LAC CDBG Project No. 601877-17 COUNTY OF LOS ANGELES
AGREEMENT TO IMPLEMENT A COMMUNITY DEVELOPMENT
BLOCK GRANT (CDBG)PROJECT WITH A PARTICIPATING CITY
AMENDMENT NUMBER 4
Operating Agency: City of Rancho Palos Verdes
Contract Number: 109952
Project Title: ADA Access Improvements—Crosswalks in Area 1
Project Number: 601877-17
This amendment to the Agreement to Implement is entered into this 30th day of May 2019, by
the County of Los Angeles, hereinafter called the"County" and the City of Rancho Palos Verdes,
hereinafter called "Operating Agency".
The Operating Agency is hereby authorized to implement this amendment to the CDBG Project
identified above upon execution of this Agreement by the Operating Agency's authorized
signatory. Said implementation shall be in full accordance with the requirements, conditions,
and assurances defined in the Contract Number 109952, between the Operating Agency and the
County of Los Angeles. In addition,the Operating Agency agrees to comply with the following:
1. TIME OF PERFORMANCE is amended to reflect a completion date of: 6/30/2020.
An amended Exhibit A, Project Description and Activity Budget, is attached hereto and
incorporated herein, and substituted in its entirety for the previously attached Exhibit A. All
other terms and conditions of said Agreement shall remain the same.
Revised 5/17
City of Rancho Palos Verdes COUNTY(1F T(l5 ANGF.T.FC
Operating Agency
Digitally signed by Elias Sassoon _
Elias Sassoon DN cn=Elias Sassoon,o=Rancho Pabs Verdes,
City of,ou,email=esassoon@rpvca.gov,c=US
B y: Date 2019.05.20 14:29 33-07'00' By:
Title: Title: Acting Director,Community Development Division
Community Development Commission
of the County of Los Angeles
Los Angeles County Development Authority Exhibit A
Los Angeles County Development Authority
County of Los Angeles
Project Description and Activity Budget
Contract No. 109952 Version 4
PROJECT OPERATING AGENCY
Project No: 601877-17 Organization
Title: ADA Access Improvements— Name: City of Rancho Palos Verdes
Crosswalks in Area 1
Type: Participating City
Funding Period: 7/1/2017 To: 6/30/2020
Jurisdiction:Rancho Palos Verdes LACDA Program Mgr: Jeffrey Badre
Project Administration
Micheal Neal, CDBG Consultant
3760 Kilroy Airport Way, Suite 270
Long Beach, CA 90806
Phone: (909)261-2770
Email: mneal@mbakerintl.com
Eligibility Summary
Funding Source: CDBG
HUD Code: 03L Sidewalks
Eligibility Citation: 570.201(c)
National Objective: LMC
Nat. Objective Citation: 570.208(a)(2) (ii)(A)
Est.Accomplishments: 568 Performance Indicator: People(General)
Activity Summary
This new project provides for the removal or relocation of approximately twelve (12) sidewalk
curb barriers at approximately six(6) crosswalk intersections throughout the City and replacement
with access curb ramps conforming to Americans with Disabilities Act(ADA) standards. The
activity locations are: Grayslake Road at Groveoak Place, Clint Place, Waukesha Place, and
Finecrest Drive; Basswood Avenue at Ironwood Street; and Barkstone Drive at Ironwood Street.
This project is 100%CDBG funded
CDBG funds are used for non-personnel and capital outlays.
Special Conditions
Project No: 601877-17 Version: 4
Los Angeles County Development Authority Exhibit A
CONSTRUCTION CONTRACT AND PREVAILING WAGE LABOR COMPLIANCE: Failure to
perform the following minimum requirements will result in findings that may create a monetary
liability to the Operating Agency that includes, but is not limited to, disallowance of costs,
suspension of funds, and termination of this contract. Read the following carefully before starting
the procurement process. Contact your CDC Program Manager with questions and refer to the
online Construction Compliance Guidelines for detailed guidance to help your Operating Agency to
successfully meet the contract and labor compliance requirements on this project.
CONSTRUCTION CONTRACT: The Operating Agency shall:
-Submit Bid Specifications for CDC review and acceptance prior to advertising the Notice Inviting
Bids;
-Verify bidder's eligibility to receive federal funds through the Federal online system prior to
awarding a contract; and
-Send a Notice of Contract Award letter to the U.S. Department of Labor(DOL)Office of Federal
Contract Compliance Programs(OFCCP)within 10 workdays of the contract award date.
PREVAILING WAGE LABOR COMPLIANCE: Federal Prevailing Wage requirements of the
Davis-Bacon and Related Acts(DBRA) and the Federal Labor Standards Provisions (FLSP) apply to
all public works construction funded with federal dollars. In the event of a labor dispute between
Federal and State prevailing wage,the higher of the two will prevail. The Operating Agency shall
proactively administer, monitor and enforce these provisions and make maintain a Labor Standards
Enforcement File for each contractor, sub-contractor, and lower-tier contractor working at the
project site. This File must clearly document that the Operating Agency monitored the project site
on a continuous basis, conducted Employee Field Interviews with workers, reconciled the Interview
forms with the applicable weekly Certified Payroll Report,notified the contractor of any labor
deficiencies, and resolved any violations in a timely manner.
The Operating Agency shall:
-Notify the CDC Program Manager within 10 calendar days of the date of the discovery of any
underpayment; and
-Request a Contract and Labor Compliance File Review by CDC Program Manager within 10
workdays of the completion of construction.
CDC 5-PERCENT RETENTION: To allow for the availability of funds to remedy monetary
liabilities resulting from the Operating Agency's construction contractor's violation(s)of the Davis-
Bacon and Related Acts (DBRA)and/or the Federal Labor Standards Provisions(FLSP),the
Operating Agency must withhold 5%of the funding request cost reimbursements. This will be
documented on the CDBG Funding Requests by reporting 100%of the costs and including a line
item credit identified as"Retention"for 5%of the requested costs for reimbursement. This will
result in the CDC reimbursing 95%of the costs paid by the Operating Agency reported on each
funding request. Upon the completion of a CDC review of the Labor Standards Enforcement Files
and issuance of the final clearance letter,the Operating Agency may request the withheld retention.
To initiate the file review,the Operating Agency must submit a completed Request for File Review
Form (and attachments)to the assigned CDC Program Manager within 10 workdays of the
Project No: 601877-17 Version: 4
Los Angeles County Development Authority Exhibit A
completion of construction.
Program Management Mitigation Conditions
None.
Environmental Mitigation Conditions
None.
Contracted Services/Subrecipients
CDBG are used for a CDBG consultant to provide direct project-related administrative services,
design and engineering, and for a construction contractor.
Funding Summary
Cost Category Amount
Uncategorized $230,051.00
Total $230,051.00
Implementation Schedule
Phase Scheduled
Bid Document Submission 11/16/2018
Bid Document Acceptance 11/27/2018
Bid Opening 12/20/2018
Contract Award 1/15/2019
Construction Completed 5/6/2019
Location
Name: Rancho Palos Verdes City Hall
Address:30940 Hawthorne Blvd
City: Rancho Palos Verdes
Service Area
Region Population Low/Mod Pop
6704.11 BG 1 Rancho Palos Verdes 1,040 128
6704.11 BG 2 Rancho Palos Verdes 2,090 315
Grand Total: 3,130 44314.15% Low/Mod
Project No: 601877-17 Version: 4
! "#$%#
&' () *+,
& ! %"$-
' ) #( !."$/
!0/12
/1
23
'
!4 (56&
! 7 !
8 4
3 9 !+: //
!"#$%#/!+
03)/
++
3
;<9')
( ;<'=
(
> ?;<'
+ '+ = ' ' >-
( @
AB.C"/" 3""D3'>-
''+=9->
(@AB /. 3""D& 3
.3 5E(6<'9<')
+ '+=
''>-
(@AB.C"/" 3""D3
C3 (;))9'')
;
()>)')
'<7!++
&3
<7! / & ( 5/
/!<7!3
3
COUNTY OF LOS ANGELES
Operating Agency
By: By:
Title: Title: Director, Community Development Division
Community Development Commission
of the County of Los Angeles
City of Rancho Palos Verdes
Doug Willmore Digitally signed by Doug Willmore
DN: cn=Doug Willmore, o=City of Rancho Palos Verdes,
ou=City Manager, email=lornac@rpvca.gov, c=US
Date: 2018.12.18 17:37:24 -08'00'
Community Development Commission
County of Los Angeles
Project Description and Activity Budget
Contract No.Version
PROJECT
Title:
Project No:Organization
Name:
Type:
Funding Period:To:
CDC Program Mgr:Jurisdiction:
Eligibility Summary
Funding Source:
HUD Code:
Eligibility Citation:
National Objective:
Nat. Objective Citation:
Est. Accomplishments:Performance Indicator:
Activity Summary
Project Administration
Micheal Neal, CDBG Consultant
3760 Kilroy Airport Way, Suite 270
Long Beach, CA 90806
Phone: (909) 261-2770
Email: mneal@mbakerintl.com
109869 3
601877-17
ADA Access Improvements –
Crosswalks in Area 1
City of Rancho Palos Verdes
Participating City
Jeffrey Badre
7/1/2017 6/30/2019
CDBG
03L
570.201(c)
LMC
570.208(a)(2)
568 People (General)
Rancho Palos Verdes
Sidewalks
(ii)(A)
OPERATING AGENCY
Special Conditions
This new project provides for the removal or relocation of approximately twelve (12) sidewalk
curb barriers at approximately six (6) crosswalk intersections throughout the City and replacement
with access curb ramps conforming to Americans with Disabilities Act (ADA) standards. The
activity locations are: Grayslake Road at Groveoak Place, Clint Place, Waukesha Place, and
Finecrest Drive; Basswood Avenue at Ironwood Street; and Barkstone Drive at Ironwood Street.
This project is 100% CDBG funded
CDBG funds are used for non-personnel and capital outlays.
Los Angeles County Community Development Commission Exhibit A
Project No:Version:601877-17 3
Los Angeles County Community Development Commission Exhibit A
CONSTRUCTION CONTRACT AND PREVAILING WAGE LABOR COMPLIANCE: Failure to
perform the following minimum requirements will result in findings that may create a monetary
liability to the Operating Agency that includes, but is not limited to, disallowance of costs,
suspension of funds, and termination of this contract. Read the following carefully before starting
the procurement process. Contact your CDC Program Manager with questions and refer to the
online Construction Compliance Guidelines for detailed guidance to help your Operating Agency to
successfully meet the contract and labor compliance requirements on this project.
CONSTRUCTION CONTRACT: The Operating Agency shall:
-Submit Bid Specifications for CDC review and acceptance prior to advertising the Notice Inviting
Bids;
-Verify bidder’s eligibility to receive federal funds through the Federal online system prior to
awarding a contract; and
-Send a Notice of Contract Award letter to the U.S. Department of Labor (DOL) Office of Federal
Contract Compliance Programs (OFCCP) within 10 workdays of the contract award date.
PREVAILING WAGE LABOR COMPLIANCE: Federal Prevailing Wage requirements of the
Davis-Bacon and Related Acts (DBRA) and the Federal Labor Standards Provisions (FLSP) apply to
all public works construction funded with federal dollars. In the event of a labor dispute between
Federal and State prevailing wage, the higher of the two will prevail. The Operating Agency shall
proactively administer, monitor and enforce these provisions and make maintain a Labor Standards
Enforcement File for each contractor, sub-contractor, and lower-tier contractor working at the
project site. This File must clearly document that the Operating Agency monitored the project site
on a continuous basis, conducted Employee Field Interviews with workers, reconciled the Interview
forms with the applicable weekly Certified Payroll Report, notified the contractor of any labor
deficiencies, and resolved any violations in a timely manner.
The Operating Agency shall:
-Notify the CDC Program Manager within 10 calendar days of the date of the discovery of any
underpayment; and
-Request a Contract and Labor Compliance File Review by CDC Program Manager within 10
workdays of the completion of construction.
CDC 5-PERCENT RETENTION: To allow for the availability of funds to remedy monetary
liabilities resulting from the Operating Agency’s construction contractor’s violation(s) of the Davis-
Bacon and Related Acts (DBRA) and/or the Federal Labor Standards Provisions (FLSP), the
Operating Agency must withhold 5% of the funding request cost reimbursements. This will be
documented on the CDBG Funding Requests by reporting 100% of the costs and including a line
item credit identified as “Retention” for 5% of the requested costs for reimbursement. This will
result in the CDC reimbursing 95% of the costs paid by the Operating Agency reported on each
funding request. Upon the completion of a CDC review of the Labor Standards Enforcement Files
and issuance of the final clearance letter, the Operating Agency may request the withheld retention.
To initiate the file review, the Operating Agency must submit a completed Request for File Review
Form (and attachments) to the assigned CDC Program Manager within 10 workdays of the
completion of construction.
Project No:Version:601877-17 3
Los Angeles County Community Development Commission Exhibit A
None.
Funding Summary
Contracted Services/Subrecipients
CDBG are used for a CDBG consultant to provide direct project-related administrative services,
design and engineering, and for a construction contractor.
Service Area
None.
Program Management Mitigation Conditions
Environmental Mitigation Conditions
CDC 5-PERCENT RETENTION: To allow for the availability of funds to remedy monetaryliabilities resulting from the Operating Agency’s construction contractor’s violation(s) of the Davis-Bacon and Related Acts (DBRA) and/or the Federal Labor Standards Provisions (FLSP), theOperating Agency must withhold 5% of the funding request cost reimbursements. This will bedocumented on the CDBG Funding Requests by reporting 100% of the costs and including a lineitem credit identified as “Retention” for 5% of the requested costs for reimbursement. This willresult in the CDC reimbursing 95% of the costs paid by the Operating Agency reported on eachfunding request. Upon the completion of a CDC review of the Labor Standards Enforcement Filesand issuance of the final clearance letter, the Operating Agency may request the withheld retention.To initiate the file review, the Operating Agency must submit a completed Request for File Review
Form (and attachments) to the assigned CDC Program Manager within 10 workdays of the
completion of construction.
Cost Category Amount
Uncategorized $230,051.00
Total $230,051.00
Implementation Schedule
Phase Scheduled
Bid Document Submission 11/16/2018
Bid Document Acceptance 11/27/2018
Bid Opening 12/20/2018
Contract Award 1/15/2019
Construction Completed 3/22/2019
Location
Name:Rancho Palos Verdes City Hall
Address:
City:
30940 Hawthorne Blvd
Rancho Palos Verdes Zip:90275
Region Population Low/Mod Pop
6704.11 BG 1 Rancho Palos Verdes 1,040 128
6704.11 BG 2 Rancho Palos Verdes 2,090 315
Grand Total:3,130 443 14.15% Low/Mod
Project No:Version:601877-17 3
COUNTY OF LOS ANGELES
AGREEMENT TO IMPLEMENT A COMMUNITY DEVELOPMENT
BLOCK GRANT (CDBG) PROJECT WITH A PARTICIPATING CITY
AMENDMENT NUMBER 2
Operating Agency: City of Rancho Palos Verdes
Contract Number: 109612
Project Title: ADA Access Improvements—Crosswalks in Area 1
Project Number: 601877-17
This amendment to the Agreement to Implement is entered into this 6th day of June 2018, by the
County of Los Angeles, hereinafter called the "County" and the City of Rancho Palos Verdes,
hereinafter called "Operating Agency".
The Operating Agency is hereby authorized to implement this amendment to the CDBG Project
identified above upon execution of this Agreement by the Operating Agency's authorized
signatory. Said implementation shall be in full accordance with the requirements. conditions,
and assurances defined in the Contract Number 109612, between the Operating Agency and the
County of Los Angeles. In addition, the Operating Agency agrees to comply with the following:
1. TIME OF PERFORMANCE is amended to reflect a completion date of: 6/30/2019.
2. COMPENSATION AND METHOD OF PAYMENT is amended to reflect the
following: One Hundred Seventy-Eight Thousand Seven Hundred Seventy-Six Dollars
and Zero Cents ($178,776.00). This is an increase of Fifty-Two Thousand Five
Hundred Twenty-Nine Dollars and Zero Cents ($52,529.00)to the project amount.
3. BUDGET SECTION is amended to reflect the new compensation of One Hundred
Seventy-Eight Thousand Seven Hundred Seventy-Six Dollars and Zero Cents
($178,776.00).
An amended Exhibit A, Project Description and Activity Budget, is attached hereto and
incorporated herein, and substituted in its entirety for the previously attached Exhibit A. All
other terms and conditions of said Agreement shall remain the same.
Revised 5/17
Title: Title: Director, Community Development Division
Community Development Commission
of the County of Los Angeles
Los Angeles County Community Development Commission Exhibit A
Community Development Commission
County of Los Angeles
Project Description and Activity Budget
Contract No. 109612 Version 2
PROJECT OPERATING AGENCY
Project No: 601877-17 Organization
Title: ADA Access Improvements— Name: City of Rancho Palos Verdes
Crosswalks in Area 1
Type: Participating City
Funding Period: 7/1/2017 To: 6/30/2019
Jurisdiction:Rancho Palos Verdes CDC Program Mgr: Jeffrey Badre
Project Administration
Lorna Cloke, Senior Administrative Analyst
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes,CA 90275-59391
P: (310) 544-5247
F: (310) 544-5292
Email: lornac@rpvca.gov
Eligibility Summary
Funding Source: CDBG
HUD Code: 03L Sidewalks
Eligibility Citation: 570.201(c)
National Objective: LMC
Nat. Objective Citation: 570.208(a)(2) (ii)(A)
Est.Accomplishments: 568 Performance Indicator: People(General)
Activity Summary
This new project provides for the removal or relocation of approximately twelve(12) sidewalk
curb barriers at approximately six(6)crosswalk intersections throughout the City and replacement
with access curb ramps conforming to Americans with Disabilities Act(ADA) standards. The
activity locations are: Grayslake Road at Groveoak Place, Clint Place, Waukesha Place, and
Finecrest Drive; Basswood Avenue at Ironwood Street; and Barkstone Drive at Ironwood Street.
This project is 100%CDBG funded
CDBG funds are used for non-personnel and capital outlays.
Project No: 601877-17 Version: 2
Los Angeles County Community Development Commission Exhibit A
Special Conditions
CONSTRUCTION CONTRACT AND PREVAILING WAGE LABOR COMPLIANCE: Failure to
perform the following minimum requirements will result in findings that may create a monetary
liability to the Operating Agency that includes, but is not limited to, disallowance of costs,
suspension of funds, and termination of this contract. Read the following carefully before starting
the procurement process. Contact your CDC Program Manager with questions and refer to the
online Construction Compliance Guidelines for detailed guidance to help your Operating Agency to
successfully meet the contract and labor compliance requirements on this project.
CONSTRUCTION CONTRACT: The Operating Agency shall:
-Submit Bid Specifications for CDC review and acceptance prior to advertising the Notice Inviting
Bids;
-Verify bidder's eligibility to receive federal funds through the Federal online system prior to
awarding a contract; and
-Send a Notice of Contract Award letter to the U.S. Department of Labor(DOL)Office of Federal
Contract Compliance Programs(OFCCP)within 10 workdays of the contract award date.
PREVAILING WAGE LABOR COMPLIANCE: Federal Prevailing Wage requirements of the
Davis-Bacon and Related Acts (DBRA) and the Federal Labor Standards Provisions (FLSP)apply to
all public works construction funded with federal dollars. In the event of a labor dispute between
Federal and State prevailing wage,the higher of the two will prevail. The Operating Agency shall
proactively administer, monitor and enforce these provisions and make maintain a Labor Standards
Enforcement File for each contractor, sub-contractor, and lower-tier contractor working at the
project site. This File must clearly document that the Operating Agency monitored the project site
on a continuous basis, conducted Employee Field Interviews with workers, reconciled the Interview
forms with the applicable weekly Certified Payroll Report, notified the contractor of any labor
deficiencies, and resolved any violations in a timely manner.
The Operating Agency shall:
-Notify the CDC Program Manager within 10 calendar days of the date of the discovery of any
underpayment; and
-Request a Contract and Labor Compliance File Review by CDC Program Manager within 10
workdays of the completion of construction.
CDC 5-PERCENT RETENTION: To allow for the availability of funds to remedy monetary
liabilities resulting from the Operating Agency's construction contractor's violation(s)of the Davis-
Bacon and Related Acts(DBRA)and/or the Federal Labor Standards Provisions(FLSP),the
Operating Agency must withhold 5%of the funding request cost reimbursements. This will be
documented on the CDBG Funding Requests by reporting 100%of the costs and including a line
item credit identified as"Retention"for 5%of the requested costs for reimbursement. This will
result in the CDC reimbursing 95%of the costs paid by the Operating Agency reported on each
funding request. Upon the completion of a CDC review of the Labor Standards Enforcement Files
and issuance of the final clearance letter,the Operating Agency may request the withheld retention.
To initiate the file review,the Operating Agency must submit a completed Request for File Review
Project No: 601877-17 Version: 2
Los Angeles County Community Development Commission Exhibit A
Form(and attachments)to the assigned CDC Program Manager within 10 workdays of the
completion of construction.
Program Management Mitigation Conditions
None.
Environmental Mitigation Conditions
None.
Contracted Services/Subrecipients
CDBG are used for a CDBG consultant to provide direct project-related administrative services,
design and engineering, and for a construction contractor.
Funding Summary
Cost Category Amount
Uncategorized $178,776.00
Total $178,776.00
DBRA & Section 3
Reauires DBRA: Yes
Reauires Section 3: No
Labor Standards Compliance Review: Project File Review
Implementation Schedule
Phase Scheduled
Bid Document Submission 4/23/2018
Bid Document Acceptance 4/30/2018
Bid Opening 5/21/2018
Contract Award 6/5/2018
Construction Completed 8/30/2018
Location
Name: Rancho Palos Verdes City Hall
Address:30940 Hawthorne Blvd
City: Rancho Palos Verdes
Service Area
Region Population Low/Mod Pop
6704.11 BG 1 Rancho Palos Verdes 1,040 128
Project No: 601877-17 Version: 2
Los Angeles County Community Development Commission Exhibit A
6704.11 BG 2 Rancho Palos Verdes 2,090 315
Grand Total: 3,130 443 14.15% Low/Mod
Project No: 601877-17 Version: 2
COUNTY OF LOS ANGELES
AGREEMENT TO IMPLEMENT A COMMUNITY DEVELOPMENT
BLOCK GRANT(CDBG) PROJECT WITH A PARTICIPATING CITY
AMENDMENT NUMBER 1
Operating Agency: City of Rancho Palos Verdes
Contract Number: 109259
Project Title: ADA Access Improvements—Crosswalks in Area 1
Project Number: 601877-17
This amendment to the Agreement to Implement is entered into this 28th day of August 2017, by
the County of Los Angeles, hereinafter called the"County"and the City of Rancho Palos Verdes,
hereinafter called"Operating Agency".
The Operating Agency is hereby authorized to implement this amendment to the CDBG Project
identified above upon execution of this Agreement by the Operating Agency's authorized
signatory. Said implementation shall be in full accordance with the requirements, conditions,
and assurances defined in the Contract Number 109259, between the Operating Agency and the
County of Los Angeles. In addition,the Operating Agency agrees to comply with the following:
1. COMPENSATION AND METHOD OF PAYMENT is amended to reflect the
following: One Hundred Twenty-Six Thousand Two Hundred Forty-Seven Dollars and
Zero Cents ($126,247.00). This is a decrease of Thirteen Thousand Dollars and Zero
Cents ($13,000.00)to the project amount.
2. BUDGET SECTION is amended to reflect the new compensation of One Hundred
Twenty-Six Thousand Two Hundred Forty-Seven Dollars and Zero Cents
($126,247.00).
An amended Exhibit A, Project Description and Activity Budget, is attached hereto and
incorporated herein, and substituted in its entirety for the previously attached Exhibit A. All
other terms and conditions of said Agreement shall remain the same.
Revised 5/17
City of Rancho Mos 31:des COUNTY OF LOS ANGELES
Operating Agency
By:Terry Rod rig ue ;g B
Y
Title: Title: Director,Community Development Division
Community Development Commission
of the County of Los Angeles
Los Angeles County Community Development Commission Exhibit A
Community Development Commission
County of Los Angeles
Project Description and Activity Budget
Contract No. 109259 Version 1
PROJECT OPERATING AGENCY
Project No: 601877-17 Organization
Title: ADA Access Improvements— Name: City of Rancho Palos Verdes
Crosswalks in Area 1
Type: Participating City
Funding Period: 7/1/2017 To: 6/30/2018
Jurisdiction:Rancho Palos Verdes CDC Program Mgr: Jeffrey Badre
Project Administration
Michael Gibson, Senior Administrative Analyst
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes, CA 90275-59391
P: (310) 544-5247
F: (310) 544-5292
Email: mike@rpv.com
Eligibility Summary
Fundine Source: CDBG
HUD Code: 03L Sidewalks
Eligibility Citation: 570.201(c)
National Objective: LMC
Nat. Objective Citation: 570.208(a)(2) (ii)(A)
Est. Accomplishments: 568 Performance Indicator: People(General)
Activity Summary
This new project provides for the removal or relocation of approximately twelve(12) sidewalk
curb barriers at approximately six(6)crosswalk intersections throughout the City and replacement
with access curb ramps conforming to Americans with Disabilities Act(ADA) standards. The
activity locations are: Grayslake Road at Groveoak Place,Clint Place, Waukesha Place, and
Finecrest Drive; Basswood Avenue at Ironwood Street; and Barkstone Drive at Ironwood Street.
This project is 100%CDBG funded
CDBG funds are used for non-personnel and capital outlays.
Project No: 601877-17 Version: 1
Los Angeles County Community Development Commission Exhibit A
Special Conditions
CONSTRUCTION CONTRACT AND PREVAILING WAGE LABOR COMPLIANCE: Failure to
perform the following minimum requirements will result in findings that may create a monetary
liability to the Operating Agency that includes, but is not limited to, disallowance of costs,
suspension of funds, and termination of this contract. Read the following carefully before starting
the procurement process. Contact your CDC Program Manager with questions and refer to the
online Construction Compliance Guidelines for detailed guidance to help your Operating Agency to
successfully meet the contract and labor compliance requirements on this project.
CONSTRUCTION CONTRACT: The Operating Agency shall:
-Submit Bid Specifications for CDC review and acceptance prior to advertising the Notice Inviting
Bids;
-Verify bidder's eligibility to receive federal funds through the Federal online system prior to
awarding a contract; and
-Send a Notice of Contract Award letter to the U.S. Department of Labor(DOL)Office of Federal
Contract Compliance Programs(OFCCP)within 10 workdays of the contract award date.
PREVAILING WAGE LABOR COMPLIANCE: Federal Prevailing Wage requirements of the
Davis-Bacon and Related Acts (DBRA) and the Federal Labor Standards Provisions(FLSP)apply to
all public works construction funded with federal dollars. In the event of a labor dispute between
Federal and State prevailing wage,the higher of the two will prevail. The Operating Agency shall
proactively administer,monitor and enforce these provisions and make maintain a Labor Standards
Enforcement File for each contractor, sub-contractor,and lower-tier contractor working at the
project site. This File must clearly document that the Operating Agency monitored the project site
on a continuous basis, conducted Employee Field Interviews with workers,reconciled the Interview
forms with the applicable weekly Certified Payroll Report, notified the contractor of any labor
deficiencies, and resolved any violations in a timely manner.
The Operating Agency shall:
-Notify the CDC Program Manager within 10 calendar days of the date of the discovery of any
underpayment; and
-Request a Contract and Labor Compliance File Review by CDC Program Manager within 10
workdays of the completion of construction.
CDC 5-PERCENT RETENTION: To allow for the availability of funds to remedy monetary
liabilities resulting from the Operating Agency's construction contractor's violation(s)of the Davis-
Bacon and Related Acts (DBRA)and/or the Federal Labor Standards Provisions(FLSP),the
Operating Agency must withhold 5%of the funding request cost reimbursements. This will be
documented on the CDBG Funding Requests by reporting 100%of the costs and including a line
item credit identified as"Retention"for 5%of the requested costs for reimbursement. This will
result in the CDC reimbursing 95%of the costs paid by the Operating Agency reported on each
funding request. Upon the completion of a CDC review of the Labor Standards Enforcement Files
and issuance of the final clearance letter,the Operating Agency may request the withheld retention.
To initiate the file review,the Operating Agency must submit a completed Request for File Review
Project No: 601877-17 Version: 1
Los Angeles County Community Development Commission Exhibit A
Form (and attachments)to the assigned CDC Program Manager within 10 workdays of the
completion of construction.
Program Management Mitigation Conditions
None.
Environmental Mitigation Conditions
None.
Contracted Services/Subrecipients
CDBG are used for a CDBG consultant to provide direct project-related administrative services,
design and engineering, and for a construction contractor.
Funding Summary
Cost Category Amount
Uncategorized $126,247.00
Total $126,247.00
Implementation Schedule
Phase Scheduled
Bid Document Submission 12/4/2017
Bid Document Acceptance 12/11/2017
Bid Opening 1/17/2018
Contract Award 2/21/2018
Construction Completed 5/30/2018
Location
Name: Rancho Palos Verdes City Hall
Address:30940 Hawthorne Blvd
City: Rancho Palos Verdes
Service Area
Region Population Low/Mod Pop
6704.11 BG 1 Rancho Palos Verdes 1,040 128
6704.11 BG 2 Rancho Palos Verdes 2,090 315
Grand Total: 3,130 44314.15% Low/Mod
Project No: 601877-17 Version: 1
1
COUNTY OF LOS ANGELES
AGREEMENT TO IMPLEMENT A COMMUNITY DEVELOPMENT
BLOCK GRANT (CDBG) PROJECT
WITH A PARTICIPATING CITY
Operating Agency: CITY OF RANCHO PALOS VERDES
Contract Number: 109151
The Operating Agency is hereby authorized to implement the CDBG Project(s) identified below upon execution
of this Agreement by the Operating Agency's authorized signatory. Said implementation shall be in full
accordance with the requirements, conditions, and assurances defined in the Contract Number 70741, between
the Operating Agency and the County of Los Angeles. In addition, the Operating Agency agrees to comply
with the following:
1. SCOPE OF SERVICE. The Project described in the Exhibit A(s), listed below,shall be implemented.
2. TIME OF PERFORMANCE. Services are to commence as of , and be completed no later than
Saturday, June 30, 2018.
3. BUDGET SECTION. No more than the amounts specified in the Exhibit A(s), listed below, may be
spent, without written approval of the Community Development Commission of the County of Los
Angeles.
Project No. Project Name Amount
601877-17 ADA ACCESS IMPROVEMENTS—CROSSWALKS IN AREA 1 $139247.00
CITY OF RANCHO PALOS VERDES TOTAL $139,247.00
Revised 05/17
City of Rancho iilos§kdes COUNTY OF LOS ANGELES
Operating Agency
By: Terry Rodrigue Digitally
by Terry a��ao::�.�5mm By:
_,.. .20/11-40?-,
Title: 1/1--f- C V vv� N + ✓ e �"�" o
// ,� � ee Title: Director, Community Development Division
0 -r PV (30 WO Y �S
Community Development Commission
of the County of Los Angeles
Los Angeles County Community Development Commission Exhibit A
Community Development Commission
County of Los Angeles
Project Description and Activity Budget
Contract No. 109151 Version 0
PROJECT OPERATING AGENCY
Project No: 601877-17 Organization
Title: ADA Access Improvements — Name: City of Rancho Palos Verdes
Crosswalks in Area 1
Type: Participating City
Funding Period: 7/1/2017 To: 6/30/2018
Jurisdiction: Rancho Palos Verdes CDC Program Mgr: Jeffrey Badre
Project Administration
Michael Gibson, Senior Administrative Analyst
City of Rancho Palos Verdes
30940 Hawthorne Blvd.
Rancho Palos Verdes, CA 90275-59391
P: (310) 544-5247
F: (310) 544-5292
Email: mike@rpv.com
Eligibility Summary
Funding Source: CDBG
HUD Code: 03L Sidewalks
Eligibility Citation: 570.201(c)
National Objective: LMC
Nat. Objective Citation: 570.208(a)(2) (ii)(A)
Est. Accomplishments: 568 Performance Indicator: People (General)
Activity Summary
This new project provides for the removal or relocation of approximately twelve (12) sidewalk
curb barriers at approximately six (6) crosswalk intersections throughout the City and replacement
with access curb ramps conforming to Americans with Disabilities Act (ADA) standards. The
activity locations are: Grayslake Road at Groveoak Place, Clint Place, Waukesha Place, and
Finecrest Drive; Basswood Avenue at Ironwood Street; and Barkstone Drive at Ironwood Street.
This project is 100% CDBG funded
CDBG funds are used for non-personnel and capital outlays.
Project No: 601877-17 Version: 0
Los Angeles County Community Development Commission Exhibit A
Special Conditions
CONSTRUCTION CONTRACT AND PREVAILING WAGE LABOR COMPLIANCE: Failure to
perform the following minimum requirements will result in findings that may create a monetary
liability to the Operating Agency that includes, but is not limited to, disallowance of costs,
suspension of funds, and termination of this contract. Read the following carefully before starting
the procurement process. Contact your CDC Program Manager with questions and refer to the
online Construction Compliance Guidelines for detailed guidance to help your Operating Agency to
successfully meet the contract and labor compliance requirements on this project.
CONSTRUCTION CONTRACT: The Operating Agency shall:
-Submit Bid Specifications for CDC review and acceptance prior to advertising the Notice Inviting
Bids;
-Verify bidder's eligibility to receive federal funds through the Federal online system prior to
awarding a contract; and
-Send a Notice of Contract Award letter to the U.S. Department of Labor (DOL) Office of Federal
Contract Compliance Programs (OFCCP) within 10 workdays of the contract award date.
PREVAILING WAGE LABOR COMPLIANCE: Federal Prevailing Wage requirements of the
Davis-Bacon and Related Acts (DBRA) and the Federal Labor Standards Provisions (FLSP) apply to
all public works construction funded with federal dollars. In the event of a labor dispute between
Federal and State prevailing wage, the higher of the two will prevail. The Operating Agency shall
proactively administer, monitor and enforce these provisions and make maintain a Labor Standards
Enforcement File for each contractor, sub-contractor, and lower-tier contractor working at the
project site. This File must clearly document that the Operating Agency monitored the project site
on a continuous basis, conducted Employee Field Interviews with workers, reconciled the Interview
forms with the applicable weekly Certified Payroll Report, notified the contractor of any labor
deficiencies, and resolved any violations in a timely manner.
The Operating Agency shall:
-Notify the CDC Program Manager within 10 calendar days of the date of the discovery of any
underpayment; and
-Request a Contract and Labor Compliance File Review by CDC Program Manager within 10
workdays of the completion of construction.
CDC 5-PERCENT RETENTION: To allow for the availability of funds to remedy monetary
liabilities resulting from the Operating Agency's construction contractor's violation(s) of the Davis-
Bacon and Related Acts (DBRA) and/or the Federal Labor Standards Provisions (FLSP), the
Operating Agency must withhold 5% of the funding request cost reimbursements. This will be
documented on the CDBG Funding Requests by reporting 100% of the costs and including a line
item credit identified as "Retention" for 5% of the requested costs for reimbursement. This will
result in the CDC reimbursing 95% of the costs paid by the Operating Agency reported on each
funding request. Upon the completion of a CDC review of the Labor Standards Enforcement Files
and issuance of the final clearance letter, the Operating Agency may request the withheld retention.
To initiate the file review, the Operating Agency must submit a completed Request for File Review
Project No: 601877-17 Version: 0
Los Angeles County Community Development Commission Exhibit A
Form (and attachments) to the assigned CDC Program Manager within 10 workdays of the
completion of construction.
Program Management Mitigation Conditions
None.
Environmental Mitigation Conditions
None.
Contracted Services/Subrecipients
CDBG are used for a CDBG consultant to provide direct project-related administrative services,
design and engineering, and for a construction contractor.
Funding Summary
Cost Category Amount
Uncategorized $139,247.00
Total $139,247.00
Implementation Schedule
Phase Scheduled
Bid Document Submission 12/4/2017
Bid Document Acceptance 12/11/2017
Bid Opening 1/17/2018
Contract Award 2/21/2018
Construction Completed 5/30/2018
Location
Name: Rancho Palos Verdes City Hall
Address:30940 Hawthorne Blvd
City: Rancho Palos Verdes
Service Area
Region Population Low/Mod Pop
6704.11 BG 1 Rancho Palos Verdes 1,040 128
6704.11 BG 2 Rancho Palos Verdes 2,090 315
Grand Total: 3,130 44314.15% Low/Mod
Project No: 601877-17 Version: 0