assistant 111 97.00 Project Accountant 78.00 Director 203.00 Assistant Building Inspector* 105.00 9100 Principal Engineer 221.00 Senior Code Enforcement Officer 105.00 Project Accountant If Mileage reimbursement will be charged at the emtent Federal guideline rate at the time of billing. Vehicles will be charged at a monthly rate of 5500.00- ' S13E per hour ror Prevailing Wage Project Additional billing classifications may be added to the above listing during the year as new positions are created. Consultation in connection with litigation and court appearances will be quoted separately. The above schedule is for straight time. Overtime. will he charged at 1.5 times, and Sundays and holidays, 20 times the standard rates. Blueprinting, reproduction, messenger services, and printing will be invoiced at cost plus fifteen percent (15%). A sub consultant management fee of fifteen percent(15%) will be added tothe direct cost of all sub consultant services to provide for the cost of administration, consultation, and coordination. Valid July 1, 2015 thru June 30, 2016, thereafter, the rates may be raised once per year to the value of change of the Consumer Price Index for the Los Angeles/Orange County/Sacramento/San Francisco/San lose area, but not more than five percent per year. Rev.1 09.01.2015 WILLDAN so City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ En ne rind Services try WILLDAN Soil Technician (Non -prevailing Wages) 80.00 Sr. Soil Technician (Non -prevailing Wages) 90.00 Soil Technician (Prevailing Wages) 110.00 Sr. Soil Technician (Prevailing Wages) 110.00 Assistant Engineer III/Geologist Iii 116.00 Associate Engineer II/Geologist II 139.00 Senior Engineer III/Geologist II 160.00 Supervising Engineer/Geotechnical Engineer/Geologist 177.00 Principal Engineer/Geologist 221.00 P. -3,1108"T"1011— 3?3 yN {{S fiAk i 1 �S7 ttdY 1�� l'1S ,> Special Inspection (Non -Prevailing Wages) 75.00 Special Inspection (Prevailing Wages) 110.00 Supervisor 125.00 Construction Material Engineer 160.00 h WILLDAN GEOTECHNICAL Fee Schedule -Personnel Effective July 1, 2015 to June 30, 2016 Administrative Assistant 1 68.00 Administrative Assistant 11 83.00 Administrative Assistant III 97.00 Senior Drafter/CAD Operator 121.00 Principal Engineer/Geologist 350.00 Staff assignments depend on availability of personnel, site location, and the level of experience that will satisfy the technical requirements of the project and meet the prevailing standard of professional care. The above schedule is for straight time. Overtime will be charged at 1.5 times, and Sundays and holidays, 2.0 times the standard rates. Travel time to and from the job site will be charged at the hourly rates for the appropriate personnel. Blueprinting, reproduction, messenger services, and printing will be invoiced at cost plus fifteen percent (15%). A subconsultant management fee offifteen percent (15%) will be added to the direct cost of all sub consultant services to provide for the cost of administration, consultation, and coordination. Mileage/Field Vehicle usage will be charged at the rate of $.575/mile or $5 per hour, subject to negotiation. The rates will be subjected to a 4% annual escalation and will be automatically adjusted in the invoices. VVWILLIDAN I 31 City of Rancho Palos Verdes Engineering Statement of Qualifications for Pudic Works/ Cr5lering Services Ni ! h I ` -* Ali WI LLDAN In -Situ Moisture and Density (ASTM D2937) 20.00 Grain Size Analysis (ASTM D422) 70,00 Sieve Only (3" to #200) One Point 75.00 Specific Gravity (ASTM D854) 75.00 Sand Equivalent (ASTM D2419) 75.00 Percent Passing #200 Sieve (ASTM D1140) 50.00 Atterberg Limits (ASTM D4318) Multi Point 110.00 Sieve and Hydrometer 120.00 Modified Proctor Compaction (ASTM D1557) 165.00 Method A or B (4" Mold) 50.00 Method A or B (6" Mold) 175.00 Compaction, California 216 180.00 R -Value 250.00 California Bearing Ratio CBR (ASTM D1883) 450.00 3 points 70.00 Torvane/Pocket Penetrometer 15.00 Direct Shear - per point 85.00 Consolidated -Drained per pt. (ASTM D3080) Residual per pt 120.00 Unconfined Compression (ASTM D2166) 120.00 Unconsolidated -Undrained (UU) 150.00 Wash Gradation 100.00 Extraction/Asphalt 185.00 HVeem/Mar5hall Maximum Density 220.00 WILLDAN GEOTECHNICAL Laboratory Foos Effective July 1, 2095 to June 30, 2016 Additional load increment 25.00 Additional Time rate per load increment 50.00 Single point (collapse test) 50.00 Remolded sample per specimen 50.00 Single Load Swell (ASTM D4546) 70.00 Ring sample, field moisture 60.00 Ring sample, air dried 70.00 Expansion Index (ASTM D4829/UBC 29-2) 12S.00 Consolidation (ASTM D2435) 160.00 8 load increments w/ane time -rate Constant Head (ASTM D2434) 235.00 Falling Head Flexible Wall (ASTM D5084) 285.00 Triaxial Permeability (EPA 9100) 330.00 Organic content (ASTM D2974) 70.00 Corrosivity (pH, resistivity, sulfates, chlorides) 165.00 Concrete Test Report 12.00 6 X1Z Concrete Cylinder (C39) 25.00 2", 4", 6" Diameter Concrete Cores (Test Only) 25.00 Mortar and Grout, Cylinder and Cubes 25.00 Cylinders Pick-up 45.00 Reinforcing Steel, Tensile and Bend Tests 60.00 Unit rates presented are for roatineiy performed geotechtical and construction material laboratory tests_ Other tests can be performed in our laburatory, inCuding rock core, soil cement, and soil ime tests. Additional tests wilt be quoted on request. The rates will remai n fi tm fora period of 120 days from the date of this submittal. Unit rates presented herein assume samples are uncontaminated and do notconta=n heavy metals, acids, carcinogens, or volatile organic comWu rids that can be measured by an OVA or PID with concentrations greater than 50 ppm. W ilidan wit! not accept contaminated samples. Uncoatannated samples will be disposed of 30 days after presentation of test resuts. The rates will be wbjerted toa A%annual escalation and will be;mtoucibcally adjusted in the i=moires. AV VWILLDAN I 32 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ Dur -2 -Ing Services Insurance WILLDAN shall maintain in force at its own cost and expense at all times during the performance of this agreement (except as noted under Professional Liability Insurance) the following policy or policies of insurance: 1. Workers' Compensation and Employer's Liability Insurance as prescribed by applicable law. 2. Comprehensive General Liability Insurance (bodily injury and property damage), the limits of which shall not be less than one million dollars ($1,000,000) combined single limit per occurrence and annual aggregate. 3. Automobile bodily injury and property damage liability insurance, the limits of which shall not be less than one million dollars ($1,000,000) combined single limit per occurrence. Such insurance shall extend to owned, non -owned and hired automobiles used by CONSULTANT's employees, agents or assigns in the performance of this contract. 4. Design Professional Liability Insurance covering negligent acts, errors or omissions of CONSULTANT, the limits of which shall not be less than one million dollars ($1,000,000) per occurrence and annual aggregate. Each insurance policy required by this Agreement shall provide for thirty (30) days prior written notice of cancellation to the AGENCY. Each insurance policy required by this Agreement, excepting policies for Workers' Compensation/Employer's Liability and Professional Liability, shall name the AGENCY, its officials and employees as additional insured and be primary and in excess of any coverages carried by the AGENCY. Prior to commencement of any work under this Agreement, WILLDAN shall deliver to the AGENCY insurance certificates confirming the existence of the insurance required by this Agreement, indicating policy expiration dates and including the applicable provisions referenced above. WILLDAN I 33 City of Rancho Palos Verdes Engineering Siaisrneni of Qualific:aiions for Public Works/ [ r�n�c ring ;services a Appendix Staff Resumes W) LLDAN 34 City of Rancho Palos Verdes Engineering Sta.tWnent of Quadi icatioris for Pudic Works/ E54ering Services William C. Pagett, PE Senior Vice President/Director Of City Engineering Education As Senior Vice President/Director of City Engineering of Willdan Engineering, Mr. 1974, BS, Civil William C. Pagett, PE, oversees City Engineering Services in Los Angeles County. Engineering, California Mr. Pagett presently serves as City Engineer and Water Engineer for the City of State University, Long Paramount and as City Engineer for the Cities of Lakewood and La Puente. Mr. Beach Pagett also served as Acting Public Works Director in the City of Bell Gardens Registration administering transportation services and the solid waste program among other 1990, California, 46068, duties. He has previously served as Acting Water Utility Director for the City of Civil Paramount. Mr. Pagett also serves as one of the appointed Public Works Officials on Affiliations the Gateway Council of Government Transportation Committee and he is also the American Society of Civil Chairman for the Technical Advisory Committee for the 1-710 Freeway Master Engineers Investment Study. He has also previously served on the Executive Advisory Committee for the Los Angeles County NPDES Program, and currently administers American water works the City of Paramount's NPDES program. Association To his credit, Mr. Pagett has overseen the design and construction of more than $15 American Public Works million in water system improvements for the City of Paramount. Notable projects Association have included the design and construction of two new wells that involved drilling, Los Angeles City and housing, pump facilities, and telemetry systems. Mr. Pagett has overseen the design County Engineers and construction of more than 50,000 -linear feet of water mains for the City of Bell Gateway COG - Public Gardens including the $2.5 million domestic water well. Working closely with both Works Group cities, Mr. Pagett has provided project administration and coordination for more than $120 million in public works improvements, including the $8 million Alondra Boulevard Gateway COG Transportation Committee Grade Separation in the City of Paramount. He is also responsible for reviewing — Public Works Appointee current water, sewer, and storm drain projects to ensure that the Master Plan intent is maintained. Mr. Pagett has over 48 years of experience in his field of City 48 Years' Experience Engineering Services. Project Management Experience Includes: ■ Street Reconstruction 0 Concrete Repairs ■ Street Widening ■ Entrance Signs ■ Medians 0 Landscape Improvements ■ Storm Drains ■ Park Improvements ■ Overlay and Slurry Seal 0 Right -of -Way Acquisition ■ Sewers 0 Public Facility Improvements ■ Waterlines ■ Traffic Signals Special Project Experience Includes: ■ assessment district engineering ■ infrastructure studies ■ NPDES and ADA programs ■ water, storm drain, and sewer master plans • pavement management reports • development of funding programs • expert witness ■ FEMA Flood Programs -IO/W I LLDAN I 35 City of Rancho Palos Verdes Engineering Statement of Qualifications for Pudic Works/ Pr5&ring Services Adel M. Freij, PE Principal Project Manager Education Mr. Adel M. Freij, PE, is an accomplished project manager and construction manager BS, Civil Engineering for large-scale multi -discipline public works projects who is recognized for providing University of Missouri, innovative quality engineering and construction management services and meeting Kansas City clients' project budgets and schedules. A Principal Project Manager for Construction Resident Engineer Management and City Engineering, Mr. Freij has 26 years of engineering and Academy construction management experience on many types of Capital Improvement Projects, including street reconstruction, street widening, overlay and slurry seal, Registration bridge construction, flood control and drainage, water and sewer improvements, traffic Registered Civil Engineer, signals, signing and striping, and landscape and park improvements. Mr. Freij is California, No. 55564 proficient at managing multiple subconsultants and combining various disciplines, often acting as an extension of Agency/City staff to provide close overall supervision Affiliations of the engineering and construction management services on local, state, and American Society of Civil federally funded projects. Engineers American Public Works Relevant Project Experience Association City of South Gate, California Avenue Improvements - Project/Construction Construction Management Manager for the design and construction management services for the California Association of America Avenue Street Improvement project, with limits from the north city limit to the south Los Angeles City and city limit. The project included asphalt -rubber hot mix (ARHM) overlay, concrete County Engineers repairs, access curb ramps in compliance with ADA requirements, video detection, Association LED, communication conduits, street lighting, and signing and striping. California 26 Years' Experience Avenue is a key corridor in the City of South Gate that serves the Civic Center, where City Hall and the Police Department are located, and fronts various residential and commercial properties. Willdan's services included civil and traffic engineering design, pavement engineering, contract administration, construction observation, utility coordination, monument restoration, material testing, and federal labor compliance. The project was funded by STPL federal funds, Proposition C, and Gas Tax funds. City of Culver City, Sepulveda Boulevard Widening. Project Manager for delivery of conceptual design, preparation of construction drawings and technical specifications for a major street widening on Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. The project included: pavement rehabilitation, concrete repairs and ADA access curb ramps, landscape and irrigation improvements, traffic signal modifications, traffic signal interconnect, signing and striping, and street lighting improvements. Sepulveda Boulevard is a major corridor parallel to the 405 Freeway through Culver City with an average traffic count of 50,000 vehicles. Sepulveda Boulevard is an alternate route for access to Los Angeles International Airport. This project was done to alleviate an existing bottle -neck and to provide for a third southbound lane within the existing right-of-way. A portion of the project was located in the City of Los Angeles and Caltrans right-of-way. Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering, and utility coordination. Los Angeles Gateway Region, LA River Catch Basin Retrofit. Project Manager for construction management services for the installation of full capture catch basin trash and debris system. The catch basins are located within the Los Angeles River Watershed of 16 Gateway cities. The project is funded by the economic stimulus funds from the State Water Resources Control Board under its Clean Water State Revolving Fund Program. Willdan services included contract administration, construction observation, State Water Resources Control Board invoicing, and federal labor compliance. WI LLDAN I 36 City of Rancho Palos Verdes Engineering Staternent of Qualifications for Public Works/ E1 6 ring Services Adel M. Freij, PE City of Maywood, Local Street Rehabilitation. Project Manager for construction Continued management services for the Local Streets Rehabilitation project on 52nd Street, from Maywood Avenue to Corona Avenue, and on Randolph Street, from Atlantic Boulevard to west city limit. The project general items of work included Asphalt Rubber Hot Mix (ARHM) overlay, cold milling, concrete repairs, curb ramps in compliance with ADA requirements, roadway striping, and traffic loop replacement. Willdan services included contract administration, construction observation, utility coordination, engineering support, and material testing. City of La Puente, Street Rehabilitation (ARRA 1 Savings). Project Manager for the design services for the Street Rehabilitation (ARRA 1 Savings) project. The project included engineering design, project management, and funding administration to prepare the request for authorization to proceed with construction (E-76) services for the street improvements on the following streets: Loukelton Street, from Hacienda Boulevard to east City limit; Unruh Avenue, from Amar Road to Hacienda Boulevard. The project included the following improvements: resurfacing of streets with Asphalt - Rubber Hot Mix (ARHM); reconstruction of existing damaged and uplifted concrete sidewalk, curb and gutter, portion of cross gutter, and drive approaches; reconstruction of existing damaged A.C. pavement; installation of new access curb ramps in compliance with the Americans with Disabilities Act (ADA) requirements; including truncated domes; and installation of traffic signal loops and signing and striping.. City of La Puente, Hacienda Boulevard Improvement Project. Project Manager for construction management services for the Hacienda Boulevard Improvement Project, from Nelson Avenue to Amar Road. The project general items of work included Asphalt Rubber Hot Mix (ARHM) overlay, cold milling, pavement reconstruction, concrete repairs, curb ramps in compliance with Americans with Disabilities (ADA) requirements, and pavement markings. Willdan services included contract administration, construction observation, utility coordination, funding administration, federal labor compliance, and material testing. The project was federally funded by the ESPL funds. City of La Puente, Glendora Avenue Improvement Project. Project Manager for construction management services for the Glendora Avenue Improvement Project, from Temple Avenue to Hacienda Boulevard. The project general items of work included Asphalt Rubber Hot Mix (ARHM) street resurfacing, cold milling, concrete repairs, curb ramps in compliance with Americans with Disabilities (ADA) requirements, and pavement markings. Willdan services included contract administration, construction observation, utility coordination, funding administration, federal labor compliance, and material testing. The project was federally funded by the ESPL funds. City of La Puente, Sewer Improvements — Phase III Project. Project Manager for construction management services for the Sewer Improvements — Phase III Project, on various City streets. The project general items of work included replacement of the existing sanitary sewers with larger diameter sewers, reconstruction of sewer laterals and repaving of streets. The work also includes installation of a new sewer and manhole on Nelson Avenue between Willow Avenue and Adrilla Avenue. Willdan services included contract administration, utility coordination, and construction observation. WI LLDAN 37 City of Rancho Palos Verdes Engineering >taternent of Qualifications for Public Works/ E:,r— ring Services Structure Design Manager, 1-805 Carroll Canyon Road Bridge Caltrans' Design Oversight Project, San Diego, California. As Caltrans' oversight Structure Design Manager, worked closely with District 11 Contract Manager to administer a SANDAG- funded consultant task order. This task order's objective was to design a multi -span post -tension reinforced concrete bridge along with various specialty -designed retaining walls. Successfully negotiated with consultants on various consultant task order contracts and amendments, which included discussing project scope and schedule, reviewing consultant submittals and cost estimate, preparing independent cost estimates and record of negotiations. Riverside Drive Viaduct Replacement Project over LA River, Los Angeles, CA: Lead Bridge Resident Engineer/Structure Representative providing construction management services to the City of LA DPW Bureau of Engineering Bridge Improvement Division. Partnered with the LA Bureau of Contract Administration and the contractor to build a multi -span viaduct over LA Metro tracks and the LA River. Estimated cost: $40 million. 1-15/1-215 Devore Interchange Design -Build Improvement Project, San Bernardino, CA: Lead Structure Manager on cross -functional project development team coordinating structural design and construction portion for $290M Major Interchange Design -Build pilot project. Estimated cost: $290 million VVWILLDAN I 38 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ EI -5. ring Services Newton Armstrong, PE Director ®f Engineering Education Mr. Newton Armstrong, PE, Mr. Armstrong manages improvement projects for MBA, Consulting various agencies and municipalities. Mr. Armstrong has served as project manager Concentration, University for various projects such as rail design and bridges. Mr. Armstrong has over 15 years of California, Irvine of engineering experience. MA, Christian Apologetics Relevant Project Experience (Theology), Biola University, La Mirada, Project Manager, Templeton to Atascadero Connector Grade Separation, California Templeton, California. Served as Wilson & Company's Project Manager providing rail design services to the Tetra Tech Project Manager. This project studied a BA, Structural proposed grade separation for the UPRR tracks over a Private Road in the City of Engineering, University of Templeton, CA. Managed Wilson's project budget, ensuring that the proper resources California, San Diego where available for each task, and overseeing the coordinating efforts between Registration Wilson's project delivery team and the prime consultant. Registered Civil Engineer, California, No. C56367 Project Manager, Whatcom Waterway Clean-up & Marina Development, Port of Bellingham, Washington. Served as Wilson & Company's Project Manager Affiliations providing rail design services to the Anchor QEA, LLC. This project studied a American Society of Civil proposed concept for a BNSF railroad industrial spur. The rail design concept met the Engineers 10% concept layout requirements per the BNSF Industrial track guidelines. This role American Public Works included managing Wilson's project budget and ensuring that the proper resources Association where available for each task. Construction Management Association of America Project Manager, Park Place Extension Grade Separation, EI Segundo, Los Angeles City and California. Served as Wilson & Company's Project Manager providing rail design County Engineers services to the NCM Engineering Project Manager. This project studied a proposed Association grade separation for the BNSF and UPRR tracks over Park Place in the City of EI Segundo. Managed Wilson's project budget, ensuring that the proper resources 15 Years' Experience where available for each task, and overseeing the coordinating efforts with UPRR and BNSF for track design approval, and writing the final rail options report. Structure Design Manager, 1-805 Carroll Canyon Road Bridge Caltrans' Design Oversight Project, San Diego, California. As Caltrans' oversight Structure Design Manager, worked closely with District 11 Contract Manager to administer a SANDAG- funded consultant task order. This task order's objective was to design a multi -span post -tension reinforced concrete bridge along with various specialty -designed retaining walls. Successfully negotiated with consultants on various consultant task order contracts and amendments, which included discussing project scope and schedule, reviewing consultant submittals and cost estimate, preparing independent cost estimates and record of negotiations. Riverside Drive Viaduct Replacement Project over LA River, Los Angeles, CA: Lead Bridge Resident Engineer/Structure Representative providing construction management services to the City of LA DPW Bureau of Engineering Bridge Improvement Division. Partnered with the LA Bureau of Contract Administration and the contractor to build a multi -span viaduct over LA Metro tracks and the LA River. Estimated cost: $40 million. 1-15/1-215 Devore Interchange Design -Build Improvement Project, San Bernardino, CA: Lead Structure Manager on cross -functional project development team coordinating structural design and construction portion for $290M Major Interchange Design -Build pilot project. Estimated cost: $290 million VVWILLDAN I 38 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ EI -5. ring Services Newton Armstrong, PE Various Caltrans —District 8 Structure Construction Projects, San Bernardino, Continued CA: Supervising Branch Chief (acting) supervised a staff of 14 structure construction field engineers. Organized and managed the Branch administrative system, which allowed more efficient staff administration and easier supervisor transition. Provided Area Construction Manager with detailed reports on $123M San Bernardino Metro area workload. Universal City Freeway OC, LA Metro, Los Angeles, CA: Caltrans' oversight structure representative on steel box girder bridge interchange. Ensuring Metro CM consultant performed proper structure construction contract administration on one of the few steel box girder structures in Southern California. Estimated cost: $36 million. Alameda Corridor, Mid -Corridor Rail Cargo Expressway, ACTA, Carson, CA: Performed construction oversight of Contractor's Quality Control/ Quality Assurance program on $712 million Mid -Corridor Rail Cargo Expressway. Assimilated structural information from general technical provisions and construction plans to assess whether QC inspectors performed needed inspection of structural items. Wrote detailed field engineering reports and surveillance reports using the latest Project Management software pertaining to on-going construction activities. 'WI LLDAN ( 39 City of Rancho Palos Verdes Engineering St.afernent of Qualifications for Public Works/ EIZE -ring Services City of Brea, California. Storm Drain Master Plan. Project Manager. Responsible for oversight of project team preparing a master plan of drainage that will assess the storm drain system's adequacy for handling storm water run-off; compile available City and county records into a GIS format which will then be used in system modeling activities and to produce a working tool for the city staff when complete. Updated hydrologic data for the region will be incorporated and storm runoff conditions and flows will be defined. This data will be used in the hydraulic modeling to evaluate system capacities and/or deficiencies. Resulting deficiencies will be validated and costs/priorities developed for establishing a CIP plan and schedule for the city to use in their annual project planning. A final report will be prepared for adoption as the updated master plan. Sewer System Management Plan, City of Covina, California. Mr. Wellington served as project manager. Willdan was retained to assist the City in accomplishing compliance with the State Depart of Water Resources Order No. 2006-0003-DWQ "Statewide General Waste Discharge Requirements for Sanitary Sewer Systems." Compliance requires each sewer entity to develop and implement a Sewer System Management Plan (SSMP). The process involved review and evaluation of all sewer system related codes, practices, mapping, reporting, financing and public information -A'(WI LLDAN 40 City of Rancho Palos Verdes Engineering Staferrnent of Qualifications 'or Public Works/ E61& ring Services Ray Wellington, PE Deputy Director Engineering Services Education Mr. Ray Wellington joined Willdan in 2006 and brings an extensive and diverse BS, Civil Engineering, background to the team. Mr. Wellington has served both public and private entities in California State Polytechnic such roles as designer, traffic engineer, project manager, construction manager, University, Pomona consulting engineer, city engineer, public works director, general manger, and owner. Graduate Courses in Public These various roles have involved coordination with boards, councils, commissions, Administration, and various clients, committees, staffs and stakeholder interest groups. Mr. Wellington has technical and managerial performed numerous infrastructure planning, funding, design and construction seminars and workshops improvement projects. Within these roles he has also addressed development siting, Resident Engineer project economics and funding, rates and fees, mapping, agreements, facility academy (UC -ITS) integration, construction, occupancy, and maintenance of facilities. On occasion he has dealt with matters of litigation, arbitration, regional wastewater agreements, water Registration conservation, recycled water usage, and historic water rights in both groundwater Civil Engineer, California, basins and surface flows. He has also performed groundwater management and No. 25131 negotiations. Registered Traffic Engineer, California, No. 00958 Mr. Wellington's specific experiences in storm water/sanitary sewer/potable water projects ranges from initial project planning, scoping, design oversight, plan and Affiliations specification reviews, bidding process, construction management and inspection. His American Society of Civil most recent experiences have involved: feasibility studies for sewers, recycled water Engineers - Various offices use, drainage improvements, development of sewer system management plans, and and committees the related permitting and inter agency coordination required for such projects. He City and County Engineers has also been involved in the funding evaluations and rate and fee evaluations for Association - Past Pres. such improvements. and committee chairs Institute for the Relevant Project Experience Advancement of LA County DPW. Marina Del Rey Sewer Odor Abatement. Project Manager. Engineering Honorary Responsible, in a teaming arrangement with PACE Advance Wastewater Engineering, membership for evaluating, identifying, and quantifying a treatment method to eliminate sewer odor American Water Works (H2S) from a slow flowing gravity system and force main combination within the sewer Association system. A scope of work including bench testing and equipment changes has been approved, but existing lift station facilities are limiting some options. Willdan is American Public Works Association evaluating optional courses of action in order to proceed with the project intent of odor elimination. 42 Years' Experience City of Brea, California. Storm Drain Master Plan. Project Manager. Responsible for oversight of project team preparing a master plan of drainage that will assess the storm drain system's adequacy for handling storm water run-off; compile available City and county records into a GIS format which will then be used in system modeling activities and to produce a working tool for the city staff when complete. Updated hydrologic data for the region will be incorporated and storm runoff conditions and flows will be defined. This data will be used in the hydraulic modeling to evaluate system capacities and/or deficiencies. Resulting deficiencies will be validated and costs/priorities developed for establishing a CIP plan and schedule for the city to use in their annual project planning. A final report will be prepared for adoption as the updated master plan. Sewer System Management Plan, City of Covina, California. Mr. Wellington served as project manager. Willdan was retained to assist the City in accomplishing compliance with the State Depart of Water Resources Order No. 2006-0003-DWQ "Statewide General Waste Discharge Requirements for Sanitary Sewer Systems." Compliance requires each sewer entity to develop and implement a Sewer System Management Plan (SSMP). The process involved review and evaluation of all sewer system related codes, practices, mapping, reporting, financing and public information -A'(WI LLDAN 40 City of Rancho Palos Verdes Engineering Staferrnent of Qualifications 'or Public Works/ E61& ring Services Ray Wellington, PE dissemination. The objective was to develop a composite reference and training Continued guideline for regular use by the City in meeting its sewer system operation and maintenance criteria and to prevent/reduce the risks associated with sanitary sewer overflows and their impact on the community. 41A/WILLDAN Engineering Sewer System Management Plan, City of Lynwood, California. Mr. Wellington directed the research, coordination and development of the required SSMP in response to the 2006 order of the SWRCB. The objective is development of a composite reference and training guide for regular use by the city in meeting its sewer operations and maintenance criteria and policies to reduce the risks associated with SSO. Such development involves review and evaluation of all sewer system related codes, policies, design practices, mapping, reporting, financing, and public information and involvement. It also requires a hydraulic evaluation of the sewer system for capacity assurance and critical maintenance issues. The work also included the development of GIS mapping and data base files. Sewer System Management Plan, City of South Gate, California. Mr. Wellington served as project manager. Willdan was retained to assist the City in accomplishing compliance with the State Department of Water Resources Order No. 2006-0003- DWQ "Statewide General Waste Discharge Requirements for Sanitary Sewer Systems." Compliance required each sewer entity to develop and implement a Sewer System Management Plan) SSMP. The process involved review and evaluation of all sewer systems related codes, policies, practices, mapping, reporting, financing and public information discrimination. The objective was to develop a composite reference and training guidelines for regular use by the City in meeting its sewer systems operations and maintenance criteria and to prevent/reduce the risk associated with sanitary sewer overflows and their impact on the community. Sewer System Management Plan, City of Sierra Madre, California. Mr. Wellington directed the research, coordination and development of the required SSMP in response to the 2006 order of the SWRCB. The objective is development of a composite reference and training guide for regular use by the city in meeting its sewer operations and maintenance criteria and policies to reduce the risks associated with SSO. Such development involves review and evaluation of all sewer system related codes, policies, design practices, mapping, reporting, financing, and public information and involvement. The development process involved utilizing two subcontractors to clean, CCTV inspect and perform selected flow monitoring of the sewer system prior to modeling the hydraulics and evaluating various operations and maintenance issues. The project also involved updating the city's GIS map file for the sewer system. Design of Green River Road Sewer Line Replacement, City of Corona, California. Mr. Wellington directed the research, evaluation and design of the Green River Road sewer line replacement. The project involves 1,620 feet of new 20 -inch DIP sewer pipe, 7 manholes, a connection to an active pump station wet well facility and connections to 2 active manholes and 4 inflow sewer pipes. The project is located in an active secondary arterial roadway. 41 City of Rancho Palos Verdes Staiernen! of C,2ualificaiions for Public Works/ Ei e 4ering scrvices Peter Miessner, PE Project Manager II Education Mr. Peter Miessner has proven expertise in approvals, design and construction of large - BS, Civil Engineering, South scale infrastructure projects. He possesses an effective management style that Dakota State University contributes to the bottom line while exceeding contract expectations. He has managed Registration/Certification numerous high profile, complex projects where his proven leadership and teambuilding Civil Engineer, California No. skills have maximized employee productivity and client satisfaction. His experience with 42592 specific infrastructure includes local, state highways, bridges; light rail; river 23 Years' Experience improvements; master sewer system and treatment plant; master water system, wells, tanks and treatment plant; recycled water supply; agricultural pipeline relocation and supply; electric transmission towers, substation and agreements; high pressure gas mains; oil pipelines; master programming, scheduling and phasing; right of way; cost estimating; funding. Mr. Miessner has managed complex local- and state -funded transportation projects and understands the how to maneuver projects though the funding and permitting processes. He has worked with Caltrans on numerous projects. His experience includes managing site improvement projects for office complexes, hospitals, college campuses, and institutional projects some having included LEED ratings. Relevant Project Experience MTA Orange Line Extension, Brutoco Engineering & Construction, Inc.; Los Angeles County Metropolitan Transportation Authority, Los Angeles, California. Served as Field Liaison responsible for the daily work execution of the Project Team for this 4.5 mile long, $83 million BRT improvement project. Willdan provided professional engineering design and construction support services for the design/build project of the MOL Extension extending from the existing Chatsworth Station to the Canoga Station in the San Fernando Valley along Canoga Avenue. Willdan prepared and processed plans, specifications, and estimate for street widening, raised landscaped medians, irrigation system, ADA -compliant curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communication conduits, bus stations and parking facilities, and signing and striping improvements for the LAMTA and City of Los Angeles. A bike path (Class I bikeway), which included a pedestrian path, was designed and constructed within the Metro right-of-way from the terminus of the existing MOL bikeway/pedestrian path at Canoga Avenue, north to Lassen Street, and along Lassen Street to connect within the existing bike path on the east side of the existing Browns Creek drainage channel. The busway and bikeway cross at nine signalized intersections. . Wilson and Walker Creek Bridges, Phase II, County of Glenn, California. Serves as Senior Engineer for the improvements for State bridge replacement projects. Willdan is providing overall project management, utility coordination, and supplemental surveys as well as developing floodplain and hydraulic reports, NEPA and CEQA environmental documentation, and preparation of final roadway and bridge plans, specifications, and estimate documents for the Walker and Wilson Creek Low Water Crossing Bridge Replacement Projects. Culver City Station Plaza Design Phase 2, Exposition Metro Line Construction Authority, Culver City, California. (Role). {Responsibility}. Willdan will provide professional engineering design services based on a revised site plan dated 4/15/14 provided by the Authority (Expo). The scope work includes preparing a new concept site plan, updating and processing PS&E (Plans, Specifications and Estimates), and providing support to the Expo during construction. Previously prepared plans (RevO, 100% plans dated 10/31/13) will be used as a basis for preparing the new concept as well as the PS&E. AVLLDAN I 42 City of Rancho Palos Verdes Engineering Statement of Qualifications for PLAblic Works/ E_62-ing Services Peter Miessner, PE Various Roadway Improvements including Class II Bicycle Lanes, Various Agencies, Continued California and Arizona. Managed roadway projects that include Class II bicycle lanes. Projects include Copper Hill Drive, Commerce Center Drive, Henry Mayo Drive; Tatum Boulevard; Del Mar Heights Road, Mission Gorge Road; and San Elijo Road. Old Road Design, City of Santa Clarita, California. Performed utility relocation, right- of-way, and survey. The project had a multi -agency design team for $60 million major arterial roadway project that included Caltrans, Los Angeles County as well as design consultants and regional utilities. Project included complicated geologic, environmental, utility, and funding constraints. Services included roadway design, bridge design, river engineering, utility engineering, bikeway design, trunk sewer siphons, etc. Programming project phasing and geotechnical settlement were major issues. The Old Road serves as a major utility corridor for large diameter high pressure gas mains, oil lines. Magic Mountain Parkway Interchange, City of Santa Clarita, California. Integrated regional utilities with the design of a new major freeway interchange on Interstate 5. Utilities included large diameter high pressure gas mains, major power lines, 54 -inch diameter water supply line, regional water and recycled water mains, trunk sewers, regional communications lines, etc. Multiple agency coordination was required including Caltrans, Socal Gas, Oil Companies, Los Angeles County, City of Santa Clarita, Los Angeles County Sanitation District, Valencia Water Company, ATT, Time Warner, Edison Electric, Castaic Lake Water District and others. CR67 BR 11C0015, 11C0016, 11C0017, and 11CO0179 (Phase II), County of Glenn, California. Provide overall project management, utility coordination, and supplemental surveys, develop floodplain and hydraulic reports, NEPA and CEQA environmental documentation, and prepare final roadway and bridge PS&E documents. Effort to include preliminary engineering and environmental assessment necessary to complete the project design including finalizing the plans, specifications and estimate ready for bidding and complete the environmental documentation. McBean RTC Public Outreach, City of Santa Clarita, California. The City of Santa Clarita retained Willdan to provide planning and landscape architectural services for the expansion of the McBean RTC. Culver City Parking Lot Stage 11, Balfour Beatty Infrastructure, Inc. Balfour Beatty Infrastructure, Inc. retain Willdan to provide engineering and landscape architecture services for the Parking Lot Stage II expansion at the Exposition Line Station, City of Culver City. VWILLDAN I 43 City of Rancho Palos Verdes Engineering Statement of Quaiificaaons for Public Works/ E16,&-,ing Services Roxanne C. Hughes, PE Principal Project Manager Education Ms. Roxanne C. Hughes is a Principal Project Manager in the City Engineering BS, Civil Engineering, Technical Group at Willdan Engineering. She has worked in varying aspects of civil California Polytechnic engineering for 16 years. Her primary responsibilities include city engineering, project University, San Luis Obispo management, and pavement engineering. Ms. Hughes specializes in project Registration management, city engineering, pavement engineering, construction management, ■ City of Fillmore administration of federally -funded projects, and coordination and oversight of various Civil Engineer, California public works plan checking. No. 62381 Relevant Project Experience 16 Years' Experience Ms. Hughes performs a variety of City Engineering services on as -needed basis for various City and County agencies. Through the years, she has served as contract Associate Engineer, Project Engineer, Traffic Engineer, Environmental Services Manager and Stormwater Program Manager for different client agencies. Currently, Ms. Hughes is serving as the contract Deputy City Engineer for the City of Westlake Village. Serving as contract staff, Ms. Hughes has developed capability to function in the public agency context with a well rounded understanding of the city budgeting process, lines of authority and communication. Ms. Hughes can efficiently manage public works and engineering projects from initial concept through project development, budgeting, scheduling, design, bid, award and execution including preparation of all necessary staff reports, public outreach, and interdepartmental coordination for successful implementation. Ms. Hughes also provides Land Development Plan Check Services for several agencies Engineering and/or Public Works Departments. Services provided include development plan checking, change order processing and associated engineering development project coordination. She is responsible for quality assurance and compliance review of plans for public works projects such as grading and drainage, streets, storm drains, sewer and water systems. Land development plan checks typically include review of all supporting engineering documents including planning resolutions (conditions of approval), title reports, soils and geology reports, hydrology and hydraulics reports, water and sewer design reports, stormwater mitigation plans, easements and right-of-way dedication or vacation, etc. Ms. Hughes has been in responsible charge of thousands of public works land development plan checks during her tenure with Willdan and is very adept at all levels of development review and coordination including residential, small and large subdivision, industrial and commercial sites. ■ City of Westlake Village ■ City of Agoura Hills ■ City of Camarillo ■ County of Kern ■ City of Calabasas ■ City of Santa Barbara ■ City of Ridgecrest ■ City of Azusa ■ City of Thousand Oaks ■ City of Bakersfield ■ City of Fillmore ■ City of Rocklin WI LLDAN I 44 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ E64pring Services Roxanne C. Hughes, PE Pavement Management Experience Continued pavement Management Services, City of Malibu, California. Ms. Hughes provided pavement engineering services for conversion to MicroPaver and update of the 2008 citywide pavement management system for the City of Malibu. Services provided included creation of a citywide database describing all roadway segments with current pavement condition and historical treatment data for upload to MicroPaver, and generating a brief pavement management update report with a five-year maintenance and rehabilitation strategy using assigned budgets. Pavement Management Services, City of Ridgecrest, California. Ms. Hughes provided pavement engineering services for conversion to MicroPaver and update of the 2002 citywide pavement management system from Street Saver. Services provided included creation of a citywide database describing all roadway segments with current pavement condition and historical treatment data for upload to MicroPaver, GIS linkage for use in the City's GIS and generating a full pavement management report with a five-year maintenance and rehabilitation strategy using assigned budgets. Pavement Management Services, City of South Gate, California. Ms. Hughes is the project manager for the 2011 Pavement Management System update for the City of South Gate. Services include updating the existing a citywide database to include construction history that has occurred since the 2008 PMS was completed, develop and upload current pavement condition for the citywide bus routes, update GIS linkage for use in the City's GIS and generating a full 2011 pavement management report with a five-year maintenance and rehabilitation strategy using assigned budgets. The 2008 inspection data will be used for the streets and alleys that are not included in the pavement condition assessment along the bus routes. Pavement Management Services, City of Calabasas, California. Ms. Hughes provided pavement engineering services for preparation of a citywide pavement management system. Services provided included creation of a citywide database describing all roadway segments with current pavement condition and historical treatment data, and generating a full pavement management report with a five-year maintenance and rehabilitation strategy using assigned budgets. Design and Construction Management Experience City of Westlake Village, Westlake Village Community Park/YMCA Project Grading and Drainage Improvements. As Deputy City Engineer for the City of Westlake Village, Ms. Hughes provided project management and oversight for all facets of the Westlake Village Community Park/YMCA Project. The project consists of developing a YMCA community recreation center and multi-purpose sports field complex on a 33 -acre hillside site along the north side of Thousand Oaks Boulevard in Westlake Village. The overall earthwork involved remediation, cut and fill quantities of over 1 million cubic yards of earth. The design of the back -bone storm drain infrastructure as wells as debris and retention basin design. The site utility plan included services for water, sanitary sewer, gas and electric. The water system includes three booster pump stations, one for potable service to the site uses and the other two are reclaimed water for irrigation use. Willdan coordinated the processing of plans through the Los Angeles County Department of Public Works and provided engineering construction support services to facilitate construction and resolve construction issues during the construction. 4VVWI LLDAN ( 45 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ E61&ring Services Abner Catig Senior Design Winger Education Mr. Abner Catig, as a Senior Design Manager for the Design Services Division of BS, Civil Engineering Willdan, is responsible for design and preparation of plans, specifications, and Cebu Institute of estimates (PS&E) for numerous public works projects. His 32 years experience Technology, Philippines includes design of flood control and drainage improvements, grading and site plans, Short Course - Los hydrology studies, sewer improvements, storm drains, and streets and highways. He Angeles County possesses extensive knowledge of California Department of Transportation Hydrologic Method (Caltrans), Los Angeles County Department of Public Works, and Orange County California State University Environmental Management Agency design criteria and guidelines. As a project Long Beach engineer, Mr. Catig ensures that design team members, including pavement, 32 Years' Experience geotechnical, and survey crew subconsultants are provided with all necessary information to accurately complete plans and specifications. Additionally, Mr. Catig works closely with drafters and technicians to develop a comprehensive and accurate product. Mr. Catig's computer experience includes the Microstation and COGO programs. Prior to joining the Willdan team, Mr. Catig was employed as a construction engineer for an international private firm, responsible for supervising construction of sewer systems in Riyadh, Saudi Arabia, which included 140 linear miles of pipe laying and 20,000 house connections. Relevant Project Experience Street and Storm Drain Palos Verdes Drive North -Bike Lane Project, Rolling Hills Estates, CA. Willdan Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Projects Grant) and state funds in the amount of $554,580 (SR2S Grant) that will serve as the local match for the design and construction of the Palos Verdes Drive North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided professional engineering and construction engineering services to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of (Class ll) 5 foot bike lanes within a 200 foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection. Hawthorne Boulevard Street Resurfacing, City of Rolling Hills Estates. Willdan provided design engineering for resurfacing from Palos Verdes Drive North to the northern city limits and from Silver Spur Road to the southern city limits. The improvements involved asphalt -rubber hot -mix overlay, ADA -compliant curb ramps, concrete repairs, signing, striping, and loop replacement. The scope of work included federal invoicing, utility coordination, and pavement engineering. City of South Gate, Willow Place Widening. Mr. Catig is the Civil Engineer of this project which involves the widening of Willow Place, within the existing right-of-way four feet on the east and west sides, from Long Beach Boulevard to Santa Fe Avenue, reducing the parkway width from 10 feet wide to six feet, with full -width sidewalks and a curb to curb width of at least 36 feet, plus upgraded street lights on Willow Place and also on numerous nearby streets. The project encompasses the following work: pavement rehab, curb and gutters, new sidewalks/curb and gutter, drive approaches removal of street trees, relocation of fire hydrants, relocation of water meters and other utilities, wheelchair ramps, relocation of street lights, conversion of street lights AWI LLDAN I 46 City of Rancho Palos Verdes Engineering : iaternent of Qualifications fol Public Works/ E66 -ring Services Abner Catig from series to multiple system, planting of street trees, striping, etc. The project Continued involves the design, bidding and award process and full construction management, including resident engineering, materials testing and utility coordination. Biweekly meetings are planned along with special meetings as warranted. Community outreach is continuous through design construction, including direct communications with residents as special needs arise. Washington Boulevard Street Improvements, City of Culver City, California. Mr. Catig is the Senior Design Manager for the civil portion of this project which involves the design of Washington Boulevard for the reconstruction of portions of roadway which are currently failing. Specifically, the reconstruction will consist of removing 26 - inches of road and constructing new base material with supportive fabric and new asphalt. The project consists of closing Washington Boulevard and detouring weekend traffic while excavation takes place. The second phase will consist of lane closure to install new base material, fabric and asphalt to various sections along Washington Boulevard from Ballona Creek to Roberts Avenue. Sepulveda Boulevard Widening, City of Culver City, California. Mr. Catig was the Lead Design Engineer for civil design for this project which involved project management, conceptual design, preparation of construction drawings and technical specifications for a major street widening on Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. Sepulveda Boulevard is a major corridor with an average traffic count of 50,000 vehicles and parallels the 405 Freeway through Culver City. Sepulveda Boulevard is an alternative route taken by many commuters to access Los Angeles International Airport. This project was done to alleviate an existing bottle -neck and provided for a third southbound lane within the existing right-of-way. A portion of the project was within the City of Los Angeles and Caltrans. Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering, and utility coordination. McManus Park Sewer Realignment, City of Culver City, California. Mr. Catig was responsible for the design and preparation of PS&E for sewer improvements totaling 600 linear feet. The project included connection of existing and new house laterals. McManus Park Improvements, City of Culver City, California. Mr. Catig was responsible for the design of drainage and grading improvements. This project involved the construction of two cul-de-sacs for park access, a baseball field, park facilities, and 100 additional parking spaces. The construction cost was approximately $2 million. 2011 Proposition 1 B Street Resurfacing, City of Rolling Hills Estates, California. Mr. Catig was the Senior Design Manager of this project which involved providing professional engineering services for the design, utility coordination, contract administration, and construction observation for Pinto Lane, Palomino Lane, Poly Lane, and Shadow Lane. Willdan prepared a bid package for the advertisement of the local streets funded through Proposition 1B and Measure R funds. The project was expedited in an effort to complete the construction no later than June 30, 2011 which was the expiration date for the Proposition 1 B funds. Project would be ready for advertisement in March 2011, awarded in April of the same year and constructed by May 2011. AV VWILLDAN I 47 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ D67 --'ring Services Elroy L. Klepke, CBO, PE City Engineer Education Mr. Elroy L. Kiepke presently serves as a City Engineer for Willdan. He joined 1969, BS, Civil Willdan in July 1979 to assist in the formation of the Building and Safety Division. As Engineering, Valparaiso the division grew, he became the Division Manager for Plan Check Services and City University, Indiana Engineer for some of Willdan's client cities. Mr. Kiepke began his professional career Registration with the County of Los Angeles in June 1969. He received training in building plan 1973, CA, 022382, Civil check and subdivision plan check before taking permanent positions in the 1986, CABO, CBO, 703 Subdivision Section and Building and Safety. 1994, ICBO Relevant Project Experience Accessibility/Usability Specialist Certificate, National Pollution Discharge Elimination System 74013 For Willdan projects, Mr. Kiepke developed the policies and procedures for projects Qualified SWPPP requiring State construction activity permits. The purpose is to create a partnership Developer, No. with the contractor to develop a Storm Drain Water Pollution Prevention Plan which 00999 best meets the needs of all parties involved with the project and complies with Clean Water Act requirements. Affiliations American Public Works Dillon Road Grade Separation Project, City of Coachella, California. Responsible Association for providing NPDES services for the Dillon Road Grade Separation Project. The project involves the construction of a new bridge at Dillon Road and the existing American Society Civil UPRR tracks. The new structure carries Dillon Road traffic over Indio Boulevard and Engineers the UPRR's two existing tracks by means of a reinforced concrete bridge. In addition, California Building the project involves the following specific items of work: new traffic signals, Officials construction of approach fills for the new bridge, installation of new curbs and gutters, International Conference installation of new signing, construction of new drainage facilities, and other of Building Officials appurtenant work. It is anticipated to take approximately 14 months and $22 million dollars to construct the new bridge. International Erosion Control Association NPDES Compliance, City of San Marino, California. Responsible for providing 43 Years' Experience NPDES services to include advising staff in required NPDES actions, complete annual NPDES report, and attend NPDES meetings. NPDES Permit Compliance, City of Agoura Hills, California. City Engineer. Responsible for attending meetings, reviewing and proposing Ordinances, preparing reports, and communicating with the community to maintain the Cities NPDES compliance efforts. This activity went from the issuance of the early permit in 1990 through August 1997. Mr. Kiepke has worked extensively with the City on compliance with NPDES permit for separate storm sewer systems. He has been instrumental in preparing ordinances for improving management practices for projects which discharge to the storm drain. On behalf of the City, he attended meetings and attended seminars to gain a better understanding of how to better shape the program's goals. NPDES Permit Compliance, Cities of Rosemead, Paramount, and Bell Gardens, California. Mr. Kiepke due to his familiarity and availability, took over the permit programs for the above cities in October 1997, and continues his efforts in this area. This includes preparation of the Site Visit database for each city budget report preparation and attendance at Watershed meetings representing the cities. Mr. Kiepke has also conducted training classes for more than 150 City personnel as required by the Permit. Cities of Calimesa, and La Canada Flintridge, California. Mr. Kiepke as part of the City Engineering responsibility, administered the NPDES Programs for these cities. The Calimesa assignment involved review of the Riverside County permit. "WI LLDAN Engineering 48 City of Rancho Palos Verdes Stuteanent Qualifications for Public Works/ E6,& Services o'r -ring Christopher C. Kelley, PE Associate Engineer Education Mr. Christopher Kelley is a Senior Design Engineer for Willdan, with 9 years of BS, Civil Engineering, design experience. He is primarily responsible for the design of public works California State Polytechnic improvement projects, including streets, highways, storm drains, sewers, and University, Pomona waterlines Registration Relevant Project Experience 2014, Professional Civil Orange Line Extension, Metropolitan Transportation Authority (MTA), Los Engineer, California No. 83179 Angeles, California. Design Engineer. Responsible for providing assistance in the 9 Years' Experience design of a variety of storm drain facilities including culvert, debris basins, streets, swales, etc. Willdan is preparing plans, specifications and estimates for street widening, raised landscaped medians, irrigation system, ADA Access curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communication conduits, and signing and striping. This includes the construction or reconstruction of three stations. Stonybrook Storm Drain Project, County of Orange, California. Design Engineer. The project provided plans, specs, and estimate for the construction of the Stonybrook Storm Drain, a 3200' storm drain extension from the existing Gilbert Street Storm Drain Stub -out just north of Ball Road along Gilbert Street, east on Stonybrook Drive to Campus Drive to reduce flooding. The new storm drain delivers flow to the Gilbert Street Storm Drain. Inlets along the alignment intercept flow and minimize ponding. Kanan/U.S. 101 Interchange Improvements, City of Agoura Hills, California. Design Engineer. The project included modifications to the freeway mainline, four new ramps, modifications to two existing ramps, realignment of Canwood Street and Roadside Drive, providing new access to Roadside Drive, widening of two bridges, replacement of one bridge, design of one new bridge, channel and drainage improvements, traffic improvements, a park and ride lot, right-of-way, and acquisition. River Road Bridge Replacement, TY Lin International. Design Engineer. This project involved the replacement of an existing two-lane bridge over the Santa Ana River with a four -lane structure. The new bridge will be elevated to allow the passage of a 100 -year discharge. The improvements also include new roadway approaches, utility relocation, and a new regional trail. Jessen Drive Bridge Replacement, City of La Canada Flintridge, California. Design Engineer. Professional engineering services as well as CEQA and NEPA environmental clearance for the reconstruction of the Jessen Drive Bridge. The project was funded by the Highway Bridge Program). The existing bridge is a single - timber trestle structure. The abutments are composed of a steel soldier piling system. The proposed improvement included replacing the bridge with a single -span precast, prestressed concrete I -girder bridge, improving channel section under the bridge, providing slope protections, and improving the roadway approach transition WI LLDAN I 49 City of Rancho Palos Verdes Engineering twer-nont of Quulifica.tions for Public Works/ E& -ring services Lucy Martinez, EIT Designer H Education Ms. Lucy Martinez brings to Willdan 13 years of civil engineering experience. Ms. 2014, BS, Civil Martinez' duties include assisting in the preparation of plans, specifications, and Engineering, California estimates (PS&E) for public works projects. Ms. Martinez is proficient with software State University, Los such as MicroStation, InRoads, SelectCad, SAP2000, AutoCAD, Windows, and MS Angeles Office. Ms. Martinez is bilingual, fluent in the Spanish language. Registration EIT Rdevant Project Experience Affiliations Safe Routes to School Project Cycle 8, City of La Puente, California. Designer II. American Society of Civil Willdan Engineering provided engineering design, project management and grant Engineers administration services for the SR2S Cycle 8 project. The City was awarded through the SR2S Grant $664,744 for construction of sidewalk repairs and infill, in -roadway 13 Years' Experience flashing lights, speed feedback signs, signing and striping upgrades surrounding Nelson Elementary School, Del Valley Elementary School and Sierra Vista Middle School. Palos Verdes Drive North -Bike Lane Project, Rolling Hills Estates, CA. Willdan Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Projects Grant) and state funds in the amount of $554,580 (SR2S Grant) that will serve as the local match for the design and construction of the Palos Verdes Drive North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided professional engineering and construction engineering services to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of (Class II) 5 foot bike lanes within a 200 foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection. Hawthorne Boulevard Street Resurfacing, City of Rolling Hills Estates. Willdan provided design engineering for resurfacing from Palos Verdes Drive North to the northern city limits and from Silver Spur Road to the southern city limits. The improvements involved asphalt -rubber hot -mix overlay, ADA -compliant curb ramps, concrete repairs, signing, striping, and loop replacement. The scope of work included federal invoicing, utility coordination, and pavement engineering. City of Lakewood, South Street Rehabilitation. Design Engineer. The project includes the preparation of plans, specification and estimate for street overlay, signing and striping plans from Lakewood Boulevard to East City Limits (2 miles). The project was funded through the American Recovery and Reinvestment Act funds and Willdan provided federal funding administration to secure the allocation of funds for construction (E-76) Other services provided by Willdan included utility coordination, pavement engineering, topographic survey, monument restoration, construction administration, construction observation, and labor compliance. South Street Rehabilitation, City of Lakewood, California. Design Engineer. The project includes the preparation of plans, specification and estimate for street overlay, signing and striping plans from Lakewood Boulevard to East City Limits (2 miles). The project was funded through the American Recovery and Reinvestment Act funds and Willdan provided federal funding administration to secure the allocation of funds for construction (E-76) Other services provided by Willdan included utility coordination, pavement engineering, topographic survey, monument restoration, construction administration, construction observation, and labor compliance. VVWILLDAN I 50 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ E, 0oring Services Lucy Martinez, EIT 1-5 Mitigation Project, Project 300, City of La Mirada, California. Civil Designer. Continued Willdan Engineering provided professional engineering design services for the preparation of plans, specification and estimates for the 1-5 Preconstruction Mitigation Project. The design involved several streets, median and traffic signal improvements in advance of the 1-5 mainline widening scheduled to begin construction in late 2010. The project was needed to accommodate the heavy volumes of traffic detoured and diverted into cities over the duration of the construction. Project 300 was located within the Cities of La Mirada and Santa Fe Springs and was administered by the City of La Mirada. The plans included the street rehabilitation of Alondra Boulevard; Valley View Avenue; Freeway Drive as well as traffic signal and median modification at Valley View Avenue/Firestone Boulevard (south); Valley View Avenue/Firestone Boulevard (north); Valley View Avenue/Alondra Boulevard and Valley View Avenue/Gannet Street. Willdan also provided utility coordination, traffic signal timing chart preparation and assistance during advertisement and bidding. 1-5 Mitigation Measures Traffic Signal Modifications, City of Norwalk, California. Ms. Martinez was the Designer II of this project which involved providing professional engineering design services for the preparation of plans, specifications and estimates (PS&E) for the 1-5 Freeway Mitigation Project, which consisted of modifying the traffic signal and intersection pavement delineation at Alondra Blvd./Shoemaker Ave.; Alondra Blvd./Carmenita Road and Alondra Blvd./Marquardt Ave., to provide protected permissive phasing, adequate left turn pocket storage, additional through lane within the existing right of way, and ADA compliant access ramps. The first phase of the project consisted in preparing a concept plan that would incorporate all the mitigation measures and assess the impacts on the existing location. Once this was completed, a memorandum summarized the recommendations for modifications including removal of parking, length of left turn pocket to name a few. Additional services provided by Willdan included utility coordination, timing chart preparation, assistance during construction, and record drawings. Tweedy Boulevard Improvements, City of South Gate, California. Ms Martinez was the Designer II of this project which involved the provision of professional engineering design for a Highway Safety Improvement Project (HSIP). The City in an effort to reduce the pedestrian vehicle conflict along Tweedy Boulevard from Alameda Street to Long Beach Boulevard would like to construct a median. The future opening of a super -school complex at the westerly City limits that will include a high school, middle school and adult continuation school increases the conflict possibilities. Additionally, the traffic signal at Tweedy Boulevard/Stanford Avenue will be modified to provide protected/permissive left -turn phasing and a flashing beacon installation will be provided at Tweedy Boulevard/Montara Avenue. Willdan prepared plans, specifications, and estimate as well as topographic survey, utility coordination, and federal paperwork administration. Public outreach will be provided for the median installation. Hawthorne Boulevard Rehabilitation Project, City of Rolling Hills Estates, California. Designer II. Project involved the preparation of Federal paperwork, plans, specifications and estimate for the City of Rolling Hills Estates' Hawthorne Boulevard from Palos Verdes Drive North to North City Limits and Hawthorne Boulevard from Palos Verdes Drive North to South City Limits rehabilitation project. The scope of work included preparation of federal paperwork, utility coordination and pavement engineering. W I LLDAN I 51 City of Rancho Palos Verdes Engineering Statement of Qualifications for PUblic VWorRs/ E74 ring Services Kenneth R. Krieger Senior Designer 26 Years' Experience Mr. Kenneth Krieger has 26 years of experience at Willdan in the design of various improvement projects for several public agencies and municipalities. He is specialized in the development and execution hydraulic modeling software for flood control, storm drain and sewer related projects. He is trained and experienced with HEC -2, HECRAS as utilizing River CADD, Storm Plus, WSPG, AES and Hydra software packages including H20Map Sewer training and other sewer hydraulic modeling software. He has performed hydrology and hydraulic calculations on numerous flood control channels, storm drains and performed capacity analysis on over 10 complete sewer systems within the past 6 years. As a member of the Design Engineering Group in Anaheim, he has worked on most of Willdan's more complex drainage and sewer designs. He is also fully versed on Micro Station, AutoCAD and ARCGIS software. Relevant Project Experience Sewer System Reconstruction Plan, City of Covina, California. Senior Designer. This project involved the reconstruction of approximately 11,180 -feet of existing sewer mainline within six (6) separate reaches. Sanitary Sewer Management Plan(SSMP), City of Covina, California. Senior Designer. Assisted in the preparation of the City's SSMP accomplishing compliance with the State Depart of Water Resources Order No. 2006-0003-DWQ "Statewide General Waste Discharge Requirements for Sanitary Sewer Systems." Compliance requires each sewering entity to develop and implement a SSMP. Ken's role in the project involved updating of data in the 2002 Covina Sewer Master Plan sewer capacity evaluation for inclusion in the SSMP report and mapping exhibits. Sanitary Sewer Management Plan, City of South Gate, California. Senior Designer. Assisted in the preparation of the City's SSMP to accomplish compliance with the State Department of Water Resources Order No. 2006-0003-DWQ "Statewide General Waste Discharge Requirements for Sanitary Sewer Systems." Ken's role in the project involved developing and executing the hydraulic modeling analysis of the 120 miles of community sewer system. This was done to determine capacity constraints that exist in the system. Godde Hills Estates Sewer Project, City of Palmdale, California. Senior Designer. Assisted in the preparation of a comprehensive sanitary sewer study plan for the sewer mainlines to establish the design for the installation of a new sewer system to serve the existing residential development. The sewer system consisted of approximately 4,500 linear feet of sewer mainline within the development and approximately 1,000 linear feet of sewer installed within Avenue M-8 connecting to the existing sewer in Almond Avenue. Downstream of the connection point the sewer connects to a Sanitation District No. 4 sewer trunk line. The sewer improvements were design in accordance with the standards of and approved by the LACDPW. Sewer Improvements NAF - Reyes Construction, EI Centro, California. Senior Designer. Assisted in the preparation of a sewer study based on current and future development of the Naval Base to determine the sizes of the new sewer facilities. Assisted in the design of the sewer improvement to adhere to the more stringent requirements of San Diego County and Imperial County standards for future privatization of the Naval Base. The design effort included the preparation of construction -ready plans, specifications and details. This design -build project involved the replacement of approximately 17,500 linear feet of sewer force main and approximately 29,000 linear feet of gravity sewer main on the United States Naval Air Facility (NAF) at EI Centro, California. AV WI LLDAN I 52 City of Rancho Palos Verdes Engineering Staternent of Qualifiications for Public Works/ En n erinc Services Kenneth R. Krieger 10th Street West Sewer Improvement Project, City of Palmdale, California. Continued Senior Designer. Assisted in the planning and preparation of plans and specifications for constructing sewer improvements for the 10th Street West commercial development associated with the Assessment District 2006-2. This is an existing commercial development consisting of thirty three (33). The sewer improvements are proposed within 10th Street West extending from Avenue ) and connecting to the existing 12 -inch sewer at Avenue M. A preliminary design alignment and assessment boundary was initially established for his project and approved by the City of Palmdale. The proposed improvements included the construction of approx. 10,600 feet of sewer mainline with pipe diameters ranging from 8-18 inches, with a construction cost approximately $1.66 M. The project plans were prepared in accordance with and approved by the LA County Sanitation District LACSD. Bellflower Sewer Master Plan. Senior Designer. Assisted in the preparation of the Sewer Master Plan for the City of Bellflower. This sewer master plan report addressed the entire 111 miles of existing local collection sewers. The work effort involved obtaining all available sewer system information, formatting a hydraulic computer model, importing current land use records, performing calculations of the sewer system capacity to determine any deficiencies and obtaining representative flow monitoring samples in order to calibrate the model to actual system conditions. Then recommendations were prepared for 10- year capital improvement program. 10 -Year Sewer Maintenance Plan, City of Covina, California. Senior Designer. Assisted in the preparation of the City of Covina 10 -year Sewer Maintenance Plan. This plan included the preparation of a 10 -year videotaping schedule to provide videotaping for all of the city of Covina sewers. The intent was to let a contract each year for 10 years to video tape the existing sewer lines per the schedule and a list of suggested and prioritized repairs compiled. Each year, this list of repairs would be incorporated into a bid schedule for an annual repair and maintenance contract. Plans and exhibits would be developed as necessary to depict and design the necessary repairs. The first two years of this plan have been completed and completed under separate contracts for videotaping and rehabilitation. Sanitary Sewer System Master Plan, City of Covina, California. Senior Designer. Assisted in the preparation of a comprehensive sanitary sewer master plan and management program to repair or replace the existing sewer lines, upgrade the sewer system, and provide a sewer system capacity analysis. The master plan included a narrative report, a database (including a pipeline inventory), video inventory, electronic base map, and a five-year capital improvement plan with cost estimates. W"WI LLDAN ( 53 City of Rancho Palos Verdes Engineering statement of Qualifications for Public Works/ E , ,i3:,nrig Services Herbert L. Gluesing, Jr. PE, TE, PTOE Director Of Engineering Education Mr. Herbert L. Gluesing, Jr., a Director of Engineering at Willdan, supervises 14 BS, Civil Engineering, engineers and technicians providing traffic engineering and design and construction California State University, survey services throughout California and in support of our Arizona and Nevada Long Beach offices. Mr. Gluesing has 50 years of experience in traffic and transportation Registration engineering, including neighborhood traffic management, traffic circulation, impact Professional Traffic and parking studies, design and operations, municipal engineering, and operational Operation Engineer analyses. To date, Mr. Gluesing has supervised the completion of more than 10,000 larger and smaller -scale projects. He has personally designed more than 1,000 new Traffic, California No. 1683 and modified traffic signal installations, as well as two traffic signal master computer Civil, California No. 45729 systems, employing various interconnect and communication facilities. Prior to joining Civil, Nevada, No. 10857 the Willdan team, he served 12 years with Herman Kimmel and Associates and 12 years with the Cities of Newport Beach and Fullerton. Affiliations American Society of Civil In addition to serving as City Traffic Engineer for the Cities of Malibu, Lakewood, La Engineers Puente, Lawndale, Norwalk, and Paramount, in his capacity as a Director of Engineering, Mr. Gluesing is responsible for the following services: Institute of Transportation Engineers 9 City traffic engineering and municipal support services Orange County Traffic 0 Design and construction survey services Engineering Council Funding applications 2 CPUC, FHWA, and local agency coordination and applications City Traffic Engineers R At -grade rail crossing traffic control design American Public Works 9 Traffic signing and striping design Association n Construction traffic control and detour design R Traffic signal systems and coordination design and operations 50 Years' Experience 9 State Highway and Freeway traffic design and operations 2 Street lighting analysis and design 6 Rail station study and design S Traffic impact analyses and review 0 Engineering and traffic surveys a Neighborhood traffic management and traffic calming N Local intersection, traffic signal system coordination, and railroad preemption timing analysis, development, and implementation Palos Verdes Drive North -Bike Lane Project, Rolling Hills Estates, CA. Willdan Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Projects Grant) and state funds in the amount of $554,580 (SR2S Grant) that will serve as the local match for the design and construction of the Palos Verdes Drive North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided professional engineering and construction engineering services to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of (Class II) 5 foot bike lanes within a 200 foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection. WI LLDAN I 54 City of Rancho Palos Verdes Engineering ,E< 4,,, tern2nt of Qualifications for Public Works/ E74 ring Services ervices Vanessa Munoz, PE, TE, PTOE Deputy Director Of Engineering Education Ms. Vanessa Munoz is a Deputy Director of Engineering at Willdan with 17 years of 1997, BS, Civil experience in transportation planning and traffic engineering. Ms. Munoz is an Engineering, California accomplished engineer for multi -discipline and multi -agency traffic and transportation State Polytechnic projects and has supervised the completion of more than 1,000 projects, for a variety University, Pomona of large to smaller scaled projects and understands the importance of meeting Registration schedules and developing the most cost-efficient project in order to meet the City's Professional Traffic budgetary constraints. She is responsible for analysis, coordination, and design of Operation Engineer, 2007 various projects, including preparation of plans, specifications and estimate (PS&E) Registered Traffic for traffic and street improvement projects. Ms. Munoz has secured funding through Engineer, California - No. the Safe Routes to School (SR2S) and Highway Safety Improvement Program (HSIP) 2341, 2006 grants. Ms. Munoz is bilingual, fluent in the Spanish language. Registered Civil Engineer, Relevant Project Experience California - No. 67583, City Traffic Engineering Services, City of Rolling Hills, CA. City Traffic Engineer. Responsible for handling all general traffic engineering concerns within the City, such Doppler Traffic Operator, as, performing stop sign and safety analyses, engineering and traffic surveys, 2000 preparing and reviewing traffic control plans, preparing and presenting Commission Affiliations and Council reports, conducting field investigations, and investigating citizen requests. City Traffic Engineers Palos Verdes Drive North -Bike Lane Project, Rolling Hills Estates, CA. Willdan American Public Works Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Association Projects Grant) and state funds in the amount of $554,580 (SR2S Grant) that will Institute of Transportation serve as the local match for the design and construction of the Palos Verdes Drive Engineers (ITE) North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided professional engineering and construction engineering services 17 Years' Experience to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of (Class II) 5 foot bike lanes within a 200 foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection. Hawthorne Boulevard Street Resurfacing, City of Rolling Hills Estates. Willdan provided design engineering for resurfacing from Palos Verdes Drive North to the northern city limits and from Silver Spur Road to the southern city limits. The improvements involved asphalt -rubber hot -mix overlay, ADA -compliant curb ramps, concrete repairs, signing, striping, and loop replacement. The scope of work included federal invoicing, utility coordination, and pavement engineering. City of South Gate, Tweedy Boulevard Improvements — Ms. Munoz was the Project Manager of this project which involved the provision of professional engineering design for a Highway Safety Improvement Project (HSIP). The City in an effort to reduce the pedestrian vehicle conflict along Tweedy Boulevard from Alameda Street to Long Beach Boulevard would like to construct a median. The future opening of a super -school complex at the westerly City limits that will include a high school, middle school and adult continuation school increases the conflict possibilities. Additionally, the traffic signal at Tweedy Boulevard/Stanford Avenue will be modified to provide protected/permissive left -turn phasing and a flashing beacon installation will be provided at Tweedy Boulevard/Montara Avenue. Willdan prepared plans, specifications, and estimate as well as topographic survey, utility coordination, and VlVWI LLDAN I 55 City of Rancho Palos Verdes Engineering Statement o` Qualifications for Public Works/ E5.yrinc Services Vanessa Munoz, PE, TE, federal paperwork administration. Public outreach will be provided for the median PTOE installation. Continued Sepulveda Boulevard Widening, City of Culver City, California. Lead Design Engineer. Responsible for the traffic design portion of this project which involved project management, conceptual design, preparation of construction drawings and technical specifications for a major street widening on Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. Sepulveda Boulevard is a major corridor with an average traffic count of 50,000 vehicles and parallels the 405 Freeway through Culver City. Sepulveda Boulevard is an alternative route taken by many commuters to access Los Angeles International Airport. This project was done to alleviate an existing bottle -neck and provided for a third southbound lane within the existing right-of-way. A portion of the project was within the City of Los Angeles and Caltrans. Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering, and utility coordination. Firestone Boulevard Four Traffic Signals (HSIP), City of South Gate, California. Senior Design Engineer 11. Responsible for providing traffic engineering services which involved plan preparation for modification of existing traffic signals along the Firestone Boulevard corridor to provide protective left turn phasing at the following locations: Firestone Boulevard at Otis Street; Firestone Boulevard at California Avenue; Firestone Boulevard at Long Beach Avenue; and Firestone Boulevard at Santa Fe Avenue. The project included preparation of plans, specification and estimate (PS&E), field survey, environmental documentation, public outreach, utility coordination, assistance during advertising and bidding and record drawing preparation. 1-5 Mitigation Measures Traffic Signal Modifications, City of Norwalk, California. Responsible for providing professional engineering design services for the preparation of plans, specifications and estimates (PS&E) for the 1-5 Freeway Mitigation Project, which consisted of modifying the traffic signal and intersection pavement delineation at Alondra Boulevard/Shoemaker Avenue; Alondra Boulevard/Carmenita Road and Alondra Boulevard/Marquardt Avenue, to provide protected permissive phasing, adequate left turn pocket storage, additional through lane within the existing right-of- way, and ADA compliant access ramps. The first phase of the project consisted in preparing a concept plan that would incorporate all the mitigation measures and assess the impacts on the existing location. Once this was completed, a memorandum summarized the recommendations for modifications including removal of parking, length of left turn pocket to name a few. Additional services provided by Willdan included utility coordination, timing chart preparation, assistance during construction, and record drawings. Traffic Signal at Palos Verdes Drive North and Rolling Hills Road, City of Rolling Hills Estates, California. Project Manager. Willdan Engineering provided professional engineering services for the design and utility coordination for the traffic signal modification project at the intersection of Palos Verdes Drive North and Rolling Hills Road in the City of Rolling Hills Estates. Presently, the traffic signal poles have a decorative wood cover. In order to retain a similar look, the traffic signal modification will include new decorative poles designed by South Coast Lighting, including the modified foundations. The primary purpose of the traffic signal modification is to provide protected/permissive left turn phasing for both directions on Palos Verdes Drive North and the replacement of all the traffic signal poles with new decorative poles and the City has a budget of $240,000. The preparation of plans, specification and estimate will be completed within a 1 month period to expedite the process and get the project to construction within a 6 month period. Willdan will assist the City with the procurement of long -lead time equipment such as the traffic signal controller cabinet and traffic signal poles to minimize delays on the project. �W I LLDAN 56 City of Rancho Palos Verdes Engineering Staternent of Qualifications for s'ublic Works/ En ;i —%-ring Services Education 1975, BS, Civil Engineering, California State Polytechnic University (Cal Poly), Pomona, CA Registration 2007, Professional Transportation Planner (PTP) Certificate 1992, California Professional Engineer License for Traffic, Registration # TR001650 Affiliations Institute of Transportation Engineers (ITE) American Society of Civil Engineers (ASCE) Orange County Traffic Engineering Council (OCTEC) Ruth Smith, TE, PTP Project Manager Ms. Ruth Smith is a Project Manager at Willdan with more than 34 years of experience in traffic and transportation engineering. Ms. Smith's duties include performing traffic studies for client cities, such as preparing a neighborhood traffic management and parking plan, recommending future actions to upgrade a two-lane roadway to a multi -modal corridor, preparing traffic impact analyses for proposed developments, conducting traffic impact analyses for Project Study Reports (PSRs) for freeway -related improvements, conducting traffic signal warrant studies, and preparing grant applications for Suggested Route To School funding and Calls for Projects. Prior to joining Willdan, Ms. Smith's experience has included supervising the preparation of traffic impact, parking, trip generation and on-site circulation studies and reports. Ms. Smith met/interfaced with clients and municipal staff, coordinated work with civil engineering and environmental consultants, and appeared before planning commissions, city councils and boards of supervisors. She prepared studies for a variety of developments, both large and small, including planned communities, commercial developments, warehouses, distribution centers, churches, an asphalt plant, wineries, and PR/PSRs for new and existing freeway interchanges. Ms. Smith collaborated with developers, their architects and civil engineers to redesign on-site circulation plans and project access to improve traffic flow and meet jurisdiction requirements. 34 Years' Experience At a previous firm, Urban Crossroads, Inc., Ms. Smith's experience included supervision of traffic impact, parking, trip generation and onsite circulation studies and reports. She met/interfaced with clients and municipal staff, coordinated work with civil engineering and environmental consultants, and appeared before planning commissions, city councils and boards of supervisors. Ms. Smith also worked for the City of Santa Ana as a Senior Traffic Engineer for 14 years, where she not only supervised the preparation and review of signing and striping plans for three years, but also managed the design and implementation of the City's directional signage project, which consisted of three large overhead signs and approximately 50 smaller signs on the side of the roadways. In addition, Ms. Smith developed and administered the City's Neighborhood Traffic Management Plan program (including traffic diverters and speed humps), several Neighborhood Parking Management plans and the Speed Hump program. She coordinated with the Santa Ana Downtown Business Association to resolve their parking needs and concerns. Ms. Smith also handled citizen requests for stop signs, parking restrictions, crosswalks, etc. and managed the Santa Ana Pedestrian Safety Task Force. Ms. Smith regularly made presentations to City Commissions, the City Council, the Environmental and Transportation Advisory Committee, schools, business groups, and neighborhood associations. At various times, Ms. Smith was also responsible for coordinating with Caltrans on several freeway projects, including two freeway widening projects; was on the APWA committee that produced the 2001 and 2006 editions of the Work Area Traffic Control Handbook (WATCH); dealt with litigation; and handled school issues, including Suggested Route to School maps and Adult School Crossing Guard studies. Ms. Smith also administered an Office of Traffic Safety (OTS) grant for a citywide crosswalk study, a citywide speed limit update, the City's Traffic Control Devices Inventory and the City's Accident Data Base (Crossroads). WI LLDAN I 57 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ E7n�.ering Services Ruth Smith, TE, PTP Relevant Project Experience Continued Sea Bluff Area Permit Parking Assessment, City of Rancho Palos Verdes, California. Willdan performed a parking study in response to resident concerns regarding parking intrusion from an adjacent resort by users of nearby walking trails going to the bluffs and/or beach. The purpose of the study was to assess the magnitude, extent, and sources of the parking intrusion and to evaluate the effectiveness of permit parking and other possible measures to address the residents' concerns and improve traffic safety. A parking survey consisting of a license plate survey and an origin and destination (O/D) study was performed to assess the level and source of parking intrusion on five affected residential streets. In order to be as unobtrusive as possible, Willdan introduced an innovative method of performing the O/D survey by placing video cameras at strategic locations — allowing pedestrians to be tracked from where they parked to their destinations and vice versa. The cameras provided destination clues based upon how the pedestrians were dressed (i.e., resort employees in uniforms). The survey results generally supported the residents' claims; however, they also revealed that many of those parked on the streets were visiting residents. The results indicated that most of the others were related to the resort and not to trail users or beach goers. Based upon the study's findings, various permit parking options, as well as other potential actions, were presented and recommended actions were provided. The study methodologies, analyses, findings, and recommendations were summarized in a report and presented to the City's Traffic Safety Committee. Traffic Engineering Services, City of Rancho Palos Verdes, California. Consultant Traffic Engineer. Willdan currently provides on-call traffic engineering services to the City of Rancho Palos Verdes. Ms. Smith prepares a variety of traffic studies for the City, such as Engineering and Traffic Surveys to update individual speed limits, neighborhood traffic studies/plans and neighborhood parking studies. She also provides traffic engineering data and support for grant applications such as the Highway Safety Improvement Program (HSIP) the Metro Call -for Projects, and Safe Routes to School, and performs the grant -funded services. Major studies include preparing a Complete Street multi -modal study that included pedestrian, bicycle and equestrian elements for a six -mile long, steep, narrow, two-lane winding minor arterial, and the traffic impact analysis for the update of the General Plan Circulation Element. Many of these studies include presentations to the Traffic Safety Commission and the City Council. Ms. Smith also prepared and presented a paper summarizing the Complete Street study at the Institute of Transportation Engineers (ITE) 2011 Western District Annual Meeting in Anchorage, Alaska. Ms. Smith also manages the various other services performed by the Willdan traffic engineering team, such as the Citywide Engineering and Traffic Survey, the Highway Performance Monitoring System (HPMS), the Metro Congestion Management Program (CMP) monitoring. Traffic Engineering Services, City of Placentia, California. City Traffic Engineer. Responsible for providing traffic engineering services support at the City one day a week, handling typical citizen requests such as parking restrictions, stop sign requests and reported problems with traffic signals. Ms. Smith is also responsible for the City's Traffic Safety Commission that meets bi-monthly. She prepares the meeting agendas and staff reports, approves the draft meeting minutes, gives the staff reports and updates at the meetings, and takes recommended actions to the City Council for approval. Ms. Smith coordinates with the school district and schools regarding parking and circulation issues, and performs school crossing guard studies. Ms. Smith also manages the permit parking and speed hump programs, reviews traffic studies and signing and striping plans, and handles the review of traffic signal plans. Her duties also include drafting traffic -related City policies and coordinating improvements with neighboring jurisdictions. WI LLDAN I 58 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ E7,& -ring Services Joanne Itagaki Senior Design Mann er Education Ms. Joanne Itagaki is a Senior Design Manager at Willdan with more than 27 years 1986, BS, Civil of experience in traffic and transportation engineering. She serves as the Traffic Engineering, California Engineering Deputy for the City of Norwalk and Traffic Advisor to the City of State Polytechnic Rosemead. She is responsible for analysis, coordination, and design of a variety of University, Pomona projects, including preparation of traffic impact studies, engineering and traffic Institute of Transportation surveys, and design projects. Studies Prior to joining the Willdan team, Ms. Itagaki worked for the City of Los Angeles Fundamentals of Traffic investigating citizen's requests for various items, including parking restrictions, stop Engineering signs, and traffic signals. She also worked for Caltrans where she analyzed vehicle Fundamentals of Traffic counts and vehicle occupancy for high occupancy vehicle (HOV) on-ramp access Signal Design Safety lanes for Interstate 210 (Foothill Freeway). through Construction and Maintenance Zones Relevant Project Experience Orange County Municipal Transportation Engineering Services Transportation District Ms. Itagaki has served as Traffic Engineering Deputy or assisted the Traffic Engineer Transportation Demand for the below -referenced California communities. She has performed numerous traffic Management Alternative Work Hours Seminar investigations, including stop sign, traffic signal and school area traffic control evaluations, as well as installation of parking and turning restrictions, curb markings, Transportation Demand and speed bumps. She coordinated maintenance of the traffic control system and Management Ridesharing acted as Traffic Advisor to various Traffic Commissions. She also reviewed and Seminar commented on EIRs and traffic impact studies submitted to these communities: Registration 0 Baldwin Park M Paramount ■ Tustin 1992, Doppler Traffic Radar Operator N Bell Gardens 2 Rolling Hills 0 Norwalk Affiliations • Downey ■ Rosemead American Society of Civil Traffic Engineering and Planning Services, City of Culver City, California. Task Engineers Manager. Responsible for providing as -needed traffic engineering and planning City Traffic Engineers services relating to development and traffic impact study review. Association Traffic Engineering Services, City of Norwalk, California. Traffic Engineering Institute of Transportation Deputy. Responsible for providing professional traffic engineering services to the City Engineers of Norwalk on a routine basis. This assignment included assistance in planning, 27 Years' Experience organizing, supervising and performing a variety of field and office professional civil and traffic engineering work; planning, designing, and reviewing construction of community development projects; supervising or performing technical studies; serving as project engineer for major capital traffic and transportation improvement projects; coordinating traffic signal timing and maintenance with public services staff; overseeing operation of the City's Traffic Management Center; and performing related duties as required. Traffic Engineering Services, City of Lawndale, California. Senior Design Manager. Responsible for providing traffic engineering services to the City of Lawndale including review and comment on traffic and parking impact studies; analysis and comment on traffic and circulation patterns; traffic signal timing plans and construction plans and specifications; review and analysis of private development projects for compliance with applicable local, county, state and other agency codes, standards and rules; work with other City departments and other public and private agencies on traffic related issues. Review, analyze and respond to citizen complaints and public official inquiries and attend Traffic Safety Commission, Planning Commission and City Council meetings as needed in support of City staff. On -Call Traffic Engineering Services, City of Rosemead, California. Traffic Advisor. Responsible for providing traffic engineering services on an on-call basis to WI LLDAN I 59 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ En i�rino Services Joanne Itagaki the City of Rosemead including attendance at City Council and/or Traffic Commission Continued meetings to address traffic issues, programs or projects. Traffic engineering services for the City of Rosemead also included review and analysis of citizen inquiries such as parking restrictions and stop sign analyses. Traffic Impact and Analysis Studies Ms. Itagaki assisted and prepared the following traffic impact analyses in accordance with the below -referenced city and agency standards, CEQA, and CMP requirements. The analyses included determination of existing and future traffic conditions and recommended mitigation measures to alleviate significant traffic impacts. Her computer experience includes the utilization of capacity and traffic impact programs in a database format. ■ Agoura Hills • Burbank ■ Dana Point • Core Capital Corporation ■ Six Flags Magic Mountain ■ Glendale ■ Huntington Beach ■ Monrovia ■ Santa Monica ■ West Hollywood ■ Alhambra ■ Costa Mesa ■ County of Los Angeles ■ Riverside Cement Company ■ W. B. Core Company ■ Hidden Hills ■ Lake Forest ■ Rosemead ■ Simi Valley Citywide Traffic Signal Study, City of Lakewood, California. Senior Design Manager. Responsible for providing professional engineering services to conduct a Citywide Traffic Signal Study that included a traffic signal inventory of each intersection with type of signals, signal standards, traffic signal controllers with related equipment, left -turn warrants, new traffic signal warrants, 24 hour traffic volume counts, pedestrian counts, speed surveys, ICU calculations and timing sheet and traffic accident review. All of the data was included in a final bound report with safety upgrade recommendations. Protected Left -Turn Phasing Traffic Study Update for Rosemead Boulevard and Marshall Street, City of Rosemead, California. A previous study conducted at the intersection of Rosemead Boulevard and Marshall Street concluded that protected left -turn phasing on Marshall Street was warranted. This study, however, was not accepted favorably by Caltrans, the agency responsible for operations on Rosemead Boulevard. The City requested Willdan conduct a follow-up traffic study and submit findings to Caltrans. Ms. Itagaki prepared this follow-up study. Traffic conditions and data were gathered and applied to Caltrans guidelines for the installation of protected left -turn phasing. The study update concluded that protect left -turn phasing was warranted and was submitted to Caltrans who agreed with the findings. Protected left -turn phasing was then installed on Marshall Street at Rosemead Boulevard. W) LLDAN 60 City of Rancho Palos Verdes Engineering S4r_terrieni of Qualiiit;aiior7s forPublic 1/Vcorks! ErNering Services Jeffrey Lau, PE Associate Engineer Education Mr. Jeffrey Lau is an Associate Engineer. Prior to joining Willdan, Mr. Lau interned 2006, BS, Civil with the Cities of Chino Hills and Glendale where he was introduced to the various Engineering California facets of traffic engineering, including field investigations, traffic data collection and State Polytechnic analysis, traffic design, and project management. Since joining Willdan, Mr. Lau has University, Pomona, CA been involved in fieldwork, design, and drafting on a variety of traffic engineering Registration projects including traffic signals, signing and striping, street lighting, and construction 2015, Civil Engineer, traffic control. Mr. Lau has also assisted in the preparation of traffic impact studies California No. 83887 and analysis, plan checking, and engineering and traffic survey updates. Mr. Lau is Doppler Radar Operator highly proficient in numerous traffic software programs such as AutoCAD, MicroStation, Synchro, HCS+, PC -Warrants, and Crossroads Collision Database. Affiliations American Society of Civil Relevant Project Experience Engineers Traffic Signal at Palos Verdes Drive North and Rolling Hills Road, City of Rolling 10 Years' Experience Hills Estates, California. Traffic Design Lead. Willdan Engineering provided Industry Office professional engineering services for the design and utility coordination for the traffic signal modification project at the intersection of Palos Verdes Drive North and Rolling Hills Road in the City of Rolling Hills Estates. Presently, the traffic signal poles have a decorative wood cover. In order to retain a similar look, the traffic signal modification will include new decorative poles designed by South Coast Lighting, including the modified foundations. The primary purpose of the traffic signal modification is to provide protected/permissive left turn phasing for both directions on Palos Verdes Drive North and the replacement of all the traffic signal poles with new decorative poles and the City has a budget of $240,000. The preparation of plans, specification and estimate will be completed within a 1 month period to expedite the process and get the project to construction within a 6 month period. Willdan will assist the City with the procurement of long -lead time equipment such as the traffic signal controller cabinet and traffic signal poles to minimize delays on the project. Traffic Signal Modification Palos Verdes Drive North and Crenshaw Boulevard, City of Rolling Hills Estates, California. Design Engineer. Responsible for traffic engineering services for this project which consisted of the preparation of plans, specification, and estimate for the modification of the traffic signal at Palos Verdes Drive North and Crenshaw Boulevard in the City of Rolling Hills Estates. Project consisted of upgrading a large traffic signal pole, 8" vehicle heads, old pedestrian heads, and pedestrian push buttons to current standards. Additionally, utility coordination was also provided by Willdan. Peninsula Village Traffic Signal Concepts, City of Rolling Hills Estates, California. Design Engineer. Responsible for the preparation of concept plans at 12 locations showing existing conditions with proposed mitigation measures for future upgrades. The plans included upgrades to the traffic signal equipment, controller, controller cabinet, detector loops, conduit and wiring. Each concept plan included a schematic of the mitigation measures and a detailed list of each specific item to be upgraded. Each concept plan included an engineer's estimate pertaining to each mitigation shown. The project also included the preparation of an ICU analysis at specific locations where the intersection has multiple mitigation measures. Sepulveda Boulevard Widening, City of Culver City, California. Design Engineer. Responsible for traffic engineering services for this project which involved project management, conceptual design, preparation of construction drawings and technical specifications for a major street widening on Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. Sepulveda Boulevard is a major corridor with an average traffic count of 50,000 vehicles and parallels the 405 Freeway through Culver City. Sepulveda Boulevard is an alternative route taken by WI LLDAN Engineering I 61 City of Rancho Palos Verdes Staiernent of Qualifications for Public Works/ E_:i84ering Services Jeffrey Lau, EIT many commuters to access Los Angeles International Airport. This project was done Continued to alleviate an existing bottle -neck and provided for a third southbound lane within the existing right-of-way. A portion of the project was within the City of Los Angeles and Caltrans. Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering, and utility coordination. Paramount Boulevard Rehabilitation Project, City of Pico Rivera, California. Design Engineer. Responsible for the preparation of traffic control plans for the Paramount Boulevard Rehabilitation Project. The roadway width of Paramount Boulevard within the project limits of Washington Boulevard to Gallatin Road varies from 58 feet to 72 feet wide. The services for this project included civil design, traffic engineering, survey, utility coordination, and preparation of technical specifications for the project. California Avenue Improvements, City of South Gate, California. Design Engineer. Responsible for traffic engineering services for this project which involved the preparation of street lighting and signing and striping plans for this project and also included professional engineering design, pavement engineering, and utility coordination services for the California Avenue improvements between north City limit and south City limit. The proposed improvements included asphalt -rubber hot mix overlay, traffic signal modification, ADA access curb ramps, concrete repairs, communication conduits, street lighting, and signing and striping. Shoemaker Avenue/Excelsior Drive Traffic Signal, City of Norwalk, California. Senior Design Engineer. Responsible for traffic engineering services for this project which involved providing professional engineering design services for the preparation of plans, specifications, and estimates (PS&E) for the construction of a traffic signal at Shoemaker Avenue and Excelsior Drive in the City of Norwalk. The existing T - intersection incorporated the driveway on the east side of the street as the fourth leg of the traffic signal. Careful consideration was given to the selection of the traffic signal pole location and types to avoid the existing overhead lines on the east side of the street along Shoemaker Avenue. Additional services provided by Willdan included utility coordination, timing chart preparation and record drawings. 1-5 Mitigation Measures Traffic Signal Modifications, City of Norwalk, California. Senior Design Engineer. Responsible for traffic engineering services for this project which involved providing professional engineering design services for the preparation of plans, specifications and estimates (PS&E) for the 1-5 Freeway Mitigation Project, which consisted of modifying the traffic signal and intersection pavement delineation at Alondra Boulevard/Shoemaker Avenue; Alondra Boulevard/Carmenita Road and Alondra Boulevard/Marquardt Avenue, to provide protected permissive phasing, adequate left turn pocket storage, additional through lane within the existing right-of- way, and ADA compliant access ramps. The first phase of the project consisted in preparing a concept plan that would incorporate all the mitigation measures and assess the impacts on the existing location. Once this was completed, a memorandum summarized the recommendations for modifications including removal of parking, length of left turn pocket to name a few. Additional services provided by Willdan included utility coordination, timing chart preparation, assistance during construction, and record drawings. Paramount Boulevard Rehabilitation Project, City of Pico Rivera, California. Design Engineer. Responsible for the preparation of traffic control plans for the Paramount Boulevard Rehabilitation Project. The roadway width of Paramount Boulevard within the project limits of Washington Boulevard to Gallatin Road varies from 58 feet to 72 feet wide. The services for this project included civil design, traffic engineering, survey, utility coordination, and preparation of technical specifications for the project. M/WI LLDAN I 62 City of Rancho Palos Verdes Engineering Siaiemenf of Qualifications for Public Works/ Li ring Services Reginald J. Greene Senior ®Sign Engineer II Education As a Senior Design Engineer at Willdan, Mr. Reginald J. Greene provides assistance 2004, BS, Civil in traffic design services for a variety of traffic engineering projects for client cities, Engineering, California outside agencies, and California Department of Transportation (Caltrans) projects. State Polytechnic Mr. Greene offers 17 years of traffic -related experience and has experience using University, Pomona AutoCAD, MicroStation, SPEEDPLOT, and Crossroads Collision software. Registration Additionally, he has experience using Caltrans' Standard Plans, Traffic Manual, Doppler Traffic Radar Manual on Uniform Traffic Control Devices (MUTCD), California Manual on Uniform Operation Traffic Control Devices (California MUTCD), and Highway Design Manual. Affiliations ieflCv nt Project Exper9ence American Society of Civil Engineers (Former Orange Line Extension Project, Metropolitan Transportation Authority (MTA). Student Chapter Officer) Traffic Designer. Provided Quality Assurance and Quality Control (QA)/QC) b y reviewing design plans. Institute of Transportation Engineers (Former Safe Routes to School Project, City of South Gate, California. Senior Design Student Chapter Officer) Engineer 11. Responsible for professional engineering design services for the Safe National Society of Black Routes to School (SRTS) Grant Project. The project involved the design of traffic Engineers (Former signals, speed awareness signs, flashing beacons, and street improvements including Student Chapter Officer) sidewalks and ADA compliant ramps along Pinehurst Avenue from Tweedy Boulevard to Southern Avenue. The project included the upgrading of 122 countdown Society of Hispanic pedestrian signal heads and the solar powered speed awareness signs nearby to 14 Professional Engineers elementary schools. Other services provided by Willdan included topographic survey, 17 Years' Experience utility coordination, and federal paperwork administration. Town Center Street Improvement Engineering Design, City of La Canada Flintridge, California. Design Engineer. Responsible for the preparation of plans, specifications, and estimate (PS&E) for the traffic signal plans portion of this project which also involved the installation/modification of three traffic signals, streetscape design, street resurfacing, raised center medians, and center median landscaping associated with the La Canada Flintridge Town Center development. Willdan also assisted with Caltrans Encroachment Permit processing to obtain permit and performed utility coordination, right-of-way survey, pavement analysis, and streetscape design. Palos Verdes Drive North -Bike Lane Project, Rolling Hills Estates, CA. Willdan Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Projects Grant) and state funds in the amount of $554,580 (SR2S Grant) that will serve as the local match for the design and construction of the Palos Verdes Drive North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided professional engineering and construction engineering services to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of (Class II) 5 foot bike lanes within a 200 foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection. Firestone Boulevard Four Traffic Signals (HSIP), City of South Gate, California. Senior Design Engineer 11. Responsible for providing traffic engineering services which involved plan preparation for modification of existing traffic signals along the Firestone Boulevard corridor to provide protective left turn phasing at the following WI LLDAN Engineering I63 City of Rancho Palos Verdes Stafernenf of Qualifications for Public Works/ F.r83Bring Services Reginald J. Greene locations: Firestone Boulevard at Otis Street; Firestone Boulevard at California Continued Avenue; Firestone Boulevard at Long Beach Avenue; and Firestone Boulevard at Santa Fe Avenue. The project included preparation of plans, specification and estimate (PS&E), field survey, environmental documentation, public outreach, utility coordination, assistance during advertising and bidding and record drawing preparation. Traffic Signals for Three Locations (HSIP), City of La Puente, California. Senior Design Engineer II. Responsible for providing traffic engineering services for this project which involved providing professional engineering design, project management and funding administration services for the 2007-2008 Highway Safety Improvement Program (HSIP) funded project. The City was awarded $312,818 for the traffic signal modification of three locations: Temple Avenue/Sunset Avenue; Valley Boulevard/Ferrero Lane and Temple Avenue/Orange Avenue. The project involved the full design of Valley Boulevard/Ferrero Lane and modification of the other two intersections for federal compliance as well as completeness. The design included the modification of the traffic signal to protective/permissive left turn phasing. Amar Road/Tonopah Avenue Traffic Signal (HSIP), City of La Puente, California. Senior Design Engineer II. Responsible for providing traffic engineering services for this project which involved providing professional engineering design, project management and funding administration services for the 2009/2010 Highway Safety Improvement Program (HSIP) funded project. The City was awarded $200,800 for the traffic signal installation at Amar Road and Tonopah Avenue. Our scope of work included preparation of plans, specification and estimate, utility coordination and funding administration. Beverly Boulevard/Pico Park Traffic Signal, City of Pico Rivera, California. Project Manager. Responsible for providing professional traffic engineering services to prepare traffic signal installation plans for the Beverly Boulevard and Pico Park/Sandoval Avenue intersection. The design included utility coordination, revisions to the traffic signal modification plan at the adjacent Beverly Boulevard and Durfee Avenue intersection, and preparation of an engineer's estimate and technical specifications. Traffic Signal Design for 7 Locations, City of Lakewood, California. Senior Design Engineer II. Responsible for providing professional engineering design services for the preparation of plans, specification, and estimate for seven (7) traffic signal modifications. The project consisted of upgrading the traffic signal to include protected and/or protected/permissive left -turn phasing, upgrading vehicle heads, pedestrian heads, pedestrian push buttons, conduit, wiring, etc. The project received $475,000 through the Transportation Community and System Preservation Program Grant (TCSP) and the City needed to have a local match of $118,750. Other services provided by Willdan included construction observation, grant administration, utility coordination, and labor compliance. Crenshaw Boulevard and Crestridge Road Traffic Signal Modification, City of Rancho Palos Verdes, California. Senior Design Engineer. Responsible for providing professional engineering design services for the Crenshaw Boulevard and Crestridge Road traffic signal modification project. Scope of work included preparation of plans, specification and estimate for the traffic signal modification. The project was funded through a Highway Safety Improvement Project (HSIP) grant. Other services provided by Willdan Engineering included, utility coordination federal paperwork administration, labor compliance, contract administration, construction management and observation. AV i WI LLDAN ( 64 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ Gr84ering Services John J. g • Principal Project Manager,�; kServices Education Mr. John J. Hidalgo has more than 26 years of landscape architecture experience 1987, BS, Landscape encompassing a variety of activities. These include design development, project Architecture, California management, client and agency coordination, and overseeing projects from State Polytechnic conception through completion, as well as construction documentation and University, Pomona observation. He is familiar with various local, state and federal codes, regulations, Summer of 1987, procedures and standards relating to construction, safety, park and facility planning, European Study Tour and other building activities. He has successfully completed projects in compliance Hosted by Cal Poly with these various standards, and while with other firms, has represented the Owner Pomona, School of in the review process. Mr. Hidalgo has in-depth experience in both field observation Architecture and construction. His current responsibilities include park and streetscape design, Registration plan checking services, and construction observation. Registered Landscape Project Manager. Responsible for providing landscape architectural and architectural Architect, California, No. Relevant Project Experience 3551, 1991 Park Development Registered Landscape Calimesa Park Master Plan Development, Park Layout, Paragon Partners. Architect, Nevada, No. 788, 2008 Responsible for working with Paragon Partners in preparing a land acquisition study, financing plan and conceptual park development plan. The scope of the work includes 1995, Licensed establishing site selection criteria, and propose and evaluate several alternative sites. Contractor, California C- Once a site is selected, a conceptual park layout with preliminary cost estimates will 27, #713613 be prepared. The conceptual pian will identify park uses and facilities, and related Affiliations landscape recommendations. Illustrative renderings will showcase the park features American Society of and design facilities. In addition, Willdan will assist in the preparation of a plan that Landscape Architects will evaluate funds on hand, existing future revenue sources and potential new California Parks and sources of funding. Recreation Society Brookhurst Park Maintenance Yard Improvements, City of Anaheim, California. California Landscape Project Manager. Responsible for providing landscape architectural and architectural Contractors Association services for the improvements of the Brookhurst Park Maintenance Yard and Crew Quarter. The improvements included a vehicle shelter, split face concrete block walls Street Tree Seminar and parking area. The tasks included the preparation of conceptual plan, construction 26 Years' Experience plans and construction estimate. In addition, the City retained Willdan to provide construction observation services for this project. Gundry Park, City of Paramount, California. Landscape Architect. Responsible for conceptual design and preparation of construction documents and specifications for a .7 acre neighborhood park. The park consists of a tot lot playground area, seating, covered picnic shelters, decorative walkways, pedestrian lighting and an enhanced 7' high concrete block wall at two adjoining residential property boundaries. Riverfront Park, City of Maywood, California. Landscape Architect. Responsible for the design and preparation of construction documents and specifications of a 7.3 -acre park for the residents of the City of Maywood. Portions of land have been considered a "Brown Field" (contaminated soil). A thorough remediation program administered by the Environmental Protection Agency has allowed the reclamation of the land for public use. Development of the park include restroom facilities, retaining walls, landscaping, sidewalks, bicycle paths, a staging area for those using the Los Angeles River bicycle trail, a bridge, trails, demonstration garden, lawn and picnic areas, a basketball court, a soccer field, and the incorporation of a swale to add to a natural habitat setting and aid in the control of runoff. Julia Russ Asmus Park, City of Bell Gardens, California. Landscape Architect. Responsible for the design and preparation of construction documents and specifications of a 1.0 -acre neighborhood park. The park was developed with the requirement to serve two interests, 1) to provide recreational outlets for the immediate 'VWI LLDAN I 65 City of Rancho Palos Verdes Engineering SYaternent of Quadifications for Pubhc Work >/ E8,5 --ring Services John J. Hidalgo, RLA neighborhood along with a water pumping station to relieve storm water that is Continued collected during the rainy season, and 2) to link the park to the Los Angeles River through a series of bike trails from the park via the Rio Hondo Channel to the Los Angeles River. Park activities include playground area, picnic facilities, shaded picnic shelter, barbeque grills, security lighting, benches, half -court basketball, and restroom facilities. On -Call Services, City of Bell Gardens, California. Landscape Architect. Responsible for the on call contract with the City. Project experience includes the expansion of an existing linear park as a result of the construction of a water well site building. Another project involved the design of Hannon Park - a new neighborhood park located on an open space area formerly the site of abandoned homes. The City demolished the homes, infilled the open space area and constructed this neighborhood park whose amenities included play equipment, barbecue picnic tables, drinking fountain, and open lawn area. Other responsibilities included the design of street medians throughout the City. This involved the development of a theme which incorporated decorative banner poles, colorful and functional public transportation shelters, and decorative street paving. Urban Streetscape Development Sepulveda Boulevard Widening, City of Culver City, California. Landscape Architect. Responsible for project management, conceptual design, preparation of construction drawings and technical specifications for a major street widening on Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. Sepulveda Boulevard is an alternative route taken by many commuters to access Los Angeles International Airport. This project was done to alleviate an existing bottle- neck and provided for a third southbound lane within the existing right-of-way. A portion of the project was within the City of Los Angeles and Caltrans. Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering, and utility coordination. Atlantic Avenue Street Improvements, City of South Gate, California. Landscape Architect. Responsible for civil and traffic engineering design, pavement engineering, design survey, landscape architectural design, and utility coordination services for Atlantic Avenue improvements between Firestone Boulevard limit and south city limit. Bellflower Boulevard at State Route 91 Landscape Improvement, City of Bellflower, California. Project Manager. Responsible for providing landscape architectural drawings for the beautification of State Route 91 freeway at Bellflower Boulevard interchange. The beautification involved the planting of drought tolerant trees and shrubs, decorative paving and a water efficient irrigation system. The scope of work included NEPA and CEQA documentation, a conceptual landscape site plan, construction documents; and biding assistance and construction support services. AV WI LLDAN ( 66 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Wodksl E,86cring Services Education Mr. Bryan Nguyen has over 19 years of landscape architecture and graphic design 1993, BS, Landscape experience. Mr. Nguyen's experience includes the development of conceptual Architecture, Cal Poly landscape plans with extensive graphic vignettes such as photographic before and Pomona after simulations; and the preparation of construction documents. Mr. Nguyen is Registration proficient in AutoCAD, Microstation, LandFX, Adobe Photoshop, and Macromedia Registered Landscape Freehand. Other duties include the preparation of irrigation water and landscape Architect, California, No. management specification documents and agency landscape plan check submittals. 4967, 2004 Relevant Project Experience Registered Landscape Architect, Nevada, No. Sepulveda Boulevard Widening, City of Culver City, California. Responsible for 757, 2007 providing landscape design services for this project which involved conceptual design, Affiliations preparation of construction drawings and technical specifications for a major street Street Tree Seminar widening on Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. A portion of the project was within the City of Los Angeles and Caltrans. 19 Years' Experience Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering and utility coordination. Orange Line Extension, Metropolitan Transportation Authority (MTA), Los Angeles, California. Responsible for assisting in providing landscape design for this project including preparing the arborist report, tree inventory plans, tree replacement plans, and planting and irrigation plans as well as coordinating all landscape and irrigation aspects for the implementation of the design build process Willdan is providing professional engineering design for the design- build project of the MOL Extension extending from the existing Chatsworth Station to the Canoga Station in the San Fernando Valley along Canoga Avenue. Willdan is preparing plans, specifications and estimate for street widening, raised landscaped medians, irrigation system, ADA Access curb ramps, bicycle paths, park and ride and parking lot facilities, traffic signal modifications, communication conduits, and signing and striping. In addition, three (3) stations will be constructed or reconstructed. 223rd Street Improvements, City of Carson, California. Responsible for supporting landscape architect services for this project which involved the preparation of plans, specifications, and cost estimate (PS&E) for the 223rd Street Improvements, Lucerne Street to Alameda Street. Services included developing a landscape master plan to create an identity for Auto Row, and preparation of plans and specifications, street widening and rehabilitation, landscape medians, signing and striping and traffic control. Atlantic Avenue Street Improvements, City of South Gate, California. Landscape Architect. Responsible for civil and traffic engineering design, pavement engineering, design survey, landscape architectural design, and utility coordination services for Atlantic Avenue improvements between Firestone Boulevard limit and south city limit. Pacific Coast Highway Streetscape Beautifications, City of Long Beach, California. Landscape Architect. Responsible for providing plans, specifications and estimates (PS&E) for the Pacific Coast Highway Streetscape Beautifications, that are ready for Caltrans review submittal regarding Encroachment Permit Application. The project limits cover the area within Caltrans' right-of-ways on Pacific Coast Highway from 1-710 on-ramp to the City's western boundary. Bellflower Boulevard at State Route 91 Landscape Improvement, City of Bellflower, California. Responsible for preparing conceptual renderings for this project which involved providing landscape architectural drawings for the beautification of State Route 91 freeway at Bellflower Boulevard interchange. The beautification involved the planting of drought tolerant trees and shrubs, decorative 4W1 LLDAN 67 City of Rancho Palos Verdes Engineering Stater_ientof Qualificauons for Public, Works/ Er87erinq Services Bryan Nguyen, RLA paving and a water efficient irrigation system. The scope of work included NEPA and Continued CEQA documentation, a conceptual landscape site plan, construction documents; and biding assistance and construction support services. Cinderella Mobile Home Park, City of Paramount, California. Designer. Responsible for providing landscape construction drawings for improvements along the street frontage and entrance to Cinderella Mobile Home Park on Contreras Street. Amenities for the improvements included, a decorative perimeter wall, pedestrian level lighting, meandering sidewalk with enhanced paving, and low planter walls with pilasters at the entrance. 401 South Tustin Street Campus, Alexander and Hibbs Architects. Landscape Architect. Responsible for the provision of landscape architectural services for a health care facility campus comprised of a crisis residential center, a wellness center, a vocations training center, an administration building, a maintenance building, and site improvements on a three acre site. Our scope included the preparation of conceptual plans, construction drawings and construction support services. Landscape Inventory/Infrastructure Audit Services for Landscape Maintenance Assessment District Nos. 3, 4, 5, and Arterial Zones (Roadways), City of Yorba Linda, California. Responsible for performing field inventory for this project. Willdan prepared a landscape inventory of the City's Landscape Maintenance Assessment Districts (LMAD). The goals of the inventory were to lower long-term maintenance costs, improve operational efficiency, and enhance water conservation. The scope included: a) conducted a landscape inventory of the LMADs 3, 4, 5 and arterial roadway areas and b) analyzed the information. The inventory was divided into two categories: a) irrigation equipment profile for each point of connection (POC) and, b) detailed description of specific characteristics at each controller location. Finally, this document assisted the City in developing a customized landscape maintenance program that enhanced the aesthetic appearance, improved the day-to-day management of operations and ultimately addressed the long-term financial objectives of the City by balancing the annual costs with available revenue sources. Pacific Coast Highway Streetscape Beautifications, City of Long Beach, California. Responsible for providing landscape design services for this project which involved providing plans, specifications and estimates (PS&E) and Caltrans review submittal regarding Encroachment Permit Application. The project limits cover the area within Caltrans' right-of-ways on Pacific Coast Highway from 1-710 on-ramp to the City's western boundary. Beautifications/improvements will include street trees, entry signage, street furniture, street corners enhancement and ADA compliance, ornamental scrolls and banners on existing street light poles and decorative bus shelters. California Estates Frontage Landscape Improvements, City of Paramount, California. Landscape Architect. Willdan had previously prepared a conceptual landscape plan for the City of Paramount. The City of Paramount approved the concept plan and would like Willdan to proceed with the preparation of the landscape construction documents. Our task is to prepare landscape construction plans, specifications and construction estimate. WI LLDAN I 68 City of Rancho Palos Verdes Engineering Statement of'Qualificotlons for Public Works/ L 8,,& -ring Services David • . Knell, PLS Principal Project Manager,Surveying and Mapping Services Education Mr. David O. Knell has more than 42 years of experience in the surveying and 1971, BS, Cartography, mapping field. He has been responsible for a variety of mapping and construction Boston University- jobs as well as performing surveys and acting as an expert witness in legal cases. Boston, MA His experience includes the supervision of field crews, overseeing an office staff Civil Engineering and dealing with various survey projects, and extensive experience with local, state, and Land Surveying Classes, federal agencies. Mr. Knell has also done considerable work with title companies and California State University, attorneys for a variety of jobs. Long Beach Registration Reievant Project Experience 1983, Professional Land Subdivision Mapping/Map Checking/Boundary Analysis Surveyor, California No. 5301 Mr. Knell has a wide range of experience preparing and checking subdivision maps. As a contract checker for the Cities of Agoura Hills, Dana Point, Lake Forest, Bell Affiliations Gardens, Paramount, and Cerritos, and a surveyor in private practice, Mr. Knell has California Land Surveyors been involved in the preparation and checking of numerous Parcel Maps and Tract Association (CLSA) Maps, A.L.T.A Surveys, Records of Survey, Lot Line Adjustments, Parcel Map Southern California Waivers, Certificates of Compliance, and boundary determination. He also was Experts & Consultants responsible for preparing legal descriptions and sketches for a wide range of 42 Years' Experience easements involving utilities, air space reservations, and construction projects. He has also worked with major utilities and title companies in determining easements and correcting defective legal descriptions. Mr. Knell is currently the City Surveyor for the Cities of Agoura Hills, Big Bear Lake, Calabasas, Cerritos, Hawaiian Gardens, Indian Wells, La Canada Flintridge, Lake Forest, Malibu, Paramount, Rosemead, and Yorba Linda. He also has been the lead in dealing with LAFCO for various annexations in Los Angeles, Orange, and San Bernardino Counties. He lectures frequently on the Laws of Easements and how to best write effective legal descriptions. Mr. Knell also performs land surveying services for Stewart Title of California. More specific experience is as follows: Sepulveda Boulevard Widening, City of Rancho Palos Verdes, California. Responsible for survey services for this project which involved project management, conceptual design, preparation of construction drawings and technical specifications for a major street widening on Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. Sepulveda Boulevard is a major corridor with an average traffic count of 50,000 vehicles and parallels the 405 Freeway through Culver City. Sepulveda Boulevard is an alternative route taken by many commuters to access Los Angeles International Airport. This project was done to alleviate an existing bottle -neck and provided for a third southbound lane within the existing right- of-way. A portion of the project was within the City of Los Angeles and Caltrans. Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering, and utility coordination. Willow Place Widening, City of South Gate, California. Responsible for design survey for this project which involves the widening of Willow Place, within the existing right-of-way four feet on the east and west sides, from Long Beach Boulevard to Santa Fe Avenue, reducing the parkway width from 10 feet wide to six feet, with full - width sidewalks and a curb to curb width of at least 36 feet, plus upgraded street lights on Willow Place and also on numerous nearby streets. The project encompasses the following work: pavement rehab, curb and gutters, new sidewalks/curb and gutter, drive approaches removal of street trees, relocation of fire hydrants, relocation of AVVWI LLDAN I 69 City of Rancho Palos Verdes Engineering Sialernent c)f Qualifications for Public Works/ E,89ring Services David O. Knell, PLS water meters and other utilities, wheelchair ramps, relocation of street lights, Continued conversion of street lights from series to multiple system, planting of street trees, striping, etc. The project involves the design, bidding and award process and full construction management, including resident engineering, materials testing and utility coordination. Biweekly meetings are planned along with special meetings as warranted. Community outreach is continuous through design construction, including direct communications with residents as special needs arise. Alondra Boulevard Street Resurfacing, City of Paramount, California. Responsible for providing survey services for this project which involved the preparation of plans, specification and estimate for resurfacing of Alondra Boulevard from Hayter Avenue to West City Limit. Other services provided by Willdan included utility coordination, labor compliance, federal fund processing, pavement engineering, and materials engineering. Project was part of the Economic Stimulus Package funding (ARRA 2). Palos Verdes Drive North Bike Lane Project, City of Rolling Hills Estates, California. Land Surveyor. Willdan Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Projects Grant) and state fund in the amount of $554,580 (SR2S Grant) that will serve as the local match for the design and construction of the Palos Verdes Drive North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided professional engineering and construction engineering services to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of 5 foot bike lanes within a 200 foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection. Centrelia Street Rehabilitation, City of Lakewood, California. Land Surveyor. Project involved the provision of professional engineering design services for the preparation of the Centrelia Street Rehabilitation Project. Willdan prepared plans, specification and estimate for street rehabilitation, signing and striping and camera plan for Centrelia Street from Studebaker Road to East City Limits. Other services included utility coordination, pavement engineering and topographic survey. 150th Street, 160th Street and 161st Street Improvements Project, City of Lawndale, California. Land Surveyor. Responsible for providing professional engineering design services for the preparation of plans, specifications and estimate for 159th Street, 160th Street between Inglewood Avenue and Firmona Avenue and 161 st Street between Sombra Avenue and Prairie Avenue. The scope of work included pavement engineering, utility coordination, topographic survey, and the specialty of an arborist. WI LLDAN 70 City of Rancho Palos Verdes Engineering Statement Of QUaliiications for Pudic Works/ D9& ring Services Susana C. Barrientos Senior Survey Analyst Education As a Senior Survey Analyst in the Surveying and Mapping Division at Willdan, Ms. 1999, BS, Civil Susana C. Barrientos' duties include CAD drafting for various projects, including Engineering, California right-of-way drawings, subdivision maps, and other survey related drawings. Parcel State Polytechnic maps, tract maps, and surveys are some of the other items she has worked on. University, Pomona Prior to joining the Surveying and Mapping Division at Willdan, Ms. Barrientos 5 Years' Survey Experience previously worked in the Civil Design Division where her duties included assisting in 1 Years' Civil the preparation of plans, specifications, and estimates (PS&E) for public works Engineering Experience projects, as well as the preparation of geometric plans, project reports, and project study reports. Ms. Barrientos is proficient with software such as Microstation and AutoCAD computer aided drafting programs. Ms. Barrientos has over 10 years of civil engineering experience. Ms. Barrientos is bilingual, fluent in the Spanish language. ellievant Project Experience Surveying and Mapping Sepulveda Boulevard Widening, City of Culver City, California. Survey Analyst. Responsible for survey services for this project which involved project management, conceptual design, preparation of construction drawings and technical specifications for a major street widening on Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. Sepulveda Boulevard is a major corridor with an average traffic count of 50,000 vehicles and parallels the 405 Freeway through Culver City. Sepulveda Boulevard is an alternative route taken by many commuters to access Los Angeles International Airport. This project was done to alleviate an existing bottle -neck and provided for a third southbound lane within the existing right- of-way. A portion of the project was within the City of Los Angeles and Caltrans. Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering, and utility coordination. 223rd Street Improvements, City of Carson, California. Survey Analyst. Responsible for providing survey services for this project which involved the preparation of plans, specifications, and cost estimate (PS&E) for the 223rd Street Improvements, Lucerne Street to Alameda Street Project No. 1003. Services included developing a landscape master plan to create an identity for Auto Row, and preparation of plans and specifications, street widening and rehabilitation, landscape medians, signing and striping and traffic control. Atlantic Avenue Street Improvements, City of South Gate, California. Survey Analyst. Responsible for assisting Mr. Knell with providing survey services for this project. The project included civil and traffic engineering design, pavement engineering, design survey, landscape architectural design, and utility coordination services for Atlantic Avenue improvements between Firestone Boulevard limit and south city limit. Fred Waring Drive Widening, City of La Quinta, California. Survey Analyst. Responsible for assisting Mr. Knell with providing survey services for this project. Project consisted in widening Fred Waring Drive to accommodate a third lane of traffic in each direction. Project included street widening, concrete median design, traffic signal installation at Palm Royale and modification at Washington Street, signing and striping and interconnect design. Other services included utility coordination, topographic survey and legal deed preparation. Paramount Boulevard Rehabilitation, City of Pico Rivera, California. Survey Analyst. Responsible for assisting Mr. Knell with providing survey services for this project. This project involved the provision of professional engineering services including preliminary engineering, survey, and design preparation of plans and WI LLDAN I 71 City of Rancho Palos Verdes Engineering Staternent of Qualifications for Public 1l\torks/ Dgi' Bring Services Susana Barrientos specifications for the Paramount Boulevard Rehabilitation Project. The roadway width Continued of Paramount Boulevard within the project limits of Washington Boulevard to Gallatin Road varies from 58 feet to 72 feet wide. The services for this project include civil design, traffic engineering, survey, utility coordination, and preparation of technical specifications for the project. Puente Street Property, City of Covina, California. Survey Analyst. Responsible for providing survey services for this project which involved preparing legal descriptions and exhibits for a property exchange between the City of Covina Redevelopment Agency and the Covina School District, which owns an adjacent property. As -Needed Engineering Services, City of Lawndale, California. Survey Analyst. Responsible for providing as -needed surveying and mapping services to the City's Community Development Department. Santiago Oaks Regional Park, Orange County Parks. Survey Analyst. Responsible for providing survey services for this assignment. Project involves staking property line at Santiago Oaks Regional Park to clearly define limits of encroachment in preparation of removal of the encroachments and the construction of a fence. 24223 Ocean Avenue, Torrance, California, Fidelity National Title Group. Survey Analyst. Responsible for providing survey services for this assignment. Survey of property lines to identify encroachments, if any. Survey of Encroachments and Driveway, 7255 Tranquil Place, Sunland, California, The Boss Law Firm, APLC. Survey Analyst. Responsible for providing survey services for this project which involves survey of a flag lot shaped property with a driveway being used without authorization by a neighbor to the west. Fidelity National Title Group. Survey Analyst. Responsible for providing survey services for this assignment. Assignment involves survey of landlocked property currently having non -authorized ingress -egress over property owned by another party. Survey will be used to determine diminution in value to burdened property and to enable a legal description for a driveway easement to be written. Claim 258423 (Stark -de Boer), Fidelity National Title Group. Calculator. Responsible for providing office calculations for this project which involves investigating an encroachment issue and prepare a lot line adjustment, if necessary. AT&T Parking Structure Survey, Menlo Properties. Calculator. Responsible for office calculations and drafting for this project which involved preparing an ALTA survey in conjunction with a survey of the office building for a potential sale. Laguna Beach Property Survey and Record of Survey, Fidelity National Title Group. Survey Analyst. Responsible for providing survey services for this project which involved performing a property survey and preparation of record of survey for a historic area of Laguna Beach with significant encroachment problems. Owl LLDAN I 72 City of Rancho Palos Verdes Engineering Statement of QualificFtions for Pubhe Works/ E,92-inc Services Christopher t Baca,Deputy Director, Construction Management and Inspection - Education Mr. Christopher D. Baca is responsible for directing and monitoring public works BS, Public Administration, inspection services, and overseeing construction observation personnel. His California State University, experience includes construction management of large-scale projects in areas of Fullerton water systems, street improvements, park improvements, storm drains, sanitary Public Works Inspection, sewers, asphalt resurfacing (including asphalt -rubber products), concrete paving, California State University, landscaped medians, and traffic signals. In addition to his experience with Los Angeles Extension Community Development Block Grant (CDBG) funded projects, Mr. Baca is also Asphalt Paving; Contract familiar with the inspection and contract administration of other federally funded Administration and Change projects in accordance with Caltrans Local Program Manual. During his 26 years of Orders for Federally Funded experience with Willdan, Mr. Baca has served as a senior public works observer, as Projects Seminars well as a permit inspector in the Cities of Bell Gardens, Paramount, and Rosemead. Inspection Principles; Public Currently, Mr. Baca manages work in Los Angeles and Orange Counties. He Contact; Slurry Seal; and interfaces with California Department of Transportation on a regular basis. Traffic Signal Inspection and Prior to joining the Willdan team, Mr. Baca worked for a soils engineering firm Design Seminars conducting field inspections and performing laboratory testing. Registration California, Division IV, Public Relevant Project Experience Works, RCI No. 4161 Capital Improvement Projects California, Division I, Palos Verdes Drive North -Bike Lane Project, Rolling Hills Estates, CA. Willdan Engineering, RCI No. 5161 Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Affiliations Projects Grant) and state funds in the amount of $554,580 (SR2S Grant) that will American Construction serve as the local match for the design and construction of the Palos Verdes Drive Inspectors Association North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided professional engineering and construction engineering services 26 Years' Experience to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of (Class II) 5 foot bike lanes within a 200 foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection. Hawthorne Boulevard Street Resurfacing, City of Rolling Hills Estates. Willdan provided design engineering for resurfacing from Palos Verdes Drive North to the northern city limits and from Silver Spur Road to the southern city limits. The improvements involved asphalt -rubber hot -mix overlay, ADA -compliant curb ramps, concrete repairs, signing, striping, and loop replacement. The scope of work included federal invoicing, utility coordination, and pavement engineering. 9th Street Project, City of Highland, California. Project Manager. Responsible for providing construction management and construction observation of the City of Highland's 9th Street Project. The project involved the removal and replacement of damaged asphalt, repair of existing concrete improvements, asphalt overlay and slurry seal installation. Willdan tracked quantities, provided claims mitigation, responded to RFI's, track submittals, and maintained the construction file. Transit Priority, City of Santa Monica, California. Project Manager. Responsible for providing construction management services for the City's Transit Priority Project. The project involved the installation of new fiber optic, some minor traffic signal modification and other appurtenant work. In addition to construction management W I LLDAN I 73 City of Rancho Palos Verdes Engineering Staiement of Qualifications for Public Works/ Eig- 3ering Services Christopher D. Baca, RCI services, Willdan provided public outreach services to the local businesses and Continued residents. Bradford/Madison Street Improvement, City of Placentia, California. Project Manager. Responsible for providing professional construction engineering and funding administration for the Bradford/Madison Street Improvement Project. Willdan provided labor compliance, construction management, and construction inspection services for the ARRA funded project. The project involved the removal and replacement of damaged street sections, asphalt overlay, miscellaneous concrete repairs to sidewalks and curbs, planting of street trees, and other appurtenant work. Ramona B Street Improvement, City of Baldwin Park, California. Project Manager. Responsible for providing construction engineering and funding administration for the Ramona B Street Improvement Project. Willdan is providing labor compliance, construction management, and construction inspection services for the ARRA funded project. The project involves the removal and replacement of damaged street sections, asphalt overlay, miscellaneous concrete repairs to sidewalks and curbs, planting of street trees, and other appurtenant work. Palos Verdes Drive North, City of Rolling Hills Estates, California. Project Manager. Responsible for providing professional engineering services for the preparation of plans, specifications, and estimates for the rehabilitation of Crenshaw Boulevard to Rolling Hills Road. Once the design was complete, Willdan provided bid advertisement, bid analysis, and other preconstruction services. Once the project was awarded, Willdan provided labor compliance, construction management, and construction inspection services for the project. The project was funded through the Federal Highway Administration (FHWA) American Recovery and Reinvestment Act (ARRA) at a total project cost of approximately $400,000. Median and Pavement Resurfacing at the Intersection of Slauson Avenue and Atlantic Boulevard, City of Maywood, California. Responsible for the oversight of construction observation services for this project which involved construction management services for the median and pavement resurfacing of the intersection of Slauson Avenue and Atlantic Boulevard. The project general items of work included Asphalt Rubber Hot Mix (ARHM) overlay, cold milling, new landscape median islands, concrete repairs, curb ramps in compliance with ADA requirements, PCC pavement, roadway striping, and traffic loop replacement. Willdan services included contract administration, construction observation, and material testing. Arterial Street Resurfacing, City of Rancho Palos Verdes, California. Construction Manager. Responsible for providing construction management services for the City's Arterial Street Resurfacing Project. The project included improvements on: Hawthorne Boulevard from Palos Verdes Drive West to Dupre Drive and from Verde Ridge Road to Indian Peak Road; Palos Verdes Drive West (N/B) from Hawthorne Boulevard to north City Limit; and Palos Verdes Drive south (E/B) from Terranea Way to 2,200' west. The project general items of work included Asphalt Rubber Hot Mix (ARHM) street resurfacing, installation of pavement reinforcement mesh (PRM) Glasgrid, cold milling, bus pad construction, curb and gutter removal and replacement, curb ramps in compliance with ADA requirements, AC pavement reconstruction, roadway striping, and traffic loop replacement. Willdan services included contract administration, construction observation, Caltrans award and invoicing, federal labor compliance, and material testing. The project was federally funded by the ARRA funds. WI LLDAN I 74 City of Rancho Palos Verdes Engineering Staterneri' of Qualifications for Public Works; D94 -ring Services Michael D. Bustos, PE, ENV SP Connector Pipe Screen Installation, City of Monrovia, California. Project Manager. Responsible for managing all aspects of design, permitting, and construction management and inspection services. The goal of the project is to retrofit all existing City and Los Angeles County Flood Control District (LACFCD) catch basins within the city limits in order to comply with the Trash Total Maximum Daily Load (Trash TMDL) requirements established by the Los Angeles Regional Water Quality Control Board. Services include catch basin inventory, permitting assistance, design, and inspection. Preliminary Hydrology Report, Waste Water Drainage, Santa Clara Waste Water, California. Project Engineer. Mr. Bustos prepared a preliminary hydrology report in support of Santa Clara Waste Water District's (SCWWD) proposed facility expansion project in Santa Paula, CA. The report included a hydrological analysis (including discussion, calculations, and exhibits) of SCWWD's proposed on site building and hardscape improvements to determine what onsite detention would be required as a result of the proposed improvements. Mr. Bustos utilized the rational method to VWILLDAN I 75 City of Rancho Palos Verdes Engineering Stater ent of Qualifications for Public Nor is/ Er91&-ring Services Senior Engineer Education Mr. Michael D. Bustos is responsible for design and construction management of BS, Civil Engineering (Magna projects such as roadway reconstructions, drainage improvements, pipelines, pavement Cum Laude), California rehabilitation, street improvements, and grading. Mr. Bustos has served as resident Polytechnic State University, engineer for over a dozen federally- and state -funded projects over the last five years. San Luis Obispo He has gained valuable experience in on-site construction management, off-site Registration/Certification construction administration, inspection, design, and plan checking during his 13 years Civil Engineer, California No. with Willdan. 73173 Relevant Project Expeftnce Envision Sustainability Professional Trunk Water Replacement, Morongo Band of Mission Indians, Banning, California. Project Engineer/Construction Manager. Engineer of Record responsible for preparation 13 Years' Experience of plans, specifications, and estimate for construction of 16 -inch water main on Porters, Morongo, and Martin Roads. Mr. Bustos also served as Construction Manager during construction, and was responsible for contract administration, materials testing, and public works observation. Firestone/Atlantic Design, City of South Gate, California. Reclaimed Water Design Engineer. Mr. Bustos provide construction phase design support for installation of a 10 - inch reclaimed water line on Firestone Blvd: The project was constructed by the City and maintained by Central Basin Municipal Water District. Willdan provided surveying, civil engineering, geotechnical engineering, and utility coordination services for street improvements on Firestone Boulevard from Dorothy Avenue to Lotta Avenue and on Atlantic Avenue from Patata Street to Branyon Avenue. As part of our design services, Willdan provided final civil plans, including street design, storm drain, sewer and water relocation, traffic signal modification and installation, signing and striping, street lighting, contract specifications, and engineer's estimate for widening both Firestone Boulevard and Atlantic Avenue. In addition, Willdan prepared a project report and cost estimates, including aerial topography and street centerlines; roadway geometrics; hydrology study; sewer study; water study; utility relocation concepts; geotechnical recommendations; turn pocket lengths; landscaping. Force Main Rehabilitation at Kiddie and Hobie Beaches, Channel Islands Beach Community Service District, California. Project Manager. Engineer of Record responsible for preparation of plans and specifications for cured in place pipe lining of the District's existing sewer force mains. Willdan provided design engineering services in the form of an 8 -inch and 12 -inch force main rehabilitation. The project consisted of lining approximately 10,000 LF of 8 -inch and 4,000 LF of 12 -inch sewer mains. Wildman also facilitated permit procurement from the Naval Base, County of Ventura, and City of Oxnard. Connector Pipe Screen Installation, City of Monrovia, California. Project Manager. Responsible for managing all aspects of design, permitting, and construction management and inspection services. The goal of the project is to retrofit all existing City and Los Angeles County Flood Control District (LACFCD) catch basins within the city limits in order to comply with the Trash Total Maximum Daily Load (Trash TMDL) requirements established by the Los Angeles Regional Water Quality Control Board. Services include catch basin inventory, permitting assistance, design, and inspection. Preliminary Hydrology Report, Waste Water Drainage, Santa Clara Waste Water, California. Project Engineer. Mr. Bustos prepared a preliminary hydrology report in support of Santa Clara Waste Water District's (SCWWD) proposed facility expansion project in Santa Paula, CA. The report included a hydrological analysis (including discussion, calculations, and exhibits) of SCWWD's proposed on site building and hardscape improvements to determine what onsite detention would be required as a result of the proposed improvements. Mr. Bustos utilized the rational method to VWILLDAN I 75 City of Rancho Palos Verdes Engineering Stater ent of Qualifications for Public Nor is/ Er91&-ring Services Michael D. Bustos, PE, ENV determine the Q10 and Q100 runoff flows. The analysis was conducted in conformance SP with the Ventura County Hydrology Manual requirements. Continued Green Beach Access Point, HDR Engineering, Inc., California. Lift Station Design Engineer. Responsible for preparation of plans and specifications for a stormwater lift station and force main at Camp Pendleton. HDR Engineering, Inc. retained Willdan to provide engineering and landscape architectural consulting services for the preparation of plans and specifications for the improvements of Green Beach Access Roadway, located in the Camp Pendleton Marine Base. China Lake Boulevard Construction Management from Upjohn to Bowman Road, City of Ridgecrest, California. Project Manager/Resident Engineer. Construction management and inspection services for street rehabilitation on China Lake Blvd from Upjohn to Bowman Rd. Willdan will provide construction management, inspection, labor compliance, quality assurance materials testing, and federal funding compliance. La Brea Avenue Pavement Reconstruction Project, Phase II & III, DEM04L- 5164(028), City of Inglewood, California. Mr. Bustos served as Construction Manager/Resident Engineer for this $5 million federally funded roadway reconstruction project. Willdan provided Resident Engineer, Caltrans Local Assistance liaison, and quality assurance testing services to fully reconstruct the AC pavement roadway on La Brea Avenue and Hawthorne Blvd between 104th St and Market St. In addition, Willdan handled all aspects of the Federal -aid assistance process. The general nature of the work involved complete removal and hauling off existing asphalt concrete and full reconstruction of the existing roadway with hot mix asphalt over compacted aggregate base. The project scope also included PCC bus pads, minor concrete including utility frame cover adjustments, sidewalks, driveways, median curbs, and removal and replacement of concrete ADA ramps, an automatic irrigation system, tree planting, and striping / signage. Mr. Bustos' project responsibilities included contract administration, progress payment review and processing, change order preparation, and inspection coordination. Hacienda Boulevard Rehabilitation Project, RSTPL-5399(019), City of California City, California. Mr. Bustos served as Construction Manager/Resident Engineer for this federally funded roadway reconstruction project. Willdan provided Resident Engineer, Caltrans Local Assistance liaison, and quality assurance testing services to fully reconstruct the AC pavement roadway on Hacienda Blvd between California City Blvd and North Loop Blvd. In addition, Willdan handled all aspects of the Federal -aid assistance process. The general nature of the work involved complete removal and hauling off existing asphalt concrete, and full reconstruction of the existing roadway with hot mix asphalt over cement treated subgrade. The project scope also included drainage improvements, minor concrete including utility frame cover adjustments, sidewalks, driveways, and removal and replacement of concrete ADA ramps, and striping / signage. Mr. Bustos' project responsibilities included contract administration, progress payment review and processing, change order preparation, and inspection coordination. VVWI LLDAN I 76 City of Rancho Palos Verdes Engineering Staiernent of Qualifications for Public Works/ F.-r9&1ring Services Steven M. Velasco, CBI Senior Construction Manager Education Mr. Steven M. Velasco brings over 25 years of experience as a Project Manager and BS, Botany, California State Construction Manager on public works inspection, contract administration, and Long Beach construction management projects. He has managed a variety of projects from Registration pavement rehabilitation to sports parks. Mr. Velasco is an ICBO Certified Building ICBG Building Inspector Inspector and licensed landscape contractor. He also brings the added expertise of an additional 12 years working in the wholesale landscape nursery industry supplying Radiation Safety Officer plant material throughout the southwestern United States. Mr. Velasco has served as Licensed Nuclear Gauge the key management individual for all job quality control, client relations, and staff Operator administration. Confined Space Regulations - Relevant Project Experience Cal/OSHA Title 8 Sepulveda Boulevard Widening Project, City of Rancho Palos Verdes, G/SO 5157, 5158, and 5159 Construction Manager, responsible for Construction Management services for this Licensed C-27 Contractor, project which involved project management, conceptual design, preparation of California construction drawings and technical specifications for a major street widening on SureTrack Project Manager Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. Sepulveda Boulevard is a major corridor with an average traffic count of 50,000 Primavera Expedition 10.x vehicles and parallels the 405 Freeway through Culver City. Sepulveda Boulevard is Affiliations an alternative route taken by many commuters to access Los Angeles International International Code Council Airport. This project was done to alleviate an existing bottle -neck and provided for a third southbound lane within the existing right-of-way. A portion of the project was 25 Years' Experience within the City of Los Angeles and Caltrans. Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering, and utility coordination. Heil -Harbor Sewer Project, City of Garden Grove, California. Construction Manager of a $1.3 million sewer upgrade project that included the following: ■ Replace 139 feet of existing 12 -inch diameter sewer with a new 15 -inch diameter VCP sewer with three new 48 -inch manholes. ■ Extend a new 12 -inch diameter for 2,343 feet with ten new 48 -inch manholes. ■ Jack and bore 133 feet of 24 -inch diameter steel casing and install 12 -inch diameter non -bell VCP across Harbor Boulevard. ■ Construct a new 533 foot VCP sewer and five new manholes on Harbor Boulevard with a new lateral connection with a manhole. ■ Reconstruct 164 feet of 24 -inch cement lined and coated steel reclaimed water pipe and 30 feet of 8 -inch cement lined and coated steel water main with two gate valves. ■ Abandon 2,100 feet of existing 6 -inch sewer force main. Mr. Velasco was responsible for processing RFI's and submittals, maintaining project files and logs, reviewing progress payments, managing the on-site inspector, coordination of soils testing and survey, conducting weekly construction meeting and the production of meeting minutes and agendas, cost monitoring and control and project closeout. City of Santa Clarita, California. Construction Manager for a $5 million citywide infrastructure project to repair and rehabilitate major arterials and residential streets, sidewalks, driveways, curb and gutter, cross gutters, spandrels and handicap access ramps. This project consisted of 4 years of rehabilitation projects that were deferred into one project. Provided oversight of inspection team, coordinated paving, concrete repair, and traffic control operation with City, contractor, residents, and businesses. Conducted weekly coordination meetings with the City and contractor. Construction VV,WILLDAN I77 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/ D97, ring Services Steven M. Velasco, CBI occurred in residential neighborhoods and high traffic business areas. Mr. Velasco Continued personally addressed the concerns of residents and businesses in the field and maintained a log of telephone calls, issues, and complaints for the duration of the project. Citrus Ranch Park, City of Tustin, California. Construction Manager for the construction of the new $6 million park located on at the site of one of the last remaining citrus groves in Orange County. Responsible for document control, maintaining project files; coordination for submittals and RFI's and recording of weekly meeting minutes. The project involves the construction of a new 8 acre park which incorporates into and preserves an existing citrus grove. The park is a passive park which includes an access road, parking, a tot lot, picnic areas, a rest room facilities, a nature trail through the park, and a viewing pavilion on top of the central hill on which the citrus grove is located. Provided inspection oversight of rough and fine grading, underground utilities, storm drains, sewer, building construction, concrete flatwork, decorative walls, fencing, asphalt paving and striping. Conducted weekly meetings and provided liaison between the owner, design group and contractor. Street Rehabilitation of Yorba Linda Boulevard, City of Yorba Linda, California. Construction Manager for the rehabilitation project consisting of the removal and replacement of existing handicap ramps, cold mill grinding, dig outs, AHRM overlay and restoration of traffic detector loops, signage and striping. Responsible for inspection supervision, contract administration and document control. Maintain project files; log and process RFI's, submittals, verify and process progress payments, maintain logs and file of all project communication, negotiate and prepare change orders. Conduct meetings, act as the main point of contact between the City, contractor, and design engineer, and responded to resident complaints and inquiries. OC9 Water Line Phase II, City of Huntington Beach, California. Assistant Construction Manager. Assist Construction Manager in document control management. Process and record submittals, RFI's, communication logs, meeting minutes and all related project documentation. This $4.1 million project consists of the installation of approximately 13,000 linear feet of 20 and 24 -inch ductile iron pipe and appurtenances. Recreation Center Master Plan Expansion, City of Fountain Valley, California. Project/Program Manager for the $10 million expansion of a recreation center for the City of Fountain Valley. The project involves the expansion of the facility that is currently 55 acres to 78 acres and adding soccer and baseball fields, a skateboard park, rest room and concession facilities, nature trail, additional parking and access roads. Newhope Street Extension, City of Fountain Valley, California. Assistant Construction Manager. The project includes the extension of Newhope Street from Talbert Avenue to Interstate 405. The main features of the project include demolition of multiple businesses, median construction and landscaping, storm drain construction, sidewalks, traffic signal modifications, signing, striping, and Caltrans coordination. *10"'WI LLDAN 78 City of Rancho Palos Verdes Engineering Statement of Qualifications ]or Public; `Jorks/ D9I&ring Services Jason Brown, RCI Constructi®n Manager Education Mr. Jason Brown serves as both a Construction Manager and Supervising Public Public Works Inspection, Works Observer for Willdan; his duties include the inspection and management of Fullerton Community College large-scale public works improvement projects. His experience includes the Registration construction administration and inspection of subdivisions, traffic signals, storm Construction Inspector, drains, sanitary sewers, ARHM overlay, conventional asphalt overlays, and street California, No. 5510 beautification projects. In addition, Mr. Brown has experience with specially funded projects, such as ISTEA and CDBG. During Mr. Brown's 25 years of experience with 25 Years' Experience Willdan, he has served as a Permit Inspector for the Cities of Paramount, Bell Gardens, and Rosemead. Mr. Brown's previous experience includes concrete cutting and core drilling, landscape construction and maintenance, concrete finishing, and masonry construction. Relevant Project Experience Sepulveda Boulevard Widening, City of Culver City, California. Constructability Review and Quality Control. This project involved project management, conceptual design, preparation of construction drawings and technical specifications for a major street widening on Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. Sepulveda Boulevard is a major corridor with an average traffic count of 50,000 vehicles and parallels the 405 Freeway through Culver City. Sepulveda Boulevard is an alternative route taken by many commuters to access Los Angeles International Airport. This project was done to alleviate an existing bottle- neck and provided for a third southbound lane within the existing right-of-way. A portion of the project was within the City of Los Angeles and Caltrans. Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering, and utility coordination. Transit Priority, City of Santa Monica, California. Supervising Public Works Observer. This project involved providing construction management services for the City's Transit Priority Project. The project involved the installation of new fiber optic, some minor traffic signal modification and other appurtenant work. In addition to construction management services, Willdan provided public outreach services to the local businesses and residents. 2010-2011 Water Main Replacement, City of Manhattan Beach, California. Supervising Public Works Observer. This project involved providing public works observation services for the City's 2010-11 water line installation project. The project involved the installation of approximately 7,100 LF of 10"-8" ductile iron pipe. Towne Avenue Phase 2, (Lexington Avenue to Riverside Drive), City of Pomona, California. Construction Manager. This project involved providing construction management and observation for the City's street improvement project. This project included minor concrete repairs, removal and replacement of existing asphalt, cold milling, ARHM overlay, and other appurtenant items of work. Willdan also provided labor compliance and material testing. This was an ARRA funded project. Street Resurfacing on Glendora Road, City of La Puente, California. Construction Manager. This project involved providing construction management and observation for the City's street improvement project. This project included concrete repairs, removal and replacement of existing asphalt, concrete improvements, including ADA compliance curb ramps, cold milling, ARHM overlay, and other appurtenant items of work. Willdan also provided labor compliance and material testing. This was an ARRA funded project. V,VWI LLDAN I 79 City of Rancho Palos Verdes Engineering St<aterneni of Qualific<tions ror Public Works/ D99-1 Services Jason Brown, RCI Street Resurfacing on Hacienda Boulevard, City of La Puente, California. Continued Construction Manager. This project involved providing construction management and observation for the City's street improvement project. This project included concrete repairs, removal and replacement of existing asphalt, concrete improvements, including ADA compliance curb ramps, cold milling, ARHM overlay, and other appurtenant items of work. Willdan also provided labor compliance and material testing. This was an ARRA funded project. Street Resurfacing on Rosecrans Avenue, City of Paramount, California. Construction Manager. This project provided construction management and observation for the City's street improvement project. This project included concrete repairs, removal and replacement of existing asphalt, concrete improvements, including ADA compliance curb ramps, cold milling, ARHM overlay, and other appurtenant items of work. Willdan also provided labor compliance and material testing. This was an ARRA funded project. Street Resurfacing and Street Lighting Upgrades on California Avenue, City of South Gate, California. Construction Manager. This project provided construction management and observation for the City's street improvement project. This project included the installation of new streetlight conduit, conductors, service cabinets, luminaries, traffic signal modifications, removal and replacement of existing asphalt, concrete improvements, including ADA compliance curb ramps, cold milling, ARHM overlay, and other appurtenant items of work. Willdan also provided labor compliance and material testing. This was a federally funded project. Street Resurfacing on Paramount Boulevard, City of Pico Rivera, California. Construction Manager. This project involved providing construction management and observation for the City's street improvement project. This project included traffic signal modifications, concrete repairs, removal and replacement of existing asphalt, concrete improvements, including ADA compliance curb ramps, an ambient vibration mitigation trench system, cold milling, ARHM overlay, and other appurtenant items of work. Willdan also provided labor compliance and material testing. This was a federally funded project. Water Main Replacement, City of Pomona, California. Construction Manager. Willdan provided construction management and inspection for the City's water main project on White Avenue. The project involves the installation of over 8,000 LF of 12" to 8" water main, hydrants, water services, and other appurtenant work. Willdan's duties include tracking project budgets, CCO negotiation, submittal and RFI review, daily inspection of the work, labor compliance, and utility coordination. Construction Management Services for Water Project Improvements, City of Pomona, California. Supervising Public Works Observer. Willdan provided public works observation for various water projects throughout the City of Pomona. The projects may involve the installation of water lines, valves, pump stations, reservoirs, manholes and other appurtenant work. County of Los Angeles Department of Public Works. Mr. Brown will work closely with the various LACDPW Supervisors and will monitor the activities of the Willdan Public Works Observers. Willdan will provide public works observation services for various publicly funded projects throughout the County of Los Angeles. The projects include the installation of new storm drains, bridge construction, asphalt paving, sidewalk replacement, sewer line construction, traffic signals, and other appurtenant work. WI LLDAN I 80 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/1 g ;ring Services Edward Cox Education Mr. Edward Cox possesses over 32 years of public works experience. Prior to United Association local 250 joining Willdan, Mr. Cox held a position where he organized and implemented Apprentice Program construction projects. Mr. Cox performed as a project manager and site 32 Years' Experience superintendent and also supervised full-time and part-time employees. Some of Mr. Cox's projects included: ■ Albertson's Cities of Fullerton, La Mesa; Irvine, and Santa Ana ■ Vons Cities of Ojai, Bakersfield, and Newport Beach ■ Save Mart City of Clovis and the Angeles Camp ■ Trader Joe's Las Vegas and Yorba Linda As a Utility Coordinator for Willdan, Mr. Cox works closely with utility companies. His responsibilities in this capacity include: ■ Project coordination from initial design to final completion ■ Examining record drawings for potential conflict or impacts on proposed projects ■ Contacting utilities to obtain record drawings ■ Notifying utilities of construction projects in design, and maintaining contact with affected utilities for the duration of the project ■ Applying for and obtaining permits, utility easements, and other conditional documentation ■ Coordinating utility companies' and construction companies' work schedule so simultaneous work can be achieved ■ Plan checking for constructability ■ Set-up preconstruction meetings, perform minutes, and distribute to utility companies and contractor Relevant Project Experience Palos Verdes Drive North -Bike Lane Project, Rolling Hills Estates, CA. Willdan Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Projects Grant) and state funds in the amount of $554,580 (SR2S Grant) that will serve as the local match for the design and construction of the Palos Verdes Drive North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided professional engineering and construction engineering services to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of (Class II) 5 foot bike lanes within a 200 foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection. Sepulveda Boulevard Widening, City of Culver City, California. Utility Coordinator. Responsible for utility coordination services for this project which involved project management, conceptual design, preparation of construction drawings and technical specifications for a major street widening on Sepulveda Boulevard from Playa Street/Jefferson Boulevard to Green Valley Circle. Sepulveda Boulevard is a major corridor with an average traffic count of 50,000 vehicles and parallels the 405 Freeway through Culver City. Sepulveda Boulevard is an alternative route taken by many commuters to access Los Angeles International Airport. This WI LLDAN 81 City of Rancho Palos Verdes Engineering staternent of Qualifications for Public Worksl.rog rjeririg services Edward Cox project was done to alleviate an existing bottle -neck and provided for a third Continued southbound lane within the existing right-of-way. A portion of the project was within the City of Los Angeles and Caltrans. Willdan's services included civil and traffic engineering design, landscape architectural design, survey, pavement engineering, and utility coordination. South Street Rehabilitation, City of Lakewood, California. Utility Coordinator. Responsible for utility coordination services for this project which included the preparation of plans, specification and estimate for street overlay, signing and striping plans from Lakewood Boulevard to East City Limits (2 miles). The project was funded through the American Recovery and Reinvestment Act funds and Willdan provided federal funding administration to secure the allocation of funds for construction (E-76). Other services provided by Willdan included utility coordination, pavement engineering, topographic survey, monument restoration, construction administration, construction observation, and labor compliance. Traffic Signals for Three Locations (HSIP), City of La Puente, California. Utility Coordinator. Responsible for utility coordination services for this project which involved providing professional engineering design, project management and funding administration services for the 2007-2008 Highway Safety Improvement Program (HSIP) funded project. The City was awarded $312,818 for the traffic signal modification of three locations: Temple Avenue/Sunset Avenue; Valley Boulevard/Ferrero Lane and Temple Avenue/Orange Avenue. The project involved the full design of Valley Boulevard/Ferrero Lane and modification of the other two intersections for federal compliance as well as completeness. The design included the modification of the traffic signal to protective/permissive left turn phasing. Alondra Boulevard Street Resurfacing, City of Paramount, California. Utility Coordinator. Responsible for providing utility coordination services for this project which involved the preparation of plans, specification and estimate for resurfacing of Alondra Boulevard from Hayter Avenue to West City Limit. Other services provided by Willdan included utility coordination, labor compliance, federal fund processing, pavement engineering, and materials engineering. Project was part of the Economic Stimulus Package funding (ARRA 2). Atlantic Avenue, City of South Gate, California. Utility Coordinator. The project involved the preparation of plans, specification and estimate for Atlantic Avenue between Firestone Boulevard and the south city limits. Willdan Engineering provided civil and traffic engineering design, pavement engineering, design survey, landscape architectural design, and utility coordination services. The improvements included asphalt -rubber hot mix overlay, street widening, raised landscaped medians, irrigation system, ADA access curb ramps, concrete repairs, traffic signal modifications, communication conduits, and signing and striping. Willdan assisted the City through the planning process by developing a concept plan, presenting it to City Council and affected business owners and resident. Willdan attended the public outreach community meetings and incorporating design concern. This project was funded through various federal monies. Rosemead Boulevard Rehabilitation, City of Pico Rivera, California. Utility Coordinator. Responsible for utility coordination for this project. Willdan provided professional engineering services for the Rosemead Boulevard Rehabilitation Project from Washington Boulevard to Telegraph Road. Services included preliminary engineering, surveying, preparation of plans and specifications, pavement rehabilitation, reconstruction of existing damaged and uplifted concrete sidewalk, curb and gutter, and drive approaches, median improvements, traffic signal upgrades, and signing and striping. WI LLDAN I 82 City of Rancho Palos Verdes Engineering Staiernenf of Qualifications for Public Works/1T0%ering Services Barry Knutson I -1 Education Mr. Barry Knutson has over 33 years of experience in the construction industry here in Construction Estimating, Southern California. He has worked as a Carpenter's Apprentice, Journeyman Electrical House Wiring, Heat Carpenter, Carpenter Foreman, Estimator, Assistant Superintendent, Superintendent, Vent A/C Systems, Fullerton Purchasing Agent, and more specifically as a Senior Construction Administrator on large College, Fullerton scale Capital Projects throughout the County of Los Angeles for the last 12 years. Graduate, Carpenter's Union Apprenticeship School Local Relevant Project Experience 1815 Tidelands Beach Restrooms, City of Long Beach, California. Assistant Construction Registration/Certification Manager & Inspector. Construction of new and renovations to ten restrooms located General Contractor, within the Tidelands (beach) area of Long Beach. Three of the restrooms included California No. a-1 complete demolition of existing structures which were then replaced by pre -fabricated modular structures. Three more of the restrooms included complete demolition of 33 Years' Experience existing structures which were then replaced by ground up construction of new structures. The final four restrooms included selective demolition of the existing structures which were then rebuilt/remodeled. Hawthorne Boulevard Overlay, City of Rolling Hills Estates, California. Senior Public Works Observer. Responsible for providing construction inspection services for the City's $355K ARHM overlay paving project. Kraemer Memorial Park Renovation, City of Placentia, California. Senior Public Works Observer. Responsible for providing construction inspection services for the City's $1.2 million park renovation project. Heritage Park Improvements, City of Covina, California. Construction Manager. Responsible for providing on site construction inspection services for the City's $1.3 million park project. Valley Wall Phase 1, City of La Puente, California. Senior Public Works Observer. Responsible for providing construction inspection services for the City's $377,000 CDBG- funded paving project. Inyo/Ardella Streets Street Improvements, City of La Puente, California. Senior Public Works Observer. Responsible for providing construction inspection services for the City's $382,000 CDBG-funded ARHM paving/street improvement project. Loukelton and Unruh Overlay, City of La Puente, California. Senior Public Works Observer. Responsible for providing construction inspection services for the City's $391,000 ARRA-funded ARHM overlay/paving project. Dora Guzman, Del Valle, and Temple Avenues Overlay, City of La Puente, California. Senior Public Works Observer. Responsible for providing construction inspection services for this $354,000 ARHM-overlay/paving project. Orange Avenue/Somerset Overlay, City of Paramount, California. Senior Public Works Observer. Responsible for providing construction inspection services for the City's $391,000 ARHM-overlay/paving project. City Hall HVAC Replacement, City of Paramount, California. Senior Public Works Observer. Responsible for providing construction inspection services for the HVAC replacement at the City's civic hall. Glendora Avenue Street Improvements, City of La Puente, California. Senior Public Works Observer. Responsible for providing construction administration and construction inspection services for the project from start to finish. WI LLDAN I83 City of Rancho Palos Verdes Engineering Staternent of Qualifications for Public Works/1­03r- Services Barry Knutson Hacienda Boulevard Street Improvements, City of La Puente, California. Senior Continued Public Works Observer. Responsible for providing construction administration and construction inspection services on the project from start to completion. Providence Holy Cross Medical Center Tower Addition and Central Plant Upgrade, Mission Hills, California. Onsite Architectural Point of Contact. Responsible for all incoming and outgoing correspondence with the OSHPD ACO, DSE, and FLSO, owner, and contractor; processing, reviewing, and responding to all RFIs, submittals, and change orders; attending all OAC, O/H coordination, weekly IOR staff, and consultant meetings in addition to design and production meetings; assisting with change order documents and bulletin preparation; processing and approving the contractor's monthly billing; and providing QA/QC and final punch list documents; and commissioning through owner occupancy for this $153 -million, 139,000 -square -foot., five -story Moment -framed, five -phased hospital tower and central plant. Kaiser Hospital West Wing Tower, Pharmacy, and Central Plant Upgrade, Los Angeles, California. Onsite Point of Contact. Responsible for all incoming and outgoing correspondence with the OSHPD ACO, DSE, and FLSO, owner, and contractor; processing, reviewing, and responding to all RFIs, submittals, and change orders; attending all OAC, O/H coordination, weekly IOR staff, and consultant meetings in addition to design and production meetings; assisting with change order documents and bulletin preparation; processing and approving the contractor's monthly billing; and providing QA/QC and final punch list documents; and commissioning through owner occupancy for this $122 -million, 117,000 -square -foot, four-story, four -phased, interior - braced frame, precast concrete exterior skin, 97- bed hospital tower. Michael D. Antonovich Antelope Valley Courthouse, County of Los Angeles, Palmdale, California. Architectural Onsite Point of Contact. Responsible for all incoming and outgoing correspondence with the County of Los Angeles (owner), California State Superior Court, Los Angeles. County Sheriff's Office, Bureau of Corrections, contractor, and County inspection staff; reviewing and responding to RFIs and submittals; assisting with change order document preparation; issuing bulletins; attending all project -related meetings; preparing and issuing OAC meeting minutes; solving day-to-day issues for one of the largest courthouses in the State with a project valuation of $89 million; five stories; 397,000 square feet; internal -braced -frame structure with precast concrete and curtain wall exterior skin; basement detention capacity for 115 inmates; and capacity for 14 future courtrooms in shelled space. Chatsworth Courthouse, County of Los Angeles, Chatsworth, California. Architectural Onsite Point of Contact. Responsible for all incoming and outgoing correspondence with the County of Los Angeles (owner), California State Superior Court, Los Angeles. County Sheriff's Office, Bureau of Corrections, contractor, and County inspection staff; reviewing and responding to RFIs and submittals; assisting with change order document preparation; issuing bulletins; attending all project -related meetings; preparing and issuing OAC meeting minutes; solving day-to-day issues for this $69 - million, 158,000 -square -foot, internal -braced -frame structure with a granite exterior skin, secured basement detention floor, and secured judges parking, 11'WI LLDAN I 84 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public VVor:s41 , ,error( services M. Alberto Rosiles Senior Public Works Observer Education Mr. M. Alberto Rosiles has over 31 years of construction observation experience. Los Angeles Trade Tech Mr. Rosiles' experience included street rehabilitation projects in various cities where Courses in plan reading, his responsibilities included quality control, quantity calculations, and project concrete inspection, and management. His areas of expertise includes A.C. heater remix, A.C. rubber paving, building codes. overlay, P.C.C., slurry seal, underground facilities, cast -in-place pipe, A.C. and P.C.C. batch plant inspection, roadways, highways, bridges, landscape, and vertical Orange Coast College construction. Soil mechanics course in field and laboratory techniques, soils testing, and inspections. Secretary of Public Works in Departments of Projects and Laboratories Courses and work in exploration, soil mechanics, concrete, pavements, and inspections on numerous projects in Mexico. Secretary of Public Works Department of Highways Intensive courses in surveying and road locations on numerous projects in Mexico Registration Reg. 2474, State Examination for registration as a Construction Inspector Earthworks and Concrete Reg. 527, City of Long Beach Registered Deputy Pile Inspector Relevant Project Experience Bradford/Madison Street Improvement, City of Placentia, California. Public Works Observer. This project involved providing professional construction engineering and funding administration for the Bradford/Madison Street Improvement Project. Willdan provided labor compliance, construction management, and construction inspection services for the ARRA funded project. The project involved the removal and replacement of damaged street sections, asphalt overlay, miscellaneous concrete repairs to sidewalks and curbs, planting of street trees, and other appurtenant work. Third Street Improvement Project, City of Calimesa, California. Public Works Observer. This project involved providing professional construction engineering and funding administration for the Third Street Improvement Project. Willdan provided labor compliance, construction management, and construction inspection services for the ARRA funded project. The project involved the removal and replacement of damaged street sections, asphalt overlay, miscellaneous concrete repairs to sidewalk and curbs, planting of street trees, and other appurtenant work. Ramona B Street Improvement Project, City of Baldwin Park, California. Public Works Observer. This project involves providing construction engineering and funding administration for the Ramona B Street Improvement Project. Willdan is providing labor compliance, construction management, and construction inspection services for the ARRA funded project. The project involves the removal and replacement of damaged street sections, asphalt overlay, miscellaneous concrete repairs to sidewalks and curbs, planting of street trees, and other appurtenant work. Reg. 432, City of Irvine Placentia Avenue Overlay Project, City of Placentia, California. Public Works Registered Deputy Grading and Observer. Willdan provided construction management, public works observation, Asphalt Inspector material testing, and labor compliance services for the City of Placentia's Placentia CPN 13488, Certified Nuclear Avenue Overlay Project. The project will involve the removal and replacement of Gauges Technician damaged curb/gutter, sidewalk, and the installation of an Asphalt -Rubber Hot Mix 31 Years' Experience (ARHM) overlay. WILLDAN Engineering Recreation Center Master Plan Expansion - Construction Services, City of Fountain Valley, California. Senior Public Works Observer. The work effort included design and construction management services to rough and mass grade the site for constructing roadways, parking lots, pedestrian walkways, sports facilities, and amenities. These amenities included landscaping, irrigation, playing fields, stadium facilities, jogging paths, a maintenance building, and lighting. The project amenities are spread over 76 acres near the Mile Square Park area. Willdan's design team provided construction support and construction staking services throughout construction. Our construction management team provided program management, construction management, inspection, and materials testing for this $17.5 million project. Dillon Road Grade Separation Project, City of Coachella, California. Construction Inspector. The project involved the construction of a new bridge at Dillon Road and 85 City of Rancho Palos Verdes Statement of Qualifications for Public Works/I ®rr,ring Services M. Alberto Rosiles the existing UPRR tracks. The new structure carries Dillon Road traffic over Indio Continued Boulevard and the UPRR's two existing tracks by means of a reinforced concrete bridge. In addition, the project involves the following specific items of work: new traffic signals, construction of approach fills for the new bridge, installation of new curbs and gutters, installation of new signing, construction of new drainage facilities, and other appurtenant work. It is anticipated to take approximately 14 months and $22 million dollars to construct the new bridge. Intersection Widening at Brookhurst/Ellis, City of Fountain Valley, California. Construction Inspector. This widening project involved underground utilities, traffic signal modification, added sidewalks, retaining walls, and street rehabilitation. Project also included relocation of OCWD new vault and striping. Mr. Rosiles was responsible for public works inspection, management, and assisting the City Engineer. Newhope Street Extension, City of Fountain Valley, California. Resident Inspector. The project included the extension of Newhope Street from Talbert Avenue to Interstate 405. The main features of the project included demolition of multiple businesses, median construction, landscaping, storm drain construction, sidewalks, traffic signal modifications, signing, striping, and Caltrans coordination for the northbound 405 ramp widening and remodeling. Talbert from Brookhurst to East City Limit, City of Fountain Valley, California. Construction Inspector. Project involved public works inspection of complete driveways, replacement road widening overlay, new medians (AC AHRM), management, and assisting the City Engineer. Edinger/Harbor, City of Fountain Valley, California. Construction Inspector. This project involved widening, new median islands, bus stop pads, removing and remodeling handicap ramps, sidewalks, signal loop installation and striping. Mr. Rosiles was responsible for all public works inspection, management, and assisting the City Engineer. FY 2000-01 Slurry Seal and Street Resurfacing, City of Lake Forest, California. Construction Inspector. Street resurfacing projects are part of the City's annual street maintenance program. Project elements included crack sealing and base repairs, asphalt concrete overlays, slurry seals, adjusting surface utilities to grade, replacement of traffic loops, re -striping and reestablishing City survey control points. Brookhurst Street Rehabilitation and Resurfacing, City of Fountain Valley, California. Construction Inspector. Project involved the construction inspector staff augmentation services on Brookhurst Street from Talbert Avenue to Warner Avenue, and from Heil Avenue to North City limits project. The project required expertise in the removal and disposal of existing asphalt concrete/aggregate base roadway section, cold milling, placing asphalt concrete leveling course and base course, asphalt rubber hot mix (AHRM), adjusting survey well monument covers, utility covers and manholes to grade, PCC curb, gutter, driveway approaches, access ramps and median, traffic delineation, signs, and signal loops. 1-215, Beltway, Section 713, 8 and 9, Drainage Facilities, Clark County, Nevada. Construction Inspector. This $56 million project consisted of the construction of major drainage facilities, interim frontage roads and partial highway along a 6.4 mile alignment of the future Beltway around the valley. The drainage facilities accounted for $24 million of the project. Drainage improvements included the installation of cast - in -place box culverts ranging in size from 10'X10' to 23'X10' in lengths from 500' to 2,800', reinforced concrete pipe from 18" to 96", trapezoidal channels, rectangular channels, and transition structures. WI LLDAN I 86 City of Rancho Palos Verdes Engineering Statement of Qualificafions for Public Worksl.r g &ring Services Danny Ayala Senior Public Works Observer Registration Mr. Danny Ayala is responsible for the inspection of large-scale public works Contractor, California No. C10 projects. His experience includes over 35 years of public works construction Certificate of Completion in experience including: assignments in administration and inspection of subdivisions, Fiber Optic Theory, AQMD traffic signals, storm drains, sanitary sewers, ARHM overlays, conventional asphalt overlays, and street beautification projects with raised landscape medians and Professional Development, decorative parkway renovations. In addition, Mr. Ayala brings experience in all areas Asphalt Institute of traffic signal installation and inspection. His traffic signal and public works 35 Years' Experience inspection experience includes: inspection of traffic signal installations, preparation of punch lists, and coordination with contractors; coordinated the purchase of a wide variety of signal and electrical products; installation and maintenance of traffic signal controllers and equipment, fiber optic equipment and splice fiber-optic cable; inspection and installation of signal hardware, poles, streetlights, and signs; installation of conduits, pull boxes, wire, duct banks and vaults, and all necessary equipment; assistance in the development of plans and specifications for Caltrans, cities, and various government projects; negotiation and management of project change orders and contract modifications; preparation of invoicing and certified payroll; E assistance in the installation and inspection of telemetry systems; coordinate with contractors, Caltrans, cities, USA and utility companies; tracking and handling of contract quantities, changes, and correspondence; administration and inspection of subdivisions; <11 inspection of subdivision and capital improvement projects; inspection of compaction of sub grade, and base grade materials; F inspection of traffic signal installation and modifications; inspect the installation of storm drain, RCP, catch basin, box culvert, junction structures, transition structures inlet and outlet structures with wing walls; inspection of sewer systems and repair; inspection of Asphalt Rubberized Hot Mix (ARHM) and conventional asphalt overlays; inspection of new street construction from subgrade to final cap; E inspection of curb and gutter, spandrels, cross gutter, sidewalk, and driveway approaches; inspection of water main, fire hydrant, new meters, and hot tap installation; <, inspection of grade elevations using a smart level, flow liner, peep site, and laser. Rdevant Project Experience Railroad Crossing, Street Improvements, and Traffic Signal Modification, City of Paramount, California. Mr. Ayala provided public works observation services for this project which included the removal and replacement of railroad tracks, cold milling and paving of streets, curb and gutter replacements, handicap ramps, stamped concrete crosswalks installation, video detection, controller and cabinet replacement, traffic signal wire, poles and signal equipment, traffic signal conduit and pull box installation, striping and signing. M/WI LLDAN I 87 City of Rancho Palos Verdes Engineering Sf:aterrien4 of Q'ualiiications for Public'olorksi'�t0T--ring Services Danny Ayala Mansel Traffic Signal Project, City of Lawndale, California. Mr. Ayala provided Continued construction management and inspection services for the project. The project involved the installation of a new traffic signal at Mansel and Marine. Street Lighting Conversion Project, City of South Gate, California. Mr. Ayala provided construction management and inspection services for the project. The project involved the installation of new light standards, conversion from a high to low voltage system, new wiring and installation on underground conduits. William Clinton Elementary School, City of Paramount, California. Mr. Ayala provided public works observation services for this project which included removal and replacement of sidewalk, removal and replacement of curb and gutter, install driveways, modify island and irrigation and install stamped concrete with City monument, installation of reinforced concrete pipe with an inlet and outlet structure, and a new complete traffic signal installation with electrical service, striping and signing. Street Overlay at Various Locations, City of Bell Gardens, California. Mr. Ayala provided public works observation services for this project which included cold milling and paving, curb and gutter replacement, concrete sidewalk and driveway replacement, signing and striping. La Peer Water Installation and Overlay Project, City of Paramount, California. Mr. Ayala provided public works observation and contract administration services for this project, which included the installation of 12" PVC water main, fire hydrants, new meters, curb/gutter repairs, replacement of deteriorated street section, cold milling and ARHM overlay. Highway 111 Project, City of Palm Desert, California. Mr. Ayala is acting as the Resident Inspector for this project. His duties included the inspection of the entire project, as well as, the tracking of contract quantities, change orders, utility coordination, handling project correspondence, and other appurtenant work. The project involved the installation of new curb/gutter, traffic signals, ARHM overlay, and construction of turnout lanes. Phase II Overlay, Morongo Band of Mission Indians, Banning, California. Mr. Ayala assisted in the inspection of this project which included the repaving of streets within the Morongo Band of Indians reservation. Specifically, the project involved the relocation of all -exiting blow -offs; removal and replacement of the existing A/C curbs; and ARHM overlay. WI LLDAN I 88 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Workslfol8ring Services Lee J. Marshall Senior Public Works Observer Education As Senior Public Works Observer for Willdan, Mr. Lee J. Marshall's duties include Citrus Junior College, inspection of street improvements, sewer laterals and waterline installations as permit Glendora, California, specialist in City of Rosemead, City of Arcadia and City of Temple City. He also Received two certificates in assisted in the inspection and construction administration of the $2.5 million Valley public works: Boulevard ISTEA/CDBG funded improvements. He has provided full construction General Street Maintenance administration services on a number of other projects. Street Delineation Relevant Project Experience 14 Years' Experience ARHM Overlay of Lower Azusa Road, Las Tunas Avenue and Live Oak Avenue, City of Temple City, California. Mr. Marshall provided construction administration and inspection to complete this $710,000 project. Recreation Center Master Plan Expansion - Construction Services, City of Fountain Valley, California. Senior Public Works Observer. The work effort included design and construction management services to rough and mass grade the site for constructing roadways, parking lots, pedestrian walkways, sports facilities, and amenities. These amenities included landscaping, irrigation, playing fields, stadium facilities, jogging paths, a maintenance building, and lighting. The project amenities are spread over 76 acres near the Mile Square Park area. Willdan's design team provided construction support and construction staking services throughout construction. Our construction management team provided program management, construction management, inspection, and materials testing for this $17.5 million project. Roger's Lane Street Improvement, City of Highland, California. Senior Public Works Observer. The Roger's Lane Project included infill asphalt paving, curb and gutter, new sidewalks, driveway relocations, adjustment of existing mailboxes, utility relocation and adjustment, crack filling, slurry seal, and other appurtenant work. Willdan provided construction management, material testing, survey and public works observation for the project. Street Rehabilitation on Mountain, Highland, and 9th Street, City of San Bernardino, California. Mr. Marshall provided public works observation services for this project which involved grinding and paving of all streets, curb and gutter replacement, waterman, cross gutters, handicap ramps and driveways. Intersection Rehabilitation on 13th Street and G Street, City of San Bernardino, California. Mr. Marshall provided public works observation services for this project which involved removal of an AC intersection; installation of two new cross gutters, spandrels, and handicap ramps. Lakeview Street Rehabilitation, City of Big Bear Lake, California. Mr. Marshall provided public works observation services for this project which involved grading and compacting with 4" of AC on Lakeview Street. Moonridge Sidewalk Project, City of Big Bear Lake, California. Mr. Marshall provided public works observation services for this project. The project involved approximately 2,000 LF of sidewalk with a portion receiving a decorative stamped detail. The project also included five wheelchair ramps, several residential and commercial driveways, and a new bus return. South West Gas Service Replacement, City of Big Bear Lake, California. Mr. Marshall's duties included supervision of approximately 14 crews throughout the City. Mr. Marshall supervised the project which involved traffic control, BMPs backfill on trenches, compaction, and final pavement and crack seal. /W I LLDAN I89 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/11O9-0ring Services Lee J. Marshall Waterline Project, Mission Road, Shepardson Drive, Mound Street, and Lamar Continued Road, City of Loma Linda, California. Mr. Marshall provided public works observation services for this project which consisted of 12" and 8" ductile iron mainline, fire hydrants, and abandoning of the existing mainline. Housing Tract 16068, City of Highland, California. Mr. Marshall provided public works observation services for this project which involved street improvements on a new housing tract development. The project included inspection of sewer, water, storm drain, curb and gutter, sidewalk, asphalt pavement, retaining walls, utility trenching, street lights. Mr. Marshall also ensured that the entire tract had proper erosion control. 1998-99 Sidewalk, Curb and Gutter Repairs Citywide, City of Rosemead, California. Mr. Marshall provided full construction inspection and construction administration services to complete this $96,600 project of replacement of damaged concrete. Mary Beth Street Tree Improvement, City of Rosemead, California. Mr. Marshall provided public works observation for the Mary Beth Street Tree Improvement project. WI LLDAN I 90 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Works/1-11c�rring Services Education MS, Geotechnical Engineering, California State University, Long Beach BS, Geology, Pahlavi University, Iran Registration Professional Civil Engineer, California, No. 37156 Professional Geotechnical Engineer, California, No. 2202 Professional Civil Engineer, Nevada, No. 11256 Professional Civil Engineer, Arizona, No. 27068 Affiliations The Society of American Military Engineers American Society of Civil Engineers, Geotechnical Group Consulting Engineers and Land Surveyors of California Geotechnical Engineers Association American Public Works Association Council of Civil Engineers and Land Surveyors Ross Khiabani, PE, GE President/Chief Executive Officer Our Chief Engineer, Mr. Ross Khiabani, PE, GE, President of Willdan Geotechnical, has more than 35 years of professional experience in performing diversified geotechnical assignments involving soil mechanics and foundation engineering, soil stabilization, landslide analysis and stabilization, settlement evaluations, liquefaction studies, slope stability analyses, laboratory testing, and inspection services during construction operations. His vast experience includes providing engineering services for commercial, industrial, institutional, ports and harbors, public works, transportation (including major bridges, local roads, freeways and toll roads) and water and wastewater facilities projects. This broad base of experience has given him a unique insight into local geotechnical and seismic conditions, and construction processes. Mr. Khiabani has kept in close communication with local, city, county, and state reviewers and is familiar with governing codes and requirements. Relevant Project Experience Newport Learning Center, Coastal Community College District (CCCD), Newport Beach, California. Geotechnical Engineer of Record and QA/QC lead for materials testing and inspection services for construction of the Newport Learning Center. Project includes a new 3 -story type II -B building with 112,795 ASF, associated site development including a large bio -filtering facility, and parking/driveway areas. Overseeing all geotechnical observation and testing during grading, foundation excavations and utility trench backfill. Providing QA/QC for all material testing and special inspection services, including a set of poured -in-place cassions and 138 soil anchors/tiebacks to stabilize footings for slanted concrete walls. Charnock Well Field Restoration Project, Arcadia and Charnock Sites, City of Santa Monica, California. Project manager for geotechnical and material testing and inspection. The Design -Build project consisted of the construction of a Greensand Filtration system, cartridge filters, reverse osmosis treatment process, a backwash treatment system, the associated pumping and chemical feed systems, and a structure to house the reverse osmosis system. New City Hall, Laguna Niguel, California. QA/QC lead for material testing and special inspection services being provided by Willdan. Work includes testing and inspection for concrete, steel, welding, and masonry for the new City Hall. 35 Years' Experience King Kong Attraction, NBC Studios, Universal City, California. Project Manager and geotechnical engineer -of -record for new attraction at NBC Studios. Project requires extensive excavation and shoring structures, and retaining wall system with tie -backs for elaborate above ground structure housing this attraction. WILLDAN Engineering On -Call Geotechnical Design Services, Port of Los Angeles, San Pedro, California. Project Manager for Willdan's 4 -year contract to provide geotechnical design services in support of POLA's On -Call Engineering/Architectural Consulting Services Program. Tasks included retaining structures for berths, canopy structures, various port buildings, pavement rehabilitation, earthwork for backlands, boat maintenance cradles, storm drain improvements, and review of geotechnical reports submitted to POLA by others. Worked closely with POLA staff on all tasks to develop the most cost-effective and efficient solutions. 91 City of Rancho Palos Verdes Staternent of Qualifications for PLAAC Woriks/1.111r4ering Services Girish Agrawal, JD, PhD, PE, GE rincipai Engineer Education Dr. Girish Agrawal has more than 20 years of experience with geotechnical PhD, Geotechnical Engineering, engineering, investigation, design, and construction. He has worked on a wide Purdue University, West spectrum of public infrastructure, and private commercial, residential, and industrial Lafayette, Indiana projects. His particular areas of expertise are seismic hazard analysis and mitigation, MS, Geotechnical Engineering, pile foundations, earthfills and earth retaining structures, and direct -push testing and Purdue University, West sampling for assessment of subsurface conditions. Dr. Agrawal has substantial Lafayette, Indiana experience with all stages of project planning, performance and management, JD, Boalt Hall School of Law, including managing profit centers and practice areas. He has considerable University of California, experience in assisting clients shepherd projects through various city, county, and Berkeley, California state review processes and is familiar with governing codes and requirements. BTech (Hons), Civil Relevant Project Experience Engineering, Indian Institute of Technology, Delhi, India Orange Line Extension, Metropolitan Transportation Authority (MTA), Los Angeles, California. Lead Geotechnical Engineer. Responsible for providing civil Registration design services for this design -build of the MOL extension from the existing Civil Engineer, California, No. Chatsworth Station to the Canoga Station in the San Fernando Valley along Canoga 53867 Avenue. Willdan is preparing plans, specifications and cost estimate for street Geotechnical Engineer, widening, raised landscaped medians, irrigation system, ADA access curb ramps, California, No. 2478 bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, Attorney at Law, California, No. communication conduits, and signing and striping. This includes the construction of 264249 reconstruction of three stations. Affiliations Vermont Avenue Bridge Widening Over US -101 Freeway, City of Los Angeles, American Society of Civil California. Lead Geotechnical Engineer for Willdan's design team for widening of the Engineers, Member Vermont Avenue overcrossing at Route 101, northwest of downtown Los Angeles. Sigma Xi, Member Sanitary Sewer Master Plan Upgrade, City of Covina, California. Provided geotechnical engineering services for Sanitary Sewer Master Plan Upgrade Project The State Bar of California, Member aiming to replace and/or rehabilitate approximately 38,000 feet of sewer lines city wide. 20 Years Experience SR 22 at Studebaker Road Improvements, City of Seal Beach, California. Geotechnical and environmental lead for addition of a lane on the westbound on-ramp from Studebaker Road. Water Main Replacement Project, City of Manhattan Beach, California. Provided geotechnical investigation and design services for the installation of a new six -inch - diameter ductile iron pipe to replace approximately 8,340 feet of existing water mains along eleven (11) streets in Manhattan Beach. Bradford Water Well Replacement, City of Placentia, California. Provided geotechnical engineering services for design of the structure housing the mechanical - electrical facilities associated with the new well, backfilling of trenches for piping within the subject parcel, and pavement design for equipment and employee driveway and parking areas. Metro Red Line Eastside Extension (now called the Metro Gold Line Eastside Extension), Metropolitan Transportation Authority (MTA), Los Angeles, California. Managed field geotechnical investigation services. Planned and conducted an extensive drilling program that involved coordination with multiple City of Los Angeles agencies. *VVWI LLDAN I 92 City of Rancho Palos Verdes Engineering Staternent of Qualifications for Public Worksl_rli2erine services Jane E. Freij Labor Compliance Manager Education Ms. Jane E. Freij is an experienced Administrative/Project Manager with a proven 1982, BA, Linguistics, record of profitability achieved through comprehensive and effective management of University of Kansas time and budget. Key areas of expertise include project needs analyses, scheduling Registration and budgeting, contract administration/negotiation, legal documentation, policy and 1993, Attorney Assistant procedure development, and writing and editing. As a Supervising Labor Compliance Training Program, Manager, Ms. Freij provides oversight of labor compliance monitoring services for Litigation/Corporations various federally -funded projects under FHWA, FTA, HUD, and EPA. She is familiar Certificate with the FHWA federal funding administration process from field review and request for authorization to final invoicing and has specialized training in the reporting University of California, requirements and fraud detection and prevention procedures for projects funded by Los Angeles the American Recovery and Reinvestment Act of 2009 (ARRA). 18 Years' Experience Experience prior to joining Willdan includes 4 years with Edison Enterprises, where Ms. Freij served as Contract Administrator and Senior Contract Administrator. In these positions, she developed and negotiated contracts for products and services, monitored and enforced contractual compliance, constructed contractual terms and conditions, served as risk management liaison, and managed a multi -state licensing project for an energy services subsidiary. Ms. Freij has a strong legal background, having served as a paralegal and senior paralegal for litigation attorneys in the areas of real estate, land development, and contract law. She is experienced in Microsoft Word, Microsoft Excel, and Lexis -Nexis research software. Federal and State Labor Compliance Palos Verdes Drive North -Bike Lane Project, Rolling Hills Estates, CA. Willdan Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Projects Grant) and state funds in the amount of $554,580 (SR2S Grant) that will serve as the local match for the design and construction of the Palos Verdes Drive North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided professional engineering and construction engineering services to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of (Class II) 5 foot bike lanes within a 200 foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection. Federal Highway Administration (FHWA) Labor Compliance, Various Cities. Responsible for providing supervisory federal and state labor compliance services for FHWA funded projects in the following cities: ■ Baldwin Park ■ Calabasas ■ Coachella ■ Commerce ■ Hawaiian Gardens ■ Huntington Park ■ La Canada Flintridge ■ La Mirada ■ La Puente WILLDAN Engineering ■ Paramount ■ Pico Rivera ■ Placentia ■ Pomona • Rancho Palos Verdes ■ Rolling Hills Estates ■ Rosemead ■ South Gate ■ South Pasadena 93 City of Rancho Palos Verdes Staterrieni of Qualifications for Public In/orksl143rz.nng Services Jane E. Freij • Lakewood ■ Thousand Oaks Continued 0 Maywood x Westlake Village ■ Monterey Park Community Development Block Grant (CDBG) Labor Compliance, Various Cities. Responsible for providing supervisory federal and state labor compliance services for CDBG funded projects administered by the U.S. Department of Housing and Urban Development (HUD) and the Los Angeles County Community Development Commission (LACDC) in the following cities: ■ Bell Gardens ■ Burbank ■ Calimesa ■ Commerce ■ Hawaiian Gardens ■ La Mirada ■ Lawndale ■ Maywood ■ Paramount ■ Pico Rivera ■ Rosemead ■ San Marino ■ South EI Monte ■ South Gate Safe Routes to School Project, City of Hawaiian Gardens, California. Labor Compliance Manager. Willdan Engineering provided professional engineering services for the Safe Routes to School (SRTS) Project. The project consists in the preparation of plans, specifications and estimate (PS&E) for street and traffic design including field survey, environmental documentation, utility coordination, contract administration, record drawings, construction inspection and labor compliance. The improvements for street and traffic surround Fedde Middle School, Furgeson and Hawaiian Elementary School. The federal SRTS was in the amount of $611,000. The project would improve signing and striping, ADA access ramps, provide raised pedestrian crosswalks and pedestrian traffic control devices. Local Street Overlay, City of Norwalk, California. Responsible for payroll review/project oversight. The project improvements include installation of AC pavement; reconstruction of road sections; replacement of damaged curb and gutter, drive approaches, sidewalks, and cross -gutters; installation of ADA ramps; replacement of striping, legends, traffic loops, water cans and covers; and adjustment of manholes. The project will utilize Community Development Block Grant (CDBG) funds, with a construction contract period estimated to be 90 working days. The construction contract has been awarded to Hardy & Harper, Inc. in the amount of $1,876,000. Bradford/Madison Street Improvement, City of Placentia, California. Labor Compliance Manager. Responsible for providing labor compliance services for this project which involved providing professional construction engineering and funding administration for the Bradford/Madison Street Improvement Project. Willdan also provided construction management and construction inspection services for the ARRA funded project. The project involved the removal and replacement of damaged street sections, asphalt overlay, miscellaneous concrete repairs to sidewalks and curbs, planting of street trees, and other appurtenant work. VWILLDAN I 94 City of Rancho Palos Verdes Engineering Staierrient of Qualifications for Public WorkslliA,ering Services Diane D. Rukavina, PE City Engineer Education Ms. Diane D. Rukavina has 32 years of experience in municipal engineering. 1980, BS, Civil Presently, she administers Willdan's Federal/State Funding Administration program Engineering, Loyola with projects in the Cities of Hawaiian Gardens, La Canada Flintridge, Lakewood, La Marymount University Puente, Maywood, Norwalk, Paramount, Pico Rivera, Rancho Palos Verdes, South Registration Gate, and South Pasadena, Ms. Rukavina has processed over 60 federal and state 1983, California, 036380, funded projects (STPL, TEA -21, SAFETEA-LU, ARRA, HSIP, TCSP, ER, CMAQ, Civil SRTS, and SR2S) from request for authorization to final invoicing for 22 cities. Currently, she is coordinating 28 federal and state funded projects at various stages in Affiliations the funding process. Ms. Rukavina also serves as Project Manager for 6 capital American Society of Civil improvement projects for the City of Paramount, performs various city engineering Engineers related tasks, and has organized GASB 34 infrastructure inventories for the Cities of 32 Years' Experience Seal Beach, Rosemead, Monrovia, and Bell Gardens in preparation for value assessment. Prior to joining the Willdan team, Ms. Rukavina was the project manager for a major land developer. She was responsible for design, planning, and construction administration of flood control, sewer, and water systems for public works improvement, and private development infrastructure projects in the Cities of Irvine, Newport Beach, Orange, and Tustin. She was also employed by the Los Angeles County Flood Control District for 5 years and was involved in design, contract administration, and water quality. Reievnt Project Experience Federal/State Funding Administration Ms. Rukavina has over 15 years of experience in preparing and submitting required documentation to Metro and Caltrans for federal and state funded projects including STPL, TEA -21, SAFETEA-LU, ARRA, HSIP, TCSP, ER, CMAQ, SRTS, and SR2S. Although each program may encompass different components and requirements, the general process remains the same following the Caltrans Local Assistance Procedures Manual (LAPM). She also keeps informed of revisions (LPPs) to procedures and forms in the LAPM. With over 45 completed projects and 35 in progress, Ms. Rukavina has assisted cities at various stages of the federal/state-funded project as follows: ■ FTIP Programming, Obligation Plan; ■ Request for Authorization to Proceed with Preliminary Engineering; ■ Request to Initiate a Federally Funded Project; ■ Request for Authorization to Proceed with Construction; ■ Award Submittal; ■ Progress Invoice; and ■ Final Report of Expenditures Ms. Rukavina also maintains excellent relations with Caltrans' District Local Assistance Engineers and Metro's staff and will answer questions regarding the submittals and status of the projects. W I LLDAN I 95 City of Rancho Palos Verdes Engineering Statement of Qualifications for Public Worksl r i ring Services Diane D. Rukavina, PE Specific project experience includes: Continued Palos Verdes Drive North -Bike Lane Project, Rolling Hills Estates, CA. Willdan Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Projects Grant) and state funds in the amount of $554,580 (SR2S Grant) that will serve as the local match for the design and construction of the Palos Verdes Drive North Bike Lanes between Crenshaw Boulevard and the West City Limits. Willdan Engineering provided professional engineering and construction engineering services to the City of Rolling Hills Estates for the Palos Verdes Drive North Bike Lane Project. The design aspect of the project included the roadway widening approximately 1.26 miles long for the addition of (Class ll) 5 foot bike lanes within a 200 foot right-of-way, as well as the addition of a second through lane at major intersections to increase capacity. The improvements included the installation of raised medians, street resurfacing and traffic signal modifications. Other services provided by Willdan Engineering and essential to the success of the project included utility coordination/relocation, federal funding administration; environmental clearance (NEPA and CEQA); contract administration and construction inspection. Traffic Signals for Three Locations (HSIP), City of La Puente, California. Grant Administrator. Responsible for providing funding administration services for this project which included professional engineering design and project management services for the 2007-2008 Highway Safety Improvement Program (HSIP) funded project. The City was awarded $312,818 for the traffic signal modification of three locations: Temple Avenue/Sunset Avenue; Valley Boulevard/Ferrero Lane and Temple Avenue/Orange Avenue. The project involved the full design of Valley Boulevard/Ferrero Lane and modification of the other two intersections for federal compliance as well as completeness. The design included the modification of the traffic signal to protective/permissive left turn phasing. Amar Road/Tonopah Avenue Traffic Signal (HSIP), City of La Puente, California. Grant Administrator. Responsible for providing funding administration services for this project which involved providing professional engineering design and project management services for the 2009/2010 Highway Safety Improvement Program (HSIP) funded project. The City was awarded $200,800 for the traffic signal installation at Amar Road and Tonopah Avenue. Our scope of work included preparation of plans, specification and estimate, utility coordination and funding administration. Safe Routes to School Improvement Project, City of Maywood, California. Federal Paperwork Administrator. Project involved providing professional engineering design services for the Safe Routes to School (SRTS) Grant Project. The project involved the upgrading of signing and striping, installing solar powered flashing beacons, and street improvements including ADA compliant ramps, replacing sidewalks, curb and gutter for the streets surrounding Loma Vista Elementary School. Additional services provided by Willdan included utility coordination and federal paperwork administration. Atlantic Avenue Improvements, City of South Gate, California. Federal Paperwork Administrator. Project involved providing civil and traffic engineering design, pavement engineering, design survey, landscape architectural design, and utility coordination services for Atlantic Avenue improvements between Firestone Boulevard limit and south city limit. The proposed improvements included asphalt - rubber hot mix overlay, raised landscaped medians, irrigation system, ADA access curb ramps, concrete repairs, communication conduits, and signing and striping. NVWI LLDAN I 96 City of Rancho Palos Verdes Engineering StaternEont of Qu@hfica.fions for Public Works/ 1 _r i on ,, services