CC SR 20160517 M - Residential Rehabilitation Project, Phase 1, Area 2RANCHO PALOS VERDES CITY COUNCIL AGENDA REPORT AGENDA DESCRIPTION: MEETING DATE: 05/17/2016 AGENDA HEADING: Consent Calendar Consideration and possible action to award a Construction Agreement to Hardy and Harper, Inc, for the construction of the Residential Street Rehabilitation Project, Phase I; Area 2 - Concrete Asphalt Repairs; and to award a Professional Services Agreement to Anderson Penna Partners, Inc., for Construction Management and Inspection Services. RECOMMENDED COUNCIL ACTION: (1) Approve the construction plans and project specifications on file in the Public Works Department for the Residential Street Rehabilitation Project, Phase I, Area 2 - Concrete Asphalt Repairs; (2) Award a Public Works Agreement for Construction to Hardy & Harper, Inc. for a not -to -exceed amount of $1,789,000 for construction services related to the Residential Street Rehabilitation Project, Phase I, Area 2 - Concrete Asphalt Repairs; (3) Award a Professional Services Agreement to Anderson Penna Partners, Inc., for Construction Management and Inspection services for the amount of $259,453; (4) Authorize Staff to use an additional 10% ($178,900) for project contingency; and, (5) Authorize the Mayor and City Clerk to execute the Professional Services and Construction Agreements, subject to approval as to form by the City Attorney. FISCAL IMPACT: None Amount Budgeted: $2,229,400 Additional Appropriation: N/A Account Number(s): 330-3031-461-73-00 ORIGINATED BY: Ron Dragoo, PE, Principal Engineer - REVIEWED BY: Michael Throne, PE, Director of Public Works -{1� APPROVED BY: Doug Willmore, City Manager ATTACHED SUPPORTING DOCUMENTS: A. Public Works Agreement - Hardy and Harper, Inc. (page A-1) B. Professional Services Agreement - Anderson Pena Partners, Inc. (page B-1) C. Proposal - Anderson Pena Partners, Inc. (page C-1) D. Project Location Map (page D-1) BACKGROUND AND DISCUSSION: Every year, the City implements a Residential Street Rehabilitation Project as part of its Street Improvement Program. This current project includes Area 2, which is approximately bordered by Hawthorne Boulevard to the east; the City boundary to the 1 west; Monero Drive to the north; and Ocean Crest Drive/Verde Ridge Road to the south (Attachment D). The scope of this work includes localized asphalt replacement for portions of the streets that have been damaged by root intrusion or other causes; concrete curb and gutter repair; new Americans with Disabilities Act (ADA) access ramps; concrete sidewalk repair; and crack sealing to prepare the streets for slurry seal, which will follow as a separate project (Residential Street Rehabilitation Project, Phase II, Area 2 — Concrete Asphalt Repairs). During construction, Construction Management services and Inspection services are required to monitor work in the field, to ensure work is progressing and to safeguard the public. To that end, Staff is requesting professional services for Construction Management and Inspection services. Construction Contract The project was publicly advertised and sealed bids were received and opened on April 26, 2016. Hardy & Harper, Inc., submitted the lowest responsible bid out of the eight bids received. The following table summarizes the bids received: BID SUMMARY Construction Companies Bid Amount Hardy & Harper, Inc. $1,789,000.00 Sequel Contractors, Inc. $1,866,316.00 Nobest, Inc. $2,020,086.00 Sully Miller Contracting Company $2,049,896.00 Excel Paving Company, Inc. $2,124,786.00 All American Asphalt, Corp. $2,287,000.00 Sialic Contractors Corp, dba Shawnan $2,373,679.00 COPP Contracting, Inc. $2,658,042.80 Staff has verified Hardy & Harper, Inc.'s references and found their past performance on jobs of similar size and scope to be satisfactory. Hardy & Harper, Inc. has performed similar work for several agencies throughout Southern California, including the City of Norco, City of Rancho Cucamonga, and City of Simi Valley. Their bid, bonds, and insurance documents are in order and their contractor's license is current. Construction Management/Inspection Services Consulting services are needed for construction management and inspection of this project. Staff issued an RFP for these services and received four responses. The proposals were evaluated, and Anderson Penna Partners, Inc. was chosen to provide the services. The cost of services were negotiated. Accordingly, Staff is recommending awarding a Professional Services Agreement to Anderson Pena Partners, Inc. in the amount of $259,453. 2 ALTERNATIVES: In addition to the Staff recommendation, the following alternative actions are available for the City Council's consideration: 1. Direct Public Works to prepare a request for proposals from other consulting firms. 2. Take other action related to this item. 3 CITY OF RANCHO PALOS VERDES PUBLIC WORKS AGREEMENT Residential Street Rehabilitation Project, Phase I, Area 2 — Concrete Asphalt Repairs THIS AGREEMENT ("Agreement") is made and entered this 17th day of May, 2016, by and between the CITY OF RANCHO PALOS VERDES, a California municipal corporation ("City") and Hardy & Harper, Inc., a California corporation ("Contractor"). Contractor's license number is 215952. In consideration of the mutual covenants hereinafter set forth, the parties hereto agree as follows: Scope of Services. Contractor shall perform the work and provide all labor, materials, equipment and services in a good and workmanlike manner for the project identified as the Residential Street Rehabilitation Project, Phase I, Area 2 — Concrete Asphalt Repairs (Project), as described in this agreement and in the Contract Documents (including Notice Inviting Bids, the Instructions to Bidders, the Proposal, the General Provisions, the Special Provisions, Appendices I through VI, the Plans and all addenda prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents), which are attached hereto as Exhibit "A" and incorporated herein by this reference, including miscellaneous appurtenant work. All work shall be performed in accordance with the 2012 edition of the Standard Specifications for Public Works Construction (commonly known as the "Greenbook") published by Public Works Standards Inc. (collectively "Standard Specifications"), which is incorporated herein by this reference. In the event of any conflict between the terms of this Agreement and incorporated documents, the terms of this Agreement shall control. 2. Extra Work. Extra work, when ordered in writing by the Director of Public Works and accepted by the Contractor, shall be paid for underwritten work order in accordance with the terms therein provided. Payment for extra work will be made at the unit price or lump sum previously agreed upon in writing between the Contractor and the Director of Public Works. All extra work shall be adjusted daily upon report sheet furnished by the Contractor, prepared by the Director of Public Works, and signed by both parties, and said daily report shall be considered thereafter the true records of extra work done. 3. Effective Date. This Agreement is effective as of the date listed above, and shall remain in full force and effect until Contractor has rendered the services required by this Agreement. 4. Time. Time is of the essence in this Agreement. 5. Force Majeure. Neither the City nor Contractor shall be responsible for delays in performance under this Agreement due to causes beyond its control, including but not limited to acts of God, acts of the public enemy, acts of the Government, fires, floods or other casualty, epidemics, earthquakes, labor stoppages or slowdowns, freight embargoes, unusually severe weather, and supplier delays due to such causes. Neither economic nor market conditions nor the financial condition of either party shall be considered a cause to excuse delay pursuant to this Section. Each party shall notify the other promptly in writing of each such excusable delay, its cause and its expected delay, and shall upon request update such notice. 6. Compensation. In consideration of the services rendered hereunder, City shall pay Contractor a not to exceed amount of One million seven hundred eighty nine thousand dollars ($1,789,000) plus a contingency of one hundred seventy eight thousand nine hundred dollars C-1 R6871-0001\1 800726v2.doc A-1 ($178,900) in accordance with the prices as submitted in Contractor's Proposal, attached hereto as Exhibit "B" and incorporated herein by this reference. 7. Payments. City shall make payments within thirty (30) days after receipt of an undisputed and properly submitted payment request from Contractor. City shall return to Contractor any payment request determined not to be a proper payment request as soon as practicable, but not later than seven (7) days after receipt, and shall explain in writing the reasons why the payment request is not proper. A payment shall be made as the City Council of the City prescribes upon estimates approved by the City Council. However, progress payments shall not be made in excess of ninety-five percent (95%) of the percentage of actual work completed plus a like percentage of the value of material delivered on the ground or stored subject to, or under the control of, the City, and unused. The City shall withhold not less than five percent (5%) of the Agreement price until final completion and acceptance of the Project. However, at any time after fifty percent (50%) of the work has been completed, if the City Council of the City finds that satisfactory progress is being made, it may, at its discretion, make any of the remaining progress payments in full for actual work completed. 8. Substitute Security. A. At the written request and expense of Contractor, securities equivalent to any moneys withheld by the City to ensure performance under this Agreement shall be deposited with the City, or with a state or federally chartered bank in the State of California as the escrow agent, that shall then pay those moneys to Contractor. Upon satisfactory completion of the Agreement, the securities shall be returned to Contractor. B. Alternatively, Contractor may request that the City shall make payment of retentions earned directly to the escrow agent at the expense of Contractor. At the expense of Contractor, Contractor may direct the investment of the payments into securities, and Contractor shall receive the interest earned on the investments upon the same terms provided for securities deposited by Contractor. Upon satisfactory completion of the Agreement, Contractor shall receive from the escrow agent all securities, interest, and payments received by the escrow agent from the City, pursuant to the terms of this Section. C. Securities eligible for investment shall include those listed in California Government Code Section 16430, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security to which Contractor and the City mutually agree in writing. Contractor shall be the beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon. D. If Contractor elects to receive interest on moneys withheld in retention by the City, it shall, at the request of any subcontractor performing more than five percent (5%) of Contractor's total bid, make that option available to the subcontractor regarding any moneys withheld in retention by Contractor from the subcontractor. Further mandatory details are provided in Public Contract Code Section 22300(d), which is incorporated herein by this reference. E. The escrow agreement for security deposits in lieu of retention shall be substantially similar to the form provided in Public Contract Code Section 22300(f), which is incorporated herein by this reference. C-2 R6871-0001\1 800726v2.doc A-2 9. Taxes. Contractor shall calculate payment for all sales, unemployment, old age pension and other taxes imposed by local, State of California and federal law. These payments are included in the total amounts in Exhibit "B." 10. Audit. The City or its representative shall have the option of inspecting and/or auditing all records and other written materials used by Contractor in preparing its billings to the City as a condition precedent to any payment to Contractor. Contractor will promptly furnish documents requested by the City. Additionally, Contractor shall be subject to State Auditor examination and audit at the request of the City or as part of any audit of the City, for a period of three (3) years after final payment under this Agreement. 11. Unresolved Disputes. In the event that a dispute arises between the City and Contractor regarding whether the conditions materially differ, involve hazardous waste, or cause a decrease or increase in Contractor's cost of or time required for performance of any part of the work, Contractor shall not be excused from any scheduled completion date provided for by the Agreement, but shall proceed with all work to be performed under the Agreement. Contractor shall retain any and all rights provided that pertain to the resolution of disputes and protests between the parties. In the event of any dispute or controversy with the City over any matter whatsoever, Contractor shall not cause any delay or cessation in or of work, but shall proceed with the performance of the work in dispute. This includes disputed time extension requests and prices for changes. The disputed work will be categorized as an "unresolved dispute" and payment, if any, shall be as later determined by mutual agreement or a court of law. Contractor shall keep accurate, detailed records of all disputed work, claims and other disputed matters. Public Contract Code Sections 20104 et seq. and Rancho Palos Verdes Municipal Code chapter 3.24 ("Claims Against the City") shall govern the procedures of the claim process, and these provisions are incorporated herein by this reference. 12. Termination. This Agreement may be canceled by the City at any time with or without cause without penalty upon thirty (30) days' written notice. In the event of termination without fault of Contractor, City shall pay Contractor for all services satisfactorily rendered prior to date of termination as determined by the City, and such payment shall be in full satisfaction of all services rendered hereunder. 13. Indemnity. a. Contractor's Duty. To the maximum extent permitted by law, Contractor shall defend, indemnify, and hold harmless the City, its elected officials, officers, employees, volunteers, agents, successors, assigns, and those City agents serving as independent contractors in the role of City officials (collectively "Indemnitees") from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, proceedings, suits, losses, bid protests, stop notices, judgments, fines, liens, penalties, liabilities, costs and expenses of every kind and nature whatsoever, in any manner arising out of or incident to any act, failure to act, error or omission of Contractor or any of its officers, agents, servants, employees, subcontractors, materialmen, suppliers or their officers, agents, servants or employees, arising out of the Agreement, including without limitation, the payment of all consequential damages, attorneys' fees, experts' fees, and other related costs and expenses (individually, a "Claim," or collectively, "Claims"). Further, Contractor shall appoint competent defense counsel approved by the City Attorney at Contractor's own cost, expense and risk, to defend any and all such Claims that may be brought or instituted against Indemnitees. Contractor shall pay and satisfy any judgment, award or decree that C-3 R6871-0001 \1800726v2.doc A-3 may be rendered against Indemnitees in any such Claim. Contractor shall reimburse Indemnitees for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Contractor or Indemnitees. This indemnity shall apply to all Claims regardless of whether any insurance policies are applicable. b. Bid Protests. In addition to its obligations pursuant to Section 13(a), Contractor shall reimburse the City for all attorneys' fees and costs incurred by City in connection with, arising out of or incident to any bid protest. c. Civil Code Exception. Nothing in Section 13(a) shall be construed to encompass Indemnitees' sole negligence or willful misconduct to the limited extent that the underlying Agreement is subject to Civil Code section 2782(a) or the City's active negligence to the limited extent that the underlying Agreement is subject to Civil Code section 2782(b). d. Nonwaiver of Rights. Indemnitees do not and shall not waive any rights that they may possess against Contractor because the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence. e. Waiver of Right of Subrogation. Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all Claims arising out of or incident to the activities or operations performed by or on behalf of the Contractor regardless of any prior, concurrent or subsequent active or passive negligence by Indemnitees. f. Survival. The provisions of this Section 13 shall survive the termination of this Agreement and are in addition to any other rights or remedies that Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee's right to recover under this indemnity provision, and an entry of judgment against a Contractor shall be conclusive in favor of the Indemnitee's right to recover under this indemnity provision. 14. Incorporation by Reference. All of the following documents are attached hereto and incorporated herein by this reference: Insurance Requirements for the City of Rancho Palos Verdes Public Works Contract; Workers' Compensation Certificate of Insurance; Additional Insured Endorsement (Comprehensive General Liability); Additional Insured Endorsement (Automobile Liability); and Additional Insured Endorsement (Excess Liability). 15. Antitrust Claims. In entering into this Agreement, Contractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the California Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Agreement. This assignment shall be made and become effective at the time the City tenders final payment to Contractor without further acknowledgment by the parties. W R6871-0001\1 800726v2.doc E. 16. Trenching and Excavations. If the project involves trenching more than four (4) feet deep, Contractor shall promptly and before the following conditions are disturbed notify the City in writing of any: material that Contractor believes may be material that is hazardous waste, as defined in California Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; subsurface or latent physical conditions at the site differing from those indicated; or unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Agreement. The City shall promptly investigate the conditions, and if the City finds that the conditions do materially differ or do involve hazardous waste and cause a decrease or increase in Contractor's cost of or the time required for performance of any part of the work, the City shall issue a change order. 17. Utilities. The City acknowledges its responsibilities under Government Code section 4215 and incorporates that section herein by this reference. 18. Location of Existinq Elements. The methods used and costs involved to locate existing elements, points of connection and all construction methods are Contractor's sole responsibility. Accuracy of information furnished, as to existing conditions, is not guaranteed by the City. Contractor, at its sole expense, must make all investigations necessary to determine locations of existing elements, which may include, without limitation, contacting U.S.A. Alert and other private underground locating firm(s), utilizing specialized locating equipment and/or hand trenching. 19. Independent Contractor. Contractor is and shall at all times remain, as to the City, a wholly independent contractor. Neither the City nor any of its agents shall have control over the conduct of Contractor or any of the Contractor's employees, except as herein set forth, and Contractor is free to dispose of all portions of its time and activities which it is not obligated to devote to the City in such a manner and to such persons, firms, or corporations at the Contractor wishes except as expressly provided in this Agreement. Contractor shall have no power to incur any debt, obligation, or liability on behalf of the City, bind the City in any manner, or otherwise act on behalf of the City as an agent. Contractor shall not, at any time or in any manner, represent that it or any of its agents, servants or employees, are in any manner agents, servants or employees of City. Contractor agrees to pay all required taxes on amounts paid to Contractor under this Agreement, and to indemnify and hold the City harmless from any and all taxes, assessments, penalties, and interest asserted against the City by reason of the independent contractor relationship created by this Agreement. Contractor shall fully comply with the workers' compensation law regarding Contractor and its employees. Contractor further agrees to indemnify and hold the City harmless from any failure of Contractor to comply with applicable workers' compensation laws. The City shall have the right to offset against the amount of any compensation due to Contractor under this Agreement any amount due to the City from Contractor as a result of its failure to promptly pay to the City any reimbursement or indemnification arising under this Section. 20. Prevailing Wages. City and Contractor acknowledge that this project is a public work to which prevailing wages apply. The Agreement to Comply with California Labor Law Requirements is attached hereto and incorporated herein by this reference. Eight hours of labor constitutes a legal day's work. 21. Workers' Compensation. California Labor Code Sections 1860 and 3700 provide that every contractor will be required to secure the payment of compensation to its employees. In C-5 R6871-0001\1 800726v2.doc ��� accordance with the provisions of California Labor Code Section 1861, the Contractor hereby certifies as follows: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to under- take self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract." 22. Subcontracting. Contractor shall adhere to all provisions of the Subletting and Subcontracting Fair Practices Act, Public Contract Code Section 4100 et seq., which is incorporated herein by this reference. 23. Nondiscriminatory Employment. Contractor shall not unlawfully discriminate against any individual based on race, color, religion, nationality, gender, sex, sexual orientation, age or condition of disability. Contractor understands and agrees that it is bound by and will comply with the nondiscrimination mandates of all statutes and local ordinances and regulations. 24. Debarred, Suspended or Ineligible Contractors. Contractor shall not be debarred throughout the duration of this Agreement. Contractor shall not perform work with debarred subcontractor pursuant to California Labor Code Section 1777.1 or 1777.7. 25. Compliance with Laws. Contractor shall comply with all applicable federal, state and local laws, ordinances, codes and regulations in force at the time Contractor performs pursuant to this Agreement. 26. Bonds. Contractor shall obtain faithful performance and payment bonds, each in an amount that is not less than the total compensation amount of this Agreement, and nothing in this Agreement shall be read to excuse this requirement. The required forms entitled Payment Bond (Labor and Materials) and Performance Bond are attached hereto and incorporated herein by this reference. 27. Contractor's Representations. Contractor represents, covenants and agrees that: a) Contractor is licensed, qualified, and capable of furnishing the labor, materials, and expertise necessary to perform the services in accordance with the terms and conditions set forth in this Agreement; b) there are no obligations, commitments of any kind that will limit or prevent its full performance under this Agreement; c) there is no litigation pending against Contractor, and Contractor is not the subject of any criminal investigation or proceeding; and d) to Contractor's actual knowledge, neither Contractor nor its personnel have been convicted of a felony. 28. Conflicts of Interest. Contractor agrees not to accept any employment or representation during the term of this Agreement or within twelve (12) months after completion of the work under this Agreement which is or may likely make Contractor "financially interested," as provided in Government Code Section 1090 and 87100, in any decisions made by City on any matter in connection with which Contractor has been retained pursuant to this Agreement. 29. Third Party Claims. City shall have full authority to compromise or otherwise settle any claim relating to the Agreement at any time. City shall timely notify Contractor of the receipt of any third -party claim relating to the Agreement. City shall be entitled to recover its reasonable costs incurred in providing this notice. N. R6871-0001 \1800726v2.doc M 30. Non -Assignability; Subcontracting. Contractor shall not assign or transfer any interest in this Agreement nor any part thereof, whether by assignment or novation, without the City's prior written consent. Any purported assignment without written consent shall be null, void, and of no effect, and Contractor shall hold harmless, defend and indemnify the City and its officers, officials, employees, agents and representatives with respect to any claim, demand or action arising from or relating to any unauthorized assignment. 31. Applicable Law. The validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California, excluding California's choice of law rules. Venue for any such action relating to this Agreement shall be in the Los Angeles County Superior Court. 32. Titles. The titles used in this Agreement are for convenience only and shall in no way define, limit or describe the scope or intent of this Agreement or any part of it. 33. Authority. The person executing this Agreement on behalf of Contractor warrants and represents that he or she has the authority to execute this Agreement on behalf of Contractor and has the authority to bind Contractor to the performance of its obligations hereunder. 34. Entire Agreement. This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between City and Contractor. This Agreement supersedes all prior oral or written negotiations, representations or agreements. This Agreement may not be modified or amended, nor any provision or breach waived, except in a writing signed by both parties which expressly refers to this Agreement. 35. Construction. In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement. 36. Non -waiver of Terms, Rights and Remedies. Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by the City of any payment to Contractor constitute or be construed as a waiver by the City of any breach of covenant, or any default which may then exist on the part of Contractor, and the making of any such payment by the City shall in no way impair or prejudice any right or remedy available to the City with regard to such breach or default. 37. Notice. Except as otherwise required by law, any notice or other communication authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during Contractor's or City's regular business hours or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses listed below, or at such other address as one party may notify the other. To CITY: Michael Throne, Director of Public Works City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 NWA R6871-0001\1 800726v2.doc To CONTRACTOR: The address listed in Exhibit "B." 38. Counterparts. This Agreement may be executed in counterpart originals, duplicate originals, or both, each of which is deemed to be an original for all purposes. 39. Severability. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. [Signatures on the following page.] MWIP R6871-0001\1 800726v2.doc • IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first -above written. ATTEST: Carla Morreale, City Clerk APPROVED AS TO FORM: ALESHIRE & WYNDER, LLP David J. Aleshire, City Attorney CITY: CITY OF RANCHO PALOS VERDES, a municipal corporation Ken Dyda, Mayor CONSULTANT: Hardy & Harper, Incorporated By: Fred T. Maas, Jr. Name: Title: By: President, Treasurer Name: Title: Address: 1312 E. Warner Ave. Santa Ana, CA 92705 Two corporate officer signatures required when Consultant is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. CONSULTANT'S SIGNATURES SHALL BE DULY NOTARIZED, AND APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS MAY BE REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONSULTANT'S BUSINESS ENTITY • e R6871-0001 \1800726v2.doc CONTRACT SERVICES AGREEMENT By and Between CITY OF RANCHO PALOS VERDES and ANDERSONPENNA PARTNERS, INC. for CONSTRUCTION MANAGEMENT, INSPECTION, AND MATERIAL TESTING SERVICES FOR THE RESIDENTIAL STREETS REHABILITATION PROJECT — AREA 2 01203.0006/296433.1 - 1 AGREEMENT FOR CONTRACT SERVICES BETWEEN THE CITY OF RANCHO PALOS VERDES AND ANDERSONPENNA PARTNERS, INC. THIS AGREEMENT FOR CONTRACT SERVICES (herein "Agreement") is made and entered into this 17th day of May, 2016 by and between the City of Rancho Palos Verdes, a California municipal corporation ("City") and AndersonPenna Partners, Inc., ("Consultant"). City and Consultant are sometimes hereinafter individually referred to as "Party" and hereinafter collectively referred to as the "Parties". RECITALS A. City has sought, by issuance of a Request for Proposals or Invitation for Bids, the performance of the services defined and described particularly in Article 1 of this Agreement. B. Consultant, following submission of a proposal or bid for the performance of the services defined and described particularly in Article 1 of this Agreement, was selected by the City to perform those services. C. Pursuant to the City of Rancho Palos Verdes' Municipal Code, City has authority to enter into and execute this Agreement. D. The Parties desire to formalize the selection of Consultant for performance of those services defined and described particularly in Article 1 of this Agreement and desire that the terms of that performance be as particularly defined and described herein. OPERATIVE PROVISIONS NOW, THEREFORE, in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows: ARTICLE 1. SERVICES OF CONSULTANT 1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, the Consultant shall provide those services specified in the "Scope of Services" attached hereto as Exhibit "A" and incorporated herein by this reference, which may be referred to herein as the "services" or "work" hereunder. As a material inducement to the City entering into this Agreement, Consultant represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the services required under this Agreement in a thorough, competent, and professional manner, and is experienced in performing the work and services contemplated herein. Consultant shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all services described herein. Consultant covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be both of good quality as well as fit for the purpose intended. For purposes of this Agreement, the phrase "highest professional standards" shall 01203.0006/296433.1 _ 2 B 2 mean those standards of practice recognized by one or more first-class firms performing similar work under similar circumstances. 1.2 Consultant's Proposal. The Scope of Service shall include the Consultant's scope of work or bid which shall be incorporated herein by this reference as though fully set forth herein. In the event of any inconsistency between the terms of such proposal and this Agreement, the terms of this Agreement shall govern. 1.3 Compliance with Law. Consultant shall keep itself informed concerning, and shall render all services hereunder in accordance with, all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental entity having jurisdiction in effect at the time service is rendered. 1.4 Licenses, Permits, Fees and Assessments. Consultant shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by law for the performance of the services required by this Agreement. Consultant shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Consultant's performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City, its officers, employees or agents of City, against any such fees, assessments, taxes, penalties or interest levied, assessed or imposed against City hereunder. 1.5 Familiarity with Work. By executing this Agreement, Consultant warrants that Consultant (i) has thoroughly investigated and considered the scope of services to be performed, (ii) has carefully considered how the services should be performed, and (iii) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. If the services involve work upon any site, Consultant warrants that Consultant has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder. Should the Consultant discover any latent or unknown conditions, which will materially affect the performance of the services hereunder, Consultant shall immediately inform the City of such fact and shall not proceed except at Consultant's risk until written instructions are received from the Contract Officer. 1.6 Care of Work. The Consultant shall adopt reasonable methods during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as may be caused by City's own negligence. 01203.0006/296433.1 - 3 B - 3 1.7 Further Responsibilities of Parties. Both parties agree to use reasonable care and diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all instruments, prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of this Agreement. Unless hereafter specified, neither parry shall be responsible for the service of the other. 1.8 Additional Services. City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Services or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written order is first given by the Contract Officer to the Consultant, incorporating therein any adjustment in (i) the Contract Sum for the actual costs of the extra work, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Consultant. Any increase in compensation of up to ten percent (10%) of the Contract Sum or $25,000, whichever is less; or, in the time to perform of up to one hundred eighty (180) days, may be approved by the Contract Officer. Any greater increases, taken either separately or cumulatively, must be approved by the City Council. It is expressly understood by Consultant that the provisions of this Section shall not apply to services specifically set forth in the Scope of Services. Consultant hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of Services may be more costly or time consuming than Consultant anticipates and that Consultant shall not be entitled to additional compensation therefor. City may in its sole and absolute discretion have similar work done by other contractors. No claims for an increase in the Contract Sum or time for performance shall be valid unless the procedures established in this Section are followed. 1.9 Special Requirements. Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the "Special Requirements" attached hereto as Exhibit `B" and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit `B" and any other provisions of this Agreement, the provisions of Exhibit `B" shall govern. ARTICLE 2. COMPENSATION AND METHOD OF PAYMENT. 2.1 Contract Sum. Subject to any limitations set forth in this Agreement, City agrees to pay Consultant the amounts specified in the "Schedule of Compensation" attached hereto as Exhibit "C" and incorporated herein by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed Two Hundred Forty Nine Thousand Four Hundred fifty Three Dollars ($249,453.00) (the "Contract Sum"), unless additional compensation is approved pursuant to Section 1.8. 2.2 Method of Compensation. The method of compensation may include: (i) a lump sum payment upon completion; (ii) payment in accordance with specified tasks or the percentage of completion of the services, less 01203.0006/296433.1 _ 4 B _ 4 contract retention; (iii) payment for time and materials based upon the Consultant's rates as specified in the Schedule of Compensation, provided that (a) time estimates are provided for the performance of sub tasks, (b) contract retention is maintained, and (c) the Contract Sum is not exceeded; or (iv) such other methods as may be specified in the Schedule of Compensation. 2.3 Reimbursable Expenses. Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, telephone expenses, and travel expenses approved by the Contract Officer in advance, or actual subcontractor expenses of an approved subcontractor pursuant to Section 4.5, and only if specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Consultant at all project meetings reasonably deemed necessary by the City. Coordination of the performance of the work with City is a critical component of the services. If Consultant is required to attend additional meetings to facilitate such coordination, Consultant shall not be entitled to any additional compensation for attending said meetings. 2.4 Invoices. Each month Consultant shall furnish to City an original invoice for all work performed and expenses incurred during the preceding month in a form approved by City's Director of Finance. By submitting an invoice for payment under this Agreement, Consultant is certifying compliance with all provisions of the Agreement. The invoice shall detail charges for all necessary and actual expenses by the following categories: labor (by sub -category), travel, materials, equipment, supplies, and sub -contractor contracts. Sub -contractor charges shall also be detailed by such categories. Consultant shall not invoice City for any duplicate services performed by more than one person. City shall independently review each invoice submitted by the Consultant to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. Except as to any charges for work performed or expenses incurred by Consultant which are disputed by City, or as provided in Section 7.3, City will use its best efforts to cause Consultant to be paid within forty-five (45) days of receipt of Consultant's correct and undisputed invoice; however, Consultant acknowledges and agrees that due to City warrant run procedures, the City cannot guarantee that payment will occur within this time period. In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Consultant for correction and resubmission. Review and payment by City for any invoice provided by the Consultant shall not constitute a waiver of any rights or remedies provided herein or any applicable law. 2.5 Waiver. Payment to Consultant for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Consultant. ARTICLE 3. PERFORMANCE SCHEDULE 3.1 Time of Essence. Time is of the essence in the performance of this Agreement. 01203.0006/296433.1 - 5 B - 5 3.2 Schedule of Performance. Consultant shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the "Schedule of Performance" attached hereto as Exhibit "D" and incorporated herein by this reference. When requested by the Consultant, extensions to the time period(s) specified in the Schedule of Performance may be approved in writing by the Contract Officer but not exceeding one hundred eighty (18 0) days cumulatively. 3.3 Force Majeure. The time period(s) specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Consultant shall within ten (10) days of the commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified. The Contract Officer's determination shall be final and conclusive upon the parties to this Agreement. In no event shall Consultant be entitled to recover damages against the City for any delay in the performance of this Agreement, however caused, Consultant's sole remedy being extension of the Agreement pursuant to this Section. 3.4 Term. Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding one (1) years from the date hereof, except as otherwise provided in the Schedule of Performance (Exhibit «D„ ARTICLE 4. COORDINATION OF WORK 4.1 Representatives and Personnel of Consultant. The following principals of Consultant ("Principals") are hereby designated as being the principals and representatives of Consultant authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith: (Name) (Title) (Name) (Title) 01203.0006/296433.1 - 6 B - 6 (Name) (Title) It is expressly understood that the experience, knowledge, capability and reputation of the foregoing principals were a substantial inducement for City to enter into this Agreement. Therefore, the foregoing principals shall be responsible during the term of this Agreement for directing all activities of Consultant and devoting sufficient time to personally supervise the services hereunder. All personnel of Consultant, and any authorized agents, shall at all times be under the exclusive direction and control of the Principals. For purposes of this Agreement, the foregoing Principals may not be replaced nor may their responsibilities be substantially reduced by Consultant without the express written approval of City. Additionally, Consultant shall utilize only competent personnel to perform services pursuant to this Agreement. Consultant shall make every reasonable effort to maintain the stability and continuity of Consultant's staff and subcontractors, if any, assigned to perform the services required under this Agreement. Consultant shall notify City of any changes in Consultant's staff and subcontractors, if any, assigned to perform the services required under this Agreement, prior to and during any such performance. 4.2 Status of Consultant. Consultant shall have no authority to bind City in any manner, or to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. Consultant shall not at any time or in any manner represent that Consultant or any of Consultant's officers, employees, or agents are in any manner officials, officers, employees or agents of City. Neither Consultant, nor any of Consultant's officers, employees or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City's employees. Consultant expressly waives any claim Consultant may have to any such rights. 4.3 Contract Officer. The Contract Officer shall be Ron Dragoo, Principal Engineer or Michael Throne, Director of Public Works or such person as may be designated by the City Manager. It shall be the Consultant's responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and the Consultant shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority, if specified in writing by the City Manager, to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement. 4.4 Independent Consultant. Neither the City nor any of its employees shall have any control over the manner, mode or means by which Consultant, its agents or employees, perform the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of Consultant's employees, servants, representatives or agents, or in fixing their number, compensation or hours of service. Consultant shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent 01203.0006/296433.1 _ % B 7 contractor with only such obligations as are consistent with that role. Consultant shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Consultant in its business or otherwise or a joint venturer or a member of any joint enterprise with Consultant. 4.5 Prohibition Against Subcontracting or Assignment. _ The experience, knowledge, capability and reputation of Consultant, its principals and employees were a substantial inducement for the City to enter into this Agreement. Therefore, Consultant shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the City. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Consultant, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Consultant or any surety of Consultant of any liability hereunder without the express consent of City. ARTICLE 5. INSURANCE AND INDEMNIFICATION 5.1 Insurance Coverages. The Consultant shall procure and maintain, at its sole cost and expense, in a form and content satisfactory to City, during the entire term of this Agreement including any extension thereof, the following policies of insurance which shall cover all elected and appointed officers, employees and agents of City: (a) Commercial General Liability Insurance (Occurrence Form CG0001 or equivalent). A policy of comprehensive general liability insurance written on a per occurrence basis for bodily injury, personal injury and property damage. The policy of insurance shall be in an amount not less than $1,000,000.00 per occurrence or if a general aggregate limit is used, then the general aggregate limit shall be twice the occurrence limit. (b) Worker's Compensation Insurance. A policy of worker's compensation insurance in such amount as will fully comply with the laws of the State of California and which shall indemnify, insure and provide legal defense for the Consultant against any loss, claim or damage arising from any injuries or occupational diseases occurring to any worker employed by or any persons retained by the Consultant in the course of carrying out the work or services contemplated in this Agreement. (c) Automotive Insurance (Form CA 0001 (Ed 1/87,) including "any auto" and endorsement CA 0025 or equivalent). A policy of comprehensive automobile liability insurance written on a per occurrence for bodily injury and property damage in an amount not less than $1,000,000. Said policy shall include coverage for owned, non -owned, leased, hired cars and any automobile. 01203.0006/296433.1 - 8 B 8 (d) Professional Liability. Professional liability insurance appropriate to the Consultant's profession. This coverage may be written on a "claims made" basis, and must include coverage for contractual liability. The professional liability insurance required by this Agreement must be endorsed to be applicable to claims based upon, arising out of or related to services performed under this Agreement. The insurance must be maintained for at least 5 consecutive years following the completion of Consultant's services or the termination of this Agreement. During this additional 5 -year period, Consultant shall annually and upon request of the City submit written evidence of this continuous coverage. (e) Subcontractors. Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall include all of the requirements stated herein. (f) Additional Insurance. Policies of such other insurance, as may be required in the Special Requirements in Exhibit `B". 5.2 General Insurance Requirements. All of the above policies of insurance shall be primary insurance and shall name the City, its elected and appointed officers, employees and agents as additional insureds and any insurance maintained by City or its officers, employees or agents may apply in excess of, and not contribute with Consultant's insurance. The insurer is deemed hereof to waive all rights of subrogation and contribution it may have against the City, its officers, employees and agents and their respective insurers. Moreover, the insurance policy must specify that where the primary insured does not satisfy the self-insured retention, any additional insured may satisfy the self- insured retention. All of said policies of insurance shall provide that said insurance may not be amended or cancelled by the insurer or any party hereto without providing thirty (30) days prior written notice by certified mail return receipt requested to the City. In the event any of said policies of insurance are cancelled, the Consultant shall, prior to the cancellation date, submit new evidence of insurance in conformance with Section 5.1 to the Contract Officer. No work or services under this Agreement shall commence until the Consultant has provided the City with Certificates of Insurance, additional insured endorsement forms or appropriate insurance binders evidencing the above insurance coverages and said Certificates of Insurance or binders are approved by the City. City reserves the right to inspect complete, certified copies of and endorsements to all required insurance policies at any time. Any failure to comply with the reporting or other provisions of the policies including breaches or warranties shall not affect coverage provided to City. All certificates shall name the City as additional insured (providing the appropriate endorsement) and shall conform to the following "cancellation" notice: CANCELLATION: SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATED THEREOF, THE ISSUING COMPANY SHALL MAIL 01203.0006/296433.1 - 9 B 9 THIRTY (30) -DAY ADVANCE WRITTEN NOTICE TO CERTIFICATE HOLDER NAMED HEREIN. [to be initialed] Consultant Initials City, its respective elected and appointed officers, directors, officials, employees, agents and volunteers are to be covered as additional insureds as respects: liability arising out of activities Consultant performs; products and completed operations of Consultant; premises owned, occupied or used by Consultant; or any automobiles owned, leased, hired or borrowed by Consultant. The coverage shall contain no special limitations on the scope of protection afforded to City, and their respective elected and appointed officers, officials, employees or volunteers. Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City or its respective elected or appointed officers, officials, employees and volunteers or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration, defense expenses and claims. The Consultant agrees that the requirement to provide insurance shall not be construed as limiting in any way the extent to which the Consultant may be held responsible for the payment of damages to any persons or property resulting from the Consultant's activities or the activities of any person or persons for which the Consultant is otherwise responsible nor shall it limit the Consultant's indemnification liabilities as provided in Section 5.3. In the event the Consultant subcontracts any portion of the work in compliance with Section 4.5 of this Agreement, the contract between the Consultant and such subcontractor shall require the subcontractor to maintain the same policies of insurance that the Consultant is required to maintain pursuant to Section 5. 1, and such certificates and endorsements shall be provided to City. 5.3 Indemnification. To the full extent permitted by law, Consultant agrees to indemnify, defend and hold harmless the City, its officers, employees and agents ("Indemnified Parties") against, and will hold and save them and each of them harmless from, any and all actions, either judicial, administrative, arbitration or regulatory claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities whether actual or threatened (herein "claims or liabilities") that may be asserted or claimed by any person, firm or entity arising out of or in connection with the negligent performance of the work, operations or activities provided herein of Consultant, its officers, employees, agents, subcontractors, or invitees, or any individual or entity for which Consultant is legally liable ("indemnitors"), or arising from Consultant's or indemnitors' reckless or willful misconduct, or arising from Consultant's or indemnitors' negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, and in connection therewith: -10- B _ 10 01203.0006/296433.1 (a) Consultant will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys' fees incurred in connection therewith; (b) Consultant will promptly pay any judgment rendered against the City, its officers, agents or employees for any such claims or liabilities arising out of or in connection with the negligent performance of or failure to perform such work, operations or activities of Consultant hereunder; and Consultant agrees to save and hold the City, its officers, agents, and employees harmless therefrom; (c) In the event the City, its officers, agents or employees is made a party to any action or proceeding filed or prosecuted against Consultant for such damages or other claims arising out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Consultant hereunder, Consultant agrees to pay to the City, its officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys' fees. Consultant shall incorporate similar indemnity agreements with its subcontractors and if it fails to do so Consultant shall be fully responsible to indemnify City hereunder therefore, and failure of City to monitor compliance with these provisions shall not be a waiver hereof. This indemnification includes claims or liabilities arising from any negligent or wrongful act, error or omission, or reckless or willful misconduct of Consultant in the performance of professional services hereunder. The provisions of this Section do not apply to claims or liabilities occurring as a result of City's sole negligence or willful acts or omissions, but, to the fullest extent permitted by law, shall apply to claims and liabilities resulting in part from City's negligence, except that design professionals' indemnity hereunder shall be limited to claims and liabilities arising out of the negligence, recklessness or willful misconduct of the design professional. The indemnity obligation shall be binding on successors and assigns of Consultant and shall survive termination of this Agreement. 5.4 Sufficiency of Insurer. Insurance required by this Agreement shall be satisfactory only if issued by companies qualified to do business in California, rated "A" or better in the most recent edition of Best Rating Guide, The Key Rating Guide or in the Federal Register, and only if they are of a financial category Class VII or better, unless such requirements are waived by the Risk Manager of the City ("Risk Manager") due to unique circumstances. If this Agreement continues for more than 3 years duration, or in the event the risk manager determines that the work or services to be performed under this Agreement creates an increased or decreased risk of loss to the City, the Consultant agrees that the minimum limits of the insurance policies may be changed accordingly upon receipt of written notice from the Risk Manager. ARTICLE 6. RECORDS, REPORTS, AND RELEASE OF INFORMATION 6.1 Records. Consultant shall keep, and require subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports, studies or other documents relating to the disbursements charged to City and services performed hereunder (the "books and records"), as -11- - 11 01203.0006/296433.1 6 shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the performance of such services. Any and all such documents shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of three (3) years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required. In the event of dissolution of Consultant's business, custody of the books and records may be given to City, and access shall be provided by Consultant's successor in interest. Notwithstanding the above, the Consultant shall fully cooperate with the City in providing access to the books and records if a public records request is made and disclosure is required by law including but not limited to the California Public Records Act. 6.2 Reports. Consultant shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as the Contract Officer shall require. Consultant hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Consultant agrees that if Consultant becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services contemplated herein or, if Consultant is providing design services, the cost of the project being designed, Consultant shall promptly notify the Contract Officer of said fact, circumstance, technique or event and the estimated increased or decreased cost related thereto and, if Consultant is providing design services, the estimated increased or decreased cost estimate for the project being designed. 6.3 Ownership of Documents. All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents and other materials (the "documents and materials") prepared by Consultant, its employees, subcontractors and agents in the performance of this Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Consultant shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the documents and materials hereunder. Any use, reuse or assignment of such completed documents for other projects and/or use of uncompleted documents without specific written authorization by the Consultant will be at the City's sole risk and without liability to Consultant, and Consultant's guarantee and warranties shall not extend to such use, reuse or assignment. Consultant may retain copies of such documents for its own use. Consultant shall have the right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Consultant fails to secure such assignment, Consultant shall indemnify City for all damages resulting therefrom. Moreover, Consultant with respect to any documents and materials that may qualify as "works made for hire" as defined in 17 U.S.C. § 101, such documents and materials are hereby deemed "works made for hire" for the City. 01203.0006/296433.1 -12- B- 12 6.4 Confidentialitv and Release of Information. (a) All information gained or work product produced by Consultant in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Consultant. Consultant shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the Contract Officer. (b) Consultant, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the Contract Officer or unless requested by the City Attorney, voluntarily provide documents, declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered "voluntary" provided Consultant gives City notice of such court order or subpoena. (c) If Consultant, or any officer, employee, agent or subcontractor of Consultant, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Consultant for any damages, costs and fees, including attorneys fees, caused by or incurred as a result of Consultant's conduct. (d) Consultant shall promptly notify City should Consultant, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed there under. City retains the right, but has no obligation, to represent Consultant or be present at any deposition, hearing or similar proceeding. Consultant agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Consultant. However, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response. ARTICLE 7. ENFORCEMENT OF AGREEMENT AND TERMINATION 7.1 California Law. This Agreement shall be interpreted, construed and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other appropriate court in such county, and Consultant covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in the County of Los Angeles, State of California. 7.2 Disputes; Default. In the event that Consultant is in default under the terms of this Agreement, the City shall not have any obligation or duty to continue compensating Consultant for any work performed after the date of default. Instead, the City may give notice to Consultant of the default and the reasons for the default. The notice shall include the timeframe in which Consultant may cure the default. This timeframe is presumptively thirty (30) days, but may be extended, though not 01203.0006/296433.1 -13- B- 13 reduced, if circumstances warrant. During the period of time that Consultant is in default, the City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices. In the alternative, the City may, in its sole discretion, elect to pay some or all of the outstanding invoices during the period of default. If Consultant does not cure the default, the City may take necessary steps to terminate this Agreement under this Article. Any failure on the part of the City to give notice of the Consultant's default shall not be deemed to result in a waiver of the City's legal rights or any rights arising out of any provision of this Agreement. 7.3 Retention of Funds. Consultant hereby authorizes City to deduct from any amount payable to Consultant (whether or not arising out of this Agreement) (i) any amounts the payment of which may be in dispute hereunder or which are necessary to compensate City for any losses, costs, liabilities, or damages suffered by City, and (ii) all amounts for which City may be liable to third parties, by reason of Consultant's acts or omissions in performing or failing to perform Consultant's obligation under this Agreement. In the event that any claim is made by a third party, the amount or validity of which is disputed by Consultant, or any indebtedness shall exist which shall appear to be the basis for a claim of lien, City may withhold from any payment due, without liability for interest because of such withholding, an amount sufficient to cover such claim. The failure of City to exercise such right to deduct or to withhold shall not, however, affect the obligations of the Consultant to insure, indemnify, and protect City as elsewhere provided herein. 7.4 Waiver. Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision or a waiver of any subsequent breach or violation of any provision of this Agreement. Acceptance by City of any work or services by Consultant shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non -defaulting party on any default shall impair such right or remedy or be construed as a waiver. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 7.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party. 7.6 Legal Action. In addition to any other rights or remedies, either party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. Notwithstanding any contrary provision herein, Consultant shall file a statutory claim pursuant to Government Code Sections 905 et. seq. and 910 et. seq., in order to pursue a legal action under this Agreement. 01203.0006/296433.1 -14- 6 - 14 7.7 Termination Prior to Expiration of Term. This Section shall govern any termination of this Contract except as specifically provided in the following Section for termination for cause. The City reserves the right to terminate this Contract at any time, with or without cause, upon thirty (30) days' written notice to Consultant, except that where termination is due to the fault of the Consultant, the period of notice may be such shorter time as may be determined by the Contract Officer. In addition, the Consultant reserves the right to terminate this Contract at any time, with or without cause, upon sixty (60) days' written notice to City, except that where termination is due to the fault of the City, the period of notice may be such shorter time as the Consultant may determine. Upon receipt of any notice of termination, Consultant shall immediately cease all services hereunder except such as may be specifically approved by the Contract Officer. Except where the Consultant has initiated termination, the Consultant shall be entitled to compensation for all services rendered prior to the effective date of the notice of termination and for any services authorized by the Contract Officer thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, except as provided in Section 7.3. In the event the Consultant has initiated termination, the Consultant shall be entitled to compensation only for the reasonable value of the work product actually produced hereunder. In the event of termination without cause pursuant to this Section, the terminating party need not provide the non -terminating party with the opportunity to cure pursuant to Section 7.2. 7.8 Termination for Default of Consultant. If termination is due to the failure of the Consultant to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 7.2, take over the work and prosecute the same to completion by contract or otherwise, and the Consultant shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to the Consultant for the purpose of set-off or partial payment of the amounts owed the City as previously stated. 7.9 Attorneys' Fees. If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney's fees. Attorney's fees shall include attorney's fees on any appeal, and in addition a party entitled to attorney's fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment. ARTICLE 8. CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION 8.1 Non-liabili . of City Officers and Employees. No officer or employee of the City shall be personally liable to the Consultant, or any successor in interest, in the event of any default or breach by the City or for any amount which -15- B- 15 01203.0006/296433.1 may become due to the Consultant or to its successor, or for breach of any obligation of the terms of this Agreement. 8.2 Conflict of Interest. Consultant covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Consultant's performance of services under this Agreement. Consultant further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of the Contract Officer. Consultant agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement. No officer or employee of the City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which affects her/his financial interest or the financial interest of any corporation, partnership or association in which (s)he is, directly or indirectly, interested, in violation of any State statute or regulation. The Consultant warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement. 8.3 Covenant Against Discrimination. Consultant covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class in the performance of this Agreement. Consultant shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class. 8.4 Unauthorized Aliens. Consultant hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C.A. §§ 1101, et seq., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Consultant so employ such unauthorized aliens for the performance of work and/or services covered by this Agreement, and should any liability or sanctions be imposed against City for such use of unauthorized aliens, Consultant hereby agrees to and shall reimburse City for the cost of all such liabilities or sanctions imposed, together with any and all costs, including attorneys' fees, incurred by City. ARTICLE 9. MISCELLANEOUS PROVISIONS 9.1 Notices. Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail, in the case of the City, to the City Manager and to the attention of the Contract Officer (with her/his name and City title), City of Rancho -16- B- 16 01203.0006/296433.1 Palos Verdes, 30940 Hawthorne Blvd., California 90275 and in the case of the Consultant, to the person(s) at the address designated on the execution page of this Agreement. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated at the time personally delivered or in seventy-two (72) hours from the time of mailing if mailed as provided in this Section. 9.2 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. 9.3 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument. 9.4 Integration; Amendment. This Agreement including the attachments hereto is the entire, complete and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by the Consultant and by the City Council. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void. 9.5 Severability. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless. 9.6 Warranty & Representation of Non -Collusion. No official, officer, or employee of City has any financial interest, direct or indirect, in this Agreement, nor shall any official, officer, or employee of City participate in any decision relating to this Agreement which may affect his/her financial interest or the financial interest of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any State or municipal statute or regulation. The determination of "financial interest" shall be consistent with State law and shall not include interests found to be "remote" or "noninterests" pursuant to Government Code Sections 1091 or 1091.5. Consultant warrants and represents that it has not paid or given, and will not pay or give, to any third party including, but not limited to, any City official, officer, or employee, any money, consideration, or -17- B- 17 01203.0006/296433.1 other thing of value as a result or consequence of obtaining or being awarded any agreement. Consultant further warrants and represents that (s)he/it has not engaged in any act(s), omission(s), or other conduct or collusion that would result in the payment of any money, consideration, or other thing of value to any third parry including, but not limited to, any City official, officer, or employee, as a result of consequence of obtaining or being awarded any agreement. Consultant is aware of and understands that any such act(s), omission(s) or other conduct resulting in such payment of money, consideration, or other thing of value will render this Agreement void and of no force or effect. Consultant's Authorized Initials 9.7 Corporate Authority. The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE] -18- B- 18 01203.0006/296433.1 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first -above written. ATTEST: , City Clerk APPROVED AS TO FORM: ALESHIRE & WYNDER, LLP David J. Aleshire, City Attorney CITY: CITY OF RANCHO PALOS VERDES, a municipal corporation , Mayor CONSULTANT: ANDERSONPENNA PARTNERS, INC. By: Name: Title: Lo Name: Title: Address: 3737 Birch, Suite 250 Newport Beach, CA 92660 Two corporate officer signatures required when Consultant is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. CONSULTANT'S SIGNATURES SHALL BE DULY NOTARIZED, AND APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS MAY BE REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONSULTANT'S BUSINESS ENTITY. 01203.0006/296433.1 -19- B- 19 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. STATE OF CALIFORNIA COUNTY OF LOS ANGELES On , 2016 before me, , personally appeared , proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature: OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER TITLE(S) ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ❑ ATTORNEY-IN-FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER SIGNER IS REPRESENTING: (NAME OF PERSON(S) OR ENTITY(IES)) 01203.0006/296433.1 DESCRIPTION OF ATTACHED DOCUMENT TITLE OR TYPE OF DOCUMENT NUMBER OF PAGES DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED ABOVE CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. STATE OF CALIFORNIA COUNTY OF LOS ANGELES On , 2016 before me, , personally appeared , proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature: OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER TITLE(S) ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ❑ ATTORNEY-IN-FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER SIGNER IS REPRESENTING: (NAME OF PERSON(S) OR ENTITY(IES)) 01203.0006/296433.1 DESCRIPTION OF ATTACHED DOCUMENT TITLE OR TYPE OF DOCUMENT NUMBER OF PAGES DATE OF DOCUMENT SIGNERS) OTHER THAN NAMED ABOVE B-21 EXHIBIT "A" SCOPE OF SERVICES I. Consultant will perform the following Services: CONSTRUCTION MANAGEMENT SERVICES A. Oversee Inspection and Manage Project Construction B. Review Daily Inspection Reports prior to submittal to City C. Review Weekly Statement of Working Days prior to submittal to City D. Assist in the review and processing of Request for Information, Change Orders, approved Time and Material work, and Submittals. E. Ensure Compliance of work performed with specs F. Attend Weekly Progress Meetings G. Attend Pre -Construction Meeting H. Serve as liaison between City and construction contractor I. Respond to resident concerns in a timely fashion J. Final Deliverables INSPECTION SERVICES K. Inspect work for compliance with specs at all times work is in progress L. Prepare Daily Inspection Reports M. Prepare Weekly Statement of Working Days N. Assist staff with public relations during construction O. Attend Pre -Construction Meeting P. Develop a final punch list MATERIALS TESTING SERVICES Q. AC Overlay Testing 01203.0006/296433.1 6-22 R. Slurry Seal Testing S. SubgradeBase T. Concrete U. Final Deliverables II. As part of the Services, Consultant will prepare and deliver the following tangible work products to the City: A. Provide Photographs: Photographs of the work site prior, during and after construction. B. Create daily inspection reports during construction operations to be delivered to the City weekly on Friday afternoons. C. Create Weekly Statement of Working Days starting at the Notice to Proceed construction date for the project. Statement to be delivered to the City weekly on Friday Afternoons. D. Provide construction management oversight and periodic prevailing wage verification including project closeout assistance required to finalize the project. E. All lab test results in a comprehensive notebook binder upon completion of the project. F. As needed Requests for Information documents, Change Order documents, approved Time and Material work documents, and Submittal documents. G. Provide Meeting Agendas as needed. H. Provide Meeting Minutes within two business days of the meeting. I. Develop punch list when contractor believes he finished construction work. III. In addition to the requirements of Section 6.2, during performance of the Services, Consultant will keep the City appraised of the status of performance by delivering the following status reports: A. Consultant will provide a weekly summary of daily inspection reports including a summary of any prevailing wage interviews that were conducted. IV. All work product is subject to review and acceptance by the City, and must be revised by the Consultant without additional charge to the City until found satisfactory and accepted by City. 01203.0006/296433.1 B-23 V. Consultant will utilize the following personnel to accomplish the Services: A. Dino D'Emilia, PE, QSD; Principal -in -charge B. Bob Merrell, PE; Construction Manager C. Ed Pratt; Primary Inspector D. LaBelle Marvin; Materials Testing 01203.0006/296433.1 AM EXHIBIT "B" SPECIAL REQUIREMENTS (Superseding Contract Boilerplate) None. 01203.0006/296433.1 B-25 EXHIBIT "C" SCHEDULE OF COMPENSATION I. Consultant shall perform the following tasks at the following rates: RATE TIME SUB -BUDGET Item 1— Construction Management Services (a) Oversee Inspection and Manage $160/Hr. 251 Hrs. $40,160 Project Construction (b) Review Daily Inspection Reports $160/Hr. 80 Hrs. $12,800 prior to submittal to City (c) Review Weekly Statement of Working Days prior to submittal to $160/Hr. 10 Hrs. $1,600 City (d) Assist in the review and processing of Request for Information, Change Orders, $160/Hr. 20 Hrs. $3,200 approved Time and Material work, and Submittals. $118/Hr. 10 Hrs. $1,180 $80/Hr. 24 Hrs. $1,920 (e) Ensure compliance of work $160/Hr. 20 Hrs. $3,200 performed with specs (f) Attend Weekly Progress $160/Hr. 40 Hrs. $6,400 Meetings $118/Hr. 10 Hrs. $1,180 (g) Attend Pre -Construction Meeting $160/Hr. 4 Hrs. $640 (h) Serve as liaison between City $160/Hr. 40 Hrs. $6,400 and construction contractor 01203.0006/296433.1 • (i) Respond to resident concerns in a timely fashion $160/Hr. 70 Hrs. $11,200 0) Final Deliverables $160/Hr. 10 Hrs. $1,600 Subtotal CM Services Item 2 - Inspection Services (k) Inspect work for compliance with specs at all times work is in progress $118/Hr. 550 Hrs. (1) Prepare Daily Inspection Reports $118/Hr. 80 Hrs. (m) Prepare Weekly Statement of Working Days $118/Hr. 32 Hrs. (n) Assist staff with public relations during construction $160/Hr. 40 Hrs. $118/Hr. 8 Hrs. (o) Attend Pre -Construction Meeting $118/Hr. 4 Hrs. (p) Develop a final punch list $160/Hr. 8 Hrs. $118/Hr. 8 Hrs. Subtotal Inspection Services Item 3 - Materials Testing Services (q) AC Overlay Testing $118/Hr. 4 Hrs. $2,465/14r. 5 Hrs. (r) Slurry Seal Testing $118/Hr. 4 Hrs. $2,856/Hr. 18 Hrs. (s) Subgrade/Base $118/Hr. 4 Hrs. $80/Hr. 8 Hrs. (t) Concrete $118/Hr. 4 Hrs. (u) Final Deliverables $160/Hr. 2 Hrs. $118/Hr. 2 Hrs. 01203.0006/296433.1 6-27 $70/Hr. 8 Hrs. Subtotal MT services TOTAL SERVICES III. Within the budgeted amounts for each Task, and with the approval of the Contract Officer, funds may be shifted from one Task subbudget to another so long as the Contract Sum is not exceeded per Section 2.1, unless Additional Services are approved per Section 1.8. IV. The City will compensate Consultant for the Services performed upon submission of a valid invoice. Each invoice is to include: A. Line items for all personnel describing the work performed, the number of hours worked, and the hourly rate. B. Line items for all materials and equipment properly charged to the Services. C. Line items for all other approved reimbursable expenses claimed, with supporting documentation. D. Line items for all approved subcontractor labor, supplies, equipment, materials, and travel properly charged to the Services. V. The total compensation for the Services shall not exceed $249,453.00 as provided in Section 2.1 of this Agreement. VI. The Consultant's billing rates for all personnel are attached as Exhibit C-1. 01203.0006/296433.1 EXHIBIT "D" SCHEDULE OF PERFORMANCE I. Consultant shall perform all Services timely in accordance with the schedule to be developed by Consultant and subject to the written approval of the Contract Officer and the City Attorney's office. II. Consultant shall deliver the following tangible work products to the City by the following dates. A. Provide Photographs: Photographs of the work site prior, during and after construction. Pictures are to be included in daily inspection reports. B. Create daily inspection reports during construction operations to be delivered to the City weekly on Friday afternoons. C. Create Weekly Statement of Working Days starting at the Notice to Proceed construction date for the project. Statement to be delivered to the City weekly on Friday Afternoons. D. Provide construction management oversight and periodic prevailing wage verification including project closeout assistance required to finalize the project. E. All lab test results in a comprehensive notebook binder upon completion of the project. Notebook binder is to be submitted to the City within two weeks of Construction Completion. F. As needed Requests for Information documents, Change Order documents, approved Time and Material work documents, and Submittal documents. G. Provide Meeting Agendas as needed. H. Provide Meeting Minutes within two business days of the meeting. I. Develop punch list when contractor believes he finished construction work. This item will be consistent with the construction contractor's schedule. III. The Contract Officer may approve extensions for performance of the services in accordance with Section 3.2. 01203.0006/296433.1 Proposal to Provide Professional Construction Management, Inspection and Materials Testing Services for the City's Residential Streets Rehabilitation Project City of Rancho Palos Verdes April 28, 2016 Submitted by: dw /� ANDERSON • PENNA • PARTNERS IN PROJECT DELIVERY 3737 BIRCH STREET, SUITE 250 NEWPORT BEACH, CA 92660 (949) 428 1 500 WWW.ANDPEN.COM C-1 -\ ANDERSON •PENNA • PARTNERS IN PROJECT DELIVERY April 28, 2016 Lea Reis, Project Manager City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Boulevard Rancho Palos Verdes, CA 90275 Subject: Proposal for Professional Construction Management, Inspection and Materials Testing Services for the City's Residential Streets Rehabilitation Project - Area 2 Dear Lea: AndersonPenna Partners, Inc. (APP) welcomes this opportunity to continue offering the City of Rancho Palos Verdes (City) a highly qualified construction management (CM), inspection and materials testing team for the successful delivery of the City's Residential Streets Rehabilitation Project. APP has been fortunate to partner with the City to deliver several significant projects intended to improve the public's quality of life. As a result, APP is very familiar with the City's standard operating policies and procedures and has been providing similar services for the City since 2010. Recent successful completion of APP projects for the City include: Residential Streets Rehabilitation Project for Year 2013-14, Area 9; Fiscal Year 12-13 Annual Sidewalk Repair Project and the Residential Streets Improvement Project, Phases 1 and 2 Fiscal Year 11-12, Area 3 and Area 5A Project; Miraleste Plaza Storm Drain; and the Palos Verdes Drive South Rehabilitation Project. APP has also recently and/or currently providing construction management and inspection services to many Southern California local agencies, including the Cities of Burbank, Torrance, Carson, Irvine, Manhattan Beach, Newport Beach, Laguna Beach, Laguna Hills, Lake Forest and Tustin. Our team members have also provided various similar services to the Cities of Santa Monica, Los Angeles, Hermosa Beach, Anaheim, Inglewood, and Carlsbad. The APP Team has exceptional and relevant experience to continue providing comprehensive construction management, inspection, and materials testing services that will result in a streamlined project experience. Our team members continue to be assigned because their qualifications and experience are specifically relevant to the City's Residential Street Rehabilitation Project. By selecting the APP team, the City will be partnered with: • A principal -in -charge with a personal stake in the local and public works community and excellent history of success delivering construction management and inspection services in cities throughout Southern California • A highly experienced construction manager with extensive experience delivering identical services on similar projects for the City of Rancho Palos Verdes. • A full time inspector that is extensively knowledgeable with street rehabilitation, with extensive public relations in the City of Rancho Palos Verdes also the prime inspector earlier last year for the City. • A firm with an exceptional track record in the City of Rancho Palos Verdes and throughout Southern California. Our team has the proven capabilities required to successfully address this project's many critical elements, such as minimizing public inconvenience, effectively redirecting traffic and improving aesthetics. The APP Team includes the following subconsultant, La Belle Marvin, Inc. recognized as a leader in the industry, with current, relevant experience on similar street 3737 BIRCH STREET, SUITE 250 • NEWPORT BEACH, CA 902660 WWW.ANDPEN.COM PHN 949 428 1 500 • FAX 949 258 5053 CERTIFIED DBE C-2 City of Rancho Palos Verdes April 28, 2016 ANDERSON • PENNA % Page L • PARTNERS IN PROJECT DELIVERY - rehabilitation projects in Southern California. APP has worked with this firm on several projects and will therefore be able to provide a seamless work product to the City. AndersonPenna's contractual contact during the proposal period is: Mr. Dino D'Emilia, PE, QSD Vice President, Construction Services AndersonPenna Partners, Inc. 3737 Birch Street, Suite 250, Newport Beach, CA 92660 Cell: (714) 458-0703, Email: ddemilia@andpen.com The APP team is excited about this opportunity to perform comprehensive construction management, inspection and materials testing services for the City of Rancho Palos Verdes. If you have any questions or require additional information, please feel free to contact me at (714) 458-0703 or by email at ddemilia@andpen.com or Bob Merrell at (714) 875-5917 or bmerrell@andpen.com. We look forward to being invited to further discuss our team's qualifications and to continue working with the City on the successful delivery of this very significant project. Respectfully submitted, AndersonPenna Partners, Inc. Dino P. D'Emilia, PE, QSD Bob Merrell, PE Vice President, Construction Services Construction Manager C-3 Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 Table of Contents Cover Letter 1. Team Qualifications and Experience............................................................................................................................................1 OrganizationChart.................................................................................................................................................................1 Resumes.................................................................................................................................................................................. 2 2. Similar Project Experience............................................................................................................................................................8 3. Firm Qualifications.....................................................................................................................................................................13 AndersonPennaPartners, Inc...............................................................................................................................................13 Subconsultant (Materials Testing).......................................................................................................................................14 4. Project Understanding and Approach........................................................................................................................................16 ProjectUnderstanding..........................................................................................................................................................16 ProjectApproach..................................................................................................................................................................16 CriticalIssues.........................................................................................................................................................................17 Scopeof Work.......................................................................................................................................................................18 Construction Management Services.....................................................................................................................................18 InspectionServices...............................................................................................................................................................23 MaterialsTesting Services....................................................................................................................................................25 iIPage ^ \ C - A ANDERSON-PENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 1. Team Qualifications and Experience Principal -in -charge — Dino D'Emilia, PE, QSD: With over 30 years of experience on similar assignments for a variety of local agencies, Dino will provide principal oversight for this project. Dino has completed numerous similar assignments throughout Southern California including: Flower Street Pavement Rehabilitation Project, Downey Avenue Pavement Rehabilitation and the West Branch Greenway Landscape Improvements Projects for the City of Bellflower, the 2013 Street Rehabilitation Project and Midwick Tract Street Improvements Project for the City of Alhambra, La Cienega Boulevard and Fairview Boulevard for City of Inglewood, the Crenshaw Boulevard Rehabilitation (182nd Street to 190th Street) for the City of Torrance, to name a few. Dino's extensive experience performing similar services for many Southern California cities on similar projects is illustrated in his resume on the following page. Construction Manager, Bob Merrell PE brings more than 30 years of experience in design, project/ construction management and inspection for a wide variety of infrastructure improvement projects. Bob has had the opportunity to provide services on many diversified engineering assignments for the City of Rancho Palos Verdes starting with the completion of the design and construction management of the Silver Spur Road rehabilitation in the early 1990's. That project was followed by the successful achievement of the design and construction management, including inspection, for the Annual Residential Street Rehabilitation program for several annual cycles. During that period, over 100 streets were rehabilitated to varying degrees but most of them were overlaid. All of these projects were managed and/or inspected by Bob. He also designed and provided construction management and inspection for a portion of Palos Verdes Drive East above PVDS, the reconstruction of 25th Street at the City limits and the reconstruction of Palos Verdes Drive South through Portuguese Bend. Bob has also completed a number of drainage improvement projects throughout the City over the years as well. Ed Pratt, is proposed as the primary inspector for the project. Ed has more than 30 years of public works infrastructure construction and inspection experience, including asphalt concrete pavement rehabilitation, traffic signal installation and upgrade, as well as virtually every type of improvement in the public right of way. He has extensive recent experience performing identical services for the City of Rancho Palos Verdes on the Fiscal Year 12-13 Annual Sidewalk Repair Project and the Residential Streets Improvement Project, Phases 1 and 2 Fiscal Year 11-12, Area 3 and Area 5A Projects and the Palos Verdes Drive East project. His background includes construction management, construction supervision, public works inspection, expert witness representation, change order processing, schedule tracking, and municipal bidding processes. He is exceptionally well versed at monitoring and requiring compliance on traffic control, work site safety and NPDES/SWPPP. Organization Chart The APP Team's in depth relevant experience to the Residential Streets Rehabilitation Project is illustrated in our team members resumes beginning on the following page. Liq RANCHO PALOS VERDES C-5 AND RSON\NNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 Resumes Dino P. D'Emilia, Dino P. D'Emilia, PE, QSD brings 30 years of project and construction management PE9 QSD experience as well as civil engineering on a wide array of public works projects including construction management of roadways, railroads, bridges, public building Principal -in -charge facilities, police and fire facilities, parks, landscape, utilities, drainage and flood Education control, highway, and toll facilities. BS/1991/Civil Engineering, During his career, Dino has participated in both the detailed aspects of project Northeastern University controls management and the oversight of construction management teams Professional Registrations responsible for delivering of over $0.75 -billion in public improvements for local 1996/PE/CA #55453 agencies. Dino is well known in Southern California as a "hands on" CM with knowledge of public contract administration, federally funded construction contract Qualified SWPPP Developer administration and Caltrans Local Assistance Procedures Manual expertise. (QSD)/Qualified SWPPP Practitioner (QSP): Certification #C55453 RELEVANT EXPERIENCE Professional Affiliations Flower Street Pavement Rehabilitation Project, City of Bellflower, CA. APWA So. CA Chapter Principal -in -charge for construction management, inspection services and labor So. CA Chapter, 2004 compliance oversight for the Flower Street Rehabilitation Project that spans from President and 2012 Congress 130' west of Hayter Avenue to Woodruff Avenue. The improvements include Finance Chair Fina pavement rehabilitation, sidewalk, curb and gutter, traffic loops and signing and City and County Engineer's striping. The project is federally funded project and will adhere to reporting, labor Association compliance, and Buy America requirements. The construction management CMAA and ASCE processes and contract administration procedures closely adhered to Chapter 16 of Chi Epsilon, 1990 -present the Caltrans Local Assistance Procedures Manual. Honors and Awards Carson Street Master Plan, Carson Successor Agency, City of Carson, CA. Top Leader - Private Sector, APWA Principal -in -charge for construction management services for the Carson Street So. CA Chapter, 2004 Master Plan. The project extends from the San Diego (1-405) Freeway to the westerly President's Chapter Service Award, terminus boundary of Carson, near Harbor (1-110) Freeway. The proposed APWA So. CA Chapter, December, construction contract time allows 425 calendar days and the engineer's estimate of 2004 probable construction costs is $17,000,000. The project is funded by an Agency bond. The project improvements include extensive colorful, drought -tolerant landscaping Years of Experience in parkways and medians, street furniture (benches, bike racks, and pedestrian Entered the profession in 1983 lights), public art, entry monuments, a new traffic signal, reconfiguration of turn lanes, reconstruction of driveways for ADA compliance, and retrofitting median lights with LED lights. 2013 Street Rehabilitation Project and Midwick Tract Street Improvements Project, City of Alhambra, CA. Principal -in -charge for inspection of the $3.2 -million pavement rehabilitation projects for the City of Alhambra located over the Midwick Tract. Improvements consisted of traffic control, survey and monumentation, installation of BMP's, removal of existing curb and gutter, removal of sidewalk, removal of existing pavement, installation of new base course over 6" CMB, tapered cold milling, installation of 1" leveling course, installation of 2" ARMM-GG pavement overlay, adjustment of utility accesses, adjustment to manholes, striping restoration, installation of traffic detector loops, removal and replacement of full depth AC pavement, installation of crack seal and the application of slurry seal. La Cienega Boulevard and Fairview Boulevard, City of Inglewood, CA. Resident engineer responsible for this $600,000 project providing construction management and inspection services for the La Cienega Boulevard and Fairview Boulevard 21 P i g e C-6 ANDERSO TENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project — Area 2 Improvement Project is to improve traffic safety and ease congestion. This project involves the widening of Fairview Boulevard between La Cienega Boulevard and la Tijera Boulevard, the construction of dedicated right and left turn pockets at Fairview Boulevard and La Cienega Boulevard, traffic signal improvements and modifications at the intersection of La Cienega and Fairview Boulevard. Project improvements also include masonry retaining walls supported by concrete footings, concrete sidewalk and driveway, ramps, cross gutters, curb and gutters, pavement resurfacing, striping. The geotechnical aspects of this project consist of rough grading, road excavation and compaction, asphalt paving over compacted base, and subgrade preparation. The project is funded by the American Reinvestment Act (ARRA). Crenshaw Boulevard Rehabilitation (182nd Street to 190th Street), City of Torrance, CA. Principal-in- charge/construction manager responsible for this $1.6 -million, federally funded roadway rehabilitation and landscape improvement project. Work generally involved removal and replacement of deep lift paving sections, grind and overlay of the street limits using Asphalt Rubber Hot Mix (ARHM), hardscape and landscape improvements. The project utilized federal funds, requiring contract administration and project/documents controls in strict adherence to the Caltrans Local Assistance Procedures Manual. Williams and Oris Alleys Paving Improvement Projects - Compton Alleys, City of Compton, CA. Principal -in -charge responsible for project and construction management for Oris and Williams Alley street improvement projects, combined totaling $515,370. Work generally involved construction of paving, curb and gutter, alley approaches, handicap ramps, sidewalk replacement, and related construction work in addition to signage and pavement marking to complete the project. All work related to the adjustment of utility covers, valve and meter boxes affected by Contract work. Eshelman Avenue Water Main Replacement and Pavement Rehabilitation, City of Lomita, CA. Construction manager for this $1.6 -million water main replacement and roadway rehabilitation project. Waterline improvements included construction of an 8" PVC water main on Eshelman Avenue between Pacific Coast Highway and Lomita Boulevard, including installation of new fire hydrants, service laterals, valves, blow -offs, air release valves and associated water appurtenances to replace the existing 6" undersized ductile iron water main. The project also includes pavement rehabilitation and striping of Eshelman Avenue within the project limits. Paving operations included cold milling of the entire roadway on Eshelman Avenue from Lomita Boulevard to Pacific Coast Highway. Inspection of ground surface resulted in elimination of all proposed crack sealing. The paving section consisted of a 3/a inch leveling course, 3/8" chip seal and 2-1/2 inch ARHM overlay. Appurtenant work involved manhole and valve adjustments, thermoplastic striping, traffic loop replacement. The project required a Caltrans Encroachment permit for traffic control and paving operations within the State ROW at PCH. Broadway (SR -133) Streetscape Improvements (CIP Project No. 249), City of Laguna Beach, CA. Resident engineer responsible for this $321,000 federally funded landscaping and scenic beautification project that includes storm drain, hardscape, landscape and irrigation, public art and pedestrian improvements along Broadway Street/SR-133 from Cliff Drive to Forest Avenue. This primary route between the City and the SR -73 and 1-405 carries substantial vehicular traffic, is adjacent to the Laguna Canyon Channel and is home to many commercial, retail, restaurant, entertainment and artisan businesses. The project required coordination with three separate artists, transit operations, Orange County Flood Control District, Caltrans Permits and Inspection, Caltrans Office of Local Assistance, Businesses and Residents, and the Laguna Beach School District. Del Amo Boulevard Extension Project, T-30 — Phases 1 and 2, City of Torrance, CA. Construction manager overseeing the construction of a new 4 -lane roadway (Del Amo Blvd) between Crenshaw Blvd and Maple Ave and widening of an existing segment of Del Amo Blvd between Maple Ave and Prairie Ave. Construction also includes a new bridge over the BNSF Railway's mainline tracks, MSE retaining walls, drainage improvements, relocation of railroad spur track, reconstruction of affected off-site facilities and coordination with Southern California Edison and ExxonMobil Oil for relocation of their utilities. The estimated construction cost was $15 -million and was partially funded by the American Recovery and Reinvestment Act (ARRA), Regional Surface Transportation Program (RSTP) funds, as well as MTA and local funding sources. Assisted the City with a bidability/constructability review of the bid documents for phase 2, resulting in substantial savings to the project. 311' o q e /i C - 7 ANDERSON•PENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project — Area 2 Robert Merrell, PE Construction Manager Education BS/1974/Civil Engineering/ California State University, Long Beach Registrations 1976/ PE/CA #28100 Years of Experience Entered the profession in 1973 Bob Merrell, PE has an extensive career of more than 30 years in project design and construction management for public works engineering. His expertise includes design, management and right-of-way coordination for projects involving the widening of major arterials and collector streets, construction of storm drain facilities and improvements to regional channel systems. Specific areas of expertise include freeway improvements, storm drain facilities, regional channel improvements, large dams, major arterial and collector street widening, railroad grade separations and bridge projects. On behalf of cities throughout Southern California, he has served in such capacities as construction manager and engineer of record to advance the formation and use of Community Facilities and Assessment Districts. RELEVANT EXPERIENCE Residential Streets Rehabilitation Project for Year 2013-14, Area 9, City of Rancho Palos Verdes, CA. Project manager responsible for the $1 -million overall design and plan preparation for the residential street improvements throughout Area 9 including the preparation of a detailed inventory of all existing improvements within the public right-of-way that require replacement or rehabilitation. In addition to Area 9, the plans for Area 1 and Area 5B were assembled into one large PS&E package for bidding and construction. Residential Street Rehabilitation Project, Areas 3 and 5A, FY 2011-12, City of Rancho Palos Verdes, CA. Assisted with the project bidding process and followed up with serving as the full time Construction Manager directly supervising the construction inspection staff for Phase 1 and Phase 2. Provided continuous liaison with City staff and the community while also directing the preparation of weekly progress reports, leading the weekly meetings and directly coordinating the contractor's progress billings. Palos Verdes Drive South, City of Rancho Palos Verdes, CA. Project manager responsible for the plan preparation and rehabilitation of Palos Verdes Drive South. A portion of Palos Verdes Drive South lies within an unstable land mass where settlement occurs. Over the years the "ocean side" portion of roadway had settled more than the "inland side" creating an uneven cross section. In addition, the pavement began to experience areas of stress cracking with evidence of pending pavement failure. The project included street rehabilitation plans where the overlay was variable in order to achieve better cross section. The road segment had several drainage systems that were upgraded with the rehabilitation project. Directed the preparation of construction documents and completed the construction administration and inspection for the project. Point Vicente Interpretive Center Expansion, City of Rancho Palos Verdes, CA. Project manager responsible for the design and preparation of the civil plans for the building and site improvements for the expansion of the PVIC complex. In addition to the building remodel and expansion, extensive improvements were made to the storm drain system and parking areas. Palos Verdes Drive East Storm Drain Improvements, City of Rancho Palos Verdes, CA. Project manager responsible for the design and preparation of plans, specifications and estimates for the installation of drainage improvements along Palos Verdes Drive East from Bronco to southeast of Headland Drive. Steep terrain was a constraint for the outlet into a natural drainage course. Directed the preparation of construction documents and completed the construction administration and inspection for the project. Miraleste Plaza Storm Drain, City of Rancho Palos Verdes, CA. Project manager responsible for the design and installation of the Miraleste Plaza storm drain. The project included the installation of new storm drain replacing an undersized and deteriorating system previously constructed in the early 1950's. The work involved designing the system within a confined right of way and through many interfering utilities. Also served as CM and inspector through construction. 4111 a q e C-8 ANDERSONTENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project— Area 2 Storm Drain System Engineering Peer Review Services for the Naples Sea Walls, On-call Construction Management, City of Long Beach, CA. Design peer review of the project drainage system and provide an opinion of the system's fitness for intended purpose, practicality for maintenance and constructability. APP provided full-time on-site inspection and part-time management and support services to assist the Tidelands CIP Officer through the completion of the construction activities, determination of acceptability of constructed improvements and appropriate remedies. APP also provided review of project documentation to assist with claims avoidance and/or resolution. Richmond Street Arterial Improvements, City of EI Segundo, CA. Quality control/quality assurance manager responsible for the $735,000 Richmond Street arterial improvements located between EI Segundo Blvd. and Holly Ave. within the downtown area for 1,600 lineal feet with 60 feet of street and sidewalk width. Design work includes street, sidewalk, parking, survey, traffic and landscape improvements. A critical issue is solving the impacted downtown parking problem by engaging the community in outreach meetings and providing street, sidewalk, and parking design solutions. Various Drainage and Grading Improvements, Air Force Plant 42, City of Palmdale, CA. Project manager responsible for various drainage and grading improvements to the City of Palmdale. In order to bring the airfield into compliance with current lateral clearance requirements, several projects included re -grading the runway infields and undergrounding surface drainage. In addition to the installation of underground facilities, a flow -by peak flow reduction element was designed and constructed. The side -weir and storage basin construction increased the theoretical flood protection frequency to an acceptable level when most of the existing infrastructure provided less than ten year recurrence capacity. Platinum Triangle Master Land Use Plan, Sewer and Drainage Studies, City of Anaheim, CA. Project manager responsible for the plan preparation and sewer and drainage studies for the City of Anaheim. Prior to approving the Platinum Triangle Master Land Use Plan (PTMLUP), the Department of Public Works needed to study the effects to major and local sanitary sewer and storm drainage facilities. The project consisted of researching existing data regarding current sewer and storm drain master plans, facilities and requirements. Updating and modeling the sewer and storm drain facilities for the area were completed to determine the areas of local benefits for individual facilities. Finally, mitigations were developed for future developments concerning identified sewer and storm drain deficiencies. Overall Base Civil Improvements, Los Angeles Air Force Base, USAF, CA. Project manager responsible for the plan preparation for the Los Angeles Air Force Base. The project consisted of preparing roadway, drainage and utility plans for most of the interior streets and parking lots for the Los Angeles Air Force Base. The work involved realignments and upgrades to address capacity and American Disabilities deficiencies across the military complex. Stadium Area Master Plan of Drainage, City of Anaheim, CA. Project manager responsible for managing the analysis and preparing the summary report. Project involved research and inventory of existing drainage facilities for District 27 for use in updating the existing Master Plan of Drainage. This data was used to create computer models for both hydrologic and hydraulic analysis to identify deficiencies and proposed improvements. Master Plan of Drainage for District 2 and for the Southeast MPD, City of Anaheim, CA. Project manager responsible for this $30 -million project. In each case, the areas were evaluated with up to date hydrological analysis base on the County's new hydrology criteria established in 1985. Mapping for each included system deficiencies and infrastructure requirements to meet the City's new Drainage Criteria. Downtown Parkway Enhancement Project, City of Oceanside, CA. The project consisted of implementing another phase of the downtown parkway renovations. The existing parkways were generally 12 feet in width and most were made up of a varied hardscape from concrete to dirt to asphalt concrete. The improvements consisted of decorative brick inlays with tree wells. In conjunction with the parkway improvements, curb and gutter as well as drive approaches were reconstructed to extent necessary to complete the enhancement. 51Pige C-9 ANDERSONTENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 Ed Pratt Ed Pratt brings more than 42 years of public works infrastructure construction management and inspection experience. He has worked extensively with pavement Public Works Inspector construction and rehabilitation, overlay and slurry seal, striping, grading, and traffic signal installation. Ed's project expertise includes reinforced -concrete and block Educationwalls, installing landscape and irrigation, storm drains and sewers, as well as OSHA SafetyyCertifications Program Certification creating and rehabilitating channels. He has completed projects involving public Trench Safety Certification parks and community facilities. Ed has served as an expert witness and project client Concrete Technology Continuing liaison, tracked schedules, processed change orders and supported municipal Education bidding. His capabilities include traffic control, job site safety and compliance with Advanced Blueprint Reading OSHA regulations and federal and state agency funding requirements. Continuing Education RELEVANT EXPERIENCE Construction Equipment Operator On -Call Public Works Inspection, City of Fontana, CA. Currently serving as an Continuing Education inspector on variety of municipal projects in support of the city engineer. Duties Years of Experience include: reviewing plans, specifications, shop drawings and all other contract and Entered the profession in 1972 construction related documents; attending pre -construction meetings and addressing concerns; reviewing traffic control plans and enforces them in the field, and maintaining daily inspection reports, photographs, videos and daily reports. Palos Verdes Drive East, Arterial Roads Rehabilitation Project, City of Rancho Palos Verdes, CA. Inspector for this $3.2 -million, five -mile road rehabilitation. This project involved traffic control, construction survey, saw cutting, unclassified excavation, PCC curb and gutter, curb access ramps, bus pads, drainage modifications, asphalt pavement road widening and repairs, AC berms, gravity block walls, roadway signing, asphalt pavement milling and overlay, crack routing and sealing, micro -surface paving, traffic striping and markings and raised pavement markers. Sidewalk and Street Repair, Areas 3 and 5A - Phase 1, City of Rancho Palos Verdes, CA. Provided inspection services for wheelchair ramps and the removal and replacement of driveways, approximately10,000 linear feet of curb and gutter, 150,000 square feet of sidewalk and approximately 500,000 square feet of street asphalt. Roadway Pavement Rehabilitation, Areas 3 and 5A, Phase 2, City of Ranchos Palos Verdes, CA. Served as inspector on more than 1 million square feet of Type 2 and chip seal slurry. Williams and Oris Alleys Improvements, City of Compton, CA. Performed inspection services for these $515,370 street improvement projects. Work involved construction of paving, curb and gutter, alley approaches, handicap ramps, sidewalk replacement, and related construction work in addition to signage and pavement marking. Provided services related to the adjustment of utility covers and valve and meter boxes affected by contract work. Eshelman Avenue Water Main Replacement and Pavement Rehabilitation, City of Lomita, CA. Inspector for the paving portion of this $1.6 -million water main replacement and roadway rehabilitation project. Paving operations included cold milling of Eshelman Avenue in its entirety from Lomita Boulevard to Pacific Coast Highway. The ground surface inspection led to elimination of all proposed crack sealing. The paving section included a three -quarters -inch leveling course, a three - eights -inch chip seal and 2 1/2 -inch ARHM overlay. Appurtenant work involved manhole and valve adjustments, thermoplastic striping, and traffic loop replacement. The project required a Caltrans encroachment permit for traffic control and paving operations within the state right-of-way at Pacific Coast Highway. Pioneer Boulevard Rehabilitation between Imperial Highway and Lakeland Road, City of Norwalk, CA. Inspector for this $565,000,1-5 widening mitigation, roadway rehabilitation project. The work included curb and gutter, removal and replacement of 1,200 square feet of sidewalk, 1,500 lineal feet of curb and gutter, commercial driveways, median island repairs, 245,750 square feet of cold planing and 3,250 tons of rubberized asphalt. (2013) 6 111 C - 10 ANDERSONTENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 190th Street Rehabilitation and Water Main Replacement, City of Torrance, CA. Inspector for this $1.6 -million project including curb and gutter, removal and replacement of 20,000 square feet of sidewalk, 3,000 linear feet of curb and gutter, 4,000 linear feet of 12 -inch ductile iron domestic water line with house service and fire hydrant connections, 2,600 feet of CL90012-inch reclaimed water line, 2,600 feet of communication conduit with inner duct, commercial driveways landscaped median islands and bus pads. Roadway improvements included 9,000 tons of rubberized asphalt for a complete street rehab, consisting of 12 -inch base fabric, 12 -inch OV CAB, a finish of base asphalt and a 2'/z -inch rubberized cap. (2014-2015) Bandini Boulevard Street Rehabilitation, City of Bell, CA. Inspector for three miles of street rehabilitation. The work included earthwork for an 11 -inch street section, cold planing, deep lift base asphalt, AHRM overlay, striping, loops, sidewalk replacement and handicap ramps. Substantial traffic control and night work were required. South Highland Extension, City of Fontana, CA. Inspector for this five -mile street extension, including complete rehabilitation on one side, complete intersection work on two major arterial crossings, storm drain, sewer main, curb, gutter, sidewalk, handicapped ramps, three traffic signals, 42 street lights and hardscape. Responsible for quality assurance, certified payroll, quantities and billings, change management, public relations, daily reports and project closeout. Mango Avenue and Baseline Road Rehabilitation and Realignment, City of Fontana, CA. Inspector for the complete street surface removal, street realignment, compaction, curb and gutter, sewer, storm drain, traffic signal, landscaping, CAB and asphalt along city blocks of Mango Avenue and one block on Baseline Road. Oversaw traffic control, certified payroll, punch list, public relations, change orders, daily reports, verification of quantities and billing. Street Improvements, City of San Clemente, CA. Inspector for this $2 -million, 12 -mile street improvement project. The improvements included a 12 -inch street section with paving fabric, A/C base course, AHRM overlay, curb, gutter, handicap ramps, and sidewalks. Responsibilities included inspection and contract administration duties for two separate construction contract and close coordination of complex traffic control challenges to maintain resident access at all times. Street Improvements, City of Lake Forest, CA. Responsible for citywide street rehabilitation in various locations including Trabuco Road and Lake Forest Avenue. Work included pavement grinding, repaving and asphalt pavement overlay, slurry seal, striping, traffic control scheduling, and community outreach for more than 10,000 linear feet of major arterials, secondary arterials and residential streets as part of the City's annual maintenance plan. Orangethorpe Avenue Street Rehabilitation, City of La Palma, CA. Responsible for rehabilitation of Orangethorpe Avenue from Valley View Avenue to SR -91. Work included pavement grinding, pavement reconstruction, petromat placement, asphalt pavement overlay, striping, traffic control and community outreach for more than 2,500 linear feet of major arterials as part of the City's annual maintenance plan. Median Landscape, City of Torrance, CA. Inspector for median improvement project on major arterial roadway with improvements including irrigation, trees and plants. Citywide Street Improvements, City of Chino, CA. Inspector for citywide street rehabilitation including full pavement grinding, asphalt pavement overlay and traffic signal installation. The project also included striping, traffic control scheduling, and community outreach for work involving more than 10,000 linear feet of major arterials, secondary arterials and collector streets as part of the City's annual pavement maintenance plan. Citywide Street Improvements, City of Lake Forest, CA. Inspector responsible for street rehabilitation in various locations including pavement grinding, asphalt pavement overlay, slurry seal, striping, traffic control scheduling, and community outreach for over 10,000 linear feet of major arterials, secondary arterials, and residential streets as part of the City's annual pavement maintenance plan. 7111 C - 11 AND RSON\NNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 2. Similar Project Experience APP offers the City extensive relevant experience on projects identical to the Residential Streets Rehabilitation Project. Client/Reference: City of Rancho Palos Verdes Nicole Jules, Deputy Public Works Director (310) 544-5275 nicolej@rpvca.gov Project Dates: Start: 2010 Complete: Ongoing Services: Construction Management/Inspection Project Value: Construction Cost: $4 million Fee: $350,000 Team Members: Robert Merrell, PE — CM Ed Pratt — Inspector For several years, APP has been providing construction management and inspection services to the City of Rancho Palos Verdes for a variety of infrastructure projects. Examples include: Residential Streets Rehabilitation Project for Year 2013-14, Area 9, City of Rancho Palos Verdes, CA. Responsible for the overall design and plan preparation for the residential street improvements. (See next page for more project details.) Residential Street Rehabilitation Project, FY 2011-12, City of Rancho Palos Verdes, CA. Assisted with the project bidding process and followed up with serving as the full time Construction Manager directly supervising the construction inspection staff. Miraleste Plaza Storm Drain, City of Rancho Palos Verdes, CA. The project included the installation of new storm drain replacing an undersized and deteriorating system previously constructed in the early 1950s. Palos Verdes Drive South, City of Rancho Palos Verdes, CA. The project included street rehabilitation plans where the overlay was variable in order to achieve better cross section. The road segment had several drainage systems that were upgraded with the rehabilitation project. Directed the preparation of construction documents and completed the construction administration and inspection for the 81Page _ C- 12 ANDERSO TENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project — Area 2 Client/Reference: City of Rancho Palos Verdes, Dept. of PW Nicole Jules, Deputy Public Works Director } (310) 544-5275 Project Dates: NicoleJ@rpvca.gov Project Dates: Start: 2013 Complete: 2014 ~� Services: CM, Project Inspection, Materials Testing and Team Members: Quality Assurance Construction Cost: $2.8 million APP Team Members: Dino D'Emilia, PE, QSD — Principal -in -charge Ed Pratt - Public Works Inspector Subconsultant: Daniel Guzman —Soils Inspecto (Koury) APP was responsible for construction management, inspection and materials testing and quality assurance for this $3.2 -million, five -mile road rehabilitation project. This project involved traffic control, construction survey, saw cutting, unclassified excavation, PCC curb and gutter, curb access ramps, bus pads, drainage modifications, asphalt pavement road widening and repairs, AC berms, gravity block walls, roadway signing, asphalt pavement milling and overlay, crack routing and sealing, micro -surface paving, traffic striping and markings, raised pavement markers, and other work. Koury provided geotechnical monitoring as a member of the APP team. Client/Reference: City of Rancho Palos Verdes, Dept. of PW Melissa Countryman, PE, TE (retired) (310) 544-5256; melissac@rpvca.gov Project Dates: Start: 2014 Complete: Ongoing Services: Roadway Design Project Value: Construction Cost: $1 million Fee: $360,000 Team Members: Bob Merrell, PE — Project Manager ' Joe Buckner, PE, PLS, QSD — Project Engineer Design Services: The City of Rancho Palos Verdes has a program where at least one of their nine pavement management areas is addressed in detail each year. APP was selected to complete the design and prepare construction documents for the Area 9 improvements which represent the Fiscal Year 2013-14 program element. The project identified all deficiencies located with the residential street right-of-way including drive approaches, sidewalk, ADA ramps and utility cover misalignments as well as the pavement itself. The City's progressive attention to the public right of way on an annual basis keeps the pavement in very good condition where only a few streets require extensive repairs, overlays or reconstruction. Bidding Assistance: APP will assisted the city with the bidding process including preparation of any addenda necessary to address questions during the bid period. Once bids were received, APP will make necessary adjustments to the plans to brinq the project into line with available fundinq for the current proqram. C - 13 AND RSO NTENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project — Area 2 Client/Reference: City of Lomita Tom Shahbazi, PE, Associate City Engineer (310) 325-7110. Ext. 210 t.shahbazi@lomitacity.com Project Dates: Start: 2013 Complete: 2014 Services: Construction Management, Inspection Services and Labor Compliance Project Value: Construction Cost: $1.6 million Fee: $147,003.88 Status: Successfully completed Team Members: Dino D'Emilia, PE, QSD — CM Ed Pratt — Inspector Joe Stoakley, PE — Assistant CM and Supplemental Inspector APP provided construction management, inspection and labor compliance oversight services for this water main replacement and roadway rehabilitation project. Waterline improvements included construction of an 8" PVC water main on Eshelman Avenue between Pacific Coast Highway and Lomita Boulevard, including installation of new fire hydrants, service laterals, valves, blow -offs, air release valves and associated water appurtenances to replace the existing 6" undersized ductile iron water main. The project also included pavement rehabilitation and striping of Eshelman Avenue within the project limits. Paving operations included cold milling of the entire roadway on Eshelman Avenue from Lomita Boulevard to Pacific Coast Highway. Inspection of ground surface resulted in elimination of all proposed crack sealing. The paving section consisted of a 3/a inch leveling course, 3/8" chip seal and 2-1/2 inch ARHM overlay. Appurtenant work involved manhole and valve adjustments, thermoplastic striping, and traffic loop replacement. The project required a Caltrans Encroachment permit for traffic control and paving operations within the State Right of Way at PCH. 10 IP C — 14 ANDERSON • PENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 Client/Reference: City of Beverly Hills Mark Cuneo, PE, City Engineer Capital Assets Department Civil Engineering Department (310) 285-2557 mcuneo@beverlyhills.org Services: Project Management/Construction Management Team Members: Dino D'Emilia, PE — Principal -in -charge Bill Zein, PE — Project Manager APP has been providing project management services for this project since mid -2015. The City of Beverly Hills plans to reconstruct North Santa Monica Boulevard to rebuild the deteriorating roadway, upgrade the drainage system, widen the roadway between Canon Drive and Wilshire Boulevard, install new street lighting and implement low -impact drainage concepts to comply with the urban runoff water quality regulations. APP's project manager has been reviewing the plans for constructability and bidability, preparing a phasing and construction mitigation plan and making any necessary changes to the project specifications. APP'S services will also include packaging the project documents for bidding and assisting the City with the bidding process. Client/Reference: City of Torrance Lubna Arikat, Associate Engineer (310)618-3066 LArikat@torranceca.gov Project Dates: Start: 5/2014 Complete: 1/2015 Services: Construction Management Project Value: Construction Cost: $1.6 million Fee: $167,000 Status: Successfully completed Team Members: Dino D'Emilia, PE, QSD — Project Manager Joe Stoakley, PE, QSD — Project Engineer Al Aguilera — Inspector Debby Cobb — Documents Control/ Labor Comaliance APP provided construction management for this $1.6 -million, federally funded roadway rehabilitation and landscape improvement project. Work generally involved removal and replacement of deep lift paving sections, grind and overlay of the street limits using Asphalt Rubber Hot Mix (ARHM), hardscape and landscape improvements. The project utilized federal funds, requiring contract administration and project / documents controls in strict adherence to the Caltrans Local Assistance Procedures Manual. C- 15 AND O \NNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project — Area 2 Client/Reference: City of Long Beach Sean Crumby, Deputy Public Works s ; t Director/ City Engineer (562) 570-6383 BEFORE Sean.Crumby@longbeach.gov Project Dates: Start: 2014 Complete: Ongoing Services: Program Management . Project Value: Construction Cost: $15,357,905 Status: Successful at various stages BEFORE APP Team: Lisa M. Penna, PE, QSD — Principal -in - charge Behzad Sharifabadi — Program Manager The City of Long Beach contracted APP to provide design -build engineering and project management services on Residential Streets, Sidewalk and ADA/Curb Ramps Capital Improvement Projects. These projects primarily include repairs to street pavement, sidewalk, curb, gutter, drainage, and driveways. Key Accomplishments: • Residential Street Improvements — The projects include street design and construction management. Repaired 17.22 lane miles of residential streets. Total Construction cost: $9,168,565 • Sidewalk Improvements — The projects include removal and replacement of sidewalk tripping hazards. CDBG funded construction completed before federal deadline. Repaired 15.30 miles of sidewalk. Total Construction cost: $3,019,340 • Additional Improvements Street improvement — Lane Miles Constructed: 2.05 Total Construction cost: $660,000 Parking lot - Total Construction cost: $1,900,000 Alley - Total Construction cost: $110,000 • Curb Ramp Improvement Total Construction cost: $500,000 BEFORE BEFORE 121Pagi- C- 16 ANDNNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 3. Firm Qualifications AndersonPenna Partners, Inc. AndersonPenna Partners, Inc. (APP) specializes in project delivery through project management and construction management for local and regional public agencies and special districts throughout the western United States. With an emphasis on practical, experienced and cost effective solutions, APP capabilities range from local agency public works improvements, to major transportation projects and public building facility projects, as well as managing multi -project capital improvement programs for public agencies. Our clients range from various cities and counties to transportation agencies and special districts. Our team of professionals provides construction oversight and inspection, project and construction management, grant application and management, and civil engineering planning and design. APP also provides staff augmentation for public works and planning departments, federal compliance for ARRA and other federally funded projects, railroad bridge inspection and rating, and peer plan review/plan check services. We are a California corporation that has been in business since 2005, and are a woman -owned DBE and Certified SBE. We are headquartered in Newport Beach, CA with more than 70 employees operating out of Southern California. Our South Bay office is located in the City of Gardena to better serve our Los Angeles County clients, as well as support satellite and/or project/client offices for several field operations employees. Our construction management and inspection team has worked throughout California and includes experienced construction managers, construction inspectors, resident engineers, structures representatives, office engineers, labor compliance specialists, public works and structural inspectors, utility coordinators, and project and documents control support staff. We specialize in the successful delivery and audit -proof reimbursement of local agency projects that utilize all types of funding. Key staff assigned to projects are experienced in providing construction management services on public projects for many local agencies and transportation authorities. The APP Team consists of qualified staff that will undertake the construction management services for the proposed improvements using a highly qualified and responsive team. By design, our staff is comprised of professionals with extensive experience working directly for public agencies. Our familiarity and know-how gained by working side-by-side with local agency staff, in developing collaborative relationships with community and business stakeholders, and by partnering effectively with state and federal regulatory agencies, delivers successfully completed projects and services, well-managed budgets, and thoroughly satisfied stakeholders and clients. APP tailors its management approach to carefully monitor program effectiveness, and closely track work quality, quantity, and cost. Delivering projects under aggressive schedules requires careful management, administration, and oversight of project development teams from inception to completion with committed, complete ownership of all aspects. A summary of APP professional services include: • Program management, construction management and inspection services • Project management and staff augmentation for public works/planning • Civil engineering design services • Financial consulting, assessment district formation and grants administration • Energy efficiency 13 111 o g C- 17 ANDERSO NTENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 Subconsultant (Materials Testing) LaBelle Marvin, Inc. LaBelle Marvin, Inc. (LMI)has specialized in pavement engineering, material testing, design, and construction inspection since 1969. The firm has a staff of 16 professional, technical, and support personnel, with diversified skills capable of handling highly complex roadway related assignments. The strength of LaBelle Marvin lies in our in-house capabilities including our full-service Caltrans certified soils and asphalt concrete laboratory, both Road Rater and Falling Weight Deflectometer (FWD) deflection testing equipment, coring and boring machinery, Ground Penetrating Radar (GPR) and the expertise of our multidiscipline engineering department. LMI personnel have worked on the design, inspection, testing and construction of asphalt concrete pavements throughout the Western United States, and when necessary, throughout the world. LMI provides complete engineering services from initial project review to development of precise rehabilitation alternatives exploring differing design and use criteria. LMI personnel are certified by various agencies throughout the region, including the State of California. LMI personnel regularly provide inspection and testing services for projects over seen by the FAA, State of California Transportation, State of California Department of Water Resources and numerous Cities on the west coast. LMI provides a full range of pavement engineering services including construction inspection, material testing, construction management, failure analysis testing, and design. Our staff of sixteen personnel, includes three Civil Engineers, a GIS, Microdesk, and certified MicroPaver specialist, a laboratory manager, and eleven field/laboratory technicians trained and experienced in pavement investigations, asphalt concrete construction, and material testing. Pavement Design: LMI provides proactive solutions to manage, budget, verify, and design pavement structures that is expected on today's roadway projects. LMI insures all construction alternatives, maintenance strategies, and design criteria are explored and benefits defined. These elements are increasingly critical as traffic volumes increase, budgets are limited, and pavement life is often required to extend beyond the original design period. Materials Testing: Since 1969, LMI has provided a State of California certified materials laboratory to local and state agencies, other engineering and laboratory firms, and the private community relating to quality control/assurance testing, mix designs, properties of asphalt cements, emulsions, cut back asphalt binders, soil and aggregate strength properties, soil stabilization, and complete analysis of asphalt concrete mixtures and asphalt concrete pavements. Internal quality control is performed daily by the laboratory supervisor, project engineer, and principal engineer for each project, before results are reported to the client. Background: Testing and inspection services are performed in accordance with specified A.S.T.M., Caltrans, or S.S.P.W.C. procedures. LMI participates in the Caltrans Round Robin Sample Exchange Program conducted by the Caltrans Office of Materials Engineering and Testing Services. Laboratory and Engineering personnel actively participate in Standard Specifications for Public Works Construction "Greenbook" committees, American Public Works Association committees, and the American Society of Civil Engineers National Technical Activities Committee. Inspection Services: Construction Inspection provides the greatest opportunity to enhance project compliance with project plans and specifications. Obtaining inspection services during construction enables the engineer and inspector to operatively analyze the changing variables associated with construction activities. Material testing is performed through the stages of construction from the initial material selection to quality assurance during construction. Material variation and construction compliance are monitored, tested and controlled to enhance the overall performance of the pavement design. 141 P a g e _ C- 18 AND O NTENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 LMI provides grade verification, construction and batch plant inspection, material sampling, quality control and compliance testing, and construction oversight. Asphalt concrete testing includes Hveem or Marshall Stability/Density, extractions and gradations, nuclear density testing, and determination of the temperature, quantities, and placement thickness of delivered materials. Principal / Project Engineer Steven R. Marvin PE, currently President of LMI as of 1985, has received numerous honors for his work with asphalt concrete and teaches at local Colleges and Universities along with conducting seminars for pavement and material design. Steven has more than thirty nine years of experience in the area of pavement engineering. His experience includes pavement management, engineering design, construction inspection, and material testing. Steven oversees final quality control for all data and inspections performed by LMI operations of the asphalt concrete laboratory, field sampling, pavement evaluations, and testing of roadway, aggregate and subgrade materials, soil stabilization design and evaluation, pavement design, rehabilitation design for existing pavement systems, and complete investigations of material and/or design caused pavement failures. Project Responsibilities: • Engineering Field Review • Structural Section Calculations • Analysis of Laboratory Moisture and R -Value Testing • Deflection/Life Table Calculations • Engineering Analysis/Recommendations • Report Preparation • Process Deflection Data/Engineer Review Laboratory Manager Tom Williams, Laboratory Supervisor, provides all scheduling and initial quality control of all testing and data interpretation generated during on-site testing, remote site testing such as at asphalt concrete production plants, and all testing performed at the LaBelle Marvin, Inc. laboratory. Tom presently serves on the Asphalt Pavement Association Technical Committees in Orange, Los Angeles and San Diego Counties. Monthly topics cover material properties, production variability, material supply limitations, and industry/owner issues relating to asphalt concrete construction which places Tom at the forefront of industry problem solving. Tom furthers development of asphalt concrete material qualities through involvement with the Standard Specifications for Public Works Construction "Greenbook" committee and interfacing with Caltrans "Round Robin" testing programs. Project Responsibilities: • Schedules Deflection Testing • Schedules Coring and Boring Activates • Notify Underground Service Alert • Verifies Laboratory Moisture and R -Value Testing 151Page _ C - 19 ANDERSO TENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 4. Project Understanding and Approach Project Understanding The City of Rancho Palos Verdes seeks to engage a qualified engineering firm to provide construction management, inspection and material testing services for the City's Residential Street Rehabilitation Project — Area 2. The scope of work includes overseeing concrete repair of sidewalks, curb and gutter, driveways, ADA -compliant curb ramps, localized AC repair, crack routing and sealing for the Phase I project and Asphalt Rubber Aggregate Membrane (ARAM), slurry seal and/or micro surface pavement resurfacing treatments, along with signage and striping for the Phase II project currently in design. ?end Pavement Zones Project Approach The APP Team firmly believes that the key to a successful project is more than just performing tasks outlined in a scope of work. The key to a successful project is performing each task with a realistic and clear understanding of what the traffic and construction challenges are and constructing the final product with a "win-win" attitude. Management of any construction project requires a proactive approach with knowledgeable and experienced staff. APP owes the successful completion of many public client projects to our ability to find and maintain excellent professional staff and our dedication to organization, documentation, and proactive management of the construction process. Our keen understanding of and experience with the public process, local funding requirements and public construction contract administration also results in a smoother project experience. The experience and proactive approach of the APP Team keeps the project on time, within budget and on track for safe and successful completion. ------ 1611' _ C - 20 AND O \NNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 The APP Team CM approach begins with the end in mind, the end being a quality project, with minimum construction impact, safely delivered on time and within budget. This process starts with our review of the key project elements to gain a complete understanding of the project schedule, phasing, budget, and comprehensive scopes of work for all project stakeholders. APP delivers construction management systems and procedures are scalable and customized to best fit the client's project needs and budget, and to integrate with the City's way of doing business. From simple, time -tested forms and procedures to the state-of-the-art in construction management and web -based systems, APP delivers small and large projects on-time and under budget while keeping the client up to date on a real-time basis. APP's general approach to the successful delivery of major public works projects is to assign highly qualified personnel familiar with local agency project administration and have a keen understanding of technical requirements of the specific project type. Additionally, the APP team is empathetic to the local business community, residents and the general public affected by construction operations and are well versed at mitigating such impacts throughout the construction process. A successful project is built by fostering respectful relationships, trust and accountability between the design team, client agencies, the public and the contractor. The construction manager's most important role is establishing good relationships with all team members, creating efficient chains of communication and ensuring that all parties are treated fairly and with respect at all times. If the CM can accomplish these goals, all parties will work creatively together as one project team to ensure that the project is completed to the highest standards, economically and safely. Critical Issues Our team identified the following critical issues: Safety: First and foremost, APP always considers safety the most important issue on any construction project. APP managers and inspectors have, at a minimum, the 10 -Hour OSHA certification. Our team will recommend key safety provisions to require the contractor to have competent safety personnel and site-specific safety programs, submitted prior to the start of construction and continuously implemented on the project at all times. The team will monitor the Contractor's operations for compliance with the project safety requirements and requisite provisions of state and federal law. Public Relations: The APP team is well -versed in the successful completion of roadway rehabilitation and beautification projects that affect many residents, businesses and services. The following critical project elements will need to be carefully coordinated: • Both a general outreach program as well as more specific outreach for specific construction operations or impacts will greatly enhance the public's ability to plan for and coordinate with the construction activities. The project specifications include a very detailed phasing plan and continuous schedule updating requirements. The APP team will work closely with the City and contractor to keep the public apprised of the critical information associated with construction impacts. • Diligent, continuous oversight and enforcement of proper housekeeping, dust control and site maintenance on a continual basis. • Emergency Services: Traffic delays during construction can adversely affect emergency services including medical, fire and public safety. Coordination with the police, fire, and emergency medical services providers and all construction staff is extremely important. Communication of appropriate alternative routes must be made to emergency officials in advance of and throughout the duration of the project. • Access to business and residential areas will be maintained at all times. Any unforeseen impact will be promptly mitigated. • Pedestrian and bicycle safety measures must be constantly addressed, especially in high volume locations such as at bus stops and, near interactions and particularly in school zones. 17 1 P a g e C - 21 AND RSO \NNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project — Area 2 The project team will continue the public outreach/information effort as the start of construction nears and throughout the duration of the project. Traffic Control: The project encompasses primarily residential areas where most of the concrete work will be limited to small areas without significant traffic disruption to residents. The exception to this will be in the vicinity of the schools zones where special attention will be necessary, especially as students arrive or are leaving each location. In addition to proper localized traffic control by the Contractor, the APP construction manager will communicate directly with the affected school principal and the school District administration coordinator. This approach worked very well on the recently completed construction within Areas 3 and 5A. Scope of Work APP will provide construction management, inspection and materials testing for this project. The APP team will perform as part of the City's team, in the City's best interest, as an extension of City staff. The following itemization of the requested Construction Manager functions noted in blue serve as an outline of our proposed Scope of Work for the Construction Manager. The remainder of this section clarifies and expands on those categories. Specifically the following activities will be completed by Bob Merrell, PE, our Construction Manager. Construction Management Services (a) Oversee Inspection and Manage Project Construction (b) Review Daily Inspection Reports prior to submittal to City (c) Review Weekly Statement of Working Days prior to submittal to City (d) Assist in the review and processing of Request for Information, Change Orders, approved Time and Material work, and Submittals. (e) Ensure compliance of work performed with specs (f) Attend Weekly Progress Meetings (g) Attend Pre -Construction Meeting (h) Serve as liaison between City and construction contractor (i) Respond to resident concerns in a timely fashion Q) Final Deliverables Pre -construction Meeting: The APP team shall coordinate and direct a pre -construction conference and prepare minutes thereof. APP will coordinate and conduct the pre -construction meeting including notification to the contractor, utility agencies, and other stakeholders and prepare the meeting agenda and minutes. The agenda and minutes will include the following items: • Introductions of key personnel • Project overview • Project phasing and restrictions • Public relations, notifications, local access, and issue resolution • Utility coordination • Contractor's mobilization and staging area • Easements and special access considerations, night, and weekend work requirements 18 1 P a g e _ C-22 ANDERSO TENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 • Safety • Confirmation of fully executed contract and Notice to Proceed • Verification that all permits have been received • Establishment of contract time and completion date, schedule comments, and requirements for approval. • Look ahead and update requirements • Review of Working Day definition and holiday schedule • Chain of communication and key contacts • Critical work items, schedule and implementation requirements • Subcontracts • Documentation and tracking controls • Change order procedures • Scope, schedule and cost change administration, notification requirements and controls • Submittal and RFI process • Identify long lead items, if any • Inspection and testing, review all testing requirements • Progress payment procedures • Right-of-way issues, if any • Placement of signs • Contractual requirements • Questions and answers • Action item assignments APP considers the pre -construction meeting as Progress Meeting No. 1. All items discussed are designated as "open" or "closed." All open items are carried forward to subsequent progress meetings until resolved and closed. Action items are assigned a specific responsible party and a deadline for resolution. Each progress meeting is clearly documented and distributed to all attendees and affected coordination parties. APP will typically conduct or at a minimum participate in, all site meetings. Preconstruction meeting and site meeting minutes will be distributed via fax and/or email to all meeting participants and to courtesy recipients identified by the City. Schedule Review: APP CM will review the baseline construction schedule including activity sequences and duration, schedule of submittals and schedule of delivery for products with long lead-times. The CM team will evaluate the baseline project schedule for the following: • Consistency with the contract schedule (completion within the contract time) • Accurate start dates, completion dates, other dates detailed in the contract • Phasing requirements and schedule restrictions • Any impacts of weather and change orders • Sufficient detail — including submittal process and procurement requirements • Sequence of construction and correct schedule logic The schedule will not be approved as the baseline until all discrepancies are resolved. Schedule Control: During the progress of construction, the APP construction manager will compare the contractor's schedule updates to the baseline schedule and any approved time extensions, note any shortcomings, and monitor and track C-23 AND ON\NNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 corrections by the contractor to keep the project schedule on track. If necessary, APP will negotiate time extensions due to change orders or other delays. Construction Progress/Coordination Meetings: This meeting will be held as required and will focus on the following items: • Safety and traffic control Issues • Progress during the period • Major decisions made • Planned vs. actual schedule • Upcoming work schedule • Current or unresolved problems • Anticipated or pending change orders • Impacts of problems or change orders on schedule and budget • Discussion of new goals/items • Planned vs. actual budget analysis • Contractor's detailed two-week look -ahead schedule • Progress and major decisions during the last week • Update of unresolved items from previous meetings • Status of Submittals and change orders Special Meetings: These meetings will be held on as -needed basis and will focus on specific issues: • Special meetings to discuss important issues which require detailed discussion or review of plans and specifications. • Construction mitigations • Meetings to coordinate work by other contractors engaged by the City. • Status of submittals and change orders Submittal Processing and Review: The APP team will review and pass on to the Design Engineer as appropriate, shop drawings, working drawings, requests for information, samples and all other data required to be submitted by the contractor for conformity with the contract plans and specifications. APP will require, monitor and document compliance with the contract's quality assurance requirements. APP will document and submit responses to the contractor and to the City after consultation with City staff. The APP team, in conjunction with the Design Engineer, will evaluate and determine the acceptability of substitute materials and equipment proposed by the contractor and will provide recommendations to the City. Requests for Information (RFIs): Upon receipt, the CM will log, distribute and respond to each RFI as required. It is anticipated that most will be handled upon receipt. In the event that the Design Engineer or any member of the City staff is required to answer questions, the CM will coordinate a timely resolution. APP will identify potential impacts to cost or time that may result due to issues identified in the RFIs, with recommended alternatives or solutions to mitigate the potential impacts. C — 24 AND ILSON\NNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 Change order management and claims avoidance: Each issue identified as a potential change to the design, scope, cost or contract time, will generate a change notice. The CM will determine whether or not a change notice should be considered. The plans and specifications will be reviewed against the change notice. If the issue does not appear to be included in the plans or specifications, a request for quotation (RFQ) will be sent to the contractor. Any credits for work deleted as a result of the change will be required at this time as well. The contractor's response to the RFQ will be evaluated for fairness and completeness. Upon approval by the City, the CM will prepare, log, and process change orders for full execution, and administer their implementation. Once fully executed, the CM will review the timely completion of the work and coordinate inclusion of the change order in the appropriate payment application. Force Account Daily Extra Work Reports: APP will verify and sign the contractor's daily extra work reports documenting force account (time and materials) work with City concurrence. In particular, APP will monitor that only appropriate worker classifications necessary for approved time and materials work is included on extra work reports. Any inappropriate workforce and/or equipment charges will be promptly f+fi rirroria�r. wJ ninKraau ar..rrwr IRAN rejected and removed from extra work reports. Claims Avoidance: APP will assist the City with claims filed by the contractor in accordance with the general provisions and the standard specifications. APP is well -versed at negotiating and resolving claims amicably between contractors and public agencies. Should a claim require work in addition to APP's contract, APP will be available on a time and materials basis if desired by the City. The provision of any legal advice or services is specifically excluded. QA/QC: APP will implement quality assurance activities on a daily basis to make sure that QA/QC procedures are followed and deficiencies are resolved in a timely and efficient manner. The CM team will provide inspection services to insure compliance with code, plans, specifications, safety requirements, and QA/QC. The CM will coordinate the activities of the material testing company to ensure that the testing results and quality meet the requirements of the contract. Safe Conditions: APP will monitor project work and adjacent areas for unsafe conditions, promptly require corrective measures to be addressed by the Contractor in compliance with the contract documents and report such issues and corrective measures taken to the City. One of the most pervasive job hazards across all public works projects is construction adjacent to live traffic lanes. APP inspectors are intimately familiar with monitoring and enforcing proper traffic controls per the WATCH Handbook, MUTCD and/or project specific Traffic Control / Traffic Handling / Detour plans. Inspectors drive and/or walk the project limits at the start, during and before leaving the site each day to monitor proper, and/or require corrections to the required traffic control measures. Site cleanup during and especially at the end of each working day will be strictly enforced. Progress Payment Processing: A cost control system, based on the approved schedule of values, approved change orders, and the currently approved contract amount, shall be developed and implemented to monitor progress costs. APP will review the payment applications submitted by the contractor and determine whether the amount requested reflects the progress of the contractor's work. Appropriate adjustments to each payment application will be required by the contractor. When the payment application is acceptable and all backup documentation is verified (certified payrolls, stop notice / lien releases, etc.), APP will prepare and forward to the agency a progress payment report. This report shall state the total contract price, payments to date, current payment requested, retainage and actual amounts owed for the current period. The APP team is experienced in evaluating complex pay applications. It is critical to the City's best interest that payment application review be performed accurately and prudently to maintain the prime and subcontractor incentives to perform on the projects. 21111 _ C - 25 ANDERSO TENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 Progress Reports: Daily progress reports prepared by the inspector will be thoroughly reviewed for completeness and accuracy and submitted to the City with the following information included: • Report of significant events and accomplished goals • Description of progress with photos to enhance the descriptions • A comparison of actual versus planned progress, in narrative form as well as bar graph form • Identification and discussion of current problems or pending change orders, proposed solutions • and/or alternatives to consider and/or actions taken or planned to resolve such issues • An analysis of change order impacts or potential problems as they relate to schedule and budget • A discussion of new short and long term goals for the project • A comparison of actual versus planned budget expenditures. • Change order status log • Report of progress payments made to date and invoices in process • QA/QC section prepared by the inspection team addressing testing and regulatory compliance issues Documents Tracking and Control: Complete and current project files shall be kept at a location agreeable to the City, and shall be available to the City at all times. These files will consist of the contract, correspondence relating to or modifying the contract, proposal requests, clarifications, permits, logs, reports, RFIs, field orders, change orders, daily inspection reports, test reports, etc. The APP project controls system includes a detailed file indexing system for all project hard files. APP has already developed customized forms, reports database structure, and work breakdown structure, well suited for typical public works projects. We will adapt our system to the specific needs of the project, to monitor, track and control the project. This detailed tracking system will enable us to provide an accurate assessment of the progress to the City with recommendations to maintain or improve adherence to the approved project schedule. The table below illustrates the typical document control measures that are implemented on APP construction management projects: Item Method Frequency Look Ahead Schedule MS Project/Excel Weekly Correspondence Outlook, Word, Speed Memos Daily/continuous Project Documentation Hard Files and Electronic Files Daily/continuous Submittals Reviews — Word, Log — Excel Daily, as required. 72 -hour turnaround RFIs Responses — Word, Log — Excel Daily, as required. 72- hour turnaround Progress Payments Excel Measurements — Daily Quantity measurement RPTs, monthly Inspection Reports Word Daily Weekly Statements of Working Days Excel Weekly SWPPP/BMP Compliance Excel Weekly Public Relations Inquiries Log — Excel Daily, as required Photo and Video Explorer Video Pre -project, photos daily 22�P�y? _ C-26 ANDERSO TENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 Item Method Frequency Progress Reports MS Publisher, Word Monthly and as required Project Contacts Outlook and Excel Daily Project Calendar Outlook Daily Meetings Word and Outlook Weekly and as required Problem Solutions: The APP proactive approach serves to anticipate and expeditiously resolve field problems. All issues are processed with a sense of urgency and presented to the City with suggested alternatives, cost and schedule impacts and recommended solutions. The CM team will quickly implement the alternative which suits the best interests of the project and the City. APP will effectively and expeditiously communicate with City staff, design consultants and the contractor, as applicable, to identify conflicts, construction problems and coordination issues. APP will obtain the necessary action and response to submittals, RFIs and supplemental design documents, etc. Written Instruction: APP will issue written instructions (via email, transmittal letter, field speed memo, etc.) to the contractor regarding routine matters and/or follow-up of verbal instructions as necessary to properly document project issues. The following itemization of the requested Inspector functions noted in blue serve as on outline of our proposed Scope of Work for the Inspector. The remainder of this section clarifies and expands on those categories. Specifically the following activities will be completed by Ed Pratt, our Lead Inspector. Inspection Services Inspect work for compliance with specs at all times work is in progress (b) Prepare Daily Inspection Reports (c) Prepare Weekly Statement of Working Days (d) Assist staff with public relations during construction (e) Attend Pre -Construction Meeting (f) Develop a final punch list Inspection, Testing and Observations: The APP CM and inspection team will coordinate laboratory, jobsite and offsite/source inspection and testing of construction materials and required observations per the construction documents, construction codes, and Jurisdictional Agencies. The CM and the inspector will review the field layout prior to the start of work, monitor the construction activities, the testing services, track documentation and record testing results in weekly construction progress meetings. When necessary, corrective measures will be implemented and re -inspected to verify acceptable completion. Test and inspection reports will be monitored and filed. Participate in Pre -construction and Progress Meetings: The inspector will attend, and participate in a pre -construction conference, chaired by the Construction Manager, to orient the Contractor to the various reporting procedures and site rules. Safe Conditions: The inspector will monitor project work and adjacent areas for unsafe conditions, promptly require corrective measures to be addressed by the Contractor in compliance with the contract documents and report such issues and corrective measures taken to the City. Quality Assurance: The inspector will coordinate QA / QC activities on a daily basis and require any apparent deficiencies to be resolved in a timely manner. The Inspector will visit each site on a regular, full time basis, during the normal working 231PagF� _ C-27 ANDERSO TENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 hours to verify construction progress and to verify that work conforms to contract requirements. Deputy and special inspection and materials sampling and testing, if required and performed by others, will be coordinated and provided as required by the plans and specifications. When necessary, corrective measures will be implemented and re -inspected / re- tested to verify acceptable completion. The inspector will reject work that does not conform to the requirements of the contract documents and will promptly report unacceptable work to the City and contractor. Rejected work will be thoroughly documented, photographed, and tracked until repaired or replaced to the satisfaction of the City. Daily Construction Observation Reports: The inspector will compile daily observation reports documenting the contractor's workforce, material and equipment used, a summary of construction activities, field problems, disputes or claims, resolutions of issues and directions given to the contractor. Completed daily reports will be transmitted to the Construction Manager on a weekly basis who will then pass the reports to the City. Construction Staking/Survey Conformance to Design Grades: The contractor is responsible for providing any surveys required to establish horizontal and vertical control. The contractor is also responsible for the accuracy of the surveys. The CM will coordinate with the contractor and request that the survey cut sheets be submitted for review. The CM, the City and the Design Engineer may review the cut sheets to verify compliance with the design grades and alignments shown on the plans. The CM will continuously verify that the contractor is preserving the construction survey stakes and marks for the duration of their usefulness. If any of construction survey stakes and markers are lost or disturbed, the inspector will direct the contractor to replace them at no cost to the City. The project specifications clearly note the Contractor's responsibility to preserve or replace if damaged, all survey monumentation throughout the project. The APP Construction Manager and the Inspector will monitor this process to ensure compliance with Land Surveyors Act. Daily Construction Observation Reports: The APP lead inspector will compile daily observation/inspection and testing reports documenting the contractor's workforce (recording the name, trade classification, number of hours worked and employer of each work on site), material and equipment used, a summary of construction activities (by bid item), field problems, disputes or claims, resolutions of issues and directions given to the contractor. Monitor Contractor Site Security: The CM team will monitor the contractor's site security, and recommend improvements for security and safety needs. Documentation Interpretation and Technical Assistance: APP staff coordinates and expedites between the contractor, design team and City Staff to clarify any questions for interpretation of the construction documents. Timely, firm and fair determinations will be processed to minimize cost and time impacts to the project. Utility Coordination: APP assists the contractor in dealing with local utilities to coordinate and expedite temporary and permanent utility installations, utility relocations utility access structure adjustments, etc. SWPPP: APP CM and inspection staff will enforce all provisions of the Storm Water Pollution Prevention Plan and/or other requisite requirements set forth in the specifications. APP CM team members are well -versed in SWPPP monitoring through provision of dedicated services for oversight of developers and contractors on behalf of several public agencies. At a minimum, SWPPP requirements will be monitored and a specific SWPPP checklist will be compiled. Any deficiencies noted will be addressed with the contractor for immediate remedy. Upon a weather report of expecting rain, a site walk will be conducted to ensure that SWPPP measures are in place and well maintained. Additionally, if desired by the City the APP team can be assigned as the data submitter for the project to implement the notice of intent (NOI) application, uploading of various reports and processing of the notice of termination (NOT) on the SMART website. 241Page _ C - 28 ANDERSONTENNA LProfessional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project — Area 2 Materials Testing Services Materials Control: The CM team will establish a materials receiving process on site such that all materials deliveries are accompanied by proper delivery documentation satisfactory to confirm all products comply with the plans and specifications, approved submittals and bear the requisite certificate of compliance for source and product type. Materials delivered to the site lacking proper documentation will be flagged as unacceptable and not allowed to be incorporated into the work until proper documentation is provided and verified. It is requested to have materials testing to confirm compliance with specifications for the AC overlay and slurry seal materials. APP will use the materials testing services of La Belle Marvin, Inc. with a turn -around time of 24 hours for the test results to be provided to the City for each test. Timely turn -around of lab test results is an important aspect of this work. Furthermore, the City shall receive a comprehensive notebook binder that includes all of the test results upon completion of the project. La Belle Marvin, Inc. is Caltrans -certified, and all technicians are certified in these testing methods. The City's expectations and anticipated scope of work for the materials testing includes: Asphalt Concrete Overlay: 1. Full-time batch plant inspection for the first day of overlay placement; frequency will be at the discretion of the City thereafter. 2. Testing shall include gradation/sieve analysis, maximum density, asphalt content, air voids, bulk specific gravity of cores, and stability to meet Greenbook specifications 3. Loose asphalt mix samples shall be obtained per Greenbook specifications. 4. Nuclear gauge testing for proper compaction in the field. 5. Field samples shall be obtained and transported by a technician certified in AC Overlay testing methods. Slurry SeaL 1. Field samples shall be obtained and transported by technician certified in slurry seal testing methods. 2. Perform full set of tests on each sample to determine acceptable emulsion percentage and residual asphalt, in accordance with California Test 310 (extraction test), wet track abrasion, and aggregate compliance (sieve analysis and sand equivalent). 3. Testing shall be per Greenbook, AASHTO, ASTM, ISSA, and California test methods to ensure compliance with specifications. Subgrade/Base: 1. Maximum density from each CMB supplier and each soil type encountered. 2. Field density and relative compaction tests per ASTM and Greenbook. Concrete: 1. Trial batch to determine compressive strength if needed. Clerical services and materials to carry out items listed above shall be incorporated into the costs of the appropriate items. 251 P a g e C - 29 AND ERSO NTENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project —Area 2 The actual materials testing to be conducted for this project will be detailed once the Phase II design is complete. It is anticipated that Micorsurfacing will be used in lieu of Type II slurry and that all of the AC overlay overlays will be taken out of the project. We have coordinated with the well regarded firm of La Belle Marvin to assist in developing the detailed testing program once the project information is available. The testing below has been used herein to provide a general scope and to develop a budget amount which is presented with the fee portion of this proposal. AC Mill and Inlay FIELD INSPECTION Field Sampling Nuclear Gage Compaction Technician (Overtime) Nuclear Gage Equipment Surcharge Fuel / Mileage Expense LABORATORY TESTING Hveem Maximum Density REPORTING Principal Engineer Office Support Microsurfacing FIELD INSPECTION Field Technician (Overtime) Fuel / Mileage Expense LABORATORY TESTING TESTS ON MSE* SSF Viscosity AASHTO T59 Residue, % Min. AASHTO T59 Sieve Test ASTM D244 Storage Stability, 24 hr AASHTO T59 TESTS ON MSE RESIDUE* Penetration @ 77 F AASHTO T49 Softening Point AASHTO T53 TESTS ON AGGREGATE Gradation Sand Equivalent Durability Crushed Particle Count TESTS ON FINISHED PRODUCT Moisture Content Ignition, Residual Binder Content REPORTING Principal Engineer Office Support Delivery of As-builts and Close-out Documents: APP will periodically review the contractor's as -built updates on the approved job plan set, identify missing items and require the Contractor to keep as -built records up to date throughout the project as required by the specifications. APP will review the Contractor's submittal of "as -constructed" conditions and compare this submittal to APP's own documentation. Discrepancies will be discussed, resolved, and recorded. Completed "as - constructed" plans will be submitted to the City. APP will enforce the provisions of the specifications to require the Contractor to submit well -coordinated operations and maintenance manuals, warranties and guarantees, bonds, extra stock and/or other items required by the contract documents such that a timely close-out of the project is implemented. 261Page _ C — 30 ANDEMONTENNA Professional Construction Management, Inspection and Materials Testing Services for the City of Rancho Palos Verdes, Residential Streets Rehabilitation Project — Area 2 Project Close -Out: When the contract is nearing completion, the CM team will initiate closeout procedures. These procedures involve the following tasks: • Perform pre -final job walk and prepare the final punch list. • Coordinate and observe completion of the punch list. • Make acceptance recommendations and document acceptance of work by the City and other affected agencies. • Transmit to the City all required waivers, material guarantees, warranties, operations, equipment manuals and all other documentation required by the contract. • Transmit to the agency all keys, spare parts, additional material, maintenance material, complete CM files, videotapes, photo albums and as -built drawings. • Review and recommend final payment to contractor. • Prepare a final CM report summarizing the following items: — Progress report as described above since the last period though date of final acceptance — Overall project summary report addressing all issues required in the monthly progress reports, final schedule, contractor evaluation and documentation submittals — Suggestions for improvement for future projects. • APP will perform closeout duties, including final organization of project files, and submit to the City for final approval. APP will also assist with the filing of the notice of completion and release of retention. 271Page _ C - 31 ANDERSO TENNA RESIDENTIAL STREET REHABILITATION - AREA 2 City of Rancho Palos Verdes (Assume 90 Working Days) TASK CM Inspection Admin I Materials TOTAL Hours I Rate Hours Rate Hours Rate Units Rate Item 1 - Construction Management Services (a) Oversee Inspection and Manage 251 $160 $40,160 Project Construction (b) Review Daily Inspection Reports 80 $160 $12,800 prior to submittal to City $1,600 (c) Review Weekly Statement of 10 $160 Working Days prior to submittal to City (d) Assist in the review and processing of Request for Information, Change 20 $160 10 $118 24 $80 $6,300 Orders, approved Time and Material work, and Submittals. $160 (e) Ensure compliance of work 20 $3,200 performed with specs (f) Attend Weekly Progress Meetings 40 $160 10 $118 $7,580 (g) Attend Pre -Construction Meeting 4 $160 $640 (h) Serve as liaison between City and 40 $160 $6,400 construction contractor $160 (i) Respond to resident concerns in a 70 $11,200 timely fashion 8 $80 (j) Final Deliverables 10 $160 $2,240 Subtotal CM Services 545 -- 20 -- 32 -- 0 -- $92,120 5/10/2016 �-, I., t., ANDERSON- PENNA PARTNERS IN PROJECT DELIVERY - C -32 PAGE 1 OF 2 RESIDENTIAL STREET REHABILITATION - AREA 2 City of Rancho Palos Verdes TASK CM Inspection Admin I Materials TOTAL Hours Rate Hours Rate Hours Rate Units Rate Item 2 - Inspection Services (a) Inspect work for compliance with specs at all times work is in progress 0 $160 550 $118 $118 $64,900 (b) Prepare Daily Inspection Reports 0 $160 80 $9,440 (c) Prepare Weekly Statement of Working Days 0 $160 32 $118 $3,776 (d) Assist staff with public relations during construction 40 $160 8 $118 $7,344 (e) Attend Pre -Construction Meeting 4 $118 $472 (f) Develop a final punch list 8 $160 8 $118 $2,224 Subtotal Inspection Services IT -48 I -- 1 682 1 -- 1 0 - 0 1 -- 1 $88,156 Item 3 - Materials Testing Services (MT) (a) AC Overlay Testing (ARAM) 0 0 $160 $160 4 4 $118 $118 5 $2,465 $12,797 (b) Slurry Seal Testing (Micro) 18 $2,856 $51,880 (c) Subgrade/Base 0 $160 4 $118 8 $80 $1,112 (d) Concrete (e) Final Deliverables 0 $160 4 $118 $70 $472 2 $160 2 $118 8 8 $225 $2,916 Subtotal MT Services 2 -- 18 -- 8 -- -- -- $69,177 TOTAL SERVICES 595 -- 720 -- 40 -- -- -- $249,453 5/10/2016 ANDERSON- PENNAL PARTNERS IN PROJECT DELIVERY - C -33 PAGE 2OF2 Figure B D-1