CC SR 20160216 H - 2015 Storm Drain Lining & Rehab ProjectRANCHO PALOS VERDES CITY COUNCIL AGENDA REPORT AGENDA DESCRIPTION: MEETING DATE: 02/16/2016 AGENDA HEADING: Consent Calendar Consideration and possible action to award a construction contract and an inspection contract for the 2015 Storm Drain Lining Project RECOMMENDED COUNCIL ACTION: 1) Approve the construction documents for the 2015 Storm Drain Lining Project; 2) Find the bid presented by Nu Line Technologies, LLC, to be non-responsive and reject it; 3) Award a construction contract to Southwest Pipeline and Trenchless Corporation, in the amount of $897,571, and authorize a construction contingency in the amount of $90,000; 4) Award a professional services agreement for construction management and inspection to KOA Corporation in the amount of $40,000; and, 5) Authorize the Mayor and City Clerk to execute the agreements, subject to approval as to form by the City Attorney. FISCAL IMPACT: The recommended action will result in a total authorized expenditure of $1,027,571. The funding necessary to complete this work has been appropriated as part of the FY2015-16 budget (including continuing appropriations) in the Water Quality Flood Protection Program. Amount Budgeted: $ 1,140,306 Amount Authorized: $ 1,027,571 Amount Remaining: $ 112,735 Additional Appropriation: None requested Account Number(s): 501-3052-431-73-00 ORIGINATED BY: Andy Winje, Senior Engineers'%' REVIEWED BY: Michael Throne, Director of Public Works;' a APPROVED BY: Doug Willmore, City Manager:- ATTACHED SUPPORTING DOCUMENTS: A. Construction Contract with Southwest Pipeline (page A-1) B. Bid Protest Letter from Southwest Pipeline (page B-1) C. Nu Line response to Bid Protest & other correspondence (page C-1) D. Bid proposal from Nu Line (page D-1) 1 EXECUTIVE SUMMARY A primary feature of the Water Quality Flood Protection Program is the rehabilitation by lining of existing storm drain pipes. This year's program identifies 5,250 linear feet of pipe to be lined. Competitive bids were opened for the project in December 2015 and shortly thereafter a bid protest was received alleging the apparent low bidder was not qualified. It is recommended the City Council consider awarding the construction contract Southwest Pipeline and Trenchless Corporation (Southwest Pipeline), the second lowest bidder, in the amount of $897,571. The construction agreement can be found in Attachment A. BACKGROUND AND DISCUSSION The project was publicly advertised and sealed bids were received and opened on December 17, 2015. Nu Line Technologies, LLC (Nu Line) submitted the apparent low bid out of the five bids received. The following table summarizes the bids received: BID SUMMARY Construction Companies Bid Amount Nu Line Technologies, LLC $ 828,899.00 Southwest Pipeline $ 897,571.00 Insituform Technologies, LLC $ 917,103.00 ENGINEER'S ESTIMATE $ 965, 650.00 Sancon Technologies, Inc. $ 1,047,854.00 Excel Paving Company $ 1,162,911.00 A bid protest was filed by Southwest Pipeline, alleging that Nu Line does not possess the required five years' experience on similar projects and that they had erroneously certified that they possessed sufficient experience by signing the bid. The reasons for their bid protest are outlined in the letter included in Attachment B. Nu Line was asked to provide a response to the protest and replied with the letter included as Attachment C. Additional correspondence between staff and Nu Line is also included in Attachment C. In their response, Nu Line relies upon the experience of their president and founder, who owns a similar company that has been in business as a licensed contractor since 1994, and the experience of another member/owner of Nu Line who has more than five years' experience in this type of construction. Nu Line accurately stated in their bid (see Attachment D) that their corporate contractor's license is only a year old, but insists it meets the experience requirement through the person of the president and the other owner/member of Nu Line, if not technically through the company formed by the owners. However, Staff sees the technical requirement for the corporation (not only the personnel) to have sufficient experience to be relevant and meaningful. Staff therefore believes Nu Line's bid is non-responsive per the bid requirements and that the contract should be awarded to the Southwest Pipeline for providing the lowest responsive bid. The City Attorney's Office also reviewed the 2 contract documents, the bid protest and the responses, and opines that the Nu Line bid is non-responsive. Public Works performed due diligence reviews of Southwest Pipeline and found the firm to have the quality, fitness, capacity, and experience to satisfactorily perform the contract. A copy of this report was provided to each of the contractors. CONCLUSION After careful review of the bid documents, bid protest and response, Staff and the City Attorney believe the bid of the apparent low bidder, Nu Line, is not responsive. It is therefore recommended the contract be awarded to Southwest Pipeline. ALTERNATIVES In addition to the Staff recommendation, the City Council may also choose the following alternative, or provide other direction. 1. Reject all bids, and direct Public Works to re -advertise the construction project. 9 ATTACHMENT A CITY OF RANCHO PALOS VERDES PUBLIC WORKS AGREEMENT 2015 STORM DRAIN LINING PROJECT Project No. 002116 THIS AGREEMENT ("Agreement") is made and entered this 16th day of February, 2016, by and between the CITY OF RANCHO PALOS VERDES, a California municipal corporation ("City") and Southwest Pipeline and Trenchless Corporation ("Contractor"). Contractor's license number is 773862. In consideration of the mutual covenants hereinafter set forth, the parties hereto agree as follows: 1. Scope of Services. Contractor shall perform the work and provide all labor, materials, equipment and services in a good and workmanlike manner for the project identified as the 2015 Storm Drain Lining Project (Project), as described in this agreement and in the Contract Documents (including Notice Inviting Bids, the Instructions to Bidders, the Proposal, the General Provisions, the Special Provisions, Appendices I through VI, the Plans and all addenda prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents), which are attached hereto as Exhibit "A" and incorporated herein by this reference, including miscellaneous appurtenant work. All work shall be performed in accordance with the latest edition of the Standard Specifications for Public Works Construction (commonly known as the "Greenbook") prepared and promulgated by the Southern California Chapter of the American Public Works Association and the Associated General Contractors of California (collectively "Standard Specifications"), which is incorporated herein by this reference. In the event of any conflict between the terms of this Agreement and incorporated documents, the terms of this Agreement shall control. 2. Extra Work. Extra work, when ordered in writing by the Director of Public Works and accepted by the Contractor, shall be paid for underwritten work order in accordance with the terms therein provided. Payment for extra work will be made at the unit price or lump sum previously agreed upon in writing between the Contractor and the Director of Public Works. All extra work shall be adjusted daily upon report sheet furnished by the Contractor, prepared by the Director of Public Works, and signed by both parties, and said daily report shall be considered thereafter the true records of extra work done. 3. Effective Date. This Agreement is effective as of the date listed above, and shall remain in full force and effect until Contractor has rendered the services required by this Agreement. 4. Time. Time is of the essence in this Agreement. 5. Force Majeure. Neither the City nor Contractor shall be responsible for delays in performance under this Agreement due to causes beyond its control, including but not limited to acts of God, acts of the public enemy, acts of the Government, fires, floods or other casualty, epidemics, earthquakes, labor stoppages or slowdowns, freight embargoes, unusually severe weather, and supplier delays due to such causes. Neither economic nor market conditions nor the financial condition of either party shall be considered a cause to excuse delay pursuant to this Section. Each party shall notify the A-1 ATTACHMENT A other promptly in writing of each such excusable delay, its cause and its expected delay, and shall upon request update such notice. 6. Compensation. In consideration of the services rendered hereunder, City shall pay Contractor a not to exceed amount of eight hundred ninety-seven thousand five hundred seventy-one dollars ($897,571) in accordance with the prices as submitted in Contractor's Proposal, attached hereto as Exhibit "B" and incorporated herein by this reference. 7. Payments. City shall make payments within thirty (30) days after receipt of an undisputed and properly submitted payment request from Contractor. City shall return to Contractor any payment request determined not to be a proper payment request as soon as practicable, but not later than seven (7) days after receipt, and shall explain in writing the reasons why the payment request is not proper. A payment shall be made as the City Council of the City prescribes upon estimates approved by the City Council. However, progress payments shall not be made in excess of ninety-five percent (95%) of the percentage of actual work completed plus a like percentage of the value of material delivered on the ground or stored subject to, or under the control of, the City, and unused. The City shall withhold not less than five percent (5%) of the Agreement price until final completion and acceptance of the Project. However, at any time after fifty percent (50%) of the work has been completed, if the City Council of the City finds that satisfactory progress is being made, it may, at its discretion, make any of the remaining progress payments in full for actual work completed. 8. Substitute Security. A. At the written request and expense of Contractor, securities equivalent to any moneys withheld by the City to ensure performance under this Agreement shall be deposited with the City, or with a state or federally chartered bank in the State of California as the escrow agent, that shall then pay those moneys to Contractor. Upon satisfactory completion of the Agreement, the securities shall be returned to Contractor. B. Alternatively, Contractor may request that the City shall make payment of retentions earned directly to the escrow agent at the expense of Contractor. At the expense of Contractor, Contractor may direct the investment of the payments into securities, and Contractor shall receive the interest earned on the investments upon the same terms provided for securities deposited by Contractor. Upon satisfactory completion of the Agreement, Contractor shall receive from the escrow agent all securities, interest, and payments received by the escrow agent from the City, pursuant to the terms of this Section. C. Securities eligible for investment shall include those listed in California Government Code Section 16430, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security to which Contractor and the City mutually agree in writing. Contractor shall be the beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon. D. If Contractor elects to receive interest on moneys withheld in retention by the City, it shall, at the request of any subcontractor performing more than five percent (5%) A-2 ATTACHMENT A of Contractor's total bid, make that option available to the subcontractor regarding any moneys withheld in retention by Contractor from the subcontractor. Further mandatory details are provided in Public Contract Code Section 22300(d), which is incorporated herein by this reference. E. The escrow agreement for security deposits in lieu of retention shall be substantially similar to the form provided in Public Contract Code Section 22300(f), which is incorporated herein by this reference. 9. Taxes. Contractor shall calculate payment for all sales, unemployment, old age pension and other taxes imposed by local, State of California and federal law. These payments are included in the total amounts in Exhibit "B." 10. Audit. The City or its representative shall have the option of inspecting and/or auditing all records and other written materials used by Contractor in preparing its billings to the City as a condition precedent to any payment to Contractor. Contractor will promptly furnish documents requested by the City. Additionally, Contractor shall be subject to State Auditor examination and audit at the request of the City or as part of any audit of the City, for a period of three (3) years after final payment under this Agreement. 11. Unresolved Disputes. In the event that a dispute arises between the City and Contractor regarding whether the conditions materially differ, involve hazardous waste, or cause a decrease or increase in Contractor's cost of or time required for performance of any part of the work, Contractor shall not be excused from any scheduled completion date provided for by the Agreement, but shall proceed with all work to be performed under the Agreement. Contractor shall retain any and all rights provided that pertain to the resolution of disputes and protests between the parties. In the event of any dispute or controversy with the City over any matter whatsoever, Contractor shall not cause any delay or cessation in or of work, but shall proceed with the performance of the work in dispute. This includes disputed time extension requests and prices for changes. The disputed work will be categorized as an "unresolved dispute" and payment, if any, shall be as later determined by mutual agreement or a court of law. Contractor shall keep accurate, detailed records of all disputed work, claims and other disputed matters. Public Contract Code Sections 20104 et seq. and Rancho Palos Verdes Municipal Code chapter 3.24 ("Claims Against the City") shall govern the procedures of the claim process, and these provisions are incorporated herein by this reference. 12. Termination. This Agreement may be canceled by the City at any time with or without cause without penalty upon thirty (30) days' written notice. In the event of termination without fault of Contractor, City shall pay Contractor for all services satisfactorily rendered prior to date of termination as determined by the City, and such payment shall be in full satisfaction of all services rendered hereunder. 13. Indemnity. A. Contractor's Duty. To the maximum extent permitted by law, Contractor shall defend, indemnify, and hold harmless the City, its elected officials, officers, employees, volunteers, agents, successors, assigns, and those City agents serving as independent contractors in the role of City officials (collectively "Indemnitees") from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, A-3 ATTACHMENT A damages, actions, causes of action, proceedings, suits, losses, bid protests, stop notices, judgments, fines, liens, penalties, liabilities, costs and expenses of every kind and nature whatsoever, in any manner arising out of or incident to any act, failure to act, error or omission of Contractor or any of its officers, agents, servants, employees, subcontractors, materialmen, suppliers or their officers, agents, servants or employees, arising out of the Agreement, including without limitation, the payment of all consequential damages, attorneys' fees, experts' fees, and other related costs and expenses (individually, a "Claim," or collectively, "Claims"). Further, Contractor shall appoint competent defense counsel approved by the City Attorney at Contractor's own cost, expense and risk, to defend any and all such Claims that may be brought or instituted against Indemnitees. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against Indemnitees in any such Claim. Contractor shall reimburse Indemnitees for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Contractor or Indemnitees. This indemnity shall apply to all Claims regardless of whether any insurance policies are applicable. B. Bid Protests. In addition to its obligations pursuant to Section 13(A), Contractor shall reimburse the City for all attorneys' fees and costs incurred by City in connection with, arising out of or incident to any bid protest. C. Civil Code Exception. Nothing in Section 13(A) shall be construed to encompass Indemnitees' sole negligence or willful misconduct to the limited extent that the underlying Agreement is subject to Civil Code section 2782(a) or the City's active negligence to the limited extent that the underlying Agreement is subject to Civil Code section 2782(b). D. Nonwaiver of Rights. Indemnitees do not and shall not waive any rights that they may possess against Contractor because the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence. E. Waiver of Right of Subrogation. Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all Claims arising out of or incident to the activities or operations performed by or on behalf of the Contractor regardless of any prior, concurrent or subsequent active or passive negligence by Indemnitees. F. Survival. The provisions of this Section 13 shall survive the termination of this Agreement and are in addition to any other rights or remedies that Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee's right to recover under this indemnity provision, and an entry of judgment against a Contractor shall be conclusive in favor of the Indemnitee's right to recover under this indemnity provision. ATTACHMENT A 14. Incorporation by Reference. All of the following documents are attached hereto and incorporated herein by this reference: City of Rancho Palos Verdes Instructions for Execution of Instruments; Insurance Requirements for the City of Rancho Palos Verdes Public Works Contract; Workers' Compensation Certificate of Insurance; Additional Insured Endorsement (Comprehensive General Liability); Additional Insured Endorsement (Automobile Liability); and Additional Insured Endorsement (Excess Liability). 15. Antitrust Claims. In entering into this Agreement, Contractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the California Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Agreement. This assignment shall be made and become effective at the time the City tenders final payment to Contractor without further acknowledgment by the parties. 16. Trenching and Excavations. If the project involves trenching more than four (4) feet deep, Contractor shall promptly and before the following conditions are disturbed notify the City in writing of any: material that Contractor believes may be material that is hazardous waste, as defined in California Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; subsurface or latent physical conditions at the site differing from those indicated; or unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Agreement. The City shall promptly investigate the conditions, and if the City finds that the conditions do materially differ or do involve hazardous waste and cause a decrease or increase in Contractor's cost of or the time required for performance of any part of the work, the City shall issue a change order. 17. Utilities. The City acknowledges its responsibilities under Government Code section 4215 and incorporates that section herein by this reference. 18. Location of Existing Elements. The methods used and costs involved to locate existing elements, points of connection and all construction methods are Contractor's sole responsibility. Accuracy of information furnished, as to existing conditions, is not guaranteed by the City. Contractor, at its sole expense, must make all investigations necessary to determine locations of existing elements, which may include, without limitation, contacting U.S.A. Alert and other private underground locating firm(s), utilizing specialized locating equipment and/or hand trenching. 19. Independent Contractor. Contractor is and shall at all times remain, as to the City, a wholly independent contractor. Neither the City nor any of its agents shall have control over the conduct of Contractor or any of the Contractor's employees, except as herein set forth, and Contractor is free to dispose of all portions of its time and activities which it is not obligated to devote to the City in such a manner and to such persons, firms, or corporations at the Contractor wishes except as expressly provided in this Agreement. Contractor shall have no power to incur any debt, obligation, or liability on behalf of the City, bind the City in any manner, or otherwise act on behalf of the City as an agent. Contractor shall not, at any time or in any manner, represent that it or any of its agents, servants or employees, are in any manner agents, servants or employees of City. Contractor agrees to pay all required taxes on amounts paid to Contractor under this Agreement, and to indemnify and hold the City harmless from any and all taxes, m� ATTACHMENT A assessments, penalties, and interest asserted against the City by reason of the independent contractor relationship created by this Agreement. Contractor shall fully comply with the workers' compensation law regarding Contractor and its employees. Contractor further agrees to indemnify and hold the City harmless from any failure of Contractor to comply with applicable workers' compensation laws. The City shall have the right to offset against the amount of any compensation due to Contractor under this Agreement any amount due to the City from Contractor as a result of its failure to promptly pay to the City any reimbursement or indemnification arising under this Section. 20. Prevailing Wages. City and Contractor acknowledge that this project is a public work to which prevailing wages apply. The Agreement to Comply with California Labor Law Requirements is attached hereto and incorporated herein by this reference. Eight hours of labor constitutes a legal day's work. 21. Workers' Compensation. California Labor Code Sections 1860 and 3700 provide that every contractor will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, the Contractor hereby certifies as follows: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to under- take self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract." 22. Subcontracting. Contractor shall adhere to all provisions of the Subletting and Subcontracting Fair Practices Act, Public Contract Code Section 4100 et seq., which is incorporated herein by this reference. 23. Nondiscriminatory Employment. Contractor shall not unlawfully discriminate against any individual based on race, color, religion, nationality, gender, sex, sexual orientation, age or condition of disability. Contractor understands and agrees that it is bound by and will comply with the nondiscrimination mandates of all statutes and local ordinances and regulations. 24. Debarred, Suspended or Ineligible Contractors. Contractor shall not be debarred throughout the duration of this Agreement. Contractor shall not perform work with debarred subcontractor pursuant to California Labor Code Section 1777.1 or 1777.7. 25. Compliance with Laws. Contractor shall comply with all applicable federal, state and local laws, ordinances, codes and regulations in force at the time Contractor performs pursuant to this Agreement. 26. Bonds. Contractor shall obtain faithful performance and payment bonds, each in an amount that is not less than the total compensation amount of this Agreement, and nothing in this Agreement shall be read to excuse this requirement. The required forms entitled Payment Bond (Labor and Materials) and Performance Bond are attached hereto and incorporated herein by this reference. 27. Contractor's Representations. Contractor represents, covenants and agrees that: a) Contractor is licensed, qualified, and capable of furnishing the labor, materials, and M ATTACHMENT A expertise necessary to perform the services in accordance with the terms and conditions set forth in this Agreement; b) there are no obligations, commitments of any kind that will limit or prevent its full performance under this Agreement; c) there is no litigation pending against Contractor, and Contractor is not the subject of any criminal investigation or proceeding; and d) to Contractor's actual knowledge, neither Contractor nor its personnel have been convicted of a felony. 28. Conflicts of Interest. Contractor agrees not to accept any employment or representation during the term of this Agreement or within twelve (12) months after completion of the work under this Agreement which is or may likely make Contractor "financially interested," as provided in Government Code Section 1090 and 87100, in any decisions made by City on any matter in connection with which Contractor has been retained pursuant to this Agreement. 29. Third Party Claims. City shall have full authority to compromise or otherwise settle any claim relating to the Agreement at any time. City shall timely notify Contractor of the receipt of any third -party claim relating to the Agreement. City shall be entitled to recover its reasonable costs incurred in providing this notice. 30. Non -Assignability; Subcontracting. Contractor shall not assign or transfer any interest in this Agreement nor any part thereof, whether by assignment or novation, without the City's prior written consent. Any purported assignment without written consent shall be null, void, and of no effect, and Contractor shall hold harmless, defend and indemnify the City and its officers, officials, employees, agents and representatives with respect to any claim, demand or action arising from or relating to any unauthorized assignment. 31. Applicable Law. The validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California, excluding California's choice of law rules. Venue for any such action relating to this Agreement shall be in the Los Angeles County Superior Court. 32. Titles. The titles used in this Agreement are for convenience only and shall in no way define, limit or describe the scope or intent of this Agreement or any part of it. 33. Authority. The person executing this Agreement on behalf of Contractor warrants and represents that he or she has the authority to execute this Agreement on behalf of Contractor and has the authority to bind Contractor to the performance of its obligations hereunder. 34. Entire Agreement. This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between City and Contractor. This Agreement supersedes all prior oral or written negotiations, representations or agreements. This Agreement may not be modified or amended, nor any provision or breach waived, except in a writing signed by both parties which expressly refers to this Agreement. 35. Construction. In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement. A-7 ATTACHMENT A 36. Non -waiver of Terms, Rights and Remedies. Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by the City of any payment to Contractor constitute or be construed as a waiver by the City of any breach of covenant, or any default which may then exist on the part of Contractor, and the making of any such payment by the City shall in no way impair or prejudice any right or remedy available to the City with regard to such breach or default. 37. Notice. Except as otherwise required by law, any notice or other communication authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during Contractor's or City's regular business hours or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses listed below, or at such other address as one party may notify the other: To CITY: Michael Throne, Director of Public Works City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 To CONTRACTOR: The address listed in Exhibit "B." 38. Counterparts. This Agreement may be executed in counterpart originals, duplicate originals, or both, each of which is deemed to be an original for all purposes. 39. Severability. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. [Signatures continued to next page] • ATTACHMENT A IN WITNESS WHEREOF, the parties hereto have executed the within Agreement the day and year first above written. CITY OF RANCHO PALOS VERDES Mayor ATTEST: APPROVED AS TO FORM: By: By: City Clerk City Attorney Dated: ("CONTRACTOR") By: Printed Name: Title: By: Printed Name: Title: two ATTACHMENT A CONTRACT EXHIBIT A Contract Documents (including Notice Inviting Bids, the Instructions to Bidders, the General Provisions, the Special Provisions, Appendices I through Vl, the Plans and all addenda are on file in the office of the Director of Public Works for the City of Rancho Palos Verdes. A-10 ATTACHMENT A CONTRACT EXHIBIT B SOUTHWEST PIPELINE AND TRENCHLESS CORP. PROPOSAL CITY OF RANCHO PALOS VERDES 2015 STORM DRAIN LINING PROJECT PROJECT No. 002116 TO THE DIRECTOR OF PUBLIC WORKS, CITY OF RANCHO PALOS VERDES: The undersigned, as bidder, declares that: (1) this proposal is made without collusion with any other person, firm or corporation, and that the only persons or parties interested as principals are those named herein; (2) bidder has carefully examined the project plans, specifications, instructions to bidders, proposal, notice to contractors and all other information furnished therefore and the site of the proposed work; (3) bidder has investigated and is satisfied as to the conditions to be encountered, the character, quality and quantities of work to be performed and materials to be furnished. Furthermore, bidder agrees that submission of this proposal shall be conclusive evidence that such examination and investigation have been made and agrees, in the event this contract be awarded to bidder, to enter into a contract with the CITY OF RANCHO PALOS VERDES, to perform said proposed work in accordance with the plans, if any, and the terms of the specifications, in the time and manner therein prescribed, and to furnish or provide all materials, labor, tools, equipment, apparatus and other means necessary so to do, except such thereof as may otherwise be furnished or provided under the terms of said specifications, for the following stated unit prices or lump -sum price as submitted on the Schedule attached hereto: The bidder shall submit as part of this proposal a completed copy of the Contractor's Industrial Safety Record. Accompanying this proposal is Bid Bond (Insert) "$ren Percent Amount Bid"cash," "Cashier's Check," "certified check," or "Bid Bond," as the case may be) in the amount equal to at least ten percent (10%) of the total aggregate bid price hereof based on the quantities shown and the unit prices quoted in the Bid Sheets. The undersigned further agrees that should he/she be awarded the contract on the basis hereof and thereafter, defaults in executing the required contract, with necessary bonds and documents, within ten (10) days, not including Sundays and legal holidays, after having received notice that the contract has been awarded and is ready for signature, the proceeds of the security accompanying his bid shall become the property of the CITY OF RANCHO PALOS VERDES and this proposal and the acceptance thereof may be considered null and void. The undersigned certifies to have a minimum of five (5) consecutive years of current experience in the type of Work related t s r ct and that this experience is in actual operation of the firm with permanent employ s performing part of the Work as distinct from a firm operating entirely by subcontracting a phases of the W rk. The undersigned also certifies to be properly licensed by the State as a contr ctor to perform thi type of Work and further certifies to have been so licensed for the five (5) years i mediately precedi g the date of receipt of Bids, The undersigned possesses California Contractor's Lic se Number 7 2 which expires on January 31,2016 Signature(s) of bidder: If an individual, so state. If afirm or co -partnership, state the firm name and give the names of all individual co-partners comprising the firm. If a corporation, state legal name of corporation, also names of president, secretary, treasurer, and manager thereof. Two notarized officer's signatures and the corporate seal are required for corporations. 10 A-11 ATTACHMENT A Legal Business Name: Southwest Pipeline & Trenchless Corp Address: 22118 S. Vermont Ave., Torrance ,CA 90502 Telephone: 310-329-8717 Justin Duchaineau Proposals which do not show the number and date of the Bidder's License under the provisions of Chapter 9 of Division 3 of the Business & Professional Code will be rejected. To be submitted with each bid to contract for City of Rancho Palos Verdes 2015 STORM DRAIN LINING PROJECT Bid Date 12/17/2016 This information must include all construction work undertaken in the State of California by the bidder and partnership joint venture or corporation that any principal of the bidder participated in as a principal or owner for the last five calendar years and the current calendar year prior to the date of bid submittal. Separate information shall be submitted for each particular partnership, joint venture, corporate or individual bidder. The bidder may attach any additional information or explanation of data which bidder would like to be taken into consideration in evaluating the safety record, An explanation must be attached of the circumstances surrounding any and all fatalities. 11 A-12 ATTACHMENT A CITY OF RANCHO PALOS VERDES BID SHEETS FOR 2015 STORM DRAIN LINING PROJECT PROJECT No. 002116 Bidder's Name: Southwest Pipeline & Trenchless Corp. To the Honorable Mayor and Members of the City Council: In compliance with the Notice Inviting Bids, the undersigned hereby agrees to enter into the Contract to furnish all labor, materials, equipment and supplies for the 2015 Storm Drain Lining Project in accordance with the Specifications and Plan for demolition, construction and installation in the Contract Documents, as that term is defined in the Standard Specifications, to the satisfaction and under the direction of the Director of Public Works, at the following prices. LUMP SUM ITEMS SHALL INCLUDE PROVIDING AND INSTALLATION OF ALL COMPONENTS STIPULATED WITHIN THE CONTRACT DOCUMENTS AND NECESSARY INCIDENTALS TO FACILITATE PROVIDING SAID COMPONENTS. SURVEY, GRADING, AND BMPS SHALL BE CONSIDERED INCLUDED IN THE INDIVIDUAL BID ITEMS. NO ADDITIONAL PAYMENTS WILL BE MADE. The quantities reflected on the plans and in the bid -sheets are representative of the amount of work for each item on the project, but are not final quantities to be used for computing payment. Payment will be based on the measurement of actual work completed. The contractor must notify in writing to the project manager of all discrepancies between actual bid quantities and those shown in the bid document prior to commencement of work in any area of the project. 12 A-13 ATTACHMENT A BID SCHEDULE ITEM NO. DESCRIPTION ESTIMATED _QUANTITY UNIT PRICE UNIT EXTENDED AMOUNT 1 MOBILIZATION — (Not more than 5%) 1 LS $ !/pj av, dy $1 00+0 , 0 � 2 INSTALL CIPP LINER 12" 70 LF $ /20•a-, $ �j yd0' cko 3 INSTALL CIPP LINER 18" 1731 LF $ /'Z S. 0 $�/�,y3�f, tet. 5 INSTALL CIPP LINER 24" 918 LF $ j3j.00 $/2�� zl"f3. 6 INSTALL CIPP LINER 30" 678 LF $ -Z -Z $ /4,y, 7 INSTALL CIPP LINER 36" 1474 LF $ %qo�G $ 2ga r�dd,cw 8 INSTALL LINER (MINOR CONCRETE PAVING OR CIPP) 54" 378 LF $ ��, y� $ 19'9'lVwfig 9 TRAFFIC CONTROL PLAN 1 LS $j $ 1, 5'0 P, o 10 ARTERIAL TRAFFIC CONTROL 10 PER DAY $ // 5• u' $ 11 GROUTING 10 CY $ $ //jam' nom► TOTAL BASE BID PRICE IN DIGITS: $ 8710 S ?"i• 0 d TOTAL BASE BID PRICE IN WORDS: + /6HTirJv.�, p �y��ryrS'1't-u�c- TI b,Srix/a FI1x 'V-w04M SOPAWY dxJf.lw" The contract shall be awarded to the lowest responsible bidder based on the TOTAL BASE BID. c�rj Note: Some items may be adjusted or deleted. Any changes to the quantities for these items shall not classify as a substantial change as stipulated in Section 3-2.2.1 of the Standard Specifications. Therefore, regardless of total actual amount (percentage) compared to estimated quantities, the unit prices provided above by the Bidder shall be applied to the final quantity when payment is calculated for these items. No adjustment in the unit prices will be allowed. The City reserves the right to not use any of the estimated quantities, and if this right is exercised, the Contractor will not be entitled to any additional compensation. Cost of all export of material shall be included in the above unit costs; no additional compensation will be granted for such expenses. NOTE 1: Available video inspections of the some of the subject storm drain alignments are included with this bid package and are intended to be used for a general reference only. The videos provided with these Plans and Specifications for reflect the condition of the Storm Drain as far back as 2014. Understanding this, the condition of some of the storm drains may have changed in the time elapsed since the videos were made. NOTE 2: Pipes requiring lining with a diameter of 42 -inches or larger may be lined by either CIPP or Minor Concrete Paving methods in accordance with these Plans and Specifications. Payment for lining of these pipes will be based on unit prices provided in the bid, regardless of method. Pipes requiring lining with diameter less than 42 inches shall be lined by CIPP method only. Addendum No. 1 (2015 Storm Drain Lining Project) 13R A-14 ATTACHMENT A INFORMATION REQUIRED OF BIDDER Fill out all of the following information. Attach additional sheets if necessary. (1) Bidder's name: Southwest Pipeline & Trenchless Corp. (2) If the Bidder's name is a fictitious name, who or what is the full name of the registered owner? If the Bidder's name is not a fictitious name, write "NIA" in the response to this question. If you are doing business under a fictitious name, provide a copy of the filed valid Fictitious Business Name Statement. Business address: 22118 S. Vermont Ave., Torrance, CA 90502 Telephone: 310-329-8717 Facsimile: Type of firm - Individual, Partnership, LLC or Corporation: Corporation organized under the laws of the state of: _ California State Contractor's License Number and Class: 310-329-0981 Corporation California 773862 A DIR Contractor Registration Number: 1000002176 List the name and title of the person(s) who inspected the site of the proposed Work for your firm: Robert Bolger (10) Number of years' experience the company has as a contractor in construction work: 15 (11) List the names, titles, addresses and telephone numbers of all individuals, firm members, partners, joint ventures, and company or corporate officers having a principal interest in this Proposal: Justin Duchaineau-President Robert Bolger- Secretary List at least three similar projects completed as of recent date: Contract Amount Class of Work Date Completed Name, Address of Owner, & Telephone No. $2,062,906 00 CIPP Lining 8-1-2104 City of Azusa 213 E, Foothill Blvd Azusa CA 91702 626-812-5264 $3,953,120.54 CIPP Lining 2-1-2015 City of San Diego 1200 3rd Street San Diego CA 92101 619-236-6000 $3,096,664,00 CIPP Lining 4-1-2014 City of San Diego 9485 Aero Dr San Diego CA 92123 858-2434977 (10) NOTE: Upon request of the CITY, the bidder shall furnish evidence showing a notarized financial statement, financial data, construction experience, or other information. 14 A-15 ATTACHMENT A (11) "Bidder shall be properly licensed at the time of bid submission or the bid shall be considered non-responsive and shall be rejected." 15 A-16 ATTACHMENT A REFERENCES For all public agency projects in excess of $300,000 you are currently working on or have worked on in the past five (5) years, provide the following information: Project 1 Name/ Number Sewer Master Plan Improvements # 66513A Project Description Rehab using CIPP 32,900 If of 8",10",12" and 15" Approximate Construction Dates From: 12/2012 To: 8/2014 Agency Name: City of Azusa Contact Person: Daniel Bobadilla Telephone: 626-812-5264 Address: 213 E. Foothill Blvd., Azusa, CA 91702 Original Contract Amount: $ 2,664,680 Final Contract Amount: $ 2,913,796 If final amount is different from original amount, please explain (change orders, extra work, etc.) Change Order for Extra Work Did you file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 2 Name/ Number Ocean Meadows Golf Course - 601385-10 Project Description Rehab 2.514 If of 18" and 24" Sewer Main Line Approximate Construction Dates From: 3/2011 To: 11/2011 Agency Name: Goleta West Sanitary District Contact Person: Mark Nation Telephone: 805-968-2617 Address: PO BOX 4, Goleta, CA 93116 Original Contract Amount: $ 422,500 Final Contract Amount: $ 428,765 16 A-17 ATTACHMENT A If final amount is different from original amount, please explain (change orders, extra work, etc,) Change Order for Extra Work Did you file any claims against the Agency? Circle one. Yes CNo Did the Agency file any claims against you? Circle one: Yes If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 3 Name/ Number Pipeline Rehabilitation Phase R-1 Project Description Rehab 36,171 If of 8" and 10" . Install 972 Service Lateral Connections Approximate Construction Dates Agency Name: City of San Diego From: 8/2012 To: 2/2014 Contact Person: Steve Urban Telephone: Address: 1200 3rd Street, San Diego, CA 92101 619-236-6000 Original Contract Amount: $ 3,953,120.00 Final Contract Amount: $ $4,016,236.00 If final amount is different from original amount, please explain (change orders, extra work, etc.) Chanae Order for Extra Work Did you file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. 17 • ATTACHMENT A Project 4 Name/ Number 2012 Sewer Rehabilitation # 12-01 Project Description Rehab 18,840 If of 6",8",10",12" and 18" Dia sewer main Approximate Construction Dates Agency Name: City of Winters Contact Person: Jim Fletter From: 1/2013 To: 10/2013 Address: City of Winter 318 First Original Contract Amount: $ 1,457,461 Telephone: Winters. CA 95654 530-795-4910 Final Contract Amount: $ 1,676,306.00 If final amount is different from original amount, please explain (change orders, extra work, etc.) Change Order for Extra Work Did you file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 5 Name/ Number Citywide CMP Lining & Rehab Program CIP 2013-20 Project Description Rehab using CIPP 1997 LF of 18", 30", and 36" lining and 47" x 71" Arched Approximate Construction Dates From: 5/2013 To: 1 Agency Name: City of Santee Contact Person: Steve Miller Telephone: 619-258-4100 Ext. 176 Address: 10601 Magnolia Avenue, Santee, CA 92071 Original Contract Amount: $ 775,576.00 Final Contract Amount: $ 831,192.00 If final amount is different from original amount, please explain (change orders, extra work, etc.) Change Order for Extra Work 18 A-19 ATTACHMENT A A-20 ATTACHMENT A Did you file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes Na If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 6 Name/ Number Project Description Main Lining Rehabilitation Project Phase IV Rehab 91,557 If of 6",8",10",12" and 18" Dia Sewer Main Approximate Construction Dates Agency Name: City of Culver City Contact Person: Address: From: 2-2015 To: In -Progress Jason Linsdau Telephone: 760-759-2466 City of Culver City 9770 Culver Blvd., Culver City, CA 90232 Original Contract Amount: $ 3,141,590.00 Final Contract Amount: $ 3,237,993.00 If final amount is different from original amount, please explain (change orders, extra work, etc.) Change Order for Extra Work Did you file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. 19 A-21 ATTACHMENT A STATEMENT ACKNOWLEDGING PENAL AND CIVIL PENALTIES CONCERNING THE CONTRACTORS' LICENSING LAWS [Business & Professions Code 7028.15] [Public Contract Code 20103.51 I, the undersigned, certify that I am aware of the following provisions of California law and that I, or the entity on whose behalf this certification is given, hold a currently valid California contractor's license as set forth below: Business & Professions Code 7028.15. (a) It is a misdemeanor for any person to submit a bid to a public agency in order to engage in the business or act in the capacity of a contractor within this state without having a license therefore, except in any of the following cases: (1) The person is particularly exempted from this chapter. (2) The bid is submitted on a state project governed by Section 10164 of the Public Contract Code or on any local agency project governed by Section 20104 [now ` 20103.51 of the Public Contract Code. (b) If a person has been previously convicted of the offense described in this section, the court shall impose a fine of 20 percent of the price of the contract under which the unlicensed person performed contracting work, or four thousand five hundred dollars ($4,500), whichever is greater, or imprisonment in the county jail for not less than 10 days nor more than six months, or both. In the event the person performing the contracting work has agreed to furnish materials and labor on an hourly basis, "the price of the contract" for the purposes of this subdivision means the aggregate sum of the cost of materials and labor furnished and the cost of completing the work to be performed. (c) This section shall not apply to a joint venture license, as required by Section 7029.1. However, at the time of making a bid as a joint venture, each person submitting the bid shall be subject to this section with respect to his or her individual licensure. (d) This section shall not affect the right or ability of a licensed architect, land surveyor, or registered professional engineer to form joint ventures with licensed contractor to render services within the scope of their respective practices. (e) Unless one of the foregoing exceptions applies, a bid submitted to a public agency by a contractor who is not licensed in accordance with this chapter shall be considered non- responsive and shall be rejected by the public agency. Unless one of the foregoing exceptions applies, a local public agency shall, before awarding a contract or issuing a purchase order, verify that the contractor was properly licensed when the contractor submitted the bid. Notwithstanding any other provision of law, unless one of the foregoing exceptions applies, the registrar may issue a citation to any public officer or employee of a public entity who knowingly awards a contract or issues a purchase order to a contractor who is not licensed pursuant to this chapter. The amount of civil penalties, appeal, and finality of such citations shall be subject to Sections 7028,7 to 7028.13 inclusive. Any contract awarded to, or any purchase order issued to, a contractor who is not licensed 20 A-22 ATTACHMENT A pursuant to this chapter is void. (f) Any compliance or noncompliance with subdivision (e) of this section, as added by Chapter 863 of the Statutes of 1989, shall not invalidate any contract or bid awarded by a public agency during which time that subdivision was in effect. (g) A public employee or officer shall not be subject to a citation pursuant to this section if the public employee, officer, or employing agency made an inquiry to the board for the purposes of verifying the license status of any person or contractor and the board failed to respond to the inquiry within three business days. For purposes of this section, a telephone response by the board shall be deemed sufficient. Public Contract Code 20903.5: In all contracts subject to this part where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with the laws of this state. However, at the time the contract is awarded, the contractor shall be properly licensed in accordance with the laws of this state. The first payment for work or material under any contract shall not be made unless and until the Registrar of Contractors verifies to the agency that the records of the Contractor's State License Board indicate that the contractor was properly licensed at the time the contract was awarded. Any bidder or contractor not so licensed shall be subject to all legal penalties imposed by law including, but not limited to, any appropriate disciplinary action by the Contractor's State License Board. The agency shall include a statement to that effect in the standard form of prequalihcation questionnaire and financial statement. Failure of the bidder to obtain proper and adequate licensing for an award of a contract shall constitute a failure to execute the contract and shall result in the forfeiture of the security of the bidder. License—Uo--X73862 Expiration Date: Z1-31-2016 12-16-2015 21 A-23 ATTACHMENT A RESUME Attach to this Bid the experience resume of the person who will be designated as General Construction Superintendent or on-site Construction Manager for the Contractor. Daniel McCoy -Project Manager- See Attached Resume Edward Manriquez-On Site Superintended- See Attached Resume 22 A-24 ATTACHMENT A A 1 SOUTHWEST PIPELINE �J// . rnE Nt: MlG 85 r.ofln. Daniel McCoy Summary of March, 2004 - Present Qualifications Southwest Pipeline and Trenchless Corp. Gardena, CA Project Manger ■ Manage all projects, field personnel and wet -out of the Cured -in -Place pipe, SPR EX and Top Hats (Lateral Seal Connections) to complete numerous rehabilitation projects. Prepare construction schedules and required submittals to various government agencies. Assure job conformance to contract plans and specifications. Superintendent ■ Over see daily production of construction crews, involving Cured -in -Place pipe, Expanda- Ribloc, and Top Hats, Video inspection, and lateral rehab crews. Communicate directly with project managers, onsite construction inspectors, and project engineers. Enforce rules and company regulations. Foreman • Manage and oversee a five man crew, ]nstall Cured -in -Place pipe, install Expanda-Ribloc. Education and Special Skills ■ Serrano High School Diploma 1997 ■ Confined Space Training — Competent Person ■ Basic Medic First Aid — CPR Inclusive • 30 hour O.S.HA course ■ Diversity training Sewer & Storm Rehabilitation Projects (CIPP, SPR EX & Top Hats) City of San DicTo • Pipeline Rehabilitation Phase F-1-104,604 LF of 6" — 21" • Pipeline Rehabilitation Phase H-1— 34,770 LF of 6" —15" ■ Sewer Pipeline Rehabilitation Phase J-1— 47,668 LF of 8" —10" ■ Sewer Pipeline Rehabilitation Phase J -1A — 38,507 LF of 6" —10" ■ Sewer Pipeline Rehabilitation Phase J -1B — 27,092 LF of 8" ■ Sewer Pipeline Rehabilitation Phase J -1C- 35,196LF of 8" Q(y of 1,06 A 5 ■ SSRP A02A Venice Blvd. & Genesee - 7,538 LF of 8" & 10" ■ SSRP A02B Coliseum St. & La Brea Ave. --15,943 LF of 8" & 10" • SSRP Mandeville Canyon Rd. & Wedstridge Rd. —12,535 LF of 9'& 10" ■ N.E. Wilshire CSRP Unit 3 — 2,499 LF of 8" ■ SSRP P13 Range View & Ave. 55 —1,972 LF of 8" ■ SSRP U19B Prosser Ave. —11,043 LF of 8" —15" • SSRP U15 Camden Ave. — 3,777 LF of 8" —15" City pf Anaheim • Citywide Sanitary Sewer System Repair - 9,647 LF of 8" — 24" • Citywide Sanitary Sewer System Repair Phase II Group 2 —15,421 LF of 8"-18" PIP- 539 West 14011, Street Gardena, CA 90249 -Phone (310)329-8717 -Fax (310)329-0981 •12/14/2015• A-25 ATTACHMENT A —2— December 14, 2015 I.Qs Angeles County Sanitation District ■ District 5 Main Trunk Sewer Rehabilitation — 7,035 LF of 15" ■ JO "H" Unit 1F Sewer Rehabilitation — 451 LF of 36" ■ J01A Long Beach Sewer Rehabilitation — 62 LF of 24" Los Angeles County Department of Public Works ■ CMP Lining CDR Phase 1A - 6,000 LF of 15" — 66" ■ CMP Lining CDR Phase 2A —1,170 LF of 15" — 36" • Eaton Wash Spreading Ground Improvements —1,779 LF of 21" — 36" City of La Habra ■ Lining Existing Mains Project No. 1-S-09 — 21,733 LF ,) f 6" —15" City of Redwood Citw ■ 2010-2011 Sewer Rehabilitation Pr--Ject — 5,011 LF of 6" Orange County Sanitation District ■ Bayside Drive Improvements 5-61 — 3,488 LF of 24" City of West 1Iotly%vogd ■ Sewer Repair and Rehabilitation — Eastside CIP — 24,759 LF of 8"-12" ►539 West 1401' Street Gardena, CA 90249 -Phone (310)329-8717 -Fax (310)329-0981 •12/14/2015,4 A-26 ATTACHMENT A C SOUTHWEST PIPELINE r CRENCHLESS COOP. Edward Manriquez Summary of 2001 - Present Qualifications Southwest Pipeline & Trenchless Corp. Gardena, CA 90248 Cell: (310)261-0761 Lead Foreman Superintendent Education and Special Sldls Project Experience • Over 12 years' experience in CIPP Direct Project installation supervision. Project Scheduling, Inspector and Engineer Relations, Field Employee Management, Pipe Rehabilitation, .Mainline Inspection, Pipe Cleaning, CCTV Inspection, Bypass (Flow Diversion), CIPP Installation, Liner Wet -out, Onsite Wet -out, Traffic Control — National Liner (CIPP), U -Liner (HDPE), Lateral Lining, and Lateral Seal Connections (Tcl_• Hats). • Equipment Operatior. — CCTV Trucks (Cameras and Cutters), Vactors, Boilers, Pumps, etc. • Bypass • Confined Space Training • Basic Medic First Aid — CPR Inc�usive • Supervised installation of over 200,000 feet in all HDPE, CIPP, Lateral Lining, and Lateral Seal Connection (Top Hat) projects completed by Southwest Pipeline & Trenchless Corp. and its divisions, U -liner West and National Liner West. Sewer & Storm Rehabilitation Projects (CIPP, SPR EX & Top Hats) Cit; of San Dicgv ■ Pipeline Rehabilitation Phase F-1-104,604 LF of 6" — 21" • Pipeline Rehabilitauan Phase H-1— 34,770 LF of 6" —15" ■ Sewer Pipeline Rehabiiitation Phase J-1— 47,668 LF of 8" —10" • Sewer Pipeline Rehabilitation Phase J -1A — 38,507 LF of 6" —10" • Sewer Pipeline Rehabilitation Phase J-113 — 27,092 LF of 8" ■ Sewer Pipeline Rehabilitation Phase J-1C-35,196LF of 8" Cit} of Los :U,toles ■ SSRP A02A Venice Blvd. & Genesee -- 7,538 LF of 8" & 10" ■ SSRP A02B Coliseum St. & La Brea Ave. —15,943 LF of K& 10" ■ SSRP Mandeville Canyon Rd. & Wedstridge Rd. —12,535 LF of 8" & 10" ■ N.E. Wilshire CSRP Unit 3 — 2,499 LF of 8" ■ SSRP P13 Range View & Ave. 55 —1,972 LF of 8" ■ SSRP U19B Prosser Ave. —11,043 LF of 8" —15" ■ SSRP U15 Camden Ave. — 3,777 LF of 8" —15" 100- 22118 S. Vermont Ave. Torrance, CA 90502 -Phone (310)329-8717 -Fax (310)329-0981 •12/14/2015 4 A-27 ATTACHMENT A 0 3 SOUTHWEST PIPELINE 4 1 11- ­[ X X i Il ­ Edward Manriquez Cont'd City of Analicim ■ Citywide Sanitary Sewer System Repair - 9,647 LF of 8" — 24" ■ Citywide Sanitary Sewer System Repair Phase II Group 2 —15,421 LF of 8"-18" Los Angeles County Satutarion District ■ District 5 Main Trunk Sewer Rehabilitation — 7,035 LF of 15" • JO "H" Unit 1F Sewer Rehabilita.ion — 451 LF of 36" ■ J01A Long Beach Sewer Rehabilitation — 62 LF of 24" Los Angel€g County Department of P, 4j)lic Works ■ CMP Lining CDR Phase 1A - 6,000 LF of 15" — 66" ■ CMP Lining CDR Phase 2A —1,170 LF of 15" — 36" III Eaton Wash Spreading Ground Improvements —1,779 LF of 21" — 36" City !2f La Habra • Lining Existing Mains Project No. 1-S-09 — 21,733 LF of 6" —15" City of Redw gd City ■ 2010-2011 Sewer Rehabilitation Project — 5,011 LF of 6" Orange County Sanitation District ■ Bayside Drive Improvements 5-61 — 3,488 LF of 24" City of West Holl vyti c od ■ Sewer Repair and Rehabilitation_ — Eastside CIP — 24,759 LF of 8"-12" 10-22118 S. Vermont Ave.'I'orrance, CA 90502 -Phone (310)329-8717 -Fax (310)329-0981 •12/14/2015A 1 • • ATTACHMENT A DESIGNATION OF SUBCONTRACTORS [Public Contract Code 4104] List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half percent (0.5%) of the Contractor's total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor's total Bid or $10,000, whichever is greater. If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors. r The percentage of the total bid shall represent the "portion of the work' far the purposes of Public Contract Code Section 4104(b). 23 A-29 California Name under which Contractor's California DIR Type of Work Percentage of Subcontractor is License Contractor Address & Phone Number (e.g. Electrical) Total Bid (e.g., Licensed Number(s) & Registration 10%)- CI ss(es) Number J r c�arr�rl �'�' Q63r�3 ,q �, /neo 31 da /3 Sbz ' Trek ed, t'4 j✓�i1T/ � 562-�s-� e- ,�.� `,�'�� f�fi a2�'rp�+.Gr /�FGsv� 8Z5 8 Z y_ C.' —�f2 / ooa0 /,'/3Z;Z 5 305 /•vD�STi�/.!>fL V � • �V �►/IV(rTb�v F3t/�t r� Cr4 /It�ve e�^' P*o*oe- r The percentage of the total bid shall represent the "portion of the work' far the purposes of Public Contract Code Section 4104(b). 23 A-29 ATTACHMENT A CONTRACTOR'S INDUSTRIAL SAFETY RECORD Bidder's Name Southwest Pipeline & Trenchless Corp. Thebove information as compiled from the records that are available to me at this time and I declare under penalty of perjury that the Jormation is truftrand accurate within the limitations of those records. Signatu Title: P/sident Date: 12-16-2015 Signature: Title: Secretary Date: 24 12-16-2015 A-30 Current Year of 2014 2013 2012 2011 2010 Total Record Number of contracts 59 65 78 73 77 62 414 Total dollar amount of contracts (in thousands 20,173 19,883 24,224 19,750 15,418 16,498 115,946 of dollars Number of fatalities 0 0 0 0 0 0 0 Number of lost workday cases 0 1 0 1 3 9 14 Number of lost workday cases involving permanent transfer to 0 0 0 0 0 0 0 another job or termination ern Io nt Thebove information as compiled from the records that are available to me at this time and I declare under penalty of perjury that the Jormation is truftrand accurate within the limitations of those records. Signatu Title: P/sident Date: 12-16-2015 Signature: Title: Secretary Date: 24 12-16-2015 A-30 ATTACHMENT A Bond No. N/A KNOW ALL PERSONS BY THESE PRESENTS that: WHEREAS the City of Rancho Palos Verdes ("Public Agency"), has issued an invitation for Bids for the Work described as follows: 2015 STORM DRAIN LINING PROJECT Project No. 002116 WHEREAS Southwest Pipeline and Trenchless Corp. 22118 S. Vermont Avenue, Torrance, CA 90502 (Name and address of Bidder) ("Principal"), desires to submit a Bid to Public Agency for the Work. WHEREAS, Bidders are required under the provisions of the California Public Contract Code to furnish a form of Bidder's security with their Bid. NOW, THEREFORE, we, the undersigned Principal, and Liberty Mutual Insurance Company 790 The City Drive South, Suite 200, Orange, CA 92868 (Name and address of Surety) ("Surety") a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the Public Agency in the penal sum of Ten Percent of Amount Bid------------------------------------------------------------------------- Dollars ($ 10% of Amount Bid ------------------------------ ), being not less than ten percent (10%) of the total Bid price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal is awarded a contract for the Work by the Public Agency and, within the time and in the manner required by the Specifications, enters into the written form of Contract included within those Specifications, furnishes the required Bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, and furnishes the required insurance coverage, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect. In case suit is brought upon this Bond, Surety further agrees to pay all court costs incurred by the Public Agency in the suit and reasonable attorneys' fees in an amount fixed by the court. Surety hereby waives the provisions of California Civil Code Section 2845. 25 A-31 ATTACHMENT A IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body. Dated: November 24, 2015 "Principal" "Surety" IN Note: ipeline and Trenchless Corp. Liberty Mutual Insurance Company �k,S}i,. i��•Jv`a��� fVIA Its (Seal) By:nm oemi Quir , ttori y -in -Fact By: N/A Its (Seal) This Bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attomey-in-fact must be attached. 26 A-32 ATTACHMENT A CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT Civil Code § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. State of California ) ss County of Los Angeles NOV Z 4 2015 On , before me, Patricia Arana, Notary Public, personally appeared Noemi 4uiroz who proved to me on the basis of satisfactory evidence to be the person{&} whose name{s4 is�ar subscribed to the within instrument and acknowledged to me that 4ey she4liey executed the same in #is�her, ;e r authorized capacity4e54, and that by 4+s¢herA4e4 signature{s4 on the instrument the person{&}, or the entity upon behalf of which the person{ acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. PATRICIA ARANA Commission � 2043063 Z "d Notary Public • California z Los Angeles County My Comm. Expires Se 27, 2017 (Seal) Signature is Arana, Notary Public A-33 ATTACHMENT A This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except In the manner and to the extent herein staled. Not valid for mortgage, note, loan, letter of credit, bank deposit, currency rate, interest rate or residual value guarantees. To confirm the validity of this Power of Attorney call 610.632.6240 between 9:00 am and 4:30 pm EST on any business day. American Fire and Casualty Company Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That American Fire & Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the 'Companies'), pursuant to and by authority herein set forth, does hereby name, constitutetnnd-,..- f, Oemf ulroz of the city of Los Ange es state of t -A its We and lawful altomay4n-fact, with full power and authority hereby cenforred to sign, execute and acknowledge the following surety bond: Principal Name: Southwest Pipeline and Trenchless Corp. Obligee Name: City of Rancho Palos Verdes Surety Bond Number: Bid Bond Bond Amount: See Bond Form IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 181" day of November, 2013. pNU CAS' `1NSUq P`tl INS U� pN1NsUq,� American Fire and Casualty Company ti`LpRPe!`w t, y(� �JPLgRPO'Zr. �ti,q�gRtp ��{. �q�L `gyp ej'y�.y`F The Ohio Casualty Insurance Company Liberty Mutual Insurance Company � 0 u 1906 0 1912 = 1919 ° 1991 Wes merican Insurance Company d�fYE,rr�NAMgS�`@�aD Vim/)''9s'rRC#{4 Cyt�JtAM7Gs'' fps lIJDIhFiP T :Ra"'/ * w * * By: David Nf. Carey. Assistant Secretary STATE OF PENNSYLVANIA ss COUNTY OF MONTGOMERY On this 1811 day of Novembc>r, 2813, before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Amarlcan Fire and Casualty Company, Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing Instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written. fit, PAS;,o�+sof F� COMMONWEALTH OF PENNSYLVANIA � . at C Notarial Seal �P.bli, Teresa Pastella, Notary Public By: Plymouth Twp., Montgomery County Teresa P +1- rA'1'V, P, p My Commission Expires March 28,2017 A}Ty r'�h Aiern"t Penn5y:vana Associellon of Nalaries This Power of Attorney -1 made and executed pursuant to and by authority of the fotiowing By-laws and Authorizations of American Fire and Casualty Company, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ARTICLE IV — OFFICERS — Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman orthe President may prescribe, shall ap*nt such attorneys •in•fact, as may be necessary to act In behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such allomeys•in•fact, subject to the limitations set fo:1h in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such Instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney- in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIII — Execution of Contracts — SECTION 5. Surely Bonds and Undertakings. Any officer of the Company authorized for that purpose In wrltng by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-In•facl, as may be necessary to act In behalf of the Company to make, execute, seal, acknowfedge and deliver as surety any and all undertakings, bonds, recognizances and other surety obilgafions. Such attorneys -In -fact subject to the limitations set forth in [heir respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such Instruments and to attach thereto the seal of the Company. When so executed such Instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attomeys- In-fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, reoognizances and other surely obligations. Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a cerfified copy of any power of attorney issued by the Company In connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Gregory W. Davenport, the undersigned, Assistant Secretary, of American Fire and Casualty Company, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing Is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 24th day of November 2015 . 4. AMD CA`5•' A`mNSUJjR J 4SY INSU� ��iN SUq fh ':' �LgRPp�ORls. �JJ�`eRPUJ{,��r.� �iy �cgaro.rfEo �n By: 1906 o r 1912 i = 1919 _Q G 1991 Gregory W. Davenport, Assistant Secretary `JlF.h LHAM4Sk •AT iVf'AiS 1't" yd YHP,1.5P�' t f rYUrllfSr� T Ac A-34 ATTACHMENT A CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Los Angeles ) On 2 � 1 C �kl_ before me, Robert Bolger Jr., Notary Public Date Here Insert Name and Title of the Officer personally appeared Justin Duchaineau Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph ROBERT BOLGER JR is true and correct. Commission # 2061640 L WITNESS my hand and official seal. Notary Public - California z Z ` Los Angeles County My Comm. Ex ires Mar 21, 2018 Signature J Signature eoibtary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Document Date: Signer(s) Other Than Named Above: Capacity(les) Claimed by Signer(s) Signer's Name: Corporate Officer — Title(s): Partner — [ _ 1 Limited -! General Individual Attorney in Fact Trustee _ Guardian or Conservator Other: Signer Is Representing: _ Signer's Name: Corporate Officer — Title(s): Partner — Limited General Individual Attorney in Fact Trustee Guardian or Conservator Other: Signer Is Representing: 02014 National Notary Association - www.NationalNotary.org • 1 -800 -US NOTARY (1-800-876-6827) Item #5907 ATTACHMENT A NONCOLLUSION DECLARATION TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID [Public Contract Code 7106] (Public Contract Code § 7106] State of California County of Los Angeles ) ss. City of Torrance ) The undersigned declares: Southwest Pipeline & I am the President of Trenchless Corp. the party making the foregoing bid. The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation, The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability Daftnersf4a, or any other entity, hereby represents that he or she has full power to exec and does elute, this declaration on behalf of the bidder. I declare under penalty of perjury under Ve laws of the State o California that the foregoing is true and correct and that this declara on is executed on 12-16-2015 [date], at Torrance [city], Calif, [state]. ' Signature Subscribed and sworn to before me on /12-16-2015 (Notary Seal) "Signature (Date) Notary Public 27 A-36 ATTACHMENT A CALIFORNIA JURAT WITH AFFIANT STATEMENT GOVERNMENT CODE § 8202 'kSee Attached Document (Notary to cross out lines 1-6 below) ❑ See Statement Below (Lines 1-6 to be completed only by document signer[s], not Notary) Signer No. 1 Signature of Document Signer No. 2 (if any) A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of ROBERT BOLGER JR Commission # 2061640 z a =,; Notary Public - California z z ' Los Angeles County My Comm. Expires Mar 21, 2018 Seal Place Notary Seal Above Subscribed and sworn to (or affirmed) before me on this day of 2015 by Date Month Year (1) � t, s)i5 , lJ (and Name(s) of Signer(s) proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. Signature Signature of F46fary Public OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Signer(s) Other Than Named Above: Document Date: 02014 National Notary Association • www.NationalNotary.org • 1 -800 -US NOTARY (1-800-876-6827) Item #5910 A-37 ATTACHMENT A ACKNOWLEDGMENT OF ADDENDA Bidder's Name: Southwest Pipeline & Trenchless Corp. The Bidder shall signify receipt of all Addenda here, if any: Addendum Number Date Received Si afure #1 12-8-2015 If there are more Mdenda than there is room in the chart above, attach another page acknowledging r, ipt of the Addenda. S ature: Title: resident Date: 12-16-2015 28 A-38 ATTACHMENT A This form shall be submitted with the Bid PROPOSER/BIDDER STATISTICAL INFORMATION FORM All proposers/bidders responding to the solicitation must complete and submit this form in order for their proposer or bid to be considered. The information requested In the form will be used solely for statistical purposes. The contract(s) and/or subcontract(s) will be awarded without regard to gender, race, color, creed, or national origin. 1. Type of business entity: ❑ Sole partnership 0 Nonprofit organization ❑ Partnership ❑ Franchise Corporation 17 Limited Liability Corporation ❑ Other: 2. Total number of employees In firm/organization, including owners: 47- 3. Z d. Break down the total number of employees in your firm/organization into the following categories: Owners, Partners, and _Associate Partners_ Race/Ethnicity Male Female Manai,ers :staff Black / African-American Hispanic/Latino Asian -American / Pacific Islander f` American Indian / Alaska Native I Filipino American White 7 Other 4. Indicate, by percentage, how ownership of the firm/organization Is distributed: Asian- American Black / American / Indian / African- Hispanic/ Pacific Alaskan Filipino - American Latino Islander Native American White Other Men � l00070 Women S. If your firm is currently certified as a Minority (MBE), Women (WBE), Disadvantaged (DBE), and/or Disabled Veteran (DVBE) Business Enterprise by a public agency, indicate the Business Enterprise certification of your firm, the certifying agency, and the expiration date of the certification: MBE WBE DBE DVBE Name of Certllying Agency Expiration Date 0 ❑ ❑ ❑ ❑ 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 ❑ ❑ [3 C] ❑ ij 29 A-39 ATTACHMENT A CHECKLIST FOR EXECUTION OF CONSTRUCTION CONTRACT TO BE SUBMITTED BY SUCCESSFUL BIDDER: Two Executed Notarized Copies of the Agreement (Attached) Payment Bond in Amount of Contract (Attached) Performance Bond in Amount of Contract (Attached) Workers Compensation Insurance Certificate in the amount required by law (Attached) Liability Insurance Certificate in the Amount of $1 Million, Naming the City as a Co-insured Automobile Insurance Certificate in the Amount of $1 Million General Aggregate Insurance Certificate in the Amount of $2 Million, Naming the City as a Co-insured Agreement to Comply with California Labor Law Requirements (Attached) Business License with the City of Rancho Palos Verdes Indemnification and Hold Harmless Agreement (Attached) Additional Insured Endorsement - Comprehensive General Liability (Attached) Additional Insured Endorsement - Automobile Liability (Attached) Additional Insured Endorsement -Excess Liability (Attached) 30 A-40 ATTACHMENT A ADDENDUM NO. 1 2015 STORM DRAIN LINING PROJECT PROJECT No. 002116 FOR THE CITY OF RANCHO PALOS VERDES In accordance with "Addenda" section of the "Instructions to Bidders" on page 6 of the Contract Documents, the following changes (revisions, additions, and/or deletions) are hereby incorporated and made a part of the subject plans, specifications and contract documents for this project. ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED BELOW. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION. This Addendum forms a part of the Contract Documents for the above -identified project and modifies the original specifications and Contract Documents, as noted below. Portions of the Contract Documents, not specifically mentioned in the Addendum, remain in force. All trades affected shall be fully advised of these changes, deletions, and additions. This addendum included additions, deletions and changes to the contract documents as follows: 1. Clarification to Pre -Bid Meeting a. Delete Page 2 2. Revisions to Bid Sheet a. Delete Page 13 Replace with 2R (Attached) Replace with 13R (Attached) 3. Clarifications to Traffic Control Plan and Requirements a. Delete Page 84 Replace with 84R (Attached) b. Delete Page 94 Replace with 94R (Attached) c. Delete Page 95 Replace with 96R (Attached) End of Addendum No. 1. Mi el TF irector of I acknowledge receipt of this Addendum No. 1 and accept ZI/< 1 i Y Date Addendum No. 1 (2015 Storm Drain Lining Project) is Works aforementioned. Bidder ber 8. 2015 Date A-41 ATTACHMENT B s SOUTHWEST PIPELINE TRENCH L ESS ORP, 22118 South Vermont Ave., Torrance, CA 90502 Telephone: (310) 329-8717 Fax: (310) 329-0981 License # 773862-A; DIR No. 1000002176 City of Rancho Palos Verdes Public Works 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 RE: 2015 Storm Drain Lining Project No. 002116 Subject: Bid Protest To whom it may concern, Southwest Pipeline and Trenchless Corp. ("Southwest") hereby protests the bid proposal submitted by Nuline Technologies ("Nuline") for the 2015 Storm Drain Lining Project No. 002116. Nuline submitted a bid that does not meet the experience requirements that are required by the specification. Sheet 10 of the Proposal states "The undersigned certifies to have a minimum of five (5) consecutive years of current experience in the type of Work related to this Project and that this experience is in actual operation of the firm with permanent employees." Please see attached Contractor License Detail for Nuline's Contractor License showing that the license was issued on 10/10%2014. This alone should render the bid non-responsive, as Nuline is certifying with signature 5 years experience, when in fact they have approximately 1.5 years experience. Sheet 10 of the Proposal also states that "The undersigned also certifies to be properly licensed by the State as a Contractor to perform this type of Work and further certifies to have been licensed for the five(5) years immediately preceding the date of receipt of Bids." As mentioned above, Nuline has been licensed for much less than the requirement of the Bid Specifications. CIPP Lining is a highly specialized type of Work, which is why the City has these requirements. It is our understanding that Nuline has a "parent" company, but this parent company also does not have 5 years experience in CIPP lining. Burtech Pipeline ("Burtech"), Nuline's parent company, has been awarded projects that have CIPP lining on them, but listed a subcontractor for the CIPP lining portion of the work until only +j- 2 years ago, which also does not meet requirements. It should be noted that Nuline bid as Nuline and not their parent company. For these reasons, the project should be awarded to the next lowest responsible bidder, Southwest Pipeline. Thank you, r wr � ATTACHMENT B HP3 CONTRACTORS STATE UCENSE BOARD Contractor's License Detail for License # 997520 DISCLAIMER: A license status check provides information taken from the CSLB license database. Before relying on this information, you should be aware of the following limitations. CSLB complaint disclosure is restricted by law (B&P 7124.6) If this entity is subject to public complaint disclosure, a link for complaint disclosure will appear below. Click on the link or button to obtain complaint and/or legal action information. Per B&P 7071.17 , only construction related civil judgments reported to the CSLB are disclosed. Arbitrations are not listed unless the contractor fails to comply with the terms of the arbitration. Due to workload, there may be relevant information that has not yet been entered onto the Board's license database. Data current as of 12/21/2015 7:51:22 A Business Information NULINE TECHNOLOGIES LLC 102 SECOND STREET ENC INITAS, CA 92024 Business Phone P urnber:(760) 634-2822 Entity "_td Liability Issue Date 10/10/2014 Expire Date 10/31/2016 is license is current and active. information below should be reviewed. #A -,GENERAL ENGINEERING CONTRACTOR License Status Classifications Bonding Information Contractor'.-, Bond s license filed a Contractor's Bond with RLI INSURANCE COMPANY. nd Number: LSM0657586 nd Amount: $12,500 ective Date: 09/25/2014 LLC EMPLOYEEIWORKER BOND This license filed a LLC EmployeeM/orker Bond with NORTH AMERICAN SPECIALTY INSURANCE COMPANY. Bond Number: 2183785 Bond Amount: $100,000 :Effective Date: 08/15/2014 Bond of Qualifying Individual ie Responsible Managing Officer (RMO) BURTECH DOMINIC JOSEPH JR certified that he/she owns 10 percent or ore of the voting stock/equity of the corporation. A bond of qualifying individual is not required. lective Date: 10/10/2014 Workers Compensation Folow Lmlin I IIID I I LIU I lz)C I I CIZ) vVVI r%C I J L, gi I fpt� I lacmu I III I ZWU I CI I I Lq-- vv ILI ILI It; 1-viCi C.rF 1 9 3oficy Number:WC018370700 ATTACHMENT B Effective Date: 09/03/2015 Expire Date: 09/03/2016 Norkers'Compensation History 11 1' .1 --17 its license has liability insurance with GEMINI iNSURANCE COMPANY Aicy Number: VCGP021939 mount: $2,000,000 fective Date: 09/03/2015 (piration Date: 09/03/2016 ability Insurance History Other .. ... ..... Personnel listed on this license (current or disassociated) are listed on other licenses. rn-low LR� ATTACHMENT C NU LINE Technologies, LLC 12/28/15 Mr. Charles Eder, PE Department of Public Works City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 RE: 2015 Storm Drain Lining Project No. 002116 Subject: Bid Protest Response Mr. Eder: In response to your email dated December 22, 2015, 1 would like to offer the following clarifications pertinent to Nu - Line Technologies, LLC bid for the above referenced Project. Nu -Line Technologies is confident that it has met and/or exceeded the bid requirement of having more than five (5) years of current experience in the type of work related to this project. Nu -Line Technologies, LLC has a valid California Contractors' License, as a Limited Liability Corporation, that is tied to Dominic Burtech and Burtech Pipeline, Inc., which has been in operation since 1994 under Contractors License #718202. Nu -Line Technologies, LLC does have full time permanent personnel that perform this type of work. Nu -Line Technologies, LLC has submitted with its' bid package additional information as required by the bid documents that outline the Members, as well as the Resolution of the company and Fictitious Name Statement filing copy. Please see the following attached documents that are supplied to clarify the 'more than five years experience' and `actual operation of the firm with permanent employees' questions posed by the bid protestor. 1. Nu -Line Technologies, LLC Application for LLC Original Contractor License — Examination Waiver form showing Dominic Burtech as the qualifying individual with Contractor License # 718202. 2. Dominic Burtech's Certification of Work Experience. 3. Contractors State License Board Acceptance Letter 4. Nu -Line Technologies, LLC Member, Frank Durazo's Resume. 5. A listing of Nu -Line Technologies, LLC current employees. 6. A Payroll Report showing Nu -Line Technologies, LLC personnel are Full Time employees. 7. Listing of current and past jobs completed under Burtech Pipeline, Inc. Nu -Line Technologies, LLC 102 Second Street, Suite B Encinitas, CA 92024 760/634.5153 Te 1 760/634.6780 Fax C-1 ATTACHMENT C Mr. Charles Eder, PE Department of Public Works City of Rancho Palos Verdes Page 2 Thank you for allowing us the opportunity to provide this additional information showing Nu -Line Technologies, LLC as responsible bidders per the Bid Documents. Sincerely, Dominic. Burt Member C-2 ATTACHMENT C CONTRACTORS STATE LICENSE BOARD STATE OF CALIFORNIA u 9821 Business Park Drive, Sacramento, CA 95827 Governor Edmund G. Brown Jr. Mailing Address' P.O. Box 26000, Sacramento, CA 95826 800-321-CSLB (2752) 1 www.cslb.ca.gov I CheckTheLicenseFirst.com Application for Limited Liability Company (LLC) Original Contractor License — Examination Waiver (7065) Application Fees The application fee for a single classification ($300) is not Single classification.................................$300. refundable once the application has been filed. Each additional classification .......................$75. Attach a money order or a personal, business, certified, or Initial license fee ......................................$180. cashier's check made payable to the Registrar of Contractors. Do not send cash. Total fees required for original license..$480. There is a $10 service charge for each dishonored check. Voluntary contribution to Construction Management Education Account..........$ Please type or print neatly and legibly in black or dark blue ink. FOR CSLB USE ONLY SECTION 1 — LLC BUSINESS NAME AND ADDRESS Business Name: The legal business name is the name that will appear on the license and is the actual name under which the contracting business will operate. The full business name must be provided. Please refer to pages 2 and 3 of the General Information section for information on LLC business name styles. Name Compatibility: The business name must be compatible with the license classification and business entity. For example, it would not be acceptable for ABC123 Tile.LLC to apply for a C-10 Electrical contactor license, but it would be acceptable for ABC123 Construction LLC to apply for a B -General Building contractor license or for ABC123 Tile LLC to apply for a C-54 Ceramic and Mosaic Tile contractor license. 1. FULL NEW BUSINESS NAME 12. CLASSIFICATION(S) REQUESTED (See page 4 of the General Nuline Technologies, .LLC Information section.)A 3a. BUSINESS MAILING ADDRESS Number/Streetor P.O. eox City State ZIP Code 102 Second Street Encinitas CA 92024 3b. BUSINESS STREET ADDRESS Number/Street Only — NO P.O. Boxes or PMBs City State ZIP Code 1.0.2. Second Str_e.et _...... .__---- ...._. _..___ Encinitas CA 92024 3c. BUSINESS PHONE NUMBERr7610 FAX NUMBER BUSINESS EMAIL ADDRESS ,, (760 ) 634-2822 634-2415 durazo@burtechpipeline.com SECTION 2 — BUSINESS ENTITY Limited Liability Company: LLCs must provide a current and active California Secretary of State registration number below. If this LLC has officers, please be sure t6write the titles (president, secretary, and treasurer) in the space provided for the appropriate personnel in Sections 3 and 4. 4. NEW BUSINESS WILL OPERATE ASA LIMITED LIABILITY COMPANY: California Secretary of State Registration # 201409110209 SECTION .3 — QUALIFYING INDIVIDUAL FULL LEGAL NAME AND ADDRESS Qualifying lndividual (Qualifier): A qualifying individual is required for every classification on every license issued by CSLB. See NOTE below about multiple qualifiers. You must provide full legal names of all individuals. (Seepages 1 and 2 of the General Information section for more information.) 5: QUALIFIER'S FULLLEGAL-NAME "Last First Middle DATE OF BIRTH SOCIAL SECURITY NUMBER Burtech, Dominic Jr. Joseph 13/4/1960 1555-39-4676 5b. RESIDENCE ADDRESS Number/Street Only — NO P.O. Boxes or PMBs City State ZIP Code 304 La Costa Ave Encinitas CA 92024 6. QUALIFIER'S EXISTING I PREVIOUS CSLB PERCENTAGE OF NEW BUSINESS DRIVER LICENSE NUMBER RESIDENCE PHONE NUMBER LICENSE NUMBER(S) (If none, enter NIA) OWNED BY THE QUALIFIER 718202 43 % N6395786 (760 ) 436-1799 7. TITLE OR POSITION (check only one) Officer titles — president, secretary, and treasurer for LLCs that have officers. _;RME*Responsible Managing Member Responsible Managing Manager Xi RMO - Titles) CEO. Chariman of the Board * RMEs are prohibited from having an active sole owner license. Please visit CSLB's website for an Application to Inactivate Contractor's License, ifneeded. I certify under penalty of perjury under the laws of the State of California that all statements, answers, and representations made in this application, including all supplementary statements attached hereto, are true and accurate, and that I have reviewed the entire contents of this application. (The definition of perjury"is telling a lie while under oath.) I authorize the Franchise Tax Board to provide CSLB with required tax information pursuant to B&P Code Section 7145.5. Date 9/18/2014 (NOTE: If this license will have multiple qua"' blank page and complete items 1 and 2 i ec �.., `-� III IIIIII VIII II IIID IIIIIII VIII III IIIIIII IIIIII II IIIIIIIrIIIII IIII II �IIIIA P P- W A I V E R - L L CI 13A -10a (10/11) Printed Name Dominic J Burtech Jr. )r multiple assfcations, please make a copy of tl 1 andpff of Section 3 for each additional qualifier.) Application — Page 1 of 3 FOR CSLB USE ONLY C-3 ATTACHMENT C SECTION 4 —.LLC PERSONNEL FULL LEGAL NAMES AND ADDRESSES (Otherthan Qualifying Individual) The following must be completed by all individuals who will be listed on the license. You must provide full legal names of all individuals. Each individual must sign the certification under penalty of perjury. (The definition of'perjury'is telling a lie while underoath.) 9a. PERSONNEL FULL LEGAL NAME Last First Middle DATE OF BIRTH SOCIAL SECURITY NUMBER Burtech, Julie Johnston 6/2/1966 573-71-6554 RESIDENCE ADDRESS Number/Street Only – NO P.O. Boxes or PMBs City State ZIP Code DRIVER LICENSE # 304 La Costa Avenue Encinitas CA 92024 C2419877 TITLE OR POSITION (check only one) RESIDENCE PHONE NUMBER Xi Member Manager[] Officer - Title(s) (760 ) 436-1799 1 certify under penalty of perjury under the laws of the State of California that all statements, answers, and representations made in this application, including all supplementary statements attached hereto, are true and accurate, and that I have reviewed the entire contents of this application. I authorize the Franchise Tax Board to provide CSLB with req*ed ed tax information pursuant to B&P Code Section 7145.5. Date I Signatur Printed Name 9/18/2014 , ,c,C� u— Julie Burtech 9b. PERSONNEL FtIL&ILEGAL NAME Last First Middle DATE OF BIRTH SOCIAL SECURITY NUMBER Durazo, Frank Jr. Javier 4/5/1964 572-51-1229 RESIDENCE ADDRESS Number/Street Only–NO P.O. Boxes or PMBs City State ZIP Code I DRIVER LICENSE# 12637 EI Camino Real, #5302 San Diego CA 92130 IC1602179 TITLE OR POSITION (check only one) RESIDENCE PHONE NUMBER r1lXI Member _.._i Manager Officer - Title(s) ( 909 ) 297-3923 I certify under penalty of perjury under the laws of the State of California that all statements, answers, and representations made in this application, including all supplementary statements attached hereto, are true and accurate, and that I have reviewed the entire contents of this application. I authorize the Franchise Tax Board to provide CSLB _w(th_ required tax' . rmation_pursuant-to_B&P_-Code-Section 7145:5 -- — -- --- Date Signature Printed Name 9/18/2014 _ /-41. Frank J Durazo Jr. 9c. PERSONNEL FULL LEGAL NAME Last First Middle DATE OF BIRTH SOCIAL SECURITY NUMBER Aquino, Salvador Jr. S. 1/3/1977 1604-41-3249 RESIDENCE ADDRESS Number/Street Only– NO P.O. Boxes or PMBs City State ZIP Code DRIVER LICENSE # 40182 Medford Road Temecula CA 92591 D6841398 TITLE,OR.POSITION:(check:only one) RESIDENCE PHONE NUMBER XI Member LJ Manager officer - Title(s) ( 951 ) 972-4700 1 certify,.under.,penalty of perjury under the laws of the State of California that all statements, answers, and representations made in this application, including all supplementary statements attached hereto, are true and accurate, and that I have reviewed the entire contents of this application. I authorize the Franchise Tax Board to provide CSLB with required tax information pursuant to B&P Code Section 7145.5. Date Signature Printed Name 9/18/2014 Salvador S. Aquino Jr. 9d. PERSONNEL FULL LEGAL NAME Last First Middle DATE OF BIRTH SOCIAL SECURITY'NUMBER RESIDENCE ADDRESS Number/Street Only– NO P.O. Boxes or PMBs City State ZIP Code DRIVER LICENSE # TITLE OR POSITION (check only one) RESIDENCE PHONE NUMBER Member 13 Manager[] Officer - Title(s) ( ) I certify under penalty of perjury under the laws of the State of California that all statements, answers, and representations made in this application, including all supplementary statements attached hereto, are true and accurate, and that I have reviewed the entire contents of this application. I authorize the, Franchise Tax,„ Board to provide CSLB with required tax information pursuant to B&P Code Section 7145.5. Date Signature Printed Name FOR CSLB�USE;ONLY (if additional space is needed, please make a copy of this blank page.) 13A -10d (10/11) Application — Page 2 of 3 ATTACHMENT C CONTRACTORS STATE LICENSE BOARD 9821 Business Park Drive, Sacramento, CA 95827 Mailing Address: P.O. Box 26000, Sacramento, CA 95826 800.321.CSLB (2752) 1 www.cslb.ca.gov I CheckTheLicenseFirst.com Certification ®f Work Experience Governor Edmund G. Brown Please read the General Information section on the previous page before beginning. The qualifying individual must complete the information in Part 1; the individual certifying the experience (certifier) must complete Part 2. The experience must be verifiable through payroll records or similar documents. If additional space is needed to list the trade duties, please attach a separate sheet. Use a separate form for each employer. If you need additional forms, please make a copy of this blank form or visit CSLB's website. Please type or print neatly and legibly in black or dark blue ink. FORMS CONTAINING STRIKEOUTS OR MODIFICATIONS MAY NOT BE ACCEPTED. Corrections on the Certification of Work Experience forms must be initialed by the certifier. PART 1 — QUALIFYING INDIVIDUAL INFORMATION The qualifying individual must complete Part 1 in its entirety. 1. QUALIFIER'S FULL LEGAL NAME Last First Middle Burtech Dominic Jr. uwc yr =mr— I =, - —, it I — .­= n, BOX R (If you checked the box, skip line 3 and go to line 4 ) 3. EMPLOYER'S BUSINESS STREET ADDRESS Number/Street Only—NO P.O. Boxes City Joseph LICENSE NUMBER OF EMPLOYER State ZIP Code 4. WAS THE EXPERIENCE OBTAINED WORKING ON YOUR OWN PROPERTY AS AN OWNER -BUILDER (see previous page fordefinition)7 Yes X No IF YOU CHECKED -YES-ABOVE, USE THE ENCLOSED CONSTRUCTION PROJECT EXPERIENCE FORM TO PROVIDE A LIST OF COMPLETED PROJECTS. --KART 2--WORK-EXPE-RIENCE—AND-CERTI.FIGATION-STATEMENT The certifier roust complete Part 2 in its entirety after the qualifying individual has Completed Part 1. 5. APPLICANT'S FOR A TOTAL OF , JOURNEYMAN- ® FULL-TIME FROM 1/1/1981 TO 4/1/2014 33 3 LEVEL OR HIGHER YEAR(S) and MONTH(S) ❑ PART-TIME TIME -BASE Month/DayNear Month/Day/Near (Do not claim credit for full-time work if applicant worked WORKED WAS (LIST ONLY JOURNEYMAN -LEVEL OR HIGHER EXPERIENCE only part-time. For example, if applicant worked half-time (check one): THAT WAS OBTAINED IN THE APPLICABLE CLASSIFICATION) for six (6) years, write "3 years" in the space above) 6. IN THE SPACE BELOW, LIST ALL SPECIFIC TRADE DUTIES APPLICANT PERFORMED OR SUPERVISED IN THE CLASSIFICATION FOR WHICH HE/SHE IS APPLYING. PLEASE REFER TO THE DESCRIPTION OF CLASSIFICATIONS DOCUMENT FOR ASSISTANCE. (Do not list office work orindividual project names) Over 33 years experience in the installation of water, sewer and storm drain pipeline systems. The applicant also has extensive experience in trenching, shoring, underlays, tie-ins, manholes, backfilling, compaction, pressure testing and leak detection. Hands on experience with excavators, loaders, and other large earth moving equipment. Supervision of men crews from 4 - 15. My relationship to Dominic J. Burtech, Jr. is or was (check all that apply): Name of Qualifying Individual (Applicant) ❑ Employer ❑ Fellow Employee ❑ Foreman or Supervisor ❑ Journeyman 19 Business Associate ❑ Union Representative ❑ Contractor (License Number ) ❑ Client (if qualifier was self-employed) CERTIFIER'S STREET ADDRESS Number/Street Only — NO P.O. Boxes City State ZIP Code 304 La Costa Avenue Encinitas CA 92024 PHONE NUMBER FAX NUMBER EMAIL ADDRESS 60 634-2822 760 634-2415 7 pipemaster7@cox.net Ir certify that I have direct knowledge of the work covering the time period outlined above. I certify under penalty of perjury, under the laws of the State of California, that the information stated above is tru orrect. (The definif of pedury"is telling a lie while under oath ) 7. Date Signet re Printed Name 4/11/2014 Julie Burtech If Note: For info dtiopzi the collection of personal information, please refer to the General Information section at FOR CSLB USE ONLY the begiriWrlg of this application package, under the heading "Collection of Personal Information." IIIIIII Ill/ lilll II�IIII �I II�f�II IIIDII�III IIID II IIII 13A-11 (rev. 06/11) Certification of Work Experience — Page 2 of 2 C-5 ATTACHMENT C QD CONTRACTORS STATE LICENSE BOARD STATE OF CALIFORNIA �' 9821 Business Park Drive, Sacramento, Califomia 95827 P Governor Edmund G. Brown Jr — .^ / = Mailing Address: P.O.Box 26000, Sacramento, CA 95826 Z 4,.,, ic- -t \% 7'- 800-321-CSLB (2752) l t t ti ivin.cslb.ca,gov , = 1U 062014 m June 4, 2014 P - ,gib Nu Line Technologies LLC 102 Second Street Encinitas, CA 92024 Application Fee Number: 2013 0114027 BOND & FEE LETTER Dear Applicant: Congratulations! You are now eligible to be issued a contractor's license. Please submit all of the items/documents listed below to the board, along with this letter. These items/documents will be processed in .the date order they are received. These items MUST BE RECEIVED BY September 04, 2014 or the application will be void and you will have to reapply. ' You must submit $180 for the Initial License Fee. This fee is for two years. This is in addition to the application fee paid when you filed your application. The $180 Initial License Fee is required for both active and inactive licenses. If your firm must file a disciplinary bond, your license cannot be issued inactive. /This application requires that you submit a new original Contractors Bond or Cash Deposit in the amount of 12,500. Neither bonds or cash deposits can be transferred from one license entity to another. Information regarding cash deposits is enclosed. Bonds must be typed. Make sure the business name on the bond or cash deposit matches the business name on the application: Nu Line Technologies LLC v1 In addition to the Contractor's Bond, the LLC Employee/Worker Bond (Form 1313-20) or cash deposit in the amount of $100,000 must be submitted for this pending application for the issuance of an LLC license. Bonds must be typed. Make sure the business name on the bond or cash deposit matches the business name on the application: Nu Line Technologies LLC You must submit a Certificate of General Liability Insurance with the aggregate limit of $1000,000. (This figure is based on the number of personnel of record on this application and the following calculation — $1 million is required for licensees with five or fewer personnel of record, plus an additional $100,000 for each additional member of the personnel of record, not to exceed $5 million total.) The Contractors State License Board must be listed as the certificate holder on the document. The business name on the certificate must read: Nu Line Technologies LLC C-6 - � ATTACHMENT C e Fee Number: 2013 0114027 If you do not have any employees, submit an original Exemption from Workers Compensation, (Form 13L-50.) The business name on the Exemption from Workers Compensation form must read: Nu Line Technologies LLC Or ou must submit a Certificate of Workers' Compensation Insurance or a Certification of Self - Insurance of Workers' Compensation from the Director of Industrial Relations. The Contractor's State License Board must be listed as the certificate holder on the document. The business name on the certificate must read: Nu Line Technologies LLC All applicants are required by law to submit a full set of fingerprints for the purpose of a criminal background check. The Request for Live Scan Service form is being mailed to Christopher Peter Bassi and must be taken to a Live Scan site to have this service performed. Live Scan services are available at most local police departments, sheriff's offices, Department of Justice, or any public applicant Live Scan site. It is important to note that your license cannot be issued until this requirement is met. Your license number will be available on the Internet at www.cslb.ca.gov and on the automated. telephone response system once it has been issued. A pocket license card and wall license certificate will be sent upon issuance of your license to your business address of record. f �'y Sincerely, 9Camn gwnm Karen Franco Program Technician III Application Waivers Unit Ph. 916-255-4067 Fax 916-255-3957 C-7 ATTACHMENT C Frank Durazo bOperations Manager NbU LINE west Coast Region Technologies. LLC Education Mr. Durazo has over twenty years' experience in the trenchless • Rio Hondo Community technology industry with experience in Cured -In -Place and Rib Loc College pipelining processes including CIPP Wetout. Using his expertise he • Arroyo High School, El has progressed from a supervisor to Warehouse Foreman and was Monte, CA promoted to the position of Project Manager. Training • Small Crane Truck Nu -Line Technologies Certificate Operations Manager • Commercial Class A Drivers License, • Leads scheduling, managing and organization of Burtech • Forklift certification. Pipeline field activities. • Provides technical and project approach guidance to Nu -Line Certifications Technologies field personnel. • 1995 Employee of the • Communicates with owner's field representatives, site Year -Insituform engineers, inspectors and subcontractor supervisors on project - Southwest. related matters. • Assist GM and Estimator with Project Estimates for bids • Analyze and solve all field -related problems (Equipment, Installation, Personnel, Etc.). • Develop and implement sewer bypass systems. Train field employees with proper use. • Identifies, initiates and controls project revisions and field changes. • Reviews project costs and assists in developing project budgets. Repipe-California, Inc., Ontario, CA Operations Manager • Leads scheduling, managing and organization of Repipe-CA field activities. • Provides technical and project approach guidance to Repipe-CA field personnel. • Communicates with owner's field representatives, site engineers, inspectors and subcontractor supervisors on project - related matters. • Assist GM and Estimator with Project Estimates for bids • Analyze and solve all field -related problems (Equipment, Installation, Personnel, Etc.). • Develop and implement sewer bypass systems. Train field employees with proper use. • Identifies, initiates and controls project revisions and field changes. • Reviews project costs and assists in developing project budgets. Repipe-California, Inc. Ontario, CA Project Manager/Project Scheduler ATTACHMENT C GO • Responsible for scheduling and ordering of all lining materials, wet -out and delivery. • Manage multiple CIPP and Rib Loc projects simultaneously from $100k to $2.5M. • Review of job costs to ensure profitable projects. • Prepare submittals, schedules, cost estimates, and interact with clients and contractors • Assist GM and Estimator with Project Estimates for bids Repipe-California, Inc, Santa Ana, CA Warehouse Foreman/Project Scheduler • Responsible for scheduling and ordering of all lining materials, wet -out and delivery. • Maintain and repair of all Repipe-CA construction equipment and vehicles, management of all inventory and job-related materials, ordering of equipment materials and supplies, assistance to field as required on-site with Rib Loc, or CIPP installations, and establishment and maintenance of warehouse operations. • Identify and negotiate with new suppliers • Performs as the acting Safety Director and assures that OSHA safety compliance is adhered to in the field, corporate office and within the warehouse environment. Preussag Pipe Rehabilitation Warehouse Foreman • Responsible for the maintenance and repair of all PPR construction equipment and vehicles, management of all inventory and job-related materials, ordering of equipment materials and supplies, assistance to field as required on-site with RibLoc, or CIPP installations, and establishment and . maintenance of warehouse operations. • Responsible for resourcing equipment and material vendors. • Mechanical assistance to jobsite and field personnel. • Oversee Driver Vehicle Inspection Reports and Driver Daily Logs for DOT Bit Inspections and coordinates quarterly maintenance for corporate fleet in preparation of DOT bit inspections. • Performs as the acting Safety Director and assures that OSHA safety compliance is adhered to in the field, corporate office and within the warehouse environment. National Liner -West, Gardena, CA Installation Supervisor Supervision of the impregnation and installation for Cured -In - Place trenchless lining system for the Western Region of the United States. Installation Supervisor for 10 crewmembers for the U -Liner Fold and Form Lining System. Additional responsibilities included daily reporting to inspectors from various cities and counties, purchasing and ordering of equipment and materials and scheduling of equipment and personnel for projects. C-9 ATTACHMENT C Cooke Pipeline Rehabilitation Installation Supervisor Supervision for the impregnation and installation procedures for Cured -In -Place trenchiess pipeliners and the Ultra -Liner Fold and Form System pipelining system. Acted as Purchasing Agent for equipment and materials for the jobsites and was responsible for bypass planning and traffic control setup. Insituform, Southwest Installation Supervisor Responsible for the impregnation procedure for the trenchiess Cured -In -Place Lining System. Responsible for job scheduling; personnel and equipment, purchasing and ordering of materials and field sample testing and reporting. Senior Welder Responsible for welding and fabrication of equipment for the snack food industry. Additional responsibilities included blueprint design, research and development for prototypes. C-10 Ph: 760 634-5153 ATT-liAQeW4QW TLCC Fx: 760 634-6780 Employee Phone List oz�� Name Cell Home E -Mail Cell Dominic Burtech # 339895 DIR (760) 801-7028 Julie Burtech #17486601 iulie@burtechpipeline.com (760) 801-6583 Buddy Aquino (951) 972-4700 buddy@burtechpipeline.com (760) 802-8488 Frank Durazo (909) 297-3923 fdurazo@nulinetech.net (760) 443-7452 Rocky Anderson (760) 802-5924 Wendy Martin (760) 715-3308 wendv@nulinetech.net (760) 521-9231 Jorge Beltran (626) 295-0542 ibeltran@nulinetech.net (626) 295-0542 Adam Einsel (760) 859-5029 Adam Vandervort (760) 975-5856 Andres Arteaga (626) 815-0385 Cesar Magana (310) 748-3123 (760) 443-7790 Fernando Uribe (626) 391-7614 Hector Mora (562) 896-2692 Hector.Mora@sbcglobaI.net Joe Zilius (760) 792-9027 (760) 473-5084 Jonathan Griffith (760) 859-5022 Juan Diaz (909) 215-0815 (760) 801-7104 Juan Exiga (562) 500-1637 Mike Covarrubias (626) 905-5912 Rafael Correa (626) 826-0135 Robert Rico (909) 684-1024 (760) 473-1556 CA Contractors EIN # 997520 Class A Expires: 10/31/16 Issue Date: 10/10/14 # 46-5330199 BAVN # 76041 State Tax ID # 201409110209 3/26/14 Planet Bid Vendor ID # 339895 DIR # 1000003808 LA County Vendor #17486601 12/28/2015 Z:\a-NU-LINE TECH NOLOGI ES\Wendy\NuLine Emto 41ne List ATTACHMENT C (00 3:34 PM Nu -Line Technologies LLC 12/28/15 Employee Hours Detail December 13 -19, 2015 Date Payroll Item Duration Notes Beltran, Jorge A. 71.50 Burtech Pipeline, inc:NL2015-022 - 2015 Gravity Pipeline Rehab. No job assigned 8.00 12/14/2015 F02- Field Hrly =/>$30 (6316) 8.00 12/15/2015 F02- Field Hrly =/>$30 (6316) 8.00 12/16/2015 F02- Field Hrly =/>$30 (6316) 8.00 12/17/2015 F02- Field Hrly =/>$30 (6316) 8.00 12/18/2015 F02- Field Hrly =/>$30 (6316) 8.00 Total No job assigned 40.00 Total Beltran, Jorge A. 40.00 Caratachea, Roberto 71.50 Burtech Pipeline, inc:NL2015-022 - 2015 Gravity Pipeline Rehab. 12/15/2015 C5022 -G4 $49.73 (6308) 8.00 12/15/2015 C5022 -G4 OT $65.68(6308) 0.50 Total Burtech Pipeline, Inc:NL2015-022 - 201... 8.50 City of San Juan Capistrano:NL2015-037 Sewer Rehab Program CIP 15701 12/14/2015 C5037 -G4 $50.89 (6308) 8.00 12/14/2015 C5037 -G4 OT $67.31 (6308) 4.00 12/14/2015 C5037 -G4 DT $83.73 (6308) 7.50 12/16/2015 C5037 -G4 $50.89 (6308) 8.00 12/16/2015 C5037 -G4 OT $67.31 (6308) 2.50 12/17/2015 C5037 -G4 $50.89 (6308) 8.00 12/18/2015 C5037 -G4 $50.89 (6308) 8.00 12/18/2015 C5037 -G4 OT $67.31 (6308) 4.00 12/18/2015 C5037 -G4 DT $83.73 (6308) 0.50 Total City of San Juan Capistrano: N L201 5-03... 50.50 Vasilj:NL2015-069 City of LA Emergency 8" 12/19/2015 C5069 -G4 -OT $69.51 (6308) 10.50 Total Vasilj:NL2015-069 City of LA Emergenc... 10.50 No job assigned 12/19/2015 F03- Field Hrly OT<$30 (6315) 1.50 12/19/2015 F05 -Field Hrly DT<$30 (6315) 0.50 Total No job assigned 2.00 Total Caratachea, Roberto 71.50 Castillo, Andres Arteaga City of Chula Vista:NL2015-070 - Storm Drain Lining 21-54" 12/14/2015 C5070 -G4 $52.49 (6308) 4.00 Total City of Chula Vista: NL201 5-070 - Storm ... 4.00 City of San Juan Capistrano:NL2015-037 Sewer Rehab Program CIP 15701 12/16/2015 C5037 -G4 $50.89 (6308) 8.00 12/16/2015 C5037 -G4 OT $67.31 (6308) 2.50 12/17/2015 C5037 -G4 $50.89 (6308) 8.00 Total City of San Juan Capistrano: NL2015-03... 18.50 No job assigned 12/14/2015 F01- Field Hrly <$30 (6315) 1.00 Total No job assigned 1.00 Total Castillo, Andres Arteaga 23.50 Correa, Rafael City of Chula Vista:NL2016-070 - Storm Drain Lining 21-54" 12/14/2015 C5070 -G4 $52.49 (6308) 2.50 Total City of Chula Vista: N L2015-070 - Storm ... 2.50 Page 1 C-12 ATTACHMENT C 1b 3:34 PM Nu -Line Technologies LLC 12/28/15 Employee Hours Detail December 13 -19, 2015 Date Payroll Item Duration Notes No job assigned 12/14/2015 F01- Field Hrly <$30 (6315) 4.00 12/16/2015 F01- Field Hrly <$30 (6315) 3.00 Total No job assigned 7.00 Total Correa, Rafael 9.50 Covarrubias, Mike A. 62.50 - Burtech Pipeline, lnc:NL2015-022 - 2015 Gravity Pipeline Rehab. 12/15/2015 C5022 -G4 $49.73 (6308) 3.00 Total Burtech Pipeline, Inc:NL2015-022 - 201... 3.00 City of San Juan Capistrano:NL2015-037 Sewer Rehab Program CIP 15701 12/14/2015 C5037 -G4 $50.89 (6308) 8.00 12/14/2015 C5037 -G4 OT $67.31 (6308) 4.00 12/14/2015 C5037 -G4 DT $83.73 (6308) 7.50 12/16/2015 C5037 -G4 $50.89 (6308) 8.00 12/16/2015 C5037 -G4 OT $67.31 (6308) 2.50 12/18/2015 C5037 -G4 $50.89 (6308) 8.00 12/18/2015 C5037 -G4 OT $67.31 (6308) 4.00 12/18/2015 C5037 -G4 DT $83.73 (6308) 0.50 Total City of San Juan Capistrano:NL2015-03... 42.50 No job assigned 2.50 12/15/2015 F01- Field Hrly <$30 (6315) 4.00 12/17/2015 F01- Field Hrly <$30 (6315) 8.00 12/19/2015 F03- Field Hrly OT<$30 (6315) 5.00 Total No job assigned 17.00 Total Covarrubias, Mike A. 62.50 - Diaz, Juan J. City of San Juan Capistrano:NL2015-037 Sewer Rehab Program CIP 15701 12/14/2015 C5037 -G4 $50.89 (9402) 6.00 12/14/2015 C5037 -G4 OT $67.31 (9402) 4.00 12/14/2015 C5037 -G4 DT $83.73 (9402) 8.00 12/16/2015 C5037 -G4 $50.89 (9402) 8.00 12/16/2015 C5037 -G4 OT $67.31 (9402) 2.50 12/17/2015 C5037 -G4 $50.89 (9402) 8.00 12/18/2015 C5037 -G4 $50.89 (9402) 8.00 12/18/2015 C5037 -G4 OT $67.31 (9402) 4.00 12/18/2015 C5037 -G4 DT $83.73 (9402) 0.50 Total City of San Juan Capistrano:NL2015-03... 49.00 No job assigned 12/14/2015 F01- Field Hrly <$30 (6315) 2.50 Total No job assigned 2.50 Total Diaz, Juan J. 51.50 Durazo Jr., Frank J. No job assigned 12/14/2015 Estimating Salary (8742) 8.00 12/15/2015 Estimating Salary (8742) 8.00 12/16/2015 Estimating Salary (8742) 8.00 12/17/2015 Estimating Salary (8742) 8.00 12/18/2015 Estimating Salary (8742) 8.00 Total No job assigned 40.00 Total Durazo Jr., Frank J. 40.00 Einsel, Adam Burtech Pipeline, Inc:NL2015-022 - 2015 Gravity Pipeline Rehab. 12/15/2015 C5022 -G4 $49.73 (6308) 1.50 Total Burtech Pipeline, Inc:NL2015-022 - 201... 1.50 Page 2 C-13 3:34 PM 12/28/15 ATTACHMENT C Nu -Line Technologies LLC Employee Hours Detail December 13 - 19, 2015 Date Payroll Item Duration Notes Burtech Pipeline, Inc:NL2015-034 Pipeline Rehab Z-1 12/14/2015 C5034 -G4 $49.73 (6308) 8.00 12/15/2015 C5034 -G4 $49.73 (6308) 6.00 12/16/2015 C5034 -G4 $49.73 (6308) 8.00 12/17/2015 C5034 -G4 $49.73 (6308) 7.50 12/18/2015 C5034 -G4 $49.73 (6308) 8.00 Total Burtech Pipeline, Inc:NL2015-034 Pipeli... 37.50 Total Einsel, Adam 39.00 Exiga, Juan J Burtech Pipeline, Inc:NL2015-022 - 2015 Gravity Pipeline Burtech Pipeline, Inc:NL2015-022 - 2015 Gravity Pipeline Rehab. 12/15/2015 C5022 -G4 $49.73 (6308) 8.00 12/15/2015 C5022 -G4 OT $65.68(6308) 0.50 Total Burtech Pipeline, Inc:NL2015-022 - 201... 8.50 City of San Juan Capistrano:NL2015-037 Sewer Rehab Program CIP 15701 12/14/2015 C5037 -G4 $50.89 (6308) 8.00 12/14/2015 C5037 -G4 OT $67.31 (6308) 4.00 12/14/2015 C5037 -G4 DT $83.73 (6308) 7.50 12/16/2015 C5037 -G4 $50.89 (6308) 8.00 12/16/2015 C5037 -G4 OT $67.31 (6308) 2.50 12/17/2015 C5037 -G4 $50.89 (6308) 8.00 12/18/2015 C5037 -G4 $50.89 (6308) 8.00 12/18/2015 C5037 -G4 OT $67.31 (6308) 4.00 12/18/2015 C5037 -G4 DT $83.73 (6308) 0.50 Total City of San Juan Capistrano:NL2015-03... 50.50 Vasiij:NL2015-069 City of LA Emergency 8" 12/19/2015 C5069 -G4 -OT $69.51 (6308) 10.50 Total Vasilj:NL2015-069 City of LA Emergenc... 10.50 Total Exiga, Juan J 69.50 Griffith, Jonathan R Burtech Pipeline, Inc:NL2015-022 - 2015 Gravity Pipeline Rehab. 12/15/2015 C5022 -G4 $49.73 (6308) 1.50 Total Burtech Pipeline, Inc:NL2015-022 - 201... 1.50 Burtech Pipeline, Inc:NL2015-034 Pipeline Rehab Z-1 2.00 12/14/2015 C5034 -G4 $49.73 (6308) 8.00 12/15/2015 C5034 -G4 $49.73 (6308) 6.00 12/16/2015 C5034 -G4 $49.73 (6308) 8.00 12/17/2015 C5034 -G4 $49.73 (6308) 7.50 12/18/2015 C5034 -G4 $49.73 (6308) 8.00 Total Burtech Pipeline, Inc:NL2015-034 Pipeli... 37.50 Total Griffith, Jonathan R 39.00 Magana, Cesar M. Burtech Pipeline, Inc:NL2015-022 - 2015 Gravity Pipeline Rehab. 12/15/2015 C5022 -G4 $49.73 (6308) 6.00 12/15/2015 C5022 -G4 OT $65.68(6308) 2.00 Total Burtech Pipeline, Inc:NL2015-022 - 201... 8.00 City of San Juan Capistrano:NL2015-037 Sewer Rehab Program CIP 15701 12/14/2015 C5037 -G4 $50.89 (6308) 8.00 12/14/2015 C5037 -G4 OT $67.31 (6308) 4.00 12/14/2015 C5037 -G4 DT $83.73 (6308) 7.50 12/16/2015 C5037 -G4 $50.89 (6308) 8.00 12/16/2015 C5037 -G4 OT $67.31 (6308) 2.50 12/17/2015 C5037 -G4 $50.89 (6308) 8.00 12/18/2015 C5037 -G4 $50.89 (6308) 8.00 12/18/2015 C5037 -G4 OT $67.31 (6308) 4.00 12/18/2015 C5037 -G4 DT $83.73 (6308) 0.50 Total City of San Juan Capistrano: NL2015-03... 50.50 C-14 Page 3 ATTACHMENT C DO 3:34 PM Nu -Line Technologies LLC 12/28/15 Employee Hours Detail December 13 -19, 2015 Date Payroll Item Duration Notes Vasilj:NL2015-069 City of LA Emergency 8" 12/19/2015 C5069 -G4 -OT $69.51 (6308) 10.50 Total Vasilj:NL2015-069 City of LA Emergenc... 10.50 No job assigned 12/15/2015 F02- Field Hrly =/>$30 (6316) 2.00 Total No job assigned 2.00 Total Magana, Cesar M. 71.00 Martin, Wendy F 69.50 Burtech Pipeline, Inc:NL2015-022 - 2015 Gravity Pipeline Rehab. No job assigned 8.00 12/14/2015 Clerical Hourly (8810) 8.00 12/14/2015 Clerical OT Hourly (8810) 1.50 12/15/2015 Clerical Hourly (8810) 8.00 12/15/2015 Clerical OT Hourly (8810) 1.50 12/16/2015 Clerical Hourly (8810) 8.00 12/16/2015 Clerical OT Hourly (8810) 1.50 12/17/2015 Clerical Hourly (8810) 8.00 12/17/2015 Clerical OT Hourly (8810) 1.00 12/18/2015 Clerical Hourly (8810) 8.00 12/18/2015 Clerical OT Hourly (8810) 1.50 Total No job assigned 47.00 Total Martin, Wendy F 47.00 Mora, Hector 69.50 Burtech Pipeline, Inc:NL2015-022 - 2015 Gravity Pipeline Rehab. 12/15/2015 C5022 -G4 $49.73 (6308) 8.00 12/15/2015 C5022 -G4 OT $65.68(6308) 0.50 Total Burtech Pipeline, Inc:NL2015-022 - 201... 8.50 City of San Juan Capistrano:NL2015-037 Sewer Rehab Program CIP 15701 12/14/2015 C5037 -G4 $50.89 (6308) 8.00 12/14/2015 C5037 -G4 OT $67.31 (6308) 4.00 12/14/2015 C5037 -G4 DT $83.73 (6308) 7.50 12/16/2015 C5037 -G4 $50.89 (6308) 8.00 12/16/2015 C5037 -G4 OT $67.31 (6308) 1.50 12/17/2015 C5037 -G4 OT $67.31 (6308) 8.00 12/18/2015 C5037 -G4 $50.89 (6308) 8.00 12/18/2015 C5037 -G4 OT $67.31 (6308) 4.00 12/18/2015 C5037 -G4 DT $83.73 (6308) 0.50 Total City of San Juan Capistrano: NL2015-03... 49.50 Vasilj:NL2015-069 City of LA Emergency 8" 12/19/2015 C5069 -G4 -OT $69.51 (6308) 10.50 Total Vasilj:NL2015-069 City of LA Emergenc... 10.50 No job assigned 12/16/2015 F01- Field Hrly <$30 (6315) 1.00 Total No job assigned 1.00 Total Mora, Hector 69.50 Rico, Robert C City of Chula Vista:NL2015-070 - Storm Drain Lining 21-54" 12/14/2015 C5070 -G4 $52.49 (6308) 2.50 Total City of Chula Vista: N L2015-070 - Storm ... 2.50 No job assigned 12/14/2015 F01- Field Hrly <$30 (6315) 4.00 Total No job assigned 4.00 Total Rico, Robert C 6.50 Page 4 C-15 ATTACHMENT C 3:34 PM Nu -Line Technologies LLC 12/28/15 Employee Hours Detail December 13 -19, 2015 Date Payroll Item Duration Uribe, Fernando City of Chula Vista:NL2015-070 - Storm Drain Lining 21-54" 12/14/2015 C5070 -G4 $52.49 (6308) 4.00 Total City of Chula Vista: N L2015-070 - Storm ... 4.00 Vasilj:NL2015-069 City of LA Emergency 8" 12/19/2015 C5069 -G4 -OT $69.51 (6308) 10.50 Total Vasilj:NL2015-069 City of LA Emergenc... 10.50 No job assigned 12/14/2015 F02- Field Hrly =/>$30 (6316) 4.00 12/18/2015 F02- Field Hrly =/>$30 (6316) 7.00 Total No job assigned 11.00 Total Uribe, Fernando 25.50 Vandervort, Adam C No job assigned 12/16/2015 OS -Office Staff (8810) 4.00 12/17/2015 OS -Office Staff (8810) 8.00 12/18/2015 OS -Office Staff (8810) 8.00 Total No job assigned 20.00 Total Vandervort, Adam C 20.00 Zilius, Joseph City of Chula Vista:NL2015-070 - Storm Drain Lining 21-54" 12/14/2015 C5070 -G4 $52.49 (6308) 2.50 Total City of Chula Vista: N L201 5-070 - Storm ... 2.50 No job assigned 12/14/2015 F01- Field Hrly <$30 (6315) 4.00 Total No job assigned 4.00 Total Zilius, Joseph 6.50 TOTAL 692.00 Notes C-16 lJ Page 5 ATTACHMENT C �VRTECIjr BURTECH PIPELINE INCORPORATED E Cy 8 ,- 102 2ND STREET, ENCINITAS, CA 92024 p(760) 634-2822 / f(760) 634-2415 AfpELIN� JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2015-001 Mesa Drive Rutter Development Corp. (949) 933-9727 $ 605,670.00 Adam V. Mesa Drive x Sea Ridge Road, Jay Rutter irutter a( --rutterdevelooment.com Oceanside, CA 92054 Mp: 1086 F5 2015-002 Del Riego Ave. Storm Drain Replacement City of Encinitas (760) 633-2775 $ 41,320.00 Prevailing 753 Del Riego, Kipp Hefner khefnerO)encinitas.ca.gov Adam V. Encinitas, CA 92024 Mp: 1147 C4 2015-003 Pacific Highlands Ranch 13 - Market Rate Reylenn Construction Inc. (858) 367-7190 $ 1,149,325.00 Adam V. Carmel Valley Rd x Village Center Loop Rd, Robert Owens robe rto(a)revlenn.com San Diego, CA 92130 Mp: 1188 F4 2015-004 AC Water & Sewer Group 1004 City of San Diego (619) 533-7523 $ 2,221,579.26 Prevailing Morena Blvd x Napier St Jericho Gallardoigallardo an-sandiego.gov Matt R. San Diego, CA 92110 Bid Date: 0211812015 Mp: 1268 E1 K-95-9390-DBB-3 2015-005 Sewer & AC Water Group 752 City of San Diego (619) 533-3449 $ 2,465,000.00 Prevailing La Jolla Areas (Avenida Cresta x Winamar Ave) Eleida FelixYackel efelixvackel(asandiego.gov Jose R. San Diego, CA 92037 Bid Date: 031412095 Mp: 1247 E2 K-95-5280-DBB-3 2015-006 South Oceanside Waterline Replacement City of Oceanside (760) 435-5913 $ 4,230,000.00 Prevailing Ditmar Street x Kelly Street. Greg Keppler gkePPler@-ci.oceanside.ca.us Jose R. Oceanside, CA 92054 Bid Date: 03/17/2095 Mp: 1106 C3 & D3 2015-007 2015 Gravity Pipeline Rehabilitation Leucadia Wastewater District (760) 753-0155x3007 $ 669,946.00 Prevailing Various Locations in Robin Morishita RMorishita(a Iwwd.org Matt R. Encinitas, CA Bid Date: 03/9812095 Mp: Varies 2015-008 Pipeline Rehabiliation Z-1 City of San Diego (619) 533-3481 $ 1,299,107.50 Prevailing Skyline -Paradise Hills & Encanto Neighborhood Clementina Giordano cgiordano(a)sandiego.gov Adam V. San Diego, CA 92037 Bid Date: 0412112015 Edward Castaneda Mp: Varies K-15-1302-DBB-3 619-533-6656 2015-009 Job Order Contract (JOC) P15 Right of City of San Diego (619) 533-3481 $ 20,000,000.00 Prevailing Way Pipeline for Capital Improvement Clementina Giordano cgiordano(o-)sandiego.aov Projects - South of 18 Bid Date: 0512612015 Mp: Varies K-15-1346-JOC-3 2015-010 Sewer & AC Water Group 840 City of San Diego (619) 533-3482 $ 841,328.00 Prevailing Broadway between 60th St. to 63rd St., Damian Singleton dsingleton(a)sandiego.gov Matt R. San Diego, CA 92114 Bid Date: 0512712015 Mp: 1290 C3 & D3 K-15-1370-DBB-3 2015-011 Sewer Group 798 City of San Diego (619) 533-3449 $ 1,247,000.00 Prevailing La Jolla Vicinity, Eleida FelixYackel efelixyackel(5sandiego.gov Adam V. San Diego, CA 92114 Bid Date: 0611612015 Mp: Varies K-15-6289-DBB-3 2015-012 Annual Sewer Rehabilitation Program Nu -Line Technologies, LLC (760) 634-5153 $ 58,650.00 Prevailing San Juan Capistrano - CIP NO. 15701 Frank Durazo fdurazoamulinetech.net Matt R. Arguello Way, San Juan Capistrano, CA Bid Date: 0512912015 Mp: Varies 2015-013 216 S. El Camino Real Sewer Lateral - T&M Dominic J. Burtech TBD Matt R. 216 S. Elcamino Real, 2016 01,T -ltd A -n14 Oceanside, CA Pipeline i 2 (Laterals) Gity of San Diego ( 619) 53 34 2Unde..,vnvcr PFates�'.4..s RFeva VaFieusDamlen SaR Piege, GA Mp VaFies 5inniete,4 Bid Date: n�/204 K 15 1347 BB 3 (�' 7 12/23/26'tre9t49tgdldge for continuation... 2015 Bid -Job Info.xls �J6617MPM ATTACHMENT C �uRTECy BURTECH PIPELINE INCORPORATED :.: 102 2ND STREET, ENCINITAS, CA 92024 (�I A�pEL1N� p(760) 634-2822 / f(760) 634-2415 Cy (2LP JOB # JOB ADDRESS OFFICE CONTACT 2015-015 Trolley Residential Emmerson Construction, Inc. Prevailing 4981 Market Street, Zion Patton Matt R. San Diego, CA 92102 Mobile: 619-200-7759 2015-016 Sewer Capital Impvts Projects: CIPL Nu -Line Technologies, LLC Prevailing Various Locations Frank Durazo Adam V. Lemon Grove, CA Bid Date: 0212512015 2015-017 Caudor Street Emergency Storm Drain Repai Nu -Line Technologies, LLC Prevailing 1553 Caudor Street, Frank Durazo Matt R. 2015-018 PFeVailing Encinitas, CA 92024 Pipeline Oehabilitati-en AF 1 VaFieu s I aGatien Bid Date: 0212512015 G4 of Sas Diego 2015-019 San Diego, CA Mp� VaFieS Storm Drain Lining Project 2014-15 Bidgate.* 0947/20! K 16 1353 999 3 City of Fullerton Prevailing Various Locations Vince Oseguera Adam V. City of Fullerton, CA Bid Date: 0912912015 Sewer & AC Water Group 834 Mp: Varies Multiple Locations, 2015-020 Spring Street Storm Drain Repair City of San Juan Capistrano Prevailing Spring Street, Mike Marquis Brian B. San Juan Capistrano, CA Bid Date: 1013012015 Mp: Varies 2015-021 Pipeline Rehabilitation AC -1 City of San Diego Prevailing Various Locations Bijan Shakibah Adam V. San Diego, CA Bid Date: 111312015 Mp: Varies K-15-1380-DBB-3 2015-022 Tecolote Canyon Golf Course Matt R. 4" Water Repair La Jolla Area, 2755 Snead Avenue, Brian B. San Diego, CA 92111 2015-023 Emergency Slope & SD Repair Prevailing La Costa Avenu x Hwy 101, Matt R. Encinitas, CA 92024 2015-024 Sewer & AC Water Group 834 Prevailing Multiple Locations, Matt R. San Diego, CA Tecolote Canyon Golf Course Duane Conta Nu -Line Technologies, LLC Frank Durazo City of San Diego Bid Date: 1111712015 K-16-1349-DBB-3 2015-025 AC Water Group 1007 City of San Diego Prevailing La Jolla Area, Brian B. San Diego, CA 2/ O Bid Date: 107.5 l� 3 2015-026 Manning Canyon Sewer & Water Replacemei City of San Diego Prevailing Linda Vista Community, Jose R. San Diego, CA Bid Date: 1112412015 K-16-1422-DBB-3 Fax: NT (760) 456-6020 $ 191,000.00 zpatton a.emmersonconstruction.com (760)634-5153 $ 44,054.60 fdurazoCa_nulinetech.net (760)634-5153 $ 9,400.00 fdurazoQnulinetech.net (714)738-6851 $ 246,565.00 (949) 443-6326 $ 16,727.00 mmarguis(&sanivancapistrano.oro (619)533-5191 $ 3,764,428.25 BShakiba@sandieao.gov (619) 322-6186 . $ 4,750.00 tecolotecanvonsuper(a)-americangolf.com (760) 634-5153 $ 66,150.00 fdurazoCa) n ulinetech. net $ 5,772,506.89 Waiting for Contract $ 2,670,192.30 Waiting for Contract $ 7,685,289.44 Total for Year'2015'1 $ 55,199 989.24 �1a 12/23/2015 9:46 AM 2015 Bid -Job Info.xls 316 Liltapm 11111/2014 7:05 AM ATT AQ.1. N, 4EN T C Job List WPM JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT I JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2014-001 Sewer Pipeline Rehabilitation W-1 Prevailing Vicinity of La Jolla, Frank D. San Diego, CA Various 2014-002 Group 3017 - Sewer Groups 727 & 735 Prevailing Chatsworth Blvd. x Coronado Ave. Scott S. San Diego, CA 92107 Mp: 1288 Al. A2 City of San Diego Maryam Liaghat K-14-5964-DBB-3-A Bid Date: 1/9/14 City of San Diego Michael Ninh K-14-1115-DBB-3-C Bid Date: 2/6/14 2014-003 Otay 1st & 2nd Pipeline Abandonment City of San Diego Prevailing Winona Ave, Wightman St, Altadena Ave, Brian Vitelle Scott S. 54th St, Redwood St, Chollas Rd, Euclid Ave K-14-5934-DBB-3 Mp: 1270 A7 Bid Date: 2118/14 2014-004 Sewer & Water Group 815 City of San Diego Prevailing Mission Blvd between San Luis Obispo Ln Bijan Shakiba Adam V. and W. Mission Bay Drive, SD, CA 92109 K-14-5947-DBB-3 Mp: 1270 A7 Bid Date: 3/6/14 2014-005 Rios Avenue 4" Sewer Lateral Lining Frank D. 509 N. Rios Avenue, Solana Beach, CA 92075 2014-006 ICW Sewer Lateral Repair Budd A. 11455 EI Camino Real, Marleen Guess Marleen Guess Bid Date: 4/1/14 American Assets Trust Chalres Moore Bid Date: 3/20/14 LA County DPW Jose Pou Bid Date: 4/15/14 City of San Diego Jericho Gallardo K-14-1172-DBB-3 Bid Date: 5/21/14 2014-009 Wing Avenue Flood Control Improvement Flatiron Prevailing Floyd Smith Drive x Joe Crosson Drive, Ruben Claudio Frank D. EI Cajon, CA 92021 Cell# (760) 497-6668 Mp: 1251 E2 Bid Date: 5/6/14 2014-010 NW Quadrant SD (Basswood & James) City of Carlsbad Prevailing Basswood Avenue & James Drive, Sherri Howard Adam V. Carlsbad, CA 92008 Bid Date: 4/8/14 Mp: 1106 F5 2014-011 2014 Sewer PL & Storm Drain Repairs Projec City of Solana Beach Prevailing Various Locations Taryn Kjolsing Scott S. Solana Beach, CA 92014 Bid Date: 5/29/14 2014-012 Sewer Group Job 833 Prevailing Mid -City Normal Heights, Scott S. San Diego, CA 92116 2014-013 Recycled Water Pipeline Repair Project Prevailing La Costa Golf Course, Scott S. Carlsbad, CA 92009 City of San Diego Michael Ninh K-14-1225-DBB-3 Bid Date: 6/24/14 Leucadia Wastewater District Robin Morishita Bid Date: 7/17/14 2014-014 1362 Windsor Rd 4" Sewer Lateral Lining Mr. & Mrs. Borgonovi Frank D. 1362 Windsor Road, Mr. & Mrs. Borgonovi Encinitas, CA 92007 Bid Date: 7/22/14 2014-015 Batiquitos (B1/B2) Force Mains Replacement Leucadia Wastewater District Prevailing Carlsbad Blvd x Avenida Encinas Robin Morishita Scott S. Carlsbad, CA 920111 Bid Date: 8/26/14 (619) 533-5192 $ 2,465,095.10 mliaghat cDsandiego.gov (619) 533-7443 $ 3,677,000.00 mninha,sandiego.gov (619) 533-7413 $ 4,135,140.00 bvitelle(apsandiego.gov (619) 533-5191 $ 3,463,000.00 bshakiba(aa-)sandiego.goy Keith (619) 719-8030 $ 3,200.00 marleenguess@yahoo.com (858) 350-2965 $ 21,550.00 cmoore<a�americanassets. com (626) 458-2191 $ 232,000.00 JPOU aC )dpw.lacounty.gov (619) 533-7523 $ 513,000.00 jrgallardo c5sandiego.gov (760) 916-9100 $ 31,050.00 rclaudio(.5flatironcorp.com (760) 602-2756 $ 327,999.90 Sherri. Howard(a)carlsbadca.gov (858) 720-2470 $ 455,414.50 tkiolsinq .cosb.org (619) 533-7443 $ 483,300.00 mninh cDsandiego.gov (760) 753-0155 x 300 $ 194,950.00 (760) 436-2858 $ 4,200.00 giancarloborgonoviasbcglobal.net (760) 753-0155 x 300 $ 4,590,000.00 Total for this Sheet: $ xuuisi�u;�:a:59.50 San Diego, CA 92130 2014-007 Sewer Rehabilitation Project No. 9 Prevailing Various Locations Scott S. in Los Angeles Area 2014-008 Pipeline Rehabilitation X-1 Prevailing Various Locations within the Adam V. City of San Diego Marleen Guess Marleen Guess Bid Date: 4/1/14 American Assets Trust Chalres Moore Bid Date: 3/20/14 LA County DPW Jose Pou Bid Date: 4/15/14 City of San Diego Jericho Gallardo K-14-1172-DBB-3 Bid Date: 5/21/14 2014-009 Wing Avenue Flood Control Improvement Flatiron Prevailing Floyd Smith Drive x Joe Crosson Drive, Ruben Claudio Frank D. EI Cajon, CA 92021 Cell# (760) 497-6668 Mp: 1251 E2 Bid Date: 5/6/14 2014-010 NW Quadrant SD (Basswood & James) City of Carlsbad Prevailing Basswood Avenue & James Drive, Sherri Howard Adam V. Carlsbad, CA 92008 Bid Date: 4/8/14 Mp: 1106 F5 2014-011 2014 Sewer PL & Storm Drain Repairs Projec City of Solana Beach Prevailing Various Locations Taryn Kjolsing Scott S. Solana Beach, CA 92014 Bid Date: 5/29/14 2014-012 Sewer Group Job 833 Prevailing Mid -City Normal Heights, Scott S. San Diego, CA 92116 2014-013 Recycled Water Pipeline Repair Project Prevailing La Costa Golf Course, Scott S. Carlsbad, CA 92009 City of San Diego Michael Ninh K-14-1225-DBB-3 Bid Date: 6/24/14 Leucadia Wastewater District Robin Morishita Bid Date: 7/17/14 2014-014 1362 Windsor Rd 4" Sewer Lateral Lining Mr. & Mrs. Borgonovi Frank D. 1362 Windsor Road, Mr. & Mrs. Borgonovi Encinitas, CA 92007 Bid Date: 7/22/14 2014-015 Batiquitos (B1/B2) Force Mains Replacement Leucadia Wastewater District Prevailing Carlsbad Blvd x Avenida Encinas Robin Morishita Scott S. Carlsbad, CA 920111 Bid Date: 8/26/14 (619) 533-5192 $ 2,465,095.10 mliaghat cDsandiego.gov (619) 533-7443 $ 3,677,000.00 mninha,sandiego.gov (619) 533-7413 $ 4,135,140.00 bvitelle(apsandiego.gov (619) 533-5191 $ 3,463,000.00 bshakiba(aa-)sandiego.goy Keith (619) 719-8030 $ 3,200.00 marleenguess@yahoo.com (858) 350-2965 $ 21,550.00 cmoore<a�americanassets. com (626) 458-2191 $ 232,000.00 JPOU aC )dpw.lacounty.gov (619) 533-7523 $ 513,000.00 jrgallardo c5sandiego.gov (760) 916-9100 $ 31,050.00 rclaudio(.5flatironcorp.com (760) 602-2756 $ 327,999.90 Sherri. Howard(a)carlsbadca.gov (858) 720-2470 $ 455,414.50 tkiolsinq .cosb.org (619) 533-7443 $ 483,300.00 mninh cDsandiego.gov (760) 753-0155 x 300 $ 194,950.00 (760) 436-2858 $ 4,200.00 giancarloborgonoviasbcglobal.net (760) 753-0155 x 300 $ 4,590,000.00 Total for this Sheet: $ xuuisi�u;�:a:59.50 12/22/2014 9:13 AM ATIUMEN T C Job List WPM JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2014-016 Pipeline Rehab Phase F-2 (Laterals) City of San Diego (619) 533-7443 $ 5,093,938.90 Prevailing Various Locations City of San Diego K-15-1097-DBB-3 Bid Date: 9/4/14 2014-017 Ill Reduction Demonstration Project Ojai Valley Sanitary District (805) 646-5548 $ 88,200.00 Prevailing Bid Schedule C - Only Jon Turner, PE (805) 626-2100 Shady Lane, Ojai, CA 93023 Phoenix Civil Engineering Inc. Bid Date: 8/15/14 2014-018 Eucalyptus Park PUB Construction Inc. (760) 402-6839 $ 500.00 Prevailing Bancroft Drive, Mike Monsegur mike(a)pubconstruction.com La Mesa, CA 2014-019 Back Bay Drive Storm Drain Rehabilitation City of Newport Beach (949) 756-1001 $ 426,518.00 Prevailing Back Bay Drive, Mark Vukojevic Newport Beach, CA 92660 2014-020 Neptune/Downtown Valve Replacement San Dieguito Water District (760) 633-2793 $ 431,599.00 Prevailing Neptune Avenue, Blair Knoll Encinitas, CA 92024 2014-021 1401 Avenida Amantea 4" Lateral Lining Mrs. Rosewitha Wintzingerole (858) 531-1919 $ 4,400.00 Frank D. 1401 Avenida Amantea, Mrs. Rosewitha Wintzingerole Bordon rmpm.us San Diego, CA 92037 2014-022 Via La Prostata Pvt. Lateral CCTV Pete Stickler (858) 761-5117 $ 200.00 Frank D. 6923 Via La Prostata, Pete Stickler Rancho Santa Fe, CA 2014-023 1052 Skylark Drive 4" Lateral Lining Mr. Lugmair Guenther (858) 454-4573 $ 2,000.00 Frank D. 1052 Skylark Drive, Mr. Lugmair Guenther glumairla�ucsd.edu San Diego, CA 92307 CX, S 61 2014-024 Recycled Water Phase II Pipeline City of Carlsbad (760) 6.0 $ 371,833.87 Prevailing Expansion Segment No. 18 David Ahles A3 dahIea, ci.carlsbad.ca. us Palmer Way x Impala Drive, Bid Date: 11/18/14 Carlsbad, CA 2014-025 University Avenue Pipeline Replacements City of San Diego (619) 533-4628 $ 19,354,365.00 Prevailing University Ave, Washington St, Lewis St, Mike Bajoua mbaioua(o-)sandiego.gov Robinson Ave & Fith Avenue. Bid Date: 11/21/14 San Diego, CA 92103 2014-026 1704 Redondo Street 4" Lateral Lining Greg Ghio (619) 851-8349 $ 2,350.00 Frank D. 1704 Redondo Street, Greg Ghio gregghioagmail.com San Diego, CA 92107 Total for this Sheet: $ 25,775,904.77 Total for Year'2014'1 $ 46,372,804.27 C-20 ATTR,Q-��I T C 9111(2014 8:00 AM Job List WPM (�) JOB # JOB NAME JOB ADDRESS DEV. / GENERAL CONTR. OFFICE CONTACT Ph: Fax: CONTRACT AMOUNT I 2013-001 Sewer & Water Group 732 City of San Diego (619) 235-1979 $ 1,355,000.00 Joe L. Xenophon Street x Rosecrans Street, Hung Huynh hhuvnh(a)sandeiao.aov San Diego, CA 92106 K-13-5642-DBB-3 Mp: 1268 C-7 Bid Date: 2/12/13 2013-002 Sewer & Water Group 758 City of San Diego (619) 533-4641 $ 4,141,243.92 Adam V. Adrian Street x W. Point Loma Blvd Luis Schaar Ischaarasandiego goy San Diego, CA 92106 K-13-5449-DBB-3 Mp: 1268 C-5 & C-6 Bid Date: 3/26/13 2013-003 Water Group 958 City of San Diego (619) 533-6902 $ 3,324,000.00 Joe L. Regents Road x Hwy 52 Akram Bassyouni ABassvouni aasandieao.gov San Diego, CA 92106 K-13-1075-DBB-3 Mp: 1228 C7 Bid Date: 5/1/13 2013-004 Upgrade Water Meter from 3/4" to 1" Samir Haj (206) 227-9785 $ 7,000.00 Buddy 5630 Soledad Road, SD, CA 92037 samhai47()hotmail.com Mp: 1248 A3 2013-005 La Granada Sewer Main Extension Rimmer Construction (619) 548-8937 $ 34,025.00 Joe L. 5229 Avenida Maravillas, RSF, CA 92067 Ron Rimmer Mp: 1168 B3 2013-006 Water Group 945 City of San Diego (619) 533-4641 $ 1,780,000.00 Adam V. Fifth Avenue x Laurel Street, Luis Schaar Ischaarasandieao.aov San Diego, CA 92103 K-13-5836-DBB-3 Mp: 1269 A7 & 1289 Al Bid Date: 6/26/13 2013-007 Revelle Drive 1" Water Service Westwind Company, Inc. (619) 729-3151 $ 10,000.00 Buddy 7791 Revelle Drive, La Colla, CA 92037 Dennis Pezdek (619) 264-6575 Mp: 1227 J6 2013-008 Carmel Valley Road Recycled Water Line Pardee Homes (858) 201-0027 $ 1,234,000.00 Adam V. Improvements - Phase III Mark Sullivan OCIP Carmel Valley Rd x Edgewood Bend Ct. Mp: 1188 E5, F4 & G3 2013-009 18127 Via Roswitha Fire Hydrant Trent Construction (619) 247-7976 $ 21,600.00 Adam V. 18127 Via Roswitha, RSF, CA 92067 Tobin Trent Mp: 1148 E6 2013-010 Tierra Vista Place 1" Water Service Ralph Mursinna (858) 610-9535 $ 6,300.00 Buddy A. 3915 Tierra Vista Place, Ralph Mursinna ralphmursinnata yahoo.com Escondido, CA 92025 2013-012 Sewer Group Job 720 City of San Diego (619) 533-5191 $ 2,378,259.67 Adam Sunset Cliffs Blvd x Santa Monica Ave. Bijan Shakiba Prevailing San Diego, CA 92107 K-14-5928-DBB-3 _Mp: 1267 J6 Bid Date: 11/14/13 2013-013 Alta Del Mar 30" Waterline (Phase 3) Pardee Homes (858) 201-0027 $ 810,000.00 Adam Carmel Mountain Rd x Stable Vista Way Mark Sullivan OCIP San Diego, CA 92129 Bid Date: 10/24/13 Mp: 1228 G1 2013-014 Sewer & Water Group 695 City of San Diego (619) 533-5232 $ 2,648,355.79 Adam Dale Street x Hawthorn Street, Mahmoud Oriqat Prevailing San Diego, CA 92104 K-1 4-11 00-DBB-3 Mp: 1289 E1 & E2 Bid Date: 12/4/13 2013-015 Cardiff Estates - Encinitas 12 City Ventures (949) 258-7532 $ 428,770.00 Nick C. 1264 Lake Drive, Encinitas, CA 92024 Julia Piatt julia@cityventures.com OCIP Mp: 1167 F1 Bid Date: 12/18/13 Total for Year'2013'1 $ 18,178,554.38 Total for Year'2013'1 $ 18,178,554.38 ',&� C-21 9/11/2014 8:00 AM ATToArwUM N T C Job List WPM JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2012-001 Pipeline Rehabilitation M-1 City of San Diego Prevailing Encanto Community Neighborhood Reagan Owen Adam San Diego, CA 92114 K-12-5303-DBB-C Mp: 1290 D1 Bid Date: 11/22/11 2012-002 Sewer & Water Group Job 799 City of San Diego Adam Old Town, Uptown, Center City & Midway Jericho Gallardo Communities, San Diego, CA 92101 K-12-5364-DBB-C Mp's: 1268 E5, G4, G5, G6, 1-15; 1289 A2, A3, B: Bid Date: 2/7/12 2012-003 YBS Concrete Buddy 365 E. J. Street, Chula Vista, CA 91910 Dump Fees for YBS Projects 2012-004 845 63rd Street Sewer & Water Services Laurence Kaiser Buddy 845 63rd Street, San Diego, CA 92114 Mp: 1290 D3 2012-005 Water & Sewer Group Job 929 City of San Diego Adam San Diego, California Maryam Liaghat Job Site 1 - Fir St. x Fifth Ave. Mp: 1289 Al K-12-5545-DBB-3-C Job Site 2 - Hilltop Dr. x Quail St. Mp: 1289 G3 Bid Date: 3/23/12 2012-006 150 Juniper Ave. Sewer & Water Services Robert "Bob" Barelmann Buddy 150 Juniper Avenue, Carslbad, CA 92008 Mp: 1106 E7 2012-007 Harbor Drive Pipelines Replacement & City of San Diego Prevailing Lindbergh Field 16" Cast Iron Main Replacen John Stohr Adam Area 1 - Harbor Drive x Nimitz Blvd K-12-5423-DBB-3-C Area 2 - Harbor Drive x Laurel Street Bid Date: 4/5/12 2012-008 Pipeline Rehabilitation S-1 City of San Diego Prevailing Clairemont Mesa & North Clairemont Mesa, Luis Schaar Adam City of San Diego, California 92117 K-12-5582-DBB-3-C Bid Date: 5/23/12 2012-009 Harrah's Rincon Phase 7 Expansion W.E. O'Neil Construction Joe L. 777 Harah's Rincon Way, Mike Rable Valley Center, CA 92082 Control# 250902550 Mp: 1071 E3 Project# 0712402 Bid Date: 8/10/12 2012-010 Terramar Sewer Lift Station & Force Main City of Carlsbad Joe L. Replacement / Contract No. 5502 Mark Biscup Canon Road x EI Arbol Drive, Bid No. PWS 13-11 UTIL Carlsbad, CA 92008 Bid Date: 10/10/12 Mp: 1126 G2 2012-011 Emergency Sewer Rehabilitation on City of Chula Vista Joe L. Third Avenue Between "H" St. and Whitney Boushra Salem Chula Vista, CA 91910 Bid Date: 12/6/12 Mp: 1310 B7 2012-012 Sewer & Water Group Job 761 City of San Diego Eagle St., Lewis St., Falcon St., Montecito Way, Chris Gascon Curlew St., Ostego Dr., Torrance St., Brookes K-13-5452-DBB-3 Ave., Jacksaw St., Walnut Ave, Hawk St., Bid Date: 12/19/12 Upas St., Spruce St. & State St. Mp: 1268 J5, J6 & J7 (619) 533-5205 $ 2,807,089.04 (619) 533-7414 (619) 533-7523 $ 4,650,000.00 (619) 533-5176 (619) 726-7317 TBD (619) 462-3118 $ 8,200.00 larolyn(aa-)cox.net (619) 533-5192 $ 2,168,000.00 (619) 533-5278 (760) 497-7777 $ 13,200.00 eco9 .roadrunner.com (619) 533-6626 $ 9,502,772.00 (619) 533-5176 (619) 533-4641 $ 4,343,851.40 (619) 533-5476 (310) 629-0517 $ 1,326,304.00 mrable(abweoneil.com (760) 602-2763 $ 683,648.00 (760)602-8562 (619) 691-5171 $ 80,700.00 bsalem(aDci.chula-vista.ca.us (619) 533-7418 $ 3,095,000.00 (619) 533-5176 Total for this page $ 28,678,764.44 ' Total for Year'2012' $ A67A4744.44 �q 9/11/2014 8:01 AM ATTAGMEN T C Job List WPM JOB NAME DEV. I GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2011-001 Sewer & Water Group 780 City of San Diego (619) 236-6129 $ 2,461,365.46 Adam EI Cajon Blvd x Dawson Avenue Frederick Ray (619) 236-5904 San Diego, CA 92115 Mp: 1270 A3, A4, B4 & 1269 J4 2011-003 Sidewalk Replacement Group 11, FY10 City of San Diego (619) 527-7515 $ 491,325.10 Buddy Various Locations Citywide Mary Wolford (858) 777-6835 San Diego, California 2011-004 Sewer Group Job 738 City of San Diego (619) 533-4641 $ 982,000.00 Adam Adams Avenue x Kansas Street, Luis Schaar (619) 533-5476 San Diego, CA 92104 Mp: 1259 D3 2011-005 Oak Knoll Villas Area Drainage John Stewart Company (858) 537-2026 $ 90,991.00 Adam 12509 Oak Knoll Road, Ivette Vela ext.28 (858) 549-2739 Poway, CA 92064 Mp: 1190 B5 2011-006 Sewer Group Job 753 City of San Diego (619) 235-1979 $ 1,221,000.00 Adam Russ Blvd x Park Blvd Hung Huynh (619) 533-7414 San Diego, CA 92104 Mp: 1289 F2, F3, E2, E3 2011-007 Viridian @ La Costa Greens Taylor Morrison (949) 341-1258 $ 5,000.00 Buddy 6595 Halite Place, Eveline Miller (949) 585-9469 Carlsbad, CA 92009 2011-008 Carmel Mountain Plaza Storm Drain American Assets (858) 354-8043 $ 33,155.00 Buddy 11602-11744 Carmel Mountain Road, Shaun Albrektsen (858) 350-2620 San Diego, CA 92128 Mp: 1190 Al 2011-009 Sewer Group Job 714 City of San Diego (619) 533-6902 $ 1,373,000.00 Adam Bird Rock Ave. x Chalsea Ave. (La Jolla) Akram Bassyouni (619) 533-5176 San Diego, CA 92037 Mp: 1247 F3 & F4 2011-010 Harbor Drive Trunk Sewer City of San Diego (619) 533-5191 $ 8,970,000.00 RON Harbor Drive (bet. Beardsley St. & 28th St.) Bijan Shakiba (619) 533-5176 San Diego, CA 92101 Mp: 1289 C5, D6 & E6 2011-011 Sewer & Water Group 792 City of San Diego (619) 533-6632 $ 2,205,600.00 Adam Encanto Community Area Joe Myers (619) 533-5278 62nd Street x Akins Avenue, SD, CA 92114 Mp: 1290 D3 & C3 2011-012 Torrey Pines & La Jolla Blvd Water Main City of San Diego (619) 533-6673 $ 1,475,000.00 Adam Replacement Phase 3 Gerry Borja (619) 533-5176 La Jolla Shores Drive x Avenida De La Playa San Diego, CA 92037 Mp: 1227 H4 & H5 2011-013 Tierrasanta Intracorp Los Angeles (949) 955-2370 $ 586,788.40 11445 Tierrasanta Blvd., Penny Waidell (949) 955-2380 San Diego, CA 92121 Mp: 1250 A3 2011-014 Sewer Rehabilitation Project FY09/10 & FYI City of Chula Vista (619) 407-3588 $ 728,017.00 RON Various Locations Alan Reyes (619) 691-5171 Chula Vista, CA 91910 2011-015 Pipeline Rehabilitation N-1 City of San Diego (619) 533-7523 $ 5,890,000.00 Prevailing Allied Gardens, Del Cerro, Navajo, San Carlos, Jericho Gallardo (619) 533-5176 RON College and Mid -City Eastern Community Areas, San Diego, CA 92120 2011-016 NW Quadrant Storm Drain Project City of Carlsbad (760) 602-2756 $ 397,000.00 Adam Madison St. and Roosevelt Street, Sherri Howard (760) 555-1234 Carlsbad, CA 92008 Mp: 1106 E5 Total for Year'2011' $ 26 y 1/612011 1:13 PM ATTACHMENT V T C Job List WPM JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2010-001 Sewer Group 745 City of San Diego (619) 533-7418 $ 3,080,000.00 Barrio Logan Community, Chris Gascon (619) 533-5176 San Diego, CA 92113 Mp: 1289 C5, D5 & D6 2010-002 Lot 177 Cielo Fire Hydrant Installation Guardian Companies c/o Glen (760) 445-1835 $ 13,500.00 7808 Camino Sin Puente, Integral Partners c/o Lance Waite Racnho Santa Fe, CA 92067 Mp: 1148 J5 2010-003 NW Quadrant Storm Drain Program City of Carlsbad (760) 602-2756 $ 558,000.00 Chestnut Avenue / Mp: 1106 F5 Sherri Howard (760) 555-1234 Pio Pico Drive/ Mp: 1106 E4 Monroe St./ Mp: 1106 F4 2010-004 Patria @ San Miguel Ranch - T&M TRI Pointe Homes, Inc. (949) 279-7144 $ 3,000.00 Corte Galeana x Avenida Altamira, Eric Jackson cell# 949-279-7144 (619) 482-1876 Chula Vista, CA 91902 Mp: 1311 C1 2010-005 Pipeline Project 2134 Helix Water District (619) 667-6278 $ 831,000.00 Prevailing Purdue Avenue x Harbinson Avenue Chris McRae (619) 667-6235 La Mesa, CA 91941 Mp: 1270 F4 2010-006 Mt. Miguel Covenant Village 8" Backflow Covenant Retirement Community (619) 931-1216 $ 58,392.46 325 Kempton St. x San Carlos Don Maes (619) 479-8003 Springvalley, CA 91977 Mp: 1291 B4 2010-007 Sidewalk Replacement Group 4 City of San Diego (619) 527-7515 $ 1,025,000.00 Various Locations Mary Wolford (619) 527-7515 San Diego, California 2010-008 Wildflower Estate Slurry Sealing Wildflower Estate (619) 987-3953 $ 65,086.52 Wildflower Valley Drive x Lone Jack Rd. Cory Crommett Encinitas, CA 92024 Mp: 1148 C5 2010-009 ICW Building Sewer Cleaning American Assets, Inc. (858) 350-2600 $ 1,500.00 11455 EI Camino Real, John Cummins (858) 350-2620 San Diego, CA 92130 Mp: 1208 A2 2010-010 Solana Beach Sewer American Assets, Inc. (619) 247-7928 $ 750.00 905-993 Lomas Santa Fe Dr., Jaime Enriquez Solan Beach, CA 92075 Mp: 1167 G7 2010-011 4130 La Jolla Village Drive Sewer American Assets, Inc. (858) 350-2600 $ 2,950.00 4130 La Jolla Village Drive, John Cummins (858) 350-2620 San Diego, CA 92037 Mp: 1228 C3 2010-012 Sewer Group Job 734 City of San Diego (619) 533-6902 $ 650,000.00 Franklin Ave., Pardee Place, Florence St. and Akram Bassyouni (619) 533-5176 Alley Block 171, 173, 641, 191 & 360 San Diego, CA 92113 Mp: 1269 F5 2010-013 Sewer & Water Group Job 728 City of San Diego (619) 235-1979 $ 1,875,000.00 Nimitz Blvd. x Willow St. Hung Huynh (619) 533-7414 Peninsula Community Plan Area San Diego, CA 92106 Mp: 1288 B1 Total for this pagel $ 8,164,178.98 r C-24 1/6/2011 1:13 PM ATTAGHMENT C Job List WPM JOB NAME DEV. I GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2010-014 207 C Street Sewer Laterals Swell Property (760) 557-1601 $ 11,980.00 207 C Street & 402 Second Street, Erik Gilmer (866) 336-5926 Encinitas, CA 92024 Mp: 1147 B7 2010-015 Fulvia Street Sewer The Harwood Group of Coldwell Bank (858) 735-4481 $ 154,947.50 385 Fulvia Street x Hymettus Avenue Douglas Harwood (858)-756-5743 Encinitas, CA 92024 Mp: 1147 B4 a 2010-016 Sewer Group Job 750 City of San Diego (619) 533-7523 $ 1,328,795.31 Rolando Blvd. x Aragon Way Jericho Gallardo (619) 533-5176 67th Street x Valencia Drive San Diego, CA 92115 Mp: 1270 D4 & E3 2010-017 4559 Contour Blvd Sewer Lateral George Ching (619) 807-4533 $ 10,760.00 4559 Contour Blvd, (760) 344-4330 San Diego, CA 92115 Mp: 1270 A4 -�j 2010-018 Los Coches Creek Sewer Main County of San Diego (858) 537-2552 $ 930,000.00 Prevailing Old Highway 80 between Palm Lane & Sarah Castaneda (858) 715-6454 EI Dorado Parkway, Lakeside, CA 91977 Mp: 1232 D6 & E6 � 2010-019 Pipeline Rehabilitation Phase K-1 City of San Diego (619) 533-5205 $ 2,495,000.00 Linda Vista and Serra Mesa Community, Regan Owen (619) 533-7414 City of San Diego, CA 92123 Mp: 1248 H6 2010-020 Sewer and Water Group 785 City of San Diego (619) 235-1979 $ 760,000.00 Southcrest Ave, Tokalon St., Whitehaven Way Hung Huynh (619) 533-7414 & Penrose Street, San Diego, CA 92110 Mp: 1268 F1 } 2010-021 Sewer Main Rehab Ph. J-1 D; K1 15013C City of San Diego (619) 533-3409 $ 4,067,420.75 Otay Mesa and Del Cerro Area, Steve Frick (619) 533-3131 San Diego, CA 92154 Mp: 1329 J7 Total for this pagel $ 9,758,903.56 ' Total for Year '2010' $ 17 923,082.54 C-25 8126/2009 11:12 AM ATTENT C Job List WPM /^ \ JOB NAME DEV./ GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2009-001 6" DCDA Assembly at Duncan's Office Duncan Newman (760) 438-8080 $ 6,990.00 6110 Yarrow Drive x Palomar Airport Road Duncan Newman (760) 438-8680 Carlsbad, CA 92011 Mp: 1127 D-3 2009-002 GRC 2007A Task Order #7A005 City of San Diego (619) 756-2340 $ 130,731.40 Prevailing Commercial Street Pipeline Retrofit Mike Fakhoury Commercial St. x 15th St., SD, CA 92101 MP: 1289 C-4 2009-003 Valve Replacements - Apex Apex Companies, LLC (858) 602-7721 $ 51,660.00 Murphy Canyon Housing; MP: 1249 G-2 Mike Clark (858) 558-1120 Chesterton Housing; MP 1249 A-6 Hartman Housing; MP 1248 B-5 & B-6 2009-004 GRC 2007A Task Order # City of San Diego (619) 756-2340 $ 457,782.12 Prevailing Sewer Main Rehabilitation Phase 1-1 Mike Fakhoury GRC Part -1 Otay Mesa and San Ysidro, SD, CA MP: 1330 E6 & F7; 1349 J2; 1350 Al, D1, E1, F1, F2 & F3 2009-005 EI Pedregal Apartments Lucas Companies (949) 474-0221 $ 477,753.50 Averil Road x San Ysidro Blvd., Joe Francis (949) 474-3097 San Diego, CA 92173 Mp: 1350 E3 2009-006 Oleander Drive Accelerated Sewer City of San Diego (858) 292-6459 $ 210,000.00 Oleander Drive, Larga Cl & Kingsley St. Allan Navarro (858) 292-6310 San Diego, CA 92106 Mp: 1268 C6 2009-007 College Avenue Storm Drain City of San Diego (619) 990-1961 $ 120,436.99 Prevailing College Ave x Canyon Crest Drive Leigh Ann Derbawka (858) 292-6310 San Diego, CA 92182 Mp: 1270 C2 r_RC_ 2_0 07A Task Order i!Gity of San Diego (649)x40 $ PFeValliRg Sewer Main Rehabilitation Phase I_4 rp GRC: Ot@y Mesa @Rd S@R YSidFn 99,9A MP: 1339 G77, F' u G6; 4359 CZ u Cn• 1354 Mike Faxkheupy $ 399,34 CANCEhhi BY CITY 4.1,3-0100: n� 2009-009 Sewer & Water Group 544 City of San Diego (619) 533-5205. $ 2,344,000.00 Peninsula Community Plan Regan Owen (619) 533-7414 Voltaire Street x Mendocino Blvd. San Diego, CA 92106 Mp: 1268 A6 & B6 2009-010 Old Police HQ Water & Fire Services Legacy Building Services Inc. (619) 336-0126 $ 23,200.00 Pacific Highway x Harbor Drive, Jonathan Holmes San Diego, CA 92101 Mp: 1288 J4 2009-011 GRC 2007A Task Order #7A025 City of San Diego (619) 756-2340 $ 133,654.67 Prevailing Brown Field Road Work Mike Fakhoury - GRC Manager Continental Street x Cactus Road, Jason Grani - Project Manager MP: 1351 D1 2009-012 GRC 2007A Task Order #7A027 City of San Diego (619) 756-2340 $ 5,416.11 Prevailing Pt. Loma FIRP I PL Corrosion Probe Instailat Mike Fakhoury - GRC Manager Ernesto Fernandez - Project Manager 2009-013 Culvert Rehabilitation Re -Pipe California (909) 291-4050 $ 22,000.00 Prevailing Sweetwater Road, Spring Valley Mp 1270 J7 Joseph Dominguez (909) 291-4070 Pino Drive, Lakeside, CA Mp 1232 C3 County of San Diego Total for this pagel $ 0,9 4.79 ' 1/11/2010 3:20 PM ATTACHMENT C Job List WPM JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2009-014 Breakaway at Arrowood The SeaCountry Group $ 55,188.20 Breakaway Drive x Treetop Road, Keith Wyer (760) 804-8400 Oceanside, CA 92057 Bill Shada (760) 685-1660 MP: 1067 B4 2009-015 GRC 2007A Task Order #7A026 City of San Diego $ 111,644.57 Prevailing Calle Candela Storm Drain Lining Mike Fakhoury - GRC Manager (619) 756-2340 North end of Vickie Drive, SD, CA 92109 Michael Handal - Project Manager MP: 1247 J3 2009-016 Terramar Pressure Red. Station Removal City of Carlsbad (760) 602-2745 $ 48,100.00 EI Camino Real x Rancho Carlsbad Drive Brandon Miles (760) 602-8562 Carlsbad, CA 92008 MP: 1107 C7 2009-017 Citywide Concrete Repair (CDBG Project) City of Encinitas (760) 633-2775 $ 24,960.00 Prevailing City of Encinitas, CA Kipp Hefner CITYWIDE 2009-018 CDBG-R Sidewalk Repairs City of EI Cajon (619) 441-1715 $ 238,516.00 Prevailing City of EI Cajon, CA Dede Porter CITYWIDE 2009-019 Sewer Group 716 City of San Diego (619) 533-7523 $ 1,889,000.00 La Jolla Community Jericho Gallardo (619) 533-5176 San Diego, CA 92037 Mp: 1227 G6 to J6 Total for this pagel $ 2,367,408.77 Total for Year '2K9'$ 6,351,033.56 ; C-27 ATTAGHMENT C 111.12009 11:36 AM JOB NAME DEV. / GENERAL CONTR. JOB # JOB ADDRESS OFFICE CONTACT 2008-001 McCormick T&M Potholing McCormick Consulting Group Cesar 2255 Paseo Saucedal, Martin Johnston Carlsbad, CA 92009 Mp: 1147 G-2 2008-002 GRC 2007A Task Order # 7AO02 City of San Diego Lisa "SBWRP PL CP System" Leigh Ann Derbawka Prevailing Hollister Street and Sunset Avenue, San Diego, CA 92173 MP: 1350 B-2 & 1350 C-3 2008-003 K083861A Pipeline Lateral Rehabilitation City of San Diego Lisa Phase C-2 Bill Swallow Various Locations in Lake Murray Area 2008-004 Valdez #5016-03 Water Repair McCormick Consulting Group Cesar 526 Black Coral Way, Martin Johnston San Diego, CA 92154 Mp: 1330 J-6 2008-005 Mike West Residence Sewer Lateral Mike West Cesar 701 Grapevine Road x Olive Avenue Mike West Vista, CA 92083 Mp: 1087 D-6 2008-006 Loftberg St Water Leak Repair - T&M Apex Companies, LLC Lisa 3616 Loftberg St., Michael Clark San Diego, CA 92124 Mp: 1249 G-3 2008-007 Evergreen Meter Box Repairs K. Hovnanian Companies Cesar Ralphs Ranch Road x Rancho Bernardo Rd Wally Reed San Diego, CA 92127 Mp: 1169 E-2 2008-008 Opus Point IV Opus West Construction Lisa 3197 Lionshead Avenue, Ralph Miller Carlsbad, CA 92010 Mp: 1127 J-2 2008-009 Group 3000 - Water Group 4648, 753, 705 City of San Diego Lisa Water Group 464B - Broadway x 11th Ave., Hung Huynh San Diego, CA 92101 (Mp: 1289 B-3) Water Group 753 - 16th Street x B Street, San Diego, CA 92101 (Mp: 1289 C-3) Water Group 705 - Natalie Dr. x Constance Dr. San Diego, CA 92115 (Mp: 1269 J-3) Sewer Group 705 - Natalie Dr. x Constance Dr. San Diego, CA 92115 (Mp: 1269 J-3) 2008-010 Mission & Douglas Center Wheelihan Construction Cesar , SW Corner of Douglas Drive x Mission Avenue Bill Lopez ext.22 Oceanside, CA 92056 Mp: 1086 G-3 2008-011 GRC 2007A Task Order # City of San Diego Lisa "Montgomery Field Paving" Mike Fakhoury Prevailing San Diego, CA 92123 2009-0.01 MP: 1249 C-3 a Rannh~ of noel.. a 76 GesaF 2008-013 NW QE)Fner DFiye x Hwy neeeee„de CA 92957 La Costa Ridge N2.5 - T&M KB Homes Cesar Corintia St. & Corte Pacifica Gilbert Valdez Carlsbad, CA 92009 gvaldez-x(a)kbhome. com Mp: 1127 J-6 Job List WPM I Ph: CONTRACT Fax: AMOUNT (619) 688-3966 $ 7,500.15 (619) 688-1263 (858) 614-5767 $ 97,090.53 (858) 292-6310 (858) 614-4528 $ 785,000.00 (858)292-6310 (619) 688-3966 $ 5,000.00 (619) 688-1263 (760) 518-6571 $ 4,000.00 (866) 549-6854 (858) 650-0835 $ 8,000.00 (858) 650-0837 (619) 454-7840 $ 1,895.50 (760)967-8434 (858) 546-5225 $ 454,264.00 (858) 546-4110 (619) 533-5205 $ 2,639,575.18 (619) 533-7414 $ 957,590.25 (760) 734-5959 $ 308,263.00 (760) 734-6555 (619)756-2340 $ 50,019.80 (858)218-5326 (619) 596-6788 $ 5,000.00 Total for this page $ 6,846,388.51 =: 1/5/2009 11:36 AM ATTACHMENT T C GRC 2007A Task Order City of San Diego Job List WPM Brown Field Airport- T&M JOB NAME DEV, I GENERAL CONTR. Ph: CONTRACT -JOB JOB ADDRESS OFFICE CONTACT Fax: City of San Diego AMOUNT 2008-014 Pasado at Del Sur William Lyon Homes (858) 864-2466 $ 6,958.40 Cesar Camino Del Sur x Paseo Del sur Clegg Atherton (858) 312-6486 Apex Companies, LLC Linda Vista, CA San Diego, CA 92127 2008-027 GRC 2007A Task Order #7A004 City of San Diego Prevailing Montgomery PL - Site 2A & 2B Mp: 1169 B-4 Riverdale St. and Admiral Baker Rd, SD, CA 2008-015 Eastlake Country Club Valve Replacement Eastlake Country Club (858) 472-3020 $ 3,893.65 Cesar 2375 Clubhouse Drive, Bob Looney (619) 656-3904 Chula Vista, CA 91915 Mp: 1311 G-6 2008-016 GRC 2007A Task Order #7A011 City of San Diego (619) 756-2340 $ 35,814.27 Lisa Kika Court CP Anode Bed Replacement Mike Fakhoury Prevailing 9901 Kika Court, San Diego, CA 92131 MP: 1189 F-7 /2008-017 Sewer & Water Group 683A City of San Diego (619) 533-5205 $ 3,270,023.85 Cesar University Avenue x 37th Street Regan Owen (619) 533-5176 San Diego, CA 92105 Mp: 1269 G-5 2008-018 Fortuna Ranch Pipeline - T&M Dietrich Corporation (619) 447-4800 $ 10,000.00 Lisa Fortuna Ranch Road Richard Dietrich Encinitas, CA 92024 Mp: 1148 C-4 2008-019 Dan Baxter Residence Dan Baxter (760) 420-8257 $ 9,850.00 Lisa 1627 Caudor Street, Dan Baxter Encinitas, CA 92024 Mp: 1147 C-2 2008-020 GRC 2007A Task Order #7A015 City of San Diego (619) 756-2340 $ 11,983.63 Lisa SBWRP 2" SS Outfall Sampling Pipeline Mike Fakhoury Prevailing 2411 Dairy Mart Road, San Diego, CA 92154 MP: 1350 E-4 2008-021 GRC 2007A Task Order #7A016 City of San Diego (619) 756-2340 $ 17,399.45 Lisa MBC's Truck Parking Lot Repair Mike Fakhoury Prevailing 5240 Convoy Street, San Diego, CA 92111 MP: 1229 C-6 2008-022 #5016-70 Calexico, CA - T&M McCormick Consulting Group Cesar 1265 J B Rodriguez St., Calexico, CA 92231 Martin Johnston MP: 6620 J-6 2008-023 GRC 2007A Task Order #7A003 City of San Diego Lisa Rancho Bernardo Pipeline Mike Fakhoury Prevailing Canyonside Park Drive, San Diego, CA 92129 MP: 1189 C-7 2008-024 GRC 2007A Task Order City of San Diego Lisa Brown Field Airport- T&M Mike Fakhoury Prevailing 1411 Continental St, San Diego, CA 92154 MP: 1351 D-1 2008-025 GRC 2007A Task Order #7A014 City of San Diego Prevailing NCWRP Guard Shack Relocation & Fencing Mike Fakhoury 4949 Eastgate Mall, San Diego, CA 92121 MP: 1228 E-1 2008-026 Linda Vista Sewer Repair - T&M Apex Companies, LLC Linda Vista, CA Mike Clark 2008-027 GRC 2007A Task Order #7A004 City of San Diego Prevailing Montgomery PL - Site 2A & 2B Mike Fakhoury Riverdale St. and Admiral Baker Rd, SD, CA MP: 1249 H-6 (619) 688-3966 $ 41,536.83 (619) 688-1263 (619) 756-2340 $ 114,539.78 (619) 756-2340 $ 75,000.00 (619) 756-2340 $ 70,183.79 (858) 602-7721 $ 804.55 (858)650-0837 (619) 756-2340 $ 325,183.25 Total for this pagel $,9 1.45 /512009 11:36 AM ATT ikJl T C Job List WPM JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2008-028 K084293A Pipeline Lateral Rehabilitation City of San Diego (858) 292-6459 $ 369,000.00 Phase C-3 Allan Navarro (858) 282-6310 Various Locations in Lake Murray Area San Diego, CA 92119 2008-029 Boys & Girls Club of Carlsbad Wheelihan Construction (760) 734-5959 $ 106,690.00 2730 Bressi Ranch Way, Bill Lopez ext.22 (760) 734-6555 Carlsbad, CA 92010 Mp: 1127 G-3 2008-030 FRCC Reclaimed Water Replacement Fairbanks Ranch Country Club (858) 259-8811 $ 194,100.00 San Dieguito Road x Camino Santa Fe Brian Darrock (858) 259-9453 San Diego, CA 92067 Mp: 1188 D-1 2008-031 Sewer Rehabilitation Phase 2 City of Chula Vista (619) 691-5027 $ 574,176.00 Various Locations in Chula Vista, CA 91910 Poten San Pedro Mp: 1310 B5, C6, C7, D7, G3 & G4 Mp: 1311 D3, E3 & E5 Mp: 1330 E2, G9 & G3 2008-032 Carmel Mountain Plaza Sewer Repair American Assets (858) 350-2600 $ 11,650.00 11602-11744 Carmel Mountain Road, Shaun Albrektsen (858) 350-2620 San Diego, CA 92128 Mp: 1189J-1 2008-033 GRC 2007A Task Order #7A020 City of San Diego (619) 756-2340 $ 19,758.96 Prevailing University City Community Sign Mike Fakhoury Genese Ave x April Ct., SD, CA 92122 MP: 1228 E-5 008-034 Sewer & Water Group 747 City of San Diego (619) 235-1978 $ 2,745,000.00 State Street x West Date Street, Catherine Dungca (619) 533-5475 San Diego, CA 92101 Mp: 1289 A-2 2008-035 Sewer & Storm Drain Rehabilitation City of EI Cajon (619) 441-1715 $ 128,998.25 Prevailing 2675 Fletcher Parkway MP: 1251 B-4 Dede Porter 386 Sandy Lane MP: 1251 F-6 EI Cajon, CA 92020 2008-036 GRC 2007A Task Order #7A021 City of San Diego (619) 756-2340 $ 20,157.49 Prevailing Repair of Falling Tiles @ Area 76 - MBC Mike Fakhoury 5240 Convoy Street, San Diego, CA 92111 MP: 1229 C-6 2008-037 GRC 2007A Task Order #7A019 City of San Diego (619) 756-2340 $ 20,564.18 Prevailing NCWRP CP Anode Installation Mike Fakhoury 4949 Eastgate Mall, San Diego, CA 92121 MP: 1228 E-1 2008-038 Sewer Group 703 City of San Diego (619) 533-5205 $ 2,345,000.00 EI Cajon Blvd x 51 st Street Reagan Owen (619) 533-7414 San Diego, CA 92115 Mp: 1270 A-4 2008-039 Water Main Replacement Group 3008 City of San Diego (619) 533-7417 $ 5,777,000.00 North Harbor Drive, Chris Gascon (619) 533-7411 San Diego, CA 92101 Mp: 1288 J-2 Total for this pagel, 12,312,094.88 Total for Year'2K8'1 $ 21,628,464.74 sm -" C-30 6/27/2007 3:38 PM ATTHJ.t .is T C Job List WPM c JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2007-001 Plaza Apartments - National City Wermers Corporation 858-535-1475 Lisa 1535 East Plaza Blvd, National City, CA 91950 Barry Webber 858-535-0171 East Plaza Blvd x Palm Ave. MP: 1310 Al 2007-002 Black Mountain Ranch Unit 4 Shea Homes 619-843-9522 Cesar Paseo Del Sur x Haaland Glen Greg Ponce 858-320-0436 San Diego, CA 92127 MP: 1169 B4 2007-003 Manchester Avenue 12" PL Replacement Olivenhain Municipal Water District 760-753-6466 Lisa Manchester Ave. x Sienna Canyon Drive George R. Briest, PE 760-753-1578 Prevailing Encinitas, CA 92024 MP: 1167 H3 2007-004 Via Las Cumbres Potholing - T&M William Lyon Homes 858-673-4959 Cesar Via Las Cumbres x Linda Vista Tye Moody 858-673-4859 San Diego, CA 92111 MP: 1268 H2 2007-005 Target Vista FH Relocation Adolfson & Peterson Construction (480) 345-8700 Cesar 1751 University Drive Ryan Reznichek (480) 345-8755 Vista, CA 92083 NIP: 1108 B3 2007-006 Bressi Ranch Lot 14 - Self Storage San Diego Contracting, Inc. (619) 596-2022 Cesar Campbell Place x Gateway Road Gary Bunday (619) 596-2003 Carlsbad, CA 92009 MP: 1127 F2 2007-007 Culvert Construction & Installation County of San Diego (858) 694-2943 Lisa Louisa Drive x Avocado Boulevard ✓ Maureen Schlentz (858) 576-8113 Prevailing Spring Valley, CA91941 MP: 1271 F4 2007-008 Urania-T&M Petersen Residence (760) 873-8871 Lisa 1060 Urania Avenue Harry Petersen (760) 873-9295 Encinitas, CA 92024 NIP: 1271 F4 2007-009 Carmax - Kearny Mesa Lusardi Construction (760) 744-3133 Cesar Ruffner Street x Dagget Street Boyd Suemnick ext. 1124 (760) 744-9064 San Diego, CA 92111 20010 GESaF MP: 1249 A2 €56(41IAo Tra6` nt^ RGI rv.nn c^rEl,°,^,+R2o760) Aurelio 63g 4c)5Q 769) 6QQ 1048 2007-011 EsGeRdidG rn WQ22 i MR. Imo'o 16 Duncan Residence Covenant Construction (858) 764-0600 Lisa 4812 EI Mirlo, Randy Thomas (858) 777-5339 Encinitas, CA 92024 MP: 1168 Al 2007-012 Westport Street - T&M Richmond American Homes (760) 272-0083 Cesar 2688 West Canyon Avenue Rich Utecht (760) 471-9851 San Diego, CA 92123 MP: 1290 D7 2007-013 Bellmont Village Assisted Living W.E. O'Neil Construction (909) 466-5300 Lisa Manchester Avenue x EI Camino Real Sean Jean (909) 466-0643 Encinitas, CA 92024 MP: 1167 G3 $ 208,130.00 $ 475,068.00 $ 735,000.00 $ 5,000.00 $ 8,250.00 $ 130,000.00 $ 33,185.00 $ 100,000.00 $ 295,438.00 $ 71,650.00 $ 5,000.00 $ 629,486.00 Total for this pagel $ 2,696 207 00 C-31 ATTACHMENT C List 6/27/2007 3:41 PM Job WPM JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2007-014 Sewer Repairs - Lakeside Sanitation County of San Diego (858) 694-2380 $ 27,500.00 Lisa Gardena Way, Prospect Ave. & Gay Rio Way Jose Sandoval / Peejay Tubongbanua (858) 694-3581 Prevailing Lakeside, CA 92040 --�-' MP: 1231 J6 2007-015 4524 Palm Avenue Sewer Millenium Construction (619) 961-6316 $ 6,000.00 Cesar 4524 Palm Avenue, Mike Haaland (619) 312-4573 La Mesa, CA 91941 MP: 1270 J2 2007-016 4563 Contour Blvd Sewer Laterals Herstein & Associates (619) 229-1876 $ 8,650.00 Lisa 4563 Contour Blvd., Bruce Herstein (619) 583-7701 San Diego, CA 92115 MP: 1270 A3 2007-017 Leucadia Street Improvements 3-D Enterprises (858) 272-3191 $ 67,395.00 Cesar Leucadia Blvd x Vulcan Avenue Gene Salas (858) 272-6089 Prevailing Encinitas, CA 92024 MP: 1147 B4 3.007 01-8—&ante-Fe-Meadows-SewerLifi-Station L-ightheuse-bevel ment Group, LLC X32\0 Cesar Future Franzen-F-arra-Rdat�r.m-Ro-ad u u, e_ 1X01 Ranr-hG-,S2anta-Fe, C^ 92427 2007-019 Quail Pointe Barratt American Homes (760) 431-0800 $ 155,713.00 Cesar Quail Gardens Drive x Encinitas Blvd. Dennis Glaser (760) 929-6432 Encinitas, CA 92024 MP: 1147 D6 2007-020 Twin Peaks Middle School Poway Unified School District (858) 679-2579 $ 287,564.00 Cesar Sierra Bonita Drive x Twin Peaks Rd. Buzz Sutphin (858) 486-0669 Prevailing Poway, CA 92064 MP: 1190 G1 2007-021 Carlsbad I Professional Building Mammoth Equities Construction (949) 276-2555 $ 8,000.00 Cesar Loker Avenue East x Palomar Airport Road Adrian Lopez /TOM (949) 276-2612 Carlsbad, CA 92010 MP: 1127 G2 2007-022 Wanis - Storm Drain R&R in Benet Road KB Home (858) 703-2186 $ 27,105.00 Lisa Benet Road x W. Airport Rd. Dean Stanley (858) 793-1005 Oceanside, CA 92054 MP: 1086 C4 2007-023 Emerson Street Drainage Improvements City of Chula Vista (619) 397-6117 $ 1,911,000.00 Lisa Emerson Street x 3rd Avenue Poten San Pedro (619) 397-6250 Prevailing Chula Vista, CA 91911 MP: 1330 D3 2007-024 UTC -Retail Building V Site Improvements Graycor Construction Company (760) 272-3421 $ 68,830.00 Lisa Towne Centre Drive x La Jolla Village Drive Milo Hama (949) 472-9268 San Diego, CA 92122 MP: 1228 D2 2007-025 Andy & Donita Gonzales Residence Goodwin Construction, Inc. (619) 993-1900 $ 9,150.00 Cesar 16460 Via De La Valle Ron Brown (858) 755-1510 Rancho Santa Fe, CA 92067 MP: 1168 D4 Total for this pagel $ 3,182,939.07 a C-32 8/14/2007 10:18 AM ATTACHNEE I T C Job List WPM JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2007-026 825 & 827 Cole Ranch Road Sewer Alan Alcorn / Ron Rosado (619) 857-1961 $ 70,155.00 Lisa 827 Cole Ranch Road, (858) 535-1901 Encinitas, CA 92024 MP: 1148 A6 2007-027 RFQ 2342 Sewer Repair at Spring Valley County of San Diego (858) 537-2572 $ 34,450.00 Cesar Carthay Circle and Lamar Street, Jose Sandoval / Peejay Tubongbanua (858) 715-6453 Prevailing Spring Valley, CA 91977 " MP: 1171 B4 & B6 2007-028 RFQ 2353 Sewer Repair at Winter Gardens County of San Diego (858) 537-2573 $ 25,915.00 Cesar Greenfield Dr. x Flamingo St. Maureen Schlentz / Pfjay T. (858) 715-6453 Prevailing Wintergardens, CA 92021 MP: 1251 H2 & H3 2007-029 NAB Force Main Relocation Apex Companies, LLC (858) 650-0835 $ 13,200.00 Lisa Naval Amphibious Base, Mike Clark (858) 650-0837 Coronado, CA 92155 MP: 1309 A2 2007-030 Construction of Pipeline Project 1253 Helix Water District (619) 667-6280 $ 848,325.00 Cesar 68th Street x Alamo Way Darrel W. Williams (619) 667-6235 Prevailing La Mesa, CA 91941 MP: 1270 E3 2007-031 GRC 2007A Right of Way Pipeline Contract City of San Diego (858) 614-5767 $ 200,000.00 Lisa Various Location on PI ROW Leigh Ann Derbawka (858) 292-6310 (may vary) Prevailing San Diego, CA MP: 2007-032 Public Alley Improvement N.W. Marsh Construction, Inc. (760) 801-31'50 $ 37,880.00 Cesar Surfrider Way x Tremont Street, Nathan Marsh (760) 941-1001 Oceanside, CA 92054 MP: 1086 A7 2007-033 Broadway and Woodward Water Services Greentree Development (714) 612-9255 $ 23,950.00 Cesar S. Broadway x Woodward Avenue Don Galbraith (714) 637-1486 Escondido, CA 92025 MP: 1129 J2 2007-034 Latigo Row Private Improvements 490 Latigo Row LLC (760) 505-5471 $ 117,608.00 Cesar Latigo Row x Lone Hill Lane Jeff Cornwell (760) 944-8198 Encinitas, CA 92024 MP: 1148 D3 2007-035 Reveles VPoint - T&M McCormick Consulting Group (619) 688-3966 $ 10,350.00 Cesar 5014-38 Martin Johnston (619) 688-1263 Las Vegas, Nevada 2007-036 7855 Herschel Ave. Sewer Lateral - T&M Prevost Construction (858) 525-5264 $ 15,500.00 Lisa 7855 Herschel Ave. JayR Garcia (858) 720-8563 La Jolla, CA 92037 MP: 1227 F6 2007-037 Union Plaza Parking Ameribuilt Construction, Inc. (858) 278-1000 $ 100,430.00 Lisa State Tree Street x Oceanside Blvd South Leo Todd ; cell 619-847-3105 (858) 278-5124 Oceanside, CA 92054 MP: 1106 C1 2007-038 Hacienda Mobile Estates Hacienda Mobile Estates (310) 459-6267 $ 70,630.00 Lisa 502 Anita Street, Dan Rooke (310) 454-2150 Chula Vista, CA 91911 MP: 1330 C5 Total for this page $ 1,568,393.00 Total for Year'2K7' $ 1.07 1'2/21/2007 2:45 PM ATTAo QiUM N T C JOB NAME DEV. / GENERAL CONTR. JOB # JOB ADDRESS OFFICE CONTACT (858) 509-2245 $ 2,671,388.00 Cesar 2007-039 Murphy Canyon Housing Apex Companies, LLC Lisa Santo Road x Aero Drive Mike Clark San Diego, CA 92124 MP: 1249 G4 2007-040 3541/3 15th Street Sewer & Water Petar Perisic Lisa 15th Street x J Street Petar Perisic $ 45,000.00 San Diego, CA 92101 1003 S. Tremont Street x West Street Kevin Reese MP: 1289 C4 2007-041 10" Water Main Leak Detection Fairbanks Ranch Country Club Cesar Via De Santa Fe x EI Apajo Brian Darrock MP: 1106 B2 San Diego, CA 92130 MP: 1168 E6 La Entrada Family Apartments 2007-042 Hampton Inn Suites - Poway R. D. Olson Construction Cesar Scripps Poway Pkwy x Stowe Drive Tommy Marcum (949) 474-3097 Poway, CA 92064 San Diego, CA 92113 MP: 1190 G7 2007-043 North Cedros Ave. Drainage & Hardscape City of Solana Beach Lisa North Cedros Avenue x Cliff Street Chandra P. Collure Prevailing Solana Beach, CA 92075 Rimmer Construction (619) 548-8937 MP: 1167 E6 Lisa 2007-044 Construction of Group 3002 City of San Diego Lisa Water Group 540A- La Jolla Shores Dr. Mahmoud Oriqat Non-Prev. La Jolla, CA 92037 (MP: 1227 J2) Water Group 550 - EI Cajo Blvd x 67th Street San Diego, CA 92115 (MP: 1270 E2) 2007-045 La Costa Spa - T&M La Costa Spa and Resort Lisa 2100 Costa Del Mar Road Matt Demel Carlsbad, CA 92009 $ 6 &.3;3j, MP: 1127 F7 2007-046 North Avenue Business Park Sun Country Builders Lisa 775 North Avenue x North Melrose Drive Brian Wardwell Vista, CA 92083 MP: 1087 F4 Fax: (858) 650-0835 (858) 650-0837 Job List WPM AMOUNT $ 21,700.00 (619) 274-1554 $ 25,725.00 (858) 259-8811 (858) 259-9453 (949) 222-3724 (949) 474-1534 (858) 720-2470 (858) 755-1782 (619)235-5264 (619) 235-5209 (760) 930-7093 (760) 931-7557 (760) 630-8042 (760)630-3718 $ 20,000.00 $ 265,000.00 $ 64,500.00 $ 3,125,138.26 $ 5,000.00 $ 537,060.00 2007-047 Palomar Medical Center - West Rudolph & Sletten Contractors (858) 509-2245 $ 2,671,388.00 Cesar 2195 Citracado Parkway Andrew Gaylor (858) 259-8282 Prevailing Escondido, CA 92029 MP: 1129 D3 2007-048 1003 S. Tremont Street CFS Incorporated (760) 529-1659 $ 45,000.00 Cesar 1003 S. Tremont Street x West Street Kevin Reese (760) 603-8131 Oceanside, CA 92054 MP: 1106 B2 2007-049 La Entrada Family Apartments Lucas Companies (949) 474-0221 $ 215,500.00 Cesar 1755 Logan Avenue x Beardsley St. Joe Francis (949) 474-3097 San Diego, CA 92113 MP: 1289 C5 2007-050 TPM 05-202 & Water Main Ext. 242 Rimmer Construction (619) 548-8937 $ 208,256.00 Lisa Lone Jack Road x Lone Jack Road Ron Rimmer (760) 753-5946 Encinitas, CA 92024 MP: 1148 A6 Total for this pagel $ 7,204,267.26 Total for Year '2K7' $ 6 &.3;3j, 7/5/2006 3:53 PM ATTH ,I,EN, T C Job List WPM a JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2006-001 San Elijo Hills J Richmond American Homes (760) 891-3689 $ 535,161.00 Lisa San Elijo Rd. x Questhaven Rd. Joe Winkler (760) 471-9851 San Marcos, CA MP: 1128 F-6 2006-002 Panorama Ridge II Heritage Pacific Homes (760) 603-3277 $ 481,705.00 Cesar Sagewood Dr. x Darwin Dr. Carrie Byrd ext.112 (760) 603-3237 Oceanside, CA 92056 MP: 1087 E-2 2006-003 La Costa Greens Phase 2, N1.06 Morrow Development (760) 929-2701 $ 840,257.00 Cesar Pyrite x Alicante Road North Kevin Sullivan (760) 929-2705 Carlsbad, CA 92009 MP: 1127 G-4 2006-004 La Costa Greens, N1.17 Warmington Homes (714) 434-4460 $ 1,400,219.00 Cesar Poinsettia Ln. x Estrella Del Mar John Walch (714) 434-4367 Carlsbad, CA 92009 MP: 1127 F-5 2006-005 The Reserve at 4S Ranch Apartments Sares-Regis Group (949) 809-2526 $ 1,715,714.00 Lisa Ranch Bernardo Dr. x Ralphs Ranch Road Jim Ivory (949) 833-7742 Rancho Bernardo, CA 92127 MP: 1169 F-3 2006-006 Buena Creek Rick Riddle Development (760) 727-7411 $ 151,023.00 Cesar Buena Creek Rd. x Buena Village Dr. Rick Riddle (760) 727-0141 Vista, CA 92083 MP: 1108 C-2 2006-007 La Costa Valley Riparian Channel Morrow Development (760) 929-2701 $ 20,000.00 Cesar Poinsettia Ln. x Mica Rd. Tim O'Grady (760) 929-2705 Carlsbad, CA 92009 MP: 1127 G-4 2006-008 Broadview Hills Sewer KB Home (858) 703-2186 $ 73,550.00 Cesar Broadview St. x Noeline Avenue Dean Stanley (858) 793-1005 San Diego, CA 91977 MP: 1291 A-4 2006-009 Washington Hills II - Trovita Ct. Shea Homes (858) 526-6526 $ 161,345.00 Lisa Washington Avenue x Veronica Place Michelle Scolari (858) 320-0436 Escondido, CA 92026 MP: 1110 D-6 2006-010 Mesa Commons - Offsite Sewer DR Horton (760) 930-6869 $ 306,050.00 Lisa EI Cajon Boulevard x Aragon Drive Daniel Maxwell (760) 929-9476 San Diego, CA 92115 MP: 1270 D-2&3 2006-011 Bonsall Street Improvements Kunzik & Sara Construction, Inc. (760) 591-3109 $ 379,559.00 Cesar Puerta De Loma x Circa De Loma Pete Sara (760) 591-0583 Bonsall, CA 92003 MP: 1047 G-7 2006-012 Oaks North Grading - T&M Morrow Development (760) 929-2701 $ 35,000.00 Lisa Rancho Santa Fe Rd x San Elijo Rd Kevin Sullivan (760) 929-2705 Carlsbad, CA 92009 MP: 1128 B-6 2006-013 Aurburn Park Wermers General Cont (858) 535-1475 $ 460,477.00 Lisa University Avenue x 52nd Street Barry Webber (858) 535-0171 San Diego, CA 92105 MP: 1270 A-5 2006-014 La Costa Oaks North, N3.6 & N3.7 Morrow Development (760) 929-2701 $ 375,057.95 Lisa Avenida Soledad x Rancho Santa Fe Road Kevin Sullivan (760) 929-2705 Carlsbad, CA 92009 MP: 1128 B-G Total for this page as 7.95 `.. 8130/2006 8:12 AM ATTA iH MF .N Job List WPM JOB # JOB ADDRESS 2006-015 Belsara - T&M Cesar Black Mountain Rd. x Carmel Valley Rd. San Diego, CA MP: 1189 D-1 2006-016 San Elijo Hills Area T Cesar San Elijo Rd. x Questhaven Rd. San Marcos, CA MP: 1128 F-6 2006-017 Lot 322 Crosby - T&M Cesar Rancho Santa Fe Rd Rancho Santa Fe, CA 92067 2006-018 Lot 251 W. S. Relocation - Crosby Estate Cesar Rancho Santa Fe Rd Rancho Santa Fe, CA 92067 2006-019 Sunset Cove Cesar Cowley Way x Iroquois Avenue San Diego, CA 92111 MP: 1248 F-6 2006-020 Moonlight Plaza Cesar 203-13 3rd Street, Encinitas, CA 92024 IAP: 1147 B-6 2006-021 La Costa Meadows Business Park - T&M Lisa 1705 La Costa Meadows Drive San Marcos, CA 92078 MP: 1128 B-5 2006-022 Eastlake Village Office Condos Lisa 2080 Otay Lakes Rd, Chula Vista, CA 91915 MP: 1311 F-5 2006-023 La Costa De Marbella Drainage Cesar La Costa Avenue x EI Camino Real Carlsbad, CA 92009 MP: 1147 F-1 2006-024 TOV WTP - North Access Water Pipeline Lisa Proj. #334553 / Subcontract #807017 3566 North Twin Oaks Valley Road, San Marcos, CA 92069 MP: 1088 F-4 2006-025 La Costa Alta Water Main Extensions Cesar Costa Alta Drive x EI Fuerte Street Carlsbad, CA 92010 MP: 1127 J-5 2006-026 Marriott Residence Inn - Oceanside Cesar Rancho Del Oro x Ocean Ranch Blvd Oceanside, CA 92056 MP: 1086 J-5 2006-027 Ocean Ranch Lot 12 Cesar Rancho Del Oro x Ocean Ranch Blvd Oceanside, CA 92056 MP: 1086 J-5 OFFICE CONTACT Fax: AMOUNT Warmington Homes (760) 427-4040 $ 5,000.00 Aron Spoelhof California Cove Communities (949) 453-1775 $ 784,850.00 Jeremy Kalma (949) 453-1822 Lucas & Mercier Development (760) 918-2823 Dan Martin (760) 918-6749 Stonefield Development (714) 812-7361 Terry Stewart (949) 589-8346 William Lyon Homes (858) 673-4959 Tye Moody (858) 673-4859 Moonlight Villas (858) 350-9996 Lawrence Holland / cp: (760) 579-1093 (858) 350-9997 Acushnet Company (760) 804-6500 Tom Handell (760) 930-4473 Snyder Langston (949) 795-8840 Scott Babcock (949) 225-3265 S�p�r. ai , 200-(p 5404 Premier Community Services, LLC (760) 730-7888 Jeff Foudy - HOA President (760) 730-7883 John Kenney - HOA VP g CH2M Hill Constructors, Inc. (760) 510-8716 Sam Morello (619) 230-6566 Ser}. 1q, -2AO y TlaMa+jl t gVITf Burgess Group, Inc. (619) 528-1042 Michael T. Burgess(619) 284-9770 CtIA, IR) "04 netn�at�'tuMM� R.D. Olson Construction (949) 222-3761 Tommy Marcom (949) 474-1534 $c,4, IS- t% 7o G T v)4ohl-x s4c' -1 Lusardi Construction (760) 744-3133 Nick Novak (760) 744-9064 $ 3,200.00 $ 9,000.00 $ 555,725.00 $ 7,220.00 $ 10,000.00 $ 456,181.00 $ 104,160.00 $ 167,032.00 $ 89,050.00 $ 286,528.00 $ 712,457.50 Total for this page $ 3,190,403.50 Total for Year '2K6' $ 10/12/2007 9:48 AM l -JOB iLMEN, T C ATTAo Q- Job List WPM NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2006-028 Granite Hills Shoreline Communities (760) 633-1050 $ 369,114.00 Lisa E. Washington Ave. x Jamacha Road Candice Ross ext. 19 (760) 633-1018 EI Cajon, CA 92019 MP: 1252 A-6 2006-029 Vista Parcel Map 3-115 Pacific Builders / GH4GP (760) 758-9032 $ 29,750.00 Lisa 1130 Mar Vista Drive, Jeff Tallman (760) 758-1240 Vista, CA 92081 MP: 1107 H-3 2006-030 Sentinels at Del Sur John Laing Homes (949) 265-2482 $ 213,608.00 Lisa Beltaire Lane x Pase Montenero Jennifer Wipper (949) 265-2498 San Diego, CA 92127 MP: 1169 B-4 2006-031 Bank of America - 4S Ranch deb Construction, Inc. (714) 632-6680 $ 17,478.00 Cesar 10511 Craftsman Way, Scott Shellhammer (714) 632-5721 San Diego, CA 92127 Dove Canyon Rd x Rancho Bernardo Rd. MP: 1169 F-3 2006-032 Via Cantebria - T&M Shea Homes (858) 526-6526 $ 70,000.00 Cesar West Bluff Drive x Via Cantebria Michelle Scolari (858) 320-0436 Encinitas, CA 92024 MP: 1147 F-6 2006-033 Levanto William Lyon Homes (858) 673-4959 $ 708,655.00 Lisa 4545 Waring Road, Tye Moody (858) 673-4859 Waring Road x Adobe Falls Drive San Diego, CA 92120 MP: 1250 A-7 2006-034 Cypress Greens - Carmel Mount'n Ranch Shea Homes (858) 526-6526 $ 788,422.00 Lisa Carmel Ridge Rd. x Highland Ranch Rd. Michelle Scolari (858) 320-0436 San Diego, CA 92128 MP: 1190 B-1 2006-035 Crosby Clubhouse Villas Ph. 5 & 6 John Laing Homes (949) 265-2482 $ 256,566.00 Cesar Bing Crosby Blvd x High Society Way Jennifer Wipper ext. 8746 (949) 265-2498 Rancho Santa Fe, CA 92127 MP: 1169 A-1 2006-036 Meadowlark Community Church Grant General Contructors (760) 438-7500 $ 131,560.00 Cesar Redwing Street x Rancho Santa Fe Road Jovy Parker (760) 438-3056 San Marcos, CA 92078 MP: 1128 A-4 Total for this pagel $ 2,585,153.00 Total for Year'2K6' $ 12,749,426.35 C-37 11/2212005 4:19 PM ATTACHMENT C Job List 6 JOB NAME DEV. I GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2005-001 La Costa Oaks North - RV Site Morrow Development Rancho Sante Rd. x Avenida Soledad Kevin Sullivan Carlsbad, CA 92009 Pg: 1128 A-7 2005-002 Crosby Villas Laing Luxury Bing Crosby Blvd. x Clambake Dr. Penny Causey Rancho Santa Fe. CA 92127 Pg: 1168J-1 2005-003 Boulder Ridge Drive Brookfield Homes Boulder Ridge Dr. x Melrose Dr. Greg McDonnell San Marcos, CA 92069 Pg: 1128 B-5 2005-004 Sycamore Estates Unit 1 Brookfield Homes Beeler Canyon x Pomerado Rd. Will Stout San Diego, CA 92145 Pg: 1210 E-2 2005-005 4S Ranch Tract 5229 4S Kelwood Ranch Bernardo Rd. x Dove Canyon Rd. Mike Rust San Diego, CA 92127 MP: 1169 F-3 2005-006 Siempre Viva Business Park Bldg.14 Lusardi Construction Siempre Viva Rd x La Media Rd. Keith Wyre San Diego, CA 92154 MP: 1351 G & H 4 2005-007 Otay Ranch Village 11 Brookfield Homes Discovery Falls x Birch Rd Ray Kirkpatrick Chula Vista, CA 91915 MP: 1331 G-1 2005-008 La Costa Greens N1.16 Morrow Development Dove Ln x Estrella Del Mar Kevin Sullivan Carlsbad, CA 92009 MP: 1127 F-5 2005-009 Eastlake Prkwy Phase 3 - PW & RW Brookfield Homes Eastlake Prkway x Olympic Prkway Greg McDonnell Chula Vista, CA 91915 MP: 1331 H-1 2005-010 Citricado Prkwy & Cranston Rd Sewer Centex Homes Citricado Prkwy x Cranston Rd Sewer Jim Hixon Escondido, CA 92025 Pg: 113D A-7 2005-011 Nantucket - Phase 1 Barratt American Homes Andrew Ave. x Sheridan Rd Richard Sanchez Encinitas, CA 92024 Pg: 1147 A-2 2005-012 Otay Ranch Town Center Bayley Construction Eastlake Prkway x Kestrell Falls Rd. Brandon Etnyre Chula Vista, CA 91915 MP: 1331 G-1 2005-013 Black Mountain Ranch William Lyon Homes Cam. Del Sur x New Park Terrace Tye Moody San Diego, CA 92127 MP: 1169 D-3 & E-3 2005-014 RVR Villas Southwind Construction Rancho Valencia Dr. x Calle Valencia John Gomez Fairbanks Ranch, CA 92067 MP: 1168 F-7 (760) 929-2701 $ 102,232.0 (760) 929-2705 (949) 265-2481 $ 579,457.00 (949) 265-2581 (858) 481-8500 $ 117,241.00 (858) 481-9375 (858) 481-8500 $ 737,924.00 (858) 481-9375 (858) 674-1300 $ 1,296,542.00 (858) 674-1301 (760) 744-3133 $ 200,447.60 (760) 744-9064 (619) 216-5877 $ 21,800.00 (619) 216-6055 (760) 929-2701 $ 405,190.00 (760) 929-2705 b (858) 481-8500 $ 488,621.00 (858) 481-9375 (760) 431-1211 $ 478,113.00 (760) 431-1593 (760) 431-0800 $ 291,109.00 (760)929-6432 (714) 540-8863 $ 3,077,600.00 (714)556-1485 (858) 673-4959 $ 222,115.00 (858)673-4959 (858) 713-7099 $ 59,660.00 (858) 713-7088 Total for this page $ 4M.50 ' 11/22/2005 4:19 PM ATTEJT C Job List JOB NAME DEV. / GENERAL CONTR. Ph: CONTRACT JOB # JOB ADDRESS OFFICE CONTACT Fax: AMOUNT 2005-015 Magnolia Estates Barratt American Homes (760) 431-0800 $ 10,000.00 EI Camino Real x Palomar Airport Rd. Richard Sanchez (760) 929-6432 Carlsbad, CA 92008 MP: 1127 F-2 2005.016 Vista Sewer Lateral Repair (T&M) Forecast Homes (909) 841-4900 $ 20,000.00 970 E. Bel Air Drive Shawn Owenings (951) 789-2886 Vista, CA 92084 MP: 1087 J-5 2005-017 Loker Business Park Lusardi Construction (760) 744-3133 $ 350,248.00 Loker Ave x Palomar Airport Rd. Clinton Fowler ext. (760) 744-9064 Carlsbad, CA 92008 MP: 1127 F-2 2005-018 Otay Ranch Village 11 R15 & R16 Brookfield Homes (858) 794-6188 $ 405,998.00 Hunte Prkway x Exploration Falls Dr. Adam Pevney (858) 793-2395 Chula Vista, CA 91915 MP: 1331 G-1 2005-019 Grand Del Mar Hotel Turner Construction Company (858) 320-4040 $ 1,446,325.00 5300 Del Mar National Driveway Lisa Taraboi (858) 558-4408 San Diego, CA 92130 MP: 188 E-7 2005-020 4S Commons Town Center KPRS Const. Services (714) 364-6668 $ 1,965,818.00 Ranch Bernardo Dr. x Dove Canyon Paul Buse (714) 672-0871 San Diego, CA MP: 1169 F-3 2005-021 Washington Hills Shea Homes (858) 526-6526 $ 1,289,920.00 EI Norte Prkway x Mission Ave. Michelle Scolari (858) 320-0436 Escondido, CA MP: 1110 C & D 2005-022 Hidden Trails - T&M William Lyon Homes (858) 673-4959 $ 82,087.00 Whitehawk Rd. x Reed St Jim Smith (858) 673-4959 Escondido, CA 92026 MP: 1130 F-1 2005-023 Sage Canyon Wermers Corporation (858) 623-4959 $ 394,129.00 San Elijo Rd. x Stephanie Street Mercedes Medina (858) 535-0171 San Marcos, CA 92078 PG: 1128 E-6 2005-024 Bernardo Center Webcor Builders (619) 544-2770 $ 538,001.00 West Bernardo Dr. x Via Del Campo Chip Olson (619) 544-2740 San Diego, CA 92127 MP: 1169 H-2 2005-025 La Costa Greens, N1.07 Morrow Development (760) 929-2701 $ 430,576.00 Poinsettia Ln. x Quartz Way Kevin Sullivan (760) 929-2705 Carlsbad, CA 92009 MP: 1127 G-4 2005-026 Villages of La Costa, N2.1 - N2.5 Morrow Development (760) 929-2701 $ 512,540.00 Corintia St. x Melrose Dr. Kevin Sullivan (760) 929-2705 Carlsbad, CA 92009 MP: 1128A-5 2005-027 Tremont Courts Concordia Communities (760) 804-1576 $ 392,293.00 Division St. x Euclid Ave. Gina Barbour (760) 804-1577 National City, CA 91950 MP: 1290 A-6 Total for this page $35.00 11/2212005 4:14 PM 'JOB NAME JOB # JOB ADDRESS ATTR id.HM xasNT C DEV. 1 GENERAL CONTR. OFFICE CONTACT Ph: Fax: Job List CONTRACT AMOUNT 2005-028 Villages of La Costa, N2.3 - N2.4 Warmington Homes (714) 434-4460 $ 357,146.00 Corintia St. x EI Fuerte Jim Skinner (714) 434-4367 Carlsbad, CA 92009 MP: 1128 A-5 2005-029 Villages of La Costa, N3.10 & N3.11 Warmington Homes (760) 479-9825 $ 9,200.00 Cam. Cereza x Corte Romero Kyle Isbell (760) 479-9828 Carlsbad, CA 92009 Pg: 1148 A-1 & B-1 2005-030 &M� COW-'(' Vr Warmington Homes (760) 479-9825 $ 1,914.00 Alicante Rd. x Lapis Rd. Rollie Roper (760) 479-9828 Carlsbad, CA 92009 Pg: 1127 G-5 2005-031 Otay Ranch Village 11 Storm Drain Brookfield Homes (619) 216-5877 $ 21,517.00 Discovery Falls x Hunte Prkwy Ray Kirkpatrick (619) 216-6055 Chula Vista, CA 91915 MP: 1331 G-2 2005-032 La Costa Ridge 2.3 - 2.4 North Shea Homes (858) 526-6526 $ 460,676.00 Corintia St. x EI Fuerte Michelle Scolari (858) 320-0436 Carlsbad, CA 92009 MP: 1128A-5 2005-033 EI Camino Real Widening - T&M Shea Homes (858) 526-6526 $ - EI Camino Real x Cannon Rd. Michelle Scolari (858) 320-0436 Carlsbad, CA 92009 MP: 1107 B-6 2005-034 San Elijo Hills V-1 Richmond American Homes (760) 891-3689 $ 608,498.00 San Elijo Rd. x Questhaven Rd. Joe Winkler (760) 471-9851 San Marcos, CA MP: 1128 F-6 2005-035 Otay Ranch Village 11 R11 & R12 Shea Homes (858) 526-6526 $ 361,709.00 Hunte Prkway x Exploration Falls Dr. Michelle Scolari (858) 320-0436 Chula Vista, CA 91915 MP: 1331 G-1 2005-036 Otay Ranch Village 11 R13 & R14 Shea Homes (858) 526-6526 $ 423,345.00 Hunte Prkway x Exploration Falls Dr. Michelle Scolari (858) 320-0436 Chula Vista, CA 91915 MP: 1331 G-1 Total for this pagel $ 2,244,005.00 Total for Year '2K5' $ 1 59 .50 ATTACHMENT C NU LINE Technologies, LLC January 13, 2016 Mr. Charles Eder, PE Department of Public Works City of Rancho Palos Verdes 30940 Hawthorne Blvd Rancho Palos Verdes, CA 90275 RE: 2015 Storm Drain Lining Project No. 002116 Subject: Answers to Additional Questions Mr. Eder, In response to your email dated 1/13/16, below are answers to the questions presented: • Nu -Line Technologies, LLC is a separate company from Burtech Pipeline, Inc. The Limited Liability Company is transferred from Burtech Pipeline, Inc. Burtech Pipeline, Inc's License, 718202, is the original license. Dominic Burtech, who holds that license is the holder of the Nu -Line license (997520) as well. The experience and financials will all funnel to Dominic Burtech, whether we are talking about Burtech Pipeline, Inc. or Nu -Line Technologies, LLC. • Burtech Pipeline has not transferred all of its' assets to Nu -Line Technologies, LLC, as Burtech Pipeline, Inc. also has current projects that do not involve Nu -Line Technologies, LLC. Burtech Pipeline assets, i.e. equipment, are used by Burtech Pipeline, Inc. and not Nu - Line Technologies, LLC. • Nu -Line Technologies has 4 office staff and approximately 15 field employees. Burtech Pipeline, Inc. has 12 office staff and approximately 110 field employees. There are times when Burtech Pipeline, Inc. office staff will train or assist Nu -Line Technologies, LLC. There are some field personnel that work for both companies. • Yes. • When we perform a job under Nu -Line Technologies, LLC, all income and expenses are tracked under their set of accounting books. The same applies to Burtech Pipeline, Inc. There are some projects where Nu -Line Technologies, LLC is the general and Burtech Pipeline, Inc. performs work as a subcontractor to Nu -Line Technologies, LLC and vice Nu -Line Technologies, LLC 760/634.5153Tel 102 Second Street, Suite B 760/634.6780 Fax Encinitas, CA 92024 C-41 ATTACHMENT C Mr. Charles Eder, PE 2015 Storm Drain Lining Project No. 002116 Page 2 versa. For this reason, we keep our books separate for accuracy of job cost accounting, payroll, taxes and insurance. • Nu -Line Technologies, LLC is currently working on a project with the County of Los Angeles, Department of Public Works (Project 11), which includes various locations in Rancho Palos Verdes. The reason Burtech Pipeline, Inc. opened Nu -Line Technologies, LLC is due to the lining rehabilitation aspect of construction. Prior to Nu -Line, Burtech Pipeline would perform lining and open cut projects. The Burtechs, along with Frank Durazo and Buddy Aquino started Nu - Line as a Partnership due to the many years of experience in the trenchless CIPP rehabilitation industry that Frank and Buddy brought to the table. All of our Insurance, Bonding and Banking, although separated, are tied together because of the Burtechs. Please let me know if you require additional information. Re - 1 C-42 �I ATTACHMENT D PROPOSAL CITY OF RANCHO PALOS VERDES 2015 STORM DRAIN LINING PROJECT PROJECT No. 002116 TO THE DIRECTOR OF PUBLIC WORKS, CITY OF RANCHO PALOS VERDES: The undersigned, as bidder, declares that: (1) this proposal is made without collusion with any other person, firm or corporation, and that the only persons or parties interested as principals are those named herein; (2) bidder has carefully examined the project plans, specifications, instructions to bidders, proposal, notice to contractors and all other information furnished therefore and the site of the proposed work; (3) bidder has investigated and is satisfied as to the conditions to be encountered, the character, quality and quantities of work to be performed and materials to be furnished. Furthermore, bidder agrees that submission of this proposal shall be conclusive evidence that such examination and investigation have been made and agrees, in the event. this contract be awarded to bidder, to enter into a contract with the CITY OF RANCHO PALOS VERDES, to perform said proposed work in accordance with the plans, if any, and the terms of the specifications, in the time and manner therein j prescribed, and to furnish or provide all materials, labor, tools, equipment, apparatus and other means necessary so to do, except such thereof as may otherwise be furnished or provided under the terms of said specifications, for the following stated unit prices or lump -sum price as submitted on the Schedule attached hereto: The bidder shall submit as part of this proposal a completed copy of the Contractor's Industrial Safety Record. 'r Accompanying this proposal i(Insert) "$J`Q�%."cash," "Cashier's Check," "certified check," or "Bid Bond," as the case may be) in fhe amount equal to at least f ten percent (10%) of the total aggregate bid price hereof based on the quantities shown and the unit I, prices quoted in the Bid Sheets. i The undersigned further agrees that should he/she be awarded the contract on the basis hereof and thereafter, defaults in executing the required contract, with necessary bonds and documents, within ten (10) days, not including Sundays and legal holidays, after having received notice that the contract has been awarded and is ready for signature, the proceeds of the security accompanying his bid shall ` 1 become the property of the CITY OF RANCHO PALOS VERDES and this proposal and the acceptance thereof may be considered null and void. The undersigned certifies to have a minimum of five (5) consecutive years of current experience in the type of Work related to this Project and that this experience is in actual operation of the firm with permanent employees performing a part of the Work as distinct from a firm operating entirely by subcontracting all phases of the Work. The undersigned also certifies to be properly licensed by the State as a contractor to perform this type of Work and further certifies to have been so licensed for the five (5) years immediately preceding the date of receipt of Bids. The undersigned ppos sees California Contractor's License Number q q'j52D , Class_, which expires on C7 12-0a, Signature(s) of bidder: If an individual, so state. If a firm or co -pa individual co-partners composing the firm///,f a names of president, secretary, treasurer, qMd mai the corporate seal are required for corporations. 10 ✓state the firm name and give the names of all rporation, state legal name of corporation, also er thereof. Two notarized officer's signatures and D-1 ATTACHMENT D Legal Business Name: Address; IST, So - Lt�L t�JlT fS1, CrI 42094 Telephone: (z5p- (0 • �J3 Contact: 12ft(\ Z- ^-DJ"2-0 , Lae= t 6 -fl /' `tel& -g& C . Proposals which do not show the number and date of the Bidder's License under the provisions of Chapter 9 of Division 3 of the Business & Professional Code will be rejected. To be submitted with each bid to contractf for City of Rancho Palos Verdes 2015 STORM DRAIN LINING PROJECT Bid Date This information must include all construction work undertaken in the State of California by the bidder and partnership joint venture or corporation that any principal of the bidder participated in as a principal Jj or owner for the last five calendar years and the current calendar year prior to the date of bid submittal. Separate information shall be submitted for each particular partnership, joint venture, corporate or individual bidder. The bidder may attach any additional information or explanation of data which bidder would like to be taken into consideration in evaluating the safety record. An explanation must be attached of the circumstances surrounding any and all fatalities. 11 D-2 ATTACHMENT D CITY OF RANCHO PALOS VERDES BID SHEETS FOR 2015 STORM DRAIN LINING PROJECT PROJECT No. 002116 Bidder's Name: N a— LL- In ✓1 D To the Honorable Mayor and Members of the City Council: In compliance with the Notice Inviting Bids, the undersigned hereby agrees to enter into the Contract to furnish all labor, materials, equipment and supplies for the 2015 Storm Drain Lining Project in accordance with the Specifications and Plan for demolition, construction and installation in the Contract Documents, as that term is defined in the Standard Specifications, to the satisfaction and under the direction of the Director of Public Works, at the following prices. LUMP SUM ITEMS SHALL INCLUDE PROVIDING AND INSTALLATION OF ALL COMPONENTS STIPULATED WITHIN THE CONTRACT DOCUMENTS AND NECESSARY INCIDENTALS TO FACILITATE PROVIDING SAID COMPONENTS. SURVEY, GRADING, AND BMPS SHALL BE CONSIDERED INCLUDED IN THE INDIVIDUAL BID ITEMS. NO ADDITIONAL PAYMENTS WILL BE MADE. The quantities reflected on the plans and in the bid -sheets are representative of the amount of work for each item on the project, but are not final quantities to be used for computing payment. Payment will be based on the measurement of actual work completed. The contractor must notify in writing to the project manager of all discrepancies between actual bid quantities and those shown in the bid document prior to commencement of work in any area of the project. 12 D-3 ATTACHMENT D BID SCHEDULE ITEM NO. DESCRIPTION ESTIMATED QUANTITY UNIT PRICE UNIT EXTENDED AMOUNT 1 MOBILIZATION — (Not more than 5%) 1 LS $ 21 ti5)0, $ jpp' 2 INSTALL CIPP LINER 12" 70 LF $ g25,L�0 $ b� I b0.00 3 INSTALL CIPP LINER 18" 1731 LF $ qto b0 $ Ro(o,17k W 5 INSTALL CIPP LINER 24" 918 LF $ 12 )'Oo $ 1 )01 ((-0.00 6 INSTALL CIPP LINER 30" 678 LF $ M6,60 $ 132�21Qm 7 INSTALL CIPP LINER 36" 1474 LF $ 22C),OD $32,4128D.OD 8 INSTALL LINER (MINOR CONCRETE PAVING OR CIPP 54" 378 LF $ �3 50 $-31,563,m 9 TRAFFIC CONTROL PLAN 1 LS $ 1G, $ 16, OX, 10 ARTERIAL TRAFFIC CONTROL 10 DAY $ �,�2�.�' $1-7,260-°D 11 GROUTING 10 CY $ t��.00 $ A 6w,co TOTAL BASE BID PRICE IN DIGITS: $ U� TOTAL BASE BID PRICE IN WORDS: d -fib E I 6-"T (.VYIct- I AcW M I �JG Y The contract shall be awarded to the lowest responsible bidder based on the TOTAL BASE BID. Note: Some items may be adjusted or deleted. Any changes to the quantities for these items shall not classify as a substantial change as stipulated in Section 3-2.2.1 of the Standard Specifications. Therefore, regardless of total actual amount (percentage) compared to estimated quantities, the unit prices provided above by the Bidder shall be applied to the final quantity when payment is calculated for these items. No adjustment in the unit prices will be allowed. The City reserves the right to not use any of the estimated quantities, and if this right is exercised, the Contractor will not be entitled to any additional compensation. Cost of all export of material shall be included in the above unit costs; no additional compensation will be granted for such expenses. NOTE 1: Available video inspections of the some of the subject storm drain alignments are included with this bid package and are intended to be used for a general reference only. The videos provided with these Plans and Specifications for reflect the condition of the Storm Drain as far back as 2014. Understanding this, the condition of some of the storm drains may have changed in the time elapsed since the videos were made. NOTE 2: Pipes requiring lining with a diameter of 42 -inches or larger may be lined by either CIPP or Minor Concrete Paving methods in accordance with these Plans and Specifications. Payment for lining of these pipes will be based on unit prices provided in the bid, regardless of method. Pipes requiring lining with diameter less than 42 inches shall be lined by CIPP method only. Addendum No. 1 (2015 Storm Drain Lining Project) 13R ATTACHMENT D BID SCHEDULE ITEM NO. DESCRIPTION ESTIMATED QUANTITY UNIT PRICE UNIT TENDED AMOUNT 1 MOBILIZATION — (Not more than 5%) 1 LS $ $ 2 INSTALL C! P LINER 12" 70 LF $ $ 3 INSTALL CIPP LINER 18" 1731 LF $ $ 5 INSTALL CIPP LINER �` 24" 918 LF $ $ 6 INSTALL CIPP LINER \301, 678 F $ $ 7 INSTALL CIPP LINER 36 1474 LF $ $ 8 INSTALL LINER (MINOR CONCRETE PAVING OR CIPP)` ` 54" 37 LF $ $ TOTAL BASE BID PRICE IN DIGITS: $ TOTAL BASE BID PRICE IN WORDS: The contract shall be awarded to the lowest responsible bidder based on the TOTAL BASE BID. Note: Some items may be adjusted or deleted. Any changes to the,quantities for these items shall not classify as a substantial change as/stipulated in Section 3-2.2.1\\of the Standard Specifications. Therefore, regardless of total actual//amount (percentage) compared Ftp estimated quantities, the unit prices provided above by the Bidder/shall be applied to the final quantity When payment is calculated for these items. No adjustment in the/6hit prices will be allowed. The City reslerves the right to not use any l of the estimated quantities, and if tks right is exercised, the Contractor will nol,,be entitled to any additional compensation. Cost of all exp;of material shall be included in the above, unit costs; no additional compensation will be granted,for such expenses. NOTE 1: Available video inspections of the some of the subject storm drain ali nments are included with this bid package an /are intended to be used for a general reference only. The ideos provided with these Plans and Spe fications for 'reflect the condition of the Storm Drain as far back as 2014. Understanding this, t e condition of some of the storm drains may have changed in the time elapsed since the videos wee made. NOTE 2: P,i6es requiring lining with a diameter of 42 -inches or larger may be lined by ither CIPP or Minor Conctete Paving methods in accordance with these Plans .and Specifications. P ment for j lining of these pipes will be based on unit prices provided in the bid, regardless of method. Pipes equiring lining with diameter less than 42 inches shall be lined by CIPP method only. 13 D-5 ATTACHMENT D INFORMATION REQUIRED OF BIDDER Fill out all of the following information. Attach additional sheets if necessary. . , I I _ (1) Bidder's name: 1J LA - (2) If the Bidder's name is a fictitious name, who or what is the full name of the registered owner? If the Bidder's name is not a fictitious name, write "N/A" in the response to this question. If you are doing business under a fictitious name, provide a copy of the filed valid Fictitious Business Name Statement. 'LlMlNLG :3--8UeTF_Gt1 (3) Business address: _I ono, 8E_7LCn D S"r ,SL)aL 6 FLJC (ti] i -nes Cwt q2_02-4- (4) Telephone: (o34 •6153 Facsimile::] IoD • (o344 - 6:i780 (5) Type of firm - Individual, Partnership, LLC or Corporation: LLC. (6) Corporation organized under the laws of the state of: 04L- -IGLU-8-1114 (7) California State Contractor's License Number and Class: 9q-76-2_0 (8) DIR Contractor Registration Number: 1000DO35DE) (9) List the name and title of the person(s) who inspected the site of the proposed Work for your firm: (10) Number of years' experience the company has as a contractor in construction work: (11) List the names, titles, addresses and telephone numbers of all individuals, firm members, partners, joint ventures, and company or corporate officers having a principal interest in this Proposal: Jam. L*4 l n 1 L J - 6L)Z >`") 4�- -�rn�� 102 ck ST,mss -Z (aD • 34 , 2..S22_ • - v tbz t � ru 10 2 b U.on sl, Qj c, 0 rM SC coq -7&0-(0:34-2822- IC) 7%0•fo34.2822!0 2 SeLwD Sr E:lJn t i S,cm `7(00. 1034.24322 List at least three similar projects completed as of recent date: (10) NOTE: Upon request of the CITY, the bidder shall furnish evidence showing a notarized financial -f statement, financial data, construction experience, or other information. 14 D-6 Contract Amount Class of Work Date Completed Name, Address of Owner, & Telephone No. Z0f-72DP. 60 �M, on e 2U t `� V T � Gf+ 92(06 �cl c✓ �9 33�i r -7 2015 e o " S o i r, mo f �� "1 ©• 7 5� • CA `2a�9 ll03 r�'73. °O r P Ia_c�.. 1 l I b� ZDI 5 S.D.,c,� -12.b tf7��s", io 8�.�8 • 0058 (10) NOTE: Upon request of the CITY, the bidder shall furnish evidence showing a notarized financial -f statement, financial data, construction experience, or other information. 14 D-6 ATTACHMENT D (11) "Bidder shall be properly licensed at the time of bid submission or the bid shall be considered non-responsive and shall be rejected." 15 D-7 ATTACHMENT D REFERENCES For all public agency projects in excess of $300,000 you are currently working on or have worked on in the past five (5) years, provide the following information: Project 1 Name/ Number 2-0 t4 �Ie�lI r ct aJb� IIT n WO --PH-6S UV- I Proje scription C1 PP Lt V Guts OP 2-11-754 LF vr ge.4YER . n rcpa i r, Via --y k o In 676P s, 425 rr9rl bc.n ck� VIDEU Approximate Construction Dates From: (al& !4- To: -3/19//s Agency Name: OTY Of �ftnl I�IEZso Contact Person: M*gdprM Li pr& H-rr'r , Pe. Telephone: (r,[9 •538, 5r�2 Address: 625 13 -BT� ► -75,'SA-h1-D1Ef,� CO Ref DI Original Contract Amount: $ �lo�o� 1a9. °O Final Contract Amount: $ (00/1031, 8 2. If final amount is different from original amount, please explain (change orders, extra work, etc.) CN�tN� [�i2s Did you file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 2 Name/ Numbersftt. ,) Ln l Opo ISTi --Oq -1 b Project Descri tion 1P►° Lrnin9 o -F 13,SQ4 L. T- y't �`►� l'L'�, !g� 2l„ �! �( "31%4&W, S.E ,� Approximate Construction Dates From: g 3 To: CrJi0-ie.E/JT ISSS P . Agency Name: , t'fY O'r ��-IJ �-w- iSTP-f}ti1b Contact Person:Y`'► ► c-� ae.� �'iaf(�U15� I�. E • Telephone; Q� �� 3 • (0 37 Address: 324bb paseb A -J, -i o � sa4n ") UzLn b, C -A ILLS Original Contract Amount: $ 1 l0-7*1 Oki, bb 16 Final Contract Amount: $ L3301-7-7 - CXR we* ATTACHMENT D If final amount is different from original amount, please explain (change orders, extra work, etc.) r rufs� C�-*,tee S Did you file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yes o If you answered yes to either of the above two questions, please explain and indicate outcome of claims. rl Project 3 Name/ Number 2-01 eLi QQ-- I 1 ? ProjectDescri tionC � Lin, 1''' c 1,13,e42- L� C. 4 �0IV 1— 'S7r�4-MP1V1 Approximate Construction Dates From: 9�/O 1 To: I I- 1 - Agency Name: LO.� (E5 0J Al ILS Contact Person: OU Telephone: �Zfc • X58 ' 2l Address: '?CD al TH 4j1,ewt ani Ave. iA- ( krt,y►L kreL, G* q oo i 4 Original Contract Amount: $ 435 I Q5 , 45� Final Contract Amount: $X35, 233, °D If final amount is different from original amount, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Circle one: Yes OqD Did the Agency file any claims against you? Circle one: Yes If you answered yes to either of the above two questions, please explain and indicate outcome of claims. 17 W ATTACHMENT D Project 4 Name/ Number i"l pEjl h,b11 J 1 E 2-- Project Description C t pp L v) v.9 0-C 131 SDO LT- OAF 8" dl Q.Meler 5AN iTArzY Beak q 300 —w vA p, 4s, --300 e•� i L ftAdid.L o , 300 4' i p � e" Al -IIA-n--r ori Approximate Construction Dates From: (NIQI1-3 To: Cu2�Eti1T Agency Name: �) Contact Person: �11lC Ert9c-� , ���• Telephone: (old • (5-33- 51q / Address: 625 6 -zj2ecr , MS40OA-� SAj I�&o CA (0 -101 r� Original Contract Amount: $ ?,n-7 q. —50 Final Contract Amount: $ SD(=,, 649 ,08 If final amount is different from original amount, please explain (change orders, extra work, etc.) 0-fi t NJL-51F, brAe-IrS -� Did you file any claims against the Agency? Circle one: . Yes No Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 5 Name/ Number A2 w19--r� $ SEZ)Jew Gx out -T78 P 'ect Descriptiono-1 1--l'o%V1 o� 11,004 LT' o -t V Mt1 vi-4v"(SEUXR 00-ntl6Le c,1�a-b., TAP �-rs. 1�--rpt Lr h l vtg � Inas s t,�w��► vt Approximate Construction Dates From: ' l < 1 ►`71 I ts To: ,, Lk-r%rCn1" Agency Name: 0r Contact Person: Ayail M i 1� i 1�. Telephone: 6:�'lq • Address: -52e)--6 CS7YZ.4:-rE7 , M S 1?o81q { �' lorh3 CPI Q2101 Original Contract Amount: $ 4 toi l �4 , 00 Final Contract Amount: $410, 114.Ob If final amount is different from original amount, please explain (change orders, extra work, etc.) 18 D-10 ATTACHMENT D Did you file any claims against the Agency? Circle one: Yes No r I Did the Agency file any claims against you? Circle one: Yes No If you answered yes to either of the above two questions, please explain and indicate outcome of claims. Project 6 Name/ Number Cf --, Q rTIAS 2-0i4—LS l 5 A4 -✓1 n LcoJ S4PrwC1DV'0_L'r) -tr+,nLYN C L - o-� '2,4-34 'F o -C '' Project Descnption _ I�j° Divi �- �� � 50 -Sro,eN 1�)rH Ile 5, V19 Approximate Construction Dates From: 16 11 To: 0, LweP-GN T Agency Name: 0r 15jC1til,f�15 Contact Person: lc-�JS Telephone: -7620 - (233,26o(.)D Address: S.telCprrJ E�1Grr.l i TSS fO i4 202-4 Original Contract Amount: $ 62-(�1160L' 00 Final Contract Amount: $ 1-�q ,_3%D. vU If final amount is different from poriginal amount, please explain (change orders, extra work, etc.) -S _.J r Did you file any claims against the Agency? Circle one: Yes No Did the Agency file any claims against you? Circle one: Yeso If you answered yes to either of the above two questions, please explain and indicate outcome of claims. 19 D-11 on 1600 PACIFIC HIGHWAYi SUITE 760 - P.O. BOX 121750, SAN DIEGO; CA 92112-1750 (614)237-0502 Return' Mal Ina Address Name: Ross J, Schwartz, Esq. Address: 101 K Broadway, Suite 810 San Diego CA 92101 Clty ,tote ZIP Code ATTACHMENT D x Ernest J. Dronenburg, Jr, County of San Diego Recorder/County Clerk mmadarcc.com IN PERS® FICTITIOUS BUSINESS NAME STATEMENT 2014-028893 OCT -31-2014 PILED IJrnest J, Dronenburg, Jr. SAN DIEGO COUNTY CLERIC FEES: 42.00 EXPIRES: OCT -31-2019 DEPUTY: JMURO TY F•IU G ND FILING EEE [Chock onl e Original- $42,00 (FOR ORIGINAL FILING WITH ONE BUSINESS NAME ON STATEMENT) wool= n Renewal -$42:00 (NO CHANGES IN THE FACTS FROM ORIGINAL FILING) EOFIDENTIFICATION PROW0 01 ( I REG (�AuENT EACH ADDITIONAL COPY IS $2,00'AND EACH ADDITIONAL CERTIFIED COPY IS 93;00 �RIVsa'S LICENSE (I MILITARY 10 (J a1 $5.00- EACH ADDITIONAL OWNER IN EXCESS OF ONE OWNER /( I PASSPORT () OTHER $5,00- EACH ADDITIONAL BUSINESS NAM It FILED ON SAME STATEMENT, DOING BUSINESS AT SAME LOCATION, (1) FICTITIOUS BUSINESS NAMEIS)I PLEASE NOTEI YOU WILL BE REQUIRED TO PRESENT A VAUD PHOTO ID To FILI! THIS STATEMENT IN PERSON. NU LINE TECHNOLOGIES, LLC FMINr FMTITIOUS BUSINESS NAME(S) (z) LOCATED AT: 102 SECOND STREET /. ENCINITAS /_// CA SAN DIEGO /92024_ �_ STREETADOREas OF PMNCPPMMCE of OUSIAUS(P. o. BOXNOTACGEPTEO) CITY STATE COUNTY 21f Godo MAILING ADDRESS; (3) THIS BUSINESS IS -REGISTERED SYTHE FOLLOWING* NU LINE' TECHNOLOOIES, LLC - full Name/Corp/LLC 102 SECOND -STREET ENCINITAS CA 92024 sldence Address (P.O, Box hot accepted) - CRY State ZIP Cade A CALIFORNIA LIMITED' LIABILITY COMPANY IT Corporation or LLC — Print Steta of Incorporation/OrsanIzAtlon Full Name/Corp/LLC Residence Address P. O. Box not accepted) qty State If Corporation or U.C— Print State orinoorporatlon/OrSanlxation (4) THIS BUSINESS IS CONDUCTED BY. (Check one) ❑ A. An Individual E. Joint Venture r I'. A Llmitod Liability Company B, A Married Couple F. A Corporation J. Limited Liability partnership C. A General Partnership G. A Trust K,An Unincorporated Assocletlon-Other than a partnership D. A Limited Partnershlp H.'Co-Partners L, State or Local Registered Domestic Partners (5) THE FIRST DAY OP 0USINES$ WAS; 03 1.'26 r 2014 OR IF NOT STARTED YET, CHECK HERE ❑NOT APPLICABLE I declare that all Information In this statement Is true and Dorreet,•(A registrant who declares as true any material matter pursuant to Section 1791.3 of the Business and Professions codethat the registrant knows to be false Is guilty ofa misdemeanor punishable by a fine not -to exceed one thousand dollars ($1,000).) (6) REGISTRANT NAME NU LINE TECHNOLOGIES, LLC TITLE MEMBER . (Pdnl{ ICorP/llc PnnlilUa) JULIE BU.RTECH REGISTRANTSIGiNATUREdOr' IF CORP OR LLC, NAME THIS STATEMENT WAS FF hROV10ED WMiBRBCOROER/COUNTYCLERk'OPSANDIEGOCOUNTY ASINDICATED BYTHITILESTAMP ABOVE. NOT ICC: INACCORDAN .WI UOVIVIS16N14)OfS%TION17920,AFICTIIOUSNAME STATEMENT GENERALLY EXPIRES ATTHE END OFFIVE YEARS IS) FROM THE DATE ONWHICH ITWAS FILED INTHE OFFICIOf THE COUNTY CLCRK, BX , AS IN SUBDIVISION (b) OF BECKON 17910, WHERE ITEXPIRES 40 DAYS AFTER ANY CHANGE IN THC PAM SET FORTH IN THE STATBMCNT.PURSUANTTO SECTION 17015 OTHER THAN A CHANGE IN THE RESIDENCE ADDRESS OFA 11E01091106WNER. A NEW FICTITIOUS BUSINESS NAME STATEMENT MUST Ba. FILED DEFORETHE EXPIRATION. °ILING OF THIS STATEMENT DOES NOT OF ITSELF AUT,rI$ RII THE ON IN THIS STATE OFA FICTITIOUS BUSINESS NAME IN VIOMTION OF THE RIG? ITS OP-ANOT11in UNDER FBDZRAL,ETATS, OR COMMON LAW ?CTION 14411 LT SGB., BUSINESS AND PROF059IONS COI)SI. JMITTING THE STATEMENT IN PERSON, THB misTRANYOR AGENT WILL 8E ASKED TO PRESENT A VALID PHOTO ID FOR ALL THe FICTITIOUS IIUSINESS NAME FILINGS, IF SUBMITTING THE STATEMENT BY MAIL, THEREGISTRANT Oft AG gTMVSTATTACHACOPYOfAVAUD2tjOT0IDORANOTARIZEDC RTIFICATEOEACKNOWLEDGEMENT, CC231P (Rev. 2/14/2014) 0' "' 9.j PA a O,dr D-12 ATTACHMENT D NU)))LINE L ! achlhiopicts, L( - .C - RESOLUTION OF NU LINE TECHNOLOGIES, LLC RESOLVED BY THE MEMBERS/PARTNERS of Nu -Line Technoloizies, LLC. a California Corporation as follows: Appointment of Dominic J. Burtech Jr. as the official signatories for: Bidding Purposes - Contract Award Change Orders - Dispute Resolutions Project Completion Documents The resolution was adopted by the MEMBERS/PARTNERS of the LLC on. this 21 It day of July, 2015 at 102 Second Street SUITE B, Encinitas, CA 92024. CERTIFICATE OF MEMBERS/PARTNERS Dominic J. Bur(e& Jr Member/Partner l rant J. Durazo, Member/Pariner Salvador SAA)eJr., ember/Partner D-13 ATTACHMENT D C01f©rnaa Ac owledg ent Form A notary public or other officer completing This certificate verifies only the identity of the individual who signed the documeltt to which this certificate is attached, and not the truthfulness, accuracy, or validity Of that document. State of Cawo is r ss. County of ,'.,�.z�� v On % S� before me, Arthur �arquilila, Notary Public , (h s inse name,and title of the afficer) personally appearec �r1l,n Ic,,'% 4t wee'?lt'IG.z IT who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) i are ubscribed r to the within instrument and acknowledged to me that he/sh ey xecuted the same in his/her heir u- thorized capacity(ies), and that by his/h eir signatures) on e instrument the person(s), or the entity upon behalf of which the person(s) acte cuted the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Seal ARTHUR P. ARQUILLA { ':. Commission No. 2057358 0 NOTARY PUBLIC -CALIFORNIA �+ a''.. SAN DIEGO COUNTY �vC©mmission Expires Jamiaty T, 20713 -- Optional Information To help prevent fraud, it is rccummcodcd dint you prnvidc infaiTnation about Uic aunchcd document below. .1"I'li s is Lig( required under Califonutt Slalc noiar/ public Into."'" Document `Title: Notes # of Pages: FOA JA r,nid— :, "'i., 1— In, 'RM Ii;;_)ur D-14 ATTACHMENT D STATEMENT ACKNOWLEDGING PENAL AND CIVIL PENALTIES CONCERNING THE CONTRACTORS' LICENSING LAWS [Business & Professions Code 7028.15] [Public Contract Code 20103.5] I, the undersigned, certify that I am aware of the following provisions of California law and that I, or the entity on whose behalf this certification is given, hold a currently valid California contractor's license as set forth below: Business & Professions Code 7028.95: (a) It is a misdemeanor for any person to submit a bid to a public agency in order to engage in the business or act in the capacity of a contractor within this state without having a license therefore, except in any of the following cases: (1) The person is particularly exempted from this chapter. (2) The bid is submitted on a state project governed by Section 10164 of the Public Contract Code or on any local agency project governed by Section 20104 [now ` 20103.5] of the Public Contract Code. (b) If a person has been previously convicted of the offense described in this section, the court shall impose a fine of 20 percent of the price of the contract under which the unlicensed person performed contracting work, or four thousand five hundred dollars ($4,500), whichever is greater, or imprisonment in the county jail for not less than 10 days nor more than six months, or both. In the event the person performing the contracting work has agreed to furnish materials and labor on an hourly basis, "the price of the contract' for the purposes of this subdivision means the aggregate sum of the cost of materials and labor furnished and the cost of completing the work to be performed. (c) This section shall not apply to a joint venture license, as required by Section 7029.1. However, at the time of making a bid as a joint venture, each person submitting the bid shall be subject to this section with respect to his or her individual licensure. (d) This section shall not affect the right or ability of a licensed architect, land surveyor, or registered professional engineer to form joint ventures with licensed contractor to render iservices within the scope of their respective practices. (e) Unless one of the foregoing exceptions applies, a bid submitted to a public agency by a contractor who is not licensed in accordance with this chapter shall be considered non- responsive and shall be rejected by the public agency. Unless one of the foregoing exceptions applies, a local public agency shall, before awarding a contract or issuing a purchase order, verify that the contractor was properly licensed when the contractor submitted the bid. Notwithstanding any other provision of law, unless one of the foregoing exceptions applies, the registrar may issue, a citation to any public officer or employee of a public entity who knowingly awards a contract or issues a purchase order to a contractor who is not licensed pursuant to this chapter. The amount of civil penalties, appeal, and ' finality of such citations shall be subject to Sections 7028.7 to 7028.13 inclusive. Any contract awarded to, or any purchase order issued to, a contractor who is not licensed --I 20 D-15 r ATTACHMENT D pursuant to this chapter is void. (f) Any compliance or noncompliance with subdivision (e) of this section, as added by Chapter 863 of the Statutes of 1989, shall not invalidate any contract or bid awarded by a public agency during which time that subdivision was in effect. j(g) A public employee or officer shall not be subject to a citation pursuant to this section if the public employee, officer, or employing agency made an inquiry to the board for the purposes of verifying the license status of any person or contractor and the board failed to respond to the inquiry within three business days. For purposes of this section, a telephone response by the board shall be deemed sufficient. Public Contract Code 20103.5: In all contracts subject to this part where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with the laws of this state. However, at the time the contract is awarded, the contractor shall be properly licensed in accordance with the laws of this state. The first payment for work or material under any contract shall not be made unless and until the Registrar of Contractors verifies to the agency that the records of the Contractor's State License Board indicate that the contractor was properly licensed at the time the contract was awarded. Any bidder or contractor not so licensed shall be subject to all legal penalties imposed by law including, but not limited to, any appropriate disciplinary action by the Contractor's State License Board. The agency shall include a statement to that effect in the standard form of prequalification questionnaire and financial statement. Failure of the bidder to obtain proper and adequate licensing for an award of a contract shall constitute a failure to execute the contract and shall result in the forfeiture of the security of the bidder. License No.: q( -i 7 52-0 Class: A. Expiration Date: 1c) i I (4n/ Date: 11-1 t (pl 16 Signature: 21 D-16 ATTACHMENT D RESUME Attach to this Bid the experience resume of the person who will be designated as General Construction Superintendent or on-site Construction Manager for the Contractor. 22 D-17 NU0LINE Technclogle% LLC Education • Azusa High School, Azusa, CA Training • Confined Space training Boom certification • Forklift certification • CPR training • Alcohol and Drug training. ATTACHMENT D Jorge Beltran Superintendent Mr. Beltran has over twenty years' experience in the construction, trenchless technology and pipeline rehabilitation industry with a Career progression from a Laborer to Foreman up to a Superintendent. His expertise with the large diameter CIPP and Rib Loc sewer/storm drain lining include extensive knowledge in sewer bypass operations. Nu -Line Technologies Operations Manager • Leads scheduling, managing and organization of Nu -Line Technologies, LLC field activities. • Provides technical and project approach guidance to Nu -Line Technologies field personnel. • Communicates with owner's field representatives, site engineers, inspectors and subcontractor supervisors on project - related matters. • Assist GM and Estimator with Project Estimates for bids • Analyze and solve all field -related problems (Equipment, Installation, Personnel, Etc.). • Develop and implement sewer bypass systems. Train field employees with proper use. • Identifies, initiates and controls project revisions and field changes. • Reviews project costs and assists in developing project budgets. RePipe-California Superintendent • Responsible for management of crews for the installation of Both CIPP and RibLoc Pipe Rehabilitation Systems. • Reports to the Operations and Project Managers with regard to Daily construction progress and activities. • Schedules and manages weekly construction work and man- hours, and reports daily • Construction hours and progress from lining Foremen and Cutters, to Operations and Accounting. • Oversee daily bypass and traffic control (set-up, operation, tear -down) • Provides field technical support, problem solving and Troubleshooting. • Interaction and contact with City Engineers and Inspectors. • Works in conjunction with Project Estimator on job walks prior To project bid. ATTACHMENT D Preussag Pipe Rehabilitation, Inc. Superintendent Management of crews for the installation of the RibLoc Pipe Rehabilitation System. • Reported construction progress and activities. • Managed weekly schedules. • Provides field technical support, problem solving and Troubleshooting. • Worked directly with project managers G.B. Cooke Pipeline Rehabilitation Installation Supervisor • Responsibility for the supervision and scheduling of crews. • Schedule projects, complete daily reports, complete employee time sheets, run projects and complete yearly employee evaluations. Insituform, Southwest Installation Supervisor Responsibility for the supervision and scheduling of crews. Schedule projects, complete daily reports, complete employee time sheets, run projects and complete yearly employee evaluations. Began employment as a Laborer and was promoted to a Supervisor. D-19 ATTAcKm E -N -T DESIGNATION OF SUBCONTRACTORS [Public Contract Code 4104] List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half percent (0.5%) of the Contractor's total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor's total Bid or $10,000, whichever is greater. If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors. * The percentage of the total bid shall represent the "portion of the work" for the purposes of Public Contract Code Section 4104(b). 23 D-20 California Name under which Contractor's California DIR Type of Work Percentage of Subcontractor is License Contractor Address & Phone Number (e.g. Electrical) Total Bid (e.g., Licensed Number(s) & Registration 10%). — Class(es) Number u -n wb�ICS Sey, rtd 6, In6 96373 - 1000020D31 13 r 1 Wh �c gOboS Ci1�A1�1 (.45010 CA 0.55 A562 4 - 201 - 403(- �yu�n�r f r_ �LLnL 525824 l bOCO IA:5 5305 k �aQ ter. 1+girt-ntsErron��� n � fay► ° s�# rt �J Q3 °lo 'l +tNola�ES C-�2-. -714 5 a•-738� 2N i�(71rn . * The percentage of the total bid shall represent the "portion of the work" for the purposes of Public Contract Code Section 4104(b). 23 D-20 AT C- HMENT D �, l �CONTRACTOR'S INDUSTRIAL SAFETY RECORD Bidder's Name / V (� - I� Lf/lQ� I �'_GYi rl 01 QQ I4—LLL The above information was compiled from the records that are available to me at this time and I declare under penalty of perjury that the information is true and accurate within the limitations of those records. Signature: Signature: k Title: Title:`-Tt�` Date: Date: 1241('116 / 24 D-21 Current Year Of 2014 2013 2012 2011 2010 Total Record Number of contracts �3 NIA NIA w 1"'f16 Total dollar amount of contracts (in thousands -7, (o3D of dollars Number of fatalities II I I I Number of lost workday cases J (YI) I I. A I N l i� I Ain- n- � i Iq Number of lost workday pares involving ermanent transfer to � �� - N /� [ Nib- Nil l!J another job or termination of employment The above information was compiled from the records that are available to me at this time and I declare under penalty of perjury that the information is true and accurate within the limitations of those records. Signature: Signature: k Title: Title:`-Tt�` Date: Date: 1241('116 / 24 D-21 ATTACHMENT D Bond No. BID BOND KNOW ALL PERSONS BY THESE PRESENTS that: WHEREAS the City of Rancho Palos Verdes ("Public Agency"), has Issued an Invbtlon for Bids for the Work described as follows: 2015 STORM DRAIN LINING PROJECT Project No, 002116 WHEREAS NU LINE TECHNOLOGIES, LLC, 102 SECOND STREET, ENCINITAS, CA 92024 (!Jame and address of Bidder) ("Principal"), desires to submit a Bid to Public Agency for the Work. WHEREAS, Bidders are required under the provisions of the California Public Contract Code to furnish a form of Bidder's security with their Bid. NOW, THEREFORE, we, the undersigned Principal, and NORTH AMERICAN SPECIALTY INSURANCE COMPANY 6 HUTTON CENTRE DRIVE SUITE 850 SANTA ANA CA 92707 (Nance and address of Surety) ("Surety") a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the Public Agency In the penal sum of TEN PERCENT OF GREATER AMOUNT BID Dollars ($ 10% ), being not less than ten percent (10%) of the total Bid price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal Is awarded a contract for the Work by the Public Agency and, within the time and in the manner required by the Specifications, enters into the written form of Contract Included within those Specifications, furnishes the required Bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, and furnishes the required insurance coverage, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect. In case suit is brought upon this Bond, Surety further agrees to pay all court costs incurred by the Public Agency in the suit and reasonable attorneys' fees in an amount fixed by the court. Surety hereby waives the provisions of California Civil Code Section 2845. 25 D-22 ATTACHMENT D IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body. Dated: DECEMBER 8, 2015 "Principal" `Surety" NORTH AMERICAN SPECIALTY NU LINE TECHNOLOGIES, LLC. INSURANCE COMPANY By: _ By: 0. Its DOMINIC J. B C , R., PARTNER Its MARK D. IATAROLA, ATTORNEY-IN-FACT By: By: its Its (Sea/) (Seal) Note: This Bond must be dated, al/ signatures must be notarized, and evidence of the authority of any person signing as attomey-In-fact must be attached. 26 D-23 ATTACHMENT D California Acknowledgment Form A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy. or validity of that document. State of Califoppia �� } ss. County of On i before me Arthur P. Arquilla, Notary Publie here I ert name and title of the oKct personally a peare '►'1 I✓) n who proved to me on the basis of satisfactory evidence to be the person(s) whose name(is are subscribed to the within instrument and ackno dged to me that ie he/they executed the same t Is er/their au- thorized capacity(ies), and that b hi erltheir signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. Seal ARTHUR P. ARQUILLA I yCommission No. 2051358 0 Vaconimuion NOTARY PUBLIC -CALIFORNIA �+ SAN DIEGO COUNTY Expires January 7, 2018 my hand a official seal Signature of Optional Information To help prevent Baud, it is recommended that you provide information about die attached document below. """This is not required under California State notary public laws"" Document Title: Notes I # of Pages: Olt)14 r I'l— Ctwt MM—, I., .anvw mm- -f MM 7L4-1 077 D-24 ATTACHMENT D CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL .. �.•. .:w Ste:/, :'• .%4i- , a :� .c. -�C n•r: .��:n�L.'�•, :mac :^t "::4rs�c� Ns�atii �{'sC{!'A{..�•_. {.T •�a :1{!�i.t�u.•. �f/qC .:� .'T'C!"2 '.!"*{l�t.:�Ci A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of SAN DIEGO On 12/8/2015 Date personally appeared before me, JISSELLE MARIE SANCHEZ, NOTARY PUBLIC Here Insert Name and Title of the Officer MARK D. IATAROLA Name(&) of Signers) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(&) is/sre subscribed to the within instrument and acknowledged to me that he}�g executed the same in hisMerAheir authorized capacity(ies), and that by his/4eW4h4* signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. ASSELLE MARIE SANCHEZ r COMM # 2129586 Z SAN DIEGO COUNTY Q NOTARY PUBLIC -CALIFORNIA 7` Q My cOMMiS610N EXPIRES OCT, 04, 2014 I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature— �: Notqoublic Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: MARK D. IATAROLA ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ® Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — El Limited ❑ General ❑ Individual 0 Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: 02014 National Notary Association - www.Nationa[Notary.org • 1 -800 -US NOTARY (1-800-876-6827) Item #5907 D-25 ATTACHMENT D NAS SURETY :'ROUP NORTH AMERICAN SPECIALTY INSURANCE COMPANY WASHINGTON INTERNATIONAL INSURANCE COMPANY GENERAL POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, THAT North American Specialty Insurance Company, a corporation duly organized and existing under laws of the State of New Hampshire, and having its principal office in the City of Manchester, New Hampshire, and Washington International Insurance Company, a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Schaumburg, Illinois, each does hereby make, constitute and appoint; JOHN G. MALONEY, HELEN MALONEY, MICHELLE M. BASUIL, and MARK D. IATAROLA JOINTLY OR SEVERALLY Its true and lawful Attorneys) -in -Fact, to make, execute, sea] and deliver, for and on its behalf and as its act and deed, bonds or other writings obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the amount of FIFTY MILLION ($50,000,000.00) DOLLARS This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held on the 9`h of May, 2012: "RESOLVED, that any two ofthe Presidents, any Managing Director, any Senior Vice President, any Vice President, any Assistant Vice President, the Secretary or any Assistant Secretary be, and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behal f of the Company bonds, undertakings and all contracts of surety, and that each or any of them hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Company when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached." 11tUi�s, MI `\���\\P O � yQ j}{p4 of�i:�'.`PG G �yr pSION,tt ty Y yd t f U TF "•. ' n ro4 gg ie�s i. Steven P. Anderson, Senior Vice President of Washington International Insurance Company �` P+ SEAL u—t Ory: & Senior \'ice President of North American Specialty Insurance Company O i R, ti/tp111111111111A\\` 't'b±J-••.•.....•* Michael A. IBto, , maw' r V%o Pm rut o asiingloonternat ora nsurance i. ompnny & Senior Vice President or No th American Specialty Insurance Company IN WITNESS WHEREOF, North American Specialty Insurance Company and Washington International Insurance Company have caused their official seats to be hereunto affixed, and these presents to be signed by their authorized officers this 17th day of September 2015 North American Specialty Insurance Company Washington International Insurance Company State of Illinois County of Cook ss: On this 17th day of September , 201 before me, a Notary Public personally appeared Steven P. Anderson , Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and Michael A. Ito Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company, personally known to me, who being by me duly sworn, acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the voluntary act and deed of their respective companies. OFFICIAL SEAL M KENNY NOTARY PUBLIC, STATE OF ILLINOIS WCOMMISSION EXPIRES 17011017 M. Kenny, Notary Publi c'Z 1, Jeffrey Goldbem , the duly elected Assistant Secretary of North American Specialty Insurance Company and Washington International Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North American Specialty Insurance Company and Washington International Insurance Company, which is still in full force and effect. IN WITNESS WHEREOF, I have set my hand and affixed the seats of the Companies this 8TH day of DECEMBER , 20 15 J_ l//..? Jeffrey Goldin tS, Vice President & Assistant Sectelary of Washington lnlema4oed Insurance Company & North American Specially Insurance Company ATTACHMENT D NONCOLLUSION DECLARATION TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID [Public Contract Code 7106] [Public Contract Code § 7106] State of California ) County of ) ss. Cityof til ITs ) The undersigned declares: I am thof u-L� -the party making the foregoing bid. The bid is not made in the interest' of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of Califo nia that the foregoing is true and correct and that thisclaration• is executed on 12 ��15' [date], at MCI N I T*[city], [state]. Signature t Subscribed and - sworn to before me on ARTHUR P. ARQUILLA J F'. Commission No. 2051358 NOTARY PUBLIC -CALIFORNIA SAN DIEGO COUNTY Commission Expires January 7. 2018 f (Notary Seal) Signature 27 Notary D-27 ATTACHMENT D ACKNOWLEDGMENT OF ADDENDA Bidder's Name: M u — (__ I,VVe �C. � 1-1�0 t b Cele SLLL The Bidder shall signify receipt of all Addenda here, if any: Addendum Number Date Received I Signature 1 2 Zoi S x f If there are more Addenda than there is room in the chart above, attach another page acknowledging receipt of the Addenda. Signature: Title: Date: 1211 to�� 28 i ATTACHMENT D ri r,, I This form shall be submitted with the Bid I� PROPOSER/BIDDER STATISTICAL INFORMATION FORM I' All proposers/bidders responding to the solicitation must complete and submit this form In order for their proposer or bid to be considered, The information requested In the form will be used solely for statistical purposes. The contract(s) and/or subcontract($) will be awarded without regard to gender, race, color, creed, or national origin. ' 1. Type of business entity: ❑ Sole partnership ❑ Nonprofit organization ❑ Partnership ❑ Franchise ❑ Corporation Limited Liability Corporation ❑ Other: I. i' 2. Total number of employees in firm/organization, Including owners: 2A r 1\ 3. Break down the total number of employees in your firm/organlzatlon into the following categories: Owners, Partners, and Associate Partners Race/Ethniclty Male Female Managers staff 1 Black / African-American l Hispanic / Latlno 2 !r Asian -American / Pacific Islander American Indian/ Alaska Native I Filipino American White Other 4. Indicate, by percentage, how ownership of the firm/organization is distributed: Asian- American l Black/ American / Indian / African- Hispanic / Pacific Alaskan Filipino - American Latino Islander Native American White Other i.i Menem o°!o I Women -'' S. If your firm is currently certified as a Minority (MBE), Women (WBE), Disadvantaged (DBE), and/or Disabled Veteran (DVBE) Business Enterprise by a public agency, indicate the Business Enterprise certification of your firm, the certifying agency, and the expiration date of the certification: MBE WISE DBE DVBE Name of Certifying Agency Expiration Date ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ L 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ! I 29 D-29 ATTACHMENT D ADDENDUM NO. 1 2015 STORM DRAIN LINING PROJECT PROJECT No. 002116 FOR THE CITY OF RANCHO PALOS VERDES In accordance with "Addenda" section of the "Instructions to Bidders" on page 6 of the Contract Documents, the following changes (revisions, additions, and/or deletions) are hereby incorporated and made a part of the subject plans, specifications and contract documents for this project. ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED BELOW. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION. This Addendum forms a part of the Contract Documents for the above -identified project and modifies the original specifications and Contract Documents, as noted below. Portions of the Contract Documents, not specifically mentioned in the Addendum, remain in force. All trades affected shall be fully advised of these changes, deletions, and additions. This addendum included additions, deletions and changes to the contract documents as follows: 1. Clarification to Pre -Bid Meeting a. Delete Page 2 2. Revisions to Bid Sheet a. Delete Page 13 Replace with 2R (Attached) Replace with 13R (Attached) 3. Clarifications to Traffic Control Plan and Requirements a. Delete Page 84 Replace with 84R (Attached) b. Delete Page 94 Replace with 94R (Attached) c. Delete Page 95 Replace with 95R (Attached) End of Addendum No. 1. 646" d-4-- - December 8, 2015 Michael Throne Date Director of Public Works I acknowledge receipt of this Addendum No. 1 and accept the aforementioned. Date Bidder Addendum No. 1 (2015 Storm Drain Lining Project) D-30 ATTACHMENT D OBTAINING BID DOCUMENTS Potential Bidders may obtain the Contract Documents for the Project at Rancho Palos Verdes City Hall, 30940 Hawthorne Blvd, Rancho Palos Verdes, California 90275 for a non-refundable fee of $30.00 per set, or $60.00 per set if mailed. The City must receive payment before the Contract Documents will be provided. Interested parties may also download the Contract Documents free of charge from the City's website, http://www.rl2vca.gov/437/Business- Resources. Video inspection footage is not available from the City's website. A DVD containing the video is included in plan sets purchased at City Hall. A DVD may also be obtained separately for a non-refundable fee of $5, or $10 if mailed. PLAN HOLDERS LIST Potential Bidders who purchase Contract Documents from City Hall will be placed on the list of Plan Holders at the time of purchase. Only those firms on the list of Plan Holders will be automatically informed of any and all subsequent project information prior to bid opening, including Addenda. Addenda will be issued only by email and only to a Plan Holder. Those downloading documents who want to be placed on the list of Plan Holders will need to contact the Public Works office at publicworks@rpvca.aov or 310-544-5252 and ask to be registered as a Plan Holder for the specified project. Potential Bidders must provide company contact information including company name, address, telephone and facsimile numbers, email address, and the project number and title as it appears on this Notice along with their request to be registered. There is no charge to be placed on the list of Plan Holders. FACSIMILE NUMBER AND EMAIL ADDRESS Anyone obtaining Contract Documents must immediately supply the Director of Public Works with a facsimile number and email address such that Addenda and other information may be transmitted as rapidly as possible. Failure to provide such a facsimile number and email address may result in late notification. In any case, City does not guarantee Addenda will be faxed or emailed, and Bidder shall be responsible for all Addenda regardless of whether Bidder received any such fax or email. PRE-BID MEETING A pre-bid meeting will be held on Wednesday, December 2, 2015 at 10:00 a.m. at City Hall, 30940 Hawthorne Blvd, Rancho Palos Verdes, California 90275. Attendance at the pre-bid meeting is not mandatory, but is strongly advised. No allowances for cost adjustments will be made if Bidders fail to adequately examine the premises before submitting a Proposal. REQUESTS FOR CLARIFICATION If you discover any error, omission, ambiguity or conflict in the Plans or Specifications and wish to have a clarification, please fax or email your request for clarification to the Director of Public Works at publicworks@rpvca.gov such that it is received by him or her no later than close of business on December 7, 2015. Requests for clarification received after this date will be disregarded. Please indicate the Project and identification number in your request for clarification. Addendum No. 1 (2015 Storm Drain Lining Project) 2R D-31 ATTACHMENT D BID SCHEDULE ITEM NO. DESCRIPTION ESTIMATED QUANTITY UNIT PRICE UNIT EXTENDED AMOUNT 1 MOBILIZATION — (Not more than 5%) 1 LS $ $ 2 INSTALL CIPP LINER 12" 70 LF $ $ 3 INSTALL CIPP LINER 18" 1731 LF $ $ 5 INSTALL CIPP LINER 24" 918 LF $ $ 6 INSTALL CIPP LINER 30" 678 LF $ $ 7 INSTALL CIPP LINER 36" 1474 LF $ $ 8 INSTALL LINER (MINOR CONCRETE PAVING OR CIPP 54" 378 LF $ $ 9 TRAFFIC CONTROL PLAN 1 LS $ $ 10 ARTERIAL TRAFFIC CONTROL 10 PER DAY $ $ 11 GROUTING 10 CY $ $ TOTAL BASE BID PRICE IN DIGITS TOTAL BASE BID PRICE IN WORDS: The contract shall be awarded to the lowest responsible bidder based on the TOTAL BASE BID. Note: Some items may be adjusted or deleted. Any changes to the quantities for these items shall not classify as a substantial change as stipulated in Section 3-2.2.1 of the Standard Specifications. Therefore, regardless of total actual amount (percentage) compared to estimated quantities, the unit prices provided above by the Bidder shall be applied to the final quantity when payment is calculated for these items. No adjustment in the unit prices will be allowed. The City reserves the right to not use any of the estimated quantities, and if this right is exercised, the Contractor will not be entitled to any additional compensation. Cost of all export of material shall be included in the above unit costs; no additional compensation will be granted for such expenses. NOTE 1: Available video inspections of the some of the subject storm drain alignments are included with this bid package and are intended to be used for a general reference only. The videos provided with these Plans and Specifications for reflect the condition of the Storm Drain as far back as 2014. Understanding this, the condition of some of the storm drains may have changed in the time elapsed since the videos were made. NOTE 2: Pipes requiring lining with a diameter of 42 -inches or larger may be lined by either CIPP or Minor Concrete Paving methods in accordance with these Plans and Specifications. Payment for lining of these pipes will be based on unit prices provided in the bid, regardless of method. Pipes requiring lining with diameter less than 42 inches shall be lined by CIPP method only. Addendum No. 1 (2015 Storm Drain Lining Project) 13R D-32 ATTACHMENT D for emergency work, i.e. broken water line repair, gas leak repair or similar emergency work as directed by the Engineer. This assessment shall be deducted from the amount due the Contractor on this project. Lane closures shall be limited to 9am-3pm unless express written permission otherwise is obtained from the Director of Public Works or his authorized representative. If the Contractor is found to be negligent in furnishing warning and protective measures as detailed above, the City may direct the Contractor's attention to the hazard and it shall be the Contractor's responsibility to furnish and install the necessary warning and protective measures at his/her expense. Should the City point out the inadequacy of warning and protective measures, such action on the part of the City shall not relieve the Contractor from responsibility for public safety or abrogate its obligation to furnish and pay for these devices. (d) Traffic Control Plan and Arterial Traffic Control: NOTE. These specifications pertain to construction operations that will affect all traffic on the following public arterial streets: Palos Verdes Drive West, Palos Verdes Drive South, Palos Verdes Drive East, Hawthorne Blvd., Crenshaw Blvd., Silver Spur Rd., Montemalaga Drive, Granvia Altamira, Highridge Rd., Crest Rd., Miraleste Dr., Western Ave., Crestridge Rd., Ridgegate Dr. and Indian Peak Rd. Traffic control for residential streets is covered in Section U.B.1— Technical Project Information, General. Ten (10) working days prior to commencement of any work, the Contractor shall submit to the Director of Public Works or his authorized representative a Traffic Control Plan for the various locations and phases of construction affecting arterials. Said plan shall follow the requirements of Section 7-10.2.2 of the Standard Specifications and the referenced CA MUTCD. The Traffic Control Plan shall be stamped by a qualified Registered Civil Engineer (or Traffic Engineer) in the State of California and submitted to the City's Traffic Engineer for approval. Payment - Payment for providing an approved Traffic Control Plan shall be included in the Lump Sum price bid for Traffic Control Plan. Payment for providing labor and equipment to furnish, install and maintain traffic control along arterials shall be paid on a unit cost basis per bid item "Arterial Traffic Control" paid over the duration of the project based on actual days of necessary deployment during active construction operations, and shall include full compensation for furnishing all labor, material, equipment, signage, tools, and incidentals necessary to complete the work, and no additional payment will be made. SCHEDULING. NOTIFICATIONS AND POSTING Order of Work: Order of work shall conform to the provisions of Section 6-1, "Construction Schedule and Commencement of Work," of the Standard Specifications and these Special Provisions. The Contractor shall conduct his operations so as to cause minimum obstruction and inconvenience to traffic, schools and residences. Addendum No. 1 (2015 Storm Drain Lining Project) 84R D-33 ATTACHMENT D 23. MOBILIZATION Mobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials, portable toilets and incidentals to the project site necessary for work on the project and for all other work and operations which must be performed or costs incurred including bonds, insurance, City business license and financing prior to beginning work on the various contract items on the project site. The Contractor shall provide a detailed project schedule, both electronically and in hard copy form (see previous item on Scheduling and Notices). Schedule updates shall be provided whenever the schedule changes. The Contractor's project manager, superintendent and foreman are required to attend the pre -construction meeting and weekly progress meetings. The Contractor shall have on the work site at all times, as its agent, a competent and fluent English speaking superintendent capable of reading and thoroughly understanding the plans, specifications, other related documents, and directions from City's Construction Representative. The Contractor is responsible for securing an adequate storage site for equipment and materials (see separate items that detail these requirements elsewhere in these General Provisions). The cost for mobilization shall include but not be limited to providing bonds, insurance, financing, moving equipment to the job site and preparing an approved work schedule, and no additional compensation will be allowed therefor. The payment amount for Mobilization shall be limited to a maximum amount of 5% of the total construction bid. In addition, Mobilization shall only be paid when a minimum amount of 5% of the other construction work items has been completed. Payment — Payment for mobilization items shall be included in the Lump Sum basis for bid item "Mobilization", and no additional payment will be made. A. TECHNICAL PROJECT INFORMATION 1 — GENERAL Traffic Management for Residential Streets: A residential street traffic management plan shall be submitted to the Engineer prior to commencement of any work. This plan shall include, but not be limited to, location of all signs and barriers and proposed traffic flow diagrams. The information shall include the minimum requirements of W.A.T.C.H., latest edition. The Contractor shall furnish at his expense and with no extra cost to the City such flagmen and guards as are necessary to give adequate warning to the public that roadway work is underway and of any dangerous conditions. Flagmen shall perform their duties and be provided with equipment in accordance with current "Instructions to Flagmen" of the State of California, Division of Highways. The equipment shall be furnished, kept clean and in good repair by the Contractor at his own expense. Addendum No. 1 (2015 Storm Drain Lining Project) 94R D-34 ATTACHMENT D The Contractor shall furnish, erect, maintain and regularly inspect barricades, lights, signs and other devices as are necessary to prevent accidents and avoid damage or injury to the public. These devices shall conform to the requirements set forth in the current "Manual of Warning Signs, Lights and Devices for Use in Performance of Work Upon Highways," issued by the State of California, Department of Transportation. Any painted graffiti, vandalized, or otherwise damaged signs or equipment shall be immediately replaced. Prior to commencing construction, the Contractor shall notify the police and fire departments giving the expected starting date, the name and telephone number of a responsible person that is to be contacted, at any hour, in the event of a condition requiring immediate correction. Should the Contractor appear to be neglectful or negligent in furnishing warning and protective measures, the Director of Public Works may direct the Contractor's attention to the existence of such hazards. The Contractor shall provide all necessary warning and protective measures immediately, at his expense. Whether the Director of Public Works points out the inadequacy of warning and protective measures or not, such action, or lack of action, on the part of the Director of Public Works shall not relieve the Contractor from the responsibility for public safety or abrogate his obligation to furnish and pay for safety measures and devices. If attention is directed to the existence of a hazard, and the Contractor fails to provide an appropriate remedy, any expense incurred by the City for furnishing or maintaining safety measures and devices may be deducted from the pay estimates and the total contract price for the work. Full compensation for complying with the work contained in this section shall be considered as included in prices paid for the various contract items of work involved and shall include professional services, labor materials and incidentals to thoroughly complete the work of this section, with no additional compensation allowed therefore. 2 - FURNISH AND APPLY WATER Furnishing and applying water shall be considered as included in the unit prices paid for the various bid items requiring water, and no additional compensation will be allowed therefore. Should the Contractor require water for construction operations, such as for storm drain line installation, compaction, cleaning and dust control, he shall apply for a water meter from, and follow the requirements of, the California Water Service Co. 3 - CONSTRUCTION METHODS (a) General: The Contractor shall contact the affected utility companies for information regarding identification, location, and depth of underground utilities. (b) Preservation of Property: Existing improvements in areas adjoining the property whereon demolition and removal is being performed shall be protected from injury or damage resulting from operations of the Contractor and the Contractor shall be responsible for such damage. In like manner any building, structure, tree, shrub, or other Addendum No. 1 (2015 Storm Drain Lining Project) 95R D-35