Loading...
RPVCCA_CC_SR_2015_06_16_I_2015_Five_Year_CIPMEMORANDUM TO: HONORABLE MAYOR & CITY COUNCIL MEMBERS FROM: DEBORAH CULLEN, DIRECTOR OF FINANCE DATE: JUNE 16, 2015 SUBJECT: 2015 FIVE-YEAR CAPITAL IMPROVEMENT PLAN REVIEWED: DOUG WILLMORE, CITY MANAGER Project Manager: Allan Kaufman, Senior Administrative Analyst RECOMMENDATION Approve the 2015 Five -Year Capital Improvement Plan. EXECUTIVE SUMMARY The CIP is a guide for the efficient and effective provision of resources for improving and maintaining public infrastructure and facilities. The CIP is segregated into both Funded and Unfunded projects and includes detailed "project sheets" that provide a project description, project type (e.g. Roadway Infrastructure), location, department responsible, estimates of cost, and the justification (e.g. safety, City Council goal, outside funding available). The CIP document does not include any projects with estimated costs below the infrastructure capitalization threshold of $100,000. Although the CIP document presents project funding for five years, the City Council approves CIP projects for the upcoming fiscal year only. This gives the City Council the ability to shift priorities when needed, while at the same time identify future projects and potential funding mechanisms. Projects are generally added to the "Funded" list as available funding sources are identified. Projects are usually funded first from restricted funds, to be conservative in allocating General Fund monies only when necessary. Staff recommends planning for use of the CIP Reserve (funded with General Fund money equivalent to transient occupancy tax revenue and prior year favorable General Fund expenditure variance in accordance with City Council Policy No. 41 — Reserve Policies). ii 2015 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 16, 2015 Page 2of3 On May 26, 2015, the Planning Commission reviewed the CIP Document and adopted P.C. Resolution 2015-10, finding it to be consistent with the General Plan. Based on City Council direction on June 2, 2016, the following changes have been made to the 2015 CIP: • Civic Center Tennis Court and Skate Plaza projects were combined and moved to the Unfunded list; • ADA Improvement Project at Del Cerro and Burma Road was removed from the CIP; • Fiber Optic Cabling at Abalone Cove Sewer Lift Stations, Abalone Shoreline Park, and Ladera Linda Community Center was removed from the CIP; and • Funding for the Hawthorne Boulevard Corridor Beautification Study was moved from year 5 to year 1 The CIP list of "funded" projects (totaling $34.9 million) has been integrated into the 2015 Five -Year Financial Model. Projects listed in Year 1 of the CIP (table below), totaling $3.2 million have been included in the proposed FY15-16 budget, which is also on the June 16, 2015 agenda for City Council consideration. Projects Page FY15-16 Landslide Dewatering Well Program 15 $ 450,000 Citywide ADA Transition Plan Implementation 20 200,000 PVIC Exhibits 24 455,000 'Traffic Safety Improvements - PVDE at Bronco 32 500,300 Hawthorne Blvd Corridor Beautification Study (Phase 1) 35 150,000 Pavement Management Program Update 36 120,000 Regional Storm Water Quality Project 44 100,000 Subtotal Capital Improvement Projects Fund $ 1,975,300 Storm Drain Lining 41 $ 340,836 Storm Drain Point Repairs 42 900,000 Subtotal Water Quality Flood Protection Fund $ 1;240,836 Total Capital Spending $ 3,216,136 Note: The Five -Year Capital Improvement Plan includes only projects with cost estimates of $100,000 or more. Summary of Resources Used for Funding Capital Spending; FY15-16 Use of CIP & General Fund resources $ 1,020,030 Use of restricted funds and revenue 2,196,106 Total Resources Used to fund Capital Spending $ 3,216,136 K 2015 FIVE-YEAR CAPITAL IMPROVEMENT PLAN June 16, 2015 Page 3 of 3 BACKGROUND AND DISCUSSION Programming capital facilities and improvements over time can promote better use of the City's limited financial resources, reduce costs and assist in the coordination of public and private development. Based on guidelines of the framework and those set forth by the City Council, Staff developed an inventory of capital projects. This inventory was compiled through a comprehensive review of existing reports, infrastructure plans, community input and the City Council's direction, goals and priorities. Some of these plans include the following: the Pavement Management System, Vision Plan, Sanitary Sewer Master Plan, Public Use Master Plan, Trails Network Plan, Storm Drain Master Plan and the General Plan. Staff evaluated every project quantified during the establishment and update of the CIP and established Criteria justifications that are reflected on each project sheet. These justification categories include: safety, support of essential City services, support of Council plan goals, economy and efficiency, outside funding, and community quality/sustainability. The Criteria justifications and the availability of restricted (non - General Fund) monies, are utilized to establish the priority level of CIP projects. Staff has included columns on the Funded and Unfunded lists (pages 11 & 68 of the document) to indicate whether the project supports public safety or another City Council priority. Expected Additions to Future CIP Documents Staff anticipates there will be future factors in 2015 and 2016 that will drive additional projects to the CIP, namely: 1. Completion of the Storm Drain Master Plan is expected in 2015, 2. Draft Parks Master Plan will be presented to the City Council on June 30, 2015; and 3. Update of the City's General Plan is expected to be finalized in FY15-16. Attachment: 2015 Five -Year Capital Improvement Plan (page 4) 3 Ago TABLE OF CONTENTS INTRODUCTION 3 FUNDED PROJECTS 10 FIVE YEAR CIP FUNDED LIST 11 ABALONE COVE SEWER DISTRICT REHABILITATION 12 PALOS VERDES DRIVE SOUTH LANDSLIDE 14 PARK SITES 16 PUBLIC BUILDINGS 19 RIGHT OF WAY 25 SANITARY SEWERS 37 STORM WATER SYSTEM 40 UNFUNDED PROJECTS 45 UNFUNDED LIST 46 PALOS VERDES DRIVE SOUTH LANDSLIDE 47 PARK SITES 49 PUBLIC BUILDINGS 55 RIGHT OF WAY 59 STORM WATER SYSTEM 70 TRAILS 76 KA 5 INTRODUCTION A Capital Improvement Plan (CIP) is a guide toward the efficient and effective provision of public infrastructure and facilities. Programming capital facilities and improvements over time can promote better use of the City's limited financial resources, reduce costs, and assist in the coordination of public and private development. In addition, the planning process is valuable as a means of coordinating and taking advantage of joint planning and development of facilities and infrastructure where possible. Careful management of these assets keeps the City poised for flexible and responsive strategic planning that allows the City to proactively prepare the groundwork for capital projects so that when funding opportunities arise, a plan is ready to be implemented. By looking beyond year-to-year budgeting and projecting what, where, when and how capital investments should be made, capital planning enables public organizations to maintain an effective level of service for the present and future population. THE CAPITAL IMPROVEMENT PLAN (CIP) The result of this continuing planning process is the CIP, which is the City's mid-term plan for infrastructure projects. The CIP addresses the City's needs relating to the acquisition, expansion, and rehabilitation of facilities and infrastructure. The CIP serves as a planning instrument, in conjunction with the City's General Plan and the City Council's Goals, to identify needed capital projects and coordinate the financing and timing of improvements in a way that maximizes the return to the public. It provides a planned systematic approach to utilizing the City's limited financial resources in the most responsive and efficient manner to meet its service and infrastructure needs. It serves as the "blueprint" for the future of the community and is a management and planning tool, rather than a binding document. The underlying strategy of the CIP is to plan for necessary land acquisition, construction and maintenance of public facilities necessary for the safe and efficient provision of public services in accordance with City policies and objectives adopted in the City's General Plan. A critical element of a balanced CIP is the provision of funds to both preserve or enhance existing facilities and provide new assets to respond to changing needs and community growth. While the program serves as a mid-term plan, it is reviewed and revised annually in conjunction with the budget. Priorities may be changed due to funding opportunities or circumstances that propel a project to a higher level of importance. Along the way, projects may be revised for significant cost variances. The CIP is primarily a document that assists in addressing the City's mid-term needs. As such, the projects and their scopes are subject to change from year-to-year as the needs of the community become more defined and projects move closer to final implementation. The adoption of the CIP is neither a commitment to a particular project nor a limitation to a particular cost. As a basic tool for scheduling anticipated capital projects, it is also a key element in controlling future capital financing. For this reason, the CIP includes some "unfunded" projects in which needs have been identified and quantified, but specific solutions and funding sources have not been determined. When adopted, the CIP provides the framework for the City's management team and the City Council with respect to investment planning, project planning, and the managing of any City debt. This document is independent of the City Council's goals and is intended to serve as a mid-term planning document. An integrated infrastructure management plan (IMP) is scheduled to be developed in FY15-16 to determine the impact of different funding strategies/scenarios and prioritization on project delivery over the course of multiple planning decades. The IMP will consider the maintenance level required and the useful life for each public asset and will focus particularly on the community's current and future needs (including public safety and regulatory mandates) and community expectations. The City is currently engaged in updating the General Plan, the 1989 Parks Master Plan and the 2004 Storm Drainage Master Plan, which are expected to be adopted in FY15-16. These three master plans will heavily influence the scheduling of projects during the CIP process. 3 10 A City Council -appointed Infrastructure Management Advisory Committee (IMAC) was formed in FY14-15 to assist in the implementation of the IMP and the use of the infrastructure planning tool. THE CIP PROCESS The capital improvement plan and budget is the result of an ongoing infrastructure planning process. Infrastructure planning decisions must be made with regard to both existing and new facilities and equipment. For existing facilities, the planning process addresses appropriate capital renewal strategies and repair -versus -replacement of facilities. New service demands are also considered, since they often affect capital facility requirements. Planning for the five-year CIP period and subsequent years, includes linking the General Plan to the capital plan requirements, conducting needs assessments and allowing for flexibility to take advantage of opportunities for capital investment. The FY15-16 through FY19-20 CIP is developed through input from professional staff, citizens of Rancho Palos Verdes, and elected or appointed City officials. CIP REVIEW TEAM A CIP Review Team is responsible for annually reviewing capital project requests and providing recommendations to the City Manager. This team is comprised of staff from the Office of the City Manager, Finance, Public Works, Community Development, and Recreation and Parks Departments, and the City Attorney. This team conducts an in-depth analysis of the impact of the CIP on present and future cash flows and financial obligations, as well as the City's ability to finance, process, design, and ultimately maintain projects. The Team will also analyze the fiscal impact for each individual project; including future maintenance and replacement costs, associated monetary benefits (e.g. future maintenance savings), as well as any applicable future revenue opportunities. The Team meets periodically throughout the year to evaluate the progress of projects, and examine future needs of the City. The overall goal of the CIP Review Team is to develop CIP recommendations that: ■ Preserve the past by investing in the continued upgrade of City assets and infrastructure; ■ Protect the present with improvements to City facilities and infrastructure; and ■ Plan for the future. Projects are identified by staff, professional consultants, residents and/or elected officials. There are typically more proposals than can be funded in the five-year CIP period, so the team conducts an internal project ranking process. The criteria used in this internal ranking includes, but is not limited to, safety, support of essential City services, support of City Council's goals, economy and efficiency, outside funding committed (or eligible for), and community quality/sustainability. Projects are prioritized based on the criteria outlined in this plan in the following section. If a project receives a lower ranking, it just means that other projects in that period of time are more critical for the City to address. While ratings are important in determining recommended projects, the realities of the City's financial situation are critical to all decisions. CIP CRITERIA Safety: Enhance or improve the overall safety of the City and delivery of services. Protect the health and welfare of residents. Supports Essential City Services: Maintenance and development of existing or new facilities and infrastructure which allows the City to deliver essential services to residents of Rancho Palos Verdes. Supports City Council Goals: Supports the goals established annually by the City Council. Meets citywide long-term goals and is in compliance with the City's General Plan. Economy and Efficiency: Maintain and enhance the economy and efficiency of providing services in Rancho Palos Verdes. This criterion would include projects which improve business processes and overall efficiency while also evaluating environmental impacts. Il 7 Outside Funding Committed or Eligible: Support a project for which outside funding has been committed to or may be obtained through restricted revenue sources. Community Quality/Sustainability: Maintain and enhance the infrastructure and services which support our residential and business community. This criterion would include projects which preserve and enhance the overall quality of life in Rancho Palos Verdes and projects which ensure economic viability to support the community. THE CIP CALENDAR October -December Departments prepare CIP requests January CIP Review Team reviews requests February -May Recommendations developed to be included in the Five -Year Model and Draft Budget May -June Planning Commission Review May -June Recommendations presented to the City Council for approval Additional forms and methods of public outreach will be conducted as directed by the City Council. PROJECT LISTS The CIP includes a comprehensive listing of all projects contained in the Five -Year Plan and also projects beyond the five-year period. Detailed project sheets are contained in the Plan for all projects included in the CIP. Another list of unfunded projects is also contained in the Plan to highlight quantified projects beyond the five-year period. Projects which are included in the CIP were evaluated based on the criteria approved by the City Council and are in compliance with the goals set forth in the City's General Plan. Application of these criteria ensures that each project recommended for Council consideration does indeed support the policy objectives of the City's long-term planning documents and identifies a basis for scheduling and allocation of resources. Cost estimates have been developed for each project based on preliminary project descriptions, and include all estimated costs for land acquisition, permits and inspections, project management and project engineering, consultant design work, construction, utilities, information technology infrastructure and other associated project costs. Estimates are based on today's dollars. CAPITAL IMPROVEMENT POLICIES The Finance Department, in cooperation with all other City Departments and the City Attorney, shall produce a working document designed to identify capital needs annually in conjunction with the budget process. This Five -Year Capital Improvement Plan (CIP) is submitted to the City Council to utilize in reviewing and prioritizing capital projects. After adoption by the City Council during the budget process, the CIP becomes the City's plan for capital improvements for the next five years, with annual adjustments as needed. Type of Project Definitions Capital asset: An asset with a cost in excess of $5,000 and an expected useful life of more than one year, such as automobiles, equipment, and furniture. These items will continue to be included in the operating budget. Items such as automobiles, minor equipment, and furniture will continue 5 • to be accounted for and funded using the Equipment Replacement Fund and are not included in the capital improvement plan. Capital project: A project expected to have a useful life greater than ten years and an estimated cost of $100,000 or more. Capital projects include the construction, acquisition, or major renovation of buildings, roadways, utility systems, or other structures, purchase of land, and major landscaping projects. Projects meeting the above definition will be included in the CIP document in addition to the City's budget document. The information will be tied to the capital budget and totals for each project in the CIP will be included in the capital budget. Selecting the Projects for the CIP The comprehensive capital project planning process has the following essential components: ■ The General Plan (Long-term Plan - 10 Years) ■ The Capital Improvement Plan (Mid-term Plan - 5 Years) ■ The Capital Budget (Short-term Plan - 1 Year) ■ City Council Goals (Long-term and Short-term evaluated each year) All projects selected for the CIP should be consistent with the goals identified by the City Council or as outlined in the City's General Plan. The project selection process strives to achieve a balanced plan for the community to include all necessary and high priority projects, while also enhancing City services and facilities. Operating Budget Impact Identified in the CIP The operating impact of proposed capital projects, including personnel, operating expenditures, capital outlay, and debt service, as applicable, will be identified in the CIP document and considered in preparing the annual operating budget and Five -Year Financial Model. Moving Projects from the CIP to the Capital Budget All projects approved in the annual capital budget are appropriated at the estimated cost to complete the project. At the end of each fiscal year, the remaining appropriation for uncompleted portions of the project will be carried forward to subsequent fiscal years. Staff will identify the estimated costs, potential funding sources, operating impact, and project schedule for each capital project proposal before it is submitted to the City Council. Staff will coordinate development of the capital improvement budget with the development of the operating budget. All costs for internal professional services needed to implement the CIP will be included in the capital budget as part of the budget document for the years the CIP is to be implemented. Cost tracking for components of the capital improvement program will be updated semi-annually to ensure project completion against budget and established time lines. Funding of the CIP Reserve Fund City Council Policy No. 41 regarding the City's Reserves provides for a minimum CIP Reserve level of $3,000,000 for emergency projects, the transfer of the total annual Transient Occupancy Tax (TOT) revenue into the CIP Reserve, and the transfer of any prior year General Fund favorable expenditure variance to the CIP Reserve. The TOT revenue for FY15-16 is estimated to be about $5.0 million. Definition of Capital Budget Year A capital budget year runs concurrent to the operating budget fiscal year beginning July 1St and ending June 301h n. N Types of Financing The nature and cost of the project generally determines the financing options as do projected revenue. The following financing instruments could be used in the following preferred order: ■ Outside funding that does not require repayment, including grants, federal, state and county restricted funding (i.e. transportation funding), and donations; ■ Developer Fees; ■ City restricted revenue imposed by voters (i.e. environmental excise tax, storm drain user fee); ■ Accumulated Fund Balances in Restricted Funds; ■ General Fund; ■ Debt Secured by a Restricted Revenue Source; and ■ General Obligation Debt. Application of Restricted Funding Sources It is the City's policy to apply restricted funding sources after a project is completed and final cost is identified, or at the close of each fiscal year, whichever occurs first. Evaluation of Capital Projects Capital project and program reviews are to monitor existing project performance and to update the Five -Year CIP. Each project must be actively managed and semi-annual reports on the physical and fiscal status of each project should be made available to the City Council in conjunction with the budget adoption and Mid -Year Financial Review. Green Building Standards The City of Rancho Palos Verdes requires the incorporation of green building principles and practices into the design, construction, and operation of all City facilities, and to evaluate all land purchases for future development on the basis of reducing environmental impacts whenever feasible. Standards for Maintenance It is important to have standards in place for the various infrastructure systems throughout the City to maintain this investment and be positioned to provide adequate services for the residents of Rancho Palos Verdes. Staff will develop maintenance standards and schedules as appropriate. Contingency Policy The need for contingencies will be evaluated with each project and be included in the CIP on a case-by-case basis. Project Change Orders Project change orders will be made in accordance with the policy stated in Section 02.44 of the Municipal Code. GENERAL PLAN GOALS The goals stated below are included in the City's General Plan which serves as the City's long-term strategic planning tool. All CIP projects should contribute to fulfilling one or more of the goals listed below. Natural Environment Element ■ It is the goal of the City of Rancho Palos Verdes to conserve, protect, and enhance its natural resources, beauty, and open space for the benefit and enjoyment of its residents and the residents of the entire region. Future development shall recognize the sensitivity of the natural environmental and be accomplished in such a manner as to maximize the protection of it. 7 Socio/Cultural Element ■ It is the goal of the City to preserve and protect its cultural resources and to promote programs to meet the social needs of its citizens. Cultural Resources ■ The City shall strive to protect and preserve all significant archaeological, paleontological and historical resources within the City. Current Social, Service, and Cultural Organizations ■ Work toward a coordinated program to aid in matching the facility needs of the many and diverse groups in the community with existing and future facility resources throughout the City. Social Services ■ Encourage programs for community involvement, participation, and action to minimize the sense of isolation and powerlessness felt by many individuals in the community. ■ Encourage programs for recreation, social services, and cultural and educational achievement. ■ Encourage a framework for interaction among the four cities on the peninsula and between the peninsula and its surrounding communities to solve common problems. Urban Environment Element ■ It is the goal of the City to carefully control and direct future growth towards making a positive contribution to all elements of the community. Growth in Rancho Palos Verdes should be a cautious, evolutionary process that follows a well -conceived set of general guidelines, which respond to both holding capacity limitations for the region and environmental factors on the peninsula. Activity Areas ■ It is the goal of the City of Rancho Palos Verdes to preserve and enhance the community's quality living environment; to enhance the visual character and physical quality of existing neighborhoods; and to encourage the development of housing in a manner which adequately serves the needs of all present and future residents of the community. ■ The City shall discourage industrial and major commercial activities due to the terrain and environmental characteristics of the City. Commercial development shall be carefully and strictly controlled and limited to consideration of convenience or neighborhood service facilities. ■ The City shall encourage the development of institutional facilities to serve the political, social, and cultural needs of its citizens. ■ The City shall endeavor to provide, develop, and maintain recreational facilities and programs of various types to provide a variety of activities for persons of all age groups and in all areas of the community. ■ Agricultural uses within the City shall be encouraged, since they are desirable for resource management and open space. Infrastructure ■ It shall be a goal of the City to ensure adequate public utilities and communications services to all residents, while maintaining the quality of the environment. R 11 ■ It shall be a goal of the City to provide residents with a safe and efficient system of roads, trails, and paths. ■ It shall be a goal of the City to encourage the increased mobility of residents through the development of an adequate public transportation system. Safety ■ It shall be a goal of the City to provide for the protection of life and property from both natural and man-made hazards within the community. • It shall be a goal of the City to provide for the protection of the public through effective law enforcement and fire protection programs. ■ It shall be a goal of the City to develop and enforce health and sanitation, emergency communications, and disaster preparedness programs to ensure the overall health and safety of all residents. ■ It shall be a goal of the City to protect life and property and reduce adverse economic, environmental, and social impacts resulting from any geologic activity. Sensory Environment ■ It shall be the goal of the City of Rancho Palos Verdes, through proper land use planning and regulations, to provide for a quiet and serene residential community with a minimum amount of restriction on citizen activity. Palos Verdes peninsula is graced with views and vistas of the surrounding Los Angeles basin and coastal region. Because of its unique geographic form and coastal resources, these views and vistas are a significant resource to residents and visitors, as they provide a rare means of experiencing the beauty of the peninsula and the Los Angeles region. It is the responsibility of the City to preserve these views and vistas for the public benefit and, where appropriate, the City should strive to enhance and restore these resources, the visual character of the City, and provide and maintain access for the benefit and enjoyment of the public. Land Use Plan ■ It is the goal of the City of Rancho Palos Verdes to provide for land uses which will be sensitive to and enhance the natural environment and character of the community, supply appropriate facilities to serve residents and visitors, promote a range of housing types, promote fiscal balance, and protect the general health, safety, and welfare of the community. Fiscal Element • It shall be a goal of the City to hold the property tax to a minimum and to continually explore and analyze the advantages and disadvantages of alternate or new sources of revenue. ■ It shall be a goal of the City to explore cooperative financing strategies that might be undertaken in association with other jurisdictions. ■ It shall be a goal of the City to take maximum advantage of regulatory legislation to obtain contributions, dedications, and reservations (i.e., easements). ■ It shall be a goal of the City to ascertain that all revenues generated by growth are sufficient to cover costs related to growth. • It shall be a goal of the City to thoroughly evaluate capital acquisition and operating expenditures and their impacts before implementation of programs. p 12 FUNDED PROJECTS The following projects are those which have been identified as capital needs through various planning processes along with a proposed funding source. Because the City Council approves CIP projects for the upcoming year, proposed funding sources could change in subsequent years. 13 Palos Verdes Five Year Capital Safety Council Identified Funding umentPlan- Funded Projects Page Goal Priority FYIS-16 FY16.17 FY17.18 FY18.19 FY19.20 Source Abalone Cove Sewer District Rehabilitation 13 X X $ 500,000 $ 500,000 $ 500,000 $ 500,000 CIP Reserve Palos Verdes Drive South Landslide X X $ 407,000 CIP Reserve Storm Water System' Landslide Dewatering Well Program 15 X X $ 450,000 $ 450,000 $ 180,000 $ 180,000 $ 180,000 CIP Reserve Park Sites WQFP User Fees/CIP Storm Drain Lining 41 X X Abalone Cove Beach Access Road 17 X Reserve Paintbrush Canyon Drainage Project Study Report $ 100,000 X X CIPReserve Grandview Parklmprovements (Phase 1) 18 CIP Reserve X 43 X X $ 635,000 CIPReserve Public Buildings WQFP User Fees Storm Water Quality Improvement Program 44 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 Ctyw ide ADA Transition Plan Implementation 20 X $ 200,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 EEfICIPReserve Ladera Linda Community Center Improvements 21 X $ 4,000,000 CIPReserve Solar Power System Hesse Park 22 $ 385,000 Energy Savings Grant Solar Power System PVIC 23 $ 410,000 Energy Savings Grant Restricted Donations PVIC Exhibits 24 $ 455,000 Fund Right of Way General Fund, TDA Residential Street Rehabilitation Zone 7 26 X X $2,282,000 Article 3 funds Residential Street Rehabilitation Zone 8 27 X X $ 2,200,000 General Fund Residential Street Rehabilitation Zone 3 & 4 28 X X $ 2,100,000 General Fund General Fund, TDA Residential Street Rehabilitation Zone 5 29 X X $2,182,000 Article 3 funds Measure R, Prop A, Prop C, STPL, CIP Arterial Rehabilitation - Crenshaw Boulevard 30 X X $ 200,000 $ 2,600,000 Reserve Measure R, Prop A, Prop C, STPD, CIP Arterial Rehabilitation - IndianPeakRoad 31 X X $ 200,000 $1,600,000 Reserve HSIP 90%, CIP Reserve Traffic Safety Improvements - PVDEat Bronco 32 X X $ 500,300 10% PVDS Road Way Realignment and Drainage Project 33 X X $ 3,060,000 CIPReserve 50/50 Inter -Agency Cost Western Avenue Traffic Improvements 34 X X $3,200,000 Share/CIPReserve Hawthorne Blvd Corridor Beautification Study (Phase 1) 35 X X $ 150,000 CIPReserve Pavement Management Program Update 36 X X $ 120,000 $ 120,000 CIPReserve Sanitary Sewer Sewer Capacity Project- Other Locations 38 X X $ 465,000 CIP Reserve Malaga Canyon - Sew er Improvement 39 X X $ 407,000 CIP Reserve Storm Water System' WQFP User Fees/CIP Storm Drain Lining 41 X X $ 340,836 $ 347,653 $ 350,000 $ 350,000 $ 350,000 Reserve Paintbrush Canyon Drainage Project Study Report 42 X X $ 120,000 CIP Reserve Storm Drain Point Repairs 43 X X $ 900,000 WQFP User Fees Storm Water Quality Improvement Program 44 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 CIPReserve Totals ! $3,216,136 -$8,686,653 $,6,490,000 $11,396,000 .$6,182,000 11 M ABALONE COVE SEWER The Abalone Cove Sewer Maintenance District is a unique system serving 110 developed parcels in an active landslide area, and is maintained by the City. Sewer user fees are collected from property owners, but are not sufficient to provide for maintenance and rehabilitation of the system. The Abalone Cove Sewer Maintenance District is heavily subsidized by the City. 12 15 PROJECT: ABALONE COVE SEWER DISTRICT REHABILITATION TYPE: Sewer System LOCATION: Abalone Cove Sewer District DEPARTMENT: Public Works DESCRIPTION: Construction of the Abalone Cove Sewer system was completed in 2001 to replace property owner's septic tanks in the active landslide area of the City. Minimal maintenance has been performed since that time. Due to the active landslide, the system is now in need of more substantive rehabilitation and upgrades to comply with current engineering, operations, and maintenance standards in Los Angeles County. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $500,000 $500,000 $500,000 $500,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $500,000 $500,000 $500,000 $500,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds (General Fund money). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Rehabilitation of the system will result in reliable system performance and compliance with state requirements. This is expected to decrease maintenance costs. 13 16 PALOS VERDES DRIVE SOUTH LANDSLIDE PROJECTS The Palos Verdes Drive South Landslide Projects refers to projects that lessen the effect of erosion on the Portuguese Bend Landslide, which is the only continuously active landslide in the United States. These projects are intended to address landslide movement and public safety risks by using proven methods, such as runoff diversion, dewatering, and geospatial monitoring. 14 i1h PROJECT: INSTALLATION OF LANDSLIDE DEWATERING WELLS TYPE: Landslide Project LOCATION: Portuguese Bend and Abalone Cove DEPARTMENT: Public Works DESCRIPTION: Dewatering wells are considered to be one of the most effective methods of minimizing runoff from entering the landslide, which helps slow land movement within the landslide area. All runoff that percolates into the ground eventually becomes part of the groundwater and will cause an increase in the depth of the groundwater table. Removing groundwater through dewatering wells helps to lower the groundwater table, relieving soil pressures at depth and minimizing the negative effects groundwater has on the landslide. These new wells should improve the system's effectiveness by increasing the system's water removal capacity and by removing water more rapidly. The cost to install each well is estimated to be $90,000. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $450,000 $450,000 $180,000 $180,000 $180,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $450,000 $450,000 $180,000 $180,000 $180,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds (General Fund money). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Maintenance costs will be performed as needed. 15 im• PARK SITES The development and maintenance of community parks, recreational areas, and open space has been established as a top priority for the City, as stated in the General Plan and various other planning documents. The General Plan states, "It is the goal of the City of Rancho Palos Verdes to conserve, protect, and enhance its natural resources, beauty, and open space for the benefit and enjoyment of its residents and the residents of the entire region. Future development shall recognize the sensitivity of the natural environment and be accomplished in such a manner as to maximize the protection of it." Many park sites and open space areas have been acquired throughout the City, and some have been developed for use by the general public. Some sites remain vacant or underutilized. The City Council approved the Vision Plan in September 2008 which outlines various trail and park projects, which have been included in this plan. The Public Use Master Plan has also outlined a strategy for the development of trails. These recreational projects add to the vibrancy of the community and are designed to contribute to all residents' quality of life. Parks and other open spaces have been carefully planned to take advantage of the beautiful coastline and natural landscape of the peninsula. At its July 29, 2014 meeting, the City Council directed staff to complete an update of the City's 1989 Parks Master Plan. This update is intended to provide a comprehensive strategy for addressing the future use of the City's parks, recreation and open space resources. The updated Master Plan will serve as a long-range vision for the City's recreation opportunities within a flexible framework than can be adapted to changes in technology, demographics, economics, and shifting recreational trends. The draft Parks Master Plan is scheduled to be presented to the City Council on June 30, 2015. The update will consolidate plans that currently exist for a number of major park sites, while being consistent and in compliance with the City's General Plan and other guiding documents. A review and update of the City's parks inventory will be a major element as well as an update of the Coast Vision Plan. A dozen public workshops were conducted between November 2014 and February 2015, in addition to an online survey which generated over 500 responses. The Parks Master Plan's precise impact to the CIP is not known at this time. A number of projects that will likely be part of the final Master Plan document are probably already part of the current CIP's funded or unfunded categories, while other recommended projects may not reach the CIP threshold. W W PROJECT: ABALONE COVE BEACH ACCESS ROAD TYPE: Recreation, Parks, & Open Space LOCATION: Abalone Cove DEPARTMENT: Public Works The Abalone Cove Beach access road from PVDS to the beachfront DESCRIPTION: must be re -graded and re -paved to improve accessibility for emergency response and maintenance vehicles. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $100,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $100,000 IMPACT ON OPERATING BUDGET Funding Information: CIP Reserve funds (General Fund money). Maintenance will require new slurry seal every eight (8) years. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: The life expectancy of the access road should last approximately 20 years. 17 20 PROJECT: GRANDVIEW PARK IMPROVEMENTS (PHASE 1) TYPE: Recreation, Parks & Open Space LOCATION: Grandview Park DEPARTMENT: Public Works DESCRIPTION: The scope of work of the proposed 'Phase One' of Grandview Park includes construction of a natural parking lot, restrooms/office, play area, picnic area, and some landscaping. These basic items are chosen from the concept plan option "Sycamore", which was selected by the City Council. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $75,000 CONSTRUCTION $560,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $635,000 IMPACT ON OPERATING BUDGET Funding Information: CIP Reserve funds (General Fund money). Impacts to operating budget include: periodic parking lot maintenance ($10,000 /yr.), facility services ($3,000 /yr.), and trash collection ($4,000). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: ff.*] 21 PUBLIC BUILDINGS Buildings and other facility improvements may include any proposed new City facility or renovation or improvement of any existing City facilities. The City owns and maintains the following public buildings: ■ City Hall Administration Building at Point Vicente Park ■ City Hall Community Development Building at Point Vicente Park ■ RPV TV Studio Building at Point Vicente Park ■ City Hall trailer leased by Palos Verdes on the Net at Point Vicente Park ■ City Hall Emergency Communications Center trailer at Point Vicente Park ■ Fred Hesse Jr. Community Center Building (John C. McTaggart Hall) ■ Pointe Vicente Interpretive Center (PVIC) at Lower Point Vicente Park ■ Robert Ryan Park Building ■ Ladera Linda Community Center Buildings (5) ■ Buildings at Abalone Cove Shoreline Park, currently used for staffing, public restrooms, and a nursery school on the beach. ■ Pelican Cove Restroom Building ■ Eastview Park Restroom Buildings Except for PVIC, these buildings are 25 years old or more and showing signs of daily use. Many of the facilities were purchased from the school district or transferred to the City from the federal government. In some cases, little to no improvements have been made since their acquisition. It is important to perform adequate maintenance to extend the life of these facilities. It will be necessary to renovate these buildings as they age to meet the needs of the community and ensure that all building and safety guidelines are satisfied. PVIC, the most recently remodeled City facility, was built in 1984 and expanded in 2005. The City Hall buildings and Ladera Linda Community Center buildings are the best examples of buildings that are in great need of renovation to meet organizational needs, comply with safety and code requirements, and comply with all Americans with Disabilities Act (ADA) guidelines. The projects listed on the following pages have been developed based on individual staff assessments, input from the community, and professional consultants' assessments and studies. 19 P PROJECT: CITYWIDE ADA TRANSITION PLAN IMPLEMENTATION TYPE: Buildings and Other Facility Improvements LOCATION: Various DEPARTMENT: Public Works DESCRIPTION: These projects include improvements identified in the Citywide ADA Transition Plan. The projects for any given year are selected based on public need and on the degree of severity reported in the ADA compliance report prepared in 2013. Project examples would include: accessibility path to Hesse Park Community Center building; installation of new audible signals at crosswalks; and building concrete ramps at crosswalks. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $17,500 $10,000 $10,000 $10,000 $10,000 CONSTRUCTION $182,500 $140,000 $140,000 $140,000 $140,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $200,000 $150,000 $150,000 $150,000 $150,000 IMPACT ON OPERATING BUDGET Funding Source: CIP Reserve funds (General Fund money) and Environmental Excise Tax. These projects are not expected to have any impact on the operating budget. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: 20 23 21 24 LADERA LINDA PARK & COMMUNITY PROJECT: CENTER BUILDINGS REPLACEMENT TYPE: Buildings and Other Facility Improvements LOCATION: Ladera Linda Park / Community Center DEPARTMENT: Public Works The initial stage of this project, for which a budget has been established, is to create a master plan which will lay the groundwork for the site's long-term redevelopment and phased implementation. This stage involves a study of community needs through public outreach, along with contemplating the City's needs for public service facilities. This work will be followed by programming, quantifying the needs, planning and preparing a feasibility report to create a master plan, which can be phased for design and construction. The cost calculation for the Ladera Linda Buildings Replacement project is based on an estimated need for 12,000 square -feet of DESCRIPTION: buildings to replace the existing 18,000 square -feet. The anticipated square -footage could include park restrooms, a staff building, multipurpose room, activity rooms, discovery room, and a Park Ranger/Deputy Sheriff drop-in office. Other improvements include park grounds landscaping and irrigation, picnic tables, benches, and an emergency generator. The project can be divided into three phases. The first phase will include hazmat abatement, removal of all buildings, installation of all utility infrastructures, the construction of 6,000 SF of new building space, park grounds, landscaping and other improvements. The second and third phase will include 3,000 SF of new buildings space. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $4,000,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $4,000,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds (General Fund money). Phase 1- $4 million in CIP Reserves Phase II - $1.6 million in CIP Reserves Phase III - $1.6 million in CIP Reserves Total Cost: $7.2 million JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Current maintenance costs would cease. As the new facility ages, maintenance costs will rise. 21 24 PROJECT: SOLAR POWER SYSTEM FOR HESSE PARK BUILDING TYPE: Buildings and Other Facility Improvements LOCATION: Hesse Park DEPARTMENT: Public Works DESCRIPTION: Installation of lightweight and advanced solar energy generating systems over the roof of Hesse Park to reduce power consumption, with occasional opportunities to sell power to the grid. This project will help the City with its energy savings goal and will reduce considerable amounts of emissions. Typically, the energy savings can cover the cost of projects of this scale over an estimated period of 15 to 20 years. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $35,000 CONSTRUCTION $350,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $385,000 IMPACT ON OPERATING BUDGET Funding Information: Fully funded with an Energy Savings grant (federal/state) JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY X SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Potential electricity savings is about $18,000 annually. The life of the system is expected to be 20-25 years. Solar system components are generally under warranty for 10-12 years. 22 25 PROJECT: SOLAR POWER SYSTEM FOR POINT VICENTE INTERPRETIVE CENTER (PVIC) TYPE: Buildings and Other Facility Improvements LOCATION: PVIC DEPARTMENT: Public Works DESCRIPTION: Installation of lightweight and advanced solar energy generating systems over the roof of PVIC to reduce power consumption, with occasional opportunities to sell power to the grid. This project will help the City with its energy savings goal and will reduce considerable amounts of emissions. Typically, the energy savings can cover the cost of projects of this scale over an estimated period of 15 to 20 years. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $35,000 CONSTRUCTION $375,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $410,000 IMPACT ON OPERATING BUDGET Funding: Fully funded with an Energy Savings grant (federal/state) JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY X SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Potential electricity savings is about $20,000 annually. The life of the system is expected to be 20-25 years. Solar system components are generally under warranty for 10-12 years. 23 26 PROJECT: POINT VICENTE INTERPRETIVE CENTER EXHIBITS TYPE: Recreation, Parks, & Open Space LOCATION: Point Vicente Interpretive Center DEPARTMENT: Recreation & Parks/Public Works DESCRIPTION: Private restricted donations have been collected for enhancements to the PVIC museum exhibits. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $455,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $455,000 IMPACT ON OPERATING BUDGET Funding Information: Private Restricted Donations. Exhibit maintenance will be at a nominal cost; and therefore, should not impact the operating budget. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: 24 27 RIGHT OF WAY PROJECTS Roadway infrastructure is one of the most widely used major capital investments of a municipality. Without a well-maintained street system, the transportation needs of the public, business, industry, and government cannot be met. The roads are also part of a critical public safety need, as they contribute to the general health and welfare of the community. Maintaining quality roadway infrastructure is also important for maintaining property values. It has been shown that property values tend to suffer from adjacent poorly maintained streets. Roadway infrastructure includes residential streets, arterial streets, and traffic safety improvements. In the City of Rancho Palos Verdes, there are 44.3 miles of arterial streets and 104.2 miles of residential streets. The total of all streets and alleys mileage is 148.5 centerline miles. To manage the City's residential and arterial streets, the City hires a consultant who conducts a full -detailed assessment of all streets once every three years. This report, known as the Pavement Management Program (PMP), helps to identify any serious issues and provides the City with a rating for each street. The report includes the overall Pavement Condition Index (PCI). The City of Rancho Palos Verdes maintains a minimum standard for PCI for a municipal street system at 80. The City's current PCI is 81.8 based upon the PMP report prepared by Bucknam Infrastructure Group, Inc. in 2013. Since 1997, the City has maintained a pavement rating between 80 and 90. The report also helps in defining a schedule to complete the work. The City has been divided into nine zones for residential streets, but in the case of some areas, zones may be completed together in one year for added efficiency. 25 MP PROJECT: RESIDENTIAL REHABILITATION TYPE: Roadway Infrastructure LOCATION: Zone 7 DEPARTMENT: Public Works DESCRIPTION: As part of the City's Pavement Management Plan, Zone 7 of the residential rehabilitation program is scheduled for implementation during the FY15-16 budget cycle. This project will include micro- surfacing, slurry seal, overlay, curb repair, root removals, and ADA compliance updates of the streets and sidewalks in Zone 7. This infrastructure enhancement will also include updating traffic signs, striping, curb painting, house numbering, and monument surveying. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $2,282,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $2,282,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDA Article 3 of approximately $82,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY16-17. This project is funded by the General Fund, and has a goal to achieve a pavement condition of 86 or higher, which is considered "Very Good Condition." LOCATION PHOTO LOCATION DESCRIPTION - Zone 7: The Ladera Linda community, Ganado Area, streets near Mira Catalina School, San Ramon and Calle Aventura. 26 29 PROJECT: RESIDENTIAL REHABILITATION TYPE: Roadway Infrastructure LOCATION: Zone 8 DEPARTMENT: Public Works As part of the City's PMP, Zone 8 of the residential rehabilitation program is scheduled for implementation during the FY16-17 DESCRIPTION: budget cycle. This project will include micro -surfacing, slurry seal, overlay, curb repair, root removals, and ADA compliance updates of the streets and sidewalks in Zone 8. This infrastructure enhancement will also include updating traffic signs, striping, curb painting, house numbering, and monument surveying. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $2,200,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $2,200,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY17-18. This project is funded by the General Fund, and has a goal to achieve a pavement condition of 86 or higher, which is considered "Very Good Condition." LOCATION PHOTO LOCATION DESCRIPTION Zone 8: Residential neighborhoods off of Palos Verdes Drive East in the northern and eastern parts of the City. } 27 Wo PROJECT: RESIDENTIAL REHABILITATION TYPE: Roadway Infrastructure LOCATION: Zones 3 & 4 DEPARTMENT: Public Works As part of the City's PMP, Zones 3 & 4 of the residential rehabilitation program are scheduled for implementation during the FY18-19 budget cycle. This project will include micro -surfacing, DESCRIPTION: slurry seal, overlay, curb repair, root removals, and ADA compliance updates of the streets and sidewalks in Zones 3 & 4. This infrastructure enhancement will also include updating traffic signs, striping, curb painting, house numbering, and monument surveying, PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $2,100,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $2,100,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X I COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY18-19. This project is funded by the General Fund, and has a goal to achieve a pavement condition of 86 or higher, which is considered "Very Good Condition." LOCATION PHOTO LOCATION DESCRIPTION Zone 3: Residential streets north of Silver Spur Rd and east of Hawthorne Blvd, including the Blackhorse community, Silver Arrow, Longhill, and Beechgate. Zone 4: Residential streets bordering Crenshaw Blvd and Crest Road, including the Sea Crest, Sea Breeze, Island View, and Ridgecrest communities. E�nD9l�fi�Q W 31 PROJECT: RESIDENTIAL REHABILITATION TYPE: Roadway Infrastructure LOCATION: Zone 5 DEPARTMENT: Public Works As part of the City's PMP, Zone 5 of the residential rehabilitation program is scheduled for implementation during the FY19-20 budget cycle. This project will include micro -surfacing, slurry seal, overlay, DESCRIPTION: curb repair, root removals and ADA compliance updates of the streets and sidewalks in Zone 5. This infrastructure enhancement will also include updating traffic signs, striping, curb painting, house numbering, and monument surveying. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $2,182,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $2,182,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: General Fund and TDA Article 3 of approximately $82,000 JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project is part of the annual residential street overlay and slurry seal program and is scheduled for completion in FY19-20. This project is funded by the General Fund, and has a goal to achieve a pavement condition of 86 or higher, which is considered "Ver Good Condition." LOCATION PHOTO LOCATION DESCRIPTION Zone 5: Residential streets in the most western part of the City, off Hawthorne and between Crest and PVDW. k.N'M•1 t s, 29 32 PROJECT: ARTERIAL REHABILITATION - CRENSHAW BLVD TYPE: Roadway Infrastructure LOCATION: Crenshaw Blvd. DEPARTMENT: Public Works As part of the City's PMP, the Crenshaw Blvd. arterial will be DESCRIPTION: resurfaced. The project will include milling and overlay, roadway patching, crack filling, curb and gutter repair, sidewalk repair, and ADA upgrades. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $200,000 CONSTRUCTION $2,600,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $200,000 $2,600,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Proposition A, Proposition C, CIP Reserve funds (General Fund money), Measure R funds, and/or State Transportation Local Program funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: The project goal would result in a pavement condition of 86 or higher, which is considered "Very Good Condition." 30 33 31 34 ARTERIAL REHABILITATION - INDIAN PROJECT: PEAK ROAD TYPE: Roadway Infrastructure LOCATION: Indian Peak Road DEPARTMENT: Public Works As part of the City's PMP, the Indian Peak Road arterial will be DESCRIPTION: resurfaced. The project will include milling and overlay, roadway patching, crack filling, curb and gutter repair, sidewalk repair, and ADA upgrades. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $200,000 CONSTRUCTION $1,600,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $200,000 $1,600,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: Proposition A, Proposition C, CIP Reserve funds (General Fund money), Measure R funds, and/or State Transportation Local Program funds. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: The project goal would result in a pavement condition of 86 or higher, which is considered "Very Good Condition." 31 34 TRAFFIC SAFETY IMPROVEMENTS PROJECT: PALOS VERDES DRIVE EAST AT BRONCO DRIVE TYPE: Traffic Improvements LOCATION: PVDE at Bronco Drive DEPARTMENT: Public Works Improve portions of PVDE to provide wider travel lanes in each direction, a shared -use equestrian and pedestrian path located behind the existing guardrail, a high visibility equestrian DESCRIPTION: crossing at Bronco Drive complete with flashing beacons, augmented crossing signage and advanced crossing signage with flashing beacons, and installation of safety barriers and railing to reduce vehicle collisions and cross-over accidents. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $500,300 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $500,300 IMPACT ON OPERATING BUDGET To be determined at the conclusion of design and construction. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Staff has secured an HSIP grant that requires a 10% local match from CIP Reserve funds (General Fund money). LOCATION PHOTO MAP 32 35 PROJECT: PVDS ROADWAY REALIGNMENT TYPE: Roadway Project LOCATION: PVDS DEPARTMENT: Public Works DESCRIPTION: The project would re-align approximately 1.6 miles of Palos Verdes Drive South, which is located within and traverses the Abalone Cove, Portuguese Bend, and Klondike Canyon Landslides. The location of the roadway is constantly moving as the sub-soils within the landslide move. Extensive grading is needed to re-establish (relocate) the roadway within the right-of- way. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $3,060,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $3,060,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds (General Fund money). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Project design of $245,000 was appropriated in FY13-14. Realignment of PVDS was last performed around 1988. 33 36 PROJECT: WESTERN AVENUE TRAFFIC IMPROVEMENTS TYPE: Roadway Infrastructure LOCATION: Western Avenue DEPARTMENT: Public Works DESCRIPTION: The Western Avenue Task Force group was formed, consisting of City of RPV, City of LA, and Caltrans staff. Since its inception, the working group completed a Western Avenue Corridor Study in 2007, which is a strategic action plan that: • Identified the current and future deficiencies in the multi -modal transportation system within the corridor; and • Recommended consensus -based solutions (including required strategies) to address the deficiencies. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $3,200,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $3,200,000 IMPACT ON OPERATING BUDGET Minimal impact to operating budget since right-of-way is primarily maintained by Caltrans. The City is responsible for trees, graffiti, and trash removal. Requirements of the Ponta Vista development project may mitigate some of the traffic needs identified in 2007. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project is eligible for Measure R funding through the South Bay Highway Program administered through the South Bay Council of Governments. WESTERN CORRIDOR IMPROVEMENT PROJECT 34 37 PROJECT: HAWTHORNE BLVD RIGHT OF WAY BEAUTIFICATION Phase 1 TYPE: Roadway Infrastructure LOCATION: Hawthorne Blvd (City Hall to Northerly City Limits) DEPARTMENT: Public Works DESCRIPTION: Make simple beautification improvements to the Hawthorne Blvd median that would include new trees, modest paved median improvements (surface treatment) and removal of damaged private chain link fence along the roadside. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $10,000 CONSTRUCTION $140,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $150,000 IMPACT ON OPERATING BUDGET No impact to operating budget. On-going median and roadside maintenance is included in operating budget. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: This project precedes longer-term work to address the condition and replacement of private walls and fences adjacent to the right-of-way 35 a* PROJECT: PAVEMENT MANAGEMENT PROGRAM (PMP) UPDATE TYPE: Intangible Capital Outlay LOCATION: N/A DEPARTMENT: Public Works DESCRIPTION: The PMP is updated every three years to evaluate the condition of the City's roadway system and to identify Citywide Arterial and Residential Street Rehabilitation projects. The Metropolitan Transit Authority (Metro) requires the PMP update in order for the City to continue receiving Proposition C funds. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $120,000 $120,000 CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $120,000 $120,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds (General Fund money). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY X SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: 36 39 SANITARY SEWER PROJECTS The City's sanitary sewer system is essential to City operations, yet it has not required significant expenditures in past years due to an inter -local agreement with Los Angeles County for maintenance of the system. The City owns the system, but the County has the primary responsibility for ongoing maintenance of the system, which does not include the Abalone Cove Sewer system. The County collects a sewer fee from the City's property owners, which is used to maintain the system. Although the County maintains the sewer system, the City retains responsibility for its operation, public safety, and welfare. The City, not the County, maintains legal and regulatory responsibility (i.e., any state or federal fines resulting from spillage). The City conducted a survey of the system, and in 2004 and updated that survey in 2009 through the Sanitary Sewer Master Plan Update, which was created to help in the management of this asset. The study examined sample areas throughout the City and assessed the overall system as "fair." The inspection revealed root intrusion and cracking in the pipes, in addition to accumulated fats and grease clogging certain areas. It appeared that the County had not been performing preventative maintenance in prior years. Without regular maintenance, overflows due to root and grease blockages will occur. To minimize the potential for overflow and to restore and maintain the system in "good" condition, a significant investment in pipeline inspection, repair, and maintenance was performed by the County. The County has completed a full inspection and cleaning of all RPV sewer mains. Problem areas are being properly maintained and/or are scheduled for repair through larger projects. The projects identified herein were included in the City's Wastewater Master Plan Update, which was completed in 2009 to address potential locations of under - capacity (the ability of the existing pipe to convey sewage flows without overflowing into the street). Further physical investigation will be made before contracting for construction of repairs. Planned projects may change once physical inspections are performed. The County maintenance and repair program does not provide for replacement of pipeline due to capacity issues. 37 .s PROJECT: SEWER CAPACITY PROJECT- OTHER LOCATIONS TYPE: Sewer System LOCATION: Various DEPARTMENT: Public Works DESCRIPTION: Several smaller locations throughout the City may require repairs. The 2009 Sanitary Sewer Master Plan indicated that unidentified sections of the City's sewer system may be under capacity. The Plan indicates that these projects could replace 1,951 feet of 8 -inch sewer pipe with 12 -inch vitrified clay pipelines. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $75,000 CONSTRUCTION $340,000 PROJECT MANAGEMENT/OVERSIGHT $50,000 LEGAL TOTAL $465,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds (General Fund money). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: As funding becomes available, projects should be performed in the order they are ranked in the Wastewater Master Plan Update. This project is ranked Number 8 out of the 8 identified capital improvement projects in the plan. W 41 PROJECT: SEWER REPLACEMENT PROJECT - MALAGA CANYON TYPE: Sewer System LOCATION: N/A DEPARTMENT: Public Works DESCRIPTION: This section of the City's sewer system has been determined to be under capacity. This project will replace 1,850 feet of 10 -inch sewer pipe. The pipe will be replaced with a 15 -inch vitrified clay pipeline. The pipeline runs behind properties in Malaga Canyon, parallel to Basswood Avenue between Mossbank Drive and Mazur Drive. This section of pipeline is over capacity when analyzed, considering the factor of safety flow run. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $59,000 CONSTRUCTION $335,000 PROJECT MANAGEMENT/OVERSIGHT $13,000 LEGAL TOTAL $407,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds (General Fund money). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: As funding becomes available, projects should be performed in the order they are ranked in the Wastewater Master Plan Update. This project is ranked number 5 out of the 8 identified capital Improvement projects in the plan. 39 42 STORM WATER SYSTEM The 2004 Update to the 1998 Master Plan of Drainage identified 38 potential projects, excluding storm drain lining, that staff would need to address in the City's storm drain system. Staff has addressed all or portions of these projects and has added other projects to the lists. A new Master Plan of Drainage was commissioned to provide a comprehensive and current analysis of the drainage needs in the City in consideration of the work already done and new engineering standards promulgated by the LA County Flood Control District. The new Master Plan will be finalized in 2015. Staff expects the new Master Plan will identify additional projects to correct pipes with deficient capacity, poor physical condition, or both. Staff has also conducted a thorough video inspection of the entire City -owned pipe inventory and has compiled the results for analysis. This will lead to identifying lining needs for the coming years. While it is not clear yet which pipes will be programmed for lining first, the need is clear. The following table depicts the overall observations made of the City -owned pipes. About 23% of the City's pipes (about 26,800 linear feet) have a condition rating of 3 or worse. Of this amount, about 18,300 linear feet are corrugated metal pipes (CMP) and would rank at highest priority for lining. In time, all CMP should be lined and reinforced concrete pipe (RCP) with condition defects will need to be addressed on an individual basis to determine if lining will resolve the issues. Storm Drain Video Inspection Summary 43 --------------------------- Level Condition ! Linear Feet % of Total % CMP Number I Inspected % RCP 15% CMP Level Good 77,997 67%------- _ _ 85% 85% RCP r II Light/minor 30% CMP Level 1 defect j 7,631 7% �. 70% RCP Moderate 35% CMP i Level 2 defect 4,059 3% — -- - 65% RCP 1 Average 40% CMP Level 3 1 defect 7,360 6% g0% RCP �--- 60% CMP Level 4 j Heavy defect 6,966 6% - --- - 40% RCP 90% CMP Level 5 Severe defect 12,475 ! 11% 10% RCP Total Linear Footage - - -_ 116,488 100% J 43 PROJECT: STORM DRAIN LINING TYPE: Storm Drain System LOCATION: Project Area 12 DEPARTMENT: Public Works All Corrugated Metal Pipe storm drain lines within the City have reached their design life expectancy and need to be lined to extend their life another 30+ years. CMP dating back to the 1940s has been DESCRIPTION: discovered and requires rehabilitation, along with those most recently installed in the 1970s. A large number of drainage problems citywide can be overcome by relining deteriorated pipes and improving inlet and outlet structures. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $340,836 $347,653 $350,000 $350,000 $350,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $340,836 $347,653 $350,000 $350,000 $350,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: WQFP user fees through FY15-16 and the CIP Reserve funds (General Fund money) thereafter. Ongoing maintenance costs should decrease, as pipes which have been lined generally require less maintenance, resulting in a cost savings. Because the Storm Drain User Fee sunsets in FY15-16, lining projects will compete with other infrastructure rehabilitation projects for funding from the CIP Reserve in the future. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: LOCATION PHOTO MAP i RSR. i 41 .A PROJECT: PAINTBRUSH CANYON DRAINAGE PROJECT STUDY REPORT TYPE: Storm Drain System LOCATION: Project Area 11 DEPARTMENT: Public Works The Project Study Report is expected to include: 1) a study of the drainage area; 2) a study of the drainage needs; 3) multiple design alternatives; 4) identification of environmental requirements; 5) DESCRIPTION: identification of right-of-way needs; and 6) a recommended scope for development of an engineering design leading to construction of drainage improvements. Any improvements to drainage in Paintbrush Canyon will be complex due to right-of-way and landslide issues. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN $120,000 CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $120,000 IMPACT ON OPERATING BUDGET Funding Information: WQFP user fees and CIP Reserve funds (General Fund money). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X I COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Preventing runoff water from entering the landslide has been shown to directly affect land movement in landslide areas. This project is expected to help slow movement within the Portuguese Bend landslide, eventually affecting the land movement on Palos Verdes Drive South. 4 42 45 PROJECT: STORM DRAIN POINT REPAIR PROJECTS TYPE: Storm Drain System LOCATION: Citywide DEPARTMENT: Public Works DESCRIPTION: During the 2012 Storm Drain Lining and Rehabilitation Project, several pipes were unable to be lined due to local structural failure of the pipes. This project will provide funds to correct the deficient locations in these pipes to prepare them for lining in the future. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $900,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $900,000 IMPACT ON OPERATING BUDGET Funding Information: WQFP user fees. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Many of these point repairs are difficult to access and may require acquisition of temporary or permanent access easements to address current and future maintenance needs. Locations include Santa Rena pipe inlet, Enrose Avenue CMP, Via Colinita north of Maine, Vista Mesa, and PVDE at Marion Drive. LOCATION PHOTO ,A; MAP Point Repair Projects — Legacy from 2012 Lining Project yt 43 A • 47 STORM WATER QUALITY REGIONAL PROJECT: IMPROVEMENT PROJECT TYPE: Storm Water Quality Project LOCATION: TBD DEPARTMENT: Public Works In order to comply with the new MS4 permit requirements, the Peninsula cities will work together to address storm water quality issues by developing an Enhanced Watershed Management Plan (EWMP), including the development of structural treatment DESCRIPTION: projects. This provides an estimate of the City's share of the cost to build these Storm Water Quality Improvement projects. The first phase projects must be built within 30 months of when the MS4 permit is received. Scope and timing of future phases will be determined upon approval of the EWMP by the Regional Storm Water Quality Board. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION $100,000 $100,000 $100,000 $100,000 $100,000 PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 IMPACT ON OPERATING BUDGET Funding and/or Grant Information: CIP Reserve funds (General Fund money). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Required as part of MS4 Permit Enhanced Watershed Management Plan. Locations to be determined once pollutant monitoring studies are analyzed. The City will have an ongoing commitment to additional projects in the future. In the absence of more defined information, a placeholder of $100,000 annually has been included as the City's contribution to other storm water quality projects. 47 UNFUNDED PROJECTS The following projects are those which have been identified as capital needs through various planning processes, but currently there are no identified financial resources to complete the projects. As funding becomes available and the City Council prioritizes and approves projects, they may be moved into the funded Five - Year CIP schedule. Additional projects will be identified in 2015 and 2016, through the development of the Infrastructure Management Plan (IMP), involvement of the Infrastructure Management Committee (IMAC), and completion of the Storm Drain Master Plan, General Plan and Parks Master Plan. aim H; RPV Capital Improvement Plan - Unfunded Projects Potential Safety City Council Cost Range Proiect Paae Fundina Goal Prioritv Minimum Maximum Palos Verdes Drive South Landslide Landslide Early Warning System 48 x x 300,000 300,000 Park Sites Restroom at Del Cerro Park 50 250,000 300,000 Lower Point Vicente Park Improvement Project 51 x 2,400,000 2400000 Civic Center Skate Plaza & Tennis Court 52 x x x 850,000 850,000 Coast Vision Plan - Trailhead/Ovedook/Vista Point Development 53 x 800,000 11040,000 Concrete Stairs at Ladera Linda & Hesse 54 x 140,000 180,000 Public Buildings Citywide ADA Transition Plan Implementation 56 x x 4,520 000 41520,000 Point Vicente Park Community Center 57 x 3 000 000 8,000,000 Corporation Storage Yard Relocation 58 300,000 300,000 Right of Way Hawthorne Blvd. Median Improvements is Rivera to City Hall 60 250,000 250,000 Lower Point Vicente Park Access Modification Project PVDW at PVIC 61 x x x 250,000 300,000 Crenshaw Blvd Extension Parking Improvements 62 x 125,000 150,000 Hawthorne Blvd. Right of Way Beautification Phase 2 63 x x 2,200,000 2600000 Hawthorne Blvd. Bike Lane Gap Closure 64 x x 1,200,000 1,500 000 Traffic Safety Improvements - PVDE at Miraleste Drive 65 x x x 200,000 300,000 Utility Undergrounding Crenshaw 66 x x 1,200,000 2000000 Utility Undergrounding along PVDS La Rotonda and City Limits 67 x x 1,000,000 1500000 Utility Undergrounding at Entrance to PVIC 68 x x 1 150,000 200,000 Utility Undergrounding at PVDS and Terranea Way 69 x x 150,000 200,000 Storm Water System Altamira Canyon 71 x x 1,600,000 5350 000 Paintbrush Canyon Drainage 72 x x 2,568,000 2568 000 PVDE - Miraleste Canyon 73 x x 2,500 000 3,200,000 San Pedro & Averill Canyons 74 x x 2,700,000 3300000 Catch Basin Screen Installation 75 x x 600,000 900,000 Trails Preserve Trail Plan - New Trail Implementation 77 x x 150,000 150,000 California Coastal Trail Improvements 78 x 223,000 223,000 Totals Min, and Max. $ 29,626,000 $ 42,581,000 .n. 51 s PALOS VERDES DRIVE SOUTH LANDSLIDE UNFUNDED PROJECTS 47 50 LANDSLIDE EARLY WARNING PROJECT: SYSTEM (LEWS) TYPE: Landslide Project LOCATION: Palos Verdes Drive South in the Portuguese Bend Landslide Area DEPARTMENT: Public Works The main sewer trunk line owned and operated by the Sanitation Districts of Los Angeles County, and which serves a significant portion of the residential properties in RPV, parallels the PVDS roadway above ground in the landslide area. Both facilities require constant maintenance due to landslide movement, which poses a significant operational hazard should the landslide experience rapid land movement. Closure of these facilities would be highly disruptive DESCRIPTION: to the city's economic vitality, transportation, public health and safety, and use of public open space and trails. Sewer overflows from the trunk line could potentially threaten the ecosystems of the nearby Pacific Ocean coastline. A landslide early warning system (LEWS) would provide critical advanced knowledge of changed landslide conditions by alerting public safety and public works first - responders, who would be able to respond sooner and more proactively with public safety information and preventative measures. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET It is estimated that LEWS annual operations and maintenance cost would be approximately $30,000 per year, which would include scheduled on-site equipment inspection and fees for wireless or satellite communication systems. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY X SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Sensors placed in the area would transmit data through a wireless or satellite -based system to a web -hosted application designed to send alerts to public safety and public works first- ,`....;.. responders when specified land movement criteria is reached. Many of the existing dewatering wells may be suitable for /` t0 , fPC sensor deployment. The first responders would then be afforded more time to notify users of the public open space and trails in the area, mobilize equipment, establish roadway detours and alternative sewer conveyance, all of which is intended to protect the public and the environment. There are partnership possibilities with the Sanitation Districts of LA County and the LA County Sheriff's and Fire Departments. Estimated Cost: $300,000. M. 51 PARK SITES UNFUNDED PROJECTS 52 PROJECT: RESTROOM AT DEL CERRO PARK TYPE: Recreation, Parks, & Open Space LOCATION: Del Cerro Park DEPARTMENT: Recreation and Parks/Community Development DESCRIPTION: This project would include the construction of a restroom at Del Cerro park to serve the park visitors and the users of the trails in the Portuguese Bend Open Space area. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET To be assessed. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $250,000 - $300,000 50 53 PROJECT: LOWER POINT VICENTE PARK IMPROVEMENT PROJECT TYPE: Recreation Parks & Trails Improvements LOCATION: Lower Point Vicente DEPARTMENT: Public Works DESCRIPTION: The park improvement plan for Lower Point Vicente derives from an extensive public outreach process associated with the City Council's adopted Vision Plan. The scope of work consists of constructing new decomposed granite trails, overlooks, reconfigured and new parking spaces (including a new upper terrace parking lot), drainage facilities (including a bioswale), landscaping, fencing, way finding signs and minor site grading to accommodate the improvements (excavation cannot occur in areas capped for lead remediation.) PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET TBD Project not expected to begin until FY22-23. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $2,400,000. 51 54 PROJECT: CIVIC CENTER SKATE PLAZA & TENNIS COURT TYPE: Recreation Parks & Trails Improvements LOCATION: Point Vicente Park DEPARTMENT: Public Works & Recreation and Parks This project could include construction of: 1) a 15,000 square -foot skate plaza; 2) a restroom; 3) appropriate parking and benches; 4) landscaping and 5) a single -court tennis court (to replace the existing original court). If a skate plaza is determined to be a feasible use through the program of utilization that controls the site, DESCRIPTION: staff will continue to work with the City Council and Skate Park PV to provide funding for this facility. The plaza/skate area would be constructed of concrete with complimenting walkways, stage, handrails, planters, landscaping, a restroom building, and parking. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET Annual facility maintenance is currently estimated to be $13,000. Additional staffing and security may be necessary to operate the facility. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $850,000 ($750,000 for skate plaza, $100,000 for tennis court) Private funding may become available. Skate Park PV has expressed a willingness to fund project construction and ongoing maintenance. However, no commitment has been made at this time. Once this project begins, the City may incur engineering, management and/or oversight costs. Since this is a community-based project, these costs are unknown at this time. 52 55 53 56 COAST VISION PLAN PROJECT: TRAILHEAD/OVERLOOK/VISTA POINT DEVELOPMENT TYPE: Recreation, Parks, & Open Space LOCATION: Various Locations DEPARTMENT: Public Works/Community Development The Vision Plan identifies the construction of trailheads at key entrances to the existing City trail system, along with overlooks and vista points within the Vision Plan project area. The trailheads would consist of a permeable surface pad, a bench, a plastic bag kiosk for dog owners, trash and recycling receptacles, signage, a freestanding kiosk for trail notices, small native trees for shade, and pockets of native shrubs, where appropriate. The overlook/vista points would be placed on decomposed granite or other permeable DESCRIPTION: material, with flush stone edging and could include a semicircle bench, a stone pilaster displaying pertinent information, a stone clad wall less than 3 -feet in height and pockets of native shrubs. Phase 1 would involve a trailhead at Shoreline Park/251h Street and overlooks/vista points at Inspiration Point and Eagles Nest. Phase 2 would involve trailheads and overlook/vista points at the cul-de-sac next to St. Paul's Church, Del Cerro Park, and the end of Ocean Terrace. Phase 3 would involve a trailhead at the Switch backs/PVD E Turnout and overlook/vista points at the Switch backs/PVD E Turnout, Paintbrush Canyon/Burma Road, and Burma Road above Gateway Park. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET To be assessed. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $100,000 to $130,000 per site x 8 sites = Range of $800,000 - $1,040,000 53 56 PROJECT: CONCRETE STAIRS AT LADERA LINDA AND HESSE PARKS TYPE: Buildings and Other Facility Improvements LOCATION: Various DEPARTMENT: Public Works DESCRIPTION: Replacement of the wooden stairs at Ladera Linda Park and Hesse Park is desired to minimize tripping hazards and introduce uniformity to the stair tread lengths and heights at these two locations. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET TBD JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $140,000 - 180,000 54 57 PUBLIC BUILDINGS UNFUNDED PROJECTS 55 w• 56 59 CITYWIDE ADA TRANSITION PLAN PROJECT: IMPLEMENTATION TYPE: Buildings and Other Facility Improvements LOCATION: Various DEPARTMENT: Public Works The Citywide ADA Transition Plan, adopted by the City Council on June 4, 2013, identified total costs of $11.85 million for implementation. The cost estimate included improvements to ADA compliance at the Civic Center (buildings and grounds) totaling $1.36 million, and those at Ladera Linda Park totaling $1.72 million. Any future improvements at these sites are expected to bring the facilities into ADA compliance. Additionally, the total cost of $11.85 DESCRIPTION: million includes right-of-way improvements totaling $2.64 million, including curb ramps and bus stops. Those improvements will be addressed as part of each roadway rehabilitation project. The remaining identified costs of $6.12 million will be addressed through an annual implementation allocation that began in FYI 3-14. Project costs "funded" through FYI 9-20 total $1.60 million. The remaining portion of the $5.97 million, which has not been moved to the "funded" list is included here. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET TBD JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $4,520,000 Environmental Excise Tax (EET) funding may become available. 56 59 PROJECT: POINT VICENTE PARK COMMUNITY CENTER TYPE: Buildings and Other Facility Improvements LOCATION: Point Vicente/Civic Center DEPARTMENT: City Manager/Public Works DESCRIPTION: Originally studied by the Open Space Planning, Recreation and Parks Task Force in 2004, the concept for this facility was later refined during the redevelopment of the Coast Vision Plan. Adopted by the City Council in 2008, the latest concept calls for a 20,000 square -foot community center that could accommodate meeting space for community groups, recreational facilities, classroom space, and a full-sized recreational pool. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET Impact will need to be assessed, as projects are considered. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $3,000,000 - $8,000,000 A private donation of $100,000 has been made and additional donations and/or other outside funding may become available based upon the scope of the project. 57 W 61 CORPORATION STORAGE YARD PROJECT: RELOCATION TYPE: Buildings and Other Facility Improvements LOCATION: Various Locations throughout the City DEPARTMENT: City Manager/Public Works It has been proposed that City maintenance services be spread out citywide in strategic locations with a central office at City Hall. The existing corporation/storage yard is located on the Point Vicente Park site, which had been identified for various other community uses due to its prime location. DESCRIPTION: It may be feasible to create a central location for the storage yard with satellite locations throughout the City, serving the storage and construction needs of the Public Works Department. The central location of the storage yard will be situated at or near City Hall for administrative purposes. This central location will control all satellite locations through the use of maintenance personnel and through the efficient use of the City's computer system network. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET To be assessed. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY X SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: The satellite locations will fulfill the following roles: there will bean office trailer at each location; a construction yard for contractors located throughout the City (possibly generating rental income for the City); possible satellite EOC centers for access throughout the City; and storage space for various City equipment items. Estimated Cost: $300,000 W 61 RIGHT OF WAY UNFUNDED PROJECTS 59 62 PROJECT: HAWTHORNE BLVD. MEDIAN IMPROVEMENTS (VIA RIVERA TO CITY HALL) TYPE: Roadway Infrastructure LOCATION: Hawthorne Blvd. (Via Rivera to City Hall) DEPARTMENT: Public Works DESCRIPTION: The development of this median would include installing draught tolerant landscaping, which would require minimal maintenance. Development will also include the installation of irrigation systems and controllers, hardscape, and decorative stone. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET To be assessed. However, a rough estimate of annual maintenance is about 10% of the total project cost. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $250,000 .e] Ong PROJECT: LOWER POINT VICENTE PARK ACCESS MODIFICATION PROJECT TYPE: Traffic Improvements LOCATION: PVDW/PVDS at Lower Point Vicente Park Entrance DEPARTMENT: Public Works DESCRIPTION: Improve access into and out of the Lower Point Vicente Park area by restricting turn movements to right turn only out of the site at the southern entrance/exit to minimize vehicle conflicts while negotiating turn movements. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET To be assessed. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: Estimated Cost: $250,000 - $300,000 Highway Safety Grant funding may become available. 61 Me PROJECT: CRENSHAW BOULEVARD EXTENSION PARKING IMPROVEMENTS TYPE: Roadway Infrastructure LOCATION: Crenshaw Blvd (Valley View Rd to Burma Rd) DEPARTMENT: Public Works DESCRIPTION: In an effort to improve safety, parking and access to the Nature Preserve entrance near Del Cerro Park, parking improvements and restrictions are needed to accommodate the growing user demand and need for emergency vehicle access. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET There is no impact on the operating budget. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $125,000 - $150,000 r 4 62 65 63 HAWTHORNE BLVD RIGHT OF WAY PROJECT: BEAUTIFICATION (Phase 2) TYPE: Roadway Infrastructure LOCATION: Hawthorne Blvd (City Hall to Northerly City Limits) DEPARTMENT: Public Works The City's Right of Way along Hawthorne Blvd will be beautified by DESCRIPTION: landscaping and masking blight conditions created by failed fences, walls and other private improvements. The medians in this area will be improved by landscape and/or hardscape enhancements. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET Unknown at this time. Impact would be contingent on level of beautification and project components. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $2,200,000 - $2,600,000 l k' J This project is contingent upon the adoption by the City Council of a plan to address the condition and replacement of private walls and fences along the roadside. f _ 1 63 M 67 HAWTHORNE BLVD BIKE LANE GAP PROJECT: CLOSURE TYPE: Roadway Infrastructure LOCATION: Hawthorne Blvd (Vallon Drive to Dupre Road) DEPARTMENT: Public Works This project will improve roadway safety and complete a bike lane DESCRIPTION: gap closure that exists due to on -street parking demand, roadway configuration, and existing median barriers. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET Striping refreshing is minimal and would be funded out of the FY15-16 operating allocation. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $1,200,000 - $1,500,000 Highway Safety Grant funding may become available. ao y,. M 67 PROJECT: TRAFFIC SAFETY IMPROVEMENTS - PALOS VERDES DRIVE EAST AT MIRALESTE DRIVE TYPE: Traffic Improvements LOCATION: PVDE at Miraleste Drive DEPARTMENT: Public Works DESCRIPTION: Improve intersection operations to create improved traffic flow and vehicle and pedestrian safety. Operational improvements could include a roundabout. If a traffic signal was considered, the cost estimate would increase; however, and Marymount College would likely fund a small share of the project's cost. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET If a traffic signal is contemplated, annual maintenance cost could be about $7,000. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS X I COMMUNITY QUALITY/SUSTAINABILITY OTHER PROJECT INFORMATION: Estimated Cost: $200,000 - $300,000 Highway Safety Grant funding could become available. 65 PROJECT: CRENSHAW BLVD UTILITY UNDERGROUNDING PROJECT TYPE: Public Utilities LOCATION: Crenshaw Blvd at Crest Road DEPARTMENT: Public Works DESCRIPTION: The project will underground overhead utility lines along Crenshaw Blvd south of Crest Road. This project qualifies for Rule 20A funding. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET There is no impact on the operating budget. This project would be entirely funded by Rule 20A work credits. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: OTHER PROJECT INFORMATION: Estimated Cost: $1,200,000 - $2,000,000 This project will be included in the RPV Overhead Utilities Conversion Plan for City Council consideration as a priority undergrounding location. Irrespective of funding, SCE will own the asset and be responsible for providing ongoing maintenance. UTILITY UNDERGROUNDING ALONG PROJECT: PALOS VERDES DRIVE SOUTH BETWEEN LA ROTONDA AND THE CITY LIMITS TYPE: Public Utilities LOCATION: PVDS between La Rotonda and City Limits DEPARTMENT: Public Works This project includes the removal of overhead wires and the DESCRIPTION: coordination of undergrounding all utilities at this location. The City will coordinate with the associated utility companies (electrical, communications, etc.) to relocate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET This project could be funded through Southern California Edison's (SCE's) Rule 20A Funding, which accumulates at a rate of about $80,000 per year. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $1,000,000 - $1,500,000 This project will be included in the RPV Overhead Utilities Conversion Plan for City Council consideration as a priority undergrounding location. Irrespective of funding, SCE will own the asset and be responsible for providing ongoing maintenance. 67 70 PROJECT: UTILITY UNDERGROUNDING AT ENTRANCE TO PVIC TYPE: Public Utilities LOCATION: Palos Verdes Drive South (at PVIC) DEPARTMENT: Public Works DESCRIPTION: This project includes the removal of overhead wires and the coordination of undergrounding all utilities at this location. The City will coordinate with the associated utility companies (electrical, communications, etc.) to relocate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET This project could be funded through Southern California Edison's (SCE's) Rule 20A Funding, which accumulates at a rate of about $80,000 per year. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $150,000 - $200,000 This project will be included in the RPV Overhead Utilities Conversion Plan for City Council consideration as a priority undergrounding location. Irrespective of funding, SCE will own the asset and be responsible for providing ongoing maintenance. 71 PROJECT: UTILITY UNDERGROUNDING AT PVDS AND TERRANEA WAY TYPE: Public Utilities LOCATION: PVDS and Terranea Way DEPARTMENT: Public Works This project includes the removal of overhead wires and the DESCRIPTION: coordination of undergrounding all utilities at this location. The City will coordinate with the associated utility companies (electrical, communications, etc.) to relocate all wires underground. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET This project could be funded through Southern California Edison's (SCE's) Rule 20A Funding, which accumulates at a rate of about $80,000 per year. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $150,000 - $200,000 This project will be included in the RPV Overhead Utilities Conversion Plan for City Council consideration as a priority undergrounding location. Irrespective of funding, SCE will own the asset and be responsible for providing ongoing maintenance. .• 72 STORM WATER SYSTEM UNFUNDED PROJECTS 70 73 PROJECT: ALTAMIRA CANYON TYPE: Storm Drain System LOCATION: Project Area 4 DEPARTMENT: Public Works A project within lower Altamira Canyon to aid in slowing the damage being caused by storm water runoff through the entire reach of the Canyon is needed. The installation of Gabion-type erosion control structures within lower Altamira Canyon are needed to help control DESCRIPTION: runoff velocities and minimize erosion within the canyon. This project includes the installation of protective measures to minimize further erosion in Altamira Canyon. This project could range from stabilization at bends in stream beds, with limited velocity controls, to channel stabilization. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET To be assessed. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Note: The Altamira Canyon project has been studied and analyzed over the past decades; however the need to minimize runoff from entering the ground in Altamira Canyon still remains. A project study report has been funded for FY14-15. This estimate does not include right-of-way costs. A previously designed and funded project was abandoned due to right-of-way issues and owners lack of support. Estimated Cost: $1,600,000 - $5,350,000 71 74 PROJECT: PAINTBRUSH CANYON DRAINAGE TYPE: Storm Drain System LOCATION: Portuguese Bend DEPARTMENT: Public Works DESCRIPTION: The Paintbrush Canyon Drainage System project will capture runoff at the head of the Portuguese Bend landslide in three locations, transfer that runoff via surface-mounted High Density Polyethylene (HDPE) pipe under Palos Verdes Drive South, (through an existing steel tunnel), and continue the flow along the existing storm drain pipe alignment to the ocean. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET TBD JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Preventing runoff water from entering the landslide has been shown to directly affect land movement in landslide areas. This project is expected to help slow movement within the Portuguese Bend landslide, eventually affecting the land movement at Palos Verdes Drive South. A project study report has been proposed for FY19-20. Estimated Cost: $2,568,000 72 75 PROJECT: PVDE- MIRALESTE CANYON TYPE: Storm Drain System LOCATION: Project Area 5 DEPARTMENT: Public Works DESCRIPTION: Work within this project area includes storm drainage systems along Palos Verdes Drive East at the northern end of PVDE, South Coach, Rocking Horse, Clevis, North Colt, South Colt, Via Canada, and South Via Canada. This project includes the installation of a number of pipelines and re -setting surface drainage systems to drain into Miraleste Canyon. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET TBD JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $2,500,000 - $3,200,000 73 76 PROJECT: SAN PEDRO & AVERILL CANYONS TYPE: Storm Drain Systems LOCATION: Project Area 6 DEPARTMENT: Public Works DESCRIPTION: Work within this project area would include storm drainage systems at Miraleste, South Miraleste, North Corsini, Via Colinita, La Vista, Vista Mesa, and a curb and gutter project on Via Frascati. This project would include the installation of a number of pipelines and regrading of roads and surface drainage systems to drain into the San Pedro and Averill Canyons. A project at Miraleste Plaza has been completed. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET TBD JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $2,700,000 - $3,300,000 77 75 CATCH BASIN SCREEN PROJECT: INSTALLATION TYPE: Storm Drain System LOCATION: Citywide DEPARTMENT: Public Works In order to comply with certain water quality regulations imposed by the Regional Water Control Board, the City will need to install catch basin screens to prevent trash and debris from entering the Santa DESCRIPTION: Monica Bay and LA Harbor. It is not clear yet how many of the City's catch basins will require the retrofit or how intense the implementation scheme will be. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET Funding Information: WQFP (Storm Drain User Fee) Fund and CIP Reserve funds (General Fund money). JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY X ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: The City has installed these screens in about 100 catch basins (for the Machado Lake watershed) at a recent cost of about $700 each (not including permitting). There are up to 1,200 catch basins remaining that may require this retrofit. Estimate cost: $600,000 - $900,000. , � t�mr rfiq vrv. rrr !ir'rrrt.S?:�:�w�.yv rrsti �ill�r _.. __ ..:tMVf�y.'t•,':t•''••':t•:•:}'}:•.':''•'}":::::t:t.•.'.'.•.:'l.'}ll'.•}:'}:}:•:::•, l'•"?: .'''0 {4 x. r.:::::ir�....:;:r �{...•�vi}}�:{�gYri}y...;....'rgl. ;.. 4 l<' yay��s�c:i{sifi}:{•}irrii: � Y?•iiiv}t {•} :rr i}::.}} �vl ri}}C ;�iir{ri I'llA:r, rf : •• vrii}}i�j/�f �e't�li;: r r. ' '� y 11.x• rw 75 TRAILS UNFUNDED PROJECTS Iw m 77 :1 PRESERVE TRAILS PLAN - NEW PROJECT: TRAIL IMPLEMENTATION TYPE: Recreation, Parks, & Open Space LOCATION: Palos Verdes Nature Preserve DEPARTMENT: Community Development/Public Works In October 2012, the City Council adopted an updated Preserve Trails Plan (PTP) for the NCCP's Palos Verdes Nature Preserve, which identifies trail routes and trail uses within the Preserve. Pursuant to the approved management agreement between the City and PVPLC, PVPLC is responsible for maintenance and repair of existing unimproved trails in the Preserve, while the City is responsible for the construction of new trails identified in the PTP. DESCRIPTION: According to the PTP, there are three approved trail routes that currently do not exist and need to be constructed at some point by the City. Since projects are moving forward on two of the three new trails needed (the Smugglers Trail in the Abalone Cove Reserve and the Switchback Trail in the San Ramon Reserve), construction of the Crystal Trail (.12 mile) in the Forrestal Reserve remains as the only new trail that needs construction. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET To be assessed. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES OUTSIDE FUNDING COMMITTED/ELIGIBLE X SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $150,000 If a trail improvement is considered to be a critical link, outside grant funding may become available. If the trail improvement is in the right-of-way, then potential funding may become available through the Active Transportation Program (ATP). 77 :1 PROJECT: CALIFORNIA COASTAL TRAIL IMPROVEMENTS TYPE: Recreation Parks & Trails Improvements LOCATION: PVDW — Marguerite Drive to Calle Entradero & PVIC Blufftop DEPARTMENT: Public Works & Recreation and Parks DESCRIPTION: Two sections of the California Coastal Trail near the Point Vicente Interpretive Center (PVIC) and Oceanfront Estates are paved with asphalt that has deteriorated. This project would replace the asphalt with decomposed granite, enhancing the aesthetic value of the California Coastal Trail within the City. PROJECT COST ESTIMATES (IF KNOWN) CATEGORY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 ACQUISITION ENGINEERING/DESIGN CONSTRUCTION PROJECT MANAGEMENT/OVERSIGHT LEGAL TOTAL IMPACT ON OPERATING BUDGET To be assessed. JUSTIFICATION FOR INCLUSION ON 5 YEAR CIP SAFETY ECONOMY AND EFFICIENCY SUPPORTS ESSENTIAL CITY SERVICES X OUTSIDE FUNDING COMMITTED/ELIGIBLE SUPPORTS CITY COUNCIL GOALS X COMMUNITY QUALITY/SUSTAINABILITY X OTHER PROJECT INFORMATION: Estimated Cost: $223,000 W a