Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CC 20161206 H Abalone Cove Sewer System Cleaning, Reporting & Inspection
RANCHO PALOS VERDES CITY COUNCIL AGENDA REPORT AGENDA DESCRIPTION: MEETING DATE: 12/06/2016 AGENDA HEADING: Consent Calendar Consideration and possible action to award a Public Works Agreement for the Abalone Cove Sewer System Cleaning, Inspection and Reporting FY16-17 Project to Performance Pipeline Technologies. RECOMMENDED COUNCIL ACTION: (1) Award a Public Works Agreement with Performance Pipeline Technologies in the amount not to exceed of $55,307 for the services related to the Abalone Cove Sewer System Cleaning, Inspection and Reporting FY16-17 Project; and (2) Authorize the Mayor and City Clerk to execute the Public Works Agreement pending City Attorney's approval as to form. FISCAL IMPACT: The not -to -exceed cost to perform sewer system work is $55,307. Amount Budgeted: $223,100 Additional Appropriation: N/A Account Number(s): 225-3025-431-43-00' Ii', ORIGINATED BY: Nadia Carrasco, Assistant Engineer REVIEWED BY: Michael Throne, PE, Public Works Director APPROVED BY: Doug Willmore, City Manager./11',1J ATTACHED SUPPORTING DOCUMENTS: A. Public Works Agreement (page A-1) B. Performance Pipeline Technologies Bid Submittal (page B-1) BACKGROUND AND DISCUSSION: The last cleaning of the Abalone Cove Sewer System was performed in 2014. Work planned for this fiscal year includes video inspection and cleaning included 72 manholes, 14,220 linear feet of sanitary sewer and 4 lift stations (pump stations). The City formally advertised for the cleaning, inspection and reporting of the Abalone Cove Sewer System as part of our duties to ensure compliance with state regulations and to comply with the adopted Rancho Palos Verdes Sewer System Management Plan. The following table depicts the five bids the City received on November 7, 2016: 1 Abalone Cove Sewer System Cleaning, Inspection and Reporting FY16-17 Contractor Bid Amount Engineer's Estimate $46,100 Performance Pipeline Technologies $55,307 Downstream Services, Inc. $82,861 Professional Pipe Services $83,885 Nor -Cal Pipeline Services $99,691 Pipe and Plant Solutions, Inc. $102,460 The difference between the engineer's estimate and the bids received this year are a result of costs associated with compliance with the Public Works Contracting Code that require the submission of a formal bid including a bid bond; compliance with contract requirements including a payment bond; and traffic control requirements, items that were not required in 2014. Although the bids received are higher than anticipated, Staff recommends the City Council award a contract to Performance Pipeline Technologies in the amount of $55,307. Performance Pipeline Technologies has provided services to the City in the past that have been completed in a successful, timely manner and within budget. ALTERNATIVES: In addition to the Staff recommendation, the following alternative action is available for the City Council's consideration: Reject all bids and re -advertise the project, which could take approximately two months to complete and may result in increased costs. 2 PUBLIC WORKS AGREEMENT By and Between CITY OF RANCHO PALOS VERDES and PERFORMANCE PIPELINE TECHNOLOGIES for ABALONE COVE SEWER SYSTEM CLEANING, INSPECTION AND REPORTING FY 16-17 01203.0006/324560.2 1 AGREEMENT FOR PUBLIC WORKS SERVICES BETWEEN THE CITY OF RANCHO PALOS VERDES AND PERFORMANCE PIPELINE TECHNOLOGIES THIS AGREEMENT FOR PUBLIC WORKS SERVICES (herein "Agreement") is made and entered into this 6th day of December, 2016 by and between the City of Rancho Palos Verdes, a California municipal corporation ("City") and Performance Pipeline Technologies, a sole proprietor ("Contractor"). City and Contractor are sometimes hereinafter individually referred to as "Party" and hereinafter collectively referred to as the "Parties". RECITALS A. City has sought, by issuance of a Request for Proposals or Invitation for Bids, the performance of the services defined and described particularly in Article 1 of this Agreement. B. Contractor, following submission of a proposal or bid for the performance of the services defined and described particularly in Article 1 of this Agreement, was selected by the City to perform those services. C. Pursuant to the City of Rancho Palos Verdes Municipal Code, City has authority to enter into and execute this Agreement. D. The Parties desire to formalize the selection of Contractor for performance of those services defined and described particularly in Article 1 of this Agreement and desire that the terms of that performance be as particularly defined and described herein. OPERATIVE PROVISIONS NOW, THEREFORE, in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows: ARTICLE 1. WORK OF CONTRACTOR 1.1 Scope of Work. In compliance with all terms and conditions of this Agreement, the Contractor shall provide those services specified in the "Scope of Work" attached hereto as Exhibit "A" and incorporated herein by this reference, which may be referred to herein as the "services" or "work" hereunder. As a material inducement to the City entering into this Agreement, Contractor represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the work required under this Agreement in a thorough, competent, and professional manner, and is experienced in performing the work and services contemplated herein. Contractor shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all services described herein. Contractor covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be both of good quality as well as fit for the purpose intended. For purposes of this Agreement, the phrase "highest 01203.0006/324560.2 -1 A-2 professional standards" shall mean those standards of practice recognized by one or more first-class firms performing similar work under similar circumstances. 1.2 Bid Documents. The Scope of Work shall include the "General Provisions" and "Special Provisions" in the bid documents for the project entitled Abalone Cove Sewer System Cleaning, Inspection and Reporting FY 16-17, including any documents or exhibits referenced therein (collectively, "bid documents"), all of which are incorporated herein by this reference. In the event of any inconsistency between the terms of the bid documents and this Agreement, the terms of this Agreement shall govern. 1.3 Compliance with Law. Contractor shall keep itself informed concerning, and shall render all services hereunder in accordance with, all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental entity having jurisdiction in effect at the time service is rendered. 1.4 Compliance with California Labor Law. (a) Public Work. The Parties acknowledge that the work to be performed under this Agreement is a "public work" as defined in Labor Code Section 1720 and that this Agreement is therefore subject to the requirements of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works contracts and the rules and regulations established by the Department of Industrial Relations ("DIR") implementing such statutes. The work performed under this Agreement is subject to compliance monitoring and enforcement by the DIR. Contractor shall post job site notices, as prescribed by regulation. (b) Prevailing Wages. Contractor shall pay prevailing wages to the extent required by Labor Code Section 1771. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are on file at City Hall and will be made available to any interested party on request. By initiating any work under this Agreement, Contractor acknowledges receipt of a copy of the Department of Industrial Relations (DIR) determination of the prevailing rate of per diem wages, and Contractor shall post a copy of the same at each job site where work is performed under this Agreement. (c) Penalty for Failure to Pay Prevailing Wages. Contractor shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty to the City, forfeit two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Contractor or by any subcontractor. (d) Payroll Records. Contractor shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Contractor and each subcontractor to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in 01203.0006/324560.2 -2 A-3 Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform the City of the location of the records. (e) Apprentices. Contractor shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777.6, and 1777.7 and California Code of Regulations Title 8, Section 200 et seq. concerning the employment of apprentices on public works projects. Contractor shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Contractor shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within sixty (60) days after concluding work pursuant to this Agreement, Contractor and each of its subcontractors shall submit to the City a verified statement of the j ourneyman and apprentice hours performed under this Agreement. (f) Eight -Hour Work DaX. Contractor acknowledges that eight (8) hours labor constitutes a legal day's work. Contractor shall comply with and be bound by Labor Code Section 1810. (g) Penalties for Excess Hours. Contractor shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Contractor shall, as a penalty to the City, forfeit twenty-five dollars ($25) for each worker employed in the performance of this Agreement by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Contractor in excess of eight (8) hours per day, and forty (40) hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than one and one-half (11/2) times the basic rate of pay. (h) Workers' Compensation. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees if it has employees. In accordance with the provisions of California Labor Code Section 1861, Contractor certifies as follows: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract." Contractor's Authorized Initials (i) Contractor's Responsibility for Subcontractors. For every subcontractor who will perform work under this Agreement, Contractor shall be responsible for such subcontractor's compliance with Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, and shall make such compliance a requirement in any contract with any subcontractor for work under this Agreement. Contractor shall be required to take all actions necessary to enforce such contractual provisions and ensure subcontractor's compliance, including 01203.0006/324560.2 -3 A-4 without limitation, conducting a review of the certified payroll records of the subcontractor on a periodic basis or upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages. Consultant shall diligently take corrective action to halt or rectify any such failure by any subcontractor. 1.5 Licenses, Permits, Fees and Assessments. Contractor shall obtain at its sole cost and expense such licenses, permits, registrations, and approvals as may be required by law for the performance of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Contractor's performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City, its officers, employees or agents of City, against any such fees, assessments, taxes, penalties or interest levied, assessed or imposed against City hereunder. 1.6 Familiarity with Work. (a) By executing this Agreement, Contractor warrants that Contractor (i) has thoroughly investigated and considered the scope of work to be performed, (ii) has carefully considered how the services should be performed, and (iii) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. If the services involve work upon any site, Contractor warrants that Contractor has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder. (b) Contractor shall promptly, and before the following conditions are disturbed, notify the City, in writing, of any: (i) material Contractor believes may be hazardous waste as defined in Section 25117 of the Health & Safety Code required to be removed to a Class I, II, or III disposal site in accordance with existing law; (ii) subsurface, unknown or latent conditions, materially different from those indicated; or (iii) unknown physical conditions at the site of any unusual nature, different from those ordinarily encountered and generally recognized as inherent in work of the character provided for in this Agreement, and will materially affect the performance of the services hereunder. (c) City shall promptly investigate the conditions, and if it finds that the conditions do materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor's cost of, or the time required for, performance of any part of the work, shall issue a change order per Section 1.10 of this Agreement. (d) In the event that a dispute arises between City and Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in Contractor's cost of, or time required for, performance of any part of the work, Contractor shall not be excused from any scheduled completion date set, but shall proceed with all work to be performed under the Agreement. Contractor shall retain any and all rights provided either by contract or by law, which pertain to the resolution of disputes and protests between the contracting parties. (e) City will compensate Contractor to the extent required by Government Code Section 4215 by issuing a change order per Section 1.10 of this Agreement. 01203.0006/324560.2 -4- 5 1.7 Protection and Care of Work and Materials. The Contractor shall adopt reasonable methods, including providing and maintaining storage facilities, during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as caused by City's own negligence. Stored materials shall be reasonably accessible for inspection. Contractor shall not, without City's consent, assign, sell, mortgage, hypothecate, or remove equipment or materials which have been installed or delivered and which may be necessary for the completion of the work. 1.8 Warranty. Contractor warrants all work under the Agreement (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non -conforming materials incorporated into the work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Agreement or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the work or non-conformance of the work to the Agreement, commence and prosecute with due diligence all work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act as soon as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair, remove and replace any portions of the work (or work of other contractors) damaged by its defective work or which becomes damaged in the course of repairing or replacing defective work. For any work so corrected, Contractor's obligation hereunder to correct defective work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected work. Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Agreement. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Agreement, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non -conforming work and any work damaged by such work or the replacement or correction thereof at Contractor's sole expense. Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand. 1.9 Further Responsibilities of Parties. Both parties agree to use reasonable care and diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all instruments, 01203.0006/324560.2 -5 prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of this Agreement. Unless hereafter specified, neither party shall be responsible for the service of the other. 1.10 Additional Work and Change Orders. (a) City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Work or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written change order is first given by the Contract Officer to the Contractor, incorporating therein any adjustment in (i) the Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Contractor ("Change Order"). All Change Orders must be signed by the Contractor and Contract Officer prior to commencing the extra work thereunder. (b) Any increase in compensation of up to ten percent (10%) of the Contract Sum or $25,000, whichever is less; or any increase in the time to perform of up to one hundred eighty (180) days; and does not materially affect the Work and which are not detrimental to the Work or to the interest of the City, may be approved by the Contract Officer. Any greater increases, taken either separately or cumulatively, must be approved by the City Council. (c) Any adjustment in the Contract Sum for a Change Order must be in accordance with the rates set forth in the Schedule of Compensation in Exhibit "C". If the rates in the Schedule of Compensation do not cover the type of work in the Change Order, the cost of such work shall not exceed an amount agreed upon in writing and signed by Contractor and Contract Officer. If the cost of the Change Order cannot be agreed upon, the City will pay for actual work of the Change Order completed, to the satisfaction of the City, as follows: (i) Labor: the cost of labor shall be the actual cost for wages of workers and subcontractors performing the work for the Change Order at the time such work is done. The use of labor classifications that would increase the cost of such work shall not be permitted. (ii) Materials and Equipment: the cost of materials and equipment shall be at cost to Contractor or lowest current price which such materials and equipment are reasonably available at the time the work is done, whichever is lower. (iii) If the cost of the extra work cannot be agreed upon, the Contractor must provide a daily report that includes invoices for labor, materials and equipment costs for the work under the Change Order. The daily report must include: list of names of workers, classifications, and hours worked; description and list of quantities of materials used; type of equipment, size, identification number, and hours of operation, including loading and transportation, if applicable; description of other City authorized services and expenditures in such detail as the City may require. Failure to submit a daily report by the close of the next working day may, at the City's sole and absolute discretion, waive the Contractor's rights for that day. (d) It is expressly understood by Contractor that the provisions of this Section 1.10 shall not apply to services specifically set forth in the Scope of Work. Contractor hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of 01203.0006/324560.2 -6-A-7 Work may be more costly or time consuming than Contractor anticipates and that Contractor shall not be entitled to additional compensation therefor. City may in its sole and absolute discretion have similar work done by other contractors. (e) No claim for an increase in the Contract Sum or time for performance shall be valid unless the procedures established in this Section are followed. 1.11 Special Requirements. Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the "Special Requirements" attached hereto as Exhibit `B" and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit `B" and any other provisions of this Agreement, the provisions of Exhibit "B" shall govern. ARTICLE 2. COMPENSATION AND METHOD OF PAYMENT. 2.1 Contract Sum. Subject to any limitations set forth in this Agreement, City agrees to pay Contractor the amounts specified in the "Schedule of Compensation" attached hereto as Exhibit "C" and incorporated herein by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed Fifty Five Thousand Three Hundred Seven Dollars ($55,307) (the "Contract Sum"), unless additional compensation is approved pursuant to Section 1.10. 2.2 Method of Compensation. The method of compensation may include: (i) a lump sum payment upon completion, (ii) payment in accordance with specified tasks or the percentage of completion of the services less the contract retention;, (iii) payment for time and materials based upon the Contractor's rates as specified in the Schedule of Compensation, provided that (a) time estimates are provided for the performance of sub tasks, (b) contract retention is maintained and (c) the Contract Sum is not exceeded; or (iv) such other methods as may be specified in the Schedule of Compensation. 2.3 Reimbursable Expenses. Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, telephone expenses, and travel expenses approved by the Contract Officer in advance, or actual subcontractor expenses of an approved subcontractor pursuant to Section 4.5, and only if specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Contractor at all project meetings reasonably deemed necessary by the City. Coordination of the performance of the work with City is a critical component of the services. If Contractor is required to attend additional meetings to facilitate such coordination, Contractor shall not be entitled to any additional compensation for attending said meetings. 2.4 Invoices. Each month Contractor shall furnish to City an original invoice for all work performed and expenses incurred during the preceding month in a form approved by City's Director 01203.0006/324560.2 -7- of Finance. By submitting an invoice for payment under this Agreement, Contractor is certifying compliance with all provisions of the Agreement. The invoice shall detail charges for all necessary and actual expenses by the following categories: labor (by sub -category), travel, materials, equipment, supplies, and sub -contractor contracts. Sub -contractor charges shall also be detailed by such categories. Contractor shall not invoice City for any duplicate services performed by more than one person. City shall, as soon as practicable, independently review each invoice submitted by the Contractor to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. Except as to any charges for work performed or expenses incurred by Contractor which are disputed by City, or as provided in Section 7.3, City will cause Contractor to be paid within thirty (3 0) days of receipt of Contractor's correct and undisputed invoice; however, Contractor acknowledges and agrees that due to City warrant run procedures, the City cannot guarantee that payment will occur within this time period. In the event that City does not cause Contractor to be paid within thirty (30) days of receipt of an undisputed and properly submitted invoice, Contractor shall be entitled to the payment of interest to the extent allowed under Public Contract Code Section 20104.50. In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Contractor, not later than seven (7) days after receipt by the City, for correction and resubmission. Returned invoices shall be accompanied by a document setting forth in writing the reasons why the payment request was rejected. Review and payment by the City of any invoice provided by the Contractor shall not constitute a waiver of any rights or remedies provided herein or any applicable law. 2.5 Waiver. Payment to Contractor for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Contractor. ARTICLE 3. PERFORMANCE SCHEDULE 3.1 Time of Essence. Time is of the essence in the performance of this Agreement. 3.2 Schedule of Performance. Contractor shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the "Schedule of Performance" attached hereto as Exhibit "D" and incorporated herein by this reference. When requested by the Contractor, extensions to the time period(s) specified in the Schedule of Performance may be approved in writing by the Contract Officer but not exceeding one hundred eighty (18 0) days cumulatively. 3.3 Force Majeure. The time period(s) specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor, 01203.0006/324560.2 -8-A-9 including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Contractor shall within ten (10) days of the commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified. The Contract Officer's determination shall be final and conclusive upon the parties to this Agreement. In no event shall Contractor be entitled to recover damages against the City for any delay in the performance of this Agreement, however caused, Contractor's sole remedy being extension of the Agreement pursuant to this Section. 3.4 Inspection and Final Acceptance. City may inspect and accept or reject any of Contractor's work under this Agreement, either during performance or when completed. City shall reject or finally accept Contractor's work within forty-five (45) days after submitted to City. City shall accept work by a timely written acceptance, otherwise work shall be deemed to have been rejected. City's acceptance shall be conclusive as to such work except with respect to latent defects, fraud and such gross mistakes as to amount to fraud. Acceptance of any work by City shall not constitute a waiver of any of the provisions of this Agreement including, but not limited to, Articles 1 and 5, pertaining to warranty and indemnification and insurance, respectively. 3.5 Term. Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding one (1) years from the date hereof, except as otherwise provided in the Schedule of Performance (Exhibit "D"). ARTICLE 4. COORDINATION OF WORK 4.1 Representatives and Personnel of Contractor. The following principals of Contractor ("Principals") are hereby designated as being the principals and representatives of Contractor authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith: (Name) (Title) (Name) (Title) (Name) (Title) -9- A-10 01203.0006/324560.2 It is expressly understood that the experience, knowledge, capability and reputation of the foregoing Principals were a substantial inducement for City to enter into this Agreement. Therefore, the Principals shall be responsible during the term of this Agreement for directing all activities of Contractor and devoting sufficient time to personally supervise the services hereunder. All personnel of Contractor, and any authorized agents, shall at all times be under the exclusive direction and control of the Principals. For purposes of this Agreement, the Principals may not be replaced nor may their responsibilities be substantially reduced by Contractor without the express written approval of City. Additionally, Contractor shall make every reasonable effort to maintain the stability and continuity of Contractor's staff and subcontractors, if any, assigned to perform the services required under this Agreement. Contractor shall notify City of any changes in Contractor's staff and subcontractors, if any, assigned to perform the services required under this Agreement, prior to and during any such performance. 4.2 Status of Contractor. Contractor shall have no authority to bind City in any manner, or to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. Contractor shall not at any time or in any manner represent that Contractor or any of Contractor's officers, employees, or agents are in any manner officials, officers, employees or agents of City. Neither Contractor, nor any of Contractor's officers, employees or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City's employees. Contractor expressly waives any claim Contractor may have to any such rights. 4.3 Contract Officer. The Contract Officer shall be Ron Dragoo, Principal Engineer, or Michael Throne, Director of Public Works or such person as may be designated by the City Manager. It shall be the Contractor's responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and the Contractor shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority, if specified in writing by the City Manager, to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement. 4.4 Independent Contractor. Neither the City nor any of its employees shall have any control over the manner, mode or means by which Contractor, its agents or employees, perform the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of Contractor's employees, servants, representatives or agents, or in fixing their number, compensation or hours of service. Contractor shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Contractor shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of 01203.0006/324560.2 -10- A-11 Contractor in its business or otherwise or a joint venturer or a member of any joint enterprise with Contractor. 4.5 Prohibition Against Subcontracting or Assignment. The experience, knowledge, capability and reputation of Contractor, its principals and employees were a substantial inducement for the City to enter into this Agreement. Therefore, Contractor shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the City. All subcontractors shall obtain, at its or Contractor's expense, such licenses, permits, registrations and approvals (including from the City) as may be required by law for the performance of any services or work under this Agreement. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without the express consent of City. ARTICLE 5. INSURANCE, INDEMNIFICATION AND BONDS 5.1 Insurance Coverages. The Contractor shall procure and maintain, at its sole cost and expense, in a form and content satisfactory to City, during the entire term of this Agreement including any extension thereof, the following policies of insurance which shall cover all elected and appointed officers, employees and agents of City: (a) Commercial General Liability Insurance (Occurrence Form CG0001 or e uivalent). A policy of comprehensive general liability insurance written on a per occurrence basis for bodily injury, personal injury and property damage. The policy of insurance shall be in an amount not less than $1,000,000 per occurrence or if a general aggregate limit is used, then the general aggregate limit shall be twice the occurrence limit. (b) Workers Compensation Insurance. A policy of workers compensation insurance in such amount as will fully comply with the laws of the State of California and which shall indemnify, insure and provide legal defense for the Contractor against any loss, claim or damage arising from any injuries or occupational diseases occurring to any worker employed by or any persons retained by the Contractor in the course of carrying out the work or services contemplated in this Agreement. (c) Automotive Insurance (Form CA 0001 (Ed 1/87) including `an, auto" and endorsement CA 0025 or equivalent). A policy of comprehensive automobile liability insurance written on a per occurrence for bodily injury and property damage in an amount not less than $1,000,000. Said policy shall include coverage for owned, non -owned, leased, hired cars and any automobile. -11- A-12 01203.0006/324560.2 (d) Professional Liability. Professional liability insurance appropriate to the Contractor's profession. This coverage may be written on a "claims made" basis, and must include coverage for contractual liability. The professional liability insurance required by this Agreement must be endorsed to be applicable to claims based upon, arising out of or related to services performed under this Agreement. The insurance must be maintained for at least 5 consecutive years following the completion of Contractor's services or the termination of this Agreement. During this additional 5 -year period, Contractor shall annually and upon request of the City submit written evidence of this continuous coverage. (e) Additional Insurance. Policies of such other insurance, as may be required in the Special Requirements in Exhibit `B". (f) Subcontractors. Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein. 5.2 General Insurance Requirements. All of the above policies of insurance shall be primary insurance and shall name the City, its elected and appointed officers, employees and agents as additional insureds and any insurance maintained by City or its officers, employees or agents may apply in excess of, and not contribute with Contractor's insurance. The insurer is deemed hereof to waive all rights of subrogation and contribution it may have against the City, its officers, employees and agents and their respective insurers. Moreover, the insurance policy must specify that where the primary insured does not satisfy the self-insured retention, any additional insured may satisfy the self-insured retention. All of said policies of insurance shall provide that said insurance may not be amended or cancelled by the insurer or any party hereto without providing thirty (30) days prior written notice by certified mail return receipt requested to the City. In the event any of said policies of insurance are cancelled, the Consultant shall, prior to the cancellation date, submit new evidence of insurance in conformance with Section 5.1 to the Contract Officer. No work or services under this Agreement shall commence until the Consultant has provided the City with Certificates of Insurance, additional insured endorsement forms or appropriate insurance binders evidencing the above insurance coverages and said Certificates of Insurance or binders are approved by the City. City reserves the right to inspect complete, certified copies of and endorsements to all required insurance policies at any time. Any failure to comply with the reporting or other provisions of the policies including breaches or warranties shall not affect coverage provided to City. All certificates shall name the City as additional insured (providing the appropriate endorsement) and shall conform to the following "cancellation" notice: CANCELLATION: -12- A-13 01203.0006/324560.2 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATED THEREOF, THE ISSUING COMPANY SHALL MAIL THIRTY (30) -DAY ADVANCE WRITTEN NOTICE TO CERTIFICATE HOLDER I►: u 0 IL [to be initialed] Agent's Initials City, its respective elected and appointed officers, directors, officials, employees, agents and volunteers are to be covered as additional insureds as respects: liability arising out of activities Contractor performs; products and completed operations of Contractor; premises owned, occupied or used by Contractor; or any automobiles owned, leased, hired or borrowed by Contractor. The coverage shall contain no special limitations on the scope of protection afforded to City, and their respective elected and appointed officers, officials, employees or volunteers. Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City or its respective elected or appointed officers, officials, employees and volunteers or the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration, defense expenses and claims. The Contractor agrees that the requirement to provide insurance shall not be construed as limiting in any way the extent to which the Contractor may be held responsible for the payment of damages to any persons or property resulting from the Contractor's activities or the activities of any person or persons for which the Contractor is otherwise responsible nor shall it limit the Contractor's indemnification liabilities as provided in Section 5.3. In the event the Contractor subcontracts any portion of the work in compliance with Section 4.5 of this Agreement, the contract between the Contractor and such subcontractor shall require the subcontractor to maintain the same policies of insurance that the Contractor is required to maintain pursuant to Section 5. 1, and such certificates and endorsements shall be provided to City. 5.3 Indemnification. To the full extent permitted by law, Contractor agrees to indemnify, defend and hold harmless the City, its officers, employees and agents ("Indemnified Parties") against, and will hold and save them and each of them harmless from, any and all actions, either judicial, administrative, arbitration or regulatory claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities whether actual or threatened (herein "claims or liabilities") that may be asserted or claimed by any person, firm or entity arising out of or in connection with the negligent performance of the work, operations or activities provided herein of Contractor, its officers, employees, agents, subcontractors, or invitees, or any individual or entity for which Contractor is legally liable ("indemnitors"), or arising from Contractor's or indemnitors' reckless or willful misconduct, or arising from Contractor's or indemnitors' negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, and in connection therewith: -13- A-14 01203.0006/324560.2 (a) Contractor will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys' fees incurred in connection therewith; (b) Contractor will promptly pay any judgment rendered against the City, its officers, agents or employees for any such claims or liabilities arising out of or in connection with the negligent performance of or failure to perform such work, operations or activities of Contractor hereunder; and Contractor agrees to save and hold the City, its officers, agents, and employees harmless therefrom; (c) In the event the City, its officers, agents or employees is made a party to any action or proceeding filed or prosecuted against Contractor for such damages or other claims arising out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Contractor hereunder, Contractor agrees to pay to the City, its officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys' fees. In addition, Contractor agrees to indemnify, defend and hold harmless the Indemnified Parties from, any and all claims and liabilities for any infringement of patent rights, copyrights or trademark on any person or persons in consequence of the use by the Indemnified Parties of articles to be supplied by Contractor under this Agreement, and of which the Contractor is not the patentee or assignee or has not the lawful right to sell the same. Contractor shall incorporate similar indemnity agreements with its subcontractors and if it fails to do so Contractor shall be fully responsible to indemnify City hereunder therefore, and failure of City to monitor compliance with these provisions shall not be a waiver hereof. This indemnification includes claims or liabilities arising from any negligent or wrongful act, error or omission, or reckless or willful misconduct of Contractor in the performance of professional services and work hereunder. The provisions of this Section do not apply to claims or liabilities occurring as a result of City's sole negligence or willful acts or omissions, but, to the fullest extent permitted by law, shall apply to claims and liabilities resulting in part from City's negligence, except that design professionals' indemnity hereunder shall be limited to claims and liabilities arising out of the negligence, recklessness or willful misconduct of the design professional. The indemnity obligation shall be binding on successors and assigns of Contractor and shall survive termination of this Agreement. 5.4 Notification of Third -Party Claims. City shall timely notify Contractor of the receipt of any third -party claim relating to the work under this Agreement. City shall be entitled to recover from Contractor its reasonable costs incurred in providing such notification. 5.5 Performance and Labor Bonds. Concurrently with execution of this Agreement Contractor shall deliver to the City, the following: -14- A-15 01203.0006/324560.2 (a) A performance bond in the amount of the Contract Sum of this Agreement, in the form provided by the City Clerk, which secures the faithful performance of this Agreement. (b) A labor and materials bond in the amount of the Contract Sum of this Agreement, in the form provided by the City Clerk, which secures the payment of all persons furnishing labor and/or materials in connection with the work under this Agreement. Both the performance and labors bonds required under this Section 5.5 shall contain the original notarized signature of an authorized officer of the surety and affixed thereto shall be a certified and current copy of his power of attorney. The bond shall be unconditional and remain in force during the entire term of the Agreement and shall be null and void only if the Contractor promptly and faithfully performs all terms and conditions of this Agreement and pays all labor and materials for work and services under this Agreement. 5.6 Sufficiency of Insurer or Surety. Insurance and bonds required by this Agreement shall be satisfactory only if issued by companies qualified to do business in California, rated "A" or better in the most recent edition of Best's Rating Guide, The Key Rating Guide or in the Federal Register, and only if they are of a financial category Class VII or better, unless such requirements are waived by the Risk Manager of the City ("Risk Manager") due to unique circumstances. If this Agreement continues for more than 3 years duration, or in the event the Risk Manager determines that the work or services to be performed under this Agreement creates an increased or decreased risk of loss to the City, the Contractor agrees that the minimum limits of the insurance policies and the performance bond required by Section 5.5 may be changed accordingly upon receipt of written notice from the Risk Manager. 5.7 Substitution of Securities. Pursuant to Public Contract Code Section 22300, substitution of eligible equivalent securities for any funds withheld to ensure performance under this Agreement may be permitted at the request and sole expense of the Contractor. Alternatively, the Contractor may, pursuant to an escrow agreement in a form prescribed by Public Contract Code Section 22300, request payment of retentions funds earned directly to the escrow agent at the sole expense of the Contractor. 5.8 Release of Securities. City shall release the Performance and Labor Bonds when the following have occurred: (a) Contractor has made a written request for release and provided evidence of satisfaction of all other requirements under Article 5 of this Agreement; (b) the Work has been accepted; and (c) after passage of the time within which lien claims are required to be made pursuant to applicable laws; if lien claims have been timely filed, City shall hold the Labor 01203.0006/324560.2 -15- A-16 Bond until such claims have been resolved, Contractor has provided statutory bond, or otherwise as required by applicable law. ARTICLE 6. RECORDS, REPORTS, AND RELEASE OF INFORMATION 6.1 Records. Contractor shall keep, and require subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports, studies, certified and accurate copies of payroll records in compliance with all applicable laws, or other documents relating to the disbursements charged to City and services performed hereunder (the "books and records"), as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the performance of such services. Any and all such documents shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of 3 years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required. In the event of dissolution of Contractor's business, custody of the books and records may be given to City, and access shall be provided by Contractor's successor in interest. Notwithstanding the above, the Contractor shall fully cooperate with the City in providing access to the books and records if a public records request is made and disclosure is required by law including but not limited to the California Public Records Act. 6.2 Reports. Contractor shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as the Contract Officer shall require. Contractor hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Contractor agrees that if Contractor becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services contemplated herein or, if Contractor is providing design services, the cost of the project being designed, Contractor shall promptly notify the Contract Officer of said fact, circumstance, technique or event and the estimated increased or decreased cost related thereto and, if Contractor is providing design services, the estimated increased or decreased cost estimate for the project being designed. 6.3 Ownership of Documents. All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents and other materials (the "documents and materials") prepared by Contractor, its employees, subcontractors and agents in the performance of this Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Contractor shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the documents and materials hereunder. Any use, reuse or assignment of such completed documents for other projects and/or use of uncompleted documents 01203.0006/324560.2 -16- A-17 without specific written authorization by the Contractor will be at the City's sole risk and without liability to Contractor, and Contractor's guarantee and warranties shall not extend to such use, reuse or assignment. Contractor may retain copies of such documents for its own use. Contractor shall have an unrestricted right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Contractor fails to secure such assignment, Contractor shall indemnify City for all damages resulting therefrom. Moreover, Contractor with respect to any documents and materials that may qualify as "works made for hire" as defined in 17 U.S.C. § 101, such documents and materials are hereby deemed "works made for hire" for the City. 6.4 Confidentiality and Release of Information. (a) information gained or work product produced by Contractor in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Contractor. Contractor shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the Contract Officer. (b) Contractor, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the Contract Officer or unless requested by the City Attorney, voluntarily provide documents, declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered "voluntary" provided Contractor gives City notice of such court order or subpoena. (c) If Contractor, or any officer, employee, agent or subcontractor of Contractor, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Contractor for any damages, costs and fees, including attorneys' fees, caused by or incurred as a result of Contractor's conduct. (d) Contractor shall promptly notify City should Contractor, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed there under. City retains the right, but has no obligation, to represent Contractor or be present at any deposition, hearing or similar proceeding. Contractor agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Contractor. However, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response. ARTICLE 7. ENFORCEMENT OF AGREEMENT AND TERMINATION 7.1 California Law. This Agreement shall be interpreted, construed and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other 01203.0006/324560.2 -17- A-18 appropriate court in such county, and Contractor covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in the County of Los Angeles, State of California. 7.2 Disputes. (a) Default; Cure. In the event that Contractor is in default under the terms of this Agreement, the City shall not have any obligation or duty to continue compensating Contractor for any work performed after the date of default. Instead, the City may give notice to Contractor of the default and the reasons for the default. The notice shall include the timeframe in which Contractor may cure the default. This timeframe is presumptively thirty (30) days, but may be extended, though not reduced, if circumstances warrant. During the period of time that Contractor is in default, the City shall hold all invoices and shall proceed with payment on the invoices only when the default is cured. In the alternative, the City may, in its sole discretion, elect to pay some or all of the outstanding invoices during the period of default. If Contractor does not cure the default, the City may take necessary steps to terminate this Agreement under this Article. Any failure on the part of the City to give notice of the Contractor's default shall not be deemed to result in a waiver of the City's legal rights or any rights arising out of any provision of this Agreement. (b) Dispute Resolution. This contract is subject to the provisions of Article 1.5 (commencing at Section 20104) of Division 2, Part 3 of the California Public Contract Code regarding the resolution of public works claims of less than $375,000. Article 1.5 mandates certain procedures for the filing of claims and supporting documentation by the Contractor, for the response to such claims by the City, for a mandatory meet and confer conference upon the request of the Contractor, for mandatory non-binding mediation in the event litigation is commenced, and for mandatory judicial arbitration upon the failure to resolve the dispute through mediation. This Agreement hereby incorporates the provisions of Article 1.5 as though fully set forth herein. 7.3 Retention of Funds. Contractor hereby authorizes City to deduct from any amount payable to Contractor (whether or not arising out of this Agreement) (i) any amounts the payment of which may be in dispute hereunder or which are necessary to compensate City for any losses, costs, liabilities, or damages suffered by City, and (ii) all amounts for which City may be liable to third parties, by reason of Contractor's acts or omissions in performing or failing to perform Contractor's obligation under this Agreement. In the event that any claim is made by a third party, the amount or validity of which is disputed by Contractor, or any indebtedness shall exist which shall appear to be the basis for a claim of lien, City may withhold from any payment due, without liability for interest because of such withholding, an amount sufficient to cover such claim. The failure of City to exercise such right to deduct or to withhold shall not, however, affect the obligations of the Contractor to insure, indemnify, and protect City as elsewhere provided herein. -ls- A-19 01203.0006/324560.2 7.4 Waiver. Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision or a waiver of any subsequent breach or violation of any provision of this Agreement. Acceptance by City of any work or services by Contractor shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non - defaulting party on any default shall impair such right or remedy or be construed as a waiver. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 7.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party. 7.6 Legal Action. In addition to any other rights or remedies, either party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. Notwithstanding any contrary provision herein, Contractor shall file a claim pursuant to Government Code Sections 905 et seq. and 910 et seq., in order to pursue a legal action under this Agreement. 7.7 Liquidated Damages. Since the determination of actual damages for any delay in performance of this Agreement would be extremely difficult or impractical to determine in the event of a breach of this Agreement, the Contractor and its sureties shall be liable for and shall pay to the City the sum of Two Hundred Dollars ($200) as liquidated damages for each working day of delay in the performance of any service required hereunder, as specified in the Schedule of Performance (Exhibit "D"). The City may withhold from any monies payable on account of services performed by the Contractor any accrued liquidated damages. Pursuant to Government Code Section 4215, Contractor shall not be assessed liquidated damages for delay in completion of the project when such delay was caused by the failure of the public agency or owner of the utility to provide for removal or relocation of utility facilities. 7.8 Termination Prior to Expiration of Term. This Section shall govern any termination of this Contract except as specifically provided in the following Section for termination for cause. The City reserves the right to terminate this Contract at any time, with or without cause, upon thirty (3 0) days' written notice to Contractor, except that where termination is due to the fault of the Contractor, the period of notice may be such shorter time as may be determined by the Contract Officer. In addition, the Contractor reserves the -19- A-20 01203.0006/324560.2 right to terminate this Contract at any time, with or without cause, upon sixty (60) days' written notice to City, except that where termination is due to the fault of the City, the period of notice may be such shorter time as the Contractor may determine. Upon receipt of any notice of termination, Contractor shall immediately cease all services hereunder except such as may be specifically approved by the Contract Officer. Except where the Contractor has initiated termination, the Contractor shall be entitled to compensation for all services rendered prior to the effective date of the notice of termination and for any services authorized by the Contract Officer thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, except as provided in Section 7.3. In the event the Contractor has initiated termination, the Contractor shall be entitled to compensation only for the reasonable value of the work product actually produced hereunder. In the event of termination without cause pursuant to this Section, the terminating party need not provide the non -terminating party with the opportunity to cure pursuant to Section 7.2. 7.9 Termination for Default of Contractor. If termination is due to the failure of the Contractor to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 7.2, take over the work and prosecute the same to completion by contract or otherwise, and the Contractor shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to the Contractor for the purpose of set-off or partial payment of the amounts owed the City as previously stated. 7.10 Attorneys' Fees. If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney's fees. Attorney's fees shall include attorney's fees on any appeal, and in addition a party entitled to attorney's fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment. 7.11 Unfair Business Practices Claims. In entering into this Agreement, Contractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials related to this Agreement. This assignment shall be made and become effective at the time the City renders final payment to the Contractor without further acknowledgment of the Parties. 01203.0006/324560.2 -20- A-21 ARTICLE 8. CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION 8.1 Non -liability of City Officers and Employees. No officer or employee of the City shall be personally liable to the Contractor, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Contractor or to its successor, or for breach of any obligation of the terms of this Agreement. 8.2 Conflict of Interest. Contractor covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Contractor's performance of services under this Agreement. Contractor further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of the Contract Officer. Contractor agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement. No officer or employee of the City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which effects his financial interest or the financial interest of any corporation, partnership or association in which he is, directly or indirectly, interested, in violation of any State statute or regulation. The Contractor warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement. 8.3 Covenant Against Discrimination. Contractor covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry, or other protected class in the performance of this Agreement. Contractor shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry, or other protected class. 8.4 Unauthorized Aliens. Contractor hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C.A. §§ 1101, et seq., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Contractor so employ such unauthorized aliens for the performance of work and/or services covered by this Agreement, and should any liability or sanctions be imposed against City for such use of unauthorized aliens, Contractor hereby agrees to and shall reimburse City for the cost of all such liabilities or sanctions imposed, together with any and all costs, including attorneys' fees, incurred by City. 01203.0006/324560.2 -21- A-22 ARTICLE 9. MISCELLANEOUS PROVISIONS 9.1 Notices. Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail, in the case of the City, to the City Manager and to the attention of the Contract Officer (with her/his name and City title), City of Rancho Palos Verdes, 30940 Hawthorne Boulevard, Ranchos Palos Verdes, California 90275 and in the case of the Contractor, to the person at the address designated on the execution page of this Agreement. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated at the time personally delivered or in seventy-two (72) hours from the time of mailing if mailed as provided in this Section. All correspondence relating to this Agreement shall be serialized consecutively. 9.2 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. 9.3 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument. 9.4 Integration; Amendment. This Agreement including the attachments hereto is the entire, complete and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by the Contractor and by the City Council. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void. 9.5 Severability. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless. -22- A-23 01203.0006/324560.2 9.6 Warranty & Representation of Non -Collusion. No official, officer, or employee of City has any financial interest, direct or indirect, in this Agreement, nor shall any official, officer, or employee of City participate in any decision relating to this Agreement which may affect his/her financial interest or the financial interest of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any State or municipal statute or regulation. The determination of "financial interest" shall be consistent with State law and shall not include interests found to be "remote" or "noninterests" pursuant to Government Code Sections 1091 or 1091.5. Contractor warrants and represents that it has not paid or given, and will not pay or give, to any third party including, but not limited to, any City official, officer, or employee, any money, consideration, or other thing of value as a result or consequence of obtaining or being awarded any agreement. Contractor further warrants and represents that (s)he/it has not engaged in any act(s), omission(s), or other conduct or collusion that would result in the payment of any money, consideration, or other thing of value to any third party including, but not limited to, any City official, officer, or employee, as a result of consequence of obtaining or being awarded any agreement. Contractor is aware of and understands that any such act(s), omission(s) or other conduct resulting in such payment of money, consideration, or other thing of value will render this Agreement void and of no force or effect. Contractor's Authorized Initials 9.7 Corporate Authority. The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE] 01203.0006/324560.2 -23- A-24 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first -above written. ATTEST: Carla Morreale , City Clerk APPROVED AS TO FORM: ALESHIRE & WYNDER, LLP David J. Aleshire, City Attorney CITY: CITY OF RANCHO PALOS VERDES, a municipal corporation Ken Dyda, Mayor CONTRACTOR: PERFORMANCE PIPELINE TECHNOLOGIES, A SOLE PROPRIETOR CONTRACTOR By: Name: Title: By: Name: Title: Address: Two corporate officer signatures required when Contractor is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. CONTRACTOR'S SIGNATURES SHALL BE DULY NOTARIZED, AND APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS MAY BE REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONTRACTOR'S BUSINESS ENTITY. -24- A-25 01203.0006/324560.2 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. STATE OF CALIFORNIA COUNTY OF LOS ANGELES On 12016 before me, , personally appeared , proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature: OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER TITLE(S) ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ❑ ATTORNEY-IN-FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER SIGNER IS REPRESENTING: (NAME OF PERSON(S) OR ENTITY(IES)) 01203.0006/324560.2 DESCRIPTION OF ATTACHED DOCUMENT TITLE OR TYPE OF DOCUMENT NUMBER OF PAGES DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED ABOVE A-26 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. STATE OF CALIFORNIA COUNTY OF LOS ANGELES On 12016 before me, , personally appeared , proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature: OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER TITLE(S) ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ❑ ATTORNEY-IN-FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER SIGNER IS REPRESENTING: (NAME OF PERSON(S) OR ENTITY(IES)) 01203.0006/324560.2 DESCRIPTION OF ATTACHED DOCUMENT TITLE OR TYPE OF DOCUMENT NUMBER OF PAGES DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED ABOVE A-27 EXHIBIT "A" SCOPE OF WORK I. Contractor shall perform all of the work and comply with all of the specifications and requirements in the "General Provisions" and "Special Provisions" included in the bid documents for the project entitled Abalone Cove Sewer Cleaning, Inspection And Reporting FY 2016-2017, including any documents or exhibits referenced therein. II. Brief description of the work to be performed: The purpose of this scope of work is to clean, assess the structural integrity and maintenance condition of the sanitary sewer manholes, pipelines and lift stations. The project includes a total of approximately 14,220 linear feet of sanitary sewer comprised of 8 inch diameter pipes, 72 manholes and 4 lift stations accessible in streets and city easements, some of which may be difficult to access. The CCTV inspection work must be completed by certified National Association of Sewer Service Companies (NASSCO) Pipeline Assessment and Certification Program (PACP) trained operator(s) using established PACP coding and observations. The work to be accomplished in this project includes all labor, material, and equipment necessary for sanitary sewer cleaning, inspection, inspection reporting, and traffic control unless specified otherwise in this document. III. In addition to the requirements of Section 6.2, during performance of the work, Contractor will keep the City appraised of the status of performance by delivering the following status reports: After the first working day of televising, the Contractor shall submit the work completed (video recordings, photographs, and data) from all trucks and operators that are scheduled to work on this project to verify the quality of the work being performed. IV. As part of the Scope of Work, Contractor shall deliver the following tangible work products to the City. All deliverables become property of the City, including the external hard drives: A. Final Report: (1) Contractor will deliver to City a Final Report explaining and analyzing the sewer lines, manholes and lift station condition. B. Data: 01203.0006/324560.2 (l) As part of the Final Report submittal, the Contractor shall submit all video recordings, image files, for all the required sewer line segments, manholes and lift stations inspected and a database that includes ALL of the collected data, including the data provided in the progress report submittal. These items shall be stored on one (1) external hard drive as pre -approved by the City. The submittal shall include the power cord and connection cable. The external hard drive and cables will become property of the City upon completion of the project. A-1 • (2) External hard drive(s), binder cover and binder spine label shall include the following information on computer-generated labels: City of RPV — Abalone Cove Sewer System General Contractor Name and Sub -contractor Name Project Name (e.g. YOTV0506A) Start Date of CCTV Inspections (e.g. MM/DD/YYYY) Finish Date of CCTV Inspections (e.g. MM/DD/YYYY) (3) All files included as part of the deliverables shall be contained within one single folder on the hard drive and labeled with the project name, the date, and the name of the submittal (i.e. first, second, final, punch list) as: YOTV0708A-20071220—Punchlist(Proj ectName—YYYYMMDD—SubmitalName) (4) The Contractor shall maintain a complete backup of all versions of electronic data submitted for a minimum of two years from date of project completion, and shall provide the City with a complete copy within this timeframe upon request at no cost. V. All work is subject to review and acceptance by the City, and must be revised by the Contractor without additional charge to the City until found satisfactory and accepted by City. VI. Contractor shall provide safe and continuous passage for pedestrian and vehicular traffic in accordance with the latest edition of the California MUTCD and as indicated in the bid documents. 01203.0006/324560.2 A-2 A-29 EXHIBIT "B" SPECIAL REQUIREMENTS (Superseding Contract Boilerplate) I. Section 5.5, Performance and Labor Bonds, is hereby deleted in its entirety. II. Section 5.8, Release of Securities, is hereby deleted in its entirety. 01203.0006/324560.2 B-1 A-30 EXHIBIT "C" SCHEDULE OF COMPENSATION I. Contractor shall perform all work at the rates on the Bid Sheet submitted as part of Contractor's Proposal, and listed below: BID SCHEDULE Abalone Cove Sewer System. Cleaning, Inspection and Reporting FY 16-17 Line Description Unit Estimated Unit Price Extended Price Quantity (Estimated Quantity x Unit Price 1. Sewer Line Cleaning LF 14,220 $ , $ t Z 1 0 uz� 2. Sewer Line CCTV Inspection & LF 14,220 $ i 00 $ � � '04) Inspection Reporting 1'�'L(' 3. Manhole Cleaning EA 20 $ `L 5o , ono $�' CJ (� 0 , U0 4. Manhole CCTV Inspection EA 72 $ 2so.ao $ `z opo .� & Inspection Reporting i 5. Lift Station Cleanup EA 4 S t to b(`} . Mi3 S LA 1660 . 00 6. Lift Station CCTV Inspection & Inspection EA 4 $ h- J 6o • U� $ 2, G60 . (Jo Reporting TOTAL BASE BID SCHEDULE IN 'NUMBERS: 5 $ L) °_O_3_____ TOTAL BASE BID SCHEDULE IN WORDS: C1 v� �0"1SA-J S l'Af-r-C- �_- -2_,&+(u c<,AS----------- --- The contract shall be awarded to the lowest responsible bidder based on the TOTAL BASE BID. Note: Some items may be adjusted or deleted. Any changes to the quantities for these items shall not classify as a substantial change as stipulated in Section 3-2.2.1 of the Standard Specifications. Therefore, regardless of total actual amount (percentage) compared to estimated quantities, the unit prices provided above by the Bidder shall be applied to the final quantity when payment is calculated for these items. No adjustment in the unit prices will be allowed, The Clty reserves the right to not use any of the estimated quantities, and if this right is exercised, the Contractor will not be entitled to any additional compensation. Cost of all export of material shall be included in the above unit costs; no additional compensation will be granted for such expenses. The Contract shall be awarded to the lowest responsible Bidder based on the total Bid price. This proposal shall include provision for at -risk youth employment per specification and grant requirements. 01203.0006/324560.2 C-1 A-31 II. Within the budgeted amounts for each item on the Bid Sheet, and with the approval of the Contract Officer, funds may be shifted from one item's subbudget to another so long as the Contract Sum is not exceeded per Section 2.1, unless Additional Work is approved per Section 1.10. III. The City will compensate Consultant for the Services performed upon submission of a valid invoice. Each invoice is to include: A. Line items shall include all labor, supplies, equipment, materials, traffic control and travel properly charged to the Services. B. Line items for all materials and equipment properly charged to the Services. C. Line items for all other approved reimbursable expenses claimed, with supporting documentation. D. Line items for all approved subcontractor labor, supplies, equipment, materials, and travel properly charged to the Services. V. The total compensation for the Services shall not exceed $55,307.00 as provided in Section 2.1 of this Agreement. 01203.0006/324560.2 C-2 A-32 EXHIBIT "D" SCHEDULE OF PERFORMANCE I. Contractor shall perform all work timely in accordance with the following schedule: All work shall be completed within the contract period of 15 working days following written Notice to Proceed. II. Contractor shall deliver the following tangible work products to the City by the following dates. A. Reports — Due 1 week after the completion of the work. B. Data — Due 1 week after the completion of the work. III. The Contract Officer may approve extensions for performance of the services in accordance with Section 3.2. 01203.0006/324560.2 D-1 A-33 Lis TO THE DIRECTOR OF PUBLIC WORKS, CITY OF RANCHO PALOS VERDES: The undersigned, as bidder, declares that: (1) this proposal is made without collusion with any other person, firm or corporation, and that the only persons or parties interested as principals are those named herein; (2) bidder has carefully examined the project plans, specifications, instructions to bidders, proposal, notice to contractors and all other information furnished therefore and the site of the proposed work; (3) bidder has investigated and is satisfied as to the conditions to be encountered, the character, quality and quantities of work to be performed and materials to be furnished. Furthermore, bidder agrees that submission of this proposal shall be conclusive evidence that such examination and investigation have been made and agrees, in the event this contract be awarded to bidder, to enter into a contract with the CITY OF RANCHO PALOS VERDES, to perform said proposed work in accordance with the plans, if any, and the terms of the specifications, in the time and manner therein prescribed, and to furnish or provide all materials, labor, tools, equipment, apparatus and other means necessary so to do, except such thereof as may otherwise be furnished or provided under the terms of said specifications, for the following stated unit prices or lump -sum price as submitted on the Schedule attached hereto: The bidder shall submit as part of this proposal a completed copy of the Contractor's Industrial Safety Record. ik Accompanying this proposal is 6, L bol (insert I I G, ct. "cash," "Cashier's Check," "certified check," or "Bid Bond," as the case may be) in the amount equal to at least ten percent (10%) of the total aggregate bid price hereof based on the quantities shown and the unit prices quoted in the Bid Schedule. The undersigned further agrees that should he/she be awarded the contract on the basis hereof and thereafter, defaults in executing the required contract, with necessary bonds and documents, within ten (10) days, not including Sundays and legal holidays, after having received notice that the contract has been awarded and is ready for signature, the proceeds of the security accompanying his bid shall become the property of the CITY OF RANCHO PALOS VERDES and this proposal and the acceptance thereof may be considered null and void. The undersigned certifies to have a minimum of five (5) consecutive years of current experience in the type of Work related to this Project and that this experience is in actual operation of the firm with permanent employees performing a part of the Work as distinct from a firm operating entirely by subcontracting all phases of the Work. The undersigned also certifies to be properly licensed by the State as a contractor to perform this type of Work and further certifies to have been so licensed for the five (5) years immediately preceding the date of receipt of Bids. The undersigned possesses California Contractor's License Number Class which expires on __ lb -30 -- Z OKI ------ Signature(s) of bidder: If an individual, so state. If a firm or co -partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, 01203.0006/300349.1 P - 1 B-1 also names of president, secretary, treasurer, and manager thereof. Two notarized officer's signatures and the corporate seal are required for corporations. Legal Business Name:. C- + q Address:— Telephone Contact: M- M Proposals which do not show the Contractor's License Number and expiration date of the Bidder's License under the provisions of Chapter 9 of Division 3 of the Business & Professional Code will be rejected. Bid Date k \ -� - 10% s This information must include all construction work undertaken in the State of California by the bidder and partnership joint venture or corporation that any principal of the bidder participated in as a principal or owner for the last five calendar years and the current calendar year prior to the date of bid submittal. Separate information shall be submitted for each particular partnership, joint venture, corporate or individual bidder. The bidder may attach any additional information or explanation of data which bidder would like to be taken into consideration in evaluating the safety record. An explanation must be attached of the circumstances surrounding any and all fatalities. 01203.0006/300349.1 P - 2 B-2 1:11DW144 ABALONE COVE SEWER SYSTEM CLEANING, INSPECTION AND REPORTING FY 16-17 Bidder's Name: T< c ti To the Honorable Mayor and Members of the City Council: In compliance with the Notice Inviting Sealed Bids, the undersigned hereby agrees to enter into a contract to furnish all labor, materials, equipment and supplies for the project identified as ABALONE COVE SEWER SYSTEM CLEANING, INSPECTION AND REPORTING FY 16.17 in accordance with the specifications and plans for demolition, construction and installation in the Contract Documents which are on file in the office of the Director of Public Works of the City of Rancho Palos Verdes to the satisfaction and under the direction of the Director of Public Works at the following prices: LUMP SUM ITEMS SHALL INCLUDE PROVIDING AND INSTALLATION OF ALL COMPONENTS STIPULATED WITHIN THE CONTRACT DOCUMENTS AND NECESSARY INCIDENTALS TO FACILITATE PROVIDING SAID COMPONENTS. SURVEY, GRADING, AND BMPS SHALL BE CONSIDERED INCLUDED IN THE INDIVIDUAL BID ITEMS. NO ADDITIONAL PAYMENTS WILL BE MADE. The quantities reflected on the plans and in the bid -sheets are representative of the amount of work for each item on the project, but are not final quantities to be used for computing payment. Payment will be based on the measurement of actual work completed. The contractor must notify in writing to the project manager of all discrepancies between actual bid quantities and those shown in the bid document prior to commencement of work in any area of the project. 01203.0006/300349.1 P - 3 B-3 BID SCHEDULE Abalone Cove Sewer System Cleaning, Inspection and Reporting FY 16-17 Line Description Unit Estimated Unit Price Extended Price Quantity (Estimated Quantity x Unit Price 1. Sewer Line Cleaning LF 14,220 $ , $ Z © o 2. Sewer Line CCTV Inspection & LF 14,220 $ U 0 $ � y �'L(, ' do Inspection Reporting 3. Manhole Cleaning EA 20 $5p , 1 oo 4. Manhole CCTV Inspection EA 72 $ 2SO 00$ t GOO , 00 & Inspection Reporting C 5. Lift Station Cleanup EA 4 $ t tnon . UO $ 1� (660 , U® 6. Lift Station CCTV Inspection & Inspection EA 4 $ 0- (so • 06 $ 2,66o.00 Reporting TOTAL BASE BID SCHEDULE IN NUMBERS: ` __455 t)c� ° (33 TOTAL BASE BID SCHEDULE IN WORDS: _ \ �4' 1 v� \ AOJ S a,J � --- JAA(-r_-C_ VAv 4Jc f t � S-vo c.J OL)WO N._..► Z 7<Au Lc,.s'cS The contract shall be awarded to the lowest responsible bidder based on the TOTAL BASE BID. Note: Some items may be adjusted or deleted. Any changes to the quantities for these items shall not classify as a substantial change as stipulated in Section 3-2.2.1 of the Standard Specifications. Therefore, regardless of total actual amount (percentage) compared to estimated quantities, the unit prices provided above by the Bidder shall be applied to the final quantity when payment is calculated for these items. No adjustment in the unit prices will be allowed. The City reserves the right to not use any of the estimated quantities, and if this right is exercised, the Contractor will not be entitled to any additional compensation. Cost of all export of material shall be included in the above unit costs; no additional compensation will be granted for such expenses. The Contract shall be awarded to the lowest responsible Bidder based on the total Bid price. This proposal shall include provision for at -risk youth employment per specification and grant requirements. 01203.0006/300349.1 P-4 B-4 I Fill out all of the following information. Attach additional sheets if necessary, (1) Bidder's name: i Ov �A 4\,-> C C_ 'i c (2) If the Bidder's name is a fictitious name, who or what is the full name of the registered owner? If the Bidder's name is not a fictitious name, write "N/A" in the response to this question. If you are doing business under a fictitious name, provide a copy of the filed valid Fictitious Business Name Statement. N CC (3) Business address: Ocw,c k'A , _b Y i (4) Telephone: TiG Facsimile: A JOJ (5) Type of firm - Individual, Partnership, LLC or Corporation: ry r V4 C, (6) Corporation organized under the laws of the state of: (7) California State Contractor's License Number and Class: LL nL Bidder shall be properly licensed at the time of bid submission or the bid shall be considered non-responsive and shall be rejected. (8) DIR Contractor Registration Number: (9) List the name and title of the person(s) who inspected the site of the proposed Work for your firm: �A V4W (10) Number of years' experience the company has as a contractor in construction work:46 (11) List the names, titles, addresses and telephone numbers of all individuals, firm members, partners, joint venturers, and company or corporate officers having a principal interest in this Proposal: kt\ wj c(A< Q, rt 11� u1j.- f c uw C11 14 1 01203.0006/300349.1 P - 5 B-5 List at least three similar projects completed as of recent date: Contract Date Name, Address of Owner, & Telephone Amount Class of Work Completed No.i AA StiLl0Uo Jqz�� vas � - l - 2��� UG�� to ��y tt\;) 5 4 o2 Ci LAI 6 � wo c LJ TA ci\ 'Lot � ^ice t 7052 t 16 ZLA4 61 is 5a - o 311- 5Tc* (12) NOTE: Upon request of the CITY, the bidder shall furnish evidence showing a notarized financial statement, financial data, construction experience, or other information. 01203.0006/300349.1 P - 6 B-6 REFERENCES For all public agency projects in excess of $300,000 you are currently working on or have worked on in the past five (5) years, provide the following information: Project 1 Name/ Number tJWNV OA CA MJrA cv U 11,C.� Project Description CtVa�o W Z M C(, -4S u� II Yt-5 �c Approximate Construction Dates From: _�_"�'� To: _k \ =_l Agency Name: (A LUv,l q t h�GtiJ t5fy'L�F Contact Person: Ati �rC.Li (� ruyio Telephone: V'� S� 3-7U 52_ Address: M"T'l L\1. S A\J e- Q- 9� SSCP Original Contract Amount: $ �2C) t duo Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Circle one: Yes Did the Agency file any claims against you? Circle one: Yes Na If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 2 Name/ Number C (-Tr J Project Description Cc7(1 S 0 c,ti 0"� C+ 5t3 -i <r A -IV-,% f Approximate Construction Dates From: _1 u -3L) `_ v � S To: _� �j _ r 266 Agency Name: © C-' 5 0 5� 7,- 70 �L Contact Person: t' C4 r -o %(Uw0 Telephone: Address: \yR14k� (--,-k\kr) PN'= i V, Q, �A . 0(n) 55 Original Contract Amount: $ L(' -fol Uov Final Contract Amount: $ 'LN6( Gb 01203.0006/300349.1 P - 7 B-7 - If final amount is different from original amount, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Circle one: Yes Did the Agency file any claims against you? Circle one: Yes Q If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 3 Name/ Number QX61 ` Project Description - Approximate Construction Dates From: _ t �- l _2� 1 To:-_ ESQ Agency Name: Ct �'/ S QAAA C0 -(- Contact Person: MAIC. ',y Telephone: U1(42 � Address: �C(�`� 3�L SN��-tl LA�� 5o+ t C 2� 7- 53 Sq 1 X350 Original Contract Amount: $ zRi goo Final Contract Amount: $ 31— of oU3 If final amount is different from original amount, please explain (change orders, extra work, etc.) CIA, (-Oo c�vM �,nuL'�1 Aa i �- A0Q1 tTvy4,l U Did you file any claims against the Agency? Circle one: Yes 6 Did the Agency file any claims against you? Circle one: Yes 49 If you answered yes to either of the above two questions, please explain and indicate outcome of claims. 01203.0006/300349.1 P - g B-8 Project 4 Name/ Number Ut fav Tr S 0'c'#A" 5<Jq 0 `'-'-'5- Project Description C-C"j 'T-^} 5 e c.c.-tv,1 C)�- � Approximate Construction Dates From: _ 2�_ To: Agency Name: C')fA I L.uv,� Contact Person: � � -t ilc kJ � Telephone: � `{ � � 0 5 e ► �- - Address: lUl`� ` kkks ewc �.y. � S �0 _ Original Contract Amount: $ t -(06t (XX3 Final Contract Amount: $ Od If final amount is different from original amount, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Circle one: Yes �I - Did the Agency file any claims against you? Circle one: Yes I If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 5 Name/ Number -i.L3ri U-) _. Project Description C—L TeJ -t:-�' v,J S -CW U Y LT -5, A A! Approximate Construction Dates From: �___________ To: ----- ------ -- Agency Name: Ci Contact Person: -)6 C- / Telephone: 70� Address: ,400 �3007-- Original Contract Amount: $ 12 5t G4) Final Contract Amount: $ r? ,/ If final amount is different from original amount, please explain (change orders, extra work, etc.) 01203.0006/300349.1 P - 9 B-9 Did you file any claims against the Agency? Circle one: Yes Did the Agency file any claims against you? Circle one: Yes I� If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 6 Name/ Number Project Description Approximate Construction Dates From: Y_____To: Agency Name: .- Contact Person: Telephone: Address: Original Contract Amount: $ Final Contract Amount: $ If final amount is different from original amount, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. 01203.0006/300349.1 P-10 STATEMENT ACKNOWLEDGING PENAL AND CIVIL PENALTIES CONCERNING THE CONTRACTORS' LICENSING LAWS [Business & Professions Code 7028.15] [Public Contract Code 20103.5] I, the undersigned, certify that I am aware of the following provisions of California law and that I, or the entity on whose behalf this certification is given, hold a currently valid California contractor's license as set forth below: Business & Professions Code 7028.95: (a) It is a misdemeanor for any person to submit a bid to a public agency in order to engage in the business or act in the capacity of a contractor within this state without having a license therefore, except in any of the following cases: (1) The person is particularly exempted from this chapter. (2) The bid is submitted on a state project governed by Section 10164 of the Public Contract Code or on any local agency project governed by Section 20104 [now 20103.51 of the Public Contract Code. (b) If a person has been previously convicted of the offense described in this section, the court shall impose a fine of 20 percent of the price of the contract under which the unlicensed person performed contracting work, or four thousand five hundred dollars ($4,500), whichever is greater, or imprisonment in the county jail for not less than 10 days nor more than six months, or both. In the event the person performing the contracting work has agreed to furnish materials and labor on an hourly basis, "the price of the contract" for the purposes of this subdivision means the aggregate sum of the cost of materials and labor furnished and the cost of completing the work to be performed. (c) This section shall not apply to a joint venture license, as required by Section 7029.1. However, at the time of making a bid as a joint venture, each person submitting the bid shall be subject to this section with respect to his or her individual licensure. (d) This section shall not affect the right or ability of a licensed architect, land surveyor, or registered professional engineer to form joint ventures with licensed contractor to render services within the scope of their respective practices. (e) Unless one of the foregoing exceptions applies, a bid submitted to a public agency by a contractor who is not licensed in accordance with this chapter shall be considered non-responsive and shall be rejected by the public agency. Unless one of the foregoing exceptions applies, a local public agency shall, before awarding a contract or issuing a purchase order, verify that the contractor was properly licensed when the contractor submitted the bid. Notwithstanding any other provision of law, unless one of the foregoing exceptions applies, the registrar may issue a citation to any public officer or employee of a public entity who knowingly awards a contract or issues a purchase order to a contractor who is not licensed pursuant to this chapter. The amount of civil penalties, appeal, 01203.0006(300349.1 P-11 B-11 and finality of such citations shall be subject to Sections 7028.7 to 7028.13 inclusive. Any contract awarded to, or any purchase order issued to, a contractor who is not licensed pursuant to this chapter is void. (f) Any compliance or noncompliance with subdivision (e) of this section, as added by Chapter 863 of the Statutes of 1989, shall not invalidate any contract or bid awarded by a public agency during which time that subdivision was in effect. (g) A public employee or officer shall not be subject to a citation pursuant to this section if the public employee, officer, or employing agency made an inquiry to the board for the purposes of verifying the license status of any person or contractor and the board failed to respond to the inquiry within three business days. For purposes of this section, a telephone response by the board shall be deemed sufficient. Public Contract Code 20903.5: In all contracts subject to this part where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with the laws of this state. However, at the time the contract is awarded, the contractor shall be properly licensed in accordance with the laws of this state. The first payment for work or material under any contract shall not be made unless and until the Registrar of Contractors verifies to the agency that the records of the Contractor's State License Board indicate that the contractor was properly licensed at the time the contract was awarded. Any bidder or contractor not so licensed shall be subject to all legal penalties imposed by law including, but not limited to, any appropriate disciplinary action by the Contractor's State License Board. The agency shall include a statement to that effect in the standard form of prequalification questionnaire and financial statement. Failure of the bidder to obtain proper and adequate licensing for an award of a contract shall constitute a failure to execute the contract and shall result in the forfeiture of the security of the bidder. License No.: ` 1, ,%1-u —) Class: &(41- Expiration _(41.Expiration Date: W - '�6 " Date: Signature: 01203.0006/300349.1 P - 12 B-12 Attach to this Bid the experience resume of the person who will be designated as General Construction Superintendent or on-site Construction Manager for the Contractor, 01203.0006/300349.1 P- 13 B-1 3 1036 W. 18" St. 310 514-7900 San Pedro, CA. 90731 Objective To help build Performance Pipeline into a successful company using my management skills, cleaning and CCTV experience and my knowledge of the sanitation industry Experience 2006 to present Performance Pipeline Project Manager/ Superintendent ■ Cleaning and CCTV Inspection • Implements training for new employees • Manages all field employees H. B. CA. 2004-2006 AST Glendale CA. Superintendent • Supervised 16 employees ■ Worked directly with foreman in the completion of projects ■ Implemented training course for new employees 2000-2004 Sancon Technologies H.B. CA. ■ Leadworker Worked directly with supervisors in completing projects. ■ In charge of a 5 man crew ■ worked directly with city inspectors in completing projects 1990-2000 Hydro Chem Dallas, Tex. Foreman • In charge of a 3 man crew. ■ Projects included cleaning and CCTV Inspection a NASSCO Certified # 11805-2424 License & • Confined space entry certified Certifications ■ Commercial drivers license ■ CPR Training Certificate ■ First Aid Certificate 19284 Beckonridge lane 714 350.2131 M.B. CA. 92648 a r00�k.mr ,, U ' '*' . Ir Objective Use my expertise in the sanitation industry in operating the daily management of a trenchless company and build Performance Pipeline into a successful company using my management skills, cleaning and CCTV experience and my knowledge of the sanitation industry Experience 2003 to present Performance Pipeline H.B. CA. Owner • Oversee the daily operations of all aspects of the company 1987-2010 Sancon Engineering H.B. CA. Superintendent -Project Manager • Supervised and managed 36 employees • Worked directly with foreman in the completion of projects ■ Estimator for projects • Worked directly with city inspectors in completing projects ■ Implemented training course for new employees 1986-1987 County Sanitation District of Orange F.V. CA. Line and Pump station maintenance worker 2 ■ Cleaning sewer lines from 4" to 108" in Diameter. ■ Operated high velocity flush trucks and balling machines • Repaired and replaced sewage pumps ■ Cleaned Wet Wells of debris Qualifications I have successfully cleaned, CCTV Inspected, installed and supervised over 3 million linear feet of trench less sewer and storm drain installations, using the following methods. Fold and form PVC pipe lining,slip lining with HDPE pipe and CIPP pipe. There are thousands of sectional repairs I have installed using CIPP UV Light cured pipe, link pipe sleeves repair patches. Addition responsibility is applying protective coatings for concrete structures, steel digesters and concrete manholes ■ NASSCO Certified # U 304-1120 License & ■ California Contractor's license C-42 #825824/ HIC Certificate Certifications ■ Confined space entry certified ■ Commercial drivers license • CPR Training Certificate ■ Supervisory Training (DOT CFR) Substance Abuse/Alcohol Misuse Certificate • First Aid Certificate B-15 I " 0 C 0 4- 0 4- 0 Amo moo 0 (n - 15 2) '--6 L-- h-- Z (D C > .0 CL (1) -C 0 .(-) 0 -C N 0 0 0 U N i Q 15 ccs Q) O a C 0 om 0 m I,- - L- C/) 0 O aFO- 15 (3) () 0 0 .0 cao�0.- O co (/) c 75 0 0 00 0 00 9* ( 0 O)o 0 0 4- C: 0 z0 0 0 o 0 — _0 = -C a) z! a) Fo -6 M 0 U. 0 1h C: C OC O 0 0 0 M 0 0— MC) U. CO 0 a. LU O E .- a 0 0 0 > 0 0 0 " 0�� (D C . LO E E E UL O. 0X (Dv N o :3 CL 0 0 a)" (D 0 Z 0 0) -�- -0 Lr-- 0— 0 a) -0 -0 0 0 0 U) C 0 c- W 0 C C: 0 CO x .0 a) 0 = E U) 0) > 2 -C 0 -F U) E S. m 0 m I Amo ccs Q) aFO- 15 O co 0-0 (D LU E :3 Z a) C 0 -C CL -0 ro O 0 E E &- cn Z) -O)z 40- 0 Q) L) 0 0 4-2 0 E UC: in z 0 z -C (Dc .0 -0 F.2 0 > C 0 (D M E 15 m 0 m Z ca I IN cc n. 4-- 0 CU O Cli CU 0 0 c M CO (1)O M m 0 0 Cti E.E 0 4� -- E 0 U) m "a C: 0 Q) CU Em .0 > 0 E " C: c -C 0 P= C\j C14 co C) C"i N m 15 -2 O O >N 4.1 0 0 0 E 0 0 > 16 cufA 15 "0 0 0'- C: > 0 0 0 fit 0 E >1 -0 -0 U) CQ C 0 E0 � rz 'a E E 0 E Q) E" E cL z C8 z z '0 z 'o C'L 'M ZQ) (D cc n. 4-- 0 CU O Cli CU 0 0 c M CO (1)O M m 0 0 Cti E.E 0 4� -- E 0 U) m "a C: 0 Q) CU Em .0 > 0 E " C: c -C 0 P= B-17 I:) BID BOND NUMBER: 769502 KNOW ALL PERSONS BY THESE PRESENTS that: WHEREAS the CITY OF RANCHO PALOS VERDES, CA Agency"), has issued an invitation for bids for the work described as follows: ("Public ABALONE COVE SEWER SYSTEM CLEANING, INSPECTION AND REPORTING FY 16-17 v'IHEREAS PERFORMANCE PIPELINE TECHNOLOGIES 5305 INDUSTRIAL DRIVE, HUNTINGTON BEACH, CA 92649 ( Name and address of Bidder) ("Principal"), desires to submit a bid to Public Agency for the work. 'AlHEREAS, bidders are required under the provisions of the California Public Contract Code to urnish a form of bidder's security with their bid. NOW, THEREFORE. we the undersigned Primn�'I a AMERICN CONTRACTORS INEMNITY COMPANY, 601 S. FIGUEROA ST. 41600, LOS ANU &L % "Name and address of Surety) "Surety") a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the Public Agency in the penal sum of TEN PERCENT OF THE TOTAL AMOUNT OF THE BID IN DOLLARS ;Dollars ($10% OF BID AMOUNT, being not less than ten percent (10%) of the total bid price, in ay.lul money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors; administrators, successors, and assigns, jointly and severally, firmly by these presents. -HE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal is awarded a contract for the work by the Public Agency and, within the time and in the manner required by the bidding specifications, enters into the written form of contract included with 4 i^ding specifications, furnishes the required bonds, one to guarantee faithful performance and ne other to guarantee payment for labor and materials, and furnishes the required insurance 3overage, then this obligation shall become null and void; otherwise, it shall be and remain in 'ull force and effect. case suit is brought upon this bond, Surety further agrees to pay all court costs incurred by 7e Public Agency in the suit and reasonable attorneys' fees in an amount fixed by the court. Surety hereby waives the provisions of California Civil Code 2845, N WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on '- e date set forth below, the name o. each corporate party being hereto affixed and these resents duly signed by its undersigned representatives) pursuant to authority of its governing tiedv. ated: 11/4/2016 rncip al" vv t E PE RMANCE PIPELINE TECHNOLOGIES AMRICA CON RA ORS INDEMNITY COMPANY BY: - BY: Mic el R. La an, Attome i Fact J - 16 • R • Y l r ager convieling this cwffmft Vegas 0* the Iden* st#the mdWidual who Sued the d b wNch Ift cerffmate is affactmd, and not fie Utdhtirvm% ate, or y of That dont State of Grua County of Los Angeles on nw, NEVZNE F, AY.A,D F NOTARY PUBLIC (moi name a tilt- of #w doer) PMMMMY aPPeared Wded R. Langan wha proved Uo mean the basis of spy eydenoe to be the person( wt ish" sum to the within k1shumat and ackrKmk aged an an tits# executed the h � � and O same in Imo( or Ble � upon bef hof which O s'g' ort ttte kmmw � t I codify ursJor PENiAL?Y OF PERKY under the laws of the Stale of Cafforia fait the pmt is true and VMWESS trty hand and official seat .1 @ NEVINE F. AYAD COMM.#2024775 is C Womia LOS S ANGELES uGELES COUNTY +- Com. E . Oct. 24, 2020 (SeaQ POWER OF ATTORNEY AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS: That American Contractors Indemnity Company, a California corporation, Texas Bonding Company, an assumed name of American Contractors Indemnity Company, United States Surety Company, a Maryland corporation and U.S. Specialty Insurance Company, a Texas corporation (collectively, the "Companies"), do by these presents make, constitute and appoint: Michael R. Langan its true and lawful Attomey(s)-in-fact, each in their separate capacity if more than one is named above, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include riders, amendments, and consents of surety, providing the bond *************�* ******************** * ** penalty does not exceed I the Million Dollars ($ 5,000,000.00 ). This Power of Attorney shall expire without further action on December 20, 2017. This Power of Attorney is granted under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney -in -Fact may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be binding upon the Company as if signed by the President and scaled and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this I st clay of December, 2014. AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY Corporate Seals UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY wnunrr o'N . ......... ou��nsui n`P'r B _ �¢:.. 1 SEPT. 2�tx PAZ; Daniel - red— ent .rr-qre �F.TE♦•Y-�,• ...*. :nr"u"•�` rrtrrninnt"d�� A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Los Angeles SS: On this 1 st day of December, 2014, before me, Maria G. Rodriguez -Wong, a notary public, personally appeared Dan P. Aguilar, Vice President of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. MARIA G. RODRIGUEZ-WONG Commission # 2049771 Signature ._ (Seal) _ a'® Notary Public • California i Z' los Angeles County > My Conte. Ex ices Dec 20.2017 M I, Kio Lo, Assistant Secretary of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. In Wittte�s Whereof, I have hereunto set my hand and affixed the seals of said Companies at Los Angeles, California this day of ON 4 y, `7 t Corporate Seals oRACT�q"r ......... O•aNi�iN�'r+'ry .1�1.,, m a E�Ni =_w: 1 :4 _ - Kio LO Assistant Secretary Bond No _,y: SEPt. 251590 = ,i.. .aV` : 4= ��:, Y - } Agency No. 3129 sir gLIfORN „a m*i" O� n Y... uo u NONCOLLUSION DECLARATION TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID [Public Contract Code § 7106] State of California } County of— ) ss. city of �-w��-i,�� }vu The undersigned declares: I am the 0 N of 9 ------ {- C�l1 tLf N c the party making the foregoing bid. The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on �t,����___—[date], at -aA V, "i "J � 6 c��l E _ [city], �i _ [state]. ------ _-------------------- [ ' yl, ---------------- - Signature _ a _�L — �--_ d1l Subscribed and sworn to before me on (Notary Seal) Signature ASIA J. YOUNG _ Commission # 2.002370 a •":�"s Notary Pudic - California z $ Orange County n My Conim. Expires Dec 29, 2016 (Date) 01203.0006/300349.1 P - 18 B-21 CALIFORNIA ALL-PURPOSE ACKHOWLI-MGME6\1Ti CML CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On ?t -1U before me, Asia J. Young, Notary Public Date Here Insert Name and Title of the Oi�icer personally appeared � �-- G-" .oIJC- .e --Yr Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person( -&)-whose name*} is/are subscribed to the within instrument and acknowledged to me that he/si ey executed the same in hisAietltheir authorized capacity(W4,and that by his/f;erltll; it signature(4on the instrument the person, or the entity upon behalf of which the person(&) -acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph :.. is true and correct. 4 ASIA J. YOUNG i WITNESS my hand and fficial Commission # 2002370 a mai Notary Public - California z N, Z ® Orange County n Signature 1QU An My Comm. Ex fres Dec 29, 2016 ignature f No ublic Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Number of Pages: B-22 ACKNOWLEDGMENT OF ADDENDA Bidder's Name: Y-0'0�4 A C- TcLv�pd The Bidder shall signify receipt of all Addenda here, if any: Addendum Number Date Received Signature If there are more Addenda than there is room in the chart above, attach another page acknowledging receip of the Addenda. "7 Signature: Title: Date: 01203.0006/300349.1 P - 19 B-23