CC 20161206 D FY 15-16 Continuing AppropriationsRANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 12/06/2016 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA DESCRIPTION: Consideration and possible action to approve Continuing Appropriations in the amount of $276,148 (General Fund) and $130,000 (Capital Improvement Projects) and receive and file the FY 2015-16 Purchase Order Carryover Schedule RECOMMENDED COUNCIL ACTION: (1) Approve decreasing the FY 2015-16 Adopted Budget in the amount of $276,148 (General Fund) and $130,000 (Capital Improvement Projects); (2) Approve Continuing Appropriations from FY 2015-16 to FY 2016-17, amending the FY 2016-17 Adopted Budget in the amount of $276,148 (General Fund) and $130,000 (Capital Improvement Projects); (3) Receive and file the FY 2015-16 Purchase Order Carryover Schedule. FISCAL IMPACT: $276,148 (General Fund); $130,000 (CIP Fund) Amount Budgeted: $0 Additional Appropriation: $406,148 Account Number(s): (see attached) ORIGINATED BY: Vina Ramos, Accounting Supervisor VR - REVIEWED BY: Deborah Cullen, Director of Finance APPROVED BY: Doug Willmore, City Manager" ATTACHED SUPPORTING DOCUMENTS: A. FY 2015-16 Continuing Appropriation Schedule (A-1) B. FY 2015-16 Purchase Order Carryover Schedule (B-1) BACKGROUND AND DISCUSSION: Continuing Appropriations This is an annual staff report for the purpose of ensuring budgetary compliance for FY 2015-16 and FY 2016-17. As part of the year-end closing process, the Finance Department, in partnership with other Departments, prepares a summary of proposed continuing appropriations to be carried over to the next fiscal year. The attached Exhibit A, FY 2015-16 Continuing Appropriation Schedule identifies the projects that were included in the FY 2015-16 Adopted Budget but were not completed or spent by June 30, 2016. As a result, Staff is requesting to carryover the appropriation to the FY 2016-17 1 Adopted Budget. The majority of the proposed continuing appropriations are related to ongoing Public Works projects and expanded programs for the Palos Verdes Nature Preserve/Open Space. A brief explanation of the proposed continuing appropriations are included in Exhibit A. The process to compile the list included verifying that the projects and purchases received required approvals and that the Department meets budgetary compliance. Additionally, Staff verified that the requests are not included in the FY 2016-17 Adopted Budget and Continuing Capital Improvement Projects (CIP). The City previously appropriated the full project amount for capital projects in the current budget year. In order to reflect true annual expenditures for the City, effective in the FY 2016-17 budget adoption process, the capital projects are "Committed" via resolution by June 30th of each year. The "Committed" projects are reported as part of the CIP fund balance in the annual financial statements. Once the City is ready to begin the project, that project may be budgeted from the "Committed" fund balance. By taking this step, the City Council have the opportunity to review the committed projects and determine if priorities or funding have changed. This step also reduced the number of continuing appropriations from FY 2015- 16. It should be noted that the proposed continuing appropriations do not represent an additional appropriation of funds. The continuing appropriations are only to carryover a portion of the unspent funds from the prior fiscal year. Staff is requesting the City Council's approval to reduce the FY 2015-16 Adopted Budget by $276,148 in the General Fund and $130,000 in CIP. If approved, the same amount will be added to the FY 2016-17 Adopted Budget for the General Fund and CIP. Purchase Order Carryover In addition to the continuing appropriation year-end process, Staff also reviewed open Purchase Orders and prepared a list of projects and purchases that were encumbered in FY 2015-16 but were not completed or delivered by June 30th. In order to meet budgetary requirements, the purchase orders must be carried forward in FY 2016-17. The purchase carryovers have no net fiscal impact as it decreases the FY 2015-16 Adopted Budget and increases the FY 2016-17 Adopted Budget by the same amount. On November 1, 2016, the approved Fiscal Year 2015-16 Year -End Financial Report to the City Council included the amount for purchase order carryovers and, therefore, the amount is already accounted for in the estimated ending fund balances in FY 2015-2016. The following is a summary of the Purchase Order Carryover amount for each fund: 2 Summary of Purchase Order Carryover Fund Fund Description Amount 101 GENERAL FUND $ 801,906.87 202 STREET MAI NT $ 333,300.00 228 R/P - DONOR RESTRICTED DONATION $ 20,209.05 330 CI P - I NFRASTRUCTURE ADMI N $ 2,560,997.17 330 CI P - PARKS/TRAI LS/OPEN SPACE $ 156,836.61 330 CI P - BUI LDI NG I MPROVEMENT $ 17,000.00 330 CI P - LANDSLIDE $ 731,798.00 501 WATER QUALITY $ 933,774.56 681 EQUI PMENT REPLACEMENT $ 34,177.50 TOTAL ALL FUNDS $ 5,589,999.76 Additional details are included in the attached Exhibit B, FY 2015-16 Purchase Order Carryover Schedule. Staff is requesting the City Council's approval to receive and file the FY 2015-16 Purchase Order Carryover Schedule. 9 Exhibit A Continuing Appropriation Schedule FY 2015-2016 Department Program/Division Account Number Account Type Administration Public Safety 101-1024-421-32-00 Professional & Technical Administration Non-Department/Finance/ Community Dev 101-6000-411-32-00 Professional & Technical Administration Administration/Finance various accts from 101-1004-411-32-00 Professional & Technical Building Maintenance 101-3008-431-43-00 Maintenance Services support services for Finance & Community Recreation and Parks I Recreation Admin 101-5010-451-76-00 Vehicles FY 2015-16 FY 2015-16 Available Requested Final Budget Actual Exp Balance Amount Justification $ 180,800 $ 94,872 $ 85,928 $ 25,000 Utilized unspent amount for Public Safety programs. $ - Public Works Traffic Management 101-3006-431-32-00 Professional & Technical Public Works Building Maintenance 101-3008-431-43-00 Maintenance Services Recreation and Parks I Recreation Admin 101-5010-451-76-00 Vehicles FY 2015-16 FY 2015-16 Available Requested Final Budget Actual Exp Balance Amount Justification $ 180,800 $ 94,872 $ 85,928 $ 25,000 Utilized unspent amount for Public Safety programs. $ - $ - $ $ 25,000 Utilize unspent amount for system implementation Utilize amount to purchase supplies, tools, small equipment, uniforms for the public safety at the Preserve/Open Space Staff. Recreation and Parks Recreation Admin 101-5040-451-32-00 support services for Finance & Community $ 217,850 Total Recreation $ 140,559 $ 77,291 and Parks $ 100,787 $0 $ 91,500 Utilize unspent amount for Preserve/Open Space to support ongoing/new programs. Development $ 255,000 $ 143,403 $ 111,597 $ 50,000 Utilize unspent amount to continue staff development programs. Total Administration $ 111,597 $ 100,000 $ 102,000 $ 101,560 $ 440 $ 10,000 Approved by City Council for additional amount for $ 10,897 $ 8,703 $ 39,648 Part of FY 14-15 Street Rehab project approved by City Council on 6/6/16. the Crossing Guard services. $ 370,000 $ 286,901 $ 83,099 $ 35,000 Street Sweeping Services for Cleanstreet contract $0 $ 13,000 $0 approved on 6/21/16. Amount is the balance that Gas Tax is unable to subsidize. Total P90114 l41t $ 83,,539 $- 45,000 $0 $0 $0 $ 61,000 Utilize unspent amount to continue to purchase 1 Truck and 2 Polaris for Sheriff Preserve Enforcement Deputies. Recreation and Parks Recreation Facilities 101-5030-451-61-00 Operating Supplies/Minor Equipment $ 60,000 $ 36,504 $ 23,496 $ 30,500 Utilize amount to purchase supplies, tools, small equipment, uniforms for the public safety at the Preserve/Open Space Staff. Recreation and Parks Recreation Admin 101-5040-451-32-00 Recreation Admin $ 217,850 Total Recreation $ 140,559 $ 77,291 and Parks $ 100,787 $0 $ 91,500 Utilize unspent amount for Preserve/Open Space to support ongoing/new programs. Public Works Traffic Management 101-3006-431-43-00 Maintenance Services $ 19,600 $ 10,897 $ 8,703 $ 39,648 Part of FY 14-15 Street Rehab project approved by City Council on 6/6/16. Public Works Traffic Management 101-3006-431-61-00 Op Supplies/Minor Equip $ 13,000 $0 $ 13,000 $0 Utilize unspent amount for FY 14-15 Street Rehab project approved by City Council on 6/6/16. Public Works Public Works Admin 101-3001-431-32-00 Professional & Technical $ 217,000 $184,601 $ 32,399 $0 Utilize unspent amount for FY 14-15 Street Rehab project approved by City Council on 6/6/16. Total Public Works (GF) $ 54,102 $ 39,648; $ 189,600 $ 11,760 $ 177,840 $ 120,000 2016 Pavement Management System Update started in FY 2015-16 and will continue in FY 2016- 17. $ 1,359,174 $ 112,341 $ 1,246,833 $ 10,000 Cameras for City Council dias approved in FY 2015- 16 and will continue in FY 2016-17. Total Public Works (CIP) $ 1,424,673 $ 130,000 Total - All Funds $1,774,698.00 $406,148.00 Total - General Fund $350,025.00 $276,148.00 Total - CIP Fund $1,424,673.00 $130,000.00 A-1 Public Works CIP - Street Improvements 330-3031-461-32-00 Professional & Technical Public Works CIP - Building Improvements 330-3036-461-73-00 Improvements Total Public Works (GF) $ 54,102 $ 39,648; $ 189,600 $ 11,760 $ 177,840 $ 120,000 2016 Pavement Management System Update started in FY 2015-16 and will continue in FY 2016- 17. $ 1,359,174 $ 112,341 $ 1,246,833 $ 10,000 Cameras for City Council dias approved in FY 2015- 16 and will continue in FY 2016-17. Total Public Works (CIP) $ 1,424,673 $ 130,000 Total - All Funds $1,774,698.00 $406,148.00 Total - General Fund $350,025.00 $276,148.00 Total - CIP Fund $1,424,673.00 $130,000.00 A-1 Exhibit B Purchase Order Carryover Schedule FY 2015-16 Account Fund Dept. Dept. Description 101 GENERAL FUND Amount Carryover 801,906.87 10110064116100 Total 101 1006 RPVTV $ 2,452.50 $ 10110264216100 Total 101 1026 EMERGENCY PREP $ 1,579.41 330 CIP - LANDSLIDE 10110114116100 Total 101 1011 PERSONNEL $ 1,655.34 34,177.50 10110244216100 Total 101 1024 PUBLIC SAFETY $ 679,429.78 10120304114300 Total 101 2030 IT - DATA $ 4,700.00 10120304116100 Total 101 2030 IT - DATA $ 1,774.45 10120304113200 Total 101 2030 IT - DATA $ 19,384.49 10120304114300 Total 101 2030 IT - DATA $ 3,767.50 10120304113200 Total 101 2030 IT - DATA $ 5,538.00 10130074313200 Total 101 3007 PW STORM DRAIN $ 7,500.00 10140014413200 Total 101 4001 CDD - PLANNING $ 7,500.00 10140014415500 Total 101 4001 CDD - PLANNING $ 725.40 10150104513200 Total 101 5010 R/P - ADMIN $ 13,000.00 10150104517600 Total 101 5030 R/P - RECREATIONAL FACILITIES $ 37,900.00 22850284514300 Total 228 5028 R/P - DONOR RESTRICTED $ 16,024.75 22850284516100 Total 228 5028 R/P - DONOR RESTRICTED $ 4,184.30 33030304613200 Total 330 3030 PW - CIP ADMIN $ 18,223.00 33030314617300 Total 330 3030 PW - CIP ADMIN $ 2,542,774.17 20230034314300 Total 202 3003 PW - MAINT SERVICES $ 333,300.00 33030334617300 Total 330 3033 PW - PARKS/TRAILS/OPEN SPACE $ 156,836.61 33030364617300 Total 330 3036 PW - BUILDING IMPROVEMENTS $ 17,000.00 33030434617300 Total 330 3043 PW - LANDSLIDE $ 731,798.00 50130524313200 Total 501 3052 PW - WATER QUALITY $ 303,944.34 50130524317300 Total 501 3052 PW - WATER QUALITY $ 629,830.22 68120824997520 Total 681 2082 NONDEPT - COMPUTER EQUIP REP $ 34,177.50 10130014317600 Total 681 3081 PW - VEHICLE MAINT. (reclass to cap) $ 15,000.00 $ 5,589,999.76 Page 1 Summary of Purchase Order Carryover Fund Fund Description Amount 101 GENERAL FUND $ 801,906.87 202 STREET MAINT $ 333,300.00 228 R/P - DONOR RESTRICTED DONATION $ 20,209.05 330 CIP - INFRASTRUCTURE ADMIN $ 2,560,997.17 330 CIP - PARKS/TRAILS/OPEN SPACE $ 156,836.61 330 CIP - BUILDING IMPROVEMENT $ 17,000.00 330 CIP - LANDSLIDE $ 731,798.00 501 WATER QUALITY $ 933,774.56 681 EQUIPMENT REPLACEMENT $ 34,177.50 TOTAL ALL FUNDS 1 $ 5,589,999.76 Purchase Order Carryover Schedule Details - Account Numbers FY 2015-2016 PO# Vendor Name PO Date Account Dept. Description Enc Amt Spent Available Requisition Item Amount Carryforward Notes Description Carryover Office furniture project started in FY 15-16. Project will be D & R OFFICE completed in FY 16- 008863 WORKS, INC. 7/12/2016 10110064116100 RPVTV $ 2,452.50 $ - $ 2,452.50 FIRE SAFE FILE CABINET $ 2,452.50 17. Office furniture project started in FY 15-16. Project will be D & R OFFICE completed in FY 16- 008611 WORKS, INC. 3/23/2016 10110114116100 PERSONNEL $ 1,200.00 $ 582.06 $ 617.94 OFFICE CHAIRS $ 617.94 17. Office furniture project started in FY REPLACEMENT IT MGR 15-16. Project will be EQUIPMENT PER QUOTE completed in FY 16- 008770 D&R 6/21/2016 10110114116100 PERSONNEL $ 1,037.40 $ - $ 1,037.40 7903-R1 $ 1,037.40 17. ALPR project for PVDS/LaRotonda. Project location CROWN CASTLE EMERGENCY changed and will 008511 USA, INC. 3/2/2016 10110244216100 PUBLIC SAFETY $ 11,450.00 $ $ 11,450.00 ADMINISTRATIVE SERVICES $ 11,450.00 continue in FY 16-17. VIGILANT Project in progress. 008850 SOLUTIONS LLC 6/30/2016 10110244216100 PUBLIC SAFETY $ 667,979.78 $ $ 667,979.78 ALPR CAMERAS FY15-16 $ 667,979.78 Phase 1 Completed. Pending invoices, 8732 GEIGER 5/19/2016 10110264216100 EMERGENCY PREP $ 1,579.41 $ $ 1,579.41 SUPPLIES FOR FY 15-16 $ 1,579.41 ordered in FY 15-16. Approved in FY 15-16, NEXLEVEL FIVE YEAR IT STRATEGIC will complete in FY 16- 008660 INFORMATION 4/18/2016110120304113200 IT- DATA $ 38,470.00 $ 19,088.51 $ 19,381.49 PLAN DEVELOPMENT $ 19,384.49 17. PROSUM ANNUAL INFOMRATION Approved in FY 15-16, TECHNOLOGY TECHNOLOGY SUPPORT started in Feb, 008110 SERVICES 7/16/2015 10120304113200 IT - DATA $ 189,618.00 $ 184,080.00 $ 5,538.00 CONTRACT $ 5,538.00 completed in Aug. CIVICPLUS AND EPOWERED CUSTOM MODIFICATIONS Started in FY 15-16; 008549 SCHOOLS 3/2/2016 10120304114300 IT - DATA $ 5,000.00 $ 300.00 $ 4,700.00 TO WEBPAGE $ 4,700.00 ongoing project. Equipment purchased OCEANVIEW in FY 15-16, final TECHNOLOGIES, EMERGENCY AND PROJECT phase implemented in 008109 LLC 7/16/201SI 10120304114300 IT - DATA $ 10,000.00 $ 6,232.50 $ 3,767.50 CONSULTING $ 3,767.50 FY 16-17. Started May, REPLACEMENT IT MGR completed in June; D & R OFFICE EQUIPMENT PER QUOTE delayed in 008770 WORKS, INC. 6/21/2016 10120304116100 IT - DATA $ 1,775.45 $ $ 1,775.45 7903-R1 $ 1,774.45 manufacturing. CARRYOVER FROM PO # Project will be JOHN L. HUNTER PW - STORM 7490 OUTFALL completed in FY 16- 008990 1 & ASSOC.,INC. 6/18/2016 10130074313200 1 WATER QUALITY $ 7,500.00 $ $ 7,500.00 MONITORING CIMP I $ 7,500.00 117. Purchase Order Carryover Schedule Details - Account Numbers FY 2015-2016 PO# Vendor Name PO Date Account Dept. Description Enc Amt Spent Available Requisition Item Amount Carryforward Notes Description Carryover Office Furniture D & R OFFICE REPLACE BROKEN/OPD ordered in May 2015 008744 WORKS, INC. 6/6/2016 10140014413200 CDD - PLANNING $ 7,500.00 $ - $ 7,500.00 CHAIRS AND FILE CABINETS $ 7,500.00 delivered after 7/1/16. SUPREME DEPARTMENT BUSINESS Ordered in June and 008324 GRAPHICS, INC. 9/23/2015 10140014415500 CDD - PLANNING $ 3,000.00 $ 2,274.60 $ 725.40 CARDS AND LETTER HEAD $ 725.40 delivered in July. MOUNTAINS MOUNTAINS RECREATON Services in FY 15-16 008210 RECREATION & 8/3/2015 10150104513200 R/P - ADMIN $ 91,792.55 $ 38,190.00 $ 53,602.55 SERVICES $ 13,000.00 but invoice past 8/29. R/P - Ordered in FY 15-16 CHEVROLET OF RECREATIONAL VEHICLE FOR OPEN SPACE and delivery in FY 16- 008702 IWATSONVILLE 5/17/2016 10150304516100 FACILITIES $ 37,900.00 $ - $ 37,900.00 MANAGEMENT $ 37,900.00 17. HARDY & PW - MAINT FY 15-16 SIDEWALK 8862 HARPER, INC. 6/17/2016 20230034314300 SERVICES $ 333,300.00 $ - $ 333,300.00 REPAIRS $ 333,300.00 Project in progress. CALIFORNIA R/P - DONOR NATIVE PLANT SOCIETY NATIVE PLANT RESTRICTED MAINTENANCE PVIC Pending invoices to be 008341 SOCIET 11/2/2015 22850284514300 DONATION $ 20,000.00 $ 3,975.25 $ 16,024.75 GARDEN $ 16,024.75 paid in FY 16-17. R/P - DONOR GASSER/OLDS RESTRICTED FABRICATION OF DONOR PVIC Plaques to be 008194 CO. INC. 8/3/2015 22850284516100 DONATION $ 5,000.00 $ 815.70 $ 4,184.30 PLAQUES AT PVIC $ 4,184.30 paid in FY 16-17. HARRIS & ASSOCIATES, SANITARY SEWER CAPACITY Pending invoices to be 008615 INC. 4/6/2016 33030304613200 PW - CIP ADMIN $ 18,223.00 $ - $ 18,223.00 ANALYSIS/DESIGN PROJECT $ 18,223.00 paid in FY 16-17. TERRAMAR CONSULTING PW - STREET HAWTHORNE BLVD PED 008261 ENGRS, INC 8/27/2015 33030314617300 IMPROVEMENTS $ 5,100.00 $ 2,497.50 $ 2,602.50 LINKAGE FINALIZE PLANS $ 2,602.50 Project in progress. STL LANDSCAPE, PW - STREET HAWTHORNE BLVD. ROW 008620 INC. 4/l/2016133030314617300 IMPROVEMENTS $ 33,889.68 $ 18,886.73 $ 15,002.95 BEAUTIFICATION PROJECT $ 15,002.95 Project in progress. SUNBEAM CONSULTING, PW - STREET DESIGN RES. REHAB. AREAS 008712 INC. 5/17/2016 33030314617300 IMPROVEMENTS $ 413,700.00 $ 111,076.00 $ 302,624.00 2 & 6 $ 302,624.00 Project in progress. HARDY & PW - STREET RESIDENTIAL STREET 008859 HARPER, INC. 6/12/2016 33030314617300 IMPROVEMENTS $ 1,967,900.00 $ - $ 1,967,900.00 REHAP - PHASE 1 $ 1,967,900.00 Project in progress. PW - NEW BOLLARD HEADS TO BIEBER PARKS/TRAILS/OPE FIT EXISTING CONCRETE 008475 LIGHTING LLC 1/5/2016 33030334617300 N SPACE $ 573.00 $ $ 573.00 BASES $ 573.00 Project in progress. PW - BIEBER PARKS/TRAILS/OPE INSTALLATION OF NEW 008479 LIGHTING LLC 1/5/2016 33030334617300 N SPACE $ 1,570.00 $ $ 1,570.00 BOLLARDS $ 1,570.00 Project in progress. PW - HAMILTON & PARKS/TRAILS/OPE SUNNYSIDE RIDGE TRAIL 008836 ASSOCIATES, INC 6/28/2016 33030334617300 N SPACE $ 8,400.00 $ 4,356.70 $ 4,043.30 SEGMENT PROJECT $ 4,043.00 Project in progress. CONCEPT PW - CONSULTANT, PARKS/TRAILS/OPE CONSTRUCTION CONTRACT Project in progress. 008470 1 INC. 1 1/5/2016133030334617300 IN SPACE 1 $ 290,864.00 1 $ 150,600.39 1 $ 140,263.61 IFOR SSR TRAIL $ 140,263.61 $30k is Contingency Purchase Order Carryover Schedule Details - Account Numbers FY 2015-2016 PO# Vendor Name PO Date Account Dept. Description Enc Amt Spent Available Requisition Item Amount Carryforward Notes Description Carryover KOA PW - DESIGN & CONST. MGMT. CORPORATION PARKS/TRAILS/OPE SVCS. FOR SUNNYSIDE Project in progress. 008252 DBA 8/18/2015 33030334617300 N SPACE $ 20,000.00 $ $ 20,000.00 RIDGE $ 10,387.00 Started in FY 15-16 PACIFIC SURVEY FOR DATA ARCHITECTURE PW - BUILDING COMPLIANCE, ADA 008356 & ENGINEE 10/13/2015 33030364617300 IMPROVEMENTS $ 6,000.00 $ $ 6,000.00 IMPROVEMENTS $ 6,000.00 Project in progress. PACIFIC ARCHITECTURE PW - BUILDING CABLE BUILDING 008059 & ENGINEE 7/7/2015 33030364617300 IMPROVEMENTS $ 23,000.00 $ 12,000.00 $ 11,000.00 RENOVATIONS $ 11,000.00 Project in progress. PORTUGUESE BEND ABUNDANT LANDSLIDE DEWATERING 008580 WATER WELLS 3/23/2016 33030434617300 PW - LANDSLIDE $ 699,678.00 $ - $ 699,678.00 WELLS PROD. $ 699,678.00 Project in progress. SUNBEAM CONSULTING, CONSTRUCTION 008715 INC. 5/17/2016 33030434617300 PW - LANDSLIDE $ 32,645.00 $ 525.00 $ 32,120.00 MANAGEMENT CONTRACT $ 32,120.00 Project in progress. HARRIS & PREPARE PROJECT STUDY ASSOCIATES, PW - WATER REPORT FOR ALTAMURA 008603 INC. 5/4/2016 50130524313200 QUALITY $ 439,989.00 $ 136,044.66 $ 303,944.34 CANYON $ 303,944.34 Project in progress. CALIFORNIA WATERSHED PW - WATER STORM DRAIN POINT 008471 ENGINEERI 1/5/2016 50130524317300 QUALITY $ 149,956.00 $ 128,300.78 $ 21,655.22 REPAIR CONTRCTOR $ 21,655.22 Project in progress. INDUSTRIAL COATING & PW - WATER FINAL PHASE OF RELINING 008778 FIREPROOF 6/28/2016 50130524317300 QUALITY $ 24,850.00 $ - $ 24,850.00 OFMC CARRELL CANYON $ 24,850.00 Project in progress. CALIFORNIA WATERSHED PW - WATER DESIGN ENGINEERING 008713 ENGINEERI 5/17/2016 50130524317300 QUALITY $ 54,770.00 $ - $ 54,770.00 SERVICES $ 54,770.00 Project in progress. KOA CORPORATION PW - WATER 20155 STORM DRAIN 008675 DBA 5/4/2016 50130524317300 QUALITY $ 40,000.00 $ 21,290.00 $ 18,710.00 LINING PROJECT $ 18,710.00 Project in progress. SOUTHWEST PIPELINE&TRENC PW - WATER 2015 STORM DRAIN LINING 008704 HLESS 5/23/2016 50130524317300 QUALITY $ 678,925.00 $ - $ 509,845.00 PROJECT $ 509,845.00 Project in progress. ANDERSON PENNA PW - STREET 008861 PARTNERS INC 6/12/2016 33030314617300 IMPROVEMENTS 259,453 4,808 254,645 RESIDENTIAL STREET REHAB $ 254,644.72 Project in progress. NONDEPT - CITYWORKS RFP completed; MILLER SPATIAL COMPUTER EQUIP IMPLEMENTATION PER implementation in FY 008448 ISERVICES LLC 1 12/10/2015168120824997520 IREP 1 $ 53,707.50 1 $ 19,530.00 1 $ 34,177.50 JAGREEMENT $ 34,177.50 16-17. 92 Purchase Order Carryover Schedule Details - Account Numbers FY 2015-2016 PO# Vendor Name PO Date Account Dept. Description Enc Amt Spent Available Requisition Item Description Amount Carryover Carryforward Notes Delivered after 6/30/16. Reclass to capital item account to 101 -3001 -431 -76 - CARSON PW - VEHICLE PURCHASE OF A TRAILER 00 from 681-3081-499 008729 TRAILER, INC. 5/19/2016 68130814997600 MAINT. $ 10,000.00 $ - $ 10,000.00 FOR REC & PARKS $ 15,000.00 76. $ 6,669,748.27 $ 865,454.66 $ 5,635,213.61 1 1 $ 5,589,999.76