Loading...
CC SR 20150707 02 - Los Angeles Congestion Management Plan (CMP)CITY OFi�RANCHO PALOS VERDES PUBLIC HEARING Date: July 7, 2015 Subject: Adoption of Annual Conformance Resolution Certifying Compliance with the Los Angeles County Congestion Management Program Subject Property: Citywide 1. Report of Notice Given: City Clerk Morreale 2. Declare the Hearing Open: Mayor Knight 3. Staff Report & Recommendation: Planning Technician Mercenia Lugo 4. Public Testimony: Appellants: N/A Applicant: N/A 5. Council Questions: 6. Rebuttal: 7. Declare Hearing Closed: Mayor Knight 8. Council Deliberation: 9. Council Action: Public Hearing Cover Page CITYOF RANCHO PALOSVERDES COMMUNITY DEVELOPMENT DEPARTMENT MEMORANDUM TO: HONORABLE MAYOR & CITY COU IL MEMBERS FROM: JOEL ROJAS, COMMUELOPMENT DIRECTOR DATE: JULY 7, 2015 SUBJECT: ADOPTION OF ANNUAL CONFORMANCE RESOLUTION CERTIFYING COMPLIANCE WITH THE LOS ANGELES COUNTY CONGESTION MANAGEMENT PROGRAM REVIEWED: DOUG WILLMORE, CITY MANAGER Off' Project Manager: Mercenia Lugo, Planning Technicia RECOMMENDATION Adopt Resolution No. 2015-_, thereby adopting the City's 2015 Local Development Report (LDR) and self -certifying the City's conformance with the Congestion Management Program (CMP) for Los Angeles County. BACKGROUND A Congestion Management Program (CMP) was enacted by the State Legislature in 1990 to improve traffic congestion in California's urban areas. In accordance with the State statute, the Los Angeles County Metropolitan Transportation Authority (MTA) [then known as the L.A. County Transportation Commission (LACTC)] adopted the first CMP for Los Angeles County on November 18, 1992. The MTA has updated and adopted several Congestion Management Programs since 1992. The City and other L.A. County local jurisdictions were originally required to demonstrate compliance with the MTA's Congestion Management Program (CMP) using a debit/credit system. The debit/credit system was abolished in 2003 because the MTA began studying the concept of instituting a traffic mitigation fee to address regional congestion. Until adoption and implementation of a possible congestion mitigation fee, cities are required to continue the current practice of adopting an annual self -certified conformance resolution and self -certifying the City's conformance with the CMP requirements. As such, the City's 2015 Local Development Report (LDR), which reports 30940 HAWTHORNE BLVD. / RANCHO PALOS VERDES, CA 90275-5391 PLANNING & CODE ENFORCEMENT DIVISION (310) 544-5228 / BUILDING & SAFETY DIVISION (310) 265-7800 / DEPT. FAX (310) 544-5293 E-MAIL: PLANNING@RPVCOM/ WWW.PALOSVERDES.COM/RPV information on new net development in our City within the 2014-2015 fiscal year, is being presented to the City Council for approval along with a resolution certifying the City's compliance with the County's Congestion Management Program. Upon adoption, the resolution and 2015 LDR will be transmitted to the MTA for its review and approval. DISCUSSION In adopting the attached self -certification resolution, the City resolves that it is in conformance with all the applicable requirements of the CMP and has taken, or will take, each of the following four specific actions (the requisite action appears in bold type and the City's response in normal type): 1. By June 15, of odd numbered years, the City will conduct and transmit to the MTA traffic counts and calculated levels of service for selected arterial intersections, consistent with the requirements identified in the CMP Highway and Roadway System Chapter. The current year of 2015 is an odd numbered year and therefore the requisite action is applicable. This year the MTA gave the City an extension to July 7, 2015 to submit the required information to them. On June 30, 2015, the Public Works Department transmitted the results of the biennial highway monitoring performed at the intersection of Western Avenue and Toscanini Drive to MTA, in accordance with the requirements of the CMP (see attached). 2. The City has locally adopted and continues to implement a Transportation Demand Management (TDM) Ordinance, consistent with the minimum requirements identified in the CMP Transportation Demand Management Chapter. On February 2, 1993, the City Council adopted the required TDM Ordinance (Municipal Code Chapter 10.28) and Staff continues to implement the TDM Ordinance, where applicable. In 1997, the TDM Ordinance was incorporated into the Development Code by reference. 3. The City has locally adopted and continues to implement a land use analysis program, consistent with the minimum requirements identified in the CMP Land Use Analysis Program Chapter. On September 17, 2002, the City Council adopted an amended set of Local CEQA Guidelines, which incorporated the County's CMP Land Use Analysis program into the City's environmental review procedures. City staff continues to implement the land use analysis program where applicable. 4. The City has adopted a 2015 Local Development Report consistent with the requirements identified in the CMP. The LDR tracks new development, exempted development, and development adjustments as a result of building permits issued between June 1, 2014 and May 31, 2015. 05 During the period between June 1, 2014 and May 31, 2015, there were building permits issued for ten (10) new single family units and five (5) demolition permits, resulting in a net increase of five (5) single-family residential units in the City. Additionally, there were building permits issued for eighty-three (83) multi -family residential units and five (5) low/very low income housing units at 28220 Highridge (Highridge Condos) and 5601 Crestridge (Crestridge Senior Condos). CONCLUSION The City Council, through a noticed public hearing, must adopt a self -certification conformance resolution, whereby the City agrees to conform to the local responsibilities required by the CMP, including preparation of the 2015 LDR. As documented in this Staff Report, the City is in conformance with all applicable requirements of the CMP and has taken all of the required actions of the Deficiency Plan. Therefore, Staff recommends that the City Council adopt attached Resolution No. 2015 - _ FISCAL ANALYSIS There are no fiscal impacts related to this request. ATTACHMENT • City Council Resolution No. 2015- (Page 4) • Draft 2015 Local Implementation Report (Page 6) • Public Works Letter to MTA (Page 10) 3 RESOLUTION NO. 2015- A RESOLUTION OF THE CITY COUNCIL FINDING THE CITY OF RANCHO PALOS VERDES [LOS ANGELES COUNTY] TO BE IN CONFORMANCE WITH THE CONGESTION MANAGEMENT PROGRAM (CMP) AND ADOPTING THE CMP LOCAL DEVELOPMENT REPORT, IN ACCORDANCE WITH CALIFORNIA GOVERNMENT CODE SECTION 65089. WHEREAS, CMP statute requires the Los Angeles County Metropolitan Transportation Authority (LACMTA), acting as the Congestion Management Agency for Los Angeles County, to annually determine that the County and cities within the County are conforming to all CMP requirements; and, WHEREAS, LACMTA requires submittal of the CMP Local Development Report by September 1 of each year; and, WHEREAS, on July 7, 2015, after notice published pursuant to the provisions of the Development Code, the City Council held a public hearing, at which time all interested parties were given an opportunity to be heard and present evidence; and, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES DOES HEREBY FIND, DETERMINE AND RESOLVE AS FOLLOWS: Section 1: That the City of Rancho Palos Verdes [Los Angeles County] has taken all of the following actions and is in conformance with all applicable requirements of the 2010 CMP adopted by the LACMTA Board on October 28, 2010. By June 15, of odd -numbered years, the City of Rancho Palos Verdes [Los Angeles County] will conduct annual traffic counts and calculated levels of service for selected arterial intersections, consistent with the requirements identified in the CMP Highway and Roadway System chapter. The City of Rancho Palos Verdes [Los Angeles County] has locally adopted and continues to implement a transportation demand management ordinance, consistent with the minimum requirements identified in the CMP Transportation Demand Management chapter. The City of Rancho Palos Verdes [Los Angeles County] has locally adopted and continues to implement a land use analysis program, consistent with the minimum requirements identified in the CMP Land Use Analysis Program chapter. The City of Rancho Palos Verdes [Los Angeles County] has adopted a Local Development Report, attached hereto and made a part hereof, consistent with the requirements identified in the 2010 CMP. This report balances traffic congestion impacts due to growth within the City of Rancho Palos Verdes [Los Angeles County] with transportation improvements, and demonstrates that the City of Rancho Palos Verdes [Los Angeles County] is meeting its responsibilities under the Countywide Deficiency Plan consistent with the LACMTA Board adopted 2003 Short Range al Transportation Plan. Section 2: That the City Clerk of the City of Rancho Palos Verdes [Los Angeles County] shall certify to the adoption of this Resolution and shall forward a copy of this Resolution to the Los Angeles County Metropolitan Transportation Authority. PASSED, APPROVED AND ADOPTED this 7t" day of July 2015. Mayor Attest: City Clerk STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES )ss CITY OF RANCHO PALOS VERDES ) I, Carla Morreale, City Clerk of the City of Rancho Palos Verdes, hereby certify that the above Resolution No. 2015- was duly and regularly passed and adopted by the said City Council at a regular meeting held on July 7, 2015. City Clerk 5 City of Rancho Palos Verdes Date Prepared: June 30, 2015 2014 CMP Local Development Report Reporting Period: JUNE 1, 2014 - MAY 31, 2015 Contact: Mercenia Lugo, Planning Technician Phone Number: (310) 544-5228 CONGESTION MANAGEMENT PROGRAM FOR LOS ANGELES COUNTY * IMPORTANT: All 'Wvalue!" cells on this page are automatically calculated. Please do not enter data in these cells. DEVELOPMENT TOTALS RESIDENTIAL DEVELOPMENT ACTIVITY Single Family Residential Multi -Family Residential Group Quarters COMMERCIAL DEVELOPMENT ACTIVITY Commercial (less than 300,000 sq.ft.) Commercial (300,000 sq.ft. or more) Freestanding Eating & Drinking NON -RETAIL DEVELOPMENT ACTIVITY Lodging Industrial Office (less than 50,000 sq.ft.) Office (50,000-299,999 sq.ft.) Office (300,000 sq.ft. or more) Medical Government Institutional/Educational University (* of students) OTHER DEVELOPMENT ACTIVITY ENTER IF APPLICABLE ENTER IF APPLICABLE EXEMPTED DEVELOPMENT TOTALS Exempted Dwelling Units Exempted Non-residential sq. ft. (in 1,000s Dwelling Units 5.00 83.00 0.00 1,000 Net Sq.Ft.2 0.00 0.00 0.00 1,00 Net 5q.r-t.- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily Trips 0.00 0.00 5 0 Page 1 2. Net square feet is the difference between new development and adjustments entered on pages 2 and 3. 101 City of Rancho Palos Verdes Date Prepared: 2015 CMP Local Development Report Reporting Period: JUNE 1, 2014 - MAY 31, 2015 June 30, 2015 Enter data for all cells labeled "Enter." If there are no data for that category, enter "0." PART DEVELOPMENT RESIDENTIAL DEVELOPMENT ACTIVITY Category Dwelling Units Single Family Residential 10.00 Multi -Family Residential 83.00 Group Quarters 0.00 COMMERCIAL DEVELOPMENT ACTIVITY Category 1,000 Gross Square Feet Commercial (less than 300,000 sq.ft.) 0.00 Commercial (300,000 sq.ft. or more) 0.00 Freestanding Eating & Drinking 0.00 NON -RETAIL DEVELOPMENT ACTIVITY Category 1,000 Gross Square Feet Lodging 0.00 Industrial 0.00 Office (less than 50,000 sq.ft.) 0.00 Office (50,000-299,999 sq.ft.) 0.00 Office (300,000 sq.ft. or more) 0.00 Medical 0.00 Government 0.00 Institutional/Educational 0.00 University (# of students) 0.00 OTHER DEVELOPMENT ACTIVITY Description (Attach additional sheets if necessary) Daily Trips (Enter "0" if none) ENTER IF APPLICABLE 0.00 ENTER IF APPLICABLE 0.00 Page 2 7 City of Rancho Palos Verdes Date Prepared: 2015 CMP Local Development Report Reporting Period: JUNE 1, 2014 - MAY 31, 2015 June 30, 2015 Enter data for all cells labeled "Enter." If there are no data for that category, enter "0." PART DEVELOPMENT ADJUSTMENTS IMPORTANT: Adjustments may be claimed only for 1) development permits that were both issued and revoked, expired or withdrawn during the reporting period, and 2) demolition of any structure with the reporting period. RESIDENTIAL DEVELOPMENT ADJUSTMENTS Category Dwelling Units Single Family Residential 5.00 Multi -Family Residential 0.00 Group Quarters 0.00 COMMERCIAL DEVELOPMENT ACTIVITY Category 1,000 Gross Square Feet Commercial (less than 300,000 sq.ft.) 0.00 Commercial (300,000 sq.ft. or more) 0.00 Freestanding Eating & Drinking 0.00 NON -RETAIL DEVELOPMENT ACTIVITY Category 1,000 Gross Square Feet Lodging 0.00 Industrial 0.00 Office (less than 50,000 sq.ft.) 0.00 Office (50,000-299,999 sq.ft.) 0.00 Office (300,000 sq.ft. or more) 0.00 Medical 0.00 Government 0.00 Institutional/Educational 0.00 University (# of students) 0.00 OTHER DEVELOPMENT ACTIVITY Description (Attach additional sheets if necessary) Daily Trips (Enter "0" if none) ENTER IF APPLICABLE 0.00 ENTER IF APPLICABLE 0.00 Page 3 • City of Rancho Palos Verdes Date Prepared: June 30, 2015 2015 CMP Local Development Report Reporting Period: JUNE 1, 2014 - MAY 31, 2015 Enter data for all cells labeled "Enter." If there are no data for that category, enter "0." •- 'AEXEMPTED DEVELOPMENT ACTIVITY (NOT INCLUDED IN NEW DEVELOPMENT ACTIVITY TOTALS) (NOT Low/Very Low Income Housing 5 Dwelling Units High Density Residential 0 Dwelling Units Near Rail Stations Mixed Use Developments 0 1,000 Gross Square Feet Near Rail Stations 0 Dwelling Units Development Agreements Entered 0 1,000 Gross Square Feet into Prior to July 10, 1989 0 Dwelling Units Reconstruction of Buildings 0 1,000 Gross Square Feet Damaged due to "calamity" 0 Dwelling Units Reconstruction of Buildings 0 1,000 Gross Square Feet Damaged in Jan. 1994 Earthquake 0 Dwelling Units Total Dwelling Units 5 Total Non-residential sq. ft. (in 1,000s) 0 Page 4 Exempted Development Definitions: 1. Low/Very Low Income Housing: As defined by the California Department of Housing and Community Development as follows: Low -Income: equal to or less than 80% of the County median income, with adjustments for family size, Very Low -Income: equal to or less than 50% of the County median income, with adjustments for family size. 2. High Density Residential Near Rail Stations: Development located within 1/4 mile of a fixed rail passenger station and that is equal to or greater than 120 percent of the maximum residential density allowed under the local general plan and zoning ordinance. A project providing a minimum of 75 dwelling units per acre is automatically considered high density. 3. Mixed Uses Near Rail Stations: Mixed-use development located within 1/4 mile of a fixed rail passenger station, if more than half of the land area, or floor area, of the mixed use development is used for high density residential housing. 4. Development Agreements: Projects that entered into a development agreement (as specified under Section 65864 of the California Government Code) with a local jurisdiction prior to July 10, 1989. 5. Reconstruction or replacement of any residential or non-residential structure which is damaged or destroyed, to the extent of > or = to 50% of its reasonable value, by fire, flood, earthquake or other similar calamity. 6. Any project of a federal, state or county agency that is exempt from local jurisdiction zoning regulations and where the local jurisdiction is precluded from exercising any approval/disapproval authority. These locally precluded projects do not have to be reported in the LDR. 9 June 30, 2015 Mr. Robert Calix CMP Manager Los Angeles County Metropolitan Transportation Authority One Gateway Plaza MS 99-23-2 Los Angeles, CA 90012-2952 Subject: 2015 Congestion Management Program Dear Mr. Calix: The City of Rancho Palos Verdes hereby transmits the results of our biennial highway monitoring, collected in accordance with the requirements of the Congestion Management Program. The enclosed Level of Service calculations are summarized as follows: Intersection Date Peak Hour V/C Ratio LOS Western Avenue & 06-23-15 8:00-9:00 AM 0.547 A Toscanini Drive 06-24-15 8:00-9:00 AM 0.528 A AM Peak Hour Average 0.538 A 06-23-15 5:00-6:00 PM 0.671 B 06-24-15 5:00-6:00 PM 0.664 B PM Peak Hour Average 0.668 B If you have any questions, please contact Ms. Nicole Jules, Deputy Director, at (310) 544-5252. Sincerely, Michael Throne Director of Public Works Enclosure Copy: Nicole Jules, Deputy Director of Public Works 101471/LO1 10 INTERSECTION LAYOUT Intersection: Western Avenue and Toscanini Drive Date: G/30/2015 CMP Monitoring Station No: 128 Drawn By: N.S. Western Avenue Toscanlni Drive Signal Phasing Diagram: NOTE: 1 2 3 a NB LAGGING LEFT TURN .4 PHASE North KEY: 1. _ --,► Lane functions as separate turn lane though not striped 2. 11 INTERSECTION CAPACITY UTILIZATION CALCULATION SHEET Intersection: Western Ave & Toscanini Dr Comments: LOS Maxinium V/C Ratio Count Date: 6/23/2015 0.6 Peak Hour: 8:00 - 9:00 AM B 0.7 Analyst: N.S. C Agency: City of Rancho Palos Verdes 3. Intersection Type: 4 -Way X CMP Monitoring Station: 128 D 09 T E 1.0 Movement Volu►ne Numbe►• of Lanes Ca acit V/C Ratio Split E/W Critical Movements Total NB Left 36 NB Thru 1231 NB Right 24 1 2 0 1600 3200 0 0.023 0.392 0.000 0.392 x 0.401 SB Left 14 1 1600 0.009 0.009 x SB Thru 801 2 3200 0.258 SB Right 23 0 0 0.000 EB Left 66 0 0 0.000 0.046 x 0.046 EB Thru 7 1 1600 0.046 EB Right 59 I 1600 0.037 WB Left 49 0 0 0.000 0.000 x WB Thru 6 1 1600 0.034 WB Right 48 1 1600 0.030 Sum of Critical V/C Ratios 0.447 Adjustment for Lost Time 0.100 Intersection Capacity Utilization (ICU) 0.547 Level of Service (LOS) - Refer to table below A Notes: Comments: LOS Maxinium V/C Ratio A 0.6 1. Per lane Capacity = 1,600 VPH B 0.7 2. Dual turn lane Capacity = 2,880 VPH C 0.8 3. Intersection Type: 4 -Way X D 09 T E 1.0 Split N/S F n/a Split E/W 12 INTERSECTION CAPACITY UTILIZATION CALCULATION SHEET Intersection: Western Ave & Toscanini Dr Comments: LOS Maximum V/C Ratio Count Date: 6/24/2015 0.6 Peak Hour: 8:00 - 9:00 AM B 0.7 Analyst: N.S. C Agency: City of Rancho Palos Verdes 3. Intersection Type: 4 -Way X CMP Monitoring Station: 128 D 0.9 T E 1.0 Movement Volume I Number of Lanes Capacityl V/C Ratio n/a Split E/W Critical Movements Total NB Left 28 1 1600 0.018 0.387 x NB Thru 1223 2 3200 0.387 NB Right 15 0 0 0.000 0.393 SB Left 10 1 1600 0.006 0,006 x SB Thru 764 2 3200 0.245 SB Right 19 0 0 0.000 EB Left 56 0 0 0.000 0.035 x 0.035 EB Thru 0 1 1600 0.035 EB Right 55 1 1600 0.034 WB Left 47 0 0 0.000 0.000 x WB Thru 3 1 1600 0.031 WB Right 45 1 1600 0.028 Sum of Critical V/C Ratios 0.428 Adjustment for Lost Time 0.100 Intersection Capacity Utilization (ICU) 0.528 Level of Service (LOS) - Refer to table below A Notes: Comments: LOS Maximum V/C Ratio A 0.6 1. Per lane Capacity = 1,600 VPH B 0.7 2. Dual turn lane Capacity = 2,880 VPH C 0.8 3. Intersection Type: 4 -Way X D 0.9 T E 1.0 Split N/S F n/a Split E/W 13 INTERSECTION CAPACITY UTILIZATION CALCULATION SHEET Intersection: Western Ave & Toscanini Dr Comments: LOS Maximum V/C Ratio Count Date: 6/23/2015 0.6 Peal(Hour: 5:00 - 6:00 PM B 0.7 Analyst: N.S. C Agency: City of Rancho Palos Verdes 3. Intersection Type: 4 -Way X CMP Monitoring Station: 128 D 0.9 T E 1.0 Movement Volume Number of Lanes Capacity V/C Ratio n/a Critical Movements Total NB Left 52 1 1600 0.033 0.033 x 0.538 NB Thru 1098 2 3200 0.356 NB Right 41 0 0 0.000 SB Left 43 1 1600 0.027 0.505 x SB Thru 1575 2 3200 0.505 SB Right 42 0 0 0.000 EB Left 29 0 0 0.000 0.000 x EB Thru 7 1 1600 0.023 EB Right 37 1 1600 0.023 0.033 WB Left 44 0 0 0.000 0.033 x WB Thru 8 1 1600 0.033 WB Right 34 1 1600 0.021 Sum of Critical V/C Ratios 0.571 Adjustment for Lost Time 0.100 Intersection Capacity Utilization (ICU) 0.671 Level of Service (LOS) - Refer to table below B Notes: Comments: LOS Maximum V/C Ratio A 0.6 1. Per lane Capacity = 1,600 VPH B 0.7 2. Dual turn lane Capacity = 2,880 VPH C 0.8 3. Intersection Type: 4 -Way X D 0.9 T E 1.0 Split N/S F n/a Split E/W 14 INTERSECTION CAPACITY UTILIZATION CALCULATION SHEET Intersection: Western Ave & Toscanini Dr Comments: LOS Maximum V/C Ratio Count Date: 6/24/2015 0.6 Peak Hour: 5:00 - 6:00 PM B 0.7 Analyst: N.S. C Agency: City of Rancho Palos Verdes 3. Intersection Type: 4 -Way X CMP Monitoring Station: 128 D 0.9 T E 1.0 Movement Volume Number of Lanes Capacity V/C Ratio Split E/W Critical Movements Total NB Left 68 1 1600 0.043 0.043 x 0.531 NB Thru 1109 2 3200 0.363 NB Right 52 0 0 0.000 SB Left 32 1 1600 0.020 0.488 x SB Thru 1513 2 3200 0.488 SB Right 48 0 0 0.000 EB Left 28 0 0 0.000 0.000 x EB Thru 5 1 1600 0.021 EB Right 44 1 1600 0.028 0.033 WB Left 47 0 0 0.000 0.033 x WB Thru 6 1 1600 0.033 WB Right 22 l 1600 0.014 Sum of Critical V/C Ratios 0.564 Adjustment for Lost Time 0.100 Intersection Capacity Utilization (ICU) 0.664 Level of Service (LOS) - Refer to table below B Notes, Comments: LOS Maximum V/C Ratio A 0.6 1. Per lane Capacity = 1,600 VPH B 0.7 2. Dual turn lane Capacity = 2,880 VPH C 0.8 3. Intersection Type: 4 -Way X D 0.9 T E 1.0 Split N/S E n/a Split E/W 15 CITY TRAFFIC COUNTERS WWW. CTCOUNTERS. COM File Name :Western Toscanini Tue 16 Site Code : 00000000 Start Date : 6/23/2015 Page No : 1 Groups Printed- Unshifted Western Ave Toscanin� Dr Western Ave 1 Toscanani Dr Southbound Westbound Northbound_ - Eastbound Start Time Left Thru � Right � g Left � Thru Right . g Left Thru Right g Left ; Thru Right Int. Total 07:00 AM 5 99 1 l i 9 0 6 1 2 220 4 8 0 6 360 07:15 AM 4 108 3 3 1 14 3 229 5 15 1 4 390 07:30 AMI 3 135 41 7 1 11 2 274 6I 6 1 17 467 07:45 AM 0 193 4 11 1 5 7 259 5 13 3 13; 514 Total , 12 535 12 30 3 -_. 36 14 982 20 42 5 40 1731 08:00 AM 1 6 183 6 'I 5 0 13 i 11 303 4i 15 3 12 561 08:15 AM 5 225 5 ', 13 2 15 13 308 3 11 1 16 617 08:30 AMI 2 181 5; 20 3 10 6 338 9 19 2 11 606 08:45 AM 1 212 7 _ 11 1 10 _ _ 6 282 _ 8 _-_ 21 1 20L 580 Total 14 801 23 49 6 48 36 1231 24 66 7 59 2364 04:00 PM 5 316 7 ! 7 0 3 12 260 12 7 5 19 653 04:15 PM j 8 312 13 14 1 8 16 264 14 j 2 4 15 671 04:30 PM 14 347 20 11 2 12 1, 18 266 19 10 1 16 r 736 04:45 PM 9 384 6 I 10_ 2 2 1 12 287 9 ,_ 1 11 741 Total 36 1359 46 42 5 25 58 1077 54 _8 27 11 61 2801 05:00 PM j 5 375 5 12 3 14 12 304 11 6 2 131 762 05:15 PM 7 373 18 i 11 3 3 ! 17 274 8 5 2 8 729 05:30 PM 22 394 5 10 1 13 12 250 12 13 2 10 744 05:45 PM 9 433 14 11 1 4 11 270 10: 5 1 6 775 Total 43 1575 42 44 8 34 '': 52 1098 41 29 7 37 3010 Grand Total' 105 4270 123 165 22 143 160 4388 139 164 30 197 , 9906 Apprch % !; 2.3 94.9 2.7 50 6.7 43.3 j 3.4 93.6 3 41.9 7.7 50.4 Total % 1.1 43.1 1.2' 1.7 0.2 1.4' 1.6 44.3 1.4' 1.7 0.3 2 16 CITY TRAFFIC COUNTERS WWW. CTCOUNTERS. COM File Name : Western_Toscanini_ Tue Site Code : 00000000 Start Date : 6/23/2015 Page No :2 17 Western Ave Toscanini Dr Out In Total Western Ave Toscanani Dir 13451 838 2183! Southbound 23 801 141 Westbound Northbound Eastbound � I Start Time Left Thru Right App. Total Left Thru Right App Total Left Thru !. Right _App Total Left Thru Right App Total Int. Total Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1 No rth T A u o N o C M U `� ( Peak Hour for Entire Intersection Begins at 08:00 AM O F � rn U_nsh_rfted ! I � u� int � r it O _ 08:00 AM 6 183 6 195 5 0 13 18 `. 11 303 4 318 15 3 12 30 561 08:15 AMI 5 225 5 235 ! 13 2 15 30 ! 13 308 3 324 ! 11 1 16 28 617 08:30 AMI 2 181 5 188 20 3 10 33 '', 6 338 9 353 19 2 11 32 606 08:45 AM 1 212 7 220 11 1 10 22 6 282 8 296 21 1 20 42 580 Total Volume ! 1 - 14 23 838 49 -6 48 103 36 1231 24 1291 66 -- 7 59 59 132 2364 /o A Total ° PP 1.7 95.6 2.7 .8 .9 50 5.3 44.7 PHF .583 880010 .821 .891 I - 613 .500 800_ .780 .6 914 _ .6 914-jr .786 .583 .738 .786 _ .958 17 Western Ave Out In Total 13451 838 2183! 23 801 141 Right Thru Left � I Peak Hour Data No rth T A u o N o C M U `� ( Peak Hour Begins al 08:00 AM / n > O',, -. W l �. O F � rn U_nsh_rfted ! I � u� int � r it O _ _ � � o Flo i � III Left Thru Right 36 1231 241 909 1291 2200'. Out In Total 17 CITY TRAFFIC COUNTERS WWW. CTCOUNTERS. COM File Name : Western_Toscanini Tue Site Code : 00000000 Start Date : 6/23/2015 Page No :3 Toscanani Dr Eastbound Thru -Right App. Total Int. Total 2 13 Western Ave 2 Toscanini Dr 1.5 2 Western Ave 25 1 - 6 12 Southbound _ 37 Westbound 9.6 50.7 Northbound 875 .712 Start Time Left , Thru Right A Total pp Left Thru Right App Total Left . Thru_I, Ri ht a pp Total !. Left _ Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 ',.O .. � North No Peak Hour for Entire intersection Begins at 05:00 PM M c'^ -► C Peak Hour Begins at 05:00 Ply 1 o — l� h _ 05:00 PM 5 375 5 385 12 3 14 29 12 304 11 327 6 05:15 PMI 7 373 18 398 ! 11 3 3 17 17 274 8 299 ! 5 05:30 PM 22 394 5 421 10 1 13 24 12 250 12 274 ! 13 05:45 PM 9 433 14 456 11 4 16 I 11 270 10 291 5 Total Volume I 43 , 1575 42 1660 44 _1 8 34 86 52 1098 _ 41 , 1191 29 % App. Total ! 2.6 94.9 2.5 51.2 9.3 39.5 4.4 92.2 3.4 39.7 PHF .489 .909 .583 910 .917 .667 .6.07- .741 .765 903 .854 .911 .558__ Toscanani Dr Eastbound Thru -Right App. Total Int. Total 2 13 21 2 8 1.5 2 10 25 1 - 6 12 7 37 79 9.6 50.7 Right Thru Left 875 .712 730 762 729 744 775 3010 971 Me] Western Ave Out In Total 1161! 1660 2821, P � 42, 1.575 43 Right Thru Left i I Il - t i i Peak Hour Data - _ - �I �,' ',.O .. � North No M c'^ -► C Peak Hour Begins at 05:00 Ply 1 o — l� h _ o i Unshlfted 0 i 0 i I f Left Thru Right_ 521 10981 41} 16561 , 1191 2.84.7-j Out In Total Western Ave 762 729 744 775 3010 971 Me] CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM File Name : Western Toscanini Wed 19 Site Code : 00000000 Start Date : 6/24/2015 Page No : 1 Group -Print - ed- Unshifted Western Ave Toscanini DrWestern Ave Toscanini Dr Southbound Westbound Northbound Eastbound Start Time Le T Rig Left i_ Thr_u I Right Left Thru Right , Left Thru Right : Int. Total 07:00 AM _ 97 2 7 0 9 4 165 1 4 2 11 307 07:15 AM 2 92 1 3 3 3 6 228 1 14 3 5 361 07:30 AM 3 128 2 7 0 13 5 262 4 12 1 7 444 07:45 AM 1 159 0 15 1 16 6 _ 284 _ 4 , 19 5 11 52.1 , Total 11 476 5 32 4 41 21 939 10 '', 49 11 34 1633 08:00 AM 1 183 1 9 2 16 7 271 3 13 0 11 517 08:15 AM 1 2 184 7 10 1 11 ! 10 321 2 13 0 18 579 08:30 AM 6 189 5 11 0 9 8 315 6 12 0 14 575 08:45 AM 1 208 6 17 0 9 3 316 4-- 18 0 12 594 Total 10 764 19 -- 47 _--_ 3 _ 45 : 28 _ _- 1223 15 56 0 55 2265 04:00 PMS 7 316 16 °1 9 3 6 8 248 12 7 0 12 644 04:15 PM 6 350 1 14 2 7 5 264 10 10 3 12 684 04:30 PM 10 344 7 10 3 15 1 8 265 21 6 2 10 701 04:45PM 1378 17 2 8 14 250 13 9 3 13 714 38 33 50 - 10 36 35 , _ 1027 56 32 8 47 2743 05:00 PM 8 340 11 9 4 5 19 274 11 7 2 18 708 05:15 PM '', 11 378 10 18 1 3 15 283 15 9 2 11 756 05:30 PM 7 391 12 8 1 6 22 261 15 7 0 9 739 05:45 PM ` 5 1 6 771 Total 32 15103 i 48 47 6 22 68 -1109 52 !- 28 _ 5 44 2974 Grand Total 84 4131 105 176 23 144 152 4298 133 165 24 180 9615 Apprch % 1.9 95.6 2.4 51.3 6.7 42 3.3 93.8 2.9 44.7 6.5 48.8 Total % % 0.9 43 1.1 1.8 0.2 1.5 ' 1.6 44.7 1.4 1.7 0.2 1.9 19 CITY TRAFFIC COUNTERS WWW. CTCOUNTERS. COM File Name : Western_Toscanini Wed Site Code : 00000000 Start Date : 6/24/2015 Page No :2 Western Ave Toscanini Dr j Western Ave Toscanini Dr 13241 ; -7931 21.171 Southbound Westbound f Northbound Right Thru Left Eastbound Start Tlme Left _Thru Right App Total Left Thru Right- App Total Left_ Thru_ Right App. Total Left _Thru Right App Total Int. Total Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1 NIT North 5 a Peak Hour for Entire Intersection Begins at 08:00 AM ' _.._- - _ -_ Peak r Begins at 08:00 A N 08:00 AM ' 1 183 1 185 9 2 16 27 'll 7 271 3 281 ! 13 0 11 24 517 08:15 AM j, 2 184 7 193 10 1 11 22 10 321 2 333 13 0 18 31 579 08:30 AM ''1 6 189 5 200 11 0 9 20 8 315 6 329 '', 12 0 14 26 575 08:45 AM 1 6 215 17 0 9- 26 3 4 3119 323 18 0 12 30 594 Total _ -208 793 47 3 45 95 1 26 .6__ 56 - 0 55 111 2265 /o A Total App. 1.3 6.3 96.3 2.4 49.5 .4 3 2 47._4 2.2 .2 .6 96.6 1.2 _ .2 50.5 _ 0 49.5 _PHF 410 .918 6 .4 .922 .691 .3 .2 .7 - .880 .7 9 6 950 .778 .000 _764 _ .895 953 Western Ave Out In Total 13241 ; -7931 21.171 19 764 10, Right Thru Left j III e Peak Hour Data NIT North 5 a v 1 C ' _.._- - _ -_ Peak r Begins at 08:00 A N - � ted r l 10 lJ I i, / i• I i Left Right _Thru 281-1223 151 i 866 1266` 21321 Out In Total CITY TRAFFIC COUNTERS WWW. CTCOUNTERS. COM File Name :Western Toscanini Wed Site Code : 00000000 Start Date : 6/24/2015 Page No : 3 Western Ave Toscanini Dr Western Ave Toscanini Dr Southbound Westbound Northbound Eastbound Start Time 11 Left i Thru I Right , App Total Left : Thru I Right 1 App Total Left Thru [ Right ,_App Total Left 1 Thru Right App Total Int. Total Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 8 340 11 359 9 4 5 18 19 274 11 304 i 7 2 18 27 708 05:15 PM -i' 11 378 10 399 18 1 3 22 15 283 15 313 ! 9 2 11 22 756 05:30 PM 7 391 12 410 ''i 8 1 6 15 22 261 15 298 7 0 9 16 739 05:45 PM 6 404 15 425 12 0 8 20 '', 12 291 11 314 5 1 6 12 771 Total Volume 32 1513 48 1593 47 6 22 75 68 _ 1109 52 1229'' 28 5 44 77 2974 % App. _Total 2 95 3 62.7 8 29-.3- 5.5 90.2 4.2 36.4 6.5 _ 57.1 PHF .727 .936 .800 .937 .653 .375 .688 .8521 .773_ .953_ .8671__ .979: .778 .625 .611 713 .964 21 j Western Ave Out InTota_I_ 11591 r 1593` 2752, 481 15131 32 Right Thru Left I i Peak Hour Data m� m! A, i _ 'O North n D' c n - c` ► Peak Hour Begins at 05:00 PM v ....._ t— 2 _Unshi ted C 0) !E Left Thru Right 681 11091 521 i 160411 1 1229"283_1 Out In Total We5tprn Ave 21